Name of work: Construction of RCC Over Head Tank at Qazigund, Anantnag and Baramulla (Package OHT-2) on Qazigund - Baramulla section of new BG Rail Line Project (J&K) Name of Contractor: M/S Md. Maqbool Reshi, R/o Watlab, Sopore, state J&K Contract agreement / work Order No.IRCON/ 1008/ J&K -DLI/ Over Head Tank/ OHT-2/8555 Date: 17/04/2006 Contract Value: Rs 1,15,020,63.90 Date of commencement of Work: 17/04/2006 Date of completion of work: Scheduled:16-02-2007, Further extension Granted Upto : 30-09-2007 BOQ Item 1

Description of Item 2

1.1

P/F GI pipe 40mm …

Unit

BOQ Qty.

3

4

Actual Date of completion of work : 30-09-2007 Rate Executed BOQ Amount (in Rs.) Quantity 5 6 7

Executed Amount 8

Percentage Variation 9

Remarks 10 5 1 9 5 2 4 / 4 6 ,1 5 5 0 3 4 3 5

m

Qazigund

138

Anantanag

138

Baramulla

135.65

Total:

240

37.30

8,952.00

411.65

15,354.55

71.52

2.1

1:2:4 Concrete flooring

sqm

165

113.7

18,760.50

0.00

-

(100.00)

Item not operated

3

Making chequers on flooring

sqm

180

9.1

1,638.00

0.00

-

(100.00)

Item not operated

4.1

P/F CI sluice valve150mm …

each

Qazigund

2

Anantanag

2

Baramulla

2

Total: 5.1

Painting GI pipe 40mm …

9

3211.2

28,900.80

Qazigund

138

Anantanag

138

240

1,656.00

110.34 104.8

Baramulla

117.2 360

1429.95

514,782.00

332.336

Qazigund

1.72

Anantanag

0.86

71.52

5 4 9 5 2 4 / 4 6 ,1 5 5 0 3 4 3 5

475,223.86

(7.68)

5 5 9 5 2 4 / 4 6 ,1 5 5 0 3 4 3 5

0.93

Total:

(+)

2,840.39

Quintal

Baramulla

7.1

411.65

Qazigund

P/L S &S CI special for mechanical joint as per IS: 13382

5 3 9 5 2 4 / 4 6 ,1 5 5 0 3 4 3 5

m

Total: 7.1

6.9

Anantanag

P/L S &S CI 300mm…

(33.33)

135.65

Total: P/L 150mm CI double flanged.

19,267.20

m

Baramulla

6.1

6.00

5 2 9 5 2 4 / 4 6 ,1 5 5 0 3 4 3 5

Quintal

7.50

3033.05

22,747.88

3.5050

10,630.84

(53.27)

7.50

4374.05

32,805.38

0.0000

0.00

(100.00)

Total of schedule "A"

630,242.55

523,316.83

25.00% above (quoted rate) for Schedule "A"

157,560.64

130,829.21

787,803.19

654,146.04

Page 1 of 3

(16.97)

Item not operated

Sch "B" 1.1

E/W in Excavation … …….. Qazigund

103.335

Anantanag

68.89

Baramulla

P/L PCC 1:4:8……

459.00

130.65

59,968.35

Qazigund

6.889 6.889

24.00

189.00

93.00

P/L Design mix M25… in dome wall etc.

60.00

7

P/L Design mix M25… in dome wall etc.

each

8

Cast in situ 500 mm dia pile

Rm

Qazigund Anantanag Baramulla Total: Carrying out Vt PLT….

5 1 9 5 0 2 4 /4 6 , 5 1 5 3 0 4 3 5 5 1 9 1 5 2 4 / 4 ,6 5 1 5 3 0 4 3 5 5 1 9 5 2 2 4 /4 ,6 5 1 5 3 0 4 3 5 5 1 9 3 5 2 4 / 4 ,6 5 1 5 3 0 4 3 5

763,219.80

667,651.76

(12.52)

540,037.05

45.043 39.505 35.086 119.634

5,806.85

694,696.69

28.64

323,412.00

11.312 17.8433 19.785 48.9403

Carrying out routine Vt load Test….

Carrying out Lateral load Test…. Qazigund Anantanag Baramulla Total:

(-)

5,390.20

263,798.01

(18.43)

928,933.45

(53.12)

-

(100.00)

219.00

9,048.20

1,981,555.80

3

2,000.00

6,000.00

173.214

1,300.63

1,989,963.90

377.40 555.00 555.00 1487.40

1,934,557.06

96,290.40

1 1 1 3

96,290.40

Item not operated

(2.78)

no

3.00

32,096.80

-

Variation NIL

no

Qazigund Anantanag Baramulla Total: Sch "B" 11

4,038.20

55.112 55.112 55.110 165.334

32.116 32.185 38.364 102.665

1,530.00

Qazigund Anantanag Baramulla Total: 10

47,117.87

m3

Qazigund Anantanag Baramulla Total:

9

20.668

P/L Design mix M25… in staircase etc.

Qazigund Anantanag Baramulla Total: 6

54,714.00

m3

Qazigund Anantanag Baramulla Total: 5

2,279.75

m3

Qazigund Anantanag Baramulla Total: 4

(13.88)

6.890

Total:

P/L Design mix M25… in Column, Beam.

33,083.85

m3

Baramulla

3

253.225

Anantanag

P/L Design mix M25… in pile cap

5 9 9 5 2 4 / 4 6 ,1 5 5 0 3 4 3 5

81.00

Total: 2

(44.83)

5 8 9 5 2 4 / 4 6 , 5 1 5 3 0 4 3 5

m3

3.00

20,209.00

60,627.00

1 1 1 3

60,627.00

-

Variation NIL

no

3.00 20,209.00 Total of schedule "B" 5.00% Below (quoted rate) for Schedule "B"

60,627.00 5,936,415.30

1 1 1 3

60,627.00 4,787,383.09

296,820.77

239,369.15

5,639,594.54

4,548,013.94

Page 2 of 3

-

(19.36)

Variation NIL

5 1 9 5 4 2 4 /4 6 , 5 1 5 3 0 4 3 5 5 1 9 5 5 2 4 / 4 6 ,5 1 5 3 0 4 3 5 1 5 6 9 5 2 4 / 4 6 ,5 1 5 3 0 4 3 5 1 5 7 9 5 2 4 / 4 6 ,5 1 5 3 0 4 3 5

Sch "C" 1

P/L …. reinforcement of TMT steel bar Qazigund Anantanag Baramulla Total:

Sch "C" 2

113,250.00

Steel builtup sections.

3,030.00

4,597,950.00

3,462,311.05

49.15

148,924.50

2,507.283 2,512.356 3,302.252 8,321.891

409,020.94

Total of schedule "C"

4,746,874.50

3,871,332.00

6.00% above (quoted rate) for Schedule "C"

284,812.47

232,279.92

5,031,686.97

4,103,611.92

Sch Earthing "D" 1 arrangement.

(24.70)

1 5 9 9 5 2 4 / 4 ,6 5 1 5 3 0 4 3 5

174.65

(18.44)

job

Qazigund Anantanag Baramulla Total:

(-)

40.60

25,413.113 29,183.760 30,681.724 85,278.60

Kg

Qazigund Anantanag Baramulla Total:

(+)

1 5 8 9 5 2 4 /4 6 , 5 1 5 3 0 4 3 5

Kg

3.00

26,048.00

78,144.00

1.000 1.000 1.000 3.000

78,144.00

-

Total of schedule "D"

78,144.00

78,144.00

0.00

45.00% below (quoted rate) for Schedule "D"

35,164.80

35,164.80

-

42,979.20

42,979.20

0.00

(quoted rate 25.00% above)

Total of schedule "A"

787,803.19

-

654,146.04

(16.97)

(quoted rate 5.00% Below )

Total of schedule "B"

5,639,594.54

-

4,548,013.94

(19.36)

(quoted rate 6.00% above )

Total of schedule "C"

5,031,686.97

-

4,103,611.92

(18.44)

(quoted rate 45.00% below )

Total of schedule "D"

42,979.20

-

42,979.20

Total

11,502,063.89

9,348,751.10

Variation NIL

2 5 0 9 5 2 4 /4 ,6 5 1 5 3 0 4 3 5

Variation NIL

(18.72)

Non Schedule Item:

7.1

Snowcem cement paint 2 or more coat.

Sqm

Qazigund

615.29

Anantanag

615.27

Baramulla Total:

656.52 1971.00

28.88

56,922.48

Total

11,558,986.37

ge comes to Rupees Ninety Four Lakhs Three Thousand Two Hundred and fourty Nine Only

Page 3 of 3

1887.0787

54,498.83 9,403,249.93

Approved by competent authority dated : 5 10-04-2008 9 5 2 4 / 4 6 ,1 5 5 0 3 4 3 5

Executed Quantity 7

138 138 135.65 411.65 0.00

0.00

2 2 2 6.00

138 138 135.65 411.65

110.34 104.8 117.2 332.336

1.72 0.86 0.93 3.5050

0.00

Page 4 of 3

103.335 68.89 81.00 253.225

6.889 6.889 6.890 20.668

55.112 55.112 55.110 165.334

45.043 39.505 35.086 119.634

11.312 17.8433 19.785 48.9403

32.116 32.185 38.364 102.665 0.000

377.40 555.00 555.00 1487.40

1 1 1 3

1 1 1 3

1 1 1 3

Page 5 of 3

25,413.113 29,183.760 30,681.724 85,278.60

2,507.283 2,512.356 3,302.252 8,321.891

1.000 1.000 1.000 3.000

615.29 615.27 656.52 1887.0787

Page 6 of 3

Certified that the foregoing claim is correct, for which necessary measurement were taken and recorded at the Abstract MB-533 & Reference MB No 592/610,544/545 &533 .and that the work has been satisfactorily as per drawing and specification.

Date: JGM/DGM/ Civil Certified that, Measurements Recorded in MB No. (592,610), (544, 545) & 533 are fully accepted by me and I do not have any other claim 1 against this bill. 2

The labour employed by me have been paid minimum wages as fixed in similar type of work in the area.

3

All taxes including Royalty charges. Cess, etc. due to the govt. on the materials used for this work have been fully paid and no payment is due to them.

4

All the insurance polices as per previous of the contract has been taken by me and are valid as on date.

5

I have extended the provident fund benefits to the staff engaged by me and requisites amount of providend fund has been remitted to the providend fund commissioner.

6

The statury formalities and guidelines has been complied with.

Date:

Contractor

Certified that, 1

The quantity billed is not more than the quantity actually executed at site.

2

No material has been issued to the contractor, for which the cost was to be recovered except such as specially provided in the agreement/ work order.

3

No departmental tools & plants have been issued to the contractor other than those for which hire charges have been recovered in this bill.

4

In case of lump sum payment, approximate quantity billed is not more than the quantity actually at site.

5

The work has been executed as per approved drawing and specifications and the method of measurement is correct.

6

That the statury formalities and guidelines has been complied with.

AM/C

Mgr/ Civil

Chargeble to ........................................................................ and to be included in the account for the month of ................... To be paid at …………................... in presence of ............................................................. by Cheque on or before................

Date:

Manager/Finance