Name of work Name of Owner Name of Engineer Sr. no
Item
1 Brick work
Civil work satyajeet machnisam, Mr Dhiraj Kerba Patil No Length Width Depth Unit Quantity 1 1 2 1
0.23 0.94 5.2 0.19 1.35 0.75 3 0.605
Total Rate Amount quantity
0.9 cum 0.19458 0.1 cum 0.0988 0.15 cum 0.30375 0.15 cum 0.27225 0.86938 5400 4694.652
2 Plaster
1 2 1 2 1 1
2.08 0.9 2.2 0.3 3 1.375 1.35 1.675 0.3 0.6 5.2 0.4
Sq m 1.872 Sq m 1.32 Sq m 4.125 Sq m 4.5225 Sq m 0.18 Sq m 2.08 14.0995
4 Breaking Deduction
1
1.8
2.2
0.3 cum
1.188
1
1.2
1.47
0.3 cum
0.5292 0.6588
282 3976.059
505
332.694
5 Urinal fitting
3
No
3
3 6780
20340
6 Wash basin
1
No
1
1 3225
3225
7 window grieel reparing
1
LS
1
300
300 32868.41
Total