Export Report Software Rab Xpro 19 V4.1.pdf

  • Uploaded by: Ndaru Anggriyana
  • 0
  • 0
  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Export Report Software Rab Xpro 19 V4.1.pdf as PDF for free.

More details

  • Words: 151,721
  • Pages: 267
LAPORAN RENCANA ANGGARAN BIAYA Anggaran Biaya Pelaksanaan Konstruksi ID Project Nama Project

: A002/T100.80/I-2019 : Pembangunan Rumah Tinggal 2 Lantai Type 180

Pemberi Wewenang

Ibu Isnawaty Jl. Ebony Raya No. 77, Kompleks Perumahan Villa Danau Matano, Kab. Luwu Timur, Sulawesi Selatan 08114231031

Kontraktor Pelaksana CV. Mitra Sulawesi Cont. MENGACU PADA STANDAR ANALISA SATUAN PEKERJAAN

Tahun 2019

Software RAB Exarch xPro v2019

FORMULIR DATA PROJECT No

A002/T100.80/I-2019

Pembangunan Rumah Tinggal 2 Lantai Type 180

A

PROFIL PERUSAHAAN / INSTANSI / KONTRAKTOR Nama Perusahaan/Instansi : CV. Mitra Sulawesi Cont. Bidang Usaha : Architect -Enginering - Consultant - Kontraktor - Suplier Nama Pimpinana/Direktur : Aswar,ST No. Ijin Usaha TDP : 503/0433/TDPCV-B/13/KPAP SIUP : 503/0433/SIUPK-B/13/KPAP No Kontak : PU/01/XII.135-2019 Email : [email protected] Official Website : www.mitra-arsitek.com Alamat Kantor Provinsi : Sulawesi Selatan Kabupaten : Kab. Luwu Timur Kota/Kecamatan : Soroako/Nuha Lokasi Kantor : Jl. Krakatau F269, Soroako, Kec. Nuha Soroako Kab. Luwu Timur, Sulawesi Selatan

B

PROFIL PROJECT Tahun Project ID Project Type Project Nama Project Alamat Project

Lokasi Project

: : : :

2019 A002/T100.80/I-2019 Rumah Tinggal Pembangunan Rumah Tinggal 2 Lantai Type 180

Provinsi : Sulawesi Selatan Kabupaten : Luwu Timur Kota : Soroako : Jl. Ebony Raya No. 77, Kompleks Perumahan Villa Danau Matano, Kab. Luwu Timur, Sulawesi Selatan

Estimator Project

: Aswar,ST

Nama Pemilik No HP E-Mail Alamat

: : : :

Ibu Isnawaty 08114231031 [email protected]

Jl. Ebony Raya No. 77, Kompleks Perumahan Villa Danau Matano, Kab. Luwu Timur, Sulawesi Selatan

C

DATA TEKNIS HUNIAN-PROJECT TECHNICAL Ukuran Lahan : 20x40 ( 800 m2) Luas Hunian (m2) : 180 Arah Hadap : Selatan Jumlah Penghuni : 3 Orang (Ayah Ibu dan 3 orang anak) Warna Eksterior : Putih, Coklat, Grey dan Merah Warna Interior : Putih, Kuning Cream, Ungu Muda

D

DATA PROYEK-PROJECT DATA Jenis Proyek - Project Type Jumlah Tingkat - Floor Grade Konsep - Concept Project Mulai- Project Start

: : : :

Keterangan- Project Note

:

SPESIFIKASI TEKNIS Pondasi Struktur Beton Dinding

: Pondasi Setempat (Telapak Beton) + Pondasi Lajur Batu Kali : Beton Betulang (Kualitas K225) + Besi Beton Standar SNI : Batu Bata + Plester + Aci + Plamir dan Cat Emulsi

E

www.mitra-arsitek.com

Bangunan Pribadi (Rumah Tinggal) 2 Lantai Rumah Modern Minimalis 4-Feb-2019 Project Harus dikerjakan dalam periode 180 hari Calender (6 Bulan)

1/2

Software RAB Exarch xPro v2019

Finishing Lantai Finishing Dinding Atap Kusen Daun Pintu Daun Jendela Plafond Dapur Sanitary Carport Listrik Air Bersih Perangkat Penunjang Merk Penunjang

www.mitra-arsitek.com

: Homogenius Tile 60x60 Polished (Ruang Utama),Homogenius Tile 40x40 un-Polished (teras),Homogenius Tile 30x30 unPolished (WC) : Finishing Cat Emulsi (R.Utama), Dinding Keramik 20x40 (WC) : Rangka Baja Ringan Galvanish+ Metal Spandek : Kayu Kualitas 1 atau Setara : Kayu Kualitas 1 atau Setara, Panel Pintu PVC (WC) : Jendela Geser Aluminium : Rangka Hollow Galvanish dan Gypsum Board : Meja Beton Lapis Keramik (Granit 80x80) : Kloset Duduk, Kloset Jongkok, Shower, Jet Washer, Kran, Wastafel : Rabat Beton K200 : 2000 Watt (10 A) sumber PLN : PDAM + Pompa dan Tangki 1000 L : AC 1/2 PK, Water Heater, Exhaust Fan (Dapur), Telephone, Kamera CCTV : Semen (TONASA/Tiga Roda), Baja Ringan (TASO/BMT) Atap (SakuraRoof/Ondulin), Sanitasi ( American Standar/Toto), Keramik (ROMAN, ASIA TILE, Platinun) , Electrikal (Philips/Brocco), Other Device ( Panasonic, Samsung)

2/2

Software RAB Exarch xPro v2019

RENCANA ANGGARAN BIAYA DAFTAR URAIAN DAN KUANTITAS PEKERJAAN ID PROJECT NAMA PROJECT PROVINSI KABUPATEN KOTA

: : : : :

A002/T100.80/I-2019 Pembangunan Rumah Tinggal 2 Lantai Type 180 Sulawesi Selatan Luwu Timur Soroako 24-Jan-19

190

Kode Pek.

URAIAN PEKERJAAN

ANALISA

QTY

UNIT

HARGA SATUAN

TOTAL BIAYA

A A1 A2 A3 A4 A5

PEKERJAAN PERSIAPAN & PENDAHULUAN Mobilisasi dan Demobiliasi Peralatan dan Perlengkapan Pembersihan Area/Lokasi Kerja Pengukuran dan Pemasangan Bowplank Pembuatan Bedeng dan Gudang Bahan Papan Nama Proyek uk 1, 2m x 1, 8m

B B1 B2 B3 B4 B5 B6

PEKERJAAN PONDASI Pekerjaan Pondasi Tapak (Poer/Pile Cap) Pekerjaan Galian Urugan Pasir Pek. Pemasangan Batu Kosong (Aanstamping) Pekerjaan Pembesian Pondasi Tapak Pekerjan Bekisting Pondasi Tapak Pekerjaan Cor Beton (K-225)

A.2.3.1.1. A.2.3.1.11. A.3.2.1.9. A.4.1.1.17 A.4.1.1.20 A.4.1.1.7.

22.6 1.2 3.1 989.0 22.4 8.1

m3 m3 m3 kg m2 m3

106,352 361,950 676,852 15,202 216,921 1,404,834

2,407,799 434,340 2,098,242 15,034,646 4,867,715 11,379,153

B7 B8 B9 B10

Pekerjaan Pondasi Batu Kali Pekerjaan Galian Urugan Pasir Pek. Pemasangan Batu Kosong (Aanstamping) Pekerjaan Pasangan Batu Pondasi ( 1 : 3)

A.2.3.1.1. A.2.3.1.11. A.3.2.1.9. A.3.2.1.1.

33.6 3.7 11.2 29.1

m3 m3 m3 m3

106,352 361,950 676,852 1,179,615

3,575,539 1,353,694 7,580,745 34,326,795

B11 B12

Pekerjaan Pondasi Rollag Bata Pekerjaan Galian Pek. Pasangan Pondasi Rollag

A.2.3.1.1. SNI-2002

1.4 9.0

m3 m1

106,352 47,489

148,892 427,404

Sub-total Pekerjaan B

83,634,964

AK-I.2016.(1) A.2.2.1.9. A.2.2.1.4. A.2.2.1.7. AK-SNI 2008

1.0 210.0 52.0 1.0 1.0

A

3,565,210 25,473 92,180 1,493,610 1,237,892

Sub-total Pekerjaan A

B C

Ls m2 m1 m2 bh

3,565,210 5,349,419 4,793,368 1,493,610 1,237,892

16,439,499

C1 C2 C3

PEKERJAAN SLOOF Pekerjaan Sloof Utama 25x35-K225 Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Sloof Pekerjaan Cor Beton (K-225)

A.4.1.1.17 A.4.1.1.21 A.4.1.1.7.

650.0 49.0 6.2

kg m2 m3

15,202 227,029 1,404,834

9,881,213 11,124,432 8,752,114

C4 C5 C6

Pekerjaan Sloof Praktis/Support 15x20-K225 Pekerjaan Pembesian (4d10&20-d8) Pekerjaan Bekisting Sloof Pekerjaan Cor Beton (K-225)

A.4.1.1.17 A.4.1.1.21 A.4.1.1.7.

25.0 2.4 0.2

kg m2 m3

15,202 227,029 1,404,834

380,047 544,870 252,870

Sub-total Pekerjaan C

30,935,546

D D1 D2

PEKERJAAN TIMBUNAN, PENINGGIAN DAN PEMADATAN Urugan, Timbunan dan Peninggian Elevasi AK-SNI 2008 Pemadatan Tanah A.2.3.1.10.

E

PEKERJAAN KOLOM

E1 E2 E3

Pekerjaan Kolom Utama 20-2x25-K225 Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225)

A.4.1.1.17 A.4.1.1.22 A.4.1.1.7.

150.0 18.6 1.3

kg m2 m3

15,202 404,578 1,404,834

2,280,280 7,525,151 1,826,284

E4 E5 E6

Pekerjaan Kolom Utama 20x30-K225 Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225)

A.4.1.1.17 A.4.1.1.22 A.4.1.1.7.

320.0 41.0 3.1

kg m2 m3

15,202 404,578 1,404,834

4,864,597 16,587,698 4,354,985

E7 E8 E9

Pekerjaan Kolom Praktis 13x15-K225 Pekerjaan Pembesian (4d12&18 cm-d6) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225)

A.4.1.1.17 A.4.1.1.22 A.4.1.1.7.

110.0 1.9 0.8

kg m2 m3

15,202 404,578 1,404,834

1,672,205 768,698 1,109,819

E10 E11 E12

Pekerjaan Kolom Support 15x15-K225 Pekerjaan Pembesian (4d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225)

A.4.1.1.17 A.4.1.1.22 A.4.1.1.7.

120.0 2.0 1.0

kg m2 m3

15,202 404,578 1,404,834

1,824,224 792,973 1,376,737

C 16.5 3.3

D

m3 m3

291,869 78,968

4,801,242 259,803

Sub-total Pekerjaan D

5,061,046

Kolom Lantai 1

www.mitra-arsitek.com

1/4

Software RAB Exarch xPro v2019

Kolom Lantai 2 E13 E14 E15

Pekerjaan Kolom Utama 20-2x25-K225 Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225)

A.4.1.1.17 A.4.1.1.22 A.4.1.1.7.

160.0 4.5 1.4

kg m2 m3

15,202 404,578 1,404,834

2,432,299 1,820,601 1,966,767

E16 E17 E18

Pekerjaan Kolom Utama 20x30-K225 Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225)

A.4.1.1.17 A.4.1.1.22 A.4.1.1.7.

170.0 4.5 1.4

kg m2 m3

15,202 404,578 1,404,834

2,584,317 1,820,601 1,966,767

E19 E20 E21

Pekerjaan Kolom Praktis 13x15-K200 Pekerjaan Pembesian (4d12&18 cm-d6) Pekerjaan Bekisting Pekerjaan Cor Beton (K-200)

A.4.1.1.17 A.4.1.1.22 A.4.1.1.6

80.0 1.4 0.5

kg m2 m3

15,202 404,578 1,380,462

1,216,149 566,409 621,208

E22 E23 E24

Pekerjaan Kolom Support 15x15-K200 Pekerjaan Pembesian (4d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-200)

A.4.1.1.17 A.4.1.1.22 A.4.1.1.6

50.0 0.9 0.4

kg m2 m3

15,202 404,578 1,380,462

760,093 364,120 552,185

E F

Sub-total Pekerjaan E

61,655,168

PEKERJAAN RINGBALOK (BALOK)

Ring Balok Lantai 1 F1 F2 F3 F4 F5 F6 F7 F8 F9

Pek. Ring Balok Utama/Type Tumpuan, 20x30-K225 Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Ring Balok Praktis 13x15-K225 Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Ring Balok Support 15x20-K225 Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225)

A.4.1.1.17 A.4.1.1.23 A.4.1.1.7.

450.0 27.1 4.1

kg m2 m3

15,202 416,034 1,404,834

6,840,840 11,274,511 5,759,818

A.4.1.1.17 A.4.1.1.23 A.4.1.1.7.

150.0 2.6 1.4

kg m2 m3

15,202 416,034 1,404,834

2,280,280 1,094,168 1,966,767

A.4.1.1.17 A.4.1.1.23 A.4.1.1.7.

25.4 0.3 0.2

kg m2 m3

15,202 416,034 1,404,834

386,127 137,291 252,870

A.4.1.1.17 A.4.1.1.23 A.4.1.1.7.

369.0 16.5 2.5

kg m2 m3

15,202 416,034 1,404,834

5,609,489 6,864,555 3,512,084

A.4.1.1.17 A.4.1.1.23 A.4.1.1.7.

235.0 2.6 2.3

kg m2 m3

15,202 416,034 1,404,834

3,572,439 1,090,008 3,287,311

A.4.1.1.17 A.4.1.1.23 A.4.1.1.7.

42.0 2.7 0.3

kg m2 m3

15,202 416,034 1,404,834

638,478 1,114,970 421,450

Ring Balok Lantai 2 F10 F11 F12 F13 F14 F15 F16 F17 F18

Pek. Ring Balok Utama/Type Tumpuan, 20x30-K225 Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Ring Balok Praktis 13x15-K225 Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Ring Balok Support 15x20-K225 Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225)

F G

Sub-total Pekerjaan F

56,103,457

G1 G2 G3

PEKERJAAN COR PLATE BETON (DAK BETON) Pekerjaan Pengecoran Plat Lantai Utama Pekerjaan Pembesian Plate lantai Pekerjaan Bekisting Pekerjaan Cor Beton (K-225)

A.4.1.1.17 A.4.1.1.24 A.4.1.1.7.

695.0 29.7 7.8

kg m2 m3

15,202 494,426 1,404,834

10,565,297 14,684,452 10,957,703

G4 G5 G6

Pekerjaan Pengecoran Plat Atap/Kanopi Teras Pekerjaan Pembesian Plat Atap/kanopi beton Pekerjaan Bekisting Sloof Pekerjaan Cor Beton (K-225)

A.4.1.1.17 A.4.1.1.24 A.4.1.1.7.

135.0 4.0 1.1

kg m2 m3

15,202 494,426 1,404,834

2,052,252 1,977,704 1,545,317

G H

PEKERJAAN DINDING

H1 H2 H3 H4

Pekerjaan Pasangan Bata dan Plasteran 1 Pek. Pasangan Bata Merah (1/2, Mix 1:5) Pek. Pasangan Bata Merah Trassram (1/2, Mix 1:3) Pekerjaan Plasteran (1.5 cm-mix 1:5) Pekerjaan Acian

H5 H6 H7 H8

Pekerjaan Pasangan Bata dan Plasteran 2 Pek. Pasangan Bata Merah (1/2, Mix 1:5) Pek. Pasangan Bata Merah Trassram (1/2, Mix 1:3) Pekerjaan Plasteran (1.5 cm-mix 1:5) Pekerjaan Acian

Sub-total Pekerjaan G

41,782,725

Dinding Lantai 1 A.4.4.1.10 A.4.4.1.8 A.4.4.2.5. A.4.4.2.27.

332.8 17.6 665.6 138.0

m2 m2 m2 m2

160,555 167,035 88,015 54,329

53,432,770 2,939,825 58,582,700 7,497,395

A.4.4.1.10 A.4.4.1.8 A.4.4.2.5. A.4.4.2.27.

159.0 6.3 317.0 40.4

m2 m2 m2 m2

160,555 167,035 88,015 54,329

25,528,277 1,043,972 27,900,715 2,193,803

Sub-total Pekerjaan H

179,119,456

Dinding Lantai 2

H

www.mitra-arsitek.com

2/4

Software RAB Exarch xPro v2019

I I1 I2 I3 I4 I5

PEKERJAAN ATAP Memasang Rangka Atap (Baja Ringan-Ex TASO) Memasang Pelapis Atap (Metal Roof-Ex Sakura Roof Memasang Nok Atap Memasang Lisplank Memasang Talang Air

J J1 J2 J3 J4 J5 J6

PEKERJAAN KUSEN, PINTU, JENDELA DAN ACCESORIS Memasang Kusen+Panel Pintu Utama Memasang Kusen+Panel Pintu Kamar/Ruangan Memasang Kusen+Panel Pintu WC Memasang Kusen+Panel Jendela Utama Memasang Jendela Pencahayaan/ Tetap (Fixed Window) Memasang Lubang Angin/Loster (Bovenlight)

K K1 K2 K3 K4 K5 K6

PEKERJAAN INST. PIPA AIR BERSIH, LIMBAH DAN SANITASI Pekerjaan Instalasi Pemipaan Air Bersih Memasang Instalasi Pipa 3/4 PVC (Ex Maspion) A.5.1.1 26. Memasang Instalasi Pipa 1/2 PVC (Ex Maspion) A.5.1.1 25. Memasang Keran Air Standar ( Ex Onda) A.5.1.1 19. Memasang Shower Mandi ( Ex TOTO) AK-I.2016.(9) Memasang Tangki Air/Tandom (Ex Penguin-1000L) AK-I.2016.(10) Memasang Pompa Air ( Ex Shimizu 125 Watt) AK-I.2016.(11)

35.0 22.0 6.0 2.0 1.0 1.0

m1 m1 bh unit unit unit

122,326 120,305 110,200 230,159 1,688,846 879,507

4,281,419 2,646,703 661,201 460,319 1,688,846 879,507

K7 K8 K9 K10 K11 K12 K13 K14 K15

Pekerjaan Instalasi Air Limbah dan Sanitasi Memasang Instalasi Pipa Limbah 3" PVC (Ex Maspio Memasang Instalasi Pipa Kloset 4" PVC (Ex Maspion) Memasang Instalasi Pipa Saluran 5" PVC (Ex Maspion Memasang Kloset Duduk ( Ex TOTO) Memasang Kloset Jongkok ( Ex TOTO) Memasang Wastafel Cuci Memasang Floor Drain Pekerjaan Septik Tank ( 1000 L) Pekerjaan Sumur Resapan Limbah (800 L)

36.0 19.0 9.0 1.0 2.0 1.0 4.0 1.0 0.8

m1 m1 m1 bh bh bh bh m3 m3

147,773 148,447 148,447 3,502,727 763,355 2,463,900 89,803 9,472,375 6,669,245

5,319,844 2,820,499 1,336,026 3,502,727 1,526,710 2,463,900 359,210 9,472,375 5,335,396

Sub-total Pekerjaan K

42,754,682

L L1 L2 L3 L4 L5 L6 L7 L8 L9 L10

PEKERJAAN INST. LISTRIK DAN PENERANGAN Pemasangan MCB Pengaman dan Box Pemasangan Instalasi Pembumian (Grounding) Pemasangan Kabel Instalasi ( NYM-3x2,5 mm2) Pemasangan Kabel Instalasi ( NYM-3x1,5 mm2) Pemasangan Fitting Lampu Pemasangan Saklar Lampu Pemasangan Receiptackle (Colokan Listrik) Pemasangan Lampu 5 Watt (ex-PHILIPS LED) Pemasangan Lampu 15 Watt (ex-PHILIPS LED) Pemasangan Lampu 20 Watt (ex-PHILIPS LED)

M M1 M2 M3 M4 M5 M6 M7

PEKERJAAN KERAMIK LANTAI DAN DINDING Pekerjaan Cor Lantai Kerja Non Struktur (K100- 1:4:4 Memasang Keramik Lantai Utama (Ex Granito 60x60 Memasang Keramik Lantai Teras (Ex Platinum 40x40 Memasang Keramik Lantai WC (Ex Asia Tile 20x20) Memasang Keramik Dinding WC (Ex Roman 20x40) Memasang Plint Keramik Dinding (Ex Granito 15x60) Memasang Rope Tile (Kuku Tegel/Plint Sudut)

N N1 N2 N3

PEKERJAAN LANGIT-LANGIT (PLAFON) Memasang Rangka Plafon ( Ex Furing 2/4 - 4/4) Memasang Pelapis Pelafon ( Ex Gipsum Board 9mm) Memasang List Plafon

O O1 O2 O3 O4 O5 O6 O7

PEKERJAAN PENGECATAN DAN WATERPROFING Pekerjaan Plamir Dinding Pekerjaan Cat Anti Lumut dan Waterprofing Pekerjaan Pengecatan Exterior ( Ex Mowilex) Pekerjaan Pengecatan Interior ( Ex Nippon Paint) Pekerjaan Pengecatan Plafon( Ex Mowilex) Pekerjaan Pengecatan Kayu ( Ex Avian) Pekerjaan Pengecatan Besi ( Ex Avian)

A.4.2.1.24. A.4.5.2.32. A.4.5.2.37. A.4.6.1.21. A.4.2.1.19

152.2 152.2 34.0 65.0 30.0

I AK-I.2016.(2) AK-I.2016.(3) AK-I.2016.(4) AK-I.2016.(5) AK-I.2016.(6) AK-I.2016.(8)

3.0 6.0 3.0 8.0 5.0 37.0

K AK-I.2016.(14) AK-I.2016.(15) AK-I.2016.(16) AK-I.2016.(17) AK-I.2016.(18) AK-I.2016.(19) AK-I.2016.(23) AK-I.2016.(20) AK-I.2016.(21) AK-I.2016.(22)

1.0 1.0 125.0 150.0 21.0 14.0 10.0 3.0 10.0 8.0

L A.4.1.1.4 A.4.4.3.13. A.4.4.3.4. A.4.4.3.6. A.4.4.3.54. A.4.4.3.28. A.4.4.3.31.

6.0 162.0 18.0 3.7 27.0 87.0 33.0

194.0 194.0 247.0

O P

504.0 178.4 178.4 504.0 194.0 4.5 6.5

46,779,215 15,712,821 5,791,106 6,472,895 4,436,010

79,192,048

2,703,879 2,142,329 1,580,779 1,315,672 1,011,969 44,103

8,111,636 12,853,972 4,742,336 10,525,375 5,059,844 1,631,823

Sub-total Pekerjaan J

42,924,986

Unit btg m1 m1 Unit unit unit unit unit unit

598,732 935,662 23,954 20,087 43,060 44,176 50,338 37,120 49,474 60,705

m3 m2 m2 m2 m2 m1 m2

1,136,581 245,104 198,929 439,860 321,764 66,373 88,683

Sub-total Pekerjaan M

N AK-I.2016.(28) AK-I.2016.(29) A.4.7.1.10. A.4.7.1.10. A.4.7.1.10. A.4.7.1.4. A.4.7.1.16.

unit unit unit unit unit unit

Sub-total Pekerjaan L

M A.4.2.1.20. A.4.5.1.7. A.4.5.1.10.

307,354 103,238 170,327 99,583 147,867

Sub-total Pekerjaan I

J

A.5.1.1 31. A.5.1.1 32. A.5.1.1 32. A.5.1.1.1. A.5.1.1 2. A.5.1.1 5. A.5.1.1 14. AK-I.2016.(12) AK-I.2016.(13)

m2 m2 m1 m1 m1

m2 m2 m2

598,732 935,662 2,994,205 3,013,079 904,254 618,467 503,383 111,361 494,743 485,642

10,659,527 6,819,489 39,706,778 3,580,723 1,627,482 8,687,619 5,774,439 2,926,546

69,123,075

301,969 60,177 67,982

58,581,892 11,674,369 16,791,589

Sub-total Pekerjaan N

87,047,849

m2 m2 m2 m2 m2 m2 m2

29,588 25,453 39,762 39,762 39,762 49,381 46,242

Sub-total Pekerjaan O

14,912,183 4,540,816 7,093,497 20,039,925 7,713,781 222,214 300,570

54,822,986

PEKERJAAN TANGGA Pek. Struktur Dasar (Pondasi dan Sloof)

www.mitra-arsitek.com

3/4

Software RAB Exarch xPro v2019

P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12

Pekerjaan Galian Pekerjaan Urugan Tanah Galian Urugan Pasir Pasangan Batu Pondasi (1:4) Pekerjaan Pembesian Sloof Pekerjaan Bekisting Sloof Pekerjaan Cor Beton Sloof (K225) Pek. Bentangan Tangga (Badan Utama) Pekerjaan Pembesian Utama ( d10-18 cm) Pekerjaan Pembesian Anak Tangga ( d10-18 cm) Pekerjaan Bekisting Tangga Pekerjaan Cor Beton (K-225) Pekerjaan Plasteran ( 1,5 cm- 1: 5)

P13 P14 P15 P16 P17

Pekerjaan Finishing Tangga Pekerjaan Keramik Tangga ( Ex Asia Tile 40x40) Pekerjaan Rope Tile Pekerjaan Plamir Pekerjaan Pengecatan Tangga Pekerjaan Railing Tangga

A.2.3.1.1. A.2.3.1.9. A.2.3.1.11. A.3.2.1.2. A.4.1.1.17 A.4.1.1.21 A.4.1.1.6

2.1 0.2 0.2 0.6 34.6 0.5 0.6

m3 m3 m3 m3 kg m2 m3

106,352 39,484 361,950 1,124,205 15,202 227,029 1,380,462

227,592 9,476 72,390 674,523 525,985 122,596 773,059

A.4.1.1.17 A.4.1.1.17 A.4.1.1.26 A.4.1.1.6 A.4.4.2.8.

145.0 124.0 3.4 2.0 7.0

kg kg m2 m3 m2

15,202 15,202 384,039 1,380,462 85,895

2,204,271 1,885,031 1,305,734 2,733,316 601,267

18.5 12.6 7.0 7.0 6.2

m2 m2 m2 m2 m2

198,929 88,683 29,588 46,242 301,969

3,680,187 1,117,408 207,114 323,691 1,872,205

A.4.4.3.4. A.4.4.3.31. AK-I.2016.(28) A.4.7.1.16. A.4.2.1.20.

P Q

Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q10 Q11 Q12 Q13

PEKERJAAN PAGAR DAN TAMAN/HALAMAN Pekerjaan Pagar Pekerjaan Struktur (Pondasi, Sloof, dan Kolom) Pekerjaan Galian Pondasi Pasangan Batu Pondasi Pekerjaan Pembesian Sloof Pekerjaan Bekisting Sloof Pekerjaan Pengecoran (K200) Pekerjaan Pembesian Kolom Pekerjaan Bekisting Kolom Pekerjaan Pengecoran (K200) Pekerjaan Pasangan Pagar Pasangan Batu Bata Pekerjaan Plasteran Pekerjaan Acian Pekerjaan Finishing Pagar Pekerjaan Pasangan Batu Alam Pekerjaan Pengecatan

Pekerjaan Taman Q14 Pekerjaan Pemasangan Paving Blok Q15 Pekerjaan Penanaman Pohon Perdu

Sub-total Pekerjaan P

A.2.3.1.1. A.3.2.1.5. A.4.1.1.17 A.4.1.1.21 A.4.1.1.6 A.4.1.1.17 A.4.1.1.22 A.4.1.1.6

6.4 2.6 45.0 2.1 0.3 48.0 1.2 0.3

m3 m3 kg m2 m3 kg m2 m3

106,352 1,021,768 15,202 227,029 1,380,462 15,202 404,578 1,380,462

680,650 2,697,467 684,084 476,761 414,139 729,690 485,494 441,748

A.4.4.1.10 A.4.4.2.8. A.4.4.2.27.

16.0 18.0 10.0

m2 m2 m2

160,555 85,895 54,329

2,568,883 1,546,114 543,290

A.4.4.3.57. A.4.7.1.10.

4.0 6.2

m2 m2

297,696 39,762

1,190,785 246,523

23.0 4.0

m2 pohon

276,522 657,414

6,360,006 2,629,657

A.4.4.3.64. AK-I.2016.(30)

Q R R1 R2 R3 R4 R5 R6

PEKERJAAN TAMBAHAN DAN LAINNYA Pekerjaan Pemasangan Meteran Listrik (PLN-2200 kWh Pekerjaan Pemasangan Meteran Air (PDAM) Pekerjaan Pemasangan Pintu Toko (Folding Door) Pemasangan Exhaust Fan Pemasangan AC (Air Conditioner-1 PK, Ex. Sharp) Pembersihan Area Kerja (Pasca Konstruksi)

AK-I.2016.(26) AK-I.2016.(27) SNI-2007 AK-I.2016.(25) AK-I.2016.(24) A.2.2.1.9.a

R

Sub-total Pekerjaan Q 1.0 1.0 10.0 1.0 2.0 160.0

Ls Ls m2 unit unit m2

www.mitra-arsitek.com

21,695,290

6,177,050 2,807,750 965,648 858,970 3,610,565 19,869

6,177,050 2,807,750 9,656,479 858,970 7,221,131 3,179,083

Sub-total Pekerjaan R

29,900,463

JUMLAH A+B+C…. PPN 10% JUMLAH TOTAL DIBULATKAN TERBILANG :

18,335,844

931,188,612 93,118,861 1,024,307,473

1,024,310,000

Satu Milyar Dua Puluh Empat Juta Tiga Ratus Sepuluh Ribu Rupiah

4/4

Software RAB Exarch xPro v2019

RENCANA ANGGARAN BIAYA REKAPITULASI ANGGARAN BIAYA ID PROJECT NAMA PROJECT PROVINSI KABUPATEN KOTA

: : : : :

A002/T100.80/I-2019 Pembangunan Rumah Tinggal 2 Lantai Type 180 Sulawesi Selatan Luwu Timur Soroako 1/24/2019

NO A B C D E F G H I J K L M N O P Q R

URAIAN PEKERJAAN

TOTAL BIAYA

PEKERJAAN PERSIAPAN & PENDAHULUAN PEKERJAAN PONDASI PEKERJAAN SLOOF PEKERJAAN TIMBUNAN, PENINGGIAN DAN PEMADATAN PEKERJAAN KOLOM PEKERJAAN RINGBALOK (BALOK) PEKERJAAN COR PLATE BETON (DAK BETON) PEKERJAAN DINDING PEKERJAAN ATAP PEKERJAAN KUSEN, PINTU, JENDELA DAN ACCESORIS PEKERJAAN INST. PIPA AIR BERSIH, LIMBAH DAN SANITASI PEKERJAAN INST. LISTRIK DAN PENERANGAN PEKERJAAN KERAMIK LANTAI DAN DINDING PEKERJAAN LANGIT-LANGIT (PLAFON) PEKERJAAN PENGECATAN DAN WATERPROFING PEKERJAAN TANGGA PEKERJAAN PAGAR DAN TAMAN/HALAMAN PEKERJAAN TAMBAHAN DAN LAINNYA

16,439,499 83,634,964 30,935,546 5,061,046 61,655,168 56,103,457 41,782,725 179,119,456 79,192,048 42,924,986 42,754,682 10,659,527 69,123,075 87,047,849 54,822,986 18,335,844 21,695,290 29,900,463 .

JUMLAH A+B+C…R PPN 10% JUMLAH TOTAL DIBULATKAN

931,188,612 93,118,861 1,024,307,473

1,024,310,000

TERBILANG : Satu Milyar Dua Puluh Empat Juta Tiga Ratus Sepuluh Ribu Rupiah

www.mitra-arsitek.com

1/1

Software RAB Exarch xPro v2019

WAKTU PELAKSANAAN (TIME SCHEDULE) A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180

Mode Kurva Nilai Anggaran :

Kurva S 931,188,612

Kurva S

Start

04-Feb-19

Finish

2-Aug-19

Monday

Friday

15-Apr-19

22-Apr-19

29-Apr-19

6-May-19

13-May-19

20-May-19

27-May-19

3-Jun-19

10-Jun-19

17-Jun-19

24-Jun-19

1-Jul-19

8-Jul-19

15-Jul-19

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

0.045

0.045 0.017

25 94%

27 100% 100%

88%

0.017

81%

0.005

75%

26 99%

5-Aug-19

8-Apr-19

2

29-Jul-19

1-Apr-19

1 0.018

22-Jul-19

25-Mar-19

100%

18-Mar-19

1 2 3 3 15 18 9 18 19 23 21 21 23 24 25 11 13 26

11-Mar-19

Selesai

1 1 2 3 4 5 8 18 19 21 10 21 21 22 24 1 9 25

4-Mar-19

Mulai

25-Feb-19

0.018 0.090 0.033 0.005 0.066 0.060 0.045 0.192 0.085 0.046 0.046 0.011 0.074 0.093 0.059 0.020 0.023 0.032

Minggu Pelaksanaan

18-Feb-19

Pekerjaan Persiapan & Pendahuluan Pekerjaan Pondasi Pekerjaan Sloof Pekerjaan Timbunan, Peninggian Dan Pemadatan Pekerjaan Kolom Pekerjaan Ringbalok (Balok) Pekerjaan Cor Plate Beton (Dak Beton) Pekerjaan Dinding Pekerjaan Atap Pekerjaan Kusen, Pintu, Jendela Dan Accesoris Pekerjaan Inst. Pipa Air Bersih, Limbah Dan Sanitasi Pekerjaan Inst. Listrik Dan Penerangan Pekerjaan Keramik Lantai Dan Dinding Pekerjaan Langit-Langit (Plafon) Pekerjaan Pengecatan Dan Waterprofing Pekerjaan Tangga Pekerjaan Pagar Dan Taman/Halaman Pekerjaan Tambahan Dan Lainnya

Bobot

11-Feb-19

A B C D E F G H I J K L M N O P Q R

URAIAN PEKERJAAN

PERIODE PELAKSANAAN 4-Feb-19

NO

1.0 PROGRESS

1.000

0.006

0.006

0.006

0.006

0.006

0.006

0.006

0.006

0.006

0.006

0.006

0.006

0.004

0.004

0.004

0.004

0.004

0.004

0.004

0.004

0.004

0.004

0.004

0.022

0.022

74% 0.004

0.004

0.004

68%

68%

0.19259%

50%

0.085 0.015 0.004

25%

0.002

19% 20% 16%0.00216%0.00218%0.002 0.002 0.002 0.00213%0.002

7%

0.004

0.004

0.004

0.004

0.004

38%

36%

35%

33%

31%

29%

27%

23%

0.004

0.004

0.004

39%

38%

0.004

0.004

0.015

0.015

0.025

0.025

0.031

0.031

0.004 0.011 0.025

0.031 0.029

0.002

0.002

0.002

0.005

0.005

0.005

0.005

0.029

0.005

0%

0.016

0.016

0.0%

www.mitra-arsitek.com

0.016

0.98

1.00

1.00

7%

13%

16%

16%

18%

19%

20%

23%

27%

29%

31%

33%

35%

36%

38%

38%

39%

59%

68%

68%

74%

81%

88%

94%

99%

100%

100%

186.69 82.75

0.00

59.92

58.95

22.20

6.80

10.81

10.81

10.81

31.70

36.04

18.71

18.71

17.05

17.05

12.71

12.71

7.57

7.57

3.56

51.57

66.37

66.37

56.43

42.36

14.95

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

Selisih (Deviasi)

0.000

-

Cash Flow (x 1 jt)-PLAN Cash Flow (x 1 jt)-AKTUAL

14.95

0.045

0.94

42.36

0.061

0.88

56.43

0.071

0.81

66.37

0.071

0.74

66.37

0.055

0.68

51.57

0.004

0.68

3.56

0.089

0.59

82.75

0.200

0.39

186.69

0.008

0.38

7.57

0.008

0.37

7.6

0.014

0.36

12.7

0.014

0.34

12.7

0.018

0.32

17.0

0.018

0.31

17.0

0.020

0.29

18.7

0.020

0.27

18.7

0.039

0.23

36.0

0.034

0.19

31.7

0.012

0.18

10.8

0.012

0.17

10.8

0.012

0.16

10.8

0.007

0.15

6.8

0.024

0.13

22.2

0.063

0.06

59.0

0.064

Progres Kumulatif Progres Kumulatif (%)

59.9

Progrees Mingguan

1/1

Software RAB Exarch xPro 2019

Jadwal Pelaksanaan January '19

February '19

March '19

S

M

T 1

W 2

T 3

F 4

S 5

S

M

T

W

T

F 1

S 2

S

M

T

W

T

F 1

S 2

6

7

8

9

10

11

12

3

4

5

6

7

8

9

3

4

5

6

7

8

9

13

14

15

16

17

18

19

10

11

12

13

14

15

16

10

11

12

13

14

15

16

20

21

22

23

24

25

26

17

18

19

20

21

22

23

17

18

19

20

21

22

23

27

28

29

30

31

24

25

26

27

28

24

25

26

27

28

29

30

31

ID Pek A A1 A2 A3 A4 A5 B B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 C C1 C2 C3 C4 C5 C6 D D1 D2 E E1 E2 E3 E4 E5 E6 E7 E8 E9 E10 E11 E12 E13 E14 E15

Uraian Pekerjaan

Start

PEKERJAAN PERSIAPAN & PENDAHULUAN 4-Feb-19 Mobilisasi dan Demobiliasi Peralatan dan Perlengkapan 4-Feb-19 Pembersihan Area/Lokasi Kerja 5-Feb-19 Pengukuran dan Pemasangan Bowplank 6-Feb-19 Pembuatan Bedeng dan Gudang Bahan 6-Feb-19 Papan Nama Proyek uk 1, 2m x 1, 8m 7-Feb-19 PEKERJAAN PONDASI 7-Feb-19 Pekerjaan Galian 7-Feb-19 Urugan Pasir 8-Feb-19 Pek. Pemasangan Batu Kosong (Aanstamping) 9-Feb-19 Pekerjaan Pembesian Pondasi Tapak 11-Feb-19 Pekerjan Bekisting Pondasi Tapak 12-Feb-19 Pekerjaan Cor Beton (K-225) 14-Feb-19 Pekerjaan Galian 9-Feb-19 Urugan Pasir 8-Feb-19 Pek. Pemasangan Batu Kosong (Aanstamping) 9-Feb-19 Pekerjaan Pasangan Batu Pondasi ( 1 : 3) 12-Feb-19 Pekerjaan Galian 7-Feb-19 Pek. Pasangan Pondasi Rollag 15-Feb-19 PEKERJAAN SLOOF 16-Feb-19 Pekerjaan Pembesian (8d12&15-d8) 16-Feb-19 Pekerjaan Bekisting Sloof 18-Feb-19 Pekerjaan Cor Beton (K-225) 20-Feb-19 Pekerjaan Pembesian (4d10&20-d8) 18-Feb-19 Pekerjaan Bekisting Sloof 19-Feb-19 Pekerjaan Cor Beton (K-225) 21-Feb-19 PEKERJAAN TIMBUNAN, PENINGGIAN DAN PEMADATAN 22-Feb-19 Urugan, Timbunan dan Peninggian Elevasi 22-Feb-19 Pemadatan Tanah 23-Feb-19 PEKERJAAN KOLOM 25-Feb-19 Pekerjaan Pembesian (8d12&15-d8) 25-Feb-19 Pekerjaan Bekisting 26-Feb-19 Pekerjaan Cor Beton (K-225) 27-Feb-19 Pekerjaan Pembesian (8d12&15-d8) 28-Feb-19 Pekerjaan Bekisting 3-Mar-19 Pekerjaan Cor Beton (K-225) 5-Mar-19 Pekerjaan Pembesian (4d12&18 cm-d6) 25-Feb-19 Pekerjaan Bekisting 26-Feb-19 Pekerjaan Cor Beton (K-225) 27-Feb-19 Pekerjaan Pembesian (4d12&15-d8) 28-Feb-19 Pekerjaan Bekisting 3-Mar-19 Pekerjaan Cor Beton (K-225) 26-Apr-19 Pekerjaan Pembesian (8d12&15-d8) 27-Apr-19 Pekerjaan Bekisting 30-Apr-19 Pekerjaan Cor Beton (K-225) 2-May-19

www.mitra-arsitek.com

Lama 1 2 1 1 1 2 1 2 3 2 2 4 1 4 4 1 1 3 3 2 2 1 1 2 2 2 1 1 3 2 1 2 1 1 2 1 1 3 2 1

Selesai 7-Feb-19 4-Feb-19 6-Feb-19 6-Feb-19 6-Feb-19 7-Feb-19 15-Feb-19 8-Feb-19 8-Feb-19 10-Feb-19 13-Feb-19 13-Feb-19 15-Feb-19 12-Feb-19 8-Feb-19 12-Feb-19 15-Feb-19 7-Feb-19 15-Feb-19 21-Feb-19 18-Feb-19 20-Feb-19 21-Feb-19 19-Feb-19 19-Feb-19 21-Feb-19 24-Feb-19 23-Feb-19 24-Feb-19 14-May-19 26-Feb-19 26-Feb-19 27-Feb-19 2-Mar-19 4-Mar-19 5-Mar-19 26-Feb-19 26-Feb-19 27-Feb-19 1-Mar-19 3-Mar-19 26-Apr-19 29-Apr-19 1-May-19 2-May-19

1/4

Software RAB Exarch xPro 2019

E16 E17 E18 E19 E20 E21 E22 E23 E24 F F1 F2 F3 F4 F5 F6 F7 F8 F9 F10 F11 F12 F13 F14 F15 F16 F17 F18 G G1 G2 G3 G4 G5 G6 H H1 H2 H3 H4 H5 H6 H7 H8 I I1 I2 I3 I4 I5 J J1 J2 J3 J4 J5 J6 K K1

Pekerjaan Pembesian (8d12&15-d8) 3-May-19 Pekerjaan Bekisting 6-May-19 Pekerjaan Cor Beton (K-225) 8-May-19 Pekerjaan Pembesian (4d12&18 cm-d6) 9-May-19 Pekerjaan Bekisting 10-May-19 Pekerjaan Cor Beton (K-200) 11-May-19 Pekerjaan Pembesian (4d12&15-d8) 12-May-19 Pekerjaan Bekisting 13-May-19 Pekerjaan Cor Beton (K-200) 14-May-19 PEKERJAAN RINGBALOK (BALOK) 7-Mar-19 Pekerjaan Pembesian (7d12&15-d8) 7-Mar-19 Pekerjaan Bekisting 10-Mar-19 Pekerjaan Cor Beton (K-225) 13-Mar-19 Pekerjaan Pembesian (7d12&15-d8) 15-Mar-19 Pekerjaan Bekisting 17-Mar-19 Pekerjaan Cor Beton (K-225) 18-Mar-19 Pekerjaan Pembesian (7d12&15-d8) 19-Mar-19 Pekerjaan Bekisting 20-Mar-19 Pekerjaan Cor Beton (K-225) 21-Mar-19 Pekerjaan Pembesian (7d12&15-d8) 18-May-19 Pekerjaan Bekisting 22-May-19 Pekerjaan Cor Beton (K-225) 25-May-19 Pekerjaan Pembesian (7d12&15-d8) 27-May-19 Pekerjaan Bekisting 30-May-19 Pekerjaan Cor Beton (K-225) 1-Jun-19 Pekerjaan Pembesian (7d12&15-d8) 2-Jun-19 Pekerjaan Bekisting 3-Jun-19 Pekerjaan Cor Beton (K-225) 4-Jun-19 PEKERJAAN COR PLATE BETON (DAK BETON) 25-Mar-19 Pekerjaan Pembesian Plate lantai 30-Mar-19 Pekerjaan Bekisting 25-Mar-19 Pekerjaan Cor Beton (K-225) 5-Apr-19 Pekerjaan Pembesian Plat Atap/kanopi beton 30-Mar-19 Pekerjaan Bekisting Sloof 25-Mar-19 Pekerjaan Cor Beton (K-225) 5-Apr-19 PEKERJAAN DINDING 8-Jun-19 Pek. Pasangan Bata Merah (1/2, Mix 1:5) 8-Jun-19 Pek. Pasangan Bata Merah Trassram (1/2, Mix 1:3) 8-Jun-19 Pekerjaan Plasteran (1.5 cm-mix 1:5) 12-Jun-19 Pekerjaan Acian 19-Jun-19 Pek. Pasangan Bata Merah (1/2, Mix 1:5) 25-Jun-19 Pek. Pasangan Bata Merah Trassram (1/2, Mix 1:3) 2-Jul-19 Pekerjaan Plasteran (1.5 cm-mix 1:5) 6-Jul-19 Pekerjaan Acian 12-Jul-19 PEKERJAAN ATAP 10-Jun-19 Memasang Rangka Atap (Baja Ringan-Ex TASO) 10-Jun-19 Memasang Pelapis Atap (Metal Roof-Ex Sakura Roof 14-Jun-19 Memasang Nok Atap 18-Jun-19 Memasang Lisplank 20-Jun-19 Memasang Talang Air 21-Jun-19 PEKERJAAN KUSEN, PINTU, JENDELA DAN ACCESORIS 28-Jun-19 Memasang Kusen+Panel Pintu Utama 28-Jun-19 Memasang Kusen+Panel Pintu Kamar/Ruangan 30-Jun-19 Memasang Kusen+Panel Pintu WC 3-Jul-19 Memasang Kusen+Panel Jendela Utama 4-Jul-19 Memasang Jendela Pencahayaan/ Tetap (Fixed Window) 6-Jul-19 Memasang Lubang Angin/Loster (Bovenlight) 8-Jul-19 PEKERJAAN INST. PIPA AIR BERSIH, LIMBAH DAN SANITASI 8-Apr-19 Memasang Instalasi Pipa 3/4 PVC (Ex Maspion) 12-Jun-19

www.mitra-arsitek.com

3 2 1 1 1 1 1 1 1 3 3 2 2 1 1 1 1 1 4 3 2 3 2 1 1 1 1 6 5 1 2 1 1 5 2 5 4 5 2 4 2 4 4 2 1 1 2 3 1 2 2 4 2

5-May-19 7-May-19 8-May-19 9-May-19 10-May-19 11-May-19 12-May-19 13-May-19 14-May-19 4-Jun-19 9-Mar-19 12-Mar-19 14-Mar-19 16-Mar-19 17-Mar-19 18-Mar-19 19-Mar-19 20-Mar-19 21-Mar-19 21-May-19 24-May-19 26-May-19 29-May-19 31-May-19 1-Jun-19 2-Jun-19 3-Jun-19 4-Jun-19 5-Apr-19 4-Apr-19 29-Mar-19 5-Apr-19 31-Mar-19 25-Mar-19 5-Apr-19 9-Jun-19 12-Jun-19 9-Jun-19 16-Jun-19 22-Jun-19 29-Jun-19 3-Jul-19 9-Jul-19 13-Jul-19 13-Jun-19 13-Jun-19 17-Jun-19 19-Jun-19 20-Jun-19 21-Jun-19 11-Jul-19 29-Jun-19 2-Jul-19 3-Jul-19 5-Jul-19 7-Jul-19 11-Jul-19 26-Jun-19 13-Jun-19

2/4

Software RAB Exarch xPro 2019

K2 K3 K4 K5 K6 K7 K8 K9 K10 K11 K12 K13 K14 K15 L L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 M M1 M2 M3 M4 M5 M6 M7 N N1 N2 N3 O O1 O2 O3 O4 O5 O6 O7 P P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13

Memasang Instalasi Pipa 1/2 PVC (Ex Maspion) Memasang Keran Air Standar ( Ex Onda) Memasang Shower Mandi ( Ex TOTO) Memasang Tangki Air/Tandom (Ex Penguin-1000L) Memasang Pompa Air ( Ex Shimizu 125 Watt) Memasang Instalasi Pipa Limbah 3" PVC (Ex Maspio Memasang Instalasi Pipa Kloset 4" PVC (Ex Maspion) Memasang Instalasi Pipa Saluran 5" PVC (Ex Maspion Memasang Kloset Duduk ( Ex TOTO) Memasang Kloset Jongkok ( Ex TOTO) Memasang Wastafel Cuci Memasang Floor Drain Pekerjaan Septik Tank ( 1000 L) Pekerjaan Sumur Resapan Limbah (800 L) PEKERJAAN INST. LISTRIK DAN PENERANGAN Pemasangan MCB Pengaman dan Box Pemasangan Instalasi Pembumian (Grounding) Pemasangan Kabel Instalasi ( NYM-3x2,5 mm2) Pemasangan Kabel Instalasi ( NYM-3x1,5 mm2) Pemasangan Fitting Lampu Pemasangan Saklar Lampu Pemasangan Receiptackle (Colokan Listrik) Pemasangan Lampu 5 Watt (ex-PHILIPS LED) Pemasangan Lampu 15 Watt (ex-PHILIPS LED) Pemasangan Lampu 20 Watt (ex-PHILIPS LED) PEKERJAAN KERAMIK LANTAI DAN DINDING Pekerjaan Cor Lantai Kerja Non Struktur (K100- 1:4:4 Memasang Keramik Lantai Utama (Ex Granito 60x60 Memasang Keramik Lantai Teras (Ex Platinum 40x40 Memasang Keramik Lantai WC (Ex Asia Tile 20x20) Memasang Keramik Dinding WC (Ex Roman 20x40) Memasang Plint Keramik Dinding (Ex Granito 15x60) Memasang Rope Tile (Kuku Tegel/Plint Sudut) PEKERJAAN LANGIT-LANGIT (PLAFON) Memasang Rangka Plafon ( Ex Furing 2/4 - 4/4) Memasang Pelapis Pelafon ( Ex Gipsum Board 9mm) Memasang List Plafon PEKERJAAN PENGECATAN DAN WATERPROFING Pekerjaan Plamir Dinding Pekerjaan Cat Anti Lumut dan Waterprofing Pekerjaan Pengecatan Exterior ( Ex Mowilex) Pekerjaan Pengecatan Interior ( Ex Nippon Paint) Pekerjaan Pengecatan Plafon( Ex Mowilex) Pekerjaan Pengecatan Kayu ( Ex Avian) Pekerjaan Pengecatan Besi ( Ex Avian) PEKERJAAN TANGGA Pekerjaan Galian Pekerjaan Urugan Tanah Galian Urugan Pasir Pasangan Batu Pondasi (1:4) Pekerjaan Pembesian Sloof Pekerjaan Bekisting Sloof Pekerjaan Cor Beton Sloof (K225) Pekerjaan Pembesian Utama ( d10-18 cm) Pekerjaan Pembesian Anak Tangga ( d10-18 cm) Pekerjaan Bekisting Tangga Pekerjaan Cor Beton (K-225) Pekerjaan Plasteran ( 1,5 cm- 1: 5) Pekerjaan Keramik Tangga ( Ex Asia Tile 40x40)

www.mitra-arsitek.com

13-Jun-19 15-Jun-19 17-Jun-19 18-Jun-19 19-Jun-19 20-Jun-19 21-Jun-19 22-Jun-19 23-Jun-19 24-Jun-19 25-Jun-19 26-Jun-19 8-Apr-19 11-Apr-19 27-Jun-19 27-Jun-19 28-Jun-19 29-Jun-19 2-Jul-19 5-Jul-19 7-Jul-19 9-Jul-19 11-Jul-19 12-Jul-19 14-Jul-19 25-Jun-19 25-Jun-19 28-Jun-19 5-Jul-19 7-Jul-19 8-Jul-19 10-Jul-19 12-Jul-19 7-Jul-19 7-Jul-19 11-Jul-19 15-Jul-19 18-Jul-19 18-Jul-19 18-Jul-19 21-Jul-19 21-Jul-19 24-Jul-19 25-Jul-19 25-Jul-19 10-Feb-19 10-Feb-19 10-Feb-19 10-Feb-19 12-Feb-19 13-Feb-19 14-Feb-19 15-Feb-19 30-Mar-19 30-Mar-19 30-Mar-19 7-Apr-19 8-Apr-19 9-Apr-19

2 2 1 1 1 1 1 1 1 1 1 1 3 2 1 1 3 3 2 2 2 1 2 2 2 7 2 1 2 2 1 4 4 2 3 4 4 4 4 1 1 1 1 1 1 1 1 1 2 2 1 1 1 2

14-Jun-19 16-Jun-19 17-Jun-19 18-Jun-19 19-Jun-19 20-Jun-19 21-Jun-19 22-Jun-19 23-Jun-19 24-Jun-19 25-Jun-19 26-Jun-19 10-Apr-19 12-Apr-19 27-Jun-19 27-Jun-19 28-Jun-19 1-Jul-19 4-Jul-19 6-Jul-19 8-Jul-19 10-Jul-19 11-Jul-19 13-Jul-19 15-Jul-19 12-Jul-19 26-Jun-19 4-Jul-19 6-Jul-19 7-Jul-19 9-Jul-19 11-Jul-19 12-Jul-19 16-Jul-19 10-Jul-19 14-Jul-19 16-Jul-19 27-Jul-19 20-Jul-19 21-Jul-19 24-Jul-19 24-Jul-19 27-Jul-19 25-Jul-19 25-Jul-19 16-Apr-19 10-Feb-19 10-Feb-19 10-Feb-19 12-Feb-19 13-Feb-19 14-Feb-19 15-Feb-19 31-Mar-19 31-Mar-19 30-Mar-19 7-Apr-19 8-Apr-19 10-Apr-19

3/4

Software RAB Exarch xPro 2019

P14 P15 P16 P17 Q Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q10 Q11 Q12 Q13 Q14 Q15 R R1 R2 R3 R4 R5 R6 ..

Pekerjaan Rope Tile Pekerjaan Plamir Pekerjaan Pengecatan Tangga Pekerjaan Railing Tangga PEKERJAAN PAGAR DAN TAMAN/HALAMAN Pekerjaan Galian Pondasi Pasangan Batu Pondasi Pekerjaan Pembesian Sloof Pekerjaan Bekisting Sloof Pekerjaan Pengecoran (K200) Pekerjaan Pembesian Kolom Pekerjaan Bekisting Kolom Pekerjaan Pengecoran (K200) Pasangan Batu Bata Pekerjaan Plasteran Pekerjaan Acian Pekerjaan Pasangan Batu Alam Pekerjaan Pengecatan Pekerjaan Pemasangan Paving Blok Pekerjaan Penanaman Pohon Perdu PEKERJAAN TAMBAHAN DAN LAINNYA Pekerjaan Pemasangan Meteran Listrik (PLN-2200 kWh Pekerjaan Pemasangan Meteran Air (PDAM) Pekerjaan Pemasangan Pintu Toko (Folding Door) Pemasangan Exhaust Fan Pemasangan AC (Air Conditioner-1 PK, Ex. Sharp) Pembersihan Area Kerja (Pasca Konstruksi) .

www.mitra-arsitek.com

11-Apr-19 13-Apr-19 14-Apr-19 15-Apr-19 7-Apr-19 7-Apr-19 8-Apr-19 9-Apr-19 10-Apr-19 11-Apr-19 12-Apr-19 13-Apr-19 14-Apr-19 15-Apr-19 17-Apr-19 19-Apr-19 21-Apr-19 23-Apr-19 25-Apr-19 29-Apr-19 28-Jul-19 28-Jul-19 28-Jul-19 28-Jul-19 31-Jul-19 31-Jul-19 1-Aug-19

2 1 1 2 1 1 1 1 1 1 1 1 2 2 2 2 2 4 1 2 2 2 1 2 2

12-Apr-19 13-Apr-19 14-Apr-19 16-Apr-19 29-Apr-19 7-Apr-19 8-Apr-19 9-Apr-19 10-Apr-19 11-Apr-19 12-Apr-19 13-Apr-19 14-Apr-19 16-Apr-19 18-Apr-19 20-Apr-19 22-Apr-19 24-Apr-19 28-Apr-19 29-Apr-19 2-Aug-19 29-Jul-19 29-Jul-19 29-Jul-19 31-Jul-19 1-Aug-19 2-Aug-19

4/4

Software RAB Exarch xPro v2019

KALENDER KERJA PROJECT

2019 January '19 S

M

T 1

A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180

February '19

W 2

T 3

F 4

S 5

S

M

T

W

T

24-Jan-19 4-Feb-19

March '19 F 1

S 2

S

M

T

W

T

F 1

S 2

Today (Hari Ini) Project Mulai (Start)

4-Feb-19

7-Feb-19

DIVISI PEKERJAAN UTAMA PEKERJAAN PERSIAPAN & PENDAHULUAN

6

7

8

9

10

11

12

3

4

5

6

7

8

9

3

4

5

6

7

8

9

7-Feb-19

15-Feb-19

PEKERJAAN PONDASI

13

14

15

16

17

18

19

10

11

12

13

14

15

16

10

11

12

13

14

15

16

16-Feb-19

21-Feb-19

PEKERJAAN SLOOF

20

21

22

23

24

25

26

17

18

19

20

21

22

23

17

18

19

20

21

22

23

25-Feb-19

14-May-19

PEKERJAAN KOLOM

27

28

29

30

31

24

25

26

27

28

24

25

26

27

28

29

30

22-Feb-19

24-Feb-19

PEKERJAAN TIMBUNAN, PENINGGIAN DAN PEMADATAN

25-Feb-19 7-Mar-19 25-Mar-19

14-May-19 4-Jun-19 5-Apr-19

PEKERJAAN KOLOM PEKERJAAN RINGBALOK (BALOK) PEKERJAAN COR PLATE BETON (DAK BETON)

8-Jun-19 10-Jun-19 28-Jun-19 8-Apr-19 27-Jun-19 25-Jun-19 7-Jul-19 18-Jul-19

9-Jun-19 13-Jun-19 11-Jul-19 26-Jun-19 27-Jun-19 12-Jul-19 16-Jul-19 27-Jul-19

PEKERJAAN DINDING PEKERJAAN ATAP PEKERJAAN KUSEN, PINTU, JENDELA DAN ACCESORIS PEKERJAAN INST. PIPA AIR BERSIH, LIMBAH DAN SANITASI PEKERJAAN INST. LISTRIK DAN PENERANGAN PEKERJAAN KERAMIK LANTAI DAN DINDING PEKERJAAN LANGIT-LANGIT (PLAFON) PEKERJAAN PENGECATAN DAN WATERPROFING

10-Feb-19

16-Apr-19

PEKERJAAN TANGGA

7-Apr-19 28-Jul-19 14-Feb-19 16-Feb-19 7-Mar-19 14-Feb-19 10-Jun-19

29-Apr-19 2-Aug-19 15-Feb-19 18-Feb-19 9-Mar-19 15-Feb-19 13-Jun-19

PEKERJAAN PAGAR DAN TAMAN/HALAMAN PEKERJAAN TAMBAHAN DAN LAINNYA Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Cor Beton (K-225) Memasang Rangka Atap (Baja Ringan-Ex TASO) TERMIN BIAYA KONTRAK (ALL)

21-Jan-19

28-Jan-19

TERMIN 1 ( 5%)

8-Feb-19 25-Mar-19 18-May-19 11-Jul-19

15-Feb-19 1-Apr-19 25-May-19 18-Jul-19

TERMIN 2 ( 10%) TERMIN 3 ( 25%) TERMIN 4 ( 30%) TERMIN 5 ( 30%)

31

April '19 S

M 1 8 15 22 29

T 2 9 16 23 30

7 14 21 28

M 1 8 15 22 29

T 2 9 16 23 30

S

M

6 13 20 27

7 14 21 28

W 3 10 17 24

T 4 11 18 25

May '19 F 5 12 19 26

S 6 13 20 27

F 5 12 19 26

S 6 13 20 27

F 4 11 18 25

S 5 12 19 26

S

M

T

5 12 19 26

6 13 20 27

7 14 21 28

S

M

T

W

4 11 18 25

5 12 19 26

6 13 20 27

7 14 21 28

S

M

T

W

T

3 10 17

4 11 18

5 12 19

6 13 20

24

25

26

27

July '19 S

W 3 10 17 24 31

T 4 11 18 25

7 14 21

W 2 9 16 23

T 3 10 17 24

28

29

30

31

www.mitra-arsitek.com

T 2 9 16 23 30

June '19 F 3 10 17 24 31

S 4 11 18 25

S

M

T

W

T

F

2 9 16 23 30

3 10 17 24

4 11 18 25

5 12 19 26

6 13 20 27

7 14 21 28

F 2 9 16 23 30

S 3 10 17 24 31

S 1 8 15 22 29

M 2 9 16 23 30

7 14 21

F 1 8 15 22

S 2 9 16 23

S 1 8 15 22

M 2 9 16 23

T 3 10 17 24

28

29

30

29

30

31

August '19

October '19 T 1 8 15 22

W 1 8 15 22 29

T 1 8 15 22 29

S 1 8 15 22 29

September '19

November '19

T 3 10 17 24

W 4 11 18 25

T 5 12 19 26

F 6 13 20 27

S 7 14 21 28

December '19 W 4 11 18 25

T 5 12 19 26

F 6 13 20 27

S 7 14 21 28

2-Aug-19 10-Aug-19

Project Selesai (Finish) Serah Terima

Software RAB Exarch xPro v2019

PERENCANAAN TERMIN PEMBAYARAN

TERMIN BIAYA KONTRAK (ALL)

TERMIN BIAYA KONTRAK (ALL) 5% ID PROJECT NAMA PROJECT NILAI TERMIN Project Mulai Hari Calendar Termin Delay

Rencana Termin

TERMIN 1 TERMIN 2 TERMIN 3 TERMIN 4 TERMIN 5 TOTAL

www.mitra-arsitek.com

10%

: A002/T100.80/I-2019 : Pembangunan Rumah Tinggal 2 Lantai Type 180 931,188,612 : Rp : Monday, February 4, 2019 180 : 7 :

Nilai Project RangeTermin Progress (%) (%)

5% 10% 25% 30% 30% 100%

5% 15% 40% 70% 100%

1 Mode Termin

TERMIN BIAYA KONTRAK (ALL)

Tanggal Pembayaran (Jatuh Tempo) Jatuh Tempo

Batas Akhir (H-1)

Biaya Termin

Monday, January 21, 2019

Monday, January 28, 2019

46,559,431

Friday, February 8, 2019

Friday, February 15, 2019

93,118,861

Monday, March 25, 2019

Monday, April 1, 2019

232,797,153

Saturday, May 18, 2019

Saturday, May 25, 2019

279,356,584

Thursday, July 11, 2019

Thursday, July 18, 2019

279,356,584

30%

TERMIN 1

TERMIN 3 TERMIN 4

931,188,612

30%

TERMIN 5

Project Progress (%)

100% 70%

40% 5%

NILAI KONTRAK

25%

TERMIN 2

TERMIN 1

15% TERMIN 2

TERMIN 3

TERMIN 4

TERMIN 5

1/1

Software RAB Exarch xPro v2019

DAFTAR ANALISA SATUAN PEKERJAAN ID PROJECT NAMA PROJECT PROVINSI KABUPATEN KOTA Jumlah Analisa :

A002/T100.80/I-2019 Pembangunan Rumah Tinggal 2 Lantai Type 180 Sulawesi Selatan Luwu Timur Soroako 88

NO

ID AHS

ANALISA

1

A-001

AK-I.2016.(1)

2

3

4

5

6

7

P-009

A.2.2.1.9.

P-004

A.2.2.1.4.

P-007

S-017

A.2.2.1.7.

AK-SNI 2008

P-017

P-027

www.mitra-arsitek.com

A.2.3.1.1.

A.2.3.1.11.

INDEX

URAIAN BAHAN DAN UPAH KERJA

2.00 2.00 2.00

Ls oh/Ls Ls Ls

Pekerjaan Mobilisasi dan demobilisasi Upah Kerja Mobiliasasi/Demobilisasi Alat Kerja Mobilisasi/Demobilisasi Bahan Kerja Mobilisasi/Demobilisasi

1.00 0.10 0.05

m2 OH OH

(K3) Pembersihan lapangan dan perataan Pekerja Mandor

1.00 0.10 0.10 0.01 0.01 0.01 0.02 0.01

m1 OH OH OH OH m3 Kg m3

Pengukuran dan pemasangan Bouwplank Pekerja Tukang Kayu Kepala Tukang Mandor Kayu balok 5/7 Kelas II Paku Biasa 2" - 5" Kayu papan 3/20

1.00 1.00 2.00 0.20 0.05 1.70 0.21 0.30 10.50 0.03 0.05 1.50 0.25

m2 OH OH OH OH btg m3 Kg Kg m3 m3 Lbr Lbr

(K3) Pembuatan gudang semen dan Pekerja Tukang Kayu Kepala Tukang Mandor Dolken kayu Ø 8-10/400 cm Papan kayu 3/20 Kelas II Paku Biasa 2" - 5" Semen Pasir beton Koral beton Seng Gelombang 3" x 6" BJLS 28 Seng Gelombang 3" x 6" BJLS 28

1.00 0.04 1.40 0.60 1.50 16.80 0.03 0.04 2.10 0.02 1.00 1.00 1.01

bh m3 m1 kg kg kg m3 m3 oh oh oh oh oh

Membuat Papan Nama Proyek 80x120 cm (bahan seng) Papan kayu 3/20 Kelas II Seng Gelombang 3" x 6" BJLS 28 Paku Biasa 2" - 5" Cat kayu Semen Pasir beton Kerikil Pekerja Tukang batu Tukang kayu Tukang cat Mandor

1.00 0.75 0.03

m3 OH OH

Penggalian tanah biasa sedalam 1 m Pekerja Mandor

1.00 0.30 0.01 1.20

m3 OH OH M3

Pengurugan dengan pasir urug Pekerja Mandor Pasir urug

HARGA SATUAN

JUMLAH HARGA

910,800 456,750 253,000 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

1,821,600 913,500 506,000 3,241,100 324,110 3,565,210 3,565,300

121,578 219,998 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

12,158 11,000 23,158 2,316 25,473 25,500

121,578 162,104 185,261 219,998 2,246,200 25,525 3,573,500 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

12,158 16,210 1,853 1,100 26,954 511 25,015 83,800 8,380 92,180 92,200

121,578 162,104 185,261 219,998 20,420 3,318,250 25,525 1,480 295,069 221,047 51,050 51,050 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

121,578 324,207 37,052 11,000 34,714 696,833 7,658 15,545 8,852 11,052 76,575 12,763 1,357,828 135,783 1,493,610 1,493,700

3,318,250 51,050 25,525 50,948 1,480 295,069 239,935 121,578 162,104 162,104 162,104 219,998 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

116,139 71,470 15,315 76,422 24,872 7,967 9,717 255,313 2,837 162,104 162,104 221,098 1,125,356 112,536 1,237,892 1,237,900

121,578 219,998 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

91,183 5,500 96,683 9,668 106,352 106,400

121,578 219,998 241,977 Jumlah Bahan & Upah =

36,473 2,200 290,372 329,046

1/12

Software RAB Exarch xPro v2019

8

9

10

11

12

13

14

P-039

P-058

P-061

P-048

P-031

S-095

P-062

www.mitra-arsitek.com

A.3.2.1.9.

A.4.1.1.17

A.4.1.1.20

A.4.1.1.7.

A.3.2.1.1.

SNI-2002

A.4.1.1.21

Overhead & Profit 10% = Jumlah Total = Dibulatkan =

32,905 361,950 362,000

121,578 162,104 185,261 219,998 280,775 241,977 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

94,831 63,220 7,225 8,580 336,930 104,534 615,320 61,532 676,852 676,900

121,578 162,104 185,261 219,998 10,721 23,994 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

851 1,135 130 88 11,257 360 13,820 1,382 15,202 15,300

121,578 162,104 185,261 219,998 1,837,800 23,994 5,871 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan = Membuat beton mutu f’ = 19,3 MPa (K 225), slump (120 ± 20) mm, w/c = 0,58 Pekerja 121,578 Tukang Batu 162,104 Kepala Tukang 185,261 Mandor 219,998 Semen 1,480 Pasir Beton (kg) 255 Kerikil (kg) 153 Air 562 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan = Pemasangan pondasi batu belah campuran 1SP : 3PP Pekerja 121,578 Tukang Batu 162,104 Kepala Tukang 185,261 Mandor 219,998 Batu belah 280,775 Semen 1,480 Pasir Pasang 210,428 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan = Memasang rollag bata , campuran spesi 1 PC : 3 PP Bata merah 919 Semen 1,480 Pasir pasang 210,428 Pekerja 121,578 Tukang batu 162,104 Kepala tukang 185,261 Mandor 219,998 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan = (K3) Pemasangan bekisting untuk sloof Pekerja 121,578 Tukang Kayu 162,104 Kepala Tukang 185,261 Mandor 219,998 Papan kayu 3/20 Kelas III 1,837,800 Paku 5 - 10 cm 23,994 Minyak bekisting 5,871 Jumlah Bahan & Upah =

63,220 42,147 4,817 5,720 73,512 7,198 587 197,201 19,720 216,921 217,000

1.00 0.78 0.39 0.04 0.04 1.20 0.43

m3 OH OH OH OH m3 m3

Pemasangan batu kosong (anstamping) Pekerja Tukang Batu Kepala Tukang Mandor Batu belah Pasir urug

1.00 0.01 0.01 0.00 0.00 1.05 0.02

kg OH OH OH OH kg kg

Pembesian dengan besi polos atau besi ulir Pekerja Tukang Besi Kepala Tukang Mandor Besi beton Kawat beton

1.00 0.52 0.26 0.03 0.03 0.04 0.30 0.10

m2 OH OH OH OH m3 kg Ltr

(K3) Pemasangan bekisting untuk pondasi Pekerja Tukang Kayu Kepala Tukang Mandor Papan kayu 3/20 Kelas III Paku 5 - 10 cm Minyak bekisting

1.00 1.65 0.28 0.03 0.08 371.00 698.00 1047.00 215.00

m3 OH OH OH OH kg kg kg Ltr

1.00 1.50 0.75 0.08 0.08 1.20 202.00 0.49

m3 OH OH OH OH m3 Kg m3

1.00 17.00 4.94 0.01 0.09 0.03 0.00 0.00

m1 bh kg m3 oh oh oh oh

1.00 0.52 0.26 0.03 0.03 0.05 0.30 0.10

m2 OH OH OH OH m3 kg Ltr

200,603 44,578 5,187 18,260 549,247 178,165 160,348 120,733 1,277,122 127,712 1,404,834 1,404,900 182,367 121,578 13,895 16,500 336,930 299,051 102,058 1,072,377 107,238 1,179,615 1,179,700 15,621 7,317 2,883 10,942 4,863 556 990 43,172 4,317 47,489 47,500 63,220 42,147 4,817 5,720 82,701 7,198 587 206,390

2/12

Software RAB Exarch xPro v2019

15

16

17

18

19

20

21

S-049

AK-SNI 2008

P-026

P-063

P-047

P-064

P-065

P-135

www.mitra-arsitek.com

A.2.3.1.10.

A.4.1.1.22

A.4.1.1.6

A.4.1.1.23

A.4.1.1.24

A.4.4.1.10

Overhead & Profit 10% = Jumlah Total = Dibulatkan =

20,639 227,029 227,100

188,885 121,578 219,998 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

226,662 36,473 2,200 265,335 26,534 291,869 291,900

121,578 219,998 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

60,789 11,000 71,789 7,179 78,968 79,000

121,578 162,104 185,261 219,998 1,837,800 25,525 5,871 3,471,400 122,520 20,420 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan = Membuat beton mutu f’= 16,9 MPa (K 200), slump (120 ± 20) mm, w/c = 0,61 Pekerja 121,578 Tukang Batu 162,104 Kepala Tukang 185,261 Mandor 219,998 Semen 1,480 Pasir Beton (kg) 255 Kerikil (kg) 153 Air 562 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan = (K3) Pemasangan bekisting untuk balok Pekerja 121,578 Tukang Kayu 162,104 Kepala Tukang 185,261 Mandor 219,998 Papan kayu 3/20 Kelas III 1,837,800 Paku Biasa 2" - 5" 25,525 Minyak bekisting 5,871 Balok kayu kelas II 3,471,400 Plywood 120x240 tbl. 9 mm 122,520 Dolken kayu Ø 8-10/400 cm 20,420 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan = (K3) Pemasangan bekisting untuk lantai Pekerja 121,578 Tukang Kayu 162,104 Kepala Tukang 185,261 Mandor 219,998 Papan kayu 3/20 Kelas III 1,837,800 Paku Biasa 2" - 5" 25,525 Minyak bekisting 5,871 Balok kayu kelas II 3,471,400 Plywood 120x240 tbl. 9 mm 122,520 Dolken kayu Ø 8-10/400 cm 20,420 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan = Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran 1 SP : 5 PP Pekerja 121,578 Tukang Batu 162,104 Kepala Tukang 185,261 Mandor 219,998 Bata merah 919 Semen 1,480

80,241 53,494 6,114 7,260 73,512 10,210 1,174 52,071 42,882 40,840 367,798 36,780 404,578 404,600

1.00 1.20 0.30 0.01

m3 m3 oh oh

Urug tanah mendatangkan Tanah urug Pekerja Mandor

1.00 0.50 0.05

m3 OH OH

(K3) Pemadatan tanah tanah ( per 20 cm) Pekerja Mandor

1.00 0.66 0.33 0.03 0.03 0.04 0.40 0.20 0.02 0.35 2.00

m2 OH OH OH OH m3 kg Ltr m3 Lbr btg

(K3) Pemasangan bekisting untuk kolom Pekerja Tukang Kayu Kepala Tukang Mandor Papan kayu 3/20 Kelas III Paku Biasa 2" - 5" Minyak bekisting Balok kayu kelas II Plywood 120x240 tbl. 9 mm Dolken kayu Ø 8-10/400 cm

1.00 1.65 0.28 0.03 0.08 352.00 731.00 1031.00 215.00

m3 OH OH OH OH kg kg kg Ltr

1.00 0.66 0.33 0.03 0.03 0.04 0.40 0.20 0.02 0.35 2.00

m2 OH OH OH OH m3 kg Ltr m3 Lbr btg

1.00 0.66 0.33 0.03 0.03 0.04 0.40 0.20 0.02 0.35 6.00

m2 OH OH OH OH m3 kg Ltr m3 Lbr btg

1.00 0.30 0.10 0.01 0.02 70.00 9.68

m2 OH OH OH OH bh Kg

200,603 44,578 5,187 18,260 521,118 186,588 157,898 120,733 1,254,966 125,497 1,380,462 1,380,500 80,241 53,494 6,114 7,260 73,512 10,210 1,174 62,485 42,882 40,840 378,212 37,821 416,034 416,100 80,241 53,494 6,114 7,260 73,512 10,210 1,174 52,071 42,882 122,520 449,478 44,948 494,426 494,500 36,473 16,210 1,853 3,300 64,323 14,331

3/12

Software RAB Exarch xPro v2019

0.05

m3

22

P-133

A.4.4.1.8

1.00 0.30 0.10 0.01 0.02 70.00 14.37 0.04

m2 OH OH OH OH bh Kg m3

23

P-156

A.4.4.2.5.

1.00 0.30 0.15 0.02 0.02 5.18 0.03

m2 OH OH OH OH Kg m3

24

P-178

A.4.4.2.27.

1.00 0.20 0.10 0.01 0.01 3.25

m2 OH OH OH OH Kg

25

P-125

A.4.2.1.24.

1.00 0.20 0.45 0.01 0.05 3.72 28.00 2.00 5.40 0.12 0.10

m2 OH OH OH OH M' bh bh M' M' Ls

26

P-291

A.4.5.2.32.

1.00 0.20 0.10 0.01 0.00 1.30 0.20

m2 OH OH OH OH Bh Kg

27

P-296

A.4.5.2.37.

1.00 0.25 0.15 0.02 0.01 1.10 0.05

m1 OH OH OH OH Bh Kg

28

P-323

A.4.6.1.21.

1.00 0.10 0.20 0.02 0.01 0.01 0.10

m1 OH OH OH OH m3 kg

www.mitra-arsitek.com

Pasir Pasang

210,428 9,469 Jumlah Bahan & Upah = 145,959 Overhead & Profit 10% = 14,596 Jumlah Total = 160,555 Dibulatkan = 160,600 Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP Pekerja 121,578 36,473 Tukang Batu 162,104 16,210 Kepala Tukang 185,261 1,853 Mandor 219,998 3,300 Bata merah 919 64,323 Semen 1,480 21,274 Pasir Pasang 210,428 8,417 Jumlah Bahan & Upah = 151,850 Overhead & Profit 10% = 15,185 Jumlah Total = 167,035 Dibulatkan = 167,100 Pemasangan plesteran 1SP : 5PP tebal 15 mm Pekerja 121,578 36,473 Tukang Batu 162,104 24,316 Kepala Tukang 185,261 2,779 Mandor 219,998 3,300 Semen 1,480 7,675 Pasir Pasang 210,428 5,471 Jumlah Bahan & Upah = 80,014 Overhead & Profit 10% = 8,001 Jumlah Total = 88,015 Dibulatkan = 88,100 Pemasangan acian. Pekerja 121,578 24,316 Tukang Batu 162,104 16,210 Kepala Tukang 185,261 1,853 Mandor 219,998 2,200 Semen 1,480 4,811 Jumlah Bahan & Upah = 49,390 Overhead & Profit 10% = 4,939 Jumlah Total = 54,329 Dibulatkan = 54,400 Pemasangan PASANG KUDA-KUDA BAJA RINGAN + RENG UNTUK ATAP GENTENG BIASA/METAL Pekerja 121,578 24,316 Tukang Besi 162,104 72,947 Kepala Tukang 185,261 1,853 Mandor 219,998 11,000 Baja Ringan-C Truss 15,315 56,972 Baut (Srew driver) 459 12,865 Baut Ramset / Dina Bolt 4,748 9,495 Baja Ringan- Reng Truss 7,147 38,594 Talang / Jurai Canai Dingin 45,945 5,697 Alat Rangka Atap Baja Canai Dingin 456,750 45,675 Jumlah Bahan & Upah = 279,412 Overhead & Profit 10% = 27,941 Jumlah Total = 307,354 Dibulatkan = 307,400 Pemasangan genteng metal ukuran 80 x 100 atap pelana Pekerja 121,578 24,316 Tukang Kayu 162,104 16,210 Kepala tukang 185,261 1,853 Mandor 219,998 220 Genteng metal 35,735 46,456 Paku Biasa ½" - 1" 23,994 4,799 Jumlah Bahan & Upah = 93,853 Overhead & Profit 10% = 9,385 Jumlah Total = 103,238 Dibulatkan = 103,300 Pemasangan nok genteng metal Pekerja 121,578 30,394 Tukang Kayu 162,104 24,316 Kepala tukang 185,261 2,779 Mandor 219,998 2,860 nok genteng metal 84,743 93,217 Paku Biasa 2" - 5" 25,525 1,276 Jumlah Bahan & Upah = 154,842 Overhead & Profit 10% = 15,484 Jumlah Total = 170,327 Dibulatkan = 170,400 Pemasangan lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II Pekerja 121,578 12,158 Tukang kayu 162,104 32,421 Kepala tukang 185,261 3,705 Mandor 219,998 1,100 Kayu Papan 3/20 3,573,500 38,594 Paku Biasa 2" - 5" 25,525 2,553 Jumlah Bahan & Upah = 90,530

4/12

Software RAB Exarch xPro v2019

29

30

31

32

33

34

35

36

P-120

A-002

A-003

A-004

A-005

A-006

A-008

A.4.2.1.19

1.00 0.15 0.30 0.03 0.01 1.05 0.01 0.50

m1 OH OH OH OH m kg kg

1.00 0.40 0.50 0.80 0.10

unit set Ls Oh Oh Oh

1.00 0.40 0.50 0.80 0.10

unit set Ls Oh Oh Oh

1.00 0.40 0.50 0.80 0.10

unit set Ls Oh Oh Oh

1.00 0.20 0.30 0.60 0.05

unit set Ls Oh Oh Oh

1.00 0.40 0.50 0.80 0.07

unit set Ls Oh Oh Oh

1.00 0.01 0.01 0.05 0.01

unit Unit Ls Oh Oh Oh

1.00 0.04 0.06 0.01 0.00 1.20 0.35

m1 OH OH OH OH M %

AK-I.2016.(2)

AK-I.2016.(3)

AK-I.2016.(4)

AK-I.2016.(5)

AK-I.2016.(6)

AK-I.2016.(8)

P-401

www.mitra-arsitek.com

A.5.1.1 26.

Overhead & Profit 10% = Jumlah Total = Dibulatkan = Pemasangan talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm Pekerja 121,578 Tukang Atap 162,104 Kepala tukang 185,261 Mandor 219,998 Seng Gelombang 3" x 6" BJLS 28 51,050 Paku Biasa 2" - 5" 25,525 Baja strip (0,2 x 2) cm 12,763 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan = Pekerjaan Pasangan Pintu utama type P1 Pintu Utama (Kusen+Panel) Type P1 2,144,100 Perlengkapan 253,750 Pekerja 121,578 Tukang Kayu 162,104 Mandor 219,998 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan = Pekerjaan Pasangan Pintu Ruangan type P2 Pintu Utama (Kusen+Panel) Type P2 1,633,600 Perlengkapan 253,750 Pekerja 121,578 Tukang Kayu 162,104 Mandor 219,998 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan = Pekerjaan Pasangan Pintu WC type P3 Pintu Utama (Kusen+Panel) Type P3 1,123,100 Perlengkapan 253,750 Pekerja 121,578 Tukang Kayu 162,104 Mandor 219,998 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan = Pekerjaan Pasangan Jendela type J1 Jendela Type J1 1,000,580 Perlengkapan 253,750 Pekerja 121,578 Tukang Kayu 162,104 Mandor 219,998 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan = Pekerjaan Pasangan Jendela type J2 Jendela Type J2 612,600 Perlengkapan 253,750 Pekerja 121,578 Tukang Kayu 162,104 Mandor 219,998 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan = Pekerjaan Pasangan Lubang Angin/Roster Lubang Angin 26,036 Perlengkapan 253,750 Pekerja 121,578 Tukang Batu 162,104 Mandor 219,998 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan = Pemasangan pipa PVC tipe AW diameter 3/4” Pekerja 121,578 Tukang batu 162,104 Kepala tukang 185,261 Mandor 219,998 Pipa PVC 3/4" 5,616 Perlengkapan 253,750 Jumlah Bahan & Upah =

9,053 99,583 99,600 18,237 48,631 5,558 1,760 53,603 255 6,381 134,425 13,442 147,867 147,900 2,144,100 101,500 60,789 129,683 22,000 2,458,072 245,807 2,703,879 2,703,900 1,633,600 101,500 60,789 129,683 22,000 1,947,572 194,757 2,142,329 2,142,400 1,123,100 101,500 60,789 129,683 22,000 1,437,072 143,707 1,580,779 1,580,800 1,000,580 50,750 36,473 97,262 11,000 1,196,065 119,607 1,315,672 1,315,700 612,600 101,500 60,789 129,683 15,400 919,972 91,997 1,011,969 1,012,000 26,036 2,538 1,216 8,105 2,200 40,094 4,009 44,103 44,200 4,377 9,726 1,112 440 6,739 88,813 111,206

5/12

Software RAB Exarch xPro v2019

37

38

39

40

41

42

43

44

P-400

A.5.1.1 25.

P-394

A-009

A-010

A-011

A.5.1.1 19.

1.00 0.04 0.06 0.01 0.00 1.20 0.35

m1 OH OH OH OH M %

Pemasangan pipa PVC tipe AW diameter 1/2” Pekerja Tukang batu Kepala tukang Mandor Pipa PVC 1/2" Perlengkapan

1.00 0.01 0.40 0.04 0.01 1.00 0.03

bh OH OH OH OH M bh

Pemasangan kran diameter ½” atau 3/4” Pekerja Tukang batu Kepala tukang Mandor Kran air Sealtape

1.00 0.10 0.20 0.10 0.03

unit Unit Ls Oh Oh Oh

Pekerjaan Pasangan Shower Mandi Shower Mandi Perlengkapan Pekerja Tukang Pipa Mandor

1.00 0.60 0.50 0.25 0.03

unit Unit Ls Oh Oh Oh

Pekerjaan Pasangan Tangki Air Tangki Air Perlengkapan Pekerja Tukang Pipa Mandor

1.00 0.40 0.40 0.20 0.02

unit Unit Ls Oh Oh Oh

Pekerjaan Pasangan Pompa Air Pompa Air Perlengkapan Pekerja Tukang Pipa Mandor

1.00 0.08 0.14 0.01 0.00 1.20 0.35

m1 OH OH OH OH M %

Pemasangan pipa PVC tipe AW diameter 3” Pekerja Tukang batu Kepala tukang Mandor Pipa PVC 3” Perlengkapan

1.00 0.08 0.14 0.01 0.00 1.20 0.35

m1 OH OH OH OH M %

Pemasangan pipa PVC tipe AW diameter 4” Pekerja Tukang batu Kepala tukang Mandor Pipa PVC 4" Perlengkapan

1.00 3.30 1.10 0.01 0.16 1.00

bh OH OH OH OH Unit

(K3) Pemasangan closet duduk/moblock Pekerja Tukang batu Kepala tukang Mandor Kloset duduk / monoblock

AK-I.2016.(9)

AK-I.2016.(10)

AK-I.2016.(11)

P-406

P-407

P-376

www.mitra-arsitek.com

A.5.1.1 31.

A.5.1.1 32.

A.5.1.1.1.

Overhead & Profit 10% = Jumlah Total = Dibulatkan =

11,121 122,326 122,400

121,578 162,104 185,261 219,998 4,084 253,750 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

4,377 9,726 1,112 440 4,901 88,813 109,368 10,937 120,305 120,400

121,578 162,104 185,261 219,998 25,525 3,574 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

1,216 64,841 7,410 1,100 25,525 89 100,182 10,018 110,200 110,300

137,835 253,750 121,578 162,104 219,998 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

137,835 25,375 24,316 16,210 5,500 209,236 20,924 230,159 230,200

1,276,250 253,750 121,578 162,104 219,998 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

1,276,250 152,250 60,789 40,526 5,500 1,535,315 153,531 1,688,846 1,688,900

612,600 253,750 121,578 162,104 219,998 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

612,600 101,500 48,631 32,421 4,400 799,552 79,955 879,507 879,600

121,578 162,104 185,261 219,998 8,679 253,750 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

9,848 21,884 2,501 880 10,414 88,813 134,339 13,434 147,773 147,800

121,578 162,104 185,261 219,998 9,189 253,750 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

9,848 21,884 2,501 880 11,027 88,813 134,952 13,495 148,447 148,500

121,578 162,104 185,261 219,998 2,552,500

401,206 178,314 1,853 35,200 2,552,500

6/12

Software RAB Exarch xPro v2019

45

46

47

48

49

50

51

52

P-377

A.5.1.1 2.

P-380

A.5.1.1 5.

P-389

A-012

A-013

A-014

A-015

A-016

A.5.1.1 14.

0.06

%

1.00 1.00 1.50 0.15 0.16 1.00 6.00 0.01

bh OH OH OH OH Unit Kg M3

Pemasangan closet jongkok porslen Pekerja Tukang batu Kepala tukang Mandor Kloset jongkok teraso Semen Pasir pasang

1.00 1.20 1.45 0.15 0.06 1.20 6.00 0.01 0.12

bh OH OH OH OH Unit Kg M3 %

(K3) Pemasangan wastafel Pekerja Tukang batu Kepala tukang Mandor Wastafel Semen Pasir pasang Perlengkapan

1.00 0.01 0.10 0.01 0.01 1.00

bh OH OH OH OH Unit

Pemasangan floor drain Pekerja Tukang batu Kepala tukang Mandor Floor drain

1.00 1.00 1.00

m3 oh/m3 Ls Ls

Pekerjaan Septik Tank Volume 1 m3 Upah Kerja Pembuatan Septik Tank Alat Kerja Pembuatan Septik Tank Bahan Kerja Pembuatan Septik Tank

1.00 1.00 1.00

m3 oh/m3 Ls Ls

Pekerjaan Sumur Resapan Air Hujan/Limbah Volume 1 m3 Upah Kerja Pembuatan Sumur Resapan Limbah Alat Kerja Pembuatan Sumur Resapan Limbah Bahan Kerja Pembuatan Sumur Resapan Limbah

1.00 0.40 0.40 0.20 0.02

Unit Unit Ls Oh Oh Oh

Pekerjaan Pasangan Box MCB MCB + Box Perlengkapan Pekerja Tukang Listrik Mandor

1.00 0.40 0.40 0.20 0.02

btg btg Ls Oh Oh Oh

Pekerjaan Pasangan Pembumian (Grounding) Tembaga dia.1/2"-1.5m Perlengkapan Pekerja Tukang Listrik Mandor

1.10 0.02 0.02 0.01 0.00

m1 m1 Ls Oh Oh Oh

Pekerjaan Instalasi Kabel NYM-3x2.5m2 Kabel NYM 3x2,5 mm2-SNI Perlengkapan Pekerja Tukang Listrik Mandor

AK-I.2016.(12)

AK-I.2016.(13)

AK-I.2016.(14)

AK-I.2016.(15)

AK-I.2016.(16)

www.mitra-arsitek.com

Perlengkapan

253,750 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

15,225 3,184,298 318,430 3,502,727 3,502,800

121,578 162,104 185,261 219,998 255,250 1,480 210,428 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

121,578 243,155 27,789 35,200 255,250 8,883 2,104 693,959 69,396 763,355 763,400

121,578 162,104 185,261 219,998 1,480,450 1,480 210,428 253,750 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

145,893 235,050 27,789 13,200 1,776,540 8,883 2,104 30,450 2,239,910 223,991 2,463,900 2,464,000

121,578 162,104 185,261 219,998 61,260 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

1,216 16,210 1,853 1,100 61,260 81,639 8,164 89,803 89,900

1,518,000 456,750 6,636,500 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

1,518,000 456,750 6,636,500 8,611,250 861,125 9,472,375 9,472,400

1,113,200 355,250 4,594,500 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

1,113,200 355,250 4,594,500 6,062,950 606,295 6,669,245 6,669,300

357,350 253,750 121,578 162,104 219,998 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

357,350 101,500 48,631 32,421 4,400 544,302 54,430 598,732 598,800

663,650 253,750 121,578 162,104 219,998 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

663,650 101,500 48,631 32,421 4,400 850,602 85,060 935,662 935,700

12,252 253,750 121,578 162,104 219,998 Jumlah Bahan & Upah =

13,477 3,806 2,432 1,621 440 21,776

7/12

Software RAB Exarch xPro v2019

53

54

55

56

57

58

59

60

A-017

A-018

A-019

A-023

A-020

A-021

A-022

AK-I.2016.(17)

11,231 2,538 2,432 1,621 440 18,261 1,826 20,087 20,100

25,525 253,750 121,578 162,104 219,998 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

25,525 5,075 4,863 3,242 440 39,145 3,915 43,060 43,100

25,525 253,750 121,578 162,104 219,998 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

25,525 6,090 4,863 3,242 440 40,160 4,016 44,176 44,200

30,630 253,750 121,578 162,104 219,998 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

30,630 6,344 5,106 3,242 440 45,762 4,576 50,338 50,400

24,504 253,750 121,578 162,104 219,998 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

24,504 2,538 4,863 1,621 220 33,746 3,375 37,120 37,200

35,735 253,750 121,578 162,104 219,998 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

35,735 2,538 4,863 1,621 220 44,977 4,498 49,474 49,500

45,945 253,750 121,578 162,104 219,998 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan = Membuat lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87 Pekerja 121,578 Tukang Batu 162,104 Kepala Tukang 185,261 Mandor 219,998 Semen 1,480 Pasir Beton (kg) 255 Kerikil (kg) 153 Air 562 Jumlah Bahan & Upah =

45,945 2,538 4,863 1,621 220 55,187 5,519 60,705 60,800

Pekerjaan Instalasi Kabel NYM 2x1,5 mm2 Kabel NYM 2x1,5 mm2-SNI Perlengkapan Pekerja Tukang Listrik Mandor

1.00 0.02 0.04 0.02 0.00

Unit unit Ls Oh Oh Oh

Pekerjaan Pasangan Fitting Lampu Fitting Lampu Perlengkapan Pekerja Tukang Listrik Mandor

1.00 0.02 0.04 0.02 0.00

unit unit Ls Oh Oh Oh

Pekerjaan Pasangan Saklar Lampu Saklar Listrik Perlengkapan Pekerja Tukang Listrik Mandor

1.00 0.03 0.04 0.02 0.00

unit unit Ls Oh Oh Oh

Pekerjaan Pasangan Colokan Listrik (Receiptackle) Receiptackle Perlengkapan Pekerja Tukang Listrik Mandor

1.00 0.01 0.04 0.01 0.00

unit unit Ls Oh Oh Oh

Pekerjaan Pasangan Lampu 5 W Lampu 5W Perlengkapan Pekerja Tukang Listrik Mandor

1.00 0.01 0.04 0.01 0.00

unit unit Ls Oh Oh Oh

Pekerjaan Pasangan Lampu 15 W Lampu 15W Perlengkapan Pekerja Tukang Listrik Mandor

1.00 0.01 0.04 0.01 0.00

unit unit Ls Oh Oh Oh

Pekerjaan Pasangan Lampu 20 W Lampu 20W Perlengkapan Pekerja Tukang Listrik Mandor

1.00 1.20 0.20 0.02 0.06 230.00 893.00 1027.00 200.00

m3 OH OH OH OH kg kg kg Ltr

AK-I.2016.(23)

AK-I.2016.(20)

AK-I.2016.(21)

AK-I.2016.(22)

www.mitra-arsitek.com

10,210 253,750 121,578 162,104 219,998 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

m1 m1 Ls Oh Oh Oh

AK-I.2016.(19)

A.4.1.1.4

2,178 23,954 24,000

1.10 0.01 0.02 0.01 0.00

AK-I.2016.(18)

P-045

Overhead & Profit 10% = Jumlah Total = Dibulatkan =

145,893 32,421 3,705 13,200 340,504 227,938 157,285 112,310 1,033,256

8/12

Software RAB Exarch xPro v2019

61

62

63

64

65

66

67

P-193

P-184

P-186

P-234

P-208

P-211

P-121

www.mitra-arsitek.com

A.4.4.3.13.

A.4.4.3.4.

A.4.4.3.6.

A.4.4.3.54.

A.4.4.3.28.

A.4.4.3.31.

A.4.2.1.20.

Overhead & Profit 10% = Jumlah Total = Dibulatkan =

103,326 1,136,581 1,136,600

121,578 162,104 185,261 219,998 45,945 1,480 2,144 210,428 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

29,179 19,452 2,223 2,640 142,430 14,212 3,216 9,469 222,821 22,282 245,104 245,200

121,578 162,104 185,261 219,998 14,805 1,480 2,144 210,428 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

30,394 20,263 2,408 2,860 98,154 14,508 2,787 9,469 180,845 18,084 198,929 199,000

121,578 162,104 185,261 219,998 11,742 1,480 2,144 210,428 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

32,826 21,884 2,594 3,080 311,150 15,397 3,473 9,469 399,873 39,987 439,860 439,900

121,578 162,104 185,261 219,998 63,813 1,480 210,428 2,144 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

109,420 72,947 8,337 9,900 70,194 13,768 3,788 4,160 292,512 29,251 321,764 321,800

121,578 162,104 185,261 219,998 17,357 1,480 2,144 210,428 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

10,942 14,589 1,667 1,100 29,507 1,688 214 631 60,339 6,034 66,373 66,400

121,578 162,104 185,261 219,998 4,595 2,144 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan = Pemasangan rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi Pekerja 121,578 Tukang Besi 162,104 Kepala Tukang 185,261

43,768 29,179 3,335 3,960 165 214 80,621 8,062 88,683 88,700

1.00 0.24 0.12 0.01 0.01 3.10 9.60 1.50 0.05

m2 OH OH OH OH Bh kg Kg M3

Pemasangan lantai ubin teralux marmer ukuran 60cm x60cm Pekerja Tukang Batu Kepala tukang Mandor ubin teralux marmer ukuran 60cm x60cm Semen Semen Warna Pasir Pasang

1.00 0.25 0.13 0.01 0.01 6.63 9.80 1.30 0.05

m2 OH OH OH OH Bh kg Kg M3

Pemasangan lantai ubin warna ukuran 40cm x40 cm Pekerja Tukang Batu Kepala tukang Mandor ubin warna ukuran 40cm x40 cm Semen Semen Warna Pasir Pasang

1.00 0.27 0.14 0.01 0.01 26.50 10.40 1.62 0.05

m2 OH OH OH OH Bh kg Kg M3

Pemasangan lantai ubin warna ukuran 20cm x20cm Pekerja Tukang Batu Kepala tukang Mandor ubin warna ukuran 20cm x20cm Semen Semen Warna Pasir Pasang

1.00 0.90 0.45 0.05 0.05 1.10 9.30 0.02 1.94

m2 OH OH OH OH m2 Kg M3 Kg

Pemasangan dinding keramik 20cm x 20cm Pekerja Tukang Batu Kepala tukang Mandor keramik Dinding 20cm x 20cm Semen Pasir Pasang Semen Warna

1.00 0.09 0.09 0.01 0.01 1.70 1.14 0.10 0.00

m1 OH OH OH OH Bh kg Kg M3

Pemasangan plint ubin teralux marmer ukuran 10cm x 60cm Pekerja Tukang Batu Kepala tukang Mandor plint ubin teralux marmer ukuran 10cm x 60cm Semen Semen Warna Pasir Pasang

1.00 0.36 0.18 0.02 0.02 0.04 0.10

m2 OH OH OH OH M3 Kg

Pemasangan lantai teraso cor di tempat, tebal 3cm Pekerja Tukang Batu Kepala tukang Mandor Teraso cor di tempat, tebal 3cm Semen warna

1.00 0.25 0.25 0.03

m2 OH OH OH

30,394 40,526 4,632

9/12

Software RAB Exarch xPro v2019

68

69

70

71

72

73

74

P-255

A.4.5.1.7.

P-259

A-028

A-029

A.4.5.1.10.

0.01 3.50 1.00

OH M1 Ls

1.00 0.10 0.05 0.01 0.01 0.36 0.11

m2 OH OH OH OH Lbr kg

1.00 0.10 0.05 0.01 0.01 1.05 6.00

m2 OH OH OH OH M' bh

0.10 0.50 0.02 0.07 0.01 0.01

m2 kg Lbr oh oh oh oh

0.10 0.50 0.01 0.02 0.07 0.01 0.01

m2 kg Lbr ea oh oh oh oh

1.00 0.02 0.06 0.01 0.00 0.10 0.10 0.26

m2 OH OH OH OH Kg Kg Kg

1.00 0.07 0.01 0.01 0.00 0.20 0.15 0.17 0.26 0.01 0.03 0.20

m2 OH OH OH OH Kg Kg Kg Kg Bh Kg Lbr

1.00 0.02 0.20

m2 OH OH

AK-I.2016.(28)

AK-I.2016.(29)

P-363

P-357

P-369

www.mitra-arsitek.com

A.4.7.1.10.

A.4.7.1.4.

A.4.7.1.16.

Mandor Hollow 4/4 Assesoris (perkuatan, las dll)

219,998 10,210 160,370 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan = Pemasangan langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm Pekerja 121,578 Tukang kayu 162,104 Kepala tukang 185,261 Mandor 219,998 Gypsum board 9 mm 88,827 Paku sekrup 766 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan = Pemasangan List Plafond PVC Pekerja 121,578 Tukang Kayu 162,104 Kepala tukang 185,261 Mandor 219,998 List PVC (setara Shunda Plafon,LS 301-1 Min.Silver Metalic) 34,714 Screw 511 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan = Pekerjaan Pekerjaan Plamir (1 Lapis) Plamir 57,482 Amplas 6,637 Pekerja 121,578 Tukang Cat 162,104 Kepala Tukang 185,261 Mandor 219,998 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan = Pekerjaan Cat Anti Lumut dan Waterproofing Cat Anti Bocor+Waterproofing 17,357 Amplas 6,637 Rol Cat 25,375 Pekerja 121,578 Tukang Cat 162,104 Kepala Tukang 185,261 Mandor 219,998 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan = Pengecatan tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) Pekerja 121,578 Tukang cat 162,104 Kepala tukang 185,261 Mandor 219,998 Plamir 57,482 Cat dasar Tembok 66,365 Cat Penutup Tembok 35,735 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan = Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) Pekerja 121,578 Tukang cat 162,104 Kepala tukang 185,261 Mandor 219,998 Cat meni 16,642 Plamir 57,482 Cat dasar Kayu 31,651 Cat kayu 50,948 Kuas 17,357 Pengencer 35,735 Amplas 6,637 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan = Pengecatan permukaan baja dengan menie besi Pekerja 121,578 Tukang cat 162,104

2,860 35,735 160,370 274,517 27,452 301,969 302,000 12,158 8,105 926 1,100 32,333 84 54,707 5,471 60,177 60,200 12,158 8,105 926 1,100 36,450 3,063 61,802 6,180 67,982 68,000 5,748 3,318 2,432 11,347 1,853 2,200 26,898 2,690 29,588 29,600 1,736 3,318 254 2,432 11,347 1,853 2,200 23,139 2,314 25,453 25,500 2,432 10,213 1,167 660 5,748 6,637 9,291 36,147 3,615 39,762 39,800 8,510 1,459 1,112 660 3,328 8,622 5,381 13,246 174 1,072 1,327 44,892 4,489 49,381 49,400 2,432 32,421

10/12

Software RAB Exarch xPro v2019

75

76

77

78

79

80

81

P-025

P-032

P-067

P-159

P-035

P-237

P-244

www.mitra-arsitek.com

A.2.3.1.9.

A.3.2.1.2.

A.4.1.1.26

A.4.4.2.8.

A.3.2.1.5.

A.4.4.3.57.

A.4.4.3.64.

0.02 0.00 0.10 0.01

OH OH Kg Bh

Kepala tukang Mandor Menie besi Kuas

1.00 0.25 0.03

m3 OH OH

Pengurugan kembali galian tanah Tanah Biasa Sedalam 1 M Pekerja Mandor

1.00 1.50 0.75 0.08 0.08 1.20 163.00 0.52

m3 OH OH OH OH m3 Kg m3

Pemasangan pondasi batu belah campuran 1SP : 4PP Pekerja Tukang Batu Kepala Tukang Mandor Batu belah Semen Pasir Pasang

1.00 0.66 0.33 0.03 0.03 0.03 0.40 0.15 0.02 0.35 2.00

m2 OH OH OH OH m3 kg Ltr m3 Lbr btg

(K3) Pemasangan bekisting untuk tangga Pekerja Tukang Kayu Kepala Tukang Mandor Papan kayu 3/20 Kelas III Paku Biasa 2" - 5" Minyak bekisting Balok kayu kelas II Plywood 120x240 tbl. 9 mm Dolken kayu Ø 8-10/400 cm

1.00 0.30 0.15 0.02 0.02 3.46 0.03

m2 OH OH OH OH Kg m3

Pemasangan plesteran 1SP : 8PP tebal 15 mm Pekerja Tukang Batu Kepala Tukang Mandor Semen Pasir Pasang

1.00 1.50 0.75 0.08 0.08 1.20 91.00 0.58

m3 OH OH OH OH m3 Kg m3

Pemasangan pondasi batu belah campuran 1SP : 8PP Pekerja Tukang Batu Kepala Tukang Mandor Batu belah Semen Pasir Pasang

1.00 0.70 0.35 0.04 0.04 1.10 11.75 0.04

m2 OH OH OH OH Bh Kg M3

Pemasangan dinding batu paras Pekerja Tukang Batu Kepala tukang Mandor Batu paras Dinding Semen Pasir Pasang

1.00 0.25 0.25 0.03 0.00 1.01

m2 OH OH OH OH M2

Pemasangan paving block natural tebal 6 cm Pekerja Tukang Kayu Kepala tukang Mandor Paving block 6 cm

185,261 219,998 27,567 17,357 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

3,705 550 2,757 174 42,038 4,204 46,242 46,300

121,578 219,998 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

30,394 5,500 35,894 3,589 39,484 39,500

121,578 162,104 185,261 219,998 280,775 1,480 210,428 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

182,367 121,578 13,895 16,500 336,930 241,313 109,423 1,022,005 102,200 1,124,205 1,124,300

121,578 162,104 185,261 219,998 1,837,800 25,525 5,871 3,471,400 122,520 20,420 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

80,241 53,494 6,114 7,260 55,134 10,210 881 52,071 42,882 40,840 349,127 34,913 384,039 384,100

121,578 162,104 185,261 219,998 1,480 210,428 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

36,473 24,316 2,779 3,300 5,116 6,102 78,087 7,809 85,895 85,900

121,578 162,104 185,261 219,998 280,775 1,480 210,428 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

182,367 121,578 13,895 16,500 336,930 134,721 122,890 928,880 92,888 1,021,768 1,021,800

121,578 162,104 185,261 219,998 81,680 1,480 210,428 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

85,104 56,736 6,484 7,700 89,848 17,395 7,365 270,633 27,063 297,696 297,700

121,578 162,104 185,261 219,998 137,835

30,394 40,526 4,632 550 139,213

11/12

Software RAB Exarch xPro v2019

82

83

84

85

86

87

88

A-030

A-026

A-027

A-024

M3 %

1.00 0.04 0.20 0.30 0.01 0.01

pohon unit Ls oh oh oh oh

1.00

Ls Ls

Penyambungan Instalasi Listrik PLN Biaya Pengurusan Daya Listrik PLN

1.00

Ls Ls

Penyambungan Instalasi Air PDAM Biaya Pengurusan Instalasai PDAM

1.00 15.00 32.80 0.05 1.05 1.05 0.11 0.05

m2 kg kg kg oh oh oh oh

1.00 0.03 0.04 0.02 0.00

unit unit Ls Oh Oh Oh

1.00 0.03 0.04 0.02 0.00

unit unit Ls Oh Oh Oh

1.00 0.10 0.02 0.01

m2 OH OH OH

AK-I.2016.(30)

AK-I.2016.(26)

AK-I.2016.(27)

S-548

A-025

0.05 0.10

SNI-2007

AK-I.2016.(25)

AK-I.2016.(24)

A-031

www.mitra-arsitek.com

A.2.2.1.9.a

Pasir beton Bahan Kerja Paving Blok

295,069 213,150 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

14,753 21,315 251,384 25,138 276,522 276,600

510,500 253,750 121,578 162,104 185,261 219,998 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

510,500 10,150 24,316 48,631 1,853 2,200 597,649 59,765 657,414 657,500

5,615,500 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

5,615,500 5,615,500 561,550 6,177,050 6,177,100

2,552,500 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan = Membuat 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku Besi siku L 30.30.3 13,681 Besi plat baja 10,414 Kawat las listrik 45,945 Pekerja 121,578 Tukang besi 162,104 Kepala tukang 185,261 Mandor 219,998 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan = Pekerjaan Pasangan Exhaust Fan Exhaust Fan 765,750 Perlengkapan 253,750 Pekerja 121,578 Tukang Listrik 162,104 Mandor 219,998 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan = Pekerjaan Pasangan Air Conditioner Air Conditioner 3,267,200 Perlengkapan 253,750 Pekerja 121,578 Tukang Listrik 162,104 Mandor 219,998 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan = Pembersihan Area Kerja Pasca Konstruksi Pekerja 121,578 Kepala Tukang 185,261 Mandor 219,998 Jumlah Bahan & Upah = Overhead & Profit 10% = Jumlah Total = Dibulatkan =

2,552,500 2,552,500 255,250 2,807,750 2,807,800

Pekerjaan Menanam Pohon Perdu Pohon Perdu Perlengkapan Pekerja Tukang Batu Kepala Tukang Mandor

205,221 341,586 2,297 127,657 170,209 19,452 11,440 877,862 87,786 965,648 965,700 765,750 6,344 5,106 3,242 440 780,882 78,088 858,970 859,000 3,267,200 6,344 5,106 3,242 440 3,282,332 328,233 3,610,565 3,610,600 12,158 3,705 2,200 18,063 1,806 19,869 19,900

12/12

LAPORAN Bill of Material - BoM Mode All, All upah, All Bahan, All Alat - BoM Mode LT1, LT2, FN1, FN2 - BoM Mode Sub Pekerjaan (A,B,C…)

Software RAB Exarch xPro v2019

RENCANA ANGGARAN BIAYA BILL Of MATERIAL (BoM)

A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180 Nama Pekerjaan Unit Item Waktu Mulai (Start) Waktu Selesai (Finish)

REKAP TOTAL PEMAKAIAN 1 BAHAN & UPAH PROYEK : ALL : Monday, February 4, 2019 : Friday, August 2, 2019

:

Biaya Upah Biaya Alat Biaya Bahan TOTAL BIAYA % dari RAB Total OH

Range Termin

120

ID ALL 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59

Nama Elemen Bahan dan Upah

Kode

Qty

Unit

Harga Satuan

oh oh oh oh oh oh oh oh oh oh Ls Ls Ls Ls Ltr Bh m3 Bh m3 kg m3 m3 kg m3 M3 Kg Kg m3 btg m3 m3 m3 m3 m3 M' m1 Kg bh bh Kg Kg Kg M1 Kg Kg kg Kg Kg bh bh Unit Unit Unit M Unit M M M M

121,578 162,104 162,104 162,104 162,104 162,104 162,104 162,104 219,998 185,261 456,750 160,370 213,150 253,750 562 919 280,775 81,680 239,935 153 221,047 295,069 255 210,428 241,977 1,480 2,144 188,885 20,420 3,471,400 2,246,200 3,573,500 3,318,250 1,837,800 7,147 15,315 12,763 459 4,748 10,721 10,414 13,681 10,210 23,994 45,945 23,994 23,994 25,525 766 511 61,260 2,552,500 255,250 25,525 1,480,450 4,084 5,616 8,679 9,189

REKAP TOTAL PEMAKAIAN BAHAN & UPAH PROYEK Pekerja Tukang Atap Tukang batu Tukang Besi Tukang cat Tukang Kayu Tukang Listrik Tukang Pipa Mandor Kepala Tukang Alat Rangka Atap Baja Canai Dingin Assesoris (perkuatan, las dll) Bahan Kerja Paving Blok Perlengkapan Air Bata merah Batu belah Batu paras Dinding Kerikil Kerikil (kg) Koral beton Pasir beton Pasir Beton (kg) Pasir pasang Pasir urug Semen Semen Warna Tanah urug Dolken kayu Ø 8-10/400 cm Balok kayu kelas II Kayu balok 5/7 Kelas II Kayu papan 3/20 Papan kayu 3/20 Kelas II Papan kayu 3/20 Kelas III Baja Ringan- Reng Truss Baja Ringan-C Truss Baja strip (0,2 x 2) cm Baut (Srew driver) Baut Ramset / Dina Bolt Besi beton Besi plat baja Besi siku L 30.30.3 Hollow 4/4 Kawat beton Kawat las listrik Paku 5 - 10 cm Paku Biasa ½" - 1" Paku Biasa 2" - 5" Paku sekrup Screw Floor drain Kloset duduk / monoblock Kloset jongkok teraso Kran air Wastafel Pipa PVC 1/2" Pipa PVC 3/4" Pipa PVC 3” Pipa PVC 4"

www.mitra-arsitek.com

L.IV.01 L.IV.06 L.IV.07 L.IV.08 L.IV.10 L.IV.16 L.IV.19 L.IV.20 L.IV.35 L.IV.36 A.IV.2 A.IV.3 A.IV.4 A.IV.12 M.IV.1 M.IV.7 M.IV.13 M.IV.16 M.IV.24 M.IV.25 M.IV.26 M.IV.28 M.IV.29 M.IV.30 M.IV.32 M.IV.33 M.IV.36 M.IV.39 M.IV.42 M.IV.78 M.IV.82 M.IV.100 M.IV.105 M.IV.106 M.IV.124 M.IV.125 M.IV.126 M.IV.127 M.IV.128 M.IV.130 M.IV.134 M.IV.137 M.IV.139 M.IV.141 M.IV.148 M.IV.152 M.IV.154 M.IV.155 M.IV.162 M.IV.179 M.IV.186 M.IV.188 M.IV.190 M.IV.191 M.IV.198 M.IV.200 M.IV.201 M.IV.207 M.IV.208

1422.8 9.9 379.5 182.9 118.4 178.2 4.8 0.7 99.3 84.3 16.7 220.2 2.5 63.9 12485.2 41105.4 61.6 4.8 0.0 61079.4 0.1 1.3 42287.2 83.8 13.6 42376.5 398.3 21.7 513.0 2.9 0.7 1.2 0.3 10.9 904.1 622.8 16.5 4687.8 334.8 6146.9 360.8 165.0 770.8 87.8 0.6 25.2 33.5 84.0 23.5 1630.2 4.4 1.1 2.2 6.6 1.3 29.0 46.2 47.5 37.0

Total Harga 2/4/2019 172,983,001 1,604,826 61,517,472 29,652,543 19,186,993 28,891,927 770,316 115,904 21,837,172 15,609,727 7,646,909 35,316,681 539,270 16,224,420 7,011,044 37,771,706 17,285,857 395,331 10,689 9,354,307 12,158 391,763 10,793,808 17,634,417 3,286,086 62,736,246 853,979 4,101,449 10,474,929 10,040,393 1,541,792 4,190,286 894,268 19,997,874 6,461,374 9,538,219 210,581 2,153,791 1,589,703 65,897,949 3,757,443 2,257,431 7,869,562 2,106,941 25,270 605,558 803,398 2,145,346 17,975 832,217 269,544 2,807,750 561,550 168,465 1,954,194 118,599 259,436 412,402 339,625

357,379,657 61,596,970 512,211,985

931,188,612 100.00% 2,485 Monday, February 4, 2019 Friday, August 2, 2019

Spesifikasi Teknis 8/2/2019 Grade Skill 4-Semi Terampil/Terlatih Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade 1-Leader & Professional Skill Grade 2-Expert Skill

1/2

Software RAB Exarch xPro v2019

60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ..

Gypsum board 9 mm M.IV.350 List PVC (setara Shunda Plafon,LS 301-1 Min.Silver M.IV.354 Metalic) Plywood 120x240 tbl. 9 mm M.IV.364 Seng Gelombang 3" x 6" BJLS 28 M.IV.365 Cat dasar Kayu M.IV.377 Cat dasar Tembok M.IV.378 Cat kayu M.IV.382 Cat meni M.IV.383 Cat Penutup Tembok M.IV.384 Kuas M.IV.387 Menie besi M.IV.393 Pengencer M.IV.395 Plamir M.IV.396 keramik Dinding 20cm x 20cm M.IV.406 plint ubin teralux marmer ukuran 10cm x 60cm M.IV.437 ubin teralux marmer ukuran 60cm x60cm M.IV.467 ubin warna ukuran 20cm x20cm M.IV.472 ubin warna ukuran 40cm x40 cm M.IV.474 Genteng metal M.IV.490 nok genteng metal M.IV.498 Talang / Jurai Canai Dingin M.IV.508 Fitting Lampu M.IV.509 Paving block 6 cm M.IV.539 Teraso cor di tempat, tebal 3cm M.IV.543 Amplas M.IV.545 Minyak bekisting M.IV.552 Sealtape M.IV.591 Upah Kerja Mobiliasasi/Demobilisasi L.IV.a.1 Alat Kerja Mobilisasi/Demobilisasi A.IV.a.1 Bahan Kerja Mobilisasi/Demobilisasi L.IV.a.1 Upah Kerja Pembuatan Septik Tank L.IV.a.2 Alat Kerja Pembuatan Septik Tank A.IV.a.2 Bahan Kerja Pembuatan Septik Tank M.IV.a.1 Upah Kerja Pembuatan Sumur Resapan Limbah L.IV.a.3 Alat Kerja Pembuatan Sumur Resapan Limbah A.IV.a.3 Bahan Kerja Pembuatan Sumur Resapan Limbah M.IV.a.2 Biaya Pengurusan Daya Listrik PLN M.IV.a.3 Biaya Pengurusan Instalasai PDAM M.IV.a.4 Shower Mandi M.IV.a.5 Tangki Air M.IV.a.6 Pompa Air M.IV.a.7 Pintu Utama (Kusen+Panel) Type P1 M.IV.a.8 Pintu Utama (Kusen+Panel) Type P2 M.IV.a.9 Pintu Utama (Kusen+Panel) Type P3 M.IV.a.10 Jendela Type J1 M.IV.a.11 Jendela Type J2 M.IV.a.12 Lubang Angin M.IV.a.14 MCB + Box M.IV.a.15 Tembaga dia.1/2"-1.5m M.IV.a.16 Kabel NYM 3x2,5 mm2-SNI M.IV.a.17 Kabel NYM 2x1,5 mm2-SNI M.IV.a.18 Saklar Listrik M.IV.a.19 Lampu 5W M.IV.a.20 Lampu 15W M.IV.a.21 Lampu 20W M.IV.a.22 Receiptackle M.IV.a.23 Air Conditioner M.IV.a.24 Exhaust Fan M.IV.a.25 Cat Anti Bocor+Waterproofing M.IV.a.26 Rol Cat A.IV.a.4 Pohon Perdu M.IV.a.28 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

www.mitra-arsitek.com

77.7 285.3 63.5 38.1 0.8 97.1 2.9 1.0 252.4 0.2 1.5 0.1 154.0 32.7 162.7 552.4 107.9 266.2 217.6 41.1 20.8 23.1 25.6 1.8 380.2 44.5 0.2 2.2 2.2 2.2 1.1 1.1 1.1 0.9 0.9 0.9 1.1 1.1 2.2 1.1 1.1 3.3 6.6 3.3 8.8 5.5 40.7 1.1 1.1 151.3 181.5 15.4 3.3 11.0 8.8 11.0 2.2 1.1 19.6 2.0 4.4 . . . . . . . . . . . . . . . .

lbr M' Lbr Lbr Kg Kg kg Kg Kg Bh Kg Kg Kg m2 Bh Bh Bh Bh Bh Bh M' bh M2 M3 Lbr Ltr bh oh/Ls Ls Ls oh/m3 Ls Ls oh/m3 Ls Ls Ls Ls Unit Unit Unit set set set set set Unit Unit btg m1 m1 unit unit unit unit unit unit unit kg unit unit -

88,827 34,714 122,520 51,050 31,651 66,365 50,948 16,642 35,735 17,357 27,567 35,735 57,482 63,813 17,357 45,945 11,742 14,805 35,735 84,743 45,945 25,525 137,835 4,595 6,637 5,871 3,574 910,800 456,750 253,000 1,518,000 456,750 6,636,500 1,113,200 355,250 4,594,500 5,615,500 2,552,500 137,835 1,276,250 612,600 2,144,100 1,633,600 1,123,100 1,000,580 612,600 26,036 357,350 663,650 12,252 10,210 25,525 24,504 35,735 45,945 30,630 3,267,200 765,750 17,357 25,375 510,500 . . . . . . . . . . . . . . . .

6,899,868 9,903,383 7,779,309 1,945,771 26,634 6,443,112 149,634 16,476 9,020,357 3,437 40,937 5,307 8,854,487 2,084,754 2,823,810 25,380,937 1,266,379 3,940,876 7,777,580 3,486,327 953,822 589,628 3,522,098 8,297 2,522,932 261,297 590 2,003,760 1,004,850 556,600 1,669,800 502,425 7,300,150 979,616 312,620 4,043,160 6,177,050 2,807,750 303,237 1,403,875 673,860 7,075,530 10,781,760 3,706,230 8,805,104 3,369,300 1,059,645 393,085 730,015 1,853,115 1,853,115 393,085 80,863 393,085 404,316 336,930 7,187,840 842,325 340,614 49,796 2,246,200 . . . . . . . . . . . . . . . .

Merk Onda Penguin 1100L Merk Shimizu 125 W-18L/min Pintu Ganda 60cm/80cmx200-K1 Pintu Kayu 80x200 Pintu PVC 70x195 standar Jendela Ganda 2x60x150-K1 Jendela Tunggal 60x150-K1 Ukuran 20x30-Beton

. . . . . . . . . . . . . . . .

2/2

Software RAB Exarch xPro v2019

RENCANA ANGGARAN BIAYA BILL Of MATERIAL (BoM)

A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180 Nama Pekerjaan Unit Item Waktu Mulai (Start) Waktu Selesai (Finish)

REKAP TOTAL PEMAKAIAN 1 BAHAN & UPAH PROYEK : Upah : Monday, February 4, 2019 : Friday, August 2, 2019

:

Biaya Upah Biaya Alat Biaya Bahan TOTAL BIAYA % dari RAB Total OH

357,379,657 -

357,379,657 38.38% 2,485 Monday, February 4, 2019 Friday, August 2, 2019

Range Termin

14

ID

Nama Elemen Bahan dan Upah

ALL 1 2 3 4 5 6 7 8 9 10 11 12 13 14 .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ..

Pekerja Tukang Atap Tukang batu Tukang Besi Tukang cat Tukang Kayu Tukang Listrik Tukang Pipa Mandor Kepala Tukang Upah Kerja Mobiliasasi/Demobilisasi Bahan Kerja Mobilisasi/Demobilisasi Upah Kerja Pembuatan Septik Tank Upah Kerja Pembuatan Sumur Resapan Limbah . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Kode

Qty

Unit

Harga Satuan

oh oh oh oh oh oh oh oh oh oh oh/Ls Ls oh/m3 oh/m3 -

121,578 162,104 162,104 162,104 162,104 162,104 162,104 162,104 219,998 185,261 910,800 253,000 1,518,000 1,113,200 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

REKAP TOTAL PEMAKAIAN BAHAN & UPAH PROYEK

www.mitra-arsitek.com

L.IV.01 L.IV.06 L.IV.07 L.IV.08 L.IV.10 L.IV.16 L.IV.19 L.IV.20 L.IV.35 L.IV.36 L.IV.a.1 L.IV.a.1 L.IV.a.2 L.IV.a.3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1422.8 9.9 379.5 182.9 118.4 178.2 4.8 0.7 99.3 84.3 2.2 2.2 1.1 0.9 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Total Harga

Spesifikasi Teknis

2/4/2019 172,983,001 1,604,826 61,517,472 29,652,543 19,186,993 28,891,927 770,316 115,904 21,837,172 15,609,727 2,003,760 556,600 1,669,800 979,616 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8/2/2019 Grade Skill 4-Semi Terampil/Terlatih Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade 1-Leader & Professional Skill Grade 2-Expert Skill

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1/2

Software RAB Exarch xPro v2019

.. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ..

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

www.mitra-arsitek.com

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

-

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2/2

Software RAB Exarch xPro v2019

RENCANA ANGGARAN BIAYA BILL Of MATERIAL (BoM)

A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180 Nama Pekerjaan Unit Item Waktu Mulai (Start) Waktu Selesai (Finish)

REKAP TOTAL PEMAKAIAN 1 BAHAN & UPAH PROYEK : Alat : Monday, February 4, 2019 : Friday, August 2, 2019

:

Biaya Upah Biaya Alat Biaya Bahan TOTAL BIAYA % dari RAB Total OH

ALL 1 2 3 4 5 6 7 8 .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ..

61,596,970 6.61% Monday, February 4, 2019 Friday, August 2, 2019

Range Termin

8

ID

61,596,970 -

Nama Elemen Bahan dan Upah

Kode

Qty

Unit

Harga Satuan

REKAP TOTAL PEMAKAIAN BAHAN & UPAH PROYEK Alat Rangka Atap Baja Canai Dingin Assesoris (perkuatan, las dll) Bahan Kerja Paving Blok Perlengkapan Alat Kerja Mobilisasi/Demobilisasi Alat Kerja Pembuatan Septik Tank Alat Kerja Pembuatan Sumur Resapan Limbah Rol Cat . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

www.mitra-arsitek.com

A.IV.2 A.IV.3 A.IV.4 A.IV.12 A.IV.a.1 A.IV.a.2 A.IV.a.3 A.IV.a.4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

16.7 220.2 2.5 63.9 2.2 1.1 0.9 2.0 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Ls Ls Ls Ls Ls Ls Ls unit -

456,750 160,370 213,150 253,750 456,750 456,750 355,250 25,375 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Total Harga

Spesifikasi Teknis

2/4/2019

8/2/2019

7,646,909 35,316,681 539,270 16,224,420 1,004,850 502,425 312,620 49,796 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1/2

Software RAB Exarch xPro v2019

.. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ..

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

www.mitra-arsitek.com

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

-

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2/2

Software RAB Exarch xPro v2019

RENCANA ANGGARAN BIAYA BILL Of MATERIAL (BoM)

A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180 Nama Pekerjaan Unit Item Waktu Mulai (Start) Waktu Selesai (Finish)

REKAP TOTAL PEMAKAIAN 1 BAHAN & UPAH PROYEK : Bahan : Monday, February 4, 2019 : Friday, August 2, 2019

:

Biaya Upah Biaya Alat Biaya Bahan TOTAL BIAYA % dari RAB Total OH

Range Termin

98

ID ALL 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59

Nama Elemen Bahan dan Upah

Kode

Qty

Unit

Harga Satuan

Ltr Bh m3 Bh m3 kg m3 m3 kg m3 M3 Kg Kg m3 btg m3 m3 m3 m3 m3 M' m1 Kg bh bh Kg Kg Kg M1 Kg Kg kg Kg Kg bh bh Unit Unit Unit M Unit M M M M lbr M' Lbr Lbr Kg Kg kg Kg Kg Bh Kg Kg Kg m2

562 919 280,775 81,680 239,935 153 221,047 295,069 255 210,428 241,977 1,480 2,144 188,885 20,420 3,471,400 2,246,200 3,573,500 3,318,250 1,837,800 7,147 15,315 12,763 459 4,748 10,721 10,414 13,681 10,210 23,994 45,945 23,994 23,994 25,525 766 511 61,260 2,552,500 255,250 25,525 1,480,450 4,084 5,616 8,679 9,189 88,827 34,714 122,520 51,050 31,651 66,365 50,948 16,642 35,735 17,357 27,567 35,735 57,482 63,813

REKAP TOTAL PEMAKAIAN BAHAN & UPAH PROYEK Air M.IV.1 12485.2 Bata merah M.IV.7 41105.4 Batu belah M.IV.13 61.6 Batu paras Dinding M.IV.16 4.8 Kerikil M.IV.24 0.0 Kerikil (kg) M.IV.25 61079.4 Koral beton M.IV.26 0.1 Pasir beton M.IV.28 1.3 Pasir Beton (kg) M.IV.29 42287.2 Pasir pasang M.IV.30 83.8 Pasir urug M.IV.32 13.6 Semen M.IV.33 42376.5 Semen Warna M.IV.36 398.3 Tanah urug M.IV.39 21.7 Dolken kayu Ø 8-10/400 cm M.IV.42 513.0 Balok kayu kelas II M.IV.78 2.9 Kayu balok 5/7 Kelas II M.IV.82 0.7 Kayu papan 3/20 M.IV.100 1.2 Papan kayu 3/20 Kelas II M.IV.105 0.3 Papan kayu 3/20 Kelas III M.IV.106 10.9 Baja Ringan- Reng Truss M.IV.124 904.1 Baja Ringan-C Truss M.IV.125 622.8 Baja strip (0,2 x 2) cm M.IV.126 16.5 Baut (Srew driver) M.IV.127 4687.8 Baut Ramset / Dina Bolt M.IV.128 334.8 Besi beton M.IV.130 6146.9 Besi plat baja M.IV.134 360.8 Besi siku L 30.30.3 M.IV.137 165.0 Hollow 4/4 M.IV.139 770.8 Kawat beton M.IV.141 87.8 Kawat las listrik M.IV.148 0.6 Paku 5 - 10 cm M.IV.152 25.2 Paku Biasa ½" - 1" M.IV.154 33.5 Paku Biasa 2" - 5" M.IV.155 84.0 Paku sekrup M.IV.162 23.5 Screw M.IV.179 1630.2 Floor drain M.IV.186 4.4 Kloset duduk / monoblock M.IV.188 1.1 Kloset jongkok teraso M.IV.190 2.2 Kran air M.IV.191 6.6 Wastafel M.IV.198 1.3 Pipa PVC 1/2" M.IV.200 29.0 Pipa PVC 3/4" M.IV.201 46.2 Pipa PVC 3” M.IV.207 47.5 Pipa PVC 4" M.IV.208 37.0 Gypsum board 9 mm M.IV.350 77.7 List PVC (setara Shunda Plafon,LS 301-1 Min.Silver M.IV.354 Metalic) 285.3 Plywood 120x240 tbl. 9 mm M.IV.364 63.5 Seng Gelombang 3" x 6" BJLS 28 M.IV.365 38.1 Cat dasar Kayu M.IV.377 0.8 Cat dasar Tembok M.IV.378 97.1 Cat kayu M.IV.382 2.9 Cat meni M.IV.383 1.0 Cat Penutup Tembok M.IV.384 252.4 Kuas M.IV.387 0.2 Menie besi M.IV.393 1.5 Pengencer M.IV.395 0.1 Plamir M.IV.396 154.0 keramik Dinding 20cm x 20cm M.IV.406 32.7

www.mitra-arsitek.com

512,211,985

512,211,985 55.01% Monday, February 4, 2019 Friday, August 2, 2019

Total Harga

Spesifikasi Teknis

2/4/2019

8/2/2019

7,011,044 37,771,706 17,285,857 395,331 10,689 9,354,307 12,158 391,763 10,793,808 17,634,417 3,286,086 62,736,246 853,979 4,101,449 10,474,929 10,040,393 1,541,792 4,190,286 894,268 19,997,874 6,461,374 9,538,219 210,581 2,153,791 1,589,703 65,897,949 3,757,443 2,257,431 7,869,562 2,106,941 25,270 605,558 803,398 2,145,346 17,975 832,217 269,544 2,807,750 561,550 168,465 1,954,194 118,599 259,436 412,402 339,625 6,899,868 9,903,383 7,779,309 1,945,771 26,634 6,443,112 149,634 16,476 9,020,357 3,437 40,937 5,307 8,854,487 2,084,754

1/2

Software RAB Exarch xPro v2019

60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ..

plint ubin teralux marmer ukuran 10cm x 60cm M.IV.437 ubin teralux marmer ukuran 60cm x60cm M.IV.467 ubin warna ukuran 20cm x20cm M.IV.472 ubin warna ukuran 40cm x40 cm M.IV.474 Genteng metal M.IV.490 nok genteng metal M.IV.498 Talang / Jurai Canai Dingin M.IV.508 Fitting Lampu M.IV.509 Paving block 6 cm M.IV.539 Teraso cor di tempat, tebal 3cm M.IV.543 Amplas M.IV.545 Minyak bekisting M.IV.552 Sealtape M.IV.591 Bahan Kerja Pembuatan Septik Tank M.IV.a.1 Bahan Kerja Pembuatan Sumur Resapan Limbah M.IV.a.2 Biaya Pengurusan Daya Listrik PLN M.IV.a.3 Biaya Pengurusan Instalasai PDAM M.IV.a.4 Shower Mandi M.IV.a.5 Tangki Air M.IV.a.6 Pompa Air M.IV.a.7 Pintu Utama (Kusen+Panel) Type P1 M.IV.a.8 Pintu Utama (Kusen+Panel) Type P2 M.IV.a.9 Pintu Utama (Kusen+Panel) Type P3 M.IV.a.10 Jendela Type J1 M.IV.a.11 Jendela Type J2 M.IV.a.12 Lubang Angin M.IV.a.14 MCB + Box M.IV.a.15 Tembaga dia.1/2"-1.5m M.IV.a.16 Kabel NYM 3x2,5 mm2-SNI M.IV.a.17 Kabel NYM 2x1,5 mm2-SNI M.IV.a.18 Saklar Listrik M.IV.a.19 Lampu 5W M.IV.a.20 Lampu 15W M.IV.a.21 Lampu 20W M.IV.a.22 Receiptackle M.IV.a.23 Air Conditioner M.IV.a.24 Exhaust Fan M.IV.a.25 Cat Anti Bocor+Waterproofing M.IV.a.26 Pohon Perdu M.IV.a.28 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

www.mitra-arsitek.com

162.7 552.4 107.9 266.2 217.6 41.1 20.8 23.1 25.6 1.8 380.2 44.5 0.2 1.1 0.9 1.1 1.1 2.2 1.1 1.1 3.3 6.6 3.3 8.8 5.5 40.7 1.1 1.1 151.3 181.5 15.4 3.3 11.0 8.8 11.0 2.2 1.1 19.6 4.4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Bh Bh Bh Bh Bh Bh M' bh M2 M3 Lbr Ltr bh Ls Ls Ls Ls Unit Unit Unit set set set set set Unit Unit btg m1 m1 unit unit unit unit unit unit unit kg unit -

17,357 45,945 11,742 14,805 35,735 84,743 45,945 25,525 137,835 4,595 6,637 5,871 3,574 6,636,500 4,594,500 5,615,500 2,552,500 137,835 1,276,250 612,600 2,144,100 1,633,600 1,123,100 1,000,580 612,600 26,036 357,350 663,650 12,252 10,210 25,525 24,504 35,735 45,945 30,630 3,267,200 765,750 17,357 510,500 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2,823,810 25,380,937 1,266,379 3,940,876 7,777,580 3,486,327 953,822 589,628 3,522,098 8,297 2,522,932 261,297 590 7,300,150 4,043,160 6,177,050 2,807,750 303,237 1,403,875 673,860 7,075,530 10,781,760 3,706,230 8,805,104 3,369,300 1,059,645 393,085 730,015 1,853,115 1,853,115 393,085 80,863 393,085 404,316 336,930 7,187,840 842,325 340,614 2,246,200 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Merk Onda Penguin 1100L Merk Shimizu 125 W-18L/min Pintu Ganda 60cm/80cmx200-K1 Pintu Kayu 80x200 Pintu PVC 70x195 standar Jendela Ganda 2x60x150-K1 Jendela Tunggal 60x150-K1 Ukuran 20x30-Beton

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2/2

Software RAB Exarch xPro v2019

RENCANA ANGGARAN BIAYA BILL Of MATERIAL (BoM)

A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180 Nama Pekerjaan Unit Item Waktu Mulai (Start) Waktu Selesai (Finish)

PEKERJAAN LANTAI 1 2 : ALL : Monday, January 7, 2019 : Sunday, August 11, 2019

:

Biaya Upah Biaya Alat Biaya Bahan TOTAL BIAYA % dari RAB Total OH

LT-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ..

339,075,342 36.41% 1,073 Monday, February 4, 2019 Friday, August 2, 2019

Range Termin

36

ID

150,938,323 1,004,850 187,132,169

Nama Elemen Bahan dan Upah

Kode

Qty

Unit

Harga Satuan

L.IV.01 L.IV.07 L.IV.08 L.IV.10 L.IV.16 L.IV.35 L.IV.36 M.IV.1 M.IV.7 M.IV.13 M.IV.24 M.IV.25 M.IV.26 M.IV.28 M.IV.29 M.IV.30 M.IV.32 M.IV.33 M.IV.39 M.IV.42 M.IV.78 M.IV.82 M.IV.100 M.IV.105 M.IV.106 M.IV.130 M.IV.141 M.IV.152 M.IV.155 M.IV.364 M.IV.365 M.IV.382 M.IV.552 L.IV.a.1 A.IV.a.1 L.IV.a.1 . . . . . . . . . . . . . . . . . . . . . . .

702.4 202.3 24.1 1.1 65.5 45.9 29.1 6494.3 27149.1 57.3 0.0 31625.7 0.1 0.1 21083.8 51.9 13.3 25862.1 21.7 234.0 1.7 0.7 0.4 0.3 7.8 3608.7 51.6 24.4 45.0 37.5 3.5 1.7 29.6 2.2 2.2 2.2 . . . . . . . . . . . . . . . . . . . . . . .

oh oh oh oh oh oh oh Ltr Bh m3 m3 kg m3 m3 kg m3 M3 Kg m3 btg m3 m3 m3 m3 m3 Kg Kg kg Kg Lbr Lbr kg Ltr oh/Ls Ls Ls -

121,578 162,104 162,104 162,104 162,104 219,998 185,261 562 919 280,775 239,935 153 221,047 295,069 255 210,428 241,977 1,480 188,885 20,420 3,471,400 2,246,200 3,573,500 3,318,250 1,837,800 10,721 23,994 23,994 25,525 122,520 51,050 50,948 5,871 910,800 456,750 253,000 . . . . . . . . . . . . . . . . . . . . . . .

PEKERJAAN LANTAI 1 Pekerja Tukang batu Tukang Besi Tukang cat Tukang Kayu Mandor Kepala Tukang Air Bata merah Batu belah Kerikil Kerikil (kg) Koral beton Pasir beton Pasir Beton (kg) Pasir pasang Pasir urug Semen Tanah urug Dolken kayu Ø 8-10/400 cm Balok kayu kelas II Kayu balok 5/7 Kelas II Kayu papan 3/20 Papan kayu 3/20 Kelas II Papan kayu 3/20 Kelas III Besi beton Kawat beton Paku 5 - 10 cm Paku Biasa 2" - 5" Plywood 120x240 tbl. 9 mm Seng Gelombang 3" x 6" BJLS 28 Cat kayu Minyak bekisting Upah Kerja Mobiliasasi/Demobilisasi Alat Kerja Mobilisasi/Demobilisasi Bahan Kerja Mobilisasi/Demobilisasi . . . . . . . . . . . . . . . . . . . . . . .

www.mitra-arsitek.com

Total Harga

Spesifikasi Teknis

1/7/2019 85,398,233 32,795,683 3,899,869 178,314 10,623,946 10,091,912 5,390,005 3,646,869 24,947,308 16,085,038 10,689 4,843,473 12,158 18,501 5,381,637 10,930,612 3,222,204 38,287,593 4,101,449 4,778,566 5,930,116 1,541,792 1,430,829 894,268 14,376,264 38,686,875 1,236,927 584,654 1,149,717 4,600,038 176,888 84,064 173,638 2,003,760 1,004,850 556,600 . . . . . . . . . . . . . . . . . . . . . . .

8/11/2019 Grade Skill 4-Semi Terampil/Terlatih Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade 1-Leader & Professional Skill Grade 2-Expert Skill

. . . . . . . . . . . . . . . . . . . . . . .

1/2

Software RAB Exarch xPro v2019

.. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ..

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

www.mitra-arsitek.com

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

-

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2/2

Software RAB Exarch xPro v2019

RENCANA ANGGARAN BIAYA BILL Of MATERIAL (BoM)

A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180 Nama Pekerjaan Unit Item Waktu Mulai (Start) Waktu Selesai (Finish)

PEKERJAAN LANTAI 2 3 : ALL : Monday, January 7, 2019 : Sunday, August 11, 2019

:

Biaya Upah Biaya Alat Biaya Bahan TOTAL BIAYA % dari RAB Total OH

LT-2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ..

135,656,520 14.57% 399 Monday, February 4, 2019 Friday, August 2, 2019

Range Termin

20

ID

55,239,809 80,416,712

Nama Elemen Bahan dan Upah

Kode

Qty

Unit

L.IV.01 L.IV.07 L.IV.08 L.IV.16 L.IV.35 L.IV.36 M.IV.1 M.IV.7 M.IV.25 M.IV.29 M.IV.30 M.IV.33 M.IV.42 M.IV.78 M.IV.106 M.IV.130 M.IV.141 M.IV.155 M.IV.364 M.IV.552 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

257.6 79.9 13.9 22.8 13.0 11.7 3923.5 12724.3 19091.7 12768.7 17.2 10496.5 268.8 1.1 2.8 2080.2 29.7 27.6 24.2 13.8 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

oh oh oh oh oh oh Ltr Bh kg kg m3 Kg btg m3 m3 Kg Kg Kg Lbr Ltr -

Harga Satuan

PEKERJAAN LANTAI 2 Pekerja Tukang batu Tukang Besi Tukang Kayu Mandor Kepala Tukang Air Bata merah Kerikil (kg) Pasir Beton (kg) Pasir pasang Semen Dolken kayu Ø 8-10/400 cm Balok kayu kelas II Papan kayu 3/20 Kelas III Besi beton Kawat beton Paku Biasa 2" - 5" Plywood 120x240 tbl. 9 mm Minyak bekisting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

www.mitra-arsitek.com

Total Harga

Spesifikasi Teknis

1/7/2019 121,578 162,104 162,104 162,104 219,998 185,261 562 919 153 255 210,428 1,480 20,420 3,471,400 1,837,800 10,721 23,994 25,525 122,520 5,871 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

31,318,107 12,959,012 2,248,004 3,695,379 2,857,342 2,161,964 2,203,261 11,692,313 2,923,900 3,259,200 3,621,825 15,539,483 5,489,713 3,846,797 5,078,209 22,300,302 713,003 705,307 2,962,289 81,110 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8/11/2019 Grade Skill 4-Semi Terampil/Terlatih Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade 1-Leader & Professional Skill Grade 2-Expert Skill

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1/1

Software RAB Exarch xPro v2019

RENCANA ANGGARAN BIAYA BILL Of MATERIAL (BoM)

A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180 Nama Pekerjaan Unit Item Waktu Mulai (Start) Waktu Selesai (Finish)

PEKERJAAN FINISHING 1 4 : ALL : Monday, January 7, 2019 : Sunday, August 11, 2019

:

Biaya Upah Biaya Alat Biaya Bahan TOTAL BIAYA % dari RAB Total OH

Range Termin

89

ID FN-1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59

Nama Elemen Bahan dan Upah

Kode

Qty

Unit

Harga Satuan

369.1 9.9 78.7 128.7 114.8 81.1 4.7 0.7 35.1 35.4 16.7 213.4 63.7 1320.0 6778.2 5893.8 9.9 3870.2 370.5 0.8 904.1 622.8 16.5 4687.8 334.8 746.9 33.5 9.4 23.5 1630.2 4.4 1.1 2.2 6.6 1.3 29.0 46.2 47.5 37.0 77.7 285.3 34.7 0.8 96.4 1.3 1.0 250.7 0.1 0.7 0.1 152.6 32.7 162.7 552.4 107.9 131.3 217.6 41.1 20.8

oh oh oh oh oh oh oh oh oh oh Ls Ls Ls Ltr kg kg m3 Kg Kg m3 M' m1 Kg bh bh M1 Kg Kg bh bh Unit Unit Unit M Unit M M M M lbr M' Lbr Kg Kg kg Kg Kg Bh Kg Kg Kg m2 Bh Bh Bh Bh Bh Bh M'

121,578 162,104 162,104 162,104 162,104 162,104 162,104 162,104 219,998 185,261 456,750 160,370 253,750 562 153 255 210,428 1,480 2,144 3,573,500 7,147 15,315 12,763 459 4,748 10,210 23,994 25,525 766 511 61,260 2,552,500 255,250 25,525 1,480,450 4,084 5,616 8,679 9,189 88,827 34,714 51,050 31,651 66,365 50,948 16,642 35,735 17,357 27,567 35,735 57,482 63,813 17,357 45,945 11,742 14,805 35,735 84,743 45,945

PEKERJAAN FINISHING 1 Pekerja L.IV.01 Tukang Atap L.IV.06 Tukang batu L.IV.07 Tukang Besi L.IV.08 Tukang cat L.IV.10 Tukang Kayu L.IV.16 Tukang Listrik L.IV.19 Tukang Pipa L.IV.20 Mandor L.IV.35 Kepala Tukang L.IV.36 Alat Rangka Atap Baja Canai Dingin A.IV.2 Assesoris (perkuatan, las dll) A.IV.3 Perlengkapan A.IV.12 Air M.IV.1 Kerikil (kg) M.IV.25 Pasir Beton (kg) M.IV.29 Pasir pasang M.IV.30 Semen M.IV.33 Semen Warna M.IV.36 Kayu papan 3/20 M.IV.100 Baja Ringan- Reng Truss M.IV.124 Baja Ringan-C Truss M.IV.125 Baja strip (0,2 x 2) cm M.IV.126 Baut (Srew driver) M.IV.127 Baut Ramset / Dina Bolt M.IV.128 Hollow 4/4 M.IV.139 Paku Biasa ½" - 1" M.IV.154 Paku Biasa 2" - 5" M.IV.155 Paku sekrup M.IV.162 Screw M.IV.179 Floor drain M.IV.186 Kloset duduk / monoblock M.IV.188 Kloset jongkok teraso M.IV.190 Kran air M.IV.191 Wastafel M.IV.198 Pipa PVC 1/2" M.IV.200 Pipa PVC 3/4" M.IV.201 Pipa PVC 3” M.IV.207 Pipa PVC 4" M.IV.208 Gypsum board 9 mm M.IV.350 List PVC (setara Shunda Plafon,LS 301-1 Min.Silver M.IV.354 Metalic) Seng Gelombang 3" x 6" BJLS 28 M.IV.365 Cat dasar Kayu M.IV.377 Cat dasar Tembok M.IV.378 Cat kayu M.IV.382 Cat meni M.IV.383 Cat Penutup Tembok M.IV.384 Kuas M.IV.387 Menie besi M.IV.393 Pengencer M.IV.395 Plamir M.IV.396 keramik Dinding 20cm x 20cm M.IV.406 plint ubin teralux marmer ukuran 10cm x 60cm M.IV.437 ubin teralux marmer ukuran 60cm x60cm M.IV.467 ubin warna ukuran 20cm x20cm M.IV.472 ubin warna ukuran 40cm x40 cm M.IV.474 Genteng metal M.IV.490 nok genteng metal M.IV.498 Talang / Jurai Canai Dingin M.IV.508

www.mitra-arsitek.com

Total Harga 1/7/2019 44,875,742 1,604,826 12,761,842 20,860,951 18,602,016 13,154,221 759,618 115,904 7,717,047 6,561,775 7,646,909 34,222,958 16,158,825 741,246 1,038,081 1,504,392 2,093,307 5,729,632 794,285 2,759,457 6,461,374 9,538,219 210,581 2,153,791 1,589,703 7,625,849 803,398 238,659 17,975 832,217 269,544 2,807,750 561,550 168,465 1,954,194 118,599 259,436 412,402 339,625 6,899,868 9,903,383 1,768,883 26,634 6,397,851 65,570 16,476 8,956,992 2,100 19,710 5,307 8,771,023 2,084,754 2,823,810 25,380,937 1,266,379 1,943,446 7,777,580 3,486,327 953,822

129,663,357 58,893,533 197,968,263

386,525,153 41.51% 860 Monday, February 4, 2019 Friday, August 2, 2019

Spesifikasi Teknis 8/11/2019 Grade Skill 4-Semi Terampil/Terlatih Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade 1-Leader & Professional Skill Grade 2-Expert Skill

1/2

Software RAB Exarch xPro v2019

60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ..

Fitting Lampu M.IV.509 Teraso cor di tempat, tebal 3cm M.IV.543 Amplas M.IV.545 Sealtape M.IV.591 Upah Kerja Pembuatan Septik Tank L.IV.a.2 Alat Kerja Pembuatan Septik Tank A.IV.a.2 Bahan Kerja Pembuatan Septik Tank M.IV.a.1 Upah Kerja Pembuatan Sumur Resapan Limbah L.IV.a.3 Alat Kerja Pembuatan Sumur Resapan Limbah A.IV.a.3 Bahan Kerja Pembuatan Sumur Resapan Limbah M.IV.a.2 Shower Mandi M.IV.a.5 Tangki Air M.IV.a.6 Pompa Air M.IV.a.7 Pintu Utama (Kusen+Panel) Type P1 M.IV.a.8 Pintu Utama (Kusen+Panel) Type P2 M.IV.a.9 Pintu Utama (Kusen+Panel) Type P3 M.IV.a.10 Jendela Type J1 M.IV.a.11 Jendela Type J2 M.IV.a.12 Lubang Angin M.IV.a.14 MCB + Box M.IV.a.15 Tembaga dia.1/2"-1.5m M.IV.a.16 Kabel NYM 3x2,5 mm2-SNI M.IV.a.17 Kabel NYM 2x1,5 mm2-SNI M.IV.a.18 Saklar Listrik M.IV.a.19 Lampu 5W M.IV.a.20 Lampu 15W M.IV.a.21 Lampu 20W M.IV.a.22 Receiptackle M.IV.a.23 Cat Anti Bocor+Waterproofing M.IV.a.26 Rol Cat A.IV.a.4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

www.mitra-arsitek.com

23.1 1.3 376.3 0.2 1.1 1.1 1.1 0.9 0.9 0.9 2.2 1.1 1.1 3.3 6.6 3.3 8.8 5.5 40.7 1.1 1.1 151.3 181.5 15.4 3.3 11.0 8.8 11.0 19.6 2.0 . . . . . . . . . . . . . . . .

bh M3 Lbr bh oh/m3 Ls Ls oh/m3 Ls Ls Unit Unit Unit set set set set set Unit Unit btg m1 m1 unit unit unit unit unit kg unit -

25,525 4,595 6,637 3,574 1,518,000 456,750 6,636,500 1,113,200 355,250 4,594,500 137,835 1,276,250 612,600 2,144,100 1,633,600 1,123,100 1,000,580 612,600 26,036 357,350 663,650 12,252 10,210 25,525 24,504 35,735 45,945 30,630 17,357 25,375 . . . . . . . . . . . . . . . .

589,628 6,004 2,497,381 590 1,669,800 502,425 7,300,150 979,616 312,620 4,043,160 303,237 1,403,875 673,860 7,075,530 10,781,760 3,706,230 8,805,104 3,369,300 1,059,645 393,085 730,015 1,853,115 1,853,115 393,085 80,863 393,085 404,316 336,930 340,614 49,796 . . . . . . . . . . . . . . . .

Merk Onda Penguin 1100L Merk Shimizu 125 W-18L/min Pintu Ganda 60cm/80cmx200-K1 Pintu Kayu 80x200 Pintu PVC 70x195 standar Jendela Ganda 2x60x150-K1 Jendela Tunggal 60x150-K1 Ukuran 20x30-Beton

. . . . . . . . . . . . . . . .

2/2

Software RAB Exarch xPro v2019

RENCANA ANGGARAN BIAYA BILL Of MATERIAL (BoM)

A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180 Nama Pekerjaan Unit Item Waktu Mulai (Start) Waktu Selesai (Finish)

PEKERJAAN FINSIHING 2 5 : ALL : Monday, January 7, 2019 : Sunday, August 11, 2019

:

Biaya Upah Biaya Alat Biaya Bahan TOTAL BIAYA % dari RAB Total OH

FN-2 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ..

40,031,134 4.30% 105 Monday, February 4, 2019 Friday, August 2, 2019

Range Termin

41

ID

14,713,750 1,677,653 23,639,731

Nama Elemen Bahan dan Upah

Kode

Qty

Unit

Harga Satuan

L.IV.01 L.IV.07 L.IV.08 L.IV.10 L.IV.16 L.IV.35 L.IV.36 A.IV.3 A.IV.4 A.IV.12 M.IV.1 M.IV.7 M.IV.13 M.IV.16 M.IV.25 M.IV.28 M.IV.29 M.IV.30 M.IV.32 M.IV.33 M.IV.36 M.IV.42 M.IV.78 M.IV.106 M.IV.130 M.IV.139 M.IV.141 M.IV.152 M.IV.155 M.IV.364 M.IV.378 M.IV.384 M.IV.387 M.IV.393 M.IV.396 M.IV.474 M.IV.539 M.IV.543 M.IV.545 M.IV.552 M.IV.a.28 . . . . . . . . . . . . . . . . . .

64.4 18.5 4.8 2.5 8.7 3.0 3.4 6.8 2.5 0.2 747.3 1232.0 4.3 4.8 3583.8 1.3 2541.0 4.7 0.3 2147.7 27.8 10.1 0.1 0.3 458.1 23.9 6.5 0.9 2.0 1.8 0.7 1.8 0.1 0.8 1.5 134.9 25.6 0.5 3.9 1.1 4.4 . . . . . . . . . . . . . . . . . .

oh oh oh oh oh oh oh Ls Ls Ls Ltr Bh m3 Bh kg m3 kg m3 M3 Kg Kg btg m3 m3 Kg M1 Kg kg Kg Lbr Kg Kg Bh Kg Kg Bh M2 M3 Lbr Ltr unit -

121,578 162,104 162,104 162,104 162,104 219,998 185,261 160,370 213,150 253,750 562 919 280,775 81,680 153 295,069 255 210,428 241,977 1,480 2,144 20,420 3,471,400 1,837,800 10,721 10,210 23,994 23,994 25,525 122,520 66,365 35,735 17,357 27,567 57,482 14,805 137,835 4,595 6,637 5,871 510,500 . . . . . . . . . . . . . . . . . .

PEKERJAAN FINSIHING 2 Pekerja Tukang batu Tukang Besi Tukang cat Tukang Kayu Mandor Kepala Tukang Assesoris (perkuatan, las dll) Bahan Kerja Paving Blok Perlengkapan Air Bata merah Batu belah Batu paras Dinding Kerikil (kg) Pasir beton Pasir Beton (kg) Pasir pasang Pasir urug Semen Semen Warna Dolken kayu Ø 8-10/400 cm Balok kayu kelas II Papan kayu 3/20 Kelas III Besi beton Hollow 4/4 Kawat beton Paku 5 - 10 cm Paku Biasa 2" - 5" Plywood 120x240 tbl. 9 mm Cat dasar Tembok Cat Penutup Tembok Kuas Menie besi Plamir ubin warna ukuran 40cm x40 cm Paving block 6 cm Teraso cor di tempat, tebal 3cm Amplas Minyak bekisting Pohon Perdu . . . . . . . . . . . . . . . . . .

www.mitra-arsitek.com

Total Harga

Spesifikasi Teknis

1/7/2019 7,830,078 3,000,935 771,422 406,663 1,418,381 656,384 629,886 1,093,723 539,270 44,660 419,669 1,132,085 1,200,819 395,331 548,852 373,262 648,579 988,672 63,882 3,179,539 59,694 206,650 263,479 543,401 4,910,772 243,713 157,011 20,903 51,663 216,983 45,261 63,365 1,336 21,227 83,464 1,997,431 3,522,098 2,292 25,551 6,548 2,246,200 . . . . . . . . . . . . . . . . . .

8/11/2019 Grade Skill 4-Semi Terampil/Terlatih Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade 1-Leader & Professional Skill Grade 2-Expert Skill

. . . . . . . . . . . . . . . . . .

1/2

Software RAB Exarch xPro v2019

.. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ..

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

www.mitra-arsitek.com

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

-

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2/2

Software RAB Exarch xPro v2019

RENCANA ANGGARAN BIAYA BILL Of MATERIAL (BoM)

A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180 Nama Pekerjaan Unit Item Waktu Mulai (Start) Waktu Selesai (Finish)

PEKERJAAN PERSIAPAN &14 PENDAHULUAN : ALL : Monday, February 4, 2019 : Thursday, February 7, 2019

:

Biaya Upah Biaya Alat Biaya Bahan TOTAL BIAYA % dari RAB Total OH

A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ..

16,439,499 1.77% 58 Monday, February 4, 2019 Friday, August 2, 2019

Range Termin

20

ID

11,128,346 1,004,850 4,306,303

Nama Elemen Bahan dan Upah

Kode

Qty

Unit

Harga Satuan

32.2 0.0 1.1 9.0 13.0 0.8 0.0 0.1 0.1 30.0 1.9 0.7 0.4 0.3 2.1 3.5 1.7 2.2 2.2 2.2 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

oh oh oh oh oh oh m3 m3 m3 Kg btg m3 m3 m3 Kg Lbr kg oh/Ls Ls Ls -

121,578 162,104 162,104 162,104 219,998 185,261 239,935 221,047 295,069 1,480 20,420 2,246,200 3,573,500 3,318,250 25,525 51,050 50,948 910,800 456,750 253,000 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

PEKERJAAN PERSIAPAN & PENDAHULUAN Pekerja Tukang batu Tukang cat Tukang Kayu Mandor Kepala Tukang Kerikil Koral beton Pasir beton Semen Dolken kayu Ø 8-10/400 cm Kayu balok 5/7 Kelas II Kayu papan 3/20 Papan kayu 3/20 Kelas II Paku Biasa 2" - 5" Seng Gelombang 3" x 6" BJLS 28 Cat kayu Upah Kerja Mobiliasasi/Demobilisasi Alat Kerja Mobilisasi/Demobilisasi Bahan Kerja Mobilisasi/Demobilisasi . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

www.mitra-arsitek.com

L.IV.01 L.IV.07 L.IV.10 L.IV.16 L.IV.35 L.IV.36 M.IV.24 M.IV.26 M.IV.28 M.IV.33 M.IV.42 M.IV.82 M.IV.100 M.IV.105 M.IV.155 M.IV.365 M.IV.382 L.IV.a.1 A.IV.a.1 L.IV.a.1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Total Harga

Spesifikasi Teknis

2/4/2019 3,918,449 3,120 178,314 1,462,175 2,859,201 146,727 10,689 12,158 18,501 44,458 38,185 1,541,792 1,430,829 894,268 54,470 176,888 84,064 2,003,760 1,004,850 556,600 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2/7/2019 Grade Skill 4-Semi Terampil/Terlatih Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade 1-Leader & Professional Skill Grade 2-Expert Skill

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1/1

Software RAB Exarch xPro v2019

RENCANA ANGGARAN BIAYA BILL Of MATERIAL (BoM)

A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180 Nama Pekerjaan Unit Item Waktu Mulai (Start) Waktu Selesai (Finish)

PEKERJAAN PONDASI 15 : ALL : Thursday, February 7, 2019 : Friday, February 15, 2019

:

Biaya Upah Biaya Alat Biaya Bahan TOTAL BIAYA % dari RAB Total OH

B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ..

83,634,964 8.98% 204 Monday, February 4, 2019 Friday, August 2, 2019

Range Termin

19

ID

27,602,686 56,032,278

Nama Elemen Bahan dan Upah

Kode

Qty

Unit

L.IV.01 L.IV.07 L.IV.08 L.IV.16 L.IV.35 L.IV.36 M.IV.1 M.IV.7 M.IV.13 M.IV.25 M.IV.29 M.IV.30 M.IV.32 M.IV.33 M.IV.106 M.IV.130 M.IV.141 M.IV.152 M.IV.552 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

145.5 32.9 7.6 6.4 6.5 4.7 1915.7 168.3 57.3 9328.8 6219.2 15.7 13.3 9820.6 1.0 1142.3 16.3 7.4 2.5 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

oh oh oh oh oh oh Ltr Bh m3 kg kg m3 M3 Kg m3 Kg Kg kg Ltr -

Harga Satuan

PEKERJAAN PONDASI Pekerja Tukang batu Tukang Besi Tukang Kayu Mandor Kepala Tukang Air Bata merah Batu belah Kerikil (kg) Pasir Beton (kg) Pasir pasang Pasir urug Semen Papan kayu 3/20 Kelas III Besi beton Kawat beton Paku 5 - 10 cm Minyak bekisting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

www.mitra-arsitek.com

Total Harga

Spesifikasi Teknis

2/7/2019 121,578 162,104 162,104 162,104 219,998 185,261 562 919 280,775 153 255 210,428 241,977 1,480 1,837,800 10,721 23,994 23,994 5,871 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

17,692,909 5,331,499 1,234,468 1,040,355 1,433,337 870,119 1,075,733 154,651 16,085,038 1,428,701 1,587,446 3,295,405 3,222,204 14,538,849 1,814,570 12,245,974 391,538 177,677 14,491 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2/15/2019 Grade Skill 4-Semi Terampil/Terlatih Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade 1-Leader & Professional Skill Grade 2-Expert Skill

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1/1

Software RAB Exarch xPro v2019

RENCANA ANGGARAN BIAYA BILL Of MATERIAL (BoM)

A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180 Nama Pekerjaan Unit Item Waktu Mulai (Start) Waktu Selesai (Finish)

PEKERJAAN SLOOF 16 : ALL : Saturday, February 16, 2019 : Thursday, February 21, 2019

:

Biaya Upah Biaya Alat Biaya Bahan TOTAL BIAYA % dari RAB Total OH

C 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ..

30,935,546 3.32% 73 Monday, February 4, 2019 Friday, August 2, 2019

Range Termin

15

ID

10,083,381 20,852,165

Nama Elemen Bahan dan Upah

Kode

Qty

Unit

L.IV.01 L.IV.07 L.IV.08 L.IV.16 L.IV.35 L.IV.36 M.IV.1 M.IV.25 M.IV.29 M.IV.33 M.IV.106 M.IV.130 M.IV.141 M.IV.152 M.IV.552 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

46.2 1.9 5.2 14.7 2.4 2.2 1516.0 7382.4 4921.6 2615.9 2.5 779.6 11.1 17.0 5.7 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

oh oh oh oh oh oh Ltr kg kg Kg m3 Kg Kg kg Ltr -

Harga Satuan

PEKERJAAN SLOOF Pekerja Tukang batu Tukang Besi Tukang Kayu Mandor Kepala Tukang Air Kerikil (kg) Pasir Beton (kg) Semen Papan kayu 3/20 Kelas III Besi beton Kawat beton Paku 5 - 10 cm Minyak bekisting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

www.mitra-arsitek.com

Total Harga

Spesifikasi Teknis

2/16/2019 121,578 162,104 162,104 162,104 219,998 185,261 562 153 255 1,480 1,837,800 10,721 23,994 23,994 5,871 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5,620,835 314,323 842,534 2,382,988 517,495 405,207 851,290 1,130,614 1,256,238 3,872,740 4,675,915 8,357,970 267,228 406,978 33,193 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2/21/2019 Grade Skill 4-Semi Terampil/Terlatih Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade 1-Leader & Professional Skill Grade 2-Expert Skill

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1/1

Software RAB Exarch xPro v2019

RENCANA ANGGARAN BIAYA BILL Of MATERIAL (BoM)

A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180 Nama Pekerjaan Unit Item Waktu Mulai (Start) Waktu Selesai (Finish)

PEKERJAAN TIMBUNAN, PENINGGIAN DAN PEMADATAN 17 : ALL : Friday, February 22, 2019 : Sunday, February 24, 2019

:

Biaya Upah Biaya Alat Biaya Bahan TOTAL BIAYA % dari RAB Total OH

D 1 2 3 .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ..

5,061,046 0.54% 8 Monday, February 4, 2019 Friday, August 2, 2019

Range Termin

3

ID

959,597 4,101,449

Nama Elemen Bahan dan Upah

Kode

Qty

Unit

Harga Satuan

PEKERJAAN TIMBUNAN, PENINGGIAN DAN PEMADATAN Pekerja Mandor Tanah urug . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

www.mitra-arsitek.com

L.IV.01 L.IV.35 M.IV.39 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7.2 0.4 21.7 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Total Harga

Spesifikasi Teknis

2/22/2019 oh oh m3 -

121,578 219,998 188,885 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

879,979 79,617 4,101,449 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2/24/2019 Grade Skill 4-Semi Terampil/Terlatih Grade 1-Leader & Professional Skill . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1/1

Software RAB Exarch xPro v2019

RENCANA ANGGARAN BIAYA BILL Of MATERIAL (BoM)

A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180 Nama Pekerjaan Unit Item Waktu Mulai (Start) Waktu Selesai (Finish)

PEKERJAAN KOLOM 18 : ALL : Monday, February 25, 2019 : Tuesday, May 14, 2019

:

Biaya Upah Biaya Alat Biaya Bahan TOTAL BIAYA % dari RAB Total OH

E 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ..

61,655,168 6.62% 128 Monday, February 4, 2019 Friday, August 2, 2019

Range Termin

18

ID

17,810,990 43,844,178

Nama Elemen Bahan dan Upah

Kode

Qty

Unit

L.IV.01 L.IV.07 L.IV.08 L.IV.16 L.IV.35 L.IV.36 M.IV.1 M.IV.25 M.IV.29 M.IV.33 M.IV.42 M.IV.78 M.IV.106 M.IV.130 M.IV.141 M.IV.155 M.IV.364 M.IV.552 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

81.0 3.0 8.9 27.1 4.1 3.9 2322.4 11294.7 7570.7 3989.8 164.5 1.2 3.3 1339.8 19.1 32.9 28.8 16.4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

oh oh oh oh oh oh Ltr kg kg Kg btg m3 m3 Kg Kg Kg Lbr Ltr -

Harga Satuan

PEKERJAAN KOLOM Pekerja Tukang batu Tukang Besi Tukang Kayu Mandor Kepala Tukang Air Kerikil (kg) Pasir Beton (kg) Semen Dolken kayu Ø 8-10/400 cm Balok kayu kelas II Papan kayu 3/20 Kelas III Besi beton Kawat beton Paku Biasa 2" - 5" Plywood 120x240 tbl. 9 mm Minyak bekisting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

www.mitra-arsitek.com

Total Harga

Spesifikasi Teknis

2/25/2019 121,578 162,104 162,104 162,104 219,998 185,261 562 153 255 1,480 20,420 3,471,400 1,837,800 10,721 23,994 25,525 122,520 5,871 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

9,851,570 481,537 1,447,909 4,399,148 906,557 724,269 1,304,161 1,729,789 1,932,409 5,906,665 3,358,518 4,282,111 6,045,333 14,363,326 459,236 839,630 3,526,444 96,557 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5/14/2019 Grade Skill 4-Semi Terampil/Terlatih Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade 1-Leader & Professional Skill Grade 2-Expert Skill

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1/1

Software RAB Exarch xPro v2019

RENCANA ANGGARAN BIAYA BILL Of MATERIAL (BoM)

A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180 Nama Pekerjaan Unit Item Waktu Mulai (Start) Waktu Selesai (Finish)

PEKERJAAN RINGBALOK (BALOK) 19 : ALL : Thursday, March 7, 2019 : Tuesday, June 4, 2019

:

Biaya Upah Biaya Alat Biaya Bahan TOTAL BIAYA % dari RAB Total OH

F 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ..

56,103,457 6.02% 106 Monday, February 4, 2019 Friday, August 2, 2019

Range Termin

18

ID

14,670,816 41,432,641

Nama Elemen Bahan dan Upah

Kode

Qty

Unit

L.IV.01 L.IV.07 L.IV.08 L.IV.16 L.IV.35 L.IV.36 M.IV.1 M.IV.25 M.IV.29 M.IV.33 M.IV.42 M.IV.78 M.IV.106 M.IV.130 M.IV.141 M.IV.155 M.IV.364 M.IV.552 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

67.1 3.3 9.8 18.8 3.4 3.2 2558.9 12461.4 8307.6 4415.6 114.1 1.0 2.3 1468.5 21.0 22.8 20.0 11.4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

oh oh oh oh oh oh Ltr kg kg Kg btg m3 m3 Kg Kg Kg Lbr Ltr -

Harga Satuan

PEKERJAAN RINGBALOK (BALOK) Pekerja Tukang batu Tukang Besi Tukang Kayu Mandor Kepala Tukang Air Kerikil (kg) Pasir Beton (kg) Semen Dolken kayu Ø 8-10/400 cm Balok kayu kelas II Papan kayu 3/20 Kelas III Besi beton Kawat beton Paku Biasa 2" - 5" Plywood 120x240 tbl. 9 mm Minyak bekisting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

www.mitra-arsitek.com

Total Harga

Spesifikasi Teknis

3/7/2019 121,578 162,104 162,104 162,104 219,998 185,261 562 153 255 1,480 20,420 3,471,400 1,837,800 10,721 23,994 25,525 122,520 5,871 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8,155,243 530,573 1,586,959 3,051,630 754,548 591,864 1,436,967 1,908,462 2,120,514 6,537,137 2,329,759 3,564,531 4,193,566 15,742,700 503,338 582,440 2,446,247 66,981 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6/4/2019 Grade Skill 4-Semi Terampil/Terlatih Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade 1-Leader & Professional Skill Grade 2-Expert Skill

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1/1

Software RAB Exarch xPro v2019

RENCANA ANGGARAN BIAYA BILL Of MATERIAL (BoM)

A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180 Nama Pekerjaan Unit Item Waktu Mulai (Start) Waktu Selesai (Finish)

PEKERJAAN COR PLATE BETON 20 (DAK BETON) : ALL : Monday, March 25, 2019 : Friday, April 5, 2019

:

Biaya Upah Biaya Alat Biaya Bahan TOTAL BIAYA % dari RAB Total OH

G 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ..

41,782,725 4.49% 73 Monday, February 4, 2019 Friday, August 2, 2019

Range Termin

18

ID

10,094,959 31,687,767

Nama Elemen Bahan dan Upah

Kode

Qty

Unit

47.0 2.7 6.4 12.2 2.4 2.1 2104.9 10250.1 6833.4 3632.1 222.4 0.6 1.5 958.7 13.7 14.8 13.0 7.4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

oh oh oh oh oh oh Ltr kg kg Kg btg m3 m3 Kg Kg Kg Lbr Ltr -

Harga Satuan

PEKERJAAN COR PLATE BETON (DAK BETON) Pekerja Tukang batu Tukang Besi Tukang Kayu Mandor Kepala Tukang Air Kerikil (kg) Pasir Beton (kg) Semen Dolken kayu Ø 8-10/400 cm Balok kayu kelas II Papan kayu 3/20 Kelas III Besi beton Kawat beton Paku Biasa 2" - 5" Plywood 120x240 tbl. 9 mm Minyak bekisting . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

www.mitra-arsitek.com

L.IV.01 L.IV.07 L.IV.08 L.IV.16 L.IV.35 L.IV.36 M.IV.1 M.IV.25 M.IV.29 M.IV.33 M.IV.42 M.IV.78 M.IV.106 M.IV.130 M.IV.141 M.IV.155 M.IV.364 M.IV.552 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Total Harga

Spesifikasi Teknis

3/25/2019 121,578 162,104 162,104 162,104 219,998 185,261 562 153 255 1,480 20,420 3,471,400 1,837,800 10,721 23,994 25,525 122,520 5,871 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

5,715,453 436,423 1,036,004 1,983,030 528,232 395,816 1,181,979 1,569,807 1,744,230 5,377,128 4,541,816 1,930,272 2,725,090 10,277,207 328,591 378,485 1,589,636 43,526 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

4/5/2019 Grade Skill 4-Semi Terampil/Terlatih Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade 1-Leader & Professional Skill Grade 2-Expert Skill

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1/1

Software RAB Exarch xPro v2019

RENCANA ANGGARAN BIAYA BILL Of MATERIAL (BoM)

A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180 Nama Pekerjaan Unit Item Waktu Mulai (Start) Waktu Selesai (Finish)

PEKERJAAN DINDING 21 : ALL : Saturday, June 8, 2019 : Sunday, June 9, 2019

:

Biaya Upah Biaya Alat Biaya Bahan TOTAL BIAYA % dari RAB Total OH

H 1 2 3 4 5 6 7 .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ..

179,119,456 19.24% 823 Monday, February 4, 2019 Friday, August 2, 2019

Range Termin

7

ID

113,827,356 65,292,101

Nama Elemen Bahan dan Upah

Kode

Qty

Unit

L.IV.01 L.IV.07 L.IV.35 L.IV.36 M.IV.7 M.IV.30 M.IV.33 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

533.7 238.5 26.7 23.8 39705.1 53.5 11854.6 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

oh oh oh oh Bh m3 Kg -

Harga Satuan

PEKERJAAN DINDING Pekerja Tukang batu Mandor Kepala Tukang Bata merah Pasir pasang Semen . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

www.mitra-arsitek.com

Total Harga

Spesifikasi Teknis

6/8/2019 121,578 162,104 219,998 185,261 919 210,428 1,480 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

64,881,900 38,657,220 5,870,267 4,417,968 36,484,970 11,257,032 17,550,098 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6/9/2019 Grade Skill 4-Semi Terampil/Terlatih Grade Skill 3-Terampil/Semi Expert Grade 1-Leader & Professional Skill Grade 2-Expert Skill

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1/1

Software RAB Exarch xPro v2019

RENCANA ANGGARAN BIAYA BILL Of MATERIAL (BoM)

A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180 Nama Pekerjaan Unit Item Waktu Mulai (Start) Waktu Selesai (Finish)

PEKERJAAN ATAP 22 : ALL : Monday, June 10, 2019 : Thursday, June 13, 2019

:

Biaya Upah Biaya Alat Biaya Bahan TOTAL BIAYA % dari RAB Total OH

I 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ..

79,192,048 8.50% 226 Monday, February 4, 2019 Friday, August 2, 2019

Range Termin

19

ID

33,803,346 7,646,909 37,741,793

Nama Elemen Bahan dan Upah

Kode

Qty

Unit

L.IV.01 L.IV.06 L.IV.08 L.IV.16 L.IV.35 L.IV.36 A.IV.2 M.IV.100 M.IV.124 M.IV.125 M.IV.126 M.IV.127 M.IV.128 M.IV.154 M.IV.155 M.IV.365 M.IV.490 M.IV.498 M.IV.508 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

88.4 9.9 75.3 36.7 9.6 6.3 16.7 0.8 904.1 622.8 16.5 4687.8 334.8 33.5 9.4 34.7 217.6 41.1 20.8 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

oh oh oh oh oh oh Ls m3 M' m1 Kg bh bh Kg Kg Lbr Bh Bh M' -

Harga Satuan

PEKERJAAN ATAP Pekerja Tukang Atap Tukang Besi Tukang Kayu Mandor Kepala Tukang Alat Rangka Atap Baja Canai Dingin Kayu papan 3/20 Baja Ringan- Reng Truss Baja Ringan-C Truss Baja strip (0,2 x 2) cm Baut (Srew driver) Baut Ramset / Dina Bolt Paku Biasa ½" - 1" Paku Biasa 2" - 5" Seng Gelombang 3" x 6" BJLS 28 Genteng metal nok genteng metal Talang / Jurai Canai Dingin . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

www.mitra-arsitek.com

Total Harga

Spesifikasi Teknis

6/10/2019 121,578 162,104 162,104 162,104 219,998 185,261 456,750 3,573,500 7,147 15,315 12,763 459 4,748 23,994 25,525 51,050 35,735 84,743 45,945 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

10,749,658 1,604,826 12,212,724 5,941,421 2,122,125 1,172,593 7,646,909 2,759,457 6,461,374 9,538,219 210,581 2,153,791 1,589,703 803,398 238,659 1,768,883 7,777,580 3,486,327 953,822 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6/13/2019 Grade Skill 4-Semi Terampil/Terlatih Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade 1-Leader & Professional Skill Grade 2-Expert Skill

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1/1

Software RAB Exarch xPro v2019

RENCANA ANGGARAN BIAYA BILL Of MATERIAL (BoM)

A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180 Nama Pekerjaan Unit Item Waktu Mulai (Start) Waktu Selesai (Finish)

PEKERJAAN KUSEN, PINTU, 23 JENDELA DAN ACCESORIS : ALL : Friday, June 28, 2019 : Thursday, July 11, 2019

:

Biaya Upah Biaya Alat Biaya Bahan TOTAL BIAYA % dari RAB Total OH

J 1 2 3 4 5 6 7 8 9 10 11 .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ..

42,924,986 4.61% 37 Monday, February 4, 2019 Friday, August 2, 2019

Range Termin

11

ID

5,679,491 2,447,926 34,797,569

Nama Elemen Bahan dan Upah

Kode

Qty

Unit

Harga Satuan

oh oh oh oh Ls set set set set set Unit -

121,578 162,104 162,104 219,998 253,750 2,144,100 1,633,600 1,123,100 1,000,580 612,600 26,036 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

PEKERJAAN KUSEN, PINTU, JENDELA DAN ACCESORIS Pekerja Tukang batu Tukang Kayu Mandor Perlengkapan Pintu Utama (Kusen+Panel) Type P1 Pintu Utama (Kusen+Panel) Type P2 Pintu Utama (Kusen+Panel) Type P3 Jendela Type J1 Jendela Type J2 Lubang Angin . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

www.mitra-arsitek.com

L.IV.01 L.IV.07 L.IV.16 L.IV.35 A.IV.12 M.IV.a.8 M.IV.a.9 M.IV.a.10 M.IV.a.11 M.IV.a.12 M.IV.a.14 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

12.4 2.0 20.2 2.6 9.6 3.3 6.6 3.3 8.8 5.5 40.7 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Total Harga

Spesifikasi Teknis

6/28/2019 1,507,199 329,881 3,280,977 561,434 2,447,926 7,075,530 10,781,760 3,706,230 8,805,104 3,369,300 1,059,645 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7/11/2019 Grade Skill 4-Semi Terampil/Terlatih Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade 1-Leader & Professional Skill Pintu Ganda 60cm/80cmx200-K1 Pintu Kayu 80x200 Pintu PVC 70x195 standar Jendela Ganda 2x60x150-K1 Jendela Tunggal 60x150-K1 Ukuran 20x30-Beton . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1/1

Software RAB Exarch xPro v2019

RENCANA ANGGARAN BIAYA BILL Of MATERIAL (BoM)

A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180 Nama Pekerjaan Unit Item Waktu Mulai (Start) Waktu Selesai (Finish)

PEKERJAAN INST. PIPA AIR 24 BERSIH, LIMBAH DAN SANITASI : ALL : Monday, April 8, 2019 : Wednesday, June 26, 2019

:

Biaya Upah Biaya Alat Biaya Bahan TOTAL BIAYA % dari RAB Total OH

K 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ..

42,754,682 4.59% 45 Monday, February 4, 2019 Friday, August 2, 2019

Range Termin

27

ID

9,080,806 13,021,181 20,652,695

Nama Elemen Bahan dan Upah

Kode

Qty

Unit

Harga Satuan

PEKERJAAN INST. PIPA AIR BERSIH, LIMBAH DAN SANITASI Pekerja L.IV.01 Tukang batu L.IV.07 Tukang Pipa L.IV.20 Mandor L.IV.35 Kepala Tukang L.IV.36 Perlengkapan A.IV.12 Pasir pasang M.IV.30 Semen M.IV.33 Floor drain M.IV.186 Kloset duduk / monoblock M.IV.188 Kloset jongkok teraso M.IV.190 Kran air M.IV.191 Wastafel M.IV.198 Pipa PVC 1/2" M.IV.200 Pipa PVC 3/4" M.IV.201 Pipa PVC 3” M.IV.207 Pipa PVC 4" M.IV.208 Sealtape M.IV.591 Upah Kerja Pembuatan Septik Tank L.IV.a.2 Alat Kerja Pembuatan Septik Tank A.IV.a.2 Bahan Kerja Pembuatan Septik Tank M.IV.a.1 Upah Kerja Pembuatan Sumur Resapan Limbah L.IV.a.3 Alat Kerja Pembuatan Sumur Resapan Limbah A.IV.a.3 Bahan Kerja Pembuatan Sumur Resapan Limbah M.IV.a.2 Shower Mandi M.IV.a.5 Tangki Air M.IV.a.6 Pompa Air M.IV.a.7 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

www.mitra-arsitek.com

16.6 22.5 0.7 1.2 2.1 48.1 0.0 19.8 4.4 1.1 2.2 6.6 1.3 29.0 46.2 47.5 37.0 0.2 1.1 1.1 1.1 0.9 0.9 0.9 2.2 1.1 1.1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

oh oh oh oh oh Ls m3 Kg Unit Unit Unit M Unit M M M M bh oh/m3 Ls Ls oh/m3 Ls Ls Unit Unit Unit -

Total Harga

Spesifikasi Teknis

4/8/2019 121,578 162,104 162,104 219,998 185,261 253,750 210,428 1,480 61,260 2,552,500 255,250 25,525 1,480,450 4,084 5,616 8,679 9,189 3,574 1,518,000 456,750 6,636,500 1,113,200 355,250 4,594,500 137,835 1,276,250 612,600 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

2,024,220 3,639,388 115,904 255,307 396,570 12,206,136 6,944 29,313 269,544 2,807,750 561,550 168,465 1,954,194 118,599 259,436 412,402 339,625 590 1,669,800 502,425 7,300,150 979,616 312,620 4,043,160 303,237 1,403,875 673,860 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6/26/2019 Grade Skill 4-Semi Terampil/Terlatih Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade 1-Leader & Professional Skill Grade 2-Expert Skill

Merk Onda Penguin 1100L Merk Shimizu 125 W-18L/min . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1/1

Software RAB Exarch xPro v2019

RENCANA ANGGARAN BIAYA BILL Of MATERIAL (BoM)

A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180 Nama Pekerjaan Unit Item Waktu Mulai (Start) Waktu Selesai (Finish)

PEKERJAAN INST. LISTRIK 25DAN PENERANGAN : ALL : Thursday, June 27, 2019 : Thursday, June 27, 2019

:

Biaya Upah Biaya Alat Biaya Bahan TOTAL BIAYA % dari RAB Total OH

L 1 2 3 4 5 6 7 8 9 10 11 12 13 14 .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ..

10,659,527 1.14% 15 Monday, February 4, 2019 Friday, August 2, 2019

Range Termin

14

ID

2,127,528 1,504,763 7,027,237

Nama Elemen Bahan dan Upah

Kode

Qty

Unit

9.9 4.7 0.8 5.9 23.1 1.1 1.1 151.3 181.5 15.4 3.3 11.0 8.8 11.0 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

oh oh oh Ls bh Unit btg m1 m1 unit unit unit unit unit -

Harga Satuan

PEKERJAAN INST. LISTRIK DAN PENERANGAN Pekerja Tukang Listrik Mandor Perlengkapan Fitting Lampu MCB + Box Tembaga dia.1/2"-1.5m Kabel NYM 3x2,5 mm2-SNI Kabel NYM 2x1,5 mm2-SNI Saklar Listrik Lampu 5W Lampu 15W Lampu 20W Receiptackle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

www.mitra-arsitek.com

L.IV.01 L.IV.19 L.IV.35 A.IV.12 M.IV.509 M.IV.a.15 M.IV.a.16 M.IV.a.17 M.IV.a.18 M.IV.a.19 M.IV.a.20 M.IV.a.21 M.IV.a.22 M.IV.a.23 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Total Harga

Spesifikasi Teknis

6/27/2019 121,578 162,104 219,998 253,750 25,525 357,350 663,650 12,252 10,210 25,525 24,504 35,735 45,945 30,630 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1,198,270 759,618 169,640 1,504,763 589,628 393,085 730,015 1,853,115 1,853,115 393,085 80,863 393,085 404,316 336,930 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

6/27/2019 Grade Skill 4-Semi Terampil/Terlatih Grade Skill 3-Terampil/Semi Expert Grade 1-Leader & Professional Skill

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1/1

Software RAB Exarch xPro v2019

RENCANA ANGGARAN BIAYA BILL Of MATERIAL (BoM)

A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180 Nama Pekerjaan Unit Item Waktu Mulai (Start) Waktu Selesai (Finish)

PEKERJAAN KERAMIK LANTAI 26 DAN DINDING : ALL : Tuesday, June 25, 2019 : Friday, July 12, 2019

:

Biaya Upah Biaya Alat Biaya Bahan TOTAL BIAYA % dari RAB Total OH

23,753,057 45,370,018

69,123,075 7.42% 170 Monday, February 4, 2019 Friday, August 2, 2019

Range Termin

16

ID

Nama Elemen Bahan dan Upah

M 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ..

Pekerja Tukang batu Mandor Kepala Tukang Air Kerikil (kg) Pasir Beton (kg) Pasir pasang Semen Semen Warna keramik Dinding 20cm x 20cm plint ubin teralux marmer ukuran 10cm x 60cm ubin teralux marmer ukuran 60cm x60cm ubin warna ukuran 20cm x20cm ubin warna ukuran 40cm x40 cm Teraso cor di tempat, tebal 3cm . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Kode

Qty

Unit

105.1 54.2 5.3 5.4 1320.0 6778.2 5893.8 9.9 3850.4 370.5 32.7 162.7 552.4 107.9 131.3 1.3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

oh oh oh oh Ltr kg kg m3 Kg Kg m2 Bh Bh Bh Bh M3 -

Harga Satuan

PEKERJAAN KERAMIK LANTAI DAN DINDING

www.mitra-arsitek.com

L.IV.01 L.IV.07 L.IV.35 L.IV.36 M.IV.1 M.IV.25 M.IV.29 M.IV.30 M.IV.33 M.IV.36 M.IV.406 M.IV.437 M.IV.467 M.IV.472 M.IV.474 M.IV.543 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Total Harga

Spesifikasi Teknis

6/25/2019 121,578 162,104 219,998 185,261 562 153 255 210,428 1,480 2,144 63,813 17,357 45,945 11,742 14,805 4,595 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

12,783,640 8,792,573 1,169,768 1,007,077 741,246 1,038,081 1,504,392 2,086,363 5,700,319 794,285 2,084,754 2,823,810 25,380,937 1,266,379 1,943,446 6,004 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7/12/2019 Grade Skill 4-Semi Terampil/Terlatih Grade Skill 3-Terampil/Semi Expert Grade 1-Leader & Professional Skill Grade 2-Expert Skill

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1/1

Software RAB Exarch xPro v2019

RENCANA ANGGARAN BIAYA BILL Of MATERIAL (BoM)

A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180 Nama Pekerjaan Unit Item Waktu Mulai (Start) Waktu Selesai (Finish)

PEKERJAAN LANGIT-LANGIT 27 (PLAFON) : ALL : Sunday, July 7, 2019 : Tuesday, July 16, 2019

:

Biaya Upah Biaya Alat Biaya Bahan TOTAL BIAYA % dari RAB Total OH

N 1 2 3 4 5 6 7 8 9 10 11 .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ..

87,047,849 9.35% 192 Monday, February 4, 2019 Friday, August 2, 2019

Range Termin

11

ID

27,545,598 34,222,958 25,279,293

Nama Elemen Bahan dan Upah

Kode

Qty

Unit

101.9 53.4 24.3 5.2 7.8 213.4 746.9 23.5 1630.2 77.7 285.3 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

oh oh oh oh oh Ls M1 bh bh lbr M' -

Harga Satuan

PEKERJAAN LANGIT-LANGIT (PLAFON) Pekerja L.IV.01 Tukang Besi L.IV.08 Tukang Kayu L.IV.16 Mandor L.IV.35 Kepala Tukang L.IV.36 Assesoris (perkuatan, las dll) A.IV.3 Hollow 4/4 M.IV.139 Paku sekrup M.IV.162 Screw M.IV.179 Gypsum board 9 mm M.IV.350 List PVC (setara Shunda Plafon,LS 301-1 Min.Silver M.IV.354 Metalic) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

www.mitra-arsitek.com

Total Harga

Spesifikasi Teknis

7/7/2019 121,578 162,104 162,104 219,998 185,261 160,370 10,210 766 511 88,827 34,714 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

12,383,905 8,648,227 3,931,823 1,143,922 1,437,720 34,222,958 7,625,849 17,975 832,217 6,899,868 9,903,383 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7/16/2019 Grade Skill 4-Semi Terampil/Terlatih Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade 1-Leader & Professional Skill Grade 2-Expert Skill

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1/1

Software RAB Exarch xPro v2019

RENCANA ANGGARAN BIAYA BILL Of MATERIAL (BoM)

A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180 Nama Pekerjaan Unit Item Waktu Mulai (Start) Waktu Selesai (Finish)

PEKERJAAN PENGECATAN28 DAN WATERPROFING : ALL : Thursday, July 18, 2019 : Saturday, July 27, 2019

:

Biaya Upah Biaya Alat Biaya Bahan TOTAL BIAYA % dari RAB Total OH

O 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ..

54,822,986 5.89% 174 Monday, February 4, 2019 Friday, August 2, 2019

Range Termin

16

ID

27,673,531 49,796 27,099,659

Nama Elemen Bahan dan Upah

Kode

Qty

Unit

Harga Satuan

PEKERJAAN PENGECATAN DAN WATERPROFING Pekerja Tukang cat Mandor Kepala Tukang Cat dasar Kayu Cat dasar Tembok Cat kayu Cat meni Cat Penutup Tembok Kuas Menie besi Pengencer Plamir Amplas Cat Anti Bocor+Waterproofing Rol Cat . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

www.mitra-arsitek.com

L.IV.01 L.IV.10 L.IV.35 L.IV.36 M.IV.377 M.IV.378 M.IV.382 M.IV.383 M.IV.384 M.IV.387 M.IV.393 M.IV.395 M.IV.396 M.IV.545 M.IV.a.26 A.IV.a.4 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

34.8 114.8 10.4 13.8 0.8 96.4 1.3 1.0 250.7 0.1 0.7 0.1 152.6 376.3 19.6 2.0 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Total Harga

Spesifikasi Teknis

7/18/2019 oh oh oh oh Kg Kg kg Kg Kg Bh Kg Kg Kg Lbr kg unit -

121,578 162,104 219,998 185,261 31,651 66,365 50,948 16,642 35,735 17,357 27,567 35,735 57,482 6,637 17,357 25,375 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

4,228,850 18,602,016 2,294,850 2,547,815 26,634 6,397,851 65,570 16,476 8,956,992 2,100 19,710 5,307 8,771,023 2,497,381 340,614 49,796 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7/27/2019 Grade Skill 4-Semi Terampil/Terlatih Grade Skill 3-Terampil/Semi Expert Grade 1-Leader & Professional Skill Grade 2-Expert Skill

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1/1

Software RAB Exarch xPro v2019

RENCANA ANGGARAN BIAYA BILL Of MATERIAL (BoM)

A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180 Nama Pekerjaan Unit Item Waktu Mulai (Start) Waktu Selesai (Finish)

PEKERJAAN TANGGA 29 : ALL : Sunday, February 10, 2019 : Tuesday, April 16, 2019

:

Biaya Upah Biaya Alat Biaya Bahan TOTAL BIAYA % dari RAB Total OH

P 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ..

18,335,844 1.97% 45 Monday, February 4, 2019 Friday, August 2, 2019

Range Termin

32

ID

6,310,001 1,093,723 10,932,119

Nama Elemen Bahan dan Upah

Kode

Qty

Unit

L.IV.01 L.IV.07 L.IV.08 L.IV.10 L.IV.16 L.IV.35 L.IV.36 A.IV.3 M.IV.1 M.IV.13 M.IV.25 M.IV.29 M.IV.30 M.IV.32 M.IV.33 M.IV.36 M.IV.42 M.IV.78 M.IV.106 M.IV.130 M.IV.139 M.IV.141 M.IV.152 M.IV.155 M.IV.364 M.IV.387 M.IV.393 M.IV.396 M.IV.474 M.IV.543 M.IV.545 M.IV.552 . . . . . . . . . . . . . . . . . . . . . . . . . . .

27.0 7.5 4.0 2.1 1.4 1.4 1.5 6.8 600.7 0.8 2880.6 2042.4 1.5 0.3 1317.1 27.8 7.5 0.1 0.1 350.7 23.9 5.0 0.2 1.5 1.3 0.1 0.8 0.8 134.9 0.5 3.9 0.6 . . . . . . . . . . . . . . . . . . . . . . . . . . .

oh oh oh oh oh oh oh Ls Ltr m3 kg kg m3 M3 Kg Kg btg m3 m3 Kg M1 Kg kg Kg Lbr Bh Kg Kg Bh M3 Lbr Ltr -

Harga Satuan

PEKERJAAN TANGGA Pekerja Tukang batu Tukang Besi Tukang cat Tukang Kayu Mandor Kepala Tukang Assesoris (perkuatan, las dll) Air Batu belah Kerikil (kg) Pasir Beton (kg) Pasir pasang Pasir urug Semen Semen Warna Dolken kayu Ø 8-10/400 cm Balok kayu kelas II Papan kayu 3/20 Kelas III Besi beton Hollow 4/4 Kawat beton Paku 5 - 10 cm Paku Biasa 2" - 5" Plywood 120x240 tbl. 9 mm Kuas Menie besi Plamir ubin warna ukuran 40cm x40 cm Teraso cor di tempat, tebal 3cm Amplas Minyak bekisting . . . . . . . . . . . . . . . . . . . . . . . . . . .

www.mitra-arsitek.com

Total Harga

Spesifikasi Teknis

2/10/2019 121,578 162,104 162,104 162,104 162,104 219,998 185,261 160,370 562 280,775 153 255 210,428 241,977 1,480 2,144 20,420 3,471,400 1,837,800 10,721 10,210 23,994 23,994 25,525 122,520 17,357 27,567 57,482 14,805 4,595 6,637 5,871 . . . . . . . . . . . . . . . . . . . . . . . . . . .

3,284,142 1,208,790 655,339 337,013 225,104 315,904 283,709 1,093,723 337,329 222,374 441,166 521,326 311,907 63,882 1,949,914 59,694 152,742 194,746 255,326 3,759,229 243,713 120,193 4,276 38,185 160,379 1,336 21,227 44,261 1,997,431 2,292 25,551 3,642 . . . . . . . . . . . . . . . . . . . . . . . . . . .

4/16/2019 Grade Skill 4-Semi Terampil/Terlatih Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade 1-Leader & Professional Skill Grade 2-Expert Skill

. . . . . . . . . . . . . . . . . . . . . . . . . . .

1/1

Software RAB Exarch xPro v2019

RENCANA ANGGARAN BIAYA BILL Of MATERIAL (BoM)

A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180 Nama Pekerjaan Unit Item Waktu Mulai (Start) Waktu Selesai (Finish)

PEKERJAAN PAGAR DAN TAMAN/HALAMAN 30 : ALL : Sunday, April 7, 2019 : Monday, April 29, 2019

:

Biaya Upah Biaya Alat Biaya Bahan TOTAL BIAYA % dari RAB Total OH

Q 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ..

21,695,290 2.33% 60 Monday, February 4, 2019 Friday, August 2, 2019

Range Termin

32

ID

8,403,748 583,930 12,707,612

Nama Elemen Bahan dan Upah

Kode

Qty

Unit

Harga Satuan

37.4 11.1 0.7 0.4 7.4 1.5 1.9 2.5 0.2 146.6 1232.0 3.5 4.8 703.1 1.3 498.5 3.2 830.6 2.6 0.0 0.2 107.4 1.5 0.7 0.5 0.5 0.7 1.8 0.7 25.6 0.5 4.4 . . . . . . . . . . . . . . . . . . . . . . . . . . .

oh oh oh oh oh oh oh Ls Ls Ltr Bh m3 Bh kg m3 kg m3 Kg btg m3 m3 Kg Kg kg Kg Lbr Kg Kg Kg M2 Ltr unit -

121,578 162,104 162,104 162,104 162,104 219,998 185,261 213,150 253,750 562 919 280,775 81,680 153 295,069 255 210,428 1,480 20,420 3,471,400 1,837,800 10,721 23,994 23,994 25,525 122,520 66,365 35,735 57,482 137,835 5,871 510,500 . . . . . . . . . . . . . . . . . . . . . . . . . . .

PEKERJAAN PAGAR DAN TAMAN/HALAMAN Pekerja Tukang batu Tukang Besi Tukang cat Tukang Kayu Mandor Kepala Tukang Bahan Kerja Paving Blok Perlengkapan Air Bata merah Batu belah Batu paras Dinding Kerikil (kg) Pasir beton Pasir Beton (kg) Pasir pasang Semen Dolken kayu Ø 8-10/400 cm Balok kayu kelas II Papan kayu 3/20 Kelas III Besi beton Kawat beton Paku 5 - 10 cm Paku Biasa 2" - 5" Plywood 120x240 tbl. 9 mm Cat dasar Tembok Cat Penutup Tembok Plamir Paving block 6 cm Minyak bekisting Pohon Perdu . . . . . . . . . . . . . . . . . . . . . . . . . . .

www.mitra-arsitek.com

L.IV.01 L.IV.07 L.IV.08 L.IV.10 L.IV.16 L.IV.35 L.IV.36 A.IV.4 A.IV.12 M.IV.1 M.IV.7 M.IV.13 M.IV.16 M.IV.25 M.IV.28 M.IV.29 M.IV.30 M.IV.33 M.IV.42 M.IV.78 M.IV.106 M.IV.130 M.IV.141 M.IV.152 M.IV.155 M.IV.364 M.IV.378 M.IV.384 M.IV.396 M.IV.539 M.IV.552 M.IV.a.28 . . . . . . . . . . . . . . . . . . . . . . . . . . .

Total Harga

Spesifikasi Teknis

4/7/2019 4,545,936 1,792,145 116,082 69,649 1,193,277 340,481 346,178 539,270 44,660 82,340 1,132,085 978,445 395,331 107,686 373,262 127,253 676,765 1,229,624 53,909 68,734 288,075 1,151,543 36,818 16,627 13,477 56,604 45,261 63,365 39,203 3,522,098 2,906 2,246,200 . . . . . . . . . . . . . . . . . . . . . . . . . . .

4/29/2019 Grade Skill 4-Semi Terampil/Terlatih Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade 1-Leader & Professional Skill Grade 2-Expert Skill

. . . . . . . . . . . . . . . . . . . . . . . . . . .

1/1

Software RAB Exarch xPro v2019

RENCANA ANGGARAN BIAYA BILL Of MATERIAL (BoM)

A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180 Nama Pekerjaan Unit Item Waktu Mulai (Start) Waktu Selesai (Finish)

PEKERJAAN TAMBAHAN DAN 31 LAINNYA : ALL : Sunday, July 28, 2019 : Friday, August 2, 2019

:

Biaya Upah Biaya Alat Biaya Bahan TOTAL BIAYA % dari RAB Total OH

R 1 2 3 4 5 6 7 8 9 10 11 12 13 .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ..

29,900,463 3.21% 48 Monday, February 4, 2019 Friday, August 2, 2019

Range Termin

13

ID

6,824,419 20,934 23,055,109

Nama Elemen Bahan dan Upah

Kode

Qty

Unit

Harga Satuan

29.3 11.6 0.1 2.3 4.7 0.1 360.8 165.0 0.6 1.1 1.1 2.2 1.1 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

oh oh oh oh oh Ls Kg Kg Kg Ls Ls unit unit -

121,578 162,104 162,104 219,998 185,261 253,750 10,414 13,681 45,945 5,615,500 2,552,500 3,267,200 765,750 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

PEKERJAAN TAMBAHAN DAN LAINNYA Pekerja Tukang Besi Tukang Listrik Mandor Kepala Tukang Perlengkapan Besi plat baja Besi siku L 30.30.3 Kawat las listrik Biaya Pengurusan Daya Listrik PLN Biaya Pengurusan Instalasai PDAM Air Conditioner Exhaust Fan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

www.mitra-arsitek.com

L.IV.01 L.IV.08 L.IV.19 L.IV.35 L.IV.36 A.IV.12 M.IV.134 M.IV.137 M.IV.148 M.IV.a.3 M.IV.a.4 M.IV.a.24 M.IV.a.25 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

Total Harga

Spesifikasi Teknis

7/28/2019 3,560,841 1,872,297 10,699 514,487 866,096 20,934 3,757,443 2,257,431 25,270 6,177,050 2,807,750 7,187,840 842,325 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

8/2/2019 Grade Skill 4-Semi Terampil/Terlatih Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade 1-Leader & Professional Skill Grade 2-Expert Skill

-

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1/1

LAPORAN TERMIN -

Laporan Termin Kontrak Project Laporan Termin Mode Upah Laporan Termin Mode Alat Laporan Termin Mode Bahan

Software RAB Exarch xPro v2019

PERENCANAAN TERMIN PEMBAYARAN

TERMIN BIAYA KONTRAK (ALL)

TERMIN BIAYA KONTRAK (ALL) 5% ID PROJECT NAMA PROJECT NILAI TERMIN Project Mulai Hari Calendar Termin Delay

Rencana Termin

TERMIN 1 TERMIN 2 TERMIN 3 TERMIN 4 TERMIN 5 TOTAL

www.mitra-arsitek.com

10%

: A002/T100.80/I-2019 : Pembangunan Rumah Tinggal 2 Lantai Type 180 931,188,612 : Rp : Monday, February 4, 2019 180 : 7 :

Nilai Project RangeTermin Progress (%) (%)

5% 10% 25% 30% 30% 100%

5% 15% 40% 70% 100%

1 Mode Termin

TERMIN BIAYA KONTRAK (ALL)

Tanggal Pembayaran (Jatuh Tempo) Jatuh Tempo

Batas Akhir (H-1)

Biaya Termin

Monday, January 21, 2019

Monday, January 28, 2019

46,559,431

Friday, February 8, 2019

Friday, February 15, 2019

93,118,861

Monday, March 25, 2019

Monday, April 1, 2019

232,797,153

Saturday, May 18, 2019

Saturday, May 25, 2019

279,356,584

Thursday, July 11, 2019

Thursday, July 18, 2019

279,356,584

30%

TERMIN 1

TERMIN 3 TERMIN 4

931,188,612

30%

TERMIN 5

Project Progress (%)

100% 70%

40% 5%

NILAI KONTRAK

25%

TERMIN 2

TERMIN 1

15% TERMIN 2

TERMIN 3

TERMIN 4

TERMIN 5

1/1

Software RAB Exarch xPro v2019

PERENCANAAN TERMIN PEMBAYARAN

TERMIN BIAYA UPAH

TERMIN BIAYA UPAH 5% ID PROJECT NAMA PROJECT NILAI TERMIN Project Mulai Hari Calendar Termin Delay

Rencana Termin

TERMIN 1 TERMIN 2 TERMIN 3 TERMIN 4 TERMIN 5 TOTAL

www.mitra-arsitek.com

10%

: A002/T100.80/I-2019 : Pembangunan Rumah Tinggal 2 Lantai Type 180 357,379,657 : Rp : Monday, February 4, 2019 180 : 7 :

Nilai Project RangeTermin Progress (%) (%)

5% 10% 25% 30% 30% 100%

5% 15% 40% 70% 100%

2 Mode Termin

TERMIN BIAYA UPAH

Tanggal Pembayaran (Jatuh Tempo) Jatuh Tempo

Batas Akhir (H-1)

Biaya Termin

Monday, January 21, 2019

Monday, January 28, 2019

17,868,983

Friday, February 8, 2019

Friday, February 15, 2019

35,737,966

Monday, March 25, 2019

Monday, April 1, 2019

Saturday, May 18, 2019

Saturday, May 25, 2019

107,213,897

Thursday, July 11, 2019

Thursday, July 18, 2019

107,213,897

89,344,914

30%

TERMIN 1

TERMIN 3 TERMIN 4

357,379,657

30%

TERMIN 5

Project Progress (%)

100% 70%

40% 5%

NILAI KONTRAK

25%

TERMIN 2

TERMIN 1

15% TERMIN 2

TERMIN 3

TERMIN 4

TERMIN 5

1/1

Software RAB Exarch xPro v2019

PERENCANAAN TERMIN PEMBAYARAN

TERMIN BIAYA ALAT

TERMIN BIAYA ALAT 5% ID PROJECT NAMA PROJECT NILAI TERMIN Project Mulai Hari Calendar Termin Delay

Rencana Termin

TERMIN 1 TERMIN 2 TERMIN 3 TERMIN 4 TERMIN 5 TOTAL

www.mitra-arsitek.com

10%

: A002/T100.80/I-2019 : Pembangunan Rumah Tinggal 2 Lantai Type 180 61,596,970 : Rp : Monday, February 4, 2019 180 : 7 :

Nilai Project RangeTermin Progress (%) (%)

5% 10% 25% 30% 30% 100%

5% 15% 40% 70% 100%

3 Mode Termin

TERMIN BIAYA ALAT

Tanggal Pembayaran (Jatuh Tempo) Jatuh Tempo

Batas Akhir (H-1)

Biaya Termin

Monday, January 21, 2019

Monday, January 28, 2019

3,079,849

Friday, February 8, 2019

Friday, February 15, 2019

6,159,697

Monday, March 25, 2019

Monday, April 1, 2019

15,399,243

Saturday, May 18, 2019

Saturday, May 25, 2019

18,479,091

Thursday, July 11, 2019

Thursday, July 18, 2019

18,479,091

30%

TERMIN 1

TERMIN 3 TERMIN 4

61,596,970

30%

TERMIN 5

Project Progress (%)

100% 70%

40% 5%

NILAI KONTRAK

25%

TERMIN 2

TERMIN 1

15% TERMIN 2

TERMIN 3

TERMIN 4

TERMIN 5

1/1

Software RAB Exarch xPro v2019

PERENCANAAN TERMIN PEMBAYARAN

TERMIN BIAYA BAHAN

TERMIN BIAYA BAHAN 5% ID PROJECT NAMA PROJECT NILAI TERMIN Project Mulai Hari Calendar Termin Delay

Rencana Termin

TERMIN 1 TERMIN 2 TERMIN 3 TERMIN 4 TERMIN 5 TOTAL

www.mitra-arsitek.com

10%

: A002/T100.80/I-2019 : Pembangunan Rumah Tinggal 2 Lantai Type 180 512,211,985 : Rp : Monday, February 4, 2019 180 : 7 :

Nilai Project RangeTermin Progress (%) (%)

5% 10% 25% 30% 30% 100%

5% 15% 40% 70% 100%

4 Mode Termin

TERMIN BIAYA BAHAN

Tanggal Pembayaran (Jatuh Tempo) Jatuh Tempo

Batas Akhir (H-1)

Biaya Termin

Monday, January 21, 2019

Monday, January 28, 2019

25,610,599

Friday, February 8, 2019

Friday, February 15, 2019

51,221,198

Monday, March 25, 2019

Monday, April 1, 2019

128,052,996

Saturday, May 18, 2019

Saturday, May 25, 2019

153,663,595

Thursday, July 11, 2019

Thursday, July 18, 2019

153,663,595

30%

TERMIN 1

TERMIN 3 TERMIN 4

512,211,985

30%

TERMIN 5

Project Progress (%)

100% 70%

40% 5%

NILAI KONTRAK

25%

TERMIN 2

TERMIN 1

15% TERMIN 2

TERMIN 3

TERMIN 4

TERMIN 5

1/1

LAPORAN CURVA HARIAN (Daily Curva)

-

Curva Harian Mode Upah Curva Harian Mode Alat Curva Harian Mode Bahan Curva Harian Mode All (Curva S)

Software RAB Exarch sdaPro v2019

16,733,085 4,756,525 6,055,988 9,885,726 3,499,233 2,839,832 8,022,845 3,088,158 58,118 279,619 227,592 9,476 8,508 220,664 83,863 68,847 165,475 351,450 300,551 550,188 585,074 514,882 1,138,089 1,112,144 137,302 301,128 534,769 680,650 970,920 109,071 267,738 88,648 116,342 194,184 94,557 1,017,918 1,323,981 490,363 686,509 98,694 1,925,377 338,797 3,616,335 9,667 19,334 3,179,083

Mar 31-Mar-19

Mar 30-Mar-19

Mar 29-Mar-19

Mar 28-Mar-19

Mar 27-Mar-19

Mar 26-Mar-19

Mar 25-Mar-19

Mar 24-Mar-19

Mar 23-Mar-19

Mar 22-Mar-19

Mar 21-Mar-19

Mar 20-Mar-19

Mar 19-Mar-19

Mar 18-Mar-19

Mar 17-Mar-19

Mar 16-Mar-19

Mar 15-Mar-19

Mar 14-Mar-19

Mar 13-Mar-19

Mar 12-Mar-19

Mar 11-Mar-19

Mar 10-Mar-19

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Apr 14-Apr-19

Apr 13-Apr-19

Apr 12-Apr-19

Apr 11-Apr-19

8-Apr-19

9-Apr-19

7-Apr-19

Apr

Apr 10-Apr-19

6-Apr-19

Apr

0.00 0.00 0.00 0.00

0.00

0.01 0.01 0.01 0.01 0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.00

0.00

0.01 0.01 0.01 0.00

0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00

0.00

0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00

0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00

0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00

0.00 0.00 0.01 0.00 0.00 0.00

0.00 0.01 0.01 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.01

0.00 0.00

0.00 0.00

25%

25%

26% 26% 26%

25% 24% 23% 23%

21%

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00

22%

22%

22%

23% 23% 23% 22% 22%

21% 20% 20% 20% 20% 20% 20% 20% 20% 0.00 0.00 20%0.00 20%0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 20% 20%

0.00

20%

0.00

21%

24%

19%

0.00

19%

0.00

18%

0.00

18% 18% 18% 18% 18%

0.00

17%

0.00 0.00

15%

14%

14% 14%

16% 16% 16% 16%

0.00

0.00

0.00

0.00

0.00

14% 14% 14%

0.00 0.00

13%

0.00 0.00 0.00 0.00

12%

0.00

11%

11% 11%

0.00

0.00 0.00

10%

0.00 0.00

0.00 0.00 0.00

0.00

0.00 0.00

9%

0.00 0.00

7%

0.00 0.00 0.00 0.00

6%

5% 4% 4% 4% 3%

2% 1%

349,897

479,798

129,902

315,094

3,632,402

617,578

403,966

403,966

258,538

3,634,476

3,317,308

916,024

-

363,569

363,569

363,569

1,461,773

1,461,773

1,461,773

605,758

605,758

181,785

181,785

425,586

413,688

61,564

53,401

53,189

-

-

-

1,608,490

961,210

961,210

961,210

961,210

1,320,551

770,363

280,756

280,756

280,756

280,756

2,629,876

-

1,265,723

2,042,401

23-Feb-19

24-Feb-19

25-Feb-19

26-Feb-19

27-Feb-19

28-Feb-19

1-Mar-19

2-Mar-19

3-Mar-19

4-Mar-19

5-Mar-19

6-Mar-19

7-Mar-19

8-Mar-19

9-Mar-19

10-Mar-19

11-Mar-19

12-Mar-19

13-Mar-19

14-Mar-19

15-Mar-19

16-Mar-19

17-Mar-19

18-Mar-19

19-Mar-19

20-Mar-19

21-Mar-19

22-Mar-19

23-Mar-19

24-Mar-19

25-Mar-19

26-Mar-19

27-Mar-19

28-Mar-19

29-Mar-19

30-Mar-19

31-Mar-19

1-Apr-19

2-Apr-19

3-Apr-19

4-Apr-19

5-Apr-19

6-Apr-19

7-Apr-19

8-Apr-19

26%

22-Feb-19

25%

973,645

25%

24%

24%

23%

21-Feb-19

23%

3,002,867

23%

20-Feb-19

23%

23%

22%

2,418,694

22%

22%

22%

22%

19-Feb-19

21%

21%

2,637,863

21%

20%

20%

18-Feb-19

20%

20%

525,156

20%

20%

20%

17-Feb-19

20%

20%

20%

20%

525,156

20%

16-Feb-19

20%

15-Feb-19

19%

19%

18%

4,209,536

18%

18%

18%

3,941,134

18%

18%

17%

14-Feb-19

16%

16%

16%

4,988,942

16%

15%

13-Feb-19

14%

14%

9%

14%

7%

14%

6%

6,555,103

14%

5%

14%

4%

13%

4%

2,228,406

12%

4%

11%

3%

11%

2%

10%

1%

12-Feb-19

0.26

11-Feb-19

0.00

0.25 0.26 0.26

1,971,363

0.00 0.00 0.00

0.25 0.25

10-Feb-19

0.00 0.00

0.23 0.23 0.24 0.24

1,725,786

0.01 0.00 0.00 0.01

0.23

9-Feb-19

0.00

0.23

1,414,050

0.00

0.22 0.22 0.22

8-Feb-19

0.00 0.00 0.00

0.21 0.21 0.22 0.22

7-Feb-19

0.00 0.00 0.00 0.00

0.21 0.21

2,236,592

0.00 0.00

0.20 0.20 0.20

6-Feb-19

0.00 0.00 0.00

0.20 0.20

2,560,360

0.00 0.00

0.20 0.20 0.20

5,009,476

0.00 0.00 0.00

0.20 0.20 0.20 0.20

2,674,710

0.00 0.00 0.00 0.00

0.19

5-Feb-19

0.00

0.19

4-Feb-19

0.00

0.18 0.18 0.19

26%

0.00 0.00 0.00

0.18 0.18 0.18

26%

0.00 0.00 0.00

0.16 0.17 0.18

25%

0.00 0.01 0.01

0.15 0.16 0.16

9%

0.00 0.00 0.00

0.14 0.15

7%

0.00 0.01

0.14 0.14 0.14 0.14

6%

0.00 0.00 0.00 0.00

0.12 0.13 0.14

5%

0.01 0.01 0.01

0.11 0.11

4%

0.00 0.00

0.07 0.09 0.10 0.11

4%

0.02 0.01 0.01 0.01

0.06

4%

0.01

0.05

3%

0.01

0.03 0.04 0.04

2%

0.01 0.00 0.00

0.01 0.01 0.03

1%

0.01 0.01 0.01

Aktual Load (red Line)

Hari Kalender

Apr

5-Apr-19

Apr

4-Apr-19

3-Apr-19

Apr

Apr

2-Apr-19

Apr

1-Apr-19

Apr

9-Mar-19

Apr

8-Mar-19

7-Mar-19

Mar

6-Mar-19

Mar

Mar

5-Mar-19

4-Mar-19

Mar

3-Mar-19

Mar

Mar

2-Mar-19

Mar

1-Mar-19

Mar

Feb 28-Feb-19

Mar

Feb 27-Feb-19

Feb 26-Feb-19

Feb 25-Feb-19

Feb 24-Feb-19

Feb 23-Feb-19

Feb 22-Feb-19

Feb 21-Feb-19

Feb 20-Feb-19

Feb 19-Feb-19

Feb 18-Feb-19

Feb 17-Feb-19

Feb 16-Feb-19

Feb 15-Feb-19

Feb 13-Feb-19

8-Feb-19

7-Feb-19

6-Feb-19

4-Feb-19

9-Feb-19 0.00

Load Plan (Blue Line)

CASH FLO WDAILY BIAYA KURVA UPAH

www.mitra-arsitek.com

0.00 0.00

0.00

11%

0.00% Total Bobot Kumulatif

0.00

0.00 0.00

10% 11% 11% 11% 12% 13% 14% 14% 14% 14% 14% 14% 15% 16% 16% 16% 16% 17% 18% 18% 18% 18% 18% 18% 19% 19% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 20% 21% 21% 21% 22% 22% 22% 22% 22% 23% 23% 23% 23% 23% 24% 24% 25% 25% 25% 26% 26% 26%

395,685

1,288,446 9,532,665 1,107,330 245,761 5,957,915 2,708,182 2,912,759

0.00 0.00 0.00 0.00

0.00

14-Apr-19

93,997 93,997 617,731 741,277 197,394 131,596 96,672 22,124 73,746 58,996

0.00

0.00

331,486

602,701 378,841 492,147 101,257 117,496 93,997 1,390,467 733,858 347,617 678,230 940,988 464,126 89,666 1,669,800 979,616

0.00

0.01

13-Apr-19

701,156 1,402,312 701,156 1,273,671 1,132,294 468,902

0.00 0.00 0.00

0.01 0.01

1,162,222

18,435,397 7,131,843 2,257,047 3,530,935 2,448,123

D9 D10 D11 D12 D13 D14 D15 D16 D17 D18 D19 D20 D21 D22 D23 D24 D25 D26 D27 D28 D29 D30 D31 D32 D33 D34 D35 D36 D37 D38 D39 D40 D41 D42 D43 D44 D45 D46 D47 D48 D49 D50 D51 D52 D53 D54 D55 D56 D57 D58 D59 D60 D61 D62 D63 D64 D65 D66 D67 D68 D69 D70

0

1,134,528

21,172,695 1,119,710 48,957,883 6,767,015 10,115,560 397,624 23,316,780 1,980,087

D8

D4

0

12-Apr-19

1,684,538 4,806,052 2,304,835 327,213 647,280 325,041

D7

D3

11-Apr-19

1,090,708 4,385,320 1,211,516 363,569 425,586 413,688 61,564 53,401 53,189 894,381 2,670,029 738,729 569,592 423,968 691,451 101,799 433,677 88,648

D6

D2

0.01

1,393,383

363,569 3,009,851 384,139 775,615 6,634,617 916,024 266,618 307,458 233,438 290,856 317,167 289,582 387,807 728,190 413,688 412,045 728,190 413,688 193,904 226,548 132,971 121,190 145,638 118,197

D5

D1

0.00 0.00

9-Apr-19

699,793 259,803

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70

10-Apr-19

1,575,468 6,247,230 1,840,913 60,595 305,987 53,189

Finish 7-Feb-2019 4-Feb-2019 6-Feb-2019 6-Feb-2019 6-Feb-2019 7-Feb-2019 15-Feb-2019 8-Feb-2019 8-Feb-2019 10-Feb-2019 13-Feb-2019 13-Feb-2019 15-Feb-2019 12-Feb-2019 8-Feb-2019 12-Feb-2019 15-Feb-2019 7-Feb-2019 15-Feb-2019 21-Feb-2019 18-Feb-2019 20-Feb-2019 21-Feb-2019 19-Feb-2019 19-Feb-2019 21-Feb-2019 24-Feb-2019 23-Feb-2019 24-Feb-2019 14-May-2019 26-Feb-2019 26-Feb-2019 27-Feb-2019 2-Mar-2019 4-Mar-2019 5-Mar-2019 26-Feb-2019 26-Feb-2019 27-Feb-2019 1-Mar-2019 3-Mar-2019 26-Apr-2019 29-Apr-2019 1-May-2019 2-May-2019 5-May-2019 7-May-2019 8-May-2019 9-May-2019 10-May-2019 11-May-2019 12-May-2019 13-May-2019 14-May-2019 4-Jun-2019 9-Mar-2019 12-Mar-2019 14-Mar-2019 16-Mar-2019 17-Mar-2019 18-Mar-2019 19-Mar-2019 20-Mar-2019 21-Mar-2019 21-May-2019 24-May-2019 26-May-2019 29-May-2019 31-May-2019 1-Jun-2019 2-Jun-2019 3-Jun-2019 4-Jun-2019 5-Apr-2019 4-Apr-2019 29-Mar-2019 5-Apr-2019 31-Mar-2019 25-Mar-2019 5-Apr-2019 9-Jun-2019 12-Jun-2019 9-Jun-2019 16-Jun-2019 22-Jun-2019 29-Jun-2019 3-Jul-2019 9-Jul-2019 13-Jul-2019 13-Jun-2019 13-Jun-2019 17-Jun-2019 19-Jun-2019 20-Jun-2019 21-Jun-2019 11-Jul-2019 29-Jun-2019 2-Jul-2019 3-Jul-2019 5-Jul-2019 7-Jul-2019 11-Jul-2019 26-Jun-2019 13-Jun-2019 14-Jun-2019 16-Jun-2019 17-Jun-2019 18-Jun-2019 19-Jun-2019 20-Jun-2019 21-Jun-2019 22-Jun-2019 23-Jun-2019 24-Jun-2019 25-Jun-2019 26-Jun-2019 10-Apr-2019 12-Apr-2019 27-Jun-2019 27-Jun-2019 28-Jun-2019 1-Jul-2019 4-Jul-2019 6-Jul-2019 8-Jul-2019 10-Jul-2019 11-Jul-2019 13-Jul-2019 15-Jul-2019 12-Jul-2019 26-Jun-2019 4-Jul-2019 6-Jul-2019 7-Jul-2019 9-Jul-2019 11-Jul-2019 12-Jul-2019 16-Jul-2019 10-Jul-2019 14-Jul-2019 16-Jul-2019 27-Jul-2019 20-Jul-2019 21-Jul-2019 24-Jul-2019 24-Jul-2019 27-Jul-2019 25-Jul-2019 25-Jul-2019 16-Apr-2019 10-Feb-2019 10-Feb-2019 10-Feb-2019 12-Feb-2019 13-Feb-2019 14-Feb-2019 15-Feb-2019 31-Mar-2019 31-Mar-2019 30-Mar-2019 7-Apr-2019 8-Apr-2019 10-Apr-2019 12-Apr-2019 13-Apr-2019 14-Apr-2019 16-Apr-2019 29-Apr-2019 7-Apr-2019 8-Apr-2019 9-Apr-2019 10-Apr-2019 11-Apr-2019 12-Apr-2019 13-Apr-2019 14-Apr-2019 16-Apr-2019 18-Apr-2019 20-Apr-2019 22-Apr-2019 24-Apr-2019 28-Apr-2019 29-Apr-2019 2-Aug-2019 29-Jul-2019 29-Jul-2019 29-Jul-2019 31-Jul-2019 1-Aug-2019 2-Aug-2019

9

1,234,715

2,407,799 51,049 592,849 2,397,135 2,860,976 2,393,483 3,575,539 159,102 2,141,907 10,702,182 148,892 171,774

0.01 0.01 0.01 0.00 0.00 0.01 0.00 0.00 0.01 0.01 0.01 0.01 0.00 0.01 0.03 0.00 0.00 0.00 0.02 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00 0.00 0.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.00 0.00 0.00 0.06 0.00 0.14 0.02 0.03 0.00 0.07 0.01 0.05 0.02 0.01 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.03 0.00 0.00 0.02 0.01 0.01 0.05 0.01 0.02 0.03 0.01 0.01 0.02 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00 0.01 0.00 0.00 0.01

8

Feb 12-Feb-19

2,560,360 5,349,419 1,791,546 543,221 883,800

Waktu S tart 4-Feb-2019 4-Feb-2019 5-Feb-2019 6-Feb-2019 6-Feb-2019 7-Feb-2019 7-Feb-2019 7-Feb-2019 8-Feb-2019 9-Feb-2019 11-Feb-2019 12-Feb-2019 14-Feb-2019 9-Feb-2019 8-Feb-2019 9-Feb-2019 12-Feb-2019 7-Feb-2019 15-Feb-2019 16-Feb-2019 16-Feb-2019 18-Feb-2019 20-Feb-2019 18-Feb-2019 19-Feb-2019 21-Feb-2019 22-Feb-2019 22-Feb-2019 23-Feb-2019 25-Feb-2019 25-Feb-2019 26-Feb-2019 27-Feb-2019 28-Feb-2019 3-Mar-2019 5-Mar-2019 25-Feb-2019 26-Feb-2019 27-Feb-2019 28-Feb-2019 3-Mar-2019 26-Apr-2019 27-Apr-2019 30-Apr-2019 2-May-2019 3-May-2019 6-May-2019 8-May-2019 9-May-2019 10-May-2019 11-May-2019 12-May-2019 13-May-2019 14-May-2019 7-Mar-2019 7-Mar-2019 10-Mar-2019 13-Mar-2019 15-Mar-2019 17-Mar-2019 18-Mar-2019 19-Mar-2019 20-Mar-2019 21-Mar-2019 18-May-2019 22-May-2019 25-May-2019 27-May-2019 30-May-2019 1-Jun-2019 2-Jun-2019 3-Jun-2019 4-Jun-2019 25-Mar-2019 30-Mar-2019 25-Mar-2019 5-Apr-2019 30-Mar-2019 25-Mar-2019 5-Apr-2019 8-Jun-2019 8-Jun-2019 8-Jun-2019 12-Jun-2019 19-Jun-2019 25-Jun-2019 2-Jul-2019 6-Jul-2019 12-Jul-2019 10-Jun-2019 10-Jun-2019 14-Jun-2019 18-Jun-2019 20-Jun-2019 21-Jun-2019 28-Jun-2019 28-Jun-2019 30-Jun-2019 3-Jul-2019 4-Jul-2019 6-Jul-2019 8-Jul-2019 8-Apr-2019 12-Jun-2019 13-Jun-2019 15-Jun-2019 17-Jun-2019 18-Jun-2019 19-Jun-2019 20-Jun-2019 21-Jun-2019 22-Jun-2019 23-Jun-2019 24-Jun-2019 25-Jun-2019 26-Jun-2019 8-Apr-2019 11-Apr-2019 27-Jun-2019 27-Jun-2019 28-Jun-2019 29-Jun-2019 2-Jul-2019 5-Jul-2019 7-Jul-2019 9-Jul-2019 11-Jul-2019 12-Jul-2019 14-Jul-2019 25-Jun-2019 25-Jun-2019 28-Jun-2019 5-Jul-2019 7-Jul-2019 8-Jul-2019 10-Jul-2019 12-Jul-2019 7-Jul-2019 7-Jul-2019 11-Jul-2019 15-Jul-2019 18-Jul-2019 18-Jul-2019 18-Jul-2019 21-Jul-2019 21-Jul-2019 24-Jul-2019 25-Jul-2019 25-Jul-2019 10-Feb-2019 10-Feb-2019 10-Feb-2019 10-Feb-2019 12-Feb-2019 13-Feb-2019 14-Feb-2019 15-Feb-2019 30-Mar-2019 30-Mar-2019 30-Mar-2019 7-Apr-2019 8-Apr-2019 9-Apr-2019 11-Apr-2019 13-Apr-2019 14-Apr-2019 15-Apr-2019 7-Apr-2019 7-Apr-2019 8-Apr-2019 9-Apr-2019 10-Apr-2019 11-Apr-2019 12-Apr-2019 13-Apr-2019 14-Apr-2019 15-Apr-2019 17-Apr-2019 19-Apr-2019 21-Apr-2019 23-Apr-2019 25-Apr-2019 29-Apr-2019 28-Jul-2019 28-Jul-2019 28-Jul-2019 28-Jul-2019 31-Jul-2019 31-Jul-2019 1-Aug-2019

7

Feb 11-Feb-19

(x100% )

6

Feb 10-Feb-19

(rupiah)

5

Induk Pekerjaan

Waktu Pelakasanaan Progress Pekerjaan

Feb

Bobot

4

7

187 Serah T erima (overhand)

Feb

PEKERJAAN PERSIAPAN & PENDAHULUAN Mobilisasi dan Demobiliasi Peralatan dan Perlengkapan Pembersihan Area/Lokasi Kerja Pengukuran dan Pemasangan Bowplank Pembuatan Bedeng dan Gudang Bahan Papan Nama Proyek uk 1, 2m x 1, 8m PEKERJAAN PO NDASI Pekerjaan Galian Urugan Pasir Pek. Pemasangan Batu Kosong (Aanstamping) Pekerjaan Pembesian Pondasi T apak Pekerjan Bekisting Pondasi T apak Pekerjaan Cor Beton (K-225) Pekerjaan Galian Urugan Pasir Pek. Pemasangan Batu Kosong (Aanstamping) Pekerjaan Pasangan Batu Pondasi ( 1 : 3) Pekerjaan Galian Pek. Pasangan Pondasi Rollag PEKERJAAN SLO O F Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Sloof Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d10&20-d8) Pekerjaan Bekisting Sloof Pekerjaan Cor Beton (K-225) PEKERJAAN TIMBUNAN, PENINGGIAN DAN PEMADATAN Urugan, T imbunan dan Peninggian Elevasi Pemadatan T anah PEKERJAAN KO LO M Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d12&18 cm-d6) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d12&18 cm-d6) Pekerjaan Bekisting Pekerjaan Cor Beton (K-200) Pekerjaan Pembesian (4d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-200) PEKERJAAN RINGBALO K (BALO K) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) PEKERJAAN CO R PLATE BETO N (DAK BETO N) Pekerjaan Pembesian Plate lantai Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian Plat Atap/kanopi beton Pekerjaan Bekisting Sloof Pekerjaan Cor Beton (K-225) PEKERJAAN DINDING Pek. Pasangan Bata Merah (1/2, Mix 1:5) Pek. Pasangan Bata Merah T rassram (1/2, Mix 1:3) Pekerjaan Plasteran (1.5 cm-mix 1:5) Pekerjaan Acian Pek. Pasangan Bata Merah (1/2, Mix 1:5) Pek. Pasangan Bata Merah T rassram (1/2, Mix 1:3) Pekerjaan Plasteran (1.5 cm-mix 1:5) Pekerjaan Acian PEKERJAAN ATAP Memasang Rangka Atap (Baja Ringan-Ex T ASO) Memasang Pelapis Atap (Metal Roof-Ex Sakura Roof Memasang Nok Atap Memasang Lisplank Memasang T alang Air PEKERJAAN KUSEN, PINTU, JENDELA DAN ACCESO RIS Memasang Kusen+Panel Pintu Utama Memasang Kusen+Panel Pintu Kamar/Ruangan Memasang Kusen+Panel Pintu WC Memasang Kusen+Panel Jendela Utama Memasang Jendela Pencahayaan/ T etap (Fixed Window) Memasang Lubang Angin/Loster (Bovenlight) PEKERJAAN INST. PIPA AIR BERSIH, LIMBAH DAN SANITASI Memasang Instalasi Pipa 3/4 PVC (Ex Maspion) Memasang Instalasi Pipa 1/2 PVC (Ex Maspion) Memasang Keran Air Standar ( Ex Onda) Memasang Shower Mandi ( Ex T OT O) Memasang T angki Air/T andom (Ex Penguin-1000L) Memasang Pompa Air ( Ex Shimizu 125 Watt) Memasang Instalasi Pipa Limbah 3" PVC (Ex Maspio Memasang Instalasi Pipa Kloset 4" PVC (Ex Maspion) Memasang Instalasi Pipa Saluran 5" PVC (Ex Maspion Memasang Kloset Duduk ( Ex T OT O) Memasang Kloset Jongkok ( Ex T OT O) Memasang Wastafel Cuci Memasang Floor Drain Pekerjaan Septik T ank ( 1000 L) Pekerjaan Sumur Resapan Limbah (800 L) PEKERJAAN INST. LISTRIK DAN PENERANGAN Pemasangan MCB Pengaman dan Box Pemasangan Instalasi Pembumian (Grounding) Pemasangan Kabel Instalasi ( NYM-3x2,5 mm2) Pemasangan Kabel Instalasi ( NYM-3x1,5 mm2) Pemasangan Fitting Lampu Pemasangan Saklar Lampu Pemasangan Receiptackle (Colokan Listrik) Pemasangan Lampu 5 Watt (ex-PHILIPS LED) Pemasangan Lampu 15 Watt (ex-PHILIPS LED) Pemasangan Lampu 20 Watt (ex-PHILIPS LED) PEKERJAAN KERAMIK LANTAI DAN DINDING Pekerjaan Cor Lantai Kerja Non Struktur (K100- 1:4:4 Memasang Keramik Lantai Utama (Ex Granito 60x60 Memasang Keramik Lantai T eras (Ex Platinum 40x40 Memasang Keramik Lantai WC (Ex Asia T ile 20x20) Memasang Keramik Dinding WC (Ex Roman 20x40) Memasang Plint Keramik Dinding (Ex Granito 15x60) Memasang Rope T ile (Kuku T egel/Plint Sudut) PEKERJAAN LANGIT-LANGIT (PLAFO N) Memasang Rangka Plafon ( Ex Furing 2/4 - 4/4) Memasang Pelapis Pelafon ( Ex Gipsum Board 9mm) Memasang List Plafon PEKERJAAN PENGECATAN DAN WATERPRO FING Pekerjaan Plamir Dinding Pekerjaan Cat Anti Lumut dan Waterprofing Pekerjaan Pengecatan Exterior ( Ex Mowilex) Pekerjaan Pengecatan Interior ( Ex Nippon Paint) Pekerjaan Pengecatan Plafon( Ex Mowilex) Pekerjaan Pengecatan Kayu ( Ex Avian) Pekerjaan Pengecatan Besi ( Ex Avian) PEKERJAAN TANGGA Pekerjaan Galian Pekerjaan Urugan T anah Galian Urugan Pasir Pasangan Batu Pondasi (1:4) Pekerjaan Pembesian Sloof Pekerjaan Bekisting Sloof Pekerjaan Cor Beton Sloof (K225) Pekerjaan Pembesian Utama ( d10-18 cm) Pekerjaan Pembesian Anak T angga ( d10-18 cm) Pekerjaan Bekisting T angga Pekerjaan Cor Beton (K-225) Pekerjaan Plasteran ( 1,5 cm- 1: 5) Pekerjaan Keramik T angga ( Ex Asia T ile 40x40) Pekerjaan Rope T ile Pekerjaan Plamir Pekerjaan Pengecatan T angga Pekerjaan Railing T angga PEKERJAAN PAGAR DAN TAMAN/HALAMAN Pekerjaan Galian Pondasi Pasangan Batu Pondasi Pekerjaan Pembesian Sloof Pekerjaan Bekisting Sloof Pekerjaan Pengecoran (K200) Pekerjaan Pembesian Kolom Pekerjaan Bekisting Kolom Pekerjaan Pengecoran (K200) Pasangan Batu Bata Pekerjaan Plasteran Pekerjaan Acian Pekerjaan Pasangan Batu Alam Pekerjaan Pengecatan Pekerjaan Pemasangan Paving Blok Pekerjaan Penanaman Pohon Perdu PEKERJAAN TAMBAHAN DAN LAINNYA Pekerjaan Pemasangan Meteran Listrik (PLN-2200 kWh Pekerjaan Pemasangan Meteran Air (PDAM) Pekerjaan Pemasangan Pintu T oko (Folding Door) Pemasangan Exhaust Fan Pemasangan AC (Air Conditioner-1 PK, Ex. Sharp) Pembersihan Area Kerja (Pasca Konstruksi)

1.00

Biaya

3

Feb

A A1 A2 A3 A4 A5 B B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 C C1 C2 C3 C4 C5 C6 D D1 D2 E E1 E2 E3 E4 E5 E6 E7 E8 E9 E10 E11 E12 E13 E14 E15 E16 E17 E18 E19 E20 E21 E22 E23 E24 F F1 F2 F3 F4 F5 F6 F7 F8 F9 F10 F11 F12 F13 F14 F15 F16 F17 F18 G G1 G2 G3 G4 G5 G6 H H1 H2 H3 H4 H5 H6 H7 H8 I I1 I2 I3 I4 I5 J J1 J2 J3 J4 J5 J6 K K1 K2 K3 K4 K5 K6 K7 K8 K9 K10 K11 K12 K13 K14 K15 L L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 M M1 M2 M3 M4 M5 M6 M7 N N1 N2 N3 O O1 O2 O3 O4 O5 O6 O7 P P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 P16 P17 Q Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q 10 Q 11 Q 12 Q 13 Q 14 Q 15 R R1 R2 R3 R4 R5 R6

Uraian Pekerjaan

2

Feb

26 Minggu 357,379,657

ID Pekerjaan

1

180

Feb

Total

Selesai (Finish) : Hari ( Work Day) :

Feb

512,211,985 357,379,657 61,596,970 931,188,612

5-Feb-19

4-Feb-2019 Monday 2-Aug-2019 Friday

Mulai (Start) : Bahan : Upah : Alat :

Wednesday, May 9, 2018 -270 1 Project Mulai (start) ## Hari Ini (today) 180 Project Selesai (Finish)

Feb 14-Feb-19

LAMPIRAN KURVA UPAH A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180

2

1/1

Software RAB Exarch sdaPro v2019

LAMPIRAN KURVA UPAH A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180

4-Feb-2019 Monday 2-Aug-2019 Friday

Jun 22-Jun-19

Jun 21-Jun-19

Jun 20-Jun-19

Jun 19-Jun-19

Jun 18-Jun-19

Jun 17-Jun-19

Jun 16-Jun-19

Jun 15-Jun-19

9-Jun-19

Jun 14-Jun-19

8-Jun-19

Jun

Jun 13-Jun-19

7-Jun-19

Jun

Jun 12-Jun-19

6-Jun-19

Jun

Jun 11-Jun-19

5-Jun-19

Jun

Jun 10-Jun-19

4-Jun-19

Jun

3-Jun-19

Jun

2-Jun-19

Jun

1-Jun-19

Jun

Jun

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May 9-May-19

May 8-May-19

May 6-May-19

May 5-May-19

May 4-May-19

May 3-May-19

May 2-May-19

Apr 30-Apr-19

May 1-May-19

Apr 29-Apr-19

Apr 28-Apr-19

Apr 27-Apr-19

Apr 26-Apr-19

Apr 25-Apr-19

Apr 24-Apr-19

Apr 23-Apr-19

Apr 22-Apr-19

Apr 21-Apr-19

Apr 20-Apr-19

Apr 19-Apr-19

Apr 18-Apr-19

Apr 17-Apr-19

May 7-May-19 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00

0.00

0.00

0.00

0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

63% 63%

0.00 0.00 0.00

61%

59% 58%

59%

58% 0.00 0.00 0.01 0.01 0.01

0.01

0.01

0.00 0.00 0.03

0.03 0.03 0.03 0.03 0.00 0.00 0.00

0.00

54%

0.00

0.00

0.00

0.01

0.01

0.01

0.00 0.01 0.00 0.00 0.00

0.00

51%

0.00

0.00 0.01 0.01

48%

0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00

0.00

0.00 0.00

0.00 0.00 0.00

0.00

0.00 0.00 0.00 0.00

44%

0.00 0.00 0.00 0.00 0.00 0.00

38%

36%

33% 32%

26%

26%

26%

27%

27% 27% 27% 27% 27% 27% 27% 27%

27%

28%

29% 29% 29% 29% 29% 29% 29% 29% 29% 29% 29% 29% 29% 29% 28% 29% 28% 28% 28% 28% 28% 28% 28% 28%

29%

30%

30% 30% 30% 30% 30% 30% 30% 30%

31% 31% 31% 31% 31% 31% 31%

0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00

0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00

0.00 0.00 0.00

0.00

29%

29%

29%

29%

29%

30%

30%

30%

31%

31%

32%

38%

44%

48%

58%

59%

63%

63%

29%

61%

29%

59%

28%

58%

28%

54%

28%

51%

27%

36%

27%

33%

27%

31%

27%

31%

0.37

31%

0.01

0.34 0.36 0.37

31%

0.01 0.02 0.01

0.32 0.33

31%

0.01 0.00

0.22 0.25 0.29 0.32

30%

0.04 0.03 0.03 0.03

0.18

30%

0.05

0.13

30%

0.02

0.06 0.08 0.10

30%

0.01 0.01 0.02

0.05 0.05 0.05 0.05

30%

0.00 0.00 0.00 0.00

0.05 0.05

30%

0.00 0.00

0.05 0.05 0.05

29%

0.00 0.00 0.00

0.04 0.04

29%

0.00 0.00

0.04 0.04 0.04

29%

0.00 0.00 0.00

0.03 0.04 0.04 0.04

29%

0.00 0.00 0.00 0.00

0.03

29%

0.00

0.03

29%

0.00

0.03 0.03 0.03

29%

0.00 0.00 0.00

0.03 0.03 0.03

29%

0.00 0.00 0.00

0.03 0.03 0.03

29%

0.00 0.00 0.00

0.03 0.03 0.03

28%

0.00 0.00 0.00

0.03 0.03

28%

0.00 0.00

0.02 0.02 0.02 0.02

28%

0.00 0.00 0.00 0.00

0.02 0.02 0.02

28%

0.00 0.00 0.00

0.02 0.02

28%

0.00 0.00

0.01 0.01 0.01 0.01

28%

0.00 0.00 0.00 0.00

0.01

28%

0.00

0.01

27%

0.00

0.01 0.01 0.01

27%

0.00 0.00 0.00

0.00 0.00 0.01

27%

0.00 0.00 0.00

27%

www.mitra-arsitek.com

0.00

27%

189,864

211,984

211,984

691,451

101,799

433,677

88,648

-

-

28-May-19

29-May-19

30-May-19

31-May-19

1-Jun-19

2-Jun-19

3-Jun-19

4-Jun-19

5-Jun-19

6-Jun-19

2,039,370

189,864

27-May-19

22-Jun-19

189,864

26-May-19

4,873,735

369,365

25-May-19

21-Jun-19

369,365

24-May-19

6,613,156

890,010

23-May-19

20-Jun-19

890,010

22-May-19

2,914,274

890,010

21-May-19

19-Jun-19

223,595

20-May-19

1,246,020

223,595

19-May-19

18-Jun-19

223,595

18-May-19

17-Jun-19

223,595

17-May-19

1,884,218

-

16-May-19

11,820,611

-

15-May-19

16-Jun-19

-

14-May-19

11,820,611

118,197

13-May-19

15-Jun-19

145,638

12-May-19

11,763,958

121,190

11-May-19

14-Jun-19

132,971

10-May-19

14,891,197

226,548

9-May-19

13-Jun-19

193,904

8-May-19

8,843,388

413,688

7-May-19

18,936,316

364,095

6-May-19

12-Jun-19

364,095

5-May-19

11-Jun-19

137,348

4-May-19

8,843,388

137,348

10-Jun-19

137,348 3-May-19

4,794,394

413,688 2-May-19

9-Jun-19

364,095 1-May-19

8-Jun-19

364,095 30-Apr-19

-

468,066 29-Apr-19

4,794,394

610,613 28-Apr-19

7-Jun-19

610,613

26% 26% 26% 27% 27% 27% 27% 27% 27% 27% 27% 27% 27% 28% 28% 28% 28% 28% 28% 28% 28% 28% 28% 29% 29% 29% 29% 29% 29% 29% 29% 29% 29% 29% 29% 29% 29% 29% 29% 30% 30% 30% 30% 30% 30% 30% 30% 30% 31% 31% 31% 31% 31% 31% 31% 32% 33% 36% 38% 44% 48% 51% 54% 58% 58% 59% 59% 61% 63% 63%

27-Apr-19

Hari Kalender

0.00

27%

CASH FLO WDAILY BIAYA KURVA UPAH

0.00 0.00

26%

Aktual Load (red Line)

0.00

26%

Load Plan (Blue Line)

0.00

26%

25.74% Total Bobot Kumulatif

0.00 0.00

770,926

3,616,335 9,667 19,334 3,179,083

0.00 0.00

26-Apr-19

680,650 970,920 109,071 267,738 88,648 116,342 194,184 94,557 1,017,918 1,323,981 490,363 686,509 98,694 1,925,377 338,797

0.00 0.00 0.00

25-Apr-19

227,592 9,476 8,508 220,664 83,863 68,847 165,475 351,450 300,551 550,188 585,074 514,882 1,138,089 1,112,144 137,302 301,128 534,769

0.00 0.00 0.00

49,347

9,885,726 3,499,233 2,839,832 8,022,845 3,088,158 58,118 279,619

0.00 0.00

481,344

16,733,085 4,756,525 6,055,988

0.00 0.00 0.00 0.00

24-Apr-19

1,288,446 9,532,665 1,107,330 245,761 5,957,915 2,708,182 2,912,759

0.00 0.00 0.00

0.00

49,347

93,997 93,997 617,731 741,277 197,394 131,596 96,672 22,124 73,746 58,996

0.00

23-Apr-19

602,701 378,841 492,147 101,257 117,496 93,997 1,390,467 733,858 347,617 678,230 940,988 464,126 89,666 1,669,800 979,616

0.00 0.00

0.00

343,254

701,156 1,402,312 701,156 1,273,671 1,132,294 468,902

0.00 0.00 0.00 0.00

22-Apr-19

18,435,397 7,131,843 2,257,047 3,530,935 2,448,123

0.00

343,254

21,172,695 1,119,710 48,957,883 6,767,015 10,115,560 397,624 23,316,780 1,980,087

0.00

21-Apr-19

1,684,538 4,806,052 2,304,835 327,213 647,280 325,041

0.00 0.00 0.00

245,182

1,090,708 4,385,320 1,211,516 363,569 425,586 413,688 61,564 53,401 53,189 894,381 2,670,029 738,729 569,592 423,968 691,451 101,799 433,677 88,648

0.00 0.00 0.00

20-Apr-19

363,569 3,009,851 384,139 775,615 6,634,617 916,024 266,618 307,458 233,438 290,856 317,167 289,582 387,807 728,190 413,688 412,045 728,190 413,688 193,904 226,548 132,971 121,190 145,638 118,197

245,182

699,793 259,803

D70 D71 D72 D73 D74 D75 D76 D77 D78 D79 D80 D81 D82 D83 D84 D85 D86 D87 D88 D89 D90 D91 D92 D93 D94 D95 D96 D97 D98 D99 D100D101D102D103D104D105D106D107D108D109D110D111D112D113D114D115D116D117D118D119D120D121D122D123D124D125D126D127D128D129D130D131D132D133D134D135D136D137D138D139

19-Apr-19

1,575,468 6,247,230 1,840,913 60,595 305,987 53,189

Finish 7-Feb-2019 4-Feb-2019 6-Feb-2019 6-Feb-2019 6-Feb-2019 7-Feb-2019 15-Feb-2019 8-Feb-2019 8-Feb-2019 10-Feb-2019 13-Feb-2019 13-Feb-2019 15-Feb-2019 12-Feb-2019 8-Feb-2019 12-Feb-2019 15-Feb-2019 7-Feb-2019 15-Feb-2019 21-Feb-2019 18-Feb-2019 20-Feb-2019 21-Feb-2019 19-Feb-2019 19-Feb-2019 21-Feb-2019 24-Feb-2019 23-Feb-2019 24-Feb-2019 14-May-2019 26-Feb-2019 26-Feb-2019 27-Feb-2019 2-Mar-2019 4-Mar-2019 5-Mar-2019 26-Feb-2019 26-Feb-2019 27-Feb-2019 1-Mar-2019 3-Mar-2019 26-Apr-2019 29-Apr-2019 1-May-2019 2-May-2019 5-May-2019 7-May-2019 8-May-2019 9-May-2019 10-May-2019 11-May-2019 12-May-2019 13-May-2019 14-May-2019 4-Jun-2019 9-Mar-2019 12-Mar-2019 14-Mar-2019 16-Mar-2019 17-Mar-2019 18-Mar-2019 19-Mar-2019 20-Mar-2019 21-Mar-2019 21-May-2019 24-May-2019 26-May-2019 29-May-2019 31-May-2019 1-Jun-2019 2-Jun-2019 3-Jun-2019 4-Jun-2019 5-Apr-2019 4-Apr-2019 29-Mar-2019 5-Apr-2019 31-Mar-2019 25-Mar-2019 5-Apr-2019 9-Jun-2019 12-Jun-2019 9-Jun-2019 16-Jun-2019 22-Jun-2019 29-Jun-2019 3-Jul-2019 9-Jul-2019 13-Jul-2019 13-Jun-2019 13-Jun-2019 17-Jun-2019 19-Jun-2019 20-Jun-2019 21-Jun-2019 11-Jul-2019 29-Jun-2019 2-Jul-2019 3-Jul-2019 5-Jul-2019 7-Jul-2019 11-Jul-2019 26-Jun-2019 13-Jun-2019 14-Jun-2019 16-Jun-2019 17-Jun-2019 18-Jun-2019 19-Jun-2019 20-Jun-2019 21-Jun-2019 22-Jun-2019 23-Jun-2019 24-Jun-2019 25-Jun-2019 26-Jun-2019 10-Apr-2019 12-Apr-2019 27-Jun-2019 27-Jun-2019 28-Jun-2019 1-Jul-2019 4-Jul-2019 6-Jul-2019 8-Jul-2019 10-Jul-2019 11-Jul-2019 13-Jul-2019 15-Jul-2019 12-Jul-2019 26-Jun-2019 4-Jul-2019 6-Jul-2019 7-Jul-2019 9-Jul-2019 11-Jul-2019 12-Jul-2019 16-Jul-2019 10-Jul-2019 14-Jul-2019 16-Jul-2019 27-Jul-2019 20-Jul-2019 21-Jul-2019 24-Jul-2019 24-Jul-2019 27-Jul-2019 25-Jul-2019 25-Jul-2019 16-Apr-2019 10-Feb-2019 10-Feb-2019 10-Feb-2019 12-Feb-2019 13-Feb-2019 14-Feb-2019 15-Feb-2019 31-Mar-2019 31-Mar-2019 30-Mar-2019 7-Apr-2019 8-Apr-2019 10-Apr-2019 12-Apr-2019 13-Apr-2019 14-Apr-2019 16-Apr-2019 29-Apr-2019 7-Apr-2019 8-Apr-2019 9-Apr-2019 10-Apr-2019 11-Apr-2019 12-Apr-2019 13-Apr-2019 14-Apr-2019 16-Apr-2019 18-Apr-2019 20-Apr-2019 22-Apr-2019 24-Apr-2019 28-Apr-2019 29-Apr-2019 2-Aug-2019 29-Jul-2019 29-Jul-2019 29-Jul-2019 31-Jul-2019 1-Aug-2019 2-Aug-2019

661,991

2,407,799 51,049 592,849 2,397,135 2,860,976 2,393,483 3,575,539 159,102 2,141,907 10,702,182 148,892 171,774

0.01 0.01 0.01 0.00 0.00 0.01 0.00 0.00 0.01 0.01 0.01 0.01 0.00 0.01 0.03 0.00 0.00 0.00 0.02 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00 0.00 0.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.00 0.00 0.00 0.06 0.00 0.14 0.02 0.03 0.00 0.07 0.01 0.05 0.02 0.01 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.03 0.00 0.00 0.02 0.01 0.01 0.05 0.01 0.02 0.03 0.01 0.01 0.02 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00 0.01 0.00 0.00 0.01

18-Apr-19

2,560,360 5,349,419 1,791,546 543,221 883,800

Waktu S tart 4-Feb-2019 4-Feb-2019 5-Feb-2019 6-Feb-2019 6-Feb-2019 7-Feb-2019 7-Feb-2019 7-Feb-2019 8-Feb-2019 9-Feb-2019 11-Feb-2019 12-Feb-2019 14-Feb-2019 9-Feb-2019 8-Feb-2019 9-Feb-2019 12-Feb-2019 7-Feb-2019 15-Feb-2019 16-Feb-2019 16-Feb-2019 18-Feb-2019 20-Feb-2019 18-Feb-2019 19-Feb-2019 21-Feb-2019 22-Feb-2019 22-Feb-2019 23-Feb-2019 25-Feb-2019 25-Feb-2019 26-Feb-2019 27-Feb-2019 28-Feb-2019 3-Mar-2019 5-Mar-2019 25-Feb-2019 26-Feb-2019 27-Feb-2019 28-Feb-2019 3-Mar-2019 26-Apr-2019 27-Apr-2019 30-Apr-2019 2-May-2019 3-May-2019 6-May-2019 8-May-2019 9-May-2019 10-May-2019 11-May-2019 12-May-2019 13-May-2019 14-May-2019 7-Mar-2019 7-Mar-2019 10-Mar-2019 13-Mar-2019 15-Mar-2019 17-Mar-2019 18-Mar-2019 19-Mar-2019 20-Mar-2019 21-Mar-2019 18-May-2019 22-May-2019 25-May-2019 27-May-2019 30-May-2019 1-Jun-2019 2-Jun-2019 3-Jun-2019 4-Jun-2019 25-Mar-2019 30-Mar-2019 25-Mar-2019 5-Apr-2019 30-Mar-2019 25-Mar-2019 5-Apr-2019 8-Jun-2019 8-Jun-2019 8-Jun-2019 12-Jun-2019 19-Jun-2019 25-Jun-2019 2-Jul-2019 6-Jul-2019 12-Jul-2019 10-Jun-2019 10-Jun-2019 14-Jun-2019 18-Jun-2019 20-Jun-2019 21-Jun-2019 28-Jun-2019 28-Jun-2019 30-Jun-2019 3-Jul-2019 4-Jul-2019 6-Jul-2019 8-Jul-2019 8-Apr-2019 12-Jun-2019 13-Jun-2019 15-Jun-2019 17-Jun-2019 18-Jun-2019 19-Jun-2019 20-Jun-2019 21-Jun-2019 22-Jun-2019 23-Jun-2019 24-Jun-2019 25-Jun-2019 26-Jun-2019 8-Apr-2019 11-Apr-2019 27-Jun-2019 27-Jun-2019 28-Jun-2019 29-Jun-2019 2-Jul-2019 5-Jul-2019 7-Jul-2019 9-Jul-2019 11-Jul-2019 12-Jul-2019 14-Jul-2019 25-Jun-2019 25-Jun-2019 28-Jun-2019 5-Jul-2019 7-Jul-2019 8-Jul-2019 10-Jul-2019 12-Jul-2019 7-Jul-2019 7-Jul-2019 11-Jul-2019 15-Jul-2019 18-Jul-2019 18-Jul-2019 18-Jul-2019 21-Jul-2019 21-Jul-2019 24-Jul-2019 25-Jul-2019 25-Jul-2019 10-Feb-2019 10-Feb-2019 10-Feb-2019 10-Feb-2019 12-Feb-2019 13-Feb-2019 14-Feb-2019 15-Feb-2019 30-Mar-2019 30-Mar-2019 30-Mar-2019 7-Apr-2019 8-Apr-2019 9-Apr-2019 11-Apr-2019 13-Apr-2019 14-Apr-2019 15-Apr-2019 7-Apr-2019 7-Apr-2019 8-Apr-2019 9-Apr-2019 10-Apr-2019 11-Apr-2019 12-Apr-2019 13-Apr-2019 14-Apr-2019 15-Apr-2019 17-Apr-2019 19-Apr-2019 21-Apr-2019 23-Apr-2019 25-Apr-2019 29-Apr-2019 28-Jul-2019 28-Jul-2019 28-Jul-2019 28-Jul-2019 31-Jul-2019 31-Jul-2019 1-Aug-2019

Apr 16-Apr-19

(x100% )

17-Apr-19

(rupiah)

Apr 15-Apr-19

Apr 14-Apr-19

Bobot

661,991

PEKERJAAN PERSIAPAN & PENDAHULUAN Mobilisasi dan Demobiliasi Peralatan dan Perlengkapan Pembersihan Area/Lokasi Kerja Pengukuran dan Pemasangan Bowplank Pembuatan Bedeng dan Gudang Bahan Papan Nama Proyek uk 1, 2m x 1, 8m PEKERJAAN PO NDASI Pekerjaan Galian Urugan Pasir Pek. Pemasangan Batu Kosong (Aanstamping) Pekerjaan Pembesian Pondasi T apak Pekerjan Bekisting Pondasi T apak Pekerjaan Cor Beton (K-225) Pekerjaan Galian Urugan Pasir Pek. Pemasangan Batu Kosong (Aanstamping) Pekerjaan Pasangan Batu Pondasi ( 1 : 3) Pekerjaan Galian Pek. Pasangan Pondasi Rollag PEKERJAAN SLO O F Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Sloof Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d10&20-d8) Pekerjaan Bekisting Sloof Pekerjaan Cor Beton (K-225) PEKERJAAN TIMBUNAN, PENINGGIAN DAN PEMADATAN Urugan, T imbunan dan Peninggian Elevasi Pemadatan T anah PEKERJAAN KO LO M Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d12&18 cm-d6) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d12&18 cm-d6) Pekerjaan Bekisting Pekerjaan Cor Beton (K-200) Pekerjaan Pembesian (4d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-200) PEKERJAAN RINGBALO K (BALO K) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) PEKERJAAN CO R PLATE BETO N (DAK BETO N) Pekerjaan Pembesian Plate lantai Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian Plat Atap/kanopi beton Pekerjaan Bekisting Sloof Pekerjaan Cor Beton (K-225) PEKERJAAN DINDING Pek. Pasangan Bata Merah (1/2, Mix 1:5) Pek. Pasangan Bata Merah T rassram (1/2, Mix 1:3) Pekerjaan Plasteran (1.5 cm-mix 1:5) Pekerjaan Acian Pek. Pasangan Bata Merah (1/2, Mix 1:5) Pek. Pasangan Bata Merah T rassram (1/2, Mix 1:3) Pekerjaan Plasteran (1.5 cm-mix 1:5) Pekerjaan Acian PEKERJAAN ATAP Memasang Rangka Atap (Baja Ringan-Ex T ASO) Memasang Pelapis Atap (Metal Roof-Ex Sakura Roof Memasang Nok Atap Memasang Lisplank Memasang T alang Air PEKERJAAN KUSEN, PINTU, JENDELA DAN ACCESO RIS Memasang Kusen+Panel Pintu Utama Memasang Kusen+Panel Pintu Kamar/Ruangan Memasang Kusen+Panel Pintu WC Memasang Kusen+Panel Jendela Utama Memasang Jendela Pencahayaan/ T etap (Fixed Window) Memasang Lubang Angin/Loster (Bovenlight) PEKERJAAN INST. PIPA AIR BERSIH, LIMBAH DAN SANITASI Memasang Instalasi Pipa 3/4 PVC (Ex Maspion) Memasang Instalasi Pipa 1/2 PVC (Ex Maspion) Memasang Keran Air Standar ( Ex Onda) Memasang Shower Mandi ( Ex T OT O) Memasang T angki Air/T andom (Ex Penguin-1000L) Memasang Pompa Air ( Ex Shimizu 125 Watt) Memasang Instalasi Pipa Limbah 3" PVC (Ex Maspio Memasang Instalasi Pipa Kloset 4" PVC (Ex Maspion) Memasang Instalasi Pipa Saluran 5" PVC (Ex Maspion Memasang Kloset Duduk ( Ex T OT O) Memasang Kloset Jongkok ( Ex T OT O) Memasang Wastafel Cuci Memasang Floor Drain Pekerjaan Septik T ank ( 1000 L) Pekerjaan Sumur Resapan Limbah (800 L) PEKERJAAN INST. LISTRIK DAN PENERANGAN Pemasangan MCB Pengaman dan Box Pemasangan Instalasi Pembumian (Grounding) Pemasangan Kabel Instalasi ( NYM-3x2,5 mm2) Pemasangan Kabel Instalasi ( NYM-3x1,5 mm2) Pemasangan Fitting Lampu Pemasangan Saklar Lampu Pemasangan Receiptackle (Colokan Listrik) Pemasangan Lampu 5 Watt (ex-PHILIPS LED) Pemasangan Lampu 15 Watt (ex-PHILIPS LED) Pemasangan Lampu 20 Watt (ex-PHILIPS LED) PEKERJAAN KERAMIK LANTAI DAN DINDING Pekerjaan Cor Lantai Kerja Non Struktur (K100- 1:4:4 Memasang Keramik Lantai Utama (Ex Granito 60x60 Memasang Keramik Lantai T eras (Ex Platinum 40x40 Memasang Keramik Lantai WC (Ex Asia T ile 20x20) Memasang Keramik Dinding WC (Ex Roman 20x40) Memasang Plint Keramik Dinding (Ex Granito 15x60) Memasang Rope T ile (Kuku T egel/Plint Sudut) PEKERJAAN LANGIT-LANGIT (PLAFO N) Memasang Rangka Plafon ( Ex Furing 2/4 - 4/4) Memasang Pelapis Pelafon ( Ex Gipsum Board 9mm) Memasang List Plafon PEKERJAAN PENGECATAN DAN WATERPRO FING Pekerjaan Plamir Dinding Pekerjaan Cat Anti Lumut dan Waterprofing Pekerjaan Pengecatan Exterior ( Ex Mowilex) Pekerjaan Pengecatan Interior ( Ex Nippon Paint) Pekerjaan Pengecatan Plafon( Ex Mowilex) Pekerjaan Pengecatan Kayu ( Ex Avian) Pekerjaan Pengecatan Besi ( Ex Avian) PEKERJAAN TANGGA Pekerjaan Galian Pekerjaan Urugan T anah Galian Urugan Pasir Pasangan Batu Pondasi (1:4) Pekerjaan Pembesian Sloof Pekerjaan Bekisting Sloof Pekerjaan Cor Beton Sloof (K225) Pekerjaan Pembesian Utama ( d10-18 cm) Pekerjaan Pembesian Anak T angga ( d10-18 cm) Pekerjaan Bekisting T angga Pekerjaan Cor Beton (K-225) Pekerjaan Plasteran ( 1,5 cm- 1: 5) Pekerjaan Keramik T angga ( Ex Asia T ile 40x40) Pekerjaan Rope T ile Pekerjaan Plamir Pekerjaan Pengecatan T angga Pekerjaan Railing T angga PEKERJAAN PAGAR DAN TAMAN/HALAMAN Pekerjaan Galian Pondasi Pasangan Batu Pondasi Pekerjaan Pembesian Sloof Pekerjaan Bekisting Sloof Pekerjaan Pengecoran (K200) Pekerjaan Pembesian Kolom Pekerjaan Bekisting Kolom Pekerjaan Pengecoran (K200) Pasangan Batu Bata Pekerjaan Plasteran Pekerjaan Acian Pekerjaan Pasangan Batu Alam Pekerjaan Pengecatan Pekerjaan Pemasangan Paving Blok Pekerjaan Penanaman Pohon Perdu PEKERJAAN TAMBAHAN DAN LAINNYA Pekerjaan Pemasangan Meteran Listrik (PLN-2200 kWh Pekerjaan Pemasangan Meteran Air (PDAM) Pekerjaan Pemasangan Pintu T oko (Folding Door) Pemasangan Exhaust Fan Pemasangan AC (Air Conditioner-1 PK, Ex. Sharp) Pembersihan Area Kerja (Pasca Konstruksi)

1.00

Biaya

16-Apr-19

A A1 A2 A3 A4 A5 B B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 C C1 C2 C3 C4 C5 C6 D D1 D2 E E1 E2 E3 E4 E5 E6 E7 E8 E9 E10 E11 E12 E13 E14 E15 E16 E17 E18 E19 E20 E21 E22 E23 E24 F F1 F2 F3 F4 F5 F6 F7 F8 F9 F10 F11 F12 F13 F14 F15 F16 F17 F18 G G1 G2 G3 G4 G5 G6 H H1 H2 H3 H4 H5 H6 H7 H8 I I1 I2 I3 I4 I5 J J1 J2 J3 J4 J5 J6 K K1 K2 K3 K4 K5 K6 K7 K8 K9 K10 K11 K12 K13 K14 K15 L L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 M M1 M2 M3 M4 M5 M6 M7 N N1 N2 N3 O O1 O2 O3 O4 O5 O6 O7 P P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 P16 P17 Q Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q 10 Q 11 Q 12 Q 13 Q 14 Q 15 R R1 R2 R3 R4 R5 R6

Uraian Pekerjaan

395,685

26 Minggu 357,379,657

ID Pekerjaan

70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##

180

776,343

Total

Selesai (Finish) : Hari ( Work Day) :

Induk Pekerjaan

Waktu Pelakasanaan Progress Pekerjaan

776,343

512,211,985 357,379,657 61,596,970 931,188,612

7

187 Serah T erima (overhand)

15-Apr-19

Mulai (Start) : Bahan : Upah : Alat :

Wednesday, May 9, 2018 -270 1 Project Mulai (start) ## Hari Ini (today) 180 Project Selesai (Finish)

14-Apr-19

2

1/1

Software RAB Exarch sdaPro v2019

LAMPIRAN KURVA UPAH A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180

4-Feb-2019 Monday 2-Aug-2019 Friday

0.01

Aug 31-Aug-19

Aug 30-Aug-19

Aug 29-Aug-19

Aug 28-Aug-19

Aug 27-Aug-19

Aug 26-Aug-19

Aug 25-Aug-19

Aug 24-Aug-19

Aug 23-Aug-19

Aug 22-Aug-19

Aug 21-Aug-19

31-Jul-19

Aug 20-Aug-19

30-Jul-19

Jul

Aug 19-Aug-19

29-Jul-19

Jul

Aug 18-Aug-19

28-Jul-19

Jul

Aug 17-Aug-19

27-Jul-19

Jul

Aug 16-Aug-19

26-Jul-19

Jul

Aug 15-Aug-19

25-Jul-19

Jul

Aug 14-Aug-19

24-Jul-19

Jul

Aug 13-Aug-19

23-Jul-19

Jul

Aug 12-Aug-19

22-Jul-19

Jul

Aug 11-Aug-19

21-Jul-19

Jul

Aug 10-Aug-19

20-Jul-19

Jul

Aug 9-Aug-19

19-Jul-19

Jul

Aug 8-Aug-19

18-Jul-19

Jul

Aug 7-Aug-19

17-Jul-19

Jul

Aug 6-Aug-19

16-Jul-19

Jul

Aug 5-Aug-19

15-Jul-19

Jul

Aug 4-Aug-19

14-Jul-19

Jul

Aug 3-Aug-19

13-Jul-19

Aug 2-Aug-19

12-Jul-19

Jul

Aug 1-Aug-19

11-Jul-19

8-Jul-19

Jul

Jul

7-Jul-19

Jul

Jul

6-Jul-19

Jul

Jul

5-Jul-19

Jul

9-Jul-19

4-Jul-19

Jul

10-Jul-19

3-Jul-19

Jul

Jul

2-Jul-19

Jul

Jul

1-Jul-19

Jul

Jun 30-Jun-19

Jun 29-Jun-19

Jun 28-Jun-19

Jun 27-Jun-19

Jun 26-Jun-19

0.01 0.01 0.01

0.01 0.00 0.00 0.02

0.02 0.02 0.02 0.00 0.00

0.00

0.00

0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00

0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00

0.00 0.00 0.00

0.00

0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00 0.01 0.01 0.00 0.00 0.01 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.01 0.01 0.01

0.01 0.00 0.00 0.00

0.00 0.00

0.00

0.00 0.01

0.01 0.00

0.00 0.00 0.00

0.01

0.01 0.01

0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00 0.00 0.00

0.01

0.01 0.01 0.01 0.00

0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.01

0.01

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

96%

98%

99%

99%

99%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

93%

100%

90%

100%

89%

100%

86%

100%

77%

100%

72%

100%

69%

100%

69%

100%

68%

100%

0.37

100%

0.00

0.37 0.37 0.37

100%

0.00 0.00 0.00

0.37 0.37

100%

0.00 0.00

0.37 0.37 0.37 0.37

100%

0.00 0.00 0.00 0.00

0.37

100%

0.00

0.37

100%

0.00

0.37 0.37 0.37

100%

0.00 0.00 0.00

0.37 0.37 0.37 0.37

100%

0.00 0.00 0.00 0.00

0.37 0.37

99%

0.00 0.00

0.37 0.37 0.37

100%

0.00 0.00 0.00

0.37 0.37

98%

0.00 0.00

0.37 0.37 0.37

98%

0.00 0.00 0.00

0.36 0.36 0.36 0.37

97%

0.00 0.00 0.00 0.00

0.36

96%

0.01

0.35

95%

0.01

0.34 0.35 0.35

94%

0.00 0.00 0.00

0.32 0.33 0.34

92%

0.01 0.01 0.01

0.30 0.31 0.32

90%

0.01 0.01 0.01

0.27 0.27 0.28

90%

0.01 0.00 0.01

0.25 0.26

88%

0.00 0.01

0.22 0.23 0.25 0.25

88%

0.02 0.01 0.01 0.01

0.13 0.17 0.21

86%

0.03 0.04 0.04

0.08 0.10

84%

0.00 0.02

0.06 0.07 0.07 0.08

80%

0.01 0.01 0.01 0.01

0.05

74%

0.01

0.05

71%

0.01

0.02 0.03 0.04

71%

0.01 0.01 0.01

0.00 0.00 0.01

70%

0.00 0.00 0.01

67%

www.mitra-arsitek.com

63%

66%

7,047,704

10,890,172

13,174,447

13,156,985

5,702,923

2,682,571

5,128,806

2,216,048

1,218,630

3,057,492

3,027,994

-

4,170,050

4,170,050

4,170,050

3,590,478

2,715,669

2,715,669

3,487,709

1,109,776

772,040

772,040

1,808,167

1,808,167

-

19,334

1,599,209

1,589,542

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

7-Jul-19

8-Jul-19

9-Jul-19

10-Jul-19

11-Jul-19

12-Jul-19

13-Jul-19

14-Jul-19

15-Jul-19

16-Jul-19

17-Jul-19

18-Jul-19

19-Jul-19

20-Jul-19

21-Jul-19

22-Jul-19

23-Jul-19

24-Jul-19

25-Jul-19

26-Jul-19

27-Jul-19

28-Jul-19

29-Jul-19

30-Jul-19

31-Jul-19

1-Aug-19

2-Aug-19

3-Aug-19

4-Aug-19

5-Aug-19

6-Aug-19

7-Aug-19

8-Aug-19

9-Aug-19

10-Aug-19

11-Aug-19

12-Aug-19

13-Aug-19

14-Aug-19

15-Aug-19

16-Aug-19

17-Aug-19

18-Aug-19

19-Aug-19

20-Aug-19

21-Aug-19

22-Aug-19

23-Aug-19

24-Aug-19

25-Aug-19

26-Aug-19

27-Aug-19

28-Aug-19

29-Aug-19

30-Aug-19

31-Aug-19

63% 64% 65% 65% 66% 67% 68% 69% 69% 70% 71% 71% 72% 74% 77% 80% 84% 86% 86% 88% 88% 89% 90% 90% 90% 92% 93% 94% 95% 96% 96% 97% 98% 98% 98% 99% 99% 99% 99% #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### ####

6-Jul-19

Hari Kalender

65%

65% 64%

65%

CASH FLO WDAILY BIAYA KURVA UPAH

67% 66%

65%

Aktual Load (red Line)

69% 69%

68%

64%

Load Plan (Blue Line)

72% 71% 71% 70%

63%

63.18% Total Bobot Kumulatif

74%

1,289,197

3,616,335 9,667 19,334 3,179,083

77%

5-Jul-19

680,650 970,920 109,071 267,738 88,648 116,342 194,184 94,557 1,017,918 1,323,981 490,363 686,509 98,694 1,925,377 338,797

80%

4-Jul-19

227,592 9,476 8,508 220,664 83,863 68,847 165,475 351,450 300,551 550,188 585,074 514,882 1,138,089 1,112,144 137,302 301,128 534,769

86%

84%

2,245,737

9,885,726 3,499,233 2,839,832 8,022,845 3,088,158 58,118 279,619

88%

86%

2,508,870

16,733,085 4,756,525 6,055,988

89%

3-Jul-19

1,288,446 9,532,665 1,107,330 245,761 5,957,915 2,708,182 2,912,759

90% 88%

2,275,151

93,997 93,997 617,731 741,277 197,394 131,596 96,672 22,124 73,746 58,996

92% 90% 90%

2-Jul-19

602,701 378,841 492,147 101,257 117,496 93,997 1,390,467 733,858 347,617 678,230 940,988 464,126 89,666 1,669,800 979,616

94%

93%

2,035,157

701,156 1,402,312 701,156 1,273,671 1,132,294 468,902

96%

96% 95%

1-Jul-19

18,435,397 7,131,843 2,257,047 3,530,935 2,448,123

98%

2,035,157

21,172,695 1,119,710 48,957,883 6,767,015 10,115,560 397,624 23,316,780 1,980,087

98%

30-Jun-19

1,684,538 4,806,052 2,304,835 327,213 647,280 325,041

98%

3,941,410

1,090,708 4,385,320 1,211,516 363,569 425,586 413,688 61,564 53,401 53,189 894,381 2,670,029 738,729 569,592 423,968 691,451 101,799 433,677 88,648

97%

29-Jun-19

363,569 3,009,851 384,139 775,615 6,634,617 916,024 266,618 307,458 233,438 290,856 317,167 289,582 387,807 728,190 413,688 412,045 728,190 413,688 193,904 226,548 132,971 121,190 145,638 118,197

100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100% 100% 100%

99% 99% 99% 99%

3,829,496

699,793 259,803

D140D141D142D143D144D145D146D147D148D149D150D151D152D153D154D155D156D157D158D159D160D161D162D163D164D165D166D167D168D169D170D171D172D173D174D175D176D177D178D179D180D181D182D183D184D185D186D187D188D189D190D191D192D193D194D195D196D197D198D199D200D201D202D203D204D205D206D207D208D209

28-Jun-19

1,575,468 6,247,230 1,840,913 60,595 305,987 53,189

Finish 7-Feb-2019 4-Feb-2019 6-Feb-2019 6-Feb-2019 6-Feb-2019 7-Feb-2019 15-Feb-2019 8-Feb-2019 8-Feb-2019 10-Feb-2019 13-Feb-2019 13-Feb-2019 15-Feb-2019 12-Feb-2019 8-Feb-2019 12-Feb-2019 15-Feb-2019 7-Feb-2019 15-Feb-2019 21-Feb-2019 18-Feb-2019 20-Feb-2019 21-Feb-2019 19-Feb-2019 19-Feb-2019 21-Feb-2019 24-Feb-2019 23-Feb-2019 24-Feb-2019 14-May-2019 26-Feb-2019 26-Feb-2019 27-Feb-2019 2-Mar-2019 4-Mar-2019 5-Mar-2019 26-Feb-2019 26-Feb-2019 27-Feb-2019 1-Mar-2019 3-Mar-2019 26-Apr-2019 29-Apr-2019 1-May-2019 2-May-2019 5-May-2019 7-May-2019 8-May-2019 9-May-2019 10-May-2019 11-May-2019 12-May-2019 13-May-2019 14-May-2019 4-Jun-2019 9-Mar-2019 12-Mar-2019 14-Mar-2019 16-Mar-2019 17-Mar-2019 18-Mar-2019 19-Mar-2019 20-Mar-2019 21-Mar-2019 21-May-2019 24-May-2019 26-May-2019 29-May-2019 31-May-2019 1-Jun-2019 2-Jun-2019 3-Jun-2019 4-Jun-2019 5-Apr-2019 4-Apr-2019 29-Mar-2019 5-Apr-2019 31-Mar-2019 25-Mar-2019 5-Apr-2019 9-Jun-2019 12-Jun-2019 9-Jun-2019 16-Jun-2019 22-Jun-2019 29-Jun-2019 3-Jul-2019 9-Jul-2019 13-Jul-2019 13-Jun-2019 13-Jun-2019 17-Jun-2019 19-Jun-2019 20-Jun-2019 21-Jun-2019 11-Jul-2019 29-Jun-2019 2-Jul-2019 3-Jul-2019 5-Jul-2019 7-Jul-2019 11-Jul-2019 26-Jun-2019 13-Jun-2019 14-Jun-2019 16-Jun-2019 17-Jun-2019 18-Jun-2019 19-Jun-2019 20-Jun-2019 21-Jun-2019 22-Jun-2019 23-Jun-2019 24-Jun-2019 25-Jun-2019 26-Jun-2019 10-Apr-2019 12-Apr-2019 27-Jun-2019 27-Jun-2019 28-Jun-2019 1-Jul-2019 4-Jul-2019 6-Jul-2019 8-Jul-2019 10-Jul-2019 11-Jul-2019 13-Jul-2019 15-Jul-2019 12-Jul-2019 26-Jun-2019 4-Jul-2019 6-Jul-2019 7-Jul-2019 9-Jul-2019 11-Jul-2019 12-Jul-2019 16-Jul-2019 10-Jul-2019 14-Jul-2019 16-Jul-2019 27-Jul-2019 20-Jul-2019 21-Jul-2019 24-Jul-2019 24-Jul-2019 27-Jul-2019 25-Jul-2019 25-Jul-2019 16-Apr-2019 10-Feb-2019 10-Feb-2019 10-Feb-2019 12-Feb-2019 13-Feb-2019 14-Feb-2019 15-Feb-2019 31-Mar-2019 31-Mar-2019 30-Mar-2019 7-Apr-2019 8-Apr-2019 10-Apr-2019 12-Apr-2019 13-Apr-2019 14-Apr-2019 16-Apr-2019 29-Apr-2019 7-Apr-2019 8-Apr-2019 9-Apr-2019 10-Apr-2019 11-Apr-2019 12-Apr-2019 13-Apr-2019 14-Apr-2019 16-Apr-2019 18-Apr-2019 20-Apr-2019 22-Apr-2019 24-Apr-2019 28-Apr-2019 29-Apr-2019 2-Aug-2019 29-Jul-2019 29-Jul-2019 29-Jul-2019 31-Jul-2019 1-Aug-2019 2-Aug-2019

2,117,109

2,407,799 51,049 592,849 2,397,135 2,860,976 2,393,483 3,575,539 159,102 2,141,907 10,702,182 148,892 171,774

0.01 0.01 0.01 0.00 0.00 0.01 0.00 0.00 0.01 0.01 0.01 0.01 0.00 0.01 0.03 0.00 0.00 0.00 0.02 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00 0.00 0.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.00 0.00 0.00 0.06 0.00 0.14 0.02 0.03 0.00 0.07 0.01 0.05 0.02 0.01 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.03 0.00 0.00 0.02 0.01 0.01 0.05 0.01 0.02 0.03 0.01 0.01 0.02 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00 0.01 0.00 0.00 0.01

27-Jun-19

2,560,360 5,349,419 1,791,546 543,221 883,800

Waktu S tart 4-Feb-2019 4-Feb-2019 5-Feb-2019 6-Feb-2019 6-Feb-2019 7-Feb-2019 7-Feb-2019 7-Feb-2019 8-Feb-2019 9-Feb-2019 11-Feb-2019 12-Feb-2019 14-Feb-2019 9-Feb-2019 8-Feb-2019 9-Feb-2019 12-Feb-2019 7-Feb-2019 15-Feb-2019 16-Feb-2019 16-Feb-2019 18-Feb-2019 20-Feb-2019 18-Feb-2019 19-Feb-2019 21-Feb-2019 22-Feb-2019 22-Feb-2019 23-Feb-2019 25-Feb-2019 25-Feb-2019 26-Feb-2019 27-Feb-2019 28-Feb-2019 3-Mar-2019 5-Mar-2019 25-Feb-2019 26-Feb-2019 27-Feb-2019 28-Feb-2019 3-Mar-2019 26-Apr-2019 27-Apr-2019 30-Apr-2019 2-May-2019 3-May-2019 6-May-2019 8-May-2019 9-May-2019 10-May-2019 11-May-2019 12-May-2019 13-May-2019 14-May-2019 7-Mar-2019 7-Mar-2019 10-Mar-2019 13-Mar-2019 15-Mar-2019 17-Mar-2019 18-Mar-2019 19-Mar-2019 20-Mar-2019 21-Mar-2019 18-May-2019 22-May-2019 25-May-2019 27-May-2019 30-May-2019 1-Jun-2019 2-Jun-2019 3-Jun-2019 4-Jun-2019 25-Mar-2019 30-Mar-2019 25-Mar-2019 5-Apr-2019 30-Mar-2019 25-Mar-2019 5-Apr-2019 8-Jun-2019 8-Jun-2019 8-Jun-2019 12-Jun-2019 19-Jun-2019 25-Jun-2019 2-Jul-2019 6-Jul-2019 12-Jul-2019 10-Jun-2019 10-Jun-2019 14-Jun-2019 18-Jun-2019 20-Jun-2019 21-Jun-2019 28-Jun-2019 28-Jun-2019 30-Jun-2019 3-Jul-2019 4-Jul-2019 6-Jul-2019 8-Jul-2019 8-Apr-2019 12-Jun-2019 13-Jun-2019 15-Jun-2019 17-Jun-2019 18-Jun-2019 19-Jun-2019 20-Jun-2019 21-Jun-2019 22-Jun-2019 23-Jun-2019 24-Jun-2019 25-Jun-2019 26-Jun-2019 8-Apr-2019 11-Apr-2019 27-Jun-2019 27-Jun-2019 28-Jun-2019 29-Jun-2019 2-Jul-2019 5-Jul-2019 7-Jul-2019 9-Jul-2019 11-Jul-2019 12-Jul-2019 14-Jul-2019 25-Jun-2019 25-Jun-2019 28-Jun-2019 5-Jul-2019 7-Jul-2019 8-Jul-2019 10-Jul-2019 12-Jul-2019 7-Jul-2019 7-Jul-2019 11-Jul-2019 15-Jul-2019 18-Jul-2019 18-Jul-2019 18-Jul-2019 21-Jul-2019 21-Jul-2019 24-Jul-2019 25-Jul-2019 25-Jul-2019 10-Feb-2019 10-Feb-2019 10-Feb-2019 10-Feb-2019 12-Feb-2019 13-Feb-2019 14-Feb-2019 15-Feb-2019 30-Mar-2019 30-Mar-2019 30-Mar-2019 7-Apr-2019 8-Apr-2019 9-Apr-2019 11-Apr-2019 13-Apr-2019 14-Apr-2019 15-Apr-2019 7-Apr-2019 7-Apr-2019 8-Apr-2019 9-Apr-2019 10-Apr-2019 11-Apr-2019 12-Apr-2019 13-Apr-2019 14-Apr-2019 15-Apr-2019 17-Apr-2019 19-Apr-2019 21-Apr-2019 23-Apr-2019 25-Apr-2019 29-Apr-2019 28-Jul-2019 28-Jul-2019 28-Jul-2019 28-Jul-2019 31-Jul-2019 31-Jul-2019 1-Aug-2019

Jun 25-Jun-19

(x100% )

26-Jun-19

(rupiah)

Jun 24-Jun-19

Jun 23-Jun-19

Bobot

2,757,001

PEKERJAAN PERSIAPAN & PENDAHULUAN Mobilisasi dan Demobiliasi Peralatan dan Perlengkapan Pembersihan Area/Lokasi Kerja Pengukuran dan Pemasangan Bowplank Pembuatan Bedeng dan Gudang Bahan Papan Nama Proyek uk 1, 2m x 1, 8m PEKERJAAN PO NDASI Pekerjaan Galian Urugan Pasir Pek. Pemasangan Batu Kosong (Aanstamping) Pekerjaan Pembesian Pondasi T apak Pekerjan Bekisting Pondasi T apak Pekerjaan Cor Beton (K-225) Pekerjaan Galian Urugan Pasir Pek. Pemasangan Batu Kosong (Aanstamping) Pekerjaan Pasangan Batu Pondasi ( 1 : 3) Pekerjaan Galian Pek. Pasangan Pondasi Rollag PEKERJAAN SLO O F Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Sloof Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d10&20-d8) Pekerjaan Bekisting Sloof Pekerjaan Cor Beton (K-225) PEKERJAAN TIMBUNAN, PENINGGIAN DAN PEMADATAN Urugan, T imbunan dan Peninggian Elevasi Pemadatan T anah PEKERJAAN KO LO M Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d12&18 cm-d6) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d12&18 cm-d6) Pekerjaan Bekisting Pekerjaan Cor Beton (K-200) Pekerjaan Pembesian (4d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-200) PEKERJAAN RINGBALO K (BALO K) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) PEKERJAAN CO R PLATE BETO N (DAK BETO N) Pekerjaan Pembesian Plate lantai Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian Plat Atap/kanopi beton Pekerjaan Bekisting Sloof Pekerjaan Cor Beton (K-225) PEKERJAAN DINDING Pek. Pasangan Bata Merah (1/2, Mix 1:5) Pek. Pasangan Bata Merah T rassram (1/2, Mix 1:3) Pekerjaan Plasteran (1.5 cm-mix 1:5) Pekerjaan Acian Pek. Pasangan Bata Merah (1/2, Mix 1:5) Pek. Pasangan Bata Merah T rassram (1/2, Mix 1:3) Pekerjaan Plasteran (1.5 cm-mix 1:5) Pekerjaan Acian PEKERJAAN ATAP Memasang Rangka Atap (Baja Ringan-Ex T ASO) Memasang Pelapis Atap (Metal Roof-Ex Sakura Roof Memasang Nok Atap Memasang Lisplank Memasang T alang Air PEKERJAAN KUSEN, PINTU, JENDELA DAN ACCESO RIS Memasang Kusen+Panel Pintu Utama Memasang Kusen+Panel Pintu Kamar/Ruangan Memasang Kusen+Panel Pintu WC Memasang Kusen+Panel Jendela Utama Memasang Jendela Pencahayaan/ T etap (Fixed Window) Memasang Lubang Angin/Loster (Bovenlight) PEKERJAAN INST. PIPA AIR BERSIH, LIMBAH DAN SANITASI Memasang Instalasi Pipa 3/4 PVC (Ex Maspion) Memasang Instalasi Pipa 1/2 PVC (Ex Maspion) Memasang Keran Air Standar ( Ex Onda) Memasang Shower Mandi ( Ex T OT O) Memasang T angki Air/T andom (Ex Penguin-1000L) Memasang Pompa Air ( Ex Shimizu 125 Watt) Memasang Instalasi Pipa Limbah 3" PVC (Ex Maspio Memasang Instalasi Pipa Kloset 4" PVC (Ex Maspion) Memasang Instalasi Pipa Saluran 5" PVC (Ex Maspion Memasang Kloset Duduk ( Ex T OT O) Memasang Kloset Jongkok ( Ex T OT O) Memasang Wastafel Cuci Memasang Floor Drain Pekerjaan Septik T ank ( 1000 L) Pekerjaan Sumur Resapan Limbah (800 L) PEKERJAAN INST. LISTRIK DAN PENERANGAN Pemasangan MCB Pengaman dan Box Pemasangan Instalasi Pembumian (Grounding) Pemasangan Kabel Instalasi ( NYM-3x2,5 mm2) Pemasangan Kabel Instalasi ( NYM-3x1,5 mm2) Pemasangan Fitting Lampu Pemasangan Saklar Lampu Pemasangan Receiptackle (Colokan Listrik) Pemasangan Lampu 5 Watt (ex-PHILIPS LED) Pemasangan Lampu 15 Watt (ex-PHILIPS LED) Pemasangan Lampu 20 Watt (ex-PHILIPS LED) PEKERJAAN KERAMIK LANTAI DAN DINDING Pekerjaan Cor Lantai Kerja Non Struktur (K100- 1:4:4 Memasang Keramik Lantai Utama (Ex Granito 60x60 Memasang Keramik Lantai T eras (Ex Platinum 40x40 Memasang Keramik Lantai WC (Ex Asia T ile 20x20) Memasang Keramik Dinding WC (Ex Roman 20x40) Memasang Plint Keramik Dinding (Ex Granito 15x60) Memasang Rope T ile (Kuku T egel/Plint Sudut) PEKERJAAN LANGIT-LANGIT (PLAFO N) Memasang Rangka Plafon ( Ex Furing 2/4 - 4/4) Memasang Pelapis Pelafon ( Ex Gipsum Board 9mm) Memasang List Plafon PEKERJAAN PENGECATAN DAN WATERPRO FING Pekerjaan Plamir Dinding Pekerjaan Cat Anti Lumut dan Waterprofing Pekerjaan Pengecatan Exterior ( Ex Mowilex) Pekerjaan Pengecatan Interior ( Ex Nippon Paint) Pekerjaan Pengecatan Plafon( Ex Mowilex) Pekerjaan Pengecatan Kayu ( Ex Avian) Pekerjaan Pengecatan Besi ( Ex Avian) PEKERJAAN TANGGA Pekerjaan Galian Pekerjaan Urugan T anah Galian Urugan Pasir Pasangan Batu Pondasi (1:4) Pekerjaan Pembesian Sloof Pekerjaan Bekisting Sloof Pekerjaan Cor Beton Sloof (K225) Pekerjaan Pembesian Utama ( d10-18 cm) Pekerjaan Pembesian Anak T angga ( d10-18 cm) Pekerjaan Bekisting T angga Pekerjaan Cor Beton (K-225) Pekerjaan Plasteran ( 1,5 cm- 1: 5) Pekerjaan Keramik T angga ( Ex Asia T ile 40x40) Pekerjaan Rope T ile Pekerjaan Plamir Pekerjaan Pengecatan T angga Pekerjaan Railing T angga PEKERJAAN PAGAR DAN TAMAN/HALAMAN Pekerjaan Galian Pondasi Pasangan Batu Pondasi Pekerjaan Pembesian Sloof Pekerjaan Bekisting Sloof Pekerjaan Pengecoran (K200) Pekerjaan Pembesian Kolom Pekerjaan Bekisting Kolom Pekerjaan Pengecoran (K200) Pasangan Batu Bata Pekerjaan Plasteran Pekerjaan Acian Pekerjaan Pasangan Batu Alam Pekerjaan Pengecatan Pekerjaan Pemasangan Paving Blok Pekerjaan Penanaman Pohon Perdu PEKERJAAN TAMBAHAN DAN LAINNYA Pekerjaan Pemasangan Meteran Listrik (PLN-2200 kWh Pekerjaan Pemasangan Meteran Air (PDAM) Pekerjaan Pemasangan Pintu T oko (Folding Door) Pemasangan Exhaust Fan Pemasangan AC (Air Conditioner-1 PK, Ex. Sharp) Pembersihan Area Kerja (Pasca Konstruksi)

1.00

Biaya

25-Jun-19

A A1 A2 A3 A4 A5 B B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 C C1 C2 C3 C4 C5 C6 D D1 D2 E E1 E2 E3 E4 E5 E6 E7 E8 E9 E10 E11 E12 E13 E14 E15 E16 E17 E18 E19 E20 E21 E22 E23 E24 F F1 F2 F3 F4 F5 F6 F7 F8 F9 F10 F11 F12 F13 F14 F15 F16 F17 F18 G G1 G2 G3 G4 G5 G6 H H1 H2 H3 H4 H5 H6 H7 H8 I I1 I2 I3 I4 I5 J J1 J2 J3 J4 J5 J6 K K1 K2 K3 K4 K5 K6 K7 K8 K9 K10 K11 K12 K13 K14 K15 L L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 M M1 M2 M3 M4 M5 M6 M7 N N1 N2 N3 O O1 O2 O3 O4 O5 O6 O7 P P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 P16 P17 Q Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q 10 Q 11 Q 12 Q 13 Q 14 Q 15 R R1 R2 R3 R4 R5 R6

Uraian Pekerjaan

678,230

26 Minggu 357,379,657

ID Pekerjaan

## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##

180

940,988

Total

Selesai (Finish) : Hari ( Work Day) :

Induk Pekerjaan

Waktu Pelakasanaan Progress Pekerjaan

3,131,461

512,211,985 357,379,657 61,596,970 931,188,612

7

187 Serah T erima (overhand)

24-Jun-19

Mulai (Start) : Bahan : Upah : Alat :

Wednesday, May 9, 2018 -270 1 Project Mulai (start) ## Hari Ini (today) 180 Project Selesai (Finish)

23-Jun-19

2

1/1

Software RAB Exarch sdaPro v2019

Mar 31-Mar-19

Mar 30-Mar-19

Mar 29-Mar-19

Mar 28-Mar-19

Mar 27-Mar-19

Mar 26-Mar-19

Mar 25-Mar-19

Mar 24-Mar-19

Mar 23-Mar-19

Mar 22-Mar-19

Mar 21-Mar-19

Mar 20-Mar-19

Mar 19-Mar-19

Mar 18-Mar-19

Mar 17-Mar-19

Mar 16-Mar-19

Mar 15-Mar-19

Mar 14-Mar-19

Mar 13-Mar-19

Mar 12-Mar-19

Mar 11-Mar-19

Mar 10-Mar-19

Apr 14-Apr-19

Apr 13-Apr-19

Apr 12-Apr-19

Apr 11-Apr-19

8-Apr-19

9-Apr-19

7-Apr-19

Apr

Apr 10-Apr-19

6-Apr-19

Apr

Apr

5-Apr-19

Apr

4-Apr-19

3-Apr-19

Apr

Apr

2-Apr-19

Apr

1-Apr-19

Apr

9-Mar-19

Apr

8-Mar-19

7-Mar-19

Mar

6-Mar-19

Mar

Mar

5-Mar-19

4-Mar-19

Mar

3-Mar-19

Mar

Mar

2-Mar-19

Mar

1-Mar-19

Mar

Feb 28-Feb-19

Mar

Feb 27-Feb-19

Feb 26-Feb-19

Feb 25-Feb-19

Feb 24-Feb-19

Feb 23-Feb-19

Feb 22-Feb-19

Feb 21-Feb-19

Feb 20-Feb-19

Feb 19-Feb-19

Feb 18-Feb-19

Feb 17-Feb-19

Feb 16-Feb-19

Feb 12-Feb-19

Feb 15-Feb-19

Feb 13-Feb-19

Feb 11-Feb-19

9-Feb-19

Feb 10-Feb-19

8-Feb-19

Feb

7-Feb-19

6-Feb-19

Feb

0.00

0.00

0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00

0.00

0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00

0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00

0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

0.00 0.00

0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

0.00

0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%

2%

2%

3%

3%

3% 3%3%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

3%

3%

3%

3%

3%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

2%

3%

3%

3%

3%

3%

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

167,475

167,475

167,475

156,310

156,310

-

-

2-Mar-19

3-Mar-19

4-Mar-19

5-Mar-19

6-Mar-19

7-Mar-19

8-Mar-19

9-Mar-19

10-Mar-19

11-Mar-19

12-Mar-19

13-Mar-19

14-Mar-19

15-Mar-19

16-Mar-19

17-Mar-19

18-Mar-19

19-Mar-19

20-Mar-19

21-Mar-19

22-Mar-19

23-Mar-19

24-Mar-19

25-Mar-19

26-Mar-19

27-Mar-19

28-Mar-19

29-Mar-19

30-Mar-19

31-Mar-19

1-Apr-19

2-Apr-19

3-Apr-19

4-Apr-19

5-Apr-19

6-Apr-19

7-Apr-19

8-Apr-19

9-Apr-19

10-Apr-19

11-Apr-19

12-Apr-19

13-Apr-19

14-Apr-19

0.03

1-Mar-19

0.00

0.03 0.03 0.03

-

0.00 0.00 0.00

0.02 0.02

28-Feb-19

0.00 0.00

0.02 0.02 0.02 0.02

-

0.00 0.00 0.00 0.00

0.02

27-Feb-19

0.00

0.02

-

0.00

0.02 0.02 0.02

26-Feb-19

0.00 0.00 0.00

0.02 0.02 0.02 0.02

-

0.00 0.00 0.00 0.00

0.02 0.02

25-Feb-19

0.00 0.00

0.02 0.02 0.02

24-Feb-19

0.00 0.00 0.00

0.02 0.02

-

0.00 0.00

0.02 0.02 0.02

-

0.00 0.00 0.00

0.02 0.02 0.02 0.02

23-Feb-19

0.00 0.00 0.00 0.00

0.02

-

0.00

0.02

22-Feb-19

0.00

0.02 0.02 0.02

-

0.00 0.00 0.00

0.02 0.02 0.02

21-Feb-19

0.00 0.00 0.00

0.02 0.02 0.02

-

0.00 0.00 0.00

0.02 0.02 0.02

20-Feb-19

0.00 0.00 0.00

0.02 0.02

-

0.00 0.00

0.02 0.02 0.02 0.02

19-Feb-19

0.00 0.00 0.00 0.00

0.02 0.02 0.02

-

0.00 0.00 0.00

0.02 0.02

18-Feb-19

0.00 0.00

0.02 0.02 0.02 0.02

-

0.00 0.00 0.00 0.00

0.02

17-Feb-19

0.00

0.02

-

0.00

0.02 0.02 0.02

16-Feb-19

0.00 0.00 0.00

0.02 0.02 0.02

15-Feb-19

0.02 0.00 0.00

2%

www.mitra-arsitek.com

0.00

2%

Hari Kalender

0.00

2%

CASH FLO WDAILY BIAYA KURVA ALAT

0.00

2%

Aktual Load (red Line)

0.00

2%

Load Plan (Blue Line)

Feb

4-Feb-19

0.00% Total Bobot Kumulatif

0.00

-

6,978 13,956 -

0.00 0.00

0.00

-

539,270 44,660

0.00

0.00 0.00

14-Feb-19

1,093,723

0.00 0.00 0.00 0.00

0.00

-

49,796 -

0.00

0.00

13-Feb-19

34,222,958 -

0.00

0.00

-

-

0.00 0.00 0.00

0.00 0.00

-

111,650 111,650 523,359 418,688 117,233 93,786 69,781 8,374 27,913 22,330

D9 D10 D11 D12 D13 D14 D15 D16 D17 D18 D19 D20 D21 D22 D23 D24 D25 D26 D27 D28 D29 D30 D31 D32 D33 D34 D35 D36 D37 D38 D39 D40 D41 D42 D43 D44 D45 D46 D47 D48 D49 D50 D51 D52 D53 D54 D55 D56 D57 D58 D59 D60 D61 D62 D63 D64 D65 D66 D67 D68 D69 D70

0

12-Feb-19

3,419,281 2,149,263 55,825 167,475 111,650 3,516,975 1,856,181 879,244 16,748 33,495 502,425 312,620

D8

D4

0

11-Feb-19

334,950 669,900 334,950 446,600 558,250 103,276

D7

D3

-

7,646,909 -

D6

D2

0.02

10-Feb-19

-

D5

D1

0.00 0.00

-

-

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70

9-Feb-19

-

9

-

-

8

8-Feb-19

-

7

7-Feb-19

-

Finish 7-Feb-2019 4-Feb-2019 6-Feb-2019 6-Feb-2019 6-Feb-2019 7-Feb-2019 15-Feb-2019 8-Feb-2019 8-Feb-2019 10-Feb-2019 13-Feb-2019 13-Feb-2019 15-Feb-2019 12-Feb-2019 8-Feb-2019 12-Feb-2019 15-Feb-2019 7-Feb-2019 15-Feb-2019 21-Feb-2019 18-Feb-2019 20-Feb-2019 21-Feb-2019 19-Feb-2019 19-Feb-2019 21-Feb-2019 24-Feb-2019 23-Feb-2019 24-Feb-2019 14-May-2019 26-Feb-2019 26-Feb-2019 27-Feb-2019 2-Mar-2019 4-Mar-2019 5-Mar-2019 26-Feb-2019 26-Feb-2019 27-Feb-2019 1-Mar-2019 3-Mar-2019 26-Apr-2019 29-Apr-2019 1-May-2019 2-May-2019 5-May-2019 7-May-2019 8-May-2019 9-May-2019 10-May-2019 11-May-2019 12-May-2019 13-May-2019 14-May-2019 4-Jun-2019 9-Mar-2019 12-Mar-2019 14-Mar-2019 16-Mar-2019 17-Mar-2019 18-Mar-2019 19-Mar-2019 20-Mar-2019 21-Mar-2019 21-May-2019 24-May-2019 26-May-2019 29-May-2019 31-May-2019 1-Jun-2019 2-Jun-2019 3-Jun-2019 4-Jun-2019 5-Apr-2019 4-Apr-2019 29-Mar-2019 5-Apr-2019 31-Mar-2019 25-Mar-2019 5-Apr-2019 9-Jun-2019 12-Jun-2019 9-Jun-2019 16-Jun-2019 22-Jun-2019 29-Jun-2019 3-Jul-2019 9-Jul-2019 13-Jul-2019 13-Jun-2019 13-Jun-2019 17-Jun-2019 19-Jun-2019 20-Jun-2019 21-Jun-2019 11-Jul-2019 29-Jun-2019 2-Jul-2019 3-Jul-2019 5-Jul-2019 7-Jul-2019 11-Jul-2019 26-Jun-2019 13-Jun-2019 14-Jun-2019 16-Jun-2019 17-Jun-2019 18-Jun-2019 19-Jun-2019 20-Jun-2019 21-Jun-2019 22-Jun-2019 23-Jun-2019 24-Jun-2019 25-Jun-2019 26-Jun-2019 10-Apr-2019 12-Apr-2019 27-Jun-2019 27-Jun-2019 28-Jun-2019 1-Jul-2019 4-Jul-2019 6-Jul-2019 8-Jul-2019 10-Jul-2019 11-Jul-2019 13-Jul-2019 15-Jul-2019 12-Jul-2019 26-Jun-2019 4-Jul-2019 6-Jul-2019 7-Jul-2019 9-Jul-2019 11-Jul-2019 12-Jul-2019 16-Jul-2019 10-Jul-2019 14-Jul-2019 16-Jul-2019 27-Jul-2019 20-Jul-2019 21-Jul-2019 24-Jul-2019 24-Jul-2019 27-Jul-2019 25-Jul-2019 25-Jul-2019 16-Apr-2019 10-Feb-2019 10-Feb-2019 10-Feb-2019 12-Feb-2019 13-Feb-2019 14-Feb-2019 15-Feb-2019 31-Mar-2019 31-Mar-2019 30-Mar-2019 7-Apr-2019 8-Apr-2019 10-Apr-2019 12-Apr-2019 13-Apr-2019 14-Apr-2019 16-Apr-2019 29-Apr-2019 7-Apr-2019 8-Apr-2019 9-Apr-2019 10-Apr-2019 11-Apr-2019 12-Apr-2019 13-Apr-2019 14-Apr-2019 16-Apr-2019 18-Apr-2019 20-Apr-2019 22-Apr-2019 24-Apr-2019 28-Apr-2019 29-Apr-2019 2-Aug-2019 29-Jul-2019 29-Jul-2019 29-Jul-2019 31-Jul-2019 1-Aug-2019 2-Aug-2019

6

-

-

0.02 0.12 0.01 0.01 0.01 0.01 0.01 0.00 0.06 0.03 0.00 0.00 0.00 0.06 0.03 0.01 0.00 0.00 0.01 0.01 0.00 0.00 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.56 0.00 0.02 0.01 0.00 0.00 0.00 -

5

6-Feb-19

1,004,850 -

Waktu S tart 4-Feb-2019 4-Feb-2019 5-Feb-2019 6-Feb-2019 6-Feb-2019 7-Feb-2019 7-Feb-2019 7-Feb-2019 8-Feb-2019 9-Feb-2019 11-Feb-2019 12-Feb-2019 14-Feb-2019 9-Feb-2019 8-Feb-2019 9-Feb-2019 12-Feb-2019 7-Feb-2019 15-Feb-2019 16-Feb-2019 16-Feb-2019 18-Feb-2019 20-Feb-2019 18-Feb-2019 19-Feb-2019 21-Feb-2019 22-Feb-2019 22-Feb-2019 23-Feb-2019 25-Feb-2019 25-Feb-2019 26-Feb-2019 27-Feb-2019 28-Feb-2019 3-Mar-2019 5-Mar-2019 25-Feb-2019 26-Feb-2019 27-Feb-2019 28-Feb-2019 3-Mar-2019 26-Apr-2019 27-Apr-2019 30-Apr-2019 2-May-2019 3-May-2019 6-May-2019 8-May-2019 9-May-2019 10-May-2019 11-May-2019 12-May-2019 13-May-2019 14-May-2019 7-Mar-2019 7-Mar-2019 10-Mar-2019 13-Mar-2019 15-Mar-2019 17-Mar-2019 18-Mar-2019 19-Mar-2019 20-Mar-2019 21-Mar-2019 18-May-2019 22-May-2019 25-May-2019 27-May-2019 30-May-2019 1-Jun-2019 2-Jun-2019 3-Jun-2019 4-Jun-2019 25-Mar-2019 30-Mar-2019 25-Mar-2019 5-Apr-2019 30-Mar-2019 25-Mar-2019 5-Apr-2019 8-Jun-2019 8-Jun-2019 8-Jun-2019 12-Jun-2019 19-Jun-2019 25-Jun-2019 2-Jul-2019 6-Jul-2019 12-Jul-2019 10-Jun-2019 10-Jun-2019 14-Jun-2019 18-Jun-2019 20-Jun-2019 21-Jun-2019 28-Jun-2019 28-Jun-2019 30-Jun-2019 3-Jul-2019 4-Jul-2019 6-Jul-2019 8-Jul-2019 8-Apr-2019 12-Jun-2019 13-Jun-2019 15-Jun-2019 17-Jun-2019 18-Jun-2019 19-Jun-2019 20-Jun-2019 21-Jun-2019 22-Jun-2019 23-Jun-2019 24-Jun-2019 25-Jun-2019 26-Jun-2019 8-Apr-2019 11-Apr-2019 27-Jun-2019 27-Jun-2019 28-Jun-2019 29-Jun-2019 2-Jul-2019 5-Jul-2019 7-Jul-2019 9-Jul-2019 11-Jul-2019 12-Jul-2019 14-Jul-2019 25-Jun-2019 25-Jun-2019 28-Jun-2019 5-Jul-2019 7-Jul-2019 8-Jul-2019 10-Jul-2019 12-Jul-2019 7-Jul-2019 7-Jul-2019 11-Jul-2019 15-Jul-2019 18-Jul-2019 18-Jul-2019 18-Jul-2019 21-Jul-2019 21-Jul-2019 24-Jul-2019 25-Jul-2019 25-Jul-2019 10-Feb-2019 10-Feb-2019 10-Feb-2019 10-Feb-2019 12-Feb-2019 13-Feb-2019 14-Feb-2019 15-Feb-2019 30-Mar-2019 30-Mar-2019 30-Mar-2019 7-Apr-2019 8-Apr-2019 9-Apr-2019 11-Apr-2019 13-Apr-2019 14-Apr-2019 15-Apr-2019 7-Apr-2019 7-Apr-2019 8-Apr-2019 9-Apr-2019 10-Apr-2019 11-Apr-2019 12-Apr-2019 13-Apr-2019 14-Apr-2019 15-Apr-2019 17-Apr-2019 19-Apr-2019 21-Apr-2019 23-Apr-2019 25-Apr-2019 29-Apr-2019 28-Jul-2019 28-Jul-2019 28-Jul-2019 28-Jul-2019 31-Jul-2019 31-Jul-2019 1-Aug-2019

Feb

(x100% )

Feb

(rupiah)

Feb

Bobot

4

-

PEKERJAAN PERSIAPAN & PENDAHULUAN Mobilisasi dan Demobiliasi Peralatan dan Perlengkapan Pembersihan Area/Lokasi Kerja Pengukuran dan Pemasangan Bowplank Pembuatan Bedeng dan Gudang Bahan Papan Nama Proyek uk 1, 2m x 1, 8m PEKERJAAN PO NDASI Pekerjaan Galian Urugan Pasir Pek. Pemasangan Batu Kosong (Aanstamping) Pekerjaan Pembesian Pondasi T apak Pekerjan Bekisting Pondasi T apak Pekerjaan Cor Beton (K-225) Pekerjaan Galian Urugan Pasir Pek. Pemasangan Batu Kosong (Aanstamping) Pekerjaan Pasangan Batu Pondasi ( 1 : 3) Pekerjaan Galian Pek. Pasangan Pondasi Rollag PEKERJAAN SLO O F Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Sloof Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d10&20-d8) Pekerjaan Bekisting Sloof Pekerjaan Cor Beton (K-225) PEKERJAAN TIMBUNAN, PENINGGIAN DAN PEMADATAN Urugan, T imbunan dan Peninggian Elevasi Pemadatan T anah PEKERJAAN KO LO M Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d12&18 cm-d6) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d12&18 cm-d6) Pekerjaan Bekisting Pekerjaan Cor Beton (K-200) Pekerjaan Pembesian (4d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-200) PEKERJAAN RINGBALO K (BALO K) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) PEKERJAAN CO R PLATE BETO N (DAK BETO N) Pekerjaan Pembesian Plate lantai Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian Plat Atap/kanopi beton Pekerjaan Bekisting Sloof Pekerjaan Cor Beton (K-225) PEKERJAAN DINDING Pek. Pasangan Bata Merah (1/2, Mix 1:5) Pek. Pasangan Bata Merah T rassram (1/2, Mix 1:3) Pekerjaan Plasteran (1.5 cm-mix 1:5) Pekerjaan Acian Pek. Pasangan Bata Merah (1/2, Mix 1:5) Pek. Pasangan Bata Merah T rassram (1/2, Mix 1:3) Pekerjaan Plasteran (1.5 cm-mix 1:5) Pekerjaan Acian PEKERJAAN ATAP Memasang Rangka Atap (Baja Ringan-Ex T ASO) Memasang Pelapis Atap (Metal Roof-Ex Sakura Roof Memasang Nok Atap Memasang Lisplank Memasang T alang Air PEKERJAAN KUSEN, PINTU, JENDELA DAN ACCESO RIS Memasang Kusen+Panel Pintu Utama Memasang Kusen+Panel Pintu Kamar/Ruangan Memasang Kusen+Panel Pintu WC Memasang Kusen+Panel Jendela Utama Memasang Jendela Pencahayaan/ T etap (Fixed Window) Memasang Lubang Angin/Loster (Bovenlight) PEKERJAAN INST. PIPA AIR BERSIH, LIMBAH DAN SANITASI Memasang Instalasi Pipa 3/4 PVC (Ex Maspion) Memasang Instalasi Pipa 1/2 PVC (Ex Maspion) Memasang Keran Air Standar ( Ex Onda) Memasang Shower Mandi ( Ex T OT O) Memasang T angki Air/T andom (Ex Penguin-1000L) Memasang Pompa Air ( Ex Shimizu 125 Watt) Memasang Instalasi Pipa Limbah 3" PVC (Ex Maspio Memasang Instalasi Pipa Kloset 4" PVC (Ex Maspion) Memasang Instalasi Pipa Saluran 5" PVC (Ex Maspion Memasang Kloset Duduk ( Ex T OT O) Memasang Kloset Jongkok ( Ex T OT O) Memasang Wastafel Cuci Memasang Floor Drain Pekerjaan Septik T ank ( 1000 L) Pekerjaan Sumur Resapan Limbah (800 L) PEKERJAAN INST. LISTRIK DAN PENERANGAN Pemasangan MCB Pengaman dan Box Pemasangan Instalasi Pembumian (Grounding) Pemasangan Kabel Instalasi ( NYM-3x2,5 mm2) Pemasangan Kabel Instalasi ( NYM-3x1,5 mm2) Pemasangan Fitting Lampu Pemasangan Saklar Lampu Pemasangan Receiptackle (Colokan Listrik) Pemasangan Lampu 5 Watt (ex-PHILIPS LED) Pemasangan Lampu 15 Watt (ex-PHILIPS LED) Pemasangan Lampu 20 Watt (ex-PHILIPS LED) PEKERJAAN KERAMIK LANTAI DAN DINDING Pekerjaan Cor Lantai Kerja Non Struktur (K100- 1:4:4 Memasang Keramik Lantai Utama (Ex Granito 60x60 Memasang Keramik Lantai T eras (Ex Platinum 40x40 Memasang Keramik Lantai WC (Ex Asia T ile 20x20) Memasang Keramik Dinding WC (Ex Roman 20x40) Memasang Plint Keramik Dinding (Ex Granito 15x60) Memasang Rope T ile (Kuku T egel/Plint Sudut) PEKERJAAN LANGIT-LANGIT (PLAFO N) Memasang Rangka Plafon ( Ex Furing 2/4 - 4/4) Memasang Pelapis Pelafon ( Ex Gipsum Board 9mm) Memasang List Plafon PEKERJAAN PENGECATAN DAN WATERPRO FING Pekerjaan Plamir Dinding Pekerjaan Cat Anti Lumut dan Waterprofing Pekerjaan Pengecatan Exterior ( Ex Mowilex) Pekerjaan Pengecatan Interior ( Ex Nippon Paint) Pekerjaan Pengecatan Plafon( Ex Mowilex) Pekerjaan Pengecatan Kayu ( Ex Avian) Pekerjaan Pengecatan Besi ( Ex Avian) PEKERJAAN TANGGA Pekerjaan Galian Pekerjaan Urugan T anah Galian Urugan Pasir Pasangan Batu Pondasi (1:4) Pekerjaan Pembesian Sloof Pekerjaan Bekisting Sloof Pekerjaan Cor Beton Sloof (K225) Pekerjaan Pembesian Utama ( d10-18 cm) Pekerjaan Pembesian Anak T angga ( d10-18 cm) Pekerjaan Bekisting T angga Pekerjaan Cor Beton (K-225) Pekerjaan Plasteran ( 1,5 cm- 1: 5) Pekerjaan Keramik T angga ( Ex Asia T ile 40x40) Pekerjaan Rope T ile Pekerjaan Plamir Pekerjaan Pengecatan T angga Pekerjaan Railing T angga PEKERJAAN PAGAR DAN TAMAN/HALAMAN Pekerjaan Galian Pondasi Pasangan Batu Pondasi Pekerjaan Pembesian Sloof Pekerjaan Bekisting Sloof Pekerjaan Pengecoran (K200) Pekerjaan Pembesian Kolom Pekerjaan Bekisting Kolom Pekerjaan Pengecoran (K200) Pasangan Batu Bata Pekerjaan Plasteran Pekerjaan Acian Pekerjaan Pasangan Batu Alam Pekerjaan Pengecatan Pekerjaan Pemasangan Paving Blok Pekerjaan Penanaman Pohon Perdu PEKERJAAN TAMBAHAN DAN LAINNYA Pekerjaan Pemasangan Meteran Listrik (PLN-2200 kWh Pekerjaan Pemasangan Meteran Air (PDAM) Pekerjaan Pemasangan Pintu T oko (Folding Door) Pemasangan Exhaust Fan Pemasangan AC (Air Conditioner-1 PK, Ex. Sharp) Pembersihan Area Kerja (Pasca Konstruksi)

1.00

Biaya

3

-

A A1 A2 A3 A4 A5 B B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 C C1 C2 C3 C4 C5 C6 D D1 D2 E E1 E2 E3 E4 E5 E6 E7 E8 E9 E10 E11 E12 E13 E14 E15 E16 E17 E18 E19 E20 E21 E22 E23 E24 F F1 F2 F3 F4 F5 F6 F7 F8 F9 F10 F11 F12 F13 F14 F15 F16 F17 F18 G G1 G2 G3 G4 G5 G6 H H1 H2 H3 H4 H5 H6 H7 H8 I I1 I2 I3 I4 I5 J J1 J2 J3 J4 J5 J6 K K1 K2 K3 K4 K5 K6 K7 K8 K9 K10 K11 K12 K13 K14 K15 L L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 M M1 M2 M3 M4 M5 M6 M7 N N1 N2 N3 O O1 O2 O3 O4 O5 O6 O7 P P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 P16 P17 Q Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q 10 Q 11 Q 12 Q 13 Q 14 Q 15 R R1 R2 R3 R4 R5 R6

Uraian Pekerjaan

2

1,004,850

26 Minggu 61,596,970

ID Pekerjaan

1

180

Induk Pekerjaan

Waktu Pelakasanaan Progress Pekerjaan

5-Feb-19

Total

Selesai (Finish) : Hari ( Work Day) :

7

187 Serah T erima (overhand)

4-Feb-19

512,211,985 357,379,657 61,596,970 931,188,612

5-Feb-19

4-Feb-2019 Monday 2-Aug-2019 Friday

Mulai (Start) : Bahan : Upah : Alat :

Wednesday, May 9, 2018 -270 1 Project Mulai (start) ## Hari Ini (today) 180 Project Selesai (Finish)

Feb 14-Feb-19

LAMPIRAN KURVA ALAT A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180

3

1/1

Software RAB Exarch sdaPro v2019

LAMPIRAN KURVA ALAT A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180

4-Feb-2019 Monday 2-Aug-2019 Friday

34,222,958 49,796 1,093,723 539,270 44,660 6,978 13,956 -

0.00 0.00 0.00

Jun 22-Jun-19

Jun 21-Jun-19

Jun 20-Jun-19

Jun 19-Jun-19

Jun 18-Jun-19

Jun 17-Jun-19

0.00 0.00

0.00

0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00

0.00

0.00

0.00

0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

0.00

0.00

0.00

0.03

0.03

0.03

0.03 0.00 0.00 0.00

0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.03

0.03

0.00 0.00

0.00 0.00 0.00

0.00

0.02 0.02 0.00 0.00 0.00 0.00 0.00 0.06 0.03 0.01

38%

36%

33%

27% 27% 27% 27%

28%

28%

25%

0.00 0.00 0.00

18%

12% 0.00 0.01 0.01 0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00

9%

0.00 0.00 0.00

5% 0.00 5% 0.00 5% 5% 5% 5% 5% 5% 5% 0.00

4%

5%

5%

5%

6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6% 6%

0.00 0.00

0.00

3%

0.00 0.00 0.00

0.00 0.00

0.00 0.00

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

9%

5%

5%

5%

5%

5%

5%

5%

5%

5%

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

6%

9%

-

546,862

546,862

-

-

-

-

-

-

-

-

134,817

134,817

134,817

134,817

44,660

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

1,911,727

1,911,727

3,621,368

4,695,999

1,074,631

-

14-Apr-19

15-Apr-19

16-Apr-19

17-Apr-19

18-Apr-19

19-Apr-19

20-Apr-19

21-Apr-19

22-Apr-19

23-Apr-19

24-Apr-19

25-Apr-19

26-Apr-19

27-Apr-19

28-Apr-19

29-Apr-19

30-Apr-19

1-May-19

2-May-19

3-May-19

4-May-19

5-May-19

6-May-19

7-May-19

8-May-19

9-May-19

10-May-19

11-May-19

12-May-19

13-May-19

14-May-19

15-May-19

16-May-19

17-May-19

18-May-19

19-May-19

20-May-19

21-May-19

22-May-19

23-May-19

24-May-19

25-May-19

26-May-19

27-May-19

28-May-19

29-May-19

30-May-19

31-May-19

1-Jun-19

2-Jun-19

3-Jun-19

4-Jun-19

5-Jun-19

6-Jun-19

7-Jun-19

8-Jun-19

9-Jun-19

10-Jun-19

11-Jun-19

12-Jun-19

13-Jun-19

14-Jun-19

15-Jun-19

38%

6%

5%

36%

6%

5%

33%

6%

28%

6%

5%

28%

6%

27%

6%

4%

27%

6%

3%

27%

6%

Aktual Load (red Line)

27%

6%

25%

6%

18%

6%

0.35

6%

0.01

0.25 0.30 0.33

6%

0.00 0.06 0.03

0.24 0.25

6%

0.00 0.00

0.22 0.24 0.24 0.24

6%

0.08 0.02 0.00 0.00

0.15

6%

0.06

0.09

6%

0.03

0.03 0.03 0.06

6%

0.00 0.00 0.03

0.03 0.03 0.03 0.03

6%

0.00 0.00 0.00 0.00

0.03 0.03

6%

0.00 0.00

0.03 0.03 0.03

6%

0.00 0.00 0.00

0.03 0.03

6%

0.00 0.00

0.03 0.03 0.03

6%

0.00 0.00 0.00

0.03 0.03 0.03 0.03

6%

0.00 0.00 0.00 0.00

0.03

6%

0.00

0.03

5%

0.00

0.03 0.03 0.03

5%

0.00 0.00 0.00

0.03 0.03 0.03

5%

0.00 0.00 0.00

0.03 0.03 0.03

5%

0.00 0.00 0.00

0.03 0.03 0.03

5%

0.00 0.00 0.00

0.03 0.03

5%

0.00 0.00

0.03 0.03 0.03 0.03

5%

0.00 0.00 0.00 0.00

0.03 0.03 0.03

5%

0.00 0.00 0.00

0.02 0.02

5%

0.00 0.00

0.02 0.02 0.02 0.02

5%

0.00 0.00 0.00 0.00

0.02

5%

0.00

0.02

5%

0.00

0.02 0.02 0.02

4%

0.00 0.00 0.00

0.00 0.01 0.02

3%

0.00 0.01 0.01

Load Plan (Blue Line)

Hari Kalender

Jun 16-Jun-19

Jun 15-Jun-19

Jun 14-Jun-19

Jun 13-Jun-19

Jun 12-Jun-19

Jun 11-Jun-19

9-Jun-19

Jun 10-Jun-19

7-Jun-19

8-Jun-19

6-Jun-19

Jun

Jun

5-Jun-19

Jun

Jun

4-Jun-19

Jun

3-Jun-19

Jun

2-Jun-19

Jun

1-Jun-19

Jun

Jun

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May 9-May-19

May 8-May-19

May 6-May-19

May 5-May-19

May 4-May-19

May 3-May-19

May 2-May-19

Apr 30-Apr-19

May 1-May-19

Apr 29-Apr-19

Apr 28-Apr-19

Apr 27-Apr-19

Apr 26-Apr-19

Apr 25-Apr-19

Apr 24-Apr-19

Apr 23-Apr-19

Apr 22-Apr-19

May 7-May-19

0.00 0.00 0.00

0.00

CASH FLO WDAILY BIAYA KURVA ALAT

www.mitra-arsitek.com

0.00 0.00

12%

2.95% Total Bobot Kumulatif

0.00 0.00 0.00 0.00

12% 18% 25% 27% 27% 27% 27% 28% 28% 33% 36% 38%

879,244

111,650 111,650 523,359 418,688 117,233 93,786 69,781 8,374 27,913 22,330

0.00 0.00 0.00

22-Jun-19

3,419,281 2,149,263 55,825 167,475 111,650 3,516,975 1,856,181 879,244 16,748 33,495 502,425 312,620

0.00 0.00

1,856,181

334,950 669,900 334,950 446,600 558,250 103,276

0.00 0.00 0.00 0.00

21-Jun-19

7,646,909 -

0.00

3,516,975

-

0.00

20-Jun-19

-

0.00 0.00 0.00

111,650

-

0.00 0.00 0.00

19-Jun-19

-

167,475

-

D70 D71 D72 D73 D74 D75 D76 D77 D78 D79 D80 D81 D82 D83 D84 D85 D86 D87 D88 D89 D90 D91 D92 D93 D94 D95 D96 D97 D98 D99 D100D101D102D103D104D105D106D107D108D109D110D111D112D113D114D115D116D117D118D119D120D121D122D123D124D125D126D127D128D129D130D131D132D133D134D135D136D137D138D139

18-Jun-19

-

Finish 7-Feb-2019 4-Feb-2019 6-Feb-2019 6-Feb-2019 6-Feb-2019 7-Feb-2019 15-Feb-2019 8-Feb-2019 8-Feb-2019 10-Feb-2019 13-Feb-2019 13-Feb-2019 15-Feb-2019 12-Feb-2019 8-Feb-2019 12-Feb-2019 15-Feb-2019 7-Feb-2019 15-Feb-2019 21-Feb-2019 18-Feb-2019 20-Feb-2019 21-Feb-2019 19-Feb-2019 19-Feb-2019 21-Feb-2019 24-Feb-2019 23-Feb-2019 24-Feb-2019 14-May-2019 26-Feb-2019 26-Feb-2019 27-Feb-2019 2-Mar-2019 4-Mar-2019 5-Mar-2019 26-Feb-2019 26-Feb-2019 27-Feb-2019 1-Mar-2019 3-Mar-2019 26-Apr-2019 29-Apr-2019 1-May-2019 2-May-2019 5-May-2019 7-May-2019 8-May-2019 9-May-2019 10-May-2019 11-May-2019 12-May-2019 13-May-2019 14-May-2019 4-Jun-2019 9-Mar-2019 12-Mar-2019 14-Mar-2019 16-Mar-2019 17-Mar-2019 18-Mar-2019 19-Mar-2019 20-Mar-2019 21-Mar-2019 21-May-2019 24-May-2019 26-May-2019 29-May-2019 31-May-2019 1-Jun-2019 2-Jun-2019 3-Jun-2019 4-Jun-2019 5-Apr-2019 4-Apr-2019 29-Mar-2019 5-Apr-2019 31-Mar-2019 25-Mar-2019 5-Apr-2019 9-Jun-2019 12-Jun-2019 9-Jun-2019 16-Jun-2019 22-Jun-2019 29-Jun-2019 3-Jul-2019 9-Jul-2019 13-Jul-2019 13-Jun-2019 13-Jun-2019 17-Jun-2019 19-Jun-2019 20-Jun-2019 21-Jun-2019 11-Jul-2019 29-Jun-2019 2-Jul-2019 3-Jul-2019 5-Jul-2019 7-Jul-2019 11-Jul-2019 26-Jun-2019 13-Jun-2019 14-Jun-2019 16-Jun-2019 17-Jun-2019 18-Jun-2019 19-Jun-2019 20-Jun-2019 21-Jun-2019 22-Jun-2019 23-Jun-2019 24-Jun-2019 25-Jun-2019 26-Jun-2019 10-Apr-2019 12-Apr-2019 27-Jun-2019 27-Jun-2019 28-Jun-2019 1-Jul-2019 4-Jul-2019 6-Jul-2019 8-Jul-2019 10-Jul-2019 11-Jul-2019 13-Jul-2019 15-Jul-2019 12-Jul-2019 26-Jun-2019 4-Jul-2019 6-Jul-2019 7-Jul-2019 9-Jul-2019 11-Jul-2019 12-Jul-2019 16-Jul-2019 10-Jul-2019 14-Jul-2019 16-Jul-2019 27-Jul-2019 20-Jul-2019 21-Jul-2019 24-Jul-2019 24-Jul-2019 27-Jul-2019 25-Jul-2019 25-Jul-2019 16-Apr-2019 10-Feb-2019 10-Feb-2019 10-Feb-2019 12-Feb-2019 13-Feb-2019 14-Feb-2019 15-Feb-2019 31-Mar-2019 31-Mar-2019 30-Mar-2019 7-Apr-2019 8-Apr-2019 10-Apr-2019 12-Apr-2019 13-Apr-2019 14-Apr-2019 16-Apr-2019 29-Apr-2019 7-Apr-2019 8-Apr-2019 9-Apr-2019 10-Apr-2019 11-Apr-2019 12-Apr-2019 13-Apr-2019 14-Apr-2019 16-Apr-2019 18-Apr-2019 20-Apr-2019 22-Apr-2019 24-Apr-2019 28-Apr-2019 29-Apr-2019 2-Aug-2019 29-Jul-2019 29-Jul-2019 29-Jul-2019 31-Jul-2019 1-Aug-2019 2-Aug-2019

17-Jun-19

-

0.02 0.12 0.01 0.01 0.01 0.01 0.01 0.00 0.06 0.03 0.00 0.00 0.00 0.06 0.03 0.01 0.00 0.00 0.01 0.01 0.00 0.00 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.56 0.00 0.02 0.01 0.00 0.00 0.00 -

-

1,004,850 -

Waktu S tart 4-Feb-2019 4-Feb-2019 5-Feb-2019 6-Feb-2019 6-Feb-2019 7-Feb-2019 7-Feb-2019 7-Feb-2019 8-Feb-2019 9-Feb-2019 11-Feb-2019 12-Feb-2019 14-Feb-2019 9-Feb-2019 8-Feb-2019 9-Feb-2019 12-Feb-2019 7-Feb-2019 15-Feb-2019 16-Feb-2019 16-Feb-2019 18-Feb-2019 20-Feb-2019 18-Feb-2019 19-Feb-2019 21-Feb-2019 22-Feb-2019 22-Feb-2019 23-Feb-2019 25-Feb-2019 25-Feb-2019 26-Feb-2019 27-Feb-2019 28-Feb-2019 3-Mar-2019 5-Mar-2019 25-Feb-2019 26-Feb-2019 27-Feb-2019 28-Feb-2019 3-Mar-2019 26-Apr-2019 27-Apr-2019 30-Apr-2019 2-May-2019 3-May-2019 6-May-2019 8-May-2019 9-May-2019 10-May-2019 11-May-2019 12-May-2019 13-May-2019 14-May-2019 7-Mar-2019 7-Mar-2019 10-Mar-2019 13-Mar-2019 15-Mar-2019 17-Mar-2019 18-Mar-2019 19-Mar-2019 20-Mar-2019 21-Mar-2019 18-May-2019 22-May-2019 25-May-2019 27-May-2019 30-May-2019 1-Jun-2019 2-Jun-2019 3-Jun-2019 4-Jun-2019 25-Mar-2019 30-Mar-2019 25-Mar-2019 5-Apr-2019 30-Mar-2019 25-Mar-2019 5-Apr-2019 8-Jun-2019 8-Jun-2019 8-Jun-2019 12-Jun-2019 19-Jun-2019 25-Jun-2019 2-Jul-2019 6-Jul-2019 12-Jul-2019 10-Jun-2019 10-Jun-2019 14-Jun-2019 18-Jun-2019 20-Jun-2019 21-Jun-2019 28-Jun-2019 28-Jun-2019 30-Jun-2019 3-Jul-2019 4-Jul-2019 6-Jul-2019 8-Jul-2019 8-Apr-2019 12-Jun-2019 13-Jun-2019 15-Jun-2019 17-Jun-2019 18-Jun-2019 19-Jun-2019 20-Jun-2019 21-Jun-2019 22-Jun-2019 23-Jun-2019 24-Jun-2019 25-Jun-2019 26-Jun-2019 8-Apr-2019 11-Apr-2019 27-Jun-2019 27-Jun-2019 28-Jun-2019 29-Jun-2019 2-Jul-2019 5-Jul-2019 7-Jul-2019 9-Jul-2019 11-Jul-2019 12-Jul-2019 14-Jul-2019 25-Jun-2019 25-Jun-2019 28-Jun-2019 5-Jul-2019 7-Jul-2019 8-Jul-2019 10-Jul-2019 12-Jul-2019 7-Jul-2019 7-Jul-2019 11-Jul-2019 15-Jul-2019 18-Jul-2019 18-Jul-2019 18-Jul-2019 21-Jul-2019 21-Jul-2019 24-Jul-2019 25-Jul-2019 25-Jul-2019 10-Feb-2019 10-Feb-2019 10-Feb-2019 10-Feb-2019 12-Feb-2019 13-Feb-2019 14-Feb-2019 15-Feb-2019 30-Mar-2019 30-Mar-2019 30-Mar-2019 7-Apr-2019 8-Apr-2019 9-Apr-2019 11-Apr-2019 13-Apr-2019 14-Apr-2019 15-Apr-2019 7-Apr-2019 7-Apr-2019 8-Apr-2019 9-Apr-2019 10-Apr-2019 11-Apr-2019 12-Apr-2019 13-Apr-2019 14-Apr-2019 15-Apr-2019 17-Apr-2019 19-Apr-2019 21-Apr-2019 23-Apr-2019 25-Apr-2019 29-Apr-2019 28-Jul-2019 28-Jul-2019 28-Jul-2019 28-Jul-2019 31-Jul-2019 31-Jul-2019 1-Aug-2019

Apr 21-Apr-19

(x100% )

Apr 20-Apr-19

(rupiah)

Apr 19-Apr-19

Bobot

55,825

PEKERJAAN PERSIAPAN & PENDAHULUAN Mobilisasi dan Demobiliasi Peralatan dan Perlengkapan Pembersihan Area/Lokasi Kerja Pengukuran dan Pemasangan Bowplank Pembuatan Bedeng dan Gudang Bahan Papan Nama Proyek uk 1, 2m x 1, 8m PEKERJAAN PO NDASI Pekerjaan Galian Urugan Pasir Pek. Pemasangan Batu Kosong (Aanstamping) Pekerjaan Pembesian Pondasi T apak Pekerjan Bekisting Pondasi T apak Pekerjaan Cor Beton (K-225) Pekerjaan Galian Urugan Pasir Pek. Pemasangan Batu Kosong (Aanstamping) Pekerjaan Pasangan Batu Pondasi ( 1 : 3) Pekerjaan Galian Pek. Pasangan Pondasi Rollag PEKERJAAN SLO O F Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Sloof Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d10&20-d8) Pekerjaan Bekisting Sloof Pekerjaan Cor Beton (K-225) PEKERJAAN TIMBUNAN, PENINGGIAN DAN PEMADATAN Urugan, T imbunan dan Peninggian Elevasi Pemadatan T anah PEKERJAAN KO LO M Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d12&18 cm-d6) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d12&18 cm-d6) Pekerjaan Bekisting Pekerjaan Cor Beton (K-200) Pekerjaan Pembesian (4d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-200) PEKERJAAN RINGBALO K (BALO K) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) PEKERJAAN CO R PLATE BETO N (DAK BETO N) Pekerjaan Pembesian Plate lantai Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian Plat Atap/kanopi beton Pekerjaan Bekisting Sloof Pekerjaan Cor Beton (K-225) PEKERJAAN DINDING Pek. Pasangan Bata Merah (1/2, Mix 1:5) Pek. Pasangan Bata Merah T rassram (1/2, Mix 1:3) Pekerjaan Plasteran (1.5 cm-mix 1:5) Pekerjaan Acian Pek. Pasangan Bata Merah (1/2, Mix 1:5) Pek. Pasangan Bata Merah T rassram (1/2, Mix 1:3) Pekerjaan Plasteran (1.5 cm-mix 1:5) Pekerjaan Acian PEKERJAAN ATAP Memasang Rangka Atap (Baja Ringan-Ex T ASO) Memasang Pelapis Atap (Metal Roof-Ex Sakura Roof Memasang Nok Atap Memasang Lisplank Memasang T alang Air PEKERJAAN KUSEN, PINTU, JENDELA DAN ACCESO RIS Memasang Kusen+Panel Pintu Utama Memasang Kusen+Panel Pintu Kamar/Ruangan Memasang Kusen+Panel Pintu WC Memasang Kusen+Panel Jendela Utama Memasang Jendela Pencahayaan/ T etap (Fixed Window) Memasang Lubang Angin/Loster (Bovenlight) PEKERJAAN INST. PIPA AIR BERSIH, LIMBAH DAN SANITASI Memasang Instalasi Pipa 3/4 PVC (Ex Maspion) Memasang Instalasi Pipa 1/2 PVC (Ex Maspion) Memasang Keran Air Standar ( Ex Onda) Memasang Shower Mandi ( Ex T OT O) Memasang T angki Air/T andom (Ex Penguin-1000L) Memasang Pompa Air ( Ex Shimizu 125 Watt) Memasang Instalasi Pipa Limbah 3" PVC (Ex Maspio Memasang Instalasi Pipa Kloset 4" PVC (Ex Maspion) Memasang Instalasi Pipa Saluran 5" PVC (Ex Maspion Memasang Kloset Duduk ( Ex T OT O) Memasang Kloset Jongkok ( Ex T OT O) Memasang Wastafel Cuci Memasang Floor Drain Pekerjaan Septik T ank ( 1000 L) Pekerjaan Sumur Resapan Limbah (800 L) PEKERJAAN INST. LISTRIK DAN PENERANGAN Pemasangan MCB Pengaman dan Box Pemasangan Instalasi Pembumian (Grounding) Pemasangan Kabel Instalasi ( NYM-3x2,5 mm2) Pemasangan Kabel Instalasi ( NYM-3x1,5 mm2) Pemasangan Fitting Lampu Pemasangan Saklar Lampu Pemasangan Receiptackle (Colokan Listrik) Pemasangan Lampu 5 Watt (ex-PHILIPS LED) Pemasangan Lampu 15 Watt (ex-PHILIPS LED) Pemasangan Lampu 20 Watt (ex-PHILIPS LED) PEKERJAAN KERAMIK LANTAI DAN DINDING Pekerjaan Cor Lantai Kerja Non Struktur (K100- 1:4:4 Memasang Keramik Lantai Utama (Ex Granito 60x60 Memasang Keramik Lantai T eras (Ex Platinum 40x40 Memasang Keramik Lantai WC (Ex Asia T ile 20x20) Memasang Keramik Dinding WC (Ex Roman 20x40) Memasang Plint Keramik Dinding (Ex Granito 15x60) Memasang Rope T ile (Kuku T egel/Plint Sudut) PEKERJAAN LANGIT-LANGIT (PLAFO N) Memasang Rangka Plafon ( Ex Furing 2/4 - 4/4) Memasang Pelapis Pelafon ( Ex Gipsum Board 9mm) Memasang List Plafon PEKERJAAN PENGECATAN DAN WATERPRO FING Pekerjaan Plamir Dinding Pekerjaan Cat Anti Lumut dan Waterprofing Pekerjaan Pengecatan Exterior ( Ex Mowilex) Pekerjaan Pengecatan Interior ( Ex Nippon Paint) Pekerjaan Pengecatan Plafon( Ex Mowilex) Pekerjaan Pengecatan Kayu ( Ex Avian) Pekerjaan Pengecatan Besi ( Ex Avian) PEKERJAAN TANGGA Pekerjaan Galian Pekerjaan Urugan T anah Galian Urugan Pasir Pasangan Batu Pondasi (1:4) Pekerjaan Pembesian Sloof Pekerjaan Bekisting Sloof Pekerjaan Cor Beton Sloof (K225) Pekerjaan Pembesian Utama ( d10-18 cm) Pekerjaan Pembesian Anak T angga ( d10-18 cm) Pekerjaan Bekisting T angga Pekerjaan Cor Beton (K-225) Pekerjaan Plasteran ( 1,5 cm- 1: 5) Pekerjaan Keramik T angga ( Ex Asia T ile 40x40) Pekerjaan Rope T ile Pekerjaan Plamir Pekerjaan Pengecatan T angga Pekerjaan Railing T angga PEKERJAAN PAGAR DAN TAMAN/HALAMAN Pekerjaan Galian Pondasi Pasangan Batu Pondasi Pekerjaan Pembesian Sloof Pekerjaan Bekisting Sloof Pekerjaan Pengecoran (K200) Pekerjaan Pembesian Kolom Pekerjaan Bekisting Kolom Pekerjaan Pengecoran (K200) Pasangan Batu Bata Pekerjaan Plasteran Pekerjaan Acian Pekerjaan Pasangan Batu Alam Pekerjaan Pengecatan Pekerjaan Pemasangan Paving Blok Pekerjaan Penanaman Pohon Perdu PEKERJAAN TAMBAHAN DAN LAINNYA Pekerjaan Pemasangan Meteran Listrik (PLN-2200 kWh Pekerjaan Pemasangan Meteran Air (PDAM) Pekerjaan Pemasangan Pintu T oko (Folding Door) Pemasangan Exhaust Fan Pemasangan AC (Air Conditioner-1 PK, Ex. Sharp) Pembersihan Area Kerja (Pasca Konstruksi)

1.00

Biaya

Induk Pekerjaan

Waktu Pelakasanaan Progress Pekerjaan

16-Jun-19

A A1 A2 A3 A4 A5 B B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 C C1 C2 C3 C4 C5 C6 D D1 D2 E E1 E2 E3 E4 E5 E6 E7 E8 E9 E10 E11 E12 E13 E14 E15 E16 E17 E18 E19 E20 E21 E22 E23 E24 F F1 F2 F3 F4 F5 F6 F7 F8 F9 F10 F11 F12 F13 F14 F15 F16 F17 F18 G G1 G2 G3 G4 G5 G6 H H1 H2 H3 H4 H5 H6 H7 H8 I I1 I2 I3 I4 I5 J J1 J2 J3 J4 J5 J6 K K1 K2 K3 K4 K5 K6 K7 K8 K9 K10 K11 K12 K13 K14 K15 L L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 M M1 M2 M3 M4 M5 M6 M7 N N1 N2 N3 O O1 O2 O3 O4 O5 O6 O7 P P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 P16 P17 Q Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q 10 Q 11 Q 12 Q 13 Q 14 Q 15 R R1 R2 R3 R4 R5 R6

Uraian Pekerjaan

Apr 18-Apr-19

26 Minggu 61,596,970

ID Pekerjaan

7

187 Serah T erima (overhand)

70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##

180

Apr 17-Apr-19

Total

Selesai (Finish) : Hari ( Work Day) :

Apr 16-Apr-19

512,211,985 357,379,657 61,596,970 931,188,612

Apr 15-Apr-19

Mulai (Start) : Bahan : Upah : Alat :

Wednesday, May 9, 2018 -270 1 Project Mulai (start) ## Hari Ini (today) 180 Project Selesai (Finish)

Apr 14-Apr-19

3

1/1

Software RAB Exarch sdaPro v2019

LAMPIRAN KURVA ALAT A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180

4-Feb-2019 Monday 2-Aug-2019 Friday

Aug 31-Aug-19

Aug 30-Aug-19

Aug 29-Aug-19

Aug 28-Aug-19

Aug 27-Aug-19

Aug 26-Aug-19

Aug 25-Aug-19

Aug 24-Aug-19

Aug 23-Aug-19

Aug 22-Aug-19

Aug 21-Aug-19

Aug 20-Aug-19

Aug 19-Aug-19

Aug 18-Aug-19

Aug 17-Aug-19

Aug 16-Aug-19

Aug 15-Aug-19

Aug 14-Aug-19

Aug 13-Aug-19

Aug 12-Aug-19

Aug 11-Aug-19

Aug 10-Aug-19

Aug 9-Aug-19

Aug 8-Aug-19

Aug 7-Aug-19

Aug 6-Aug-19

Aug 5-Aug-19

Aug 4-Aug-19

Aug 3-Aug-19

Aug 2-Aug-19

31-Jul-19

30-Jul-19

29-Jul-19

28-Jul-19

Aug 1-Aug-19

Jul

Jul

27-Jul-19

Jul

26-Jul-19

Jul

Jul

25-Jul-19

24-Jul-19

Jul

23-Jul-19

Jul

Jul

22-Jul-19

21-Jul-19

Jul

20-Jul-19

Jul

Jul

19-Jul-19

Jul

18-Jul-19

Jul

17-Jul-19

Jul

16-Jul-19

Jul

15-Jul-19

Jul

14-Jul-19

Jul

9-Jul-19

Jul

13-Jul-19

8-Jul-19

Jul

12-Jul-19

7-Jul-19

Jul

Jul

6-Jul-19

Jul

11-Jul-19

5-Jul-19

Jul

Jul

4-Jul-19

Jul

Jul

3-Jul-19

Jul

Jul

2-Jul-19

Jul

10-Jul-19

1-Jul-19

Jul

Jun 30-Jun-19

Jun 29-Jun-19

Jun 28-Jun-19

Jun 27-Jun-19

Jun 26-Jun-19

Jul

0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00

43% 43% 42% 42% 41%

40% 0.00

40%

0.00

39%

0.00

39%

0.00

38% 38% 38% 38% 38% 0.00 0.00 0.00 0.00

0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00

0.00 0.00 0.00

0.00

0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.14 0.14 0.14

0.14 0.00 0.00 0.00

0.00 0.00

0.00

0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00

0.00 0.00

0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00 0.00 0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

58%

100%

43%

100%

40%

100%

40%

100%

39%

100%

0.62

100%

0.00

0.62 0.62 0.62

100%

0.00 0.00 0.00

0.62 0.62

100%

0.00 0.00

0.62 0.62 0.62 0.62

100%

0.00 0.00 0.00 0.00

0.62

100%

0.00

0.62

100%

0.00

0.62 0.62 0.62

100%

0.00 0.00 0.00

0.62 0.62 0.62 0.62

100%

0.00 0.00 0.00 0.00

0.62 0.62

100%

0.00 0.00

0.62 0.62 0.62

100%

0.00 0.00 0.00

0.62 0.62

100%

0.00 0.00

0.62 0.62 0.62

100%

0.00 0.00 0.00

0.62 0.62 0.62 0.62

100%

0.00 0.00 0.00 0.00

0.62

100%

0.00

0.62

100%

0.00

0.62 0.62 0.62

100%

0.00 0.00 0.00

0.62 0.62 0.62

100%

0.00 0.00 0.00

0.62 0.62 0.62

100%

0.00 0.00 0.00

0.62 0.62 0.62

100%

0.00 0.00 0.00

0.62 0.62

100%

0.00 0.00

0.62 0.62 0.62 0.62

100%

0.14 0.00 0.00 0.00

0.20 0.34 0.48

100%

0.14 0.14 0.14

0.05 0.06

86%

0.00 0.01

0.03 0.03 0.04 0.05

72%

0.01 0.01 0.01 0.01

0.02

43%

0.01

0.01

42%

0.01

0.00 0.00 0.01

42%

0.00 0.00 0.00

0.00 0.00 0.00

41%

0.00 0.00 0.00

39%

www.mitra-arsitek.com

0.00 0.00 0.00

0.00

38%

337,741

8,881,758

8,628,452

8,616,449

8,616,449

34,193

13,956

13,956

11,165

11,165

-

-

12,449

12,449

12,449

12,449

-

-

-

-

-

-

-

-

-

13,956

6,978

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

7-Jul-19

8-Jul-19

9-Jul-19

10-Jul-19

11-Jul-19

12-Jul-19

13-Jul-19

14-Jul-19

15-Jul-19

16-Jul-19

17-Jul-19

18-Jul-19

19-Jul-19

20-Jul-19

21-Jul-19

22-Jul-19

23-Jul-19

24-Jul-19

25-Jul-19

26-Jul-19

27-Jul-19

28-Jul-19

29-Jul-19

30-Jul-19

31-Jul-19

1-Aug-19

2-Aug-19

3-Aug-19

4-Aug-19

5-Aug-19

6-Aug-19

7-Aug-19

8-Aug-19

9-Aug-19

10-Aug-19

11-Aug-19

12-Aug-19

13-Aug-19

14-Aug-19

15-Aug-19

16-Aug-19

17-Aug-19

18-Aug-19

19-Aug-19

20-Aug-19

21-Aug-19

22-Aug-19

23-Aug-19

24-Aug-19

25-Aug-19

26-Aug-19

27-Aug-19

28-Aug-19

29-Aug-19

30-Aug-19

31-Aug-19

38% 38% 38% 38% 38% 39% 39% 40% 40% 41% 42% 42% 43% 43% 58% 72% 86% #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### ####

6-Jul-19

Hari Kalender

0.00 0.00

38%

CASH FLO WDAILY BIAYA KURVA ALAT

0.00 0.00

0.00

0.00 0.00 0.00

38%

Aktual Load (red Line)

0.00 0.00 0.00 0.00

0.00

0.01

38%

Load Plan (Blue Line)

0.00

38%

37.83% Total Bobot Kumulatif

0.00

281,916

6,978 13,956 -

0.00

0.00

5-Jul-19

539,270 44,660

0.00

4-Jul-19

1,093,723

0.00 0.00

362,863

49,796 -

0.00 0.00 0.00

474,513

34,222,958 -

0.00

3-Jul-19

-

0.00 0.00

362,863

111,650 111,650 523,359 418,688 117,233 93,786 69,781 8,374 27,913 22,330

0.00

2-Jul-19

3,419,281 2,149,263 55,825 167,475 111,650 3,516,975 1,856,181 879,244 16,748 33,495 502,425 312,620

0.00 0.00 0.00

397,753

334,950 669,900 334,950 446,600 558,250 103,276

0.00

1-Jul-19

7,646,909 -

58%

397,753

-

30-Jun-19

-

72%

341,928

-

86%

29-Jun-19

-

100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100% 100% 100%100%100%100%100%100%100%100%

279,125

-

D140D141D142D143D144D145D146D147D148D149D150D151D152D153D154D155D156D157D158D159D160D161D162D163D164D165D166D167D168D169D170D171D172D173D174D175D176D177D178D179D180D181D182D183D184D185D186D187D188D189D190D191D192D193D194D195D196D197D198D199D200D201D202D203D204D205D206D207D208D209

28-Jun-19

-

Finish 7-Feb-2019 4-Feb-2019 6-Feb-2019 6-Feb-2019 6-Feb-2019 7-Feb-2019 15-Feb-2019 8-Feb-2019 8-Feb-2019 10-Feb-2019 13-Feb-2019 13-Feb-2019 15-Feb-2019 12-Feb-2019 8-Feb-2019 12-Feb-2019 15-Feb-2019 7-Feb-2019 15-Feb-2019 21-Feb-2019 18-Feb-2019 20-Feb-2019 21-Feb-2019 19-Feb-2019 19-Feb-2019 21-Feb-2019 24-Feb-2019 23-Feb-2019 24-Feb-2019 14-May-2019 26-Feb-2019 26-Feb-2019 27-Feb-2019 2-Mar-2019 4-Mar-2019 5-Mar-2019 26-Feb-2019 26-Feb-2019 27-Feb-2019 1-Mar-2019 3-Mar-2019 26-Apr-2019 29-Apr-2019 1-May-2019 2-May-2019 5-May-2019 7-May-2019 8-May-2019 9-May-2019 10-May-2019 11-May-2019 12-May-2019 13-May-2019 14-May-2019 4-Jun-2019 9-Mar-2019 12-Mar-2019 14-Mar-2019 16-Mar-2019 17-Mar-2019 18-Mar-2019 19-Mar-2019 20-Mar-2019 21-Mar-2019 21-May-2019 24-May-2019 26-May-2019 29-May-2019 31-May-2019 1-Jun-2019 2-Jun-2019 3-Jun-2019 4-Jun-2019 5-Apr-2019 4-Apr-2019 29-Mar-2019 5-Apr-2019 31-Mar-2019 25-Mar-2019 5-Apr-2019 9-Jun-2019 12-Jun-2019 9-Jun-2019 16-Jun-2019 22-Jun-2019 29-Jun-2019 3-Jul-2019 9-Jul-2019 13-Jul-2019 13-Jun-2019 13-Jun-2019 17-Jun-2019 19-Jun-2019 20-Jun-2019 21-Jun-2019 11-Jul-2019 29-Jun-2019 2-Jul-2019 3-Jul-2019 5-Jul-2019 7-Jul-2019 11-Jul-2019 26-Jun-2019 13-Jun-2019 14-Jun-2019 16-Jun-2019 17-Jun-2019 18-Jun-2019 19-Jun-2019 20-Jun-2019 21-Jun-2019 22-Jun-2019 23-Jun-2019 24-Jun-2019 25-Jun-2019 26-Jun-2019 10-Apr-2019 12-Apr-2019 27-Jun-2019 27-Jun-2019 28-Jun-2019 1-Jul-2019 4-Jul-2019 6-Jul-2019 8-Jul-2019 10-Jul-2019 11-Jul-2019 13-Jul-2019 15-Jul-2019 12-Jul-2019 26-Jun-2019 4-Jul-2019 6-Jul-2019 7-Jul-2019 9-Jul-2019 11-Jul-2019 12-Jul-2019 16-Jul-2019 10-Jul-2019 14-Jul-2019 16-Jul-2019 27-Jul-2019 20-Jul-2019 21-Jul-2019 24-Jul-2019 24-Jul-2019 27-Jul-2019 25-Jul-2019 25-Jul-2019 16-Apr-2019 10-Feb-2019 10-Feb-2019 10-Feb-2019 12-Feb-2019 13-Feb-2019 14-Feb-2019 15-Feb-2019 31-Mar-2019 31-Mar-2019 30-Mar-2019 7-Apr-2019 8-Apr-2019 10-Apr-2019 12-Apr-2019 13-Apr-2019 14-Apr-2019 16-Apr-2019 29-Apr-2019 7-Apr-2019 8-Apr-2019 9-Apr-2019 10-Apr-2019 11-Apr-2019 12-Apr-2019 13-Apr-2019 14-Apr-2019 16-Apr-2019 18-Apr-2019 20-Apr-2019 22-Apr-2019 24-Apr-2019 28-Apr-2019 29-Apr-2019 2-Aug-2019 29-Jul-2019 29-Jul-2019 29-Jul-2019 31-Jul-2019 1-Aug-2019 2-Aug-2019

111,650

-

0.02 0.12 0.01 0.01 0.01 0.01 0.01 0.00 0.06 0.03 0.00 0.00 0.00 0.06 0.03 0.01 0.00 0.00 0.01 0.01 0.00 0.00 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.56 0.00 0.02 0.01 0.00 0.00 0.00 -

27-Jun-19

1,004,850 -

Waktu S tart 4-Feb-2019 4-Feb-2019 5-Feb-2019 6-Feb-2019 6-Feb-2019 7-Feb-2019 7-Feb-2019 7-Feb-2019 8-Feb-2019 9-Feb-2019 11-Feb-2019 12-Feb-2019 14-Feb-2019 9-Feb-2019 8-Feb-2019 9-Feb-2019 12-Feb-2019 7-Feb-2019 15-Feb-2019 16-Feb-2019 16-Feb-2019 18-Feb-2019 20-Feb-2019 18-Feb-2019 19-Feb-2019 21-Feb-2019 22-Feb-2019 22-Feb-2019 23-Feb-2019 25-Feb-2019 25-Feb-2019 26-Feb-2019 27-Feb-2019 28-Feb-2019 3-Mar-2019 5-Mar-2019 25-Feb-2019 26-Feb-2019 27-Feb-2019 28-Feb-2019 3-Mar-2019 26-Apr-2019 27-Apr-2019 30-Apr-2019 2-May-2019 3-May-2019 6-May-2019 8-May-2019 9-May-2019 10-May-2019 11-May-2019 12-May-2019 13-May-2019 14-May-2019 7-Mar-2019 7-Mar-2019 10-Mar-2019 13-Mar-2019 15-Mar-2019 17-Mar-2019 18-Mar-2019 19-Mar-2019 20-Mar-2019 21-Mar-2019 18-May-2019 22-May-2019 25-May-2019 27-May-2019 30-May-2019 1-Jun-2019 2-Jun-2019 3-Jun-2019 4-Jun-2019 25-Mar-2019 30-Mar-2019 25-Mar-2019 5-Apr-2019 30-Mar-2019 25-Mar-2019 5-Apr-2019 8-Jun-2019 8-Jun-2019 8-Jun-2019 12-Jun-2019 19-Jun-2019 25-Jun-2019 2-Jul-2019 6-Jul-2019 12-Jul-2019 10-Jun-2019 10-Jun-2019 14-Jun-2019 18-Jun-2019 20-Jun-2019 21-Jun-2019 28-Jun-2019 28-Jun-2019 30-Jun-2019 3-Jul-2019 4-Jul-2019 6-Jul-2019 8-Jul-2019 8-Apr-2019 12-Jun-2019 13-Jun-2019 15-Jun-2019 17-Jun-2019 18-Jun-2019 19-Jun-2019 20-Jun-2019 21-Jun-2019 22-Jun-2019 23-Jun-2019 24-Jun-2019 25-Jun-2019 26-Jun-2019 8-Apr-2019 11-Apr-2019 27-Jun-2019 27-Jun-2019 28-Jun-2019 29-Jun-2019 2-Jul-2019 5-Jul-2019 7-Jul-2019 9-Jul-2019 11-Jul-2019 12-Jul-2019 14-Jul-2019 25-Jun-2019 25-Jun-2019 28-Jun-2019 5-Jul-2019 7-Jul-2019 8-Jul-2019 10-Jul-2019 12-Jul-2019 7-Jul-2019 7-Jul-2019 11-Jul-2019 15-Jul-2019 18-Jul-2019 18-Jul-2019 18-Jul-2019 21-Jul-2019 21-Jul-2019 24-Jul-2019 25-Jul-2019 25-Jul-2019 10-Feb-2019 10-Feb-2019 10-Feb-2019 10-Feb-2019 12-Feb-2019 13-Feb-2019 14-Feb-2019 15-Feb-2019 30-Mar-2019 30-Mar-2019 30-Mar-2019 7-Apr-2019 8-Apr-2019 9-Apr-2019 11-Apr-2019 13-Apr-2019 14-Apr-2019 15-Apr-2019 7-Apr-2019 7-Apr-2019 8-Apr-2019 9-Apr-2019 10-Apr-2019 11-Apr-2019 12-Apr-2019 13-Apr-2019 14-Apr-2019 15-Apr-2019 17-Apr-2019 19-Apr-2019 21-Apr-2019 23-Apr-2019 25-Apr-2019 29-Apr-2019 28-Jul-2019 28-Jul-2019 28-Jul-2019 28-Jul-2019 31-Jul-2019 31-Jul-2019 1-Aug-2019

Jun 25-Jun-19

(x100% )

26-Jun-19

(rupiah)

Jun 24-Jun-19

Jun 23-Jun-19

Bobot

Induk Pekerjaan

Waktu Pelakasanaan Progress Pekerjaan

-

PEKERJAAN PERSIAPAN & PENDAHULUAN Mobilisasi dan Demobiliasi Peralatan dan Perlengkapan Pembersihan Area/Lokasi Kerja Pengukuran dan Pemasangan Bowplank Pembuatan Bedeng dan Gudang Bahan Papan Nama Proyek uk 1, 2m x 1, 8m PEKERJAAN PO NDASI Pekerjaan Galian Urugan Pasir Pek. Pemasangan Batu Kosong (Aanstamping) Pekerjaan Pembesian Pondasi T apak Pekerjan Bekisting Pondasi T apak Pekerjaan Cor Beton (K-225) Pekerjaan Galian Urugan Pasir Pek. Pemasangan Batu Kosong (Aanstamping) Pekerjaan Pasangan Batu Pondasi ( 1 : 3) Pekerjaan Galian Pek. Pasangan Pondasi Rollag PEKERJAAN SLO O F Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Sloof Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d10&20-d8) Pekerjaan Bekisting Sloof Pekerjaan Cor Beton (K-225) PEKERJAAN TIMBUNAN, PENINGGIAN DAN PEMADATAN Urugan, T imbunan dan Peninggian Elevasi Pemadatan T anah PEKERJAAN KO LO M Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d12&18 cm-d6) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d12&18 cm-d6) Pekerjaan Bekisting Pekerjaan Cor Beton (K-200) Pekerjaan Pembesian (4d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-200) PEKERJAAN RINGBALO K (BALO K) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) PEKERJAAN CO R PLATE BETO N (DAK BETO N) Pekerjaan Pembesian Plate lantai Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian Plat Atap/kanopi beton Pekerjaan Bekisting Sloof Pekerjaan Cor Beton (K-225) PEKERJAAN DINDING Pek. Pasangan Bata Merah (1/2, Mix 1:5) Pek. Pasangan Bata Merah T rassram (1/2, Mix 1:3) Pekerjaan Plasteran (1.5 cm-mix 1:5) Pekerjaan Acian Pek. Pasangan Bata Merah (1/2, Mix 1:5) Pek. Pasangan Bata Merah T rassram (1/2, Mix 1:3) Pekerjaan Plasteran (1.5 cm-mix 1:5) Pekerjaan Acian PEKERJAAN ATAP Memasang Rangka Atap (Baja Ringan-Ex T ASO) Memasang Pelapis Atap (Metal Roof-Ex Sakura Roof Memasang Nok Atap Memasang Lisplank Memasang T alang Air PEKERJAAN KUSEN, PINTU, JENDELA DAN ACCESO RIS Memasang Kusen+Panel Pintu Utama Memasang Kusen+Panel Pintu Kamar/Ruangan Memasang Kusen+Panel Pintu WC Memasang Kusen+Panel Jendela Utama Memasang Jendela Pencahayaan/ T etap (Fixed Window) Memasang Lubang Angin/Loster (Bovenlight) PEKERJAAN INST. PIPA AIR BERSIH, LIMBAH DAN SANITASI Memasang Instalasi Pipa 3/4 PVC (Ex Maspion) Memasang Instalasi Pipa 1/2 PVC (Ex Maspion) Memasang Keran Air Standar ( Ex Onda) Memasang Shower Mandi ( Ex T OT O) Memasang T angki Air/T andom (Ex Penguin-1000L) Memasang Pompa Air ( Ex Shimizu 125 Watt) Memasang Instalasi Pipa Limbah 3" PVC (Ex Maspio Memasang Instalasi Pipa Kloset 4" PVC (Ex Maspion) Memasang Instalasi Pipa Saluran 5" PVC (Ex Maspion Memasang Kloset Duduk ( Ex T OT O) Memasang Kloset Jongkok ( Ex T OT O) Memasang Wastafel Cuci Memasang Floor Drain Pekerjaan Septik T ank ( 1000 L) Pekerjaan Sumur Resapan Limbah (800 L) PEKERJAAN INST. LISTRIK DAN PENERANGAN Pemasangan MCB Pengaman dan Box Pemasangan Instalasi Pembumian (Grounding) Pemasangan Kabel Instalasi ( NYM-3x2,5 mm2) Pemasangan Kabel Instalasi ( NYM-3x1,5 mm2) Pemasangan Fitting Lampu Pemasangan Saklar Lampu Pemasangan Receiptackle (Colokan Listrik) Pemasangan Lampu 5 Watt (ex-PHILIPS LED) Pemasangan Lampu 15 Watt (ex-PHILIPS LED) Pemasangan Lampu 20 Watt (ex-PHILIPS LED) PEKERJAAN KERAMIK LANTAI DAN DINDING Pekerjaan Cor Lantai Kerja Non Struktur (K100- 1:4:4 Memasang Keramik Lantai Utama (Ex Granito 60x60 Memasang Keramik Lantai T eras (Ex Platinum 40x40 Memasang Keramik Lantai WC (Ex Asia T ile 20x20) Memasang Keramik Dinding WC (Ex Roman 20x40) Memasang Plint Keramik Dinding (Ex Granito 15x60) Memasang Rope T ile (Kuku T egel/Plint Sudut) PEKERJAAN LANGIT-LANGIT (PLAFO N) Memasang Rangka Plafon ( Ex Furing 2/4 - 4/4) Memasang Pelapis Pelafon ( Ex Gipsum Board 9mm) Memasang List Plafon PEKERJAAN PENGECATAN DAN WATERPRO FING Pekerjaan Plamir Dinding Pekerjaan Cat Anti Lumut dan Waterprofing Pekerjaan Pengecatan Exterior ( Ex Mowilex) Pekerjaan Pengecatan Interior ( Ex Nippon Paint) Pekerjaan Pengecatan Plafon( Ex Mowilex) Pekerjaan Pengecatan Kayu ( Ex Avian) Pekerjaan Pengecatan Besi ( Ex Avian) PEKERJAAN TANGGA Pekerjaan Galian Pekerjaan Urugan T anah Galian Urugan Pasir Pasangan Batu Pondasi (1:4) Pekerjaan Pembesian Sloof Pekerjaan Bekisting Sloof Pekerjaan Cor Beton Sloof (K225) Pekerjaan Pembesian Utama ( d10-18 cm) Pekerjaan Pembesian Anak T angga ( d10-18 cm) Pekerjaan Bekisting T angga Pekerjaan Cor Beton (K-225) Pekerjaan Plasteran ( 1,5 cm- 1: 5) Pekerjaan Keramik T angga ( Ex Asia T ile 40x40) Pekerjaan Rope T ile Pekerjaan Plamir Pekerjaan Pengecatan T angga Pekerjaan Railing T angga PEKERJAAN PAGAR DAN TAMAN/HALAMAN Pekerjaan Galian Pondasi Pasangan Batu Pondasi Pekerjaan Pembesian Sloof Pekerjaan Bekisting Sloof Pekerjaan Pengecoran (K200) Pekerjaan Pembesian Kolom Pekerjaan Bekisting Kolom Pekerjaan Pengecoran (K200) Pasangan Batu Bata Pekerjaan Plasteran Pekerjaan Acian Pekerjaan Pasangan Batu Alam Pekerjaan Pengecatan Pekerjaan Pemasangan Paving Blok Pekerjaan Penanaman Pohon Perdu PEKERJAAN TAMBAHAN DAN LAINNYA Pekerjaan Pemasangan Meteran Listrik (PLN-2200 kWh Pekerjaan Pemasangan Meteran Air (PDAM) Pekerjaan Pemasangan Pintu T oko (Folding Door) Pemasangan Exhaust Fan Pemasangan AC (Air Conditioner-1 PK, Ex. Sharp) Pembersihan Area Kerja (Pasca Konstruksi)

1.00

Biaya

25-Jun-19

A A1 A2 A3 A4 A5 B B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 C C1 C2 C3 C4 C5 C6 D D1 D2 E E1 E2 E3 E4 E5 E6 E7 E8 E9 E10 E11 E12 E13 E14 E15 E16 E17 E18 E19 E20 E21 E22 E23 E24 F F1 F2 F3 F4 F5 F6 F7 F8 F9 F10 F11 F12 F13 F14 F15 F16 F17 F18 G G1 G2 G3 G4 G5 G6 H H1 H2 H3 H4 H5 H6 H7 H8 I I1 I2 I3 I4 I5 J J1 J2 J3 J4 J5 J6 K K1 K2 K3 K4 K5 K6 K7 K8 K9 K10 K11 K12 K13 K14 K15 L L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 M M1 M2 M3 M4 M5 M6 M7 N N1 N2 N3 O O1 O2 O3 O4 O5 O6 O7 P P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 P16 P17 Q Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q 10 Q 11 Q 12 Q 13 Q 14 Q 15 R R1 R2 R3 R4 R5 R6

Uraian Pekerjaan

-

26 Minggu 61,596,970

ID Pekerjaan

7

187 Serah T erima (overhand)

## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##

180

16,748

Total

Selesai (Finish) : Hari ( Work Day) :

33,495

512,211,985 357,379,657 61,596,970 931,188,612

24-Jun-19

Mulai (Start) : Bahan : Upah : Alat :

Wednesday, May 9, 2018 -270 1 Project Mulai (start) ## Hari Ini (today) 180 Project Selesai (Finish)

23-Jun-19

3

1/1

Software RAB Exarch sdaPro v2019

7,625,849 6,917,843 10,735,601 5,026,457 991,787 4,253,665 12,017,080 4,625,622 164,097 20,951 63,882 453,860 442,121 53,749 607,584 1,852,820 1,584,481 755,546 2,148,242 86,385 2,542,098 5,264 69,812 22,563 243,713 1,726,547 575,013 209,023 325,491 613,347 291,310 347,191 1,550,965 222,133 52,926 504,276 147,829 3,895,360 2,246,200 6,177,050 2,807,750 6,040,144 842,325 7,187,840 -

Mar 31-Mar-19

Mar 30-Mar-19

Mar 29-Mar-19

Mar 28-Mar-19

Mar 27-Mar-19

Mar 26-Mar-19

Mar 25-Mar-19

Mar 24-Mar-19

Mar 23-Mar-19

Mar 22-Mar-19

Mar 21-Mar-19

Mar 20-Mar-19

Mar 19-Mar-19

Mar 18-Mar-19

Mar 17-Mar-19

Mar 16-Mar-19

Mar 15-Mar-19

Mar 14-Mar-19

Mar 13-Mar-19

Mar 12-Mar-19

Mar 11-Mar-19

Mar 10-Mar-19

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Apr 14-Apr-19

Apr 13-Apr-19

Apr 12-Apr-19

Apr 11-Apr-19

8-Apr-19

9-Apr-19

7-Apr-19

Apr

Apr 10-Apr-19

6-Apr-19

Apr

0.01 0.01

0.00

0.01 0.01 0.01 0.01 0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.01 0.01

0.01

0.00

0.00 0.00 0.00 0.01

0.01

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00

0.00

0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00

0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00

0.00 0.00 0.00

0.00

0.00 0.00 0.01 0.00 0.00 0.00

0.00 0.01 0.01 0.01

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.02

0.00 0.00

0.00

0.00

0.00 0.0038%

38%

37%

38% 38%

0.00 0.00

36% 35% 35% 34% 34%

31%

31%

32%

32%

32%

30%

29% 29% 29% 28% 28%

26% 26%

27%

27%

27% 27% 27% 27% 27% 27% 27%

26% 25% 25% 25% 24% 23%

24%

23% 23% 22% 21%

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00 20% 0.00

20%

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00

20%

0.00

19%

0.00

19%

0.00 0.00 0.00

17% 17%

17%

17%

0.00

16%

0.00

16% 15%

0.00

0.00

0.00

0.00

0.00

14%

0.00 0.00

13%

0.00 0.00

13%

0.00 0.00

12%

0.00 0.00

0.00 0.00

10%

0.00 0.00

0.00 0.00 0.00

0.00

0.00 0.00 0.00

8%

0.00 0.00 0.00 0.00 0.00

6%

3%

2% 2% 1% 1%

1%

0% 0%

2,050,724

2,050,724

-

1,661,149

6,637,689

2,318,525

2,129,678

2,129,678

1,362,994

5,452,346

4,976,540

3,438,960

-

1,916,711

1,916,711

1,916,711

2,296,397

2,296,397

2,296,397

2,274,151

2,274,151

958,355

958,355

668,582

1,553,079

324,563

83,891

199,682

-

-

-

3,306,104

1,975,680

1,975,680

1,975,680

1,975,680

4,816,843

4,061,297

1,480,126

1,480,126

1,480,126

1,480,126

9,873,144

-

2,148,242

4,246,315

23-Feb-19

24-Feb-19

25-Feb-19

26-Feb-19

27-Feb-19

28-Feb-19

1-Mar-19

2-Mar-19

3-Mar-19

4-Mar-19

5-Mar-19

6-Mar-19

7-Mar-19

8-Mar-19

9-Mar-19

10-Mar-19

11-Mar-19

12-Mar-19

13-Mar-19

14-Mar-19

15-Mar-19

16-Mar-19

17-Mar-19

18-Mar-19

19-Mar-19

20-Mar-19

21-Mar-19

22-Mar-19

23-Mar-19

24-Mar-19

25-Mar-19

26-Mar-19

27-Mar-19

28-Mar-19

29-Mar-19

30-Mar-19

31-Mar-19

1-Apr-19

2-Apr-19

3-Apr-19

4-Apr-19

5-Apr-19

6-Apr-19

7-Apr-19

8-Apr-19

38%

22-Feb-19

38%

3,655,282

36%

35%

35%

34%

21-Feb-19

34%

5,081,334

32%

20-Feb-19

32%

32%

31%

2,024,343

31%

30%

29%

29%

19-Feb-19

29%

28%

4,554,042

28%

27%

27%

18-Feb-19

27%

27%

2,768,582

27%

27%

27%

17-Feb-19

27%

27%

26%

26%

2,768,582

26%

16-Feb-19

25%

15-Feb-19

25%

25%

24%

11,262,203

24%

23%

23%

10,452,737

23%

22%

21%

14-Feb-19

20%

20%

20%

11,564,147

19%

19%

13-Feb-19

17%

8%

17%

6%

17%

3%

17%

2%

5,572,213

16%

2%

16%

1%

15%

1%

12,935,595

14%

1%

13%

0%

12%

0%

10%

Aktual Load (red Line)

12-Feb-19

0.38

11-Feb-19

0.00

0.37 0.38 0.38

2,176,287

0.00 0.01 0.00

0.36 0.37

10-Feb-19

0.01 0.01

0.34 0.34 0.35 0.35

2,112,406

0.02 0.00 0.00 0.01

0.32

9-Feb-19

0.00

0.32

1,577,884

0.00

0.31 0.31 0.32

8-Feb-19

0.01 0.00 0.00

0.29 0.29 0.29 0.30

7-Feb-19

0.00 0.00 0.00 0.01

0.28 0.28

354,092

0.01 0.00

0.27 0.27 0.27

6-Feb-19

0.00 0.00 0.00

0.27 0.27

-

0.00 0.00

0.27 0.27 0.27

-

0.00 0.00 0.00

0.26 0.26 0.26 0.27

3,952,211

0.00 0.00 0.00 0.00

0.25

5-Feb-19

0.00

0.25

4-Feb-19

0.00

0.24 0.24 0.24

38%

0.00 0.00 0.00

0.23 0.23 0.23

38%

0.01 0.00 0.00

0.20 0.21 0.22

37%

0.00 0.01 0.01

0.19 0.19 0.20

8%

0.00 0.00 0.00

0.17 0.19

6%

0.00 0.01

0.16 0.17 0.17 0.17

3%

0.01 0.00 0.00 0.00

0.14 0.14 0.15

2%

0.01 0.00 0.01

0.13 0.13

2%

0.01 0.01

0.06 0.08 0.10 0.12

1%

0.03 0.02 0.02 0.02

0.03

1%

0.01

0.02

1%

0.00

0.01 0.01 0.02

0%

0.00 0.00 0.00

0.00 0.00 0.01

0%

0.00 0.00 0.01

Load Plan (Blue Line)

Hari Kalender

Apr

5-Apr-19

Apr

4-Apr-19

3-Apr-19

Apr

Apr

2-Apr-19

Apr

1-Apr-19

Apr

9-Mar-19

Apr

8-Mar-19

7-Mar-19

Mar

6-Mar-19

Mar

Mar

5-Mar-19

4-Mar-19

Mar

3-Mar-19

Mar

Mar

2-Mar-19

Mar

1-Mar-19

Mar

Feb 28-Feb-19

Mar

Feb 27-Feb-19

Feb 26-Feb-19

Feb 25-Feb-19

Feb 24-Feb-19

Feb 23-Feb-19

Feb 22-Feb-19

Feb 21-Feb-19

Feb 20-Feb-19

Feb 19-Feb-19

Feb 18-Feb-19

Feb 17-Feb-19

Feb 16-Feb-19

Feb 15-Feb-19

Feb 13-Feb-19

8-Feb-19

7-Feb-19

6-Feb-19

4-Feb-19

9-Feb-19 0.00

0.00 0.00

CASH FLO WDAILY BIAYA KURVA BAHAN

www.mitra-arsitek.com

0.01 0.01

0.00

13%

0.00% Total Bobot Kumulatif

0.01

0.00 0.00

10% 12% 13% 13% 14% 15% 16% 16% 17% 17% 17% 17% 19% 19% 20% 20% 20% 21% 22% 23% 23% 23% 24% 24% 25% 25% 25% 26% 26% 26% 27% 27% 27% 27% 27% 27% 27% 27% 27% 28% 28% 29% 29% 29% 30% 31% 31% 32% 32% 32% 34% 34% 35% 35% 36% 37% 38% 38% 38% 38%

369,754

5,531,043 30,174,113 2,473,393 1,381,721 2,729,703 3,066,257 13,787

0.00 0.00 0.00 0.00

0.00

14-Apr-19

393,085 730,015 1,853,115 1,853,115 589,628 393,085 336,930 80,863 393,085 404,316

0.00

0.00

361,122

259,436 118,599 169,055 303,237 1,403,875 673,860 412,402 230,460 109,165 2,807,750 585,721 1,966,280 269,544 7,300,150 4,043,160

0.00

0.01

13-Apr-19

7,075,530 10,781,760 3,706,230 8,805,104 3,369,300 1,059,645

0.00 0.00 0.00

0.00 0.00

2,637,559

20,696,909 8,580,978 3,534,059 2,941,960 1,987,887

D9 D10 D11 D12 D13 D14 D15 D16 D17 D18 D19 D20 D21 D22 D23 D24 D25 D26 D27 D28 D29 D30 D31 D32 D33 D34 D35 D36 D37 D38 D39 D40 D41 D42 D43 D44 D45 D46 D47 D48 D49 D50 D51 D52 D53 D54 D55 D56 D57 D58 D59 D60 D61 D62 D63 D64 D65 D66 D67 D68 D69 D70

0

2,349,703

32,260,075 1,820,115 9,624,817 730,380 15,412,716 646,348 4,583,935 213,716

D8

D4

0

12-Apr-19

8,880,759 9,878,400 8,652,868 1,725,039 1,330,424 1,220,276

D7

D3

11-Apr-19

5,750,132 6,889,191 4,548,302 1,916,711 668,582 1,553,079 324,563 83,891 199,682 4,715,108 4,194,526 2,773,355 3,002,847 666,040 2,595,860 536,679 681,293 332,803

D6

D2

0.00

3,913,455

1,916,711 4,515,300 1,442,145 4,088,982 9,953,081 3,438,960 1,405,588 461,240 876,380 1,533,368 475,806 1,087,155 2,044,491 1,092,411 1,553,079 2,172,272 1,092,411 1,553,079 1,022,246 339,861 488,237 638,904 218,482 433,988

D5

D1

0.00 0.00

9-Apr-19

4,101,449 -

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70

10-Apr-19

8,305,746 4,877,202 6,911,201 319,452 238,883 199,682

Finish 7-Feb-2019 4-Feb-2019 6-Feb-2019 6-Feb-2019 6-Feb-2019 7-Feb-2019 15-Feb-2019 8-Feb-2019 8-Feb-2019 10-Feb-2019 13-Feb-2019 13-Feb-2019 15-Feb-2019 12-Feb-2019 8-Feb-2019 12-Feb-2019 15-Feb-2019 7-Feb-2019 15-Feb-2019 21-Feb-2019 18-Feb-2019 20-Feb-2019 21-Feb-2019 19-Feb-2019 19-Feb-2019 21-Feb-2019 24-Feb-2019 23-Feb-2019 24-Feb-2019 14-May-2019 26-Feb-2019 26-Feb-2019 27-Feb-2019 2-Mar-2019 4-Mar-2019 5-Mar-2019 26-Feb-2019 26-Feb-2019 27-Feb-2019 1-Mar-2019 3-Mar-2019 26-Apr-2019 29-Apr-2019 1-May-2019 2-May-2019 5-May-2019 7-May-2019 8-May-2019 9-May-2019 10-May-2019 11-May-2019 12-May-2019 13-May-2019 14-May-2019 4-Jun-2019 9-Mar-2019 12-Mar-2019 14-Mar-2019 16-Mar-2019 17-Mar-2019 18-Mar-2019 19-Mar-2019 20-Mar-2019 21-Mar-2019 21-May-2019 24-May-2019 26-May-2019 29-May-2019 31-May-2019 1-Jun-2019 2-Jun-2019 3-Jun-2019 4-Jun-2019 5-Apr-2019 4-Apr-2019 29-Mar-2019 5-Apr-2019 31-Mar-2019 25-Mar-2019 5-Apr-2019 9-Jun-2019 12-Jun-2019 9-Jun-2019 16-Jun-2019 22-Jun-2019 29-Jun-2019 3-Jul-2019 9-Jul-2019 13-Jul-2019 13-Jun-2019 13-Jun-2019 17-Jun-2019 19-Jun-2019 20-Jun-2019 21-Jun-2019 11-Jul-2019 29-Jun-2019 2-Jul-2019 3-Jul-2019 5-Jul-2019 7-Jul-2019 11-Jul-2019 26-Jun-2019 13-Jun-2019 14-Jun-2019 16-Jun-2019 17-Jun-2019 18-Jun-2019 19-Jun-2019 20-Jun-2019 21-Jun-2019 22-Jun-2019 23-Jun-2019 24-Jun-2019 25-Jun-2019 26-Jun-2019 10-Apr-2019 12-Apr-2019 27-Jun-2019 27-Jun-2019 28-Jun-2019 1-Jul-2019 4-Jul-2019 6-Jul-2019 8-Jul-2019 10-Jul-2019 11-Jul-2019 13-Jul-2019 15-Jul-2019 12-Jul-2019 26-Jun-2019 4-Jul-2019 6-Jul-2019 7-Jul-2019 9-Jul-2019 11-Jul-2019 12-Jul-2019 16-Jul-2019 10-Jul-2019 14-Jul-2019 16-Jul-2019 27-Jul-2019 20-Jul-2019 21-Jul-2019 24-Jul-2019 24-Jul-2019 27-Jul-2019 25-Jul-2019 25-Jul-2019 16-Apr-2019 10-Feb-2019 10-Feb-2019 10-Feb-2019 12-Feb-2019 13-Feb-2019 14-Feb-2019 15-Feb-2019 31-Mar-2019 31-Mar-2019 30-Mar-2019 7-Apr-2019 8-Apr-2019 10-Apr-2019 12-Apr-2019 13-Apr-2019 14-Apr-2019 16-Apr-2019 29-Apr-2019 7-Apr-2019 8-Apr-2019 9-Apr-2019 10-Apr-2019 11-Apr-2019 12-Apr-2019 13-Apr-2019 14-Apr-2019 16-Apr-2019 18-Apr-2019 20-Apr-2019 22-Apr-2019 24-Apr-2019 28-Apr-2019 29-Apr-2019 2-Aug-2019 29-Jul-2019 29-Jul-2019 29-Jul-2019 31-Jul-2019 1-Aug-2019 2-Aug-2019

9

4,279,446

383,292 1,505,392 12,637,511 2,006,738 8,985,670 1,194,592 5,438,837 23,624,613 255,631

0.01 0.00 0.00 0.00 0.00 0.02 0.00 0.02 0.00 0.01 0.05 0.00 0.02 0.01 0.01 0.00 0.00 0.00 0.01 0.00 0.01 0.00 0.01 0.02 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.01 0.01 0.00 0.01 0.00 0.00 0.00 0.02 0.02 0.02 0.00 0.00 0.00 0.06 0.00 0.02 0.00 0.03 0.00 0.01 0.00 0.04 0.02 0.01 0.01 0.00 0.01 0.02 0.01 0.02 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00 0.00 0.00 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.06 0.00 0.00 0.01 0.01 0.00 0.01 0.01 0.02 0.01 0.00 0.01 0.02 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00 0.01 0.01 0.01 0.00 0.01 -

8

Feb 12-Feb-19

3,001,822 950,390 354,092

Waktu S tart 4-Feb-2019 4-Feb-2019 5-Feb-2019 6-Feb-2019 6-Feb-2019 7-Feb-2019 7-Feb-2019 7-Feb-2019 8-Feb-2019 9-Feb-2019 11-Feb-2019 12-Feb-2019 14-Feb-2019 9-Feb-2019 8-Feb-2019 9-Feb-2019 12-Feb-2019 7-Feb-2019 15-Feb-2019 16-Feb-2019 16-Feb-2019 18-Feb-2019 20-Feb-2019 18-Feb-2019 19-Feb-2019 21-Feb-2019 22-Feb-2019 22-Feb-2019 23-Feb-2019 25-Feb-2019 25-Feb-2019 26-Feb-2019 27-Feb-2019 28-Feb-2019 3-Mar-2019 5-Mar-2019 25-Feb-2019 26-Feb-2019 27-Feb-2019 28-Feb-2019 3-Mar-2019 26-Apr-2019 27-Apr-2019 30-Apr-2019 2-May-2019 3-May-2019 6-May-2019 8-May-2019 9-May-2019 10-May-2019 11-May-2019 12-May-2019 13-May-2019 14-May-2019 7-Mar-2019 7-Mar-2019 10-Mar-2019 13-Mar-2019 15-Mar-2019 17-Mar-2019 18-Mar-2019 19-Mar-2019 20-Mar-2019 21-Mar-2019 18-May-2019 22-May-2019 25-May-2019 27-May-2019 30-May-2019 1-Jun-2019 2-Jun-2019 3-Jun-2019 4-Jun-2019 25-Mar-2019 30-Mar-2019 25-Mar-2019 5-Apr-2019 30-Mar-2019 25-Mar-2019 5-Apr-2019 8-Jun-2019 8-Jun-2019 8-Jun-2019 12-Jun-2019 19-Jun-2019 25-Jun-2019 2-Jul-2019 6-Jul-2019 12-Jul-2019 10-Jun-2019 10-Jun-2019 14-Jun-2019 18-Jun-2019 20-Jun-2019 21-Jun-2019 28-Jun-2019 28-Jun-2019 30-Jun-2019 3-Jul-2019 4-Jul-2019 6-Jul-2019 8-Jul-2019 8-Apr-2019 12-Jun-2019 13-Jun-2019 15-Jun-2019 17-Jun-2019 18-Jun-2019 19-Jun-2019 20-Jun-2019 21-Jun-2019 22-Jun-2019 23-Jun-2019 24-Jun-2019 25-Jun-2019 26-Jun-2019 8-Apr-2019 11-Apr-2019 27-Jun-2019 27-Jun-2019 28-Jun-2019 29-Jun-2019 2-Jul-2019 5-Jul-2019 7-Jul-2019 9-Jul-2019 11-Jul-2019 12-Jul-2019 14-Jul-2019 25-Jun-2019 25-Jun-2019 28-Jun-2019 5-Jul-2019 7-Jul-2019 8-Jul-2019 10-Jul-2019 12-Jul-2019 7-Jul-2019 7-Jul-2019 11-Jul-2019 15-Jul-2019 18-Jul-2019 18-Jul-2019 18-Jul-2019 21-Jul-2019 21-Jul-2019 24-Jul-2019 25-Jul-2019 25-Jul-2019 10-Feb-2019 10-Feb-2019 10-Feb-2019 10-Feb-2019 12-Feb-2019 13-Feb-2019 14-Feb-2019 15-Feb-2019 30-Mar-2019 30-Mar-2019 30-Mar-2019 7-Apr-2019 8-Apr-2019 9-Apr-2019 11-Apr-2019 13-Apr-2019 14-Apr-2019 15-Apr-2019 7-Apr-2019 7-Apr-2019 8-Apr-2019 9-Apr-2019 10-Apr-2019 11-Apr-2019 12-Apr-2019 13-Apr-2019 14-Apr-2019 15-Apr-2019 17-Apr-2019 19-Apr-2019 21-Apr-2019 23-Apr-2019 25-Apr-2019 29-Apr-2019 28-Jul-2019 28-Jul-2019 28-Jul-2019 28-Jul-2019 31-Jul-2019 31-Jul-2019 1-Aug-2019

7

Feb 11-Feb-19

(x100% )

6

Feb 10-Feb-19

(rupiah)

5

Induk Pekerjaan

Waktu Pelakasanaan Progress Pekerjaan

Feb

Bobot

4

7

187 Serah T erima (overhand)

Feb

PEKERJAAN PERSIAPAN & PENDAHULUAN Mobilisasi dan Demobiliasi Peralatan dan Perlengkapan Pembersihan Area/Lokasi Kerja Pengukuran dan Pemasangan Bowplank Pembuatan Bedeng dan Gudang Bahan Papan Nama Proyek uk 1, 2m x 1, 8m PEKERJAAN PO NDASI Pekerjaan Galian Urugan Pasir Pek. Pemasangan Batu Kosong (Aanstamping) Pekerjaan Pembesian Pondasi T apak Pekerjan Bekisting Pondasi T apak Pekerjaan Cor Beton (K-225) Pekerjaan Galian Urugan Pasir Pek. Pemasangan Batu Kosong (Aanstamping) Pekerjaan Pasangan Batu Pondasi ( 1 : 3) Pekerjaan Galian Pek. Pasangan Pondasi Rollag PEKERJAAN SLO O F Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Sloof Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d10&20-d8) Pekerjaan Bekisting Sloof Pekerjaan Cor Beton (K-225) PEKERJAAN TIMBUNAN, PENINGGIAN DAN PEMADATAN Urugan, T imbunan dan Peninggian Elevasi Pemadatan T anah PEKERJAAN KO LO M Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d12&18 cm-d6) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d12&18 cm-d6) Pekerjaan Bekisting Pekerjaan Cor Beton (K-200) Pekerjaan Pembesian (4d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-200) PEKERJAAN RINGBALO K (BALO K) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) PEKERJAAN CO R PLATE BETO N (DAK BETO N) Pekerjaan Pembesian Plate lantai Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian Plat Atap/kanopi beton Pekerjaan Bekisting Sloof Pekerjaan Cor Beton (K-225) PEKERJAAN DINDING Pek. Pasangan Bata Merah (1/2, Mix 1:5) Pek. Pasangan Bata Merah T rassram (1/2, Mix 1:3) Pekerjaan Plasteran (1.5 cm-mix 1:5) Pekerjaan Acian Pek. Pasangan Bata Merah (1/2, Mix 1:5) Pek. Pasangan Bata Merah T rassram (1/2, Mix 1:3) Pekerjaan Plasteran (1.5 cm-mix 1:5) Pekerjaan Acian PEKERJAAN ATAP Memasang Rangka Atap (Baja Ringan-Ex T ASO) Memasang Pelapis Atap (Metal Roof-Ex Sakura Roof Memasang Nok Atap Memasang Lisplank Memasang T alang Air PEKERJAAN KUSEN, PINTU, JENDELA DAN ACCESO RIS Memasang Kusen+Panel Pintu Utama Memasang Kusen+Panel Pintu Kamar/Ruangan Memasang Kusen+Panel Pintu WC Memasang Kusen+Panel Jendela Utama Memasang Jendela Pencahayaan/ T etap (Fixed Window) Memasang Lubang Angin/Loster (Bovenlight) PEKERJAAN INST. PIPA AIR BERSIH, LIMBAH DAN SANITASI Memasang Instalasi Pipa 3/4 PVC (Ex Maspion) Memasang Instalasi Pipa 1/2 PVC (Ex Maspion) Memasang Keran Air Standar ( Ex Onda) Memasang Shower Mandi ( Ex T OT O) Memasang T angki Air/T andom (Ex Penguin-1000L) Memasang Pompa Air ( Ex Shimizu 125 Watt) Memasang Instalasi Pipa Limbah 3" PVC (Ex Maspio Memasang Instalasi Pipa Kloset 4" PVC (Ex Maspion) Memasang Instalasi Pipa Saluran 5" PVC (Ex Maspion Memasang Kloset Duduk ( Ex T OT O) Memasang Kloset Jongkok ( Ex T OT O) Memasang Wastafel Cuci Memasang Floor Drain Pekerjaan Septik T ank ( 1000 L) Pekerjaan Sumur Resapan Limbah (800 L) PEKERJAAN INST. LISTRIK DAN PENERANGAN Pemasangan MCB Pengaman dan Box Pemasangan Instalasi Pembumian (Grounding) Pemasangan Kabel Instalasi ( NYM-3x2,5 mm2) Pemasangan Kabel Instalasi ( NYM-3x1,5 mm2) Pemasangan Fitting Lampu Pemasangan Saklar Lampu Pemasangan Receiptackle (Colokan Listrik) Pemasangan Lampu 5 Watt (ex-PHILIPS LED) Pemasangan Lampu 15 Watt (ex-PHILIPS LED) Pemasangan Lampu 20 Watt (ex-PHILIPS LED) PEKERJAAN KERAMIK LANTAI DAN DINDING Pekerjaan Cor Lantai Kerja Non Struktur (K100- 1:4:4 Memasang Keramik Lantai Utama (Ex Granito 60x60 Memasang Keramik Lantai T eras (Ex Platinum 40x40 Memasang Keramik Lantai WC (Ex Asia T ile 20x20) Memasang Keramik Dinding WC (Ex Roman 20x40) Memasang Plint Keramik Dinding (Ex Granito 15x60) Memasang Rope T ile (Kuku T egel/Plint Sudut) PEKERJAAN LANGIT-LANGIT (PLAFO N) Memasang Rangka Plafon ( Ex Furing 2/4 - 4/4) Memasang Pelapis Pelafon ( Ex Gipsum Board 9mm) Memasang List Plafon PEKERJAAN PENGECATAN DAN WATERPRO FING Pekerjaan Plamir Dinding Pekerjaan Cat Anti Lumut dan Waterprofing Pekerjaan Pengecatan Exterior ( Ex Mowilex) Pekerjaan Pengecatan Interior ( Ex Nippon Paint) Pekerjaan Pengecatan Plafon( Ex Mowilex) Pekerjaan Pengecatan Kayu ( Ex Avian) Pekerjaan Pengecatan Besi ( Ex Avian) PEKERJAAN TANGGA Pekerjaan Galian Pekerjaan Urugan T anah Galian Urugan Pasir Pasangan Batu Pondasi (1:4) Pekerjaan Pembesian Sloof Pekerjaan Bekisting Sloof Pekerjaan Cor Beton Sloof (K225) Pekerjaan Pembesian Utama ( d10-18 cm) Pekerjaan Pembesian Anak T angga ( d10-18 cm) Pekerjaan Bekisting T angga Pekerjaan Cor Beton (K-225) Pekerjaan Plasteran ( 1,5 cm- 1: 5) Pekerjaan Keramik T angga ( Ex Asia T ile 40x40) Pekerjaan Rope T ile Pekerjaan Plamir Pekerjaan Pengecatan T angga Pekerjaan Railing T angga PEKERJAAN PAGAR DAN TAMAN/HALAMAN Pekerjaan Galian Pondasi Pasangan Batu Pondasi Pekerjaan Pembesian Sloof Pekerjaan Bekisting Sloof Pekerjaan Pengecoran (K200) Pekerjaan Pembesian Kolom Pekerjaan Bekisting Kolom Pekerjaan Pengecoran (K200) Pasangan Batu Bata Pekerjaan Plasteran Pekerjaan Acian Pekerjaan Pasangan Batu Alam Pekerjaan Pengecatan Pekerjaan Pemasangan Paving Blok Pekerjaan Penanaman Pohon Perdu PEKERJAAN TAMBAHAN DAN LAINNYA Pekerjaan Pemasangan Meteran Listrik (PLN-2200 kWh Pekerjaan Pemasangan Meteran Air (PDAM) Pekerjaan Pemasangan Pintu T oko (Folding Door) Pemasangan Exhaust Fan Pemasangan AC (Air Conditioner-1 PK, Ex. Sharp) Pembersihan Area Kerja (Pasca Konstruksi)

1.00

Biaya

3

Feb

A A1 A2 A3 A4 A5 B B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 C C1 C2 C3 C4 C5 C6 D D1 D2 E E1 E2 E3 E4 E5 E6 E7 E8 E9 E10 E11 E12 E13 E14 E15 E16 E17 E18 E19 E20 E21 E22 E23 E24 F F1 F2 F3 F4 F5 F6 F7 F8 F9 F10 F11 F12 F13 F14 F15 F16 F17 F18 G G1 G2 G3 G4 G5 G6 H H1 H2 H3 H4 H5 H6 H7 H8 I I1 I2 I3 I4 I5 J J1 J2 J3 J4 J5 J6 K K1 K2 K3 K4 K5 K6 K7 K8 K9 K10 K11 K12 K13 K14 K15 L L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 M M1 M2 M3 M4 M5 M6 M7 N N1 N2 N3 O O1 O2 O3 O4 O5 O6 O7 P P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 P16 P17 Q Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q 10 Q 11 Q 12 Q 13 Q 14 Q 15 R R1 R2 R3 R4 R5 R6

Uraian Pekerjaan

2

Feb

26 Minggu 512,211,985

ID Pekerjaan

1

180

Feb

Total

Selesai (Finish) : Hari ( Work Day) :

Feb

512,211,985 357,379,657 61,596,970 931,188,612

5-Feb-19

4-Feb-2019 Monday 2-Aug-2019 Friday

Mulai (Start) : Bahan : Upah : Alat :

Wednesday, May 9, 2018 -270 1 Project Mulai (start) ## Hari Ini (today) 180 Project Selesai (Finish)

Feb 14-Feb-19

LAMPIRAN KURVA BAHAN A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180

4

1/1

Software RAB Exarch sdaPro v2019

LAMPIRAN KURVA BAHAN A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180

4-Feb-2019 Monday 2-Aug-2019 Friday

Jun 23-Jun-19

Jun 22-Jun-19

Jun 21-Jun-19

Jun 20-Jun-19

Jun 19-Jun-19

Jun 18-Jun-19

Jun 17-Jun-19

Jun 16-Jun-19

9-Jun-19

Jun 15-Jun-19

8-Jun-19

Jun

Jun 14-Jun-19

7-Jun-19

Jun

Jun 13-Jun-19

6-Jun-19

Jun

Jun 12-Jun-19

5-Jun-19

Jun

Jun 11-Jun-19

4-Jun-19

Jun

Jun 10-Jun-19

3-Jun-19

Jun

2-Jun-19

Jun

Jun

1-Jun-19

Jun

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May 9-May-19

May 8-May-19

May 7-May-19

May 6-May-19

May 5-May-19

May 4-May-19

May 3-May-19

May 2-May-19

Apr 30-Apr-19

May 1-May-19

Apr 29-Apr-19

Apr 28-Apr-19

Apr 27-Apr-19

Apr 26-Apr-19

Apr 25-Apr-19

Apr 24-Apr-19

Apr 23-Apr-19

Apr 22-Apr-19

Apr 21-Apr-19

Apr 20-Apr-19

Apr 19-Apr-19

Apr 18-Apr-19

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.00

64%

0.01

63% 63%

0.00

63%

0.00

62%

0.00

61% 61% 60% 60% 59%

58% 0.00

0.00

0.01

0.01 0.01 0.01

0.00

0.00

0.01

57% 0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00

54% 0.00 0.00

0.00

0.00

0.01 0.01

0.01

0.01

52%

0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00

49%

48%

46% 46% 46% 46% 46% 46% 46% 0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

41% 41% 41% 39% 38%

39% 39% 39% 39% 39% 39% 39% 39% 39%

40%

0.00 0.00 0.00 0.00

41% 41%

0.00 0.00

42% 42% 41% 41%

0.00 0.00 0.00

42%

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

43% 43% 43% 43% 43% 42% 42% 42% 42%

43%

43%

0.00

43%

0.00

44%

0.00 0.00 0.00 0.00

44%

44%

44%

45%

46% 0.00 0.00 0.00 0.00 0.00 0.00 46% 0.00 45%0.00

45%

45%

45%

0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00

0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01

40%

39%

0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00

43%

43%

43%

44%

44%

45%

45%

46%

46%

46%

49%

57%

58%

59%

61%

63%

64%

63%

42%

63%

42%

62%

42%

61%

41%

60%

41%

60%

40%

54%

39%

52%

39%

48%

39%

46%

0.26

46%

0.01

0.24 0.25 0.25

46%

0.01 0.00 0.00

0.23 0.24

46%

0.01 0.01

0.21 0.21 0.22 0.23

46%

0.01 0.01 0.01 0.00

0.20

46%

0.01

0.18

45%

0.03

0.11 0.13 0.16

45%

0.01 0.02 0.02

0.08 0.08 0.08 0.10

45%

0.00 0.00 0.00 0.01

0.08 0.08

44%

0.00 0.00

0.07 0.08 0.08

44%

0.00 0.01 0.00

0.07 0.07

43%

0.00 0.00

0.07 0.07 0.07

43%

0.00 0.00 0.00

0.06 0.06 0.06 0.06

43%

0.00 0.00 0.00 0.00

0.05

43%

0.00

0.05

43%

0.00

0.04 0.05 0.05

42%

0.00 0.00 0.00

0.04 0.04 0.04

42%

0.00 0.00 0.00

0.04 0.04 0.04

42%

0.00 0.00 0.00

0.04 0.04 0.04

42%

0.00 0.00 0.00

0.03 0.03

41%

0.00 0.00

0.03 0.03 0.03 0.03

41%

0.00 0.00 0.00 0.00

0.02 0.02 0.03

41%

0.01 0.00 0.00

0.01 0.02

41%

0.00 0.00

0.01 0.01 0.01 0.01

41%

0.00 0.00 0.00 0.00

0.01

40%

0.00

0.00

39%

0.00

0.00 0.00 0.00

39%

0.00 0.00 0.00

0.00 0.00 0.00

39%

0.00 0.00 0.00

39%

www.mitra-arsitek.com

0.00

39%

1,000,949

1,000,949

333,020

333,020

2,595,860

536,679

681,293

332,803

-

-

-

7,362,072

27-May-19

28-May-19

29-May-19

30-May-19

31-May-19

1-Jun-19

2-Jun-19

3-Jun-19

4-Jun-19

5-Jun-19

6-Jun-19

7-Jun-19

8-Jun-19

2,807,750

1,000,949

26-May-19

23-Jun-19

1,386,678

25-May-19

291,760

1,386,678

24-May-19

22-Jun-19

1,398,175

23-May-19

2,400,942

1,398,175

22-May-19

21-Jun-19

1,398,175

21-May-19

3,536,958

1,178,777

20-May-19

20-Jun-19

1,178,777

19-May-19

2,623,484

1,178,777

18-May-19

19-Jun-19

1,178,777

17-May-19

18-Jun-19

-

16-May-19

3,170,904

-

15-May-19

2,448,482

-

14-May-19

17-Jun-19

433,988

13-May-19

4,154,735

218,482

12-May-19

16-Jun-19

638,904

11-May-19

4,154,735

488,237

10-May-19

15-Jun-19

339,861

9-May-19

4,129,508

1,022,246

8-May-19

14-Jun-19

1,553,079

7-May-19

7,288,208

546,206

6-May-19

13-Jun-19

546,206

5-May-19

13,680,924

724,091

11,626,242

724,091 4-May-19

12-Jun-19

724,091 3-May-19

11-Jun-19

1,553,079 2-May-19

11,626,242

546,206 1-May-19

9-Jun-19

546,206 30-Apr-19

10-Jun-19

2,927,697 29-Apr-19

7,362,072

1,655,337

38% 39% 39% 39% 39% 39% 39% 39% 39% 39% 39% 39% 40% 40% 41% 41% 41% 41% 41% 41% 41% 42% 42% 42% 42% 42% 42% 42% 43% 43% 43% 43% 43% 43% 43% 43% 44% 44% 44% 44% 45% 45% 45% 45% 45% 46% 46% 46% 46% 46% 46% 46% 46% 46% 48% 49% 52% 54% 57% 58% 59% 60% 60% 61% 61% 62% 63% 63% 63% 64%

28-Apr-19

Hari Kalender

0.00

39%

CASH FLO WDAILY BIAYA KURVA BAHAN

0.00

39%

Aktual Load (red Line)

0.00

39%

Load Plan (Blue Line)

0.00

38%

38.10% Total Bobot Kumulatif

0.00 0.00

1,655,337

6,177,050 2,807,750 6,040,144 842,325 7,187,840 -

0.00 0.00 0.00

27-Apr-19

1,726,547 575,013 209,023 325,491 613,347 291,310 347,191 1,550,965 222,133 52,926 504,276 147,829 3,895,360 2,246,200

0.00

26-Apr-19

63,882 453,860 442,121 53,749 607,584 1,852,820 1,584,481 755,546 2,148,242 86,385 2,542,098 5,264 69,812 22,563 243,713

0.00 0.00 0.00

973,840

5,026,457 991,787 4,253,665 12,017,080 4,625,622 164,097 20,951

0.00 0.00 0.00

2,060,995

7,625,849 6,917,843 10,735,601

0.00

0.00 0.00

25-Apr-19

5,531,043 30,174,113 2,473,393 1,381,721 2,729,703 3,066,257 13,787

0.00 0.00

0.00 0.00 0.00 0.00

0.00

73,915

393,085 730,015 1,853,115 1,853,115 589,628 393,085 336,930 80,863 393,085 404,316

0.00 0.00 0.00

0.00 0.00

24-Apr-19

259,436 118,599 169,055 303,237 1,403,875 673,860 412,402 230,460 109,165 2,807,750 585,721 1,966,280 269,544 7,300,150 4,043,160

0.00 0.00

0.00

73,915

7,075,530 10,781,760 3,706,230 8,805,104 3,369,300 1,059,645

0.00 0.00 0.00 0.00

23-Apr-19

20,696,909 8,580,978 3,534,059 2,941,960 1,987,887

0.00

252,138

32,260,075 1,820,115 9,624,817 730,380 15,412,716 646,348 4,583,935 213,716

0.00

22-Apr-19

8,880,759 9,878,400 8,652,868 1,725,039 1,330,424 1,220,276

0.00 0.00 0.00

252,138

5,750,132 6,889,191 4,548,302 1,916,711 668,582 1,553,079 324,563 83,891 199,682 4,715,108 4,194,526 2,773,355 3,002,847 666,040 2,595,860 536,679 681,293 332,803

0.00 0.00 0.00

21-Apr-19

1,916,711 4,515,300 1,442,145 4,088,982 9,953,081 3,438,960 1,405,588 461,240 876,380 1,533,368 475,806 1,087,155 2,044,491 1,092,411 1,553,079 2,172,272 1,092,411 1,553,079 1,022,246 339,861 488,237 638,904 218,482 433,988

26,463

4,101,449 -

D71 D72 D73 D74 D75 D76 D77 D78 D79 D80 D81 D82 D83 D84 D85 D86 D87 D88 D89 D90 D91 D92 D93 D94 D95 D96 D97 D98 D99 D100D101D102D103D104D105D106D107D108D109D110D111D112D113D114D115D116D117D118D119D120D121D122D123D124D125D126D127D128D129D130D131D132D133D134D135D136D137D138D139D140

20-Apr-19

8,305,746 4,877,202 6,911,201 319,452 238,883 199,682

Finish 7-Feb-2019 4-Feb-2019 6-Feb-2019 6-Feb-2019 6-Feb-2019 7-Feb-2019 15-Feb-2019 8-Feb-2019 8-Feb-2019 10-Feb-2019 13-Feb-2019 13-Feb-2019 15-Feb-2019 12-Feb-2019 8-Feb-2019 12-Feb-2019 15-Feb-2019 7-Feb-2019 15-Feb-2019 21-Feb-2019 18-Feb-2019 20-Feb-2019 21-Feb-2019 19-Feb-2019 19-Feb-2019 21-Feb-2019 24-Feb-2019 23-Feb-2019 24-Feb-2019 14-May-2019 26-Feb-2019 26-Feb-2019 27-Feb-2019 2-Mar-2019 4-Mar-2019 5-Mar-2019 26-Feb-2019 26-Feb-2019 27-Feb-2019 1-Mar-2019 3-Mar-2019 26-Apr-2019 29-Apr-2019 1-May-2019 2-May-2019 5-May-2019 7-May-2019 8-May-2019 9-May-2019 10-May-2019 11-May-2019 12-May-2019 13-May-2019 14-May-2019 4-Jun-2019 9-Mar-2019 12-Mar-2019 14-Mar-2019 16-Mar-2019 17-Mar-2019 18-Mar-2019 19-Mar-2019 20-Mar-2019 21-Mar-2019 21-May-2019 24-May-2019 26-May-2019 29-May-2019 31-May-2019 1-Jun-2019 2-Jun-2019 3-Jun-2019 4-Jun-2019 5-Apr-2019 4-Apr-2019 29-Mar-2019 5-Apr-2019 31-Mar-2019 25-Mar-2019 5-Apr-2019 9-Jun-2019 12-Jun-2019 9-Jun-2019 16-Jun-2019 22-Jun-2019 29-Jun-2019 3-Jul-2019 9-Jul-2019 13-Jul-2019 13-Jun-2019 13-Jun-2019 17-Jun-2019 19-Jun-2019 20-Jun-2019 21-Jun-2019 11-Jul-2019 29-Jun-2019 2-Jul-2019 3-Jul-2019 5-Jul-2019 7-Jul-2019 11-Jul-2019 26-Jun-2019 13-Jun-2019 14-Jun-2019 16-Jun-2019 17-Jun-2019 18-Jun-2019 19-Jun-2019 20-Jun-2019 21-Jun-2019 22-Jun-2019 23-Jun-2019 24-Jun-2019 25-Jun-2019 26-Jun-2019 10-Apr-2019 12-Apr-2019 27-Jun-2019 27-Jun-2019 28-Jun-2019 1-Jul-2019 4-Jul-2019 6-Jul-2019 8-Jul-2019 10-Jul-2019 11-Jul-2019 13-Jul-2019 15-Jul-2019 12-Jul-2019 26-Jun-2019 4-Jul-2019 6-Jul-2019 7-Jul-2019 9-Jul-2019 11-Jul-2019 12-Jul-2019 16-Jul-2019 10-Jul-2019 14-Jul-2019 16-Jul-2019 27-Jul-2019 20-Jul-2019 21-Jul-2019 24-Jul-2019 24-Jul-2019 27-Jul-2019 25-Jul-2019 25-Jul-2019 16-Apr-2019 10-Feb-2019 10-Feb-2019 10-Feb-2019 12-Feb-2019 13-Feb-2019 14-Feb-2019 15-Feb-2019 31-Mar-2019 31-Mar-2019 30-Mar-2019 7-Apr-2019 8-Apr-2019 10-Apr-2019 12-Apr-2019 13-Apr-2019 14-Apr-2019 16-Apr-2019 29-Apr-2019 7-Apr-2019 8-Apr-2019 9-Apr-2019 10-Apr-2019 11-Apr-2019 12-Apr-2019 13-Apr-2019 14-Apr-2019 16-Apr-2019 18-Apr-2019 20-Apr-2019 22-Apr-2019 24-Apr-2019 28-Apr-2019 29-Apr-2019 2-Aug-2019 29-Jul-2019 29-Jul-2019 29-Jul-2019 31-Jul-2019 1-Aug-2019 2-Aug-2019

26,463

383,292 1,505,392 12,637,511 2,006,738 8,985,670 1,194,592 5,438,837 23,624,613 255,631

0.01 0.00 0.00 0.00 0.00 0.02 0.00 0.02 0.00 0.01 0.05 0.00 0.02 0.01 0.01 0.00 0.00 0.00 0.01 0.00 0.01 0.00 0.01 0.02 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.01 0.01 0.00 0.01 0.00 0.00 0.00 0.02 0.02 0.02 0.00 0.00 0.00 0.06 0.00 0.02 0.00 0.03 0.00 0.01 0.00 0.04 0.02 0.01 0.01 0.00 0.01 0.02 0.01 0.02 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00 0.00 0.00 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.06 0.00 0.00 0.01 0.01 0.00 0.01 0.01 0.02 0.01 0.00 0.01 0.02 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00 0.01 0.01 0.01 0.00 0.01 -

19-Apr-19

3,001,822 950,390 354,092

Waktu S tart 4-Feb-2019 4-Feb-2019 5-Feb-2019 6-Feb-2019 6-Feb-2019 7-Feb-2019 7-Feb-2019 7-Feb-2019 8-Feb-2019 9-Feb-2019 11-Feb-2019 12-Feb-2019 14-Feb-2019 9-Feb-2019 8-Feb-2019 9-Feb-2019 12-Feb-2019 7-Feb-2019 15-Feb-2019 16-Feb-2019 16-Feb-2019 18-Feb-2019 20-Feb-2019 18-Feb-2019 19-Feb-2019 21-Feb-2019 22-Feb-2019 22-Feb-2019 23-Feb-2019 25-Feb-2019 25-Feb-2019 26-Feb-2019 27-Feb-2019 28-Feb-2019 3-Mar-2019 5-Mar-2019 25-Feb-2019 26-Feb-2019 27-Feb-2019 28-Feb-2019 3-Mar-2019 26-Apr-2019 27-Apr-2019 30-Apr-2019 2-May-2019 3-May-2019 6-May-2019 8-May-2019 9-May-2019 10-May-2019 11-May-2019 12-May-2019 13-May-2019 14-May-2019 7-Mar-2019 7-Mar-2019 10-Mar-2019 13-Mar-2019 15-Mar-2019 17-Mar-2019 18-Mar-2019 19-Mar-2019 20-Mar-2019 21-Mar-2019 18-May-2019 22-May-2019 25-May-2019 27-May-2019 30-May-2019 1-Jun-2019 2-Jun-2019 3-Jun-2019 4-Jun-2019 25-Mar-2019 30-Mar-2019 25-Mar-2019 5-Apr-2019 30-Mar-2019 25-Mar-2019 5-Apr-2019 8-Jun-2019 8-Jun-2019 8-Jun-2019 12-Jun-2019 19-Jun-2019 25-Jun-2019 2-Jul-2019 6-Jul-2019 12-Jul-2019 10-Jun-2019 10-Jun-2019 14-Jun-2019 18-Jun-2019 20-Jun-2019 21-Jun-2019 28-Jun-2019 28-Jun-2019 30-Jun-2019 3-Jul-2019 4-Jul-2019 6-Jul-2019 8-Jul-2019 8-Apr-2019 12-Jun-2019 13-Jun-2019 15-Jun-2019 17-Jun-2019 18-Jun-2019 19-Jun-2019 20-Jun-2019 21-Jun-2019 22-Jun-2019 23-Jun-2019 24-Jun-2019 25-Jun-2019 26-Jun-2019 8-Apr-2019 11-Apr-2019 27-Jun-2019 27-Jun-2019 28-Jun-2019 29-Jun-2019 2-Jul-2019 5-Jul-2019 7-Jul-2019 9-Jul-2019 11-Jul-2019 12-Jul-2019 14-Jul-2019 25-Jun-2019 25-Jun-2019 28-Jun-2019 5-Jul-2019 7-Jul-2019 8-Jul-2019 10-Jul-2019 12-Jul-2019 7-Jul-2019 7-Jul-2019 11-Jul-2019 15-Jul-2019 18-Jul-2019 18-Jul-2019 18-Jul-2019 21-Jul-2019 21-Jul-2019 24-Jul-2019 25-Jul-2019 25-Jul-2019 10-Feb-2019 10-Feb-2019 10-Feb-2019 10-Feb-2019 12-Feb-2019 13-Feb-2019 14-Feb-2019 15-Feb-2019 30-Mar-2019 30-Mar-2019 30-Mar-2019 7-Apr-2019 8-Apr-2019 9-Apr-2019 11-Apr-2019 13-Apr-2019 14-Apr-2019 15-Apr-2019 7-Apr-2019 7-Apr-2019 8-Apr-2019 9-Apr-2019 10-Apr-2019 11-Apr-2019 12-Apr-2019 13-Apr-2019 14-Apr-2019 15-Apr-2019 17-Apr-2019 19-Apr-2019 21-Apr-2019 23-Apr-2019 25-Apr-2019 29-Apr-2019 28-Jul-2019 28-Jul-2019 28-Jul-2019 28-Jul-2019 31-Jul-2019 31-Jul-2019 1-Aug-2019

Apr 17-Apr-19

(x100% )

18-Apr-19

(rupiah)

Apr 16-Apr-19

Apr 15-Apr-19

Bobot

111,067

PEKERJAAN PERSIAPAN & PENDAHULUAN Mobilisasi dan Demobiliasi Peralatan dan Perlengkapan Pembersihan Area/Lokasi Kerja Pengukuran dan Pemasangan Bowplank Pembuatan Bedeng dan Gudang Bahan Papan Nama Proyek uk 1, 2m x 1, 8m PEKERJAAN PO NDASI Pekerjaan Galian Urugan Pasir Pek. Pemasangan Batu Kosong (Aanstamping) Pekerjaan Pembesian Pondasi T apak Pekerjan Bekisting Pondasi T apak Pekerjaan Cor Beton (K-225) Pekerjaan Galian Urugan Pasir Pek. Pemasangan Batu Kosong (Aanstamping) Pekerjaan Pasangan Batu Pondasi ( 1 : 3) Pekerjaan Galian Pek. Pasangan Pondasi Rollag PEKERJAAN SLO O F Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Sloof Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d10&20-d8) Pekerjaan Bekisting Sloof Pekerjaan Cor Beton (K-225) PEKERJAAN TIMBUNAN, PENINGGIAN DAN PEMADATAN Urugan, T imbunan dan Peninggian Elevasi Pemadatan T anah PEKERJAAN KO LO M Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d12&18 cm-d6) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d12&18 cm-d6) Pekerjaan Bekisting Pekerjaan Cor Beton (K-200) Pekerjaan Pembesian (4d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-200) PEKERJAAN RINGBALO K (BALO K) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) PEKERJAAN CO R PLATE BETO N (DAK BETO N) Pekerjaan Pembesian Plate lantai Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian Plat Atap/kanopi beton Pekerjaan Bekisting Sloof Pekerjaan Cor Beton (K-225) PEKERJAAN DINDING Pek. Pasangan Bata Merah (1/2, Mix 1:5) Pek. Pasangan Bata Merah T rassram (1/2, Mix 1:3) Pekerjaan Plasteran (1.5 cm-mix 1:5) Pekerjaan Acian Pek. Pasangan Bata Merah (1/2, Mix 1:5) Pek. Pasangan Bata Merah T rassram (1/2, Mix 1:3) Pekerjaan Plasteran (1.5 cm-mix 1:5) Pekerjaan Acian PEKERJAAN ATAP Memasang Rangka Atap (Baja Ringan-Ex T ASO) Memasang Pelapis Atap (Metal Roof-Ex Sakura Roof Memasang Nok Atap Memasang Lisplank Memasang T alang Air PEKERJAAN KUSEN, PINTU, JENDELA DAN ACCESO RIS Memasang Kusen+Panel Pintu Utama Memasang Kusen+Panel Pintu Kamar/Ruangan Memasang Kusen+Panel Pintu WC Memasang Kusen+Panel Jendela Utama Memasang Jendela Pencahayaan/ T etap (Fixed Window) Memasang Lubang Angin/Loster (Bovenlight) PEKERJAAN INST. PIPA AIR BERSIH, LIMBAH DAN SANITASI Memasang Instalasi Pipa 3/4 PVC (Ex Maspion) Memasang Instalasi Pipa 1/2 PVC (Ex Maspion) Memasang Keran Air Standar ( Ex Onda) Memasang Shower Mandi ( Ex T OT O) Memasang T angki Air/T andom (Ex Penguin-1000L) Memasang Pompa Air ( Ex Shimizu 125 Watt) Memasang Instalasi Pipa Limbah 3" PVC (Ex Maspio Memasang Instalasi Pipa Kloset 4" PVC (Ex Maspion) Memasang Instalasi Pipa Saluran 5" PVC (Ex Maspion Memasang Kloset Duduk ( Ex T OT O) Memasang Kloset Jongkok ( Ex T OT O) Memasang Wastafel Cuci Memasang Floor Drain Pekerjaan Septik T ank ( 1000 L) Pekerjaan Sumur Resapan Limbah (800 L) PEKERJAAN INST. LISTRIK DAN PENERANGAN Pemasangan MCB Pengaman dan Box Pemasangan Instalasi Pembumian (Grounding) Pemasangan Kabel Instalasi ( NYM-3x2,5 mm2) Pemasangan Kabel Instalasi ( NYM-3x1,5 mm2) Pemasangan Fitting Lampu Pemasangan Saklar Lampu Pemasangan Receiptackle (Colokan Listrik) Pemasangan Lampu 5 Watt (ex-PHILIPS LED) Pemasangan Lampu 15 Watt (ex-PHILIPS LED) Pemasangan Lampu 20 Watt (ex-PHILIPS LED) PEKERJAAN KERAMIK LANTAI DAN DINDING Pekerjaan Cor Lantai Kerja Non Struktur (K100- 1:4:4 Memasang Keramik Lantai Utama (Ex Granito 60x60 Memasang Keramik Lantai T eras (Ex Platinum 40x40 Memasang Keramik Lantai WC (Ex Asia T ile 20x20) Memasang Keramik Dinding WC (Ex Roman 20x40) Memasang Plint Keramik Dinding (Ex Granito 15x60) Memasang Rope T ile (Kuku T egel/Plint Sudut) PEKERJAAN LANGIT-LANGIT (PLAFO N) Memasang Rangka Plafon ( Ex Furing 2/4 - 4/4) Memasang Pelapis Pelafon ( Ex Gipsum Board 9mm) Memasang List Plafon PEKERJAAN PENGECATAN DAN WATERPRO FING Pekerjaan Plamir Dinding Pekerjaan Cat Anti Lumut dan Waterprofing Pekerjaan Pengecatan Exterior ( Ex Mowilex) Pekerjaan Pengecatan Interior ( Ex Nippon Paint) Pekerjaan Pengecatan Plafon( Ex Mowilex) Pekerjaan Pengecatan Kayu ( Ex Avian) Pekerjaan Pengecatan Besi ( Ex Avian) PEKERJAAN TANGGA Pekerjaan Galian Pekerjaan Urugan T anah Galian Urugan Pasir Pasangan Batu Pondasi (1:4) Pekerjaan Pembesian Sloof Pekerjaan Bekisting Sloof Pekerjaan Cor Beton Sloof (K225) Pekerjaan Pembesian Utama ( d10-18 cm) Pekerjaan Pembesian Anak T angga ( d10-18 cm) Pekerjaan Bekisting T angga Pekerjaan Cor Beton (K-225) Pekerjaan Plasteran ( 1,5 cm- 1: 5) Pekerjaan Keramik T angga ( Ex Asia T ile 40x40) Pekerjaan Rope T ile Pekerjaan Plamir Pekerjaan Pengecatan T angga Pekerjaan Railing T angga PEKERJAAN PAGAR DAN TAMAN/HALAMAN Pekerjaan Galian Pondasi Pasangan Batu Pondasi Pekerjaan Pembesian Sloof Pekerjaan Bekisting Sloof Pekerjaan Pengecoran (K200) Pekerjaan Pembesian Kolom Pekerjaan Bekisting Kolom Pekerjaan Pengecoran (K200) Pasangan Batu Bata Pekerjaan Plasteran Pekerjaan Acian Pekerjaan Pasangan Batu Alam Pekerjaan Pengecatan Pekerjaan Pemasangan Paving Blok Pekerjaan Penanaman Pohon Perdu PEKERJAAN TAMBAHAN DAN LAINNYA Pekerjaan Pemasangan Meteran Listrik (PLN-2200 kWh Pekerjaan Pemasangan Meteran Air (PDAM) Pekerjaan Pemasangan Pintu T oko (Folding Door) Pemasangan Exhaust Fan Pemasangan AC (Air Conditioner-1 PK, Ex. Sharp) Pembersihan Area Kerja (Pasca Konstruksi)

1.00

Biaya

17-Apr-19

A A1 A2 A3 A4 A5 B B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 C C1 C2 C3 C4 C5 C6 D D1 D2 E E1 E2 E3 E4 E5 E6 E7 E8 E9 E10 E11 E12 E13 E14 E15 E16 E17 E18 E19 E20 E21 E22 E23 E24 F F1 F2 F3 F4 F5 F6 F7 F8 F9 F10 F11 F12 F13 F14 F15 F16 F17 F18 G G1 G2 G3 G4 G5 G6 H H1 H2 H3 H4 H5 H6 H7 H8 I I1 I2 I3 I4 I5 J J1 J2 J3 J4 J5 J6 K K1 K2 K3 K4 K5 K6 K7 K8 K9 K10 K11 K12 K13 K14 K15 L L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 M M1 M2 M3 M4 M5 M6 M7 N N1 N2 N3 O O1 O2 O3 O4 O5 O6 O7 P P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 P16 P17 Q Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q 10 Q 11 Q 12 Q 13 Q 14 Q 15 R R1 R2 R3 R4 R5 R6

Uraian Pekerjaan

897,339

26 Minggu 512,211,985

ID Pekerjaan

71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##

180

111,067

Total

Selesai (Finish) : Hari ( Work Day) :

Induk Pekerjaan

Waktu Pelakasanaan Progress Pekerjaan

897,339

512,211,985 357,379,657 61,596,970 931,188,612

7

187 Serah T erima (overhand)

16-Apr-19

Mulai (Start) : Bahan : Upah : Alat :

Wednesday, May 9, 2018 -270 1 Project Mulai (start) ## Hari Ini (today) 180 Project Selesai (Finish)

15-Apr-19

4

1/1

Software RAB Exarch sdaPro v2019

LAMPIRAN KURVA BAHAN A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180

4-Feb-2019 Monday 2-Aug-2019 Friday

Aug 31-Aug-19

Aug 30-Aug-19

Aug 29-Aug-19

Aug 28-Aug-19

Aug 27-Aug-19

Aug 26-Aug-19

Aug 25-Aug-19

Aug 24-Aug-19

Aug 23-Aug-19

Aug 22-Aug-19

Aug 21-Aug-19

31-Jul-19

Aug 20-Aug-19

30-Jul-19

Jul

Aug 19-Aug-19

29-Jul-19

Jul

Aug 18-Aug-19

28-Jul-19

Jul

Aug 17-Aug-19

27-Jul-19

Jul

Aug 16-Aug-19

26-Jul-19

Jul

Aug 15-Aug-19

25-Jul-19

Jul

Aug 14-Aug-19

24-Jul-19

Jul

Aug 13-Aug-19

23-Jul-19

Jul

Aug 12-Aug-19

22-Jul-19

Jul

Aug 11-Aug-19

21-Jul-19

Jul

Aug 10-Aug-19

20-Jul-19

Jul

Aug 9-Aug-19

19-Jul-19

Jul

Aug 8-Aug-19

18-Jul-19

Jul

Aug 7-Aug-19

17-Jul-19

Jul

Aug 6-Aug-19

16-Jul-19

Jul

Aug 5-Aug-19

15-Jul-19

Jul

Aug 4-Aug-19

14-Jul-19

Jul

Aug 3-Aug-19

13-Jul-19

Aug 2-Aug-19

12-Jul-19

Jul

Aug 1-Aug-19

11-Jul-19

8-Jul-19

Jul

Jul

7-Jul-19

Jul

Jul

6-Jul-19

Jul

Jul

5-Jul-19

Jul

9-Jul-19

4-Jul-19

Jul

10-Jul-19

3-Jul-19

Jul

Jul

2-Jul-19

Jul

Jul

1-Jul-19

Jul

Jun 30-Jun-19

Jun 29-Jun-19

Jun 28-Jun-19

Jun 27-Jun-19

Jun 26-Jun-19

0.01 0.01 0.01

0.01 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00

0.00

0.01

0.01

0.00

0.00 0.00 0.00 0.00

0.01

0.01 0.01

0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.01 0.01

0.01 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.00

0.01 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00

0.00 0.00 0.00

0.01

0.01 0.01

0.00

0.00

0.00 0.00 0.00 0.00

0.01

0.01

0.01 0.01 0.01 0.01

0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00

0.00 0.01

0.01 0.00

0.00 0.00 0.00

0.00

0.00 0.00

0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00 0.00 0.00

0.01

0.01 0.01 0.01 0.00

0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00

0.00

0.01

0.01

0.00

0.00

0.01

0.01

0.00 0.00 0.00 0.00

0.00 0.01 0.01 0.00 0.00

93%

95%

97%

99%

99%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

91%

100%

90%

100%

88%

100%

86%

100%

84%

100%

82%

100%

75%

100%

73%

100%

72%

100%

0.37

100%

0.00

0.37 0.37 0.37

100%

0.00 0.00 0.00

0.37 0.37

100%

0.00 0.00

0.37 0.37 0.37 0.37

100%

0.00 0.00 0.00 0.00

0.37

100%

0.00

0.37

100%

0.00

0.37 0.37 0.37

100%

0.00 0.00 0.00

0.37 0.37 0.37 0.37

100%

0.00 0.00 0.00 0.00

0.37 0.37

99%

0.00 0.00

0.37 0.37 0.37

100%

0.00 0.00 0.00

0.37 0.37

96%

0.00 0.00

0.37 0.37 0.37

95%

0.00 0.00 0.00

0.35 0.36 0.37 0.37

95%

0.00 0.01 0.01 0.00

0.35

94%

0.01

0.34

92%

0.01

0.32 0.32 0.32

91%

0.00 0.00 0.00

0.30 0.31 0.32

91%

0.01 0.01 0.01

0.28 0.28 0.29

90%

0.00 0.00 0.01

0.27 0.27 0.28

89%

0.01 0.00 0.00

0.25 0.26

88%

0.00 0.01

0.23 0.24 0.24 0.25

87%

0.01 0.01 0.00 0.00

0.20 0.21 0.22

87%

0.01 0.01 0.01

0.18 0.19

86%

0.01 0.01

0.12 0.14 0.15 0.17

85%

0.02 0.02 0.02 0.02

0.10

82%

0.02

0.09

80%

0.02

0.03 0.04 0.06

79%

0.01 0.01 0.02

0.01 0.01 0.02

77%

0.01 0.00 0.02

70%

www.mitra-arsitek.com

0.01

67%

4,362,144

6,315,359

4,878,751

4,850,674

3,872,967

3,608,364

2,046,648

2,032,861

1,931,619

5,569,958

5,367,800

-

1,923,432

1,923,432

1,923,432

4,315,633

4,067,686

4,067,686

5,224,092

1,341,454

1,156,406

1,156,406

7,512,472

7,512,472

-

4,436,245

3,593,920

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

7-Jul-19

8-Jul-19

9-Jul-19

10-Jul-19

11-Jul-19

12-Jul-19

13-Jul-19

14-Jul-19

15-Jul-19

16-Jul-19

17-Jul-19

18-Jul-19

19-Jul-19

20-Jul-19

21-Jul-19

22-Jul-19

23-Jul-19

24-Jul-19

25-Jul-19

26-Jul-19

27-Jul-19

28-Jul-19

29-Jul-19

30-Jul-19

31-Jul-19

1-Aug-19

2-Aug-19

3-Aug-19

4-Aug-19

5-Aug-19

6-Aug-19

7-Aug-19

8-Aug-19

9-Aug-19

10-Aug-19

11-Aug-19

12-Aug-19

13-Aug-19

14-Aug-19

15-Aug-19

16-Aug-19

17-Aug-19

18-Aug-19

19-Aug-19

20-Aug-19

21-Aug-19

22-Aug-19

23-Aug-19

24-Aug-19

25-Aug-19

26-Aug-19

27-Aug-19

28-Aug-19

29-Aug-19

30-Aug-19

31-Aug-19

64% 64% 65% 67% 67% 70% 72% 73% 75% 77% 79% 80% 82% 82% 84% 85% 86% 86% 87% 87% 88% 88% 89% 90% 90% 91% 91% 91% 92% 93% 94% 95% 95% 95% 96% 97% 99% 99% 99% #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### ####

6-Jul-19

Hari Kalender

65%

64% 64%

67%

CASH FLO WDAILY BIAYA KURVA BAHAN

67% 67%

65%

Aktual Load (red Line)

70%

64%

Load Plan (Blue Line)

73%

72%

64%

63.08% Total Bobot Kumulatif

75%

5,934,062

6,177,050 2,807,750 6,040,144 842,325 7,187,840 -

77%

5-Jul-19

1,726,547 575,013 209,023 325,491 613,347 291,310 347,191 1,550,965 222,133 52,926 504,276 147,829 3,895,360 2,246,200

79%

4-Jul-19

63,882 453,860 442,121 53,749 607,584 1,852,820 1,584,481 755,546 2,148,242 86,385 2,542,098 5,264 69,812 22,563 243,713

82% 80%

9,330,845

5,026,457 991,787 4,253,665 12,017,080 4,625,622 164,097 20,951

84% 82%

8,957,696

7,625,849 6,917,843 10,735,601

86% 85%

3-Jul-19

5,531,043 30,174,113 2,473,393 1,381,721 2,729,703 3,066,257 13,787

87% 87% 86%

8,845,386

393,085 730,015 1,853,115 1,853,115 589,628 393,085 336,930 80,863 393,085 404,316

89% 88% 88%

2-Jul-19

259,436 118,599 169,055 303,237 1,403,875 673,860 412,402 230,460 109,165 2,807,750 585,721 1,966,280 269,544 7,300,150 4,043,160

91%

8,522,213

7,075,530 10,781,760 3,706,230 8,805,104 3,369,300 1,059,645

91% 91% 90% 90%

1-Jul-19

20,696,909 8,580,978 3,534,059 2,941,960 1,987,887

93%

92%

8,522,213

32,260,075 1,820,115 9,624,817 730,380 15,412,716 646,348 4,583,935 213,716

95%

94%

30-Jun-19

8,880,759 9,878,400 8,652,868 1,725,039 1,330,424 1,220,276

95%

96%

11,548,601

5,750,132 6,889,191 4,548,302 1,916,711 668,582 1,553,079 324,563 83,891 199,682 4,715,108 4,194,526 2,773,355 3,002,847 666,040 2,595,860 536,679 681,293 332,803

97%

95%

29-Jun-19

1,916,711 4,515,300 1,442,145 4,088,982 9,953,081 3,438,960 1,405,588 461,240 876,380 1,533,368 475,806 1,087,155 2,044,491 1,092,411 1,553,079 2,172,272 1,092,411 1,553,079 1,022,246 339,861 488,237 638,904 218,482 433,988

100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100% 100%

99% 99% 99%

11,660,911

4,101,449 -

D140D141D142D143D144D145D146D147D148D149D150D151D152D153D154D155D156D157D158D159D160D161D162D163D164D165D166D167D168D169D170D171D172D173D174D175D176D177D178D179D180D181D182D183D184D185D186D187D188D189D190D191D192D193D194D195D196D197D198D199D200D201D202D203D204D205D206D207D208D209

28-Jun-19

8,305,746 4,877,202 6,911,201 319,452 238,883 199,682

Finish 7-Feb-2019 4-Feb-2019 6-Feb-2019 6-Feb-2019 6-Feb-2019 7-Feb-2019 15-Feb-2019 8-Feb-2019 8-Feb-2019 10-Feb-2019 13-Feb-2019 13-Feb-2019 15-Feb-2019 12-Feb-2019 8-Feb-2019 12-Feb-2019 15-Feb-2019 7-Feb-2019 15-Feb-2019 21-Feb-2019 18-Feb-2019 20-Feb-2019 21-Feb-2019 19-Feb-2019 19-Feb-2019 21-Feb-2019 24-Feb-2019 23-Feb-2019 24-Feb-2019 14-May-2019 26-Feb-2019 26-Feb-2019 27-Feb-2019 2-Mar-2019 4-Mar-2019 5-Mar-2019 26-Feb-2019 26-Feb-2019 27-Feb-2019 1-Mar-2019 3-Mar-2019 26-Apr-2019 29-Apr-2019 1-May-2019 2-May-2019 5-May-2019 7-May-2019 8-May-2019 9-May-2019 10-May-2019 11-May-2019 12-May-2019 13-May-2019 14-May-2019 4-Jun-2019 9-Mar-2019 12-Mar-2019 14-Mar-2019 16-Mar-2019 17-Mar-2019 18-Mar-2019 19-Mar-2019 20-Mar-2019 21-Mar-2019 21-May-2019 24-May-2019 26-May-2019 29-May-2019 31-May-2019 1-Jun-2019 2-Jun-2019 3-Jun-2019 4-Jun-2019 5-Apr-2019 4-Apr-2019 29-Mar-2019 5-Apr-2019 31-Mar-2019 25-Mar-2019 5-Apr-2019 9-Jun-2019 12-Jun-2019 9-Jun-2019 16-Jun-2019 22-Jun-2019 29-Jun-2019 3-Jul-2019 9-Jul-2019 13-Jul-2019 13-Jun-2019 13-Jun-2019 17-Jun-2019 19-Jun-2019 20-Jun-2019 21-Jun-2019 11-Jul-2019 29-Jun-2019 2-Jul-2019 3-Jul-2019 5-Jul-2019 7-Jul-2019 11-Jul-2019 26-Jun-2019 13-Jun-2019 14-Jun-2019 16-Jun-2019 17-Jun-2019 18-Jun-2019 19-Jun-2019 20-Jun-2019 21-Jun-2019 22-Jun-2019 23-Jun-2019 24-Jun-2019 25-Jun-2019 26-Jun-2019 10-Apr-2019 12-Apr-2019 27-Jun-2019 27-Jun-2019 28-Jun-2019 1-Jul-2019 4-Jul-2019 6-Jul-2019 8-Jul-2019 10-Jul-2019 11-Jul-2019 13-Jul-2019 15-Jul-2019 12-Jul-2019 26-Jun-2019 4-Jul-2019 6-Jul-2019 7-Jul-2019 9-Jul-2019 11-Jul-2019 12-Jul-2019 16-Jul-2019 10-Jul-2019 14-Jul-2019 16-Jul-2019 27-Jul-2019 20-Jul-2019 21-Jul-2019 24-Jul-2019 24-Jul-2019 27-Jul-2019 25-Jul-2019 25-Jul-2019 16-Apr-2019 10-Feb-2019 10-Feb-2019 10-Feb-2019 12-Feb-2019 13-Feb-2019 14-Feb-2019 15-Feb-2019 31-Mar-2019 31-Mar-2019 30-Mar-2019 7-Apr-2019 8-Apr-2019 10-Apr-2019 12-Apr-2019 13-Apr-2019 14-Apr-2019 16-Apr-2019 29-Apr-2019 7-Apr-2019 8-Apr-2019 9-Apr-2019 10-Apr-2019 11-Apr-2019 12-Apr-2019 13-Apr-2019 14-Apr-2019 16-Apr-2019 18-Apr-2019 20-Apr-2019 22-Apr-2019 24-Apr-2019 28-Apr-2019 29-Apr-2019 2-Aug-2019 29-Jul-2019 29-Jul-2019 29-Jul-2019 31-Jul-2019 1-Aug-2019 2-Aug-2019

3,475,628

383,292 1,505,392 12,637,511 2,006,738 8,985,670 1,194,592 5,438,837 23,624,613 255,631

0.01 0.00 0.00 0.00 0.00 0.02 0.00 0.02 0.00 0.01 0.05 0.00 0.02 0.01 0.01 0.00 0.00 0.00 0.01 0.00 0.01 0.00 0.01 0.02 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.01 0.01 0.00 0.01 0.00 0.00 0.00 0.02 0.02 0.02 0.00 0.00 0.00 0.06 0.00 0.02 0.00 0.03 0.00 0.01 0.00 0.04 0.02 0.01 0.01 0.00 0.01 0.02 0.01 0.02 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00 0.00 0.00 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.06 0.00 0.00 0.01 0.01 0.00 0.01 0.01 0.02 0.01 0.00 0.01 0.02 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00 0.01 0.01 0.01 0.00 0.01 -

27-Jun-19

3,001,822 950,390 354,092

Waktu S tart 4-Feb-2019 4-Feb-2019 5-Feb-2019 6-Feb-2019 6-Feb-2019 7-Feb-2019 7-Feb-2019 7-Feb-2019 8-Feb-2019 9-Feb-2019 11-Feb-2019 12-Feb-2019 14-Feb-2019 9-Feb-2019 8-Feb-2019 9-Feb-2019 12-Feb-2019 7-Feb-2019 15-Feb-2019 16-Feb-2019 16-Feb-2019 18-Feb-2019 20-Feb-2019 18-Feb-2019 19-Feb-2019 21-Feb-2019 22-Feb-2019 22-Feb-2019 23-Feb-2019 25-Feb-2019 25-Feb-2019 26-Feb-2019 27-Feb-2019 28-Feb-2019 3-Mar-2019 5-Mar-2019 25-Feb-2019 26-Feb-2019 27-Feb-2019 28-Feb-2019 3-Mar-2019 26-Apr-2019 27-Apr-2019 30-Apr-2019 2-May-2019 3-May-2019 6-May-2019 8-May-2019 9-May-2019 10-May-2019 11-May-2019 12-May-2019 13-May-2019 14-May-2019 7-Mar-2019 7-Mar-2019 10-Mar-2019 13-Mar-2019 15-Mar-2019 17-Mar-2019 18-Mar-2019 19-Mar-2019 20-Mar-2019 21-Mar-2019 18-May-2019 22-May-2019 25-May-2019 27-May-2019 30-May-2019 1-Jun-2019 2-Jun-2019 3-Jun-2019 4-Jun-2019 25-Mar-2019 30-Mar-2019 25-Mar-2019 5-Apr-2019 30-Mar-2019 25-Mar-2019 5-Apr-2019 8-Jun-2019 8-Jun-2019 8-Jun-2019 12-Jun-2019 19-Jun-2019 25-Jun-2019 2-Jul-2019 6-Jul-2019 12-Jul-2019 10-Jun-2019 10-Jun-2019 14-Jun-2019 18-Jun-2019 20-Jun-2019 21-Jun-2019 28-Jun-2019 28-Jun-2019 30-Jun-2019 3-Jul-2019 4-Jul-2019 6-Jul-2019 8-Jul-2019 8-Apr-2019 12-Jun-2019 13-Jun-2019 15-Jun-2019 17-Jun-2019 18-Jun-2019 19-Jun-2019 20-Jun-2019 21-Jun-2019 22-Jun-2019 23-Jun-2019 24-Jun-2019 25-Jun-2019 26-Jun-2019 8-Apr-2019 11-Apr-2019 27-Jun-2019 27-Jun-2019 28-Jun-2019 29-Jun-2019 2-Jul-2019 5-Jul-2019 7-Jul-2019 9-Jul-2019 11-Jul-2019 12-Jul-2019 14-Jul-2019 25-Jun-2019 25-Jun-2019 28-Jun-2019 5-Jul-2019 7-Jul-2019 8-Jul-2019 10-Jul-2019 12-Jul-2019 7-Jul-2019 7-Jul-2019 11-Jul-2019 15-Jul-2019 18-Jul-2019 18-Jul-2019 18-Jul-2019 21-Jul-2019 21-Jul-2019 24-Jul-2019 25-Jul-2019 25-Jul-2019 10-Feb-2019 10-Feb-2019 10-Feb-2019 10-Feb-2019 12-Feb-2019 13-Feb-2019 14-Feb-2019 15-Feb-2019 30-Mar-2019 30-Mar-2019 30-Mar-2019 7-Apr-2019 8-Apr-2019 9-Apr-2019 11-Apr-2019 13-Apr-2019 14-Apr-2019 15-Apr-2019 7-Apr-2019 7-Apr-2019 8-Apr-2019 9-Apr-2019 10-Apr-2019 11-Apr-2019 12-Apr-2019 13-Apr-2019 14-Apr-2019 15-Apr-2019 17-Apr-2019 19-Apr-2019 21-Apr-2019 23-Apr-2019 25-Apr-2019 29-Apr-2019 28-Jul-2019 28-Jul-2019 28-Jul-2019 28-Jul-2019 31-Jul-2019 31-Jul-2019 1-Aug-2019

Jun 25-Jun-19

(x100% )

26-Jun-19

(rupiah)

Jun 24-Jun-19

Jun 23-Jun-19

Bobot

Induk Pekerjaan

Waktu Pelakasanaan Progress Pekerjaan

6,117,609

PEKERJAAN PERSIAPAN & PENDAHULUAN Mobilisasi dan Demobiliasi Peralatan dan Perlengkapan Pembersihan Area/Lokasi Kerja Pengukuran dan Pemasangan Bowplank Pembuatan Bedeng dan Gudang Bahan Papan Nama Proyek uk 1, 2m x 1, 8m PEKERJAAN PO NDASI Pekerjaan Galian Urugan Pasir Pek. Pemasangan Batu Kosong (Aanstamping) Pekerjaan Pembesian Pondasi T apak Pekerjan Bekisting Pondasi T apak Pekerjaan Cor Beton (K-225) Pekerjaan Galian Urugan Pasir Pek. Pemasangan Batu Kosong (Aanstamping) Pekerjaan Pasangan Batu Pondasi ( 1 : 3) Pekerjaan Galian Pek. Pasangan Pondasi Rollag PEKERJAAN SLO O F Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Sloof Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d10&20-d8) Pekerjaan Bekisting Sloof Pekerjaan Cor Beton (K-225) PEKERJAAN TIMBUNAN, PENINGGIAN DAN PEMADATAN Urugan, T imbunan dan Peninggian Elevasi Pemadatan T anah PEKERJAAN KO LO M Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d12&18 cm-d6) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d12&18 cm-d6) Pekerjaan Bekisting Pekerjaan Cor Beton (K-200) Pekerjaan Pembesian (4d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-200) PEKERJAAN RINGBALO K (BALO K) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) PEKERJAAN CO R PLATE BETO N (DAK BETO N) Pekerjaan Pembesian Plate lantai Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian Plat Atap/kanopi beton Pekerjaan Bekisting Sloof Pekerjaan Cor Beton (K-225) PEKERJAAN DINDING Pek. Pasangan Bata Merah (1/2, Mix 1:5) Pek. Pasangan Bata Merah T rassram (1/2, Mix 1:3) Pekerjaan Plasteran (1.5 cm-mix 1:5) Pekerjaan Acian Pek. Pasangan Bata Merah (1/2, Mix 1:5) Pek. Pasangan Bata Merah T rassram (1/2, Mix 1:3) Pekerjaan Plasteran (1.5 cm-mix 1:5) Pekerjaan Acian PEKERJAAN ATAP Memasang Rangka Atap (Baja Ringan-Ex T ASO) Memasang Pelapis Atap (Metal Roof-Ex Sakura Roof Memasang Nok Atap Memasang Lisplank Memasang T alang Air PEKERJAAN KUSEN, PINTU, JENDELA DAN ACCESO RIS Memasang Kusen+Panel Pintu Utama Memasang Kusen+Panel Pintu Kamar/Ruangan Memasang Kusen+Panel Pintu WC Memasang Kusen+Panel Jendela Utama Memasang Jendela Pencahayaan/ T etap (Fixed Window) Memasang Lubang Angin/Loster (Bovenlight) PEKERJAAN INST. PIPA AIR BERSIH, LIMBAH DAN SANITASI Memasang Instalasi Pipa 3/4 PVC (Ex Maspion) Memasang Instalasi Pipa 1/2 PVC (Ex Maspion) Memasang Keran Air Standar ( Ex Onda) Memasang Shower Mandi ( Ex T OT O) Memasang T angki Air/T andom (Ex Penguin-1000L) Memasang Pompa Air ( Ex Shimizu 125 Watt) Memasang Instalasi Pipa Limbah 3" PVC (Ex Maspio Memasang Instalasi Pipa Kloset 4" PVC (Ex Maspion) Memasang Instalasi Pipa Saluran 5" PVC (Ex Maspion Memasang Kloset Duduk ( Ex T OT O) Memasang Kloset Jongkok ( Ex T OT O) Memasang Wastafel Cuci Memasang Floor Drain Pekerjaan Septik T ank ( 1000 L) Pekerjaan Sumur Resapan Limbah (800 L) PEKERJAAN INST. LISTRIK DAN PENERANGAN Pemasangan MCB Pengaman dan Box Pemasangan Instalasi Pembumian (Grounding) Pemasangan Kabel Instalasi ( NYM-3x2,5 mm2) Pemasangan Kabel Instalasi ( NYM-3x1,5 mm2) Pemasangan Fitting Lampu Pemasangan Saklar Lampu Pemasangan Receiptackle (Colokan Listrik) Pemasangan Lampu 5 Watt (ex-PHILIPS LED) Pemasangan Lampu 15 Watt (ex-PHILIPS LED) Pemasangan Lampu 20 Watt (ex-PHILIPS LED) PEKERJAAN KERAMIK LANTAI DAN DINDING Pekerjaan Cor Lantai Kerja Non Struktur (K100- 1:4:4 Memasang Keramik Lantai Utama (Ex Granito 60x60 Memasang Keramik Lantai T eras (Ex Platinum 40x40 Memasang Keramik Lantai WC (Ex Asia T ile 20x20) Memasang Keramik Dinding WC (Ex Roman 20x40) Memasang Plint Keramik Dinding (Ex Granito 15x60) Memasang Rope T ile (Kuku T egel/Plint Sudut) PEKERJAAN LANGIT-LANGIT (PLAFO N) Memasang Rangka Plafon ( Ex Furing 2/4 - 4/4) Memasang Pelapis Pelafon ( Ex Gipsum Board 9mm) Memasang List Plafon PEKERJAAN PENGECATAN DAN WATERPRO FING Pekerjaan Plamir Dinding Pekerjaan Cat Anti Lumut dan Waterprofing Pekerjaan Pengecatan Exterior ( Ex Mowilex) Pekerjaan Pengecatan Interior ( Ex Nippon Paint) Pekerjaan Pengecatan Plafon( Ex Mowilex) Pekerjaan Pengecatan Kayu ( Ex Avian) Pekerjaan Pengecatan Besi ( Ex Avian) PEKERJAAN TANGGA Pekerjaan Galian Pekerjaan Urugan T anah Galian Urugan Pasir Pasangan Batu Pondasi (1:4) Pekerjaan Pembesian Sloof Pekerjaan Bekisting Sloof Pekerjaan Cor Beton Sloof (K225) Pekerjaan Pembesian Utama ( d10-18 cm) Pekerjaan Pembesian Anak T angga ( d10-18 cm) Pekerjaan Bekisting T angga Pekerjaan Cor Beton (K-225) Pekerjaan Plasteran ( 1,5 cm- 1: 5) Pekerjaan Keramik T angga ( Ex Asia T ile 40x40) Pekerjaan Rope T ile Pekerjaan Plamir Pekerjaan Pengecatan T angga Pekerjaan Railing T angga PEKERJAAN PAGAR DAN TAMAN/HALAMAN Pekerjaan Galian Pondasi Pasangan Batu Pondasi Pekerjaan Pembesian Sloof Pekerjaan Bekisting Sloof Pekerjaan Pengecoran (K200) Pekerjaan Pembesian Kolom Pekerjaan Bekisting Kolom Pekerjaan Pengecoran (K200) Pasangan Batu Bata Pekerjaan Plasteran Pekerjaan Acian Pekerjaan Pasangan Batu Alam Pekerjaan Pengecatan Pekerjaan Pemasangan Paving Blok Pekerjaan Penanaman Pohon Perdu PEKERJAAN TAMBAHAN DAN LAINNYA Pekerjaan Pemasangan Meteran Listrik (PLN-2200 kWh Pekerjaan Pemasangan Meteran Air (PDAM) Pekerjaan Pemasangan Pintu T oko (Folding Door) Pemasangan Exhaust Fan Pemasangan AC (Air Conditioner-1 PK, Ex. Sharp) Pembersihan Area Kerja (Pasca Konstruksi)

1.00

Biaya

25-Jun-19

A A1 A2 A3 A4 A5 B B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 C C1 C2 C3 C4 C5 C6 D D1 D2 E E1 E2 E3 E4 E5 E6 E7 E8 E9 E10 E11 E12 E13 E14 E15 E16 E17 E18 E19 E20 E21 E22 E23 E24 F F1 F2 F3 F4 F5 F6 F7 F8 F9 F10 F11 F12 F13 F14 F15 F16 F17 F18 G G1 G2 G3 G4 G5 G6 H H1 H2 H3 H4 H5 H6 H7 H8 I I1 I2 I3 I4 I5 J J1 J2 J3 J4 J5 J6 K K1 K2 K3 K4 K5 K6 K7 K8 K9 K10 K11 K12 K13 K14 K15 L L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 M M1 M2 M3 M4 M5 M6 M7 N N1 N2 N3 O O1 O2 O3 O4 O5 O6 O7 P P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 P16 P17 Q Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q 10 Q 11 Q 12 Q 13 Q 14 Q 15 R R1 R2 R3 R4 R5 R6

Uraian Pekerjaan

585,721

26 Minggu 512,211,985

ID Pekerjaan

7

187 Serah T erima (overhand)

## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##

180

2,807,750

Total

Selesai (Finish) : Hari ( Work Day) :

7,814,344

512,211,985 357,379,657 61,596,970 931,188,612

24-Jun-19

Mulai (Start) : Bahan : Upah : Alat :

Wednesday, May 9, 2018 -270 1 Project Mulai (start) ## Hari Ini (today) 180 Project Selesai (Finish)

23-Jun-19

4

1/1

Software RAB Exarch sdaPro v2019

58,581,892 11,674,369 16,791,589 14,912,183 4,540,816 7,093,497 20,039,925 7,713,781 222,214 300,570 227,592 9,476 72,390 674,523 525,985 122,596 773,059 2,204,271 1,885,031 1,305,734 2,733,316 601,267 3,680,187 1,117,408 207,114 323,691 1,872,205 680,650 2,697,467 684,084 476,761 414,139 729,690 485,494 441,748 2,568,883 1,546,114 543,290 1,190,785 246,523 6,360,006 2,629,657 6,177,050 2,807,750 9,656,479 858,970 7,221,131 3,179,083

Mar 31-Mar-19

Mar 30-Mar-19

Mar 29-Mar-19

Mar 28-Mar-19

Mar 27-Mar-19

Mar 26-Mar-19

Mar 25-Mar-19

Mar 24-Mar-19

Mar 23-Mar-19

Mar 22-Mar-19

Mar 21-Mar-19

Mar 20-Mar-19

Mar 19-Mar-19

Mar 18-Mar-19

Mar 17-Mar-19

Mar 16-Mar-19

Mar 15-Mar-19

Mar 14-Mar-19

Mar 13-Mar-19

Mar 12-Mar-19

Mar 11-Mar-19

Mar 10-Mar-19

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Apr 14-Apr-19

Apr 13-Apr-19

Apr 12-Apr-19

Apr 11-Apr-19

8-Apr-19

9-Apr-19

7-Apr-19

Apr

Apr 10-Apr-19

6-Apr-19

Apr

0.00 0.00 0.01 0.01

0.00

0.01 0.01 0.01 0.01 0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00

0.00

0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00

0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00

0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00

0.00 0.00 0.01 0.00 0.00 0.00

0.00 0.01 0.01 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.01

0.00 0.00

0.00 0.00

31% 31% 31% 31% 30%

30% 29% 28% 28% 28%

26%

26%

26%

26% 27%

25%

23%

22%

22% 23% 22% 22%

24%

24%

24%

25%

23% 23% 23% 23% 23% 23% 23%

22%

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

21% 21% 20% 20% 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.0020% 0.00

20% 20%

0.00

19%

0.00 0.00

18% 0.00 0.00

17%

0.00

17%

17%

17%

16%

0.00

14%

15%

15% 15%

15%

0.00

0.00

0.00

0.00

0.00

14%

0.00 0.00

13%

0.00 0.00

13%

0.00 0.00

12% 11%

0.00

11%

0.00

0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00

0.00

9%

0.00 0.00 0.00

8%

0.00 0.00 0.00

6%

0.00

4% 3% 3%

2% 0%

2%

2%

1%

2,400,621

2,530,523

129,902

1,976,243

10,270,091

2,936,103

2,533,644

2,533,644

1,621,532

9,086,822

8,293,849

4,354,985

-

2,280,280

2,280,280

2,280,280

3,758,170

3,758,170

3,758,170

2,879,909

2,879,909

1,140,140

1,140,140

1,094,168

1,966,767

386,127

137,291

252,870

-

-

-

4,914,594

2,936,890

2,936,890

2,936,890

2,936,890

6,137,394

4,831,660

1,760,883

1,760,883

1,760,883

1,760,883

12,503,020

-

3,413,966

6,456,192

22-Feb-19

23-Feb-19

24-Feb-19

25-Feb-19

26-Feb-19

27-Feb-19

28-Feb-19

1-Mar-19

2-Mar-19

3-Mar-19

4-Mar-19

5-Mar-19

6-Mar-19

7-Mar-19

8-Mar-19

9-Mar-19

10-Mar-19

11-Mar-19

12-Mar-19

13-Mar-19

14-Mar-19

15-Mar-19

16-Mar-19

17-Mar-19

18-Mar-19

19-Mar-19

20-Mar-19

21-Mar-19

22-Mar-19

23-Mar-19

24-Mar-19

25-Mar-19

26-Mar-19

27-Mar-19

28-Mar-19

29-Mar-19

30-Mar-19

31-Mar-19

1-Apr-19

2-Apr-19

3-Apr-19

4-Apr-19

5-Apr-19

6-Apr-19

7-Apr-19

8-Apr-19

31%

4,628,927

31%

21-Feb-19

30%

29%

28%

28%

8,084,201

28%

20-Feb-19

27%

4,443,037

26%

26%

26%

19-Feb-19

26%

25%

25%

24%

7,191,905

24%

24%

18-Feb-19

23%

23%

23%

3,293,738

23%

23%

17-Feb-19

23%

23%

23%

3,293,738

23%

22%

22%

22%

16-Feb-19

22%

15-Feb-19

22%

15,471,739

21%

21%

20%

14,393,871

20%

20%

20%

14-Feb-19

20%

19%

18%

16,553,089

17%

17%

17%

13-Feb-19

17%

16%

9%

7,800,620

15%

8%

15%

6%

15%

4%

15%

3%

19,490,699

14%

3%

14%

2%

13%

2%

12-Feb-19

13%

2%

12%

1%

11%

0%

11-Feb-19

0.31

4,147,650

0.00

0.30 0.31 0.31

10-Feb-19

0.00 0.00 0.00

0.30 0.30

3,838,192

0.01 0.01

0.28 0.28 0.28 0.29

9-Feb-19

0.01 0.00 0.00 0.01

0.26

2,991,934

0.00

0.26

8-Feb-19

0.00

0.26 0.26 0.26

7-Feb-19

0.01 0.00 0.00

0.24 0.24 0.25 0.25

2,590,684

0.00 0.00 0.00 0.01

0.23 0.24

6-Feb-19

0.01 0.00

0.23 0.23 0.23

3,565,210

0.00 0.00 0.00

0.23 0.23

8,961,688

0.00 0.00

0.22 0.23 0.23

2,674,710

0.00 0.00 0.00

0.22 0.22 0.22 0.22

5-Feb-19

0.00 0.00 0.00 0.00

0.21

4-Feb-19

0.00

0.21

31%

0.00

0.20 0.20 0.21

31%

0.00 0.00 0.00

0.20 0.20 0.20

30%

0.00 0.00 0.00

0.17 0.18 0.19

9%

0.00 0.01 0.01

0.17 0.17 0.17

8%

0.00 0.00 0.00

0.15 0.16

6%

0.00 0.01

0.14 0.15 0.15 0.15

4%

0.00 0.00 0.00 0.00

0.12 0.13 0.14

3%

0.01 0.00 0.01

0.11 0.12

3%

0.00 0.00

0.06 0.08 0.09 0.11

2%

0.02 0.02 0.02 0.02

0.04

2%

0.01

0.03

2%

0.00

0.02 0.02 0.03

1%

0.00 0.00 0.00

0.00 0.01 0.02

0%

0.00 0.00 0.01

Aktual Load (red Line)

Hari Kalender

Apr

5-Apr-19

Apr

4-Apr-19

3-Apr-19

Apr

Apr

2-Apr-19

Apr

1-Apr-19

Apr

9-Mar-19

Apr

8-Mar-19

7-Mar-19

Mar

6-Mar-19

Mar

Mar

5-Mar-19

4-Mar-19

Mar

3-Mar-19

Mar

Mar

2-Mar-19

Mar

1-Mar-19

Mar

Feb 28-Feb-19

Mar

Feb 27-Feb-19

Feb 26-Feb-19

Feb 25-Feb-19

Feb 24-Feb-19

Feb 23-Feb-19

Feb 22-Feb-19

Feb 21-Feb-19

Feb 20-Feb-19

Feb 19-Feb-19

Feb 18-Feb-19

Feb 17-Feb-19

Feb 16-Feb-19

Feb 15-Feb-19

Feb 13-Feb-19

8-Feb-19

7-Feb-19

6-Feb-19

4-Feb-19

9-Feb-19 0.00

Load Plan (Blue Line)

CASH FLO WDAILY BIAYA KURVA S

www.mitra-arsitek.com

0.01 0.01

0.00

11%

0.00% Total Bobot Kumulatif

0.01

0.00 0.00

11% 11% 12% 13% 13% 14% 14% 15% 15% 15% 15% 16% 17% 17% 17% 17% 18% 19% 20% 20% 20% 20% 20% 21% 21% 22% 22% 22% 22% 22% 23% 23% 23% 23% 23% 23% 23% 23% 23% 24% 24% 24% 25% 25% 26% 26% 26% 26% 27% 28% 28% 28% 29% 30% 30% 31% 31% 31% 31%

765,439

6,819,489 39,706,778 3,580,723 1,627,482 8,687,619 5,774,439 2,926,546

0.00 0.00 0.00 0.00

0.00

14-Apr-19

598,732 935,662 2,994,205 3,013,079 904,254 618,467 503,383 111,361 494,743 485,642

0.00

0.00

692,607

4,281,419 2,646,703 661,201 460,319 1,688,846 879,507 5,319,844 2,820,499 1,336,026 3,502,727 1,526,710 2,463,900 359,210 9,472,375 5,335,396

0.00

0.01

13-Apr-19

8,111,636 12,853,972 4,742,336 10,525,375 5,059,844 1,631,823

0.00 0.00 0.00

0.00 0.00

3,956,092

46,779,215 15,712,821 5,791,106 6,472,895 4,436,010

D9 D10 D11 D12 D13 D14 D15 D16 D17 D18 D19 D20 D21 D22 D23 D24 D25 D26 D27 D28 D29 D30 D31 D32 D33 D34 D35 D36 D37 D38 D39 D40 D41 D42 D43 D44 D45 D46 D47 D48 D49 D50 D51 D52 D53 D54 D55 D56 D57 D58 D59 D60 D61 D62 D63 D64 D65 D66 D67 D68 D69 D70

0

3,640,541

53,432,770 2,939,825 58,582,700 7,497,395 25,528,277 1,043,972 27,900,715 2,193,803

D8

D4

0

12-Apr-19

10,565,297 14,684,452 10,957,703 2,052,252 1,977,704 1,545,317

D7

D3

11-Apr-19

6,840,840 11,274,511 5,759,818 2,280,280 1,094,168 1,966,767 386,127 137,291 252,870 5,609,489 6,864,555 3,512,084 3,572,439 1,090,008 3,287,311 638,478 1,114,970 421,450

D6

D2

0.00

5,474,313

2,280,280 7,525,151 1,826,284 4,864,597 16,587,698 4,354,985 1,672,205 768,698 1,109,819 1,824,224 792,973 1,376,737 2,432,299 1,820,601 1,966,767 2,584,317 1,820,601 1,966,767 1,216,149 566,409 621,208 760,093 364,120 552,185

D5

D1

0.00 0.00

9-Apr-19

4,801,242 259,803

10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70

10-Apr-19

9,881,213 11,124,432 8,752,114 380,047 544,870 252,870

Finish 7-Feb-2019 4-Feb-2019 6-Feb-2019 6-Feb-2019 6-Feb-2019 7-Feb-2019 15-Feb-2019 8-Feb-2019 8-Feb-2019 10-Feb-2019 13-Feb-2019 13-Feb-2019 15-Feb-2019 12-Feb-2019 8-Feb-2019 12-Feb-2019 15-Feb-2019 7-Feb-2019 15-Feb-2019 21-Feb-2019 18-Feb-2019 20-Feb-2019 21-Feb-2019 19-Feb-2019 19-Feb-2019 21-Feb-2019 24-Feb-2019 23-Feb-2019 24-Feb-2019 14-May-2019 26-Feb-2019 26-Feb-2019 27-Feb-2019 2-Mar-2019 4-Mar-2019 5-Mar-2019 26-Feb-2019 26-Feb-2019 27-Feb-2019 1-Mar-2019 3-Mar-2019 26-Apr-2019 29-Apr-2019 1-May-2019 2-May-2019 5-May-2019 7-May-2019 8-May-2019 9-May-2019 10-May-2019 11-May-2019 12-May-2019 13-May-2019 14-May-2019 4-Jun-2019 9-Mar-2019 12-Mar-2019 14-Mar-2019 16-Mar-2019 17-Mar-2019 18-Mar-2019 19-Mar-2019 20-Mar-2019 21-Mar-2019 21-May-2019 24-May-2019 26-May-2019 29-May-2019 31-May-2019 1-Jun-2019 2-Jun-2019 3-Jun-2019 4-Jun-2019 5-Apr-2019 4-Apr-2019 29-Mar-2019 5-Apr-2019 31-Mar-2019 25-Mar-2019 5-Apr-2019 9-Jun-2019 12-Jun-2019 9-Jun-2019 16-Jun-2019 22-Jun-2019 29-Jun-2019 3-Jul-2019 9-Jul-2019 13-Jul-2019 13-Jun-2019 13-Jun-2019 17-Jun-2019 19-Jun-2019 20-Jun-2019 21-Jun-2019 11-Jul-2019 29-Jun-2019 2-Jul-2019 3-Jul-2019 5-Jul-2019 7-Jul-2019 11-Jul-2019 26-Jun-2019 13-Jun-2019 14-Jun-2019 16-Jun-2019 17-Jun-2019 18-Jun-2019 19-Jun-2019 20-Jun-2019 21-Jun-2019 22-Jun-2019 23-Jun-2019 24-Jun-2019 25-Jun-2019 26-Jun-2019 10-Apr-2019 12-Apr-2019 27-Jun-2019 27-Jun-2019 28-Jun-2019 1-Jul-2019 4-Jul-2019 6-Jul-2019 8-Jul-2019 10-Jul-2019 11-Jul-2019 13-Jul-2019 15-Jul-2019 12-Jul-2019 26-Jun-2019 4-Jul-2019 6-Jul-2019 7-Jul-2019 9-Jul-2019 11-Jul-2019 12-Jul-2019 16-Jul-2019 10-Jul-2019 14-Jul-2019 16-Jul-2019 27-Jul-2019 20-Jul-2019 21-Jul-2019 24-Jul-2019 24-Jul-2019 27-Jul-2019 25-Jul-2019 25-Jul-2019 16-Apr-2019 10-Feb-2019 10-Feb-2019 10-Feb-2019 12-Feb-2019 13-Feb-2019 14-Feb-2019 15-Feb-2019 31-Mar-2019 31-Mar-2019 30-Mar-2019 7-Apr-2019 8-Apr-2019 10-Apr-2019 12-Apr-2019 13-Apr-2019 14-Apr-2019 16-Apr-2019 29-Apr-2019 7-Apr-2019 8-Apr-2019 9-Apr-2019 10-Apr-2019 11-Apr-2019 12-Apr-2019 13-Apr-2019 14-Apr-2019 16-Apr-2019 18-Apr-2019 20-Apr-2019 22-Apr-2019 24-Apr-2019 28-Apr-2019 29-Apr-2019 2-Aug-2019 29-Jul-2019 29-Jul-2019 29-Jul-2019 31-Jul-2019 1-Aug-2019 2-Aug-2019

9

5,681,636

2,407,799 434,340 2,098,242 15,034,646 4,867,715 11,379,153 3,575,539 1,353,694 7,580,745 34,326,795 148,892 427,404

0.00 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.02 0.01 0.01 0.00 0.00 0.01 0.04 0.00 0.00 0.01 0.01 0.01 0.00 0.00 0.00 0.01 0.00 0.00 0.01 0.00 0.01 0.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.02 0.01 0.00 0.00 0.00 0.06 0.00 0.06 0.01 0.03 0.00 0.03 0.00 0.05 0.02 0.01 0.01 0.00 0.01 0.01 0.01 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.04 0.00 0.00 0.01 0.01 0.00 0.06 0.01 0.02 0.02 0.00 0.01 0.02 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00 0.01 0.00 0.01 0.00 0.01 0.00

8

Feb 12-Feb-19

3,565,210 5,349,419 4,793,368 1,493,610 1,237,892

Waktu S tart 4-Feb-2019 4-Feb-2019 5-Feb-2019 6-Feb-2019 6-Feb-2019 7-Feb-2019 7-Feb-2019 7-Feb-2019 8-Feb-2019 9-Feb-2019 11-Feb-2019 12-Feb-2019 14-Feb-2019 9-Feb-2019 8-Feb-2019 9-Feb-2019 12-Feb-2019 7-Feb-2019 15-Feb-2019 16-Feb-2019 16-Feb-2019 18-Feb-2019 20-Feb-2019 18-Feb-2019 19-Feb-2019 21-Feb-2019 22-Feb-2019 22-Feb-2019 23-Feb-2019 25-Feb-2019 25-Feb-2019 26-Feb-2019 27-Feb-2019 28-Feb-2019 3-Mar-2019 5-Mar-2019 25-Feb-2019 26-Feb-2019 27-Feb-2019 28-Feb-2019 3-Mar-2019 26-Apr-2019 27-Apr-2019 30-Apr-2019 2-May-2019 3-May-2019 6-May-2019 8-May-2019 9-May-2019 10-May-2019 11-May-2019 12-May-2019 13-May-2019 14-May-2019 7-Mar-2019 7-Mar-2019 10-Mar-2019 13-Mar-2019 15-Mar-2019 17-Mar-2019 18-Mar-2019 19-Mar-2019 20-Mar-2019 21-Mar-2019 18-May-2019 22-May-2019 25-May-2019 27-May-2019 30-May-2019 1-Jun-2019 2-Jun-2019 3-Jun-2019 4-Jun-2019 25-Mar-2019 30-Mar-2019 25-Mar-2019 5-Apr-2019 30-Mar-2019 25-Mar-2019 5-Apr-2019 8-Jun-2019 8-Jun-2019 8-Jun-2019 12-Jun-2019 19-Jun-2019 25-Jun-2019 2-Jul-2019 6-Jul-2019 12-Jul-2019 10-Jun-2019 10-Jun-2019 14-Jun-2019 18-Jun-2019 20-Jun-2019 21-Jun-2019 28-Jun-2019 28-Jun-2019 30-Jun-2019 3-Jul-2019 4-Jul-2019 6-Jul-2019 8-Jul-2019 8-Apr-2019 12-Jun-2019 13-Jun-2019 15-Jun-2019 17-Jun-2019 18-Jun-2019 19-Jun-2019 20-Jun-2019 21-Jun-2019 22-Jun-2019 23-Jun-2019 24-Jun-2019 25-Jun-2019 26-Jun-2019 8-Apr-2019 11-Apr-2019 27-Jun-2019 27-Jun-2019 28-Jun-2019 29-Jun-2019 2-Jul-2019 5-Jul-2019 7-Jul-2019 9-Jul-2019 11-Jul-2019 12-Jul-2019 14-Jul-2019 25-Jun-2019 25-Jun-2019 28-Jun-2019 5-Jul-2019 7-Jul-2019 8-Jul-2019 10-Jul-2019 12-Jul-2019 7-Jul-2019 7-Jul-2019 11-Jul-2019 15-Jul-2019 18-Jul-2019 18-Jul-2019 18-Jul-2019 21-Jul-2019 21-Jul-2019 24-Jul-2019 25-Jul-2019 25-Jul-2019 10-Feb-2019 10-Feb-2019 10-Feb-2019 10-Feb-2019 12-Feb-2019 13-Feb-2019 14-Feb-2019 15-Feb-2019 30-Mar-2019 30-Mar-2019 30-Mar-2019 7-Apr-2019 8-Apr-2019 9-Apr-2019 11-Apr-2019 13-Apr-2019 14-Apr-2019 15-Apr-2019 7-Apr-2019 7-Apr-2019 8-Apr-2019 9-Apr-2019 10-Apr-2019 11-Apr-2019 12-Apr-2019 13-Apr-2019 14-Apr-2019 15-Apr-2019 17-Apr-2019 19-Apr-2019 21-Apr-2019 23-Apr-2019 25-Apr-2019 29-Apr-2019 28-Jul-2019 28-Jul-2019 28-Jul-2019 28-Jul-2019 31-Jul-2019 31-Jul-2019 1-Aug-2019

7

Feb 11-Feb-19

(x100% )

6

Feb 10-Feb-19

(rupiah)

5

Induk Pekerjaan

Waktu Pelakasanaan Progress Pekerjaan

Feb

Bobot

4

7

187 Serah T erima (overhand)

Feb

PEKERJAAN PERSIAPAN & PENDAHULUAN Mobilisasi dan Demobiliasi Peralatan dan Perlengkapan Pembersihan Area/Lokasi Kerja Pengukuran dan Pemasangan Bowplank Pembuatan Bedeng dan Gudang Bahan Papan Nama Proyek uk 1, 2m x 1, 8m PEKERJAAN PO NDASI Pekerjaan Galian Urugan Pasir Pek. Pemasangan Batu Kosong (Aanstamping) Pekerjaan Pembesian Pondasi T apak Pekerjan Bekisting Pondasi T apak Pekerjaan Cor Beton (K-225) Pekerjaan Galian Urugan Pasir Pek. Pemasangan Batu Kosong (Aanstamping) Pekerjaan Pasangan Batu Pondasi ( 1 : 3) Pekerjaan Galian Pek. Pasangan Pondasi Rollag PEKERJAAN SLO O F Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Sloof Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d10&20-d8) Pekerjaan Bekisting Sloof Pekerjaan Cor Beton (K-225) PEKERJAAN TIMBUNAN, PENINGGIAN DAN PEMADATAN Urugan, T imbunan dan Peninggian Elevasi Pemadatan T anah PEKERJAAN KO LO M Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d12&18 cm-d6) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d12&18 cm-d6) Pekerjaan Bekisting Pekerjaan Cor Beton (K-200) Pekerjaan Pembesian (4d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-200) PEKERJAAN RINGBALO K (BALO K) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) PEKERJAAN CO R PLATE BETO N (DAK BETO N) Pekerjaan Pembesian Plate lantai Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian Plat Atap/kanopi beton Pekerjaan Bekisting Sloof Pekerjaan Cor Beton (K-225) PEKERJAAN DINDING Pek. Pasangan Bata Merah (1/2, Mix 1:5) Pek. Pasangan Bata Merah T rassram (1/2, Mix 1:3) Pekerjaan Plasteran (1.5 cm-mix 1:5) Pekerjaan Acian Pek. Pasangan Bata Merah (1/2, Mix 1:5) Pek. Pasangan Bata Merah T rassram (1/2, Mix 1:3) Pekerjaan Plasteran (1.5 cm-mix 1:5) Pekerjaan Acian PEKERJAAN ATAP Memasang Rangka Atap (Baja Ringan-Ex T ASO) Memasang Pelapis Atap (Metal Roof-Ex Sakura Roof Memasang Nok Atap Memasang Lisplank Memasang T alang Air PEKERJAAN KUSEN, PINTU, JENDELA DAN ACCESO RIS Memasang Kusen+Panel Pintu Utama Memasang Kusen+Panel Pintu Kamar/Ruangan Memasang Kusen+Panel Pintu WC Memasang Kusen+Panel Jendela Utama Memasang Jendela Pencahayaan/ T etap (Fixed Window) Memasang Lubang Angin/Loster (Bovenlight) PEKERJAAN INST. PIPA AIR BERSIH, LIMBAH DAN SANITASI Memasang Instalasi Pipa 3/4 PVC (Ex Maspion) Memasang Instalasi Pipa 1/2 PVC (Ex Maspion) Memasang Keran Air Standar ( Ex Onda) Memasang Shower Mandi ( Ex T OT O) Memasang T angki Air/T andom (Ex Penguin-1000L) Memasang Pompa Air ( Ex Shimizu 125 Watt) Memasang Instalasi Pipa Limbah 3" PVC (Ex Maspio Memasang Instalasi Pipa Kloset 4" PVC (Ex Maspion) Memasang Instalasi Pipa Saluran 5" PVC (Ex Maspion Memasang Kloset Duduk ( Ex T OT O) Memasang Kloset Jongkok ( Ex T OT O) Memasang Wastafel Cuci Memasang Floor Drain Pekerjaan Septik T ank ( 1000 L) Pekerjaan Sumur Resapan Limbah (800 L) PEKERJAAN INST. LISTRIK DAN PENERANGAN Pemasangan MCB Pengaman dan Box Pemasangan Instalasi Pembumian (Grounding) Pemasangan Kabel Instalasi ( NYM-3x2,5 mm2) Pemasangan Kabel Instalasi ( NYM-3x1,5 mm2) Pemasangan Fitting Lampu Pemasangan Saklar Lampu Pemasangan Receiptackle (Colokan Listrik) Pemasangan Lampu 5 Watt (ex-PHILIPS LED) Pemasangan Lampu 15 Watt (ex-PHILIPS LED) Pemasangan Lampu 20 Watt (ex-PHILIPS LED) PEKERJAAN KERAMIK LANTAI DAN DINDING Pekerjaan Cor Lantai Kerja Non Struktur (K100- 1:4:4 Memasang Keramik Lantai Utama (Ex Granito 60x60 Memasang Keramik Lantai T eras (Ex Platinum 40x40 Memasang Keramik Lantai WC (Ex Asia T ile 20x20) Memasang Keramik Dinding WC (Ex Roman 20x40) Memasang Plint Keramik Dinding (Ex Granito 15x60) Memasang Rope T ile (Kuku T egel/Plint Sudut) PEKERJAAN LANGIT-LANGIT (PLAFO N) Memasang Rangka Plafon ( Ex Furing 2/4 - 4/4) Memasang Pelapis Pelafon ( Ex Gipsum Board 9mm) Memasang List Plafon PEKERJAAN PENGECATAN DAN WATERPRO FING Pekerjaan Plamir Dinding Pekerjaan Cat Anti Lumut dan Waterprofing Pekerjaan Pengecatan Exterior ( Ex Mowilex) Pekerjaan Pengecatan Interior ( Ex Nippon Paint) Pekerjaan Pengecatan Plafon( Ex Mowilex) Pekerjaan Pengecatan Kayu ( Ex Avian) Pekerjaan Pengecatan Besi ( Ex Avian) PEKERJAAN TANGGA Pekerjaan Galian Pekerjaan Urugan T anah Galian Urugan Pasir Pasangan Batu Pondasi (1:4) Pekerjaan Pembesian Sloof Pekerjaan Bekisting Sloof Pekerjaan Cor Beton Sloof (K225) Pekerjaan Pembesian Utama ( d10-18 cm) Pekerjaan Pembesian Anak T angga ( d10-18 cm) Pekerjaan Bekisting T angga Pekerjaan Cor Beton (K-225) Pekerjaan Plasteran ( 1,5 cm- 1: 5) Pekerjaan Keramik T angga ( Ex Asia T ile 40x40) Pekerjaan Rope T ile Pekerjaan Plamir Pekerjaan Pengecatan T angga Pekerjaan Railing T angga PEKERJAAN PAGAR DAN TAMAN/HALAMAN Pekerjaan Galian Pondasi Pasangan Batu Pondasi Pekerjaan Pembesian Sloof Pekerjaan Bekisting Sloof Pekerjaan Pengecoran (K200) Pekerjaan Pembesian Kolom Pekerjaan Bekisting Kolom Pekerjaan Pengecoran (K200) Pasangan Batu Bata Pekerjaan Plasteran Pekerjaan Acian Pekerjaan Pasangan Batu Alam Pekerjaan Pengecatan Pekerjaan Pemasangan Paving Blok Pekerjaan Penanaman Pohon Perdu PEKERJAAN TAMBAHAN DAN LAINNYA Pekerjaan Pemasangan Meteran Listrik (PLN-2200 kWh Pekerjaan Pemasangan Meteran Air (PDAM) Pekerjaan Pemasangan Pintu T oko (Folding Door) Pemasangan Exhaust Fan Pemasangan AC (Air Conditioner-1 PK, Ex. Sharp) Pembersihan Area Kerja (Pasca Konstruksi)

1.00

Biaya

3

Feb

A A1 A2 A3 A4 A5 B B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 C C1 C2 C3 C4 C5 C6 D D1 D2 E E1 E2 E3 E4 E5 E6 E7 E8 E9 E10 E11 E12 E13 E14 E15 E16 E17 E18 E19 E20 E21 E22 E23 E24 F F1 F2 F3 F4 F5 F6 F7 F8 F9 F10 F11 F12 F13 F14 F15 F16 F17 F18 G G1 G2 G3 G4 G5 G6 H H1 H2 H3 H4 H5 H6 H7 H8 I I1 I2 I3 I4 I5 J J1 J2 J3 J4 J5 J6 K K1 K2 K3 K4 K5 K6 K7 K8 K9 K10 K11 K12 K13 K14 K15 L L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 M M1 M2 M3 M4 M5 M6 M7 N N1 N2 N3 O O1 O2 O3 O4 O5 O6 O7 P P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 P16 P17 Q Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q 10 Q 11 Q 12 Q 13 Q 14 Q 15 R R1 R2 R3 R4 R5 R6

Uraian Pekerjaan

2

Feb

26 Minggu 931,188,612

ID Pekerjaan

1

180

Feb

Total

Selesai (Finish) : Hari ( Work Day) :

Feb

512,211,985 357,379,657 61,596,970 931,188,612

5-Feb-19

4-Feb-2019 Monday 2-Aug-2019 Friday

Mulai (Start) : Bahan : Upah : Alat :

Wednesday, May 9, 2018 -270 1 Project Mulai (start) ## Hari Ini (today) 180 Project Selesai (Finish)

Feb 14-Feb-19

LAMPIRAN KURVA S A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180

1

1/1

Software RAB Exarch sdaPro v2019

LAMPIRAN KURVA S A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180

4-Feb-2019 Monday 2-Aug-2019 Friday

Jun 23-Jun-19

Jun 22-Jun-19

Jun 21-Jun-19

Jun 20-Jun-19

Jun 19-Jun-19

Jun 18-Jun-19

Jun 17-Jun-19

Jun 16-Jun-19

Jun 15-Jun-19

9-Jun-19

Jun 14-Jun-19

8-Jun-19

Jun

Jun 13-Jun-19

7-Jun-19

Jun

Jun 12-Jun-19

6-Jun-19

Jun

Jun 11-Jun-19

5-Jun-19

Jun

Jun 10-Jun-19

4-Jun-19

Jun

3-Jun-19

Jun

2-Jun-19

Jun

Jun

1-Jun-19

Jun

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May ########

May 9-May-19

May 8-May-19

May 7-May-19

May 6-May-19

May 5-May-19

May 4-May-19

May 3-May-19

May 2-May-19

Apr 30-Apr-19

May 1-May-19

Apr 29-Apr-19

Apr 28-Apr-19

Apr 27-Apr-19

Apr 26-Apr-19

Apr 25-Apr-19

Apr 24-Apr-19

Apr 23-Apr-19

Apr 22-Apr-19

Apr 21-Apr-19

Apr 20-Apr-19

Apr 19-Apr-19

Apr 18-Apr-19

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00 0.00 0.00

61%

62% 62%

60%

59% 58%

58%

0.00

0.00

0.01

0.01 0.01 0.01

0.00

0.00

57%

0.01

0.01

0.01

0.01 0.01 0.01

55%

0.00

0.00 0.00 0.00

54% 0.00 0.00 0.01 0.01

0.00

0.00

0.01 0.01 52% 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00

49%

0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

45%

0.00

0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00

0.00 0.00 0.00 0.00 0.00

43%

0.00 0.01 0.00 0.00

40%

0.00

39% 38% 38% 38% 38% 38% 38% 38%

33% 33% 34% 33% 31%

33%

34% 34% 34% 34% 34% 34%

34%

35% 35% 35% 35% 35% 35% 35% 35% 35% 35%

35% 35%

36%

36%

36%

36%

36%

37% 37%

37% 37% 37% 37%

33%

32% 32% 32% 32% 32% 32% 32% 32% 32% 32%

0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00

0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00

35%

35%

35%

36%

36%

37%

37%

37%

38%

38%

40%

49%

52%

54%

58%

60%

62%

62%

35%

61%

34%

59%

34%

58%

34%

57%

33%

55%

33%

45%

32%

43%

32%

39%

32%

38%

0.31

38%

0.00

0.29 0.30 0.30

38%

0.01 0.01 0.00

0.27 0.28

38%

0.00 0.01

0.23 0.24 0.26 0.26

38%

0.02 0.02 0.02 0.00

0.21

37%

0.03

0.18

37%

0.04

0.09 0.12 0.14

37%

0.01 0.02 0.02

0.07 0.07 0.07 0.08

36%

0.00 0.00 0.00 0.01

0.07 0.07

36%

0.00 0.00

0.06 0.06 0.06

36%

0.00 0.00 0.00

0.06 0.06

35%

0.00 0.00

0.05 0.06 0.06

35%

0.00 0.00 0.00

0.05 0.05 0.05 0.05

35%

0.00 0.00 0.00 0.00

0.04

35%

0.00

0.04

35%

0.00

0.04 0.04 0.04

35%

0.00 0.00 0.00

0.04 0.04 0.04

35%

0.00 0.00 0.00

0.04 0.04 0.04

35%

0.00 0.00 0.00

0.03 0.03 0.04

34%

0.00 0.00 0.00

0.03 0.03

34%

0.00 0.00

0.03 0.03 0.03 0.03

34%

0.00 0.00 0.00 0.00

0.02 0.02 0.02

34%

0.00 0.00 0.00

0.02 0.02

34%

0.00 0.00

0.01 0.01 0.01 0.01

33%

0.00 0.00 0.00 0.00

0.01

33%

0.00

0.01

33%

0.00

0.01 0.01 0.01

32%

0.00 0.00 0.00

0.00 0.00 0.01

32%

0.00 0.00 0.00

32%

www.mitra-arsitek.com

0.00

32%

1,190,813

1,190,813

545,004

545,004

3,287,311

638,478

1,114,970

421,450

-

-

-

12,156,466

27-May-19

28-May-19

29-May-19

30-May-19

31-May-19

1-Jun-19

2-Jun-19

3-Jun-19

4-Jun-19

5-Jun-19

6-Jun-19

7-Jun-19

8-Jun-19

3,502,727

1,190,813

26-May-19

23-Jun-19

1,756,042

25-May-19

3,210,375

1,756,042

24-May-19

22-Jun-19

2,288,185

23-May-19

9,130,858

2,288,185

22-May-19

21-Jun-19

2,288,185

21-May-19

13,667,088

1,402,372

20-May-19

20-Jun-19

1,402,372

19-May-19

5,649,409

1,402,372

18-May-19

19-Jun-19

1,402,372

17-May-19

18-Jun-19

-

16-May-19

4,584,399

-

15-May-19

4,388,524

-

14-May-19

17-Jun-19

552,185

13-May-19

15,975,346

364,120

12-May-19

16-Jun-19

760,093

11-May-19

15,975,346

621,208

10-May-19

15-Jun-19

566,409

9-May-19

16,968,097

1,216,149

8-May-19

14-Jun-19

1,966,767

7-May-19

26,875,404

910,300

6-May-19

13-Jun-19

910,300

5-May-19

36,238,607

861,439

22,381,358

861,439 4-May-19

12-Jun-19

861,439 3-May-19

11-Jun-19

1,966,767 2-May-19

22,381,358

910,300 1-May-19

9-Jun-19

910,300 30-Apr-19

10-Jun-19

3,440,423 29-Apr-19

12,156,466

2,400,768

31% 32% 32% 32% 32% 32% 32% 32% 32% 32% 32% 33% 33% 33% 33% 33% 34% 34% 34% 34% 34% 34% 34% 34% 35% 35% 35% 35% 35% 35% 35% 35% 35% 35% 35% 35% 36% 36% 36% 36% 36% 37% 37% 37% 37% 37% 37% 38% 38% 38% 38% 38% 38% 38% 39% 40% 43% 45% 49% 52% 54% 55% 57% 58% 58% 59% 60% 61% 62% 62%

28-Apr-19

Hari Kalender

0.00

32%

CASH FLO WDAILY BIAYA KURVA S

0.00 0.00

32%

Aktual Load (red Line)

0.00 0.00 0.00

32%

Load Plan (Blue Line)

0.00

31%

31.07% Total Bobot Kumulatif

0.00 0.00

2,400,768

6,177,050 2,807,750 9,656,479 858,970 7,221,131 3,179,083

0.00

27-Apr-19

680,650 2,697,467 684,084 476,761 414,139 729,690 485,494 441,748 2,568,883 1,546,114 543,290 1,190,785 246,523 6,360,006 2,629,657

0.00

26-Apr-19

227,592 9,476 72,390 674,523 525,985 122,596 773,059 2,204,271 1,885,031 1,305,734 2,733,316 601,267 3,680,187 1,117,408 207,114 323,691 1,872,205

0.00 0.00 0.00

2,966,739

14,912,183 4,540,816 7,093,497 20,039,925 7,713,781 222,214 300,570

0.00 0.00 0.00

1,590,002

58,581,892 11,674,369 16,791,589

0.00

0.00 0.00

25-Apr-19

6,819,489 39,706,778 3,580,723 1,627,482 8,687,619 5,774,439 2,926,546

0.00 0.00

0.00 0.00 0.00 0.00

123,261

598,732 935,662 2,994,205 3,013,079 904,254 618,467 503,383 111,361 494,743 485,642

0.00 0.00 0.00

24-Apr-19

4,281,419 2,646,703 661,201 460,319 1,688,846 879,507 5,319,844 2,820,499 1,336,026 3,502,727 1,526,710 2,463,900 359,210 9,472,375 5,335,396

0.00 0.00

123,261

8,111,636 12,853,972 4,742,336 10,525,375 5,059,844 1,631,823

0.00 0.00 0.00 0.00

23-Apr-19

46,779,215 15,712,821 5,791,106 6,472,895 4,436,010

0.00

595,393

53,432,770 2,939,825 58,582,700 7,497,395 25,528,277 1,043,972 27,900,715 2,193,803

0.00

22-Apr-19

10,565,297 14,684,452 10,957,703 2,052,252 1,977,704 1,545,317

0.00 0.00 0.00

595,393

6,840,840 11,274,511 5,759,818 2,280,280 1,094,168 1,966,767 386,127 137,291 252,870 5,609,489 6,864,555 3,512,084 3,572,439 1,090,008 3,287,311 638,478 1,114,970 421,450

0.00 0.00 0.00

21-Apr-19

2,280,280 7,525,151 1,826,284 4,864,597 16,587,698 4,354,985 1,672,205 768,698 1,109,819 1,824,224 792,973 1,376,737 2,432,299 1,820,601 1,966,767 2,584,317 1,820,601 1,966,767 1,216,149 566,409 621,208 760,093 364,120 552,185

271,645

4,801,242 259,803

D71 D72 D73 D74 D75 D76 D77 D78 D79 D80 D81 D82 D83 D84 D85 D86 D87 D88 D89 D90 D91 D92 D93 D94 D95 D96 D97 D98 D99 D100D101D102D103D104D105D106D107D108D109D110D111D112D113D114D115D116D117D118D119D120D121D122D123D124D125D126D127D128D129D130D131D132D133D134D135D136D137D138D139D140

20-Apr-19

9,881,213 11,124,432 8,752,114 380,047 544,870 252,870

Finish 7-Feb-2019 4-Feb-2019 6-Feb-2019 6-Feb-2019 6-Feb-2019 7-Feb-2019 15-Feb-2019 8-Feb-2019 8-Feb-2019 10-Feb-2019 13-Feb-2019 13-Feb-2019 15-Feb-2019 12-Feb-2019 8-Feb-2019 12-Feb-2019 15-Feb-2019 7-Feb-2019 15-Feb-2019 21-Feb-2019 18-Feb-2019 20-Feb-2019 21-Feb-2019 19-Feb-2019 19-Feb-2019 21-Feb-2019 24-Feb-2019 23-Feb-2019 24-Feb-2019 14-May-2019 26-Feb-2019 26-Feb-2019 27-Feb-2019 2-Mar-2019 4-Mar-2019 5-Mar-2019 26-Feb-2019 26-Feb-2019 27-Feb-2019 1-Mar-2019 3-Mar-2019 26-Apr-2019 29-Apr-2019 1-May-2019 2-May-2019 5-May-2019 7-May-2019 8-May-2019 9-May-2019 10-May-2019 11-May-2019 12-May-2019 13-May-2019 14-May-2019 4-Jun-2019 9-Mar-2019 12-Mar-2019 14-Mar-2019 16-Mar-2019 17-Mar-2019 18-Mar-2019 19-Mar-2019 20-Mar-2019 21-Mar-2019 21-May-2019 24-May-2019 26-May-2019 29-May-2019 31-May-2019 1-Jun-2019 2-Jun-2019 3-Jun-2019 4-Jun-2019 5-Apr-2019 4-Apr-2019 29-Mar-2019 5-Apr-2019 31-Mar-2019 25-Mar-2019 5-Apr-2019 9-Jun-2019 12-Jun-2019 9-Jun-2019 16-Jun-2019 22-Jun-2019 29-Jun-2019 3-Jul-2019 9-Jul-2019 13-Jul-2019 13-Jun-2019 13-Jun-2019 17-Jun-2019 19-Jun-2019 20-Jun-2019 21-Jun-2019 11-Jul-2019 29-Jun-2019 2-Jul-2019 3-Jul-2019 5-Jul-2019 7-Jul-2019 11-Jul-2019 26-Jun-2019 13-Jun-2019 14-Jun-2019 16-Jun-2019 17-Jun-2019 18-Jun-2019 19-Jun-2019 20-Jun-2019 21-Jun-2019 22-Jun-2019 23-Jun-2019 24-Jun-2019 25-Jun-2019 26-Jun-2019 10-Apr-2019 12-Apr-2019 27-Jun-2019 27-Jun-2019 28-Jun-2019 1-Jul-2019 4-Jul-2019 6-Jul-2019 8-Jul-2019 10-Jul-2019 11-Jul-2019 13-Jul-2019 15-Jul-2019 12-Jul-2019 26-Jun-2019 4-Jul-2019 6-Jul-2019 7-Jul-2019 9-Jul-2019 11-Jul-2019 12-Jul-2019 16-Jul-2019 10-Jul-2019 14-Jul-2019 16-Jul-2019 27-Jul-2019 20-Jul-2019 21-Jul-2019 24-Jul-2019 24-Jul-2019 27-Jul-2019 25-Jul-2019 25-Jul-2019 16-Apr-2019 10-Feb-2019 10-Feb-2019 10-Feb-2019 12-Feb-2019 13-Feb-2019 14-Feb-2019 15-Feb-2019 31-Mar-2019 31-Mar-2019 30-Mar-2019 7-Apr-2019 8-Apr-2019 10-Apr-2019 12-Apr-2019 13-Apr-2019 14-Apr-2019 16-Apr-2019 29-Apr-2019 7-Apr-2019 8-Apr-2019 9-Apr-2019 10-Apr-2019 11-Apr-2019 12-Apr-2019 13-Apr-2019 14-Apr-2019 16-Apr-2019 18-Apr-2019 20-Apr-2019 22-Apr-2019 24-Apr-2019 28-Apr-2019 29-Apr-2019 2-Aug-2019 29-Jul-2019 29-Jul-2019 29-Jul-2019 31-Jul-2019 1-Aug-2019 2-Aug-2019

271,645

2,407,799 434,340 2,098,242 15,034,646 4,867,715 11,379,153 3,575,539 1,353,694 7,580,745 34,326,795 148,892 427,404

0.00 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.02 0.01 0.01 0.00 0.00 0.01 0.04 0.00 0.00 0.01 0.01 0.01 0.00 0.00 0.00 0.01 0.00 0.00 0.01 0.00 0.01 0.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.02 0.01 0.00 0.00 0.00 0.06 0.00 0.06 0.01 0.03 0.00 0.03 0.00 0.05 0.02 0.01 0.01 0.00 0.01 0.01 0.01 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.04 0.00 0.00 0.01 0.01 0.00 0.06 0.01 0.02 0.02 0.00 0.01 0.02 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00 0.01 0.00 0.01 0.00 0.01 0.00

19-Apr-19

3,565,210 5,349,419 4,793,368 1,493,610 1,237,892

Waktu S tart 4-Feb-2019 4-Feb-2019 5-Feb-2019 6-Feb-2019 6-Feb-2019 7-Feb-2019 7-Feb-2019 7-Feb-2019 8-Feb-2019 9-Feb-2019 11-Feb-2019 12-Feb-2019 14-Feb-2019 9-Feb-2019 8-Feb-2019 9-Feb-2019 12-Feb-2019 7-Feb-2019 15-Feb-2019 16-Feb-2019 16-Feb-2019 18-Feb-2019 20-Feb-2019 18-Feb-2019 19-Feb-2019 21-Feb-2019 22-Feb-2019 22-Feb-2019 23-Feb-2019 25-Feb-2019 25-Feb-2019 26-Feb-2019 27-Feb-2019 28-Feb-2019 3-Mar-2019 5-Mar-2019 25-Feb-2019 26-Feb-2019 27-Feb-2019 28-Feb-2019 3-Mar-2019 26-Apr-2019 27-Apr-2019 30-Apr-2019 2-May-2019 3-May-2019 6-May-2019 8-May-2019 9-May-2019 10-May-2019 11-May-2019 12-May-2019 13-May-2019 14-May-2019 7-Mar-2019 7-Mar-2019 10-Mar-2019 13-Mar-2019 15-Mar-2019 17-Mar-2019 18-Mar-2019 19-Mar-2019 20-Mar-2019 21-Mar-2019 18-May-2019 22-May-2019 25-May-2019 27-May-2019 30-May-2019 1-Jun-2019 2-Jun-2019 3-Jun-2019 4-Jun-2019 25-Mar-2019 30-Mar-2019 25-Mar-2019 5-Apr-2019 30-Mar-2019 25-Mar-2019 5-Apr-2019 8-Jun-2019 8-Jun-2019 8-Jun-2019 12-Jun-2019 19-Jun-2019 25-Jun-2019 2-Jul-2019 6-Jul-2019 12-Jul-2019 10-Jun-2019 10-Jun-2019 14-Jun-2019 18-Jun-2019 20-Jun-2019 21-Jun-2019 28-Jun-2019 28-Jun-2019 30-Jun-2019 3-Jul-2019 4-Jul-2019 6-Jul-2019 8-Jul-2019 8-Apr-2019 12-Jun-2019 13-Jun-2019 15-Jun-2019 17-Jun-2019 18-Jun-2019 19-Jun-2019 20-Jun-2019 21-Jun-2019 22-Jun-2019 23-Jun-2019 24-Jun-2019 25-Jun-2019 26-Jun-2019 8-Apr-2019 11-Apr-2019 27-Jun-2019 27-Jun-2019 28-Jun-2019 29-Jun-2019 2-Jul-2019 5-Jul-2019 7-Jul-2019 9-Jul-2019 11-Jul-2019 12-Jul-2019 14-Jul-2019 25-Jun-2019 25-Jun-2019 28-Jun-2019 5-Jul-2019 7-Jul-2019 8-Jul-2019 10-Jul-2019 12-Jul-2019 7-Jul-2019 7-Jul-2019 11-Jul-2019 15-Jul-2019 18-Jul-2019 18-Jul-2019 18-Jul-2019 21-Jul-2019 21-Jul-2019 24-Jul-2019 25-Jul-2019 25-Jul-2019 10-Feb-2019 10-Feb-2019 10-Feb-2019 10-Feb-2019 12-Feb-2019 13-Feb-2019 14-Feb-2019 15-Feb-2019 30-Mar-2019 30-Mar-2019 30-Mar-2019 7-Apr-2019 8-Apr-2019 9-Apr-2019 11-Apr-2019 13-Apr-2019 14-Apr-2019 15-Apr-2019 7-Apr-2019 7-Apr-2019 8-Apr-2019 9-Apr-2019 10-Apr-2019 11-Apr-2019 12-Apr-2019 13-Apr-2019 14-Apr-2019 15-Apr-2019 17-Apr-2019 19-Apr-2019 21-Apr-2019 23-Apr-2019 25-Apr-2019 29-Apr-2019 28-Jul-2019 28-Jul-2019 28-Jul-2019 28-Jul-2019 31-Jul-2019 31-Jul-2019 1-Aug-2019

Apr 17-Apr-19

(x100% )

18-Apr-19

(rupiah)

Apr 16-Apr-19

Apr 15-Apr-19

Bobot

773,057

PEKERJAAN PERSIAPAN & PENDAHULUAN Mobilisasi dan Demobiliasi Peralatan dan Perlengkapan Pembersihan Area/Lokasi Kerja Pengukuran dan Pemasangan Bowplank Pembuatan Bedeng dan Gudang Bahan Papan Nama Proyek uk 1, 2m x 1, 8m PEKERJAAN PO NDASI Pekerjaan Galian Urugan Pasir Pek. Pemasangan Batu Kosong (Aanstamping) Pekerjaan Pembesian Pondasi T apak Pekerjan Bekisting Pondasi T apak Pekerjaan Cor Beton (K-225) Pekerjaan Galian Urugan Pasir Pek. Pemasangan Batu Kosong (Aanstamping) Pekerjaan Pasangan Batu Pondasi ( 1 : 3) Pekerjaan Galian Pek. Pasangan Pondasi Rollag PEKERJAAN SLO O F Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Sloof Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d10&20-d8) Pekerjaan Bekisting Sloof Pekerjaan Cor Beton (K-225) PEKERJAAN TIMBUNAN, PENINGGIAN DAN PEMADATAN Urugan, T imbunan dan Peninggian Elevasi Pemadatan T anah PEKERJAAN KO LO M Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d12&18 cm-d6) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d12&18 cm-d6) Pekerjaan Bekisting Pekerjaan Cor Beton (K-200) Pekerjaan Pembesian (4d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-200) PEKERJAAN RINGBALO K (BALO K) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) PEKERJAAN CO R PLATE BETO N (DAK BETO N) Pekerjaan Pembesian Plate lantai Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian Plat Atap/kanopi beton Pekerjaan Bekisting Sloof Pekerjaan Cor Beton (K-225) PEKERJAAN DINDING Pek. Pasangan Bata Merah (1/2, Mix 1:5) Pek. Pasangan Bata Merah T rassram (1/2, Mix 1:3) Pekerjaan Plasteran (1.5 cm-mix 1:5) Pekerjaan Acian Pek. Pasangan Bata Merah (1/2, Mix 1:5) Pek. Pasangan Bata Merah T rassram (1/2, Mix 1:3) Pekerjaan Plasteran (1.5 cm-mix 1:5) Pekerjaan Acian PEKERJAAN ATAP Memasang Rangka Atap (Baja Ringan-Ex T ASO) Memasang Pelapis Atap (Metal Roof-Ex Sakura Roof Memasang Nok Atap Memasang Lisplank Memasang T alang Air PEKERJAAN KUSEN, PINTU, JENDELA DAN ACCESO RIS Memasang Kusen+Panel Pintu Utama Memasang Kusen+Panel Pintu Kamar/Ruangan Memasang Kusen+Panel Pintu WC Memasang Kusen+Panel Jendela Utama Memasang Jendela Pencahayaan/ T etap (Fixed Window) Memasang Lubang Angin/Loster (Bovenlight) PEKERJAAN INST. PIPA AIR BERSIH, LIMBAH DAN SANITASI Memasang Instalasi Pipa 3/4 PVC (Ex Maspion) Memasang Instalasi Pipa 1/2 PVC (Ex Maspion) Memasang Keran Air Standar ( Ex Onda) Memasang Shower Mandi ( Ex T OT O) Memasang T angki Air/T andom (Ex Penguin-1000L) Memasang Pompa Air ( Ex Shimizu 125 Watt) Memasang Instalasi Pipa Limbah 3" PVC (Ex Maspio Memasang Instalasi Pipa Kloset 4" PVC (Ex Maspion) Memasang Instalasi Pipa Saluran 5" PVC (Ex Maspion Memasang Kloset Duduk ( Ex T OT O) Memasang Kloset Jongkok ( Ex T OT O) Memasang Wastafel Cuci Memasang Floor Drain Pekerjaan Septik T ank ( 1000 L) Pekerjaan Sumur Resapan Limbah (800 L) PEKERJAAN INST. LISTRIK DAN PENERANGAN Pemasangan MCB Pengaman dan Box Pemasangan Instalasi Pembumian (Grounding) Pemasangan Kabel Instalasi ( NYM-3x2,5 mm2) Pemasangan Kabel Instalasi ( NYM-3x1,5 mm2) Pemasangan Fitting Lampu Pemasangan Saklar Lampu Pemasangan Receiptackle (Colokan Listrik) Pemasangan Lampu 5 Watt (ex-PHILIPS LED) Pemasangan Lampu 15 Watt (ex-PHILIPS LED) Pemasangan Lampu 20 Watt (ex-PHILIPS LED) PEKERJAAN KERAMIK LANTAI DAN DINDING Pekerjaan Cor Lantai Kerja Non Struktur (K100- 1:4:4 Memasang Keramik Lantai Utama (Ex Granito 60x60 Memasang Keramik Lantai T eras (Ex Platinum 40x40 Memasang Keramik Lantai WC (Ex Asia T ile 20x20) Memasang Keramik Dinding WC (Ex Roman 20x40) Memasang Plint Keramik Dinding (Ex Granito 15x60) Memasang Rope T ile (Kuku T egel/Plint Sudut) PEKERJAAN LANGIT-LANGIT (PLAFO N) Memasang Rangka Plafon ( Ex Furing 2/4 - 4/4) Memasang Pelapis Pelafon ( Ex Gipsum Board 9mm) Memasang List Plafon PEKERJAAN PENGECATAN DAN WATERPRO FING Pekerjaan Plamir Dinding Pekerjaan Cat Anti Lumut dan Waterprofing Pekerjaan Pengecatan Exterior ( Ex Mowilex) Pekerjaan Pengecatan Interior ( Ex Nippon Paint) Pekerjaan Pengecatan Plafon( Ex Mowilex) Pekerjaan Pengecatan Kayu ( Ex Avian) Pekerjaan Pengecatan Besi ( Ex Avian) PEKERJAAN TANGGA Pekerjaan Galian Pekerjaan Urugan T anah Galian Urugan Pasir Pasangan Batu Pondasi (1:4) Pekerjaan Pembesian Sloof Pekerjaan Bekisting Sloof Pekerjaan Cor Beton Sloof (K225) Pekerjaan Pembesian Utama ( d10-18 cm) Pekerjaan Pembesian Anak T angga ( d10-18 cm) Pekerjaan Bekisting T angga Pekerjaan Cor Beton (K-225) Pekerjaan Plasteran ( 1,5 cm- 1: 5) Pekerjaan Keramik T angga ( Ex Asia T ile 40x40) Pekerjaan Rope T ile Pekerjaan Plamir Pekerjaan Pengecatan T angga Pekerjaan Railing T angga PEKERJAAN PAGAR DAN TAMAN/HALAMAN Pekerjaan Galian Pondasi Pasangan Batu Pondasi Pekerjaan Pembesian Sloof Pekerjaan Bekisting Sloof Pekerjaan Pengecoran (K200) Pekerjaan Pembesian Kolom Pekerjaan Bekisting Kolom Pekerjaan Pengecoran (K200) Pasangan Batu Bata Pekerjaan Plasteran Pekerjaan Acian Pekerjaan Pasangan Batu Alam Pekerjaan Pengecatan Pekerjaan Pemasangan Paving Blok Pekerjaan Penanaman Pohon Perdu PEKERJAAN TAMBAHAN DAN LAINNYA Pekerjaan Pemasangan Meteran Listrik (PLN-2200 kWh Pekerjaan Pemasangan Meteran Air (PDAM) Pekerjaan Pemasangan Pintu T oko (Folding Door) Pemasangan Exhaust Fan Pemasangan AC (Air Conditioner-1 PK, Ex. Sharp) Pembersihan Area Kerja (Pasca Konstruksi)

1.00

Biaya

17-Apr-19

A A1 A2 A3 A4 A5 B B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 C C1 C2 C3 C4 C5 C6 D D1 D2 E E1 E2 E3 E4 E5 E6 E7 E8 E9 E10 E11 E12 E13 E14 E15 E16 E17 E18 E19 E20 E21 E22 E23 E24 F F1 F2 F3 F4 F5 F6 F7 F8 F9 F10 F11 F12 F13 F14 F15 F16 F17 F18 G G1 G2 G3 G4 G5 G6 H H1 H2 H3 H4 H5 H6 H7 H8 I I1 I2 I3 I4 I5 J J1 J2 J3 J4 J5 J6 K K1 K2 K3 K4 K5 K6 K7 K8 K9 K10 K11 K12 K13 K14 K15 L L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 M M1 M2 M3 M4 M5 M6 M7 N N1 N2 N3 O O1 O2 O3 O4 O5 O6 O7 P P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 P16 P17 Q Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q 10 Q 11 Q 12 Q 13 Q 14 Q 15 R R1 R2 R3 R4 R5 R6

Uraian Pekerjaan

773,057

26 Minggu 931,188,612

ID Pekerjaan

71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##

180

2,220,544

Total

Selesai (Finish) : Hari ( Work Day) :

Induk Pekerjaan

Waktu Pelakasanaan Progress Pekerjaan

2,220,544

512,211,985 357,379,657 61,596,970 931,188,612

7

187 Serah T erima (overhand)

16-Apr-19

Mulai (Start) : Bahan : Upah : Alat :

Wednesday, May 9, 2018 -270 1 Project Mulai (start) ## Hari Ini (today) 180 Project Selesai (Finish)

15-Apr-19

1

1/1

Software RAB Exarch sdaPro v2019

LAMPIRAN KURVA S A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180

4-Feb-2019 Monday 2-Aug-2019 Friday

Aug 31-Aug-19

Aug 30-Aug-19

Aug 29-Aug-19

Aug 28-Aug-19

Aug 27-Aug-19

Aug 26-Aug-19

Aug 25-Aug-19

Aug 24-Aug-19

Aug 23-Aug-19

Aug 22-Aug-19

Aug 21-Aug-19

31-Jul-19

Aug 20-Aug-19

30-Jul-19

Jul

Aug 19-Aug-19

29-Jul-19

Jul

Aug 18-Aug-19

28-Jul-19

Jul

Aug 17-Aug-19

27-Jul-19

Jul

Aug 16-Aug-19

26-Jul-19

Jul

Aug 15-Aug-19

25-Jul-19

Jul

Aug 14-Aug-19

24-Jul-19

Jul

Aug 13-Aug-19

23-Jul-19

Jul

Aug 12-Aug-19

22-Jul-19

Jul

Aug 11-Aug-19

21-Jul-19

Jul

Aug 10-Aug-19

20-Jul-19

Jul

Aug 9-Aug-19

19-Jul-19

Jul

Aug 8-Aug-19

18-Jul-19

Jul

Aug 7-Aug-19

17-Jul-19

Jul

Aug 6-Aug-19

16-Jul-19

Jul

Aug 5-Aug-19

15-Jul-19

Jul

Aug 4-Aug-19

14-Jul-19

Jul

Aug 3-Aug-19

13-Jul-19

Aug 2-Aug-19

12-Jul-19

Jul

Aug 1-Aug-19

11-Jul-19

8-Jul-19

Jul

Jul

7-Jul-19

Jul

Jul

6-Jul-19

Jul

Jul

5-Jul-19

Jul

9-Jul-19

4-Jul-19

Jul

10-Jul-19

3-Jul-19

Jul

Jul

2-Jul-19

Jul

Jul

1-Jul-19

Jul

Jun 30-Jun-19

Jun 29-Jun-19

Jun 28-Jun-19

Jun 27-Jun-19

Jun 26-Jun-19

62% 62%

0.01

0.01 0.01 0.01

0.01 0.00 0.00 0.01

0.01 0.01 0.01 0.00 0.00

0.00

0.00

0.00

0.00

0.00

0.00 0.00 0.00 0.00

0.00

0.00 0.00

0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.01 0.01

0.01 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00

0.00

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00

0.00

0.00 0.00 0.00

0.00

0.00 0.01

0.00

0.00

0.00 0.00 0.00 0.00

0.01

0.01

0.01 0.01 0.01 0.01

0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00

0.02 0.02 0.02

0.02 0.00 0.00 0.00

0.00 0.00

0.00

0.00 0.01

0.01 0.00

0.00 0.00 0.00

0.01

0.01 0.01

0.00

0.00 0.00 0.00

0.00 0.00 0.00

0.00

0.00 0.00 0.00

0.01

0.01 0.01 0.01 0.00

0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

0.00

0.00

0.00

0.00

0.00

0.00

0.01

0.01

0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00

95%

96%

98%

99%

99%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

100%

92%

100%

91%

100%

89%

100%

87%

100%

79%

100%

75%

100%

71%

100%

69%

100%

68%

100%

0.39

100%

0.00

0.39 0.39 0.39

100%

0.00 0.00 0.00

0.39 0.39

100%

0.00 0.00

0.39 0.39 0.39 0.39

100%

0.00 0.00 0.00 0.00

0.39

100%

0.00

0.39

100%

0.00

0.39 0.39 0.39

100%

0.00 0.00 0.00

0.39 0.39 0.39 0.39

100%

0.00 0.00 0.00 0.00

0.39 0.39

99%

0.00 0.00

0.39 0.39 0.39

100%

0.00 0.00 0.00

0.39 0.39

97%

0.00 0.00

0.39 0.39 0.39

97%

0.00 0.00 0.00

0.37 0.38 0.38 0.39

96%

0.00 0.00 0.01 0.00

0.37

95%

0.01

0.36

94%

0.01

0.35 0.35 0.35

93%

0.00 0.00 0.00

0.33 0.34 0.35

92%

0.01 0.01 0.01

0.31 0.31 0.32

91%

0.01 0.01 0.01

0.29 0.29 0.30

90%

0.01 0.00 0.01

0.28 0.29

89%

0.00 0.01

0.25 0.26 0.27 0.27

88%

0.02 0.01 0.01 0.00

0.18 0.21 0.23

88%

0.03 0.03 0.03

0.14 0.15

85%

0.01 0.01

0.09 0.10 0.12 0.13

82%

0.01 0.01 0.01 0.01

0.08

76%

0.01

0.07

74%

0.02

0.03 0.03 0.05

73%

0.01 0.01 0.02

0.00 0.01 0.02

72%

0.00 0.00 0.01

67%

www.mitra-arsitek.com

65% 64% 63%

65%

11,747,589

26,087,289

26,681,650

26,624,108

18,192,340

6,325,128

7,189,411

4,262,865

3,161,413

8,638,616

8,395,794

-

6,105,932

6,105,932

6,105,932

7,918,560

6,783,356

6,783,356

8,711,801

2,451,229

1,928,445

1,928,445

9,320,639

9,320,639

-

4,469,536

5,200,107

1,589,542

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

-

7-Jul-19

8-Jul-19

9-Jul-19

10-Jul-19

11-Jul-19

12-Jul-19

13-Jul-19

14-Jul-19

15-Jul-19

16-Jul-19

17-Jul-19

18-Jul-19

19-Jul-19

20-Jul-19

21-Jul-19

22-Jul-19

23-Jul-19

24-Jul-19

25-Jul-19

26-Jul-19

27-Jul-19

28-Jul-19

29-Jul-19

30-Jul-19

31-Jul-19

1-Aug-19

2-Aug-19

3-Aug-19

4-Aug-19

5-Aug-19

6-Aug-19

7-Aug-19

8-Aug-19

9-Aug-19

10-Aug-19

11-Aug-19

12-Aug-19

13-Aug-19

14-Aug-19

15-Aug-19

16-Aug-19

17-Aug-19

18-Aug-19

19-Aug-19

20-Aug-19

21-Aug-19

22-Aug-19

23-Aug-19

24-Aug-19

25-Aug-19

26-Aug-19

27-Aug-19

28-Aug-19

29-Aug-19

30-Aug-19

31-Aug-19

62% 62% 63% 64% 65% 67% 68% 69% 71% 72% 73% 74% 75% 76% 79% 82% 85% 87% 88% 88% 89% 89% 90% 91% 91% 92% 92% 93% 94% 95% 95% 96% 96% 97% 97% 98% 99% 99% 99% #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### #### ####

6-Jul-19

Hari Kalender

67%

64%

CASH FLO WDAILY BIAYA KURVA S

69%

68%

63%

Aktual Load (red Line)

72% 71%

62%

Load Plan (Blue Line)

74% 73%

62%

61.45% Total Bobot Kumulatif

76%

75%

7,505,176

6,177,050 2,807,750 9,656,479 858,970 7,221,131 3,179,083

79%

5-Jul-19

680,650 2,697,467 684,084 476,761 414,139 729,690 485,494 441,748 2,568,883 1,546,114 543,290 1,190,785 246,523 6,360,006 2,629,657

82%

4-Jul-19

227,592 9,476 72,390 674,523 525,985 122,596 773,059 2,204,271 1,885,031 1,305,734 2,733,316 601,267 3,680,187 1,117,408 207,114 323,691 1,872,205

85%

11,939,444

14,912,183 4,540,816 7,093,497 20,039,925 7,713,781 222,214 300,570

87%

11,941,078

58,581,892 11,674,369 16,791,589

89%

3-Jul-19

6,819,489 39,706,778 3,580,723 1,627,482 8,687,619 5,774,439 2,926,546

89% 88% 88%

11,483,400

598,732 935,662 2,994,205 3,013,079 904,254 618,467 503,383 111,361 494,743 485,642

91% 91% 90%

2-Jul-19

4,281,419 2,646,703 661,201 460,319 1,688,846 879,507 5,319,844 2,820,499 1,336,026 3,502,727 1,526,710 2,463,900 359,210 9,472,375 5,335,396

93%

92% 92%

10,955,122

8,111,636 12,853,972 4,742,336 10,525,375 5,059,844 1,631,823

95% 95% 94%

1-Jul-19

46,779,215 15,712,821 5,791,106 6,472,895 4,436,010

97%

10,955,122

53,432,770 2,939,825 58,582,700 7,497,395 25,528,277 1,043,972 27,900,715 2,193,803

97%

30-Jun-19

10,565,297 14,684,452 10,957,703 2,052,252 1,977,704 1,545,317

96%

15,831,938

6,840,840 11,274,511 5,759,818 2,280,280 1,094,168 1,966,767 386,127 137,291 252,870 5,609,489 6,864,555 3,512,084 3,572,439 1,090,008 3,287,311 638,478 1,114,970 421,450

98%

96%

29-Jun-19

2,280,280 7,525,151 1,826,284 4,864,597 16,587,698 4,354,985 1,672,205 768,698 1,109,819 1,824,224 792,973 1,376,737 2,432,299 1,820,601 1,966,767 2,584,317 1,820,601 1,966,767 1,216,149 566,409 621,208 760,093 364,120 552,185

100% 100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%100%

99% 99% 99%

15,769,532

4,801,242 259,803

D140D141D142D143D144D145D146D147D148D149D150D151D152D153D154D155D156D157D158D159D160D161D162D163D164D165D166D167D168D169D170D171D172D173D174D175D176D177D178D179D180D181D182D183D184D185D186D187D188D189D190D191D192D193D194D195D196D197D198D199D200D201D202D203D204D205D206D207D208D209

28-Jun-19

9,881,213 11,124,432 8,752,114 380,047 544,870 252,870

Finish 7-Feb-2019 4-Feb-2019 6-Feb-2019 6-Feb-2019 6-Feb-2019 7-Feb-2019 15-Feb-2019 8-Feb-2019 8-Feb-2019 10-Feb-2019 13-Feb-2019 13-Feb-2019 15-Feb-2019 12-Feb-2019 8-Feb-2019 12-Feb-2019 15-Feb-2019 7-Feb-2019 15-Feb-2019 21-Feb-2019 18-Feb-2019 20-Feb-2019 21-Feb-2019 19-Feb-2019 19-Feb-2019 21-Feb-2019 24-Feb-2019 23-Feb-2019 24-Feb-2019 14-May-2019 26-Feb-2019 26-Feb-2019 27-Feb-2019 2-Mar-2019 4-Mar-2019 5-Mar-2019 26-Feb-2019 26-Feb-2019 27-Feb-2019 1-Mar-2019 3-Mar-2019 26-Apr-2019 29-Apr-2019 1-May-2019 2-May-2019 5-May-2019 7-May-2019 8-May-2019 9-May-2019 10-May-2019 11-May-2019 12-May-2019 13-May-2019 14-May-2019 4-Jun-2019 9-Mar-2019 12-Mar-2019 14-Mar-2019 16-Mar-2019 17-Mar-2019 18-Mar-2019 19-Mar-2019 20-Mar-2019 21-Mar-2019 21-May-2019 24-May-2019 26-May-2019 29-May-2019 31-May-2019 1-Jun-2019 2-Jun-2019 3-Jun-2019 4-Jun-2019 5-Apr-2019 4-Apr-2019 29-Mar-2019 5-Apr-2019 31-Mar-2019 25-Mar-2019 5-Apr-2019 9-Jun-2019 12-Jun-2019 9-Jun-2019 16-Jun-2019 22-Jun-2019 29-Jun-2019 3-Jul-2019 9-Jul-2019 13-Jul-2019 13-Jun-2019 13-Jun-2019 17-Jun-2019 19-Jun-2019 20-Jun-2019 21-Jun-2019 11-Jul-2019 29-Jun-2019 2-Jul-2019 3-Jul-2019 5-Jul-2019 7-Jul-2019 11-Jul-2019 26-Jun-2019 13-Jun-2019 14-Jun-2019 16-Jun-2019 17-Jun-2019 18-Jun-2019 19-Jun-2019 20-Jun-2019 21-Jun-2019 22-Jun-2019 23-Jun-2019 24-Jun-2019 25-Jun-2019 26-Jun-2019 10-Apr-2019 12-Apr-2019 27-Jun-2019 27-Jun-2019 28-Jun-2019 1-Jul-2019 4-Jul-2019 6-Jul-2019 8-Jul-2019 10-Jul-2019 11-Jul-2019 13-Jul-2019 15-Jul-2019 12-Jul-2019 26-Jun-2019 4-Jul-2019 6-Jul-2019 7-Jul-2019 9-Jul-2019 11-Jul-2019 12-Jul-2019 16-Jul-2019 10-Jul-2019 14-Jul-2019 16-Jul-2019 27-Jul-2019 20-Jul-2019 21-Jul-2019 24-Jul-2019 24-Jul-2019 27-Jul-2019 25-Jul-2019 25-Jul-2019 16-Apr-2019 10-Feb-2019 10-Feb-2019 10-Feb-2019 12-Feb-2019 13-Feb-2019 14-Feb-2019 15-Feb-2019 31-Mar-2019 31-Mar-2019 30-Mar-2019 7-Apr-2019 8-Apr-2019 10-Apr-2019 12-Apr-2019 13-Apr-2019 14-Apr-2019 16-Apr-2019 29-Apr-2019 7-Apr-2019 8-Apr-2019 9-Apr-2019 10-Apr-2019 11-Apr-2019 12-Apr-2019 13-Apr-2019 14-Apr-2019 16-Apr-2019 18-Apr-2019 20-Apr-2019 22-Apr-2019 24-Apr-2019 28-Apr-2019 29-Apr-2019 2-Aug-2019 29-Jul-2019 29-Jul-2019 29-Jul-2019 31-Jul-2019 1-Aug-2019 2-Aug-2019

5,704,387

2,407,799 434,340 2,098,242 15,034,646 4,867,715 11,379,153 3,575,539 1,353,694 7,580,745 34,326,795 148,892 427,404

0.00 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.02 0.01 0.01 0.00 0.00 0.01 0.04 0.00 0.00 0.01 0.01 0.01 0.00 0.00 0.00 0.01 0.00 0.00 0.01 0.00 0.01 0.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.02 0.01 0.00 0.00 0.00 0.06 0.00 0.06 0.01 0.03 0.00 0.03 0.00 0.05 0.02 0.01 0.01 0.00 0.01 0.01 0.01 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.04 0.00 0.00 0.01 0.01 0.00 0.06 0.01 0.02 0.02 0.00 0.01 0.02 0.01 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.01 0.00 0.01 0.00 0.01 0.00 0.01 0.00

27-Jun-19

3,565,210 5,349,419 4,793,368 1,493,610 1,237,892

Waktu S tart 4-Feb-2019 4-Feb-2019 5-Feb-2019 6-Feb-2019 6-Feb-2019 7-Feb-2019 7-Feb-2019 7-Feb-2019 8-Feb-2019 9-Feb-2019 11-Feb-2019 12-Feb-2019 14-Feb-2019 9-Feb-2019 8-Feb-2019 9-Feb-2019 12-Feb-2019 7-Feb-2019 15-Feb-2019 16-Feb-2019 16-Feb-2019 18-Feb-2019 20-Feb-2019 18-Feb-2019 19-Feb-2019 21-Feb-2019 22-Feb-2019 22-Feb-2019 23-Feb-2019 25-Feb-2019 25-Feb-2019 26-Feb-2019 27-Feb-2019 28-Feb-2019 3-Mar-2019 5-Mar-2019 25-Feb-2019 26-Feb-2019 27-Feb-2019 28-Feb-2019 3-Mar-2019 26-Apr-2019 27-Apr-2019 30-Apr-2019 2-May-2019 3-May-2019 6-May-2019 8-May-2019 9-May-2019 10-May-2019 11-May-2019 12-May-2019 13-May-2019 14-May-2019 7-Mar-2019 7-Mar-2019 10-Mar-2019 13-Mar-2019 15-Mar-2019 17-Mar-2019 18-Mar-2019 19-Mar-2019 20-Mar-2019 21-Mar-2019 18-May-2019 22-May-2019 25-May-2019 27-May-2019 30-May-2019 1-Jun-2019 2-Jun-2019 3-Jun-2019 4-Jun-2019 25-Mar-2019 30-Mar-2019 25-Mar-2019 5-Apr-2019 30-Mar-2019 25-Mar-2019 5-Apr-2019 8-Jun-2019 8-Jun-2019 8-Jun-2019 12-Jun-2019 19-Jun-2019 25-Jun-2019 2-Jul-2019 6-Jul-2019 12-Jul-2019 10-Jun-2019 10-Jun-2019 14-Jun-2019 18-Jun-2019 20-Jun-2019 21-Jun-2019 28-Jun-2019 28-Jun-2019 30-Jun-2019 3-Jul-2019 4-Jul-2019 6-Jul-2019 8-Jul-2019 8-Apr-2019 12-Jun-2019 13-Jun-2019 15-Jun-2019 17-Jun-2019 18-Jun-2019 19-Jun-2019 20-Jun-2019 21-Jun-2019 22-Jun-2019 23-Jun-2019 24-Jun-2019 25-Jun-2019 26-Jun-2019 8-Apr-2019 11-Apr-2019 27-Jun-2019 27-Jun-2019 28-Jun-2019 29-Jun-2019 2-Jul-2019 5-Jul-2019 7-Jul-2019 9-Jul-2019 11-Jul-2019 12-Jul-2019 14-Jul-2019 25-Jun-2019 25-Jun-2019 28-Jun-2019 5-Jul-2019 7-Jul-2019 8-Jul-2019 10-Jul-2019 12-Jul-2019 7-Jul-2019 7-Jul-2019 11-Jul-2019 15-Jul-2019 18-Jul-2019 18-Jul-2019 18-Jul-2019 21-Jul-2019 21-Jul-2019 24-Jul-2019 25-Jul-2019 25-Jul-2019 10-Feb-2019 10-Feb-2019 10-Feb-2019 10-Feb-2019 12-Feb-2019 13-Feb-2019 14-Feb-2019 15-Feb-2019 30-Mar-2019 30-Mar-2019 30-Mar-2019 7-Apr-2019 8-Apr-2019 9-Apr-2019 11-Apr-2019 13-Apr-2019 14-Apr-2019 15-Apr-2019 7-Apr-2019 7-Apr-2019 8-Apr-2019 9-Apr-2019 10-Apr-2019 11-Apr-2019 12-Apr-2019 13-Apr-2019 14-Apr-2019 15-Apr-2019 17-Apr-2019 19-Apr-2019 21-Apr-2019 23-Apr-2019 25-Apr-2019 29-Apr-2019 28-Jul-2019 28-Jul-2019 28-Jul-2019 28-Jul-2019 31-Jul-2019 31-Jul-2019 1-Aug-2019

Jun 25-Jun-19

(x100% )

26-Jun-19

(rupiah)

Jun 24-Jun-19

Jun 23-Jun-19

Bobot

8,874,610

PEKERJAAN PERSIAPAN & PENDAHULUAN Mobilisasi dan Demobiliasi Peralatan dan Perlengkapan Pembersihan Area/Lokasi Kerja Pengukuran dan Pemasangan Bowplank Pembuatan Bedeng dan Gudang Bahan Papan Nama Proyek uk 1, 2m x 1, 8m PEKERJAAN PO NDASI Pekerjaan Galian Urugan Pasir Pek. Pemasangan Batu Kosong (Aanstamping) Pekerjaan Pembesian Pondasi T apak Pekerjan Bekisting Pondasi T apak Pekerjaan Cor Beton (K-225) Pekerjaan Galian Urugan Pasir Pek. Pemasangan Batu Kosong (Aanstamping) Pekerjaan Pasangan Batu Pondasi ( 1 : 3) Pekerjaan Galian Pek. Pasangan Pondasi Rollag PEKERJAAN SLO O F Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Sloof Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d10&20-d8) Pekerjaan Bekisting Sloof Pekerjaan Cor Beton (K-225) PEKERJAAN TIMBUNAN, PENINGGIAN DAN PEMADATAN Urugan, T imbunan dan Peninggian Elevasi Pemadatan T anah PEKERJAAN KO LO M Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d12&18 cm-d6) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (8d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (4d12&18 cm-d6) Pekerjaan Bekisting Pekerjaan Cor Beton (K-200) Pekerjaan Pembesian (4d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-200) PEKERJAAN RINGBALO K (BALO K) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian (7d12&15-d8) Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) PEKERJAAN CO R PLATE BETO N (DAK BETO N) Pekerjaan Pembesian Plate lantai Pekerjaan Bekisting Pekerjaan Cor Beton (K-225) Pekerjaan Pembesian Plat Atap/kanopi beton Pekerjaan Bekisting Sloof Pekerjaan Cor Beton (K-225) PEKERJAAN DINDING Pek. Pasangan Bata Merah (1/2, Mix 1:5) Pek. Pasangan Bata Merah T rassram (1/2, Mix 1:3) Pekerjaan Plasteran (1.5 cm-mix 1:5) Pekerjaan Acian Pek. Pasangan Bata Merah (1/2, Mix 1:5) Pek. Pasangan Bata Merah T rassram (1/2, Mix 1:3) Pekerjaan Plasteran (1.5 cm-mix 1:5) Pekerjaan Acian PEKERJAAN ATAP Memasang Rangka Atap (Baja Ringan-Ex T ASO) Memasang Pelapis Atap (Metal Roof-Ex Sakura Roof Memasang Nok Atap Memasang Lisplank Memasang T alang Air PEKERJAAN KUSEN, PINTU, JENDELA DAN ACCESO RIS Memasang Kusen+Panel Pintu Utama Memasang Kusen+Panel Pintu Kamar/Ruangan Memasang Kusen+Panel Pintu WC Memasang Kusen+Panel Jendela Utama Memasang Jendela Pencahayaan/ T etap (Fixed Window) Memasang Lubang Angin/Loster (Bovenlight) PEKERJAAN INST. PIPA AIR BERSIH, LIMBAH DAN SANITASI Memasang Instalasi Pipa 3/4 PVC (Ex Maspion) Memasang Instalasi Pipa 1/2 PVC (Ex Maspion) Memasang Keran Air Standar ( Ex Onda) Memasang Shower Mandi ( Ex T OT O) Memasang T angki Air/T andom (Ex Penguin-1000L) Memasang Pompa Air ( Ex Shimizu 125 Watt) Memasang Instalasi Pipa Limbah 3" PVC (Ex Maspio Memasang Instalasi Pipa Kloset 4" PVC (Ex Maspion) Memasang Instalasi Pipa Saluran 5" PVC (Ex Maspion Memasang Kloset Duduk ( Ex T OT O) Memasang Kloset Jongkok ( Ex T OT O) Memasang Wastafel Cuci Memasang Floor Drain Pekerjaan Septik T ank ( 1000 L) Pekerjaan Sumur Resapan Limbah (800 L) PEKERJAAN INST. LISTRIK DAN PENERANGAN Pemasangan MCB Pengaman dan Box Pemasangan Instalasi Pembumian (Grounding) Pemasangan Kabel Instalasi ( NYM-3x2,5 mm2) Pemasangan Kabel Instalasi ( NYM-3x1,5 mm2) Pemasangan Fitting Lampu Pemasangan Saklar Lampu Pemasangan Receiptackle (Colokan Listrik) Pemasangan Lampu 5 Watt (ex-PHILIPS LED) Pemasangan Lampu 15 Watt (ex-PHILIPS LED) Pemasangan Lampu 20 Watt (ex-PHILIPS LED) PEKERJAAN KERAMIK LANTAI DAN DINDING Pekerjaan Cor Lantai Kerja Non Struktur (K100- 1:4:4 Memasang Keramik Lantai Utama (Ex Granito 60x60 Memasang Keramik Lantai T eras (Ex Platinum 40x40 Memasang Keramik Lantai WC (Ex Asia T ile 20x20) Memasang Keramik Dinding WC (Ex Roman 20x40) Memasang Plint Keramik Dinding (Ex Granito 15x60) Memasang Rope T ile (Kuku T egel/Plint Sudut) PEKERJAAN LANGIT-LANGIT (PLAFO N) Memasang Rangka Plafon ( Ex Furing 2/4 - 4/4) Memasang Pelapis Pelafon ( Ex Gipsum Board 9mm) Memasang List Plafon PEKERJAAN PENGECATAN DAN WATERPRO FING Pekerjaan Plamir Dinding Pekerjaan Cat Anti Lumut dan Waterprofing Pekerjaan Pengecatan Exterior ( Ex Mowilex) Pekerjaan Pengecatan Interior ( Ex Nippon Paint) Pekerjaan Pengecatan Plafon( Ex Mowilex) Pekerjaan Pengecatan Kayu ( Ex Avian) Pekerjaan Pengecatan Besi ( Ex Avian) PEKERJAAN TANGGA Pekerjaan Galian Pekerjaan Urugan T anah Galian Urugan Pasir Pasangan Batu Pondasi (1:4) Pekerjaan Pembesian Sloof Pekerjaan Bekisting Sloof Pekerjaan Cor Beton Sloof (K225) Pekerjaan Pembesian Utama ( d10-18 cm) Pekerjaan Pembesian Anak T angga ( d10-18 cm) Pekerjaan Bekisting T angga Pekerjaan Cor Beton (K-225) Pekerjaan Plasteran ( 1,5 cm- 1: 5) Pekerjaan Keramik T angga ( Ex Asia T ile 40x40) Pekerjaan Rope T ile Pekerjaan Plamir Pekerjaan Pengecatan T angga Pekerjaan Railing T angga PEKERJAAN PAGAR DAN TAMAN/HALAMAN Pekerjaan Galian Pondasi Pasangan Batu Pondasi Pekerjaan Pembesian Sloof Pekerjaan Bekisting Sloof Pekerjaan Pengecoran (K200) Pekerjaan Pembesian Kolom Pekerjaan Bekisting Kolom Pekerjaan Pengecoran (K200) Pasangan Batu Bata Pekerjaan Plasteran Pekerjaan Acian Pekerjaan Pasangan Batu Alam Pekerjaan Pengecatan Pekerjaan Pemasangan Paving Blok Pekerjaan Penanaman Pohon Perdu PEKERJAAN TAMBAHAN DAN LAINNYA Pekerjaan Pemasangan Meteran Listrik (PLN-2200 kWh Pekerjaan Pemasangan Meteran Air (PDAM) Pekerjaan Pemasangan Pintu T oko (Folding Door) Pemasangan Exhaust Fan Pemasangan AC (Air Conditioner-1 PK, Ex. Sharp) Pembersihan Area Kerja (Pasca Konstruksi)

1.00

Biaya

25-Jun-19

A A1 A2 A3 A4 A5 B B1 B2 B3 B4 B5 B6 B7 B8 B9 B10 B11 B12 C C1 C2 C3 C4 C5 C6 D D1 D2 E E1 E2 E3 E4 E5 E6 E7 E8 E9 E10 E11 E12 E13 E14 E15 E16 E17 E18 E19 E20 E21 E22 E23 E24 F F1 F2 F3 F4 F5 F6 F7 F8 F9 F10 F11 F12 F13 F14 F15 F16 F17 F18 G G1 G2 G3 G4 G5 G6 H H1 H2 H3 H4 H5 H6 H7 H8 I I1 I2 I3 I4 I5 J J1 J2 J3 J4 J5 J6 K K1 K2 K3 K4 K5 K6 K7 K8 K9 K10 K11 K12 K13 K14 K15 L L1 L2 L3 L4 L5 L6 L7 L8 L9 L10 M M1 M2 M3 M4 M5 M6 M7 N N1 N2 N3 O O1 O2 O3 O4 O5 O6 O7 P P1 P2 P3 P4 P5 P6 P7 P8 P9 P10 P11 P12 P13 P14 P15 P16 P17 Q Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q 10 Q 11 Q 12 Q 13 Q 14 Q 15 R R1 R2 R3 R4 R5 R6

Uraian Pekerjaan

3,502,727

26 Minggu 931,188,612

ID Pekerjaan

## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ## ##

180

1,526,710

Total

Selesai (Finish) : Hari ( Work Day) :

Induk Pekerjaan

Waktu Pelakasanaan Progress Pekerjaan

10,979,300

512,211,985 357,379,657 61,596,970 931,188,612

7

187 Serah T erima (overhand)

24-Jun-19

Mulai (Start) : Bahan : Upah : Alat :

Wednesday, May 9, 2018 -270 1 Project Mulai (start) ## Hari Ini (today) 180 Project Selesai (Finish)

23-Jun-19

1

1/1

LAPORAN CURVA MINGGUAN (Weekly Curva)

-

Curva Mingguan Mode Upah Curva Mingguan Mode Alat Curva Mingguan Mode Bahan Curva Mingguan Mode All (Curva S)

Software RAB Exarch xPro v2019

WAKTU PELAKSANAAN (TIME SCHEDULE) A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180

Mode Kurva Nilai Anggaran :

Kurva Upah 357,379,657

Kurva Upah

Start

04-Feb-19

Finish

2-Aug-19

Monday

Friday

15-Apr-19

22-Apr-19

29-Apr-19

6-May-19

13-May-19

20-May-19

27-May-19

3-Jun-19

10-Jun-19

17-Jun-19

24-Jun-19

1-Jul-19

8-Jul-19

15-Jul-19

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

0.039

0.039 0.014

25 95%

26

27

100% 100% 100%

88%

0.014

83%

0.003

75%

5-Aug-19

8-Apr-19

2

29-Jul-19

1-Apr-19

1 0.031

22-Jul-19

25-Mar-19

100%

18-Mar-19

1 2 3 3 15 18 9 18 19 23 21 21 23 24 25 11 13 26

11-Mar-19

Selesai

1 1 2 3 4 5 8 18 19 21 10 21 21 22 24 1 9 25

4-Mar-19

Mulai

25-Feb-19

0.031 0.077 0.028 0.003 0.050 0.041 0.028 0.319 0.095 0.016 0.025 0.006 0.066 0.077 0.077 0.018 0.024 0.019

Minggu Pelaksanaan

18-Feb-19

Pekerjaan Persiapan & Pendahuluan Pekerjaan Pondasi Pekerjaan Sloof Pekerjaan Timbunan, Peninggian Dan Pemadatan Pekerjaan Kolom Pekerjaan Ringbalok (Balok) Pekerjaan Cor Plate Beton (Dak Beton) Pekerjaan Dinding Pekerjaan Atap Pekerjaan Kusen, Pintu, Jendela Dan Accesoris Pekerjaan Inst. Pipa Air Bersih, Limbah Dan Sanitasi Pekerjaan Inst. Listrik Dan Penerangan Pekerjaan Keramik Lantai Dan Dinding Pekerjaan Langit-Langit (Plafon) Pekerjaan Pengecatan Dan Waterprofing Pekerjaan Tangga Pekerjaan Pagar Dan Taman/Halaman Pekerjaan Tambahan Dan Lainnya

Bobot

11-Feb-19

A B C D E F G H I J K L M N O P Q R

URAIAN PEKERJAAN

PERIODE PELAKSANAAN 4-Feb-19

NO

1.0 PROGRESS

1.000

0.004

0.004

0.004

0.004

0.004

0.004

0.004

0.004

0.004

0.004

0.004

0.004

0.003

0.003

0.003

0.003

0.003

0.003

0.003

0.003

0.003

0.003

0.003

0.014

0.014

74% 0.003

0.003

78%

74%

0.003

64% 0.319

50%

0.095 0.005 0.002

0.002

0.002

0.002

0.002

0.002

0.002

0.002

0.002

0.002

0.002

0.005

0.005

0.022

0.022

0.026

0.026

0.002 0.006

25% 23%

0.002

20% 16%0.00217%0.00218%0.002 0.002 0.00213%0.00215%0.00215% 0.002

0.002

0.002

0.005

0.005

0.005

8%

31%

30%

29%

28%

26%

25%

32%

31%

0.022

0.026 0.039

0.005

0.039

0.005

0%

0.010

0.010

0.0%

www.mitra-arsitek.com

0.010

0.99

1.00

1.00

8%

13%

15%

15%

16%

17%

18%

20%

23%

25%

26%

28%

29%

30%

31%

31%

32%

64%

74%

74%

78%

83%

88%

95%

100%

100%

100%

115.63 34.56

0.00

25.50

19.42

6.57

2.06

3.11

3.11

3.11

8.15

9.83

5.54

5.54

4.97

4.97

3.29

3.29

1.80

1.80

0.76

12.70

18.99

18.99

23.02

17.25

3.41

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

Selisih (Deviasi)

0.000

-

Cash Flow (x 1 jt)-PLAN Cash Flow (x 1 jt)-AKTUAL

3.41

0.048

0.94

17.25

0.064

0.88

23.02

0.053

0.82

18.99

0.053

0.77

18.99

0.036

0.74

12.70

0.002

0.73

0.76

0.097

0.64

34.56

0.324

0.31

115.63

0.005

0.31

1.80

0.005

0.30

1.8

0.009

0.29

3.3

0.009

0.29

3.3

0.014

0.27

5.0

0.014

0.26

5.0

0.016

0.24

5.5

0.016

0.23

5.5

0.028

0.20

9.8

0.023

0.18

8.2

0.009

0.17

3.1

0.009

0.16

3.1

0.009

0.15

3.1

0.006

0.14

2.1

0.018

0.13

6.6

0.054

0.07

19.4

0.071

Progres Kumulatif Progres Kumulatif (%)

25.5

Progrees Mingguan

1/1

Software RAB Exarch xPro v2019

WAKTU PELAKSANAAN (TIME SCHEDULE) A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180

Mode Kurva Nilai Anggaran :

Kurva Alat 61,596,970

Kurva Alat

Start

04-Feb-19

Finish

2-Aug-19

Monday

Friday

15-Apr-19

22-Apr-19

29-Apr-19

6-May-19

13-May-19

20-May-19

27-May-19

3-Jun-19

10-Jun-19

17-Jun-19

24-Jun-19

1-Jul-19

8-Jul-19

15-Jul-19

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

0.000

5-Aug-19

8-Apr-19

2

29-Jul-19

1-Apr-19

1 0.016

22-Jul-19

25-Mar-19

100%

18-Mar-19

1 2 3 3 15 18 9 18 19 23 21 21 23 24 25 11 13 26

11-Mar-19

Selesai

1 1 2 3 4 5 8 18 19 21 10 21 21 22 24 1 9 25

4-Mar-19

Mulai

25-Feb-19

0.016 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.124 0.040 0.211 0.024 0.000 0.556 0.001 0.018 0.009 0.000

Minggu Pelaksanaan

18-Feb-19

Pekerjaan Persiapan & Pendahuluan Pekerjaan Pondasi Pekerjaan Sloof Pekerjaan Timbunan, Peninggian Dan Pemadatan Pekerjaan Kolom Pekerjaan Ringbalok (Balok) Pekerjaan Cor Plate Beton (Dak Beton) Pekerjaan Dinding Pekerjaan Atap Pekerjaan Kusen, Pintu, Jendela Dan Accesoris Pekerjaan Inst. Pipa Air Bersih, Limbah Dan Sanitasi Pekerjaan Inst. Listrik Dan Penerangan Pekerjaan Keramik Lantai Dan Dinding Pekerjaan Langit-Langit (Plafon) Pekerjaan Pengecatan Dan Waterprofing Pekerjaan Tangga Pekerjaan Pagar Dan Taman/Halaman Pekerjaan Tambahan Dan Lainnya

Bobot

11-Feb-19

A B C D E F G H I J K L M N O P Q R

URAIAN PEKERJAAN

PERIODE PELAKSANAAN 4-Feb-19

NO

1.0 PROGRESS

1.000

25

26

27

100% 100% 100% 100% 0.000 0.000

0.000

82%

0.000

75%

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

62%

0.000

50%

0.124 0.013 0.018

0.018

0.018

0.018

0.018

0.018

0.018

0.018

0.018

0.018

0.018

35% 25%

0.000

0.002

0.002

2%

0%

0.002

2%

0.002

3%

0.002

3%

0.002

3%

0.002

3%

0.002

3%

0.002

0.002

0.002

0.002

6%

4%

3%

15%

14%

0.002

12% 0.0028% 0.00210%0.002

0.013

0.000

0.000

0.185

0.185

21%

19%

17%

0.013

0.01842%

37% 0.024 0.185 0.000

0.000

0.000

0.000

Progrees Mingguan

0.018

0.002

0.002

0.002

0.002

0.002

0.002

0.002

0.004

0.021

0.021

0.020

0.020

0.018

0.018

0.018

0.018

0.018

0.142

0.018

0.055

0.198

0.198

0.186

0.001

0.000

Progres Kumulatif Progres Kumulatif (%)

0.02

0.02

0.02

0.02

0.02

0.03

0.03

0.03

0.03

0.05

0.07

0.09

0.11

0.13

0.15

0.17

0.18

0.20

0.34

0.36

0.42

0.62

0.81

1.00

1.00

1.00

1.00

2%

2%

3%

3%

3%

3%

3%

3%

4%

6%

8%

10%

12%

14%

15%

17%

19%

21%

35%

37%

42%

62%

82%

100%

100%

100%

100%

Cash Flow (x 1 jt)-PLAN

1.10

0.10

0.10

0.10

0.10

0.10

0.10

0.10

0.22

1.30

1.30

1.20

1.20

1.09

1.09

1.09

1.09

1.09

8.73

1.09

3.41

12.22

12.22

11.43

0.04

0.01

0.00

Cash Flow (x 1 jt)-AKTUAL

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

1.1

0.1

0.1

0.1

0.1

0.1

0.1

0.1

0.2

1.3

1.3

1.2

1.2

1.1

1.1

1.1

1.09

1.09

8.73

1.09

3.41

12.22

12.22

11.43

0.04

0.01

0.0%

Selisih (Deviasi)

www.mitra-arsitek.com

-

0.000

1/1

Software RAB Exarch xPro v2019

WAKTU PELAKSANAAN (TIME SCHEDULE) A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180

Mode Kurva Nilai Anggaran :

Kurva Bahan 512,211,985

Kurva Bahan

Start

04-Feb-19

Finish

2-Aug-19

Monday

Friday

15-Apr-19

22-Apr-19

29-Apr-19

6-May-19

13-May-19

20-May-19

27-May-19

3-Jun-19

10-Jun-19

17-Jun-19

24-Jun-19

1-Jul-19

8-Jul-19

15-Jul-19

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

0.055

0.055 0.020

89%

0.020

26 98%

27 100% 100%

82%

0.008

75%

93%

5-Aug-19

8-Apr-19

2

0.008

29-Jul-19

1-Apr-19

1

22-Jul-19

25-Mar-19

100%

18-Mar-19

1 2 3 3 15 18 9 18 19 23 21 21 23 24 25 11 13 26

11-Mar-19

Selesai

1 1 2 3 4 5 8 18 19 21 10 21 21 22 24 1 9 25

4-Mar-19

Mulai

25-Feb-19

0.008 0.109 0.041 0.008 0.086 0.081 0.062 0.127 0.074 0.068 0.040 0.014 0.089 0.049 0.053 0.021 0.025 0.045

Minggu Pelaksanaan

18-Feb-19

Pekerjaan Persiapan & Pendahuluan Pekerjaan Pondasi Pekerjaan Sloof Pekerjaan Timbunan, Peninggian Dan Pemadatan Pekerjaan Kolom Pekerjaan Ringbalok (Balok) Pekerjaan Cor Plate Beton (Dak Beton) Pekerjaan Dinding Pekerjaan Atap Pekerjaan Kusen, Pintu, Jendela Dan Accesoris Pekerjaan Inst. Pipa Air Bersih, Limbah Dan Sanitasi Pekerjaan Inst. Listrik Dan Penerangan Pekerjaan Keramik Lantai Dan Dinding Pekerjaan Langit-Langit (Plafon) Pekerjaan Pengecatan Dan Waterprofing Pekerjaan Tangga Pekerjaan Pagar Dan Taman/Halaman Pekerjaan Tambahan Dan Lainnya

Bobot

11-Feb-19

A B C D E F G H I J K L M N O P Q R

URAIAN PEKERJAAN

PERIODE PELAKSANAAN 4-Feb-19

NO

1.0 PROGRESS

1.000

0.007

0.007

0.007

0.007

0.007

0.007

0.007

0.007

0.007

0.007

0.007

0.007

0.006

0.006

0.006

0.006

0.006

0.006

0.006

0.006

0.006

0.006

0.006

0.031

0.031

75% 0.006

0.006

0.006

68%

68%

0.12760%

50%

0.074

0.003

43% 40%0.00342%0.003 0.003

0.003

37%

35%

33%

25%

0.003

47%

46%

45%

0.003

0.003

0.023

0.003

0.003

0.003

0.002

0.00215%0.002

20%

19%

18%

0.002

0.002

0.002

0.023

0.030

0.030

0.016

0.016

0.014 0.030

28% 23%

22%

0.023

0.003

0.016 0.026

0.002

0.002

7%

0.002

0.002

0.002

0.005

0.005

0.005

0.005

0.026

0.005

0%

0.023

0.023

0.0%

www.mitra-arsitek.com

0.023

0.98

1.00

1.00

7%

15%

18%

19%

20%

22%

23%

28%

33%

35%

37%

40%

42%

43%

45%

46%

47%

60%

68%

68%

75%

82%

89%

93%

98%

100%

100%

0.00

33.32

39.44

15.52

4.65

7.61

7.61

7.61

23.45

25.99

11.87

11.87

10.88

10.88

8.33

8.33

4.68

4.68

69.97

39.46

1.72

35.47

35.15

35.15

21.98

25.08

11.53

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

Selisih (Deviasi)

0.000

-

Cash Flow (x 1 jt)-PLAN Cash Flow (x 1 jt)-AKTUAL

11.53

0.049

0.93

25.08

0.043

0.89

21.98

0.069

0.82

35.15

0.069

0.75

35.15

0.069

0.68

35.47

0.003

0.68

1.72

0.077

0.60

39.46

0.137

0.46

69.97

0.009

0.45

4.68

0.009

0.44

4.7

0.016

0.43

8.3

0.016

0.41

8.3

0.021

0.39

10.9

0.021

0.37

10.9

0.023

0.35

11.9

0.023

0.32

11.9

0.051

0.27

26.0

0.046

0.23

23.5

0.015

0.21

7.6

0.015

0.20

7.6

0.015

0.18

7.6

0.009

0.17

4.6

0.030

0.14

15.5

0.077

0.07

39.4

0.065

Progres Kumulatif Progres Kumulatif (%)

33.3

Progrees Mingguan

1/1

Software RAB Exarch xPro v2019

WAKTU PELAKSANAAN (TIME SCHEDULE) A002/T100.80/I-2019-Pembangunan Rumah Tinggal 2 Lantai Type 180

Mode Kurva Nilai Anggaran :

Kurva S 931,188,612

Kurva S

Start

04-Feb-19

Finish

2-Aug-19

Monday

Friday

15-Apr-19

22-Apr-19

29-Apr-19

6-May-19

13-May-19

20-May-19

27-May-19

3-Jun-19

10-Jun-19

17-Jun-19

24-Jun-19

1-Jul-19

8-Jul-19

15-Jul-19

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

0.045

0.045 0.017

25 94%

27 100% 100%

88%

0.017

81%

0.005

75%

26 99%

5-Aug-19

8-Apr-19

2

29-Jul-19

1-Apr-19

1 0.018

22-Jul-19

25-Mar-19

100%

18-Mar-19

1 2 3 3 15 18 9 18 19 23 21 21 23 24 25 11 13 26

11-Mar-19

Selesai

1 1 2 3 4 5 8 18 19 21 10 21 21 22 24 1 9 25

4-Mar-19

Mulai

25-Feb-19

0.018 0.090 0.033 0.005 0.066 0.060 0.045 0.192 0.085 0.046 0.046 0.011 0.074 0.093 0.059 0.020 0.023 0.032

Minggu Pelaksanaan

18-Feb-19

Pekerjaan Persiapan & Pendahuluan Pekerjaan Pondasi Pekerjaan Sloof Pekerjaan Timbunan, Peninggian Dan Pemadatan Pekerjaan Kolom Pekerjaan Ringbalok (Balok) Pekerjaan Cor Plate Beton (Dak Beton) Pekerjaan Dinding Pekerjaan Atap Pekerjaan Kusen, Pintu, Jendela Dan Accesoris Pekerjaan Inst. Pipa Air Bersih, Limbah Dan Sanitasi Pekerjaan Inst. Listrik Dan Penerangan Pekerjaan Keramik Lantai Dan Dinding Pekerjaan Langit-Langit (Plafon) Pekerjaan Pengecatan Dan Waterprofing Pekerjaan Tangga Pekerjaan Pagar Dan Taman/Halaman Pekerjaan Tambahan Dan Lainnya

Bobot

11-Feb-19

A B C D E F G H I J K L M N O P Q R

URAIAN PEKERJAAN

PERIODE PELAKSANAAN 4-Feb-19

NO

1.0 PROGRESS

1.000

0.006

0.006

0.006

0.006

0.006

0.006

0.006

0.006

0.006

0.006

0.006

0.006

0.004

0.004

0.004

0.004

0.004

0.004

0.004

0.004

0.004

0.004

0.004

0.022

0.022

74% 0.004

0.004

0.004

68%

68%

0.19259%

50%

0.085 0.015 0.004

25%

0.002

19% 20% 16%0.00216%0.00218%0.002 0.002 0.002 0.00213%0.002

7%

0.004

0.004

0.004

0.004

0.004

38%

36%

35%

33%

31%

29%

27%

23%

0.004

0.004

0.004

39%

38%

0.004

0.004

0.015

0.015

0.025

0.025

0.031

0.031

0.004 0.011 0.025

0.031 0.029

0.002

0.002

0.002

0.005

0.005

0.005

0.005

0.029

0.005

0%

0.016

0.016

0.0%

www.mitra-arsitek.com

0.016

0.98

1.00

1.00

7%

13%

16%

16%

18%

19%

20%

23%

27%

29%

31%

33%

35%

36%

38%

38%

39%

59%

68%

68%

74%

81%

88%

94%

99%

100%

100%

186.69 82.75

0.00

59.92

58.95

22.20

6.80

10.81

10.81

10.81

31.70

36.04

18.71

18.71

17.05

17.05

12.71

12.71

7.57

7.57

3.56

51.57

66.37

66.37

56.43

42.36

14.95

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

Selisih (Deviasi)

0.000

-

Cash Flow (x 1 jt)-PLAN Cash Flow (x 1 jt)-AKTUAL

14.95

0.045

0.94

42.36

0.061

0.88

56.43

0.071

0.81

66.37

0.071

0.74

66.37

0.055

0.68

51.57

0.004

0.68

3.56

0.089

0.59

82.75

0.200

0.39

186.69

0.008

0.38

7.57

0.008

0.37

7.6

0.014

0.36

12.7

0.014

0.34

12.7

0.018

0.32

17.0

0.018

0.31

17.0

0.020

0.29

18.7

0.020

0.27

18.7

0.039

0.23

36.0

0.034

0.19

31.7

0.012

0.18

10.8

0.012

0.17

10.8

0.012

0.16

10.8

0.007

0.15

6.8

0.024

0.13

22.2

0.063

0.06

59.0

0.064

Progres Kumulatif Progres Kumulatif (%)

59.9

Progrees Mingguan

1/1

LAMPIRAN -

Database Basic Price Terbaru Database Detail AHS PU, SNI , AK Database Rekap AHS PU, SNI , AK Database UMP Terbaru

Software RAB Exarch xPro v2019

I.) DAFTAR HARGA UPAH KERJA (Kode : L) Tahun Anggaran 2019 Kuartal I (Jan 19-Maret 19 )

. NO A 1 2 3 4 5 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 C 1 2 3 4 D 1 2 3 4 5 6 7 8 9 10 11 12 13 14 E

. URAIAN

BURUH & LABORAN Pekerja Pekerja penganyam Pekerja pengisi batu Teknisi sampling kualitas air Buruh Kasar TUKANG TERAMPIL Tukang Atap Tukang batu Tukang Besi Tukang Besi Konstruksi Tukang cat Tukang ereksi Tukang Pancang Tukang Kayu/Bekisting Tukang gambar Tukang Interior Tukang Kayu Tukang Las Tukang Las Konstruksi Tukang Listrik Tukang Pipa Tukang Plafon Tukang Prodo Tukang Ukir Tukang vibrator Tukang Bor Tukang cat dan tulis *) Tukang Jahit Tukang Las biasa Tukang Las Listrik Tukang penganyam Tukang Gali Tukang gali sumur LEADER Direktur Kontraktor (Pemberi Tugas) Supervisor (Staf Kontraktor) Mandor Kepala Tukang OPERATOR Operator alat berat Operator Alat Pipa Operator crane Supir truck Supir kendaraan < 2 ton (termasuk sedan) Kenek Pembantu operator crane Operator Alat Pipa Pembantu Operator Alat Pipa Operator Alat Elektronik Operator Pompa Operator printer Operator Tripod/Crane *) Operator, driver speedboat TENAGA AHLI

www.mitra-arsitek.com

HARGA SATUAN

KODE SATUAN

KETERANGAN

L.IV.01 L.IV.02 L.IV.03 L.IV.04 L.IV.05

oh oh oh oh oh

Rp Rp Rp Rp Rp

121,578 115,788 115,788 115,788 104,209

Grade Skill 4-Semi Terampil/Terlatih

L.IV.06 L.IV.07 L.IV.08 L.IV.09 L.IV.10 L.IV.11 L.IV.12 L.IV.13 L.IV.14 L.IV.15 L.IV.16 L.IV.17 L.IV.18 L.IV.19 L.IV.20 L.IV.21 L.IV.22 L.IV.23 L.IV.24 L.IV.25 L.IV.26 L.IV.27 L.IV.28 L.IV.29 L.IV.30 L.IV.31 L.IV.32

oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

162,104 162,104 162,104 162,104 162,104 162,104 162,104 162,104 162,104 162,104 162,104 162,104 162,104 162,104 162,104 162,104 162,104 162,104 162,104 162,104 162,104 162,104 162,104 162,104 162,104 162,104 162,104

Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert

L.IV.33 L.IV.34 L.IV.35 L.IV.36

oh oh oh oh

Rp Rp Rp Rp

289,471 231,577 219,998 185,261

Pelaksana/Pemilik wewenang project

L.IV.37 L.IV.38 L.IV.39 L.IV.40 L.IV.41 L.IV.42 L.IV.43 L.IV.44 L.IV.45 L.IV.46 L.IV.47 L.IV.48 L.IV.49 L.IV.50

oh oh oh oh oh oh oh oh oh oh oh oh oh oh

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

133,157 133,157 138,946 133,157 133,157 115,788 115,788 133,157 115,788 133,157 121,578 121,578 144,735 133,157

Grade 3-Terlatih dan Terampil

Grade Skill 4-Semi Terampil/Terlatih Grade Skill 4-Semi Terampil/Terlatih Grade Skill 4-Semi Terampil/Terlatih Grade Skill 5-Terampil Dasar

Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert Grade Skill 3-Terampil/Semi Expert

Staf Kontraktor Grade 1-Leader & Professional Skill Grade 2-Expert Skill

Grade 3-Terlatih dan Terampil Grade 3-Terlatih dan Terampil Grade 3-Terlatih dan Terampil Grade 3-Terlatih dan Terampil Grade 4-Terlatih Grade 4-Terlatih Grade 3-Terlatih dan Terampil Grade 4-Terlatih Grade 3-Terlatih dan Terampil Grade 3-Terlatih dan Terampil Grade 3-Terlatih dan Terampil Grade 3-Terlatih dan Terampil Grade 3-Terlatih dan Terampil

1/13

Software RAB Exarch xPro v2019

1 2 3 4 5 6 7 8 9 F 1 2 3 4

Ahli madya (sipil/hidrologi) Ahli madya geologist Engineer (sipil/geologi)/ahli madya Ahli Alat Berat Ahli K3 Dokter Perawat Juru Ukur Asisten Ahli Ukur LAINNYA Penjaga malam/Satpam Tukang gambar Desain Engineer Operator komputer/printer/ploter

L.IV.51 L.IV.52 L.IV.53 L.IV.54 L.IV.55 L.IV.56 L.IV.57 L.IV.58 L.IV.59

oh oh oh oh oh oh oh oh oh

Rp Rp Rp Rp Rp Rp Rp Rp Rp

277,892 277,892 289,471 277,892 277,892 312,628 243,155 231,577 208,419

Grade 2-Specialist Skill

L.IV.60 L.IV.61 L.IV.62 L.IV.63

oh oh oh oh

Rp Rp Rp Rp

138,946 225,787 289,471 121,578

Grade 3-Terlatih dan Terampil

Grade 2-Specialist Skill Grade 2-Specialist Skill Grade 2-Specialist Skill Grade 2-Specialist Skill Grade 2-Specialist Skill Grade 3-Terlatih dan Terampil Grade 3-Terlatih dan Terampil Grade 4-Terlatih

Grade 3-Terlatih dan Terampil Grade 2-Specialist Skill Grade 3-Terlatih dan Terampil

II.) DAFTAR PELALATAN DAN SEWA ALAT (Kode : A) Tahun Anggaran 2019 Kuartal I (Jan 19-Maret 19 )

NO

URAIAN

A.PERALATAN DAN PERLENGKAPAN UTAMA 1 Alat Bantu/Perlengkapan Umum 2 Alat Rangka Atap Baja Canai Dingin 3 Assesoris (perkuatan, las dll) 4 Bahan Kerja Paving Blok 5 Bahan Pasang Dinding Bata Ringan 6 Bahan potong pipa T1/manual (gergaji) /saw 7 Bahan potong pipa T2/mekanik / cilinder 8 Mobile crane =< 3 ton 9 Penjaga jarak bekisting / spacer 10 Peralatan Pasang Dinding Bata Ringan 11 Perancah kayu 12 Perlengkapan 13 Perlengkapan Badkip 14 Perlengkapan Bak 15 Perlengkapan Kloset 16 Perlengkapan Pipa 17 Perlengkapan Urinoir 18 Perlengkapan Wastafel 19 Scafolding 20 Sewa alat las 21 Sewa alat perakitan baja 22 Sewa alat Perakitan Baja IWF 23 Sewa alat ukur 24 Sewa crane 25 Sewa excavator type 225 kap 0,5 -1,0 m3 26 Sewa Genset 1500 watt 27 Sewa pipe support 28 Sewa Pompa Submersible 3m3/h 29 Sewa Tripot/Tackel & handle crane 2 T

KODE SATUAN

A.IV.1 Ls Rp A.IV.2 Ls Rp A.IV.3 Ls Rp A.IV.4 Ls Rp A.IV.5 Ls Rp A.IV.6 hari Rp A.IV.7 hari Rp A.IV.8 hari Rp A.IV.9 bh Rp A.IV.10 Ls Rp A.IV.11 m3 Rp A.IV.12 Ls Rp A.IV.13 Ls Rp A.IV.14 Ls Rp A.IV.15 Ls Rp A.IV.16 Ls Rp A.IV.17 Ls Rp A.IV.18 Ls Rp A.IV.19 sewa-unit Rp A.IV.20 Jam Rp A.IV.21 Jam Rp A.IV.22 Jam Rp A.IV.23 hr Rp A.IV.24 unit hari Rp A.IV.25 hari Rp A.IV.26 hari Rp A.IV.27 Buah hari Rp A.IV.28 hari Rp A.IV.29 hari Rp

HARGA SATUAN

KETERANGAN

253,750 456,750 160,370 213,150 213,150 243,600 659,750 1,065,750 4,568 248,675 1,370,250 253,750 152,250 152,250 152,250 152,250 152,250 152,250 25,375 50,750 65,975 65,975 65,975 1,250,480 1,747,830 319,725 324,800 291,305 479,588

III.) DAFTAR HARGA MATERIAL KERJA (Kode : M) Tahun Anggaran 2019 Kuartal I (Jan 19-Maret 19 )

www.mitra-arsitek.com

2/13

Software RAB Exarch xPro v2019

NO

URAIAN

HARGA SATUAN

KODE SATUAN

A 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40

KELOMPOK AIR, TANAH, BATU DAN SEMEN Air M.IV.1 Air test (air bersih) M.IV.2 Alang-alang M.IV.3 Alkasit M.IV.4 Bata ringan tebal 7,5 cm M.IV.5 Bata berongga M.IV.6 Bata merah M.IV.7 Bata pelapis Dinding 3cm x 7cm x 24cm M.IV.8 Bata rooster M.IV.9 Batako M.IV.10 Batu alam / tempel M.IV.11 Batu apung M.IV.12 Batu belah M.IV.13 Batu granit M.IV.14 Batu paras M.IV.15 Batu paras Dinding M.IV.16 Batu pecah 2/3 M.IV.17 Batu teraso M.IV.18 Ijuk M.IV.19 Kapur M.IV.20 Kapur padam M.IV.21 Kapur Pasang M.IV.22 Kapur sirih M.IV.23 Kerikil M.IV.24 Kerikil (kg) M.IV.25 Koral beton M.IV.26 Mortar siap pakai M.IV.27 Pasir beton M.IV.28 Pasir Beton (kg) M.IV.29 Pasir pasang M.IV.30 Pasir Silika M.IV.31 Pasir urug M.IV.32 Semen M.IV.33 Semen grout M.IV.34 Semen nat M.IV.35 Semen Warna M.IV.36 Sirtu M.IV.37 Tanah Liat M.IV.38 Tanah urug M.IV.39 Tepung gypsum M.IV.40

Ltr m3 Ikat kg m3 bh Bh Bh bh bh m2 kg m3 Kg m2 Bh m3 Kg m3 m3 m3 m3 Kg m3 kg m3 Kg m3 kg m3 Kg M3 Kg Kg Kg Kg m3 m3 m3 kg

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

562 51,050 511 44,924 2,873,926 1,532 919 868 766 3,829 272,607 30,548 280,775 15,315 81,680 81,680 357,350 2,450 214,410 360,924 84,028 500,290 13,477 239,935 153 221,047 11,231 295,069 255 210,428 2,144 241,977 1,480 1,634 9,189 2,144 244,019 138,039 188,885 3,931

B 1 2 3 4 5 6

KELOMPOK KAYU Bambu Ø 6 - 8 / 600 cm Dolken kayu Ø 8-10/400 cm List kayu 2/4 List kayu profil Plepet kayu Kayu cetakan

M.IV.41 M.IV.42 M.IV.43 M.IV.44 M.IV.45 M.IV.46

btg btg m3 m m1 m2

Rp Rp Rp Rp Rp Rp

18,378 20,420 5,615,500 2,930 2,144 153,150

1 2 3 4 5 6 7 8 9 10

Kelompok Kayu Reng Reng 2 x 3 cm Kayu Kelas II Reng bengkirai 2/3 Reng bengkirai 3/4 Reng jati (lokal) 2/3 Reng jati (lokal) 3/4 Reng jati 3/4 (klas 1) Reng kamper 2/3 Reng kamper 3/4 Reng kruing 2/3 Reng kruing 3/4

M.IV.47 M.IV.48 M.IV.49 M.IV.50 M.IV.51 M.IV.52 M.IV.53 M.IV.54 M.IV.55 M.IV.56

m3 m1 m1 m1 m1 m1 m1 m1 m1 m1

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

3,267,200 4,595 9,189 6,065 12,129 15,928 4,227 8,454 3,614 7,229

KETERANGAN

Kelompok Kayu Kaso

www.mitra-arsitek.com

3/13

Software RAB Exarch xPro v2019

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Kaso 5/7 Kelas II Kaso 5/7 ( albasiah/meranti ) Kaso-kaso (5 x 7) cm bengkirai Kaso-kaso (5 x 7) cm jati lokal Kaso-kaso (5 x 7) cm kamper Kaso-kaso (5 x 7) cm kruing Kayu Kaso 5 / 7 (borneo) Kayu Kaso 5 / 7 (borneo/meranti) Kayu kruing 5/7 Usuk kayu bengkirai 5/7 Usuk kayu jati (lokal) 5/7 Usuk kayu jati 5/7 (klas 1) Usuk kayu kamper 5/7 Usuk kayu kruing 5/7 Usuk Kayu meranti 5/7 Kelas III

M.IV.57 M.IV.58 M.IV.59 M.IV.60 M.IV.61 M.IV.62 M.IV.63 M.IV.64 M.IV.65 M.IV.66 M.IV.67 M.IV.68 M.IV.69 M.IV.70 M.IV.71

m3 m3 m3 m3 m3 m3 btg m3 m3 m1 m1 m1 m1 m1 m3

Rp 3,573,500 Rp 3,573,500 Rp 6,381,250 Rp 11,333,100 Rp 6,355,725 Rp 4,594,500 Rp 50,029 Rp 3,573,500 Rp 4,594,500 Rp 23,228 Rp 33,948 Rp 41,095 Rp 23,228 Rp 16,081 Rp 2,552,500

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

Kelompok Kayu Balok Balok kayu 8/15 Kelas I Balok kayu bengkirai Balok Kayu Borneo Balok kayu jati (klas plitur) Balok kayu jati (lokal) Balok kayu kamper Balok kayu kelas II Balok kayu kruing Balok kayu papan (klas plitur) Balok kayu, 6 x 12 Kayu balok 5/7 Kelas II Kayu balok 5/7 kelas III Kayu balok borneo Kayu bengkirai balok Kayu glugu balok Kayu jati (klas plitur) balok Kayu jati (lokal) balok Kayu kamper balok Kayu kelas II balok Kayu kruing balok

M.IV.72 M.IV.73 M.IV.74 M.IV.75 M.IV.76 M.IV.77 M.IV.78 M.IV.79 M.IV.80 M.IV.81 M.IV.82 M.IV.83 M.IV.84 M.IV.85 M.IV.86 M.IV.87 M.IV.88 M.IV.89 M.IV.90 M.IV.91

m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 M3 m3 m3 m3 m3 m3 M3 m3

Rp 7,657,500 Rp 6,381,250 Rp 3,573,500 Rp 11,333,100 Rp 9,291,100 Rp 6,355,725 Rp 3,471,400 Rp 4,594,500 Rp 6,636,500 Rp 4,594,500 Rp 2,246,200 Rp 2,144,100 Rp 3,573,500 Rp 6,381,250 Rp 1,633,600 Rp 9,699,500 Rp 7,657,500 Rp 6,355,725 Rp 3,063,000 Rp 4,594,500

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22

Kelompok Kayu Papan Kayu bengkirai papan Kayu jati (lokal) papan Kayu jati papan Kayu jati papan (klas 1) Kayu kamper papan Kayu kelas III (papan) Kayu kruing papan Kayu Papan 3 / 20 borneo/meranti Kayu papan 3/20 Kayu Papan kelas I Kayu Papan kelas II Kayu papan kelas III Papan cetakan Papan kayu 3/20 Kelas II Papan kayu 3/20 Kelas III Papan kayu bengkirai Papan Kayu Borneo tebal 3cm Papan kayu jati (klas plitur) Papan kayu jati (lokal) Papan kayu kamper Papan kayu kelas II Papan kayu kruing

M.IV.92 M.IV.93 M.IV.94 M.IV.95 M.IV.96 M.IV.97 M.IV.98 M.IV.99 M.IV.100 M.IV.101 M.IV.102 M.IV.103 M.IV.104 M.IV.105 M.IV.106 M.IV.107 M.IV.108 M.IV.109 M.IV.110 M.IV.111 M.IV.112 M.IV.113

m3 m3 m3 m3 m3 m3 m3 m3 m3 M3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3

Rp 6,381,250 Rp 9,699,500 Rp 9,699,500 Rp 11,333,100 Rp 6,355,725 Rp 2,552,500 Rp 4,594,500 Rp 3,573,500 Rp 3,573,500 Rp 6,355,725 Rp 3,573,500 Rp 2,552,500 Rp 1,633,600 Rp 3,318,250 Rp 1,837,800 Rp 6,381,250 Rp 3,573,500 Rp 9,699,500 Rp 9,699,500 Rp 6,355,725 Rp 3,573,500 Rp 4,594,500

1 2 3 4

Kelompok Kayu Ram Ram kayu bengkirai Ram kayu jati (lokal) Ram kayu kamper Ram kayu kruing

M.IV.114 M.IV.115 M.IV.116 M.IV.117

m3 m3 m3 m3

Rp Rp Rp Rp

www.mitra-arsitek.com

5,360,250 7,657,500 5,334,725 3,573,500

4/13

Software RAB Exarch xPro v2019

C 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64

KELOMPOK BESI DAN ALUMINIUM Alluminium B Alluminium C Aluminium Composite Panel Aluminium foil Aluminium strip Alumunium gel tbl 0,55 Baja Ringan- Reng Truss Baja Ringan-C Truss Baja strip (0,2 x 2) cm Baut (Srew driver) Baut Ramset / Dina Bolt Besi angkur Ø=8 mm Besi beton Besi hollow 50.50.3 Besi IWF Besi lis kaca (1 x 1) cm Besi plat baja Besi Profil Besi rangka Besi siku L 30.30.3 Besi square tube Hollow 4/4 Kait angin Kawat beton Kawat burung Kawat dia 4 mm Kawat duri Kawat harmonika Kawat jaring Kawat kassa Kawat las listrik Kawat nyamuk Kawat penggantung Pagar kawat jaring Paku 5 - 10 cm Paku anti karat Paku Biasa ½" - 1" Paku Biasa 2" - 5" Paku eternit Paku gypsum Paku Hak Panjang 15cm Paku Pancing 60 x 230 Paku plepet Paku reng Paku sekrup Paku sekrup 3,5" Paku skrup 1 cm – 2,5 cm Paku skrup 10 cm Paku skrup 5 cm Paku sumbat Paku tripleks Paku usuk Paku/skrup atap anti karat Pintu alluminium Pintu alumunium Pintu gulung besi Profil Alluminium "T" Profil kusen alluminium Rel pintu dorong Rolling door alluminium Screening Screw Sekrup fixer Sunscreen alumunium

www.mitra-arsitek.com

M.IV.118 M.IV.119 M.IV.120 M.IV.121 M.IV.122 M.IV.123 M.IV.124 M.IV.125 M.IV.126 M.IV.127 M.IV.128 M.IV.129 M.IV.130 M.IV.131 M.IV.132 M.IV.133 M.IV.134 M.IV.135 M.IV.136 M.IV.137 M.IV.138 M.IV.139 M.IV.140 M.IV.141 M.IV.142 M.IV.143 M.IV.144 M.IV.145 M.IV.146 M.IV.147 M.IV.148 M.IV.149 M.IV.150 M.IV.151 M.IV.152 M.IV.153 M.IV.154 M.IV.155 M.IV.156 M.IV.157 M.IV.158 M.IV.159 M.IV.160 M.IV.161 M.IV.162 M.IV.163 M.IV.164 M.IV.165 M.IV.166 M.IV.167 M.IV.168 M.IV.169 M.IV.170 M.IV.171 M.IV.172 M.IV.173 M.IV.174 M.IV.175 M.IV.176 M.IV.177 M.IV.178 M.IV.179 M.IV.180 M.IV.181

Kg Kg Lbr M2 m Lbr M' m1 Kg bh bh Kg Kg Kg Kg m Kg Kg kg Kg m M1 Bh Kg m2 kg M’ m2 Lbr m2 Kg m2 m1 lbr kg kg Kg Kg kg kg Kg Kg kg kg bh Kg bh kg kg bh kg kg bh m m2 m2 m m1 Set m2 Kg bh bh m2

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

24,504 26,138 309,363 30,528 26,138 148,045 7,147 15,315 12,763 459 4,748 11,231 10,721 17,051 7,964 45,945 10,414 15,928 1,634 13,681 27,057 10,210 5,616 23,994 15,826 35,225 56,155 42,882 112,310 12,252 45,945 12,252 511 35,735 23,994 20,931 23,994 25,525 19,910 17,868 11,231 12,252 16,847 16,847 766 12,252 511 14,294 17,357 408 18,378 16,336 1,021 459,450 216,248 561,550 12,456 122,520 204,200 530,920 2,553 511 255 255,250

5/13

Software RAB Exarch xPro v2019

D 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66

KELOMPOK PIPA, SANITASI DAN ACCESORIS Bak cuci piring M.IV.182 Bak fiberglass M.IV.183 Bak mandi teraso M.IV.184 Bathcuip M.IV.185 Floor drain M.IV.186 Klem Pipa M.IV.187 Kloset duduk / monoblock M.IV.188 Kloset jongkok porselen M.IV.189 Kloset jongkok teraso M.IV.190 Kran air M.IV.191 L.Bow M.IV.192 Pipa Beton M.IV.193 Pipa Conduit M.IV.194 Pipa tanah M.IV.195 Socket Pipa M.IV.196 Urinoir M.IV.197 Wastafel M.IV.198 Waterdrain M.IV.199 Pipa PVC 1/2" M.IV.200 Pipa PVC 3/4" M.IV.201 Pipa PVC 1” M.IV.202 Pipa PVC 11/2” M.IV.203 Pipa PVC 2” M.IV.204 Pipa PVC 21/2” M.IV.205 Pipa PVC 3" M.IV.206 Pipa PVC 3” M.IV.207 Pipa PVC 4" M.IV.208 Pipa galvanis ½” M.IV.209 Pipa galvanis 3/4” M.IV.210 Pipa galvanis 1” M.IV.211 Pipa galvanis 11/2” M.IV.212 Pipa galvanis 3” M.IV.213 Pipa galvanis 4” M.IV.214 Pipa Baja Ø 63 mm M.IV.215 Pipa Baja Ø 100 mm M.IV.216 Pipa Baja Ø 125 mm M.IV.217 Pipa Baja Ø 150 mm M.IV.218 Pipa Baja Ø 200 mm M.IV.219 Pipa Baja Ø 250 mm M.IV.220 Pipa Baja Ø 300 mm M.IV.221 Pipa Baja Ø 400 mm M.IV.222 Pipa Baja Ø 450 mm M.IV.223 Pipa Baja Ø 500 mm M.IV.224 Pipa Baja Ø 600 mm M.IV.225 Pipa Baja Ø 800 mm M.IV.226 Pipa Baja Ø 900 mm M.IV.227 Pipa Baja Ø 1000 mm M.IV.228 Pipa Baja Ø 1100 mm M.IV.229 Pipa Baja Ø 1200 mm M.IV.230 Pipa DCI Ø 100 mm M.IV.231 Pipa DCI Ø 125 mm M.IV.232 Pipa DCI Ø 150 mm M.IV.233 Pipa DCI Ø 200 mm M.IV.234 Pipa DCI Ø 250 mm M.IV.235 Pipa DCI Ø 300 mm M.IV.236 Pipa DCI Ø 400 mm M.IV.237 Pipa DCI Ø 450 mm M.IV.238 Pipa DCI Ø 500 mm M.IV.239 Pipa DCI Ø 600 mm M.IV.240 Pipa DCI Ø 800 mm M.IV.241 Pipa DCI Ø 900 mm M.IV.242 Pipa DCI Ø 1000 mm M.IV.243 Pipa DCI Ø 1100 mm M.IV.244 Pipa DCI Ø 1200 mm M.IV.245 Pipa GIP Ø 63 mm M.IV.246 Pipa GIP Ø 100 mm M.IV.247

www.mitra-arsitek.com

Unit Unit bh Unit Unit bh Unit bh Unit M bh Bh M' Bh bh Unit Unit Bh M M M M M M m1 M M M M M M M M m m m m m m m m m m m m m m m m m m m M M m m m m m m m m m m m m

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

439,030 326,720 189,906 2,807,750 61,260 1,532 2,552,500 153,150 255,250 25,525 10,210 56,155 5,309 47,477 14,294 1,429,400 1,480,450 77,596 4,084 5,616 6,126 6,637 7,147 7,658 8,168 8,679 9,189 21,441 26,546 40,840 77,596 102,100 136,814 212,708 382,875 212,708 126,604 218,494 267,502 321,615 428,820 481,912 536,025 648,335 857,640 964,845 1,225,200 1,276,250 1,327,300 139,877 204,200 315,489 561,550 790,254 1,072,050 2,450,400 2,858,800 3,267,200 3,675,600 4,900,800 5,207,100 6,126,000 6,636,500 7,453,300 153,150 223,599

6/13

Software RAB Exarch xPro v2019

67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133

Pipa GIP Ø 125 mm Pipa GIP Ø 150 mm Pipa GIP Ø 200 mm Pipa GIP Ø 250 mm Pipa GIP Ø 300 mm Pipa GIP Ø 400 mm Pipa GIP Ø 450 mm Pipa GIP Ø 500 mm Pipa GIP Ø 600 mm Pipa GIP Ø 800 mm Pipa GIP Ø 900 mm Pipa GIP Ø 1000 mm Pipa GIP Ø 1100 mm Pipa GIP Ø 1200 mm Pipa HDPE Ø 63 mm Pipa HDPE Ø 100 mm Pipa HDPE Ø 125 mm Pipa HDPE Ø 150 mm Pipa HDPE Ø 200 mm Pipa HDPE Ø 250 mm Pipa HDPE Ø 300 mm Pipa HDPE Ø 400 mm Pipa HDPE Ø 450 mm Pipa HDPE Ø 500 mm Pipa HDPE Ø 600 mm Pipa HDPE Ø 800 mm Pipa HDPE Ø 900 mm Pipa HDPE Ø 1000 Pipa HDPE Ø 1000 mm Pipa HDPE Ø 1100 Pipa HDPE Ø 1100 mm Pipa HDPE Ø 1200 mm Pipa Ø 80 mm Pipa Ø 100 mm Pipa Ø 150 mm Pipa Ø 200 mm Pipa Ø 250 mm Pipa Ø 300 mm Pipa Ø 400 mm Pipa Ø 450 mm Pipa Ø 500 mm Pipa Ø 600 mm Pipa Ø 700 mm Pipa Ø 800 mm Pipa PVC Ø 63 mm Pipa PVC Ø 90 mm Pipa PVC Ø 110 mm Pipa PVC Ø 150 mm Pipa PVC Ø 200 mm Pipa PVC Ø 250 mm Pipa PVC Ø 300 mm Pipa PVC Ø 400 mm Pipa PVC Ø 450 mm Pipa PVC Ø 500 mm Pipa PVC Ø 600 mm Pipa PVC Ø 800 mm Pipa PVC Ø 900 mm Pipa PVC Ø 1000 mm Pipa PVC Ø 1100 mm Pipa PVC Ø 1200 mm Tee Ø 150 mm Tee Ø 200 mm Tee Ø 250 mm Tee Ø 300 mm Tee Ø 400 mm Tee Ø 450 mm Tee Ø 500 mm

www.mitra-arsitek.com

M.IV.248 M.IV.249 M.IV.250 M.IV.251 M.IV.252 M.IV.253 M.IV.254 M.IV.255 M.IV.256 M.IV.257 M.IV.258 M.IV.259 M.IV.260 M.IV.261 M.IV.262 M.IV.263 M.IV.264 M.IV.265 M.IV.266 M.IV.267 M.IV.268 M.IV.269 M.IV.270 M.IV.271 M.IV.272 M.IV.273 M.IV.274 M.IV.275 M.IV.276 M.IV.277 M.IV.278 M.IV.279 M.IV.280 M.IV.281 M.IV.282 M.IV.283 M.IV.284 M.IV.285 M.IV.286 M.IV.287 M.IV.288 M.IV.289 M.IV.290 M.IV.291 M.IV.292 M.IV.293 M.IV.294 M.IV.295 M.IV.296 M.IV.297 M.IV.298 M.IV.299 M.IV.300 M.IV.301 M.IV.302 M.IV.303 M.IV.304 M.IV.305 M.IV.306 M.IV.307 M.IV.308 M.IV.309 M.IV.310 M.IV.311 M.IV.312 M.IV.313 M.IV.314

m m m m m m m m m m m m m m m m m m m m m m m m bh m m bh m bh m m bh bh bh bh bh bh bh bh bh bh bh bh m m m m m m m m m m m m m m m m bh bh bh bh bh bh bh

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

281,413 337,696 450,261 562,826 675,392 900,522 1,013,087 1,125,653 1,350,783 1,801,044 2,026,175 2,251,305 2,476,436 2,701,566 56,155 126,604 242,998 302,216 619,747 965,866 1,551,920 2,468,778 3,127,323 3,777,700 6,126,000 8,882,700 10,005,800 10,720,500 11,741,500 10,720,500 11,741,500 12,762,500 59,218 90,869 96,995 181,738 224,620 273,628 364,497 450,261 481,912 600,348 728,994 803,527 84,743 104,142 134,772 168,465 331,825 481,912 750,435 1,380,392 1,633,600 2,348,300 3,675,600 5,002,900 6,330,200 7,657,500 8,984,800 10,312,100 1 1 1 1 1 1 1

7/13

Software RAB Exarch xPro v2019

134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154

Tee Ø 600 mm Tee Ø 700 mm Tee Ø 800 mm Tee Ø 900 mm Tee Ø 1000 mm Tee Ø 1100 mm Tee Ø 1200 mm Valve Ø 150 mm Valve Ø 200 mm Valve Ø 250 mm Valve Ø 300 mm Valve Ø 400 mm Valve Ø 450 mm Valve Ø 500 mm Valve Ø 600 mm Valve Ø 700 mm Valve Ø 800 mm Valve Ø 900 mm Valve Ø 1000 mm Valve Ø 1100 mm Valve Ø 1200 mm

M.IV.315 M.IV.316 M.IV.317 M.IV.318 M.IV.319 M.IV.320 M.IV.321 M.IV.322 M.IV.323 M.IV.324 M.IV.325 M.IV.326 M.IV.327 M.IV.328 M.IV.329 M.IV.330 M.IV.331 M.IV.332 M.IV.333 M.IV.334 M.IV.335

bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

1 1 1 1 1 1 1 5,717,600 6,840,700 9,699,500 1 1 1 1 1 1 1 1 1 1 1

E 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36

BAHAN PELAPIS DAN LEMBARAN Akustik Uk. 60 cm x 120 cm M.IV.336 Akustik ukuran 30 x 30 cm M.IV.337 Akustik ukuran 30 x 60 cm M.IV.338 Asbes semen M.IV.339 Asbes 1,00 x 1,00 m M.IV.340 Asbes Gelombang M.IV.341 Asbes gelombang 92x250 M.IV.342 Asbes plat M.IV.343 Asbes semen tebal 4 mm M.IV.344 Asbes semen tebal 5 mm M.IV.345 Asbes semen tebal 6 mm M.IV.346 Bilik bambu M.IV.347 Formika M.IV.348 Gymfloor M.IV.349 Gypsum board 9 mm M.IV.350 Kalsiboard 3.5 mm M.IV.351 Karpet M.IV.352 List profil cornees gypsum M.IV.353 List PVC (setara Shunda Plafon,LS 301-1 Min.SilverM.IV.354 Metalic) Multiplek M.IV.355 Parquet kayu M.IV.356 Parquet kayu gymfloor M.IV.357 Phel film 12mm M.IV.358 Plafond PVC M.IV.359 Plastic aerator M.IV.360 Polycarbonat M.IV.361 Plywood 120x240 tbl. 4 mm M.IV.362 Plywood 120x240 tbl. 6 mm M.IV.363 Plywood 120x240 tbl. 9 mm M.IV.364 Seng Gelombang 3" x 6" BJLS 28 M.IV.365 Seng Gelombang BJLS 32 M.IV.366 Teakwood 4 mm 90 x 220 cm M.IV.367 Teakwood 4 mm, 120 x 240 M.IV.368 Tripleks M.IV.369 underlayer (pelapis bawah karpet) M.IV.370 Wallpaper M.IV.371

Lbr Lbr Lbr m2 lbr lbr Lbr m2 m2 m2 m2 m2 Lbr m2 lbr lbr m2 m1 M' lbr m2 m2 Lbr m2 Bh m2 Lbr Lbr Lbr Lbr lbr Lbr Lbr Lbr m2 m

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

130,688 35,735 56,155 81,680 24,504 112,310 109,247 34,714 19,910 22,973 25,525 76,575 91,890 139,877 88,827 68,407 581,970 27,567 34,714 86,785 14,294 296,090 148,045 111,289 35,735 148,556 73,512 81,680 122,520 51,050 117,415 59,218 71,470 37,777 29,099 35,735

F 1 2 3 4 5 6

BAHAN CAT DAN LABURAN Cat alkali resisting primer Cat antara Cat Besi Cat dasar Cat dasar Besi Cat dasar Kayu

kg Kg Kg kg Kg Kg

Rp Rp Rp Rp Rp Rp

32,672 45,945 51,050 28,588 31,651 31,651

www.mitra-arsitek.com

M.IV.372 M.IV.373 M.IV.374 M.IV.375 M.IV.376 M.IV.377

8/13

Software RAB Exarch xPro v2019

7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

Cat dasar Tembok Cat duco Cat emco Cat ICI Weathershield Cat kayu Cat meni Cat Penutup Tembok Dempul Flincoat Kuas Meni ( Read Lead ) A Meni ( Read Lead ) B Meni besi Menie A Menie B Menie besi Minyak cat Pengencer Plamir Politur Teak oil Tinner Vernis Vinyl

M.IV.378 M.IV.379 M.IV.380 M.IV.381 M.IV.382 M.IV.383 M.IV.384 M.IV.385 M.IV.386 M.IV.387 M.IV.388 M.IV.389 M.IV.390 M.IV.391 M.IV.392 M.IV.393 M.IV.394 M.IV.395 M.IV.396 M.IV.397 M.IV.398 M.IV.399 M.IV.400 M.IV.401

Kg kg kg kg kg Kg Kg Kg kg Bh Kg Kg Ltr Kg Kg Kg kg Kg Kg L L ltr L Bh

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

66,365 66,365 42,882 61,260 50,948 16,642 35,735 39,615 37,777 17,357 34,714 36,756 30,630 34,714 36,756 27,567 35,735 35,735 57,482 35,735 16,847 38,798 117,415 19,093

G 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41

BAHAN KERAMIK Hospital plint keramik artistik 10cm x 10cm atau 5cm x 20cm keramik artistik 10cm x 20cm keramik Dinding 10cm x 20cm keramik Dinding 20cm x 20cm Keramik Dinding artistik Keramik mozaik ukuran 30cm x 30cm Keramik ukuran 20cm x 20cm keramik ukuran 30cm x 30cm keramik ukuran 33cm x 33cm List keramik dinding motif Marmer marmer ukuran 100cm x 100cm Mosaik Plint internal cove artistik 5cm x 5cm x 20cm Plint keramik artistik Plint keramik ukuran 10cm x 10cm Plint keramik ukuran 10cm x 20cm Plint keramik ukuran 5cm x 20cm Plint Ubin Plint ubin granit Plint ubin granit ukuran 10cm x 30cm Plint ubin granit ukuran 10cm x 40cm Plint ubin keramik 10 x 30 cm Plint ubin keramik 10 x 40 cm Plint ubin Pc abu-abu ukuran 10cm x 30cm Plint ubin Pc abu-abu ukuran 10cm x 40cm Plint ubin Pc abu-abu ukuran 15cm x 20cm Plint ubin PC warna Plint ubin teralux kerang Plint ubin teralux kerang ukuran 10cm x 30cm Plint ubin teralux kerang ukuran 10cm x 40cm Plint ubin teralux marmer Plint ubin teralux marmer ukuran 10cm x 30cm Plint ubin teralux marmer ukuran 10cm x 40cm plint ubin teralux marmer ukuran 10cm x 60cm Plint ubin teraso Plint ubin teraso ukuran 10cm x 30cm Plint ubin teraso ukuran 10cm x 40cm Plint ubin warna ukuran 10cm x 20cm Plint ubin warna ukuran 10cm x 30cm

M.IV.402 M.IV.403 M.IV.404 M.IV.405 M.IV.406 M.IV.407 M.IV.408 M.IV.409 M.IV.410 M.IV.411 M.IV.412 M.IV.413 M.IV.414 M.IV.415 M.IV.416 M.IV.417 M.IV.418 M.IV.419 M.IV.420 M.IV.421 M.IV.422 M.IV.423 M.IV.424 M.IV.425 M.IV.426 M.IV.427 M.IV.428 M.IV.429 M.IV.430 M.IV.431 M.IV.432 M.IV.433 M.IV.434 M.IV.435 M.IV.436 M.IV.437 M.IV.438 M.IV.439 M.IV.440 M.IV.441 M.IV.442

bh Bh m2 m2 m2 m2 Bh Bh Bh Bh bh m2 Bh m2 Bh bh Bh Bh Bh bh bh Bh Bh bh bh Bh Bh Bh bh bh Bh Bh bh Bh Bh Bh bh Bh Bh Bh Bh

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

12,252 2,553 76,575 86,785 63,813 67,386 12,252 4,595 6,126 7,658 12,252 459,450 59,218 214,410 4,595 11,231 5,718 6,637 4,595 3,574 12,252 13,273 14,294 4,697 6,126 5,105 6,126 6,637 5,616 6,126 6,534 7,147 13,273 14,294 15,315 17,357 4,697 5,105 7,147 4,595 5,105

www.mitra-arsitek.com

9/13

Software RAB Exarch xPro v2019

42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73

Plint ubin warna ukuran 10cm x 40cm plint vynil 15cm x 30cm Porselen Porselen (11 x 11) cm Porselen Dinding 10x20 Porselen Dinding 20x20 Print outdoor flexi Stepnosing granito Ubin abu-abu Ubin granit ubin granit ukuran 30cm x30cm ubin granit ukuran 40cm x40cm Ubin keramik Ubin keramik artistik ubin PC abu-abu ukuran 20cm x20 cm ubin PC abu-abu ukuran 30cm x30 cm ubin PC abu-abu ukuran 40cm x40cm Ubin porselen ubin teralux marmer ukuran 40cm x40cm ubin teralux ukuran 30cm x30cm Ubin teralux kerang Ubin teralux marmer ubin teralux marmer ukuran 30cm x30cm ubin teralux marmer ukuran 40cm x40cm ubin teralux marmer ukuran 60cm x60cm Ubin teraso ubin teraso ukuran 30cm x30cm ubin teraso ukuran 40cm x40cm Ubin warna ubin warna ukuran 20cm x20cm ubin warna ukuran 30cm x30cm ubin warna ukuran 40cm x40 cm

M.IV.443 M.IV.444 M.IV.445 M.IV.446 M.IV.447 M.IV.448 M.IV.449 M.IV.450 M.IV.451 M.IV.452 M.IV.453 M.IV.454 M.IV.455 M.IV.456 M.IV.457 M.IV.458 M.IV.459 M.IV.460 M.IV.461 M.IV.462 M.IV.463 M.IV.464 M.IV.465 M.IV.466 M.IV.467 M.IV.468 M.IV.469 M.IV.470 M.IV.471 M.IV.472 M.IV.473 M.IV.474

Bh Bh m2 Bh Bh Bh m2 bh m2 m2 Bh Bh Bh m2 Bh Bh Bh Bh Bh Bh m2 m2 Bh Bh Bh m2 Bh Bh m2 Bh Bh Bh

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

6,637 25,525 137,835 6,637 5,105 7,147 55,134 10,721 35,735 290,985 16,336 20,420 15,315 57,176 3,063 4,595 6,126 6,637 12,252 14,294 79,638 295,069 34,714 36,756 45,945 148,045 13,784 15,826 112,310 11,742 12,763 14,805

H 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33

BAHAN ATAP DAN ACCESORIS ATAP Atap Alluminium Gelombang tebal 0.55 Atap metal gelombang t 0.35 mm Bubung stel gel. Bubungan gent.krmk KIA natural Bubungan genteng beton warna Bubungan genteng paris Genteng aspal Genteng beton Genteng beton natural Genteng beton Warna Genteng bubung Genteng Bubung Kodok Genteng Bubung Palentong Genteng keramik KIA natural Genteng kodok Genteng metal Genteng palentong Genteng Palentong Super Genteng paris Genteng Sirap nok genteng aspal nok genteng beton Nok Genteng Decra Bond nok genteng metal Nok metal Nok Paten Nok standar 40 cm 18, swg 22 Nok standar 40x18 Nok Stel Gelombang Nok Stel rata Roof Light Fiberglass Rooflight 90x180 Sirap kayu

M.IV.475 M.IV.476 M.IV.477 M.IV.478 M.IV.479 M.IV.480 M.IV.481 M.IV.482 M.IV.483 M.IV.484 M.IV.485 M.IV.486 M.IV.487 M.IV.488 M.IV.489 M.IV.490 M.IV.491 M.IV.492 M.IV.493 M.IV.494 M.IV.495 M.IV.496 M.IV.497 M.IV.498 M.IV.499 M.IV.500 M.IV.501 M.IV.502 M.IV.503 M.IV.504 M.IV.505 M.IV.506 M.IV.507

m2 m2 Lbr bh bh bh Bh Bh bh bh Bh bh bh bh Bh Bh Bh bh bh lbr Bh Bh lbr Bh bh Lbr m2 Bh lbr lbr lbr Lbr Bh

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

168,465 63,047 16,336 28,078 22,462 21,441 2,859 2,757 2,808 3,063 5,105 1,532 2,042 6,637 1,532 35,735 2,553 3,574 817 4,084 25,525 15,315 72,491 84,743 75,554 42,372 82,701 5,954 75,554 56,155 140,898 122,520 2,553

www.mitra-arsitek.com

10/13

Software RAB Exarch xPro v2019

34

Talang / Jurai Canai Dingin

M.IV.508

M'

Rp

45,945

I 1 2 3 4 5 6 7 11

BAHAN LISTRIK & ACCESORIS Fitting Lampu Kabel NYM 3x2,5 mm2 Klem Pipa Listrik Las Dop Mongkok (Listrik) Saklar (standar) Tee Doos Pipa listrik 5/8”

M.IV.509 M.IV.510 M.IV.511 M.IV.512 M.IV.513 M.IV.514 M.IV.515 M.IV.516

bh m bh bh bh bh bh btg

Rp Rp Rp Rp Rp Rp Rp Rp

25,525 19,297 766 1,021 1,532 35,735 1,532 12,763

J 1 2 3 4 5 6 7 8 9 10

BAHAN KACA Kaca buram 12 mm Kaca cermin 5 mm Kaca cermin 8 mm Kaca patri 5mm Kaca polos Kaca tebal 3mm Kaca tebal 5 mm Kaca tebal 8 mm Kaca wire glass Profil kaca

M.IV.517 M.IV.518 M.IV.519 M.IV.520 M.IV.521 M.IV.522 M.IV.523 M.IV.524 M.IV.525 M.IV.526

m2 m2 m2 m2 m2 m2 m2 m2 m2 m

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

153,150 153,661 239,935 86,785 112,310 91,890 122,520 187,354 239,935 66,365

K 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18

BAHAN BETON DAN CETAKAN/CAMPURAN Bahan teraso cor M.IV.527 Beton 1:2:3 M.IV.528 Beton kedap air M.IV.529 Buis beton D. 80 cm M.IV.530 Conblock M.IV.531 Hollow Block 10 M.IV.532 Hollow Block 15 M.IV.533 Hollow Block 20 M.IV.534 Kasa gypsum M.IV.535 Kolom beton pracetak M.IV.536 Panel Beton Pracetak M.IV.537 Paving block 8 cm berwarna M.IV.538 Paving block 6 cm M.IV.539 Paving block 6cm berwarna M.IV.540 Paving block 8 cm natural M.IV.541 Roster 25/25 cm M.IV.542 Teraso cor di tempat, tebal 3cm M.IV.543 Terawang (roster) M.IV.544

m3 M3 m3 bh m2 bh bh bh roll btg Lbr M2 M2 M2 M2 bh M3 bh

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

1,000,580 1,225,200 304,258 63,302 6,126 6,637 7,147 11,231 457,408 205,834 153,150 112,310 137,835 132,730 3,574 15,315 4,595 8,679

L 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

BAHAN HABIS PAKAI (COMSUMABLE) Amplas Bahan Bakar Bahan Kimia Lem Lem kayu Lem Putih Lem vinyl Minyak bekisting Minyak pelumas Oli Perekat Residu Sabun Soda api Solar

M.IV.545 M.IV.546 M.IV.547 M.IV.548 M.IV.549 M.IV.550 M.IV.551 M.IV.552 M.IV.553 M.IV.554 M.IV.555 M.IV.556 M.IV.557 M.IV.558 M.IV.559

Lbr Ltr Ltr kg Kg Kg kg Ltr Ltr Ltr Kg Ltr Kg Kg L

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

6,637 10,210 45,435 15,315 13,273 15,315 20,420 5,871 35,735 35,735 45,945 8,679 11,435 45,945 6,126

M 1 2 3 4 5

PINTU JENDELA DAN ACCESORIS Door closer Door holder Door stop Engsel angin Engsel jendela

M.IV.560 M.IV.561 M.IV.562 M.IV.563 M.IV.564

set Bh Bh Bh bh

Rp Rp Rp Rp Rp

255,250 99,037 100,058 8,168 9,189

www.mitra-arsitek.com

11/13

Software RAB Exarch xPro v2019

6 7 8 9 10 11 12 13 14 15 16 17 18

Engsel kupu-kupu Engsel pintu Jendela besi Jendela naco Jendela nako (rangka + kaca 5 mm) Kait angin Kunci lemari Kunci silinder Kunci slot Kunci tanam antik Kunci tanam biasa Kunci tanam KM Pintu lipat

M.IV.565 M.IV.566 M.IV.567 M.IV.568 M.IV.569 M.IV.570 M.IV.571 M.IV.572 M.IV.573 M.IV.574 M.IV.575 M.IV.576 M.IV.577

Bh Bh m2 Bh m2 Bh Set Bh Bh Bh Bh Bh m2

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

20,420 17,357 842,325 25,015 56,155 6,637 12,252 76,575 51,050 255,250 132,730 51,050 510,500

N 1 2 3 21 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

LAIN-LAIN Badkip Floor hardener Grassblock Gebalan Rumput Internal cove Jaring kawat baja dilas Kalkarium Kerta karbon Kertas 100 x 100 cm Lantai kerja tebal 10cm Pengelasan Prodo Sealant Sealtape Spring knip Strorox - 100 Tali ijuk Underlayer irubber corrugated Venetions blinds dan vertical blinds (tirai) Waterstop lebar 150 mm Waterstop lebar 200 mm Waterstop lebar 230 mm - 320 mm

M.IV.578 M.IV.579 M.IV.580 M.IV.581 M.IV.582 M.IV.583 M.IV.584 M.IV.585 M.IV.586 M.IV.587 M.IV.588 M.IV.589 M.IV.590 M.IV.591 M.IV.592 M.IV.593 M.IV.594 M.IV.595 M.IV.596 M.IV.597 M.IV.598 M.IV.599

bh Kg m2 m2 bh kg Kg lbr lb m3 cm m2 Tube bh Bh kg Kg m2 m2 m m m

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

15,315 3,829 45,945 30,630 7,658 12,252 5,360 3,880 5,718 765,750 4,595 3,063,000 222,578 3,574 7,658 43,393 23,891 95,464 76,575 79,638 81,680 96,995

F

Paket Satuan Pekerjaan

1 2 3 4 5 6 7 8 9 9 9

Upah Kerja Mobiliasasi/Demobilisasi Alat Kerja Mobilisasi/Demobilisasi Bahan Kerja Mobilisasi/Demobilisasi Upah Kerja Pembuatan Septik Tank Alat Kerja Pembuatan Septik Tank Bahan Kerja Pembuatan Septik Tank Upah Kerja Pembuatan Sumur Resapan Limbah Alat Kerja Pembuatan Sumur Resapan Limbah Bahan Kerja Pembuatan Sumur Resapan Limbah Biaya Pengurusan Daya Listrik PLN Biaya Pengurusan Instalasai PDAM

L.IV.a.1 A.IV.a.1 L.IV.a.1 L.IV.a.2 A.IV.a.2 M.IV.a.1 L.IV.a.3 A.IV.a.3 M.IV.a.2 M.IV.a.3 M.IV.a.4

oh/Ls Ls Ls oh/m3 Ls Ls oh/m3 Ls Ls Ls Ls

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

910,800 456,750 253,000 1,518,000 456,750 6,636,500 1,113,200 355,250 4,594,500 5,615,500 2,552,500

IV.) DAFTAR ITEM TAMBAHAN (L = Pekerja, A =Alat M=Bahan) Tahun Anggaran 2019 Kuartal I (Jan 19-Maret 19 )

NO

www.mitra-arsitek.com

URAIAN

KODE SATUAN

HARGA SATUAN

KETERANGAN

12/13

Software RAB Exarch xPro v2019

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 18 20 21 22 23 24 25

Shower Mandi Tangki Air Pompa Air Pintu Utama (Kusen+Panel) Type P1 Pintu Utama (Kusen+Panel) Type P2 Pintu Utama (Kusen+Panel) Type P3 Jendela Type J1 Jendela Type J2 Jendela Type J3 Lubang Angin MCB + Box Tembaga dia.1/2"-1.5m Kabel NYM 3x2,5 mm2-SNI Kabel NYM 2x1,5 mm2-SNI Saklar Listrik Lampu 5W Lampu 15W Lampu 20W Receiptackle Air Conditioner Exhaust Fan Cat Anti Bocor+Waterproofing Rol Cat Pohon Perdu ………….

www.mitra-arsitek.com

M.IV.a.5 M.IV.a.6 M.IV.a.7 M.IV.a.8 M.IV.a.9 M.IV.a.10 M.IV.a.11 M.IV.a.12 M.IV.a.13 M.IV.a.14 M.IV.a.15 M.IV.a.16 M.IV.a.17 M.IV.a.18 M.IV.a.19 M.IV.a.20 M.IV.a.21 M.IV.a.22 M.IV.a.23 M.IV.a.24 M.IV.a.25 M.IV.a.26 A.IV.a.4 M.IV.a.28

Unit Unit Unit set set set set set set Unit Unit btg m1 m1 unit unit unit unit unit unit unit kg unit unit

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

137,835 1,276,250 612,600 2,144,100 1,633,600 1,123,100 1,000,580 612,600 2,552,500 26,036 357,350 663,650 12,252 10,210 25,525 24,504 35,735 45,945 30,630 3,267,200 765,750 17,357 25,375 510,500 102

Merk Onda Penguin 1100L Merk Shimizu 125 W-18L/min Pintu Ganda 60cm/80cmx200-K1 Pintu Kayu 80x200 Pintu PVC 70x195 standar Jendela Ganda 2x60x150-K1 Jendela Tunggal 60x150-K1 Jendela Sudut 2x60-160-K1 Ukuran 20x30-Beton

13/13

Software RAB Exarch xPro v2019

DAFTAR ANALISA UTAMA Analisa Harga Satuan Pekerjaan Sesuai Acuan PUPERA Tahun 2016 Bidang IV CIPTA KARYA Update Januari 2019 STANDAR ID Koef. Unit Uraian PERMEN PUPERA NO 28 Tahun 2016 (Update Tahun 2019-Kuartal I) Cek Only

P-000

A.2.2.1.1.

P-001

A.2.2.1.2

P-002

A.2.2.1.3.

P-003

A.2.2.1.4.

P-004

A.2.2.1.5.

P-005

www.mitra-arsitek.com

1.00 0.40 0.20 0.02 0.02 1.25 5.00 0.01 0.01 0.07 0.06 0.40 1.00 0.20 0.40 0.02 0.02 1.25 2.50 1.20 0.01 0.01 0.07 0.06 0.45 1.00 0.20 0.30 0.02 0.02 1.00 2.00 25.00 0.01 0.01 0.06 1.00 0.10 0.10 0.01 0.01 0.01 0.02 0.01 1.00 2.00 2.00 1.00 0.30 0.05 1.25 0.18

Ls OH OH m2 OH OH OH OH btg Kg m3 m3 m3 Kg Ltr m2 OH OH OH OH btg Kg Lbr m3 m3 m3 Kg Ltr m2 OH OH OH OH btg Kg M’ m3 m3 Kg m1 OH OH OH OH m3 Kg m3 m2 OH OH OH OH OH btg m3

Harga

Analisa Kosongan/Pengecekan Pekerja Mandor (K3) Pembuatan pagar sementara dari kayu tinggi 2 meter 292,278 Pekerja 48,631 Tukang Kayu 32,421 Kepala Tukang 3,705 Mandor 4,400 Dolken kayu Ø 8-10/400 cm 25,525 Semen 7,402 Pasir beton 1,475 Koral beton 1,989 Kayu balok 5/7 Kelas II 161,726 Paku Biasa 2" - 5" 1,532 Residu 3,471 (K3) Pembuatan pagar sementara dari seng gelombang tinggi 2 meter 368,254 Pekerja 24,316 Tukang Kayu 64,841 Kepala Tukang 3,705 Mandor 4,400 Dolken kayu Ø 8-10/400 cm 25,525 Semen 3,701 Seng Gelombang 3" x 6" BJLS 28 61,260 Pasir beton 1,475 Koral beton 1,989 Kayu balok 5/7 Kelas II 161,726 Paku Biasa 2" - 5" 1,532 Meni besi 13,784 Pembuatan pagar sementara dari kawat duri tinggi 1,8 meter 1,513,304 Pekerja 24,316 Tukang Kayu 48,631 Kepala Tukang 3,705 Mandor 4,400 Dolken kayu Ø 8-10/400 cm 20,420 Semen 2,961 Kawat duri 1,403,875 Pasir beton 1,475 Koral beton 1,989 Paku Biasa 2" - 5" 1,532 Pengukuran dan pemasangan Bouwplank 83,800 Pekerja 12,158 Tukang Kayu 16,210 Kepala Tukang 1,853 Mandor 1,100 Kayu balok 5/7 Kelas II 26,954 Paku Biasa 2" - 5" 511 Kayu papan 3/20 25,015 (K3) Pembuatan kantor sementara lantai plesteran 1,466,648 Pekerja 243,155 Tukang Kayu 324,207 Tukang batu 162,104 Kepala Tukang 55,578 Mandor 11,000 Dolken kayu Ø 8-10/400 cm 25,525 Kayu balok 5/7 Kelas II 404,316

1/151

Software RAB Exarch xPro v2019

A.2.2.1.6.

P-006

A.2.2.1.7.

P-007

A.2.2.1.8.

P-008

A.2.2.1.9.

P-009

A.2.2.1.10.

P-010

A.2.2.1.11.

P-011

www.mitra-arsitek.com

0.08 1.10 35.00 0.15 0.10 0.15 30.00 0.25 0.20 0.08 0.15 0.06 1.00 1.00 1.50 0.15 0.05 3.00 0.28 0.70 1.50 1.00 1.00 2.00 0.20 0.05 1.70 0.21 0.30 10.50 0.03 0.05 1.50 0.25 1.00 1.00 2.00 0.20 0.05 1.25 0.19 0.30 18.00 0.03 0.05 1.50 1.35 1.00 0.10 0.05 1.00 1.00 2.00 0.20 0.05 1.25 0.19 1.00 0.30 0.03 0.04 0.02 0.08

Kg Kg Kg m3 m3 m3 Bh Lbr Bh m2 Bh Lbr m2 OH OH OH OH btg m3 Kg Lbr m2 OH OH OH OH btg m3 Kg Kg m3 m3 Lbr Lbr m2 OH OH OH OH btg m3 Kg Kg m3 m3 Lbr Lbr m2 OH OH m2 OH OH OH OH btg Kg m2 OH OH m3 m3 kg

Paku Biasa 2" - 5" Baja strip (0,2 x 2) cm Semen Pasir pasang Pasir beton Koral beton Bata merah Seng Gelombang 3" x 6" BJLS 28 Jendela naco Kaca polos Kunci tanam biasa Plywood 120x240 tbl. 4 mm (K3) Pembuatan rumah jaga (konstruksi kayu ) Pekerja Tukang Kayu Kepala tukang Mandor Dolken kayu Ø 8-10/400 cm Papan kayu 3/20 Kelas II Paku Biasa 2" - 5" Seng Gelombang 3" x 6" BJLS 28 (K3) Pembuatan gudang semen dan Pekerja Tukang Kayu Kepala Tukang Mandor Dolken kayu Ø 8-10/400 cm Papan kayu 3/20 Kelas II Paku Biasa 2" - 5" Semen Pasir beton Koral beton Seng Gelombang 3" x 6" BJLS 28 Seng Gelombang 3" x 6" BJLS 28 (K3) Pembuatan bedeng pekerja Pekerja Tukang Kayu Kepala Tukang Mandor Dolken kayu Ø 8-10/400 cm Papan kayu 3/20 Kelas II Paku Biasa 2" - 5" Semen Pasir beton Koral beton Seng Gelombang 3" x 6" BJLS 28 Plywood 120x240 tbl. 4 mm (K3) Pembersihan lapangan dan perataan Pekerja Mandor (K3) Pembuatan steger/perancah dari bambu Pekerja Tukang Kayu Kepala Tukang Mandor Bambu Ø 6 - 8 / 600 cm Tali ijuk Pembuatan kotak adukan ukuran 40cm x50cm x25cm Tukang Kayu Kepala Tukang Kayu papan kelas III Kayu balok 5/7 kelas III Paku Biasa 2" - 5"

2,042 14,039 51,816 31,564 29,507 33,157 27,567 12,763 5,003 8,985 19,910 4,411 1,475,062 121,578 243,155 27,789 11,000 61,260 915,837 17,868 76,575 1,357,828 121,578 324,207 37,052 11,000 34,714 696,833 7,658 15,545 8,852 11,052 76,575 12,763 1,366,583 121,578 324,207 37,052 11,000 25,525 617,195 7,658 26,648 8,852 11,052 76,575 99,241 23,158 12,158 11,000 521,253 121,578 324,207 37,052 11,000 22,973 4,444 193,147 48,631 5,558 91,890 45,026 2,042

2/151

Software RAB Exarch xPro v2019

A.2.2.1.12.

P-012

A.2.2.1.13.

P-013

A.2.2.1.14.

P-014

A.2.2.1.15.

P-015

A.2.2.1.16.

P-016

A.2.3.1.1.

P-017

A.2.3.1.2.

P-018

A.2.3.1.3.

P-019

A.2.3.1.4.

P-020

A.2.3.1.5.

P-021

A.2.3.1.6.

P-022

A.2.3.1.7.

P-023

A.2.3.1.8.

P-024

A.2.3.1.9.

P-025

A.2.3.1.10.

P-026

A.2.3.1.11.

P-027

A.2.3.1.12.

P-028

www.mitra-arsitek.com

1.00 1.00 0.01 0.15 0.09 0.01 1.00 1.33 0.67 1.00 0.67 0.33 1.00 0.04 0.00 0.00 0.04 0.14 1.00 0.38 0.13 0.01 0.02 0.99 0.53 45.00 0.07 0.15 1.00 0.75 0.03 1.00 0.90 0.05 1.00 1.05 0.07 1.00 1.00 0.03 1.00 1.50 0.06 1.00 1.20 0.05 1.00 0.05 0.01 1.00 0.33 0.01 1.00 0.25 0.03 1.00 0.50 0.05 1.00 0.30 0.01 1.20 1.00

m2 OH OH m3 m3 m3 m2 OH OH m3 OH OH m2 OH OH OH OH Lbr m2 OH OH OH OH Lbr btg Kg m3 m3 m3 OH OH m3 OH OH m3 OH OH m3 OH OH m3 OH OH m3 OH OH m2 OH OH m3 OH OH m3 OH OH m3 OH OH m3 OH OH M3 m3

Pembuatan jalan sementara Pekerja Mandor Batu belah Batu pecah 2/3 Pasir pasang Pembongkaran beton bertulang Pekerja Mandor Pembongkaran dinding tembok bata Pekerja Mandor Pemasangan pagar kawat jaring galvanis panjang 240 cm Pekerja Tukang Besi Kepala Tukang Mandor Kawat jaring Pemasangan panel beton pracetak 5x50x240 cm Pekerja Tukang Batu Kepala Tukang Mandor Panel Beton Pracetak Kolom beton pracetak Semen Pasir beton Koral beton Penggalian tanah biasa sedalam 1 m Pekerja Mandor Penggalian tanah biasa sedalam 2 m Pekerja Mandor Menggali tanah biasa sedalam 3 m Pekerja Mandor Menggali tanah keras sedalam 1 m Pekerja Mandor Menggali tanah cadas sedalam 1 m Pekerja Mandor Menggali tanah lumpur sedalam 1 m Pekerja Mandor Pengerjaan stripping tanah tebing setinggi 1 meter Pekerja Mandor (K3) Pembuangan tanah sejauh 30 meter Pekerja Mandor Pengurugan kembali galian tanah Tanah Biasa Sedalam 1 M Pekerja Mandor (K3) Pemadatan tanah tanah ( per 20 cm) Pekerja Mandor Pengurugan dengan pasir urug Pekerja Mandor Pasir urug Pemasangan lapisan pudel campuran 1KP:3PP:7TL

199,060 121,578 1,100 42,116 32,162 2,104 308,630 162,112 146,519 154,315 81,056 73,259 31,470 5,106 648 371 9,240 16,105 452,054 45,592 20,263 2,223 4,180 151,006 108,063 66,620 21,835 32,273 96,683 91,183 5,500 119,320 109,420 9,900 142,396 127,657 14,740 128,618 121,578 7,040 195,566 182,367 13,200 155,793 145,893 9,900 7,179 6,079 1,100 42,321 40,121 2,200 35,894 30,394 5,500 71,789 60,789 11,000 329,046 36,473 2,200 290,372 450,871

3/151

Software RAB Exarch xPro v2019

A.2.3.1.13.

P-029

A.2.3.1.14.

P-030

A.3.2.1.1.

P-031

A.3.2.1.2.

P-032

A.3.2.1.3.

P-033

A.3.2.1.4.

P-034

A.3.2.1.5.

P-035

A.3.2.1.6.

P-036

www.mitra-arsitek.com

0.80 0.40 0.04 0.08 0.14 0.40 0.95 1.00 0.15 0.02 6.00 1.00 0.25 0.03 1.20 1.00 1.50 0.75 0.08 0.08 1.20 202.00 0.49 1.00 1.50 0.75 0.08 0.08 1.20 163.00 0.52 1.00 1.50 0.75 0.08 0.08 1.20 136.00 0.54 1.00 1.50 0.75 0.08 0.08 1.20 117.00 0.56 1.00 1.50 0.75 0.08 0.08 1.20 91.00 0.58 1.00 1.50 0.75 0.08 0.08 1.20 0.17 170.00

OH OH OH OH m3 m3 m3 m3 OH OH m3 m3 OH OH m3 m3 OH OH OH OH m3 Kg m3 m3 OH OH OH OH m3 Kg m3 m3 OH OH OH OH m3 Kg m3 m3 OH OH OH OH m3 Kg m3 m3 OH OH OH OH m3 Kg m3 m3 OH OH OH OH m3 m3 Kg

Pekerja Tukang Batu Kepala Tukang Mandor Kapur Pasir Pasang Tanah Liat Pemasangan lapisan ijuk tebal 10 cm untuk bidang resapan Pekerja Mandor Ijuk Pengurugan sirtu padat Pekerja Mandor Sirtu Pemasangan pondasi batu belah campuran 1SP : 3PP Pekerja Tukang Batu Kepala Tukang Mandor Batu belah Semen Pasir Pasang Pemasangan pondasi batu belah campuran 1SP : 4PP Pekerja Tukang Batu Kepala Tukang Mandor Batu belah Semen Pasir Pasang Pemasangan pondasi batu belah campuran 1SP : 5PP Pekerja Tukang Batu Kepala Tukang Mandor Batu belah Semen Pasir Pasang Pemasangan pondasi batu belah campuran 1SP : 6PP Pekerja Tukang Batu Kepala Tukang Mandor Batu belah Semen Pasir Pasang Pemasangan pondasi batu belah campuran 1SP : 8PP Pekerja Tukang Batu Kepala Tukang Mandor Batu belah Semen Pasir Pasang Pemasangan pondasi batu belah campuran 1SP : 1KP : 2PP Pekerja Tukang Batu Kepala Tukang Mandor Batu belah Kapur Semen

97,262 64,841 7,410 17,600 48,725 84,171 130,861 1,307,997 18,237 3,300 1,286,460 328,717 30,394 5,500 292,823 1,072,377 182,367 121,578 13,895 16,500 336,930 299,051 102,058 1,022,005 182,367 121,578 13,895 16,500 336,930 241,313 109,423 987,083 182,367 121,578 13,895 16,500 336,930 201,341 114,473 962,532 182,367 121,578 13,895 16,500 336,930 173,213 118,050 928,880 182,367 121,578 13,895 16,500 336,930 134,721 122,890 1,055,848 182,367 121,578 13,895 16,500 336,930 61,357 251,677

4/151

Software RAB Exarch xPro v2019

A.3.2.1.7.

P-037

A.3.2.1.8.

P-038

A.3.2.1.9.

P-039

A.3.2.1.10.

P-040

A.3.2.1.11.

P-041

A.4.1.1.1

P-042

A.4.1.1.2

P-043

www.mitra-arsitek.com

0.34 1.00 1.50 0.75 0.08 0.08 1.20 61.00 0.15 0.49 1.00 1.50 0.75 0.08 0.08 1.20 41.00 0.13 0.52 1.00 0.78 0.39 0.04 0.04 1.20 0.43 1.00 3.40 0.85 0.09 0.17 0.48 194.00 0.31 0.47 126.00 1.80 1.00 2.40 0.80 0.08 0.12 0.45 194.00 0.31 0.47 1.00 1.65 0.28 0.03 0.08 247.00 869.00 999.00 215.00 1.00 1.65 0.28 0.03 0.08 276.00 828.00 ######

m3 m3 OH OH OH OH m3 Kg m3 m3 m3 OH OH OH OH m3 Kg m3 m3 m3 OH OH OH OH m3 m3 m3 OH OH OH OH m3 Kg m3 m3 Kg Kg m3 OH OH OH OH m3 Kg m3 m3 m3 OH OH OH OH kg kg kg Ltr m3 OH OH OH OH kg kg kg

Pasir Pasang 71,546 Pemasangan pondasi batu belah campuran 1 SP : 3 KP : 10 PP 918,163 Pekerja 182,367 Tukang Batu 121,578 Kepala Tukang 13,895 Mandor 16,500 Batu belah 336,930 Semen 90,307 Kapur 53,056 Pasir Pasang 103,531 Pemasangan pondasi batu belah campuran ¼ SP : 1 KP : 4PP 889,302 Pekerja 182,367 Tukang Batu 121,578 Kepala Tukang 13,895 Mandor 16,500 Batu belah 336,930 Semen 60,698 Kapur 47,281 Pasir Pasang 110,054 Pemasangan batu kosong (anstamping) 615,320 Pekerja 94,831 Tukang Batu 63,220 Kepala Tukang 7,225 Mandor 8,580 Batu belah 336,930 Pasir urug 104,534 (K3) Pemasangan pondasi siklop, 60% beton campuran 1SP : 2,624,601 2 PB : 3 Kr dan 40% ba Pekerja 413,364 Tukang Batu 137,788 Kepala Tukang 15,747 Mandor 37,400 Batu belah 134,772 Semen 287,207 Pasir Beton 92,062 Kerikil 112,290 Besi beton 1,350,783 Kawat beton 43,188 Pemasangan pondasi sumuran, diameter 100 cm 1,080,377 Pekerja 291,786 Tukang Batu 129,683 Kepala Tukang 14,821 Mandor 26,180 Batu belah 126,349 Semen 287,207 Pasir Beton 92,062 Kerikil 112,290 Membuat beton mutu f’c = 7,4 MPa (K 100) 1,129,842 Pekerja 200,603 Tukang Batu 44,578 Kepala Tukang 5,187 Mandor 18,260 Semen 365,671 Pasir Beton (kg) 221,812 Kerikil (kg) 152,997 Air 120,733 Membuat beton mutu f’= 9,8 MPa (K 125) 1,164,301 Pekerja 200,603 Tukang Batu 44,578 Kepala Tukang 5,187 Mandor 18,260 Semen 408,604 Pasir Beton (kg) 211,347 Kerikil (kg) 154,988

5/151

Software RAB Exarch xPro v2019

A.4.1.1.3

P-044

A.4.1.1.4

P-045

A.4.1.1.5.

P-046

A.4.1.1.6

P-047

A.4.1.1.7.

P-048

A.4.1.1.8.

P-049

A.4.1.1.9.

P-050

www.mitra-arsitek.com

215.00 1.00 1.65 0.28 0.03 0.08 299.00 799.00 ###### 215.00 1.00 1.20 0.20 0.02 0.06 230.00 893.00 ###### 200.00 1.00 1.65 0.28 0.03 0.08 326.00 760.00 ###### 215.00 1.00 1.65 0.28 0.03 0.08 352.00 731.00 ###### 215.00 1.00 1.65 0.28 0.03 0.08 371.00 698.00 ###### 215.00 1.00 1.65 0.28 0.03 0.08 384.00 692.00 ###### 215.00 1.00 1.65 0.28 0.03 0.08 406.00 684.00 ######

Ltr m3 OH OH OH OH kg kg kg Ltr m3 OH OH OH OH kg kg kg Ltr m3 OH OH OH OH kg kg kg Ltr m3 OH OH OH OH kg kg kg Ltr m3 OH OH OH OH kg kg kg Ltr m3 OH OH OH OH kg kg kg Ltr m3 OH OH OH OH kg kg kg

Air 120,733 Membuat beton mutu f’= 12,2 MPa (K 150) 1,191,715 Pekerja 200,603 Tukang Batu 44,578 Kepala Tukang 5,187 Mandor 18,260 Semen 442,655 Pasir Beton (kg) 203,945 Kerikil (kg) 155,754 Air 120,733 Membuat lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump1,033,256 (3-6) cm, w/c = 0,87 Pekerja 145,893 Tukang Batu 32,421 Kepala Tukang 3,705 Mandor 13,200 Semen 340,504 Pasir Beton (kg) 227,938 Kerikil (kg) 157,285 Air 112,310 Membuat beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm,1,223,570 w/c = 0,66 Pekerja 200,603 Tukang Batu 44,578 Kepala Tukang 5,187 Mandor 18,260 Semen 482,627 Pasir Beton (kg) 193,990 Kerikil (kg) 157,591 Air 120,733 Membuat beton mutu f’= 16,9 MPa (K 200), slump (120 ± 20) mm, 1,254,966 w/c = 0,61 Pekerja 200,603 Tukang Batu 44,578 Kepala Tukang 5,187 Mandor 18,260 Semen 521,118 Pasir Beton (kg) 186,588 Kerikil (kg) 157,898 Air 120,733 Membuat beton mutu f’ = 19,3 MPa (K 225), slump (120 ± 20) mm, 1,277,122 w/c = 0,58 Pekerja 200,603 Tukang Batu 44,578 Kepala Tukang 5,187 Mandor 18,260 Semen 549,247 Pasir Beton (kg) 178,165 Kerikil (kg) 160,348 Air 120,733 Membuat beton mutu f’= 21,7 MPa (K 250), slump (120 ± 20) mm, 1,293,611 w/c = 0,56 Pekerja 200,603 Tukang Batu 44,578 Kepala Tukang 5,187 Mandor 18,260 Semen 568,493 Pasir Beton (kg) 176,633 Kerikil (kg) 159,123 Air 120,733 Membuat beton mutu f’ = 24,0 MPa (K 275), slump (120 ± 20) mm, 1,322,148 w/c = 0,53 Pekerja 200,603 Tukang Batu 44,578 Kepala Tukang 5,187 Mandor 18,260 Semen 601,063 Pasir Beton (kg) 174,591 Kerikil (kg) 157,132

6/151

Software RAB Exarch xPro v2019

A.4.1.1.10.

P-051

A.4.1.1.11.

P-052

A.4.1.1.12.

P-053

A.4.1.1.12.

P-053a

A.4.1.1.13

P-054

A.4.1.1.14

P-055

A.4.1.1.15

P-056

A.4.1.1.16

P-057

www.mitra-arsitek.com

215.00 1.00 1.65 0.28 0.03 0.08 413.00 681.00 ###### 215.00 1.00 2.10 0.35 0.04 0.11 439.00 670.00 ###### 215.00 1.00 2.10 0.35 0.04 0.11 448.00 667.00 ###### 215.00 1.00 2.10 0.35 0.04 0.11 448.00 667.00 ###### 4.50 215.00 1.00 2.10 0.35 0.04 0.11 400.00 0.48 0.80 1.20 1.00 0.06 0.03 0.00 0.00 1.05 1.00 0.07 0.04 0.00 0.01 1.05 1.00 0.08 0.04 0.00

Ltr m3 OH OH OH OH kg kg kg Ltr m3 OH OH OH OH kg kg kg Ltr m3 OH OH OH OH kg kg kg Ltr m3 OH OH OH OH kg kg kg Ltr Ltr m3 OH OH OH OH kg m3 m3 kg m1 OH OH OH OH m m1 OH OH OH OH m m1 OH OH OH

Air 120,733 Membuat beton mutu f’c = 26,4 MPa (K 300), slump (120 ± 20) mm, 1,330,979 w/c = 0,52 Pekerja 200,603 Tukang Batu 44,578 Kepala Tukang 5,187 Mandor 18,260 Semen 611,426 Pasir Beton (kg) 173,825 Kerikil (kg) 156,366 Air 120,733 Membuat beton mutu f’c = 28,8 MPa (K 325), slump (120 ± 20) mm, 1,437,371 w/c = 0,49 Pekerja 255,313 Tukang Batu 56,736 Kepala Tukang 6,484 Mandor 23,100 Semen 649,918 Pasir Beton (kg) 171,018 Kerikil (kg) 154,069 Air 120,733 Membuat beton mutu f’c = 31,2 MPa (K 350), slump (120 ± 20) mm, 1,449,010 w/c = 0,48 Pekerja 255,313 Tukang Batu 56,736 Kepala Tukang 6,484 Mandor 23,100 Semen 663,242 Pasir Beton (kg) 170,252 Kerikil (kg) 153,150 Air 120,733 Membuat beton mutu f’c = 31,2 MPa (K 350), campuran bahan 1,653,465 kimia Pekerja 255,313 Tukang Batu 56,736 Kepala Tukang 6,484 Mandor 23,100 Semen 663,242 Pasir Beton (kg) 170,252 Kerikil (kg) 153,150 Bahan Kimia 204,455 Air 120,733 Membuat beton kedap air dengan strorox - 100 1,319,465 Pekerja 255,313 Tukang Batu 56,736 Kepala Tukang 6,484 Mandor 23,100 Semen 592,180 Pasir Beton 141,633 Kerikil 191,948 Strorox - 100 52,071 Pemasangan PVC Waterstop lebar 150 mm 96,993 Pekerja 7,295 Tukang Pipa 4,863 Kepala Tukang 556 Mandor 660 Waterstop lebar 150 mm 83,620 Pemasangan PVC Waterstop lebar 200 mm 102,229 Pekerja 8,510 Tukang Pipa 5,674 Kepala Tukang 741 Mandor 1,540 Waterstop lebar 200 mm 85,764 Membuat PVC Waterstop lebar 230 mm - 320 mm 119,676 Pekerja 9,726 Tukang Batu 6,484 Kepala Tukang 741

7/151

Software RAB Exarch xPro v2019

A.4.1.1.17

P-058

A.4.1.1.18

P-059

A.4.1.1.19

P-060

A.4.1.1.20

P-061

A.4.1.1.21

P-062

A.4.1.1.22

P-063

A.4.1.1.23

P-064

A.4.1.1.24

P-065

www.mitra-arsitek.com

0.00 1.05 1.00 0.01 0.01 0.00 0.00 1.05 0.02 1.00 0.01 0.01 0.00 0.00 1.05 0.01 1.00 0.00 0.00 0.00 0.00 1.02 0.01 1.00 0.52 0.26 0.03 0.03 0.04 0.30 0.10 1.00 0.52 0.26 0.03 0.03 0.05 0.30 0.10 1.00 0.66 0.33 0.03 0.03 0.04 0.40 0.20 0.02 0.35 2.00 1.00 0.66 0.33 0.03 0.03 0.04 0.40 0.20 0.02 0.35 2.00 1.00 0.66

OH m kg OH OH OH OH kg kg kg OH OH OH OH kg kg kg OH OH OH OH kg kg m2 OH OH OH OH m3 kg Ltr m2 OH OH OH OH m3 kg Ltr m2 OH OH OH OH m3 kg Ltr m3 Lbr btg m2 OH OH OH OH m3 kg Ltr m3 Lbr btg m2 OH

Mandor Waterstop lebar 230 mm - 320 mm Pembesian dengan besi polos atau besi ulir Pekerja Tukang Besi Kepala Tukang Mandor Besi beton Kawat beton Pemasangan kabel presstressed polos/strands Pekerja Tukang Besi Kepala Tukang Mandor Besi beton Kawat beton Pemasangan jaring kawat baja (wiremesh) Pekerja Tukang Besi Kepala Tukang Mandor Jaring kawat baja dilas Kawat beton (K3) Pemasangan bekisting untuk pondasi Pekerja Tukang Kayu Kepala Tukang Mandor Papan kayu 3/20 Kelas III Paku 5 - 10 cm Minyak bekisting (K3) Pemasangan bekisting untuk sloof Pekerja Tukang Kayu Kepala Tukang Mandor Papan kayu 3/20 Kelas III Paku 5 - 10 cm Minyak bekisting (K3) Pemasangan bekisting untuk kolom Pekerja Tukang Kayu Kepala Tukang Mandor Papan kayu 3/20 Kelas III Paku Biasa 2" - 5" Minyak bekisting Balok kayu kelas II Plywood 120x240 tbl. 9 mm Dolken kayu Ø 8-10/400 cm (K3) Pemasangan bekisting untuk balok Pekerja Tukang Kayu Kepala Tukang Mandor Papan kayu 3/20 Kelas III Paku Biasa 2" - 5" Minyak bekisting Balok kayu kelas II Plywood 120x240 tbl. 9 mm Dolken kayu Ø 8-10/400 cm (K3) Pemasangan bekisting untuk lantai Pekerja

880 101,845 13,820 851 1,135 130 88 11,257 360 13,073 608 811 93 66 11,257 240 13,811 304 405 463 22 12,497 120 197,201 63,220 42,147 4,817 5,720 73,512 7,198 587 206,390 63,220 42,147 4,817 5,720 82,701 7,198 587 367,798 80,241 53,494 6,114 7,260 73,512 10,210 1,174 52,071 42,882 40,840 378,212 80,241 53,494 6,114 7,260 73,512 10,210 1,174 62,485 42,882 40,840 449,478 80,241

8/151

Software RAB Exarch xPro v2019

A.4.1.1.25

P-066

A.4.1.1.26

P-067

A.4.1.1.27

P-068

A.4.1.1.28

P-069

A.4.1.1.29

P-070

www.mitra-arsitek.com

0.33 0.03 0.03 0.04 0.40 0.20 0.02 0.35 6.00 1.00 0.66 0.33 0.03 0.03 0.03 0.40 0.20 0.02 0.35 3.00 4.00 1.00 0.66 0.33 0.03 0.03 0.03 0.40 0.15 0.02 0.35 2.00 1.00 0.15 0.05 0.01 0.01 0.03 0.60 0.50 1.00 5.30 0.28 1.30 1.05 0.26 0.27 0.20 1.50 0.40 157.50 2.25 336.00 0.54 0.81 1.00 5.65 0.28 1.56 1.40 0.32 0.28 0.27

OH OH OH m3 kg Ltr m3 Lbr btg m2 OH OH OH OH m3 kg Ltr m3 Lbr btg bh m2 OH OH OH OH m3 kg Ltr m3 Lbr btg m2 OH OH OH OH m3 kg btg m3 OH OH OH OH OH OH m3 kg Ltr kg kg kg m3 m3 m3 OH OH OH OH OH OH m3

Tukang Kayu Kepala Tukang Mandor Papan kayu 3/20 Kelas III Paku Biasa 2" - 5" Minyak bekisting Balok kayu kelas II Plywood 120x240 tbl. 9 mm Dolken kayu Ø 8-10/400 cm (K3) Pemasangan bekisting untuk dinding Pekerja Tukang Kayu Kepala Tukang Mandor Papan kayu 3/20 Kelas III Paku Biasa 2" - 5" Minyak bekisting Balok kayu kelas II Plywood 120x240 tbl. 9 mm Dolken kayu Ø 8-10/400 cm Penjaga jarak bekisting / spacer (K3) Pemasangan bekisting untuk tangga Pekerja Tukang Kayu Kepala Tukang Mandor Papan kayu 3/20 Kelas III Paku Biasa 2" - 5" Minyak bekisting Balok kayu kelas II Plywood 120x240 tbl. 9 mm Dolken kayu Ø 8-10/400 cm Pemasangan jembatan untuk pengecoran beton Pekerja Tukang Kayu Kepala Tukang Mandor Kayu kelas III (papan) Paku Biasa 2" - 5" Dolken kayu Ø 8-10/400 cm Membuat pondasi beton bertulang (150 kg besi + bekisting) Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor Papan kayu 3/20 Kelas III Paku Biasa 2" - 5" Minyak bekisting Besi beton Kawat beton Semen Pasir Beton Kerikil Membuat sloof beton bertulang (200 kg besi + bekisting) Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor Papan kayu 3/20 Kelas III

53,494 6,114 7,260 73,512 10,210 1,174 52,071 42,882 122,520 405,467 80,241 53,494 6,114 7,260 55,134 10,210 1,174 69,428 42,882 61,260 18,270 349,127 80,241 53,494 6,114 7,260 55,134 10,210 881 52,071 42,882 40,840 121,939 18,237 8,105 926 1,760 67,386 15,315 10,210 4,178,497 644,362 44,578 210,735 170,209 48,538 58,299 367,560 38,288 2,348 1,688,479 53,985 497,431 159,337 194,347 5,058,598 686,914 44,578 252,882 226,945 59,839 62,259 496,206

9/151

Software RAB Exarch xPro v2019

A.4.1.1.30

P-071

A.4.1.1.31

P-072

A.4.1.1.32

P-073

A.4.1.1.33

P-074

www.mitra-arsitek.com

2.00 0.60 210.00 3.00 336.00 0.54 0.81 1.00 7.05 0.28 1.65 2.10 0.40 0.35 0.40 4.00 2.00 315.00 4.50 336.00 0.54 0.81 0.15 3.50 20.00 1.00 6.35 0.28 1.65 1.40 0.33 0.32 0.32 3.20 1.60 210.00 3.00 336.00 0.54 0.81 0.14 2.80 16.00 1.00 5.30 0.28 1.30 1.05 0.27 0.27 0.32 3.20 1.60 157.50 2.25 336.00 0.54 0.81 0.12 2.80 32.00 1.00 0.53

kg Ltr kg kg kg m3 m3 m3 OH OH OH OH OH OH m3 kg Ltr kg kg kg m3 m3 M3 Lbr btg m3 OH OH OH OH OH OH m3 kg Ltr kg kg kg m3 m3 m3 Lbr btg m3 OH OH OH OH OH OH m3 kg Ltr kg kg kg m3 m3 m3 Lbr btg m3 OH

Paku Biasa 2" - 5" Minyak bekisting Besi beton Kawat beton Semen Pasir Beton Kerikil Membuat kolom beton bertulang (300 kg besi + bekisting) Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor Papan kayu 3/20 Kelas III Paku Biasa 2" - 5" Minyak bekisting Besi beton Kawat beton Semen Pasir Beton Kerikil Kayu kelas II balok Plywood 120x240 tbl. 9 mm Dolken kayu Ø 8-10/400 cm Membuat balok beton bertulang (200 kg besi + bekisting) Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor Papan kayu 3/20 Kelas III Paku Biasa 2" - 5" Minyak bekisting Besi beton Kawat beton Semen Pasir Beton Kerikil Kayu kelas II balok Plywood 120x240 tbl. 9 mm Dolken kayu Ø 8-10/400 cm Membuat kolom beton bertulang (150 kg besi + bekisting) Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor Papan kayu 3/20 Kelas III Paku Biasa 2" - 5" Minyak bekisting Besi beton Kawat beton Semen Pasir Beton Kerikil Kayu kelas II balok Plywood 120x240 tbl. 9 mm Dolken kayu Ø 8-10/400 cm Membuat dinding beton bertulang (150 kg besi + bekisting) Pekerja

51,050 3,522 2,251,305 71,981 497,431 159,337 194,347 8,143,585 857,123 44,578 267,471 340,418 74,660 77,659 735,120 102,100 11,742 3,376,958 107,971 497,431 159,337 194,347 459,450 428,820 408,400 6,394,831 772,018 44,578 267,471 226,945 61,692 69,959 588,096 81,680 9,393 2,251,305 71,981 497,431 159,337 194,347 428,820 343,056 326,720 5,814,083 644,362 44,578 210,735 170,209 49,094 58,299 588,096 81,680 9,393 1,688,479 53,985 497,431 159,337 194,347 367,560 343,056 653,440 5,045,737 64,436

10/151

Software RAB Exarch xPro v2019

A.4.1.1.34

P-075

A.4.1.1.35

P-076

A.4.1.1.36

P-077

www.mitra-arsitek.com

0.28 1.30 1.05 0.26 0.27 0.24 3.20 1.60 157.50 2.25 336.00 0.54 0.81 0.16 2.80 24.00 1.00 5.65 0.28 1.56 1.40 0.32 0.28 0.25 3.00 1.20 210.00 3.00 336.00 0.54 0.81 0.11 2.50 14.00 1.00 0.18 0.02 0.02 0.02 0.01 0.01 0.00 0.01 1.20 3.00 0.45 4.00 0.01 0.01 1.00 0.30 0.03 0.03 0.03 0.01 0.02 0.00 0.02 1.20 3.60 0.05 5.50 0.01

OH OH OH OH OH m3 kg Ltr kg kg kg m3 m3 m3 Lbr btg m3 OH OH OH OH OH OH m3 kg Ltr kg kg kg m3 m3 m3 Lbr btg m1 OH OH OH OH OH OH m3 kg Ltr kg kg kg m3 m3 m1 OH OH OH OH OH OH m3 kg Ltr kg kg kg m3

Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor Papan kayu 3/20 Kelas III Paku Biasa 2" - 5" Minyak bekisting Besi beton Kawat beton Semen Pasir Beton Kerikil Kayu kelas II balok Plywood 120x240 tbl. 9 mm Dolken kayu Ø 8-10/400 cm Membuat dinding beton bertulang (200 kg besi + bekisting) Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor Papan kayu 3/20 Kelas III Paku Biasa 2" - 5" Minyak bekisting Besi beton Kawat beton Semen Pasir Beton Kerikil Kayu kelas II balok Plywood 120x240 tbl. 9 mm Dolken kayu Ø 8-10/400 cm Membuat kolom praktis beton bertulang (11 x 11) cm Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor Papan kayu 3/20 Kelas III Paku Biasa 2" - 5" Minyak bekisting Besi beton Kawat beton Semen Pasir Beton Kerikil Membuat ring balok beton bertulang (10 x 15) cm Pekerja Tukang batu Tukang kayu Tukang besi Kepala tukang Mandor Papan kayu 3/20 Kelas III Paku Biasa 2" - 5" Minyak bekisting Besi beton Kawat beton Semen Pasir Beton

44,578 210,735 170,209 48,538 58,299 441,072 81,680 9,393 1,688,479 53,985 497,431 159,337 194,347 490,080 343,056 490,080 5,964,684 686,914 44,578 252,882 226,945 59,839 62,259 459,450 76,575 7,045 2,251,305 71,981 497,431 159,337 194,347 321,615 306,300 285,880 98,488 21,884 3,242 3,242 3,242 1,112 1,980 3,676 255 7,045 32,162 10,797 5,922 1,770 2,159 124,569 36,109 5,349 5,349 5,349 1,853 3,300 5,513 511 7,045 38,594 1,200 8,142 2,656

11/151

Software RAB Exarch xPro v2019

A.4.1.2.1.

P-078

A.4.1.2.2.

P-079

A.4.1.2.3.

P-080

A.4.1.2.4.

P-081

A.4.1.2.5.

P-082

A.4.1.2.6.

P-083

A.4.1.2.7.

P-084

www.mitra-arsitek.com

0.02 1.00 0.13 0.02 0.00 0.01 26.08 60.80 82.32 17.20 1.00 0.17 0.03 0.00 0.01 32.60 76.00 102.90 21.50 1.00 0.20 0.03 0.00 0.01 32.12 91.20 123.48 25.80 1.00 0.25 0.04 0.00 0.01 48.90 114.00 154.35 32.25 1.00 0.01 0.08 0.01 0.00 0.08 9.39 0.01 0.08 0.20 3.88 1.00 0.00 0.04 0.00 0.00 0.01 0.04 0.20 0.69 1.00 0.00 0.04 0.00 0.00 0.00

m3 m2 OH OH OH OH Kg Kg Kg L m2 OH OH OH OH Kg Kg Kg L m2 OH OH OH OH Kg Kg Kg L m2 OH OH OH OH Kg Kg Kg L m2 OH OH OH OH m3 Kg m3 Lbr L Bh m2 OH OH OH OH m3 Lbr L Bh m2 OH OH OH OH m3

Kerikil 3,599 (K3) Pembuatan lahan produksi tebal 8cm beton f’c 14,5 Mpa (K 175) 97,920 slump (120 ± 20) Pekerja 16,048 Tukang batu 3,566 Kepala tukang 371 Mandor 1,540 Semen 38,610 Pasir Beton (kg) 15,519 Kerikil (kg) 12,607 Air 9,659 (K3) Pembuatan lahan produksi tebal 10 cm beton f’c 14,5 Mpa (K 122,409 175) slump (120 ± 2 Pekerja 20,060 Tukang batu 4,539 Kepala tukang 556 Mandor 1,760 Semen 48,263 Pasir Beton (kg) 19,399 Kerikil (kg) 15,759 Air 12,073 (K3) Pembuatan lahan produksi tebal 12 cm beton f’c 14,5 Mpa (K 136,407 175) slump (120 ± 20 Pekerja 24,072 Tukang batu 5,349 Kepala tukang 556 Mandor 2,200 Semen 47,552 Pasir Beton (kg) 23,279 Kerikil (kg) 18,911 Air 14,488 (K3) Pembuatan lahan produksi tebal 15 cm beton f’c 14,5 Mpa (K 183,640 175) slump (120 ± 20 Pekerja 30,151 Tukang batu 6,646 Kepala tukang 741 Mandor 2,860 Semen 72,394 Pasir Beton (kg) 29,099 Kerikil (kg) 23,639 Air 18,110 Pembuatan bekisting untuk plat beton pracetak ( 5 kali pakai) 285,623 Pekerja 851 Tukang batu 12,320 Kepala tukang 1,482 Mandor 220 Lantai kerja tebal 10cm 61,260 Besi hollow 50.50.3 160,174 Kaso 5/7 Kelas II 17,868 Phel film 12mm 11,844 Minyak bekisting 1,174 Baut Ramset / Dina Bolt 18,430 Pembuatan bekisting untuk balok beton pracetak ( 10-12 kali pakai) 36,305 Pekerja 486 Tukang batu 6,160 Kepala tukang 741 Mandor 220 Kaso 5/7 Kelas II 17,868 Phel film 12mm 6,366 Minyak bekisting 1,174 Baut Ramset / Dina Bolt 3,290 Pembuatan bekisting untuk kolom beton pracetak (10-12 kali pakai) 34,646 Pekerja 486 Tukang batu 6,160 Kepala tukang 741 Mandor 220 Kaso 5/7 Kelas II 14,294

12/151

Software RAB Exarch xPro v2019

A.4.1.2.8.

P-085

A.4.1.2.9.

P-086

A.4.1.2.10.

P-087

A.4.1.2.11.

P-088

A.4.1.2.12.

P-089

A.4.1.2.13.

P-090

A.4.1.2.14.

P-091

A.4.1.2.15.

P-092

A.4.1.2.16.

P-093

www.mitra-arsitek.com

0.05 0.20 0.05 0.69 1.00 0.05 0.02 0.01 1.00 0.09 0.03 0.01 1.00 0.07 0.02 0.01 1.00 0.06 0.24 0.13 0.03 0.07 1.00 0.07 0.24 0.14 0.04 0.07 1.00 0.06 0.21 0.12 0.03 0.07 1.00 0.07 0.07 0.07 0.07 0.13 0.07 0.07 6.68 0.07 1.10 1.00 0.06 0.06 0.06 0.06 0.12 0.06 0.06 6.11 0.06 1.10 1.00 0.08 0.08 0.08 0.08 0.17 0.08

Lbr L Kg Bh bh OH OH OH bh OH OH OH bh OH OH OH bh OH OH OH OH OH bh OH OH OH OH OH bh OH OH OH OH OH bh OH OH OH OH OH OH OH L unit hari Buah hari bh OH OH OH OH OH OH OH L unit hari Buah hari bh OH OH OH OH OH OH

Phel film 12mm 7,106 Minyak bekisting 1,174 Paku Biasa 2" - 5" 1,174 Baut Ramset / Dina Bolt 3,290 Pemasangan dan membuka bekisting komponen plat beton pracetak 10,461 Pekerja 6,444 Tukang kayu 2,918 Mandor 1,100 Pemasangan dan membuka bekisting komponen balok beton pracetak 16,784 Pekerja 10,820 Tukang kayu 4,863 Mandor 1,100 Pemasangan dan membuka bekisting komponen Kolom beton pracetak 13,622 Pekerja 8,632 Tukang kayu 3,890 Mandor 1,100 Penuangan/menebar beton untuk komponen plat pracetak 90,442 Pekerja 7,781 Tukang batu 39,553 Tukang vibrator 20,749 Kepala Tukang 6,299 Mandor 16,060 Penuangan/menebar beton untuk komponen balok pracetak 92,903 Pekerja 8,389 Tukang batu 39,229 Tukang vibrator 22,370 Kepala Tukang 6,855 Mandor 16,060 Penuangan/menebar beton untuk komponen kolom pracetak 83,894 Pekerja 7,416 Tukang batu 34,528 Tukang vibrator 19,777 Kepala Tukang 6,114 Mandor 16,060 Ereksi komponen untuk pelat pracetak 566,907 Operator crane 9,309 Pembantu operator crane 7,758 Pekerja 8,146 Tukang batu 10,861 Tukang ereksi 21,722 Kepala tukang 12,413 Mandor 14,740 Solar 40,897 Sewa crane 83,782 Sewa pipe support 357,280 Ereksi komponen untuk balok pracetak 548,330 Operator crane 8,476 Pembantu operator crane 7,063 Pekerja 7,416 Tukang batu 9,888 Tukang ereksi 19,777 Kepala tukang 11,301 Mandor 13,420 Solar 37,430 Sewa crane 76,279 Sewa pipe support 357,280 Ereksi komponen untuk Kolom pracetak 974,289 Operator crane 11,533 Pembantu operator crane 9,610 Pekerja 10,091 Tukang batu 13,455 Tukang ereksi 26,909 Kepala tukang 15,377

13/151

Software RAB Exarch xPro v2019

A.4.1.2.17.

P-094

A.4.1.2.18.

P-095

A.4.1.2.19.

P-096

A.4.1.2.20.

P-097

A.4.1.2.21.

P-098

A.4.1.2.22.

P-099

A.4.1.2.23.

P-100

A.4.1.2.24.

P-101

A.4.2.1.1.

P-102

A.4.2.1.2.

P-103

A.4.2.1.3.

P-104

www.mitra-arsitek.com

0.08 8.28 0.08 2.20 1.00 0.02 0.04 0.02 0.02 1.90 0.02 1.00 0.02 0.04 0.02 0.02 1.90 0.02 1.00 0.02 0.04 0.02 0.02 1.90 0.02 1.00 ###### 650.00 350.00 1.00 ###### 400.00 1.00 0.37 0.07 0.04 1.00 0.15 0.15 0.02 0.01 0.01 0.00 0.26 1.00 0.22 0.22 0.22 0.01 1.00 0.06 0.06 0.01 0.00 1.15 1.00 0.06 0.06 0.01 0.00 1.15 1.00 0.00

OH L unit hari Buah hari bh OH OH OH OH L UH bh OH OH OH OH L UH bh OH OH OH OH L UH m3 Kg Kg L m3 Kg L titik OH OH OH titik OH OH OH OH m3 m3 Kg titik OH OH OH OH titik OH OH OH OH Kg kg OH OH OH OH Kg kg OH

Mandor Solar Sewa crane Sewa pipe support Melangsir komponen plat pracetak ( ± 20 m) Pekerja Tukang batu Operator crane Pembantu operator crane Solar Sewa crane Melangsir komponen balok pracetak ( ± 20 m) Pekerja Tukang batu Operator crane Pembantu operator crane Solar Sewa crane Melangsir komponen kolom pracetak ( ± 20 m) Pekerja Tukang batu Operator crane Pembantu operator crane Solar Sewa crane Grouting campuran Semen grout Screening Air Grouting tidak campuran Semen grout Air Upah melakukan grouting pada join pracetak Tukang batu Kepala tukang Mandor Pemasangan Bekisting join pracetak Pekerja Tukang kayu Kepala tukang Mandor Kaso 5/7 Kelas II Kayu papan kelas III Paku Biasa 2" - 5" Upah Join dengan Sling Pekerja Tukang kayu Tukang besi Mandor Pemasangan besi profil Pekerja Tukang Las Konstruksi Kepala tukang Mandor Besi Profil Pemasangan rangka kuda-kuda baja IWF Pekerja Tukang Las Konstruksi Kepala tukang Mandor Besi IWF Pengerjaan pekerjaan perakitan Pekerja

18,260 50,705 103,790 714,560 48,690 2,310 6,160 2,640 2,200 11,621 23,759 48,690 2,310 6,160 2,640 2,200 11,621 23,759 48,690 2,310 6,160 2,640 2,200 11,621 23,759 3,815,988 1,960,320 1,659,125 196,543 3,246,780 3,022,160 224,620 81,341 59,492 13,709 8,140 105,411 17,872 23,829 2,779 1,100 42,882 10,210 6,739 100,493 26,747 35,663 35,663 2,420 37,109 7,295 9,726 1,112 660 18,317 27,951 7,295 9,726 1,112 660 9,158 921 122

14/151

Software RAB Exarch xPro v2019

A.4.2.1.4.

P-105

A.4.2.1.5.

P-106

A.4.2.1.6.

P-107

A.4.2.1.7.

P-108

A.4.2.1.8.

P-109

A.4.2.1.9.

P-110

A.4.2.1.10.

P-111

A.4.2.1.11.

P-112

www.mitra-arsitek.com

0.00 0.00 0.00 0.01 0.00 0.01 1.00 1.05 1.05 0.11 0.05 15.00 32.80 0.05 1.00 0.40 0.20 0.02 0.02 4.00 3.00 0.40 1.70 1.00 0.65 0.65 0.07 0.03 4.76 4.52 20.00 1.00 1.20 1.20 0.12 0.01 1.00 1.00 0.44 0.44 0.04 0.02 1.00 1.00 0.08 0.80 0.08 0.00 1.00 1.00 1.00 1.00 0.10 0.05 1.00 1.00 0.04 0.04 0.00 0.00 1.10 2.00 0.06

OH OH OH Ltr Ltr Jam m2 OH OH OH OH Kg Kg Kg m1 OH OH OH OH Kg Ltr Ltr Jam m2 OH OH OH OH m m cm m2 OH OH OH OH m2 m2 OH OH OH OH m2 m2 OH OH OH OH m2 m2 OH OH OH OH m2 m1 OH OH OH OH m bh Tube

Tukang Besi Konstruksi 162 Kepala tukang 2 Mandor 11 Solar 61 Minyak pelumas 36 Sewa alat Perakitan Baja IWF 528 Pembuatan pintu besi plat baja tebal 2 mm rangkap, rangka baja877,862 siku Pekerja 127,657 Tukang Las 170,209 Kepala tukang 19,452 Mandor 11,440 Besi siku L 30.30.3 205,221 Besi plat baja 341,586 Kawat las listrik 2,297 Pengerjaan pengelasan dengan las listrik 391,884 Pekerja 48,631 Tukang Besi Konstruksi 32,421 Kepala tukang 3,705 Mandor 4,400 Kawat las listrik 183,780 Solar 18,378 Minyak pelumas 14,294 Sewa alat las 86,275 Pembuatan rangka jendela besi scuare tube (25 x 5) cm 631,917 Pekerja 79,026 Tukang Las 105,367 Kepala tukang 12,042 Mandor 7,040 Besi square tube 128,789 Besi lis kaca (1 x 1) cm 207,763 Pengelasan 91,890 Pemasangan pintu rolling door besi 925,519 Pekerja 145,893 Tukang Las 194,524 Kepala tukang 22,231 Mandor 1,320 Pintu gulung besi 561,550 Pemasangan pintu lipat (folding door) plastik/PVC 648,311 Pekerja 53,494 Tukang kayu 71,326 Kepala tukang 8,151 Mandor 4,840 Pintu lipat 510,500 Pemasangan sunscreen alluminium 410,360 Pekerja 9,726 Tukang Besi 129,683 Kepala tukang 14,821 Mandor 880 Sunscreen alumunium 255,250 Pemasangan rolling door alluminium 844,127 Pekerja 121,578 Tukang Besi 162,104 Kepala tukang 18,526 Mandor 11,000 Rolling door alluminium 530,920 Pemasangan kusen pintu alluminium 41,024 Pekerja 5,228 Tukang Besi 6,970 Kepala tukang 797 Mandor 462 Profil Alluminium "T" 13,702 Sekrup fixer 511 Sealant 13,355

15/151

Software RAB Exarch xPro v2019

A.4.2.1.12.

P-113

A.4.2.1.13.

P-114

A.4.2.1.14.

P-115

A.4.2.1.15.

P-116

A.4.2.1.16.

P-117

A.4.2.1.17.

P-118

A.4.2.1.18.

P-119

A.4.2.1.19

P-120

A.4.2.1.20.

P-121

www.mitra-arsitek.com

1.00 0.09 0.09 0.01 0.00 4.40 14.60 1.00 0.09 0.09 0.01 0.01 4.40 4.50 0.27 1.00 0.35 0.35 0.04 0.02 1.00 1.00 1.67 1.67 0.17 0.08 6.18 27.08 1.00 0.10 0.10 0.01 0.01 1.10 11.11 1.72 1.00 0.20 0.20 0.02 0.00 1.10 10.00 7.00 1.00 0.20 0.20 0.02 0.00 1.05 0.02 0.02 1.00 0.15 0.30 0.03 0.01 1.05 0.01 0.50 1.00 0.25 0.25

m2 OH OH OH OH m m m2 OH OH OH OH m m Tube m2 OH OH OH OH m2 m2 OH OH OH OH kg cm m2 OH OH OH OH m2 cm kg m2 OH OH OH OH m2 bh m m1 OH OH OH OH m kg m3 m1 OH OH OH OH m kg kg m2 OH OH

Pemasangan pintu alluminium strip lebar 8 cm 463,028 Pekerja 10,334 Tukang Besi 13,779 Kepala tukang 1,575 Mandor 924 Profil Alluminium "T" 54,807 Aluminium strip 381,609 Pemasangan pintu kaca rangka alluminium 2,407,199 Pekerja 10,334 Tukang Besi 13,779 Kepala tukang 1,667 Mandor 1,100 Pintu alluminium 2,021,580 Profil kaca 298,643 Sealant 60,096 Pemasangan venetions blinds dan Vertical blinds 186,308 Pekerja 42,552 Tukang Interior 56,736 Kepala tukang 6,484 Mandor 3,960 Venetions blinds dan vertical blinds (tirai) 76,575 Pemasangan terali besi strip (2 x 3) mm 726,199 Pekerja 203,035 Tukang Las 270,713 Kepala tukang 30,939 Mandor 18,260 Baja strip (0,2 x 2) cm 78,834 Pengelasan 124,419 Pemasangan kawat nyamuk 117,743 Pekerja 12,158 Tukang Kayu 16,210 Kepala tukang 1,853 Mandor 1,100 Kawat nyamuk 13,477 Pengelasan 51,045 Baja strip (0,2 x 2) cm 21,900 Pemasangan jendela nako & tralis 219,427 Pekerja 24,316 Tukang Kayu 32,421 Kepala tukang 3,705 Mandor 220 Jendela nako (rangka + kaca 5 mm) 61,771 Paku sekrup 7,658 Baja strip (0,2 x 2) cm 89,338 Pemasangan talang datar/ jurai seng bjls 28 lebar 90 cm 182,543 Pekerja 24,316 Tukang Atap 32,421 Kepala tukang 3,705 Mandor 220 Seng Gelombang 3" x 6" BJLS 28 53,603 Paku Biasa 2" - 5" 383 Kayu Papan kelas II 67,897 Pemasangan talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar134,425 45 cm Pekerja 18,237 Tukang Atap 48,631 Kepala tukang 5,558 Mandor 1,760 Seng Gelombang 3" x 6" BJLS 28 53,603 Paku Biasa 2" - 5" 255 Baja strip (0,2 x 2) cm 6,381 Pemasangan rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm,274,517 dinding partisi Pekerja 30,394 Tukang Besi 40,526

16/151

Software RAB Exarch xPro v2019

A.4.2.1.21.

P-122

A.4.2.1.22.

P-123

A.4.2.1.23.

P-124

A.4.2.1.24.

P-125

A.4.4.1.1.

P-126

A.4.4.1.2.

P-127

A.4.4.1.3.

P-128

A.4.4.1.4.

P-129

www.mitra-arsitek.com

0.03 0.01 3.50 1.00 1.00 0.35 0.35 0.04 0.02 4.00 1.00 1.00 0.76 0.76 0.08 0.04 4.05 0.10 1.00 0.73 0.73 0.07 0.04 4.05 0.10 1.00 0.20 0.45 0.01 0.05 3.72 28.00 2.00 5.40 0.12 0.10 1.00 0.60 0.20 0.02 0.03 140.00 43.50 0.08 1.00 0.60 0.20 0.02 0.03 140.00 32.95 0.09 1.00 0.60 0.20 0.02 0.03 140.00 26.55 0.09 1.00 0.60 0.20

OH OH M1 Ls m2 OH OH OH OH M1 Ls m2 OH OH OH OH m1 Ls m2 OH OH OH OH m1 Ls m2 OH OH OH OH M' bh bh M' M' Ls m2 OH OH OH OH bh Kg m3 m2 OH OH OH OH bh Kg m3 m2 OH OH OH OH bh Kg m3 m2 OH OH

Kepala Tukang 4,632 Mandor 2,860 Hollow 4/4 35,735 Assesoris (perkuatan, las dll) 160,370 Pemasangan rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm,310,943 plafon Pekerja 42,552 Tukang Besi 56,736 Kepala Tukang 6,484 Mandor 3,960 Hollow 4/4 40,840 Assesoris (perkuatan, las dll) 160,370 (K3) Pemasangan atap pelana rangka atap baja canai dingin profil 345,852 C75 Pekerja 92,448 Tukang Besi 123,264 Kepala Tukang 14,080 Mandor 8,360 Baja Ringan-C Truss 62,026 Alat Rangka Atap Baja Canai Dingin 45,675 (K3) Pemasangan atap jurai rangka atap baja canai dingin profil337,587 C75 Pekerja 89,238 Tukang Besi 118,984 Kepala Tukang 13,524 Mandor 8,140 Baja Ringan-C Truss 62,026 Alat Rangka Atap Baja Canai Dingin 45,675 Pemasangan PASANG KUDA-KUDA BAJA RINGAN + RENG UNTUK 279,412 ATAP GENT Pekerja 24,316 Tukang Besi 72,947 Kepala Tukang 1,853 Mandor 11,000 Baja Ringan-C Truss 56,972 Baut (Srew driver) 12,865 Baut Ramset / Dina Bolt 9,495 Baja Ringan- Reng Truss 38,594 Talang / Jurai Canai Dingin 5,697 Alat Rangka Atap Baja Canai Dingin 45,675 Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran 325,5521 SP : 2 PP Pekerja 72,947 Tukang Batu 32,421 Kepala Tukang 3,705 Mandor 6,600 Bata merah 128,646 Semen 64,400 Pasir Pasang 16,834 Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran 312,2481 SP : 3 PP Pekerja 72,947 Tukang Batu 32,421 Kepala Tukang 3,705 Mandor 6,600 Bata merah 128,646 Semen 48,781 Pasir Pasang 19,149 Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran 303,194 1 SP : 4 PP Pekerja 72,947 Tukang Batu 32,421 Kepala Tukang 3,705 Mandor 6,600 Bata merah 128,646 Semen 39,306 Pasir Pasang 19,570 Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran 298,648 1 SP : 5 PP Pekerja 72,947 Tukang Batu 32,421

17/151

Software RAB Exarch xPro v2019

A.4.4.1.5.

P-130

A.4.4.1.6

P-131

A.4.4.1.7

P-132

A.4.4.1.8

P-133

A.4.4.1.9

P-134

A.4.4.1.10

P-135

A.4.4.1.11

P-136

A.4.4.1.12

P-137

www.mitra-arsitek.com

0.02 0.03 140.00 22.20 0.10 1.00 0.60 0.20 0.02 0.03 140.00 18.50 0.12 1.00 0.60 0.20 0.02 0.03 140.00 10.08 0.03 0.09 1.00 0.30 0.10 0.01 0.02 70.00 18.95 0.04 1.00 0.30 0.10 0.01 0.02 70.00 14.37 0.04 1.00 0.30 0.10 0.01 0.02 70.00 11.50 0.04 1.00 0.30 0.10 0.01 0.02 70.00 9.68 0.05 1.00 0.30 0.10 0.01 0.02 70.00 8.32 0.05 1.00

OH OH bh Kg m3 m2 OH OH OH OH bh Kg m3 m2 OH OH OH OH bh Kg m3 m3 m2 OH OH OH OH bh Kg m3 m2 OH OH OH OH bh Kg m3 m2 OH OH OH OH m3 Kg m3 m2 OH OH OH OH bh Kg m3 m2 OH OH OH OH bh Kg m3 m2

Kepala Tukang 3,705 Mandor 6,600 Bata merah 128,646 Semen 32,866 Pasir Pasang 21,464 Pemasangan Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 297,3791 SP : 6 PP Pekerja 72,947 Tukang Batu 32,421 Kepala Tukang 3,705 Mandor 6,600 Bata merah 128,646 Semen 27,388 Pasir Pasang 25,672 Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran 288,631 1SP : 3KP : 10P Pekerja 72,947 Tukang Batu 32,421 Kepala Tukang 3,705 Mandor 6,600 Bata merah 128,646 Semen 14,923 Kapur 9,925 Pasir Pasang 19,465 Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran 158,2101SP : 2PP Pekerja 36,473 Tukang Batu 16,210 Kepala Tukang 1,853 Mandor 3,300 Bata merah 64,323 Semen 28,055 Pasir Pasang 7,996 Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran 151,8501SP : 3PP Pekerja 36,473 Tukang Batu 16,210 Kepala Tukang 1,853 Mandor 3,300 Bata merah 64,323 Semen 21,274 Pasir Pasang 8,417 Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran 148,2331SP :4PP Pekerja 36,473 Tukang Batu 16,210 Kepala Tukang 1,853 Mandor 3,300 Bata merah 64,323 Semen 17,025 Pasir Pasang 9,048 Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran 145,959 1 SP : 5 PP Pekerja 36,473 Tukang Batu 16,210 Kepala Tukang 1,853 Mandor 3,300 Bata merah 64,323 Semen 14,331 Pasir Pasang 9,469 Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran 144,788 1 SP : 6 PP Pekerja 36,473 Tukang Batu 16,210 Kepala Tukang 1,853 Mandor 3,300 Bata merah 64,323 Semen 12,317 Pasir Pasang 10,311 Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran 142,304 1SP : 8 PP

18/151

Software RAB Exarch xPro v2019

A.4.4.1.13

P-138

A.4.4.1.14

P-139

A.4.4.1.15

P-140

A.4.4.1.16

P-141

A.4.4.1.17

P-142

A.4.4.1.8

P-143

A.4.4.1.19

P-144

www.mitra-arsitek.com

0.30 0.10 0.01 0.02 70.00 6.50 0.05 1.00 0.30 0.10 0.01 0.02 70.00 4.50 0.02 0.05 1.00 0.30 0.10 0.01 0.02 70.00 0.02 0.02 0.02 1.00 0.30 0.10 0.01 0.02 70.00 0.01 0.01 0.03 1.00 0.35 0.15 0.02 0.02 12.50 30.32 0.73 0.28 1.00 0.35 0.15 0.02 0.02 12.50 24.26 0.77 0.28 1.00 0.32 0.12 0.01 0.02 12.50 22.74 0.55 0.28 1.00 0.32

OH OH OH OH bh Kg m3 m2 OH OH OH OH bh Kg m3 m3 m2 OH OH OH OH bh Kg m3 m3 m2 OH OH OH OH bh Kg m3 m3 m2 OH OH OH OH bh Kg m3 Kg m2 OH OH OH OH m3 Kg m3 Kg m2 OH OH OH OH bh Kg m3 Kg m2 OH

Pekerja 36,473 Tukang Batu 16,210 Kepala Tukang 1,853 Mandor 3,300 Bata merah 64,323 Semen 9,623 Pasir Pasang 10,521 Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran 144,757 1SP : 3KP :10PP Pekerja 36,473 Tukang Batu 16,210 Kepala Tukang 1,853 Mandor 3,300 Bata merah 64,323 Semen 6,662 Kapur 5,414 Pasir Pasang 10,521 Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran 132,482 1SM : 1KP :1PP Pekerja 36,473 Tukang Batu 16,210 Kepala Tukang 1,853 Mandor 3,300 Bata merah 64,323 Semen Warna 39 Kapur 6,497 Pasir Pasang 3,788 Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran 133,1341SM : 1KP :2PP Pekerja 36,473 Tukang Batu 16,210 Kepala Tukang 1,853 Mandor 3,300 Bata merah 64,323 Semen Warna 30 Kapur 5,053 Pasir Pasang 5,892 Pemasangan dinding conblock HB20 campuran 1SP : 3PP 415,218 Pekerja 42,552 Tukang Batu 24,316 Kepala Tukang 2,779 Mandor 3,960 Hollow Block 20 140,388 Semen 44,887 Pasir Pasang 153,192 Besi angkur Ø=8 mm 3,145 Pemasangan dinding conblock HB20 campuran 1SP:4PP 415,505 Pekerja 42,552 Tukang Batu 24,316 Kepala Tukang 2,779 Mandor 3,960 Hollow Block 20 140,388 Semen 35,916 Pasir Pasang 162,450 Besi angkur Ø=8 mm 3,145 Pemasangan dinding conblock HB15 campuran 1SP :3PP 305,983 Pekerja 38,905 Tukang Batu 19,452 Kepala Tukang 2,223 Mandor 3,520 Hollow Block 15 89,338 Semen 33,665 Pasir Pasang 115,735 Besi angkur Ø=8 mm 3,145 Pemasangan dinding conblock HB15 campuran 1SP :4PP 305,996 Pekerja 38,905

19/151

Software RAB Exarch xPro v2019

A.4.4.1.20

P-145

A.4.4.1.21

P-146

A.4.4.1.22

P-147

A.4.4.1.23

P-148

A.4.4.1.24

P-149

A.4.4.1.25

P-150

A.4.4.1.26

P-151

www.mitra-arsitek.com

0.12 0.01 0.02 12.50 18.20 0.58 0.28 1.00 0.30 0.10 0.01 0.02 12.50 15.16 0.36 0.28 1.00 0.30 0.10 0.01 0.02 12.50 12.13 0.39 0.28 1.00 0.30 0.10 0.01 0.02 30.00 11.00 0.04 1.00 0.30 0.10 0.01 0.02 30.00 11.00 0.04 1.00 0.30 0.15 0.02 0.02 70.00 14.00 0.03 1.00 0.35 0.13 0.01 0.00 0.08 2.77 0.10 1.00 0.35 0.13 0.01 0.00 0.10

OH OH OH m3 Kg m3 Kg m2 OH OH OH OH bh Kg m3 Kg m2 OH OH OH OH bh Kg m3 Kg m2 OH OH OH OH bh Kg m3 m2 OH OH OH OH bh Kg m3 m2 OH OH OH OH m3 Kg m3 m2 OH OH OH OH m3 Kg Ls m2 OH OH OH OH m3

Tukang Batu 19,452 Kepala Tukang 2,223 Mandor 3,520 Hollow Block 15 89,338 Semen 26,944 Pasir Pasang 122,469 Besi angkur Ø=8 mm 3,145 Pemasangan dinding conblock HB10 campuran 1SP :3PP 242,977 Pekerja 36,473 Tukang Batu 16,210 Kepala Tukang 1,853 Mandor 3,300 Hollow Block 10 82,956 Semen 22,444 Pasir Pasang 76,596 Besi angkur Ø=8 mm 3,145 Pemasangan dinding conblock HB10 campuran 1SP :4PP 243,541 Pekerja 36,473 Tukang Batu 16,210 Kepala Tukang 1,853 Mandor 3,300 Hollow Block 10 82,956 Semen 17,958 Pasir Pasang 81,646 Besi angkur Ø=8 mm 3,145 Pemasangan dinding terawang (rooster) 12x11x24 campuran 1SP 104,459 :3PP Pekerja 36,473 Tukang Batu 16,210 Kepala Tukang 1,853 Mandor 3,300 Bata rooster 22,973 Semen 16,285 Pasir Pasang 7,365 Pemasangan dinding terawang (rooster) 12x11x24 campuran 1SP 127,431 :4PP Pekerja 36,473 Tukang Batu 16,210 Kepala Tukang 1,853 Mandor 3,300 Bata berongga 45,945 Semen 16,285 Pasir Pasang 7,365 Pemasangan dinding bata berongga ekspose 12x11x24 campuran147,930 1 SP : 3 PP Pekerja 36,473 Tukang Batu 24,316 Kepala Tukang 2,779 Mandor 3,300 Bata rooster 53,603 Semen 20,726 Pasir Pasang 6,734 Pemasangan dinding bata ringan tebal 7,5 cm dengan mortar siap334,686 pakai B. Pekerja 42,552 Tukang Batu 21,073 Kepala Tukang 2,408 Mandor 660 Bata ringan tebal 7,5 cm 215,544 Mortar siap pakai 31,132 Bahan Pasang Dinding Bata Ringan 21,315 Pemasangan dinding bata ringan tebal 10 cm dengan mortar siap428,371 pakai Pekerja 42,552 Tukang Batu 21,073 Kepala Tukang 2,408 Mandor 660 Bata ringan tebal 7,5 cm 287,393

20/151

Software RAB Exarch xPro v2019

A.4.4.2.1.

P-152

A.4.4.2.2.

P-153

A.4.4.2.3.

P-154

A.4.4.2.4.

P-155

A.4.4.2.5.

P-156

A.4.4.2.6.

P-157

A.4.4.2.7.

P-158

A.4.4.2.8.

P-159

A.4.4.2.9.

P-160

www.mitra-arsitek.com

4.40 0.10 1.00 0.30 0.15 0.02 0.02 15.50 0.02 1.00 0.30 0.15 0.02 0.02 10.22 0.02 1.00 0.30 0.15 0.02 0.02 7.78 0.02 1.00 0.30 0.15 0.02 0.02 6.24 0.02 1.00 0.30 0.15 0.02 0.02 5.18 0.03 1.00 0.30 0.15 0.02 0.02 4.42 0.03 1.00 0.30 0.15 0.02 0.02 3.94 0.03 1.00 0.30 0.15 0.02 0.02 3.46 0.03 1.00 0.36 0.12 0.01 0.02

Kg Ls m2 OH OH OH OH Kg m3 m2 OH OH OH OH Kg m3 m2 OH OH OH OH Kg m3 m2 OH OH OH OH Kg m3 m2 OH OH OH OH Kg m3 m2 OH OH OH OH Kg m3 m2 OH OH OH OH Kg m3 m2 OH OH OH OH Kg m3 m2 OH OH OH OH

Mortar siap pakai Peralatan Pasang Dinding Bata Ringan Pemasangan plesteran 1SP : 1PP tebal 15 mm. Pekerja Tukang Batu Kepala Tukang Mandor Semen Pasir Pasang Pemasangan plesteran 1SP : 2PP tebal 15 mm. Pekerja Tukang Batu Kepala Tukang Mandor Semen Pasir Pasang Pemasangan plesteran 1SP : 3PP tebal 15mm. Pekerja Tukang Batu Kepala Tukang Mandor Semen Pasir Pasang Pemasangan plesteran 1SP : 4PP tebal 15 mm Pekerja Tukang Batu Kepala Tukang Mandor Semen Pasir Pasang Pemasangan plesteran 1SP : 5PP tebal 15 mm Pekerja Tukang Batu Kepala Tukang Mandor Semen Pasir Pasang Pemasangan plesteran 1SP : 6PP tebal 15 mm. Pekerja Tukang Batu Kepala Tukang Mandor Semen Pasir Pasang Pemasangan plesteran 1SP : 7PP tebal 15 mm Pekerja Tukang Batu Kepala Tukang Mandor Semen Pasir Pasang Pemasangan plesteran 1SP : 8PP tebal 15 mm Pekerja Tukang Batu Kepala Tukang Mandor Semen Pasir Pasang Pemasangan plesteran 1SP : 1/2KP : 3PP tebal 15 mm Pekerja Tukang Batu Kepala Tukang Mandor

49,416 24,868 93,187 36,473 24,316 2,779 3,300 22,953 3,367 86,212 36,473 24,316 2,779 3,300 15,136 4,209 83,220 36,473 24,316 2,779 3,300 11,512 4,840 81,156 36,473 24,316 2,779 3,300 9,238 5,050 80,014 36,473 24,316 2,779 3,300 7,675 5,471 79,087 36,473 24,316 2,779 3,300 6,538 5,682 78,587 36,473 24,316 2,779 3,300 5,827 5,892 78,087 36,473 24,316 2,779 3,300 5,116 6,102 82,167 43,768 19,452 2,223 3,960

21/151

Software RAB Exarch xPro v2019

A.4.4.2.10.

P-161

A.4.4.2.11.

P-162

A.4.4.2.12.

P-163

A.4.4.2.13.

P-164

A.4.4.2.14.

P-165

A.4.4.2.15.

P-166

A.4.4.2.16.

P-167

A.4.4.2.17.

P-168

A.4.4.2.18.

P-169

www.mitra-arsitek.com

5.76 0.00 0.01 1.00 0.36 0.12 0.01 0.02 3.00 0.01 0.02 1.00 0.36 0.12 0.01 0.02 0.01 0.01 0.01 1.00 0.36 0.12 0.01 0.02 0.01 0.01 0.02 1.00 0.40 0.20 0.02 0.02 13.63 0.03 1.00 0.26 0.20 0.02 0.01 10.37 0.03 1.00 0.40 0.20 0.02 0.02 8.32 0.03 1.00 0.40 0.20 0.02 0.02 6.91 0.04 1.00 0.40 0.20 0.02 0.02 5.89 0.04 1.00

Kg m3 m3 m2 OH OH OH OH Kg m3 m3 m2 OH OH OH OH m3 m3 m3 m2 OH OH OH OH m3 m3 m3 m2 OH OH OH OH Kg m3 m2 OH OH OH OH Kg m3 m2 OH OH OH OH Kg m3 m2 OH OH OH OH Kg m3 m2 OH OH OH OH Kg m3 m2

Semen Kapur Pasang Pasir Pasang Pemasangan plesteran 1SP : 2KP : 8PP tebal 15 mm Pekerja Tukang Batu Kepala Tukang Mandor Semen Kapur Pasang Pasir Pasang Pemasangan plesteran 1SM : 1KP : 1PP tebal 15 mm Pekerja Tukang Batu Kepala Tukang Mandor Semen Kapur Pasang Pasir Pasang Pemasangan plesteran 1SM : 1KP : 2PP tebal 15 mm Pekerja Tukang Batu Kepala Tukang Mandor Semen Kapur Pasang Pasir Pasang Pemasangan plesteran 1SP : 1PP tebal 20 mm Pekerja Tukang Batu Kepala Tukang Mandor Semen Pasir Pasang Pemasangan plesteran 1SP : 3PP tebal 20 mm Pekerja Tukang Batu Kepala Tukang Mandor Semen Pasir Pasang Pemasangan plesteran 1SP : 4PP tebal 20 mm. Pekerja Tukang Batu Kepala Tukang Mandor Semen Pasir Pasang Pemasangan plesteran 1SP : 5PP tebal 20 mm Pekerja Tukang Batu Kepala Tukang Mandor Semen Pasir Pasang Pemasangan plesteran 1SP : 6PP tebal 20 mm Pekerja Tukang Batu Kepala Tukang Mandor Semen Pasir Pasang Pemasangan plesteran 1SM : 1KP : 2PP tebal 20 mm

8,527 1,501 2,736 80,555 43,768 19,452 2,223 3,960 4,441 2,501 4,209 75,813 43,768 19,452 2,223 3,960 13 4,503 1,894 76,072 43,768 19,452 2,223 3,960 10 3,502 3,156 115,460 48,631 32,421 3,705 4,840 20,181 5,682 92,469 31,610 32,421 3,705 2,860 15,349 6,523 108,648 48,631 32,421 3,705 4,840 12,317 6,734 107,195 48,631 32,421 3,705 4,840 10,233 7,365 105,889 48,631 32,421 3,705 4,840 8,717 7,575 106,376

22/151

Software RAB Exarch xPro v2019

A.4.4.2.19.

P-170

A.4.4.2.20.

P-171

A.4.4.2.21.

P-172

A.4.4.2.22.

P-173

A.4.4.2.23.

P-174

A.4.4.2.24

P-175

A.4.4.2.25.

P-176

A.4.4.2.26.

P-177

A.4.4.2.27.

P-178

www.mitra-arsitek.com

0.44 0.22 0.02 0.02 0.01 0.01 0.02 1.00 0.15 0.08 0.01 0.01 5.18 0.03 1.00 0.08 0.40 0.04 0.00 0.50 0.01 1.00 0.45 0.23 0.02 0.02 10.00 15.00 1.00 0.45 0.23 0.02 0.02 10.00 15.00 1.00 0.30 0.10 0.01 0.02 4.32 0.01 1.00 0.15 0.08 0.01 0.01 3.11 1.00 0.07 0.04 0.00 0.00 1.60 1.00 0.30 0.15 0.02 0.02 6.34 0.01 1.00 0.20

OH OH OH OH m3 m3 m3 m2 OH OH OH OH Kg m3 m1 OH OH OH OH Kg m3 m2 OH OH OH OH Kg Kg m2 OH OH OH OH Kg Kg m2 OH OH OH OH Kg m3 m2 OH OH OH OH Kg m2 OH OH OH OH Kg m2 OH OH OH OH Kg m3 m2 OH

Pekerja 53,494 Tukang Batu 35,663 Kepala Tukang 4,076 Mandor 4,840 Semen 13 Kapur Pasang 4,503 Pasir Pasang 3,788 Pemasangan berapen 1SP : 5PP tebal 15 mm 46,782 Pekerja 18,237 Tukang Batu 12,158 Kepala Tukang 1,482 Mandor 1,760 Semen 7,675 Pasir Pasang 5,471 Pemasangan plesteran skoning 1SP : 3PP lebar 10 cm 86,334 Pekerja 9,726 Tukang Batu 64,841 Kepala Tukang 7,410 Mandor 880 Semen 740 Pasir Pasang 2,736 Pemasangan plesteran granit 1SP : 2 granit tebal 1cm 345,034 Pekerja 54,710 Tukang Batu 36,473 Kepala Tukang 4,261 Mandor 5,060 Semen 14,805 Batu granit 229,725 Pemasangan plesteran traso 1SP : 2 traso tebal 1cm 152,065 Pekerja 54,710 Tukang Batu 36,473 Kepala Tukang 4,261 Mandor 5,060 Semen 14,805 Batu teraso 36,756 Pemasangan plesteran ciprat 1SP : 2PP 65,494 Pekerja 36,473 Tukang Batu 16,210 Kepala Tukang 1,853 Mandor 3,300 Semen 6,396 Pasir Pasang 1,263 Pemasangan finishing siar pasangan bata merah 38,238 Pekerja 18,237 Tukang Batu 12,158 Kepala Tukang 1,482 Mandor 1,760 Semen 4,601 Pemasangan Finishing siar pasangan conblock ekspose 18,174 Pekerja 8,510 Tukang Batu 5,674 Kepala Tukang 741 Mandor 880 Semen 2,369 Pemasangan finishing siar pasangan batu kali, campuran 1SP : 2PP. 78,779 Pekerja 36,473 Tukang Batu 24,316 Kepala Tukang 2,779 Mandor 3,300 Semen 9,386 Pasir Pasang 2,525 Pemasangan acian. 49,390 Pekerja 24,316

23/151

Software RAB Exarch xPro v2019

A.4.4.2.28.

P-179

A.4.4.2.29.

P-180

A.4.4.3.1.

P-181

A.4.4.3.2.

P-182

A.4.4.3.3.

P-183

A.4.4.3.4.

P-184

A.4.4.3.5.

P-185

A.4.4.3.6.

P-186

www.mitra-arsitek.com

0.10 0.01 0.01 3.25 1.00 0.30 0.15 0.02 0.02 16.00 1.00 0.20 0.10 0.01 0.01 3.60 1.00 0.25 0.13 0.01 0.01 6.63 9.80 0.05 1.00 0.25 0.13 0.01 0.01 11.87 10.00 0.05 1.00 0.27 0.14 0.01 0.01 26.50 10.40 0.05 1.00 0.25 0.13 0.01 0.01 6.63 9.80 1.30 0.05 1.00 0.26 0.13 0.01 0.01 11.87 10.00 1.50 0.05 1.00 0.27 0.14 0.01 0.01

OH OH OH Kg m2 OH OH OH OH Kg m2 OH OH OH OH Kg m2 OH OH OH OH Bh kg M3 m2 OH OH OH OH Bh kg M3 m2 OH OH OH OH Bh kg M3 m2 OH OH OH OH Bh kg Kg M3 m2 OH OH OH OH Bh kg Kg M3 m2 OH OH OH OH

Tukang Batu Kepala Tukang Mandor Semen Pemasangan plesteran dengan mortar siap pakai (MSP) Pekerja Tukang Batu Kepala Tukang Mandor Semen Pemasangan Acian dengan mortar siap pakai (MSP) Pekerja Tukang Batu Kepala Tukang Mandor Semen Pemasangan lantai ubin PC abu-abu ukuran 40cm x40cm Pekerja Tukang Batu Kepala tukang Mandor ubin PC abu-abu ukuran 40cm x40cm Semen Pasir Pasang Pemasangan lantai ubin PC abu-abu ukuran 30cm x30 cm Pekerja Tukang Batu Kepala tukang Mandor ubin PC abu-abu ukuran 30cm x30 cm Semen Pasir Pasang Pemasangan lantai ubin PC abu-abu ukuran 20cm x20 cm Pekerja Tukang Batu Kepala tukang Mandor ubin PC abu-abu ukuran 20cm x20 cm Semen Pasir Pasang Pemasangan lantai ubin warna ukuran 40cm x40 cm Pekerja Tukang Batu Kepala tukang Mandor ubin warna ukuran 40cm x40 cm Semen Semen Warna Pasir Pasang Pemasangan lantai ubin warna ukuran 30cm x30cm Pekerja Tukang Batu Kepala tukang Mandor ubin warna ukuran 30cm x30cm Semen Semen Warna Pasir Pasang Pemasangan lantai ubin warna ukuran 20cm x20cm Pekerja Tukang Batu Kepala tukang Mandor

16,210 1,853 2,200 4,811 90,555 36,473 24,316 2,779 3,300 23,687 49,908 24,316 16,210 1,853 2,200 5,330 120,519 30,394 20,263 2,408 2,860 40,615 14,508 9,469 134,736 30,394 20,263 2,408 2,860 54,537 14,805 9,469 166,419 32,826 21,884 2,594 3,080 81,170 15,397 9,469 180,845 30,394 20,263 2,408 2,860 98,154 14,508 2,787 9,469 236,933 31,610 21,073 2,408 2,860 151,491 14,805 3,216 9,469 399,873 32,826 21,884 2,594 3,080

24/151

Software RAB Exarch xPro v2019

A.4.4.3.7.

P-187

A.4.4.3.8.

P-188

A.4.4.3.9.

P-189

A.4.4.3.10.

P-190

A.4.4.3.11.

P-191

A.4.4.3.12.

P-192

A.4.4.3.13.

P-193

www.mitra-arsitek.com

26.50 10.40 1.62 0.05 1.00 0.25 0.13 0.01 0.01 6.63 9.80 1.30 0.05 1.00 0.26 0.13 0.01 0.01 11.87 10.00 1.50 0.05 1.00 0.25 0.13 0.01 0.01 6.63 9.80 1.30 0.05 1.00 0.26 0.13 0.01 0.01 11.87 10.00 1.50 0.05 1.00 0.25 0.13 0.01 0.01 6.63 9.80 1.30 0.05 1.00 0.26 0.13 0.01 0.01 11.87 10.00 1.50 0.05 1.00 0.24 0.12 0.01 0.01

Bh kg Kg M3 m2 OH OH OH OH Bh kg Kg M3 m2 OH OH OH OH Bh kg Kg M3 m2 OH OH OH OH Bh kg Kg M3 m2 OH OH OH OH Bh kg Kg M3 m2 OH OH OH OH Bh kg Kg M3 m2 OH OH OH OH Bh kg Kg M3 m2 OH OH OH OH

ubin warna ukuran 20cm x20cm Semen Semen Warna Pasir Pasang Pemasangan lantai ubin teraso ukuran 40cm x40cm Pekerja Tukang Batu Kepala tukang Mandor ubin teraso ukuran 40cm x40cm Semen Semen Warna Pasir Pasang Pemasangan lantai ubin teraso ukuran 30cm x30cm Pekerja Tukang Batu Kepala tukang Mandor ubin teraso ukuran 30cm x30cm Semen Semen Warna Pasir Pasang Pemasangan lantai ubin granit ukuran 40cm x40cm Pekerja Tukang Batu Kepala tukang Mandor ubin granit ukuran 40cm x40cm Semen Semen Warna Pasir Pasang Pemasangan lantai ubin granit ukuran 30cm x30cm Pekerja Tukang Batu Kepala tukang Mandor ubin granit ukuran 30cm x30cm Semen Semen Warna Pasir Pasang Pemasangan lantai ubin teralux marmer ukuran 40cm x40cm Pekerja Tukang Batu Kepala tukang Mandor ubin teralux marmer ukuran 40cm x40cm Semen Semen Warna Pasir Pasang Pemasangan lantai ubin teralux ukuran 30cm x30cm Pekerja Tukang Batu Kepala tukang Mandor ubin teralux ukuran 30cm x30cm Semen Semen Warna Pasir Pasang Pemasangan lantai ubin teralux marmer ukuran 60cm x60cm Pekerja Tukang Batu Kepala tukang Mandor

311,150 15,397 3,473 9,469 187,614 30,394 20,263 2,408 2,860 104,923 14,508 2,787 9,469 249,052 31,610 21,073 2,408 2,860 163,610 14,805 3,216 9,469 218,075 30,394 20,263 2,408 2,860 135,385 14,508 2,787 9,469 279,350 31,610 21,073 2,408 2,860 193,908 14,805 3,216 9,469 163,922 30,394 20,263 2,408 2,860 81,231 14,508 2,787 9,469 255,112 31,610 21,073 2,408 2,860 169,670 14,805 3,216 9,469 222,821 29,179 19,452 2,223 2,640

25/151

Software RAB Exarch xPro v2019

A.4.4.3.14.

P-194

A.4.4.3.15.

P-195

A.4.4.3.16.

P-196

A.4.4.3.17.

P-197

A.4.4.3.18.

P-198

A.4.4.3.19.

P-199

A.4.4.3.20.

P-200

www.mitra-arsitek.com

3.10 9.60 1.50 0.05 1.00 0.25 0.13 0.01 0.01 6.63 9.80 1.30 0.05 1.00 0.26 0.13 0.01 0.01 11.87 10.00 1.50 0.05 1.00 0.09 0.09 0.01 0.01 5.30 1.65 0.00 1.00 0.09 0.09 0.01 0.01 3.53 1.24 0.00 1.00 0.09 0.09 0.01 0.01 2.65 1.24 0.00 1.00 0.09 0.09 0.01 0.01 2.65 1.14 0.10 0.00 1.00 0.09 0.09 0.01 0.01 3.53 1.14 0.10

Bh kg Kg M3 m2 OH OH OH OH Bh kg Kg M3 m2 OH OH OH OH Bh kg Kg M3 m1 OH OH OH OH Bh kg M3 m1 OH OH OH OH Bh kg M3 m1 OH OH OH OH Bh kg M3 m1 OH OH OH OH Bh kg Kg M3 m1 OH OH OH OH Bh kg Kg

ubin teralux marmer ukuran 60cm x60cm Semen Semen Warna Pasir Pasang Pemasangan lantai ubin teralux marmer ukuran 40cm x40cm Pekerja Tukang Batu Kepala tukang Mandor ubin teralux marmer ukuran 40cm x40cm Semen Semen Warna Pasir Pasang Pemasangan lantai ubin teralux marmer ukuran 30cm x30cm Pekerja Tukang Batu Kepala tukang Mandor ubin teralux marmer ukuran 30cm x30cm Semen Semen Warna Pasir Pasang Pemasangan plint ubin Pc abu-abu ukuran 15cm x 20cm Pekerja Tukang Batu Kepala tukang Mandor Plint ubin Pc abu-abu ukuran 15cm x 20cm Semen Pasir Pasang Pemasangan plint ubin Pc abu-abu ukuran 10cm x 30cm Pekerja Tukang Batu Kepala tukang Mandor Plint ubin Pc abu-abu ukuran 10cm x 30cm Semen Pasir Pasang Pemasangan plint ubin Pc abu-abu ukuran 10cm x 40cm Pekerja Tukang Batu Kepala tukang Mandor Plint ubin Pc abu-abu ukuran 10cm x 40cm Semen Pasir pasang Pemasangan plint ubin warna ukuran 10cm x 20cm Pekerja Tukang Batu Kepala tukang Mandor Plint ubin warna ukuran 10cm x 20cm Semen Semen Warna Pasir Pasang Pemasangan plint ubin warna ukuran 10cm x 30cm Pekerja Tukang Batu Kepala tukang Mandor Plint ubin warna ukuran 10cm x 30cm Semen Semen Warna

142,430 14,212 3,216 9,469 326,383 30,394 20,263 2,408 2,860 243,692 14,508 2,787 9,469 497,497 31,610 21,073 2,408 2,860 412,055 14,805 3,216 9,469 66,757 10,942 14,589 1,667 1,100 35,173 2,443 842 48,786 10,942 14,589 1,667 1,100 18,021 1,836 631 47,000 10,942 14,589 1,667 1,100 16,234 1,836 631 43,007 10,942 14,589 1,667 1,100 12,175 1,688 214 631 48,853 10,942 14,589 1,667 1,100 18,021 1,688 214

26/151

Software RAB Exarch xPro v2019

A.4.4.3.21.

P-201

A.4.4.3.22.

P-202

A.4.4.3.23.

P-203

A.4.4.3.24.

P-204

A.4.4.3.25.

P-205

A.4.4.3.26.

P-206

A.4.4.3.27.

P-207

www.mitra-arsitek.com

0.00 1.00 0.09 0.09 0.01 0.01 2.65 1.14 0.10 0.00 1.00 0.09 0.09 0.01 0.01 3.53 1.14 0.10 0.00 1.00 0.09 0.09 0.01 0.01 2.65 1.14 0.10 0.00 1.00 0.09 0.09 0.01 0.01 2.65 1.14 0.10 0.00 1.00 0.09 0.09 0.01 0.01 3.53 1.14 0.10 0.00 1.00 0.09 0.09 0.01 0.01 2.63 1.14 0.10 0.00 1.00 0.09 0.09 0.01 0.01 3.53 1.14 0.10

M3 m1 OH OH OH OH Bh kg Kg M3 m1 OH OH OH OH Bh kg Kg M3 m1 OH OH OH OH Bh kg Kg M3 m1 OH OH OH OH Bh kg Kg M3 m1 OH OH OH OH Bh kg Kg M3 m1 OH OH OH OH Bh kg Kg M3 m1 OH OH OH OH Bh kg Kg

Pasir Pasang Pemasangan plint ubin warna ukuran 10cm x 40cm Pekerja Tukang Batu Kepala tukang Mandor Plint ubin warna ukuran 10cm x 40cm Semen Semen Warna Pasir Pasang Pemasangan plint ubin teraso ukuran 10cm x 30cm Pekerja Tukang Batu Kepala tukang Mandor Plint ubin teraso ukuran 10cm x 30cm Semen Semen Warna Pasir Pasang Pemasangan plint ubin teraso ukuran 10cm x 40cm Pekerja Tukang Batu Kepala tukang Mandor Plint ubin teraso ukuran 10cm x 40cm Semen Semen Warna Pasir Pasang Pemasangan plint ubin granit ukuran 10cm x 40cm Pekerja Tukang Batu Kepala tukang Mandor Plint ubin granit ukuran 10cm x 40cm Semen Semen Warna Pasir Pasang Pemasangan plint ubin granit ukuran 10cm x 30cm Pekerja Tukang Batu Kepala tukang Mandor Plint ubin granit ukuran 10cm x 30cm Semen Semen Warna Pasir Pasang Pemasangan plint ubin teralux kerang ukuran 10cm x 40cm Pekerja Tukang Batu Kepala tukang Mandor Plint ubin teralux kerang ukuran 10cm x 40cm Semen Semen Warna Pasir Pasang Pemasangan plint ubin teralux kerang ukuran 10cm x 30cm Pekerja Tukang Batu Kepala tukang Mandor Plint ubin teralux kerang ukuran 10cm x 30cm Semen Semen Warna

631 48,419 10,942 14,589 1,667 1,100 17,587 1,688 214 631 48,853 10,942 14,589 1,667 1,100 18,021 1,688 214 631 49,772 10,942 14,589 1,667 1,100 18,940 1,688 214 631 68,711 10,942 14,589 1,667 1,100 37,879 1,688 214 631 77,686 10,942 14,589 1,667 1,100 46,854 1,688 214 631 49,629 10,942 14,589 1,667 1,100 18,797 1,688 214 631 53,898 10,942 14,589 1,667 1,100 23,066 1,688 214

27/151

Software RAB Exarch xPro v2019

A.4.4.3.28.

P-208

A.4.4.3.29.

P-209

A.4.4.3.30.

P-210

A.4.4.3.31.

P-211

A.4.4.3.32.

P-212

A.4.4.3.33.

P-213

A.4.4.3.34.

P-214

A.4.4.3.35.

P-215

www.mitra-arsitek.com

0.00 1.00 0.09 0.09 0.01 0.01 1.70 1.14 0.10 0.00 1.00 0.09 0.09 0.01 0.01 2.65 1.14 0.10 0.00 1.00 0.09 0.09 0.01 0.01 3.53 1.14 0.10 0.00 1.00 0.36 0.18 0.02 0.02 0.04 0.10 1.00 0.70 0.35 0.04 0.04 1.05 8.19 0.05 2.75 1.00 0.70 0.35 0.04 0.04 106.00 8.19 0.05 3.20 1.00 0.70 0.35 0.04 0.04 10.00 8.19 0.05 1.62 1.00

M3 m1 OH OH OH OH Bh kg Kg M3 m1 OH OH OH OH Bh kg Kg M3 m1 OH OH OH OH Bh kg Kg M3 m2 OH OH OH OH M3 Kg m2 OH OH OH OH m2 Kg M3 Kg m2 OH OH OH OH Bh Kg M3 Kg m2 OH OH OH OH Bh Kg M3 Kg m2

Pasir Pasang 631 Pemasangan plint ubin teralux marmer ukuran 10cm x 60cm 60,339 Pekerja 10,942 Tukang Batu 14,589 Kepala tukang 1,667 Mandor 1,100 plint ubin teralux marmer ukuran 10cm x 60cm 29,507 Semen 1,688 Semen Warna 214 Pasir Pasang 631 Pemasangan plint ubin teralux marmer ukuran 10cm x 40cm 71,417 Pekerja 10,942 Tukang Batu 14,589 Kepala tukang 1,667 Mandor 1,100 Plint ubin teralux marmer ukuran 10cm x 40cm 40,585 Semen 1,688 Semen Warna 214 Pasir Pasang 631 Pemasangan plint ubin teralux marmer ukuran 10cm x 30cm 81,290 Pekerja 10,942 Tukang Batu 14,589 Kepala tukang 1,667 Mandor 1,100 Plint ubin teralux marmer ukuran 10cm x 30cm 50,458 Semen 1,688 Semen Warna 214 Pasir Pasang 631 Pemasangan lantai teraso cor di tempat, tebal 3cm 80,621 Pekerja 43,768 Tukang Batu 29,179 Kepala tukang 3,335 Mandor 3,960 Teraso cor di tempat, tebal 3cm 165 Semen warna 214 Pemasangan lantai keramik artistik 10cm x 20cm 263,919 Pekerja 85,104 Tukang Batu 56,736 Kepala tukang 6,484 Mandor 7,700 keramik artistik 10cm x 20cm 80,404 Semen 12,125 Pasir pasang 9,469 Semen warna 5,896 Pemasangan lantai keramik artistik 10cm x 10cm atau 5cm x 20cm 455,045 Pekerja 85,104 Tukang Batu 56,736 Kepala tukang 6,484 Mandor 7,700 keramik artistik 10cm x 10cm atau 5cm x 20cm 270,565 Semen 12,125 Pasir Pasang 9,469 Semen Warna 6,861 Pemasangan lantai keramik ukuran 33cm x 33cm 257,667 Pekerja 85,104 Tukang Batu 56,736 Kepala tukang 6,484 Mandor 7,700 keramik ukuran 33cm x 33cm 76,575 Semen 12,125 Pasir Pasang 9,469 Semen Warna 3,473 Pemasangan lantai keramik ukuran 30cm x 30cm 256,230

28/151

Software RAB Exarch xPro v2019

A.4.4.3.36.

P-216

A.4.4.3.37.

P-217

A.4.4.3.38.

P-218

A.4.4.3.39.

P-219

A.4.4.3.40.

P-220

A.4.4.3.41.

P-221

A.4.4.3.42.

P-222

www.mitra-arsitek.com

0.70 0.35 0.04 0.04 11.87 10.00 0.05 1.50 1.00 0.70 0.35 0.04 0.04 26.50 10.40 0.05 1.62 1.00 1.05 0.53 0.05 0.05 33.00 9.80 0.05 4.37 1.00 0.70 0.35 0.04 0.04 11.87 14.15 0.04 2.00 1.00 0.09 0.09 0.04 0.01 5.30 1.14 0.00 0.03 1.00 0.09 0.09 0.04 0.01 10.60 1.14 0.00 0.05 1.00 0.09 0.09 0.04 0.01 5.30 0.57 0.00 0.01 1.00

OH OH OH OH Bh Kg M3 Kg m2 OH OH OH OH Bh Kg M3 Kg m2 OH OH OH OH Bh Kg M3 Kg m2 OH OH OH OH Bh Kg M3 Kg m1 OH OH OH OH Bh Kg M3 Kg m1 OH OH OH OH Bh Kg M3 Kg m1 OH OH OH OH Bh Kg M3 Kg m1

Pekerja Tukang Batu Kepala tukang Mandor keramik ukuran 30cm x 30cm Semen Pasir Pasang Semen Warna Pemasangan lantai keramik ukuran 20cm x 20cm Pekerja Tukang Batu Kepala tukang Mandor Keramik ukuran 20cm x 20cm Semen Pasir Pasang Semen Warna keramik ukuran 10cm x 33cm untuk variasi/border Pekerja Tukang Batu Kepala tukang Mandor Ubin keramik Semen Pasir Pasang Semen Warna Pemasangan lantai keramik mozaik ukuran 30cm x 30cm Pekerja Tukang Batu Kepala tukang Mandor Keramik mozaik ukuran 30cm x 30cm Semen Pasir Pasang Semen Warna Pemasangan plint keramik ukuran 10cm x 20cm Pekerja Tukang Batu Kepala tukang Mandor Plint keramik ukuran 10cm x 20cm Semen Pasir Pasang Semen Warna Pemasangan plint keramik ukuran 10cm x 10cm Pekerja Tukang Batu Kepala tukang Mandor Plint keramik ukuran 10cm x 10cm Semen Pasir Pasang Semen Warna Pemasangan plint keramik ukuran 5cm x 20cm Pekerja Tukang Batu Kepala tukang Mandor Plint keramik ukuran 5cm x 20cm Semen Pasir Pasang Semen Warna Pemasangan plint internal cove artistik 5cm x 5cm x 20cm

85,104 56,736 6,484 7,700 72,716 14,805 9,469 3,216 306,118 85,104 56,736 6,484 7,700 121,754 15,397 9,469 3,473 772,982 127,657 85,104 9,819 11,660 505,395 14,508 9,469 9,370 334,899 85,104 56,736 6,484 7,700 145,431 20,948 8,207 4,288 70,662 10,942 14,589 6,484 1,100 35,173 1,688 631 54 96,148 10,942 14,589 6,484 1,100 60,607 1,688 631 107 58,654 10,942 14,589 6,484 1,100 24,351 844 316 28 261,900

29/151

Software RAB Exarch xPro v2019

A.4.4.3.43.

P-223

A.4.4.3.44.

P-224

A.4.4.3.45.

P-225

A.4.4.3.46.

P-226

A.4.4.3.47.

P-227

A.4.4.3.48.

P-228

A.4.4.3.49.

P-229

www.mitra-arsitek.com

0.75 0.75 0.08 0.04 5.30 1.14 0.00 0.10 1.00 0.70 0.35 0.04 0.04 1.06 8.19 0.05 0.65 1.00 0.17 0.17 0.02 0.01 1.05 0.35 1.00 0.12 0.12 0.01 0.01 1.05 0.35 1.00 0.70 0.35 0.04 0.04 1.05 0.60 1.00 0.70 0.35 0.04 0.04 1.05 0.60 1.00 1.00 0.50 0.05 0.05 86.00 9.30 0.02 1.50 1.00 0.90 0.45 0.05 0.05 53.00 9.30 0.02 2.75

OH OH OH OH Bh Kg M3 Kg m2 OH OH OH OH Bh Kg M3 Kg m2 OH OH OH OH m2 Kg m2 OH OH OH OH m2 Kg m2 OH OH OH OH m2 Kg m2 OH OH OH OH m2 Kg m2 OH OH OH OH Bh Kg M3 Kg m2 OH OH OH OH Bh Kg M3 Kg

Pekerja Tukang Batu Kepala tukang Mandor Plint internal cove artistik 5cm x 5cm x 20cm Semen Pasir Pasang Semen Warna Pemasangan lantai marmer ukuran 100cm x 100cm Pekerja Tukang Batu Kepala tukang Mandor marmer ukuran 100cm x 100cm Semen Pasir Pasang Semen Warna Pemasangan lantai karpet Pekerja Tukang Kayu Kepala tukang Mandor Karpet Lem kayu Pemasangan underlayer (pelapis bawah karpet) Pekerja Tukang Kayu Kepala tukang Mandor underlayer (pelapis bawah karpet) Lem kayu Pemasangan lantai parquet kayu Pekerja Tukang Kayu Kepala tukang Mandor Parquet kayu Lem kayu Pemasangan lantai kayu gymfloor Pekerja Tukang Kayu Kepala tukang Mandor Parquet kayu gymfloor Lem kayu Pemasangan dinding porslen 11cm x 11cm Pekerja Tukang Batu Kepala tukang Mandor Porselen (11 x 11) cm Semen Pasir Pasang Semen Warna Pemasangan dinding porslen 10cm x 20cm Pekerja Tukang Batu Kepala tukang Mandor Porselen Dinding 10x20 Semen Pasir Pasang Semen Warna

91,183 121,578 13,895 8,360 24,351 1,688 631 214 241,784 85,104 56,736 6,484 7,700 62,771 12,125 9,469 1,394 669,069 20,668 27,558 3,149 1,980 611,069 4,646 72,784 14,589 19,452 2,223 1,320 30,553 4,646 178,997 85,104 56,736 6,484 7,700 15,009 7,964 474,883 85,104 56,736 6,484 7,700 310,895 7,964 814,404 121,578 81,052 9,263 11,000 570,739 13,768 3,788 3,216 494,620 109,420 72,947 8,337 9,900 270,565 13,768 3,788 5,896

30/151

Software RAB Exarch xPro v2019

A.4.4.3.50.

P-230

A.4.4.3.51.

P-231

A.4.4.3.52.

P-232

A.4.4.3.53.

P-233

A.4.4.3.54.

P-234

A.4.4.3.55.

P-235

A.4.4.3.56.

P-236

www.mitra-arsitek.com

1.00 0.90 0.45 0.05 0.05 26.00 9.30 0.02 1.94 1.00 0.90 0.45 0.05 0.05 1.10 9.30 0.02 2.75 1.00 0.90 0.45 0.05 0.05 1.05 9.30 0.02 2.90 1.00 0.90 0.45 0.05 0.05 1.05 9.30 0.02 2.75 1.00 0.90 0.45 0.05 0.05 1.10 9.30 0.02 1.94 1.00 1.30 0.65 0.07 0.07 1.06 12.44 0.03 0.65 3.03 1.00 1.00 0.50 0.05 0.05 63.00 12.44 0.03

m2 OH OH OH OH Bh Kg M3 Kg m2 OH OH OH OH m2 Kg M3 Kg m2 OH OH OH OH m2 Kg M3 Kg m2 OH OH OH OH m2 Kg M3 Kg m2 OH OH OH OH m2 Kg M3 Kg m2 OH OH OH OH Bh Kg M3 Kg Bh m2 OH OH OH OH Bh Kg M3

Pemasangan dinding porslen 20cm x 20cm Pekerja Tukang Batu Kepala tukang Mandor Porselen Dinding 20x20 Semen Pasir Pasang Semen Warna Pemasangan dinding keramik artistik 10cm x 20cm Pekerja Tukang Batu Kepala tukang Mandor Keramik Dinding artistik Semen Pasir Pasang Semen Warna Pemasangan dinding keramik artistik 5cm x 20cm Pekerja Tukang Batu Kepala tukang Mandor Keramik Dinding artistik Semen Pasir Pasang Semen Warna Pemasangan dinding keramik 10cm x 20cm Pekerja Tukang Batu Kepala tukang Mandor keramik Dinding 10cm x 20cm Semen Pasir Pasang Semen Warna Pemasangan dinding keramik 20cm x 20cm Pekerja Tukang Batu Kepala tukang Mandor keramik Dinding 20cm x 20cm Semen Pasir Pasang Semen Warna Pemasangan dinding marmer 100cm x 100cm Pekerja Tukang Batu Kepala tukang Mandor marmer ukuran 100cm x 100cm Semen Semen Pasir Pasang Semen Warna Pemasangan dinding bata pelapis 3cm x 7cm x 24cm Pekerja Tukang Batu Kepala tukang Mandor Bata pelapis Dinding 3cm x 7cm x 24cm Semen Pasir Pasang

408,141 109,420 72,947 8,337 9,900 185,822 13,768 3,788 4,160 298,180 109,420 72,947 8,337 9,900 74,125 13,768 3,788 5,896 295,132 109,420 72,947 8,337 9,900 70,755 13,768 3,788 6,218 315,180 109,420 72,947 8,337 9,900 91,124 13,768 3,788 5,896 292,512 109,420 72,947 8,337 9,900 70,194 13,768 3,788 4,160 514,260 158,051 105,367 12,042 14,300 62,771 18,417 37 136,778 6,497 307,141 121,578 81,052 9,263 11,000 54,675 18,417 5,261

31/151

Software RAB Exarch xPro v2019

A.4.4.3.57.

P-237

A.4.4.3.58.

P-238

A.4.4.3.59.

P-239

A.4.4.3.60.

P-240

A.4.4.3.61.

P-241

A.4.4.3.62.

P-242

A.4.4.3.63.

P-243

A.4.4.3.64.

P-244

A.4.4.3.65.

P-245

www.mitra-arsitek.com

2.75 1.00 0.70 0.35 0.04 0.04 1.10 11.75 0.04 1.00 0.70 0.35 0.04 0.04 1.10 11.75 0.04 1.00 0.15 0.15 0.02 0.01 11.87 0.35 1.00 0.35 0.18 0.02 0.00 2.20 0.25 1.00 0.12 0.12 0.01 0.01 5.00 1.00 0.08 0.08 0.01 0.00 1.76 0.08 1.00 0.12 0.12 0.01 0.01 0.00 0.05 1.00 0.25 0.25 0.03 0.00 1.01 0.05 0.10 1.00 0.25 0.25 0.03

Kg m2 OH OH OH OH Bh Kg M3 m2 OH OH OH OH m2 Kg M3 m2 OH OH OH OH Bh Kg m2 OH OH OH OH m Kg m2 OH OH OH OH Kg m1 OH OH OH OH Bh Kg m1 OH OH OH OH M3 Kg m2 OH OH OH OH M2 M3 % m2 OH OH OH

Semen Warna Pemasangan dinding batu paras Pekerja Tukang Batu Kepala tukang Mandor Batu paras Dinding Semen Pasir Pasang Pemasangan dinding batu tempel hitam Pekerja Tukang Batu Kepala tukang Mandor Batu alam / tempel Semen Pasir Pasang Pemasangan lantai vynil ukuran 30cm x 30cm Pekerja Tukang Batu Kepala tukang Mandor Vinyl Lem kayu Pemasangan wallpaper lebar 50 cm Pekerja Tukang Batu Kepala tukang Mandor Wallpaper Lem Putih Pemasangan floor harderner Pekerja Tukang Batu Kepala tukang Mandor Floor hardener Pemasangan plint vynil 15cm x 30cm Pekerja Tukang Batu Kepala tukang Mandor plint vynil 15cm x 30cm Lem kayu Pemasangan plint kayu tebal 2 cm lebar 10 cm Pekerja Tukang Batu Kepala tukang Mandor Kayu Papan kelas I Paku sekrup Pemasangan paving block natural tebal 6 cm Pekerja Tukang Kayu Kepala tukang Mandor Paving block 6 cm Pasir beton Bahan Kerja Paving Blok Pemasangan paving block natural tebal 8 cm Pekerja Tukang Kayu Kepala tukang

5,896 270,633 85,104 56,736 6,484 7,700 89,848 17,395 7,365 480,653 85,104 56,736 6,484 7,700 299,868 17,395 7,365 278,367 18,237 24,316 2,779 1,760 226,630 4,646 156,956 42,552 28,368 3,149 440 78,617 3,829 56,729 14,589 19,452 2,223 1,320 19,144 71,042 9,726 12,968 1,482 880 44,924 1,062 56,690 14,589 19,452 2,223 1,320 19,067 38 251,384 30,394 40,526 4,632 550 139,213 14,753 21,315 121,681 30,394 40,526 4,632

32/151

Software RAB Exarch xPro v2019

A.4.4.3.66.

P-246

A.4.4.3.67.

P-247

A.4.4.3.68.

P-248

A.4.5.1.1.

P-249

A.4.5.1.2.

P-250

A.4.5.1.3.

P-251

A.4.5.1.4.

P-252

A.4.5.1.5.

P-253

A.4.5.1.6.

P-254

www.mitra-arsitek.com

0.00 1.01 0.07 0.10 1.00 0.25 0.25 0.03 0.00 1.01 0.05 0.10 1.00 0.25 0.25 0.03 0.00 1.01 0.07 0.10 1.00 0.15 0.08 0.01 0.01 0.37 20.00 1.00 0.03 0.07 0.01 0.00 1.10 0.01 1.00 0.12 0.12 0.01 0.01 12.00 0.05 1.00 0.12 0.12 0.01 0.01 5.80 0.05 1.00 0.10 0.10 0.01 0.01 1.50 0.05 1.00 0.10 0.10 0.01 0.01 0.38 0.03 1.00

OH M2 M3 % m2 OH OH OH OH M2 M3 % m2 OH OH OH OH M2 M3 % m2 OH OH OH OH Lbr bh m2 OH OH OH OH m2 kg m2 OH OH OH OH Lbr kg m2 OH OH OH OH Lbr kg m2 OH OH OH OH Lbr kg m2 OH OH OH OH Lbr kg m2

Mandor 550 Paving block 8 cm natural 3,609 Pasir beton 20,655 Bahan Kerja Paving Blok 21,315 Pemasangan paving block berwarna tebal 6 cm 246,228 Pekerja 30,394 Tukang Kayu 40,526 Kepala tukang 4,632 Mandor 550 Paving block 6cm berwarna 134,057 Pasir beton 14,753 Bahan Kerja Paving Blok 21,315 Pemasangan paving block berwarna tebal 8 cm 231,505 Pekerja 30,394 Tukang Kayu 40,526 Kepala tukang 4,632 Mandor 550 Paving block 8 cm berwarna 113,433 Pasir beton 20,655 Bahan Kerja Paving Blok 21,315 Pemasangan Aluminium Composite Panel 156,764 Pekerja 18,237 Tukang Besi 12,158 Kepala Tukang 1,482 Mandor 1,760 Aluminium Composite Panel 112,917 Screw 10,210 Pemasangan langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 107,203 mm Pekerja 3,647 Tukang kayu 11,347 Kepala tukang 1,297 Mandor 880 Asbes semen 89,848 Paku tripleks 184 Pemasangan langit-langit akustik ukuran (30 x 30) cm 467,324 Pekerja 14,589 Tukang kayu 19,452 Kepala tukang 2,223 Mandor 1,320 Akustik ukuran 30 x 30 cm 428,820 Paku tripleks 919 Pemasangan langit-langit akustik ukuran (30 x 60) cm 364,203 Pekerja 14,589 Tukang kayu 19,452 Kepala tukang 2,223 Mandor 1,320 Akustik ukuran 30 x 60 cm 325,699 Paku tripleks 919 Pemasangan langit-langit akustik ukuran (60 x 120) cm 228,272 Pekerja 12,158 Tukang kayu 16,210 Kepala tukang 1,853 Mandor 1,100 Akustik Uk. 60 cm x 120 cm 196,032 Paku tripleks 919 Pemasangan langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 46,038 4 mm & 6 Pekerja 12,158 Tukang kayu 16,210 Kepala tukang 1,853 Mandor 1,100 Tripleks 14,166 Paku tripleks 551 Pemasangan langit-langit lambrisering kayu, tebal 9 mm 304,352

33/151

Software RAB Exarch xPro v2019

A.4.5.1.7.

P-255

A.4.5.1.8.

P-256

A.4.5.1.9.

P-257

A.4.5.1.10.

P-258

A.4.5.1.10.

P-259

A.4.5.2.1.

P-260

A.4.5.2.2.

P-261

A.4.5.2.3.

P-262

A.4.5.2.4.

P-263

www.mitra-arsitek.com

0.80 0.80 0.08 0.04 0.02 0.01 1.00 0.10 0.05 0.01 0.01 0.36 0.11 1.00 0.50 0.50 0.05 0.03 3.60 0.15 1.05 1.50 1.00 0.05 0.05 0.01 0.00 1.05 0.01 1.00 0.15 0.25 0.03 0.08 1.05 18.00 1.00 0.10 0.05 0.01 0.01 1.05 6.00 1.00 0.15 0.08 0.01 0.01 25.00 1.00 0.15 0.08 0.01 0.01 25.00 1.00 0.15 0.08 0.01 0.01 12.00 1.00 0.40

OH OH OH OH m3 kg m2 OH OH OH OH Lbr kg m2 OH OH OH OH m kg bh Lbr m1 OH OH OH OH m kg m2 OH OH OH OH m2 bh m2 OH OH OH OH M' bh m2 OH OH OH OH Bh m2 OH OH OH OH Bh m2 OH OH OH OH Bh m1 OH

Pekerja 97,262 Tukang kayu 129,683 Kepala tukang 14,821 Mandor 8,800 Kayu Papan 3/20 53,603 Paku tripleks 184 Pemasangan langit-langit gypsum board ukuran (120x240x9) mm,54,707 tebal 9 mm Pekerja 12,158 Tukang kayu 8,105 Kepala tukang 926 Mandor 1,100 Gypsum board 9 mm 32,333 Paku sekrup 84 Pemasangan langit-langit akustik ukuran (60 x 120) cm berikut 407,747 rangka alluminium Pekerja 60,789 Tukang kayu 81,052 Kepala tukang 9,263 Mandor 5,500 Profil Alluminium "T" 44,842 Kawat dia 4 mm 5,284 Baut Ramset / Dina Bolt 4,985 Akustik Uk. 60 cm x 120 cm 196,032 Pemasangan list langit-langit kayu profil 19,102 Pekerja 6,079 Tukang Kayu 8,105 Kepala tukang 926 Mandor 660 List kayu profil 3,077 Paku Biasa 2" - 5" 255 Pemasangan Plafond PVC 205,936 Pekerja 18,237 Tukang Kayu 40,526 Kepala tukang 4,632 Mandor 16,500 Plafond PVC 116,853 Screw 9,189 Pemasangan List Plafond PVC 61,802 Pekerja 12,158 Tukang Kayu 8,105 Kepala tukang 926 Mandor 1,100 List PVC (setara Shunda Plafon,LS 301-1 Min.Silver Metalic) 36,450 Screw 3,063 Pemasangan atap genteng palentong kecil 97,356 Pekerja 18,237 Tukang Kayu 12,158 Kepala tukang 1,389 Mandor 1,760 Genteng palentong 63,813 Pemasangan atap genteng kodok glazuur 71,924 Pekerja 18,237 Tukang Kayu 12,158 Kepala tukang 1,482 Mandor 1,760 Genteng kodok 38,288 Pemasangan atap genteng palentong besar/super 52,014 Pekerja 18,237 Tukang Kayu 12,158 Kepala tukang 1,482 Mandor 1,760 Genteng kodok 18,378 Pemasangan bubung genteng palentong 129,299 Pekerja 48,631

34/151

Software RAB Exarch xPro v2019

A.4.5.2.5.

P-264

A.4.5.2.6.

P-265

A.4.5.2.7.

P-266

A.4.5.2.8.

P-267

A.4.5.2.9.

P-268

A.4.5.2.10.

P-269

A.4.5.2.11.

P-270

A.4.5.2.12.

P-271

www.mitra-arsitek.com

0.20 0.02 0.00 5.00 8.00 0.03 1.00 0.40 0.20 0.02 0.00 5.00 8.00 0.03 1.00 0.40 0.20 0.02 0.00 4.00 8.00 0.03 1.00 0.14 0.07 0.01 0.01 0.60 0.05 1.00 0.14 0.08 0.01 0.01 0.50 0.12 1.00 0.14 0.08 0.01 0.01 0.60 0.12 1.00 0.14 0.07 0.01 0.01 0.60 0.12 1.00 0.14 0.07 0.01 0.01 0.75 0.12 1.00 0.14 0.07 0.01 0.01 0.35

OH OH OH Bh Kg M3 m1 OH OH OH OH Bh Kg M3 m1 OH OH OH OH Bh Kg M3 m2 OH OH OH OH Lbr Kg m2 OH OH OH OH Lbr Kg m2 OH OH OH OH Lbr Kg m2 OH OH OH OH Lbr Kg m2 OH OH OH OH Lbr Kg m2 OH OH OH OH Lbr

Tukang Kayu Kepala tukang Mandor Genteng bubung Semen Pasir Pasang Pemasangan bubung genteng kodok glazuur Pekerja Tukang Kayu Kepala tukang Mandor Genteng bubung Semen Pasir Pasang Pemasangan bubung genteng palentong besar Pekerja Tukang Kayu Kepala tukang Mandor Genteng bubung Semen Pasir Pasang Pemasangan roof light fibreglass 90x180 Pekerja Tukang Kayu Kepala tukang Mandor Rooflight 90x180 Paku Biasa 2" - 5" Pemasangan atap asbes gelombang 0,92mx2,5m x 5mm Pekerja Tukang Kayu Kepala tukang Mandor Asbes gelombang 92x250 Paku Pancing 60 x 230 Pemasangan atap asbes gelombang 0,92mx2,25m x 5mm Pekerja Tukang Kayu Kepala tukang Mandor Asbes gelombang 92x250 Paku Pancing 60 x 230 Pemasangan atap asbes gelombang 0,92mx2,00m x 5mm Pekerja Tukang Kayu Kepala tukang Mandor Asbes gelombang 92x250 Paku Pancing 60 x 230 Pemasangan atap asbes gelombang 0,92mx1.80m x 5mm Pekerja Tukang Kayu Kepala tukang Mandor Asbes gelombang 92x250 Paku Pancing 60 x 230 Pemasangan atap asbes gelombang 1.05mx3.00m x 4mm Pekerja Tukang Kayu Kepala tukang Mandor Asbes gelombang 92x250

32,421 3,705 440 25,525 11,844 6,734 129,299 48,631 32,421 3,705 440 25,525 11,844 6,734 124,194 48,631 32,421 3,705 440 20,420 11,844 6,734 105,507 17,021 10,861 1,297 1,540 73,512 1,276 88,514 17,021 12,158 1,482 1,760 54,624 1,470 99,439 17,021 12,158 1,482 1,760 65,548 1,470 98,223 17,021 11,347 1,297 1,540 65,548 1,470 114,610 17,021 11,347 1,297 1,540 81,935 1,470 70,912 17,021 11,347 1,297 1,540 38,236

35/151

Software RAB Exarch xPro v2019

A.4.5.2.13.

P-272

A.4.5.2.14.

P-273

A.4.5.2.15.

P-274

A.4.5.2.16.

P-275

A.4.5.2.17.

P-276

A.4.5.2.18.

P-277

A.4.5.2.19.

P-278

A.4.5.2.20.

P-279

A.4.5.2.21.

P-280

www.mitra-arsitek.com

0.12 1.00 0.14 0.07 0.01 0.01 0.42 0.12 1.00 0.14 0.07 0.01 0.01 0.44 0.12 1.00 0.14 0.07 0.01 0.01 0.51 0.12 1.00 0.14 0.07 0.01 0.01 0.80 0.12 1.00 0.14 0.07 0.01 0.01 0.37 0.12 1.00 0.14 0.07 0.01 0.01 0.38 0.12 1.00 0.14 0.07 0.01 0.01 0.46 0.12 1.00 0.14 0.07 0.01 0.01 0.49 0.12 1.00 0.14 0.07 0.01 0.01 0.57

Kg m2 OH OH OH OH Lbr Kg m2 OH OH OH OH Lbr Kg m2 OH OH OH OH Lbr Kg m2 OH OH OH OH Lbr Kg m2 OH OH OH OH Lbr Kg m2 OH OH OH OH Lbr Kg m2 OH OH OH OH Lbr Kg m2 OH OH OH OH Lbr Kg m2 OH OH OH OH Lbr

Paku Pancing 60 x 230 Pemasangan atap asbes gelombang 1.05mx2.70m x 4mm Pekerja Tukang Kayu Kepala tukang Mandor Asbes gelombang 92x250 Paku Pancing 60 x 230 Pemasangan atap asbes gelombang 1.05mx2.40m x 4mm Pekerja Tukang Kayu Kepala tukang Mandor Asbes gelombang 92x250 Paku Pancing 60 x 230 Pemasangan atap asbes gelombang 1.05mx2.10m x 4mm Pekerja Tukang Kayu Kepala tukang Mandor Asbes gelombang 92x250 Paku Pancing 60 x 230 Pemasangan atap asbes gelombang 1.05mx1.50m x 4mm Pekerja Tukang Kayu Kepala tukang Mandor Asbes gelombang 92x250 Paku Pancing 60 x 230 Pemasangan atap asbes gelombang 1.08mx3.00m x 6mm Pekerja Tukang Kayu Kepala tukang Mandor Asbes gelombang 92x250 Paku Pancing 60 x 230 Pemasangan atap asbes gelombang 1.08mx2.70m x 6mm Pekerja Tukang Kayu Kepala tukang Mandor Asbes gelombang 92x250 Paku Pancing 60 x 230 Pemasangan atap asbes gelombang 1.08mx2.40m x 6mm Pekerja Tukang Kayu Kepala tukang Mandor Asbes gelombang 92x250 Paku Pancing 60 x 230 Pemasangan atap asbes gelombang 1.08mx2.10m x 6mm Pekerja Tukang Kayu Kepala tukang Mandor Asbes gelombang 92x250 Paku Pancing 60 x 230 Pemasangan atap asbes gelombang 1.08mx1.80m x 6mm Pekerja Tukang Kayu Kepala tukang Mandor Asbes gelombang 92x250

1,470 78,559 17,021 11,347 1,297 1,540 45,884 1,470 80,744 17,021 11,347 1,297 1,540 48,069 1,470 88,391 17,021 11,347 1,297 1,540 55,716 1,470 120,073 17,021 11,347 1,297 1,540 87,398 1,470 73,097 17,021 11,347 1,297 1,540 40,421 1,470 74,189 17,021 11,347 1,297 1,540 41,514 1,470 82,929 17,021 11,347 1,297 1,540 50,254 1,470 86,206 17,021 11,347 1,297 1,540 53,531 1,470 94,946 17,021 11,347 1,297 1,540 62,271

36/151

Software RAB Exarch xPro v2019

A.4.5.2.22.

P-281

A.4.5.2.23.

P-282

A.4.5.2.24.

P-283

A.4.5.2.25.

P-284

A.4.5.2.26.

P-285

A.4.5.2.27.

P-286

A.4.5.2.28.

P-287

A.4.5.2.29.

P-288

A.4.5.2.30.

P-289

www.mitra-arsitek.com

0.12 1.00 0.08 0.13 0.01 0.00 2.40 6.00 1.00 0.08 0.13 0.01 0.00 2.10 6.00 1.00 0.08 0.13 0.01 0.00 2.05 6.00 1.00 0.08 0.13 0.01 0.00 1.20 6.00 1.00 0.08 0.13 0.01 0.00 1.20 6.00 1.00 0.08 0.13 0.01 0.00 1.20 6.00 1.00 0.10 0.15 0.01 0.00 1.10 6.00 1.00 0.08 0.13 0.01 0.00 1.10 6.00 1.00 0.20 0.10 0.01 0.01 11.00

Kg m1 OH OH OH OH Lbr Bh m1 OH OH OH OH Lbr Bh m1 OH OH OH OH Lbr Bh m1 OH OH OH OH Lbr Bh m1 OH OH OH OH Lbr Bh m1 OH OH OH OH Lbr Bh m1 OH OH OH OH Lbr Bh m1 OH OH OH OH Lbr Bh m2 OH OH OH OH Bh

Paku Pancing 60 x 230 Pemasangan bubung stel gelombang 0,92m Pekerja Tukang Kayu Kepala tukang Mandor Bubung stel gel. Paku sekrup Pemasangan bubung stel gelombang 1,05m Pekerja Tukang Kayu Kepala tukang Mandor Bubung stel gel. Paku sekrup Pemasangan bubung stel gelombang 1,08m Pekerja Tukang Kayu Kepala tukang Mandor Bubung stel gel. Paku sekrup Pemasangan Nok paten 0,92m Pekerja Tukang Kayu Kepala tukang Mandor Nok Paten Paku sekrup Pemasangan Nok paten 1,05m Pekerja Tukang Kayu Kepala tukang Mandor Nok Paten Paku sekrup Pemasangan Nok paten 1,08m Pekerja Tukang Kayu Kepala tukang Mandor Nok Paten Paku sekrup Pemasangan nok stel rata 0,92m Pekerja Tukang Kayu Kepala tukang Mandor Nok Paten Paku sekrup Pemasangan nok stel rata 1,05m Pekerja Tukang Kayu Kepala tukang Mandor Nok Paten Paku sekrup Pemasangan genteng beton Pekerja Tukang Kayu Kepala tukang Mandor Genteng beton

1,470 77,565 10,213 20,263 2,408 880 39,206 4,595 72,664 10,213 20,263 2,408 880 34,306 4,595 71,847 10,213 20,263 2,408 880 33,489 4,595 89,204 10,213 20,263 2,408 880 50,846 4,595 89,204 10,213 20,263 2,408 880 50,846 4,595 89,204 10,213 20,263 2,408 880 50,846 4,595 90,965 12,158 24,316 2,408 880 46,609 4,595 84,967 10,213 20,263 2,408 880 46,609 4,595 75,668 24,316 16,210 1,853 2,200 30,324

37/151

Software RAB Exarch xPro v2019

A.4.5.2.31.

P-290

A.4.5.2.32.

P-291

A.4.5.2.33.

P-292

A.4.5.2.34.

P-293

A.4.5.2.35.

P-294

A.4.5.2.36.

P-295

A.4.5.2.37.

P-296

A.4.5.2.38.

P-297

www.mitra-arsitek.com

0.03 1.00 0.20 0.30 0.00 0.01 6.90 0.35 0.03 0.50 1.00 0.20 0.10 0.01 0.00 1.30 0.20 1.00 0.20 0.10 0.01 0.00 2.00 0.20 1.00 0.17 0.25 0.03 0.01 30.00 0.20 1.00 0.40 0.20 0.02 0.02 3.50 0.05 10.80 0.03 1.00 1.00 0.13 0.25 0.03 0.01 2.00 0.05 0.00 1.00 0.25 0.15 0.02 0.01 1.10 0.05 1.00 0.13 0.25 0.03 0.01 0.40 0.05

Kg m2 OH OH OH OH Bh Lbr Kg Bh m2 OH OH OH OH Bh Kg m2 OH OH OH OH Bh Kg m2 OH OH OH OH Bh Kg m1 OH OH OH OH Bh Kg Kg M3 Kg m1 OH OH OH OH Bh Kg M3 m1 OH OH OH OH Bh Kg m1 OH OH OH OH Lbr Kg

Paku Biasa 2" - 5" Pemasangan genteng aspal Pekerja Tukang Kayu Kepala tukang Mandor Genteng aspal Plywood 120x240 tbl. 6 mm Paku Biasa 2" - 5" Plastic aerator Pemasangan genteng metal ukuran 80 x 100 atap pelana Pekerja Tukang Kayu Kepala tukang Mandor Genteng metal Paku Biasa ½" - 1" Pemasangan genteng metal ukuran 80 x 100 atap Jurai Pekerja Tukang Kayu Kepala tukang Mandor Genteng metal Paku Biasa ½" - 1" Pemasangan atap sirap kayu Pekerja Tukang Kayu Kepala tukang Mandor Sirap kayu Paku Biasa 2" - 5" Pemasangan nok genteng beton Pekerja Tukang Kayu Kepala tukang Mandor nok genteng beton Paku Biasa 2" - 5" Semen Pasir Pasang Semen warna Pemasangan Nok genteng aspal Pekerja Tukang Kayu Kepala tukang Mandor nok genteng aspal Paku Biasa 2" - 5" Kayu balok borneo Pemasangan nok genteng metal Pekerja Tukang Kayu Kepala tukang Mandor nok genteng metal Paku Biasa 2" - 5" Pemasangan Nok sirap Pekerja Tukang Kayu Kepala tukang Mandor Seng Gelombang 3" x 6" BJLS 28 Paku Biasa 2" - 5"

766 142,649 24,316 48,631 556 2,200 19,726 28,588 766 17,868 93,853 24,316 16,210 1,853 220 46,456 4,799 118,867 24,316 16,210 1,853 220 71,470 4,799 148,779 20,182 40,526 4,632 1,760 76,575 5,105 168,902 48,631 32,421 3,705 4,400 53,603 1,276 15,989 6,734 2,144 126,508 15,197 40,526 4,632 1,320 51,050 1,276 12,507 154,842 30,394 24,316 2,779 2,860 93,217 1,276 84,647 15,197 40,526 4,632 1,320 20,420 1,276

38/151

Software RAB Exarch xPro v2019

A.4.5.2.39.

P-298

A.4.5.2.40.

P-299

A.4.5.2.41.

P-300

A.4.5.2.42.

P-301

A.4.5.2.43.

P-302

A.4.6.1.1.

P-303

A.4.6.1.2.

P-304

A.4.6.1.3.

P-305

A.4.6.1.4.

P-306

www.mitra-arsitek.com

0.05 1.00 0.12 0.06 0.01 0.01 0.70 0.02 1.00 0.15 0.07 0.01 0.01 0.30 0.04 1.00 0.15 0.75 0.08 0.01 1.05 0.02 1.00 0.10 1.00 0.10 0.05 1.20 0.04 1.00 0.15 0.05 0.01 0.01 1.05 1.00 7.00 21.00 2.10 0.35 1.10 1.25 1.00 1.00 6.00 18.00 1.80 0.30 1.20 1.25 1.00 1.00 0.35 1.05 0.11 0.02 0.04 0.05 1.00 0.35 1.05 0.11 0.02

Kg m2 OH OH OH OH Lbr Kg m1 OH OH OH OH Lbr Kg m2 OH OH OH OH Lbr Kg m1 OH OH OH OH Bh Kg m2 OH OH OH OH M2 m3 OH OH OH OH m3 Kg Kg m3 OH OH OH OH m3 Kg Kg m2 OH OH OH OH m3 Kg m2 OH OH OH OH

Paku Biasa 2" - 5" 1,276 Pemasangan atap seng gelombang 62,993 Pekerja 14,589 Tukang Kayu 9,726 Kepala tukang 1,112 Mandor 1,320 Seng Gelombang 3" x 6" BJLS 28 35,735 Paku Biasa 2" - 5" 511 Pemasangan nok atap seng 48,537 Pekerja 18,237 Tukang Kayu 11,347 Kepala tukang 1,297 Mandor 1,320 Seng Gelombang 3" x 6" BJLS 28 15,315 Paku Biasa 2" - 5" 1,021 Pemasangan atap alumunium 311,627 Pekerja 18,237 Tukang Kayu 121,578 Kepala tukang 14,821 Mandor 1,320 Alumunium gel tbl 0,55 155,447 Paku Hak Panjang 15cm 225 Pemasangan Nok alumunium 211,382 Pekerja 12,158 Tukang Kayu 162,104 Kepala tukang 18,526 Mandor 11,000 Nok standar 40x18 7,145 Paku Hak Panjang 15cm 449 Pemasangan alumunium foil/sisalation 61,082 Pekerja 18,237 Tukang Kayu 8,105 Kepala tukang 926 Mandor 1,760 Aluminium foil 32,054 Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu 13,189,697 kelas I Pekerja 851,044 Tukang kayu 3,404,176 Kepala tukang 389,049 Mandor 76,999 Balok kayu 8/15 Kelas I 8,423,250 Paku Biasa 2" - 5" 31,906 Lem kayu 13,273 Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu 13,280,980 kelas II atau III Pekerja 729,466 Tukang kayu 2,917,865 Kepala tukang 333,470 Mandor 65,999 Balok kayu 8/15 Kelas I 9,189,000 Paku Biasa 2" - 5" 31,906 Lem kayu 13,273 Pembuatan dan pemasangan pintu klamp standar, kayu kelas II 380,390 Pekerja 42,552 Tukang kayu 170,209 Kepala tukang 19,452 Mandor 3,960 Kayu Papan 3/20 142,940 Paku Biasa 2" - 5" 1,276 Pembuatan dan pemasangan pintu klamp sederhana, kayu kelas 380,390 III Pekerja 42,552 Tukang kayu 170,209 Kepala tukang 19,452 Mandor 3,960

39/151

Software RAB Exarch xPro v2019

A.4.6.1.5.

P-307

A.4.6.1.6.

P-308

A.4.6.1.7.

P-309

A.4.6.1.8.

P-310

A.4.6.1.9.

P-311

A.4.6.1.10.

P-312

A.4.6.1.11.

P-313

A.4.6.1.12.

P-314

www.mitra-arsitek.com

0.04 0.05 1.00 1.00 3.00 0.30 0.05 0.04 0.50 1.00 0.80 2.40 0.24 0.04 0.02 0.30 1.00 1.00 3.00 0.30 0.05 0.06 0.50 1.00 0.70 2.10 0.21 0.04 0.03 0.03 0.50 1.00 1.00 0.80 2.40 0.24 0.04 0.03 0.03 0.50 1.00 1.00 0.67 2.00 0.20 0.34 0.06 0.15 1.00 0.80 2.40 0.24 0.04 0.03 0.03 0.30 1.00 1.00 0.85 2.55 0.26 0.04 0.03

m3 Kg m2 OH OH OH OH m3 Kg m2 OH OH OH OH m3 Kg m2 OH OH OH OH m3 Kg m2 OH OH OH OH m3 kg kg Lbr m2 OH OH OH OH m3 kg kg Lbr m2 OH OH OH OH m3 kg m2 OH OH OH OH m3 kg kg Lbr m2 OH OH OH OH m3

Kayu Papan 3/20 142,940 Paku Biasa 2" - 5" 1,276 Pembuatan dan pemasangan daun pintu panel, kayu kelas I atau824,043 II Pekerja 121,578 Tukang kayu 486,311 Kepala tukang 55,578 Mandor 11,000 Kayu Papan 3/20 142,940 Lem kayu 6,637 Pembuatan dan pemasangan pintu dan jendela kaca, kayu kelas 629,319 I atau II Pekerja 97,262 Tukang kayu 389,049 Kepala tukang 44,463 Mandor 8,800 Kayu Papan 3/20 85,764 Lem kayu 3,982 Pembuatan dan pemasangan pintu dan jendela jalusi kayu kelas 909,807 I atau II Pekerja 121,578 Tukang kayu 486,311 Kepala tukang 55,578 Mandor 11,000 Kayu Papan 3/20 228,704 Lem kayu 6,637 Pembuatan daun pintu plywood rangkap, rangka kayu kelas II tertutup 642,379 Pekerja 85,104 Tukang kayu 340,418 Kepala tukang 38,905 Mandor 7,700 Kayu Papan 3/20 89,338 Paku Biasa 2" - 5" 766 Lem kayu 6,637 Plywood 120x240 tbl. 4 mm 73,512 Pembuatan pintu plywood rangkap, rangka expose kayu kelas I 711,969 atau II Pekerja 97,262 Tukang kayu 389,049 Kepala tukang 44,463 Mandor 8,800 Kayu Papan 3/20 91,482 Paku Biasa 2" - 5" 766 Lem kayu 6,637 Plywood 120x240 tbl. 4 mm 73,512 Pemasangan jalusi kusen, kayu kelas I atau II 734,655 Pekerja 81,457 Tukang kayu 324,207 Kepala tukang 37,052 Mandor 73,699 Kayu Papan 3/20 214,410 Paku Biasa 2" - 5" 3,829 Pemasangan teakwood rangkap, rangka expose kayu kelas I 692,877 Pekerja 97,262 Tukang kayu 389,049 Kepala tukang 44,463 Mandor 8,800 Kayu Papan 3/20 89,338 Paku Biasa 2" - 5" 766 Lem kayu 3,982 Teakwood 4 mm 90 x 220 cm 59,218 Pemasangan teakwood rangkap lapis formika, rangka expose kayu 779,291 kelas II Pekerja 103,341 Tukang kayu 413,364 Kepala tukang 47,242 Mandor 9,460 Kayu Papan 3/20 89,338

40/151

Software RAB Exarch xPro v2019

A.4.6.1.13.

P-315

A.4.6.1.14.

P-316

A.4.6.1.15.

P-317

A.4.6.1.16.

P-318

A.4.6.1.17.

P-319

A.4.6.1.18.

P-320

A.4.6.1.19.

P-321

A.4.6.1.20.

P-322

www.mitra-arsitek.com

0.03 0.80 1.00 0.50 1.00 4.00 12.00 1.20 0.20 1.10 15.00 5.60 1.00 6.70 20.10 2.01 0.34 1.20 15.00 5.60 1.00 6.70 20.10 2.01 0,335 1.10 15.00 3.00 1.00 0.10 0.10 0.01 0.01 0.01 0.04 0.25 1.00 0.10 0.10 0.01 0.01 0.01 0.06 0.25 1.00 0.12 0.12 0.01 0.01 0.01 0.06 1.00 0.15 0.30 0.03 0.08 0.02 0.20 1.00 0.20 0.30 0.03 0.01

kg kg Lbr Lbr m3 OH OH OH OH m3 kg kg m3 OH OH OH OH m3 kg kg m3 OH OH OH OH m3 kg kg m2 OH OH OH OH m3 m3 kg m2 OH OH OH OH m3 m3 kg m2 OH OH OH OH m3 m3 m2 OH OH OH OH m3 kg m2 OH OH OH OH

Paku Biasa 2" - 5" 766 Lem kayu 10,618 Teakwood 4 mm 90 x 220 cm 59,218 Formika 45,945 Pemasangan konstruksi kuda-kuda konvensional, kayu kelas I,11,455,495 II dan III bentang 6 me Pekerja 486,311 Tukang kayu 1,945,243 Kepala tukang 222,314 Mandor 44,000 Balok kayu 8/15 Kelas I 8,423,250 Baja strip (0,2 x 2) cm 191,438 Paku Biasa 2" - 5" 142,940 Pemasangan konstruksi kuda-kuda expose, kayu kelas I 14,042,305 Pekerja 814,571 Tukang kayu 3,258,283 Kepala tukang 372,375 Mandor 73,699 Balok kayu 8/15 Kelas I 9,189,000 Baja strip (0,2 x 2) cm 191,438 Paku Biasa 2" - 5" 142,940 Pemasangan konstruksi gordeng, kayu kelas II 13,136,491 Pekerja 814,571 Tukang kayu 3,258,283 Kepala tukang 372,375 Mandor XXX Balok kayu 8/15 Kelas I 8,423,250 Baja strip (0,2 x 2) cm 191,438 Paku Biasa 2" - 5" 76,575 Pemasangan rangka atap genteng keramik, kayu kelas II 186,768 Pekerja 12,158 Tukang kayu 16,210 Kepala tukang 1,853 Mandor 1,100 Kayu balok 5/7 Kelas II 31,447 Reng 2 x 3 cm Kayu Kelas II 117,619 Paku Biasa 2" - 5" 6,381 Pemasangan rangka atap genteng beton, kayu kelas II 255,379 Pekerja 12,158 Tukang kayu 16,210 Kepala tukang 1,853 Mandor 1,100 Kayu balok 5/7 Kelas II 31,447 Reng 2 x 3 cm Kayu Kelas II 186,230 Paku Biasa 2" - 5" 6,381 Pemasangan rangka atap sirap, kayu kelas II 70,487 Pekerja 14,589 Tukang kayu 19,452 Kepala tukang 2,223 Mandor 1,320 Kayu balok 5/7 Kelas II 31,447 Paku Biasa 2" - 5" 1,455 Pemasangan rangka langit-langit (50 x 100) cm, kayu kelas II atau 128,622 III Pekerja 18,237 Tukang kayu 48,631 Kepala tukang 5,558 Mandor 16,500 Kayu balok 5/7 Kelas II 34,591 Paku Biasa 2" - 5" 5,105 Pemasangan rangka langit-langit (60 x 60) cm, kayu kelas II atau 123,699 III Pekerja 24,316 Tukang kayu 48,631 Kepala tukang 5,558 Mandor 2,200

41/151

Software RAB Exarch xPro v2019

A.4.6.1.21.

P-323

A.4.6.1.22.

P-324

A.4.6.1.23.

P-325

A.4.6.1.24.

P-326

A.4.6.1.25.

P-327

A.4.6.1.26.

P-328

A.4.6.1.27.

P-329

A.4.6.1.28.

P-330

www.mitra-arsitek.com

0.02 0.25 1.00 0.10 0.20 0.02 0.01 0.01 0.10 1.00 0.10 0.20 0.02 0.01 0.01 0.05 1.00 0.15 0.45 0.05 0.01 0.03 0.15 1.00 0.15 0.45 0.05 0.01 0.03 0.15 0.86 0.56 1.00 0.20 0.60 0.06 0.01 0.03 0.15 0.86 0.56 1.00 0.60 1.80 0.18 0.03 0.01 0.10 0.15 1.00 0.03 0.08 0.01 0.00 0.40 0.05 1.00 0.10 0.05 0.01 0.01 1.50 0.01

m3 kg m1 OH OH OH OH m3 kg m1 OH OH OH OH m3 kg m2 OH OH OH OH m3 kg m2 OH OH OH OH m3 kg Lbr kg m2 OH OH OH OH m3 kg Lbr kg m2 OH OH OH OH m3 kg kg m2 OH OH OH OH m3 kg m2 OH OH OH OH m2 m3

Kayu balok 5/7 Kelas II 36,613 Paku Biasa 2" - 5" 6,381 Pemasangan lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II90,530 Pekerja 12,158 Tukang kayu 32,421 Kepala tukang 3,705 Mandor 1,100 Kayu Papan 3/20 38,594 Paku Biasa 2" - 5" 2,553 Pemasangan lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II89,968 Pekerja 12,158 Tukang kayu 32,421 Kepala tukang 3,705 Mandor 1,100 Kayu Papan 3/20 39,309 Paku Biasa 2" - 5" 1,276 Pemasangan rangka dinding pemisah (60 x 120) cm kayu kelas II319,519 atau III Pekerja 18,237 Tukang kayu 72,947 Kepala tukang 8,337 Mandor 1,760 Balok kayu 8/15 Kelas I 214,410 Paku Biasa 2" - 5" 3,829 Pemasangan dinding pemisah teakwood rangkap, rangka kayu kelas 302,652 II Pekerja 18,237 Tukang kayu 72,947 Kepala tukang 8,337 Mandor 1,760 Balok kayu, 6 x 12 128,646 Paku Biasa 2" - 5" 3,829 Teakwood 4 mm, 120 x 240 61,464 Lem kayu 7,433 Pemasangan dinding pemisah plywood rangkap, rangka kayu kelas 338,021 II Pekerja 24,316 Tukang kayu 97,262 Kepala tukang 11,116 Mandor 2,200 Balok kayu, 6 x 12 128,646 Paku Biasa 2" - 5" 3,829 Plywood 120x240 tbl. 4 mm 63,220 Lem kayu 7,433 Pemasangan dinding lambrisering dari Kayu Papan kelas I 432,362 Pekerja 72,947 Tukang kayu 291,786 Kepala tukang 33,347 Mandor 6,600 Kayu Papan 3/20 25,015 Paku Biasa 2" - 5" 2,553 Paku sekrup 115 Pemasangan dinding lambrisering dari plywood ukuran (120 x 240) 47,580 cm Pekerja 3,039 Tukang kayu 12,158 Kepala tukang 1,482 Mandor 220 Plywood 120x240 tbl. 4 mm 29,405 Paku Biasa 2" - 5" 1,276 Pemasangan dinding bilik, rangka kayu kelas III atau IV 185,751 Pekerja 12,158 Tukang kayu 8,105 Kepala tukang 926 Mandor 1,100 Bilik bambu 114,863 Kayu balok 5/7 Kelas II 31,447

42/151

Software RAB Exarch xPro v2019

A.4.6.2.1.

P-331

A.4.6.2.2.

P-332

A.4.6.2.3.

P-333

A.4.6.2.4.

P-334

A.4.6.2.5.

P-335

A.4.6.2.6.

P-336

A.4.6.2.7.

P-337

A.4.6.2.8.

P-338

A.4.6.2.9.

P-339

A.4.6.2.10.

P-340

A.4.6.2.11.

P-341

www.mitra-arsitek.com

0.01 0.00 1.00 0.06 0.60 0.06 0.00 1.00 1.00 0.01 0.50 0.05 0.01 1.00 1.00 0.01 0.50 0.05 0.00 1.00 1.00 0.01 0.50 0.05 0.00 1.00 1.00 0.02 0.15 0.02 0.00 1.00 1.00 0.01 0.10 0.01 0.00 1.00 1.00 0.10 0.20 0.02 0.00 1.00 1.00 0.02 0.15 0.02 0.01 1.00 1.00 0.02 0.15 0.02 0.01 1.00 1.00 0.05 0.50 0.05 0.00 1.00 1.00

kg m3 bh OH OH OH OH Bh bh OH OH OH OH Bh bh OH OH OH OH Bh bh OH OH OH OH Bh bh OH OH OH OH Bh bh OH OH OH OH Bh bh OH OH OH OH Bh bh OH OH OH OH Bh bh OH OH OH OH Bh bh OH OH OH OH set bh

Paku Biasa 2" - 5" List kayu 2/4 Pemasangan kunci tanam antik Pekerja Tukang kayu Kepala tukang Mandor Kunci tanam antik Pemasangan kunci tanam biasa Pekerja Tukang kayu Kepala tukang Mandor Kunci tanam biasa Pemasangan kunci kamar mandi Pekerja Tukang kayu Kepala tukang Mandor Kunci tanam KM Pemasangan kunci silinder Pekerja Tukang kayu Kepala tukang Mandor Kunci silinder Pemasangan engsel pintu Pekerja Tukang kayu Kepala tukang Mandor Engsel pintu Pemasangan engsel jendela kupu-kupu Pekerja Tukang kayu Kepala tukang Mandor Engsel kupu-kupu Pemasangan engsel angin Pekerja Tukang kayu Kepala tukang Mandor Engsel angin Pemasangan spring knip Pekerja Tukang kayu Kepala tukang Mandor Spring knip Pemasangan kait angin Pekerja Tukang kayu Kepala tukang Mandor Kait angin Pemasangan door closer Pekerja Tukang kayu Kepala tukang Mandor Door closer Pemasangan kunci slot

306 16,847 371,582 7,295 97,262 11,116 660 255,250 225,361 1,216 81,052 9,263 1,100 132,730 142,633 608 81,052 9,263 660 51,050 168,158 608 81,052 9,263 660 76,575 46,451 1,824 24,316 2,779 176 17,357 39,809 1,216 16,210 1,853 110 20,420 56,562 12,158 32,421 3,705 110 8,168 38,336 1,824 24,316 2,779 1,760 7,658 36,294 1,824 24,316 2,779 1,760 5,616 352,304 6,079 81,052 9,263 660 255,250 89,827

43/151

Software RAB Exarch xPro v2019

A.4.6.2.12.

P-342

A.4.6.2.13.

P-343

A.4.6.2.14.

P-344

A.4.6.2.15.

P-345

A.4.6.2.16.

P-346

A.4.6.2.17.

P-347

A.4.6.2.18.

P-348

A.4.6.2.19.

P-349

A.4.6.2.20.

P-350

www.mitra-arsitek.com

0.02 0.20 0.02 0.00 1.00 1.00 0.05 0.50 0.05 0.00 1.00 1.00 0.01 0.10 0.01 0.01 1.00 1.00 0.06 0.60 0.06 0.00 1.00 1.00 0.03 0.25 0.03 0.00 1.00 1.00 0.02 0.15 0.02 0.00 1.10 0.05 1.00 0.02 0.15 0.02 0.00 1.10 0.05 1.00 0.02 0.17 0.02 0.00 1.10 0.07 1.00 0.03 0.25 0.03 0.00 1.10 0.07 1.00 0.02 0.15 0.02 0.01 1.10

OH OH OH OH Bh bh OH OH OH OH Bh bh OH OH OH OH Bh bh OH OH OH OH Set bh OH OH OH OH Set m2 OH OH OH OH m2 Kg m2 OH OH OH OH m2 Kg m2 OH OH OH OH m2 Kg m2 OH OH OH OH m2 Kg m2 OH OH OH OH m2

Pekerja Tukang kayu Kepala tukang Mandor Kunci slot Pemasangan Door holder Pekerja Tukang kayu Kepala tukang Mandor Door holder Pemasangan door stop Pekerja Tukang kayu Kepala tukang Mandor Door stop Pemasangan Rrel pintu sorong Pekerja Tukang kayu Kepala tukang Mandor Rel pintu dorong Pemasangan kunci lemari Pekerja Tukang kayu Kepala tukang Mandor Kunci lemari Pemasangan kaca tebal 3 mm Pekerja Tukang kayu Kepala tukang Mandor Kaca tebal 3mm SEalant Pemasangan kaca tebal 5 mm Pekerja Tukang kayu Kepala tukang Mandor Kaca tebal 5 mm SEalant Pemasangan kaca tebal 8 mm Pekerja Tukang kayu Kepala tukang Mandor Kaca tebal 8 mm SEalant Pemasangan kaca buram tebal 12 mm Pekerja Tukang kayu Kepala tukang Mandor Kaca buram 12 mm SEalant Pemasangan kaca cermin tebal 5 mm Pekerja Tukang kayu Kepala tukang Mandor Kaca cermin 5 mm

2,432 32,421 3,705 220 51,050 196,091 6,079 81,052 9,263 660 99,037 120,437 1,216 16,210 1,853 1,100 100,058 320,532 7,295 97,262 11,116 660 204,200 60,735 3,039 40,526 4,632 286 12,252 141,302 1,824 24,316 2,779 176 101,079 11,129 174,995 1,824 24,316 2,779 176 134,772 11,129 254,641 2,067 27,558 3,149 198 206,089 15,580 232,528 3,039 40,526 4,632 286 168,465 15,580 199,705 1,824 24,316 2,779 1,760 169,027

44/151

Software RAB Exarch xPro v2019

A.4.6.2.21.

P-351

A.4.6.2.22.

P-352

A.4.6.2.23.

P-353

A.4.7.1.1.

P-354

A.4.7.1.2.

P-355

A.4.7.1.3.

P-356

A.4.7.1.4.

P-357

A.4.7.1.5.

P-358

A.4.7.1.6.

P-359

A.4.7.1.7.

P-360

www.mitra-arsitek.com

1.00 0.02 0.17 0.02 0.01 1.10 1.00 0.02 0.15 0.02 0.01 1.10 1.00 0.08 0.15 0.02 0.00 1.10 0.05 1.00 0.15 0.00 0.05 1.00 0.15 0.00 0.05 1.00 0.15 0.01 0.05 1.00 0.07 0.01 0.01 0.00 0.20 0.15 0.17 0.26 0.01 0.03 0.20 1.00 0.07 0.11 0.00 0.00 0.20 0.15 0.17 0.35 0.01 0.03 0.20 1.00 0.04 0.06 0.06 0.00 0.36 1.00 0.04

m2 OH OH OH OH m2 m2 OH OH OH OH m2 m2 OH OH OH OH m2 Kg m2 OH OH Kg m2 OH OH Kg m2 OH OH Kg m2 OH OH OH OH Kg Kg Kg Kg Bh Kg Lbr m2 OH OH OH OH Kg Kg Kg Kg Bh Kg Lbr m2 OH OH OH OH L m2 OH

Pemasangan kaca cermin tebal 8 mm 298,682 Pekerja 2,067 Tukang kayu 27,558 Kepala tukang 3,149 Mandor 1,980 Kaca cermin 8 mm 263,929 Pemasangan kaca wireglassed tebal 5 mm 294,607 Pekerja 1,824 Tukang kayu 24,316 Kepala tukang 2,779 Mandor 1,760 Kaca wire glass 263,929 Pemasangan kaca patri tebal 5 mm 143,685 Pekerja 9,118 Tukang kayu 24,316 Kepala tukang 2,779 Mandor 880 Kaca patri 5mm 95,464 Sealant 11,129 Pengikisan/pengerokan permukaan cat lama 21,194 Pekerja 18,237 Mandor 660 Soda api 2,297 Pencucian bidang permukaan tembok yang pernah dicat 19,468 Pekerja 18,237 Mandor 660 Sabun 572 Pengerokan karat pada permukaan baja cara manual 20,568 Pekerja 18,237 Mandor 1,760 Sabun 572 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 244,892 lapis cat penutup) Pekerja 8,510 Tukang cat 1,459 Kepala tukang 1,112 Mandor 660 Cat meni 3,328 Plamir 8,622 Cat dasar Kayu 5,381 Cat kayu 13,246 Kuas 174 Pengencer 1,072 Amplas 1,327 Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 64,669 3 lapis cat Penutup) Pekerja 8,510 Tukang cat 17,021 Kepala tukang 741 Mandor 660 Cat meni 3,328 Plamir 8,622 Cat dasar Kayu 5,381 Cat kayu 17,832 Kuas 174 Pengencer 1,072 Amplas 1,327 Pelaburan bidang kayu dengan teak oil 33,472 Pekerja 4,863 Tukang cat 10,213 Kepala tukang 11,671 Mandor 660 Teak oil 6,065 Pelaburan bidang kayu dengan politur 50,140 Pekerja 4,863

45/151

Software RAB Exarch xPro v2019

A.4.7.1.8.

P-361

A.4.7.1.9.

P-362

A.4.7.1.10.

P-363

A.4.7.1.11.

P-364

A.4.7.1.12.

P-365

A.4.7.1.13.

P-366

A.4.7.1.14.

P-367

A.4.7.1.15.

P-368

A.4.7.1.16.

P-369

www.mitra-arsitek.com

0.06 0.02 0.00 0.15 0.37 2.00 1.00 0.10 0.01 0.35 1.00 0.16 0.16 0.02 0.00 0.15 0.05 0.10 1.00 0.02 0.06 0.01 0.00 0.10 0.10 0.26 1.00 0.03 0.04 0.00 0.00 0.12 0.18 1.00 0.03 0.04 0.00 0.00 0.10 1.00 0.15 0.00 0.00 0.00 0.15 0.10 0.25 1.00 0.04 0.01 0.00 0.00 0.30 0.20 0.25 1.00 0.02 0.20 0.02 0.00 1.20 0.20 1.00

OH OH OH L L Lbr m2 OH OH L m2 OH OH OH OH L Kg Lbr m2 OH OH OH OH Kg Kg Kg m2 OH OH OH OH Kg Kg m2 OH OH OH OH Kg m2 OH OH OH OH Kg Lbr Ikat m2 OH OH OH OH Kg Lbr Ikat m2 OH OH OH OH m2 Kg m2

Tukang cat 9,726 Kepala tukang 2,964 Mandor 660 Politur 5,360 Politur 13,293 Amplas 13,273 Pelaburan bidang kayu dengan cat residu dan ter 16,515 Pekerja 12,158 Mandor 1,320 Residu 3,037 Pelaburan bidang kayu dengan vernis 69,270 Pekerja 19,452 Tukang cat 25,937 Kepala tukang 2,964 Mandor 660 Vernis 17,612 Dempul 1,981 Amplas 664 Pengecatan tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis 36,147 cat penutup) Pekerja 2,432 Tukang cat 10,213 Kepala tukang 1,167 Mandor 660 Plamir 5,748 Cat dasar Tembok 6,637 Cat Penutup Tembok 9,291 Pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup) 26,047 Pekerja 3,404 Tukang cat 6,808 Kepala tukang 778 Mandor 660 Cat dasar Tembok 7,964 Cat Penutup Tembok 6,432 Pelaburan tembok dengan kalkarium 12,187 Pekerja 3,404 Tukang cat 6,808 Kepala tukang 778 Mandor 660 Kalkarium 536 Pelaburan tembok dengan kapur sirih 21,780 Pekerja 18,237 Tukang cat 162 Kepala tukang 19 Mandor 550 Kapur sirih 2,022 Amplas 664 Alang-alang 128 Pelaburan tembok lama dengan kapur sirih (pemeliharaan) 11,814 Pekerja 4,863 Tukang cat 811 Kepala tukang 93 Mandor 550 Kapur sirih 4,043 Amplas 1,327 Alang-alang 128 Pemasangan wallpaper 84,644 Pekerja 2,432 Tukang cat 32,421 Kepala tukang 3,705 Mandor 550 Wallpaper 42,882 Lem kayu 2,655 Pengecatan permukaan baja dengan menie besi 42,038

46/151

Software RAB Exarch xPro v2019

A.4.7.1.17.

P-370

A.4.7.1.18.

P-371

A.4.7.1.19.

P-372

A.4.7.1.20.

P-373

A.4.7.1.21.

P-374

A.4.7.1.22.

P-375

A.5.1.1.1.

P-376

www.mitra-arsitek.com

0.02 0.20 0.02 0.00 0.10 0.01 1.00 0.25 0.23 0.02 0.01 0.10 0.01 0.01 0.00 1.00 0.25 0.25 0.03 0.00 0.10 0.10 0.08 0.01 0.01 1.00 0.06 0.06 0.01 0.00 0.30 0.01 0.01 1.00 0.40 0.80 0.08 0.02 0.11 0.17 0.08 0.01 0.01 1.00 0.40 0.70 0.07 0.02 0.30 0.01 1.00 0.04 0.07 0.01 0.00 0.03 0.00 1.00 3.30 1.10 0.01 0.16 1.00

OH OH OH OH Kg Bh m2 OH OH OH OH Kg L Bh m3 m2 OH OH OH OH Kg Kg Kg Bh L m2 OH OH OH OH Kg Bh L m2 OH OH OH OH Kg Kg Kg Bh L m2 OH OH OH OH Kg L m2 OH OH OH OH Kg L bh OH OH OH OH Unit

Pekerja 2,432 Tukang cat 32,421 Kepala tukang 3,705 Mandor 550 Menie besi 2,757 Kuas 174 Pengecatan permukaan baja dengan menie besi dengan perancah 78,714 Pekerja 30,394 Tukang cat 36,473 Kepala tukang 4,168 Mandor 1,650 Menie besi 2,757 Pengencer 357 Kuas 174 Perancah kayu 2,741 Pengecatan permukaan baja galvanis secara manual 4 lapis 87,600 Pekerja 30,394 Tukang cat 40,526 Kepala tukang 4,632 Mandor 286 Menie A 3,471 Menie B 3,676 Cat Besi 4,084 Kuas 174 Pengencer 357 Pengecatan permukaan baja galvanis secara manual sistem 1 lapis35,750 cat mutakhir Pekerja 7,295 Tukang cat 9,726 Kepala tukang 2,223 Mandor 660 Cat Besi 15,315 Kuas 174 Pengencer 357 Pengecatan permukaan baja galvanis secara manual sistem 3 lapis 213,442 Pekerja 48,631 Tukang cat 129,683 Kepala tukang 14,821 Mandor 4,400 Cat dasar Besi 3,482 Cat antara 7,811 Cat Besi 4,084 Kuas 174 Pengencer 357 Pengecatan permukaan baja galvanis secara semprot sistem 3 lapis 195,144 cat mutakhir Pekerja 48,631 Tukang cat 113,473 Kepala tukang 12,968 Mandor 4,400 Cat Besi 15,315 Pengencer 357 Plituran dengan plitur melamic 18,932 Pekerja 4,863 Tukang cat 11,347 Kepala tukang 1,297 Mandor 440 Cat Dasar Kayu 950 Pengencer 36 (K3) Pemasangan closet duduk/moblock 3,184,298 Pekerja 401,206 Tukang batu 178,314 Kepala tukang 1,853 Mandor 35,200 Kloset duduk / monoblock 2,552,500

47/151

Software RAB Exarch xPro v2019

A.5.1.1 2.

P-377

A.5.1.1 3.

P-378

A.5.1.1 4.

P-379

A.5.1.1 5.

P-380

A.5.1.1 6.

P-381

A.5.1.1 7.

P-382

A.5.1.1 8.

P-383

A.5.1.1 9.

P-384

www.mitra-arsitek.com

0.06 1.00 1.00 1.50 0.15 0.16 1.00 6.00 0.01 1.00 1.00 1.50 0.15 0.05 1.00 6.00 0.01 7.00 1.00 1.00 1.00 0.10 0.05 1.00 6.00 0.01 0.30 1.00 1.20 1.45 0.15 0.06 1.20 6.00 0.01 0.12 1.00 0.08 0.75 0.08 0.00 1.00 0.20 1.00 3.00 4.50 0.05 0.90 1.00 0.12 1.00 6.00 3.00 0.30 0.03 150.00 120.00 0.30 360.00 6.00 1.00 3.00 4.50

% bh OH OH OH OH Unit Kg M3 bh OH OH OH OH Unit Kg M3 Bh bh OH OH OH OH Unit Kg M3 % bh OH OH OH OH Unit Kg M3 % bh OH OH OH OH Unit % bh OH OH OH OH Unit % bh OH OH OH OH M3 Kg M3 bh Kg bh OH OH

Perlengkapan Pemasangan closet jongkok porslen Pekerja Tukang batu Kepala tukang Mandor Kloset jongkok teraso Semen Pasir pasang Pemasangan closet jongkok teraso Pekerja Tukang batu Kepala tukang Mandor Kloset jongkok teraso Semen Pasir pasang Bata merah (K3) Pemasangan uriir Pekerja Tukang batu Kepala tukang Mandor Urinoir Semen Pasir pasang Perlengkapan (K3) Pemasangan wastafel Pekerja Tukang batu Kepala tukang Mandor Wastafel Semen Pasir pasang Perlengkapan (K3) Pemasangan bathcuip porselen Pekerja Tukang batu Kepala tukang Mandor Bathcuip Perlengkapan (K3) Pemasangan bak fibreglass vol 1 m3 Pekerja Tukang batu Kepala tukang Mandor Bak fiberglass Perlengkapan (K3) Pemasangan bak mandi batu bata vol 0,30 m3 Pekerja Tukang batu Kepala tukang Mandor Bata merah Semen Pasir pasang Porselen (11 x 11) cm Semen warna Pemasangan bak mandi teraso vol 0,30 m3 Pekerja Tukang batu

15,225 693,959 121,578 243,155 27,789 35,200 255,250 8,883 2,104 676,191 121,578 243,155 27,789 11,000 255,250 8,883 2,104 6,432 1,829,719 121,578 162,104 18,526 11,000 1,429,400 8,883 2,104 76,125 2,239,910 145,893 235,050 27,789 13,200 1,776,540 8,883 2,104 30,450 3,003,751 9,118 121,578 13,895 660 2,807,750 50,750 1,658,630 364,733 729,466 9,263 197,998 326,720 30,450 4,058,577 729,466 486,311 55,578 6,600 137,835 177,654 63,128 2,389,140 12,865 1,658,630 364,733 729,466

48/151

Software RAB Exarch xPro v2019

A.5.1.1 10.

P-385

A.5.1.1 11.

P-386

A.5.1.1 12.

P-387

A.5.1.1 13.

P-388

A.5.1.1 14.

P-389

A.5.1.1 15.

P-390

A.5.1.1 16.

P-391

www.mitra-arsitek.com

0.05 0.90 1.00 0.12 1.00 0.30 0.45 0.05 0.02 1.00 0.12 1.00 3.50 4.50 0.05 0.02 0.90 180.00 8.00 500.00 0.10 1.00 0.03 0.30 0.03 0.02 1.00 1.00 1.00 0.05 0.50 0.05 0.03 1.00 1.00 20.00 0.05 1.00 0.01 0.10 0.01 0.01 1.00 1.00 2.16 0.72 0.07 0.01 40.00 44.00 0.07 0.06 0.07 1.60 1.00 3.20 1.15 0.01 0.02 70.00 77.00 0.13 0.09

OH OH Unit % bh OH OH OH OH Unit % bh OH OH OH OH M3 Kg M2 Bh % bh OH OH OH OH Unit Bh bh OH OH OH OH Unit Bh Kg M3 bh OH OH OH OH Unit bh OH OH OH OH bh Kg M3 M3 M3 Kg bh OH OH OH OH bh Kg M3 M3

Kepala tukang 9,263 Mandor 197,998 Bak fiberglass 326,720 Perlengkapan 30,450 Pemasangan bak air fibreglass vol 1 m3 478,227 Pekerja 36,473 Tukang batu 72,947 Kepala tukang 8,337 Mandor 3,300 Bak fiberglass 326,720 Perlengkapan 30,450 Pemasangan bak beton volume 1 m3 8,769,406 Pekerja 425,522 Tukang batu 729,466 Kepala tukang 9,263 Mandor 3,960 Beton 1:2:3 1,102,680 Besi beton 1,929,690 Kayu cetakan 1,225,200 Ubin porselen 3,318,250 Perlengkapan 25,375 Pemasangan bak cuci piring stainlessteel 577,762 Pekerja 3,647 Tukang batu 48,631 Kepala tukang 5,558 Mandor 3,300 Bak cuci piring 439,030 Waterdrain 77,596 Pemasangan bak cuci piring teraso 658,650 Pekerja 6,079 Tukang batu 81,052 Kepala tukang 9,263 Mandor 5,500 Bak cuci piring 439,030 Waterdrain 77,596 Semen 29,609 Pasir pasang 10,521 Pemasangan floor drain 81,639 Pekerja 1,216 Tukang batu 16,210 Kepala tukang 1,853 Mandor 1,100 Floor drain 61,260 Pemasangan bak kontrol pasangan bata 30x30 tinggi 35 cm 563,359 Pekerja 262,608 Tukang batu 116,715 Kepala tukang 13,339 Mandor 2,420 Bata merah 36,756 Semen 65,140 Pasir pasang 14,730 Pasir beton 17,704 Kerikil 16,795 Besi beton 17,153 Pemasangan bak kontrol pasangan bata 45cm x45cm tinggi 50 cm845,927 Pekerja 389,049 Tukang batu 186,419 Kepala tukang 2,038 Mandor 3,520 Bata merah 64,323 Semen 113,995 Pasir pasang 27,356 Pasir beton 26,556

49/151

Software RAB Exarch xPro v2019

A.5.1.1 17.

P-392

A.5.1.1 18.

P-393

A.5.1.1 19.

P-394

A.5.1.1 20.

P-395

A.5.1.1 21.

P-396

A.5.1.1 22.

P-397

A.5.1.1 23.

P-398

A.5.1.1 24.

P-399

A.5.1.1 25.

P-400

www.mitra-arsitek.com

0.02 2.60 1.00 3.20 1.15 0.01 0.02 123.00 114.00 0.18 0.12 0.03 4.85 1.00 0.05 0.09 0.01 0.03 1.20 0.35 1.00 0.01 0.40 0.04 0.01 1.00 0.03 1.00 0.05 0.09 0.01 0.03 1.20 0.35 1.00 0.05 0.09 0.01 0.03 1.20 0.35 1.00 0.11 0.18 0.02 0.01 1.20 0.35 1.00 0.14 0.23 0.02 0.01 1.20 0.35 1.00 0.14 0.23 0.02 0.01 1.20 0.35 1.00

M3 Kg bh OH OH OH OH bh Kg M3 M3 M3 Kg m1 OH OH OH OH M % bh OH OH OH OH M bh m1 OH OH OH OH M % m1 OH OH OH OH M % m1 OH OH OH OH M % m1 OH OH OH OH M % m1 OH OH OH OH M % m1

Kerikil 4,799 Besi beton 27,873 Pemasangan bak kontrol pasangan bata 60cm x60cm tinggi 65 cm996,861 Pekerja 389,049 Tukang batu 186,419 Kepala tukang 2,038 Mandor 3,520 Bata merah 113,025 Semen 168,771 Pasir pasang 38,719 Pasir beton 35,408 Kerikil 7,918 Besi beton 51,994 Pemasangan pipa galvanis diameter ½” 143,304 Pekerja 6,565 Tukang batu 14,589 Kepala tukang 1,667 Mandor 5,940 Pipa galvanis ½” 25,729 Perlengkapan 88,813 Pemasangan kran diameter ½” atau 3/4” 100,182 Pekerja 1,216 Tukang batu 64,841 Kepala tukang 7,410 Mandor 1,100 Kran air 25,525 Sealtape 89 Pemasangan pipa galvanis diameter 3/4” 149,430 Pekerja 6,565 Tukang batu 14,589 Kepala tukang 1,667 Mandor 5,940 Pipa galvanis 3/4” 31,855 Perlengkapan 88,813 Pemasangan pipa galvanis diameter 1” 166,582 Pekerja 6,565 Tukang batu 14,589 Kepala tukang 1,667 Mandor 5,940 Pipa galvanis 1” 49,008 Perlengkapan 88,813 Pemasangan pipa galvanis diameter 1 ½” 228,671 Pekerja 13,130 Tukang batu 29,179 Kepala tukang 3,335 Mandor 1,100 Pipa galvanis 11/2” 93,115 Perlengkapan 88,813 Pemasangan pipa galvanis diameter 3” 270,020 Pekerja 16,413 Tukang batu 36,473 Kepala tukang 4,261 Mandor 1,540 Pipa galvanis 3” 122,520 Perlengkapan 88,813 Pemasangan pipa galvanis diameter 4” 311,677 Pekerja 16,413 Tukang batu 36,473 Kepala tukang 4,261 Mandor 1,540 Pipa galvanis 4” 164,177 Perlengkapan 88,813 Pemasangan pipa PVC tipe AW diameter 1/2” 109,368

50/151

Software RAB Exarch xPro v2019

A.5.1.1 26.

P-401

A.5.1.1 27.

P-402

A.5.1.1 28.

P-403

A.5.1.1 29.

P-404

A.5.1.1 30.

P-405

A.5.1.1 31.

P-406

A.5.1.1 32.

P-407

A.5.1.1 33.

P-408

www.mitra-arsitek.com

0.04 0.06 0.01 0.00 1.20 0.35 1.00 0.04 0.06 0.01 0.00 1.20 0.35 1.00 0.04 0.06 0.01 0.00 1.20 0.35 1.00 0.05 0.09 0.01 0.00 1.20 0.35 1.00 0.05 0.09 0.01 0.00 1.20 0.35 1.00 0.08 0.14 0.01 0.00 1.20 0.35 1.00 0.08 0.14 0.01 0.00 1.20 0.35 1.00 0.08 0.14 0.01 0.00 1.20 0.35 1.00 0.08 0.04 0.00 0.00 1.60 35.00 0.01

OH OH OH OH M % m1 OH OH OH OH M % m1 OH OH OH OH M % m1 OH OH OH OH M % m1 OH OH OH OH M % m1 OH OH OH OH M % m1 OH OH OH OH M % m1 OH OH OH OH M % m1 OH OH OH OH m Kg M3

Pekerja Tukang batu Kepala tukang Mandor Pipa PVC 1/2" Perlengkapan Pemasangan pipa PVC tipe AW diameter 3/4” Pekerja Tukang batu Kepala tukang Mandor Pipa PVC 3/4" Perlengkapan Pemasangan pipa PVC tipe AW diameter 1” Pekerja Tukang batu Kepala tukang Mandor Pipa PVC 1” Perlengkapan Pemasangan pipa PVC tipe AW diameter 11/2” Pekerja Tukang batu Kepala tukang Mandor Pipa PVC 11/2” Perlengkapan Pemasangan pipa PVC tipe AW diameter 2” Pekerja Tukang batu Kepala tukang Mandor Pipa PVC 2” Perlengkapan Pemasangan pipa PVC tipe AW diameter 21/2” Pekerja Tukang batu Kepala tukang Mandor Pipa PVC 21/2” Perlengkapan Pemasangan pipa PVC tipe AW diameter 3” Pekerja Tukang batu Kepala tukang Mandor Pipa PVC 3” Perlengkapan Pemasangan pipa PVC tipe AW diameter 4” Pekerja Tukang batu Kepala tukang Mandor Pipa PVC 4" Perlengkapan Pemasangan pipa air limbah jenis pipa tanah Pekerja Tukang batu Kepala tukang Mandor Pipa tanah Semen Pasir pasang

4,377 9,726 1,112 440 4,901 88,813 111,206 4,377 9,726 1,112 440 6,739 88,813 111,818 4,377 9,726 1,112 440 7,351 88,813 120,258 6,565 14,589 1,667 660 7,964 88,813 120,871 6,565 14,589 1,667 660 8,576 88,813 133,114 9,848 21,884 2,501 880 9,189 88,813 134,339 9,848 21,884 2,501 880 10,414 88,813 134,952 9,848 21,884 2,501 880 11,027 88,813 151,943 9,726 6,484 741 880 75,962 51,816 2,946

51/151

Software RAB Exarch xPro v2019

A.5.1.1 34.

P-409

A.5.1.1 35.

P-410

A.5.1.1.36.

P-411

A.8.4.1.1

P-412

A.8.4.1.2

P-413

A.8.4.1.3

P-414

A.8.4.1.4

P-415

A.8.4.1.5

P-416

A.8.4.1.6

P-417

www.mitra-arsitek.com

0.01 1.00 0.06 0.03 0.00 0.00 1.60 0.68 0.01 0.01 1.00 0.14 0.07 0.01 0.01 1.10 0.03 3.92 0.06 0.02 1.00 0.38 0.19 0.02 0.02 1.10 0.55 10.30 0.06 0.07 1.00 0.08 0.04 0.01 1.00 0.01 1.00 0.09 0.05 0.01 1.00 0.01 1.00 0.11 0.05 0.01 1.00 0.01 1.00 0.12 0.06 0.01 1.00 0.01 1.00 0.19 0.10 0.02 1.00 0.02 1.00 0.26 0.13

M3 m1 OH OH OH OH Bh Kg M3 M3 m1 OH OH OH OH Bh M3 Kg M3 M3 m1 OH OH OH OH Bh M3 Kg M3 M3 m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH

Pasir urug Pemasangan pipa air limbah jenis pipa tanah diameter 15 cm Pekerja Tukang batu Kepala tukang Mandor Pipa tanah Semen Pasir pasang Pasir urug Pemasangan pipa beton diameter 15 - 20 cm Pekerja Tukang batu Kepala tukang Mandor Pipa Beton Bata merah Semen Pasir pasang Pasir urug Pemasangan pipa beton diameter 30 - 100 cm Pekerja Tukang batu Kepala tukang Mandor Pipa Beton Bata merah Semen Pasir pasang Pasir urug (K3) Pemasangan pipa PVC Ø 63 mm Pekerja Tukang pipa Mandor Pipa PVC Ø 63 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa PVC Ø 90 mm Pekerja Tukang pipa Mandor Pipa PVC Ø 90 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa PVC Ø 110 mm Pekerja Tukang pipa Mandor Pipa PVC Ø 110 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa PVC Ø 150 mm Pekerja Tukang pipa Mandor Pipa PVC Ø 150 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasngan pipa PVC Ø 200 mm Pekerja Tukang pipa Mandor Pipa PVC Ø 200 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa PVC Ø 250 mm Pekerja Tukang pipa

3,388 95,740 7,295 4,863 556 660 75,962 1,007 2,736 2,662 116,395 17,021 11,347 1,297 1,540 61,771 25 5,803 11,784 5,807 191,756 46,200 30,800 3,520 4,180 61,771 505 15,249 12,836 16,696 105,875 9,848 6,646 1,760 84,743 2,878 129,006 11,428 7,619 1,980 104,142 3,837 163,345 12,766 8,591 2,420 134,772 4,796 200,770 14,346 9,564 2,640 168,465 5,755 385,893 22,978 15,400 4,180 331,825 11,510 555,811 31,124 20,749

52/151

Software RAB Exarch xPro v2019

A.8.4.1.7

P-418

A.8.4.1.8

P-419

A.8.4.1.9

P-420

A.8.4.1.10

P-421

A.8.4.1.11

P-422

A.8.4.1.12

P-423

A.8.4.1.13

P-424

A.8.4.1.14

P-425

A.8.4.1.15

P-426

A.8.4.1.16

P-427

www.mitra-arsitek.com

0.03 1.00 0.03 1.00 0.29 0.15 0.03 1.00 0.04 1.00 0.54 0.27 0.05 1.00 0.08 1.00 0.67 0.34 0.07 1.00 0.10 1.00 0.81 0.41 0.08 1.00 0.12 1.00 0.96 0.48 0.10 1.00 0.15 1.00 1.62 0.81 0.16 1.00 0.25 1.00 1.69 0.85 0.17 1.00 0.26 1.00 1.90 0.95 0.19 1.00 0.29 1.00 2.10 1.05 0.21 1.00 0.33 1.00 2.30 1.15 0.23 1.00 0.36

OH m hari m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH OH m hari

Mandor Pipa PVC Ø 250 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa PVC Ø 300 mm Pekerja Tukang pipa Mandor Pipa PVC Ø 300 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa PVC Ø 400 mm Pekerja Tukang pipa Mandor Pipa PVC Ø 400 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa PVC Ø 450 mm Pekerja Tukang pipa Mandor Pipa PVC Ø 450 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa PVC Ø 500 mm Pekerja Tukang pipa Mandor Pipa PVC Ø 500 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa PVC Ø 600 mm Pekerja Tukang pipa Mandor Pipa PVC Ø 600 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa PVC Ø 800 mm Pekerja Tukang pipa Mandor Pipa PVC Ø 800 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa PVC Ø 900 mm Pekerja Tukang pipa Mandor Pipa PVC Ø 900 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa PVC Ø 1000 mm Pekerja Tukang pipa Mandor Pipa PVC Ø 1000 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa PVC Ø 1100 mm Pekerja Tukang pipa Mandor Pipa PVC Ø 1100 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa PVC Ø 1200 mm Pekerja Tukang pipa Mandor Pipa PVC Ø 1200 mm Sewa Tripot/Tackel & handle crane 2 T

5,720 481,912 16,306 835,572 35,744 23,829 6,380 750,435 19,184 1,540,869 66,138 44,092 11,880 1,380,392 38,367 1,831,939 81,335 54,305 14,740 1,633,600 47,959 2,588,638 98,356 65,652 17,820 2,348,300 58,510 3,960,257 116,350 77,648 21,120 3,675,600 69,540 5,486,291 196,713 131,142 35,640 5,002,900 119,897 6,835,759 205,588 137,140 37,180 6,330,200 125,652 8,224,362 230,390 153,674 41,800 7,657,500 140,999 9,613,225 255,192 170,209 46,200 8,984,800 156,825 11,001,608 279,993 186,743 50,599 10,312,100 172,172

53/151

Software RAB Exarch xPro v2019

A.8.4.1.17

P-428

A.8.4.1.18

P-429

A.8.4.1.19

P-430

A.8.4.1.20

P-431

A.8.4.1.21

P-432

A.8.4.1.22

P-433

A.8.4.1.23

P-434

A.8.4.1.24

P-435

A.8.4.1.25

P-436

A.8.4.1.26

P-437

A.8.4.1.27

P-438

www.mitra-arsitek.com

1.00 0.04 0.02 0.00 1.00 0.02 1.00 0.04 0.02 0.00 1.00 0.02 1.00 0.05 0.02 0.01 1.00 0.02 1.00 0.06 0.03 0.01 1.00 0.02 1.00 0.10 0.05 0.01 1.00 0.02 1.00 0.13 0.07 0.01 1.00 0.04 1.00 0.17 0.09 0.02 1.00 0.07 1.00 0.29 0.15 0.03 1.00 0.15 1.00 0.36 0.18 0.04 1.00 0.20 1.00 0.43 0.22 0.04 1.00 0.25 1.00 0.51 0.26

m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH

(K3) Pemasangan pipa HDPE Ø 63 mm Pekerja Tukang pipa Mandor Pipa HDPE Ø 63 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa HDPE Ø 100 mm Pekerja Tukang pipa Mandor Pipa HDPE Ø 100 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa HDPE Ø 125 mm Pekerja Tukang pipa Mandor Pipa HDPE Ø 125 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa HDPE Ø 150 mm Pekerja Tukang pipa Mandor Pipa HDPE Ø 150 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa HDPE Ø 200 mm Pekerja Tukang pipa Mandor Pipa HDPE Ø 200 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa HDPE Ø 250 mm Pekerja Tukang pipa Mandor Pipa HDPE Ø 250 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa HDPE Ø 300 mm Pekerja Tukang pipa Mandor Pipa HDPE Ø 300 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa HDPE Ø 400 mm Pekerja Tukang pipa Mandor Pipa HDPE Ø 400 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa HDPE Ø 450 mm Pekerja Tukang pipa Mandor Pipa HDPE Ø 450 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa HDPE Ø 500 mm Pekerja Tukang pipa Mandor Pipa HDPE Ø 500 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa HDPE Ø 600 mm Pekerja Tukang pipa

72,938 4,255 2,756 660 56,155 9,112 144,701 4,863 3,242 880 126,604 9,112 262,410 5,471 3,728 1,100 242,998 9,112 325,211 7,538 5,025 1,320 302,216 9,112 651,727 12,401 8,267 2,200 619,747 9,112 1,015,899 16,170 10,861 2,860 965,866 20,143 1,621,280 20,668 13,779 3,740 1,551,920 31,173 2,606,818 35,258 23,505 6,380 2,468,778 72,897 3,303,985 43,646 29,179 7,920 3,127,323 95,918 3,995,194 52,643 35,014 9,460 3,777,700 120,376 4,039,900 62,248 41,499

54/151

Software RAB Exarch xPro v2019

A.8.4.1.28

P-439

A.8.4.1.29

P-440

A.8.4.1.30

P-441

A.8.4.1.31

P-442

A.8.4.1.32

P-443

A.8.4.1.33

P-444

A.8.4.1.34

P-445

A.8.4.1.35

P-446

A.8.4.1.36

P-447

A.8.4.1.37

P-448

www.mitra-arsitek.com

0.05 1.00 0.31 1.00 0.89 0.45 0.09 1.00 0.57 1.00 1.35 0.68 0.14 1.00 0.88 1.00 1.66 0.83 0.17 1.00 1.09 1.00 1.82 0.91 0.18 1.00 1.21 1.00 2.37 1.19 0.24 1.00 1.58 1.00 0.35 0.17 0.03 1.00 0.04 1.00 0.40 0.20 0.04 1.00 0.04 1.00 0.45 0.22 0.05 1.00 0.04 1.00 0.51 0.25 0.05 1.00 0.04 1.00 0.80 0.40 0.08 1.00 0.04

OH m hari m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH OH m hari

Mandor Pipa HDPE Ø 500 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa HDPE Ø 800 mm Pekerja Tukang pipa Mandor Pipa HDPE Ø 800 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa HDPE Ø 900 mm Pekerja Tukang pipa Mandor Pipa HDPE Ø 900 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa HDPE Ø 1000 mm Pekerja Tukang pipa Mandor Pipa HDPE Ø 1000 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa HDPE Ø 1100 mm Pekerja Tukang pipa Mandor Pipa HDPE Ø 1100 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa HDPE Ø 1200 mm Pekerja Tukang pipa Mandor Pipa HDPE Ø 1200 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa GIP Ø 63 mm Pekerja Tukang pipa Mandor Pipa GIP Ø 63 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa GIP Ø 100 mm Pekerja Tukang pipa Mandor Pipa GIP Ø 100 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa GIP Ø 125 mm Pekerja Tukang pipa Mandor Pipa GIP Ø 125 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa GIP Ø 150 mm Pekerja Tukang pipa Mandor Pipa GIP Ø 150 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa GIP Ø 200 mm Pekerja Tukang pipa Mandor Pipa GIP Ø 200 mm Sewa Tripot/Tackel & handle crane 2 T

11,220 3,777,700 147,233 9,357,951 108,569 72,298 19,580 8,882,700 274,804 10,733,214 164,495 109,744 29,700 10,005,800 423,476 12,638,452 201,697 134,546 36,520 11,741,500 524,189 12,727,823 221,028 147,352 40,040 11,741,500 577,903 14,054,538 288,139 192,093 52,139 12,762,500 759,667 248,680 41,944 27,882 7,480 153,150 18,224 331,675 48,631 32,421 8,800 223,599 18,224 400,315 54,467 36,311 9,900 281,413 18,224 471,589 61,518 41,012 11,220 337,696 20,143 649,297 96,776 64,517 17,600 450,261 20,143

55/151

Software RAB Exarch xPro v2019

A.8.4.1.38

P-449

A.8.4.1.39

P-450

A.8.4.1.40

P-451

A.8.4.1.41

P-452

A.8.4.1.42

P-453

A.8.4.1.43

P-454

A.8.4.1.44

P-455

A.8.4.1.45

P-456

A.8.4.1.46

P-457

A.8.4.1.47

P-458

A.8.4.1.48

P-459

www.mitra-arsitek.com

1.00 0.95 0.48 0.10 1.00 0.04 1.00 0.96 0.48 0.10 1.00 0.04 1.00 1.21 0.61 0.12 1.00 0.06 1.00 1.35 0.68 0.14 1.00 0.06 1.00 1.47 0.74 0.15 1.00 0.08 1.00 1.33 0.66 0.13 1.00 0.08 1.00 2.33 1.16 0.23 1.00 0.09 1.00 2.62 1.31 0.26 1.00 0.09 1.00 2.91 1.46 0.29 1.00 0.09 1.00 3.20 1.60 0.32 1.00 0.09 1.00 0.35 1.74

m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH

(K3) Pemasangan pipa GIP Ø 250 mm Pekerja Tukang pipa Mandor Pipa GIP Ø 250 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa GIP Ø 300 mm Pekerja Tukang pipa Mandor Pipa GIP Ø 300 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa GIP Ø 400 mm Pekerja Tukang pipa Mandor Pipa GIP Ø 400 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa GIP Ø 450 mm Pekerja Tukang pipa Mandor Pipa GIP Ø 450 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa GIP Ø 500 mm Pekerja Tukang pipa Mandor Pipa GIP Ø 500 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa GIP Ø 600 mm Pekerja Tukang pipa Mandor Pipa GIP Ø 600 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa GIP Ø 800 mm Pekerja Tukang pipa Mandor Pipa GIP Ø 800 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa GIP Ø 900 mm Pekerja Tukang pipa Mandor Pipa GIP Ø 900 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa GIP Ø 1000 mm Pekerja Tukang pipa Mandor Pipa GIP Ø 1000 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa GIP Ø 1100 mm Pekerja Tukang pipa Mandor Pipa GIP Ø 1100 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa GIP Ø 1200 mm Pekerja Tukang pipa

796,245 115,377 76,999 20,900 562,826 20,143 910,773 116,471 77,648 21,120 675,392 20,143 1,200,305 147,352 98,235 26,620 900,522 27,576 1,344,440 164,495 109,582 29,700 1,013,087 27,576 1,492,504 178,598 119,146 32,340 1,125,653 36,768 1,685,781 161,334 107,637 29,260 1,350,783 36,768 2,365,106 282,911 188,526 51,259 1,801,044 41,364 2,656,757 318,898 212,680 57,639 2,026,175 41,364 2,946,624 353,913 236,023 64,019 2,251,305 41,364 3,236,614 389,049 259,366 70,399 2,476,436 41,364 3,144,825 42,406 282,709

56/151

Software RAB Exarch xPro v2019

A.8.4.1.49

P-460

A.8.4.1.50

P-461

A.8.4.1.51

P-462

A.8.4.1.52

P-463

A.8.4.1.53

P-464

A.8.4.1.54

P-465

A.8.4.1.55

P-466

A.8.4.1.56

P-467

A.8.4.1.57

P-468

www.mitra-arsitek.com

0.35 1.00 0.09 1.00 0.49 0.10 0.05 1.00 0.38 1.00 0.55 0.11 0.06 1.00 0.38 1.00 0.61 0.12 0.06 1.00 0.38 1.00 0.86 0.17 0.09 1.00 0.38 1.00 0.95 0.19 0.10 1.00 0.05 1.00 0.97 0.20 0.10 1.00 0.07 1.00 1.55 0.31 0.09 0.15 1.00 0.02 0.03 1.00 1.81 0.36 0.14 0.18 1.00 0.03 0.04 1.00 2.05 0.41 0.19 0.21 1.00 0.03 0.05

OH m hari m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH OH M hari m1 OH OH OH M hari m1 OH OH OH m hari m1 OH OH OH OH m hari hari m1 OH OH OH OH m hari hari m1 OH OH OH OH m hari hari

Mandor Pipa GIP Ø 1200 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa DCI Ø 100 mm Pekerja Tukang pipa Mandor Pipa DCI Ø 100 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa DCI Ø 125 mm Pekerja Tukang pipa Mandor Pipa DCI Ø 125 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa DCI Ø 150 mm Pekerja Tukang pipa Mandor Pipa DCI Ø 150 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa DCI Ø 200 mm Pekerja Tukang pipa Mandor Pipa DCI Ø 200 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa DCI Ø 250 mm Pekerja Tukang pipa Mandor Pipa DCI Ø 250 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa DCI Ø 300 mm Pekerja Tukang pipa Mandor Pipa DCI Ø 300 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa DCI Ø 400 mm Pekerja Tukang pipa Operator alat berat Mandor Pipa DCI Ø 400 mm Sewa excavator type 225 kap 0,5 -1,0 m3 Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa DCI Ø 450 mm Pekerja Tukang pipa Operator alat berat Mandor Pipa DCI Ø 450 mm Sewa excavator type 225 kap 0,5 -1,0 m3 Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa DCI Ø 500 mm Pekerja Tukang pipa Operator alat berat Mandor Pipa DCI Ø 500 mm Sewa excavator type 225 kap 0,5 -1,0 m3 Sewa Tripot/Tackel & handle crane 2 T

76,779 2,701,566 41,364 408,238 59,451 15,886 10,780 139,877 182,243 482,715 66,503 17,669 12,100 204,200 182,243 605,618 74,527 19,939 13,420 315,489 182,243 894,162 103,949 27,720 18,700 561,550 182,243 981,553 115,620 30,800 20,900 790,254 23,979 1,277,346 118,295 31,610 21,340 1,072,050 34,051 2,789,658 187,838 50,090 12,384 33,880 2,450,400 40,200 14,867 3,266,316 220,420 58,844 19,041 39,820 2,858,800 50,687 18,704 3,734,176 248,870 66,300 25,699 45,100 3,267,200 59,426 21,581

57/151

Software RAB Exarch xPro v2019

A.8.4.1.58

P-469

A.8.4.1.59

P-470

A.8.4.1.60

P-471

A.8.4.1.61

P-472

A.8.4.1.62

P-473

A.8.4.1.63

P-474

A.8.4.1.64

P-475

A.8.4.1.65

P-476

A.8.4.1.66

P-477

www.mitra-arsitek.com

1.00 2.01 0.40 0.29 0.20 1.00 0.06 0.08 1.00 3.86 0.77 0.49 0.39 1.00 0.08 0.23 1.00 5.00 1.00 0.59 0.50 1.00 0.09 0.25 1.00 5.93 1.19 0.79 0.69 1.00 0.11 0.30 1.00 6.95 1.39 0.79 0.70 1.00 0.15 0.30 1.00 8.06 1.61 0.89 0.81 1.00 0.18 0.36 1.00 0.50 0.10 0.05 1.00 0.00 1.00 0.58 0.12 0.06 1.00 0.00 1.00 0.65 0.13

m1 OH OH OH OH m hari hari m1 OH OH OH OH m hari hari m1 OH OH OH OH m hari hari m1 OH OH OH OH m hari hari m1 OH OH OH OH m hari hari m1 OH OH OH OH m hari hari m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH

(K3) Pemasangan pipa DCI Ø 600 mm Pekerja Tukang pipa Operator alat berat Mandor Pipa DCI Ø 600 mm Sewa excavator type 225 kap 0,5 -1,0 m3 Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa DCI Ø800 mm Pekerja Tukang pipa Operator alat berat Mandor Pipa DCI Ø 800 mm Sewa excavator type 225 kap 0,5 -1,0 m3 Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa DCI Ø900 mm Pekerja Tukang pipa Operator alat berat Mandor Pipa DCI Ø 900 mm Sewa excavator type 225 kap 0,5 -1,0 m3 Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa DCI Ø1000 mm Pekerja Tukang pipa Operator alat berat Mandor Pipa DCI Ø 1000 mm Sewa excavator type 225 kap 0,5 -1,0 m3 Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa DCI Ø1100 mm Pekerja Tukang pipa Operator alat berat Mandor Pipa DCI Ø 1100 mm Sewa excavator type 225 kap 0,5 -1,0 m3 Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa DCI Ø1200 mm Pekerja Tukang pipa Operator alat berat Mandor Pipa DCI Ø 1200 mm Sewa excavator type 225 kap 0,5 -1,0 m3 Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa baja Ø 63 mm Pekerja Tukang pipa Mandor Pipa Baja Ø 63 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa baja Ø 100 mm Pekerja Tukang pipa Mandor Pipa Baja Ø 100 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa baja Ø 125 mm Pekerja Tukang pipa

4,206,795 244,493 65,166 39,015 44,220 3,675,600 101,374 36,928 5,900,403 469,168 125,144 65,646 84,919 4,900,800 146,818 107,907 6,446,549 607,281 161,942 78,962 109,779 5,207,100 162,548 118,938 7,636,058 721,077 192,255 105,593 152,458 6,126,000 195,757 142,917 8,376,624 844,843 225,324 105,593 152,898 6,636,500 265,670 145,795 9,477,367 979,430 261,149 118,909 177,318 7,453,300 314,609 172,652 302,504 60,667 16,210 11,000 212,708 1,918 486,751 70,393 18,804 12,760 382,875 1,918 328,782 78,782 21,073

58/151

Software RAB Exarch xPro v2019

A.8.4.1.67

P-478

A.8.4.1.68

P-479

A.8.4.1.69

P-480

A.8.4.1.70

P-481

A.8.4.1.71

P-482

A.8.4.1.72

P-483

A.8.4.1.73

P-484

A.8.4.1.74

P-485

A.8.4.1.75

P-486

A.8.4.1.76

P-487

www.mitra-arsitek.com

0.07 1.00 0.00 1.00 0.71 0.14 0.07 1.00 0.00 1.00 1.11 0.22 0.11 1.00 0.00 1.00 1.33 0.27 0.13 1.00 0.00 1.00 1.42 0.28 0.14 1.00 0.00 1.00 2.37 0.47 0.24 1.00 0.03 0.04 1.00 2.23 0.45 0.22 1.00 0.03 0.04 1.00 2.43 0.49 0.24 1.00 0.03 0.05 1.00 2.21 0.44 0.22 1.00 0.03 0.04 1.00 3.90 0.78 0.39 1.00 0.05 0.10 1.00

OH m hari m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH OH m hari m1 OH OH OH m hari hari m1 OH OH OH m hari hari m1 OH OH OH m hari hari m1 OH OH OH m hari hari m1 OH OH OH m hari hari m1

Mandor Pipa Baja Ø 125 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa baja Ø 150 mm Pekerja Tukang pipa Mandor Pipa Baja Ø 150 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa baja Ø 200 mm Pekerja Tukang pipa Mandor Pipa Baja Ø 200 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa baja Ø 250 mm Pekerja Tukang pipa Mandor Pipa Baja Ø 250 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa baja Ø 300 mm Pekerja Tukang pipa Mandor Pipa Baja Ø 300 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa baja Ø 400 mm Pekerja Tukang pipa Mandor Pipa Baja Ø 400 mm Sewa excavator type 225 kap 0,5 -1,0 m3 Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa baja Ø 450 mm Pekerja Tukang pipa Mandor Pipa Baja Ø 450 mm Sewa excavator type 225 kap 0,5 -1,0 m3 Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa baja Ø 500 mm Pekerja Tukang pipa Mandor Pipa Baja Ø 500 mm Sewa excavator type 225 kap 0,5 -1,0 m3 Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa baja Ø 600 mm Pekerja Tukang pipa Mandor Pipa Baja Ø 600 mm Sewa excavator type 225 kap 0,5 -1,0 m3 Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa baja Ø 800 mm Pekerja Tukang pipa Mandor Pipa Baja Ø 800 mm Sewa excavator type 225 kap 0,5 -1,0 m3 Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa baja Ø 900 mm

14,300 212,708 1,918 253,238 86,077 23,019 15,620 126,604 1,918 416,297 135,316 36,149 24,420 218,494 1,918 502,728 161,090 42,957 29,260 267,502 1,918 572,461 172,032 45,875 31,020 321,615 1,918 911,183 287,653 76,675 52,139 428,820 47,191 18,704 937,698 271,240 72,298 49,059 481,912 45,444 17,745 1,036,212 295,677 78,782 53,459 536,025 50,687 21,581 1,102,943 268,444 71,650 48,620 648,335 47,191 18,704 1,670,906 473,788 126,279 85,799 857,640 80,400 47,000 1,756,121

59/151

Software RAB Exarch xPro v2019

A.8.4.1.77

P-488

A.8.4.1.78

P-489

A.8.4.1.79

P-490

A.8.4.2.1

P-491

A.8.4.2.2

P-492

A.8.4.2.3

P-493

A.8.4.2.4

P-494

A.8.4.2.5

P-495

A.8.4.2.6

P-496

www.mitra-arsitek.com

4.40 0.08 0.44 1.00 0.05 0.12 1.00 4.90 0.98 0.49 1.00 0.06 0.13 1.00 5.39 1.08 0.54 1.00 0.06 0.15 1.00 5.90 1.18 0.59 1.00 0.07 0.17 1.00 0.01 0.00 0.00 1.00 0.00 1.00 0.01 0.01 0.00 1.00 0.00 1.00 0.02 0.01 0.00 1.00 0.00 1.00 0.03 0.02 0.00 1.00 0.00 1.00 0.08 0.04 0.01 1.00 0.02 1.00 0.13 0.06 0.01 1.00 0.03

OH OH OH m hari hari m1 OH OH OH m hari hari m1 OH OH OH m hari hari m1 OH OH OH m hari hari m1 OH OH OH bh hari m1 OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari

Pekerja Tukang pipa Mandor Pipa Baja Ø 900 mm Sewa excavator type 225 kap 0,5 -1,0 m3 Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa baja Ø 1000 mm Pekerja Tukang pipa Mandor Pipa Baja Ø 1000 mm Sewa excavator type 225 kap 0,5 -1,0 m3 Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa baja Ø 1100 mm Pekerja Tukang pipa Mandor Pipa Baja Ø 1100 mm Sewa excavator type 225 kap 0,5 -1,0 m3 Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan pipa baja Ø 1200 mm Pekerja Tukang pipa Mandor Pipa Baja Ø 1200 mm Sewa excavator type 225 kap 0,5 -1,0 m3 Sewa Tripot/Tackel & handle crane 2 T (K3) Pemotongan pipa PVC Ø 63 mm Pekerja Tukang pipa Mandor Pipa PVC Ø 63 mm Bahan potong pipa T1/manual (gergaji) /saw (K3) Pemotongan pipa PVC Ø 90 mm Pekerja Tukang pipa Mandor Pipa PVC Ø 90 mm Bahan potong pipa T1/manual (gergaji) /saw (K3) Pemotongan pipa PVC Ø 110 mm Pekerja Tukang pipa Mandor Pipa PVC Ø 110 mm Bahan potong pipa T1/manual (gergaji) /saw (K3) Pemotongan pipa PVC Ø 150 mm Pekerja Tukang pipa Mandor Pipa PVC Ø 150 mm Bahan potong pipa T1/manual (gergaji) /saw (K3) Pemotongan pipa PVC Ø 200 mm Pekerja Tukang pipa Mandor Pipa PVC Ø 200 mm Bahan potong pipa T1/manual (gergaji) /saw (K3) Pemotongan pipa PVC Ø 250 mm Pekerja Tukang pipa Mandor Pipa PVC Ø 250 mm Bahan potong pipa T1/manual (gergaji) /saw

535,307 13,130 96,799 964,845 90,887 55,153 2,251,760 595,123 158,699 107,579 1,225,200 101,374 63,785 2,408,153 654,939 174,586 118,579 1,276,250 111,861 71,938 2,566,675 716,944 190,634 129,359 1,327,300 122,348 80,091 86,516 608 324 110 84,743 731 107,930 1,702 1,135 220 104,142 731 140,401 2,675 1,783 440 134,772 731 176,056 3,769 2,432 660 168,465 731 354,058 9,848 6,484 1,760 331,825 4,141 518,017 15,562 10,375 2,860 481,912 7,308

60/151

Software RAB Exarch xPro v2019

A.8.4.2.7

P-497

A.8.4.2.8

P-498

A.8.4.2.9

P-499

A.8.4.2.10

P-500

A.8.4.2.11

P-501

A.8.4.2.12

P-502

A.8.4.2.13

P-503

A.8.4.2.14

P-504

A.8.4.2.15

P-505

A.8.4.2.16

P-506

A.8.4.2.17

P-507

www.mitra-arsitek.com

1.00 0.16 0.08 0.02 1.00 0.04 1.00 0.33 0.17 0.03 1.00 0.09 1.00 0.42 0.21 0.04 1.00 0.05 1.00 0.52 0.26 0.05 1.00 0.07 1.00 0.62 0.31 0.06 1.00 0.09 1.00 1.09 0.55 0.11 1.00 0.16 1.00 1.14 0.57 0.11 1.00 0.17 1.00 1.29 0.64 0.13 1.00 0.19 1.00 1.43 0.72 0.14 1.00 0.21 1.00 1.57 0.79 0.16 1.00 0.24 1.00 0.00 0.00

bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH

(K3) Pemotongan pipa PVC Ø 300 mm Pekerja Tukang pipa Mandor Pipa PVC Ø 300 mm Bahan potong pipa T1/manual (gergaji) /saw (K3) Pemotongan pipa PVC Ø 400 mm Pekerja Tukang pipa Mandor Pipa PVC Ø 400 mm Bahan potong pipa T1/manual (gergaji) /saw (K3) Pemotongan pipa PVC Ø 450 mm Pekerja Tukang pipa Mandor Pipa PVC Ø 450 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa PVC Ø 500 mm Pekerja Tukang pipa Mandor Pipa PVC Ø 500 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa PVC Ø 600 mm Pekerja Tukang pipa Mandor Pipa PVC Ø 600 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa PVC Ø 800 mm Pekerja Tukang pipa Mandor Pipa PVC Ø 800 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa PVC Ø 900 mm Pekerja Tukang pipa Mandor Pipa PVC Ø 900 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa PVC Ø 1000 mm Pekerja Tukang pipa Mandor Pipa PVC Ø 1000 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa PVC Ø 1100 mm Pekerja Tukang pipa Mandor Pipa PVC Ø 1100 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa PVC Ø 1200 mm Pekerja Tukang pipa Mandor Pipa PVC Ø 1200 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa HDPE Ø 63 mm Pekerja Tukang pipa

794,075 18,845 12,482 3,300 750,435 9,013 1,475,753 40,242 26,909 7,260 1,380,392 20,950 1,763,571 51,063 34,042 9,240 1,633,600 35,627 2,510,225 62,977 41,985 11,440 2,348,300 45,523 3,872,135 75,743 50,414 13,640 3,675,600 56,739 5,353,184 132,398 88,346 23,980 5,002,900 105,560 6,697,399 138,720 92,561 25,080 6,330,200 110,838 8,072,352 156,227 104,233 28,380 7,657,500 126,012 9,446,425 173,735 115,904 31,460 8,984,800 140,527 10,821,158 191,242 127,576 34,540 10,312,100 155,701 63,771 243 162

61/151

Software RAB Exarch xPro v2019

A.8.4.2.18

P-508

A.8.4.2.19

P-509

A.8.4.2.20

P-510

A.8.4.2.21

P-511

A.8.4.2.22

P-512

A.8.4.2.23

P-513

A.8.4.2.24

P-514

A.8.4.2.25

P-515

A.8.4.2.26

P-516

www.mitra-arsitek.com

0.00 0.03 1.00 0.00 1.00 0.01 0.00 0.00 0.07 1.00 0.01 1.00 0.01 0.01 0.00 0.10 1.00 0.01 1.00 0.02 0.01 0.00 0.12 1.00 0.01 1.00 0.04 0.02 0.00 0.17 1.00 0.02 1.00 0.07 0.03 0.01 0.22 1.00 0.02 1.00 0.09 0.05 0.01 0.27 1.00 0.03 1.00 0.18 0.09 0.02 0.37 1.00 0.06 1.00 0.23 0.11 0.02 0.42 1.00 0.07 1.00 0.28 0.14

OH OH bh hari bh OH OH OH OH bh hari bh OH OH OH OH bh hari bh OH OH OH OH bh hari bh OH OH OH OH bh hari bh OH OH OH OH bh hari bh OH OH OH OH bh hari bh OH OH OH OH bh hari bh OH OH OH OH bh hari bh OH OH

Mandor Operator Alat Pipa Pipa HDPE Ø 63 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa HDPE Ø 100 mm Pekerja Tukang pipa Mandor Operator Alat Pipa Pipa HDPE Ø 100 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa HDPE Ø 125 mm Pekerja Tukang pipa Mandor Operator Alat Pipa Pipa HDPE Ø 125 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa HDPE Ø 150 mm Pekerja Tukang pipa Mandor Operator Alat Pipa Pipa HDPE Ø 150 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa HDPE Ø 200 mm Pekerja Tukang pipa Mandor Operator Alat Pipa Pipa HDPE Ø 200 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipaHDPE Ø 250 mm Pekerja Tukang pipa Mandor Operator Alat Pipa Pipa HDPE Ø 250 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa HDPE Ø 300 mm Pekerja Tukang pipa Mandor Operator Alat Pipa Pipa HDPE Ø 300 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa HDPE Ø 400 mm Pekerja Tukang pipa Mandor Operator Alat Pipa Pipa HDPE Ø 400 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa HDPE Ø 450 mm Pekerja Tukang pipa Mandor Operator Alat Pipa Pipa HDPE Ø 450 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa HDPE Ø 500 mm Pekerja Tukang pipa

44 4,527 56,155 2,639 140,793 729 486 220 9,454 126,604 3,299 261,864 1,094 811 220 12,783 242,998 3,959 327,948 1,945 1,297 440 16,112 302,216 5,938 663,528 5,349 3,566 880 22,770 619,747 11,216 1,025,503 8,146 5,349 1,540 29,428 965,866 15,174 1,628,015 10,942 7,295 1,980 36,085 1,551,920 19,793 2,594,210 21,519 14,265 3,960 49,401 2,468,778 36,286 3,280,297 27,355 18,318 5,060 56,059 3,127,323 46,183 3,958,865 33,677 22,532

62/151

Software RAB Exarch xPro v2019

A.8.4.2.27

P-517

A.8.4.2.28

P-518

A.8.4.2.29

P-519

A.8.4.2.30

P-520

A.8.4.2.31

P-521

A.8.4.2.32

P-522

A.8.4.2.33

P-523

A.8.4.2.34

P-524

A.8.4.2.35

P-525

www.mitra-arsitek.com

0.03 0.47 1.00 0.09 1.00 0.33 0.17 0.03 0.57 1.00 0.10 1.00 0.60 0.30 0.06 0.77 1.00 0.18 1.00 0.91 0.46 0.09 0.87 1.00 0.27 1.00 1.13 0.56 0.11 0.97 1.00 0.33 1.00 1.24 0.62 0.12 1.07 1.00 0.37 1.00 1.62 0.81 0.16 1.17 1.00 0.48 1.00 0.02 0.01 0.00 1.00 0.02 1.00 0.06 0.03 0.01 1.00 0.02 1.00 0.09 0.05 0.01 1.00

OH OH bh hari bh OH OH OH OH bh hari bh OH OH OH OH bh hari bh OH OH OH OH bh hari bh OH OH OH OH bh hari bh OH OH OH OH bh hari bh OH OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh

Mandor Operator Alat Pipa Pipa HDPE Ø 500 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa HDPE Ø 600 mm Pekerja Tukang pipa Mandor Operator Alat Pipa Pipa HDPE Ø 600 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa HDPE Ø 800 mm Pekerja Tukang pipa Mandor Operator Alat Pipa Pipa HDPE Ø 800 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa HDPE Ø 900 mm Pekerja Tukang pipa Mandor Operator Alat Pipa Pipa HDPE Ø 900 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa HDPE Ø 1000 mm Pekerja Tukang pipa Mandor Operator Alat Pipa Pipa HDPE Ø 1000 Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa HDPE Ø 1100 mm Pekerja Tukang pipa Mandor Operator Alat Pipa Pipa HDPE Ø 1100 Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa HDPE Ø 1200 mm Pekerja Tukang pipa Mandor Operator Alat Pipa Pipa HDPE Ø 1200 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa GIP Ø 63 mm Pekerja Tukang pipa Mandor Pipa GIP Ø 63 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa GIP Ø 100 mm Pekerja Tukang pipa Mandor Pipa GIP Ø 100 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa GIP Ø 125 mm Pekerja Tukang pipa Mandor Pipa GIP Ø 125 mm

6,160 62,717 3,777,700 56,079 6,343,484 40,485 27,071 7,260 76,032 6,126,000 66,635 9,238,520 73,068 48,793 13,200 102,664 8,882,700 118,095 10,504,851 111,000 73,919 20,020 115,979 10,005,800 178,133 11,321,349 136,775 91,102 24,640 129,295 10,720,500 219,037 11,382,054 150,513 100,342 27,280 142,611 10,720,500 240,809 13,596,743 196,834 131,142 35,640 155,926 12,762,500 314,701 168,737 2,310 1,621 440 153,150 11,216 247,887 7,052 4,701 1,320 223,599 11,216 324,467 11,185 7,457 1,980 281,413

63/151

Software RAB Exarch xPro v2019

A.8.4.2.36

P-526

A.8.4.2.37

P-527

A.8.4.2.38

P-528

A.8.4.2.39

P-529

A.8.4.2.40

P-530

A.8.4.2.41

P-531

A.8.4.2.42

P-532

A.8.4.2.43

P-533

A.8.4.2.44

P-534

A.8.4.2.45

P-535

A.8.4.2.46

P-536

www.mitra-arsitek.com

0.03 1.00 0.13 0.07 0.01 1.00 0.03 1.00 0.34 0.17 0.03 1.00 0.05 1.00 0.48 0.24 0.05 1.00 0.05 1.00 0.50 0.25 0.05 1.00 0.05 1.00 0.74 0.37 0.07 1.00 0.07 1.00 0.85 0.42 0.09 1.00 0.07 1.00 0.94 0.47 0.09 1.00 0.07 1.00 0.86 0.43 0.09 1.00 0.09 1.00 1.57 0.78 0.16 1.00 0.09 1.00 1.77 0.89 0.18 1.00 0.09 1.00 1.97

hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH

Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa GIP Ø 150 mm Pekerja Tukang pipa Mandor Pipa GIP Ø 150 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa GIP Ø 200 mm Pekerja Tukang pipa Mandor Pipa GIP Ø 200 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa GIP Ø 250 mm Pekerja Tukang pipa Mandor Pipa GIP Ø 250 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa GIP Ø 300 mm Pekerja Tukang pipa Mandor Pipa GIP Ø 300 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa GIP Ø 400 mm Pekerja Tukang pipa Mandor Pipa GIP Ø 400 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa GIP Ø 450 mm Pekerja Tukang pipa Mandor Pipa GIP Ø 450 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa GIP Ø 500 mm Pekerja Tukang pipa Mandor Pipa GIP Ø 500 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa GIP Ø 600 mm Pekerja Tukang pipa Mandor Pipa GIP Ø 600 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa GIP Ø 800 mm Pekerja Tukang pipa Mandor Pipa GIP Ø 800 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa GIP Ø 900 mm Pekerja Tukang pipa Mandor Pipa GIP Ø 900 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa GIP Ø 1000 mm Pekerja

22,432 389,613 15,927 10,699 2,860 337,696 22,432 560,282 41,336 27,558 7,480 450,261 33,647 702,981 57,749 38,419 10,340 562,826 33,647 822,164 61,275 40,850 11,000 675,392 33,647 1,111,205 89,724 59,816 16,280 900,522 44,863 1,248,480 103,098 68,732 18,700 1,013,087 44,863 1,381,951 114,405 76,351 20,680 1,125,653 44,863 1,600,853 105,043 70,029 18,920 1,350,783 56,079 2,209,102 190,512 126,927 34,540 1,801,044 56,079 2,479,847 215,193 143,462 38,940 2,026,175 56,079 2,761,930 239,994

64/151

Software RAB Exarch xPro v2019

A.8.4.2.47

P-537

A.8.4.2.48

P-538

A.8.4.2.49

P-539

A.8.4.2.50

P-540

A.8.4.2.51

P-541

A.8.4.2.52

P-542

A.8.4.2.53

P-543

A.8.4.2.54

P-544

A.8.4.2.55

P-545

A.8.4.2.56

P-546

www.mitra-arsitek.com

0.99 0.20 1.00 0.10 1.00 2.18 1.09 0.22 1.00 0.10 1.00 2.38 1.19 0.24 1.00 0.10 1.00 0.07 0.01 0.01 1.00 0.00 1.00 0.11 0.02 0.01 1.00 0.01 1.00 0.16 0.03 0.02 1.00 0.02 1.00 0.37 0.07 0.04 1.00 0.05 1.00 0.48 0.10 0.05 1.00 0.07 1.00 0.51 0.10 0.05 1.00 0.08 1.00 0.94 0.19 0.09 1.00 0.16 1.00 1.14 0.23 0.11 1.00

OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh

Tukang pipa Mandor Pipa GIP Ø 1000 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa GIP Ø 1100 mm Pekerja Tukang pipa Mandor Pipa GIP Ø 1100 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa GIP Ø 1200 mm Pekerja Tukang pipa Mandor Pipa GIP Ø 1200 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa DCI Ø 100 mm Pekerja Tukang pipa Mandor Pipa DCI Ø 100 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemotongan pipa DCI Ø 125 mm Pekerja Tukang pipa Mandor Pipa DCI Ø 125 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemotongan pipa DCI Ø 150 mm Pekerja Tukang pipa Mandor Pipa DCI Ø 150 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemotongan pipa DCI Ø 200 mm Pekerja Tukang pipa Mandor Pipa DCI Ø 200 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemotongan pipa DCI Ø 250 mm Pekerja Tukang pipa Mandor Pipa DCI Ø 250 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemotongan pipa DCI Ø 300 mm Pekerja Tukang pipa Mandor Pipa DCI Ø 300 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemotongan pipa DCI Ø 400 mm Pekerja Tukang pipa Mandor Pipa DCI Ø 400 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa DCI Ø 450 mm Pekerja Tukang pipa Mandor Pipa DCI Ø 450 mm

159,996 43,340 2,251,305 67,295 3,033,017 264,796 176,531 47,960 2,476,436 67,295 3,303,883 289,598 193,065 52,359 2,701,566 67,295 153,757 8,632 2,269 1,540 139,877 1,439 228,599 13,617 3,566 2,420 204,200 4,796 352,160 19,331 5,187 3,520 315,489 8,633 651,919 44,497 11,834 8,140 561,550 25,898 909,095 57,871 15,400 10,560 790,254 35,010 1,199,940 62,248 16,535 11,220 1,072,050 37,887 2,720,200 114,405 30,475 20,680 2,450,400 104,241 3,175,027 138,234 36,798 25,080 2,858,800

65/151

Software RAB Exarch xPro v2019

A.8.4.2.57

P-547

A.8.4.2.58

P-548

A.8.4.2.59

P-549

A.8.4.2.60

P-550

A.8.4.2.61

P-551

A.8.4.2.62

P-552

A.8.4.2.63

P-553

A.8.4.2.64

P-554

A.8.4.2.65

P-555

A.8.4.2.66

P-556

A.8.4.2.67

P-557

www.mitra-arsitek.com

0.18 1.00 1.31 0.26 0.13 1.00 0.19 1.00 1.31 0.26 0.13 1.00 0.19 1.00 2.60 0.52 0.26 1.00 0.31 1.00 3.37 0.67 0.34 1.00 0.38 1.00 4.02 0.80 0.40 1.00 0.44 1.00 4.73 0.95 0.47 1.00 0.51 1.00 5.50 1.10 0.55 1.00 0.58 1.00 0.03 0.01 0.00 1.00 0.04 1.00 0.09 0.02 0.01 1.00 0.04 1.00 0.13 0.03 0.01 1.00 0.04 1.00 0.18

hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH

Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa DCI Ø 500 mm Pekerja Tukang pipa Mandor Pipa DCI Ø 500 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa DCI Ø 600 mm Pekerja Tukang pipa Mandor Pipa DCI Ø 600 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa DCI Ø 800 mm Pekerja Tukang pipa Mandor Pipa DCI Ø 800 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa DCI Ø 900 mm Pekerja Tukang pipa Mandor Pipa DCI Ø 900 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa DCI Ø 1000 mm Pekerja Tukang pipa Mandor Pipa DCI Ø 1000 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa DCI Ø 1100 mm Pekerja Tukang pipa Mandor Pipa DCI Ø 1100 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa DCI Ø 1200 mm Pekerja Tukang pipa Mandor Pipa DCI Ø 1200 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa baja Ø 63 mm Pekerja Tukang pipa Mandor Pipa Baja Ø 63 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa baja Ø 100 mm Pekerja Tukang pipa Mandor Pipa Baja Ø 100 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa baja Ø 125 mm Pekerja Tukang pipa Mandor Pipa Baja Ø 125 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa baja Ø 150 mm Pekerja

116,116 3,624,673 159,510 42,471 28,820 3,267,200 126,672 4,032,708 159,145 42,471 28,820 3,675,600 126,672 5,562,675 315,859 84,294 57,199 4,900,800 204,523 6,051,579 409,717 109,258 74,139 5,207,100 251,365 7,124,584 488,864 130,331 88,439 6,126,000 290,950 7,802,927 575,184 153,350 104,059 6,636,500 333,834 8,801,549 668,921 178,314 120,999 7,453,300 380,016 242,156 3,404 973 660 212,708 24,411 424,115 10,334 2,756 1,760 382,875 26,390 263,824 16,170 4,377 2,860 212,708 27,710 188,621 22,370

66/151

Software RAB Exarch xPro v2019

A.8.4.2.68

P-558

A.8.4.2.69

P-559

A.8.4.2.70

P-560

A.8.4.2.71

P-561

A.8.4.2.72

P-562

A.8.4.2.73

P-563

A.8.4.2.74

P-564

A.8.4.2.75

P-565

A.8.4.2.76

P-566

A.8.4.2.77

P-567

www.mitra-arsitek.com

0.04 0.02 1.00 0.05 1.00 0.48 0.10 0.05 1.00 0.06 1.00 0.66 0.13 0.07 1.00 0.07 1.00 0.75 0.15 0.07 1.00 0.07 1.00 1.44 0.29 0.14 1.00 0.11 1.00 1.40 0.28 0.14 1.00 0.11 1.00 1.56 0.31 0.16 1.00 0.11 1.00 1.44 0.29 0.14 1.00 0.11 1.00 2.62 0.53 0.26 1.00 0.17 1.00 2.97 0.59 0.30 1.00 0.18 1.00 3.32 0.66 0.33 1.00

OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh

Tukang pipa Mandor Pipa Baja Ø 150 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa baja Ø 200 mm Pekerja Tukang pipa Mandor Pipa Baja Ø 200 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa baja Ø 250 mm Pekerja Tukang pipa Mandor Pipa Baja Ø 250 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa baja Ø 300 mm Pekerja Tukang pipa Mandor Pipa Baja Ø 300 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa baja Ø 400 mm Pekerja Tukang pipa Mandor Pipa Baja Ø 400 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa baja Ø 450 mm Pekerja Tukang pipa Mandor Pipa Baja Ø 450 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa baja Ø 500 mm Pekerja Tukang pipa Mandor Pipa Baja Ø 500 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa baja Ø 600 mm Pekerja Tukang pipa Mandor Pipa Baja Ø 600 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa baja Ø 800 mm Pekerja Tukang pipa Mandor Pipa Baja Ø 800 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa baja Ø 900 mm Pekerja Tukang pipa Mandor Pipa Baja Ø 900 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa baja Ø 1000 mm Pekerja Tukang pipa Mandor Pipa Baja Ø 1000 mm

5,998 3,960 126,604 29,689 341,910 57,871 15,400 10,560 218,494 39,585 429,051 80,606 21,560 14,520 267,502 44,863 500,126 90,575 24,153 16,280 321,615 47,502 751,531 175,072 46,686 31,680 428,820 69,274 798,781 170,087 45,389 30,800 481,912 70,593 880,932 189,418 50,576 34,320 536,025 70,593 975,797 174,707 46,524 31,680 648,335 74,552 1,428,922 319,020 85,104 57,639 857,640 109,519 1,608,415 361,207 96,290 65,339 964,845 120,734 1,942,002 403,516 107,637 73,039 1,225,200

67/151

Software RAB Exarch xPro v2019

A.8.4.2.78

P-568

A.8.4.2.79

P-569

A.8.4.3.1

P-570

A.8.4.3.2

P-571

A.8.4.3.3

P-572

A.8.4.3.4

P-573

A.8.4.3.5

P-574

A.8.4.3.6

P-575

A.8.4.3.7

P-576

A.8.4.3.8

P-577

A.8.4.3.9

P-578

www.mitra-arsitek.com

0.20 1.00 3.67 0.73 0.37 1.00 0.22 1.00 4.02 0.80 0.40 1.00 0.24 1.00 1.43 0.72 0.14 1.00 0.10 1.00 1.71 0.86 0.17 1.00 0.30 1.00 1.71 0.86 0.17 1.00 0.40 1.00 2.00 1.00 0.20 1.00 0.50 1.00 3.43 1.72 0.34 1.00 1.00 1.00 3.43 1.72 0.34 1.00 1.00 1.00 4.00 2.00 0.40 1.00 1.00 1.00 1.42 0.71 0.14 1.00 0.60 0.30 1.00

hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari hari bh

Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa baja Ø 1100 mm Pekerja Tukang pipa Mandor Pipa Baja Ø 1100 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemotongan pipa baja Ø 1200 mm Pekerja Tukang pipa Mandor Pipa Baja Ø 1100 mm Bahan potong pipa T2/mekanik / cilinder (K3) Pemasangan Valve Ø 150 mm Pekerja Tukang pipa Mandor Valve Ø 150 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan Valve Ø 200 mm Pekerja Tukang pipa Mandor Valve Ø 200 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan Valve Ø 250 mm Pekerja Tukang pipa Mandor Valve Ø 250 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan Valve Ø 300 mm Pekerja Tukang pipa Mandor Valve Ø 300 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan Valve Ø 400 mm Pekerja Tukang pipa Mandor Valve Ø 400 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan Valve Ø 450 mm Pekerja Tukang pipa Mandor Valve Ø 450 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan Valve Ø 500 mm Pekerja Tukang pipa Mandor Valve Ø 500 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan Valve Ø 600 mm Pekerja Tukang pipa Mandor Valve Ø 600 mm Sewa Tripot/Tackel & handle crane 2 T Mobile crane =< 3 ton (K3) Pemasangan Valve Ø 700 mm

132,610 2,065,462 445,825 118,822 80,739 1,276,250 143,826 2,138,694 488,134 130,169 88,439 1,276,250 155,701 6,086,657 173,735 115,904 31,460 5,717,600 47,959 7,369,503 208,384 138,923 37,620 6,840,700 143,876 10,276,262 208,384 138,923 37,620 9,699,500 191,835 689,053 243,155 162,104 44,000 1 239,794 1,249,945 416,890 278,008 75,459 1 479,588 1,249,945 416,890 278,008 75,459 1 479,588 1,378,106 486,311 324,207 87,999 1 479,588 926,736 172,762 115,256 31,240 1 287,753 319,725 1,093,768

68/151

Software RAB Exarch xPro v2019

A.8.4.3.10

P-579

A.8.4.3.11

P-580

A.8.4.3.12

P-581

A.8.4.3.13

P-582

A.8.4.3.14

P-583

A.8.4.3.15

P-584

A.8.4.3.16

P-585

A.8.4.3.17

P-586

A.8.4.3.18

P-587

www.mitra-arsitek.com

1.43 0.72 0.14 1.00 0.50 0.50 1.00 1.79 0.89 0.18 1.00 0.50 0.50 1.00 1.71 0.86 0.17 1.00 0.75 0.75 1.00 2.57 1.29 0.26 1.00 1.00 1.00 1.00 3.00 1.50 0.30 1.00 1.00 1.00 1.00 3.00 1.50 0.30 1.00 1.00 1.00 1.00 0.11 0.05 0.01 1.00 0.03 1.00 0.22 0.11 0.02 1.00 0.03 1.00 0.33 0.16 0.03 1.00 0.04 1.00 0.44 0.22 0.04

OH OH OH bh hari hari bh OH OH OH bh hari hari bh OH OH OH bh hari hari bh OH OH OH bh hari hari bh OH OH OH bh hari hari bh OH OH OH bh hari hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH

Pekerja Tukang pipa Mandor Valve Ø 700 mm Sewa Tripot/Tackel & handle crane 2 T Mobile crane =< 3 ton (K3) Pemasangan Valve Ø 800 mm Pekerja Tukang pipa Mandor Valve Ø 800 mm Sewa Tripot/Tackel & handle crane 2 T Mobile crane =< 3 ton (K3) Pemasangan Valve Ø 900 mm Pekerja Tukang pipa Mandor Valve Ø 900 mm Sewa Tripot/Tackel & handle crane 2 T Mobile crane =< 3 ton (K3) Pemasangan Valve Ø 1000 mm Pekerja Tukang pipa Mandor Valve Ø 1000 mm Sewa Tripot/Tackel & handle crane 2 T Mobile crane =< 3 ton (K3) Pemasangan Valve Ø 1100 mm Pekerja Tukang pipa Mandor Valve Ø 1100 mm Sewa Tripot/Tackel & handle crane 2 T Mobile crane =< 3 ton (K3) Pemasangan Valve Ø 1200 mm Pekerja Tukang pipa Mandor Valve Ø 1200 mm Sewa Tripot/Tackel & handle crane 2 T Mobile crane =< 3 ton (K3) Pemasangan Tee Ø 150 mm Pekerja Tukang pipa Mandor Tee Ø 150 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan Tee Ø 200 mm Pekerja Tukang pipa Mandor Tee Ø 200 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan 1 buah Tee Ø 250 mm Pekerja Tukang pipa Mandor Tee Ø 250 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan Tee Ø 300 mm Pekerja Tukang pipa Mandor

173,735 115,904 31,460 1 239,794 532,875 1,173,946 217,138 144,759 39,380 1 239,794 532,875 1,543,931 208,384 138,923 37,620 1 359,691 799,313 2,122,919 312,576 208,465 56,539 1 479,588 1,065,750 2,219,226 364,733 243,155 65,999 1 479,588 1,065,750 2,219,226 364,733 243,155 65,999 1 479,588 1,065,750 37,328 12,887 8,591 2,420 1 13,428 62,517 26,261 17,507 4,840 1 13,908 92,022 39,634 26,423 7,260 1 18,704 337,821 53,008 35,339 9,680

69/151

Software RAB Exarch xPro v2019

A.8.4.3.19

P-588

A.8.4.3.20

P-589

A.8.4.3.21

P-590

A.8.4.3.22

P-591

A.8.4.3.23

P-592

A.8.4.3.24

P-593

A.8.4.3.25

P-594

A.8.4.3.26

P-595

A.8.4.3.27

P-596

A.8.4.3.28

P-597

www.mitra-arsitek.com

1.00 0.50 1.00 0.66 0.33 0.07 1.00 0.50 1.00 0.77 0.38 0.08 1.00 0.50 1.00 0.88 0.44 0.09 1.00 0.60 1.00 1.10 0.55 0.11 1.00 0.19 0.10 1.00 1.32 0.66 0.13 1.00 0.23 0.11 1.00 1.54 0.77 0.15 1.00 0.26 0.13 1.00 1.76 0.88 0.18 1.00 0.32 0.16 1.00 1.98 0.99 0.20 1.00 0.37 0.18 1.00 2.20 1.10 0.22 1.00 0.39 0.19 1.00

bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari bh OH OH OH bh hari hari bh OH OH OH bh hari hari bh OH OH OH bh hari hari bh OH OH OH bh hari hari bh OH OH OH bh hari hari bh OH OH OH bh hari hari bh

Tee Ø 300 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan Tee Ø 400 mm Pekerja Tukang pipa Mandor Tee Ø 400 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan Tee Ø 450 mm Pekerja Tukang pipa Mandor Tee Ø 450 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan Tee Ø 500 mm Pekerja Tukang pipa Mandor Tee Ø 500 mm Sewa Tripot/Tackel & handle crane 2 T (K3) Pemasangan Tee Ø 600 mm Pekerja Tukang pipa Mandor Tee Ø 600 mm Sewa Tripot/Tackel & handle crane 2 T Mobile crane =< 3 ton (K3) Pemasangan Tee Ø 700 mm Pekerja Tukang pipa Mandor Tee Ø 700 mm Sewa Tripot/Tackel & handle crane 2 T Mobile crane =< 3 ton (K3) Pemasangan Tee Ø 800 mm Pekerja Tukang pipa Mandor Tee Ø 800 mm Sewa Tripot/Tackel & handle crane 2 T Mobile crane =< 3 ton (K3) Pemasangan Tee Ø 900 mm Pekerja Tukang pipa Mandor Tee Ø 900 mm Sewa Tripot/Tackel & handle crane 2 T Mobile crane =< 3 ton (K3) Pemasangan Tee Ø 1000 mm Pekerja Tukang pipa Mandor Tee Ø 1000 mm Sewa Tripot/Tackel & handle crane 2 T Mobile crane =< 3 ton (K3) Pemasangan Tee Ø 1100 mm Pekerja Tukang pipa Mandor Tee Ø 1100 mm Sewa Tripot/Tackel & handle crane 2 T Mobile crane =< 3 ton (K3) Pemasangan Tee Ø 1200 mm

1 239,794 387,240 79,755 53,170 14,520 1 239,794 411,949 93,129 62,086 16,940 1 239,794 484,617 106,502 71,001 19,360 1 287,753 441,155 133,249 88,833 24,200 1 92,560 102,312 524,038 159,996 106,664 29,040 1 107,907 120,430 605,855 186,743 124,496 33,880 1 123,254 137,482 720,071 213,490 142,327 38,720 1 153,948 171,586 814,518 240,238 160,158 43,560 1 175,529 195,032 884,185 266,985 177,990 48,400 1 185,121 205,690 998,401

70/151

Software RAB Exarch xPro v2019

A.8.4.4.1

P-598

A.8.4.4.2

P-599

A.8.4.4.3

P-600

A.8.4.4.4

P-601

A.8.4.4.5

P-602

A.8.4.4.6

P-603

A.8.4.4.7

P-604

www.mitra-arsitek.com

2.42 1.21 0.24 1.00 0.45 0.23 1.00 1.47 0.73 0.15 1.00 0.61 0.08 0.97 0.87 1.00 1.65 0.82 0.17 1.00 0.65 0.16 1.08 0.91 1.00 2.10 1.05 0.21 1.00 0.76 0.37 1.35 1.03 1.00 2.55 1.27 0.26 1.00 0.87 0.58 1.63 1.14 1.00 3.00 1.50 0.30 1.00 0.98 0.79 1.90 1.26 1.00 3.45 1.72 0.35 1.00 1.09 1.00 2.18 1.37 1.00 4.35 2.17

OH OH OH bh hari hari bh OH OH OH bh hari hari hari hari bh OH OH OH bh hari hari hari hari bh OH OH OH bh hari hari hari hari bh OH OH OH bh hari hari hari hari bh OH OH OH bh hari hari hari hari bh OH OH OH bh hari hari hari hari bh OH OH

Pekerja Tukang pipa Mandor Tee Ø 1200 mm Sewa Tripot/Tackel & handle crane 2 T Mobile crane =< 3 ton (K3) Penyambungan pipa baru ke pipa yang ada Ø 80 mm Pekerja Tukang pipa Mandor Pipa Ø 80 mm Bahan potong pipa T2/mekanik / cilinder Sewa Genset 1500 watt Sewa Pompa Submersible 3m3/h Sewa Tripot/Tackel & handle crane 2 T (K3) Penyambungan pipa baru ke pipa yang ada Ø 100 mm Pekerja Tukang pipa Mandor Pipa Ø 100 mm Bahan potong pipa T2/mekanik / cilinder Sewa Genset 1500 watt Sewa Pompa Submersible 3m3/h Sewa Tripot/Tackel & handle crane 2 T (K3) Penyambungan pipa baru ke pipa yang ada Ø 150 mm Pekerja Tukang pipa Mandor Pipa Ø 150 mm Bahan potong pipa T2/mekanik / cilinder Sewa Genset 1500 watt Sewa Pompa Submersible 3m3/h Sewa Tripot/Tackel & handle crane 2 T (K3) Penyambungan pipa baru ke pipa yang ada Ø 200 mm Pekerja Tukang pipa Mandor Pipa Ø 200 mm Bahan potong pipa T2/mekanik / cilinder Sewa Genset 1500 watt Sewa Pompa Submersible 3m3/h Sewa Tripot/Tackel & handle crane 2 T (K3) Penyambungan pipa baru ke pipa yang ada Ø 250 mm Pekerja Tukang pipa Mandor Pipa Ø 250 mm Bahan potong pipa T2/mekanik / cilinder Sewa Genset 1500 watt Sewa Pompa Submersible 3m3/h Sewa Tripot/Tackel & handle crane 2 T (K3) Penyambungan pipa baru ke pipa yang ada Ø 300 mm Pekerja Tukang pipa Mandor Pipa Ø 300 mm Bahan potong pipa T2/mekanik / cilinder Sewa Genset 1500 watt Sewa Pompa Submersible 3m3/h Sewa Tripot/Tackel & handle crane 2 T (K3) Penyambungan pipa baru ke pipa yang ada Ø 400 mm Pekerja Tukang pipa

293,732 195,821 53,239 1 215,814 239,794 1,509,227 178,233 118,822 32,340 59,218 399,809 23,979 281,983 414,843 1,691,302 200,117 133,411 36,300 90,869 428,838 50,836 314,027 436,904 2,073,487 254,827 169,885 46,200 96,995 501,410 117,979 394,136 492,057 2,534,289 309,537 206,358 56,099 181,738 573,983 185,121 474,245 547,209 2,953,231 364,247 242,831 65,999 224,620 646,555 252,263 554,353 602,362 3,378,298 418,957 279,305 75,899 273,628 719,128 319,405 634,462 657,514 4,221,286 528,377 352,251

71/151

Software RAB Exarch xPro v2019

A.8.4.4.8

P-605

A.8.4.4.9

P-606

A.8.4.4.10

P-607

A.8.4.4.11

P-608

A.8.4.4.12

P-609

A.8.4.5.1

P-610

A.8.4.5.2

P-611

www.mitra-arsitek.com

0.44 1.00 1.31 1.42 2.73 1.60 1.00 4.80 2.40 0.48 1.00 1.42 1.63 3.00 1.72 1.00 5.25 2.62 0.53 1.00 1.53 1.84 3.28 1.83 1.00 6.15 3.07 0.62 1.00 1.75 2.26 3.83 2.06 1.00 7.05 3.52 0.71 1.00 1.97 2.68 4.38 2.29 1.00 7.95 3.97 0.80 1.00 2.19 3.10 4.93 2.52 1.00 0.01 0.00 0.00 0.06 0.00 1.00 0.01 0.00 0.00 0.06 0.00

OH bh hari hari hari hari bh OH OH OH bh hari hari hari hari bh OH OH OH bh hari hari hari hari bh OH OH OH bh hari hari hari hari bh OH OH OH bh hari hari hari hari bh OH OH OH bh hari hari hari hari bh OH OH m3 Ltr Ltr m1 OH OH m3 Ltr Ltr

Mandor Pipa Ø 400 mm Bahan potong pipa T2/mekanik / cilinder Sewa Genset 1500 watt Sewa Pompa Submersible 3m3/h Sewa Tripot/Tackel & handle crane 2 T (K3) Penyambungan pipa baru ke pipa yang ada Ø 450 mm Pekerja Tukang pipa Mandor Pipa Ø 450 mm Bahan potong pipa T2/mekanik / cilinder Sewa Genset 1500 watt Sewa Pompa Submersible 3m3/h Sewa Tripot/Tackel & handle crane 2 T (K3) Penyambungan pipa baru ke pipa yang ada Ø 500 mm Pekerja Tukang pipa Mandor Pipa Ø 500 mm Bahan potong pipa T2/mekanik / cilinder Sewa Genset 1500 watt Sewa Pompa Submersible 3m3/h Sewa Tripot/Tackel & handle crane 2 T (K3) Penyambungan pipa baru ke pipa yang ada Ø 600 mm Pekerja Tukang pipa Mandor Pipa Ø 600 mm Bahan potong pipa T2/mekanik / cilinder Sewa Genset 1500 watt Sewa Pompa Submersible 3m3/h Sewa Tripot/Tackel & handle crane 2 T (K3) Penyambungan pipa baru ke pipa yang ada Ø 700 mm Pekerja Tukang pipa Mandor Pipa Ø 700 mm Bahan potong pipa T2/mekanik / cilinder Sewa Genset 1500 watt Sewa Pompa Submersible 3m3/h Sewa Tripot/Tackel & handle crane 2 T (K3) Penyambungan pipa baru ke pipa yang ada Ø 800 mm Pekerja Tukang pipa Mandor Pipa Ø 800 mm Bahan potong pipa T2/mekanik / cilinder Sewa Genset 1500 watt Sewa Pompa Submersible 3m3/h Sewa Tripot/Tackel & handle crane 2 T (K3) Pengetesan pipa Ø 50 mm Pekerja Mandor Air test (air bersih) Bahan Bakar Oli (K3) Pengetesan pipa Ø 75 mm Pekerja Mandor Air test (air bersih) Bahan Bakar Oli

95,699 364,497 864,273 453,690 794,680 767,820 4,683,109 583,087 388,724 105,599 450,261 936,845 520,832 874,789 822,972 5,090,820 637,797 425,198 115,499 481,912 1,009,418 587,974 954,898 878,125 5,961,374 747,217 498,144 135,299 600,348 1,154,563 722,259 1,115,116 988,430 6,842,139 856,637 571,091 155,098 728,994 1,299,708 856,543 1,275,333 1,098,735 7,668,791 966,056 644,038 174,898 803,527 1,444,853 990,828 1,435,551 1,209,040 1,935 973 176 102 613 71 2,037 973 176 204 613 71

72/151

Software RAB Exarch xPro v2019

A.8.4.5.3

P-612

A.8.4.5.4

P-613

A.8.4.5.5

P-614

A.8.4.5.6

P-615

A.8.4.5.7

P-616

A.8.4.5.8

P-617

A.8.4.5.9

P-618

A.8.4.5.10

P-619

A.8.4.6.1

P-620

A.8.4.6.2

P-621

www.mitra-arsitek.com

1.00 0.01 0.00 0.01 0.06 0.00 1.00 0.01 0.00 0.02 0.06 0.00 1.00 0.01 0.00 0.03 0.06 0.00 1.00 0.01 0.00 0.05 0.06 0.00 1.00 0.01 0.00 0.07 0.06 0.00 1.00 0.01 0.00 0.13 0.06 0.00 1.00 0.01 0.00 0.16 0.06 0.00 1.00 0.01 0.00 0.28 0.06 0.00 1.00 0.15 0.15 0.03 0.03 0.28 24.00 3.00 4.00 3.00 24.00 1.00 1.00 1.00 1.00

m1 OH OH m3 Ltr Ltr m1 OH OH m3 Ltr Ltr m1 OH OH m3 Ltr Ltr m1 OH OH m3 Ltr Ltr m1 OH OH m3 Ltr Ltr m1 OH OH m3 Ltr Ltr m1 OH OH m3 Ltr Ltr m1 OH OH m3 Ltr Ltr titik OH OH OH OH btg m bh bh bh bh bh bh bh titik

(K3) Pengetesan pipa Ø 100 mm Pekerja Mandor Air test (air bersih) Bahan Bakar Oli (K3) Pengetesan pipa Ø 150 mm Pekerja Mandor Air test (air bersih) Bahan Bakar Oli (K3) Pengetesan 1 m pipa Ø 200 mm Pekerja Mandor Air test (air bersih) Bahan Bakar Oli (K3) Pengetesan pipa Ø 250 mm Pekerja Mandor Air test (air bersih) Bahan Bakar Oli (K3) Pengetesan 1 m pipa Ø 300 mm Pekerja Mandor Air test (air bersih) Bahan Bakar Oli (K3) Pengetesan pipa Ø 400 mm Pekerja Mandor Air test (air bersih) Bahan Bakar Oli (K3) Pengetesan 1 m pipa Ø 500 mm Pekerja Mandor Air test (air bersih) Bahan Bakar Oli (K3) Pengetesan pipa Ø 600 mm Pekerja Mandor Air test (air bersih) Bahan Bakar Oli (K3) Pemasangan titik lampu Pekerja Tukang batu Kepala tukang Mandor Pipa listrik 5/8” Kabel NYM 3x2,5 mm2 Tee Doos L.Bow Las Dop Klem Pipa Listrik Mongkok (Listrik) Saklar (standar) Fitting Lampu Memasang Instalasi Penerangan

2,241 973 176 408 613 71 2,752 973 176 919 613 71 3,415 973 176 1,583 613 71 4,334 973 176 2,501 613 71 5,457 973 176 3,625 613 71 8,265 973 176 6,432 613 71 9,899 973 176 8,066 613 71 16,280 973 176 14,447 613 71 651,114 18,237 24,316 5,558 6,600 3,612 463,126 4,595 40,840 3,063 18,378 1,532 35,735 25,525 351,795

73/151

Software RAB Exarch xPro v2019

0.15 0.15 0.03 0.03 11.00 11.00 1.00 2.00 3.00 6.00 2.00 0.25

OH OH OH OH M' M' bh bh bh bh bh bh

Pekerja Tukang batu Kepala tukang Mandor Kabel NYM 3x2,5 mm2 Pipa Conduit Socket Pipa Tee Doos Klem Pipa Sekrup fixer Las Dop Sealtape

18,237 24,316 5,558 6,600 212,266 58,401 14,294 3,063 4,595 1,532 2,042 893

DAFTAR ANALISA UTAMA Analisa Harga Satuan Pekerjaan Sesuai Acuan Berdasarkan Standar Nasional Indonesia Tahun 2008 Pembaharuan Data Tahun 2018

STANDAR

ID

SNI-2002

S-001

SNI 2008

S-002

SNI-2002

S-003

AK-SNI 2008

S-004

SNI-2002

S-005

SNI-2002

S-006

www.mitra-arsitek.com

Koef. 1.00 0.01 0.01 0.02 0.10 0.10 0.01 0.01 1.00 0.08 0.02 0.01 0.02 0.01 1.00 0.10 0.05 1.00 0.28 0.03 0.05 1.00 0.10 1.00 0.15 0.09 0.01 1.00 0.05 1.00 1.25 0.18 0.85 1.10 35.00 0.15 0.10 0.15 30.00 0.25 0.50 0.08

Unit m1 m3 m3 kg oh oh oh oh m2 oh oh oh oh hr m2 oh oh m2 m3 m3 m3 oh oh m2 m3 m3 m3 oh oh m2 btg m3 kg kg kg m3 m3 m3 bh lbr bh m2

Uraian Pek. Pengukuran & Pemasangan Bowplank Kayu Kaso 5 / 7 (borneo/meranti) Kayu Papan 3 / 20 borneo/meranti Paku Biasa 2" - 5" Pekerja Tukang kayu Kepala tukang Mandor Pekerjaan Pengukuran Gedung Pekerja Mandor Mandor Asisten Ahli Ukur Sewa alat ukur Membersihkan Lapangan dan Perataan Pekerja Mandor Pembuatan jalan sementara, tebal 25 cm Batu belah Kerikil Pasir Urug Pekerja Mandor Pembuatan Jalan Sementara Batu belah Batu belah Pasir pasang Pekerja Mandor Pek. Kantor Direksi Keet , dengan lantai plesteran Dolken kayu Ø 8-10/400 cm Kayu balok borneo Paku Biasa 2" - 5" Baja strip (0,2 x 2) cm Semen Pasir pasang Pasir beton Koral Beton Bata merah Seng Gelombang 3" x 6" BJLS 28 Jendela nako (rangka + kaca 5 mm) Kaca Polos

Harga 99,728 42,882 25,015 511 12,158 16,210 1,853 1,100 20,054 9,726 4,400 1,100 4,168 660 23,158 12,158 11,000 240,088 77,213 7,198 12,099 121,578 22,000 202,068 42,116 25,270 2,104 121,578 11,000 1,748,290 25,525 643,230 21,696 14,039 51,816 31,564 29,507 33,157 27,567 12,763 28,078 8,985

74/151

Software RAB Exarch xPro v2019

SNI-2002

S-007

SNI-2002

S-008

SNI-2002

S-009

SNI-2002

S-010

SNI-2002

S-011

SNI-2002

S-012

www.mitra-arsitek.com

0.15 0.06 2.00 2.00 1.00 0.30 0.05 1.00 1.25 2.50 1.20 0.01 0.01 0.07 0.06 0.45 0.40 0.20 0.02 0.02 1.00 1.00 2.00 25.00 0.01 0.01 0.06 0.30 0.20 0.02 0.02 1.00 1.25 2.50 0.01 0.01 0.07 0.06 0.40 0.40 0.20 0.02 0.02 1.00 0.43 0.04 0.04 0.00 0.00 1.00 1.70 0.21 0.30 10.50 0.03 0.05 1.50 1.00 2.00 0.20 0.05 1.00 3.00

bh lbr oh oh oh oh oh m1 btg Kg lbr m3 m3 m3 Kg Lt oh oh oh oh m1 btg Kg Kg m3 m3 Kg oh oh oh oh m1 btg Kg m3 m3 m3 Kg Lt oh oh oh oh m1 lbr oh oh oh oh m2 btg m3 Kg Kg m3 m3 lbr oh oh oh oh m2 btg

Kunci tanam biasa Plywood 120x240 tbl. 4 mm Pekerja Tukang kayu Tukang batu Kepala tukang Mandor Pagar Sementara dari Seng Gelombang tinggi 2 m Dolken kayu Ø 8-10/400 cm Semen Seng Gelombang 3" x 6" BJLS 28 Pasir beton Koral Beton Kaso 5/7 ( albasiah/meranti ) Paku Biasa 2" - 5" Meni Besi Pekerja Tukang kayu Kepala tukang Mandor Pagar Sementara dari Kawat Duri tinggi 1.8 m Dolken kayu Ø 8-10/400 cm Semen Kawat Duri Pasir beton Koral Beton Paku Biasa 2" - 5" Pekerja Tukang kayu Kepala tukang Mandor Pagar Sementara dari Kayu tinggi 2 m Dolken kayu Ø 8-10/400 cm Semen Pasir beton Koral Beton Kaso 5/7 ( albasiah/meranti ) Paku Biasa 2" - 5" Residu Pekerja Tukang kayu Kepala tukang Mandor Pasang pagar kawat jaring galvanis, tinggi 1,00 m Pagar kawat jaring Pekerja Tukang besi Kepala Tukang Mandor Pembuatan Gudang Semen dan Alat - alat Dolken kayu Ø 8-10/400 cm Kayu balok borneo Paku Biasa 2" - 5" Semen Pasir beton Koral Beton Seng Gelombang BJLS 32 Pekerja Tukang kayu Kepala tukang Mandor Pembuatan Rumah Jaga / Konstruksi Kayu Dolken kayu Ø 8-10/400 cm

19,910 4,411 243,155 324,207 162,104 55,578 11,000 455,715 25,525 3,701 61,260 1,475 1,989 257,292 1,532 13,784 48,631 32,421 3,705 4,400 1,509,251 20,420 2,961 1,403,875 1,475 1,989 1,532 36,473 32,421 3,705 4,400 384,143 25,525 3,701 1,475 1,989 257,292 1,532 3,471 48,631 32,421 3,705 4,400 28,605 15,509 5,106 6,808 741 440 1,498,215 34,714 750,435 7,658 15,545 8,852 11,052 176,123 121,578 324,207 37,052 11,000 1,645,058 61,260

75/151

Software RAB Exarch xPro v2019

SNI-2002

S-013

SNI-2002

S-014

SNI-2002

S-015

SNI-2002

S-016

AK-SNI 2008

S-017

AK-SNI 2008

S-018

www.mitra-arsitek.com

0.28 0.70 1.50 1.00 1.50 0.15 0.05 1.00 1.25 0.19 0.30 18.00 0.03 0.05 1.50 1.35 1.00 2.00 0.20 0.05 1.00 0.04 0.08 1.00 0.03 0.00 1.00 1.00 0.25 0.00 0.02 0.25 0.01 1.00 0.99 0.53 0.07 0.15 45.00 0.38 0.13 0.01 0.02 1.00 0.04 1.40 0.60 1.50 16.80 0.03 0.04 2.10 0.02 1.00 1.00 1.01 1.00 0.04 1.00 0.60 1.50 16.80 0.03

m3 Kg lbr oh oh oh oh m2 btg m3 Kg Kg m3 m3 lbr lbr oh oh oh oh m2 m3 Kg btg oh oh m2 btg Kg oh oh oh oh m1 lbr btg m3 m3 kg oh oh oh oh bh m3 m1 kg kg kg m3 m3 oh oh oh oh oh bh m3 m2 kg kg kg m3

Kayu balok borneo Paku Biasa 2" - 5" Seng Gelombang BJLS 32 Pekerja Tukang kayu Kepala tukang Mandor Pembuatan Bedeng Buruh Dolken kayu Ø 8-10/400 cm Kayu balok borneo Paku Biasa 2" - 5" Semen Pasir beton Koral Beton Seng Gelombang BJLS 32 Plywood 120x240 tbl. 4 mm Pekerja Tukang kayu Kepala tukang Mandor Pembuatan Bak Adukan ( 40 x 50 x 20 ) cm Papan kayu 3/20 Kelas II Paku Biasa 2" - 5" Kayu Kaso 5 / 7 (borneo) Tukang kayu Mandor Pembuatan Stegger dari Bambu, ( 40 x 50 x 20 ) cm Bambu Ø 6 - 8 / 600 cm Tali ijuk Pekerja Tukang kayu Kepala tukang Mandor Pasang pagar beton pracetak ( 5 x 50 x 213 ) cm Panel beton pracetak Kolom beton pracetak Pasir beton Batu pecah 2/3 Semen Pekerja Tukang batu Kepala tukang Mandor Membuat Papan Nama Proyek 80x120 cm (bahan seng) Papan kayu 3/20 Kelas II Seng Gelombang 3" x 6" BJLS 28 Paku Biasa 2" - 5" Cat kayu Semen Pasir beton Kerikil Pekerja Tukang batu Tukang kayu Tukang cat Mandor Membuat Papan Nama Proyek 80x120 cm (bahan flexi) Papan kayu 3/20 Kelas II Print outdoor flexi Paku Biasa 2" - 5" Cat kayu Semen Pasir beton

986,286 17,868 176,123 121,578 243,155 27,789 11,000 1,513,607 25,525 664,671 7,658 26,648 8,852 11,052 176,123 99,241 121,578 324,207 37,052 11,000 176,721 119,457 2,042 50,029 4,863 330 76,415 18,378 5,973 243 2,756 46,315 2,750 471,955 151,006 108,063 21,835 52,173 66,620 45,592 20,263 2,223 4,180 1,125,356 116,139 71,470 15,315 76,422 24,872 7,967 9,717 255,313 2,837 162,104 162,104 221,098 776,187 116,139 55,134 15,315 76,422 24,872 7,967

76/151

Software RAB Exarch xPro v2019

AK-SNI 2008

S-019

AK-SNI 2008

S-020

AK-SNI 2008

S-021

AK-SNI 2008

S-022

AK-SNI 2008

S-023

AK-SNI 2008

S-024

AK-SNI 2008

S-025

AK-SNI 2008

S-026

AK-SNI 2008

S-027

AK-SNI 2008

S-028

AK-SNI 2008

S-029

AK-SNI 2008

S-030

SNI-2007

S-031

SNI-2007

S-032

SNI-2007

S-033

SNI-2007

S-034

SNI-2007

S-035

www.mitra-arsitek.com

0.04 0.02 1.00 1.00 1.00 0.10 1.00 4.00 0.40 1.00 2.00 0.10 1.00 0.20 8.00 0.10 1.00 0.20 0.01 1.00 0.13 0.01 1.00 0.20 0.01 1.00 0.05 0.10 1.00 0.06 0.01 0.20 0.01 1.00 0.20 0.01 1.00 6.00 0.60 4.00 0.20 1.00 1.00 0.20 1.00 12.00 1.20 4.00 0.20 1.00 0.75 0.03 1.00 0.90 0.05 1.00 1.05 0.07 1.00 1.00 0.03 1.00 1.50

m3 oh oh oh oh oh m3 oh oh m3 oh oh m3 oh oh oh m2 oh oh m2 oh oh m2 oh oh m2 oh oh m2 oh oh oh oh m2 oh oh m3 oh oh oh oh m3 oh oh m3 oh oh oh oh m3 oh oh m3 oh oh m3 oh oh m3 oh oh m3 oh

Kerikil 9,717 Tukang batu 2,837 Tukang kayu 162,104 Tukang cat 162,104 Pekerja 121,578 Mandor 22,000 Membongkar pasangan batu kali 697,046 Tukang batu 648,414 Pekerja 48,631 Membongkar pasangan batu merah dan membersihkan 336,365 Tukang batu 324,207 Pekerja 12,158 Membongkar beton bertulang dan membersihkan 1,027,042 Tukang batu 32,421 Pekerja 972,622 Mandor 22,000 Pekerjaan bongkar lantai tegel untuk dipergunakan lagi 26,516 Pekerja 24,316 Mandor 2,200 Mengupas plesteran lama 17,947 Pekerja 15,197 Mandor 2,750 Membongkar genteng / sirap untuk dipergunakan lagi 26,516 Pekerja 24,316 Mandor 2,200 Membongkar atap seng 20,263 Tukang besi 8,105 Pekerja 12,158 Membongkar usuk / reng dipakai lagi 37,353 Tukang kayu 9,726 Kepala Tukang 1,112 Pekerja 24,316 Mandor 2,200 Membongkar usuk / reng tidak dipakai lagi 26,516 Pekerja 24,316 Mandor 2,200 Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan1,614,089 untuk digunakan lagi Tukang kayu 972,622 Kepala Tukang 111,157 Pekerja 486,311 Mandor 44,000 Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan tidak 165,577 digunakan lagi Pekerja 121,578 Mandor 44,000 Mengerjakan kembali bangunan kayu yang telah dibongkar 2,697,867 Tukang kayu 1,945,243 Kepala Tukang 222,314 Pekerja 486,311 Mandor 44,000 Menggali tanah biasa sedalam 1 meter 96,683 Pekerja 91,183 Mandor 5,500 Menggali tanah biasa sedalam 2 meter 119,320 Pekerja 109,420 Mandor 9,900 Menggali tanah biasa sedalam 3 meter 142,396 Pekerja 127,657 Mandor 14,740 Menggali tanah keras sedalam 1 meter 128,618 Pekerja 121,578 Mandor 7,040 Menggali tanah cadas sedalam 1 meter 195,566 Pekerja 182,367

77/151

Software RAB Exarch xPro v2019

SNI-2007

S-036

SNI-2007

S-037

SNI-2002

S-038

SNI-2007

S-039

SNI-2002

S-040

SNI-2007

S-041

AK-SNI 2008

S-042

SNI-2007

S-043

SNI-2007

S-044

SNI-2007

S-045

SNI-2007

S-046

SNI-2002

S-047

SNI-2007

S-048

AK-SNI 2008

S-049

AK-SNI 2008

S-050

AK-SNI 2008

S-051

www.mitra-arsitek.com

0.06 1.00 1.20 0.05 1.00 0.05 0.01 1.00 0.19 0.02 1.00 0.33 0.01 1.00 0.52 0.05 1.00 0.50 0.05 1.00 0.25 0.01 1.00 1.20 0.30 0.01 1.00 0.14 0.40 0.95 0.80 0.40 0.04 0.08 1.00 0.25 1.24 0.80 0.40 0.04 0.08 1.00 1.50 0.15 0.02 1.00 1.20 0.15 0.02 1.00 1.20 0.25 0.03 1.00 1.20 0.30 0.01 1.00 0.25 0.01 1.00 2.00 1.00

oh m3 oh oh m2 oh oh m3 oh oh m3 oh oh m3 oh oh m3 oh oh m2 oh oh m3 m3 oh oh m3 m3 m3 m3 oh oh oh oh m3 m3 m3 oh oh oh oh m3 m3 oh oh m3 m3 oh oh m3 m3 oh oh m3 m3 oh oh m3 oh oh m1 bh oh

Mandor Menggali tanah lumpur sedalam 1 meter Pekerja Mandor Mengerjakan stripping tebing setinggi 1 meter Pekerja Mandor Urug kembali bekas galian Pekerja Mandor Membuang tanah sejauh 30 meter Pekerja Mandor Membuang tanah sejauh 150 meter Pekerja Mandor Memadatkan tanah (per 20 cm) Pekerja Mandor Meratakan tanah ditumbuk halus Pekerja Mandor Mengurug pasir urug Pasir urug Pekerja Mandor Memasang Lapisan pudel campuran 1 KP : 3 PP : 7 TL Kapur padam Pasir pasang Tanah Liat Pekerja Tukang batu Kepala tukang Mandor Memasang Lapisan pudel campuran 1 KP : 5 TL Kapur padam Tanah Liat Pekerja Tukang batu Kepala tukang Mandor Memasang lapisan ijuk tebal 10 cm Ijuk Pekerja Mandor Pemasangan lapisan ijuk Ijuk Pekerja Mandor Mengurug sirtu padat untuk peninggian lantai bangunan Sirtu Pekerja Mandor Urug tanah mendatangkan Tanah urug Pekerja Mandor Membuang tanah dengan menghampar Pekerja Mandor Pekerjaan Membuat sumur Buis beton D. 80 cm Tukang gali sumur

13,200 155,793 145,893 9,900 7,179 6,079 1,100 27,523 23,343 4,180 42,321 40,121 2,200 73,734 62,734 11,000 71,789 60,789 11,000 32,594 30,394 2,200 329,046 290,372 36,473 2,200 413,490 11,344 84,171 130,861 97,262 64,841 7,410 17,600 379,122 20,839 171,169 97,262 64,841 7,410 17,600 343,152 321,615 18,237 3,300 278,829 257,292 18,237 3,300 328,717 292,823 30,394 5,500 265,335 226,662 36,473 2,200 32,594 30,394 2,200 394,237 126,604 162,104

78/151

Software RAB Exarch xPro v2019

AK-SNI 2008

S-052

SNI-2002

S-053

SNI-2002

S-054

SNI-2007

S-055

SNI-2007

S-056

SNI-2007

S-057

SNI-2007

S-058

SNI-2007

S-059

www.mitra-arsitek.com

0.74 0.07 1.00 0.20 1.00 0.50 0.03 1.00 1.10 392.00 0.31 1.50 0.75 0.08 0.08 1.00 1.10 267.00 0.43 1.50 0.75 0.08 0.08 1.00 1.20 202.00 0.49 1.50 0.75 0.08 0.08 1.00 1.20 163.00 0.52 1.50 0.75 0.08 0.08 1.00 1.20 136.00 0.54 1.50 0.75 0.08 0.08 1.00 1.20 117.00 0.56 1.50 0.75 0.08 0.08 1.00 1.20 91.00 0.58 1.50 0.75 0.08 0.08

oh oh m2 btg m2 oh oh m3 m3 kg m3 oh oh oh oh m3 m3 kg m3 oh oh oh oh m3 m3 kg m3 oh oh oh oh m3 m3 kg m3 oh oh oh oh m3 m3 kg m3 oh oh oh oh m3 m3 kg m3 oh oh oh oh m3 m3 kg m3 oh oh oh oh

Pekerja Mandor Pekerjaan Gebalan rumput Bambu Ø 6 - 8 / 600 cm Gebalan rumput Pekerja Mandor Pasangan pondasi 1 Pc : 1 Ps Batu belah Semen Pasir pasang Pekerja Tukang batu Kepala Tukang Mandor Pasangan pondasi 1 Pc : 2 Ps Batu belah Semen Pasir pasang Pekerja Tukang batu Kepala Tukang Mandor Memasang pondasi batu belah, campuran 1 PC : 3 PP Batu belah Semen Pasir pasang Pekerja Tukang batu Kepala tukang Mandor Memasang pondasi batu belah, campuran 1 PC : 4 PP Batu belah Semen Pasir pasang Pekerja Tukang batu Kepala tukang Mandor Memasang pondasi batu belah, campuran 1 PC : 5 PP Batu belah Semen Pasir pasang Pekerja Tukang batu Kepala tukang Mandor Memasang pondasi batu belah, campuran 1 PC : 6 PP Batu belah Semen Pasir pasang Pekerja Tukang batu Kepala tukang Mandor Memasang pondasi batu belah, campuran 1 PC : 8 PP Batu belah Semen Pasir pasang Pekerja Tukang batu Kepala tukang Mandor

89,360 16,170 100,594 3,676 30,630 60,789 5,500 1,289,602 308,853 580,336 66,074 182,367 121,578 13,895 16,500 1,128,324 308,853 395,280 89,853 182,367 121,578 13,895 16,500 1,072,377 336,930 299,051 102,058 182,367 121,578 13,895 16,500 1,022,005 336,930 241,313 109,423 182,367 121,578 13,895 16,500 987,083 336,930 201,341 114,473 182,367 121,578 13,895 16,500 962,532 336,930 173,213 118,050 182,367 121,578 13,895 16,500 928,880 336,930 134,721 122,890 182,367 121,578 13,895 16,500

79/151

Software RAB Exarch xPro v2019

SNI-2002

S-060

SNI-2007

S-061

AK-SNI 2008

S-062

SNI-2007

S-063

SNI-2007

S-064

SNI-2007

S-065

SNI-2007

S-066

www.mitra-arsitek.com

1.00 1.10 0.23 0.23 0.54 1.50 0.75 0.08 0.08 1.00 1.20 0.17 0.17 0.34 1.50 0.75 0.08 0.08 1.00 1.20 95.42 0.23 0.38 1.50 0.75 0.08 0.08 1.00 1.20 61.00 0.15 0.49 1.50 0.75 0.08 0.08 1.00 1.20 41.00 0.13 0.52 1.50 0.75 0.08 0.08 1.00 1.20 0.43 0.78 0.39 0.04 0.04 1.00 0.48 194.00 0.31 0.47 126.00 1.80 3.40 0.85 0.09 0.17

m3 m3 m3 m3 m3 oh oh oh oh m3 m3 m3 m3 m3 oh oh oh oh m3 m3 kg m3 m3 oh oh oh oh m3 m3 kg m3 m3 oh oh oh oh m3 m3 kg m3 m3 oh oh oh oh m3 m3 m3 oh oh oh oh m3 m3 kg m3 m3 kg kg oh oh oh oh

Pasangan pondasi 1 Kp : 1 Sm : 1 Ps 872,721 Batu belah 308,853 Kapur Pasang 114,566 Semen Warna 491 Pasir pasang 114,473 Pekerja 182,367 Tukang batu 121,578 Kepala Tukang 13,895 Mandor 16,500 Memasang pondasi batu belah, campuran 1 KP : 1 SM : 2 PP 828,228 Batu belah 336,930 Kapur Pasang 85,049 Semen Warna 364 Pasir pasang 71,546 Pekerja 182,367 Tukang batu 121,578 Kepala tukang 13,895 Mandor 16,500 Pasangan pondasi 1 Pc : 3 Kp : 5 Ps 1,007,483 Batu belah 336,930 Semen 141,265 Kapur Pasang 114,566 Pasir pasang 80,384 Pekerja 182,367 Tukang batu 121,578 Kepala Tukang 13,895 Mandor 16,500 Memasang pondasi batu belah, campuran 1 PC : 3 KP : 10 PP 938,649 Batu belah 336,930 Semen 90,307 Kapur Pasang 73,543 Pasir pasang 103,531 Pekerja 182,367 Tukang batu 121,578 Kepala tukang 13,895 Mandor 16,500 Memasang pondasi batu belah, campuran 1/4 PC : 1 KP : 4 PP 907,559 Batu belah 336,930 Semen 60,698 Kapur Pasang 65,538 Pasir pasang 110,054 Pekerja 182,367 Tukang batu 121,578 Kepala tukang 13,895 Mandor 16,500 Memasang batu kosong (aanstamping) 615,320 Batu belah 336,930 Pasir urug 104,534 Pekerja 94,831 Tukang batu 63,220 Kepala tukang 7,225 Mandor 8,580 Memasang pondasi siklop, 60% beton campuran 1 PC:2 PB:3 KR 2,615,761 dan 40% batu belah Batu belah 134,772 Semen 287,207 Pasir beton 92,062 Koral Beton 103,450 Besi beton 1,350,783 Kawat beton 43,188 Pekerja 413,364 Tukang batu 137,788 Kepala tukang 15,747 Mandor 37,400

80/151

Software RAB Exarch xPro v2019

SNI-2007

S-067

SNI-2007

S-068

SNI-2007

S-069

SNI-2007

S-070

SNI-2007

S-071

SNI-2007

S-072

SNI-2007

S-073

SNI-2007

S-074

www.mitra-arsitek.com

1.00 0.48 194.00 0.31 0.47 3.40 0.85 0.09 0.17 1.00 0.45 194.00 0.31 0.47 2.40 0.80 0.08 0.12 1.00 140.00 43.50 0.08 0.60 0.20 0.02 0.03 1.00 140.00 32.95 0.09 0.60 0.20 0.02 0.03 1.00 140.00 26.55 0.09 0.60 0.20 0.02 0.03 1.00 140.00 22.20 0.10 0.60 0.20 0.02 0.03 1.00 140.00 18.50 0.12 0.60 0.20 0.02 0.03 1.00 140.00 10.08 0.09 0.03

m3 m3 kg m3 m3 oh oh oh oh m3 m3 kg m3 m3 oh oh oh oh m2 bh kg m3 oh oh oh oh m2 bh kg m3 oh oh oh oh m2 bh kg m3 oh oh oh oh m2 bh kg m3 oh oh oh oh m2 bh kg m3 oh oh oh oh m2 bh kg m3 m3

Memasang pondasi siklop, 60% beton campuran 1 PC:2 PB:3 KR 1,221,790 dan 40% batu belah Batu belah 134,772 Semen 287,207 Pasir beton 92,062 Koral Beton 103,450 Pekerja 413,364 Tukang batu 137,788 Kepala tukang 15,747 Mandor 37,400 Memasang pondasi sumuran, diameter 100 cm 1,071,537 Batu belah 126,349 Semen 287,207 Pasir beton 92,062 Koral Beton 103,450 Pekerja 291,786 Tukang batu 129,683 Kepala tukang 14,821 Mandor 26,180 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, 325,552 campuran spesi 1 P Bata merah 128,646 Semen 64,400 Pasir pasang 16,834 Pekerja 72,947 Tukang batu 32,421 Kepala tukang 3,705 Mandor 6,600 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, 312,248 campuran spesi 1 P Bata merah 128,646 Semen 48,781 Pasir pasang 19,149 Pekerja 72,947 Tukang batu 32,421 Kepala tukang 3,705 Mandor 6,600 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, 303,194 campuran spesi 1 P Bata merah 128,646 Semen 39,306 Pasir pasang 19,570 Pekerja 72,947 Tukang batu 32,421 Kepala tukang 3,705 Mandor 6,600 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, 298,648 campuran spesi 1 P Bata merah 128,646 Semen 32,866 Pasir pasang 21,464 Pekerja 72,947 Tukang batu 32,421 Kepala tukang 3,705 Mandor 6,600 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, 297,379 campuran spesi 1 P Bata merah 128,646 Semen 27,388 Pasir pasang 25,672 Pekerja 72,947 Tukang batu 32,421 Kepala tukang 3,705 Mandor 6,600 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, 281,017 campuran spesi 1 P Bata merah 128,646 Semen 14,923 Pasir pasang 19,465 Kapur padam 2,311

81/151

Software RAB Exarch xPro v2019

SNI-2007

S-075

SNI-2007

S-076

SNI-2007

S-077

SNI-2007

S-078

SNI-2007

S-079

SNI-2007

S-080

SNI-2007

S-081

SNI-2007

S-082

www.mitra-arsitek.com

0.60 0.20 0.02 0.03 1.00 70.00 18.95 0.04 0.30 0.10 0.01 0.02 1.00 70.00 14.37 0.04 0.30 0.10 0.01 0.02 1.00 70.00 11.50 0.04 0.30 0.10 0.01 0.02 1.00 70.00 9.68 0.05 0.30 0.10 0.01 0.02 1.00 70.00 8.32 0.05 0.30 0.10 0.01 0.02 1.00 70.00 6.50 0.05 0.30 0.10 0.01 0.02 1.00 70.00 4.50 0.05 0.02 0.30 0.10 0.01 0.02 1.00 70.00

oh oh oh oh m2 bh kg m3 oh oh oh oh m2 bh kg m3 oh oh oh oh m2 bh kg m3 oh oh oh oh m2 bh kg m3 oh oh oh oh m2 bh kg m3 oh oh oh oh m2 bh kg m3 oh oh oh oh m2 bh kg m3 m3 oh oh oh oh m2 bh

Pekerja 72,947 Tukang batu 32,421 Kepala tukang 3,705 Mandor 6,600 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, 158,210 campuran spesi Bata merah 64,323 Semen 28,055 Pasir pasang 7,996 Pekerja 36,473 Tukang batu 16,210 Kepala tukang 1,853 Mandor 3,300 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, 151,850 campuran spesi Bata merah 64,323 Semen 21,274 Pasir pasang 8,417 Pekerja 36,473 Tukang batu 16,210 Kepala tukang 1,853 Mandor 3,300 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, 148,233 campuran spesi Bata merah 64,323 Semen 17,025 Pasir pasang 9,048 Pekerja 36,473 Tukang batu 16,210 Kepala tukang 1,853 Mandor 3,300 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, 145,959 campuran spesi Bata merah 64,323 Semen 14,331 Pasir pasang 9,469 Pekerja 36,473 Tukang batu 16,210 Kepala tukang 1,853 Mandor 3,300 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, 144,788 campuran spesi Bata merah 64,323 Semen 12,317 Pasir pasang 10,311 Pekerja 36,473 Tukang batu 16,210 Kepala tukang 1,853 Mandor 3,300 Memasang dinding bata merah ukuran (5 x 11 x 22) tebal 1/2 bata, 142,304 campuran spesi 1 PC Bata merah 64,323 Semen 9,623 Pasir pasang 10,521 Pekerja 36,473 Tukang batu 16,210 Kepala tukang 1,853 Mandor 3,300 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, 140,603 campuran spesi Bata merah 64,323 Semen 6,662 Pasir pasang 10,521 Kapur padam 1,260 Pekerja 36,473 Tukang batu 16,210 Kepala tukang 1,853 Mandor 3,300 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 127,498 bata, campuran spesi Bata merah 64,323

82/151

Software RAB Exarch xPro v2019

SNI-2007

S-083

SNI-2007

S-084

SNI-2007

S-085

SNI-2007

S-086

SNI-2007

S-087

SNI-2007

S-088

SNI-2007

S-089

www.mitra-arsitek.com

0.02 0.02 0.02 0.30 0.10 0.01 0.02 1.00 70.00 0.01 0.03 0.01 0.30 0.10 0.01 0.02 1.00 12.50 30.32 0.73 0.28 0.30 0.15 0.02 0.02 1.00 12.50 24.26 0.77 0.28 0.30 0.15 0.02 0.02 1.00 12.50 22.74 0.55 0.28 0.36 0.12 0.01 0.02 1.00 12.50 18.20 0.58 0.28 0.36 0.12 0.01 0.02 1.00 12.50 15.16 0.36 0.28 0.30 0.10 0.01 0.02 1.00 12.50

m3 m3 m3 oh oh oh oh m2 bh m3 m3 m3 oh oh oh oh m2 bh kg m3 kg oh oh oh oh m2 bh kg m3 kg oh oh oh oh m2 bh kg m3 kg oh oh oh oh m2 bh kg m3 kg oh oh oh oh m2 bh kg m3 kg oh oh oh oh m2 bh

Semen Warna 39 Pasir pasang 3,788 Kapur padam 1,513 Pekerja 36,473 Tukang batu 16,210 Kepala tukang 1,853 Mandor 3,300 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, 129,258 campuran spesi Bata merah 64,323 Semen Warna 30 Pasir pasang 5,892 Kapur padam 1,176 Pekerja 36,473 Tukang batu 16,210 Kepala tukang 1,853 Mandor 3,300 Memasang dinding HB 20, campuran spesi 1 PC : 3 PP 408,479 Hollow Block 20 140,388 Semen 44,887 Pasir pasang 153,192 Besi angkur Ø=8 mm 3,145 Pekerja 36,473 Tukang batu 24,316 Kepala tukang 2,779 Mandor 3,300 Memasang dinding HB 20, campuran spesi 1 PC : 4 PP 408,766 Hollow Block 20 140,388 Semen 35,916 Pasir pasang 162,450 Besi angkur Ø=8 mm 3,145 Pekerja 36,473 Tukang batu 24,316 Kepala tukang 2,779 Mandor 3,300 Memasang dinding HB 15, campuran spesi 1 PC : 3 PP 311,287 Hollow Block 15 89,338 Semen 33,665 Pasir pasang 115,735 Besi angkur Ø=8 mm 3,145 Pekerja 43,768 Tukang batu 19,452 Kepala tukang 2,223 Mandor 3,960 Memasang dinding HB 15, campuran spesi 1 PC : 4 PP 311,299 Hollow Block 15 89,338 Semen 26,944 Pasir pasang 122,469 Besi angkur Ø=8 mm 3,145 Pekerja 43,768 Tukang batu 19,452 Kepala tukang 2,223 Mandor 3,960 Memasang dinding HB 10, campuran spesi 1 PC : 3 PP 242,977 Hollow Block 10 82,956 Semen 22,444 Pasir pasang 76,596 Besi angkur Ø=8 mm 3,145 Pekerja 36,473 Tukang batu 16,210 Kepala tukang 1,853 Mandor 3,300 Memasang dinding HB 10, campuran spesi 1 PC : 4 PP 243,541 Hollow Block 10 82,956

83/151

Software RAB Exarch xPro v2019

SNI-2007

S-090

SNI-2007

S-091

SNI-2007

S-092

SNI-2007

S-093

SNI-2002

S-094

SNI-2002

S-095

SNI-2007

S-096

www.mitra-arsitek.com

12.13 0.39 0.28 0.30 0.10 0.01 0.02 1.00 16.00 14.00 0.03 0.30 0.10 0.01 0.02 1.00 30.00 14.00 0.03 0.30 0.10 0.01 0.02 1.00 30.00 11.00 0.04 0.30 0.10 0.01 0.02 1.00 70.00 14.00 0.03 0.30 0.15 0.02 0.02 1.00 12.50 12.50 0.04 0.10 0.01 0.50 0.03 1.00 17.00 4.94 0.01 0.09 0.03 0.00 0.00 1.00 247.00 0.62 0.74 215.00 1.65 0.28 0.03

kg m3 kg oh oh oh oh m2 bh kg m3 oh oh oh oh m2 bh kg m3 oh oh oh oh m2 bh kg m3 oh oh oh oh m2 bh kg m3 oh oh oh oh m2 bh kg m3 oh oh oh oh m1 bh kg m3 oh oh oh oh m3 kg m3 m3 Ltr oh oh oh

Semen 17,958 Pasir pasang 81,646 Besi angkur Ø=8 mm 3,145 Pekerja 36,473 Tukang batu 16,210 Kepala tukang 1,853 Mandor 3,300 Memasang dinding terawang (roster) ukuran 25 x 25 cm, campuran 330,336 spesi 1 PC : 3 PP Roster 25/25 cm 245,040 Semen 20,726 Pasir pasang 6,734 Pekerja 36,473 Tukang batu 16,210 Kepala tukang 1,853 Mandor 3,300 Memasang dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran 345,651 spesi 1 PC : 3 Terawang (roster) 260,355 Semen 20,726 Pasir pasang 6,734 Pekerja 36,473 Tukang batu 16,210 Kepala tukang 1,853 Mandor 3,300 Memasang dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran 341,841 spesi 1 PC : 4 Terawang (roster) 260,355 Semen 16,285 Pasir pasang 7,365 Pekerja 36,473 Tukang batu 16,210 Kepala tukang 1,853 Mandor 3,300 Memasang dinding bata berongga ekspose ukuran (5 x 11 x 24) cm, 201,533 campuran spesi 1 P Bata berongga 107,205 Semen 20,726 Pasir pasang 6,734 Pekerja 36,473 Tukang batu 24,316 Kepala tukang 2,779 Mandor 3,300 Pasangan dinding batako 159,134 Batako 47,859 Semen 18,506 Pasir pasang 8,417 Tukang batu 16,210 Kepala Tukang 1,853 Pekerja 60,789 Mandor 5,500 Memasang rollag bata , campuran spesi 1 PC : 3 PP 43,172 Bata merah 15,621 Semen 7,317 Pasir pasang 2,883 Pekerja 10,942 Tukang batu 4,863 Kepala tukang 556 Mandor 990 Membuat beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm,1,101,757 w/c = 0,87 Semen 365,671 Pasir beton 183,149 Koral beton 163,574 Air 120,733 Pekerja 200,603 Tukang batu 44,578 Kepala tukang 5,187

84/151

Software RAB Exarch xPro v2019

SNI-2007

S-097

SNI-2007

S-098

SNI-2007

S-099

SNI-2007

S-100

SNI-2007

S-101

SNI-2007

S-102

SNI-2007

S-103

www.mitra-arsitek.com

0.08 1.00 276.00 0.59 0.75 215.00 1.65 0.28 0.03 0.08 1.00 299.00 0.57 0.75 215.00 1.65 0.28 0.03 0.08 1.00 230.00 0.64 0.76 200.00 1.20 0.20 0.02 0.06 1.00 326.00 0.54 0.76 215.00 1.65 0.28 0.03 0.08 1.00 352.00 0.52 0.76 215.00 1.65 0.28 0.03 0.08 1.00 371.00 0.50 0.78 215.00 1.65 0.28 0.03 0.08 1.00 384.00 0.49 0.77 215.00 1.65 0.28 0.03

oh m3 kg m3 m3 Ltr oh oh oh oh m3 kg m3 m3 Ltr oh oh oh oh m3 kg m3 m3 Ltr oh oh oh oh m3 kg m3 m3 Ltr oh oh oh oh m3 kg m3 m3 Ltr oh oh oh oh m3 kg m3 m3 Ltr oh oh oh oh m3 kg m3 m3 Ltr oh oh oh

Mandor 18,260 Membuat 1 m3 beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) 1,138,167 cm, w/c = 0,78 Semen 408,604 Pasir beton 174,504 Koral beton 165,696 Air 120,733 Pekerja 200,603 Tukang batu 44,578 Kepala tukang 5,187 Mandor 18,260 Membuat beton mutu f’c = 12,2 MPa (K 150), slump (12 ± 2) cm,1,166,927 w/c = 0,72 Semen 442,655 Pasir beton 168,396 Koral beton 166,514 Air 120,733 Pekerja 200,603 Tukang batu 44,578 Kepala tukang 5,187 Mandor 18,260 Membuat lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump1,004,407 (3-6) cm, w/c = 0,87 Semen 340,504 Pasir beton 188,225 Koral beton 168,150 Air 112,310 Pekerja 145,893 Tukang batu 32,421 Kepala tukang 3,705 Mandor 13,200 Membuat beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm,1,200,663 w/c = 0,66 Semen 482,627 Pasir beton 160,193 Koral beton 168,482 Air 120,733 Pekerja 200,603 Tukang batu 44,578 Kepala tukang 5,187 Mandor 18,260 Membuat beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 2) cm,1,233,349 w/c = 0,61 Semen 521,118 Pasir beton 154,056 Koral beton 168,813 Air 120,733 Pekerja 200,603 Tukang batu 44,578 Kepala tukang 5,187 Mandor 18,260 Membuat beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm,1,257,174 w/c = 0,58 Semen 549,247 Pasir beton 147,121 Koral beton 171,444 Air 120,733 Pekerja 200,603 Tukang batu 44,578 Kepala tukang 5,187 Mandor 18,260 Membuat beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm,1,273,825 w/c = 0,56 Semen 568,493 Pasir beton 145,853 Koral beton 170,117 Air 120,733 Pekerja 200,603 Tukang batu 44,578 Kepala tukang 5,187

85/151

Software RAB Exarch xPro v2019

SNI-2007

S-104

SNI-2007

S-105

SNI-2007

S-106

SNI-2007

S-107

SNI-2007

S-108

SNI-2007

S-109

SNI-2007

S-110

SNI-2007

S-111

www.mitra-arsitek.com

0.08 1.00 406.00 0.49 0.76 215.00 1.65 0.28 0.03 0.08 1.00 413.00 0.49 0.76 215.00 1.65 0.28 0.03 0.08 1.00 439.00 0.48 0.75 215.00 2.10 0.35 0.04 0.11 1.00 448.00 0.48 0.74 215.00 2.10 0.35 0.04 0.11 1.00 400.00 0.48 0.80 1.20 2.10 0.35 0.04 0.11 1.00 1.05 0.02 0.01 0.01 0.00 0.00 1.00 1.05 0.02 0.01 0.01 0.00 0.00 1.00 1.05 0.01

oh m3 kg m3 m3 Ltr oh oh oh oh m3 kg m3 m3 Ltr oh oh oh oh m3 kg m3 m3 Ltr oh oh oh oh m3 kg m3 m3 Ltr oh oh oh oh m3 kg m3 m3 kg oh oh oh oh kg kg kg oh oh oh oh kg kg kg oh oh oh oh kg kg kg

Mandor 18,260 Membuat beton mutu f’c = 24,0 MPa (K 275), slump (12 ± 2) cm,1,302,591 w/c = 0,53 Semen 601,063 Pasir beton 144,171 Koral beton 167,995 Air 120,733 Pekerja 200,603 Tukang batu 44,578 Kepala tukang 5,187 Mandor 18,260 Membuat beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm,1,311,487 w/c = 0,52 Semen 611,426 Pasir beton 143,522 Koral beton 167,177 Air 120,733 Pekerja 200,603 Tukang batu 44,578 Kepala tukang 5,187 Mandor 18,260 Membuat beton mutu f’c = 28,8 MPa (K 325), slump (12 ± 2) cm,1,418,228 w/c = 0,49 Semen 649,918 Pasir beton 141,220 Koral beton 164,724 Air 120,733 Pekerja 255,313 Tukang batu 56,736 Kepala tukang 6,484 Mandor 23,100 Membuat beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 2) cm,1,429,908 w/c = 0,48 Semen 663,242 Pasir beton 140,571 Koral beton 163,729 Air 120,733 Pekerja 255,313 Tukang batu 56,736 Kepala tukang 6,484 Mandor 23,100 Membuat beton kedap air dengan strorox – 100 1,304,355 Semen 592,180 Pasir beton 141,633 Koral Beton 176,837 Strorox - 100 52,071 Pekerja 255,313 Tukang batu 56,736 Kepala tukang 6,484 Mandor 23,100 Pembesian dengan besi ulir 13,820 Besi beton 11,257 Kawat beton 360 Pekerja 851 Tukang besi 1,135 Kepala tukang 130 Mandor 88 Pembesian dengan besi polos 13,820 Besi beton 11,257 Kawat beton 360 Pekerja 851 Tukang besi 1,135 Kepala tukang 130 Mandor 88 Memasang kabel presstressed polos/strands 13,073 Besi beton 11,257 Kawat beton 240

86/151

Software RAB Exarch xPro v2019

SNI-2007

S-112

AK-SNI 2008

S-113

AK-SNI 2008

S-114

AK-SNI 2008

S-115

SNI-2002

S-116

SNI-2002

S-117

www.mitra-arsitek.com

0.01 0.01 0.00 0.00 10.00 1.02 0.01 0.00 0.00 0.00 0.00 1.00 0.02 0.02 0.40 0.20 0.50 0.05 0.01 1.00 0.02 0.35 0.40 0.20 0.50 0.05 0.01 1.00 4.00 0.70 3.50 10.50 1.05 0.18 32.00 2.20 3.50 0.35 0.12 1.00 0.02 0.09 0.15 60.50 45.00 0.90 0.03 0.12 0.09 0.24 1.00 0.67 0.07 0.05 1.00 0.02 0.08 0.13 49.00 34.50 0.70 0.03 0.12

oh oh oh oh kg kg kg oh oh oh oh m2 m3 m3 kg oh oh oh oh m2 m3 lbr kg oh oh oh oh m3 oh m3 oh oh oh oh sewa-unit oh oh oh oh m1 m3 m3 m3 kg kg kg m3 kg ltr kg oh oh oh oh m1 m3 m3 m3 kg kg kg m3 kg

Pekerja Tukang besi Kepala tukang Mandor Memasang jaring kawat baja/wire mesh Jaring kawat baja dilas Kawat beton Pekerja Tukang besi Kepala tukang Mandor Cetakan beton / begisting memakai papan Usuk Kayu meranti 5/7 Kelas III Papan cetakan Paku Biasa 2" - 5" Pekerja Tukang kayu Kepala Tukang Mandor Cetakan beton / begisting memakai multiplek Usuk Kayu meranti 5/7 Kelas III Multiplek Paku Biasa 2" - 5" Pekerja Tukang kayu Kepala Tukang Mandor Membongkar cetakan Pekerja Perancah kayu Pekerja Tukang kayu Kepala Tukang Mandor Scafolding Pekerja Tukang kayu Kepala Tukang Mandor Pembuatan tiang pancang (40 x 40) cm, beton bertulang Pasir urug Pasir beton Batu pecah 2/3 Semen Besi beton Kawat beton Kayu kruing 5/7 Paku reng Minyak bekisting Plamir Pekerja Tukang batu Kepala Tukang Mandor Pembuatan tiang pancang (35 x 35) cm, beton bertulang Pasir urug Pasir beton Batu pecah 2/3 Semen Besi beton Kawat beton Kayu kruing 5/7 Paku Biasa 2" - 5"

608 811 93 66 13,811 12,497 120 304 405 463 22 209,639 43,393 39,206 10,210 24,316 81,052 9,263 2,200 200,547 43,393 30,114 10,210 24,316 81,052 9,263 2,200 5,544,194 486,311 959,175 425,522 1,702,088 194,524 38,500 812,000 267,471 567,363 64,841 26,400 1,096,490 4,598 27,736 53,603 89,567 482,423 21,594 147,024 2,022 528 13,796 121,578 108,609 12,413 11,000 866,857 3,872 23,606 44,669 72,542 369,857 16,795 124,052 3,063

87/151

Software RAB Exarch xPro v2019

SNI-2007

S-118

SNI-2007

S-119

SNI-2007

S-120

AK-SNI 2008

S-121

AK-SNI 2008

S-122

SNI-2007

S-123

SNI-2007

S-124

SNI-2007

S-125

www.mitra-arsitek.com

0.09 0.20 0.80 0.50 0.05 0.04 1.00 1.05 0.06 0.03 0.00 0.00 1.00 1.05 0.07 0.04 0.00 0.01 1.00 1.05 0.08 0.04 0.00 0.00 1.00 15.30 0.02 0.04 0.00 0.03 0.03 0.02 0.01 0.14 0.01 1.00 30.60 0.05 0.07 0.00 0.03 0.03 0.03 0.01 0.25 0.01 1.00 15.50 0.02 0.30 0.15 0.02 0.02 1.00 10.22 0.02 0.30 0.15 0.02 0.02 1.00 7.78 0.02

ltr kg oh oh oh oh m1 m1 oh oh oh oh m1 m1 oh oh oh oh m1 m1 oh oh oh oh m1 kg m3 m3 m3 kg oh oh oh oh oh m1 kg m3 m3 m3 kg oh oh oh oh oh m2 kg m3 oh oh oh oh m2 kg m3 oh oh oh oh m2 kg m3

Minyak bekisting Plamir Pekerja Tukang batu Kepala Tukang Mandor Memasang 1 m’ PVC Waterstop lebar 150 mm Waterstop lebar 150 mm Pekerja Tukang batu Kepala tukang Mandor Memasang PVC Waterstop lebar 200 mm Waterstop lebar 150 mm Pekerja Tukang batu Kepala tukang Mandor Membuat PVC Waterstop lebar 230 mm – 320 mm Waterstop lebar 150 mm Pekerja Tukang batu Kepala tukang Mandor Cor beton kerb ( 15 x 30 ) cm Semen Pasir pasang Kerikil Papan cetakan Paku Biasa 2" - 5" Tukang kayu Tukang batu Kepala tukang Pekerja Mandor Cor beton Devider ( 30 x 30 ) cm Semen Pasir pasang Kerikil Papan cetakan Paku Biasa 2" - 5" Tukang kayu Tukang batu Kepala tukang Pekerja Mandor Memasang plesteran 1 PC : 1 PP, tebal 15 mm Semen Pasir pasang Pekerja Tukang batu Kepala tukang Mandor Memasang plesteran 1 PC : 2 PP, tebal 15 mm Semen Pasir pasang Pekerja Tukang batu Kepala tukang Mandor Memasang plesteran 1 PC : 3 PP, tebal 15 mm Semen Pasir pasang

528 11,496 97,262 81,052 9,263 8,800 96,993 83,620 7,295 4,863 556 660 100,085 83,620 8,510 5,674 741 1,540 101,451 83,620 9,726 6,484 741 880 68,813 22,651 5,113 8,854 4,411 694 5,512 2,561 926 16,705 1,386 123,116 45,302 10,227 17,707 4,411 694 5,512 5,106 1,223 30,382 2,552 93,187 22,953 3,367 36,473 24,316 2,779 3,300 86,212 15,136 4,209 36,473 24,316 2,779 3,300 83,220 11,512 4,840

88/151

Software RAB Exarch xPro v2019

SNI-2007

S-126

SNI-2007

S-127

SNI-2007

S-128

SNI-2007

S-129

SNI-2007

S-130

SNI-2007

S-131

SNI-2007

S-132

SNI-2007

S-133

www.mitra-arsitek.com

0.30 0.15 0.02 0.02 1.00 6.24 0.02 0.30 0.15 0.02 0.02 1.00 5.18 0.03 0.30 0.15 0.02 0.02 1.00 4.42 0.03 0.30 0.15 0.02 0.02 1.00 3.94 0.03 0.30 0.15 0.02 0.02 1.00 3.46 0.03 0.30 0.15 0.02 0.02 1.00 5.76 0.00 0.01 0.36 0.12 0.01 0.02 1.00 3.00 0.01 0.02 0.36 0.12 0.01 0.02 1.00 0.01 0.01 0.01 0.36 0.12 0.01 0.02

oh oh oh oh m2 kg m3 oh oh oh oh m2 kg m3 oh oh oh oh m2 kg m3 oh oh oh oh m2 kg m3 oh oh oh oh m2 kg m3 oh oh oh oh m2 kg m3 m3 oh oh oh oh m2 kg m3 m3 oh oh oh oh m2 m3 m3 m3 oh oh oh oh

Pekerja Tukang batu Kepala tukang Mandor Memasang plesteran 1 PC : 4 PP, tebal 15 mm Semen Pasir pasang Pekerja Tukang batu Kepala tukang Mandor Memasang plesteran 1 PC : 5 PP, tebal 15 mm Semen Pasir pasang Pekerja Tukang batu Kepala tukang Mandor Memasang plesteran 1 PC : 6 PP, tebal 15 mm Semen Pasir pasang Pekerja Tukang batu Kepala tukang Mandor Memasang plesteran 1 PC : 7 PP, tebal 15 mm Semen Pasir pasang Pekerja Tukang batu Kepala tukang Mandor Memasang plesteran 1 PC : 8 PP, tebal 15 mm Semen Pasir pasang Pekerja Tukang batu Kepala tukang Mandor Memasang plesteran 1 PC : 1/2 KP : 3 PP, tebal 15 mm Semen Kapur padam Pasir pasang Pekerja Tukang batu Kepala tukang Mandor Memasang plesteran 1 PC : 2 KP : 8 PP, tebal 15 mm Semen Kapur padam Pasir pasang Pekerja Tukang batu Kepala tukang Mandor Memasang plesteran 1 SM : 1 KP : 1 PP, tebal 15 mm Semen Warna Kapur padam Pasir pasang Pekerja Tukang batu Kepala tukang Mandor

36,473 24,316 2,779 3,300 81,156 9,238 5,050 36,473 24,316 2,779 3,300 80,014 7,675 5,471 36,473 24,316 2,779 3,300 79,087 6,538 5,682 36,473 24,316 2,779 3,300 78,587 5,827 5,892 36,473 24,316 2,779 3,300 78,087 5,116 6,102 36,473 24,316 2,779 3,300 80,919 8,527 252 2,736 43,768 19,452 2,223 3,960 78,474 4,441 420 4,209 43,768 19,452 2,223 3,960 72,073 19 756 1,894 43,768 19,452 2,223 3,960

89/151

Software RAB Exarch xPro v2019

SNI-2007

S-134

SNI-2002

S-135

SNI-2007

S-136

SNI-2007

S-137

SNI-2007

S-138

SNI-2007

S-139

SNI-2007

S-140

SNI-2007

S-141

SNI-2007

S-142

www.mitra-arsitek.com

1.00 0.01 0.01 0.02 0.36 0.12 0.01 0.02 1.00 1.84 0.01 0.01 0.36 0.12 0.01 0.02 1.00 13.63 0.03 0.40 0.20 0.02 0.02 1.00 10.37 0.03 0.26 0.20 0.02 0.01 1.00 8.32 0.03 0.40 0.20 0.02 0.02 1.00 6.91 0.04 0.40 0.20 0.02 0.02 1.00 5.89 0.04 0.40 0.20 0.02 0.02 1.00 0.01 0.01 0.02 0.44 0.22 0.02 0.02 1.00 5.18 0.03 0.15

m2 m3 m3 m3 oh oh oh oh m2 kg m3 m3 oh oh oh oh m2 kg m3 oh oh oh oh m2 kg m3 oh oh oh oh m2 kg m3 oh oh oh oh m2 kg m3 oh oh oh oh m2 kg m3 oh oh oh oh m2 m3 m3 m3 oh oh oh oh m2 kg m3 oh

Memasang plesteran 1 SM : 1 KP : 2 PP, tebal 15 mm Semen Warna Kapur padam Pasir pasang Pekerja Tukang batu Kepala tukang Mandor Plesteran 1 Pc : 3 Kp : 10 Ps, tebal 15 mm Semen Kapur Pasang Pasir pasang Pekerja Tukang batu Kepala Tukang Mandor Memasang plesteran 1 PC : 2 PP, tebal 20 mm Semen Pasir pasang Pekerja Tukang batu Kepala tukang Mandor Memasang plesteran 1 PC : 3 PP, tebal 20 mm Semen Pasir pasang Pekerja Tukang batu Kepala tukang Mandor Memasang plesteran 1 PC : 4 PP, tebal 20 mm Semen Pasir pasang Pekerja Tukang batu Kepala tukang Mandor Memasang plesteran 1 PC : 5 PP, tebal 20 mm Semen Pasir pasang Pekerja Tukang batu Kepala tukang Mandor Memasang plesteran 1 PC : 6 PP, tebal 20 mm Semen Pasir pasang Pekerja Tukang batu Kepala tukang Mandor Memasang plesteran 1 SM : 1 KP : 2 PP, tebal 20 mm Semen Warna Kapur padam Pasir pasang Pekerja Tukang batu Kepala tukang Mandor Memasang Berapen 1 PC : 5 PP, tebal 15 mm Semen Pasir pasang Pekerja

73,163 15 588 3,156 43,768 19,452 2,223 3,960 78,075 2,724 3,002 2,946 43,768 19,452 2,223 3,960 115,460 20,181 5,682 48,631 32,421 3,705 4,840 92,469 15,349 6,523 31,610 32,421 3,705 2,860 108,648 12,317 6,734 48,631 32,421 3,705 4,840 107,195 10,233 7,365 48,631 32,421 3,705 4,840 105,889 8,717 7,575 48,631 32,421 3,705 4,840 102,636 19 756 3,788 53,494 35,663 4,076 4,840 46,782 7,675 5,471 18,237

90/151

Software RAB Exarch xPro v2019

SNI-2002

S-143

AK-SNI 2008

S-144

SNI-2007

S-145

SNI-2007

S-146

SNI-2007

S-147

SNI-2007

S-148

SNI-2007

S-149

SNI-2002

S-150

SNI-2007

S-151

www.mitra-arsitek.com

0.08 0.01 0.01 1.00 0.50 0.00 0.06 0.04 0.04 0.00 1.00 0.36 0.00 0.09 0.03 0.00 0.00 1.00 10.00 15.00 0.45 0.23 0.02 0.02 1.00 10.00 15.00 0.45 0.23 0.02 0.02 1.00 4.32 0.01 0.30 0.10 0.01 0.02 1.00 3.11 0.15 0.08 0.01 0.01 1.00 1.60 0.07 0.04 0.00 0.00 1.00 4.32 0.02 0.15 0.07 0.01 0.01 1.00 3.25 0.20 0.10 0.01 0.01

oh oh oh m1 kg m3 oh oh oh oh m1 kg m3 oh oh oh oh m2 kg kg oh oh oh oh m2 kg kg oh oh oh oh m2 kg m3 oh oh oh oh m2 kg oh oh oh oh m2 kg oh oh oh oh m2 kg m3 oh oh oh oh m2 kg oh oh oh oh

Tukang batu 12,158 Kepala tukang 1,482 Mandor 1,760 Plesteran skoneng 1 Pc : 2 Ps ( untuk gedung ) 21,731 Semen 740 Pasir pasang 421 Pekerja 6,930 Tukang batu 6,160 Kepala Tukang 7,040 Mandor 440 Sponengan (untuk saluran dan sejenisnya) 18,065 Semen 533 Pasir pasang 181 Pekerja 10,942 Tukang batu 4,863 Kepala Tukang 556 Mandor 990 Memasang Plesteran Granit , 1 PC : 2 Granit, tebal 10 mm 345,034 Semen 14,805 Batu granit 229,725 Pekerja 54,710 Tukang batu 36,473 Kepala tukang 4,261 Mandor 5,060 Memasang Plesteran Teraso , 1 PC : 2 Batu Teraso, tebal 10 mm 152,065 Semen 14,805 Batu teraso 36,756 Pekerja 54,710 Tukang batu 36,473 Kepala tukang 4,261 Mandor 5,060 Memasang Plesteran Ciprat 1 PC : 2 PP 65,494 Semen 6,396 Pasir pasang 1,263 Pekerja 36,473 Tukang batu 16,210 Kepala tukang 1,853 Mandor 3,300 Memasang finishing siar pasangan dinding bata merah (=20 m’) 38,238 Semen 4,601 Pekerja 18,237 Tukang batu 12,158 Kepala tukang 1,482 Mandor 1,760 Memasang finishing siar pasangan dinding conblock ekspose (=8 m’) 18,174 Semen 2,369 Pekerja 8,510 Tukang batu 5,674 Kepala tukang 741 Mandor 880 Plesteran siar adukan 1 Pc : 2 Ps 42,403 Semen 6,396 Pasir pasang 3,367 Pekerja 18,237 Tukang batu 11,347 Kepala Tukang 1,297 Mandor 1,760 Memasang acian 49,390 Semen 4,811 Pekerja 24,316 Tukang batu 16,210 Kepala tukang 1,853 Mandor 2,200

91/151

Software RAB Exarch xPro v2019

SNI-2002

S-152

AK-SNI 2008

S-153

AK-SNI 2008

S-154

AK-SNI 2008

S-155

AK-SNI 2008

S-156

SNI-2007

S-157

SNI-2007

S-158

SNI-2007

S-159

SNI-2007

S-160

www.mitra-arsitek.com

1.00 7.07 0.02 0.26 0.20 0.02 0.01 1.00 5.10 0.00 0.01 0.40 0.20 0.02 0.02 1.00 8.16 0.02 0.40 0.20 0.02 0.02 1.00 6.51 0.02 0.40 0.20 0.02 0.02 1.00 11.12 0.03 0.36 0.18 0.02 0.02 1.00 1.06 9.80 0.05 0.25 0.13 0.01 0.01 1.00 1.07 10.00 0.05 0.26 0.13 0.01 0.01 1.00 1.06 10.40 0.05 0.27 0.14 0.01 0.01 1.00 1.06 9.80

m2 kg m3 oh oh oh oh m2 kg m3 m3 oh oh oh oh m2 kg m3 oh oh oh oh m2 kg m3 oh oh oh oh m2 kg m3 oh oh oh oh m2 m2 kg m3 oh oh oh oh m2 m2 kg m3 oh oh oh oh m2 m2 kg m3 oh oh oh oh m2 m2 kg

Plesteran beton 1 Pc : 3 Ps, tebal 15 mm Semen Pasir pasang Pekerja Tukang batu Kepala Tukang Mandor Plesteran batu kali 1pc:1/2kp:5ps tebal 10 mm Semen Kapur pasang Pasir pasang Pekerja Tukang batu Kepala Tukang Mandor Plesteran batu kali 1pc:3ps Semen Pasir pasang Pekerja Tukang batu Kepala Tukang Mandor Plesteran batu kali 1pc:4ps Semen Pasir pasang Pekerja Tukang batu Kepala Tukang Mandor Plesteran K- 50, tebal 20 mm Semen Pasir pasang Pekerja Tukang batu Kepala Tukang Mandor Memasang lantai ubin PC abu-abu ukuran (40 x 40) cm Ubin abu-abu Semen Pasir pasang Pekerja Tukang batu Kepala tukang Mandor Memasang lantai ubin PC abu-abu ukuran (30 x 30) cm Ubin abu-abu Semen Pasir pasang Pekerja Tukang batu Kepala tukang Mandor Memasang lantai ubin PC abu-abu ukuran (20 x 20) cm Ubin abu-abu Semen Pasir pasang Pekerja Tukang batu Kepala tukang Mandor Memasang lantai ubin warna ukuran (40 x 40) cm Ubin warna Semen

85,482 10,467 4,419 31,610 32,421 3,705 2,860 100,270 7,550 700 2,862 48,631 32,421 3,705 4,400 105,320 12,080 4,082 48,631 32,421 3,705 4,400 103,194 9,639 4,398 48,631 32,421 3,705 4,400 103,017 16,463 6,313 43,768 29,179 3,335 3,960 117,811 37,908 14,508 9,469 30,394 20,263 2,408 2,860 120,402 38,176 14,805 9,469 31,610 21,073 2,408 2,860 123,129 37,879 15,397 9,469 32,826 21,884 2,594 3,080 201,829 119,138 14,508

92/151

Software RAB Exarch xPro v2019

SNI-2007

S-161

SNI-2007

S-162

SNI-2007

S-163

SNI-2007

S-164

SNI-2007

S-165

SNI-2007

S-166

SNI-2007

S-167

www.mitra-arsitek.com

0.05 1.30 0.25 0.13 0.01 0.01 1.00 1.07 10.00 0.05 1.50 0.26 0.13 0.01 0.01 1.00 1.06 10.40 0.05 1.62 0.27 0.14 0.01 0.01 1.00 1.06 9.80 0.05 1.30 0.25 0.13 0.01 0.01 1.00 1.07 10.00 0.05 1.50 0.26 0.13 0.01 0.01 1.00 1.06 9.80 0.05 1.30 0.25 0.13 0.01 0.01 1.00 1.07 10.00 0.05 1.50 0.26 0.13 0.01 0.01 1.00 1.06 9.80

m3 kg oh oh oh oh m2 m2 kg m3 kg oh oh oh oh m2 m2 kg m3 kg oh oh oh oh m2 m2 kg m3 kg oh oh oh oh m2 m2 kg m3 kg oh oh oh oh m2 m2 kg m3 kg oh oh oh oh m2 m2 kg m3 kg oh oh oh oh m2 m2 kg

Pasir pasang Semen warna Pekerja Tukang batu Kepala tukang Mandor Memasang lantai ubin warna ukuran (30 x 30) cm Ubin warna Semen Pasir pasang Semen warna Pekerja Tukang batu Kepala tukang Mandor Memasang lantai ubin warna ukuran (20 x 20) cm Ubin warna Semen Pasir pasang Semen warna Pekerja Tukang batu Kepala tukang Mandor Memasang lantai ubin teraso ukuran (40 x 40) cm Ubin teraso Semen Pasir pasang Semen warna Pekerja Tukang batu Kepala tukang Mandor Memasang lantai ubin teraso ukuran (30 x 30) cm Ubin teraso Semen Pasir pasang Semen warna Pekerja Tukang batu Kepala tukang Mandor Memasang lantai ubin granit ukuran (40 x 40) cm Ubin granit Semen Pasir pasang Semen warna Pekerja Tukang batu Kepala tukang Mandor Memasang lantai ubin granit ukuran (30 x 30) cm Ubin granit Semen Pasir pasang Semen warna Pekerja Tukang batu Kepala tukang Mandor Memasang lantai ubin teralux ukuran (40 x 40) cm Ubin teralux kerang Semen

9,469 2,787 30,394 20,263 2,408 2,860 205,423 119,981 14,805 9,469 3,216 31,610 21,073 2,408 2,860 207,772 119,049 15,397 9,469 3,473 32,826 21,884 2,594 3,080 239,737 157,046 14,508 9,469 2,787 30,394 20,263 2,408 2,860 243,598 158,156 14,805 9,469 3,216 31,610 21,073 2,408 2,860 391,368 308,677 14,508 9,469 2,787 30,394 20,263 2,408 2,860 396,301 310,859 14,805 9,469 3,216 31,610 21,073 2,408 2,860 167,171 84,480 14,508

93/151

Software RAB Exarch xPro v2019

SNI-2007

S-168

SNI-2007

S-169

SNI-2007

S-170

SNI-2007

S-171

SNI-2007

S-172

SNI-2007

S-173

SNI-2007

S-174

www.mitra-arsitek.com

0.05 1.30 0.25 0.13 0.01 0.01 1.00 1.07 10.00 0.05 1.50 0.26 0.13 0.01 0.01 1.00 1.12 9.60 0.05 1.50 0.24 0.12 0.01 0.01 1.00 1.06 9.80 0.05 1.30 0.25 0.13 0.01 0.01 1.00 1.07 10.00 0.05 1.50 0.26 0.13 0.01 0.01 1.00 5.30 1.65 0.00 0.09 0.09 0.01 0.01 1.00 3.53 1.24 0.00 0.09 0.09 0.01 0.01 1.00 2.65 1.24 0.00 0.09

m3 kg oh oh oh oh m2 m2 kg m3 kg oh oh oh oh m2 m2 kg m3 kg oh oh oh oh m2 m2 kg m3 kg oh oh oh oh m2 m2 kg m3 kg oh oh oh oh m1 bh kg m3 oh oh oh oh m1 bh kg m3 oh oh oh oh m1 bh kg m3 oh

Pasir pasang Semen warna Pekerja Tukang batu Kepala tukang Mandor Memasang lantai ubin teralux ukuran (30 x 30) cm Ubin teralux kerang Semen Pasir pasang Semen warna Pekerja Tukang batu Kepala tukang Mandor Memasang lantai ubin teralux marmer ukuran (60 x 60) cm Ubin teralux marmer Semen Pasir pasang Semen warna Pekerja Tukang batu Kepala tukang Mandor Memasang lantai ubin teralux marmer ukuran (40 x 40) cm Ubin teralux marmer Semen Pasir pasang Semen warna Pekerja Tukang batu Kepala tukang Mandor Memasang lantai ubin teralux marmer ukuran (30 x 30) cm Ubin teralux marmer Semen Pasir pasang Semen warna Pekerja Tukang batu Kepala tukang Mandor Memasang plint ubin PC abu-abu ukuran (15 x 20) cm Plint Ubin Semen Pasir pasang Pekerja Tukang batu Kepala tukang Mandor Memasang plint ubin PC abu-abu ukuran (10 x 30) cm Plint Ubin Semen Pasir pasang Pekerja Tukang batu Kepala tukang Mandor Memasang plint ubin PC abu-abu ukuran (10 x 40) cm Plint Ubin Semen Pasir pasang Pekerja

9,469 2,787 30,394 20,263 2,408 2,860 170,519 85,077 14,805 9,469 3,216 31,610 21,073 2,408 2,860 409,689 329,297 14,212 9,469 3,216 29,179 19,452 2,223 2,640 395,700 313,009 14,508 9,469 2,787 30,394 20,263 2,408 2,860 400,664 315,222 14,805 9,469 3,216 31,610 21,073 2,408 2,860 50,523 18,940 2,443 842 10,942 14,589 1,667 1,100 43,380 12,614 1,836 631 10,942 14,589 1,667 1,100 40,235 9,470 1,836 631 10,942

94/151

Software RAB Exarch xPro v2019

SNI-2002

S-175

SNI-2007

S-176

SNI-2007

S-177

SNI-2007

S-178

SNI-2007

S-179

SNI-2007

S-180

SNI-2007

S-181

www.mitra-arsitek.com

0.09 0.01 0.01 1.00 5.30 1.56 0.00 0.09 0.09 0.01 0.01 1.00 5.30 1.14 0.00 0.10 0.09 0.09 0.01 0.01 1.00 3.53 1.14 0.00 0.10 0.09 0.09 0.01 0.01 1.00 2.65 1.14 0.00 0.10 0.09 0.09 0.01 0.01 1.00 3.53 1.14 0.00 0.10 0.09 0.09 0.01 0.01 1.00 2.65 1.14 0.00 0.10 0.09 0.09 0.01 0.01 1.00 2.65 1.14 0.00 0.10 0.09 0.09

oh oh oh m1 bh kg m3 oh oh oh oh m1 bh kg m3 kg oh oh oh oh m1 bh kg m3 kg oh oh oh oh m1 bh kg m3 kg oh oh oh oh m1 bh kg m3 kg oh oh oh oh m1 bh kg m3 kg oh oh oh oh m1 bh kg m3 kg oh oh

Tukang batu Kepala tukang Mandor Pasang plint ubin PC abu-abu ukuran 10 x 20 cm Plint keramik ukuran 10cm x 10cm Semen Pasir pasang Pekerja Tukang batu Kepala Tukang Mandor Memasang plint ubin PC warna ukuran (10 x 20) cm Plint ubin PC warna Semen Pasir pasang Semen warna Pekerja Tukang batu Kepala tukang Mandor Memasang plint ubin PC warna ukuran (10 x 30) cm Plint ubin PC warna Semen Pasir pasang Semen warna Pekerja Tukang batu Kepala tukang Mandor Memasang plint ubin PC warna ukuran (10 x 40) cm Plint ubin PC warna Semen Pasir pasang Semen warna Pekerja Tukang batu Kepala tukang Mandor Memasang plint ubin teraso ukuran (10 x 30) cm Plint ubin teraso Semen Pasir pasang Semen warna Pekerja Tukang batu Kepala tukang Mandor Memasang plint ubin teraso ukuran (10 x 40) cm Plint ubin teraso Semen Pasir pasang Semen warna Pekerja Tukang batu Kepala tukang Mandor Memasang plint ubin granit ukuran (10 x 40) cm Plint ubin granit Semen Pasir pasang Semen warna Pekerja Tukang batu

14,589 1,667 1,100 61,543 30,303 2,310 631 10,942 14,589 1,667 1,100 60,594 29,762 1,688 631 214 10,942 14,589 1,667 1,100 50,655 19,823 1,688 631 214 10,942 14,589 1,667 1,100 45,713 14,881 1,688 631 214 10,942 14,589 1,667 1,100 47,411 16,579 1,688 631 214 10,942 14,589 1,667 1,100 43,278 12,446 1,688 631 214 10,942 14,589 1,667 1,100 63,300 32,468 1,688 631 214 10,942 14,589

95/151

Software RAB Exarch xPro v2019

SNI-2007

S-182

SNI-2007

S-183

SNI-2007

S-184

SNI-2007

S-185

SNI-2007

S-186

SNI-2007

S-187

SNI-2007

S-188

SNI-2007

S-189

www.mitra-arsitek.com

0.01 0.01 1.00 3.53 1.14 0.00 0.10 0.09 0.09 0.01 0.01 1.00 2.65 1.14 0.00 0.10 0.09 0.09 0.01 0.01 1.00 3.53 1.14 0.00 0.10 0.09 0.09 0.01 0.01 1.00 1.70 1.14 0.00 0.10 0.09 0.09 0.01 0.01 1.00 2.65 1.14 0.00 0.10 0.09 0.09 0.01 0.01 1.00 3.53 1.14 0.00 0.10 0.09 0.09 0.01 0.01 1.00 0.04 0.36 0.18 0.02 0.02 1.00

oh oh m1 bh kg m3 kg oh oh oh oh m1 bh kg m3 kg oh oh oh oh m1 bh kg m3 kg oh oh oh oh m1 bh kg m3 kg oh oh oh oh m1 bh kg m3 kg oh oh oh oh m1 bh kg m3 kg oh oh oh oh m2 m3 oh oh oh oh m2

Kepala tukang Mandor Memasang plint ubin granit ukuran (10 x 30) cm Plint ubin granit Semen Pasir pasang Semen warna Pekerja Tukang batu Kepala tukang Mandor Memasang plint ubin teralux kerang ukuran (10 x 40) cm Plint ubin teralux kerang Semen Pasir pasang Semen warna Pekerja Tukang batu Kepala tukang Mandor Memasang plint ubin teralux kerang ukuran (10 x 30) cm Plint ubin teralux kerang Semen Pasir pasang Semen warna Pekerja Tukang batu Kepala tukang Mandor Memasang plint ubin teralux marmer ukuran (10 x 60) cm Plint ubin teralux marmer Semen Pasir pasang Semen warna Pekerja Tukang batu Kepala tukang Mandor Memasang plint ubin teralux marmer ukuran (10 x 40) cm Plint ubin teralux marmer Semen Pasir pasang Semen warna Pekerja Tukang batu Kepala tukang Mandor Memasang plint ubin teralux marmer ukuran (10 x 30) cm Plint ubin teralux marmer Semen Pasir pasang Semen warna Pekerja Tukang batu Kepala tukang Mandor Memasang lantai teraso cor ditempat, tebal 3 cm Bahan teraso cor Pekerja Tukang batu Kepala tukang Mandor Memasang lantai keramik artistik ukuran (10 x 20) cm

1,667 1,100 74,082 43,250 1,688 631 214 10,942 14,589 1,667 1,100 47,066 16,234 1,688 631 214 10,942 14,589 1,667 1,100 52,457 21,625 1,688 631 214 10,942 14,589 1,667 1,100 53,396 22,564 1,688 631 214 10,942 14,589 1,667 1,100 66,006 35,173 1,688 631 214 10,942 14,589 1,667 1,100 77,686 46,854 1,688 631 214 10,942 14,589 1,667 1,100 116,262 36,021 43,768 29,179 3,335 3,960 244,122

96/151

Software RAB Exarch xPro v2019

SNI-2007

S-190

SNI-2007

S-191

SNI-2007

S-192

SNI-2007

S-193

SNI-2007

S-194

SNI-2007

S-195

SNI-2007

S-196

www.mitra-arsitek.com

1.06 8.19 0.05 2.75 0.70 0.35 0.04 0.04 1.00 1.06 8.19 0.05 3.20 0.70 0.35 0.04 0.04 1.00 1.09 8.19 0.05 1.62 0.70 0.35 0.04 0.04 1.00 1.07 10.00 0.05 1.50 0.70 0.35 0.04 0.04 1.00 1.06 10.40 0.05 1.62 0.70 0.35 0.04 0.04 1.00 1.09 9.80 0.05 4.37 1.05 0.53 0.05 0.05 1.00 1.07 14.15 0.04 2.00 0.70 0.35 0.04 0.04 1.00

m2 kg m3 kg oh oh oh oh m2 m2 kg m3 kg oh oh oh oh m2 m2 kg m3 kg oh oh oh oh m2 m2 kg m3 kg oh oh oh oh m2 m2 kg m3 kg oh oh oh oh m2 m2 kg m3 kg oh oh oh oh m2 m2 kg m3 kg oh oh oh oh m1

Ubin keramik artistik 60,607 Semen 12,125 Pasir pasang 9,469 Semen warna 5,896 Pekerja 85,104 Tukang batu 56,736 Kepala tukang 6,484 Mandor 7,700 Memasang lantai keramik artistik ukuran (10 x 10) cm atau (5 x 20) 245,087 cm Ubin keramik artistik 60,607 Semen 12,125 Pasir pasang 9,469 Semen warna 6,861 Pekerja 85,104 Tukang batu 56,736 Kepala tukang 6,484 Mandor 7,700 Memasang lantai keramik ukuran (33 x 33) cm 197,770 Ubin keramik 16,678 Semen 12,125 Pasir pasang 9,469 Semen warna 3,473 Pekerja 85,104 Tukang batu 56,736 Kepala tukang 6,484 Mandor 7,700 Memasang lantai keramik ukuran (30 x 30) cm 199,871 Ubin keramik 16,356 Semen 14,805 Pasir pasang 9,469 Semen warna 3,216 Pekerja 85,104 Tukang batu 56,736 Kepala tukang 6,484 Mandor 7,700 Memasang lantai keramik ukuran (20 x 20) cm 200,598 Ubin keramik 16,234 Semen 15,397 Pasir pasang 9,469 Semen warna 3,473 Pekerja 85,104 Tukang batu 56,736 Kepala tukang 6,484 Mandor 7,700 Memasang lantai keramik ukuran (10 x 33) cm, variasi/border 284,265 Ubin keramik 16,678 Semen 14,508 Pasir pasang 9,469 Semen warna 9,370 Pekerja 127,657 Tukang batu 85,104 Kepala tukang 9,819 Mandor 11,660 Memasang lantai mosaik ukuran (30 x 30) cm, campuran spesi 1 PC 418,522 : 3 PP Mosaik 229,054 Semen 20,948 Pasir pasang 8,207 Semen warna 4,288 Pekerja 85,104 Tukang batu 56,736 Kepala tukang 6,484 Mandor 7,700 Memasang plint keramik artisitk ukuran (10 x 20) cm 90,196

97/151

Software RAB Exarch xPro v2019

SNI-2007

S-197

SNI-2007

S-198

SNI-2002

S-199

SNI-2002

S-200

SNI-2007

S-201

SNI-2007

S-202

SNI-2007

S-203

www.mitra-arsitek.com

5.30 1.14 0.00 0.03 0.09 0.09 0.01 0.01 1.00 10.60 1.14 0.00 0.05 0.09 0.09 0.01 0.01 1.00 5.30 0.57 0.00 0.01 0.09 0.09 0.01 0.01 1.00 2.65 1.20 0.00 0.10 0.09 0.09 0.01 0.01 1.00 3.53 1.65 0.00 0.10 0.09 0.09 0.01 0.01 1.00 5.30 1.14 0.00 0.10 0.09 0.09 0.01 0.01 1.00 1.06 8.19 0.05 0.65 0.70 0.35 0.04 0.04 1.00

bh kg m3 kg oh oh oh oh m1 bh kg m3 kg oh oh oh oh m1 bh kg m3 kg oh oh oh oh m1 bh kg m3 kg oh oh oh oh m1 bh kg m3 kg oh oh oh oh m1 bh kg m3 kg oh oh oh oh m2 m2 kg m3 kg oh oh oh oh m2

Plint keramik artistik Semen Pasir pasang Semen warna Pekerja Tukang batu Kepala tukang Mandor Memasang plint keramik artisitik ukuran (10 x 10) cm Plint keramik artistik Semen Pasir pasang Semen warna Pekerja Tukang batu Kepala tukang Mandor Memasang plint keramik ukuran (5 x 20) cm Plint keramik artistik Semen Pasir pasang Semen warna Pekerja Tukang batu Kepala tukang Mandor Pasang plint keramik ukuran 10 x 40 cm Plint ubin keramik 10 x 40 cm Semen Pasir pasang Semen warna Pekerja Tukang batu Kepala Tukang Mandor Pasang plint keramik ukuran 10 x 30 cm Plint ubin keramik 10 x 30 cm Semen Pasir pasang Semen warna Pekerja Tukang batu Kepala Tukang Mandor Memasang plint internal cove artistik ukuran (5 x 5 x 20) cm Internal cove Semen Pasir pasang Semen warna Pekerja Tukang batu Kepala tukang Mandor Memasang lantai marmer ukuran (100 x 100) cm Marmer Semen Pasir pasang Semen warna Pekerja Tukang batu Kepala tukang Mandor Memasang lantai karpet

59,524 1,688 631 54 10,942 14,589 1,667 1,100 149,773 119,049 1,688 631 107 10,942 14,589 1,667 1,100 89,010 59,524 844 316 28 10,942 14,589 1,667 1,100 47,155 16,234 1,777 631 214 10,942 14,589 1,667 1,100 48,208 16,579 2,443 673 214 10,942 14,589 1,667 1,100 71,417 40,585 1,688 631 214 10,942 14,589 1,667 1,100 666,030 487,017 12,125 9,469 1,394 85,104 56,736 6,484 7,700 669,784

98/151

Software RAB Exarch xPro v2019

SNI-2007

S-204

SNI-2007

S-205

SNI-2007

S-206

SNI-2007

S-207

SNI-2007

S-208

SNI-2007

S-209

SNI-2007

S-210

www.mitra-arsitek.com

1.05 0.35 0.17 0.17 0.02 0.01 1.00 1.05 0.35 0.12 0.12 0.01 0.01 1.00 1.05 0.60 0.70 0.35 0.04 0.04 1.00 1.05 0.60 0.70 0.35 0.04 0.04 1.00 1.05 9.30 0.02 1.50 1.00 0.50 0.05 0.05 1.00 1.06 9.30 0.02 2.75 0.90 0.45 0.05 0.05 1.00 1.06 9.30 0.02 1.94 0.90 0.45 0.05 0.05 1.00 1.06 9.30 0.02 2.75 0.90 0.45 0.05 0.05

m2 kg oh oh oh oh m2 m2 kg oh oh oh oh m2 m2 kg oh oh oh oh m2 m2 kg oh oh oh oh m2 m2 kg m3 kg oh oh oh oh m2 m2 kg m3 kg oh oh oh oh m2 m2 kg m3 kg oh oh oh oh m2 m2 kg m3 kg oh oh oh oh

Karpet Lem Pekerja Tukang kayu Kepala tukang Mandor Memasang underlayer Underlayer irubber corrugated Lem Pekerja Tukang kayu Kepala tukang Mandor Memasang lantai parquet Parquet kayu Lem Pekerja Tukang kayu Kepala tukang Mandor Memasang lantai kayu (gym floor) Gymfloor Lem Pekerja Tukang kayu Kepala tukang Mandor Memasang dinding porselen ukuran (11 x 11) cm Porselen Semen Pasir pasang Semen warna Pekerja Tukang batu Kepala tukang Mandor Memasang dinding porselin ukuran (10 x 20) cm Porselen Semen Pasir pasang Semen warna Pekerja Tukang batu Kepala tukang Mandor Memasang dinding porselin ukuran (20 x 20) cm Porselen Semen Pasir pasang Semen warna Pekerja Tukang batu Kepala tukang Mandor Memasang dinding keramik ukuran (10 x 20) cm keramik artistik 10cm x 20cm Semen Pasir pasang Semen warna Pekerja Tukang batu Kepala tukang Mandor

611,069 5,360 20,668 27,558 3,149 1,980 143,182 100,237 5,360 14,589 19,452 2,223 1,320 180,222 15,009 9,189 85,104 56,736 6,484 7,700 312,085 146,871 9,189 85,104 56,736 6,484 7,700 387,840 144,175 13,768 3,788 3,216 121,578 81,052 9,263 11,000 370,160 146,105 13,768 3,788 5,896 109,420 72,947 8,337 9,900 368,424 146,105 13,768 3,788 4,160 109,420 72,947 8,337 9,900 305,225 81,170 13,768 3,788 5,896 109,420 72,947 8,337 9,900

99/151

Software RAB Exarch xPro v2019

SNI-2007

S-211

SNI-2007

S-212

SNI-2007

S-213

SNI-2007

S-214

SNI-2007

S-215

SNI-2007

S-216

SNI-2007

S-217

SNI-2007

S-218

AK-SNI 2008

S-219

www.mitra-arsitek.com

1.00 1.06 3.00 12.44 0.03 0.65 1.30 0.65 0.07 0.07 1.00 63.00 12.44 0.03 2.75 1.00 0.50 0.05 0.05 1.00 1.10 11.75 0.04 0.70 0.35 0.04 0.04 1.00 1.10 11.75 0.04 0.70 0.35 0.04 0.04 1.00 11.87 0.35 0.15 0.15 0.02 0.01 1.00 2.20 0.25 0.35 0.18 0.02 0.00 1.00 5.00 0.12 0.12 0.01 0.01 1.00 0.00 0.05 0.12 0.12 0.01 0.01 1.00

m2 m2 bh kg m3 kg oh oh oh oh m2 bh kg m3 kg oh oh oh oh m2 m2 kg m3 oh oh oh oh m2 m2 kg m3 oh oh oh oh m2 m2 kg oh oh oh oh m2 m1 kg oh oh oh oh m2 kg oh oh oh oh m1 m3 kg oh oh oh oh m1

Memasang dinding marmer ukuran (100 x 100) cm Marmer Paku Biasa 2" - 5" Semen Pasir pasang Semen warna Pekerja Tukang batu Kepala tukang Mandor Memasang dinding bata pelapis ukuran (3 x 7 x 24) cm Bata merah Semen Pasir pasang Semen warna Pekerja Tukang batu Kepala tukang Mandor Memasang dinding batu paras Batu paras Semen Pasir pasang Pekerja Tukang batu Kepala tukang Mandor Memasang dinding batu tempel hitam Batu alam / tempel Semen Pasir pasang Pekerja Tukang batu Kepala tukang Mandor Memasang lantai vinyl ukuran (30 x 30) cm KL I Vinyl Lem vinyl Pekerja Tukang kayu Kepala tukang Mandor Memasang wall paper, lebar 50 cm Wallpaper Lem Pekerja Tukang Interior Kepala tukang Mandor Memasang floor hardener Floor hardener Pekerja Tukang kayu Kepala tukang Mandor Memasang plint kayu kelas II ukuran (2 x 10) cm Papan kayu kelas II Paku skrup 5 cm Pekerja Tukang kayu Kepala tukang Mandor Pasang keramik stepnosing granito 7/30

878,500 487,017 76,652 18,417 5,261 1,394 158,051 105,367 12,042 14,300 310,357 57,891 18,417 5,261 5,896 121,578 81,052 9,263 11,000 270,633 89,848 17,395 7,365 85,104 56,736 6,484 7,700 480,653 299,868 17,395 7,365 85,104 56,736 6,484 7,700 280,868 226,630 7,147 18,237 24,316 2,779 1,760 156,956 78,617 3,829 42,552 28,368 3,149 440 56,729 19,144 14,589 19,452 2,223 1,320 49,173 10,721 868 14,589 19,452 2,223 1,320 64,208

100/151

Software RAB Exarch xPro v2019

AK-SNI 2008

S-220

AK-SNI 2008

S-221

AK-SNI 2008

S-222

AK-SNI 2008

S-223

AK-SNI 2008

S-224

AK-SNI 2008

S-225

AK-SNI 2008

S-226

www.mitra-arsitek.com

3.60 0.41 0.00 0.06 0.10 0.01 0.05 0.00 1.00 5.00 0.41 0.00 0.06 0.10 0.01 0.05 0.00 1.00 5.30 1.14 0.00 0.03 0.09 0.09 0.01 0.01 1.00 3.53 1.14 0.00 0.03 0.09 0.09 0.01 0.01 1.00 1.00 0.05 0.50 0.25 0.03 0.03 1.00 1.00 0.05 0.50 0.25 0.03 0.03 1.00 1.00 0.05 0.50 0.25 0.03 0.03 1.00 1.00 0.05 0.50 0.25 0.03 0.03

bh kg m3 kg oh oh oh oh m1 bh kg m3 kg oh oh oh oh m1 bh kg m3 kg oh oh oh oh m1 bh kg m3 kg oh oh oh oh m2 m2 m3 oh oh oh oh m2 m2 m3 oh oh oh oh m2 m2 m3 oh oh oh oh m2 m2 m3 oh oh oh oh

Stepnosing granito 38,594 Semen 604 Pasir Pasang 189 Semen Warna 129 Tukang batu 16,210 Kepala Tukang 1,853 Pekerja 6,079 Mandor 550 Pasang list keramik dinding 5/20 86,874 List keramik dinding motif 61,260 Semen 604 Pasir pasang 189 Semen Warna 129 Tukang batu 16,210 Kepala Tukang 1,853 Pekerja 6,079 Mandor 550 Memasang hospital plint panjang 20 cm 95,607 Hospital plint 64,936 Semen 1,688 Pasir pasang 631 Semen warna 54 Pekerja 10,942 Tukang batu 14,589 Kepala tukang 1,667 Mandor 1,100 Memasang hospital plint panjang 30 cm 47,250 Plint ubin keramik 10 x 30 cm 16,579 Semen 1,688 Pasir pasang 631 Semen warna 54 Pekerja 10,942 Tukang batu 14,589 Kepala Tukang 1,667 Mandor 1,100 Pasang conblock tipe segi-empat, uni, segi-enam abu-abu 8 cm, K-400 129,671 Conblock 6,126 Pasir urug 12,099 Pekerja 60,789 Tukang batu 40,526 Kepala Tukang 4,632 Mandor 5,500 Pasang conblock tipe uni, segi-empat abu-abu 8 cm, K-300 129,671 Conblock 6,126 Pasir urug 12,099 Pekerja 60,789 Tukang batu 40,526 Kepala Tukang 4,632 Mandor 5,500 Pasang conblock tipe segi-empat abu-abu 6 cm, K-200 129,671 Conblock 6,126 Pasir urug 12,099 Pekerja 60,789 Tukang batu 40,526 Kepala Tukang 4,632 Mandor 5,500 Pasang conblock tipe segi-empat abu-abu 8 cm, K-200 129,671 Conblock 6,126 Pasir urug 12,099 Pekerja 60,789 Tukang batu 40,526 Kepala Tukang 4,632 Mandor 5,500

101/151

Software RAB Exarch xPro v2019

AK-SNI 2008

S-227

AK-SNI 2008

S-228

AK-SNI 2008

S-229

AK-SNI 2008

S-230

AK-SNI 2008

S-231

AK-SNI 2008

S-232

AK-SNI 2008

S-233

AK-SNI 2008

S-234

AK-SNI 2008

S-235

www.mitra-arsitek.com

1.00 1.00 0.05 0.50 0.25 0.03 0.03 1.00 1.00 0.05 0.50 0.25 0.03 0.03 1.00 1.00 0.05 0.50 0.25 0.03 0.03 1.00 1.00 0.05 0.50 0.25 0.03 0.03 1.00 1.00 0.05 0.50 0.25 0.03 0.03 1.00 1.00 0.05 0.50 0.25 0.03 0.03 1.00 1.00 0.05 0.50 0.25 0.03 0.03 1.00 1.00 0.05 0.50 0.25 0.03 0.03 1.00 1.00 0.05 0.50 0.25 0.03 0.03

m2 m2 m3 oh oh oh oh m2 m2 m3 oh oh oh oh m2 m2 m3 oh oh oh oh m2 m2 m3 oh oh oh oh m2 m2 m3 oh oh oh oh m2 m2 m3 oh oh oh oh m2 m2 m3 oh oh oh oh m2 m2 m3 oh oh oh oh m2 m2 m3 oh oh oh oh

Pasang conblock tipe segi-enam abu-abu 6 cm, K-200 129,671 Conblock 6,126 Pasir urug 12,099 Pekerja 60,789 Tukang batu 40,526 Kepala Tukang 4,632 Mandor 5,500 Pasang conblock tipe segi-enam abu-abu 8 cm, K-200 129,671 Conblock 6,126 Pasir urug 12,099 Pekerja 60,789 Tukang batu 40,526 Kepala Tukang 4,632 Mandor 5,500 Pasang conblock tipe segi-empat, uni, segi-enam warna 8 cm, K-400 129,671 Conblock 6,126 Pasir urug 12,099 Pekerja 60,789 Tukang batu 40,526 Kepala Tukang 4,632 Mandor 5,500 Pasang conblock tipe uni, segi-empat warna 8 cm, K-300 129,671 Conblock 6,126 Pasir urug 12,099 Pekerja 60,789 Tukang batu 40,526 Kepala Tukang 4,632 Mandor 5,500 Pasang conblock tipe segi-empat warna 6 cm, K-200 129,671 Conblock 6,126 Pasir urug 12,099 Pekerja 60,789 Tukang batu 40,526 Kepala Tukang 4,632 Mandor 5,500 Pasang conblock tipe segi-empat warna 8 cm, K-200 129,671 Conblock 6,126 Pasir urug 12,099 Pekerja 60,789 Tukang batu 40,526 Kepala Tukang 4,632 Mandor 5,500 Pasang conblock tipe segi-enam warna 6 cm, K-200 129,671 Conblock 6,126 Pasir urug 12,099 Pekerja 60,789 Tukang batu 40,526 Kepala Tukang 4,632 Mandor 5,500 Pasang conblock tipe segi-enam warna 8 cm, K-200 129,671 Conblock 6,126 Pasir urug 12,099 Pekerja 60,789 Tukang batu 40,526 Kepala Tukang 4,632 Mandor 5,500 Pasang grassblock bulat tebal 10 cm 169,490 Grassblock 45,945 Pasir urug 12,099 Pekerja 60,789 Tukang batu 40,526 Kepala Tukang 4,632 Mandor 5,500

102/151

Software RAB Exarch xPro v2019

AK-SNI 2008

S-236

SNI-2007

S-237

SNI-2007

S-238

SNI-2007

S-239

SNI-2007

S-240

SNI-2007

S-241

SNI-2007

S-242

SNI-2007

S-243

SNI-2007

S-244

www.mitra-arsitek.com

1.00 1.00 0.05 0.50 0.25 0.03 0.03 1.00 1.10 1.25 1.00 7.00 21.00 2.10 0.35 1.00 1.10 1.25 1.00 7.00 21.00 2.10 0.35 1.00 1.20 1.25 1.00 6.00 18.00 1.80 0.30 1.00 1.20 1.25 1.00 6.00 18.00 1.80 0.30 1.00 1.20 1.25 1.00 6.00 18.00 1.80 0.30 1.00 0.04 0.05 0.35 1.05 0.11 0.02 1.00 0.04 0.05 0.35 1.05 0.11 0.02 1.00 0.04

m2 m2 m3 oh oh oh oh m3 m3 kg kg oh oh oh oh m3 m3 kg kg oh oh oh oh m3 m3 kg kg oh oh oh oh m3 m3 kg kg oh oh oh oh m3 m3 kg kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3

Pasang grassblock tebal 10 cm 169,490 Grassblock 45,945 Pasir urug 12,099 Pekerja 60,789 Tukang batu 40,526 Kepala Tukang 4,632 Mandor 5,500 Membuat dan memasang kusen pintu dan kusen jendela, kayu17,232,857 jati (klas plitur) Balok kayu jati (klas plitur) 12,466,410 Paku Biasa 2" - 5" 31,906 Lem kayu 13,273 Pekerja 851,044 Tukang kayu 3,404,176 Kepala tukang 389,049 Mandor 76,999 Membuat dan memasang kusen pintu dan kusen jendela, kayu14,986,657 jati lokal Balok kayu jati (lokal) 10,220,210 Paku Biasa 2" - 5" 31,906 Lem kayu 13,273 Pekerja 851,044 Tukang kayu 3,404,176 Kepala tukang 389,049 Mandor 76,999 Membuat dan memasang kusen pintu dan kusen jendela, kayu11,718,850 kamper Balok kayu kamper 7,626,870 Paku Biasa 2" - 5" 31,906 Lem kayu 13,273 Pekerja 729,466 Tukang kayu 2,917,865 Kepala tukang 333,470 Mandor 65,999 Membuat dan memasang kusen pintu dan kusen jendela, kayu11,749,480 bengkirai Balok kayu bengkirai 7,657,500 Paku Biasa 2" - 5" 31,906 Lem kayu 13,273 Pekerja 729,466 Tukang kayu 2,917,865 Kepala tukang 333,470 Mandor 65,999 Membuat dan memasang kusen pintu dan kusen jendela, kayu kruing 9,605,380 Balok kayu kruing 5,513,400 Paku Biasa 2" - 5" 31,906 Lem kayu 13,273 Pekerja 729,466 Tukang kayu 2,917,865 Kepala tukang 333,470 Mandor 65,999 Membuat dan memasang pintu klamp, kayu jati (klas plitur) 625,430 Papan kayu jati (klas plitur) 387,980 Paku Biasa 2" - 5" 1,276 Pekerja 42,552 Tukang kayu 170,209 Kepala tukang 19,452 Mandor 3,960 Membuat dan memasang pintu klamp, kayu jati (lokal) 625,430 Papan kayu jati (lokal) 387,980 Paku Biasa 2" - 5" 1,276 Pekerja 42,552 Tukang kayu 170,209 Kepala tukang 19,452 Mandor 3,960 Membuat dan memasang pintu klamp, kayu kamper 491,679 Papan kayu kamper 254,229

103/151

Software RAB Exarch xPro v2019

SNI-2007

S-245

SNI-2007

S-246

SNI-2007

S-247

SNI-2007

S-248

SNI-2007

S-249

SNI-2007

S-250

SNI-2007

S-251

SNI-2007

S-252

SNI-2007

S-253

www.mitra-arsitek.com

0.05 0.35 1.05 0.11 0.02 1.00 0.04 0.05 0.35 1.05 0.11 0.02 1.00 0.04 0.05 0.35 1.05 0.11 0.02 1.00 0.04 0.50 1.00 3.00 0.30 0.05 1.00 0.04 0.50 1.00 3.00 0.30 0.05 1.00 0.04 0.50 1.00 3.00 0.30 0.05 1.00 0.04 0.50 1.00 3.00 0.30 0.05 1.00 0.04 0.50 1.00 3.00 0.30 0.05 1.00 0.02 0.30 0.80 2.40 0.24 0.04 1.00 0.02

kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3

Paku Biasa 2" - 5" 1,276 Pekerja 42,552 Tukang kayu 170,209 Kepala tukang 19,452 Mandor 3,960 Membuat dan memasang pintu klamp, kayu bengkirai 492,700 Papan kayu bengkirai 255,250 Paku Biasa 2" - 5" 1,276 Pekerja 42,552 Tukang kayu 170,209 Kepala tukang 19,452 Mandor 3,960 Membuat dan memasang pintu klamp, kayu kruing 421,230 Papan kayu kruing 183,780 Paku Biasa 2" - 5" 1,276 Pekerja 42,552 Tukang kayu 170,209 Kepala tukang 19,452 Mandor 3,960 Membuat dan memasang daun pintu panel, kayu jati (klas plitur) 1,069,083 Papan kayu jati (klas plitur) 387,980 Lem kayu 6,637 Pekerja 121,578 Tukang kayu 486,311 Kepala tukang 55,578 Mandor 11,000 Membuat dan memasang daun pintu panel, kayu jati (lokal) 1,069,083 Papan kayu jati (lokal) 387,980 Lem kayu 6,637 Pekerja 121,578 Tukang kayu 486,311 Kepala tukang 55,578 Mandor 11,000 Membuat dan memasang daun pintu panel, kayu kamper 935,332 Papan kayu kamper 254,229 Lem kayu 6,637 Pekerja 121,578 Tukang kayu 486,311 Kepala tukang 55,578 Mandor 11,000 Membuat dan memasang daun pintu panel, kayu bengkirai 936,353 Papan kayu bengkirai 255,250 Lem kayu 6,637 Pekerja 121,578 Tukang kayu 486,311 Kepala tukang 55,578 Mandor 11,000 Membuat dan memasang daun pintu panel, kayu kruing 864,883 Papan kayu kruing 183,780 Lem kayu 6,637 Pekerja 121,578 Tukang kayu 486,311 Kepala tukang 55,578 Mandor 11,000 Membuat dan memasang pintu dan jendela kaca, kayu jati (klas 776,343 plitur) Papan kayu jati (klas plitur) 232,788 Lem kayu 3,982 Pekerja 97,262 Tukang kayu 389,049 Kepala tukang 44,463 Mandor 8,800 Membuat dan memasang pintu dan jendela kaca, kayu jati (lokal)776,343 Papan kayu jati (lokal) 232,788

104/151

Software RAB Exarch xPro v2019

SNI-2007

S-254

SNI-2007

S-255

SNI-2007

S-256

SNI-2007

S-257

SNI-2007

S-258

SNI-2007

S-259

SNI-2007

S-260

SNI-2007

S-261

SNI-2007

S-262

www.mitra-arsitek.com

0.30 0.80 2.40 0.24 0.04 1.00 0.02 0.30 0.80 2.40 0.24 0.04 1.00 0.02 0.30 0.80 2.40 0.24 0.04 1.00 0.02 0.30 0.80 2.40 0.24 0.04 1.00 0.06 0.50 1.00 3.00 0.30 0.05 1.00 0.06 0.50 1.00 3.00 0.30 0.05 1.00 0.06 0.50 1.00 3.00 0.30 0.05 1.00 0.06 0.50 1.00 3.00 0.30 0.05 1.00 0.06 0.50 1.00 3.00 0.30 0.05 1.00 0.03

kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3

Lem kayu 3,982 Pekerja 97,262 Tukang kayu 389,049 Kepala tukang 44,463 Mandor 8,800 Membuat dan memasang pintu dan jendela kaca, kayu kamper 696,093 Papan kayu kamper 152,537 Lem kayu 3,982 Pekerja 97,262 Tukang kayu 389,049 Kepala tukang 44,463 Mandor 8,800 Membuat dan memasang pintu dan jendela kaca, kayu bengkirai 696,705 Papan kayu bengkirai 153,150 Lem kayu 3,982 Pekerja 97,262 Tukang kayu 389,049 Kepala tukang 44,463 Mandor 8,800 Membuat dan memasang pintu dan jendela kaca, kayu kruing 653,823 Papan kayu kruing 110,268 Lem kayu 3,982 Pekerja 97,262 Tukang kayu 389,049 Kepala tukang 44,463 Mandor 8,800 Membuat dan memasang pintu dan jendela jalusi kayu jati (klas1,301,871 plitur) Papan kayu jati (klas plitur) 620,768 Lem kayu 6,637 Pekerja 121,578 Tukang kayu 486,311 Kepala tukang 55,578 Mandor 11,000 Membuat dan memasang pintu dan jendela jalusi kayu jati (lokal) 1,301,871 Papan kayu jati (lokal) 620,768 Lem kayu 6,637 Pekerja 121,578 Tukang kayu 486,311 Kepala tukang 55,578 Mandor 11,000 Membuat dan memasang pintu dan jendela jalusi kayu kamper1,087,870 Papan kayu kamper 406,766 Lem kayu 6,637 Pekerja 121,578 Tukang kayu 486,311 Kepala tukang 55,578 Mandor 11,000 Membuat dan memasang pintu dan jendela jalusi kayu bengkirai 1,089,503 Papan kayu bengkirai 408,400 Lem kayu 6,637 Pekerja 121,578 Tukang kayu 486,311 Kepala tukang 55,578 Mandor 11,000 Membuat dan memasang pintu dan jendela jalusi kayu kruing 975,151 Papan kayu kruing 294,048 Lem kayu 6,637 Pekerja 121,578 Tukang kayu 486,311 Kepala tukang 55,578 Mandor 11,000 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup 795,483 kayu jati lokal (le Papan kayu jati (lokal) 242,488

105/151

Software RAB Exarch xPro v2019

SNI-2007

S-263

SNI-2007

S-264

SNI-2007

S-265

SNI-2007

S-266

SNI-2007

S-267

SNI-2007

S-268

SNI-2007

S-269

SNI-2007

S-270

www.mitra-arsitek.com

0.03 0.50 1.00 0.70 2.10 0.21 0.04 1.00 0.03 0.03 0.50 1.00 0.70 2.10 0.21 0.04 1.00 0.03 0.03 0.50 1.00 0.70 2.10 0.21 0.04 1.00 0.03 0.03 0.50 1.00 0.70 2.10 0.21 0.04 1.00 0.06 0.15 0.67 2.00 0.20 0.34 1.00 0.06 0.15 0.67 2.00 0.20 0.34 1.00 0.06 0.15 0.67 2.00 0.20 0.34 1.00 0.06 0.15 0.67 2.00 0.20 0.34 1.00

kg kg lbr oh oh oh oh m2 m3 kg kg lbr oh oh oh oh m2 m3 kg kg lbr oh oh oh oh m2 m3 kg kg lbr oh oh oh oh m2 m3 kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3 kg oh oh oh oh m2

Paku Biasa ½" - 1" 720 Lem kayu 6,637 Plywood 120x240 tbl. 4 mm 73,512 Pekerja 85,104 Tukang kayu 340,418 Kepala tukang 38,905 Mandor 7,700 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup 711,888 kayu kamper (leb Papan kayu kamper 158,893 Paku Biasa ½" - 1" 720 Lem kayu 6,637 Plywood 120x240 tbl. 4 mm 73,512 Pekerja 85,104 Tukang kayu 340,418 Kepala tukang 38,905 Mandor 7,700 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup 712,526 kayu bengkirai (le Papan kayu bengkirai 159,531 Paku Biasa ½" - 1" 720 Lem kayu 6,637 Plywood 120x240 tbl. 4 mm 73,512 Pekerja 85,104 Tukang kayu 340,418 Kepala tukang 38,905 Mandor 7,700 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup 667,858 kayu kruing (leba Papan kayu kruing 114,863 Paku Biasa ½" - 1" 720 Lem kayu 6,637 Plywood 120x240 tbl. 4 mm 73,512 Pekerja 85,104 Tukang kayu 340,418 Kepala tukang 38,905 Mandor 7,700 Memasang jalusi kusen, kayu jati (klas plitur) 1,101,985 Papan kayu jati (klas plitur) 581,970 Paku Biasa ½" - 1" 3,599 Pekerja 81,457 Tukang kayu 324,207 Kepala tukang 37,052 Mandor 73,699 Memasang jalusi kusen, kayu jati (lokal) 1,101,985 Papan kayu jati (lokal) 581,970 Paku Biasa ½" - 1" 3,599 Pekerja 81,457 Tukang kayu 324,207 Kepala tukang 37,052 Mandor 73,699 Memasang jalusi kusen, kayu kamper 901,358 Papan kayu kamper 381,344 Paku Biasa ½" - 1" 3,599 Pekerja 81,457 Tukang kayu 324,207 Kepala tukang 37,052 Mandor 73,699 Memasang jalusi kusen, kayu bengkirai 902,890 Papan kayu bengkirai 382,875 Paku Biasa ½" - 1" 3,599 Pekerja 81,457 Tukang kayu 324,207 Kepala tukang 37,052 Mandor 73,699 Memasang jalusi kusen, kayu kruing 795,685

106/151

Software RAB Exarch xPro v2019

SNI-2002

S-271

SNI-2002

S-272

SNI-2002

S-273

SNI-2002

S-274

SNI-2007

S-275

SNI-2007

S-276

SNI-2007

S-277

www.mitra-arsitek.com

0.06 0.15 0.67 2.00 0.20 0.34 1.00 0.02 0.03 0.30 1.00 0.60 2.00 0.20 0.03 1.00 0.02 0.03 0.30 1.00 0.60 2.00 0.20 0.03 1.00 0.02 0.03 0.30 1.00 0.60 2.00 0.20 0.03 1.00 0.02 0.03 0.30 1.00 0.60 2.00 0.20 0.03 1.00 0.03 0.03 0.80 1.00 0.50 0.85 2.55 0.26 0.04 1.00 0.03 0.03 0.80 1.00 0.50 0.85 2.55 0.26 0.04 1.00

m3 kg oh oh oh oh m2 m3 kg kg lbr oh oh oh oh m2 m3 kg kg lbr oh oh oh oh m2 m3 kg kg lbr oh oh oh oh m2 m3 kg kg lbr oh oh oh oh m2 m3 kg kg lbr lbr oh oh oh oh m2 m3 kg kg lbr lbr oh oh oh oh m2

Papan kayu kruing 275,670 Paku Biasa ½" - 1" 3,599 Pekerja 81,457 Tukang kayu 324,207 Kepala tukang 37,052 Mandor 73,699 Pasang pintu teakwood rangkap, rangka kayu jati (lokal) 707,088 Papan kayu jati (lokal) 190,110 Paku Biasa ½" - 1" 720 Lem kayu 3,982 Teakwood 4 mm, 120 x 240 71,470 Pekerja 72,947 Tukang kayu 324,207 Kepala Tukang 37,052 Mandor 6,600 Pasang pintu teakwood rangkap, rangka kayu kamper 641,550 Papan kayu kamper 124,572 Paku Biasa ½" - 1" 720 Lem kayu 3,982 Teakwood 4 mm, 120 x 240 71,470 Pekerja 72,947 Tukang kayu 324,207 Kepala Tukang 37,052 Mandor 6,600 Pasang pintu teakwood rangkap, rangka kayu bengkirai 642,050 Papan kayu bengkirai 125,073 Paku Biasa ½" - 1" 720 Lem kayu 3,982 Teakwood 4 mm, 120 x 240 71,470 Pekerja 72,947 Tukang kayu 324,207 Kepala Tukang 37,052 Mandor 6,600 Pasang pintu teakwood rangkap, rangka kayu kruing 607,030 Papan kayu kruing 90,052 Paku Biasa ½" - 1" 720 Lem kayu 3,982 Teakwood 4 mm, 120 x 240 71,470 Pekerja 72,947 Tukang kayu 324,207 Kepala Tukang 37,052 Mandor 6,600 Memasang teakwood rangkap lapis formika, rangka expose kayu 848,801 kamper Papan kayu kamper 158,893 Paku Biasa ½" - 1" 720 Lem kayu 10,618 Teakwood 4 mm 90 x 220 cm 59,218 Formika 45,945 Pekerja 103,341 Tukang kayu 413,364 Kepala tukang 47,242 Mandor 9,460 Memasang teakwood rangkap lapis formika, rangka expose kayu 849,439 bengkirai Papan kayu bengkirai 159,531 Paku Biasa ½" - 1" 720 Lem kayu 10,618 Teakwood 4 mm 90 x 220 cm 59,218 Formika 45,945 Pekerja 103,341 Tukang kayu 413,364 Kepala tukang 47,242 Mandor 9,460 Memasang teakwood rangkap lapis formika, rangka expose kayu 804,770 kruing

107/151

Software RAB Exarch xPro v2019

SNI-2007

S-278

SNI-2007

S-279

SNI-2007

S-280

SNI-2007

S-281

SNI-2007

S-282

SNI-2007

S-283

SNI-2007

S-284

www.mitra-arsitek.com

0.03 0.03 0.80 1.00 0.50 0.85 2.55 0.26 0.04 1.00 1.10 15.00 5.60 4.00 12.00 1.20 0.20 1.00 1.10 15.00 5.60 4.00 12.00 1.20 0.20 1.00 1.10 15.00 5.60 4.00 12.00 1.20 0.20 1.00 1.10 15.00 5.60 4.00 12.00 1.20 0.20 1.00 1.10 15.00 5.60 4.00 12.00 1.20 0.20 1.00 1.10 15.00 5.60 4.00 12.00 1.20 0.20 1.00 1.20 15.00 5.60 6.70 20.10

m3 kg kg lbr lbr oh oh oh oh m3 m3 kg kg oh oh oh oh m3 m3 kg kg oh oh oh oh m3 m3 kg kg oh oh oh oh m3 m3 kg kg oh oh oh oh m3 m3 kg kg oh oh oh oh m3 m3 kg kg oh oh oh oh m3 m3 kg kg oh oh

Papan kayu kruing 114,863 Paku Biasa ½" - 1" 720 Lem kayu 10,618 Teakwood 4 mm 90 x 220 cm 59,218 Formika 45,945 Pekerja 103,341 Tukang kayu 413,364 Kepala tukang 47,242 Mandor 9,460 Memasang konstruksi kuda-kuda konvensional, kayu jati (klas13,701,695 plitur) bentang 6 meter Kayu jati (klas plitur) balok 10,669,450 Baja strip (0,2 x 2) cm 191,438 Paku biasa 2" - 5" 142,940 Pekerja 486,311 Tukang kayu 1,945,243 Kepala tukang 222,314 Mandor 44,000 Memasang konstruksi kuda-kuda konvensional, kayu jati (lokal) 11,455,495 bentang 6 meter Kayu jati (lokal) balok 8,423,250 Baja strip (0,2 x 2) cm 191,438 Paku biasa 2" - 5" 142,940 Pekerja 486,311 Tukang kayu 1,945,243 Kepala tukang 222,314 Mandor 44,000 Memasang konstruksi kuda-kuda konvensional, kayu kamper 10,023,542 bentang 6 meter Kayu kamper balok 6,991,298 Baja strip (0,2 x 2) cm 191,438 Paku biasa 2" - 5" 142,940 Pekerja 486,311 Tukang kayu 1,945,243 Kepala tukang 222,314 Mandor 44,000 Memasang konstruksi kuda-kuda konvensional, kayu bengkirai 10,051,620 bentang 6 meter Kayu bengkirai balok 7,019,375 Baja strip (0,2 x 2) cm 191,438 Paku biasa 2" - 5" 142,940 Pekerja 486,311 Tukang kayu 1,945,243 Kepala tukang 222,314 Mandor 44,000 Memasang konstruksi kuda-kuda konvensional, kayu kruing bentang 8,086,195 6 meter Kayu kruing balok 5,053,950 Baja strip (0,2 x 2) cm 191,438 Paku biasa 2" - 5" 142,940 Pekerja 486,311 Tukang kayu 1,945,243 Kepala tukang 222,314 Mandor 44,000 Memasang konstruksi kuda-kuda konvensional, kayu glugu bentang 4,829,205 6 meter Kayu glugu balok 1,796,960 Baja strip (0,2 x 2) cm 191,438 Paku biasa 2" - 5" 142,940 Pekerja 486,311 Tukang kayu 1,945,243 Kepala tukang 222,314 Mandor 44,000 Memasang konstruksi kuda-kuda expose, kayu jati (klas plitur)16,492,705 Kayu jati (klas plitur) balok 11,639,400 Baja strip (0,2 x 2) cm 191,438 Paku biasa 2" - 5" 142,940 Pekerja 814,571 Tukang kayu 3,258,283

108/151

Software RAB Exarch xPro v2019

SNI-2007

S-285

SNI-2007

S-286

SNI-2007

S-287

SNI-2007

S-288

SNI-2007

S-289

SNI-2007

S-290

SNI-2007

S-291

SNI-2007

S-292

www.mitra-arsitek.com

2.01 0.34 1.00 1.20 15.00 5.60 6.70 20.10 2.01 0.34 1.00 1.20 15.00 5.60 6.70 20.10 2.01 0.34 1.00 1.20 15.00 5.60 6.70 20.10 2.01 0.34 1.00 1.20 15.00 5.60 6.70 20.10 2.01 0.34 1.00 1.10 15.00 3.00 2.40 7.20 0.72 0.12 1.00 1.10 15.00 3.00 2.40 7.20 0.72 0.12 1.00 1.10 15.00 3.00 2.40 7.20 0.72 0.12 1.00 1.10 15.00 3.00 2.40

oh oh m3 m3 kg kg oh oh oh oh m3 m3 kg kg oh oh oh oh m3 m3 kg kg oh oh oh oh m3 m3 kg kg oh oh oh oh m3 m3 kg kg oh oh oh oh m3 m3 kg kg oh oh oh oh m3 m3 kg kg oh oh oh oh m3 m3 kg kg oh

Kepala tukang Mandor Memasang konstruksi kuda-kuda expose, kayu jati lokal Kayu jati (lokal) balok Baja strip (0,2 x 2) cm Paku biasa 2" - 5" Pekerja Tukang kayu Kepala tukang Mandor Memasang konstruksi kuda-kuda expose, kayu kamper Kayu kamper balok Baja strip (0,2 x 2) cm Paku biasa 2" - 5" Pekerja Tukang kayu Kepala tukang Mandor Memasang konstruksi kuda-kuda expose, kayu kruing Kayu kruing balok Baja strip (0,2 x 2) cm Paku biasa 2" - 5" Pekerja Tukang kayu Kepala tukang Mandor Memasang konstruksi kuda-kuda expose, kayu bengkirai Kayu bengkirai balok Baja strip (0,2 x 2) cm Paku biasa 2" - 5" Pekerja Tukang kayu Kepala tukang Mandor Memasang konstruksi gordeng, kayu jati (klas plitur) Kayu jati (klas plitur) balok Baja strip (0,2 x 2) cm Paku biasa 2" - 5" Pekerja Tukang kayu Kepala tukang Mandor Memasang konstruksi gordeng, kayu jati lokal Kayu jati (lokal) balok Baja strip (0,2 x 2) cm Paku biasa 2" - 5" Pekerja Tukang kayu Kepala tukang Mandor Memasang konstruksi gordeng, kayu kamper Kayu kamper balok Baja strip (0,2 x 2) cm Paku biasa 2" - 5" Pekerja Tukang kayu Kepala tukang Mandor Memasang konstruksi gordeng, kayu bengkirai Kayu bengkirai balok Baja strip (0,2 x 2) cm Paku biasa 2" - 5" Pekerja

372,375 73,699 14,042,305 9,189,000 191,438 142,940 814,571 3,258,283 372,375 73,699 12,480,175 7,626,870 191,438 142,940 814,571 3,258,283 372,375 73,699 10,366,705 5,513,400 191,438 142,940 814,571 3,258,283 372,375 73,699 12,510,805 7,657,500 191,438 142,940 814,571 3,258,283 372,375 73,699 12,556,183 10,669,450 191,438 76,575 291,786 1,167,146 133,388 26,400 10,309,983 8,423,250 191,438 76,575 291,786 1,167,146 133,388 26,400 8,878,030 6,991,298 191,438 76,575 291,786 1,167,146 133,388 26,400 8,906,108 7,019,375 191,438 76,575 291,786

109/151

Software RAB Exarch xPro v2019

SNI-2007

S-293

SNI-2007

S-294

AK-SNI 2008

S-295

AK-SNI 2008

S-296

AK-SNI 2008

S-297

AK-SNI 2008

S-298

AK-SNI 2008

S-299

www.mitra-arsitek.com

7.20 0.72 0.12 1.00 1.10 15.00 3.00 2.40 7.20 0.72 0.12 1.00 1.10 15.00 3.00 2.40 7.20 0.72 0.12 1.00 2.20 5.00 0.15 0.10 0.10 0.10 0.01 0.01 1.00 2.20 5.00 0.15 0.10 0.10 0.10 0.01 0.01 1.00 2.20 5.00 0.15 0.10 0.10 0.10 0.01 0.01 1.00 2.20 5.00 0.15 0.10 0.10 0.10 0.01 0.01 1.00 2.20 5.00 0.15 0.10 0.10 0.10 0.01

oh oh oh m3 m3 kg kg oh oh oh oh m3 m3 kg kg oh oh oh oh m2 m1 m1 kg kg oh oh oh oh m2 m1 m1 kg kg oh oh oh oh m2 m1 m1 kg kg oh oh oh oh m2 m1 m1 kg kg oh oh oh oh m2 m1 m1 kg kg oh oh oh

Tukang kayu Kepala tukang Mandor Memasang konstruksi gordeng, kayu kruing Kayu kruing balok Baja strip (0,2 x 2) cm Paku biasa 2" - 5" Pekerja Tukang kayu Kepala tukang Mandor Memasang konstruksi gordeng, kayu glugu Kayu glugu balok Baja strip (0,2 x 2) cm Paku biasa 2" - 5" Pekerja Tukang kayu Kepala tukang Mandor Memasang usuk jati (lokal) 5/7, reng jati (lokal) 2/3 Usuk kayu jati (lokal) 5/7 Reng jati (lokal) 2/3 Paku usuk Paku reng Pekerja Tukang kayu Kepala Tukang Mandor Memasang usuk kamper 5/7, reng jati (lokal) 2/3 Usuk kayu kamper 5/7 Reng jati (lokal) 2/3 Paku usuk Paku reng Pekerja Tukang kayu Kepala Tukang Mandor Memasang usuk kamper 5/7, reng kamper 2/3 Usuk kayu kamper 5/7 Reng kamper 2/3 Paku usuk Paku reng Pekerja Tukang kayu Kepala Tukang Mandor Memasang usuk bengkirai 5/7, reng jati (lokal) 2/3 Usuk kayu bengkirai 5/7 Reng jati (lokal) 2/3 Paku usuk Paku reng Pekerja Tukang kayu Kepala Tukang Mandor Memasang usuk bengkirai 5/7, reng bengkirai 2/3 Usuk kayu bengkirai 5/7 Reng bengkirai 2/3 Paku usuk Paku reng Pekerja Tukang kayu Kepala Tukang

1,167,146 133,388 26,400 6,940,683 5,053,950 191,438 76,575 291,786 1,167,146 133,388 26,400 3,683,693 1,796,960 191,438 76,575 291,786 1,167,146 133,388 26,400 140,466 74,686 30,324 2,450 1,685 12,158 16,210 1,853 1,100 116,881 51,101 30,324 2,450 1,685 12,158 16,210 1,853 1,100 107,692 51,101 21,135 2,450 1,685 12,158 16,210 1,853 1,100 116,881 51,101 30,324 2,450 1,685 12,158 16,210 1,853 1,100 109,529 51,101 22,973 2,450 1,685 12,158 16,210 1,853

110/151

Software RAB Exarch xPro v2019

AK-SNI 2008

S-300

AK-SNI 2008

S-301

AK-SNI 2008

S-302

AK-SNI 2008

S-303

AK-SNI 2008

S-304

AK-SNI 2008

S-305

AK-SNI 2008

S-306

www.mitra-arsitek.com

0.01 1.00 2.20 5.00 0.15 0.10 0.10 0.10 0.01 0.01 1.00 2.20 5.00 0.15 0.10 0.10 0.10 0.01 0.01 1.00 2.20 5.00 0.15 0.10 0.10 0.10 0.01 0.01 1.00 2.20 5.00 0.15 0.10 0.10 0.10 0.01 0.01 1.00 2.20 5.00 0.15 0.10 0.10 0.10 0.01 0.01 1.00 2.20 5.00 0.15 0.10 0.10 0.10 0.01 0.01 1.00 2.20 5.00 0.15 0.10 0.10 0.10 0.01

oh m2 m1 m1 kg kg oh oh oh oh m2 m1 m1 kg kg oh oh oh oh m2 m1 m1 kg kg oh oh oh oh m2 m1 m1 kg kg oh oh oh oh m2 m1 m1 kg kg oh oh oh oh m2 m1 m1 kg kg oh oh oh oh m2 m1 m1 kg kg oh oh oh

Mandor Memasang usuk kruing 5/7, reng jati (lokal) 2/3 Usuk kayu kruing 5/7 Reng jati (lokal) 2/3 Paku usuk Paku reng Pekerja Tukang kayu Kepala Tukang Mandor Memasang usuk kruing 5/7, reng kruing 2/3 Usuk kayu kruing 5/7 Reng kruing 2/3 Paku usuk Paku reng Pekerja Tukang kayu Kepala Tukang Mandor Memasang usuk jati 5/7 (klas 1), reng jati 3/4 (klas 1) Usuk kayu jati 5/7 (klas 1) Reng jati 3/4 (klas 1) Paku usuk Paku reng Pekerja Tukang kayu Kepala Tukang Mandor Memasang usuk kamper 5/7, reng jati (lokal) 3/4 Usuk kayu kamper 5/7 Reng jati (lokal) 3/4 Paku usuk Paku reng Pekerja Tukang kayu Kepala Tukang Mandor Memasang usuk kamper 5/7, reng kamper 3/4 Usuk kayu kamper 5/7 Reng kamper 3/4 Paku usuk Paku reng Pekerja Tukang kayu Kepala Tukang Mandor Memasang usuk bengkirai 5/7, reng jati (lokal) 3/4 Usuk kayu bengkirai 5/7 Reng jati (lokal) 3/4 Paku usuk Paku reng Pekerja Tukang kayu Kepala Tukang Mandor Memasang usuk bengkirai 5/7, reng bengkirai 3/4 Usuk kayu bengkirai 5/7 Reng bengkirai 3/4 Paku usuk Paku reng Pekerja Tukang kayu Kepala Tukang

1,100 101,157 35,378 30,324 2,450 1,685 12,158 16,210 1,853 1,100 88,905 35,378 18,072 2,450 1,685 12,158 16,210 1,853 1,100 205,503 90,410 79,638 2,450 1,685 12,158 16,210 1,853 1,100 147,204 51,101 60,647 2,450 1,685 12,158 16,210 1,853 1,100 128,826 51,101 42,269 2,450 1,685 12,158 16,210 1,853 1,100 147,204 51,101 60,647 2,450 1,685 12,158 16,210 1,853 1,100 132,502 51,101 45,945 2,450 1,685 12,158 16,210 1,853

111/151

Software RAB Exarch xPro v2019

AK-SNI 2008

S-307

AK-SNI 2008

S-308

SNI-2007

S-309

SNI-2007

S-310

SNI-2007

S-311

SNI-2007

S-312

SNI-2007

S-313

SNI-2007

S-314

SNI-2007

S-315

www.mitra-arsitek.com

0.01 1.00 2.20 5.00 0.15 0.10 0.10 0.10 0.01 0.01 1.00 2.20 5.00 0.15 0.10 0.10 0.10 0.01 0.01 1.00 0.17 0.20 0.12 0.12 0.01 0.01 1.00 0.17 0.20 0.12 0.12 0.01 0.01 1.00 0.17 0.20 0.12 0.12 0.01 0.01 1.00 0.17 0.20 0.12 0.12 0.01 0.01 1.00 0.02 0.20 0.15 0.30 0.03 0.08 1.00 0.02 0.20 0.15 0.30 0.03 0.08 1.00 0.02

oh m2 m1 m1 kg kg oh oh oh oh m2 m1 m1 kg kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3

Mandor Memasang usuk kruing 5/7, reng jati (lokal) 3/4 Usuk kayu kruing 5/7 Reng jati (lokal) 3/4 Paku usuk Paku reng Pekerja Tukang kayu Kepala Tukang Mandor Memasang usuk kruing 5/7, reng kruing 3/4 Usuk kayu kruing 5/7 Reng kruing 3/4 Paku usuk Paku reng Pekerja Tukang kayu Kepala Tukang Mandor Memasang rangka atap sirap, kayu jati (lokal) Kayu jati (lokal) balok Paku Biasa 2" - 5" Pekerja Tukang kayu Kepala tukang Mandor Memasang rangka atap sirap, kayu kamper Kayu kamper balok Paku Biasa 2" - 5" Pekerja Tukang kayu Kepala tukang Mandor Memasang rangka atap sirap, kayu bengkirai Kayu bengkirai balok Paku Biasa 2" - 5" Pekerja Tukang kayu Kepala tukang Mandor Memasang rangka atap sirap, kayu kruing Kayu kruing balok Paku Biasa 2" - 5" Pekerja Tukang kayu Kepala tukang Mandor Memasang rangka langit-langit (50 x 100) cm, kayu jati (lokal) Kaso-kaso (5 x 7) cm jati lokal Paku Biasa 2" - 5" Pekerja Tukang kayu Kepala tukang Mandor Memasang rangka langit-langit (50 x 100) cm, kayu kamper Kaso-kaso (5 x 7) cm kamper Paku Biasa 2" - 5" Pekerja Tukang kayu Kepala tukang Mandor Memasang rangka langit-langit (50 x 100) cm, kayu bengkirai Kaso-kaso (5 x 7) cm bengkirai

1,100 131,481 35,378 60,647 2,450 1,685 12,158 16,210 1,853 1,100 106,977 35,378 36,143 2,450 1,685 12,158 16,210 1,853 1,100 1,306,177 1,263,488 5,105 14,589 19,452 2,223 1,320 1,091,385 1,048,695 5,105 14,589 19,452 2,223 1,320 1,095,596 1,052,906 5,105 14,589 19,452 2,223 1,320 800,782 758,093 5,105 14,589 19,452 2,223 1,320 268,560 174,530 5,105 18,237 48,631 5,558 16,500 191,909 97,878 5,105 18,237 48,631 5,558 16,500 192,302 98,271

112/151

Software RAB Exarch xPro v2019

SNI-2007

S-316

SNI-2007

S-317

SNI-2007

S-318

SNI-2007

S-319

SNI-2007

S-320

AK-SNI 2008

S-321

AK-SNI 2008

S-322

AK-SNI 2008

S-323

AK-SNI 2008

S-324

www.mitra-arsitek.com

0.20 0.15 0.30 0.03 0.08 1.00 0.02 0.20 0.15 0.30 0.03 0.08 1.00 0.02 0.25 0.20 0.30 0.03 0.01 1.00 0.02 0.25 0.20 0.30 0.03 0.01 1.00 0.02 0.25 0.20 0.30 0.03 0.01 1.00 0.02 0.25 0.20 0.30 0.03 0.01 1.00 0.01 0.12 0.17 0.27 0.03 0.01 1.00 0.01 0.12 0.17 0.27 0.03 0.01 1.00 0.01 0.12 0.17 0.27 0.03 0.01 1.00 0.01

kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3

Paku Biasa 2" - 5" Pekerja Tukang kayu Kepala tukang Mandor Memasang rangka langit-langit (50 x 100) cm, kayu kruing Kaso-kaso (5 x 7) cm kruing Paku Biasa 2" - 5" Pekerja Tukang kayu Kepala tukang Mandor Memasang rangka langit-langit (60 x 60) cm, kayu jati (lokal) Kaso-kaso (5 x 7) cm jati lokal Paku Biasa 2" - 5" Pekerja Tukang kayu Kepala tukang Mandor Memasang rangka langit-langit (60 x 60) cm, kayu kamper Kaso-kaso (5 x 7) cm kamper Paku Biasa 2" - 5" Pekerja Tukang kayu Kepala tukang Mandor Memasang rangka langit-langit (60 x 60) cm, kayu bengkirai Kaso-kaso (5 x 7) cm bengkirai Paku Biasa 2" - 5" Pekerja Tukang kayu Kepala tukang Mandor Memasang rangka langit-langit (60 x 60) cm, kayu kruing Kaso-kaso (5 x 7) cm kruing Paku Biasa 2" - 5" Pekerja Tukang kayu Kepala tukang Mandor Memasang rangka langit-langit (60 x 120) cm, kayu jati (lokal) Kayu jati (lokal) balok Paku Biasa 2" - 5" Pekerja Tukang kayu Kepala Tukang Mandor Memasang rangka langit-langit (60 x 120) cm, kayu kamper Kayu kamper balok Paku Biasa 2" - 5" Pekerja Tukang kayu Kepala Tukang Mandor Memasang rangka langit-langit (60 x 120) cm, kayu bengkirai Kayu bengkirai balok Paku Biasa 2" - 5" Pekerja Tukang kayu Kepala Tukang Mandor Memasang rangka langit-langit (60 x 120) cm, kayu kruing Kayu kruing balok

5,105 18,237 48,631 5,558 16,500 164,786 70,755 5,105 18,237 48,631 5,558 16,500 271,815 184,730 6,381 24,316 48,631 5,558 2,200 190,684 103,598 6,381 24,316 48,631 5,558 2,200 191,100 104,014 6,381 24,316 48,631 5,558 2,200 161,976 74,890 6,381 24,316 48,631 5,558 2,200 173,919 99,548 3,063 20,668 43,768 5,002 1,870 156,996 82,624 3,063 20,668 43,768 5,002 1,870 157,327 82,956 3,063 20,668 43,768 5,002 1,870 134,100 59,729

113/151

Software RAB Exarch xPro v2019

SNI-2002

S-325

SNI-2002

S-326

SNI-2002

S-327

SNI-2002

S-328

SNI-2002

S-329

SNI-2002

S-330

SNI-2002

S-331

SNI-2002

S-332

SNI-2002

S-333

www.mitra-arsitek.com

0.12 0.17 0.27 0.03 0.01 1.00 0.01 0.10 0.15 0.25 0.03 0.01 1.00 0.01 0.10 0.15 0.25 0.03 0.01 1.00 0.01 0.10 0.15 0.25 0.03 0.01 1.00 0.01 0.10 0.15 0.25 0.03 0.01 1.00 0.01 0.05 0.10 0.20 0.03 0.01 1.00 0.01 0.05 0.10 0.20 0.03 0.01 1.00 0.01 0.05 0.10 0.20 0.03 0.01 1.00 0.01 0.05 0.10 0.20 0.03 0.01 1.00 0.01

kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3

Paku Biasa 2" - 5" Pekerja Tukang kayu Kepala Tukang Mandor Memasang rangka langit-langit (1,00 x 1,00) m, kayu jati (lokal) Kayu jati (lokal) balok Paku biasa 2" - 5" Pekerja Tukang kayu Kepala Tukang Mandor Memasang rangka langit-langit (1,00 x 1,00) m, kayu kamper Kayu kamper balok Paku biasa 2" - 5" Pekerja Tukang kayu Kepala Tukang Mandor Memasang rangka langit-langit (1,00 x 1,00) m, kayu bengkirai Kayu bengkirai balok Paku biasa 2" - 5" Pekerja Tukang kayu Kepala Tukang Mandor Memasang rangka langit-langit (1,00 x 1,00) m, kayu kruing Kayu kruing balok Paku biasa 2" - 5" Pekerja Tukang kayu Kepala Tukang Mandor Memasang lisplank ukuran (3 x 20) cm, kayu jati (klas plitur) Papan kayu jati (klas plitur) Paku biasa 2" - 5" Pekerja Tukang kayu Kepala Tukang Mandor Memasang lisplank ukuran (3 x 20) cm, kayu jati (lokal) Papan kayu jati (lokal) Paku biasa 2" - 5" Pekerja Tukang kayu Kepala Tukang Mandor Memasang lisplank ukuran (3 x 20) cm, kayu kamper Papan kayu kamper Paku biasa 2" - 5" Pekerja Tukang kayu Kepala Tukang Mandor Memasang lisplank ukuran (3 x 20) cm, kayu bengkirai Papan kayu bengkirai Paku biasa 2" - 5" Pekerja Tukang kayu Kepala Tukang Mandor Memasang lisplank ukuran (3 x 20) cm, kayu kruing Papan kayu kruing

3,063 20,668 43,768 5,002 1,870 159,487 91,890 2,553 18,237 40,526 4,632 1,650 143,865 76,269 2,553 18,237 40,526 4,632 1,650 144,172 76,575 2,553 18,237 40,526 4,632 1,650 122,731 55,134 2,553 18,237 40,526 4,632 1,650 121,423 69,836 1,276 12,158 32,421 4,632 1,100 121,423 69,836 1,276 12,158 32,421 4,632 1,100 97,347 45,761 1,276 12,158 32,421 4,632 1,100 97,531 45,945 1,276 12,158 32,421 4,632 1,100 84,667 33,080

114/151

Software RAB Exarch xPro v2019

SNI-2007

S-334

SNI-2007

S-335

SNI-2007

S-336

SNI-2007

S-337

SNI-2007

S-338

SNI-2002

S-339

SNI-2002

S-340

SNI-2002

S-341

SNI-2002

S-342

www.mitra-arsitek.com

0.05 0.10 0.20 0.03 0.01 1.00 0.01 0.05 0.10 0.20 0.02 0.01 1.00 0.01 0.05 0.10 0.20 0.02 0.01 1.00 0.01 0.05 0.10 0.20 0.02 0.01 1.00 0.01 0.05 0.10 0.20 0.02 0.01 1.00 0.01 0.05 0.10 0.20 0.02 0.01 1.00 0.01 0.06 0.15 0.25 0.03 0.01 1.00 0.01 0.06 0.15 0.25 0.03 0.01 1.00 0.01 0.06 0.15 0.25 0.03 0.01 1.00 0.01

kg oh oh oh oh m1 m3 kg oh oh oh oh m1 m3 kg oh oh oh oh m1 m3 kg oh oh oh oh m1 m3 kg oh oh oh oh m1 m3 kg oh oh oh oh m1 m3 kg oh oh oh oh m1 m3 kg oh oh oh oh m1 m3 kg oh oh oh oh m1 m3

Paku biasa 2" - 5" 1,276 Pekerja 12,158 Tukang kayu 32,421 Kepala Tukang 4,632 Mandor 1,100 Memasang lisplank ukuran (3 x 30) cm, kayu jati (klas plitur) 157,354 Papan kayu jati (klas plitur) 106,695 Paku Biasa 2" - 5" 1,276 Pekerja 12,158 Tukang kayu 32,421 Kepala tukang 3,705 Mandor 1,100 Memasang lisplank ukuran (3 x 30) cm, kayu ati (lokal) 157,354 Papan kayu jati (lokal) 106,695 Paku Biasa 2" - 5" 1,276 Pekerja 12,158 Tukang kayu 32,421 Kepala tukang 3,705 Mandor 1,100 Memasang lisplank ukuran (3 x 30) cm, kayu kamper 120,573 Papan kayu kamper 69,913 Paku Biasa 2" - 5" 1,276 Pekerja 12,158 Tukang kayu 32,421 Kepala tukang 3,705 Mandor 1,100 Memasang lisplank ukuran (3 x 30) cm, kayu kelas bengkirai 120,854 Papan kayu bengkirai 70,194 Paku Biasa 2" - 5" 1,276 Pekerja 12,158 Tukang kayu 32,421 Kepala tukang 3,705 Mandor 1,100 Memasang lisplank ukuran (3 x 30) cm, kayu kruing 101,199 Papan kayu kruing 50,540 Paku Biasa 2" - 5" 1,276 Pekerja 12,158 Tukang kayu 32,421 Kepala tukang 3,705 Mandor 1,100 Memasang lisplank ukuran 2 x (3 x 20) cm, kayu jati (klas plitur)207,218 Papan kayu jati (klas plitur) 140,643 Paku biasa 2" - 5" 1,532 Pekerja 18,237 Tukang kayu 40,526 Kepala Tukang 4,632 Mandor 1,650 Memasang lisplank ukuran 2 x (3 x 20) cm, kayu jati (lokal) 207,218 Papan kayu jati (lokal) 140,643 Paku biasa 2" - 5" 1,532 Pekerja 18,237 Tukang kayu 40,526 Kepala Tukang 4,632 Mandor 1,650 Memasang lisplank ukuran 2 x (3 x 20) cm, kayu kamper 158,734 Papan kayu kamper 92,158 Paku biasa 2" - 5" 1,532 Pekerja 18,237 Tukang kayu 40,526 Kepala Tukang 4,632 Mandor 1,650 Memasang lisplank ukuran 2 x (3 x 20) cm, kayu bengkirai 159,104 Papan kayu bengkirai 92,528

115/151

Software RAB Exarch xPro v2019

SNI-2002

S-343

SNI-2002

S-344

SNI-2002

S-345

SNI-2002

S-346

SNI-2002

S-347

SNI-2002

S-348

AK-SNI 2008

S-349

AK-SNI 2008

S-350

AK-SNI 2008

S-351

www.mitra-arsitek.com

0.06 0.15 0.25 0.03 0.01 1.00 0.01 0.06 0.15 0.25 0.03 0.01 1.00 0.01 0.06 0.10 0.10 0.01 0.01 1.00 0.01 0.06 0.10 0.10 0.01 0.01 1.00 0.01 0.06 0.10 0.10 0.01 0.01 1.00 0.01 0.06 0.10 0.10 0.01 0.01 1.00 0.01 0.06 0.10 0.10 0.01 0.01 1.00 0.01 0.06 0.10 0.10 0.01 0.01 1.00 0.01 0.06 0.10 0.10 0.01 0.01 1.00 0.01

kg oh oh oh oh m1 m3 kg oh oh oh oh m1 m3 kg oh oh oh oh m1 m3 kg oh oh oh oh m1 m3 kg oh oh oh oh m1 m3 kg oh oh oh oh m1 m3 kg oh oh oh oh m1 m3 kg oh oh oh oh m1 m3 kg oh oh oh oh m1 m3

Paku biasa 2" - 5" Pekerja Tukang kayu Kepala Tukang Mandor Memasang lisplank ukuran Papan kayu kruing Paku biasa 2" - 5" Pekerja Tukang kayu Kepala Tukang Mandor Memasang lisplank ukuran Papan kayu jati (klas plitur) Paku biasa 2" - 5" Pekerja Tukang kayu Kepala Tukang Mandor Memasang lisplank ukuran Papan kayu jati (lokal) Paku biasa 2" - 5" Pekerja Tukang kayu Kepala Tukang Mandor Memasang lisplank ukuran Papan kayu kamper Paku biasa 2" - 5" Pekerja Tukang kayu Kepala Tukang Mandor Memasang lisplank ukuran Papan kayu bengkirai Paku biasa 2" - 5" Pekerja Tukang kayu Kepala Tukang Mandor Memasang lisplank ukuran Papan kayu kruing Paku biasa 2" - 5" Pekerja Tukang kayu Kepala Tukang Mandor Memasang lisplank ukuran Papan kayu jati (klas plitur) Paku biasa 2" - 5" Pekerja Tukang kayu Kepala Tukang Mandor Memasang lisplank ukuran Papan kayu jati (lokal) Paku biasa 2" - 5" Pekerja Tukang kayu Kepala Tukang Mandor Memasang lisplank ukuran Papan kayu kamper

1,532 18,237 40,526 4,632 1,650 2 x (3 x 20) cm, kayu kruing 133,196 66,620 1,532 18,237 40,526 4,632 1,650 2 x (2 x 20) cm, kayu jati (klas plitur)116,268 83,416 1,532 12,158 16,210 1,853 1,100 2 x (2 x 20) cm, kayu jati (lokal) 116,268 83,416 1,532 12,158 16,210 1,853 1,100 2 x (2 x 20) cm, kayu kamper 87,511 54,659 1,532 12,158 16,210 1,853 1,100 2 x (2 x 20) cm, kayu bengkirai 87,731 54,879 1,532 12,158 16,210 1,853 1,100 2 x (2 x 20) cm, kayu kruing 72,365 39,513 1,532 12,158 16,210 1,853 1,100 (2 x 25) cm, kayu jati (klas plitur) 91,049 58,197 1,532 12,158 16,210 1,853 1,100 (2 x 25) cm, kayu jati (lokal 91,049 58,197 1,532 12,158 16,210 1,853 1,100 (2 x 25) cm, kayu kamper 70,987 38,134

116/151

Software RAB Exarch xPro v2019

AK-SNI 2008

S-352

AK-SNI 2008

S-353

AK-SNI 2008

S-354

AK-SNI 2008

S-355

AK-SNI 2008

S-356

AK-SNI 2008

S-357

AK-SNI 2008

S-358

AK-SNI 2008

S-359

AK-SNI 2008

S-360

www.mitra-arsitek.com

0.06 0.10 0.10 0.01 0.01 1.00 0.01 0.06 0.10 0.10 0.01 0.01 1.00 0.01 0.06 0.10 0.10 0.01 0.01 1.00 0.00 0.06 0.10 0.10 0.01 0.01 1.00 0.00 0.06 0.10 0.10 0.01 0.01 1.00 0.00 0.06 0.10 0.10 0.01 0.01 1.00 0.00 0.06 0.10 0.10 0.01 0.01 1.00 0.00 0.06 0.10 0.10 0.01 0.01 1.00 0.03 1.00 0.30 0.60 1.80 0.18 0.03 1.00

kg oh oh oh oh m1 m3 kg oh oh oh oh m1 m3 kg oh oh oh oh m1 m3 kg oh oh oh oh m1 m3 kg oh oh oh oh m1 m3 kg oh oh oh oh m1 m3 kg oh oh oh oh m1 m3 kg oh oh oh oh m2 m3 m2 kg oh oh oh oh m2

Paku biasa 2" - 5" Pekerja Tukang kayu Kepala Tukang Mandor Memasang lisplank ukuran (2 x 25) cm, kayu bengkirai Papan kayu bengkirai Paku biasa 2" - 5" Pekerja Tukang kayu Kepala Tukang Mandor Memasang lisplank ukuran (2 x 25) cm, kayu kruing Papan kayu kruing Paku biasa 2" - 5" Pekerja Tukang kayu Kepala Tukang Mandor Memasang lisplank ukuran (2 x 20) cm, kayu jati (klas plitur) Papan kayu jati (klas plitur) Paku biasa 2" - 5" Pekerja Tukang kayu Kepala Tukang Mandor Memasang lisplank ukuran (2 x 20) cm, kayu jati (lokal) Papan kayu jati (lokal) Paku biasa 2" - 5" Pekerja Tukang kayu Kepala Tukang Mandor Memasang lisplank ukuran (2 x 20) cm, kayu kamper Papan kayu kamper Paku biasa 2" - 5" Pekerja Tukang kayu Kepala Tukang Mandor Memasang lisplank ukuran (2 x 20) cm, kayu bengkirai Papan kayu bengkirai Paku biasa 2" - 5" Pekerja Tukang kayu Kepala Tukang Mandor Memasang lisplank ukuran (2 x 20) cm, kayu kruing Papan kayu kruing Paku biasa 2" - 5" Pekerja Tukang kayu Kepala Tukang Mandor Membuat listplank asbes plat ram kayu jati (lokal) Ram kayu jati (lokal) Asbes plat Paku reng Pekerja Tukang kayu Kepala Tukang Mandor Membuat listplank asbes plat ram kayu kamper

1,532 12,158 16,210 1,853 1,100 71,140 38,288 1,532 12,158 16,210 1,853 1,100 60,419 27,567 1,532 12,158 16,210 1,853 1,100 79,410 46,558 1,532 12,158 16,210 1,853 1,100 79,410 46,558 1,532 12,158 16,210 1,853 1,100 63,360 30,507 1,532 12,158 16,210 1,853 1,100 63,482 30,630 1,532 12,158 16,210 1,853 1,100 54,906 22,054 1,532 12,158 16,210 1,853 1,100 635,886 191,438 34,714 5,054 72,947 291,786 33,347 6,600 577,816

117/151

Software RAB Exarch xPro v2019

AK-SNI 2008

S-361

AK-SNI 2008

S-362

SNI-2007

S-363

SNI-2007

S-364

SNI-2007

S-365

SNI-2007

S-366

SNI-2007

S-367

SNI-2007

S-368

www.mitra-arsitek.com

0.03 1.00 0.30 0.60 1.80 0.18 0.03 1.00 0.03 1.00 0.30 0.60 1.80 0.18 0.60 0.03 1.00 0.03 1.00 0.30 0.60 1.80 0.18 0.03 1.00 0.03 0.15 0.15 0.45 0.05 0.01 1.00 0.03 0.15 0.15 0.45 0.05 0.01 1.00 0.03 0.15 0.15 0.45 0.05 0.01 1.00 0.03 0.15 0.15 0.45 0.05 0.01 1.00 0.03 0.15 0.86 0.56 0.15 0.45 0.05 0.01 1.00 0.03

m3 m2 kg oh oh oh oh m2 m3 m2 kg oh oh oh oh oh m2 m3 m2 kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3 kg oh oh oh oh m2 m3 kg lbr kg oh oh oh oh m2 m3

Ram kayu kamper 133,368 Asbes plat 34,714 Paku reng 5,054 Pekerja 72,947 Tukang kayu 291,786 Kepala Tukang 33,347 Mandor 6,600 Membuat listplank asbes plat ram kayu bengkirai 651,401 Ram kayu bengkirai 134,006 Asbes plat 34,714 Paku reng 5,054 Pekerja 72,947 Tukang kayu 291,786 Kepala Tukang 33,347 Pekerja 72,947 Mandor 6,600 Membuat listplank asbes plat ram kayu kruing 533,786 Ram kayu kruing 89,338 Asbes plat 34,714 Paku reng 5,054 Pekerja 72,947 Tukang kayu 291,786 Kepala Tukang 33,347 Mandor 6,600 Memasang rangka dinding pemisah (60 x 120) cm kayu jati (lokal)365,260 Balok kayu jati (lokal) 260,151 Paku Biasa 2" - 5" 3,829 Pekerja 18,237 Tukang kayu 72,947 Kepala tukang 8,337 Mandor 1,760 Memasang rangka dinding pemisah (60 x 120) cm kayu kamper 283,069 Balok kayu kamper 177,960 Paku Biasa 2" - 5" 3,829 Pekerja 18,237 Tukang kayu 72,947 Kepala tukang 8,337 Mandor 1,760 Memasang rangka dinding pemisah (60 x 120) cm kayu bengkirai283,784 Balok kayu bengkirai 178,675 Paku Biasa 2" - 5" 3,829 Pekerja 18,237 Tukang kayu 72,947 Kepala tukang 8,337 Mandor 1,760 Memasang rangka dinding pemisah (60 x 120) cm kayu kruing 233,755 Balok kayu kruing 128,646 Paku Biasa 2" - 5" 3,829 Pekerja 18,237 Tukang kayu 72,947 Kepala tukang 8,337 Mandor 1,760 Memasangdinding pemisah teakwood rangkap, rangka kayu jati (lokal) 434,157 Balok kayu jati (lokal) 260,151 Paku Biasa 2" - 5" 3,829 Teakwood 4 mm, 120 x 240 61,464 Lem kayu 7,433 Pekerja 18,237 Tukang kayu 72,947 Kepala tukang 8,337 Mandor 1,760 Memasang dinding pemisah teakwood rangkap, rangka kayu kamper 351,966 Balok kayu kamper 177,960

118/151

Software RAB Exarch xPro v2019

SNI-2007

S-369

SNI-2007

S-370

SNI-2007

S-371

SNI-2007

S-372

SNI-2007

S-373

SNI-2007

S-374

SNI-2007

S-375

www.mitra-arsitek.com

0.15 0.86 0.56 0.15 0.45 0.05 0.01 1.00 0.03 0.15 0.86 0.56 0.15 0.45 0.05 0.01 1.00 0.03 0.15 0.86 0.56 0.15 0.45 0.05 0.01 1.00 0.03 0.15 0.86 0.56 0.20 0.60 0.06 0.01 1.00 0.03 0.15 0.86 0.56 0.20 0.60 0.06 0.01 1.00 0.03 0.15 0.86 0.56 0.20 0.60 0.06 0.01 1.00 0.01 0.10 0.15 0.60 1.80 0.18 0.03 1.00 0.01 0.10

kg lbr kg oh oh oh oh m2 m3 kg lbr kg oh oh oh oh m2 m3 kg lbr kg oh oh oh oh m2 m3 kg lbr kg oh oh oh oh m2 m3 kg lbr kg oh oh oh oh m2 m3 kg lbr kg oh oh oh oh m2 m3 kg kg oh oh oh oh m2 m3 kg

Paku Biasa 2" - 5" 3,829 Teakwood 4 mm, 120 x 240 61,464 Lem kayu 7,433 Pekerja 18,237 Tukang kayu 72,947 Kepala tukang 8,337 Mandor 1,760 Memasang dinding pemisah teakwood rangkap, rangka kayu bengkirai 352,681 Balok kayu bengkirai 178,675 Paku Biasa 2" - 5" 3,829 Teakwood 4 mm, 120 x 240 61,464 Lem kayu 7,433 Pekerja 18,237 Tukang kayu 72,947 Kepala tukang 8,337 Mandor 1,760 Memasang dinding pemisah teakwood rangkap, rangka kayu kruing 302,652 Balok kayu kruing 128,646 Paku Biasa 2" - 5" 3,829 Teakwood 4 mm, 120 x 240 61,464 Lem kayu 7,433 Pekerja 18,237 Tukang kayu 72,947 Kepala tukang 8,337 Mandor 1,760 Memasang dinding pemisah plywood rangkap, rangka kayu kamper 387,336 Balok kayu kamper 177,960 Paku Biasa 2" - 5" 3,829 Plywood 120x240 tbl. 4 mm 63,220 Lem kayu 7,433 Pekerja 24,316 Tukang kayu 97,262 Kepala tukang 11,116 Mandor 2,200 Memasang dinding pemisah plywood rangkap, rangka kayu bengkirai 388,050 Balok kayu bengkirai 178,675 Paku Biasa 2" - 5" 3,829 Plywood 120x240 tbl. 4 mm 63,220 Lem kayu 7,433 Pekerja 24,316 Tukang kayu 97,262 Kepala tukang 11,116 Mandor 2,200 Memasang dinding pemisah plywood rangkap, rangka kayu kruing 338,021 Balok kayu kruing 128,646 Paku Biasa 2" - 5" 3,829 Plywood 120x240 tbl. 4 mm 63,220 Lem kayu 7,433 Pekerja 24,316 Tukang kayu 97,262 Kepala tukang 11,116 Mandor 2,200 Memasang dinding lambriziring dari papan kayu jati (klas plitur)477,273 Papan kayu jati (klas plitur) 67,897 Paku Biasa 2" - 5" 2,553 Paku skrup 10 cm 2,144 Pekerja 72,947 Tukang kayu 291,786 Kepala tukang 33,347 Mandor 6,600 Memasang dinding lambriziring dari papan kayu jati (lokal) 477,273 Papan kayu jati (lokal) 67,897 Paku Biasa 2" - 5" 2,553

119/151

Software RAB Exarch xPro v2019

SNI-2007

S-376

SNI-2007

S-377

SNI-2007

S-378

SNI-2007

S-379

SNI-2007

S-380

AK-SNI 2008

S-381

AK-SNI 2008

S-382

AK-SNI 2008

S-383

www.mitra-arsitek.com

0.15 0.60 1.80 0.18 0.03 1.00 0.01 0.10 0.15 0.60 1.80 0.18 0.03 1.00 0.01 0.10 0.15 0.60 1.80 0.18 0.03 1.00 0.01 0.10 0.15 0.60 1.80 0.18 0.03 1.00 0.40 0.05 0.03 0.08 0.01 0.00 1.00 1.50 0.01 0.00 0.01 0.10 0.05 0.01 0.01 1.00 0.00 0.02 0.03 0.08 0.01 0.00 1.00 0.00 0.02 0.03 0.08 0.01 0.00 1.00 0.00 0.02 0.03

kg oh oh oh oh m2 m3 kg kg oh oh oh oh m2 m3 kg kg oh oh oh oh m2 m3 kg kg oh oh oh oh m2 lbr kg oh oh oh oh m2 m2 m3 m3 kg oh oh oh oh m1 m3 kg oh oh oh oh m1 m3 kg oh oh oh oh m1 m3 kg oh

Paku skrup 10 cm 2,144 Pekerja 72,947 Tukang kayu 291,786 Kepala tukang 33,347 Mandor 6,600 Memasang dinding lambriziring dari papan kayu kamper 453,867 Papan kayu kamper 44,490 Paku Biasa 2" - 5" 2,553 Paku skrup 10 cm 2,144 Pekerja 72,947 Tukang kayu 291,786 Kepala tukang 33,347 Mandor 6,600 Memasang dinding lambriziring dari papan kayu bengkirai 454,045 Papan kayu bengkirai 44,669 Paku Biasa 2" - 5" 2,553 Paku skrup 10 cm 2,144 Pekerja 72,947 Tukang kayu 291,786 Kepala tukang 33,347 Mandor 6,600 Memasang dinding lambriziring dari papan kayu kruing 441,538 Papan kayu kruing 32,162 Paku Biasa 2" - 5" 2,553 Paku skrup 10 cm 2,144 Pekerja 72,947 Tukang kayu 291,786 Kepala tukang 33,347 Mandor 6,600 Memasang dinding lambriziring dari plywood ukuran (120 x 240) cm 47,504 Plywood 120x240 tbl. 4 mm 29,405 Paku Biasa ½" - 1" 1,200 Pekerja 3,039 Tukang kayu 12,158 Kepala tukang 1,482 Mandor 220 Memasang dinding bilik, rangka kayu kruing 218,628 Bilik bambu 114,863 Kaso-kaso (5 x 7) cm kruing 64,323 List kayu 2/4 16,847 Paku Biasa 2" - 5" 306 Pekerja 12,158 Tukang kayu 8,105 Kepala tukang 926 Mandor 1,100 Mengerjakan papan ruiter kayu jati 2/20 (lokal) 57,471 Papan kayu jati (lokal) 38,798 Paku biasa 2" - 5" 511 Pekerja 3,404 Tukang kayu 12,968 Kepala Tukang 1,482 Mandor 308 Mengerjakan papan ruiter kayu kamper 2/20 44,096 Papan kayu kamper 25,423 Paku biasa 2" - 5" 511 Pekerja 3,404 Tukang kayu 12,968 Kepala Tukang 1,482 Mandor 308 Mengerjakan papan ruiter kayu bengkirai 2/20 44,198 Papan kayu bengkirai 25,525 Paku biasa 2" - 5" 511 Pekerja 3,404

120/151

Software RAB Exarch xPro v2019

AK-SNI 2008

S-384

SNI-2002

S-385

AK-SNI 2008

S-386

AK-SNI 2008

S-387

AK-SNI 2008

S-388

AK-SNI 2008

S-389

AK-SNI 2008

S-390

AK-SNI 2008

S-391

www.mitra-arsitek.com

0.08 0.01 0.00 1.00 0.00 0.02 0.03 0.08 0.01 0.00 1.00 0.40 0.05 0.03 0.08 0.01 0.00 1.00 0.01 0.06 1.10 0.18 0.32 0.03 0.01 1.00 0.01 0.06 1.10 0.18 0.32 0.03 0.01 1.00 0.01 0.06 1.10 0.18 0.32 0.03 0.01 1.00 0.01 0.06 1.10 0.18 0.32 0.03 0.01 1.00 0.01 0.06 1.10 2.60 0.01 0.01 0.18 0.32 0.03 0.01 1.00 0.01 0.06

oh oh oh m1 m3 kg oh oh oh oh m2 lbr kg oh oh oh oh m2 m3 kg lbr oh oh oh oh m2 m3 kg lbr oh oh oh oh m2 m3 kg lbr oh oh oh oh m2 m3 kg lbr oh oh oh oh m2 m3 kg lbr m1 kg kg oh oh oh oh m2 m3 kg

Tukang kayu 12,968 Kepala Tukang 1,482 Mandor 308 Mengerjakan papan ruiter kayu kruing 2/20 37,051 Papan kayu kruing 18,378 Paku biasa 2" - 5" 511 Pekerja 3,404 Tukang kayu 12,968 Kepala Tukang 1,482 Mandor 308 Pasang plywood tebal 4 mm, untuk dinding 47,554 Plywood 120x240 tbl. 4 mm 29,405 Paku biasa 2" - 5" 1,276 Pekerja 3,039 Tukang kayu 12,158 Kepala Tukang 1,389 Mandor 286 Langit-langit asbes (1,00 x 1,00) m, rangka kayu jati (lokal) tanpa202,041 plepet Kayu jati (lokal) balok 91,890 Paku Biasa 2" - 5" 1,532 Asbes 1,00 x 1,00 m 26,954 Pekerja 21,884 Tukang kayu 51,873 Kepala Tukang 5,928 Mandor 1,980 Langit-langit asbes (1,00 x 1,00) m, rangka kayu kamper tanpa plepet 186,420 Kayu kamper balok 76,269 Paku Biasa 2" - 5" 1,532 Asbes 1,00 x 1,00 m 26,954 Pekerja 21,884 Tukang kayu 51,873 Kepala Tukang 5,928 Mandor 1,980 Langit-langit asbes (1,00 x 1,00) m, rangka kayu bengkirai tanpa 186,726 plepet Kayu bengkirai balok 76,575 Paku Biasa 2" - 5" 1,532 Asbes 1,00 x 1,00 m 26,954 Pekerja 21,884 Tukang kayu 51,873 Kepala Tukang 5,928 Mandor 1,980 Langit-langit asbes (1,00 x 1,00) m, rangka kayu kruing tanpa plepet 165,285 Kayu kruing balok 55,134 Paku Biasa 2" - 5" 1,532 Asbes 1,00 x 1,00 m 26,954 Pekerja 21,884 Tukang kayu 51,873 Kepala Tukang 5,928 Mandor 1,980 Langit-langit asbes (1,00 x 1,00) m, rangka kayu jati (lokal) memakai 207,984 plepet Kayu jati (lokal) balok 91,890 Paku Biasa 2" - 5" 1,532 Asbes 1,00 x 1,00 m 26,954 Plepet kayu 5,575 Paku eternit 199 Paku plepet 168 Pekerja 21,884 Tukang kayu 51,873 Kepala Tukang 5,928 Mandor 1,980 Langit-langit asbes (1,00 x 1,00) m, rangka kayu kamper memakai192,362 plepet Kayu kamper balok 76,269 Paku Biasa 2" - 5" 1,532

121/151

Software RAB Exarch xPro v2019

AK-SNI 2008

S-392

AK-SNI 2008

S-393

AK-SNI 2008

S-394

AK-SNI 2008

S-395

AK-SNI 2008

S-396

www.mitra-arsitek.com

1.10 2.60 0.01 0.01 0.18 0.32 0.03 0.01 1.00 0.01 0.06 1.10 2.60 0.01 0.01 0.18 0.32 0.03 0.01 1.00 0.01 0.06 1.10 2.60 0.01 0.01 0.18 0.32 0.03 0.01 1.00 0.01 0.36 0.05 0.45 0.00 0.05 0.12 0.24 0.37 0.04 0.01 1.00 0.01 0.36 0.05 0.45 0.00 0.05 0.12 0.24 0.37 0.04 0.01 1.00 0.01 0.36 0.05 0.45 0.00 0.05 0.12 0.24

lbr m1 kg kg oh oh oh oh m2 m3 kg lbr m1 kg kg oh oh oh oh m2 m3 kg lbr m1 kg kg oh oh oh oh m2 m3 lbr roll kg kg kg kg oh oh oh oh m2 m3 lbr roll kg kg kg kg oh oh oh oh m2 m3 lbr roll kg kg kg kg oh

Asbes 1,00 x 1,00 m 26,954 Plepet kayu 5,575 Paku eternit 199 Paku plepet 168 Pekerja 21,884 Tukang kayu 51,873 Kepala Tukang 5,928 Mandor 1,980 Langit-langit asbes (1,00 x 1,00) m, rangka kayu bengkirai memakai 192,669 plepet Kayu bengkirai balok 76,575 Paku Biasa 2" - 5" 1,532 Asbes 1,00 x 1,00 m 26,954 Plepet kayu 5,575 Paku eternit 199 Paku plepet 168 Pekerja 21,884 Tukang kayu 51,873 Kepala Tukang 5,928 Mandor 1,980 Langit-langit asbes (1,00 x 1,00) m, rangka kayu kruing memakai171,228 plepet Kayu kruing balok 55,134 Paku Biasa 2" - 5" 1,532 Asbes 1,00 x 1,00 m 26,954 Plepet kayu 5,575 Paku eternit 199 Paku plepet 168 Pekerja 21,884 Tukang kayu 51,873 Kepala Tukang 5,928 Mandor 1,980 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu jati 257,805 (lokal) Kayu jati (lokal) balok 99,548 Gypsum board 9 mm 31,978 Kasa gypsum 22,870 Tepung gypsum 1,769 Alkasit 135 Paku gypsum 893 Paku usuk 1,960 Pekerja 29,179 Tukang kayu 59,978 Kepala Tukang 6,855 Mandor 2,640 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu kamper 240,882 Kayu kamper balok 82,624 Gypsum board 9 mm 31,978 Kasa gypsum 22,870 Tepung gypsum 1,769 Alkasit 135 Paku gypsum 893 Paku usuk 1,960 Pekerja 29,179 Tukang kayu 59,978 Kepala Tukang 6,855 Mandor 2,640 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu bengkirai 241,213 Kayu bengkirai balok 82,956 Gypsum board 9 mm 31,978 Kasa gypsum 22,870 Tepung gypsum 1,769 Alkasit 135 Paku gypsum 893 Paku usuk 1,960 Pekerja 29,179

122/151

Software RAB Exarch xPro v2019

AK-SNI 2008

S-397

AK-SNI 2008

S-398

AK-SNI 2008

S-399

AK-SNI 2008

S-400

AK-SNI 2008

S-401

www.mitra-arsitek.com

0.37 0.04 0.01 1.00 0.01 0.36 0.05 0.45 0.00 0.05 0.12 0.24 0.37 0.04 0.01 1.00 4.50 0.36 0.05 0.45 0.00 0.15 5.00 0.24 0.37 0.04 0.01 1.00 0.01 0.36 0.05 0.45 0.00 0.05 0.12 0.24 0.37 0.04 0.01 1.00 0.01 0.36 0.05 0.45 0.00 0.05 0.12 0.24 0.37 0.04 0.01 1.00 0.01 0.36 0.05 0.45 0.00 0.05 0.12 0.24 0.37 0.04 0.01

oh oh oh m2 m3 lbr roll kg kg kg kg oh oh oh oh m2 m1 lbr roll kg kg kg m1 oh oh oh oh m2 m3 lbr roll kg kg kg kg oh oh oh oh m2 m3 lbr roll kg kg kg kg oh oh oh oh m2 m3 lbr roll kg kg kg kg oh oh oh oh

Tukang kayu 59,978 Kepala Tukang 6,855 Mandor 2,640 Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu kruing 217,986 Kayu kruing balok 59,729 Gypsum board 9 mm 31,978 Kasa gypsum 22,870 Tepung gypsum 1,769 Alkasit 135 Paku gypsum 893 Paku usuk 1,960 Pekerja 29,179 Tukang kayu 59,978 Kepala Tukang 6,855 Mandor 2,640 Langit-langit gypsum board tebal 9 mm, rangka hollow 204,016 Hollow 4/4 45,945 Gypsum board 9 mm 31,978 Kasa gypsum 22,870 Tepung gypsum 1,769 Alkasit 135 Paku sekrup 115 Kawat penggantung 2,553 Pekerja 29,179 Tukang kayu 59,978 Kepala Tukang 6,855 Mandor 2,640 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu jati (lokal) 250,453 Kayu jati (lokal) balok 99,548 Kalsiboard 3.5 mm 24,627 Kasa gypsum 22,870 Tepung gypsum 1,769 Alkasit 135 Paku gypsum 893 Paku usuk 1,960 Pekerja 29,179 Tukang kayu 59,978 Kepala Tukang 6,855 Mandor 2,640 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu kamper 233,530 Kayu kamper balok 82,624 Kalsiboard 3.5 mm 24,627 Kasa gypsum 22,870 Tepung gypsum 1,769 Alkasit 135 Paku gypsum 893 Paku usuk 1,960 Pekerja 29,179 Tukang kayu 59,978 Kepala Tukang 6,855 Mandor 2,640 Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu bengkirai 233,862 Kayu bengkirai balok 82,956 Kalsiboard 3.5 mm 24,627 Kasa gypsum 22,870 Tepung gypsum 1,769 Alkasit 135 Paku gypsum 893 Paku usuk 1,960 Pekerja 29,179 Tukang kayu 59,978 Kepala Tukang 6,855 Mandor 2,640

123/151

Software RAB Exarch xPro v2019

AK-SNI 2008

S-402

AK-SNI 2008

S-403

SNI-2007

S-404

SNI-2007

S-405

SNI-2007

S-406

SNI-2007

S-407

SNI-2007

S-408

SNI-2007

S-409

www.mitra-arsitek.com

1.00 0.01 0.36 0.05 0.45 0.00 0.05 0.12 0.24 0.37 0.04 0.01 1.00 4.50 0.36 0.05 0.45 0.00 0.15 5.00 0.24 0.37 0.04 0.01 1.00 1.10 0.01 0.03 0.07 0.01 0.00 1.00 1.10 0.01 0.03 0.07 0.01 0.00 1.00 1.10 0.01 0.03 0.07 0.01 0.00 1.00 12.00 0.05 0.12 0.12 0.01 0.01 1.00 5.80 0.05 0.10 0.10 0.01 0.01 1.00 1.50 0.05 0.10

m2 m3 lbr roll kg kg kg kg oh oh oh oh m2 m1 lbr roll kg kg kg m1 oh oh oh oh m2 m2 kg oh oh oh oh m2 m2 kg oh oh oh oh m2 m2 kg oh oh oh oh m2 lbr kg oh oh oh oh m2 lbr kg oh oh oh oh m2 lbr kg oh

Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu kruing 210,634 Kayu kruing balok 59,729 Kalsiboard 3.5 mm 24,627 Kasa gypsum 22,870 Tepung gypsum 1,769 Alkasit 135 Paku gypsum 893 Paku usuk 1,960 Pekerja 29,179 Tukang kayu 59,978 Kepala Tukang 6,855 Mandor 2,640 Langit-langit kalsiboard tebal 3.5 mm, rangka hollow 196,665 Hollow 4/4 45,945 Kalsiboard 3.5 mm 24,627 Kasa gypsum 22,870 Tepung gypsum 1,769 Alkasit 135 Paku sekrup 115 Kawat penggantung 2,553 Pekerja 29,179 Tukang kayu 59,978 Kepala Tukang 6,855 Mandor 2,640 Memasang langit-langit asbes semen, tebal 4 mm 39,256 Asbes semen tebal 4 mm 21,900 Paku tripleks 184 Pekerja 3,647 Tukang kayu 11,347 Kepala tukang 1,297 Mandor 880 Memasang langit-langit asbes semen, tebal 5 mm 42,625 Asbes semen tebal 5 mm 25,270 Paku tripleks 184 Pekerja 3,647 Tukang kayu 11,347 Kepala tukang 1,297 Mandor 880 Memasang langit-langit asbes semen, tebal 6 mm 45,433 Asbes semen tebal 6 mm 28,078 Paku tripleks 184 Pekerja 3,647 Tukang kayu 11,347 Kepala tukang 1,297 Mandor 880 Memasang langit-langit akustik ukuran (30 x 30) cm 467,324 Akustik ukuran 30 x 30 cm 428,820 Paku tripleks 919 Pekerja 14,589 Tukang kayu 19,452 Kepala tukang 2,223 Mandor 1,320 Memasang langit-langit akustik ukuran (30 x 60) cm 357,939 Akustik ukuran 30 x 60 cm 325,699 Paku tripleks 919 Pekerja 12,158 Tukang kayu 16,210 Kepala tukang 1,853 Mandor 1,100 Memasang langit-langit akustik ukuran (60 x 120) cm 228,272 Akustik Uk. 60 cm x 120 cm 196,032 Paku tripleks 919 Pekerja 12,158

124/151

Software RAB Exarch xPro v2019

SNI-2007

S-410

SNI-2007

S-411

SNI-2007

S-412

SNI-2007

S-413

SNI-2007

S-414

SNI-2007

S-415

SNI-2007

S-416

AK-SNI 2008

S-417

AK-SNI 2008

S-418

www.mitra-arsitek.com

0.10 0.01 0.01 1.00 0.38 0.03 0.10 0.10 0.01 0.01 1.00 0.38 0.03 0.10 0.10 0.01 0.01 1.00 0.38 0.03 0.10 0.10 0.01 0.01 1.00 0.02 0.01 0.80 0.80 0.08 0.04 1.00 0.36 0.11 0.10 0.05 0.01 0.01 1.00 3.60 0.15 1.05 1.50 0.50 0.50 0.05 0.03 1.00 1.05 0.01 0.05 0.05 0.01 0.00 1.00 1.10 0.70 0.00 0.11 0.04 0.00 0.01 1.00

oh oh oh m2 lbr kg oh oh oh oh m2 lbr kg oh oh oh oh m2 lbr kg oh oh oh oh m2 m3 kg oh oh oh oh m2 lbr kg oh oh oh oh m2 m’ kg bh lbr oh oh oh oh m1 m1 kg oh oh oh oh m1 m1 kg kg oh oh oh oh m1

Tukang kayu 16,210 Kepala tukang 1,853 Mandor 1,100 Memasanglangit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm46,038 Tripleks 14,166 Paku tripleks 551 Pekerja 12,158 Tukang kayu 16,210 Kepala tukang 1,853 Mandor 1,100 Memasanglangit-langit tripleks ukuran (120 x 240) cm, tebal 4 mm46,038 Tripleks 14,166 Paku tripleks 551 Pekerja 12,158 Tukang kayu 16,210 Kepala tukang 1,853 Mandor 1,100 Memasanglangit-langit tripleks ukuran (120 x 240) cm, tebal 6 mm46,038 Tripleks 14,166 Paku tripleks 551 Pekerja 12,158 Tukang kayu 16,210 Kepala tukang 1,853 Mandor 1,100 Memasang langit-langit lambriziring kayu, tebal 9 mm 304,352 Kayu Papan 3/20 53,603 Paku tripleks 184 Pekerja 97,262 Tukang kayu 129,683 Kepala tukang 14,821 Mandor 8,800 Memasang langit-langit gypsum board ukuran (120x240x9) mm, tebal 54,707 9 mm Gypsum board 9 mm 32,333 Paku sekrup 84 Pekerja 12,158 Tukang kayu 8,105 Kepala tukang 926 Mandor 1,100 Memasang langit-langit akustik ukuran (60 x 120) cm + rangka alluminium 407,747 Profil Alluminium "T" 44,842 Kawat dia 4 mm 5,284 Baut Ramset / Dina Bolt 4,985 Akustik Uk. 60 cm x 120 cm 196,032 Pekerja 60,789 Tukang kayu 81,052 Kepala tukang 9,263 Mandor 5,500 Memasang ist langit-langit kayu profil 19,102 List kayu profil 3,077 Paku Biasa 2" - 5" 255 Pekerja 6,079 Tukang kayu 8,105 Kepala tukang 926 Mandor 660 Pasang list profil cornees gypsum lebar sampai 5 cm 55,104 List profil cornees gypsum 30,324 Tepung gypsum 2,752 Alkasit 157 Pekerja 13,677 Tukang kayu 6,079 Kepala Tukang 685 Mandor 1,430 Pasang list profil cornees gypsum lebar 5 - 10 cm 55,833

125/151

Software RAB Exarch xPro v2019

AK-SNI 2008

S-419

AK-SNI 2008

S-420

AK-SNI 2008

S-421

SNI-2002

S-422

AK-SNI 2008

S-423

AK-SNI 2008

S-424

SNI-2002

S-425

SNI-2002

S-426

www.mitra-arsitek.com

1.10 0.88 0.00 0.11 0.04 0.00 0.01 1.00 1.10 1.05 0.01 0.11 0.04 0.00 0.01 1.00 1.00 15.00 2.00 16.00 1.00 20.00 0.08 3.00 1.00 1.20 1.25 1.00 7.00 21.00 2.10 0.35 1.00 25.00 0.15 0.08 0.01 0.01 1.00 25.00 0.20 0.10 0.01 0.01 1.00 9.00 0.20 0.10 0.01 0.01 1.00 5.00 8.00 0.03 0.40 0.20 0.02 0.00 1.00 3.50 0.05 10.80 0.03

m1 kg kg oh oh oh oh m1 m1 kg kg oh oh oh oh m2 lb lbr oh oh oh lbr kg oh m3 m3 kg kg oh oh oh oh m2 bh oh oh oh oh m2 bh oh oh oh oh m2 bh oh oh oh oh m1 bh Kg m3 oh oh oh oh m1 lbr Kg Kg m3

List profil cornees gypsum 30,324 Tepung gypsum 3,439 Alkasit 198 Pekerja 13,677 Tukang kayu 6,079 Kepala Tukang 685 Mandor 1,430 Pasang list profil cornees gypsum lebar lebih dari 10 cm 57,022 List profil cornees gypsum 30,324 Tepung gypsum 4,127 Alkasit 238 Pekerja 13,677 Tukang kayu 6,484 Kepala Tukang 741 Mandor 1,430 Mengerjakan Ukiran Gaya Yogyakarta dengan kedalaman 1 cm, 3,789,251 tidak berlubang Kertas 100 x 100 cm 5,718 Kerta karbon 58,197 Tukang gambar 324,207 Tukang Ukir 2,593,658 Kepala Tukang 185,261 Amplas 132,730 Dempul 3,169 Tukang kayu 486,311 Memasang usuk peniung, kayu jati (klas plitur) 12,730,247 Balok kayu papan (klas plitur) 7,963,800 Paku Biasa 2" - 5" 31,906 Lem kayu 13,273 Pekerja 851,044 Tukang kayu 3,404,176 Kepala tukang 389,049 Mandor 76,999 Pasang Atap Genteng Palentong Kecil 97,449 Genteng palentong 63,813 Pekerja 18,237 Tukang kayu 12,158 Kepala Tukang 1,482 Mandor 1,760 Pasang genteng paris 64,998 Genteng paris 20,420 Pekerja 24,316 Tukang batu 16,210 Kepala Tukang 1,853 Mandor 2,200 Pasang genteng beton besar Natural ( isi 9 / m2 ) 69,848 Genteng beton natural 25,270 Pekerja 24,316 Tukang batu 16,210 Kepala Tukang 1,853 Mandor 2,200 Pasang Genteng Bubung Palentong 113,984 Genteng Bubung Palentong 10,210 Semen 11,844 Pasir pasang 6,734 Pekerja 48,631 Tukang kayu 32,421 Kepala tukang 3,705 Mandor 440 Pasang Nok Genteng Beton 124,948 Genteng Beton 9,648 Paku Biasa 2" - 5" 1,276 Semen 15,989 Pasir pasang 6,734

126/151

Software RAB Exarch xPro v2019

AK-SNI 2008

S-427

SNI-2002

S-428

SNI-2002

S-429

SNI-2002

S-430

SNI-2002

S-431

SNI-2002

S-432

SNI-2002

S-433

SNI-2002

S-434

www.mitra-arsitek.com

1.00 0.40 0.20 0.02 0.02 1.00 5.00 0.02 0.02 1.52 0.40 0.20 0.02 0.02 1.00 0.50 0.12 0.14 0.08 0.01 0.01 1.00 0.60 0.12 0.14 0.08 0.01 0.01 1.00 0.60 0.12 0.14 0.07 0.01 0.01 1.00 0.75 0.12 0.14 0.07 0.01 0.01 1.00 0.35 0.12 0.14 0.07 0.01 0.01 1.00 0.42 0.12 0.14 0.07 0.01 0.01 1.00 0.44 0.12 0.14 0.07 0.01 0.01

Kg oh oh oh oh m1 bh m3 m3 kg oh oh oh oh m2 lbr Kg oh oh oh oh m2 lbr Kg oh oh oh oh m2 lbr Kg oh oh oh oh m2 lbr Kg oh oh oh oh m2 lbr Kg oh oh oh oh m2 lbr Kg oh oh oh oh m2 lbr Kg oh oh oh oh

Semen Warna Pekerja Tukang kayu Kepala tukang Mandor Pasang bubungan genteng paris Bubungan genteng paris Kapur pasang Pasir pasang Semen Pekerja Tukang batu Kepala Tukang Mandor Pasang Atap Asbes Gelombang ( 2.50 x 0.92 m ) X 5mm Asbes Gelombang Paku Pancing 60 x 230 Pekerja Tukang kayu Kepala tukang Mandor Pasang Atap Asbes Gelombang ( 2.25 x 0.92 m ) X 5mm Asbes Gelombang Paku Pancing 60 x 230 Pekerja Tukang kayu Kepala tukang Mandor Pasang Atap Asbes Gelombang ( 2.00 x 0.92 m ) X 5mm Asbes Gelombang Paku Pancing 60 x 230 Pekerja Tukang kayu Kepala tukang Mandor Pasang Atap Asbes Gelombang ( 1.80 x 0.92 m ) X 5mm Asbes Gelombang Paku Pancing 60 x 230 Pekerja Tukang kayu Kepala tukang Mandor Pasang Atap Asbes Gelombang ( 300 x 1.05 m ) X 4mm Asbes Gelombang Paku Pancing 60 x 230 Pekerja Tukang kayu Kepala tukang Mandor Pasang Atap Asbes Gelombang ( 270 x 1.05 m ) X 4mm Asbes Gelombang Paku Pancing 60 x 230 Pekerja Tukang kayu Kepala tukang Mandor Pasang Atap Asbes Gelombang ( 240 x 1.05 m ) X 4mm Asbes Gelombang Paku Pancing 60 x 230 Pekerja Tukang kayu Kepala tukang Mandor

2,144 48,631 32,421 3,705 4,400 209,421 107,205 7,604 3,199 2,256 48,631 32,421 3,705 4,400 90,046 56,155 1,470 17,021 12,158 1,482 1,760 101,277 67,386 1,470 17,021 12,158 1,482 1,760 100,061 67,386 1,470 17,021 11,347 1,297 1,540 116,908 84,233 1,470 17,021 11,347 1,297 1,540 71,984 39,309 1,470 17,021 11,347 1,297 1,540 79,845 47,170 1,470 17,021 11,347 1,297 1,540 81,605 49,416 1,470 17,021 10,861 1,297 1,540

127/151

Software RAB Exarch xPro v2019

SNI-2002

S-435

SNI-2002

S-436

SNI-2002

S-437

SNI-2002

S-438

SNI-2002

S-439

SNI-2002

S-440

SNI-2002

S-441

SNI-2002

S-442

SNI-2002

S-443

www.mitra-arsitek.com

1.00 0.51 0.12 0.14 0.07 0.01 0.01 1.00 0.80 0.12 0.14 0.07 0.01 0.01 1.00 0.37 0.12 0.14 0.07 0.01 0.01 1.00 0.38 0.12 0.14 0.07 0.01 0.01 1.00 0.46 0.12 0.14 0.07 0.01 0.01 1.00 0.49 0.12 0.14 0.07 0.01 0.01 1.00 0.57 0.12 0.14 0.07 0.01 0.01 1.00 2.40 6.00 0.08 0.13 0.01 0.00 1.00 2.10 6.00 0.08 0.13 0.01 0.00

m2 lbr Kg oh oh oh oh m2 lbr Kg oh oh oh oh m2 lbr Kg oh oh oh oh m2 lbr Kg oh oh oh oh m2 lbr Kg oh oh oh oh m2 lbr Kg oh oh oh oh m2 lbr Kg oh oh oh oh m1 lbr Kg oh oh oh oh m1 lbr Kg oh oh oh oh

Pasang Atap Asbes Gelombang ( 210 x 1.05 m ) X 4mm Asbes Gelombang Paku Pancing 60 x 230 Pekerja Tukang kayu Kepala tukang Mandor Pasang Atap Asbes Gelombang ( 1.5 x 1.05 m ) X 4mm Asbes Gelombang Paku Pancing 60 x 230 Pekerja Tukang kayu Kepala tukang Mandor Pasang Atap Asbes Gelombang ( 3.00 x 1.08 m ) X 6mm Asbes Gelombang Paku Pancing 60 x 230 Pekerja Tukang kayu Kepala tukang Mandor Pasang Atap Asbes Gelombang ( 2.7 x 1.08 m ) X 6mm Asbes Gelombang Paku Pancing 60 x 230 Pekerja Tukang kayu Kepala tukang Mandor Pasang Atap Asbes Gelombang ( 2.4 x 1.08 m ) X 6mm Asbes Gelombang Paku Pancing 60 x 230 Pekerja Tukang kayu Kepala tukang Mandor Pasang Atap Asbes Gelombang ( 2.1 x 1.08 m ) X 6mm Asbes Gelombang Paku Pancing 60 x 230 Pekerja Tukang kayu Kepala tukang Mandor Pasang Atap Asbes Gelombang ( 1.80 x 1.08 m ) X 6mm Asbes Gelombang Paku Pancing 60 x 230 Pekerja Tukang kayu Kepala tukang Mandor Pasang Nok Stel Gelombang 0.92m Nok Stel Gelombang Paku Pancing 60 x 230 Pekerja Tukang kayu Kepala tukang Mandor Pasang Nok Stel Gelombang 1.05m Nok Stel Gelombang Paku sekrup 3,5" Pekerja Tukang kayu Kepala tukang Mandor

89,467 57,278 1,470 17,021 10,861 1,297 1,540 122,037 89,848 1,470 17,021 10,861 1,297 1,540 73,744 41,555 1,470 17,021 10,861 1,297 1,540 74,867 42,678 1,470 17,021 10,861 1,297 1,540 83,851 51,663 1,470 17,021 10,861 1,297 1,540 87,221 55,032 1,470 17,021 10,861 1,297 1,540 96,206 64,017 1,470 17,021 10,861 1,297 1,540 288,605 181,330 73,512 10,213 20,263 2,408 880 265,939 158,663 73,512 10,213 20,263 2,408 880

128/151

Software RAB Exarch xPro v2019

SNI-2002

S-444

SNI-2002

S-445

SNI-2002

S-446

SNI-2002

S-447

SNI-2002

S-448

SNI-2002

S-449

SNI-2002

S-450

SNI-2002

S-451

SNI-2002

S-452

www.mitra-arsitek.com

1.00 2.05 6.00 0.08 0.13 0.01 0.00 1.00 1.20 6.00 0.08 0.13 0.01 0.00 1.00 1.20 6.00 0.08 0.13 0.01 0.00 1.00 1.20 6.00 0.08 0.13 0.01 0.00 1.00 1.10 6.00 0.10 0.15 0.01 0.00 1.00 1.10 6.00 0.08 0.13 0.01 0.00 1.00 0.30 0.04 0.02 0.07 0.01 0.01 1.00 1.05 0.02 0.02 0.08 0.01 0.01 1.00 1.20 0.04 0.10 1.00 0.01 0.01

m1 lbr Kg oh oh oh oh m1 lbr Kg oh oh oh oh m1 lbr Kg oh oh oh oh m1 lbr Kg oh oh oh oh m1 lbr Kg oh oh oh oh m1 lbr Kg oh oh oh oh m2 lbr Kg oh oh oh oh m2 m2 Kg oh oh oh oh m2 m2 Kg oh oh oh oh

Pasang Nok Stel Gelombang 1.08m Nok Stel Gelombang Paku sekrup 3,5" Pekerja Tukang kayu Kepala tukang Mandor Pasang Nok Paten 0.92m Nok Paten Paku sekrup 3,5" Pekerja Tukang kayu Kepala tukang Mandor Pasang Nok Paten 1.05m Nok Paten Paku sekrup 3,5" Pekerja Tukang kayu Kepala tukang Mandor Pasang Nok Paten 1.08m Nok paten Paku sekrup 3,5" Pekerja Tukang kayu Kepala Tukang Mandor Pasang Nok Stel rata 0.92m Nok Stel rata Paku sekrup 3,5" Pekerja Tukang kayu Kepala tukang Mandor Pasang Nok Stel rata 1.05m Nok Stel rata Paku sekrup 3,5" Pekerja Tukang kayu Kepala tukang Mandor Pasang Nok Atap Seng Seng Gelombang 3" x 6" BJLS 28 Paku Biasa ½" - 1" Pekerja Tukang kayu Kepala tukang Mandor Pasang Atap Alluminium Atap Alluminium Gelombang tebal 0.55 Paku Hak Panjang 15cm Pekerja Tukang kayu Kepala tukang Mandor Pasang Nok Alluminium Nok standar 40 cm 18, swg 22 Paku Hak Panjang 15cm Pekerja Tukang kayu Kepala tukang Mandor

262,162 154,886 73,512 10,213 20,263 2,408 880 158,122 50,846 73,512 10,213 20,263 2,408 880 158,122 50,846 73,512 10,213 20,263 2,408 880 158,122 50,846 73,512 10,213 20,263 2,408 880 175,044 61,771 73,512 12,158 24,316 2,408 880 169,046 61,771 73,512 10,213 20,263 2,408 880 32,248 15,315 960 1,824 11,347 1,482 1,320 193,896 176,888 225 1,824 12,158 1,482 1,320 278,004 99,241 449 12,158 162,104 1,853 2,200

129/151

Software RAB Exarch xPro v2019

SNI-2002

S-453

SNI-2002

S-454

SNI-2002

S-455

SNI-2002

S-456

SNI-2002

S-457

SNI-2002

S-458

SNI-2002

S-459

SNI-2002

S-460

SNI-2002

S-461

www.mitra-arsitek.com

1.00 1.05 0.15 0.05 0.01 0.01 1.00 6.90 0.35 0.03 0.50 0.20 0.30 0.00 0.01 1.00 1.02 0.20 0.20 0.10 0.01 0.00 1.00 25.00 0.15 0.08 0.01 0.01 1.00 12.00 0.15 0.06 0.01 0.01 1.00 60.00 0.20 0.17 0.25 0.03 0.01 1.00 5.00 8.00 0.03 0.40 0.20 0.02 0.00 1.00 4.00 8.00 0.03 0.40 0.20 0.02 0.00 1.00 0.60 0.05 0.14 0.07 0.01

m2 m2 oh oh oh oh m2 lbr lbr Kg Bh oh oh oh oh m2 lbr Kg oh oh oh oh m2 bh oh oh oh oh m2 bh oh oh oh oh m2 lbr Kg oh oh oh oh m1 bh Kg m3 oh oh oh oh m1 bh Kg m3 oh oh oh oh m1 lbr Kg oh oh oh

Pasang Alluminium Foil / Sisalation Aluminium foil Pekerja Tukang kayu Kepala tukang Mandor Pasang Atap Genteng Aspal Genteng Aspal Plywood 120x240 tbl. 4 mm Paku Biasa ½" - 1" Plastic Aerator Pekerja Tukang kayu Kepala tukang Mandor Pasang Atap Genteng Metal Genteng Metal Paku Biasa 2" - 5" Pekerja Tukang kayu Kepala tukang Mandor Pasang Atap Genteng Kodok / Glazzur Genteng Kodok Pekerja Tukang kayu Kepala tukang Mandor Pasang Atap Genteng Palentong Super / Besar Genteng Palentong Super Pekerja Tukang kayu Kepala tukang Mandor Pasang Atap Sirap Genteng Sirap Paku Biasa ½" - 1" Pekerja Tukang kayu Kepala tukang Mandor Pasang Genteng Bubung Kodok Glazzur Genteng Bubung Kodok Semen Pasir pasang Pekerja Tukang kayu Kepala tukang Mandor Pasang Genteng Bubung Palentong Besar Genteng Bubung Palentong Semen Pasir pasang Pekerja Tukang kayu Kepala tukang Mandor Pasang Rooflight Fiberglass ( 180 x 90 ) cm Roof Light Fiberglass Paku Biasa 2" - 5" Pekerja Tukang kayu Kepala tukang

61,082 32,054 18,237 8,105 926 1,760 139,745 19,726 25,729 720 17,868 24,316 48,631 556 2,200 84,153 36,450 5,105 24,316 16,210 1,853 220 71,924 38,288 18,237 12,158 1,482 1,760 73,716 42,882 18,237 9,726 1,112 1,760 316,938 245,040 4,799 20,182 40,526 4,632 1,760 111,432 7,658 11,844 6,734 48,631 32,421 3,705 440 111,942 8,168 11,844 6,734 48,631 32,421 3,705 440 116,534 84,539 1,276 17,021 10,861 1,297

130/151

Software RAB Exarch xPro v2019

SNI-2002

S-462

SNI-2002

S-463

SNI-2002

S-464

SNI-2002

S-465

AK-SNI 2008

S-466

AK-SNI 2008

S-467

AK-SNI 2008

S-468

AK-SNI 2008

S-469

AK-SNI 2008

S-470

AK-SNI 2008

S-471

www.mitra-arsitek.com

0.01 1.00 2.00 0.05 0.00 0.13 0.25 0.03 0.01 1.00 1.10 0.05 0.25 0.15 0.02 0.01 1.00 0.40 0.06 0.05 0.00 0.13 0.25 0.03 0.01 1.00 0.70 0.02 0.12 0.06 0.01 0.01 1.00 25.00 0.30 0.10 0.01 0.02 1.00 9.00 0.30 0.10 0.01 0.02 1.00 9.00 0.20 0.10 0.01 0.01 1.00 9.00 0.30 0.10 0.01 0.02 1.00 14.50 0.20 0.10 0.01 0.01 1.00

oh m1 lbr Kg m3 oh oh oh oh m1 lbr Kg oh oh oh oh m1 Lbr Kg Kg m3 oh oh oh oh m2 Lbr Kg oh oh oh oh m2 bh oh oh oh oh m2 bh oh oh oh oh m2 bh oh oh oh oh m2 bh oh oh oh oh m2 bh oh oh oh oh m2

Mandor 1,540 Pasang Nok Genteng Aspal 126,432 Nok Genteng Aspal 51,050 Paku Biasa ½" - 1" 1,200 Balok Kayu Borneo 12,507 Pekerja 15,197 Tukang kayu 40,526 Kepala tukang 4,632 Mandor 1,320 Pasang Nok Genteng Metal 141,289 Nok Genteng Decra Bond 79,740 Paku Biasa ½" - 1" 1,200 Pekerja 30,394 Tukang kayu 24,316 Kepala tukang 2,779 Mandor 2,860 Pasang Nok Sirap 99,104 Seng Gelombang 3" x 6" BJLS 28 20,420 Paku Biasa ½" - 1" 1,440 Paku Biasa 2" - 5" 1,276 Papan Kayu Borneo tebal 3cm 14,294 Pekerja 15,197 Tukang kayu 40,526 Kepala tukang 4,632 Mandor 1,320 Pasang Atap Seng Gelombang 62,962 Seng Gelombang 3" x 6" BJLS 28 35,735 Paku Biasa ½" - 1" 480 Pekerja 14,589 Tukang kayu 9,726 Kepala tukang 1,112 Mandor 1,320 Pasang genteng paris untuk rumah tingkat 78,256 Genteng paris 20,420 Pekerja 36,473 Tukang batu 16,210 Kepala Tukang 1,853 Mandor 3,300 Pasang genteng beton besar Natural ( isi 9 / m2 ) untuk rumah tingkat 83,106 Genteng beton natural 25,270 Pekerja 36,473 Tukang batu 16,210 Kepala Tukang 1,853 Mandor 3,300 Pasang genteng beton besar Warna ( isi 9 / m2 ) 72,145 Genteng beton Warna 27,567 Pekerja 24,316 Tukang batu 16,210 Kepala Tukang 1,853 Mandor 2,200 Pasang genteng beton besar Warna ( isi 9 / m2 ) untuk rumah tingkat 85,403 Genteng beton Warna 27,567 Pekerja 36,473 Tukang batu 16,210 Kepala Tukang 1,853 Mandor 3,300 Pasang genteng keramik berglasir KIA, Kanmuri Natural 140,808 Genteng keramik KIA natural 96,229 Pekerja 24,316 Tukang batu 16,210 Kepala Tukang 1,853 Mandor 2,200 Pasang genteng keramik berglasir KIA, Kanmuri Natural untuk rumah 98,549tingkat

131/151

Software RAB Exarch xPro v2019

AK-SNI 2008

S-472

AK-SNI 2008

S-473

AK-SNI 2008

S-474

AK-SNI 2008

S-475

AK-SNI 2008

S-476

SNI-2002

S-477

SNI-2002

S-478

SNI-2002

S-479

SNI-2002

S-480

www.mitra-arsitek.com

14.50 0.30 0.10 0.01 0.02 1.00 4.00 0.02 0.02 1.52 0.40 0.20 0.02 0.02 1.00 4.00 0.02 0.02 1.52 0.40 0.20 0.02 0.02 1.00 1.02 4.00 0.20 0.10 0.01 0.00 1.00 1.10 0.05 0.25 0.15 0.02 0.01 1.00 1.05 7.00 9.00 0.50 0.50 0.05 0.00 1.00 0.05 0.15 0.00 1.00 0.05 0.15 0.00 1.00 0.08 0.02 0.01 0.04 0.04 0.00 0.00 1.00 0.15

bh oh oh oh oh m2 bh m3 m3 kg oh oh oh oh m2 bh m3 m3 kg oh oh oh oh m2 m2 bh oh oh oh oh m1 bh kg oh oh oh oh m2 m2 kg bh oh oh oh oh m2 kg oh oh m2 kg oh oh m2 kg kg kg oh oh oh oh m2 kg

Genteng beton natural 40,712 Pekerja 36,473 Tukang batu 16,210 Kepala Tukang 1,853 Mandor 3,300 Pasang bubungan genteng beton Warna 192,064 Bubungan genteng beton warna 89,848 Kapur pasang 7,604 Pasir pasang 3,199 Semen 2,256 Pekerja 48,631 Tukang batu 32,421 Kepala Tukang 3,705 Mandor 4,400 Pasang bubungan genteng keramik berglasir KIA, Kanmuri Natural 214,526 Bubungan gent.krmk KIA natural 112,310 Kapur pasang 7,604 Pasir pasang 3,199 Semen 2,256 Pekerja 48,631 Tukang batu 32,421 Kepala Tukang 3,705 Mandor 4,400 Pasang atap metal gelombang 110,990 Atap metal gelombang t 0.35 mm 64,308 Paku/skrup atap anti karat 4,084 Pekerja 24,316 Tukang kayu 16,210 Kepala Tukang 1,853 Mandor 220 Pasang nok genteng metal U type prima roof 144,505 Nok metal 83,109 Paku anti karat 1,047 Pekerja 30,394 Tukang kayu 24,316 Kepala Tukang 2,779 Mandor 2,860 Pasang atap polikarbonat 325,964 Polycarbonat 155,983 Besi rangka 11,435 Paku sekrup 6,892 Pekerja 60,789 Tukang besi 81,052 Kepala Tukang 9,263 Mandor 550 Mengikis / Mengerok Permukaan Cat Tembok Lama 21,084 Soda api 2,297 Pekerja 18,237 Mandor 550 Mengerok Karat Cat Lama Permukaan Baja dengan Cara Manual19,358 Sabun 572 Pekerja 18,237 Mandor 550 Mendempul dan Menggosok Kayu 16,828 Dempul 3,169 Minyak cat 715 Batu apung 305 Pekerja 4,863 Tukang Cat 6,484 Kepala tukang 741 Mandor 550 Pengecatan Bidang Kayu Lama 44,751 Plamir 8,622

132/151

Software RAB Exarch xPro v2019

SNI-2002

S-481

SNI-2002

S-482

SNI-2002

S-483

SNI-2002

S-484

SNI-2002

S-485

SNI-2002

S-486

SNI-2002

S-487

SNI-2002

S-488

www.mitra-arsitek.com

0.17 0.17 0.07 0.08 0.01 0.00 1.00 0.20 0.15 0.17 0.26 0.07 0.01 0.01 0.00 1.00 0.20 0.15 0.17 0.35 0.07 0.11 0.00 0.00 1.00 0.36 0.04 0.06 0.06 0.00 1.00 0.15 0.37 2.00 0.06 0.02 0.00 1.00 0.35 0.10 0.01 1.00 0.15 0.05 0.10 0.01 0.16 0.16 0.02 0.00 1.00 0.10 0.10 0.26 0.02 0.06 0.01 0.00 1.00 0.12 0.18 0.03 0.04

kg kg oh oh oh oh m2 kg kg kg kg oh oh oh oh m2 kg kg kg kg oh oh oh oh m2 ltr oh oh oh oh m2 ltr ltr lbr oh oh oh m2 ltr oh oh m2 Ltr Kg Lbr Bh oh oh oh oh m2 Kg Kg Kg oh oh oh oh m2 kg lbr oh oh

Cat dasar 4,860 Cat kayu 8,661 Pekerja 8,510 Tukang Cat 12,158 Kepala tukang 1,389 Mandor 550 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 41,688 2 Lapis Cat Penut Cat meni 3,328 Plamir 8,622 Cat dasar 4,860 Cat kayu 13,246 Pekerja 8,510 Tukang Cat 1,459 Kepala tukang 1,112 Mandor 550 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 61,465 3 Lapis Cat Penut Cat meni 3,328 Plamir 8,622 Cat dasar 4,860 Cat kayu 17,832 Pekerja 8,510 Tukang Cat 17,021 Kepala tukang 741 Mandor 550 Pelaburan Bidang Kayu dengan Teak Oil 33,362 Teak oil 6,065 Pekerja 4,863 Tukang Cat 10,213 Kepala tukang 11,671 Mandor 550 Pelaburan Bidang Kayu dengan Pelitur 45,167 Politur 5,360 Politur 13,293 Amplas 13,273 Tukang cat 9,726 Kepala Tukang 2,964 Mandor 550 Pelaburan Bidang Kayu dengan Cat Residu dan Ter 16,515 Residu 3,037 Pekerja 12,158 Mandor 1,320 Pelaburan Bidang Kayu dengan Vernis 69,333 Vernis 17,612 Dempul 1,981 Amplas 664 Kuas 174 Pekerja 19,452 Tukang Cat 25,937 Kepala tukang 2,964 Mandor 550 Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat 32,259 Penutup ) Plamir 5,748 Cat dasar 2,859 Cat Penutup Tembok 9,291 Pekerja 2,432 Tukang Cat 10,213 Kepala tukang 1,167 Mandor 550 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup) 21,403 Cat dasar 3,431 Cat Penutup Tembok 6,432 Pekerja 3,404 Tukang Cat 6,808

133/151

Software RAB Exarch xPro v2019

SNI-2002

S-489

SNI-2002

S-490

SNI-2002

S-491

SNI-2002

S-492

SNI-2002

S-493

SNI-2002

S-494

SNI-2002

S-495

SNI-2002

S-496

www.mitra-arsitek.com

0.00 0.00 1.00 0.10 0.03 0.04 0.00 0.00 1.00 0.10 0.25 0.00 0.15 0.15 0.00 0.00 0.00 1.00 0.00 0.30 0.04 0.01 0.00 0.00 1.00 0.10 0.01 0.02 0.20 0.02 0.01 1.00 0.10 0.01 0.00 0.25 0.23 0.02 0.01 1.00 1.20 0.20 0.02 0.20 0.00 0.00 1.00 0.10 0.10 0.04 0.04 0.01 0.00 0.01 0.01 0.02 0.01 1.00 0.30 0.01 0.06 0.01 0.01

oh oh m2 kg oh oh oh oh m2 Lbr ikat m3 Kg oh oh oh oh m2 m3 Kg oh oh oh oh m2 Kg Bh oh oh oh oh m2 Kg Bh m3 oh oh oh oh m2 m3 Kg oh oh oh oh m2 Kg Kg Kg Kg Ltr m3 oh oh oh oh m2 Kg oh oh oh oh

Kepala tukang 778 Mandor 550 Melabur tembok dengan kalkarium 12,077 Kalkarium 536 Pekerja 3,404 Tukang Cat 6,808 Kepala tukang 778 Mandor 550 Melabur Tembok dengan Kapur Sirih 24,521 Amplas 664 Alang-alang 128 Perancah Kayu 2,741 Kapur Sirih 2,022 Pekerja 18,237 Tukang Cat 162 Kepala tukang 19 Mandor 550 Melabur Tembok Lama dengan Kapur Sirih ( untuk pemeliharaan13,100 ) Perancah Kayu 2,741 Kapur Sirih 4,043 Pekerja 4,863 Tukang Cat 811 Kepala tukang 93 Mandor 550 Pengecatan Permukaan Baja dengan Meni Besi 43,994 Meni besi 3,063 Kuas 174 Pekerja 2,432 Tukang Cat 32,421 Kepala tukang 3,705 Mandor 2,200 Pengecatan Permukaan Baja dengan Meni Besi dan Perancah 78,663 Meni besi 3,063 Kuas 174 Perancah kayu 2,741 Pekerja 30,394 Tukang Cat 36,473 Kepala tukang 4,168 Mandor 1,650 Pemasangan Wall Paper 87,844 Wallpaper 42,882 Perekat 9,189 Pekerja 2,432 Tukang Cat 32,421 Kepala tukang 371 Mandor 550 Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual19,791 Sistem 4 Lapis Cat Meni ( Read Lead ) A 3,471 Meni ( Read Lead ) B 3,676 Alluminium C 1,046 Alluminium B 980 Pengencer 357 Perancah Kayu 2,741 Pekerja 729 Tukang Cat 973 Kepala tukang 4,168 Mandor 1,650 Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual23,188 Sistem 1 Lapis Cat Meni Besi 9,189 Pekerja 729 Tukang Cat 9,726 Kepala tukang 2,223 Mandor 1,320

134/151

Software RAB Exarch xPro v2019

SNI-2002

S-497

SNI-2002

S-498

SNI-2002

S-499

SNI-2002

S-500

SNI-2002

S-501

AK-SNI 2008

S-502

AK-SNI 2008

S-503

AK-SNI 2008

S-504

AK-SNI 2008

S-505

AK-SNI 2008

S-506

AK-SNI 2008

S-507

www.mitra-arsitek.com

1.00 0.11 0.17 0.08 0.50 0.80 0.30 0.20 1.00 0.30 0.40 0.70 0.20 0.20 1.00 0.05 0.15 0.00 1.00 40.00 10.00 1.60 1.60 0.80 0.50 1.00 0.05 0.15 0.00 1.00 0.10 0.36 0.06 0.01 0.02 0.00 1.00 0.17 0.20 0.15 0.07 0.11 0.00 0.00 1.00 0.35 0.10 0.01 1.00 0.43 0.06 0.20 0.10 0.30 0.03 0.01 1.00 0.36 0.02 0.06 0.01 0.00 1.00

m2 Kg Kg Kg oh oh oh oh m2 Kg oh oh oh oh m2 Kg oh oh m2 Kg Ltr oh oh oh oh m2 Kg oh oh m2 kg kg oh oh oh oh m2 kg kg ltr oh oh oh oh m2 kg oh oh m2 kg ltr oh lbr oh oh oh m2 kg oh oh oh oh m2

Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual 305,089 Sistem 3 Lapis Cat Cat Dasar 3,145 Cat Antara 7,811 Cat Besi 4,084 Pekerja 60,789 Tukang Cat 129,683 Kepala tukang 55,578 Mandor 44,000 Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Semprot 251,732 ( Airless Spray ) dg Cat Dasar 8,576 Pekerja 48,631 Tukang Cat 113,473 Kepala tukang 37,052 Mandor 44,000 Mencuci Bidang Permukaan Tembok yang Pernah dicat 19,358 Sabun 572 Pekerja 18,237 Mandor 550 Mengerok Karat atau Cat Lama Permukaan Baja dgn Pancar Pasir 899,962 ( Sanblasting ) dgn Pasir Silika 85,764 Bahan Bakar 102,100 Pekerja 194,524 Tukang Cat 259,366 Kepala tukang 148,209 Mandor 109,999 Menyabun Permukaan Tembok Lama 19,358 Sabun 572 Pekerja 18,237 Mandor 550 Pengecatan tembok tidak terlindung dari panas dan hujan 39,682 Cat alkali resisting primer 3,267 Cat ICI Weathershield 22,054 Tukang cat 10,213 Kepala Tukang 1,167 Pekerja 2,432 Mandor 550 Pengecatan bidang besi ( 3 x ) 45,631 Cat meni 2,779 Cat besi 10,210 Tinner 5,820 Pekerja 8,510 Tukang cat 17,021 Kepala Tukang 741 Mandor 550 Pengetiran kayu ( 2 x ) 16,295 Residu 3,037 Pekerja 12,158 Mandor 1,100 Pekerjaan cat duco 3 x 111,785 Cat duco 28,205 Tinner 2,211 Pekerja 24,316 Amplas 664 Tukang cat 48,631 Kepala Tukang 5,558 Mandor 2,200 Mengecat genteng 36,415 Cat ICI Weathershield 22,054 Pekerja 2,432 Tukang cat 10,213 Kepala Tukang 1,167 Mandor 550 Mengecat kerb 3 kali 100,966

135/151

Software RAB Exarch xPro v2019

AK-SNI 2008

S-508

AK-SNI 2008

S-509

SNI-2002

S-510

SNI-2002

S-511

SNI-2002

S-512

SNI-2002

S-513

SNI-2002

S-514

www.mitra-arsitek.com

0.43 0.06 0.20 0.30 0.03 0.01 1.00 1.20 0.12 0.10 8.00 1.00 1.00 0.12 0.04 0.00 0.07 0.00 0.43 0.10 5.00 0.50 0.20 0.01 1.00 1.00 0.06 3.30 1.10 0.00 0.16 1.00 1.00 6.00 0.01 1.00 1.50 1.50 0.16 1.00 1.00 7.00 6.00 0.01 1.00 1.50 0.30 0.11 1.00 1.00 0.30 6.00 0.01 1.00 1.00 0.10 0.10 1.00 1.00 0.12 6.00 0.01 1.20

kg ltr oh oh oh oh m2 m2 kg oh oh oh m2 kg oh oh oh oh kg ltr oh oh oh oh bh bh Ls oh oh oh oh bh bh kg m3 oh oh oh oh bh bh bh kg m3 oh oh oh oh bh bh Ls kg m3 oh oh oh oh bh bh Ls kg m3 oh

Cat emco Minyak cat Pekerja Tukang cat Kepala Tukang Mandor Memasang Prodo Mas 24 karat Prodo Cat kayu Tukang cat Tukang Prodo Kepala tukang Mengerjakan Cat Sungging Cat meni Tukang cat Kepala Tukang Pekerja Mandor Cat kayu Minyak cat Tukang cat Kepala Tukang Pekerja Mandor Memasang Kloset Duduk / Monoblok Kloset duduk / monoblock Perlengkapan Kloset Pekerja Tukang batu Kepala Tukang Mandor Memasang 1Kloset Jongkok Porselen Kloset jongkok porselen Semen Pasir pasang Pekerja Tukang batu Kepala Tukang Mandor Memasang Kloset Jongkok Teraso Kloset jongkok teraso Bata merah Semen Pasir pasang Pekerja Tukang batu Kepala Tukang Mandor Memasang Urinoir Urinoir Perlengkapan Urinoir Semen Pasir pasang Pekerja Tukang batu Kepala Tukang Mandor Memasang Wastafel Wastafel Perlengkapan Wastafel Semen Pasir pasang Pekerja

18,225 2,037 24,316 48,631 5,558 2,200 5,180,014 3,675,600 6,114 16,210 1,296,829 185,261 972,948 1,997 6,484 741 8,109 726 21,653 3,574 810,518 92,631 24,316 2,200 3,176,540 2,552,500 9,135 401,206 178,314 185 35,200 841,962 153,150 8,883 2,104 121,578 243,155 277,892 35,200 717,181 255,250 6,432 8,883 2,104 121,578 243,155 55,578 24,200 1,810,269 1,429,400 45,675 8,883 2,104 121,578 162,104 18,526 22,000 1,940,439 1,480,450 18,270 8,883 2,104 145,893

136/151

Software RAB Exarch xPro v2019

SNI-2002

S-515

SNI-2002

S-516

SNI-2002

S-517

SNI-2002

S-518

SNI-2002

S-519

SNI-2002

S-520

SNI-2002

S-521

SNI-2002

S-522

www.mitra-arsitek.com

1.45 0.15 0.10 1.00 1.00 0.18 1.80 2.70 0.54 0.11 1.00 1.00 0.20 1.00 0.08 0.75 0.25 1.00 1.00 0.12 3.00 4.50 0.90 0.90 1.00 1.60 0.68 0.01 0.01 0.06 0.03 0.00 0.00 1.00 1.60 0.87 0.01 0.01 0.08 0.04 0.00 0.01 1.00 1.10 16.00 3.92 0.06 0.02 0.14 0.07 0.01 0.01 1.00 1.10 330.00 10.30 0.06 0.07 0.38 0.19 0.02 0.02 1.00

oh oh oh bh bh Ls oh oh oh oh bh bh Ls oh oh oh oh bh bh Ls oh oh oh oh m1 bh kg m3 m3 oh oh oh oh m1 bh Kg m3 m3 oh oh oh oh m1 bh bh kg m3 m3 oh oh oh oh m1 bh bh kg m3 m3 oh oh oh oh bh

Tukang batu 235,050 Kepala Tukang 27,789 Mandor 22,000 Memasang Bak Mandi Fiberglass, volume 0.30 m³ 1,134,885 Bak fiberglass 326,720 Perlengkapan Bak 27,405 Pekerja 218,840 Tukang batu 437,680 Kepala Tukang 100,041 Mandor 24,200 Memasang Badkip Porselen 373,446 Badkip 15,315 Perlengkapan Badkip 30,450 Pekerja 121,578 Tukang batu 12,158 Kepala Tukang 138,946 Mandor 54,999 Memasang Bak Fiberglass volume 1 m³ air 1,803,922 Bak fiberglass 326,720 Perlengkapan Bak 18,270 Pekerja 364,733 Tukang batu 729,466 Kepala Tukang 166,735 Mandor 197,998 Memasang Pipa Penyalur Air limbah jenis Pipa Tanah Ø15 cm 95,630 Pipa tanah 75,962 Semen 1,007 Pasir pasang 2,736 Pasir urug 2,662 Pekerja 7,295 Tukang batu 4,863 Kepala Tukang 556 Mandor 550 Memasang Pipa Penyalur Air limbah jenis Pipa Tanah Ø 20 cm 102,075 Pipa tanah 75,962 Semen 1,288 Pasir pasang 2,946 Pasir urug 3,388 Pekerja 9,726 Tukang batu 6,484 Kepala Tukang 741 Mandor 1,540 Memasang Pipa Beton Ø 5 cm - 20 cm 131,073 Pipa beton 61,771 Bata merah 14,702 Semen 5,803 Pasir pasang 11,784 Pasir urug 5,807 Pekerja 17,021 Tukang batu 11,347 Kepala Tukang 1,297 Mandor 1,540 Memasang Pipa Beton Ø 30 cm - 100 cm 494,488 Pipa beton 61,771 Bata merah 303,237 Semen 15,249 Pasir pasang 12,836 Pasir urug 16,696 Pekerja 46,200 Tukang batu 30,800 Kepala Tukang 3,520 Mandor 4,180 Memasang Bak Kontrol pasangan Batu Bata ukuran (30 x 30 )cm,768,848 t = 35 cm

137/151

Software RAB Exarch xPro v2019

SNI-2002

S-523

SNI-2002

S-524

SNI-2002

S-525

SNI-2002

S-526

SNI-2002

S-527

SNI-2002

S-528

SNI-2002

S-529

www.mitra-arsitek.com

87.00 44.00 0.07 0.07 1.60 0.06 3.20 1.02 0.00 0.02 1.00 150.00 77.00 0.13 0.02 2.60 0.09 1.42 0.47 0.05 0.07 1.00 222.00 114.00 0.18 0.03 4.85 0.12 2.16 0.72 0.07 0.11 0.10 1.00 1.20 0.35 0.05 0.09 0.01 0.03 1.00 1.20 0.35 0.05 0.09 0.01 0.03 1.00 1.20 0.35 0.05 0.09 0.01 0.03 1.00 1.20 0.35 0.11 0.18 0.02 0.01 1.00 1.20

bh kg m3 m3 kg m3 oh oh oh oh bh bh kg m3 m3 kg m3 oh oh oh oh bh bh kg m3 m3 kg m3 oh oh oh oh oh m1 m1 Ls oh oh oh oh m1 m1 Ls oh oh oh oh m1 m1 Ls oh oh oh oh m1 m1 Ls oh oh oh oh m1 m1

Bata merah 79,944 Semen 65,140 Pasir pasang 14,730 Kerikil 16,795 Besi beton 17,153 Pasir beton 17,704 Pekerja 389,049 Tukang batu 164,535 Kepala Tukang 278 Mandor 3,520 Memasang Bak Kontrol pasangan Batu Bata ukuran (45 x 45 )cm,612,056 t = 50 cm Bata merah 137,835 Semen 113,995 Pasir pasang 27,356 Kerikil 4,799 Besi beton 27,873 Pasir beton 26,556 Pekerja 172,640 Tukang batu 76,675 Kepala Tukang 8,707 Mandor 15,620 Memasang Bak Kontrol pasangan Batu Bata ukuran (60 x 60 )cm,939,438 t = 65 cm Bata merah 203,996 Semen 168,771 Pasir pasang 38,719 Kerikil 7,918 Besi beton 51,994 Pasir beton 35,408 Pekerja 262,608 Tukang batu 116,715 Kepala Tukang 13,339 Mandor 23,760 Tukang Gali 16,210 Memasang Pipa Galvanis Ø ½" 107,779 Pipa galvanis ½” 25,729 Perlengkapan Pipa 53,288 Pekerja 6,565 Tukang batu 14,589 Kepala Tukang 1,667 Mandor 5,940 Memasang Pipa Galvanis Ø ¾" 113,905 Pipa galvanis 3/4” 31,855 Perlengkapan Pipa 53,288 Pekerja 6,565 Tukang batu 14,589 Kepala Tukang 1,667 Mandor 5,940 Memasang Pipa Galvanis Ø 1" 131,057 Pipa galvanis 1” 49,008 Perlengkapan Pipa 53,288 Pekerja 6,565 Tukang batu 14,589 Kepala Tukang 1,667 Mandor 5,940 Memasang Pipa Galvanis Ø 1½" 193,234 Pipa galvanis 11/2” 93,115 Perlengkapan Pipa 53,288 Pekerja 13,130 Tukang batu 29,179 Kepala Tukang 3,335 Mandor 1,188 Memasang Pipa Galvanis Ø 3" 222,639 Pipa galvanis 3” 122,520

138/151

Software RAB Exarch xPro v2019

SNI-2002

S-530

SNI-2002

S-531

SNI-2002

S-532

SNI-2002

S-533

SNI-2002

S-534

SNI-2002

S-535

SNI-2002

S-536

SNI-2002

S-537

SNI-2002

S-538

www.mitra-arsitek.com

0.35 0.11 0.18 0.02 0.01 1.00 1.20 0.35 0.14 0.23 0.02 0.01 1.00 1.20 0.35 0.04 0.06 0.01 0.00 1.00 1.20 0.35 0.04 0.06 0.01 0.00 1.00 1.20 0.35 0.04 0.06 0.01 0.00 1.00 1.20 0.35 0.04 0.06 0.01 0.00 1.00 1.20 0.35 0.05 0.09 0.01 0.00 1.00 1.20 0.35 0.04 0.06 0.01 0.00 1.00 1.20 0.35 0.08 0.14 0.01 0.00 1.00 1.20

Ls oh oh oh oh m1 m1 Ls oh oh oh oh m1 m1 Ls oh oh oh oh m1 m1 Ls oh oh oh oh m1 m1 Ls oh oh oh oh m1 m1 Ls oh oh oh oh m1 m1 Ls oh oh oh oh m1 m1 Ls oh oh oh oh m1 m1 Ls oh oh oh oh m1 m1

Perlengkapan Pipa Pekerja Tukang batu Kepala Tukang Mandor Memasang Pipa Galvanis Ø 4" Pipa galvanis 4” Perlengkapan Pipa Pekerja Tukang batu Kepala Tukang Mandor Memasang Pipa PVC tipe AW Ø ½" Pipa PVC 1/2" Perlengkapan Pipa Pekerja Tukang batu Kepala Tukang Mandor Memasang Pipa PVC tipe AW Ø ¾" Pipa PVC 3/4" Perlengkapan Pipa Pekerja Tukang batu Kepala Tukang Mandor Memasang Pipa PVC tipe AW Ø 1" Pipa PVC 1” Perlengkapan Pipa Pekerja Tukang batu Kepala Tukang Mandor Memasang Pipa PVC tipe AW Ø 1½" Pipa PVC 11/2” Perlengkapan Pipa Pekerja Tukang batu Kepala Tukang Mandor Memasang Pipa PVC tipe AW Ø 2" Pipa PVC 2” Perlengkapan Pipa Pekerja Tukang batu Kepala Tukang Mandor Memasang Pipa PVC tipe AW Ø 2½" Pipa PVC 21/2” Perlengkapan Pipa Pekerja Tukang batu Kepala Tukang Mandor Memasang Pipa PVC tipe AW Ø 3" Pipa PVC 3" Perlengkapan Pipa Pekerja Tukang batu Kepala Tukang Mandor Memasang Pipa PVC tipe AW Ø 4" Pipa PVC 4"

53,288 13,130 29,179 3,335 1,188 276,015 164,177 53,288 16,413 36,473 4,168 1,496 73,799 4,901 53,288 4,377 9,726 1,112 396 75,637 6,739 53,288 4,377 9,726 1,112 396 76,249 7,351 53,288 4,377 9,726 1,112 396 76,862 7,964 53,288 4,377 9,726 1,112 396 85,328 8,576 53,288 6,614 14,589 1,667 594 78,087 9,189 53,288 4,377 9,726 1,112 396 98,224 9,802 53,288 9,848 21,884 2,501 902 102,263 11,027

139/151

Software RAB Exarch xPro v2019

SNI-2002

S-539

SNI-2002

S-540

SNI-2002

S-541

SNI-2002

S-542

SNI-2002

S-543

SNI-2002

S-544

SNI-2002

S-545

SNI-2007

S-546

www.mitra-arsitek.com

0.35 0.08 0.14 0.01 0.00 1.00 1.00 1.00 0.03 0.30 0.03 0.00 1.00 1.00 1.00 20.00 0.05 0.05 0.50 0.05 0.00 1.00 1.00 0.03 0.01 0.10 0.01 0.01 1.00 1.00 0.01 0.10 0.01 0.01 1.00 1.00 6.00 0.01 2.10 0.75 0.07 0.11 1.00 240.00 120.00 0.30 360.00 6.00 6.00 3.00 0.30 0.30 1.00 0.90 180.00 8.00 5.00 0.10 3.50 4.50 0.90 0.90 1.00

Ls oh oh oh oh bh bh set oh oh oh oh bh bh set kg m3 oh oh oh oh bh bh bh oh oh oh oh bh bh oh oh oh oh bh bh kg m3 oh oh oh oh bh bh Kg m3 bh Kg oh oh oh oh bh m3 kg m2 m2 Ls oh oh oh oh kg

Perlengkapan Pipa Pekerja Kepala Tukang Tukang batu Mandor Memasang Bak Cuci Piring Stainles Steel Bak cuci piring Waterdrain Pekerja Tukang batu Kepala Tukang Mandor Memasang Bak Cuci Piring Teraso Bak cuci piring Waterdrain Semen Pasir pasang Pekerja Tukang batu Kepala Tukang Mandor Memasang Kran Ø ¾" atau ½" Kran air Sealtape Pekerja Tukang batu Kepala Tukang Mandor Memasang Floor Drain Floor drain Pekerja Tukang batu Kepala Tukang Mandor Memasang Bak Mandi Teraso, volume 0.30 m3 Bak mandi teraso Semen Pasir pasang Pekerja Tukang batu Kepala Tukang Mandor Memasang bak mandi batu bata volume 0,30 m3 Bata merah Semen Pasir pasang Porselen (11 x 11) cm Semen nat Pekerja Tukang batu Kepala Tukang Mandor Membuat bak beton volume 1 m3 air Beton kedap air Besi beton Kayu cetakan Ubin porselen Alat Bantu/Perlengkapan Umum Pekerja Tukang batu Kepala Tukang Mandor Memasang besi profil

53,288 9,848 25,010 2,188 902 574,792 439,030 77,596 3,647 48,631 5,558 330 653,700 439,030 77,596 29,609 10,521 6,079 81,052 9,263 550 45,993 25,525 89 1,216 16,210 1,853 1,100 81,639 61,260 1,216 16,210 1,853 1,100 614,952 189,906 8,883 2,104 255,313 121,578 12,968 24,200 4,242,947 220,536 177,654 63,128 2,389,140 55,134 729,466 486,311 55,578 65,999 5,007,001 273,832 1,929,690 1,225,200 33,183 25,375 425,522 729,466 166,735 197,998 37,109

140/151

Software RAB Exarch xPro v2019

SNI-2007

S-547

SNI-2007

S-548

SNI-2007

S-549

SNI-2007

S-550

SNI-2007

S-551

SNI-2007

S-552

SNI-2007

S-553

SNI-2007

S-554

SNI-2007

S-555

www.mitra-arsitek.com

1.15 0.06 0.06 0.01 0.00 100.00 1.00 0.10 0.10 0.10 0.00 0.01 0.80 1.00 15.00 32.80 0.05 1.05 1.05 0.11 0.05 10.00 0.40 0.30 0.04 0.04 0.02 0.00 0.00 0.17 1.00 4.76 4.52 20.00 0.65 0.65 0.07 0.03 1.00 1.00 1.20 1.20 0.12 0.01 1.00 1.00 0.44 0.44 0.04 0.02 1.00 1.00 0.08 0.80 0.08 0.00 1.00 1.00 1.00 1.00 0.10 0.05 1.00

kg oh oh oh oh kg lte ltr oh oh oh oh Jam m2 kg kg kg oh oh oh oh cm kg ltr ltr oh oh oh oh Jam m2 m1 m1 cm oh oh oh oh m2 m2 oh oh oh oh m2 m2 oh oh oh oh m2 m2 oh oh oh oh m2 m2 oh oh oh oh m1

Besi profil 18,317 Pekerja 7,295 Tukang las 9,726 Kepala tukang 1,112 Mandor 660 Mengerjakan pekerjaan perakitan 92,133 Solar 6,126 Minyak pelumas 3,574 Pekerja 12,158 Tukang besi 16,210 Kepala tukang 185 Mandor 1,100 Sewa alat perakitan baja 52,780 Membuat 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja 877,862 siku Besi siku L 30.30.3 205,221 Besi plat baja 341,586 Kawat las listrik 2,297 Pekerja 127,657 Tukang besi 170,209 Kepala tukang 19,452 Mandor 11,440 Mengerjakan pengelasan dengan las listrik 39,188 Kawat las listrik 18,378 Solar 1,838 Minyak pelumas 1,429 Pekerja 4,863 Tukang besi 3,242 Kepala tukang 371 Mandor 440 Sewa alat las 8,628 Membuat rangka jendela besi square tube (25 x 5) cm 631,917 Besi square tube 128,789 Besi lis kaca (1 x 1) cm 207,763 Pengelasan 91,890 Pekerja 79,026 Tukang besi 105,367 Kepala tukang 12,042 Mandor 7,040 Memasang pintu rolling door besi 925,519 Pintu gulung besi 561,550 Pekerja 145,893 Tukang besi 194,524 Kepala tukang 22,231 Mandor 1,320 Memasang pintu lipat (Folding door) 648,311 Pintu lipat 510,500 Pekerja 53,494 Tukang besi 71,326 Kepala tukang 8,151 Mandor 4,840 Memasang sunscreen alluminium 410,360 Sunscreen alumunium 255,250 Pekerja 9,726 Tukang besi 129,683 Kepala tukang 14,821 Mandor 880 Memasang rolling door alluminium 844,127 Rolling door alluminium 530,920 Pekerja 121,578 Tukang besi 162,104 Kepala tukang 18,526 Mandor 11,000 Memasang kusen pintu alluminium 162,094

141/151

Software RAB Exarch xPro v2019

SNI-2007

S-556

SNI-2007

S-557

SNI-2007

S-558

SNI-2007

S-559

SNI-2007

S-560

SNI-2002

S-561

SNI-2007

S-562

SNI-2007

S-563

www.mitra-arsitek.com

1.10 2.00 0.06 0.04 0.04 0.00 0.00 1.00 4.40 14.60 0.09 0.09 0.01 0.00 1.00 4.40 4.50 0.27 0.09 0.09 0.01 0.01 1.00 1.00 0.35 0.35 0.04 0.02 1.00 6.18 27.08 1.67 1.67 0.17 0.08 1.00 1.10 11.11 1.72 0.10 0.10 0.01 0.01 1.00 1.10 0.02 0.00 0.10 0.10 0.01 0.00 1.00 1.10 10.00 7.00 0.20 0.20 0.02 0.00 1.00 1.05 0.01 0.50

m1 bh Tube oh oh oh oh m2 m1 m1 oh oh oh oh m2 m1 m1 tube oh oh oh oh m2 m2 oh oh oh oh m2 kg cm oh oh oh oh m2 m2 cm kg oh oh oh oh m2 m2 kg m3 oh oh oh oh m2 m2 bh m1 oh oh oh oh m1 m kg kg

Profil kusen alluminium 134,772 Sekrup fixer 511 Sealant 13,355 Pekerja 5,228 Tukang besi konstruksi 6,970 Kepala tukang 797 Mandor 462 Memasang pintu alluminium strip lebar 8 cm 947,309 Profil kusen alluminium 539,088 Aluminium strip 381,609 Pekerja 10,334 Tukang besi konstruksi 13,779 Kepala tukang 1,575 Mandor 924 Memasang pintu kaca rangka alluminium 2,407,199 Pintu alluminium 2,021,580 Profil kaca 298,643 Sealant 60,096 Pekerja 10,334 Tukang besi 13,779 Kepala tukang 1,667 Mandor 1,100 Memasang venetions blinds dan Vertical blinds 186,308 Venetions blinds dan vertical blinds (tirai) 76,575 Pekerja 42,552 Tukang besi 56,736 Kepala tukang 6,484 Mandor 3,960 Memasang terali besi strip (2 x 3) mm 726,199 Baja strip (0,2 x 2) cm 78,834 Pengelasan 124,419 Pekerja 203,035 Tukang besi 270,713 Kepala tukang 30,939 Mandor 18,260 Memasang kawat nyamuk dengan plepet baja strip 117,743 Kawat nyamuk 13,477 Pengelasan 51,045 Baja strip (0,2 x 2) cm 21,900 Pekerja 12,158 Tukang besi 16,210 Kepala tukang 1,853 Mandor 1,100 Pasang kawat nyamuk dengan plepet kayu 55,728 Kawat nyamuk 13,477 Paku Biasa ½" - 1" 480 Kayu kamper papan 11,440 Pekerja 12,158 Tukang kayu 16,210 Kepala Tukang 1,853 Mandor 110 Memasang jendela nako & tralis 216,874 Jendela nako (rangka + kaca 5 mm) 61,771 Paku skrup 1 cm – 2,5 cm 5,105 Baja strip (0,2 x 2) cm 89,338 Pekerja 24,316 Tukang besi 32,421 Kepala tukang 3,705 Mandor 220 Memasang talang 1/2 lingkaran D-15 cm, seng plat bjls 30 lebar 45 134,409 cm Seng Gelombang 3" x 6" BJLS 28 53,603 Paku Biasa ½" - 1" 240 Baja strip (0,2 x 2) cm 6,381

142/151

Software RAB Exarch xPro v2019

SNI-2002

S-564

SNI-2002

S-565

SNI-2002

S-566

SNI-2002

S-567

SNI-2002

S-568

SNI-2002

S-569

SNI-2002

S-570

www.mitra-arsitek.com

0.15 0.30 0.03 0.01 1.00 0.50 0.02 0.01 0.25 0.15 0.40 0.03 0.00 1.00 0.50 0.02 0.01 0.25 0.15 0.40 0.03 0.00 1.00 0.50 0.02 0.01 0.25 0.15 0.40 0.03 0.00 1.00 0.50 0.02 0.01 0.25 0.15 0.40 0.03 0.00 1.00 0.50 0.02 0.01 0.25 0.15 0.40 0.03 0.00 1.00 0.50 0.02 0.02 0.30 0.04 0.40 0.03 0.00 1.00 0.50 0.02 0.02 0.25

oh oh oh oh m1 lbr kg m3 kg oh oh oh oh m1 lbr kg m3 kg oh oh oh oh m1 lbr kg m3 kg oh oh oh oh m1 lbr kg m3 kg oh oh oh oh m1 lbr kg m3 kg oh oh oh oh m1 lbr kg m3 kg oh oh oh oh m1 lbr kg m3 kg

Pekerja Tukang besi Kepala tukang Mandor Pasang talang datar, seng BJLS 28, papan kayu jati Seng Gelombang 3" x 6" BJLS 28 Paku Biasa ½" - 1" Kayu jati papan Flincoat Pekerja Tukang kayu Kepala Tukang Mandor Pasang talang datar, seng BJLS 28, papan kayu jati (lokal) Seng Gelombang 3" x 6" BJLS 28 Paku Biasa ½" - 1" Kayu jati (lokal) papan Flincoat Pekerja Tukang kayu Kepala Tukang Mandor Pasang talang datar, seng BJLS 28, papan kayu kamper Seng Gelombang 3" x 6" BJLS 28 Paku Biasa ½" - 1" Kayu kamper papan Flincoat Pekerja Tukang kayu Kepala Tukang Mandor Pasang talang datar, seng BJLS 28, papan kayu kruing Seng Gelombang 3" x 6" BJLS 28 Paku Biasa ½" - 1" Kayu kruing papan Flincoat Pekerja Tukang kayu Kepala Tukang Mandor Pasang talang datar, seng BJLS 28, papan kayu bengkirai Seng Gelombang 3" x 6" BJLS 28 Paku Biasa ½" - 1" Kayu bengkirai papan Flincoat Pekerja Tukang kayu Kepala Tukang Mandor Pasang talang miring, seng BJLS 28 papan kayu jati (klas 1) Seng Gelombang 3" x 6" BJLS 28 Paku Biasa ½" - 1" Kayu jati papan (klas 1) Flincoat Pekerja Tukang kayu Kepala Tukang Mandor Pasang talang miring, seng BJLS 28, papan kayu jati (lokal) Seng Gelombang 3" x 6" BJLS 28 Paku Biasa ½" - 1" Kayu jati (lokal) papan Flincoat

18,237 48,631 5,558 1,760 216,429 25,525 360 93,115 9,444 18,237 64,841 4,632 275 216,429 25,525 360 93,115 9,444 18,237 64,841 4,632 275 184,329 25,525 360 61,015 9,444 18,237 64,841 4,632 275 167,421 25,525 360 44,107 9,444 18,237 64,841 4,632 275 184,574 25,525 360 61,260 9,444 18,237 64,841 4,632 275 327,158 25,525 360 215,329 11,333 4,863 64,841 4,632 275 294,231 25,525 360 184,291 9,444

143/151

Software RAB Exarch xPro v2019

SNI-2002

S-571

SNI-2002

S-572

SNI-2002

S-573

AK-SNI 2008

S-574

SNI-2002

S-575

SNI-2002

S-576

SNI-2002

S-577

SNI-2002

S-578

www.mitra-arsitek.com

0.04 0.40 0.03 0.00 1.00 0.50 0.02 0.02 0.25 0.04 0.40 0.03 0.00 1.00 0.50 0.02 0.02 0.25 0.04 0.40 0.03 0.00 1.00 0.50 0.02 0.02 0.25 0.04 0.40 0.03 0.00 1.00 10.00 225.00 2.25 3.75 0.38 0.11 1.00 1.00 1.05 1.05 0.11 0.01 1.00 1.00 1.02 1.20 0.12 0.01 1.00 1.00 1.05 1.05 0.11 0.01 1.00 1.10 0.02 0.00 0.10 0.10 0.01

oh oh oh oh m1 lbr kg m3 kg oh oh oh oh m1 lbr kg m3 kg oh oh oh oh m1 lbr kg m3 kg oh oh oh oh m1 m1 bh oh oh oh oh m2 m2 oh oh oh oh m2 m2 oh oh oh oh m2 m2 oh oh oh oh m2 m2 kg m3 oh oh oh

Pekerja Tukang kayu Kepala Tukang Mandor Pasang talang miring, seng BJLS 28, papan kayu kamper Seng Gelombang 3" x 6" BJLS 28 Paku Biasa ½" - 1" Kayu kamper papan Flincoat Pekerja Tukang kayu Kepala Tukang Mandor Pasang talang miring, seng BJLS 28, papan kayu kruing Seng Gelombang 3" x 6" BJLS 28 Paku Biasa ½" - 1" Kayu kruing papan Flincoat Pekerja Tukang kayu Kepala Tukang Mandor Pasang talang miring, seng BJLS 28, papan kayu bengkirai Seng Gelombang 3" x 6" BJLS 28 Paku Biasa ½" - 1" Kayu bengkirai papan Flincoat Pekerja Tukang kayu Kepala Tukang Mandor Pasang talang torong Seng Gelombang 3" x 6" BJLS 28 Paku sumbat Pekerja Tukang besi Kepala Tukang Mandor Pasang jendela besi Jendela besi Pekerja Tukang besi konstruksi Kepala Tukang Mandor Pasang jendela besi tahan api Jendela besi Pekerja Tukang besi konstruksi Kepala Tukang Mandor Pasang pintu alumunium Pintu alumunium Pekerja Tukang besi konstruksi Kepala Tukang Mandor Pasang kawat harmonika Kawat harmonika Paku Biasa ½" - 1" Kayu kamper papan Pekerja Tukang kayu Kepala Tukang

4,863 64,841 4,632 275 230,699 25,525 360 120,759 9,444 4,863 64,841 4,632 275 197,236 25,525 360 87,296 9,444 4,863 64,841 4,632 275 231,184 25,525 360 121,244 9,444 4,863 64,841 4,632 275 1,577,501 510,500 91,890 273,550 607,889 69,473 24,200 1,160,798 842,325 127,657 170,209 19,452 1,155 1,184,653 842,325 124,252 194,524 22,231 1,320 534,710 216,248 127,657 170,209 19,452 1,144 89,421 47,170 480 11,440 12,158 16,210 1,853

144/151

Software RAB Exarch xPro v2019

SNI-2002

S-579

SNI-2002

S-580

SNI-2002

S-581

SNI-2002

S-582

SNI-2002

S-583

SNI-2002

S-584

SNI-2002

S-585

SNI-2002

S-586

SNI-2002

S-587

SNI-2002

S-588

www.mitra-arsitek.com

0.00 1.00 1.10 0.02 0.00 0.10 0.10 0.01 0.00 1.00 1.10 0.02 0.00 0.10 0.10 0.01 0.00 1.00 1.00 0.06 0.60 0.06 0.00 1.00 1.00 0.01 0.50 0.01 0.01 1.00 1.00 0.01 0.50 0.01 0.00 1.00 1.00 0.01 0.50 0.01 0.00 1.00 1.00 0.02 0.15 0.02 0.00 1.00 1.00 0.01 0.10 0.01 0.00 1.00 1.00 0.02 0.20 0.02 0.01 1.00 1.00 0.02 0.15

oh m2 m2 kg m3 oh oh oh oh m2 m2 kg m3 oh oh oh oh bh bh oh oh oh oh bh bh oh oh oh oh bh bh oh oh oh oh bh bh oh oh oh oh bh bh oh oh oh oh bh bh oh oh oh oh bh bh oh oh oh oh bh bh oh oh

Mandor Pasang kawat kassa Kawat kassa Paku Biasa ½" - 1" Kayu kamper papan Pekerja Tukang kayu Kepala Tukang Mandor Pasang kawat burung Kawat burung Paku Biasa ½" - 1" Kayu kamper papan Pekerja Tukang kayu Kepala Tukang Mandor Pasang kunci Tanam Antik kunci Tanam Antik Pekerja Tukang kayu Kepala tukang Mandor Pasang kunci Tanam Biasa Kunci tanam biasa Pekerja Tukang kayu Kepala tukang Mandor Pasang kunci Tanam Kamar Mandi Kunci tanam KM Pekerja Tukang kayu Kepala tukang Mandor Pasang kunci Silinder Kunci silinder Pekerja Tukang kayu Kepala tukang Mandor Pasang Engsel Pintu Engsel pintu Pekerja Tukang kayu Kepala tukang Mandor Pasang Engsel Jendela Kupu - kupu Engsel jendela Pekerja Tukang kayu Kepala tukang Mandor Buah Pasang Engsel Angin Engsel angin Pekerja Tukang kayu Kepala tukang Mandor Pasang Spring Knip Spring knip Pekerja Tukang kayu

110 55,728 13,477 480 11,440 12,158 16,210 1,853 110 59,659 17,408 480 11,440 12,158 16,210 1,853 110 371,582 255,250 7,295 97,262 11,116 660 217,950 132,730 1,216 81,052 1,853 1,100 134,186 51,050 608 81,052 926 550 159,216 76,575 608 81,052 926 55 46,440 17,357 1,824 24,316 2,779 165 28,578 9,189 1,216 16,210 1,853 110 48,925 8,168 2,432 32,421 3,705 2,200 36,741 7,658 1,824 24,316

145/151

Software RAB Exarch xPro v2019

SNI-2002

S-589

SNI-2002

S-590

SNI-2002

S-591

SNI-2002

S-592

SNI-2002

S-593

SNI-2002

S-594

SNI-2002

S-595

SNI-2002

S-596

SNI-2002

S-597

SNI-2002

S-598

SNI-2002

S-599

www.mitra-arsitek.com

0.02 0.00 1.00 1.00 0.02 0.15 0.02 0.00 1.00 1.00 0.05 0.50 0.05 0.00 1.00 1.00 0.02 0.20 0.02 0.00 1.00 1.00 0.05 0.50 0.05 0.00 1.00 1.00 0.01 0.10 0.01 0.00 1.00 1.00 0.06 0.60 0.06 0.00 1.00 1.00 0.03 0.25 0.03 0.00 1.00 1.10 0.02 0.15 0.02 0.00 1.00 1.10 0.02 0.15 0.02 0.00 1.00 1.10 0.02 0.17 0.02 0.00 1.00

oh oh bh bh oh oh oh oh bh bh oh oh oh oh bh bh oh oh oh oh bh bh oh oh oh oh bh bh oh oh oh oh bh bh oh oh oh oh bh bh oh oh oh oh m2 m2 oh oh oh oh m2 m2 oh oh oh oh m2 m2 oh oh oh oh m2

Kepala tukang Mandor Pasang Kait angin Kait angin Pekerja Tukang kayu Kepala tukang Mandor Pasang Door Closer Door closer Pekerja Tukang kayu Kepala tukang Mandor Pasang kunci selot Kunci slot Pekerja Tukang kayu Kepala tukang Mandor Pasang pegangan pintu / door holder Door holder Pekerja Tukang kayu Kepala tukang Mandor Pasang door stop Door stop Pekerja Tukang kayu Kepala tukang Mandor Pasang rel pintu dorong Rel pintu dorong Pekerja Tukang kayu Kepala tukang Mandor Pasang kunci lemari Kunci lemari Pekerja Tukang kayu Kepala tukang Mandor Pasang kaca, tebal 3 mm Kaca polos Pekerja Tukang kayu Kepala tukang Mandor Pasang kaca, tebal 5 mm Kaca polos Pekerja Tukang kayu Kepala tukang Mandor Pasang kaca, tebal 8 mm Kaca polos Pekerja Tukang kayu Kepala tukang Mandor Pasang kaca buram, tebal 12 mm

2,779 165 34,699 5,616 1,824 24,316 2,779 165 352,194 255,250 6,079 81,052 9,263 550 89,827 51,050 2,432 32,421 3,705 220 195,981 99,037 6,079 81,052 9,263 550 119,447 100,058 1,216 16,210 1,853 110 320,532 204,200 7,295 97,262 11,116 660 60,724 12,252 3,039 40,526 4,632 275 152,624 123,541 1,824 24,316 2,779 165 152,624 123,541 1,824 24,316 2,779 165 155,527 123,541 2,006 26,747 3,057 176 216,937

146/151

Software RAB Exarch xPro v2019

SNI-2002

S-600

SNI-2002

S-601

SNI-2002

S-602

SNI-2002

S-603

SNI-2002

S-604

1.10 0.03 0.25 0.03 0.00 1.00 1.10 0.02 0.15 0.02 0.00 1.00 0.02 0.15 0.02 0.00 1.00 1.10 0.02 0.17 0.02 0.00 1.00 1.10 0.02 0.15 0.02 0.00 1.00 1.10 0.02 0.15 0.02 0.00

m2 oh oh oh oh m2 m2 oh oh oh oh m2 oh oh oh oh m2 m2 oh oh oh oh m2 m2 oh oh oh oh m2 m2 oh oh oh oh

Kaca buram 12 mm Pekerja Tukang kayu Kepala tukang Mandor Pasang kaca cermin, tebal 5 mm Kaca cermin 5 mm Pekerja Tukang kayu Kepala tukang Mandor Pasang kaca cermin, tebal 6 mm Pekerja Tukang kayu Kepala tukang Mandor Pasang kaca cermin, tebal 8 mm Kaca cermin 5 mm Pekerja Tukang kayu Kepala tukang Mandor Pasang kaca "wireglass", tebal 5 mm Kaca wire glass Pekerja Tukang kayu Kepala tukang Mandor Pasang kaca patri, tebal 5 mm Kaca patri 5mm Pekerja Tukang kayu Kepala tukang Mandor

168,465 3,039 40,526 4,632 275 198,110 169,027 1,824 24,316 2,779 165 29,083 1,824 24,316 2,779 165 201,012 169,027 2,006 26,747 3,057 176 293,012 263,929 1,824 24,316 2,779 165 124,547 95,464 1,824 24,316 2,779 165

DAFTAR ANALISA TAMBAHAN Analisa Harga Satuan Pekerjaan Sesuai Acuan Berdasarkan Data Empiris/Data Pelaksanaan Di Lapangan

STANDAR

ID

AK-I.2016.(1)

A-001

Koef.

2.00 2.00 2.00 AK-I.2016.(2)

A-002 1.00 0.40 0.50 0.80 0.10

AK-I.2016.(3)

A-003 1.00 0.40 0.50 0.80 0.10

AK-I.2016.(4)

A-004 1.00 0.40

www.mitra-arsitek.com

Unit Ls oh/Ls Ls Ls unit set Ls Oh Oh Oh unit set Ls Oh Oh Oh unit set Ls

Uraian Pekerjaan Mobilisasi dan demobilisasi Upah Kerja Mobiliasasi/Demobilisasi Alat Kerja Mobilisasi/Demobilisasi Bahan Kerja Mobilisasi/Demobilisasi Pekerjaan Pasangan Pintu utama type P1 Pintu Utama (Kusen+Panel) Type P1 Perlengkapan Pekerja Tukang Kayu Mandor Pekerjaan Pasangan Pintu Ruangan type P2 Pintu Utama (Kusen+Panel) Type P2 Perlengkapan Pekerja Tukang Kayu Mandor Pekerjaan Pasangan Pintu WC type P3 Pintu Utama (Kusen+Panel) Type P3 Perlengkapan

Harga 3,241,100 1,821,600 913,500 506,000 2,458,072 2,144,100 101,500 60,789 129,683 22,000 1,947,572 1,633,600 101,500 60,789 129,683 22,000 1,437,072 1,123,100 101,500

147/151

Software RAB Exarch xPro v2019

0.50 0.80 0.10 AK-I.2016.(5)

A-005 1.00 0.20 0.30 0.60 0.05

AK-I.2016.(6)

A-006 1.00 0.40 0.50 0.80 0.07

AK-I.2016.(7)

A-007 1.00 0.80 0.70 0.90 0.10

AK-I.2016.(8)

A-008 1.00 0.01 0.01 0.05 0.01

AK-I.2016.(9)

A-009 1.00 0.10 0.20 0.10 0.03

AK-I.2016.(10) A-010 1.00 0.60 0.50 0.25 0.03 AK-I.2016.(11) A-011 1.00 0.40 0.40 0.20 0.02 AK-I.2016.(12) A-012 1.00 1.00 1.00 AK-I.2016.(13) A-013 1.00 1.00 1.00 AK-I.2016.(14) A-014 1.00 0.40 0.40 0.20 0.02 AK-I.2016.(15) A-015 1.00 0.40 0.40

www.mitra-arsitek.com

Oh Oh Oh unit set Ls Oh Oh Oh unit set Ls Oh Oh Oh unit set Ls Oh Oh Oh unit Unit Ls Oh Oh Oh unit Unit Ls Oh Oh Oh unit Unit Ls Oh Oh Oh unit Unit Ls Oh Oh Oh m3 oh/m3 Ls Ls m3 oh/m3 Ls Ls Unit Unit Ls Oh Oh Oh btg btg Ls Oh

Pekerja Tukang Kayu Mandor Pekerjaan Pasangan Jendela type J1 Jendela Type J1 Perlengkapan Pekerja Tukang Kayu Mandor Pekerjaan Pasangan Jendela type J2 Jendela Type J2 Perlengkapan Pekerja Tukang Kayu Mandor Pekerjaan Pasangan Jendela type J3 Jendela Type J3 Perlengkapan Pekerja Tukang Kayu Mandor Pekerjaan Pasangan Lubang Angin/Roster Lubang Angin Perlengkapan Pekerja Tukang Batu Mandor Pekerjaan Pasangan Shower Mandi Shower Mandi Perlengkapan Pekerja Tukang Pipa Mandor Pekerjaan Pasangan Tangki Air Tangki Air Perlengkapan Pekerja Tukang Pipa Mandor Pekerjaan Pasangan Pompa Air Pompa Air Perlengkapan Pekerja Tukang Pipa Mandor Pekerjaan Septik Tank Volume 1 m3 Upah Kerja Pembuatan Septik Tank Alat Kerja Pembuatan Septik Tank Bahan Kerja Pembuatan Septik Tank Pekerjaan Sumur Resapan Air Hujan/Limbah Volume 1 m3 Upah Kerja Pembuatan Sumur Resapan Limbah Alat Kerja Pembuatan Sumur Resapan Limbah Bahan Kerja Pembuatan Sumur Resapan Limbah Pekerjaan Pasangan Box MCB MCB + Box Perlengkapan Pekerja Tukang Listrik Mandor Pekerjaan Pasangan Pembumian (Grounding) Tembaga dia.1/2"-1.5m Perlengkapan Pekerja

60,789 129,683 22,000 1,196,065 1,000,580 50,750 36,473 97,262 11,000 919,972 612,600 101,500 60,789 129,683 15,400 3,008,497 2,552,500 203,000 85,104 145,893 22,000 40,094 26,036 2,538 1,216 8,105 2,200 209,236 137,835 25,375 24,316 16,210 5,500 1,535,315 1,276,250 152,250 60,789 40,526 5,500 799,552 612,600 101,500 48,631 32,421 4,400 8,611,250 1,518,000 456,750 6,636,500 6,062,950 1,113,200 355,250 4,594,500 544,302 357,350 101,500 48,631 32,421 4,400 850,602 663,650 101,500 48,631

148/151

Software RAB Exarch xPro v2019

0.20 0.02 AK-I.2016.(16) A-016 1.10 0.02 0.02 0.01 0.00 AK-I.2016.(17) A-017 1.10 0.01 0.02 0.01 0.00 AK-I.2016.(18) A-018 1.00 0.02 0.04 0.02 0.00 AK-I.2016.(19) A-019 1.00 0.02 0.04 0.02 0.00 AK-I.2016.(20) A-020 1.00 0.01 0.04 0.01 0.00 AK-I.2016.(21) A-021 1.00 0.01 0.04 0.01 0.00 AK-I.2016.(22) A-022 1.00 0.01 0.04 0.01 0.00 AK-I.2016.(23) A-023 1.00 0.03 0.04 0.02 0.00 AK-I.2016.(24) A-024 1.00 0.03 0.04 0.02 0.00 AK-I.2016.(25) A-025 1.00 0.03 0.04 0.02 0.00 AK-I.2016.(26) A-026

www.mitra-arsitek.com

Oh Oh m1 m1 Ls Oh Oh Oh m1 m1 Ls Oh Oh Oh Unit unit Ls Oh Oh Oh unit unit Ls Oh Oh Oh unit unit Ls Oh Oh Oh unit unit Ls Oh Oh Oh unit unit Ls Oh Oh Oh unit unit Ls Oh Oh Oh unit unit Ls Oh Oh Oh unit unit Ls Oh Oh Oh Ls

Tukang Listrik Mandor Pekerjaan Instalasi Kabel NYM-3x2.5m2 Kabel NYM 3x2,5 mm2-SNI Perlengkapan Pekerja Tukang Listrik Mandor Pekerjaan Instalasi Kabel NYM 2x1,5 mm2 Kabel NYM 2x1,5 mm2-SNI Perlengkapan Pekerja Tukang Listrik Mandor Pekerjaan Pasangan Fitting Lampu Fitting Lampu Perlengkapan Pekerja Tukang Listrik Mandor Pekerjaan Pasangan Saklar Lampu Saklar Listrik Perlengkapan Pekerja Tukang Listrik Mandor Pekerjaan Pasangan Lampu 5 W Lampu 5W Perlengkapan Pekerja Tukang Listrik Mandor Pekerjaan Pasangan Lampu 15 W Lampu 15W Perlengkapan Pekerja Tukang Listrik Mandor Pekerjaan Pasangan Lampu 20 W Lampu 20W Perlengkapan Pekerja Tukang Listrik Mandor Pekerjaan Pasangan Colokan Listrik (Receiptackle) Receiptackle Perlengkapan Pekerja Tukang Listrik Mandor Pekerjaan Pasangan Air Conditioner Air Conditioner Perlengkapan Pekerja Tukang Listrik Mandor Pekerjaan Pasangan Exhaust Fan Exhaust Fan Perlengkapan Pekerja Tukang Listrik Mandor Penyambungan Instalasi Listrik PLN

32,421 4,400 21,776 13,477 3,806 2,432 1,621 440 18,261 11,231 2,538 2,432 1,621 440 39,145 25,525 5,075 4,863 3,242 440 40,160 25,525 6,090 4,863 3,242 440 33,746 24,504 2,538 4,863 1,621 220 44,977 35,735 2,538 4,863 1,621 220 55,187 45,945 2,538 4,863 1,621 220 45,762 30,630 6,344 5,106 3,242 440 3,282,332 3,267,200 6,344 5,106 3,242 440 780,882 765,750 6,344 5,106 3,242 440 5,615,500

149/151

Software RAB Exarch xPro v2019

1.00

1.00 0.04 0.20 0.30 0.01 0.01 1.00 0.10 0.02 0.01

Ls Ls Ls m2 kg Lbr oh oh oh oh m2 kg Lbr ea oh oh oh oh pohon unit Ls oh oh oh oh m2 OH OH OH

1.00 1.00 1.00 1.00 1.00 1.00 1.00

Ls unit unit unit Oh Oh Sewa/hari Sewa/hari

"Tulis Judul Analisa Harga Satuan + Spesifikasinya" "Tulis Nama Bahan 1" "Tulis Nama Bahan 2" "Tulis Nama Bahan 2" "Tulis Jenis Pekerja 1" "Tulis Jenis Pekerja 2" "Tulis Nama Alat" "Tulis Nama Alat"

Ls

"Tulis Judul Analisa Harga Satuan + Spesifikasinya"

AK-I.2016.(27) A-027 1.00 AK-I.2016.(28) A-028 0.10 0.50 0.02 0.07 0.01 0.01 AK-I.2016.(29) A-029 0.10 0.50 0.01 0.02 0.07 0.01 0.01 AK-I.2016.(30) A-030

A.2.2.1.9.a

A-031

AHS.Contoh

X-001

AHS.Contoh

Y-001

www.mitra-arsitek.com

Biaya Pengurusan Daya Listrik PLN Penyambungan Instalasi Air PDAM Biaya Pengurusan Instalasai PDAM Pekerjaan Pekerjaan Plamir (1 Lapis) Plamir Amplas Pekerja Tukang Cat Kepala Tukang Mandor Pekerjaan Cat Anti Lumut dan Waterproofing Cat Anti Bocor+Waterproofing Amplas Rol Cat Pekerja Tukang Cat Kepala Tukang Mandor Pekerjaan Menanam Pohon Perdu Pohon Perdu Perlengkapan Pekerja Tukang Batu Kepala Tukang Mandor Pembersihan Area Kerja Pasca Konstruksi Pekerja Kepala Tukang Mandor

5,615,500 2,552,500 2,552,500 26,898 5,748 3,318 2,432 11,347 1,853 2,200 23,139 1,736 3,318 254 2,432 11,347 1,853 2,200 597,649 510,500 10,150 24,316 48,631 1,853 2,200 18,063 12,158 3,705 2,200

XXX XXX XXX XXX XXX XXX XXX

-

150/151

Software RAB Exarch xPro v2019

1.00 1.00

www.mitra-arsitek.com

unit unit

"Tulis Nama Bahan 1" "Tulis Nama Bahan 2"

XXX XXX

151/151

Software RAB Exarch xPro v2019

REKAP DAFTAR AHSP SNI-PU & AK

No

Kode AHS

Uraian Analisa Pekerjaan

10% Biaya Satuan Biaya AHSP AHSP+PPN/P rofit

Standar Analisa

DAFTAR ANALISA UTAMA Analisa Harga Satuan Pekerjaan Sesuai Acuan PUPERA 2016 Bidang IV Cipta Karya

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

P-000 P-001 P-002 P-003 P-004 P-005 P-006 P-007 P-008 P-009 P-010 P-011 P-012 P-013 P-014 P-015 P-016

A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN Analisa Kosongan/Pengecekan (K3) Pembuatan pagar sementara dari kayu tinggi 2 meter (K3) Pembuatan pagar sementara dari seng gelombang tinggi 2 meter Pembuatan pagar sementara dari kawat duri tinggi 1,8 meter Pengukuran dan pemasangan Bouwplank (K3) Pembuatan kantor sementara lantai plesteran (K3) Pembuatan rumah jaga (konstruksi kayu ) (K3) Pembuatan gudang semen dan (K3) Pembuatan bedeng pekerja (K3) Pembersihan lapangan dan perataan (K3) Pembuatan steger/perancah dari bambu Pembuatan kotak adukan ukuran 40cm x50cm x25cm Pembuatan jalan sementara Pembongkaran beton bertulang Pembongkaran dinding tembok bata Pemasangan pagar kawat jaring galvanis panjang 240 cm Pemasangan panel beton pracetak 5x50x240 cm

Ls m2 m2 m2 m1 m2 m2 m2 m2 m2 m2 m2 m2 m2 m3 m2 m2

18 19 20 21 22 23 24 25 26 27 28 29 30 31

P-017 P-018 P-019 P-020 P-021 P-022 P-023 P-024 P-025 P-026 P-027 P-028 P-029 P-030

A.2.3.1 HARGA SATUAN PEKERJAAN TANAH Penggalian tanah biasa sedalam 1 m Penggalian tanah biasa sedalam 2 m Menggali tanah biasa sedalam 3 m Menggali tanah keras sedalam 1 m Menggali tanah cadas sedalam 1 m Menggali tanah lumpur sedalam 1 m Pengerjaan stripping tanah tebing setinggi 1 meter (K3) Pembuangan tanah sejauh 30 meter Pengurugan kembali galian tanah Tanah Biasa Sedalam 1 M (K3) Pemadatan tanah tanah ( per 20 cm) Pengurugan dengan pasir urug Pemasangan lapisan pudel campuran 1KP:3PP:7TL Pemasangan lapisan ijuk tebal 10 cm untuk bidang resapan Pengurugan sirtu padat

m3 m3 m3 m3 m3 m3 m2 m3 m3 m3 m3 m3 m3 m3

32 33 34 35 36 37 38 39 40 41 42

P-031 P-032 P-033 P-034 P-035 P-036 P-037 P-038 P-039 P-040 P-041

A.3.2.2 HARGA SATUAN PEKERJAAN PONDASI Pemasangan pondasi batu belah campuran 1SP : 3PP m3 Pemasangan pondasi batu belah campuran 1SP : 4PP m3 Pemasangan pondasi batu belah campuran 1SP : 5PP m3 Pemasangan pondasi batu belah campuran 1SP : 6PP m3 Pemasangan pondasi batu belah campuran 1SP : 8PP m3 Pemasangan pondasi batu belah campuran 1SP : 1KP : 2PP m3 Pemasangan pondasi batu belah campuran 1 SP : 3 KP : 10 PP m3 Pemasangan pondasi batu belah campuran ¼ SP : 1 KP : 4PP m3 Pemasangan batu kosong (anstamping) m3 (K3) Pemasangan pondasi siklop, 60% beton campuran 1SP : 2 PB : 3 Kr dan 40% batu belah m3 Pemasangan pondasi sumuran, diameter 100 cm m3

43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63

P-042 P-043 P-044 P-045 P-046 P-047 P-048 P-049 P-050 P-051 P-052 P-053 P-054 P-055 P-056 P-057 P-058 P-059 P-060 P-061 P-062

A.4.1.1 HARGA SATUAN PEKERJAAN BETON Membuat beton mutu f’c = 7,4 MPa (K 100) Membuat beton mutu f’= 9,8 MPa (K 125) Membuat beton mutu f’= 12,2 MPa (K 150) Membuat lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87 Membuat beton mutu f’ = 14,5 MPa (K 175), slump (12 ±2) cm, w/c = 0,66 Membuat beton mutu f’= 16,9 MPa (K 200), slump (120 ± 20) mm, w/c = 0,61 Membuat beton mutu f’ = 19,3 MPa (K 225), slump (120 ± 20) mm, w/c = 0,58 Membuat beton mutu f’= 21,7 MPa (K 250), slump (120 ± 20) mm, w/c = 0,56 Membuat beton mutu f’ = 24,0 MPa (K 275), slump (120 ± 20) mm, w/c = 0,53 Membuat beton mutu f’c = 26,4 MPa (K 300), slump (120 ± 20) mm, w/c = 0,52 Membuat beton mutu f’c = 28,8 MPa (K 325), slump (120 ± 20) mm, w/c = 0,49 Membuat beton mutu f’c = 31,2 MPa (K 350), slump (120 ± 20) mm, w/c = 0,48 Membuat beton kedap air dengan strorox - 100 Pemasangan PVC Waterstop lebar 150 mm Pemasangan PVC Waterstop lebar 200 mm Membuat PVC Waterstop lebar 230 mm - 320 mm Pembesian dengan besi polos atau besi ulir Pemasangan kabel presstressed polos/strands Pemasangan jaring kawat baja (wiremesh) (K3) Pemasangan bekisting untuk pondasi (K3) Pemasangan bekisting untuk sloof

www.mitra-arsitek.com

m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m1 m1 m1 kg kg kg m2 m2

292,278 368,254 1,513,304 83,800 1,466,648 1,475,062 1,357,828 1,366,583 23,158 521,253 193,147 199,060 308,630 154,315 31,470 452,054

96,683 119,320 142,396 128,618 195,566 155,793 7,179 42,321 35,894 71,789 329,046 450,871 1,307,997 328,717

1,072,377 1,022,005 987,083 962,532 928,880 1,055,848 918,163 889,302 615,320 2,624,601 1,080,377

1,129,842 1,164,301 1,191,715 1,033,256 1,223,570 1,254,966 1,277,122 1,293,611 1,322,148 1,330,979 1,437,371 1,449,010 1,319,465 96,993 102,229 119,676 13,820 13,073 13,811 197,201 206,390

321,506 405,080 1,664,634 92,180 1,613,312 1,622,568 1,493,610 1,503,241 25,473 573,379 212,462 218,966 339,493 169,747 34,617 497,260

106,352 131,252 156,636 141,479 215,123 171,372 7,897 46,553 39,484 78,968 361,950 495,958 1,438,796 361,589

1,179,615 1,124,205 1,085,791 1,058,785 1,021,768 1,161,433 1,009,979 978,232 676,852 2,887,061 1,188,415

1,242,827 1,280,731 1,310,886 1,136,581 1,345,927 1,380,462 1,404,834 1,422,972 1,454,362 1,464,077 1,581,108 1,593,911 1,451,412 106,693 112,452 131,644 15,202 14,381 15,193 216,921 227,029

Cek Only A.2.2.1.1. A.2.2.1.2 A.2.2.1.3. A.2.2.1.4. A.2.2.1.5. A.2.2.1.6. A.2.2.1.7. A.2.2.1.8. A.2.2.1.9. A.2.2.1.10. A.2.2.1.11. A.2.2.1.12. A.2.2.1.13. A.2.2.1.14. A.2.2.1.15. A.2.2.1.16.

A.2.3.1.1. A.2.3.1.2. A.2.3.1.3. A.2.3.1.4. A.2.3.1.5. A.2.3.1.6. A.2.3.1.7. A.2.3.1.8. A.2.3.1.9. A.2.3.1.10. A.2.3.1.11. A.2.3.1.12. A.2.3.1.13. A.2.3.1.14.

A.3.2.1.1. A.3.2.1.2. A.3.2.1.3. A.3.2.1.4. A.3.2.1.5. A.3.2.1.6. A.3.2.1.7. A.3.2.1.8. A.3.2.1.9. A.3.2.1.10. A.3.2.1.11.

A.4.1.1.1 A.4.1.1.2 A.4.1.1.3 A.4.1.1.4 A.4.1.1.5. A.4.1.1.6 A.4.1.1.7. A.4.1.1.8. A.4.1.1.9. A.4.1.1.10. A.4.1.1.11. A.4.1.1.12. A.4.1.1.13 A.4.1.1.14 A.4.1.1.15 A.4.1.1.16 A.4.1.1.17 A.4.1.1.18 A.4.1.1.19 A.4.1.1.20 A.4.1.1.21

1/17

Software RAB Exarch xPro v2019

64 65 66 67 68 69 70 71 72 73 74 75 76 77 78

P-063 P-064 P-065 P-066 P-067 P-068 P-069 P-070 P-071 P-072 P-073 P-074 P-075 P-076 P-077

(K3) Pemasangan bekisting untuk kolom (K3) Pemasangan bekisting untuk balok (K3) Pemasangan bekisting untuk lantai (K3) Pemasangan bekisting untuk dinding (K3) Pemasangan bekisting untuk tangga Pemasangan jembatan untuk pengecoran beton Membuat pondasi beton bertulang (150 kg besi + bekisting) Membuat sloof beton bertulang (200 kg besi + bekisting) Membuat kolom beton bertulang (300 kg besi + bekisting) Membuat balok beton bertulang (200 kg besi + bekisting) Membuat kolom beton bertulang (150 kg besi + bekisting) Membuat dinding beton bertulang (150 kg besi + bekisting) Membuat dinding beton bertulang (200 kg besi + bekisting) Membuat kolom praktis beton bertulang (11 x 11) cm Membuat ring balok beton bertulang (10 x 15) cm

404,578 416,034 494,426 446,014 384,039 134,133 4,596,347 5,564,457 8,957,943 7,034,314 6,395,491 5,550,311 6,561,153 108,336 137,026

A.4.1.1.22

79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102

P-078 P-079 P-080 P-081 P-082 P-083 P-084 P-085 P-086 P-087 P-088 P-089 P-090 P-091 P-092 P-093 P-094 P-095 P-096 P-097 P-098 P-099 P-100 P-101

A.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK (K3) Pembuatan lahan produksi tebal 8cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) mmm2 (K3) Pembuatan lahan produksi tebal 10 cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) mm m2 (K3) Pembuatan lahan produksi tebal 12 cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) mm m2 (K3) Pembuatan lahan produksi tebal 15 cm beton f’c 14,5 Mpa (K 175) slump (120 ± 20) mm m2 Pembuatan bekisting untuk plat beton pracetak ( 5 kali pakai) m2 Pembuatan bekisting untuk balok beton pracetak ( 10-12 kali pakai) m2 Pembuatan bekisting untuk kolom beton pracetak (10-12 kali pakai) m2 Pemasangan dan membuka bekisting komponen plat beton pracetak bh Pemasangan dan membuka bekisting komponen balok beton pracetak bh Pemasangan dan membuka bekisting komponen Kolom beton pracetak bh Penuangan/menebar beton untuk komponen plat pracetak bh Penuangan/menebar beton untuk komponen balok pracetak bh Penuangan/menebar beton untuk komponen kolom pracetak bh Ereksi komponen untuk pelat pracetak bh Ereksi komponen untuk balok pracetak bh Ereksi komponen untuk Kolom pracetak bh Melangsir komponen plat pracetak ( ± 20 m) bh Melangsir komponen balok pracetak ( ± 20 m) bh Melangsir komponen kolom pracetak ( ± 20 m) bh Grouting campuran m3 Grouting tidak campuran m3 Upah melakukan grouting pada join pracetak titik Pemasangan Bekisting join pracetak titik Upah Join dengan Sling titik

A.4.1.2.1.

100,493

107,712 134,650 150,048 202,004 314,185 39,935 38,110 11,508 18,462 14,985 99,486 102,193 92,284 623,598 603,163 1,071,718 53,559 53,559 53,559 4,197,586 3,571,458 89,475 115,952 110,542

103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126

P-102 P-103 P-104 P-105 P-106 P-107 P-108 P-109 P-110 P-111 P-112 P-113 P-114 P-115 P-116 P-117 P-118 P-119 P-120 P-121 P-122 P-123 P-124 P-125

A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM Pemasangan besi profil titik 37,109 Pemasangan rangka kuda-kuda baja IWF kg 27,951 Pengerjaan pekerjaan perakitan kg 921 Pembuatan pintu besi plat baja tebal 2 mm rangkap, rangka baja siku m2 877,862 Pengerjaan pengelasan dengan las listrik m1 391,884 Pembuatan rangka jendela besi scuare tube (25 x 5) cm m2 631,917 Pemasangan pintu rolling door besi m2 925,519 Pemasangan pintu lipat (folding door) plastik/PVC m2 648,311 Pemasangan sunscreen alluminium m2 410,360 Pemasangan rolling door alluminium m2 844,127 Pemasangan kusen pintu alluminium m1 41,024 Pemasangan pintu alluminium strip lebar 8 cm m2 463,028 Pemasangan pintu kaca rangka alluminium m2 2,407,199 Pemasangan venetions blinds dan Vertical blinds m2 186,308 Pemasangan terali besi strip (2 x 3) mm m2 726,199 Pemasangan kawat nyamuk m2 117,743 Pemasangan jendela nako & tralis m2 219,427 Pemasangan talang datar/ jurai seng bjls 28 lebar 90 cm m1 182,543 Pemasangan talang ½ lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm m1 134,425 Pemasangan rangka besi hollow 1x40.40.2mm, modul 60 x 120 cm, dinding partisi m2 274,517 Pemasangan rangka besi hollow 1x40.40.2mm, modul 60 x 60 cm, plafon m2 310,943 (K3) Pemasangan atap pelana rangka atap baja canai dingin profil C75 m2 345,852 (K3) Pemasangan atap jurai rangka atap baja canai dingin profil C75 m2 337,587 Pemasangan PASANG KUDA-KUDA BAJA RINGAN + RENG UNTUK ATAP GENTENGm2 BIASA/METAL 279,412

40,820 30,746 1,013 965,648 431,072 695,109 1,018,071 713,142 451,396 928,540 45,126 509,331 2,647,919 204,938 798,819 129,518 241,370 200,798 147,867 301,969 342,037 380,437 371,346 307,354

127 128 129 130 131 132 133 134 135 136 137 138 139 140

P-126 P-127 P-128 P-129 P-130 P-131 P-132 P-133 P-134 P-135 P-136 P-137 P-138 P-139

A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 2 PP Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 3 PP Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 4 PP Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 SP : 5 PP Pemasangan Dinding Bata Merah (5x11x22) cm tebal 1 batu campuran 1 SP : 6 PP Pemasangan dinding bata merah (5x11x22) cm tebal 1 batu campuran 1SP : 3KP : 10PP Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 2PP Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP : 3PP Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SP :4PP Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran 1 SP : 5 PP Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran 1 SP : 6 PP Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 8 PP Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SP : 3KP :10PP Pemasangan dinding bata merah (5x11x22)cm tebal ½ batu campuran 1SM : 1KP :1PP

www.mitra-arsitek.com

m2 m2 m2 m2 m2 m2 m3 m3 m3 m3 m3 m3 m3 m1 m1

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

367,798 378,212 449,478 405,467 349,127 121,939 4,178,497 5,058,598 8,143,585 6,394,831 5,814,083 5,045,737 5,964,684 98,488 124,569

97,920 122,409 136,407 183,640 285,623 36,305 34,646 10,461 16,784 13,622 90,442 92,903 83,894 566,907 548,330 974,289 48,690 48,690 48,690 3,815,988 3,246,780 81,341 105,411

325,552 312,248 303,194 298,648 297,379 288,631 158,210 151,850 148,233 145,959 144,788 142,304 144,757 132,482

358,108 343,473 333,514 328,513 327,117 317,495 174,031 167,035 163,056 160,555 159,266 156,534 159,232 145,730

A.4.1.1.23 A.4.1.1.24 A.4.1.1.25 A.4.1.1.26 A.4.1.1.27 A.4.1.1.28 A.4.1.1.29 A.4.1.1.30 A.4.1.1.31 A.4.1.1.32 A.4.1.1.33 A.4.1.1.34 A.4.1.1.35 A.4.1.1.36

A.4.1.2.2. A.4.1.2.3. A.4.1.2.4. A.4.1.2.5. A.4.1.2.6. A.4.1.2.7. A.4.1.2.8. A.4.1.2.9. A.4.1.2.10. A.4.1.2.11. A.4.1.2.12. A.4.1.2.13. A.4.1.2.14. A.4.1.2.15. A.4.1.2.16. A.4.1.2.17. A.4.1.2.18. A.4.1.2.19. A.4.1.2.20. A.4.1.2.21. A.4.1.2.22. A.4.1.2.23. A.4.1.2.24.

A.4.2.1.1. A.4.2.1.2. A.4.2.1.3. A.4.2.1.4. A.4.2.1.5. A.4.2.1.6. A.4.2.1.7. A.4.2.1.8. A.4.2.1.9. A.4.2.1.10. A.4.2.1.11. A.4.2.1.12. A.4.2.1.13. A.4.2.1.14. A.4.2.1.15. A.4.2.1.16. A.4.2.1.17. A.4.2.1.18. A.4.2.1.19 A.4.2.1.20. A.4.2.1.21. A.4.2.1.22. A.4.2.1.23. A.4.2.1.24.

A.4.4.1.1. A.4.4.1.2. A.4.4.1.3. A.4.4.1.4. A.4.4.1.5. A.4.4.1.6 A.4.4.1.7 A.4.4.1.8 A.4.4.1.9 A.4.4.1.10 A.4.4.1.11 A.4.4.1.12 A.4.4.1.13 A.4.4.1.14

2/17

Software RAB Exarch xPro v2019

141 142 143 144 145 146 147 148 149 150 151 152

P-140 P-141 P-142 P-143 P-144 P-145 P-146 P-147 P-148 P-149 P-150 P-151

Pemasangan dinding bata merah (5x11x22) cm tebal ½ batu campuran 1SM : 1KP :2PP Pemasangan dinding conblock HB20 campuran 1SP : 3PP Pemasangan dinding conblock HB20 campuran 1SP:4PP Pemasangan dinding conblock HB15 campuran 1SP :3PP Pemasangan dinding conblock HB15 campuran 1SP :4PP Pemasangan dinding conblock HB10 campuran 1SP :3PP Pemasangan dinding conblock HB10 campuran 1SP :4PP Pemasangan dinding terawang (rooster) 12x11x24 campuran 1SP :3PP Pemasangan dinding terawang (rooster) 12x11x24 campuran 1SP :4PP Pemasangan dinding bata berongga ekspose 12x11x24 campuran 1 SP : 3 PP Pemasangan dinding bata ringan tebal 7,5 cm dengan mortar siap pakai B. Pemasangan dinding bata ringan tebal 10 cm dengan mortar siap pakai

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

133,134

153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181

P-152 P-153 P-154 P-155 P-156 P-157 P-158 P-159 P-160 P-161 P-162 P-163 P-164 P-165 P-166 P-167 P-168 P-169 P-170 P-171 P-172 P-173 P-174 P-175 P-176 P-177 P-178 P-179 P-180

A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN Pemasangan plesteran 1SP : 1PP tebal 15 mm. Pemasangan plesteran 1SP : 2PP tebal 15 mm. Pemasangan plesteran 1SP : 3PP tebal 15mm. Pemasangan plesteran 1SP : 4PP tebal 15 mm Pemasangan plesteran 1SP : 5PP tebal 15 mm Pemasangan plesteran 1SP : 6PP tebal 15 mm. Pemasangan plesteran 1SP : 7PP tebal 15 mm Pemasangan plesteran 1SP : 8PP tebal 15 mm Pemasangan plesteran 1SP : 1/2KP : 3PP tebal 15 mm Pemasangan plesteran 1SP : 2KP : 8PP tebal 15 mm Pemasangan plesteran 1SM : 1KP : 1PP tebal 15 mm Pemasangan plesteran 1SM : 1KP : 2PP tebal 15 mm Pemasangan plesteran 1SP : 1PP tebal 20 mm Pemasangan plesteran 1SP : 3PP tebal 20 mm Pemasangan plesteran 1SP : 4PP tebal 20 mm. Pemasangan plesteran 1SP : 5PP tebal 20 mm Pemasangan plesteran 1SP : 6PP tebal 20 mm Pemasangan plesteran 1SM : 1KP : 2PP tebal 20 mm Pemasangan berapen 1SP : 5PP tebal 15 mm Pemasangan plesteran skoning 1SP : 3PP lebar 10 cm Pemasangan plesteran granit 1SP : 2 granit tebal 1cm Pemasangan plesteran traso 1SP : 2 traso tebal 1cm Pemasangan plesteran ciprat 1SP : 2PP Pemasangan finishing siar pasangan bata merah Pemasangan Finishing siar pasangan conblock ekspose Pemasangan finishing siar pasangan batu kali, campuran 1SP : 2PP. Pemasangan acian. Pemasangan plesteran dengan mortar siap pakai (MSP) Pemasangan Acian dengan mortar siap pakai (MSP)

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m1 m2 m2 m2 m2 m2 m2 m2 m2 m2

93,187

182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219

P-181 P-182 P-183 P-184 P-185 P-186 P-187 P-188 P-189 P-190 P-191 P-192 P-193 P-194 P-195 P-196 P-197 P-198 P-199 P-200 P-201 P-202 P-203 P-204 P-205 P-206 P-207 P-208 P-209 P-210 P-211 P-212 P-213 P-214 P-215 P-216 P-217 P-218

A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING Pemasangan lantai ubin PC abu-abu ukuran 40cm x40cm m2 Pemasangan lantai ubin PC abu-abu ukuran 30cm x30 cm m2 Pemasangan lantai ubin PC abu-abu ukuran 20cm x20 cm m2 Pemasangan lantai ubin warna ukuran 40cm x40 cm m2 Pemasangan lantai ubin warna ukuran 30cm x30cm m2 Pemasangan lantai ubin warna ukuran 20cm x20cm m2 Pemasangan lantai ubin teraso ukuran 40cm x40cm m2 Pemasangan lantai ubin teraso ukuran 30cm x30cm m2 Pemasangan lantai ubin granit ukuran 40cm x40cm m2 Pemasangan lantai ubin granit ukuran 30cm x30cm m2 Pemasangan lantai ubin teralux marmer ukuran 40cm x40cm m2 Pemasangan lantai ubin teralux ukuran 30cm x30cm m2 Pemasangan lantai ubin teralux marmer ukuran 60cm x60cm m2 Pemasangan lantai ubin teralux marmer ukuran 40cm x40cm m2 Pemasangan lantai ubin teralux marmer ukuran 30cm x30cm m2 Pemasangan plint ubin Pc abu-abu ukuran 15cm x 20cm m1 Pemasangan plint ubin Pc abu-abu ukuran 10cm x 30cm m1 Pemasangan plint ubin Pc abu-abu ukuran 10cm x 40cm m1 Pemasangan plint ubin warna ukuran 10cm x 20cm m1 Pemasangan plint ubin warna ukuran 10cm x 30cm m1 Pemasangan plint ubin warna ukuran 10cm x 40cm m1 Pemasangan plint ubin teraso ukuran 10cm x 30cm m1 Pemasangan plint ubin teraso ukuran 10cm x 40cm m1 Pemasangan plint ubin granit ukuran 10cm x 40cm m1 Pemasangan plint ubin granit ukuran 10cm x 30cm m1 Pemasangan plint ubin teralux kerang ukuran 10cm x 40cm m1 Pemasangan plint ubin teralux kerang ukuran 10cm x 30cm m1 Pemasangan plint ubin teralux marmer ukuran 10cm x 60cm m1 Pemasangan plint ubin teralux marmer ukuran 10cm x 40cm m1 Pemasangan plint ubin teralux marmer ukuran 10cm x 30cm m1 Pemasangan lantai teraso cor di tempat, tebal 3cm m2 Pemasangan lantai keramik artistik 10cm x 20cm m2 Pemasangan lantai keramik artistik 10cm x 10cm atau 5cm x 20cm m2 Pemasangan lantai keramik ukuran 33cm x 33cm m2 Pemasangan lantai keramik ukuran 30cm x 30cm m2 Pemasangan lantai keramik ukuran 20cm x 20cm m2 keramik ukuran 10cm x 33cm untuk variasi/border m2 Pemasangan lantai keramik mozaik ukuran 30cm x 30cm m2

www.mitra-arsitek.com

415,218 415,505 305,983 305,996 242,977 243,541 104,459 127,431 147,930 334,686 428,371

86,212 83,220 81,156 80,014 79,087 78,587 78,087 82,167 80,555 75,813 76,072 115,460 92,469 108,648 107,195 105,889 106,376 46,782 86,334 345,034 152,065 65,494 38,238 18,174 78,779 49,390 90,555 49,908

120,519 134,736 166,419 180,845 236,933 399,873 187,614 249,052 218,075 279,350 163,922 255,112 222,821 326,383 497,497 66,757 48,786 47,000 43,007 48,853 48,419 48,853 49,772 68,711 77,686 49,629 53,898 60,339 71,417 81,290 80,621 263,919 455,045 257,667 256,230 306,118 772,982 334,899

146,448 456,739 457,056 336,582 336,596 267,274 267,895 114,905 140,174 162,723 368,154 471,208

102,506 94,834 91,542 89,272 88,015 86,996 86,445 85,895 90,384 88,610 83,395 83,680 127,006 101,716 119,513 117,914 116,478 117,014 51,461 94,967 379,537 167,271 72,044 42,062 19,991 86,657 54,329 99,610 54,899

132,571 148,210 183,061 198,929 260,626 439,860 206,375 273,957 239,883 307,285 180,314 280,623 245,104 359,021 547,247 73,432 53,665 51,700 47,308 53,738 53,261 53,738 54,749 75,582 85,454 54,592 59,288 66,373 78,558 89,419 88,683 290,311 500,549 283,434 281,853 336,730 850,280 368,389

A.4.4.1.15 A.4.4.1.16 A.4.4.1.17 A.4.4.1.8 A.4.4.1.19 A.4.4.1.20 A.4.4.1.21 A.4.4.1.22 A.4.4.1.23 A.4.4.1.24 A.4.4.1.25 A.4.4.1.26

A.4.4.2.1. A.4.4.2.2. A.4.4.2.3. A.4.4.2.4. A.4.4.2.5. A.4.4.2.6. A.4.4.2.7. A.4.4.2.8. A.4.4.2.9. A.4.4.2.10. A.4.4.2.11. A.4.4.2.12. A.4.4.2.13. A.4.4.2.14. A.4.4.2.15. A.4.4.2.16. A.4.4.2.17. A.4.4.2.18. A.4.4.2.19. A.4.4.2.20. A.4.4.2.21. A.4.4.2.22. A.4.4.2.23. A.4.4.2.24 A.4.4.2.25. A.4.4.2.26. A.4.4.2.27. A.4.4.2.28. A.4.4.2.29.

A.4.4.3.1. A.4.4.3.2. A.4.4.3.3. A.4.4.3.4. A.4.4.3.5. A.4.4.3.6. A.4.4.3.7. A.4.4.3.8. A.4.4.3.9. A.4.4.3.10. A.4.4.3.11. A.4.4.3.12. A.4.4.3.13. A.4.4.3.14. A.4.4.3.15. A.4.4.3.16. A.4.4.3.17. A.4.4.3.18. A.4.4.3.19. A.4.4.3.20. A.4.4.3.21. A.4.4.3.22. A.4.4.3.23. A.4.4.3.24. A.4.4.3.25. A.4.4.3.26. A.4.4.3.27. A.4.4.3.28. A.4.4.3.29. A.4.4.3.30. A.4.4.3.31. A.4.4.3.32. A.4.4.3.33. A.4.4.3.34. A.4.4.3.35. A.4.4.3.36. A.4.4.3.37. A.4.4.3.38.

3/17

Software RAB Exarch xPro v2019

220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236 237 238 239 240 241 242 243 244 245 246 247 248 249

P-219 P-220 P-221 P-222 P-223 P-224 P-225 P-226 P-227 P-228 P-229 P-230 P-231 P-232 P-233 P-234 P-235 P-236 P-237 P-238 P-239 P-240 P-241 P-242 P-243 P-244 P-245 P-246 P-247 P-248

Pemasangan plint keramik ukuran 10cm x 20cm Pemasangan plint keramik ukuran 10cm x 10cm Pemasangan plint keramik ukuran 5cm x 20cm Pemasangan plint internal cove artistik 5cm x 5cm x 20cm Pemasangan lantai marmer ukuran 100cm x 100cm Pemasangan lantai karpet Pemasangan underlayer (pelapis bawah karpet) Pemasangan lantai parquet kayu Pemasangan lantai kayu gymfloor Pemasangan dinding porslen 11cm x 11cm Pemasangan dinding porslen 10cm x 20cm Pemasangan dinding porslen 20cm x 20cm Pemasangan dinding keramik artistik 10cm x 20cm Pemasangan dinding keramik artistik 5cm x 20cm Pemasangan dinding keramik 10cm x 20cm Pemasangan dinding keramik 20cm x 20cm Pemasangan dinding marmer 100cm x 100cm Pemasangan dinding bata pelapis 3cm x 7cm x 24cm Pemasangan dinding batu paras Pemasangan dinding batu tempel hitam Pemasangan lantai vynil ukuran 30cm x 30cm Pemasangan wallpaper lebar 50 cm Pemasangan floor harderner Pemasangan plint vynil 15cm x 30cm Pemasangan plint kayu tebal 2 cm lebar 10 cm Pemasangan paving block natural tebal 6 cm Pemasangan paving block natural tebal 8 cm Pemasangan paving block berwarna tebal 6 cm Pemasangan paving block berwarna tebal 8 cm Pemasangan Aluminium Composite Panel

m1 m1 m1 m1 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m1 m1 m2 m2 m2 m2 m2

250 251 252 253 254 255 256 257 258 259 260

P-249 P-250 P-251 P-252 P-253 P-254 P-255 P-256 P-257 P-258 P-259

A.4.5.1 HARGA SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND) Pemasangan langit-langit asbes semen, tebal 4 mm, 5 mm, dan 6 mm Pemasangan langit-langit akustik ukuran (30 x 30) cm Pemasangan langit-langit akustik ukuran (30 x 60) cm Pemasangan langit-langit akustik ukuran (60 x 120) cm Pemasangan langit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm, 4 mm & 6 Pemasangan langit-langit lambrisering kayu, tebal 9 mm Pemasangan langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm Pemasangan langit-langit akustik ukuran (60 x 120) cm berikut rangka alluminium Pemasangan list langit-langit kayu profil Pemasangan Plafond PVC Pemasangan List Plafond PVC

m2 m2 m2 m2 m2 m2 m2 m2 m1 m2 m2

107,203

261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294 295 296 297 298

P-260 P-261 P-262 P-263 P-264 P-265 P-266 P-267 P-268 P-269 P-270 P-271 P-272 P-273 P-274 P-275 P-276 P-277 P-278 P-279 P-280 P-281 P-282 P-283 P-284 P-285 P-286 P-287 P-288 P-289 P-290 P-291 P-292 P-293 P-294 P-295 P-296 P-297

A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP Pemasangan atap genteng palentong kecil Pemasangan atap genteng kodok glazuur Pemasangan atap genteng palentong besar/super Pemasangan bubung genteng palentong Pemasangan bubung genteng kodok glazuur Pemasangan bubung genteng palentong besar Pemasangan roof light fibreglass 90x180 Pemasangan atap asbes gelombang 0,92mx2,5m x 5mm Pemasangan atap asbes gelombang 0,92mx2,25m x 5mm Pemasangan atap asbes gelombang 0,92mx2,00m x 5mm Pemasangan atap asbes gelombang 0,92mx1.80m x 5mm Pemasangan atap asbes gelombang 1.05mx3.00m x 4mm Pemasangan atap asbes gelombang 1.05mx2.70m x 4mm Pemasangan atap asbes gelombang 1.05mx2.40m x 4mm Pemasangan atap asbes gelombang 1.05mx2.10m x 4mm Pemasangan atap asbes gelombang 1.05mx1.50m x 4mm Pemasangan atap asbes gelombang 1.08mx3.00m x 6mm Pemasangan atap asbes gelombang 1.08mx2.70m x 6mm Pemasangan atap asbes gelombang 1.08mx2.40m x 6mm Pemasangan atap asbes gelombang 1.08mx2.10m x 6mm Pemasangan atap asbes gelombang 1.08mx1.80m x 6mm Pemasangan bubung stel gelombang 0,92m Pemasangan bubung stel gelombang 1,05m Pemasangan bubung stel gelombang 1,08m Pemasangan Nok paten 0,92m Pemasangan Nok paten 1,05m Pemasangan Nok paten 1,08m Pemasangan nok stel rata 0,92m Pemasangan nok stel rata 1,05m Pemasangan genteng beton Pemasangan genteng aspal Pemasangan genteng metal ukuran 80 x 100 atap pelana Pemasangan genteng metal ukuran 80 x 100 atap Jurai Pemasangan atap sirap kayu Pemasangan nok genteng beton Pemasangan Nok genteng aspal Pemasangan nok genteng metal Pemasangan Nok sirap

m2 m2 m2 m1 m1 m1 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m1 m1 m1 m1 m1 m1 m1 m1 m2 m2 m2 m2 m2 m1 m1 m1 m1

97,356

www.mitra-arsitek.com

70,662 96,148 58,654 261,900 241,784 669,069 72,784 178,997 474,883 814,404 494,620 408,141 298,180 295,132 315,180 292,512 514,260 307,141 270,633 480,653 278,367 156,956 56,729 71,042 56,690 251,384 121,681 246,228 231,505 156,764

467,324 364,203 228,272 46,038 304,352 54,707 407,747 19,102 205,936 61,802

71,924 52,014 129,299 129,299 124,194 105,507 88,514 99,439 98,223 114,610 70,912 78,559 80,744 88,391 120,073 73,097 74,189 82,929 86,206 94,946 77,565 72,664 71,847 89,204 89,204 89,204 90,965 84,967 75,668 142,649 93,853 118,867 148,779 168,902 126,508 154,842 84,647

77,728 105,763 64,519 288,090 265,962 735,976 80,062 196,897 522,371 895,844 544,082 448,955 327,998 324,646 346,698 321,764 565,686 337,855 297,696 528,718 306,204 172,651 62,401 78,147 62,359 276,522 133,849 270,850 254,655 172,440

117,924 514,056 400,623 251,099 50,642 334,787 60,177 448,521 21,013 226,530 67,982

107,092 79,116 57,216 142,229 142,229 136,614 116,058 97,366 109,383 108,046 126,071 78,003 86,415 88,818 97,230 132,080 80,406 81,608 91,222 94,827 104,441 85,321 79,930 79,032 98,125 98,125 98,125 100,061 93,464 83,235 156,914 103,238 130,754 163,657 185,793 139,159 170,327 93,112

A.4.4.3.39. A.4.4.3.40. A.4.4.3.41. A.4.4.3.42. A.4.4.3.43. A.4.4.3.44. A.4.4.3.45. A.4.4.3.46. A.4.4.3.47. A.4.4.3.48. A.4.4.3.49. A.4.4.3.50. A.4.4.3.51. A.4.4.3.52. A.4.4.3.53. A.4.4.3.54. A.4.4.3.55. A.4.4.3.56. A.4.4.3.57. A.4.4.3.58. A.4.4.3.59. A.4.4.3.60. A.4.4.3.61. A.4.4.3.62. A.4.4.3.63. A.4.4.3.64. A.4.4.3.65. A.4.4.3.66. A.4.4.3.67. A.4.4.3.68.

A.4.5.1.1. A.4.5.1.2. A.4.5.1.3. A.4.5.1.4. A.4.5.1.5. A.4.5.1.6. A.4.5.1.7. A.4.5.1.8. A.4.5.1.9. A.4.5.1.10. A.4.5.1.10.

A.4.5.2.1. A.4.5.2.2. A.4.5.2.3. A.4.5.2.4. A.4.5.2.5. A.4.5.2.6. A.4.5.2.7. A.4.5.2.8. A.4.5.2.9. A.4.5.2.10. A.4.5.2.11. A.4.5.2.12. A.4.5.2.13. A.4.5.2.14. A.4.5.2.15. A.4.5.2.16. A.4.5.2.17. A.4.5.2.18. A.4.5.2.19. A.4.5.2.20. A.4.5.2.21. A.4.5.2.22. A.4.5.2.23. A.4.5.2.24. A.4.5.2.25. A.4.5.2.26. A.4.5.2.27. A.4.5.2.28. A.4.5.2.29. A.4.5.2.30. A.4.5.2.31. A.4.5.2.32. A.4.5.2.33. A.4.5.2.34. A.4.5.2.35. A.4.5.2.36. A.4.5.2.37. A.4.5.2.38.

4/17

Software RAB Exarch xPro v2019

299 300 301 302 303

P-298 P-299 P-300 P-301 P-302

Pemasangan atap seng gelombang Pemasangan nok atap seng Pemasangan atap alumunium Pemasangan Nok alumunium Pemasangan alumunium foil/sisalation

m2 m1 m2 m1 m2

304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331

P-303 P-304 P-305 P-306 P-307 P-308 P-309 P-310 P-311 P-312 P-313 P-314 P-315 P-316 P-317 P-318 P-319 P-320 P-321 P-322 P-323 P-324 P-325 P-326 P-327 P-328 P-329 P-330

A.4.6.1 HARGA SATUAN PEKERJAAN KAYU Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu kelas I Pembuatan dan pemasangan kusen pintu dan kusen jendela, kayu kelas II atau III Pembuatan dan pemasangan pintu klamp standar, kayu kelas II Pembuatan dan pemasangan pintu klamp sederhana, kayu kelas III Pembuatan dan pemasangan daun pintu panel, kayu kelas I atau II Pembuatan dan pemasangan pintu dan jendela kaca, kayu kelas I atau II Pembuatan dan pemasangan pintu dan jendela jalusi kayu kelas I atau II Pembuatan daun pintu plywood rangkap, rangka kayu kelas II tertutup Pembuatan pintu plywood rangkap, rangka expose kayu kelas I atau II Pemasangan jalusi kusen, kayu kelas I atau II Pemasangan teakwood rangkap, rangka expose kayu kelas I Pemasangan teakwood rangkap lapis formika, rangka expose kayu kelas II Pemasangan konstruksi kuda-kuda konvensional, kayu kelas I, II dan III bentang 6 meter Pemasangan konstruksi kuda-kuda expose, kayu kelas I Pemasangan konstruksi gordeng, kayu kelas II Pemasangan rangka atap genteng keramik, kayu kelas II Pemasangan rangka atap genteng beton, kayu kelas II Pemasangan rangka atap sirap, kayu kelas II Pemasangan rangka langit-langit (50 x 100) cm, kayu kelas II atau III Pemasangan rangka langit-langit (60 x 60) cm, kayu kelas II atau III Pemasangan lisplank ukuran (3 x 20) cm, kayu kelas I atau kelas II Pemasangan lisplank ukuran (3 x 30) cm, kayu kelas I atau kelas II Pemasangan rangka dinding pemisah (60 x 120) cm kayu kelas II atau III Pemasangan dinding pemisah teakwood rangkap, rangka kayu kelas II Pemasangan dinding pemisah plywood rangkap, rangka kayu kelas II Pemasangan dinding lambrisering dari Kayu Papan kelas I Pemasangan dinding lambrisering dari plywood ukuran (120 x 240) cm Pemasangan dinding bilik, rangka kayu kelas III atau IV

m3 m3 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m3 m3 m3 m2 m2 m2 m2 m2 m1 m1 m2 m2 m2 m2 m2 m2

13,189,697

332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354

P-331 P-332 P-333 P-334 P-335 P-336 P-337 P-338 P-339 P-340 P-341 P-342 P-343 P-344 P-345 P-346 P-347 P-348 P-349 P-350 P-351 P-352 P-353

A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA Pemasangan kunci tanam antik Pemasangan kunci tanam biasa Pemasangan kunci kamar mandi Pemasangan kunci silinder Pemasangan engsel pintu Pemasangan engsel jendela kupu-kupu Pemasangan engsel angin Pemasangan spring knip Pemasangan kait angin Pemasangan door closer Pemasangan kunci slot Pemasangan Door holder Pemasangan door stop Pemasangan Rrel pintu sorong Pemasangan kunci lemari Pemasangan kaca tebal 3 mm Pemasangan kaca tebal 5 mm Pemasangan kaca tebal 8 mm Pemasangan kaca buram tebal 12 mm Pemasangan kaca cermin tebal 5 mm Pemasangan kaca cermin tebal 8 mm Pemasangan kaca wireglassed tebal 5 mm Pemasangan kaca patri tebal 5 mm

bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh m2 m2 m2 m2 m2 m2 m2 m2

371,582

355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375

P-354 P-355 P-356 P-357 P-358 P-359 P-360 P-361 P-362 P-363 P-364 P-365 P-366 P-367 P-368 P-369 P-370 P-371 P-372 P-373 P-374

A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN Pengikisan/pengerokan permukaan cat lama Pencucian bidang permukaan tembok yang pernah dicat Pengerokan karat pada permukaan baja cara manual Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) Pengecatan bidang kayu baru (1 lapis plamuur, 1 lapis cat dasar, 3 lapis cat Penutup) Pelaburan bidang kayu dengan teak oil Pelaburan bidang kayu dengan politur Pelaburan bidang kayu dengan cat residu dan ter Pelaburan bidang kayu dengan vernis Pengecatan tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) Pengecatan tembok lama ( 1 lapis cat dasar, 2 lapis cat penutup) Pelaburan tembok dengan kalkarium Pelaburan tembok dengan kapur sirih Pelaburan tembok lama dengan kapur sirih (pemeliharaan) Pemasangan wallpaper Pengecatan permukaan baja dengan menie besi Pengecatan permukaan baja dengan menie besi dengan perancah Pengecatan permukaan baja galvanis secara manual 4 lapis Pengecatan permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir Pengecatan permukaan baja galvanis secara manual sistem 3 lapis Pengecatan permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

21,194

www.mitra-arsitek.com

62,993 48,537 311,627 211,382 61,082

13,280,980 380,390 380,390 824,043 629,319 909,807 642,379 711,969 734,655 692,877 779,291 11,455,495 14,042,305 13,136,491 186,768 255,379 70,487 128,622 123,699 90,530 89,968 319,519 302,652 338,021 432,362 47,580 185,751

225,361 142,633 168,158 46,451 39,809 56,562 38,336 36,294 352,304 89,827 196,091 120,437 320,532 60,735 141,302 174,995 254,641 232,528 199,705 298,682 294,607 143,685

19,468 20,568 44,892 64,669 33,472 50,140 16,515 69,270 36,147 26,047 12,187 21,780 11,814 84,644 42,038 78,714 87,600 35,750 213,442 195,144

69,292 53,390 342,790 232,520 67,191

A.4.5.2.39.

14,508,667 14,609,078 418,429 418,429 906,448 692,251 1,000,788 706,616 783,166 808,120 762,164 857,221 12,601,044 15,446,536 14,450,140 205,445 280,917 77,535 141,484 136,069 99,583 98,965 351,471 332,917 371,823 475,598 52,338 204,326

A.4.6.1.1.

408,741 247,897 156,896 184,974 51,096 43,790 62,218 42,169 39,923 387,534 98,810 215,700 132,480 352,586 66,808 155,432 192,495 280,105 255,781 219,675 328,551 324,067 158,054

23,313 21,415 22,625 49,381 71,135 36,819 55,154 18,167 76,197 39,762 28,651 13,405 23,958 12,996 93,109 46,242 86,586 96,360 39,325 234,786 214,659

A.4.5.2.40. A.4.5.2.41. A.4.5.2.42. A.4.5.2.43.

A.4.6.1.2. A.4.6.1.3. A.4.6.1.4. A.4.6.1.5. A.4.6.1.6. A.4.6.1.7. A.4.6.1.8. A.4.6.1.9. A.4.6.1.10. A.4.6.1.11. A.4.6.1.12. A.4.6.1.13. A.4.6.1.14. A.4.6.1.15. A.4.6.1.16. A.4.6.1.17. A.4.6.1.18. A.4.6.1.19. A.4.6.1.20. A.4.6.1.21. A.4.6.1.22. A.4.6.1.23. A.4.6.1.24. A.4.6.1.25. A.4.6.1.26. A.4.6.1.27. A.4.6.1.28.

A.4.6.2.1. A.4.6.2.2. A.4.6.2.3. A.4.6.2.4. A.4.6.2.5. A.4.6.2.6. A.4.6.2.7. A.4.6.2.8. A.4.6.2.9. A.4.6.2.10. A.4.6.2.11. A.4.6.2.12. A.4.6.2.13. A.4.6.2.14. A.4.6.2.15. A.4.6.2.16. A.4.6.2.17. A.4.6.2.18. A.4.6.2.19. A.4.6.2.20. A.4.6.2.21. A.4.6.2.22. A.4.6.2.23.

A.4.7.1.1. A.4.7.1.2. A.4.7.1.3. A.4.7.1.4. A.4.7.1.5. A.4.7.1.6. A.4.7.1.7. A.4.7.1.8. A.4.7.1.9. A.4.7.1.10. A.4.7.1.11. A.4.7.1.12. A.4.7.1.13. A.4.7.1.14. A.4.7.1.15. A.4.7.1.16. A.4.7.1.17. A.4.7.1.18. A.4.7.1.19. A.4.7.1.20. A.4.7.1.21.

5/17

Software RAB Exarch xPro v2019

376

P-375

Plituran dengan plitur melamic

m2

18,932

20,826

A.4.7.1.22.

377 378 379 380 381 382 383 384 385 386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412

P-376 P-377 P-378 P-379 P-380 P-381 P-382 P-383 P-384 P-385 P-386 P-387 P-388 P-389 P-390 P-391 P-392 P-393 P-394 P-395 P-396 P-397 P-398 P-399 P-400 P-401 P-402 P-403 P-404 P-405 P-406 P-407 P-408 P-409 P-410 P-411

A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG (K3) Pemasangan closet duduk/moblock Pemasangan closet jongkok porslen Pemasangan closet jongkok teraso (K3) Pemasangan uriir (K3) Pemasangan wastafel (K3) Pemasangan bathcuip porselen (K3) Pemasangan bak fibreglass vol 1 m3 (K3) Pemasangan bak mandi batu bata vol 0,30 m3 Pemasangan bak mandi teraso vol 0,30 m3 Pemasangan bak air fibreglass vol 1 m3 Pemasangan bak beton volume 1 m3 Pemasangan bak cuci piring stainlessteel Pemasangan bak cuci piring teraso Pemasangan floor drain Pemasangan bak kontrol pasangan bata 30x30 tinggi 35 cm Pemasangan bak kontrol pasangan bata 45cm x45cm tinggi 50 cm Pemasangan bak kontrol pasangan bata 60cm x60cm tinggi 65 cm Pemasangan pipa galvanis diameter ½” Pemasangan kran diameter ½” atau 3/4” Pemasangan pipa galvanis diameter 3/4” Pemasangan pipa galvanis diameter 1” Pemasangan pipa galvanis diameter 1 ½” Pemasangan pipa galvanis diameter 3” Pemasangan pipa galvanis diameter 4” Pemasangan pipa PVC tipe AW diameter 1/2” Pemasangan pipa PVC tipe AW diameter 3/4” Pemasangan pipa PVC tipe AW diameter 1” Pemasangan pipa PVC tipe AW diameter 11/2” Pemasangan pipa PVC tipe AW diameter 2” Pemasangan pipa PVC tipe AW diameter 21/2” Pemasangan pipa PVC tipe AW diameter 3” Pemasangan pipa PVC tipe AW diameter 4” Pemasangan pipa air limbah jenis pipa tanah Pemasangan pipa air limbah jenis pipa tanah diameter 15 cm Pemasangan pipa beton diameter 15 - 20 cm Pemasangan pipa beton diameter 30 - 100 cm

bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh m1 bh m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1

3,184,298

3,502,727 763,355 743,811 2,012,691 2,463,900 3,304,126 1,824,493 4,464,435 1,824,493 526,049 9,646,347 635,538 724,515 89,803 619,695 930,520 1,096,547 157,634 110,200 164,372 183,241 251,539 297,022 342,844 120,305 122,326 123,000 132,284 132,958 146,426 147,773 148,447 167,138 105,314 128,035 210,932

A.5.1.1.1.

413 414 415 416 417 418 419 420 421 422 423 424 425 426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452 453 454

P-412 P-413 P-414 P-415 P-416 P-417 P-418 P-419 P-420 P-421 P-422 P-423 P-424 P-425 P-426 P-427 P-428 P-429 P-430 P-431 P-432 P-433 P-434 P-435 P-436 P-437 P-438 P-439 P-440 P-441 P-442 P-443 P-444 P-445 P-446 P-447 P-448 P-449 P-450 P-451 P-452 P-453

A.8.4.1 HARGA SATUAN PEKERJAAN PEMASANGAN PIPA (K3) Pemasangan pipa PVC Ø 63 mm (K3) Pemasangan pipa PVC Ø 90 mm (K3) Pemasangan pipa PVC Ø 110 mm (K3) Pemasangan pipa PVC Ø 150 mm (K3) Pemasngan pipa PVC Ø 200 mm (K3) Pemasangan pipa PVC Ø 250 mm (K3) Pemasangan pipa PVC Ø 300 mm (K3) Pemasangan pipa PVC Ø 400 mm (K3) Pemasangan pipa PVC Ø 450 mm (K3) Pemasangan pipa PVC Ø 500 mm (K3) Pemasangan pipa PVC Ø 600 mm (K3) Pemasangan pipa PVC Ø 800 mm (K3) Pemasangan pipa PVC Ø 900 mm (K3) Pemasangan pipa PVC Ø 1000 mm (K3) Pemasangan pipa PVC Ø 1100 mm (K3) Pemasangan pipa PVC Ø 1200 mm (K3) Pemasangan pipa HDPE Ø 63 mm (K3) Pemasangan pipa HDPE Ø 100 mm (K3) Pemasangan pipa HDPE Ø 125 mm (K3) Pemasangan pipa HDPE Ø 150 mm (K3) Pemasangan pipa HDPE Ø 200 mm (K3) Pemasangan pipa HDPE Ø 250 mm (K3) Pemasangan pipa HDPE Ø 300 mm (K3) Pemasangan pipa HDPE Ø 400 mm (K3) Pemasangan pipa HDPE Ø 450 mm (K3) Pemasangan pipa HDPE Ø 500 mm (K3) Pemasangan pipa HDPE Ø 600 mm (K3) Pemasangan pipa HDPE Ø 800 mm (K3) Pemasangan pipa HDPE Ø 900 mm (K3) Pemasangan pipa HDPE Ø 1000 mm (K3) Pemasangan pipa HDPE Ø 1100 mm (K3) Pemasangan pipa HDPE Ø 1200 mm (K3) Pemasangan pipa GIP Ø 63 mm (K3) Pemasangan pipa GIP Ø 100 mm (K3) Pemasangan pipa GIP Ø 125 mm (K3) Pemasangan pipa GIP Ø 150 mm (K3) Pemasangan pipa GIP Ø 200 mm (K3) Pemasangan pipa GIP Ø 250 mm (K3) Pemasangan pipa GIP Ø 300 mm (K3) Pemasangan pipa GIP Ø 400 mm (K3) Pemasangan pipa GIP Ø 450 mm (K3) Pemasangan pipa GIP Ø 500 mm

m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1

105,875

www.mitra-arsitek.com

693,959 676,191 1,829,719 2,239,910 3,003,751 1,658,630 4,058,577 1,658,630 478,227 8,769,406 577,762 658,650 81,639 563,359 845,927 996,861 143,304 100,182 149,430 166,582 228,671 270,020 311,677 109,368 111,206 111,818 120,258 120,871 133,114 134,339 134,952 151,943 95,740 116,395 191,756

129,006 163,345 200,770 385,893 555,811 835,572 1,540,869 1,831,939 2,588,638 3,960,257 5,486,291 6,835,759 8,224,362 9,613,225 11,001,608 72,938 144,701 262,410 325,211 651,727 1,015,899 1,621,280 2,606,818 3,303,985 3,995,194 4,039,900 9,357,951 10,733,214 12,638,452 12,727,823 14,054,538 248,680 331,675 400,315 471,589 649,297 796,245 910,773 1,200,305 1,344,440 1,492,504

116,462 141,906 179,680 220,847 424,482 611,392 919,129 1,694,956 2,015,133 2,847,502 4,356,283 6,034,920 7,519,335 9,046,798 10,574,548 12,101,769 80,232 159,171 288,650 357,732 716,900 1,117,489 1,783,408 2,867,500 3,634,384 4,394,713 4,443,890 10,293,746 11,806,536 13,902,297 14,000,605 15,459,992 273,548 364,843 440,347 518,748 714,226 875,870 1,001,850 1,320,335 1,478,884 1,641,755

A.5.1.1 2. A.5.1.1 3. A.5.1.1 4. A.5.1.1 5. A.5.1.1 6. A.5.1.1 7. A.5.1.1 8. A.5.1.1 9. A.5.1.1 10. A.5.1.1 11. A.5.1.1 12. A.5.1.1 13. A.5.1.1 14. A.5.1.1 15. A.5.1.1 16. A.5.1.1 17. A.5.1.1 18. A.5.1.1 19. A.5.1.1 20. A.5.1.1 21. A.5.1.1 22. A.5.1.1 23. A.5.1.1 24. A.5.1.1 25. A.5.1.1 26. A.5.1.1 27. A.5.1.1 28. A.5.1.1 29. A.5.1.1 30. A.5.1.1 31. A.5.1.1 32. A.5.1.1 33. A.5.1.1 34. A.5.1.1 35. A.5.1.1.36.

A.8.4.1.1 A.8.4.1.2 A.8.4.1.3 A.8.4.1.4 A.8.4.1.5 A.8.4.1.6 A.8.4.1.7 A.8.4.1.8 A.8.4.1.9 A.8.4.1.10 A.8.4.1.11 A.8.4.1.12 A.8.4.1.13 A.8.4.1.14 A.8.4.1.15 A.8.4.1.16 A.8.4.1.17 A.8.4.1.18 A.8.4.1.19 A.8.4.1.20 A.8.4.1.21 A.8.4.1.22 A.8.4.1.23 A.8.4.1.24 A.8.4.1.25 A.8.4.1.26 A.8.4.1.27 A.8.4.1.28 A.8.4.1.29 A.8.4.1.30 A.8.4.1.31 A.8.4.1.32 A.8.4.1.33 A.8.4.1.34 A.8.4.1.35 A.8.4.1.36 A.8.4.1.37 A.8.4.1.38 A.8.4.1.39 A.8.4.1.40 A.8.4.1.41 A.8.4.1.42

6/17

Software RAB Exarch xPro v2019

455 456 457 458 459 460 461 462 463 464 465 466 467 468 469 470 471 472 473 474 475 476 477 478 479 480 481 482 483 484 485 486 487 488 489 490 491

P-454 P-455 P-456 P-457 P-458 P-459 P-460 P-461 P-462 P-463 P-464 P-465 P-466 P-467 P-468 P-469 P-470 P-471 P-472 P-473 P-474 P-475 P-476 P-477 P-478 P-479 P-480 P-481 P-482 P-483 P-484 P-485 P-486 P-487 P-488 P-489 P-490

(K3) Pemasangan pipa GIP Ø 600 mm (K3) Pemasangan pipa GIP Ø 800 mm (K3) Pemasangan pipa GIP Ø 900 mm (K3) Pemasangan pipa GIP Ø 1000 mm (K3) Pemasangan pipa GIP Ø 1100 mm (K3) Pemasangan pipa GIP Ø 1200 mm (K3) Pemasangan pipa DCI Ø 100 mm (K3) Pemasangan pipa DCI Ø 125 mm (K3) Pemasangan pipa DCI Ø 150 mm (K3) Pemasangan pipa DCI Ø 200 mm (K3) Pemasangan pipa DCI Ø 250 mm (K3) Pemasangan pipa DCI Ø 300 mm (K3) Pemasangan pipa DCI Ø 400 mm (K3) Pemasangan pipa DCI Ø 450 mm (K3) Pemasangan pipa DCI Ø 500 mm (K3) Pemasangan pipa DCI Ø 600 mm (K3) Pemasangan pipa DCI Ø800 mm (K3) Pemasangan pipa DCI Ø900 mm (K3) Pemasangan pipa DCI Ø1000 mm (K3) Pemasangan pipa DCI Ø1100 mm (K3) Pemasangan pipa DCI Ø1200 mm (K3) Pemasangan pipa baja Ø 63 mm (K3) Pemasangan pipa baja Ø 100 mm (K3) Pemasangan pipa baja Ø 125 mm (K3) Pemasangan pipa baja Ø 150 mm (K3) Pemasangan pipa baja Ø 200 mm (K3) Pemasangan pipa baja Ø 250 mm (K3) Pemasangan pipa baja Ø 300 mm (K3) Pemasangan pipa baja Ø 400 mm (K3) Pemasangan pipa baja Ø 450 mm (K3) Pemasangan pipa baja Ø 500 mm (K3) Pemasangan pipa baja Ø 600 mm (K3) Pemasangan pipa baja Ø 800 mm (K3) Pemasangan pipa baja Ø 900 mm (K3) Pemasangan pipa baja Ø 1000 mm (K3) Pemasangan pipa baja Ø 1100 mm (K3) Pemasangan pipa baja Ø 1200 mm

m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1

492 493 494 495 496 497 498 499 500 501 502 503 504 505 506 507 508 509 510 511 512 513 514 515 516 517 518 519 520 521 522 523 524 525 526 527 528 529 530 531 532 533 534 535

P-491 P-492 P-493 P-494 P-495 P-496 P-497 P-498 P-499 P-500 P-501 P-502 P-503 P-504 P-505 P-506 P-507 P-508 P-509 P-510 P-511 P-512 P-513 P-514 P-515 P-516 P-517 P-518 P-519 P-520 P-521 P-522 P-523 P-524 P-525 P-526 P-527 P-528 P-529 P-530 P-531 P-532 P-533 P-534

A.8.4.2 HARGA SATUAN PEKERJAAN PEMOTONGAN PIPA (K3) Pemotongan pipa PVC Ø 63 mm (K3) Pemotongan pipa PVC Ø 90 mm (K3) Pemotongan pipa PVC Ø 110 mm (K3) Pemotongan pipa PVC Ø 150 mm (K3) Pemotongan pipa PVC Ø 200 mm (K3) Pemotongan pipa PVC Ø 250 mm (K3) Pemotongan pipa PVC Ø 300 mm (K3) Pemotongan pipa PVC Ø 400 mm (K3) Pemotongan pipa PVC Ø 450 mm (K3) Pemotongan pipa PVC Ø 500 mm (K3) Pemotongan pipa PVC Ø 600 mm (K3) Pemotongan pipa PVC Ø 800 mm (K3) Pemotongan pipa PVC Ø 900 mm (K3) Pemotongan pipa PVC Ø 1000 mm (K3) Pemotongan pipa PVC Ø 1100 mm (K3) Pemotongan pipa PVC Ø 1200 mm (K3) Pemotongan pipa HDPE Ø 63 mm (K3) Pemotongan pipa HDPE Ø 100 mm (K3) Pemotongan pipa HDPE Ø 125 mm (K3) Pemotongan pipa HDPE Ø 150 mm (K3) Pemotongan pipa HDPE Ø 200 mm (K3) Pemotongan pipaHDPE Ø 250 mm (K3) Pemotongan pipa HDPE Ø 300 mm (K3) Pemotongan pipa HDPE Ø 400 mm (K3) Pemotongan pipa HDPE Ø 450 mm (K3) Pemotongan pipa HDPE Ø 500 mm (K3) Pemotongan pipa HDPE Ø 600 mm (K3) Pemotongan pipa HDPE Ø 800 mm (K3) Pemotongan pipa HDPE Ø 900 mm (K3) Pemotongan pipa HDPE Ø 1000 mm (K3) Pemotongan pipa HDPE Ø 1100 mm (K3) Pemotongan pipa HDPE Ø 1200 mm (K3) Pemotongan pipa GIP Ø 63 mm (K3) Pemotongan pipa GIP Ø 100 mm (K3) Pemotongan pipa GIP Ø 125 mm (K3) Pemotongan pipa GIP Ø 150 mm (K3) Pemotongan pipa GIP Ø 200 mm (K3) Pemotongan pipa GIP Ø 250 mm (K3) Pemotongan pipa GIP Ø 300 mm (K3) Pemotongan pipa GIP Ø 400 mm (K3) Pemotongan pipa GIP Ø 450 mm (K3) Pemotongan pipa GIP Ø 500 mm (K3) Pemotongan pipa GIP Ø 600 mm (K3) Pemotongan pipa GIP Ø 800 mm

m1 m1 bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh

www.mitra-arsitek.com

1,685,781 2,365,106 2,656,757 2,946,624 3,236,614 3,144,825 408,238 482,715 605,618 894,162 981,553 1,277,346 2,789,658 3,266,316 3,734,176 4,206,795 5,900,403 6,446,549 7,636,058 8,376,624 9,477,367 302,504 486,751 328,782 253,238 416,297 502,728 572,461 911,183 937,698 1,036,212 1,102,943 1,670,906 1,756,121 2,251,760 2,408,153 2,566,675

86,516 107,930 140,401 176,056 354,058 518,017 794,075 1,475,753 1,763,571 2,510,225 3,872,135 5,353,184 6,697,399 8,072,352 9,446,425 10,821,158 63,771 140,793 261,864 327,948 663,528 1,025,503 1,628,015 2,594,210 3,280,297 3,958,865 6,343,484 9,238,520 10,504,851 11,321,349 11,382,054 13,596,743 168,737 247,887 324,467 389,613 560,282 702,981 822,164 1,111,205 1,248,480 1,381,951 1,600,853 2,209,102

1,854,360 2,601,616 2,922,432 3,241,287 3,560,275 3,459,307 449,062 530,987 666,180 983,578 1,079,709 1,405,080 3,068,624 3,592,948 4,107,594 4,627,475 6,490,443 7,091,204 8,399,664 9,214,286 10,425,103 332,755 535,426 361,661 278,562 457,927 553,001 629,707 1,002,301 1,031,468 1,139,834 1,213,238 1,837,996 1,931,733 2,476,937 2,648,968 2,823,343

A.8.4.1.43

95,167 118,723 154,441 193,662 389,464 569,818 873,482 1,623,328 1,939,928 2,761,247 4,259,349 5,888,503 7,367,139 8,879,587 10,391,068 11,903,274 70,148 154,872 288,051 360,743 729,881 1,128,053 1,790,816 2,853,631 3,608,327 4,354,751 6,977,832 10,162,372 11,555,336 12,453,484 12,520,260 14,956,417 185,610 272,676 356,913 428,574 616,310 773,279 904,380 1,222,326 1,373,328 1,520,146 1,760,939 2,430,012

A.8.4.2.1

A.8.4.1.44 A.8.4.1.45 A.8.4.1.46 A.8.4.1.47 A.8.4.1.48 A.8.4.1.49 A.8.4.1.50 A.8.4.1.51 A.8.4.1.52 A.8.4.1.53 A.8.4.1.54 A.8.4.1.55 A.8.4.1.56 A.8.4.1.57 A.8.4.1.58 A.8.4.1.59 A.8.4.1.60 A.8.4.1.61 A.8.4.1.62 A.8.4.1.63 A.8.4.1.64 A.8.4.1.65 A.8.4.1.66 A.8.4.1.67 A.8.4.1.68 A.8.4.1.69 A.8.4.1.70 A.8.4.1.71 A.8.4.1.72 A.8.4.1.73 A.8.4.1.74 A.8.4.1.75 A.8.4.1.76 A.8.4.1.77 A.8.4.1.78 A.8.4.1.79

A.8.4.2.2 A.8.4.2.3 A.8.4.2.4 A.8.4.2.5 A.8.4.2.6 A.8.4.2.7 A.8.4.2.8 A.8.4.2.9 A.8.4.2.10 A.8.4.2.11 A.8.4.2.12 A.8.4.2.13 A.8.4.2.14 A.8.4.2.15 A.8.4.2.16 A.8.4.2.17 A.8.4.2.18 A.8.4.2.19 A.8.4.2.20 A.8.4.2.21 A.8.4.2.22 A.8.4.2.23 A.8.4.2.24 A.8.4.2.25 A.8.4.2.26 A.8.4.2.27 A.8.4.2.28 A.8.4.2.29 A.8.4.2.30 A.8.4.2.31 A.8.4.2.32 A.8.4.2.33 A.8.4.2.34 A.8.4.2.35 A.8.4.2.36 A.8.4.2.37 A.8.4.2.38 A.8.4.2.39 A.8.4.2.40 A.8.4.2.41 A.8.4.2.42 A.8.4.2.43 A.8.4.2.44

7/17

Software RAB Exarch xPro v2019

536 537 538 539 540 541 542 543 544 545 546 547 548 549 550 551 552 553 554 555 556 557 558 559 560 561 562 563 564 565 566 567 568 569 570

P-535 P-536 P-537 P-538 P-539 P-540 P-541 P-542 P-543 P-544 P-545 P-546 P-547 P-548 P-549 P-550 P-551 P-552 P-553 P-554 P-555 P-556 P-557 P-558 P-559 P-560 P-561 P-562 P-563 P-564 P-565 P-566 P-567 P-568 P-569

(K3) Pemotongan pipa GIP Ø 900 mm (K3) Pemotongan pipa GIP Ø 1000 mm (K3) Pemotongan pipa GIP Ø 1100 mm (K3) Pemotongan pipa GIP Ø 1200 mm (K3) Pemotongan pipa DCI Ø 100 mm (K3) Pemotongan pipa DCI Ø 125 mm (K3) Pemotongan pipa DCI Ø 150 mm (K3) Pemotongan pipa DCI Ø 200 mm (K3) Pemotongan pipa DCI Ø 250 mm (K3) Pemotongan pipa DCI Ø 300 mm (K3) Pemotongan pipa DCI Ø 400 mm (K3) Pemotongan pipa DCI Ø 450 mm (K3) Pemotongan pipa DCI Ø 500 mm (K3) Pemotongan pipa DCI Ø 600 mm (K3) Pemotongan pipa DCI Ø 800 mm (K3) Pemotongan pipa DCI Ø 900 mm (K3) Pemotongan pipa DCI Ø 1000 mm (K3) Pemotongan pipa DCI Ø 1100 mm (K3) Pemotongan pipa DCI Ø 1200 mm (K3) Pemotongan pipa baja Ø 63 mm (K3) Pemotongan pipa baja Ø 100 mm (K3) Pemotongan pipa baja Ø 125 mm (K3) Pemotongan pipa baja Ø 150 mm (K3) Pemotongan pipa baja Ø 200 mm (K3) Pemotongan pipa baja Ø 250 mm (K3) Pemotongan pipa baja Ø 300 mm (K3) Pemotongan pipa baja Ø 400 mm (K3) Pemotongan pipa baja Ø 450 mm (K3) Pemotongan pipa baja Ø 500 mm (K3) Pemotongan pipa baja Ø 600 mm (K3) Pemotongan pipa baja Ø 800 mm (K3) Pemotongan pipa baja Ø 900 mm (K3) Pemotongan pipa baja Ø 1000 mm (K3) Pemotongan pipa baja Ø 1100 mm (K3) Pemotongan pipa baja Ø 1200 mm

bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh

2,479,847

571 572 573 574 575 576 577 578 579 580 581 582 583 584 585 586 587 588 589 590 591 592 593 594 595 596 597 598

P-570 P-571 P-572 P-573 P-574 P-575 P-576 P-577 P-578 P-579 P-580 P-581 P-582 P-583 P-584 P-585 P-586 P-587 P-588 P-589 P-590 P-591 P-592 P-593 P-594 P-595 P-596 P-597

A.8.4.3 HARGA SATUAN PEKERJAAN PEMASANGAN AKSESORIS PIPA (K3) Pemasangan Valve Ø 150 mm (K3) Pemasangan Valve Ø 200 mm (K3) Pemasangan Valve Ø 250 mm (K3) Pemasangan Valve Ø 300 mm (K3) Pemasangan Valve Ø 400 mm (K3) Pemasangan Valve Ø 450 mm (K3) Pemasangan Valve Ø 500 mm (K3) Pemasangan Valve Ø 600 mm (K3) Pemasangan Valve Ø 700 mm (K3) Pemasangan Valve Ø 800 mm (K3) Pemasangan Valve Ø 900 mm (K3) Pemasangan Valve Ø 1000 mm (K3) Pemasangan Valve Ø 1100 mm (K3) Pemasangan Valve Ø 1200 mm (K3) Pemasangan Tee Ø 150 mm (K3) Pemasangan Tee Ø 200 mm (K3) Pemasangan 1 buah Tee Ø 250 mm (K3) Pemasangan Tee Ø 300 mm (K3) Pemasangan Tee Ø 400 mm (K3) Pemasangan Tee Ø 450 mm (K3) Pemasangan Tee Ø 500 mm (K3) Pemasangan Tee Ø 600 mm (K3) Pemasangan Tee Ø 700 mm (K3) Pemasangan Tee Ø 800 mm (K3) Pemasangan Tee Ø 900 mm (K3) Pemasangan Tee Ø 1000 mm (K3) Pemasangan Tee Ø 1100 mm (K3) Pemasangan Tee Ø 1200 mm

bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh

6,086,657

599 600 601 602 603 604 605 606 607 608 609 610

P-598 P-599 P-600 P-601 P-602 P-603 P-604 P-605 P-606 P-607 P-608 P-609

A.8.4.4 HARGA SATUAN PEKERJAAN PENYAMBUNGAN PIPA BARU KE PIPA LAMA (K3) Penyambungan pipa baru ke pipa yang ada Ø 80 mm bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 100 mm bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 150 mm bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 200 mm bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 250 mm bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 300 mm bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 400 mm bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 450 mm bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 500 mm bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 600 mm bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 700 mm bh (K3) Penyambungan pipa baru ke pipa yang ada Ø 800 mm bh

611 612

P-610 P-611

A.8.4.5 HARGA SATUAN PEKERJAAN PENGETESAN PIPA (K3) Pengetesan pipa Ø 50 mm (K3) Pengetesan pipa Ø 75 mm

www.mitra-arsitek.com

bh m1

2,761,930 3,033,017 3,303,883 153,757 228,599 352,160 651,919 909,095 1,199,940 2,720,200 3,175,027 3,624,673 4,032,708 5,562,675 6,051,579 7,124,584 7,802,927 8,801,549 242,156 424,115 263,824 188,621 341,910 429,051 500,126 751,531 798,781 880,932 975,797 1,428,922 1,608,415 1,942,002 2,065,462 2,138,694

7,369,503 10,276,262 689,053 1,249,945 1,249,945 1,378,106 926,736 1,093,768 1,173,946 1,543,931 2,122,919 2,219,226 2,219,226 37,328 62,517 92,022 337,821 387,240 411,949 484,617 441,155 524,038 605,855 720,071 814,518 884,185 998,401

1,509,227 1,691,302 2,073,487 2,534,289 2,953,231 3,378,298 4,221,286 4,683,109 5,090,820 5,961,374 6,842,139 7,668,791

1,935 2,037

2,727,832 3,038,123 3,336,318 3,634,272 169,133 251,459 387,376 717,111 1,000,004 1,319,934 2,992,220 3,492,530 3,987,140 4,435,979 6,118,942 6,656,737 7,837,043 8,583,219 9,681,704 266,371 466,526 290,207 207,483 376,101 471,956 550,138 826,684 878,659 969,026 1,073,377 1,571,814 1,769,257 2,136,202 2,272,008 2,352,563

6,695,323 8,106,453 11,303,888 757,959 1,374,940 1,374,940 1,515,916 1,019,409 1,203,145 1,291,340 1,698,324 2,335,211 2,441,149 2,441,149 41,061 68,769 101,224 371,603 425,964 453,144 533,078 485,271 576,442 666,441 792,079 895,970 972,604 1,098,242

1,660,150 1,860,432 2,280,836 2,787,718 3,248,554 3,716,128 4,643,414 5,151,420 5,599,901 6,557,512 7,526,353 8,435,670

2,128 2,241

A.8.4.2.45 A.8.4.2.46 A.8.4.2.47 A.8.4.2.48 A.8.4.2.49 A.8.4.2.50 A.8.4.2.51 A.8.4.2.52 A.8.4.2.53 A.8.4.2.54 A.8.4.2.55 A.8.4.2.56 A.8.4.2.57 A.8.4.2.58 A.8.4.2.59 A.8.4.2.60 A.8.4.2.61 A.8.4.2.62 A.8.4.2.63 A.8.4.2.64 A.8.4.2.65 A.8.4.2.66 A.8.4.2.67 A.8.4.2.68 A.8.4.2.69 A.8.4.2.70 A.8.4.2.71 A.8.4.2.72 A.8.4.2.73 A.8.4.2.74 A.8.4.2.75 A.8.4.2.76 A.8.4.2.77 A.8.4.2.78 A.8.4.2.79

A.8.4.3.1 A.8.4.3.2 A.8.4.3.3 A.8.4.3.4 A.8.4.3.5 A.8.4.3.6 A.8.4.3.7 A.8.4.3.8 A.8.4.3.9 A.8.4.3.10 A.8.4.3.11 A.8.4.3.12 A.8.4.3.13 A.8.4.3.14 A.8.4.3.15 A.8.4.3.16 A.8.4.3.17 A.8.4.3.18 A.8.4.3.19 A.8.4.3.20 A.8.4.3.21 A.8.4.3.22 A.8.4.3.23 A.8.4.3.24 A.8.4.3.25 A.8.4.3.26 A.8.4.3.27 A.8.4.3.28

A.8.4.4.1 A.8.4.4.2 A.8.4.4.3 A.8.4.4.4 A.8.4.4.5 A.8.4.4.6 A.8.4.4.7 A.8.4.4.8 A.8.4.4.9 A.8.4.4.10 A.8.4.4.11 A.8.4.4.12

A.8.4.5.1 A.8.4.5.2

8/17

Software RAB Exarch xPro v2019

613 614 615 616 617 618 619 620

P-612 P-613 P-614 P-615 P-616 P-617 P-618 P-619

(K3) Pengetesan pipa Ø 100 mm (K3) Pengetesan pipa Ø 150 mm (K3) Pengetesan 1 m pipa Ø 200 mm (K3) Pengetesan pipa Ø 250 mm (K3) Pengetesan 1 m pipa Ø 300 mm (K3) Pengetesan pipa Ø 400 mm (K3) Pengetesan 1 m pipa Ø 500 mm (K3) Pengetesan pipa Ø 600 mm

m1 m1 m1 m1 m1 m1 m1 m1

621 622

P-620 P-621

A.8.4.6 HARGA SATUAN PEKERJAAN ELEKTRIKAL (K3) Pemasangan titik lampu Memasang Instalasi Penerangan

titik titik

2,241 2,752 3,415 4,334 5,457 8,265 9,899 16,280

651,114 351,795

2,465 3,027 3,757 4,768 6,003 9,091 10,888 17,908

A.8.4.5.3 A.8.4.5.4 A.8.4.5.5 A.8.4.5.6 A.8.4.5.7 A.8.4.5.8 A.8.4.5.9 A.8.4.5.10

716,226 386,975

A.8.4.6.1

109,701 22,060 25,473 264,096 222,275 1,923,119 501,286 1,660,177 422,557 31,465 1,648,037 1,809,564 1,664,967 194,393 84,057 519,150 1,237,892 853,806 766,750 370,001 1,129,746 29,167 19,742 29,167 22,289 41,089 29,167 1,775,498 182,135 2,967,654

SNI-2002

A.8.4.6.2

DAFTAR ANALISA UTAMA Analisa Harga Satuan Pekerjaan Sesuai Acuan Berdasarkan Standar Nasional Indonesia Tahun 2008 Pembaharuan Data Tahun 2018

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

S-001 S-002 S-003 S-004 S-005 S-006 S-007 S-008 S-009 S-010 S-011 S-012 S-013 S-014 S-015 S-016 S-017 S-018 S-019 S-020 S-021 S-022 S-023 S-024 S-025 S-026 S-027 S-028 S-029 S-030

PEKERJAAN PENDAHULUAN Pek. Pengukuran & Pemasangan Bowplank Pekerjaan Pengukuran Gedung Membersihkan Lapangan dan Perataan Pembuatan jalan sementara, tebal 25 cm Pembuatan Jalan Sementara Pek. Kantor Direksi Keet , dengan lantai plesteran Pagar Sementara dari Seng Gelombang tinggi 2 m Pagar Sementara dari Kawat Duri tinggi 1.8 m Pagar Sementara dari Kayu tinggi 2 m Pasang pagar kawat jaring galvanis, tinggi 1,00 m Pembuatan Gudang Semen dan Alat - alat Pembuatan Rumah Jaga / Konstruksi Kayu Pembuatan Bedeng Buruh Pembuatan Bak Adukan ( 40 x 50 x 20 ) cm Pembuatan Stegger dari Bambu, ( 40 x 50 x 20 ) cm Pasang pagar beton pracetak ( 5 x 50 x 213 ) cm Membuat Papan Nama Proyek 80x120 cm (bahan seng) Membuat Papan Nama Proyek 80x120 cm (bahan flexi) Membongkar pasangan batu kali Membongkar pasangan batu merah dan membersihkan Membongkar beton bertulang dan membersihkan Pekerjaan bongkar lantai tegel untuk dipergunakan lagi Mengupas plesteran lama Membongkar genteng / sirap untuk dipergunakan lagi Membongkar atap seng Membongkar usuk / reng dipakai lagi Membongkar usuk / reng tidak dipakai lagi Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan untuk digunakan lagi Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan tidak digunakan lagi Mengerjakan kembali bangunan kayu yang telah dibongkar

m1 m2 m2 m2 m2 m2 m1 m1 m1 m1 m2 m2 m2 m2 m2 m1 bh bh m3 m3 m3 m2 m2 m2 m2 m2 m2 m3 m3 m3

31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52

S-031 S-032 S-033 S-034 S-035 S-036 S-037 S-038 S-039 S-040 S-041 S-042 S-043 S-044 S-045 S-046 S-047 S-048 S-049 S-050 S-051 S-052

PEKERJAAN TANAH Menggali tanah biasa sedalam 1 meter Menggali tanah biasa sedalam 2 meter Menggali tanah biasa sedalam 3 meter Menggali tanah keras sedalam 1 meter Menggali tanah cadas sedalam 1 meter Menggali tanah lumpur sedalam 1 meter Mengerjakan stripping tebing setinggi 1 meter Urug kembali bekas galian Membuang tanah sejauh 30 meter Membuang tanah sejauh 150 meter Memadatkan tanah (per 20 cm) Meratakan tanah ditumbuk halus Mengurug pasir urug Memasang Lapisan pudel campuran 1 KP : 3 PP : 7 TL Memasang Lapisan pudel campuran 1 KP : 5 TL Memasang lapisan ijuk tebal 10 cm Pemasangan lapisan ijuk Mengurug sirtu padat untuk peninggian lantai bangunan Urug tanah mendatangkan Membuang tanah dengan menghampar Pekerjaan Membuat sumur Pekerjaan Gebalan rumput

m3 m3 m3 m3 m3 m3 m2 m3 m3 m3 m3 m2 m3 m3 m3 m3 m3 m3 m3 m3 m1 m2

53 54 55

S-053 S-054 S-055

PEKERJAAN PASANGAN PONDASI Pasangan pondasi 1 Pc : 1 Ps Pasangan pondasi 1 Pc : 2 Ps Memasang pondasi batu belah, campuran 1 PC : 3 PP

m3 m3 m3

www.mitra-arsitek.com

99,728 20,054 23,158 240,088 202,068 1,748,290 455,715 1,509,251 384,143 28,605 1,498,215 1,645,058 1,513,607 176,721 76,415 471,955 1,125,356 776,187 697,046 336,365 1,027,042 26,516 17,947 26,516 20,263 37,353 26,516 1,614,089 165,577 2,697,867

96,683 119,320 142,396 128,618 195,566 155,793 7,179 27,523 42,321 73,734 71,789 32,594 329,046 413,490 379,122 343,152 278,829 328,717 265,335 32,594 394,237 100,594

1,289,602 1,128,324 1,072,377

106,352 131,252 156,636 141,479 215,123 171,372 7,897 30,275 46,553 81,107 78,968 35,854 361,950 454,839 417,034 377,467 306,711 361,589 291,869 35,854 433,661 110,654

1,418,562 1,241,157 1,179,615

SNI 2008 SNI-2002 AK-SNI 2008 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008

SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2002 SNI-2007 SNI-2002 SNI-2007 AK-SNI 2008 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2002 SNI-2007 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008

SNI-2002 SNI-2002 SNI-2007

9/17

Software RAB Exarch xPro v2019

56 57 58 59 60 61 62 63 64 65 66 67 68

S-056 S-057 S-058 S-059 S-060 S-061 S-062 S-063 S-064 S-065 S-066 S-067 S-068

Memasang pondasi batu belah, campuran 1 PC : 4 PP m3 Memasang pondasi batu belah, campuran 1 PC : 5 PP m3 Memasang pondasi batu belah, campuran 1 PC : 6 PP m3 Memasang pondasi batu belah, campuran 1 PC : 8 PP m3 Pasangan pondasi 1 Kp : 1 Sm : 1 Ps m3 Memasang pondasi batu belah, campuran 1 KP : 1 SM : 2 PP m3 Pasangan pondasi 1 Pc : 3 Kp : 5 Ps m3 Memasang pondasi batu belah, campuran 1 PC : 3 KP : 10 PP m3 Memasang pondasi batu belah, campuran 1/4 PC : 1 KP : 4 PP m3 Memasang batu kosong (aanstamping) m3 Memasang pondasi siklop, 60% beton campuran 1 PC:2 PB:3 KR dan 40% batu belah m3 Memasang pondasi siklop, 60% beton campuran 1 PC:2 PB:3 KR dan 40% batu belah tanpa besi m3 Memasang pondasi sumuran, diameter 100 cm m3

1,071,537

1,124,205 1,085,791 1,058,785 1,021,768 959,994 911,051 1,108,231 1,032,514 998,315 676,852 2,877,337 1,343,969 1,178,691

69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95

S-069 S-070 S-071 S-072 S-073 S-074 S-075 S-076 S-077 S-078 S-079 S-080 S-081 S-082 S-083 S-084 S-085 S-086 S-087 S-088 S-089 S-090 S-091 S-092 S-093 S-094 S-095

PEKERJAAN PASANGAN DINDING TEMBOK Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 2m2 PP 325,552 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 3m2 PP 312,248 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 4m2 PP 303,194 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 5m2 PP 298,648 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 6m2 PP 297,379 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1 bata, campuran spesi 1 PC : 3m2 KP : 10 PP 281,017 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC m2 : 2 PP 158,210 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC m2 : 3 PP 151,850 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC m2 : 4 PP 148,233 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC m2 : 5 PP 145,959 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC m2 : 6 PP 144,788 Memasang dinding bata merah ukuran (5 x 11 x 22) tebal 1/2 bata, campuran spesi 1 PC : 8 PP m2 142,304 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 PC m2 : 3 KP : 10 PP140,603 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 KPm2 : 1 SM : 1 PP127,498 Memasang dinding bata merah ukuran (5 x 11 x 22) cm tebal 1/2 bata, campuran spesi 1 KP m2 : 1 SM : 2 PP 129,258 Memasang dinding HB 20, campuran spesi 1 PC : 3 PP m2 408,479 Memasang dinding HB 20, campuran spesi 1 PC : 4 PP m2 408,766 Memasang dinding HB 15, campuran spesi 1 PC : 3 PP m2 311,287 Memasang dinding HB 15, campuran spesi 1 PC : 4 PP m2 311,299 Memasang dinding HB 10, campuran spesi 1 PC : 3 PP m2 242,977 Memasang dinding HB 10, campuran spesi 1 PC : 4 PP m2 243,541 Memasang dinding terawang (roster) ukuran 25 x 25 cm, campuran spesi 1 PC : 3 PP m2 330,336 Memasang dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 3 PP m2 345,651 Memasang dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC : 4 PP m2 341,841 Memasang dinding bata berongga ekspose ukuran (5 x 11 x 24) cm, campuran spesi 1 PC : 3m2 PP 201,533 Pasangan dinding batako m2 159,134 Memasang rollag bata , campuran spesi 1 PC : 3 PP m1 43,172

358,108 343,473 333,514 328,513 327,117 309,118 174,031 167,035 163,056 160,555 159,266 156,534 154,663 140,248 142,183 449,327 449,643 342,415 342,429 267,274 267,895 363,370 380,216 376,025 221,686 175,047 47,489

SNI-2007

96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122

S-096 S-097 S-098 S-099 S-100 S-101 S-102 S-103 S-104 S-105 S-106 S-107 S-108 S-109 S-110 S-111 S-112 S-113 S-114 S-115 S-116 S-117 S-118 S-119 S-120 S-121 S-122

PEKERJAAN BETON Membuat beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87 Membuat 1 m3 beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78 Membuat beton mutu f’c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72 Membuat lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87 Membuat beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66 Membuat beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61 Membuat beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58 Membuat beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56 Membuat beton mutu f’c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53 Membuat beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52 Membuat beton mutu f’c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = 0,49 Membuat beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,48 Membuat beton kedap air dengan strorox – 100 Pembesian dengan besi ulir Pembesian dengan besi polos Memasang kabel presstressed polos/strands Memasang jaring kawat baja/wire mesh Cetakan beton / begisting memakai papan Cetakan beton / begisting memakai multiplek Membongkar cetakan Pembuatan tiang pancang (40 x 40) cm, beton bertulang Pembuatan tiang pancang (35 x 35) cm, beton bertulang Memasang 1 m’ PVC Waterstop lebar 150 mm Memasang PVC Waterstop lebar 200 mm Membuat PVC Waterstop lebar 230 mm – 320 mm Cor beton kerb ( 15 x 30 ) cm Cor beton Devider ( 30 x 30 ) cm

m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 kg kg kg kg m2 m2 m3 m1 m1 m1 m1 m1 m1 m1

1,101,757

1,211,933 1,251,983 1,283,620 1,104,848 1,320,730 1,356,684 1,382,892 1,401,207 1,432,850 1,442,636 1,560,051 1,572,899 1,434,790 15,202 15,202 14,381 15,193 230,603 220,602 6,098,614 1,206,139 953,543 106,693 110,093 111,596 75,694 135,427

SNI-2007

123 124 125 126 127 128 129 130 131 132

S-123 S-124 S-125 S-126 S-127 S-128 S-129 S-130 S-131 S-132

PEKERJAAN PLESTERAN, BENANGAN DAN ACIAN Memasang plesteran 1 PC : 1 PP, tebal 15 mm Memasang plesteran 1 PC : 2 PP, tebal 15 mm Memasang plesteran 1 PC : 3 PP, tebal 15 mm Memasang plesteran 1 PC : 4 PP, tebal 15 mm Memasang plesteran 1 PC : 5 PP, tebal 15 mm Memasang plesteran 1 PC : 6 PP, tebal 15 mm Memasang plesteran 1 PC : 7 PP, tebal 15 mm Memasang plesteran 1 PC : 8 PP, tebal 15 mm Memasang plesteran 1 PC : 1/2 KP : 3 PP, tebal 15 mm Memasang plesteran 1 PC : 2 KP : 8 PP, tebal 15 mm

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

93,187

www.mitra-arsitek.com

1,022,005 987,083 962,532 928,880 872,721 828,228 1,007,483 938,649 907,559 615,320 2,615,761 1,221,790

1,138,167 1,166,927 1,004,407 1,200,663 1,233,349 1,257,174 1,273,825 1,302,591 1,311,487 1,418,228 1,429,908 1,304,355 13,820 13,820 13,073 13,811 209,639 200,547 5,544,194 1,096,490 866,857 96,993 100,085 101,451 68,813 123,116

86,212 83,220 81,156 80,014 79,087 78,587 78,087 80,919 78,474

102,506 94,834 91,542 89,272 88,015 86,996 86,445 85,895 89,010 86,321

SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2002 SNI-2007 AK-SNI 2008 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007

SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2002 SNI-2002

SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 SNI-2002 SNI-2002 SNI-2007 SNI-2007 SNI-2007 AK-SNI 2008 AK-SNI 2008

SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007

10/17

Software RAB Exarch xPro v2019

133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156

S-133 S-134 S-135 S-136 S-137 S-138 S-139 S-140 S-141 S-142 S-143 S-144 S-145 S-146 S-147 S-148 S-149 S-150 S-151 S-152 S-153 S-154 S-155 S-156

Memasang plesteran 1 SM : 1 KP : 1 PP, tebal 15 mm Memasang plesteran 1 SM : 1 KP : 2 PP, tebal 15 mm Plesteran 1 Pc : 3 Kp : 10 Ps, tebal 15 mm Memasang plesteran 1 PC : 2 PP, tebal 20 mm Memasang plesteran 1 PC : 3 PP, tebal 20 mm Memasang plesteran 1 PC : 4 PP, tebal 20 mm Memasang plesteran 1 PC : 5 PP, tebal 20 mm Memasang plesteran 1 PC : 6 PP, tebal 20 mm Memasang plesteran 1 SM : 1 KP : 2 PP, tebal 20 mm Memasang Berapen 1 PC : 5 PP, tebal 15 mm Plesteran skoneng 1 Pc : 2 Ps ( untuk gedung ) Sponengan (untuk saluran dan sejenisnya) Memasang Plesteran Granit , 1 PC : 2 Granit, tebal 10 mm Memasang Plesteran Teraso , 1 PC : 2 Batu Teraso, tebal 10 mm Memasang Plesteran Ciprat 1 PC : 2 PP Memasang finishing siar pasangan dinding bata merah (=20 m’) Memasang finishing siar pasangan dinding conblock ekspose (=8 m’) Plesteran siar adukan 1 Pc : 2 Ps Memasang acian Plesteran beton 1 Pc : 3 Ps, tebal 15 mm Plesteran batu kali 1pc:1/2kp:5ps tebal 10 mm Plesteran batu kali 1pc:3ps Plesteran batu kali 1pc:4ps Plesteran K- 50, tebal 20 mm

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m1 m1 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213

S-157 S-158 S-159 S-160 S-161 S-162 S-163 S-164 S-165 S-166 S-167 S-168 S-169 S-170 S-171 S-172 S-173 S-174 S-175 S-176 S-177 S-178 S-179 S-180 S-181 S-182 S-183 S-184 S-185 S-186 S-187 S-188 S-189 S-190 S-191 S-192 S-193 S-194 S-195 S-196 S-197 S-198 S-199 S-200 S-201 S-202 S-203 S-204 S-205 S-206 S-207 S-208 S-209 S-210 S-211 S-212 S-213

PEKERJAAN UBIN LANTAI DAN KERAMIK Memasang lantai ubin PC abu-abu ukuran (40 x 40) cm Memasang lantai ubin PC abu-abu ukuran (30 x 30) cm Memasang lantai ubin PC abu-abu ukuran (20 x 20) cm Memasang lantai ubin warna ukuran (40 x 40) cm Memasang lantai ubin warna ukuran (30 x 30) cm Memasang lantai ubin warna ukuran (20 x 20) cm Memasang lantai ubin teraso ukuran (40 x 40) cm Memasang lantai ubin teraso ukuran (30 x 30) cm Memasang lantai ubin granit ukuran (40 x 40) cm Memasang lantai ubin granit ukuran (30 x 30) cm Memasang lantai ubin teralux ukuran (40 x 40) cm Memasang lantai ubin teralux ukuran (30 x 30) cm Memasang lantai ubin teralux marmer ukuran (60 x 60) cm Memasang lantai ubin teralux marmer ukuran (40 x 40) cm Memasang lantai ubin teralux marmer ukuran (30 x 30) cm Memasang plint ubin PC abu-abu ukuran (15 x 20) cm Memasang plint ubin PC abu-abu ukuran (10 x 30) cm Memasang plint ubin PC abu-abu ukuran (10 x 40) cm Pasang plint ubin PC abu-abu ukuran 10 x 20 cm Memasang plint ubin PC warna ukuran (10 x 20) cm Memasang plint ubin PC warna ukuran (10 x 30) cm Memasang plint ubin PC warna ukuran (10 x 40) cm Memasang plint ubin teraso ukuran (10 x 30) cm Memasang plint ubin teraso ukuran (10 x 40) cm Memasang plint ubin granit ukuran (10 x 40) cm Memasang plint ubin granit ukuran (10 x 30) cm Memasang plint ubin teralux kerang ukuran (10 x 40) cm Memasang plint ubin teralux kerang ukuran (10 x 30) cm Memasang plint ubin teralux marmer ukuran (10 x 60) cm Memasang plint ubin teralux marmer ukuran (10 x 40) cm Memasang plint ubin teralux marmer ukuran (10 x 30) cm Memasang lantai teraso cor ditempat, tebal 3 cm Memasang lantai keramik artistik ukuran (10 x 20) cm Memasang lantai keramik artistik ukuran (10 x 10) cm atau (5 x 20) cm Memasang lantai keramik ukuran (33 x 33) cm Memasang lantai keramik ukuran (30 x 30) cm Memasang lantai keramik ukuran (20 x 20) cm Memasang lantai keramik ukuran (10 x 33) cm, variasi/border Memasang lantai mosaik ukuran (30 x 30) cm, campuran spesi 1 PC : 3 PP Memasang plint keramik artisitk ukuran (10 x 20) cm Memasang plint keramik artisitik ukuran (10 x 10) cm Memasang plint keramik ukuran (5 x 20) cm Pasang plint keramik ukuran 10 x 40 cm Pasang plint keramik ukuran 10 x 30 cm Memasang plint internal cove artistik ukuran (5 x 5 x 20) cm Memasang lantai marmer ukuran (100 x 100) cm Memasang lantai karpet Memasang underlayer Memasang lantai parquet Memasang lantai kayu (gym floor) Memasang dinding porselen ukuran (11 x 11) cm Memasang dinding porselin ukuran (10 x 20) cm Memasang dinding porselin ukuran (20 x 20) cm Memasang dinding keramik ukuran (10 x 20) cm Memasang dinding marmer ukuran (100 x 100) cm Memasang dinding bata pelapis ukuran (3 x 7 x 24) cm Memasang dinding batu paras

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m2 m2 m2 m2 m2 m2 m2 m2 m1 m1 m1 m1 m1 m1 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

www.mitra-arsitek.com

72,073 73,163 78,075 115,460 92,469 108,648 107,195 105,889 102,636 46,782 21,731 18,065 345,034 152,065 65,494 38,238 18,174 42,403 49,390 85,482 100,270 105,320 103,194 103,017

117,811 120,402 123,129 201,829 205,423 207,772 239,737 243,598 391,368 396,301 167,171 170,519 409,689 395,700 400,664 50,523 43,380 40,235 61,543 60,594 50,655 45,713 47,411 43,278 63,300 74,082 47,066 52,457 53,396 66,006 77,686 116,262 244,122 245,087 197,770 199,871 200,598 284,265 418,522 90,196 149,773 89,010 47,155 48,208 71,417 666,030 669,784 143,182 180,222 312,085 387,840 370,160 368,424 305,225 878,500 310,357 270,633

79,280 80,479 85,883 127,006 101,716 119,513 117,914 116,478 112,900 51,461 23,904 19,871 379,537 167,271 72,044 42,062 19,991 46,643 54,329 94,030 110,296 115,852 113,514 113,318

129,592 132,442 135,442 222,012 225,965 228,549 263,711 267,958 430,504 435,931 183,888 187,571 450,658 435,270 440,731 55,575 47,718 44,259 67,697 66,654 55,720 50,284 52,152 47,606 69,630 81,490 51,773 57,703 58,736 72,606 85,454 127,888 268,534 269,595 217,547 219,858 220,658 312,692 460,374 99,215 164,751 97,911 51,870 53,029 78,558 732,632 736,762 157,500 198,245 343,293 426,624 407,177 405,266 335,747 966,350 341,393 297,696

SNI-2007 SNI-2007 SNI-2002 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2002 AK-SNI 2008 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2002 SNI-2007 SNI-2002 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008

SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2002 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2002 SNI-2002 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007

11/17

Software RAB Exarch xPro v2019

214 215 216 217 218 219 220 221 222 223 224 225 226 227 228 229 230 231 232 233 234 235 236

S-214 S-215 S-216 S-217 S-218 S-219 S-220 S-221 S-222 S-223 S-224 S-225 S-226 S-227 S-228 S-229 S-230 S-231 S-232 S-233 S-234 S-235 S-236

Memasang dinding batu tempel hitam Memasang lantai vinyl ukuran (30 x 30) cm KL I Memasang wall paper, lebar 50 cm Memasang floor hardener Memasang plint kayu kelas II ukuran (2 x 10) cm Pasang keramik stepnosing granito 7/30 Pasang list keramik dinding 5/20 Memasang hospital plint panjang 20 cm Memasang hospital plint panjang 30 cm Pasang conblock tipe segi-empat, uni, segi-enam abu-abu 8 cm, K-400 Pasang conblock tipe uni, segi-empat abu-abu 8 cm, K-300 Pasang conblock tipe segi-empat abu-abu 6 cm, K-200 Pasang conblock tipe segi-empat abu-abu 8 cm, K-200 Pasang conblock tipe segi-enam abu-abu 6 cm, K-200 Pasang conblock tipe segi-enam abu-abu 8 cm, K-200 Pasang conblock tipe segi-empat, uni, segi-enam warna 8 cm, K-400 Pasang conblock tipe uni, segi-empat warna 8 cm, K-300 Pasang conblock tipe segi-empat warna 6 cm, K-200 Pasang conblock tipe segi-empat warna 8 cm, K-200 Pasang conblock tipe segi-enam warna 6 cm, K-200 Pasang conblock tipe segi-enam warna 8 cm, K-200 Pasang grassblock bulat tebal 10 cm Pasang grassblock tebal 10 cm

169,490

528,718 308,955 172,651 62,401 54,091 70,628 95,561 105,168 51,975 142,638 142,638 142,638 142,638 142,638 142,638 142,638 142,638 142,638 142,638 142,638 142,638 186,439 186,439

237 238 239 240 241 242 243 244 245 246 247 248 249 250 251 252 253 254 255 256 257 258 259 260 261 262 263 264 265 266 267 268 269 270 271 272 273 274 275 276 277 278 279 280 281 282 283 284 285 286 287 288 289 290 291 292 293 294

S-237 S-238 S-239 S-240 S-241 S-242 S-243 S-244 S-245 S-246 S-247 S-248 S-249 S-250 S-251 S-252 S-253 S-254 S-255 S-256 S-257 S-258 S-259 S-260 S-261 S-262 S-263 S-264 S-265 S-266 S-267 S-268 S-269 S-270 S-271 S-272 S-273 S-274 S-275 S-276 S-277 S-278 S-279 S-280 S-281 S-282 S-283 S-284 S-285 S-286 S-287 S-288 S-289 S-290 S-291 S-292 S-293 S-294

PEKERJAAN KAYU Membuat dan memasang kusen pintu dan kusen jendela, kayu jati (klas plitur) m3 17,232,857 Membuat dan memasang kusen pintu dan kusen jendela, kayu jati lokal m3 14,986,657 Membuat dan memasang kusen pintu dan kusen jendela, kayu kamper m3 11,718,850 Membuat dan memasang kusen pintu dan kusen jendela, kayu bengkirai m3 11,749,480 Membuat dan memasang kusen pintu dan kusen jendela, kayu kruing m3 9,605,380 Membuat dan memasang pintu klamp, kayu jati (klas plitur) m2 625,430 Membuat dan memasang pintu klamp, kayu jati (lokal) m2 625,430 Membuat dan memasang pintu klamp, kayu kamper m2 491,679 Membuat dan memasang pintu klamp, kayu bengkirai m2 492,700 Membuat dan memasang pintu klamp, kayu kruing m2 421,230 Membuat dan memasang daun pintu panel, kayu jati (klas plitur) m2 1,069,083 Membuat dan memasang daun pintu panel, kayu jati (lokal) m2 1,069,083 Membuat dan memasang daun pintu panel, kayu kamper m2 935,332 Membuat dan memasang daun pintu panel, kayu bengkirai m2 936,353 Membuat dan memasang daun pintu panel, kayu kruing m2 864,883 Membuat dan memasang pintu dan jendela kaca, kayu jati (klas plitur) m2 776,343 Membuat dan memasang pintu dan jendela kaca, kayu jati (lokal) m2 776,343 Membuat dan memasang pintu dan jendela kaca, kayu kamper m2 696,093 Membuat dan memasang pintu dan jendela kaca, kayu bengkirai m2 696,705 Membuat dan memasang pintu dan jendela kaca, kayu kruing m2 653,823 Membuat dan memasang pintu dan jendela jalusi kayu jati (klas plitur) m2 1,301,871 Membuat dan memasang pintu dan jendela jalusi kayu jati (lokal) m2 1,301,871 Membuat dan memasang pintu dan jendela jalusi kayu kamper m2 1,087,870 Membuat dan memasang pintu dan jendela jalusi kayu bengkirai m2 1,089,503 Membuat dan memasang pintu dan jendela jalusi kayu kruing m2 975,151 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu jati lokal (lebar sampai m2 90 cm) 795,483 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kamper (lebar sampai m290 cm) 711,888 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu bengkirai (lebar sampai m2 90 cm) 712,526 Membuat daun pintu kayu lapis (plywood) rangkap, rangka tertutup kayu kruing (lebar sampai m290 cm) 667,858 Memasang jalusi kusen, kayu jati (klas plitur) m2 1,101,985 Memasang jalusi kusen, kayu jati (lokal) m2 1,101,985 Memasang jalusi kusen, kayu kamper m2 901,358 Memasang jalusi kusen, kayu bengkirai m2 902,890 Memasang jalusi kusen, kayu kruing m2 795,685 Pasang pintu teakwood rangkap, rangka kayu jati (lokal) m2 707,088 Pasang pintu teakwood rangkap, rangka kayu kamper m2 641,550 Pasang pintu teakwood rangkap, rangka kayu bengkirai m2 642,050 Pasang pintu teakwood rangkap, rangka kayu kruing m2 607,030 Memasang teakwood rangkap lapis formika, rangka expose kayu kamper m2 848,801 Memasang teakwood rangkap lapis formika, rangka expose kayu bengkirai m2 849,439 Memasang teakwood rangkap lapis formika, rangka expose kayu kruing m2 804,770 Memasang konstruksi kuda-kuda konvensional, kayu jati (klas plitur) bentang 6 meter m3 13,701,695 Memasang konstruksi kuda-kuda konvensional, kayu jati (lokal) bentang 6 meter m3 11,455,495 Memasang konstruksi kuda-kuda konvensional, kayu kamper bentang 6 meter m3 10,023,542 Memasang konstruksi kuda-kuda konvensional, kayu bengkirai bentang 6 meter m3 10,051,620 Memasang konstruksi kuda-kuda konvensional, kayu kruing bentang 6 meter m3 8,086,195 Memasang konstruksi kuda-kuda konvensional, kayu glugu bentang 6 meter m3 4,829,205 Memasang konstruksi kuda-kuda expose, kayu jati (klas plitur) m3 16,492,705 Memasang konstruksi kuda-kuda expose, kayu jati lokal m3 14,042,305 Memasang konstruksi kuda-kuda expose, kayu kamper m3 12,480,175 Memasang konstruksi kuda-kuda expose, kayu kruing m3 10,366,705 Memasang konstruksi kuda-kuda expose, kayu bengkirai m3 12,510,805 Memasang konstruksi gordeng, kayu jati (klas plitur) m3 12,556,183 Memasang konstruksi gordeng, kayu jati lokal m3 10,309,983 Memasang konstruksi gordeng, kayu kamper m3 8,878,030 Memasang konstruksi gordeng, kayu bengkirai m3 8,906,108 Memasang konstruksi gordeng, kayu kruing m3 6,940,683 Memasang konstruksi gordeng, kayu glugu m3 3,683,693

18,956,143 16,485,323 12,890,735 12,924,428 10,565,918 687,973 687,973 540,846 541,970 463,353 1,175,992 1,175,992 1,028,866 1,029,989 951,372 853,978 853,978 765,702 766,376 719,206 1,432,058 1,432,058 1,196,657 1,198,454 1,072,666 875,031 783,077 783,779 734,643 1,212,183 1,212,183 991,494 993,179 875,253 777,797 705,705 706,255 667,733 933,681 934,383 885,248 15,071,864 12,601,044 11,025,896 11,056,782 8,894,814 5,312,125 18,141,976 15,446,536 13,728,193 11,403,376 13,761,886 13,811,801 11,340,981 9,765,833 9,796,719 7,634,751 4,052,062

www.mitra-arsitek.com

m2 m2 m2 m2 m1 m1 m1 m1 m1 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

480,653 280,868 156,956 56,729 49,173 64,208 86,874 95,607 47,250 129,671 129,671 129,671 129,671 129,671 129,671 129,671 129,671 129,671 129,671 129,671 129,671 169,490

SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008

SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007

12/17

Software RAB Exarch xPro v2019

295 296 297 298 299 300 301 302 303 304 305 306 307 308 309 310 311 312 313 314 315 316 317 318 319 320 321 322 323 324 325 326 327 328 329 330 331 332 333 334 335 336 337 338 339 340 341 342 343 344 345 346 347 348 349 350 351 352 353 354 355 356 357 358 359 360 361 362 363 364 365 366 367 368 369 370 371 372 373 374 375 376 377

S-295 S-296 S-297 S-298 S-299 S-300 S-301 S-302 S-303 S-304 S-305 S-306 S-307 S-308 S-309 S-310 S-311 S-312 S-313 S-314 S-315 S-316 S-317 S-318 S-319 S-320 S-321 S-322 S-323 S-324 S-325 S-326 S-327 S-328 S-329 S-330 S-331 S-332 S-333 S-334 S-335 S-336 S-337 S-338 S-339 S-340 S-341 S-342 S-343 S-344 S-345 S-346 S-347 S-348 S-349 S-350 S-351 S-352 S-353 S-354 S-355 S-356 S-357 S-358 S-359 S-360 S-361 S-362 S-363 S-364 S-365 S-366 S-367 S-368 S-369 S-370 S-371 S-372 S-373 S-374 S-375 S-376 S-377

Memasang usuk jati (lokal) 5/7, reng jati (lokal) 2/3 Memasang usuk kamper 5/7, reng jati (lokal) 2/3 Memasang usuk kamper 5/7, reng kamper 2/3 Memasang usuk bengkirai 5/7, reng jati (lokal) 2/3 Memasang usuk bengkirai 5/7, reng bengkirai 2/3 Memasang usuk kruing 5/7, reng jati (lokal) 2/3 Memasang usuk kruing 5/7, reng kruing 2/3 Memasang usuk jati 5/7 (klas 1), reng jati 3/4 (klas 1) Memasang usuk kamper 5/7, reng jati (lokal) 3/4 Memasang usuk kamper 5/7, reng kamper 3/4 Memasang usuk bengkirai 5/7, reng jati (lokal) 3/4 Memasang usuk bengkirai 5/7, reng bengkirai 3/4 Memasang usuk kruing 5/7, reng jati (lokal) 3/4 Memasang usuk kruing 5/7, reng kruing 3/4 Memasang rangka atap sirap, kayu jati (lokal) Memasang rangka atap sirap, kayu kamper Memasang rangka atap sirap, kayu bengkirai Memasang rangka atap sirap, kayu kruing Memasang rangka langit-langit (50 x 100) cm, kayu jati (lokal) Memasang rangka langit-langit (50 x 100) cm, kayu kamper Memasang rangka langit-langit (50 x 100) cm, kayu bengkirai Memasang rangka langit-langit (50 x 100) cm, kayu kruing Memasang rangka langit-langit (60 x 60) cm, kayu jati (lokal) Memasang rangka langit-langit (60 x 60) cm, kayu kamper Memasang rangka langit-langit (60 x 60) cm, kayu bengkirai Memasang rangka langit-langit (60 x 60) cm, kayu kruing Memasang rangka langit-langit (60 x 120) cm, kayu jati (lokal) Memasang rangka langit-langit (60 x 120) cm, kayu kamper Memasang rangka langit-langit (60 x 120) cm, kayu bengkirai Memasang rangka langit-langit (60 x 120) cm, kayu kruing Memasang rangka langit-langit (1,00 x 1,00) m, kayu jati (lokal) Memasang rangka langit-langit (1,00 x 1,00) m, kayu kamper Memasang rangka langit-langit (1,00 x 1,00) m, kayu bengkirai Memasang rangka langit-langit (1,00 x 1,00) m, kayu kruing Memasang lisplank ukuran (3 x 20) cm, kayu jati (klas plitur) Memasang lisplank ukuran (3 x 20) cm, kayu jati (lokal) Memasang lisplank ukuran (3 x 20) cm, kayu kamper Memasang lisplank ukuran (3 x 20) cm, kayu bengkirai Memasang lisplank ukuran (3 x 20) cm, kayu kruing Memasang lisplank ukuran (3 x 30) cm, kayu jati (klas plitur) Memasang lisplank ukuran (3 x 30) cm, kayu ati (lokal) Memasang lisplank ukuran (3 x 30) cm, kayu kamper Memasang lisplank ukuran (3 x 30) cm, kayu kelas bengkirai Memasang lisplank ukuran (3 x 30) cm, kayu kruing Memasang lisplank ukuran 2 x (3 x 20) cm, kayu jati (klas plitur) Memasang lisplank ukuran 2 x (3 x 20) cm, kayu jati (lokal) Memasang lisplank ukuran 2 x (3 x 20) cm, kayu kamper Memasang lisplank ukuran 2 x (3 x 20) cm, kayu bengkirai Memasang lisplank ukuran 2 x (3 x 20) cm, kayu kruing Memasang lisplank ukuran 2 x (2 x 20) cm, kayu jati (klas plitur) Memasang lisplank ukuran 2 x (2 x 20) cm, kayu jati (lokal) Memasang lisplank ukuran 2 x (2 x 20) cm, kayu kamper Memasang lisplank ukuran 2 x (2 x 20) cm, kayu bengkirai Memasang lisplank ukuran 2 x (2 x 20) cm, kayu kruing Memasang lisplank ukuran (2 x 25) cm, kayu jati (klas plitur) Memasang lisplank ukuran (2 x 25) cm, kayu jati (lokal Memasang lisplank ukuran (2 x 25) cm, kayu kamper Memasang lisplank ukuran (2 x 25) cm, kayu bengkirai Memasang lisplank ukuran (2 x 25) cm, kayu kruing Memasang lisplank ukuran (2 x 20) cm, kayu jati (klas plitur) Memasang lisplank ukuran (2 x 20) cm, kayu jati (lokal) Memasang lisplank ukuran (2 x 20) cm, kayu kamper Memasang lisplank ukuran (2 x 20) cm, kayu bengkirai Memasang lisplank ukuran (2 x 20) cm, kayu kruing Membuat listplank asbes plat ram kayu jati (lokal) Membuat listplank asbes plat ram kayu kamper Membuat listplank asbes plat ram kayu bengkirai Membuat listplank asbes plat ram kayu kruing Memasang rangka dinding pemisah (60 x 120) cm kayu jati (lokal) Memasang rangka dinding pemisah (60 x 120) cm kayu kamper Memasang rangka dinding pemisah (60 x 120) cm kayu bengkirai Memasang rangka dinding pemisah (60 x 120) cm kayu kruing Memasangdinding pemisah teakwood rangkap, rangka kayu jati (lokal) Memasang dinding pemisah teakwood rangkap, rangka kayu kamper Memasang dinding pemisah teakwood rangkap, rangka kayu bengkirai Memasang dinding pemisah teakwood rangkap, rangka kayu kruing Memasang dinding pemisah plywood rangkap, rangka kayu kamper Memasang dinding pemisah plywood rangkap, rangka kayu bengkirai Memasang dinding pemisah plywood rangkap, rangka kayu kruing Memasang dinding lambriziring dari papan kayu jati (klas plitur) Memasang dinding lambriziring dari papan kayu jati (lokal) Memasang dinding lambriziring dari papan kayu kamper Memasang dinding lambriziring dari papan kayu bengkirai

www.mitra-arsitek.com

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

140,466 116,881 107,692 116,881 109,529 101,157 88,905 205,503 147,204 128,826 147,204 132,502 131,481 106,977 1,306,177 1,091,385 1,095,596 800,782 268,560 191,909 192,302 164,786 271,815 190,684 191,100 161,976 173,919 156,996 157,327 134,100 159,487 143,865 144,172 122,731 121,423 121,423 97,347 97,531 84,667 157,354 157,354 120,573 120,854 101,199 207,218 207,218 158,734 159,104 133,196 116,268 116,268 87,511 87,731 72,365 91,049 91,049 70,987 71,140 60,419 79,410 79,410 63,360 63,482 54,906 635,886 577,816 651,401 533,786 365,260 283,069 283,784 233,755 434,157 351,966 352,681 302,652 387,336 388,050 338,021 477,273 477,273 453,867 454,045

154,512 128,569 118,461 128,569 120,482 111,273 97,796 226,054 161,925 141,709 161,925 145,752 144,629 117,675 1,436,795 1,200,523 1,205,156 880,861 295,416 211,099 211,532 181,264 298,997 209,752 210,210 178,174 191,311 172,695 173,060 147,510 175,435 158,252 158,589 135,004 133,565 133,565 107,082 107,284 93,133 173,090 173,090 132,630 132,939 111,319 227,940 227,940 174,607 175,014 146,515 127,895 127,895 96,263 96,504 79,601 100,154 100,154 78,085 78,254 66,461 87,351 87,351 69,696 69,830 60,396 699,474 635,598 716,541 587,164 401,786 311,376 312,162 257,130 477,572 387,163 387,949 332,917 426,069 426,855 371,823 525,000 525,000 499,253 499,450

AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007

13/17

Software RAB Exarch xPro v2019

378 379 380 381 382 383 384 385

S-378 S-379 S-380 S-381 S-382 S-383 S-384 S-385

Memasang dinding lambriziring dari papan kayu kruing Memasang dinding lambriziring dari plywood ukuran (120 x 240) cm Memasang dinding bilik, rangka kayu kruing Mengerjakan papan ruiter kayu jati 2/20 (lokal) Mengerjakan papan ruiter kayu kamper 2/20 Mengerjakan papan ruiter kayu bengkirai 2/20 Mengerjakan papan ruiter kayu kruing 2/20 Pasang plywood tebal 4 mm, untuk dinding

m2 m2 m2 m1 m1 m1 m1 m2

441,538

386 387 388 389 390 391 392 393 394 395 396 397 398 399 400 401 402 403 404 405 406 407 408 409 410 411 412 413 414 415 416 417 418 419 420 421

S-386 S-387 S-388 S-389 S-390 S-391 S-392 S-393 S-394 S-395 S-396 S-397 S-398 S-399 S-400 S-401 S-402 S-403 S-404 S-405 S-406 S-407 S-408 S-409 S-410 S-411 S-412 S-413 S-414 S-415 S-416 S-417 S-418 S-419 S-420 S-421

PEKERJAAN LANGIT-LANGIT (PLAFOND) Langit-langit asbes (1,00 x 1,00) m, rangka kayu jati (lokal) tanpa plepet Langit-langit asbes (1,00 x 1,00) m, rangka kayu kamper tanpa plepet Langit-langit asbes (1,00 x 1,00) m, rangka kayu bengkirai tanpa plepet Langit-langit asbes (1,00 x 1,00) m, rangka kayu kruing tanpa plepet Langit-langit asbes (1,00 x 1,00) m, rangka kayu jati (lokal) memakai plepet Langit-langit asbes (1,00 x 1,00) m, rangka kayu kamper memakai plepet Langit-langit asbes (1,00 x 1,00) m, rangka kayu bengkirai memakai plepet Langit-langit asbes (1,00 x 1,00) m, rangka kayu kruing memakai plepet Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu jati (lokal) Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu kamper Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu bengkirai Langit-langit gypsum board tebal 9 mm, rangka 60 x 120 kayu kruing Langit-langit gypsum board tebal 9 mm, rangka hollow Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu jati (lokal) Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu kamper Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu bengkirai Langit-langit kalsiboard tebal 3.5 mm, rangka 60 x 120 kayu kruing Langit-langit kalsiboard tebal 3.5 mm, rangka hollow Memasang langit-langit asbes semen, tebal 4 mm Memasang langit-langit asbes semen, tebal 5 mm Memasang langit-langit asbes semen, tebal 6 mm Memasang langit-langit akustik ukuran (30 x 30) cm Memasang langit-langit akustik ukuran (30 x 60) cm Memasang langit-langit akustik ukuran (60 x 120) cm Memasanglangit-langit tripleks ukuran (120 x 240) cm, tebal 3 mm Memasanglangit-langit tripleks ukuran (120 x 240) cm, tebal 4 mm Memasanglangit-langit tripleks ukuran (120 x 240) cm, tebal 6 mm Memasang langit-langit lambriziring kayu, tebal 9 mm Memasang langit-langit gypsum board ukuran (120x240x9) mm, tebal 9 mm Memasang langit-langit akustik ukuran (60 x 120) cm + rangka alluminium Memasang ist langit-langit kayu profil Pasang list profil cornees gypsum lebar sampai 5 cm Pasang list profil cornees gypsum lebar 5 - 10 cm Pasang list profil cornees gypsum lebar lebih dari 10 cm Mengerjakan Ukiran Gaya Yogyakarta dengan kedalaman 1 cm, tidak berlubang Memasang usuk peniung, kayu jati (klas plitur)

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m1 m1 m1 m1 m2 m3

202,041

422 423 424 425 426 427 428 429 430 431 432 433 434 435 436 437 438 439 440 441 442 443 444 445 446 447 448 449 450 451 452 453 454 455 456

S-422 S-423 S-424 S-425 S-426 S-427 S-428 S-429 S-430 S-431 S-432 S-433 S-434 S-435 S-436 S-437 S-438 S-439 S-440 S-441 S-442 S-443 S-444 S-445 S-446 S-447 S-448 S-449 S-450 S-451 S-452 S-453 S-454 S-455 S-456

PEKERJAAN ATAP DAN PELAPIS ATAP Pasang Atap Genteng Palentong Kecil Pasang genteng paris Pasang genteng beton besar Natural ( isi 9 / m2 ) Pasang Genteng Bubung Palentong Pasang Nok Genteng Beton Pasang bubungan genteng paris Pasang Atap Asbes Gelombang ( 2.50 x 0.92 m ) X 5mm Pasang Atap Asbes Gelombang ( 2.25 x 0.92 m ) X 5mm Pasang Atap Asbes Gelombang ( 2.00 x 0.92 m ) X 5mm Pasang Atap Asbes Gelombang ( 1.80 x 0.92 m ) X 5mm Pasang Atap Asbes Gelombang ( 300 x 1.05 m ) X 4mm Pasang Atap Asbes Gelombang ( 270 x 1.05 m ) X 4mm Pasang Atap Asbes Gelombang ( 240 x 1.05 m ) X 4mm Pasang Atap Asbes Gelombang ( 210 x 1.05 m ) X 4mm Pasang Atap Asbes Gelombang ( 1.5 x 1.05 m ) X 4mm Pasang Atap Asbes Gelombang ( 3.00 x 1.08 m ) X 6mm Pasang Atap Asbes Gelombang ( 2.7 x 1.08 m ) X 6mm Pasang Atap Asbes Gelombang ( 2.4 x 1.08 m ) X 6mm Pasang Atap Asbes Gelombang ( 2.1 x 1.08 m ) X 6mm Pasang Atap Asbes Gelombang ( 1.80 x 1.08 m ) X 6mm Pasang Nok Stel Gelombang 0.92m Pasang Nok Stel Gelombang 1.05m Pasang Nok Stel Gelombang 1.08m Pasang Nok Paten 0.92m Pasang Nok Paten 1.05m Pasang Nok Paten 1.08m Pasang Nok Stel rata 0.92m Pasang Nok Stel rata 1.05m Pasang Nok Atap Seng Pasang Atap Alluminium Pasang Nok Alluminium Pasang Alluminium Foil / Sisalation Pasang Atap Genteng Aspal Pasang Atap Genteng Metal Pasang Atap Genteng Kodok / Glazzur

m2 m2 m2 m1 m1 m1 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m1 m1 m1 m1 m1 m1 m1 m1 m2 m2 m2 m2 m2 m2 m2

www.mitra-arsitek.com

47,504 218,628 57,471 44,096 44,198 37,051 47,554

186,420 186,726 165,285 207,984 192,362 192,669 171,228 257,805 240,882 241,213 217,986 204,016 250,453 233,530 233,862 210,634 196,665 39,256 42,625 45,433 467,324 357,939 228,272 46,038 46,038 46,038 304,352 54,707 407,747 19,102 55,104 55,833 57,022 3,789,251 12,730,247

97,449 64,998 69,848 113,984 124,948 209,421 90,046 101,277 100,061 116,908 71,984 79,845 81,605 89,467 122,037 73,744 74,867 83,851 87,221 96,206 288,605 265,939 262,162 158,122 158,122 158,122 175,044 169,046 32,248 193,896 278,004 61,082 139,745 84,153 71,924

485,692 52,254 240,490 63,218 48,506 48,618 40,756 52,309

222,246 205,062 205,399 181,814 228,782 211,599 211,935 188,350 283,585 264,970 265,335 239,784 224,417 275,499 256,883 257,248 231,698 216,331 43,181 46,887 49,976 514,056 393,732 251,099 50,642 50,642 50,642 334,787 60,177 448,521 21,013 60,615 61,416 62,724 4,168,176 14,003,272

107,194 71,498 76,833 125,383 137,443 230,363 99,051 111,405 110,067 128,598 79,182 87,830 89,766 98,414 134,241 81,118 82,353 92,237 95,943 105,826 317,466 292,533 288,378 173,934 173,934 173,934 192,549 185,951 35,473 213,286 305,805 67,191 153,719 92,569 79,116

SNI-2007 SNI-2007 SNI-2007 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 SNI-2002

AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008

SNI-2002 AK-SNI 2008 AK-SNI 2008 SNI-2002 SNI-2002 AK-SNI 2008 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002

14/17

Software RAB Exarch xPro v2019

457 458 459 460 461 462 463 464 465 466 467 468 469 470 471 472 473 474 475 476

S-457 S-458 S-459 S-460 S-461 S-462 S-463 S-464 S-465 S-466 S-467 S-468 S-469 S-470 S-471 S-472 S-473 S-474 S-475 S-476

Pasang Atap Genteng Palentong Super / Besar Pasang Atap Sirap Pasang Genteng Bubung Kodok Glazzur Pasang Genteng Bubung Palentong Besar Pasang Rooflight Fiberglass ( 180 x 90 ) cm Pasang Nok Genteng Aspal Pasang Nok Genteng Metal Pasang Nok Sirap Pasang Atap Seng Gelombang Pasang genteng paris untuk rumah tingkat Pasang genteng beton besar Natural ( isi 9 / m2 ) untuk rumah tingkat Pasang genteng beton besar Warna ( isi 9 / m2 ) Pasang genteng beton besar Warna ( isi 9 / m2 ) untuk rumah tingkat Pasang genteng keramik berglasir KIA, Kanmuri Natural Pasang genteng keramik berglasir KIA, Kanmuri Natural untuk rumah tingkat Pasang bubungan genteng beton Warna Pasang bubungan genteng keramik berglasir KIA, Kanmuri Natural Pasang atap metal gelombang Pasang nok genteng metal U type prima roof Pasang atap polikarbonat

477 478 479 480 481 482 483 484 485 486 487 488 489 490 491 492 493 494 495 496 497 498 499 500 501 502 503 504 505 506 507 508 509

S-477 S-478 S-479 S-480 S-481 S-482 S-483 S-484 S-485 S-486 S-487 S-488 S-489 S-490 S-491 S-492 S-493 S-494 S-495 S-496 S-497 S-498 S-499 S-500 S-501 S-502 S-503 S-504 S-505 S-506 S-507 S-508 S-509

PEKERJAAN CAT DAN LABURAN Mengikis / Mengerok Permukaan Cat Tembok Lama m2 21,084 23,192 Mengerok Karat Cat Lama Permukaan Baja dengan Cara Manual m2 19,358 21,294 Mendempul dan Menggosok Kayu m2 16,828 18,510 Pengecatan Bidang Kayu Lama m2 44,751 49,226 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 2 Lapis Cat Penutup m2 41,688 45,857 Pengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup m2 61,465 67,611 Pelaburan Bidang Kayu dengan Teak Oil m2 33,362 36,698 Pelaburan Bidang Kayu dengan Pelitur m2 45,167 49,684 Pelaburan Bidang Kayu dengan Cat Residu dan Ter m2 16,515 18,167 Pelaburan Bidang Kayu dengan Vernis m2 69,333 76,267 Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) m2 32,259 35,485 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup) m2 21,403 23,544 Melabur tembok dengan kalkarium m2 12,077 13,284 Melabur Tembok dengan Kapur Sirih m2 24,521 26,973 Melabur Tembok Lama dengan Kapur Sirih ( untuk pemeliharaan ) m2 13,100 14,410 Pengecatan Permukaan Baja dengan Meni Besi m2 43,994 48,393 Pengecatan Permukaan Baja dengan Meni Besi dan Perancah m2 78,663 86,529 Pemasangan Wall Paper m2 87,844 96,628 Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 4 Lapis Cat Konvensional, m2 tebal 200 19,791 um 21,770 Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 1 Lapis Cat Mutakhir, m2 tebal 200 um 23,188 25,507 Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Manual Sistem 3 Lapis Cat Konvensional, m2 tebal 305,089 200 um 335,598 Pengecatan Permukaan Baja Lapis Seng ( Galbani ) secara Semprot ( Airless Spray ) dgn Sistem m2 1 Lapis Cat 251,732 Mutakhir, tebal 276,905 200 um Mencuci Bidang Permukaan Tembok yang Pernah dicat m2 19,358 21,294 Mengerok Karat atau Cat Lama Permukaan Baja dgn Pancar Pasir ( Sanblasting ) dgn Tingkatm2 Kebersihan Sa 899,962 2½. 989,958 Menyabun Permukaan Tembok Lama m2 19,358 21,294 Pengecatan tembok tidak terlindung dari panas dan hujan m2 39,682 43,650 Pengecatan bidang besi ( 3 x ) m2 45,631 50,194 Pengetiran kayu ( 2 x ) m2 16,295 17,925 Pekerjaan cat duco 3 x m2 111,785 122,963 Mengecat genteng m2 36,415 40,056 Mengecat kerb 3 kali m2 100,966 111,063 Memasang Prodo Mas 24 karat m2 5,180,014 5,698,016 Mengerjakan Cat Sungging m2 972,948 1,070,243

510 511 512 513 514 515 516 517 518 519 520 521 522 523 524

S-510 S-511 S-512 S-513 S-514 S-515 S-516 S-517 S-518 S-519 S-520 S-521 S-522 S-523 S-524

PEKERJAAN SANITASI Memasang Kloset Duduk / Monoblok Memasang 1Kloset Jongkok Porselen Memasang Kloset Jongkok Teraso Memasang Urinoir Memasang Wastafel Memasang Bak Mandi Fiberglass, volume 0.30 m³ Memasang Badkip Porselen Memasang Bak Fiberglass volume 1 m³ air Memasang Pipa Penyalur Air limbah jenis Pipa Tanah Ø15 cm Memasang Pipa Penyalur Air limbah jenis Pipa Tanah Ø 20 cm Memasang Pipa Beton Ø 5 cm - 20 cm Memasang Pipa Beton Ø 30 cm - 100 cm Memasang Bak Kontrol pasangan Batu Bata ukuran (30 x 30 )cm, t = 35 cm Memasang Bak Kontrol pasangan Batu Bata ukuran (45 x 45 )cm, t = 50 cm Memasang Bak Kontrol pasangan Batu Bata ukuran (60 x 60 )cm, t = 65 cm

bh bh bh bh bh bh bh bh m1 m1 m1 m1 bh bh bh

3,176,540

525 526 527 528 529 530 531 532 533

S-525 S-526 S-527 S-528 S-529 S-530 S-531 S-532 S-533

PEKERJAAN MEMASANG PIPA Memasang Pipa Galvanis Ø ½" Memasang Pipa Galvanis Ø ¾" Memasang Pipa Galvanis Ø 1" Memasang Pipa Galvanis Ø 1½" Memasang Pipa Galvanis Ø 3" Memasang Pipa Galvanis Ø 4" Memasang Pipa PVC tipe AW Ø ½" Memasang Pipa PVC tipe AW Ø ¾" Memasang Pipa PVC tipe AW Ø 1"

m1 m1 m1 m1 m1 m1 m1 m1 m1

107,779

www.mitra-arsitek.com

m2 m2 m1 m1 m1 m1 m1 m1 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m1 m2

73,716 316,938 111,432 111,942 116,534 126,432 141,289 99,104 62,962 78,256 83,106 72,145 85,403 140,808 98,549 192,064 214,526 110,990 144,505 325,964

841,962 717,181 1,810,269 1,940,439 1,134,885 373,446 1,803,922 95,630 102,075 131,073 494,488 768,848 612,056 939,438

113,905 131,057 193,234 222,639 276,015 73,799 75,637 76,249

81,088 348,632 122,575 123,137 128,187 139,075 155,417 109,015 69,258 86,082 91,417 79,360 93,944 154,889 108,403 211,271 235,979 122,089 158,955 358,560

SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008

SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008 AK-SNI 2008

3,494,194 926,158 788,899 1,991,296 2,134,483 1,248,374 410,790 1,984,315 105,193 112,283 144,180 543,937 845,733 673,262 1,033,382

SNI-2002

118,556 125,295 144,163 212,558 244,903 303,616 81,179 83,200 83,874

SNI-2002

SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002

SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002

15/17

Software RAB Exarch xPro v2019

534 535 536 537 538 539 540 541 542 543 544 545

S-534 S-535 S-536 S-537 S-538 S-539 S-540 S-541 S-542 S-543 S-544 S-545

Memasang Pipa PVC tipe AW Ø 1½" Memasang Pipa PVC tipe AW Ø 2" Memasang Pipa PVC tipe AW Ø 2½" Memasang Pipa PVC tipe AW Ø 3" Memasang Pipa PVC tipe AW Ø 4" Memasang Bak Cuci Piring Stainles Steel Memasang Bak Cuci Piring Teraso Memasang Kran Ø ¾" atau ½" Memasang Floor Drain Memasang Bak Mandi Teraso, volume 0.30 m3 Memasang bak mandi batu bata volume 0,30 m3 Membuat bak beton volume 1 m3 air

m1 m1 m1 m1 m1 bh bh bh bh bh bh bh

546 547 548 549 550 551 552 553 554 555 556 557 558 559 560 561 562 563 564 565 566 567 568 569 570 571 572 573 574 575 576 577 578 579 580

S-546 S-547 S-548 S-549 S-550 S-551 S-552 S-553 S-554 S-555 S-556 S-557 S-558 S-559 S-560 S-561 S-562 S-563 S-564 S-565 S-566 S-567 S-568 S-569 S-570 S-571 S-572 S-573 S-574 S-575 S-576 S-577 S-578 S-579 S-580

PEKERJAAN BESI DAN ALUMINIUM Memasang besi profil Mengerjakan pekerjaan perakitan Membuat 1 m2 pintu besi plat baja tebal 2 mm rangkap, rangka baja siku Mengerjakan pengelasan dengan las listrik Membuat rangka jendela besi square tube (25 x 5) cm Memasang pintu rolling door besi Memasang pintu lipat (Folding door) Memasang sunscreen alluminium Memasang rolling door alluminium Memasang kusen pintu alluminium Memasang pintu alluminium strip lebar 8 cm Memasang pintu kaca rangka alluminium Memasang venetions blinds dan Vertical blinds Memasang terali besi strip (2 x 3) mm Memasang kawat nyamuk dengan plepet baja strip Pasang kawat nyamuk dengan plepet kayu Memasang jendela nako & tralis Memasang talang 1/2 lingkaran D-15 cm, seng plat bjls 30 lebar 45 cm Pasang talang datar, seng BJLS 28, papan kayu jati Pasang talang datar, seng BJLS 28, papan kayu jati (lokal) Pasang talang datar, seng BJLS 28, papan kayu kamper Pasang talang datar, seng BJLS 28, papan kayu kruing Pasang talang datar, seng BJLS 28, papan kayu bengkirai Pasang talang miring, seng BJLS 28 papan kayu jati (klas 1) Pasang talang miring, seng BJLS 28, papan kayu jati (lokal) Pasang talang miring, seng BJLS 28, papan kayu kamper Pasang talang miring, seng BJLS 28, papan kayu kruing Pasang talang miring, seng BJLS 28, papan kayu bengkirai Pasang talang torong Pasang jendela besi Pasang jendela besi tahan api Pasang pintu alumunium Pasang kawat harmonika Pasang kawat kassa Pasang kawat burung

kg kg m2 cm m2 m2 m2 m2 m2 m1 m2 m2 m2 m2 m2 m2 m2 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m1 m2 m2 m2 m2 m2 m2

581 582 583 584 585 586 587 588 589 590 591 592 593 594 595

S-581 S-582 S-583 S-584 S-585 S-586 S-587 S-588 S-589 S-590 S-591 S-592 S-593 S-594 S-595

PEKERJAAN KUNCI DAN ENGSEL Pasang kunci Tanam Antik Pasang kunci Tanam Biasa Pasang kunci Tanam Kamar Mandi Pasang kunci Silinder Pasang Engsel Pintu Pasang Engsel Jendela Kupu - kupu Buah Pasang Engsel Angin Pasang Spring Knip Pasang Kait angin Pasang Door Closer Pasang kunci selot Pasang pegangan pintu / door holder Pasang door stop Pasang rel pintu dorong Pasang kunci lemari

bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh

371,582

596 597 598 599 600 601 602 603 604 605

S-596 S-597 S-598 S-599 S-600 S-601 S-602 S-603 S-604 S-605

PEKERJAAN KACA Pasang kaca, tebal 3 mm Pasang kaca, tebal 5 mm Pasang kaca, tebal 8 mm Pasang kaca buram, tebal 12 mm Pasang kaca cermin, tebal 5 mm Pasang kaca cermin, tebal 6 mm Pasang kaca cermin, tebal 8 mm Pasang kaca "wireglass", tebal 5 mm Pasang kaca patri, tebal 5 mm ...

m2 m2 m2 m2 m2 m2 m2 m2 m2 …

152,624

76,862 85,328 78,087 98,224 102,263 574,792 653,700 45,993 81,639 614,952 4,242,947 5,007,001

37,109 92,133 877,862 39,188 631,917 925,519 648,311 410,360 844,127 162,094 947,309 2,407,199 186,308 726,199 117,743 55,728 216,874 134,409 216,429 216,429 184,329 167,421 184,574 327,158 294,231 230,699 197,236 231,184 1,577,501 1,160,798 1,184,653 534,710 89,421 55,728 59,659

217,950 134,186 159,216 46,440 28,578 48,925 36,741 34,699 352,194 89,827 195,981 119,447 320,532 60,724

152,624 155,527 216,937 198,110 29,083 201,012 293,012 124,547 …



84,548 93,861 85,896 108,046 112,489 632,271 719,070 50,592 89,803 676,447 4,667,242 5,507,701

SNI-2002

40,820 101,346 965,648 43,107 695,109 1,018,071 713,142 451,396 928,540 178,304 1,042,039 2,647,919 204,938 798,819 129,518 61,301 238,562 147,850 238,072 238,072 202,762 184,163 203,031 359,874 323,654 253,769 216,959 254,302 1,735,251 1,276,878 1,303,118 588,181 98,363 61,301 65,625

SNI-2007

SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002

SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2007 SNI-2002 SNI-2007 SNI-2007 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 AK-SNI 2008 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002

408,741 239,745 147,605 175,138 51,084 31,436 53,818 40,415 38,168 387,413 98,810 215,579 131,391 352,586 66,796

SNI-2002

167,887 167,887 171,080 238,631 217,921 31,991 221,114 322,313 137,001

SNI-2002

SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002

SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 SNI-2002 …

DAFTAR ANALISA TAMBAHAN Analisa Harga Satuan Pekerjaan Sesuai Acuan Berdasarkan Data Empiris/Data Pelaksanaan Di Lapangan Pembaharuan Data Tahun 2018

www.mitra-arsitek.com

16/17

Software RAB Exarch xPro v2019

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

A-001 A-002 A-003 A-004 A-005 A-006 A-007 A-008 A-009 A-010 A-011 A-012 A-013 A-014 A-015 A-016 A-017 A-018 A-019 A-020 A-021 A-022 A-023 A-024 A-025 A-026 A-027 A-028 A-029 A-030 A-031 A-032

Pekerjaan Mobilisasi dan demobilisasi Pekerjaan Pasangan Pintu utama type P1 Pekerjaan Pasangan Pintu Ruangan type P2 Pekerjaan Pasangan Pintu WC type P3 Pekerjaan Pasangan Jendela type J1 Pekerjaan Pasangan Jendela type J2 Pekerjaan Pasangan Jendela type J3 Pekerjaan Pasangan Lubang Angin/Roster Pekerjaan Pasangan Shower Mandi Pekerjaan Pasangan Tangki Air Pekerjaan Pasangan Pompa Air Pekerjaan Septik Tank Volume 1 m3 Pekerjaan Sumur Resapan Air Hujan/Limbah Volume 1 m3 Pekerjaan Pasangan Box MCB Pekerjaan Pasangan Pembumian (Grounding) Pekerjaan Instalasi Kabel NYM-3x2.5m2 Pekerjaan Instalasi Kabel NYM 2x1,5 mm2 Pekerjaan Pasangan Fitting Lampu Pekerjaan Pasangan Saklar Lampu Pekerjaan Pasangan Lampu 5 W Pekerjaan Pasangan Lampu 15 W Pekerjaan Pasangan Lampu 20 W Pekerjaan Pasangan Colokan Listrik (Receiptackle) Pekerjaan Pasangan Air Conditioner Pekerjaan Pasangan Exhaust Fan Penyambungan Instalasi Listrik PLN Penyambungan Instalasi Air PDAM Pekerjaan Pekerjaan Plamir (1 Lapis) Pekerjaan Cat Anti Lumut dan Waterproofing Pekerjaan Menanam Pohon Perdu Pembersihan Area Kerja Pasca Konstruksi ...

www.mitra-arsitek.com

Ls unit unit unit unit unit unit unit unit unit unit m3 m3 Unit btg m1 m1 Unit unit unit unit unit unit unit unit Ls Ls m2 m2 pohon m2 …

3,565,210 2,703,879 2,142,329 1,580,779 1,315,672 1,011,969 3,309,347 44,103 230,159 1,688,846 879,507 9,472,375 6,669,245 598,732 935,662 23,954 20,087 43,060 44,176 37,120 49,474 60,705 50,338 3,610,565 858,970 6,177,050 2,807,750 29,588 25,453 657,414 19,869

3,241,100 2,458,072 1,947,572 1,437,072 1,196,065 919,972 3,008,497 40,094 209,236 1,535,315 799,552 8,611,250 6,062,950 544,302 850,602 21,776 18,261 39,145 40,160 33,746 44,977 55,187 45,762 3,282,332 780,882 5,615,500 2,552,500 26,898 23,139 597,649 18,063 …



AK-I.2016.(1) AK-I.2016.(2) AK-I.2016.(3) AK-I.2016.(4) AK-I.2016.(5) AK-I.2016.(6) AK-I.2016.(7) AK-I.2016.(8) AK-I.2016.(9) AK-I.2016.(10) AK-I.2016.(11) AK-I.2016.(12) AK-I.2016.(13) AK-I.2016.(14) AK-I.2016.(15) AK-I.2016.(16) AK-I.2016.(17) AK-I.2016.(18) AK-I.2016.(19) AK-I.2016.(20) AK-I.2016.(21) AK-I.2016.(22) AK-I.2016.(23) AK-I.2016.(24) AK-I.2016.(25) AK-I.2016.(26) AK-I.2016.(27) AK-I.2016.(28) AK-I.2016.(29) AK-I.2016.(30) A.2.2.1.9.a …

17/17

Software RAB Exarch xPro 2019

UPAH MINIMUM PROVINSI (UMP)

REGION 5

REGION 4

REGION 3

REGION 2

REGION 1

Region

No

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34

Nama Provinsi

Nanggroe Aceh Darussalam (NAD) Sumatera Utara Sumatera Barat Riau Jambi Kepulauan Riau Bengkulu Sumatera Selatan Bangka Belitung Lampung DKI Jakarta Banten Jawa Barat DI Yogyakarta Jawa Tengah Jawa Timur Bali Kalimantan Barat Kalimantan Tengah Kalimantan Selatan Kalimantan Timur Kalimantan Utara Sulawesi Utara Gorontalo Sulawesi Tengah Sulawesi Barat Sulawesi Selatan Sulawesi Tenggara Nusa Tenggara Barat (NTB) Nusa Tenggara Timur (NTT) Maluku Utara Maluku Papua Barat Papua

www.mitra-arsitek.com

Ibukota

Banda Aceh Medan Padang Pekanbaru Jambi Tanjungpinang Bengkulu Palembang Pangkal Pinang Bandar Lampung Jakarta Kota Serang Bandung Yogyakarta Semarang Surabaya Denpasar Pontianak Palangkaraya Banjarmasin Samarinda Tanjung Selor Manado Kota Gorontalo Palu Mamuju Makassar Kendari Mataram Kupang Sofifi Ambon Manokwari Jayapura

2017

2018

2019

2,500,000 1,961,354 1,949,284 2,266,722 2,063,948 2,358,454 1,737,412 2,388,000 2,534,673 1,908,477 3,355,750 1,931,180 1,420,624 1,337,645 1,367,000 1,388,000 1,956,727 1,882,900 2,227,307 2,258,000 2,339,556 2,354,800 2,598,000 2,030,000 1,807,775 2,017,780 2,435,625 2,002,625 1,631,245 1,525,000 1,975,000 1,925,000 2,421,500 2,663,646

2,717,750 2,132,188 2,119,067 2,464,154 2,243,718 2,563,875 1,888,741 2,595,995 2,755,443 2,074,673 3,648,035 2,099,385 1,544,360 1,454,154 1,486,065 1,508,894 2,127,157 2,046,900 2,421,305 2,454,671 2,543,331 2,559,903 2,824,286 2,206,813 1,965,232 2,193,530 2,647,767 2,177,052 1,825,000 1,660,000 2,147,023 2,222,220 2,667,000 2,895,650

2,935,985 2,303,403 2,289,228 2,662,026 2,423,889 2,769,754 2,040,407 2,804,453 2,976,705 2,241,269 3,940,972 2,267,966 1,668,372 1,570,923 1,605,396 1,630,058 2,297,968 2,211,266 2,615,736 2,651,781 2,747,560 2,765,463 3,051,076 2,384,020 2,123,040 2,369,670 2,860,383 2,351,869 1,971,548 1,793,298 2,319,428 2,400,664 2,881,160 3,128,171

1/1

Related Documents

Report Export Pdf
May 2020 0
Rab
June 2020 33
Export+
October 2019 47
Export
November 2019 40
Export
October 2019 51

More Documents from ""