Exaple Of Letter Of Certification

  • June 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Exaple Of Letter Of Certification as PDF for free.

More details

  • Words: 363
  • Pages: 2
Example of a Positive Certification Letter TO BE TYPED ON MUNICIPALITY LETTERHEAD Kansas Department of Health and Environment Bureau of Water Public Water Supply Section 1000 SW Jackson - Suite 420 Topeka, KS 66612 Re:

AFFIRMATIVE CERTIFICATION KPWSLF Project No._________

Gentlemen: As required by the loan conditions included in the KPWSLF Project No. ______, we __________________________________________ have utilized the services of our prime engineers for a period of 12 months following completion of the project built under this loan. In accordance with the terms of our contract the engineer advised us whether the project was meeting its performance standards. The undersigned certified that the project built under this loan meets the performance and operational requirements applicable to the project and the specifications which the project was planned, designed and built to meet.

____________________________ Signature Authorized Representative ____________________________ Printed Name Authorized Representative ___________________________ Title of Signer

______________________ Date

Example of a Negative Certification Letter TO BE TYPED ON MUNICIPALITY LETTERHEAD Kansas Department of Health and Environment Bureau of Water Public Water Supply Section 1000 SW Jackson - Suite 420 Topeka, KS 66612 Re:

NEGATIVE CERTIFICATION KPWSLF Project No._________

Gentlemen: As required by the loan conditions included in the KPWSLF Project No. ______, we __________________________________________ have utilized the services of our prime engineers for a period of 12 months following completion of the project build under this loan. In accordance with the terms of our contract the engineer supervised operations, trained operating personnel, prepared curricula and training material for operating personnel, revised the operation and maintenance manual and advised as whether the project was meeting its performance standards. The undersigned certifies that the project built under this loan does not meet the performance and operational requirements applicable to the project and the specifications which the project was planned, designed and built to meet. In accordance with the terms of the loan agreement, attached is a corrective action report which contains the following: 1.

As analyses of the cause of the project's inability to meet performance standards.

2.

Actions necessary to bring the project into compliance.

3.

Reasonable scheduled date for affirmative certification of the project.

____________________________________________ Signature

______________________ Date

Authorized Representative

____________________________________________ Title of Signer

Related Documents