EPCIC OPERATION FLOW
PRE BID
ENGINEERING
PROCUREMENT
CONSTRUCTION
INSTALLATION
COMMISSIONING
CONTRACTOR’s Business Development Department invites New Clients to Pre-Qualify CONTRACTOR or to solicits for the coming tender from the existing Clients.
BIDDING OF EPCIC CONTRACT
ENGINEERING
PROCUREMENT
CONSTRUCTION
INSTALLATION
COMMISSIONING
Business Development shall forward the Pre-Qualification request or Intent To Bid from Client to the Proposal Department. Proposal Department shall be the coordinator for the Pre-Qualification or Bidding of new project until contract been awarded by the Client
CONTRACTOR Dept 1 PROPOSAL
C L I E N T
Dept 2
Dept 3,,, DPT 3 DPT DPT33
PROPOSAL WORK PROCESS
PRE-QUALIFICATION
GATHER FSP & PROJECT SPECIFIC PROCEDURE (From all support Departments)
INTENT TO BID (From CLIENT)
COLLECT ERECTION SEQUENCE (prepared by Engineering)
GET APPROVAL TO BID FROM BUSINES REVIEW COMMITTEE ASSIGN BID LEADER
COLLECT MATERIAL TAKE OFF (prepared by Engineering)
OBTAIN QUOTATION FROM VENDOR
FINALISE TECHNICAL PROPOSAL & SPREEDSHEET SUBMIT BID QUERY APPROVAL FOR SUBMISSION (decided by Business Review Committee)
BID SUBMISSION
(assisted by Procurement)
ASSIGN TECHNICAL PROPOSAL ENGINEER
COLLECT PROJECT SCHEDULE
TECHNICAL CLARIFICATION
(Prepared by Planning)
NOTIFY SUPPORT DEPARTMENTS
ORGANIZE TENDER BRIEFING
Note: FSP = Fabrication Standards Procedure PMT = Project Management Team
PREPARE PROJECT MANAGEMENT TEAM (PMT) ORGANIZATION CHART, MANPOWER & EQUIPMENT LOADING (Prepared by PMT & Human Resource)
TECHNO-COMMERCIAL (If needed)
LETTER OF AWARD (From CLIENT)
EXECUTION OF EPCIC CONTRACT
ENGINEERING
PROCUREMENT
CONSTRUCTION
INSTALLATION
PROVISION OF ENGINEERING To work on the Conceptual, Front End and Detail engineering
COMMISSIONING
ENGINEERING WORK PROCESS
REVIEW CLIENT’S DRAWING & SPECIFICATION
PREPARE SHOP DRAWING/ 3D MODELLING (for Client’s approval)
PREPARE AS-BUILT DRAWING
PREPARE FINAL DOCUMENTS
PREPARE ERECTION SEQUENCE DESIGN TEMPORARY SUPPORT (for load out/weighing operation)
CONDUCT ENGINEERING STUDY
PREPARE MATERIAL TAKE OFF
DESIGN AND PREPARE PROJECT SPECIFIC PROCEDURE (PSP)
RAISE PURCHASE REQUISITION
PROVIDE TECHNICAL SUPPORT TO PROJECT MANAGEMENT TEAM
TECHNICAL BID EVALUATION
EXECUTION OF EPCIC CONTRACT
ENGINEERING
PROCUREMENT PROCUREMENT
CONSTRUCTION
INSTALLATION
COMMISSIONING
PROVISION OF PROCUREMENT Purchasing of project materials and equipments are being centralized and organized by its Procurement Department. In some cases, Client also purchased the tag items and delivered to CONTRACTOR within the agreed timing. This requirement shall be specified by Client during the Bidding.
PROCUREMENT WORK PROCESS PROCUREMENT
EXPEDITING
PURCHASE REQUISITION
LOGISTIC, MATERIAL & W’HSE
TRANSPORT & PERMIT AP
(from Engineering)
DRAFT AGREEMENT
(If needed)
(If needed)
SOURCING APPROVE DRAWING & DOCUMENT(s) TECHNICAL EVALUATION (conducted by Engineering)
QUOTATION TABULANT / PURCHASE ORDER WORKSHEET
(approved by Project Management Team, Engineering & Client)
DELIVER ITEM TO STORE
START FABRICATION
INSPECT ITEMS AGAINST PURCHASE ORDER
(by Vendor)
CLARIFICATION MEETING
INSPECTION
(with vendor)
(by our Staff or 3rd party surveyor)
REGISTER ITEM IN SAP
ISSUE PURCHASE ORDER
CUSTOM CLEARANCE ON DUTY & TAX
RELEASE OF GOODS INCOMING INSPECTION REPORT RELEASE ITEM (to project team)
EXECUTION OF EPCIC CONTRACT
ENGINEERING
PROCUREMENT
CONSTRUCTION
INSTALLATION
PROVISION OF CONSTRUCTION Construction work of one project is handled by specific Project Management Team (PMT).
COMMISSIONING
CONSTRUCTION WORK PROCESS
RECEIVE MATERIAL
INSPECTION ON ACCURACY
UP DATE FIT UP REPORT
INSPECT MATERIAL
RELEASE MATERIAL VERIFICATION REPORT
PAINTING
RELEASE GOODS INCOMING INSPECTION REPORT
CUTTING
LIFTING/ RIGGING
RELEASE MATERIAL TO PROJECT MANAGEMENT TEAM
ASSEMBLY
CONTINUE FABRICATION ACCORDING TO ERECTION SEQUENCE
CHECK ERECTION SEQUENCE
INSPECT DIMENSION
CONSTRUCTION COMPLETE
COATING (If needed)
RELEASE FIT UP REPORT
SHOP PRIME
WELDING
MARKING
INSPEC DIMENSION
ON YARD COMMISSIONING
LOAD OUT FOR DELIVERY
EXECUTION OF EPCIC CONTRACT
ENGINEERING
PROCUREMENT
CONSTRUCTION
INSTALLATION
PROVISION OF INSTALLATION To work on the logistic,marine fleets, installation window based on sea condition and the permit needed for the offshore installation
COMMISSIONING
CURRENT MARINE FLEETS
Anchor Handling Towing Supply
Derrick/Lay Barge
Utility Workboat/DSV
EXECUTION OF EPCIC CONTRACT
ENGINEERING
PROCUREMENT
CONSTRUCTION
INSTALLATION
COMMISSIONING
PROVISION OF COMMISSIONING Commissioning Department (PMT) shall perform the testing and the pre-commissioning work onshore, hook up and commissioning activities offshore
COMMISSIONING WORK PROCESS IDENTIFY COMMISSIONING WORK SCOPE
IDENTIFY SYSTEM/ EQUIPMENT TO BE COMMISSIONED
FINISH PRE-COMMISSIONING
SUBMIT CHECK LISTS (To be approved by Client)
PREPARE COMMISSIONING PROCEDURE (To be approved by Client)
PURCHASE COMMISSIONING CONSUMABLE AND SPARES
PREPARATION PRIOR TO COMMISSIONING COMMISSIONING & TESTING ON SYSTEM/ EQUIPMENT (testing to be witnessed by Client)
REVIEW THE CHECK LIST OF INSTALLED EQUIPMENTS
NOTIFY CLIENT FOR SPECIFIC PRE-COMMISSIONING
HANDOVER SYSTEM TO CLIENT FOR APPROVAL SUBMIT THE REMAINING DOCUMENTS (If any)
SET UP TEMPORARY FACILITIES COMPLETE HANDOVER OF THE TERMINAL TO CLIENT STARTS PRE-COMMISSIONING
End