Appendix 3 Scope of Work Demolition Works Masonry Works • 4" CHB Laying with Rebars • Plastering Works Carpentry Works • Cashier Counter • Display Hooks • Stockroom Cabinet • Floating Shelves Ceiling Works • Flat Ceiling using
• •
Drop Ceiling-Circular
Drop Ceiling-Cashier Counter Wall Finishes • Stockroom Partition • Drywall Partition • Fitting Room Partition • Mirror on Plywood Backing • Glass Panel Floor Finishes • Vinyl Planks • Carpet Roll • Elevated Floor Using Plywood Painting Works • Ceiling- Flat Enamel • Wall- Semi Gloss Latex • Elevated Floor- Semi Gloss • Cashier Counter- Duco • Display Hooks- Duco • Stockroom Cabinet- Duco • Floating Shelves- Duco Other Finishes • Roll-Up Door
•
Cashier CountertopLaminated Electrical Works • Wiring and Conduit • Switches and Outlets • Lighting Fixtures • Flourescent- Cove Light • Panel Box and Accessories
DURATION: 1 Month (31 Days) 1
2
3
4
5
6
7
8
9
1 0
1 1
1 2
1 3
1 4
1 5
1 6
1 7
1 8
1 9
2 0
2 1
2 2
2 3
2 4
2 5
2 6
2 7
2 8
2 9
3 0
3 1