Ee Perenc Pembuatan Gapura Identitas - Setindo.xlsx

  • Uploaded by: Budi Rahmadi
  • 0
  • 0
  • July 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Ee Perenc Pembuatan Gapura Identitas - Setindo.xlsx as PDF for free.

More details

  • Words: 3,102
  • Pages: 36
REKAPITULASI ENGINEER'S ESTIMATE PEKERJAAN :

PERENCANAAN PEMBUATAN GAPURA IDENTITAS DI KAWASAN WISATA DANAU SIPIN

LOKASI TAHUN

KOTA JAMBI 2018

: :

NO

JENIS PEKERJAAN

HARGA (Rp)

A PEKERJAAN PERSIAPAN

3,300,000.00

B PEK. TANAH & PONDASI

1,095,088.91

C PEK. STRUKTUR BETON BERTULANG

48,152,905.63

D PEK. PASANGAN

127,414,123.68

E PEK. TANAMAN Jumlah PPn (Pajak Pertambahan Nilai) 10% Jumlah Dibulatkan Terbilang :

2,153,875.00

10%

182,115,993.21 18,211,599.32 200,327,592.53 200,327,000.00

Dua Ratus Juta Tiga Ratus Dua Puluh Tujuh Ribu Rupiah Di Rencanakan Oleh : KONSULTAN PERENCANA CV. SETINDO KARYA KONSULTAN

TRISNO SATRIA PUTRA, ST Team Leader

ENGINEER'S ESTIMATE PEKERJAAN LOKASI TAHUN

PERENCANAAN PEMBUATAN GAPURA IDENTITAS DI KAWASAN WISATA DANAU SIPIN KOTA JAMBI 2018

NO A 1 2 3 4 5

URAIAN PEKERJAAN PERSIAPAN Mobilisasi & Demobilisasi Pengukuran & Pemasangan bouwplank Pembuatan papan nama proyek Pembuatan gudang material & peralatan Laporan & Dokumentasi

VOLUME

1.00 1.00 1.00 1.00 1.00

SATU HARGA SATUAN AN (RP) Ls Ls Bh Ls Ls

300,000.00 800,000.00 350,000.00 1,000,000.00 850,000.00

M3 M3 M3

69,300.00 102,960.00 23,095.60

M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3 M3

765,984.23 3,742,750.00 3,742,750.00 3,742,750.00 4,019,009.50 4,962,765.50 4,962,765.50 4,962,765.50 5,063,459.50 5,063,459.50 5,063,459.50 4,816,240.00

17.43 35.00 35.00 1.00 28.13 0.53 51.56

M2 M2 M2 Ls M2 M3 M2

218,667.35 58,842.30 19,349.55 4,500,000.00 375,000.00 4,019,009.50 1,600,000.00

1.00 1.00

Ls Ls

2,750,000.00 18,450,000.00

Jumlah A B

PEK. TANAH & PONDASI 1 Galian tanah pondasi 2 Pasir urug di bawah pondasi tapak 3 Urugan tanah bekas galian

13.60 0.47 4.53 Jumlah B

C 1 2 3 4 5 6 7 8 9 10 11 12

PEK. STRUKTUR BETON BERTULANG Lantai kerja pondasi tapak Beton K-100 Tbl. 7 cm Pondasi Tapak Beton Bertulang P1 Uk. 1500x950x400 Pondasi Tapak Beton Bertulang P2 Uk. 2000x1000x40 Pondasi Tapak Beton Bertulang P3 Uk. 3500x800x400 Sloof Beton Bertulang Uk. 200x300 mm Kolom Beton Bertulang 250x800 mm Kolom Beton Bertulang 250x400 mm Kolom Beton Bertulang 250x450 mm Balok Beton Bertulang Uk. 200x300 mm Balok Beton Bertulang Uk. 250x250 mm Balok Beton Bertulang Uk. 150x200 mm Plat Beton Bertulang Tbl. 100 m Dudukan Rangka ACP

0.47 1.14 1.60 1.12 0.49 1.18 2.46 2.04 0.14 0.18 0.27 0.05 Jumlah C

D 1 2 3 4 5 6 7 8 9

PEK. PASANGAN Pas. Dinding Bata 1 : 4 Tebal 1 Bata Plasteran 1 : 4 tbl. 1,5 Cm Pengecatan Dinding Profilan & Relief Dinding Pasang Batu Alam Andesit Motif Alur Kanstin Beton Bak Tanaman Panel Dinding ACP PVDF tbl. 4 mm Rangka Besi Profil (Include Angkur, Sambungan2) Pasang Logo Provinsi Bahan Acrylic Pasang Tuisan Di Atas Gapura Bahan Acrylic (Bentuk dan Ukuran Sesuai Gambar)

Jumlah D E

PEK. TANAMAN

NO 1 2 3 4 5

URAIAN Tanah Humus Lempeng Rumput Gajah Mini Pohon Pucuk Merah T. 1,5 M Kembang Amarilis Tanaman Bordir

VOLUME 0.45 2.97 3.00 8.00 1.00 Jumlah E

SATU HARGA SATUAN AN (RP) M3 150,000.00 M2 65,000.00 Btg 500,000.00 Pcs 35,000.00 Ls 114,000.00

SATA DANAU SIPIN

JUMLAH HARGA (RP) 300,000.00 800,000.00 350,000.00 1,000,000.00 850,000.00 3,300,000.00 942,393.38 48,005.10 104,690.43 1,095,088.91

357,140.15 4,266,735.00 5,988,400.00 4,191,880.00 1,965,295.65 5,856,063.29 12,208,403.13 10,105,431.25 729,138.17 886,105.41 1,367,134.07 231,179.52 48,152,905.63

3,811,371.91 2,059,480.50 677,234.25 4,500,000.00 10,548,000.00 2,122,037.02 82,496,000.00 2,750,000.00 18,450,000.00 127,414,123.68

JUMLAH HARGA (RP) 66,825.00 193,050.00 1,500,000.00 280,000.00 114,000.00 2,153,875.00

ANALISA HARGA SATUAN PEKERJAAN (PERMEN PUPR NO : 28/PRT/M/2016)

A.2.3.1 PEKERJAAN TANAH A. 2.3.1.1 Penggalian 1 M3 Tanah biasa sedalam 1 M No. Uraian Satuan A TENAGA Pekerja OH Mandor OH B

Koefisien

Harga Satuan (Rp)

0.7500 80,000.00 0.0250 120,000.00 JUMLAH TENAGA KERJA

BAHAN JUMLAH HARGA BAHAN

C

PERALATAN JUMLAH HARGA ALAT

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

A. 2.3.1.2 Penggalian 1 M3 Tanah biasa sedalam 2 M No. Uraian Satuan A TENAGA Pekerja OH Mandor OH B

BAHAN

C

PERALATAN

10% x D

Koefisien

Harga Satuan (Rp)

0.9000 80,000.00 0.0450 120,000.00 JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN JUMLAH HARGA ALAT D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

A. 2.3.1.9 Pengurugan kembali 1 M3 galian tanah No. Uraian Satuan A TENAGA Pekerja OH Mandor OH B

BAHAN

C

PERALATAN

10% x D

Koefisien

Harga Satuan (Rp)

0.2500 80,000.00 0.0083 120,000.00 JUMLAH TENAGA KERJA

JUMLAH HARGA BAHAN

JUMLAH HARGA ALAT

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

10% x D

A. 2.3.1.11 Pengurugan 1 M3 dengan pasir urug No. Uraian Satuan A TENAGA Pekerja OH Mandor OH B

C

BAHAN Pasir Urug

M3

Koefisien

Harga Satuan (Rp)

0.3000 80,000.00 0.0100 120,000.00 JUMLAH TENAGA KERJA 1.2000 57,000.00 JUMLAH HARGA BAHAN

PERALATAN JUMLAH HARGA ALAT

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

10% x D

A.4.1.1 PEKERJAAN BETON A.4.1.1.4 Membuat 1 M3 lantai kerja beton mutu f'c = 7,4 Mpa (K.100), Slump (3-6) cm, w/c=0,87 No. Uraian Satuan Koefisien Harga Satuan (Rp) A TENAGA Pekerja OH 1.2000 80,000.00 Tukang Batu OH 0.2000 110,000.00 Kepala Tukang OH 0.0200 135,000.00 Mandor OH 0.0600 120,000.00 JUMLAH TENAGA KERJA B BAHAN Semen Portlant Kg 230.0000 1,250.00 Pasir Beton M3 0.6379 67,000.00 Kerikil (Maks. 30 mm) M3 0.7607 300,000.00 Air Liter 200.0000 50.00 JUMLAH HARGA BAHAN C PERALATAN JUMLAH HARGA ALAT D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

10% x D

A.4.1.1.28 Membuat 1 M3 pondasi beton bertulang (150 kg besi + bekisting) No. Uraian Satuan Koefisien Harga Satuan (Rp) A TENAGA Pekerja OH 5.3000 80,000.00 Tukang Batu OH 0.2750 110,000.00 Tukang Kayu OH 1.3000 110,000.00 Tukang Besi OH 1.0500 110,000.00 Kepala Tukang OH 0.2620 135,000.00 Mandor OH 0.2650 120,000.00 JUMLAH TENAGA KERJA

B

C

BAHAN Kayu Klas III Paku Biasa 2"-5" Minyak Bekisting Besi Beton Kawat Beton Semen Portlant Pasir Beton Kerikil

M3 Kg Liter Kg Kg Kg M3 M3

0.2000 1,935,000.00 1.5000 17,000.00 0.4000 8,500.00 157.5000 9,300.00 2.2500 19,000.00 336.0000 1,250.00 0.5400 67,000.00 0.8100 300,000.00 JUMLAH HARGA BAHAN

PERALATAN JUMLAH HARGA ALAT

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

10% x D

A.4.1.1.29b Membuat 1 M3 sloof beton bertulang (150 kg besi + bekisting) No. Uraian Satuan Koefisien Harga Satuan (Rp) A TENAGA Pekerja OH 5.6500 80,000.00 Tukang Batu OH 0.2750 110,000.00 Tukang Kayu OH 1.5600 110,000.00 Tukang Besi OH 1.4000 110,000.00 Kepala Tukang OH 0.3230 135,000.00 Mandor OH 0.2830 120,000.00 JUMLAH TENAGA KERJA B BAHAN Kayu Klas III M3 0.2700 1,935,000.00 Paku Biasa 2"-5" Kg 2.0000 17,000.00 Minyak Bekisting Liter 0.6000 8,500.00 Besi Beton Kg 157.5000 9,300.00 Kawat Beton Kg 2.2500 19,000.00 Semen Portlant Kg 336.0000 1,250.00 Pasir Beton M3 0.5400 67,000.00 Kerikil M3 0.8100 300,000.00 JUMLAH HARGA BAHAN C PERALATAN JUMLAH HARGA ALAT D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

10% x D

A.4.1.1.31b Membuat 1 M3 balok beton bertulang (150 kg besi + bekisting) No. Uraian Satuan Koefisien Harga Satuan (Rp) A TENAGA Pekerja OH 6.350 80,000.00 Tukang Batu OH 0.275 110,000.00 Tukang Kayu OH 1.650 110,000.00 Tukang Besi OH 1.400 110,000.00 Kepala Tukang OH 0.333 135,000.00 Mandor OH 0.318 120,000.00 JUMLAH TENAGA KERJA B BAHAN Kayu Klas III M3 0.3200 1,935,000.00 Paku Biasa 2"-5" Kg 3.2000 17,000.00 Minyak Bekisting Liter 1.6000 8,500.00 Besi Beton Polos Kg 157.5000 9,300.00 Kawat Beton Kg 2.2500 19,000.00 Semen Portlant Kg 336.0000 1,250.00 Pasir Beton M3 0.5400 67,000.00 Kerikil M3 0.8100 300,000.00 Kayu kelas II balok M3 0.1400 2,150,000.00 Plywood 9 mm M3 2.8000 115,500.00 Dolken kayu M3 16.0000 8,000.00 JUMLAH HARGA BAHAN C PERALATAN

JUMLAH HARGA ALAT D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

10% x D

A.4.1.1.32 Membuat 1 M3 kolom beton bertulang (150 kg besi + bekisting) No. Uraian Satuan Koefisien Harga Satuan (Rp) A TENAGA Pekerja OH 5.3000 80,000.00 Tukang Batu OH 0.2750 110,000.00 Tukang Kayu OH 1.3000 110,000.00 Tukang Besi OH 1.0500 110,000.00 Kepala Tukang OH 0.2650 135,000.00 Mandor OH 0.2650 120,000.00 JUMLAH TENAGA KERJA B BAHAN Kayu Klas III M3 0.3200 1,935,000.00 Paku Biasa 2"-5" Kg 3.2000 17,000.00 Minyak Bekisting Liter 1.6000 8,500.00 Besi Beton Kg 157.5000 9,300.00 Kawat Beton Kg 2.2500 19,000.00 Semen Portlant Kg 336.0000 1,250.00 Pasir Beton M3 0.5400 67,000.00 Kerikil M3 0.8100 300,000.00 Kayu kelas II balok M3 0.1200 2,150,000.00 Plywood 9 mm Lbr 2.8000 115,500.00 Dolken kayu Btg 32.0000 8,000.00 JUMLAH HARGA BAHAN C PERALATAN JUMLAH HARGA ALAT D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

10% x D

A.4.1.1.33 Membuat 1 M3 dinding beton bertulang (150 kg besi + bekisting) No. Uraian Satuan Koefisien Harga Satuan (Rp) A TENAGA Pekerja OH 5.3000 80,000.00 Tukang Batu OH 0.2750 110,000.00 Tukang Kayu OH 1.3000 110,000.00 Tukang Besi OH 1.0500 110,000.00 Kepala Tukang OH 0.2620 135,000.00 Mandor OH 0.2650 120,000.00 JUMLAH TENAGA KERJA B BAHAN Kayu Klas III M3 0.2400 1,935,000.00 Paku Biasa 2"-5" Kg 3.2000 17,000.00 Minyak Bekisting Liter 1.6000 8,500.00 Besi Beton Kg 157.5000 9,300.00 Kawat Beton Kg 2.2500 19,000.00 Semen Portlant Kg 336.0000 1,250.00 Pasir Beton M3 0.5400 67,000.00 Kerikil M3 0.8100 300,000.00 Kayu kelas II balok M3 0.1600 2,150,000.00 Plywood 9 mm Lbr 2.8000 115,500.00 Dolken kayu Btg 24.0000 8,000.00

JUMLAH HARGA BAHAN C

PERALATAN JUMLAH HARGA ALAT

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

10% x D

A.4.4.1. PEKERJAAN PASANGAN DINDING A.4.4.1.1 Pemasangan 1 M2 Dinding Bata Merah (5x11x22) cm tebal 1 Batu Campuran 1 SP : 2 PP No. Uraian Satuan Koefisien Harga Satuan (Rp) A TENAGA Pekerja OH 0.6000 80,000.00 Tukang Batu OH 0.2000 110,000.00 Kepala Tukang OH 0.0200 135,000.00 Mandor OH 0.0300 120,000.00 JUMLAH TENAGA KERJA B BAHAN Bata Merah Buah 140.0000 600.00 Semen Portland Kg 43.5000 1,250.00 Pasir Pasang M3 0.0800 57,000.00 JUMLAH HARGA BAHAN C PERALATAN JUMLAH HARGA ALAT D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

10% x D

A.4.4.1.2 Pemasangan 1 M2 Dinding bata merah (5x11x22) cm tebal 1 batu Campuran 1 SP : 3 PP No. Uraian Satuan Koefisien Harga Satuan (Rp) A TENAGA Pekerja OH 0.6000 80,000.00 Tukang Batu OH 0.2000 110,000.00 Kepala Tukang OH 0.0200 135,000.00 Mandor OH 0.0300 120,000.00 JUMLAH TENAGA KERJA B BAHAN Bata Merah Buah 140.0000 600.00 Semen Portland Kg 32.9500 1,250.00 Pasir Pasang M3 0.0910 57,000.00 JUMLAH HARGA BAHAN C PERALATAN JUMLAH HARGA ALAT D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

10% x D

A.4.4.1.3 Pemasangan 1 M2 Dinding bata merah (5x11x22) cm tebal 1 batu Campuran 1 SP : 4 PP No. Uraian Satuan Koefisien Harga Satuan (Rp) A TENAGA Pekerja OH 0.6000 80,000.00 Tukang Batu OH 0.2000 110,000.00 Kepala Tukang OH 0.0200 135,000.00 Mandor OH 0.0300 120,000.00 JUMLAH TENAGA KERJA

B

C

BAHAN Bata Merah Semen Portland Pasir Pasang

Buah Kg M3

140.0000 600.00 26.5500 1,250.00 0.0930 57,000.00 JUMLAH HARGA BAHAN

PERALATAN JUMLAH HARGA ALAT

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

10% x D

A.4.4.1.7 Pemasangan 1 M2 Dinding bata merah (5x11x22) cm tebal 1/2 batu Campuran 1 SP : 2 PP No. Uraian Satuan Koefisien Harga Satuan (Rp) A TENAGA Pekerja OH 0.3000 80,000.00 Tukang Batu OH 0.1000 110,000.00 Kepala Tukang OH 0.0100 135,000.00 Mandor OH 0.0150 120,000.00 JUMLAH TENAGA KERJA B BAHAN Bata Merah Buah 70.0000 600.00 Semen Portland Kg 18.9500 1,250.00 Pasir Pasang M3 0.0380 57,000.00 JUMLAH HARGA BAHAN C PERALATAN JUMLAH HARGA ALAT D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

10% x D

A.4.4.1.8 Pemasangan 1 M2 Dinding bata merah (5x11x22) cm tebal 1/2 batu Campuran 1 SP : 3 PP No. Uraian Satuan Koefisien Harga Satuan (Rp) A TENAGA Pekerja OH 0.3000 80,000.00 Tukang Batu OH 0.1000 110,000.00 Kepala Tukang OH 0.0100 135,000.00 Mandor OH 0.0150 120,000.00 JUMLAH TENAGA KERJA B BAHAN Bata Merah Buah 70.0000 600.00 Semen Portland Kg 14.3700 1,250.00 Pasir Pasang M3 0.0400 57,000.00 JUMLAH HARGA BAHAN C PERALATAN JUMLAH HARGA ALAT D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

10% x D

A.4.4.1.9 Pemasangan 1 M2 Dinding bata merah (5x11x22) cm tebal 1/2 batu Campuran 1 SP : 4 PP No. Uraian Satuan Koefisien Harga Satuan (Rp) A TENAGA Pekerja OH 0.3000 80,000.00 Tukang Batu OH 0.1000 110,000.00 Kepala Tukang OH 0.0100 135,000.00 Mandor OH 0.0150 120,000.00 JUMLAH TENAGA KERJA B BAHAN Bata Merah Buah 70.0000 600.00

Semen Portland Pasir Pasang C

Kg M3

11.5000 1,250.00 0.0430 57,000.00 JUMLAH HARGA BAHAN

PERALATAN JUMLAH HARGA ALAT

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

10% x D

A.4.4.2 PEKERJAAN PLESTERAN A.4.4.2.2 Pemasangan 1 M2 Plesteran dinding 1 SP : 2 PP tebal 15 mm No. Uraian Satuan Koefisien Harga Satuan (Rp) A TENAGA Pekerja OH 0.3000 80,000.00 Tukang Batu OH 0.1500 110,000.00 Kepala Tukang OH 0.0150 135,000.00 Mandor OH 0.0150 120,000.00 JUMLAH TENAGA KERJA B BAHAN Semen Portland Kg 10.2240 1,250.00 Pasir Pasang M3 0.0200 57,000.00 JUMLAH HARGA BAHAN C PERALATAN JUMLAH HARGA ALAT D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

10% x D

A.4.4.2.3 Pemasangan 1 M2 Plesteran dinding 1 SP : 3 PP tebal 15 mm No. Uraian Satuan Koefisien Harga Satuan (Rp) A TENAGA Pekerja OH 0.3000 80,000.00 Tukang Batu OH 0.1500 110,000.00 Kepala Tukang OH 0.0150 135,000.00 Mandor OH 0.0150 120,000.00 JUMLAH TENAGA KERJA B BAHAN Semen Portland Kg 7.7760 1,250.00 Pasir Pasang M3 0.0230 57,000.00 JUMLAH HARGA BAHAN C PERALATAN JUMLAH HARGA ALAT D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

10% x D

A.4.4.2.4 Pemasangan 1 M2 Plesteran dinding 1 SP : 4 PP tebal 15 mm No. Uraian Satuan Koefisien Harga Satuan (Rp) A TENAGA Pekerja OH 0.3000 80,000.00 Tukang Batu OH 0.1500 110,000.00 Kepala Tukang OH 0.0150 135,000.00 Mandor OH 0.0150 120,000.00 JUMLAH TENAGA KERJA B BAHAN Semen Portland Kg 6.2400 1,250.00

Pasir Pasang C

M3

0.0240 57,000.00 JUMLAH HARGA BAHAN

PERALATAN JUMLAH HARGA ALAT

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

10% x D

A.4.4.2.27 Pemasangan 1 M2 Acian No. Uraian A TENAGA Pekerja Tukang Batu Kepala Tukang Mandor B

C

BAHAN Semen Portland

Satuan

Koefisien

Harga Satuan (Rp)

OH OH OH OH

0.2000 80,000.00 0.1000 110,000.00 0.0100 135,000.00 0.0100 120,000.00 JUMLAH TENAGA KERJA

Kg

3.2500 1,250.00 JUMLAH HARGA BAHAN

PERALATAN JUMLAH HARGA ALAT

D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

10% x D

A.4.7.1 PEKERJAAN PENGECATAN A.4.7.1.10 Pengecatan 1 M2 Tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) No. Uraian Satuan Koefisien Harga Satuan (Rp) A TENAGA Pekerja OH 0.0200 80,000.00 Tukang Cat OH 0.0630 110,000.00 Kepala Tukang OH 0.0063 135,000.00 Mandor OH 0.0030 120,000.00 JUMLAH TENAGA KERJA B BAHAN Plamuur Kg 0.1000 8,500.00 Cat Dasar Kg 0.1000 18,000.00 Cat Penutup Kg 0.2600 20,000.00 JUMLAH HARGA BAHAN C PERALATAN JUMLAH HARGA ALAT D E F

Jumlah (A+B+C) Overhead & Profit Harga Satuan Pekerjaan (D+E)

10% x D

(PERMEN PUPR NO : 28/PRT/M/2016)

Jumlah Harga (Rp) 60,000.00 3,000.00 63,000.00

0.00 0.00 0.00 63,000.00 6,300.00 69,300.00

Jumlah Harga (Rp) 72,000.00 5,400.00 77,400.00

0.00 0.00 0.00 77,400.00 7,740.00 85,140.00

Jumlah Harga (Rp) 20,000.00 996.00 20,996.00 0.00 0.00 0.00 0.00

20,996.00 2,099.60 23,095.60

Jumlah Harga (Rp) 24,000.00 1,200.00 25,200.00 68,400.00 68,400.00 0.00 0.00 93,600.00 9,360.00 102,960.00

n mutu f'c = 7,4 Mpa (K.100), Slump (3-6) cm, w/c=0,87 Jumlah Harga (Rp) 96,000.00 22,000.00 2,700.00 7,200.00 127,900.00 287,500.00 42,739.30 228,210.00 10,000.00 568,449.30 0.00 0.00 696,349.30 69,634.93 765,984.23

Jumlah Harga (Rp) 424,000.00 30,250.00 143,000.00 115,500.00 35,370.00 31,800.00 779,920.00

387,000.00 25,500.00 3,400.00 1,464,750.00 42,750.00 420,000.00 36,180.00 243,000.00 2,622,580.00 0.00 0.00 3,402,500.00 340,250.00 3,742,750.00

Jumlah Harga (Rp) 452,000.00 30,250.00 171,600.00 154,000.00 43,605.00 33,960.00 885,415.00 522,450.00 34,000.00 5,100.00 1,464,750.00 42,750.00 420,000.00 36,180.00 243,000.00 2,768,230.00 0.00 0.00 3,653,645.00 365,364.50 4,019,009.50

Jumlah Harga (Rp) 508,000.00 30,250.00 181,500.00 154,000.00 44,955.00 38,160.00 956,865.00 619,200.00 54,400.00 13,600.00 1,464,750.00 42,750.00 420,000.00 36,180.00 243,000.00 301,000.00 323,400.00 128,000.00 3,646,280.00

0.00 0.00 4,603,145.00 460,314.50 5,063,459.50

Jumlah Harga (Rp) 424,000.00 30,250.00 143,000.00 115,500.00 35,775.00 31,800.00 780,325.00 619,200.00 54,400.00 13,600.00 1,464,750.00 42,750.00 420,000.00 36,180.00 243,000.00 258,000.00 323,400.00 256,000.00 3,731,280.00 0.00 0.00 4,511,605.00 451,160.50 4,962,765.50

Jumlah Harga (Rp) 424,000.00 30,250.00 143,000.00 115,500.00 35,370.00 31,800.00 779,920.00 464,400.00 54,400.00 13,600.00 1,464,750.00 42,750.00 420,000.00 36,180.00 243,000.00 344,000.00 323,400.00 192,000.00

3,598,480.00 0.00 0.00 4,378,400.00 437,840.00 4,816,240.00

Merah (5x11x22) cm tebal 1 Batu Campuran 1 SP : 2 PP Jumlah Harga (Rp) 48,000.00 22,000.00 2,700.00 3,600.00 76,300.00 84,000.00 54,375.00 4,560.00 142,935.00 0.00 0.00 219,235.00 21,923.50 241,158.50 merah (5x11x22) cm tebal 1 batu Campuran 1 SP : 3 PP Jumlah Harga (Rp) 48,000.00 22,000.00 2,700.00 3,600.00 76,300.00 84,000.00 41,187.50 5,187.00 130,374.50 0.00 0.00 206,674.50 20,667.45 227,341.95 merah (5x11x22) cm tebal 1 batu Campuran 1 SP : 4 PP Jumlah Harga (Rp) 48,000.00 22,000.00 2,700.00 3,600.00 76,300.00

84,000.00 33,187.50 5,301.00 122,488.50 0.00 0.00 198,788.50 19,878.85 218,667.35

merah (5x11x22) cm tebal 1/2 batu Campuran 1 SP : 2 PP Jumlah Harga (Rp) 24,000.00 11,000.00 1,350.00 1,800.00 38,150.00 42,000.00 23,687.50 2,166.00 67,853.50 0.00 0.00 106,003.50 10,600.35 116,603.85 merah (5x11x22) cm tebal 1/2 batu Campuran 1 SP : 3 PP Jumlah Harga (Rp) 24,000.00 11,000.00 1,350.00 1,800.00 38,150.00 42,000.00 17,962.50 2,280.00 62,242.50 0.00 0.00 100,392.50 10,039.25 110,431.75 merah (5x11x22) cm tebal 1/2 batu Campuran 1 SP : 4 PP Jumlah Harga (Rp) 24,000.00 11,000.00 1,350.00 1,800.00 38,150.00 42,000.00

14,375.00 2,451.00 58,826.00 0.00 0.00 96,976.00 9,697.60 106,673.60

Jumlah Harga (Rp) 24,000.00 16,500.00 2,025.00 1,800.00 44,325.00 12,780.00 1,140.00 13,920.00 0.00 0.00 58,245.00 5,824.50 64,069.50

Jumlah Harga (Rp) 24,000.00 16,500.00 2,025.00 1,800.00 44,325.00 9,720.00 1,311.00 11,031.00 0.00 0.00 55,356.00 5,535.60 60,891.60

Jumlah Harga (Rp) 24,000.00 16,500.00 2,025.00 1,800.00 44,325.00 7,800.00

1,368.00 9,168.00 0.00 0.00 53,493.00 5,349.30 58,842.30

Jumlah Harga (Rp) 16,000.00 11,000.00 1,350.00 1,200.00 29,550.00 4,062.50 4,062.50 0.00 0.00 33,612.50 3,361.25 36,973.75

(1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) Jumlah Harga (Rp) 1,600.00 6,930.00 850.50 360.00 9,740.50 850.00 1,800.00 5,200.00 7,850.00 0.00 0.00 17,590.50 1,759.05 19,349.55

DAFTAR HARGA SATUAN BAHAN DAN UPAH

No.

Uraian

Satuan

1

2

3

I

HARGA TENAGA KERJA

1 2 3 4

Pekerja Tukang Kepala tukang Mandor

II

HARGA BAHAN

1 2 3 4 5 6 7

Harga Satuan (Rp.) 4

Org/hr Org/hr Org/hr Org/hr

80,000.00 110,000.00 135,000.00 120,000.00

BAHAN PASANGAN DAN URUGAN Pasir beton Pasir pasang Pasir urug Kerikil Semen PC ( 50 Kg ) Semen PC ( 50 Kg ) Air

M3 M3 M3 M3 Zak Kg Ltr

67,000.00 57,000.00 57,000.00 300,000.00 62,500.00 1,250.00 50.00

1

BAHAN DINDING Batu bata

Bh

600.00

1 2 3 4 5 6 7 8

BAHAN KAYU Kayu balok klas I Kayu balok klas II Kayu balok klas III Kayu papan klas I Kayu papan klas II Kayu papan klas III Dolken kayu Ø 8-10/400 Cm Plywood 9 mm

M3 M3 M3 M3 M3 M3 Btg Lbr

5,000,000.00 2,150,000.00 1,935,000.00 6,000,000.00 2,150,000.00 1,935,000.00 8,000.00 115,500.00

1 2 3

BAHAN BESI / BAJA Besi beton Kawat ikat beton Paku biasa

kg kg Kg

9,300.00 19,000.00 17,000.00

1 2 3 4 5

BAHAN FINISHING Cat tembok Cat dasar tembok Cat dasar kayu Minyak bekisting Plamir tembok

Kg Kg Kg Ltr Kg

20,000.00 18,000.00 34,000.00 8,500.00 8,500.00

Related Documents

Ee
May 2020 12
Ee
November 2019 26
Ee
November 2019 28
Ee
August 2019 32

More Documents from "Zaremba Wojciech"