Du An Xi Mang

  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Du An Xi Mang as PDF for free.

More details

  • Words: 722
  • Pages: 7
Japanese Ministry of Environmental Study on the Program CDM

Project Template Please provide us with the information about a potential program CDM project by filling the form below. Kindly send it back to us by Friday March 9, 2007. Thank you. 1. Name of the project

Investigation, survey of energy using efficiency

in cement production

2. Project type or sector 3. Host country 4. Project location 5. Size of the project, e.g. the number of participating households, provinces, sites, etc. 6. Project description

Vietnam Hai Phong, Ha Nam, Thanh Hoa, Quang Ninh

Factory cement Chinfong Hai Phong, Factory cement Bim Son Thanh Hoa, Factory cement But Son Factory cement Hoang Thach Quang Ninh

1.

Cement production technology

Cement classification bases: - Substance composition; - Clanke type; - Use significance; - Durability; - Velocity of compression; - Time of curdling; At present in Vietnam, cement has been produced accord dry and wet methods Technolo gy

Grind material

Dryin g

Baking

Grind clanke

Dry

+

+

+

+

Wet

-

+

-

+

Pa

Japanese Ministry of Environmental Study on the Program CDM

2. Use input material

Material has mineralization components of clanke ens get cement with intensity minimum is 250 kg/cm2 after 28 follow TCVN 4029-4432-85, cement clanke has techno parameter: Saturated coefficient: KH = 0.84 - 0.87 Silic Modun: n = 2 - 2.4 Alumin Modun: p = 1.2 - 1.7 Mineralization components: C3S = 45 - 50% C2S = 27 - 32% C3A + C4AF = 20 - 24%

Raw materials use to produce clanke, which is ma contain calcium as limestone and pottery material as clay material is mixed water (wet technology) to form cement mo don’t mix water (dry technology) to form dry speck.

Chemical component of Pooclang Cement

Japanese Ministry of Environmental Study on the Program CDM

CaO

60-70%

SiO

19-24%

Al2O3

4-7%

Fe2O3

2-6%

MgO

<5%

3. Use energy

In cement manufacture, 60% price is spending on ener stages: 3.1. Energy in manufature: - Grind material - Drying - Baking - Grind clanhke - Packing - Transport in factory - Mix material 3.2. Spending on energy includes: - Fuel component - Dry and wet production technology

Japanese Ministry of Environmental Study on the Program CDM

- Production stage - Equiment Status - Management Status

4. Nowaday Viet nam has some specific norms for ce production

Norm

Unit

Wet Method

Dry method Before

After

1990

1990

780 -820

730

Adv

dn in

Wo

Thermal

Kcal/kg

1450 -

Energy

clanke

1700

Electrical

Kwh/ton

120 -130

115 -120

90 -100

<

Energy

cement

Refractory

Kg/ton

2,0 - 2,5

1,0 - 1,5

0,8 - 0,5

<

brick

clanke

Grinding

Kg/ton

1,5 - 2,0

0,3 - o,6

0,2 - 0,5

<

material

cement

Dust

Mg/Nm3

100-150

50-100

<

concentrat ion

<

Japanese Ministry of Environmental Study on the Program CDM

5. Use fuel in cement production in Viet nam

Fuel is used in cement production in Viet nam: Coal, o petrol Fuel needs annual produces cement Fuel

Unit

Weight

Dust Coal

ton

864,000

Na

ton

45,880

Coal

Duong

coal

6

Oil FO

ton

173,800

ADO

liter

14,041,642

liter

795,000

Petrol

Emission source in the cement factory

In the cement production, dust discharge from source - Turning Oven (dry, wet, semi-wet) - Dry material Grind and clanke Cooling Equiment - Coal Grind Process - Finish Grind Stage - Packing, Maintenance and Transport Air Pollutant in cement factory

Japanese Ministry of Environmental Study on the Program CDM

Mainly Pollutant

Minor Pollutant

Dust (smooth, crude)

Heavy metal

SO2

CO

NOx

Hy®rocacbon

CO2

H2S Flo Clo SO2

7. Project implementation structure 8. Project time 2007 -2008 schedule 9. Characteristics Cement of a technology to be employed

production technology

Nowaday, Cement Production Technology in Vietnam in 3 main stages: Material preparation stage

Clanke baking stage

Grind, paking stage

aterial preparation stage: To put material (limestone,

adjustment additive, mineralization additive) into a fact material mixing silo;

Japanese Ministry of Environmental Study on the Program CDM

- Clanke baking stage: From material powder removing st uniform mixing silo to clanke silo; - Grind, packing stage: From clanke removing stage in silo to finished product

10. Project’s contribution to sustainable development

For further inquiries about the Template, please feel free to contact: Hitomi Homma CDM/JI Senior Consultant Clean Energy Finance Committee Mitsubishi UFJ Securities Phone: +81-3-6213-6304 Fax: +81-3-6213-6175 Email: [email protected]

Related Documents

Du An Xi Mang
November 2019 12
Xi Mang
April 2020 15
An Ninh Mang
October 2019 12
An Ninh Mang
November 2019 13
Do An Mang Dien
June 2020 10
Du An
October 2019 27