1. The control environment is established by the highest levels of management and works downward through the organization. a) True b)False 2. The measure used to evaluate products and identify nonconformance a) Process b)Standard c) Policy d)None 3. Policies set direction but do not define specific products or procedures. a)True b)False 4. Role of Process Engineering Committee is a) Create the standard and procedure b) Ensure involved parties are adequately trained c) Approve or reject developed processes d) All of the above 5. IEEE Standard for Software Verification and Validation a) 830 - 1998 b) 1008 - 1987 c)1012 - 1998 d)1028 -1997 6. --- is the amount of resources and time required to complete test responsibilities. a) Efficiency b) Effectiveness 7. One of the most commonly identified weaknesses in software testing is the lack of metrics. a) True b) False 8. In Tool Acquisition, the Test Manager is responsible for a) Identifying tool objectives b) Identifying candidate tools c) Making the final selection of the tool or the source d) All of the above 9. Test competency is based on a) Skill sets possessed by an individual b) Performance of an individual c) both 10. Managerial desires and intents concerning either intended objectives or desired attributes is called a) Policy b) Standard c) Procedure e) Guideline 11. The advantage of having work processes for testers are: a) Improves communication b) Enables knowledge transfer c) Reduces defects and cost d) All of the above 12. .Policies define the areas in which processes will be developed. a) True b) False

13. Any member of the Process Engineering Committee should not spend more than approximately -- hour per month in a Process Engineering Committee meeting. a)1 b) 4 c) 10 d) None 14. Standard should define the following: a) Testing Workbench & Test Process b) Testing policy & test workbench c) Testing Policy & Test Process d) None 15.It is the policies that define the objective for the workbenches. a) True b) False 16. The objective of the workbench is to produce the defined input products in a defect-free manner. a)True b) False 17. Test processes are less mature than most developmental processes. a)True b) False 18. ---- is the thoughtful analysis of testing results, and then taking corrective action on the identified weaknesses. a) Standard b) Workbench c) assessment b)Quality Control 19. Which of the four components of the test environment is considered to be the most important component of the test environment: a) Management support b) Tester competency c) Test work processes d) Testing techniques and tools 20. Which are the components of tester’s workbench? a) Policy & standard b) procedure & policy c) standard & procedure d) standard &process 1.a 2.b 3.True 4.c 5.c 6.a 7.True 8.b 9.c 10.a 11.d 12.a 13.a 14.b 15.a 16.b 17.a 18.c 19.a 20.c

Related Documents

Domain02 With Ans
November 2019 21
Domain03 With Ans
November 2019 22
Subjective Que With Ans
November 2019 15
Ans
November 2019 37
Ans
October 2019 28