DOCUMENT SUBMISSION DETAIL FOR APPROVAL S NO Activity 1 2 3 4

Thickness Calculation for the pipelines DCI, MCI & Purchase Order for Line Pipes Piping Material Specification for 12" & 18" Pre-Engineering Survey Report

5

Planning Package

6 7 8 8 9 10 11

P& ID's of Station piping for 12"& 18" Hookup Drawings P & ID Terminal for 12" & 18" Fabrication & installation procedure Valve Specification for 12" & 18" Data Sheet for Shut Down Valves for 12" & 18" PS for Ball Valve/ Shut Down Valve M/s Microfibnish PS for Gate, Globe, Swing Check Valve M/s Fouress

12 Design Basis for CP system and approval of PS Approval QAP for Launcher/Receiver for 12" X 16"300# & 18" X 22"- 150# 14 Approval of HRD for hinged closure Pavement details for Launcher / Receiver for 12" & 15 18" Layout drawing for launcher/receiver

Date of Date of comment Resubmisi comment comment Resubmisi Resubmisio comments on to s from s from on to sch submissio s from n to ONGC from ONGC ONGC ONGC ONGC ONGC submission n ONGC 01.07.08 01.08.08

01.08.08 01.10.08 01.10.08 05.08.08

05.07.08 25.07.08 30.07.08 04.08.08 15.09.08, 19.09.08 21.10.08 04.11.08 24.10.08 05.08.08 26.11.08 26.11.08 13.11.08

09.07.08 14.07.08 05.08.08* 02.09.08 06.09.08 07.10.08 14.10.08 13.08.08 22.09.08 01.10.08 21.11.08 7.10.08, 14.10.08 21.11.08 20.11.08 07.11.08 01.09.08 10.12.08 20.01.09 21.11.08

16.10.08 12.11.08 25.11.08 10.12.08 01.12.08 23.12.08 13.01.09 26.11.08 02.09.08 06.09.08 31.10.08

15.11.08 19.02.09 24.03.09 25.03.09 15.11.08 03.12.08 12.01.09 11.02.09 16.08.08/1 12.11.08 20.11.08 25.11.08 10.12.08 29.12.09 0.11.08

13

10.12.08* 30.01.09* 20.01.09* 21.11.08 26.11.08 10.12.08* 14.03.09 30.04.09 19.05.09 06.07.09* 20.02.09 25.02.09 14.03.09* 12.01.09 21.01.09 04.02.09*

11.10.08 04.11.08 20.01.09 28.01.09* 05.09.08 01/05.08.0 8 15.12.08 01.10.08 05.10.08

16 PS for Launcher /receiver QAP for line pipe 17 PS for ERW pipes 18 Purchase Specification for Seamless Pipe 19 HDD Work for Disang River Crossing 20 PQD of M/s Veekay Vikram for monolithic isolation joint 21 Drawing/documents for insulation Joint 15.12.08 22 Piping Supports for 12" & 18" 10.09.08 26 Data sheet for cable 04.10.08 27 SLD of Electrical System for 12" & 18" 01.10.08 25.10.08/3 28 Sizing calculation of pressure safety valves 1.10.08 29 Pipe line marker 30 Flow tee 15.12.08

23.07.08 02.08.08 18.11.08 18.11.08 20.11.08* 26.11.08 13.12.08 30.12.08 20.02.09 26.12.08 26.12.08 12.07.08 07.11.08 15.12.08 13.02.09 15.12.08 18.12.08 26.11.08 11.12.08 26.11.08

13.01.09 06.08.08 20.11.08 06.01.09 20.02.09 30.01.09 30.01.09 13.12.08 12.01.09 10.12.08

21.11.08 15.12.08 03.03.09 07.02.09 02.03.09 15.12.08 24.02.09 30.12.08

10.12.08* 12.01.09 24.03.09* 17.02.09 24.03.09 27.04.09* 20.01.09 21.01.09 02.03.09* 06.01.09*

04.11.08 20.11.08 26.11.08 11.12.08 05.01.09 24.03.09 20.05.09* 16.10.09 24.11.09*

17.03.09*

20.01.09 28.01.09 17.03.09

11.05.09 25.05.09 04..06.09* 25.03.09 27.04.09* 30.01.09

27.02.09*

22.01.09 24.02.09 27.04.09*

31 Pressure transmitter 32 Pressure Indicator/pressure gauge 33 PS for pressure indicator *

APPROVAL DATE

30.10.08 24.07.09 08.09.09* 27/29.10.0830.03.08 11.12.08* 01.12.08 21.03.09 05.05.09*

04..06.09*

THE DATES OF SUBMISSION OF RA-BILLS TO ONGC ARE AS FOLLOWS S.No

Document

Date of Submission

Comments Received from ONGC

Date of Re submission

1

Submission of RA Bill No.ABAN&MEIL/NZR/ONCC/RA-01

16.12.2008

16.02.2009

19.02.2009

2

Submission of RA Bill No.ABAN&MEIL/NZR/ONCC/RA-02

06.03.2009

16.03.2009

18.03.2009

3

Submission of RA Bill No.ABAN&MEIL/NZR/ONCC/RA-03

16.06.2009

17.07.2009

22.08.2009

Again Comments Received from ONGC

Date of Re submission to ONGC

Date of Approval 03.02.2009

27.03.2009

01.04.2009

16.05.2009

Related Documents