PROYECTO: MANTENIMIENTO CANAL NAVEGABLE Supervisor : JUAN GONZALO BOTERO Código BPIN: Imputación Presupuestal: 121-609-378 Contrato No.: 3345/2006 - 3324-2006

NOTA:

ESTA EN TRÁMITE TRASLADO DE RECURSOS Y SOLICITUD DE VIGENCIAS FUTURAS PARA TERMINAR EL PROYECTO. EL CONTRATO DE OBRA FUÉ PRORROGADO HASTA EL 30/OCT/2008 Y EL DE INTERVENTORÍA HASTA EL 31/OCT/2008

Departamento: Valor Total: $ 39,138,496,472

PROGRAMACION FASE

2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2008 2008 2008 2008 2008 2008 2008

RESPONSABLE

PRECONTRACTUAL

PREPLIEGOS GGP PLIEGOS GGP RECEPCION PROP. GLC EVALUACION GLC ADJUDICACION GLC CONTRATO OAJ INCIO OBRA (ANTICIPO) SF GGP MES 1- INICIO DE OBRA E GGP INTERVENTORIA MES 2 GGP MES 3 GGP MES 4 GGP MES 5 GGP MES 6 GGP MES 7 GGP MES 8 GGP ANTICIPO INTERVENTORIA MES 9 GGP ANTICIPO OBRA MES 10 GGP MES 11 GGP MES 12 GGP MES 13 GGP MES 14 GGP MES 15 GGP MES 16 GGP MES 17 GGP MES 18 - FIN DE OBRA GGP MES 19 - FIN DE INTERVENTORIA LIQUIDACION GGP TOTALES

DRAGADO MANTENIM

ENCAUSAMIENT

PUERTOS

DIQUES

MUROS ESTRUCTUR

MUELLES Y/0 TERMIONALES

KM

KM

%

KM

ML

%

-

-

-

$

$ $$$$$$-

2/1/2007

2/1/2007

2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007 9/1/2007

2/28/2007 3/31/2007 4/30/2007 5/31/2007 6/30/2007 7/31/2007 8/31/2007 9/30/2007 9/30/2007 10/31/2007 10/31/2007 11/30/2007 12/31/2007 1/31/2008 2/29/2008 3/31/2008 4/30/2008 5/31/2008 6/30/2008 7/31/2008

11/1/2007 12/1/2007 1/1/2008 2/1/2008 3/1/2008 4/1/2008 5/1/2008 6/1/2008 7/1/2008

Ejecucion 2007 Ejecucion 2008 Ejecucion 2009 Ejecucion 2010 Ejecucion 2011 TOTAL 5/31/2008<=39599

EJECUCION

ANTICIPO

$$$$$$$ 12,187,851,618

10/1/2007

CORTE A

PRESUPUESTO

Fecha FIN

Fecha INIC

EJECUCION

ID 0 1 2 3 4 5 2007

ACTIVIDAD

CRONOLOGIA

CRONOLOGIA Fecha INIC

Fecha FIN

ANTICIPO

AVANCE DRAGADO

AVANCE EN ENCAUSAMIENT

PUERTOS

DIQUES

MUROS ESTRUCTUR

MUELLES Y/O TERMINALES

$

$

KM

KM

%

KM

ML

%

$-

$-

0.0

PRESUPUESTO

2/1/2007

2/1/2007

$ 12,187,851,618

$ 78,736,826 $ 115,175,380 $ 553,805,208 $ 2,519,069,928 $ 1,136,547,408 $ 1,151,176,979 $ 1,414,370,745 $ 1,865,376,139 $ 206,610,200 $ 2,442,982,384 $ 4,745,305,189 $ 3,005,048,048 $ 881,235,165 $ 505,372,225 $ 830,756,400 $ 912,934,309 $ 929,489,399 $ 1,023,162,206 $ 1,584,245,085 $ 119,756,231 $ 929,489,399

$ 16,104,587 $ 33,884,414 $ 267,963,158 $ 641,195,069 $ 597,803,995 $ 606,157,047 $ 766,336,836 $ 1,069,446,988

2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007 9/1/2007

5.7 1.2

10/1/2007

$ 775,411,612

0.6

$ 2,191,003,448 $ 2,327,226,274 $ 711,380,037 $ 2,518,746,349 $ 1,708,394,313 $ 1,154,111,132 $ 960,240,821 $ 40,502,049 $-

11/1/2007 12/1/2007 1/1/2008 2/1/2008 3/1/2008 4/1/2008 5/1/2008 6/1/2008 7/1/2008

$ 76,835,609 $ 109,976,857 $ 511,691,863 $ 900,472,147 $ 1,556,236,950 $ 1,670,601,052 $ 2,170,485,263 $ 1,574,830,628 $ 206,610,200 $ 1,272,770,099 $ 4,745,305,189 $ 1,146,252,659 $ 2,967,559,246

$ 17,322,102 $ 37,018,765 $ 291,595,614 $ 526,277,448 $ 940,783,027 $ 1,007,863,076 $ 1,320,470,166 $ 937,386,200

$ 1,529,270,490

2/28/2007 3/31/2007 4/30/2007 5/31/2007 6/30/2007 7/31/2007 8/31/2007 9/30/2007 9/30/2007 10/31/2007 10/31/2007 11/30/2007 12/31/2007 1/31/2008 2/29/2008 3/31/2008 4/30/2008 5/31/2008 6/30/2008 7/31/2008

$ 43,400,412 $ 593,738,598

$ 58,956,325 $ 62,837,862

$ 26,873,279 $ 27,135,723

0.0 0.0 0.3 0.6 0.2 0.5 0.0 -

0.0 0.0 -

-

-

$ 39,138,496,472

$ 17,139,767,007

$ 32,303,291,218 $ 5,905,715,855 $$$$ 38,209,007,073.05

$ 10,046,392,306 $ 7,093,374,701 $$$$ 17,139,767,007.00

7.5 0.9 0.0 0.0 0.0 8.4

$ 4,201,714,539

$ 7,052,872,652

0.9

7.5 0.3 0.6

0.0 1,,9 0.6 1.6 1.9 2.1 2.2

0.0 0.0 0.0 2.0 2.5 3.0

1.0

20.0

1.0 1.0

60.0 50.0

7.5

3.0

130.0

0.0 8.4 0.0 0.0 0.0 8.4

0.0 7.5 0.0 0.0 0.0 7.5

0.0 2.0 0.0 0.0 0.0 2.0

0.0 80.0 0.0 0.0 0.0 80.0

6.2

4.5

1.0

20.0

Página 1 de 11

-

$ 31,219,273,566

$ 31,219,273,566 Ejecucion 2007 $Ejecucion 2008 $Ejecucion 2009 $Ejecucion 2010 $Ejecucion 2011 $ 31,219,273,566.39 TOTAL $-

$ 6,545,276,023

-

-

-

0.0

0.0

0.0

$ 6,491,267,021 $ 54,009,002 $$$$ 6,545,276,022.95

7.5 1.6 0.0 0.0 0.0 9.1

0.0 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.0 0.0

$ 54,009,002

1.6

0.0

0.0

0.0

0.0

0

Página 2 de 11

PROYECTO: MANTENIMIENTO CANAL NAVEGABLE Supervisor : JUAN GONZALO BOTERO Código BPIN: 0 Imputación Presupuestal: 121-609-378 Contrato No.: 3345/2006 - 3324-2006

PROGRAMACION CRONOLOGIA

24

PRECONTRACTUAL

FASE

EJECUCION

ID 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

ACTIVIDAD

RESPONSABLE

PREPLIEGOS GGP PLIEGOS GGP RECEPCION PROP. GLC EVALUACION GLC ADJUDICACION GLC CONTRATO OAJ INCIO OBRA (ANTICIPO) SF GGP MES 1- INICIO DE OBRA GGP E INTERVENTORIA MES 2 GGP MES 3 GGP MES 4 GGP MES 5 GGP MES 6 GGP MES 7 GGP MES 8 GGP ANTICIPO INTERVENTORIA 0 MES 9 GGP ANTICIPO OBRA 0 MES 10 GGP MES 11 GGP MES 12 GGP MES 13 GGP MES 14 GGP MES 15 GGP MES 16 GGP MES 17 GGP MES 18 - FIN DE OBRA GGP MES 19 - FIN DE INTERVENTORIA 0 LIQUIDACION GGP TOTALES

Fecha INIC

DIAS

12/30/1899 0 12/30/1899 0 12/30/1899 0 12/30/1899 0 12/30/1899 0 12/30/1899 0 2/1/2007 0 2/1/2007 27 3/1/2007 30 4/1/2007 29 5/1/2007 30 6/1/2007 29 7/1/2007 30 8/1/2007 30 9/1/2007 29 12/30/1899 39355 10/1/2007 30 12/30/1899 39386 11/1/2007 29 12/1/2007 30 1/1/2008 30 2/1/2008 28 3/1/2008 30 4/1/2008 29 5/1/2008 30 6/1/2008 29 7/1/2008 30 12/30/1899 0 12/30/1899 0 79270

PRESUPUESTO

Fecha FIN

$

12/30/1899 $12/30/1899 $12/30/1899 $12/30/1899 $12/30/1899 $12/30/1899 $2/1/2007 $ 12,187,851,618 2/28/2007 $ 78,736,826 3/31/2007 $ 115,175,380 4/30/2007 $ 553,805,208 5/31/2007 $ 2,519,069,928 6/30/2007 $ 1,136,547,408 7/31/2007 $ 1,151,176,979 8/31/2007 $ 1,414,370,745 9/30/2007 $ 1,865,376,139 9/30/2007 $ 206,610,200 10/31/2007 $ 2,442,982,384 10/31/2007 $ 4,745,305,189 11/30/2007 $ 3,005,048,048 12/31/2007 $ 881,235,165 1/31/2008 $ 505,372,225 2/29/2008 $ 830,756,400 3/31/2008 $ 912,934,309 4/30/2008 $ 929,489,399 5/31/2008 $ 1,023,162,206 6/30/2008 $ 1,584,245,085 7/31/2008 $ 119,756,231 12/30/1899 $ 929,489,399 12/30/1899 $$ 39,138,496,472

Página 3 de 11

ANTICIPO

PRESUPUESTO PROGRAMADO

$

$$$$$$$ 12,187,851,618 $ 12,266,588,444 $ 12,381,763,824 $ 12,935,569,033 $ 15,454,638,961 $ 16,591,186,369 $ 17,742,363,348 $ 19,156,734,093 $ 21,022,110,232 $ 21,228,720,432 $ 23,671,702,816 $ 28,417,008,005 $ 31,422,056,053 $ 32,303,291,218 $ 32,808,663,443 $ 33,639,419,843 $ 34,552,354,152 $ 35,481,843,551 $ 36,505,005,757 $ 38,089,250,842 $ 38,209,007,073 $ 39,138,496,472 $ 39,138,496,472

$$$$$$$$ 16,104,587 $ 33,884,414 $ 267,963,158 $ 641,195,069 $ 597,803,995 $ 606,157,047 $ 766,336,836 $ 1,069,446,988 $$ 1,529,270,490 $$ 2,191,003,448 $ 2,327,226,274 $ 711,380,037 $ 2,518,746,349 $ 1,708,394,313 $ 1,154,111,132 $ 960,240,821 $ 40,502,049 $$$$ 17,139,767,007

ANTICIPO PROGRAMADO

$ 12,187,851,618 $ 12,171,747,031 $ 12,137,862,617 $ 11,869,899,459 $ 11,228,704,390 $ 10,630,900,395 $ 10,024,743,348 $ 9,258,406,512 $ 8,188,959,524 $ 8,395,569,724 $ 6,866,299,234 $ 11,611,604,423 $ 9,420,600,975 $ 7,093,374,701 $ 6,381,994,664 $ 3,863,248,315 $ 2,154,854,002 $ 1,000,742,870 $ 40,502,049 $$$$-

DRAGADO MANTENIM PROGRAM ADO

DRAGADO MANTENIM

KM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 7.5 0.3 0.6 0.0 0.0 0.0 0.0 0.0 0.0 0.0 8.4

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 7.5 7.8 8.4 8.4 8.4 8.4 8.4 8.4 8.4 8.4

ENCAUSAMIEN

KM 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1,,9 0.6 1.6 1.9 2.1 2.2 0.0 0.0 0.0 8.4

NCAUSAMIENT

ENCAUSAMIEN T PROGRAMADO

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.6 2.2 4.1 6.2 8.4 8.4 8.4 8.4

PUERTOS ML PUENTES PROGRA MADO -

%

KM

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.0 2.5 3.0 0.0 0.0 0.0 7.5

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.0 0.0 0.0 0.0 1.0 1.0 0.0 3.0

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 2.0 4.5 7.5 7.5 7.5 7.5

DIQUES META 5 DIQUES (UNIDAD DE PROGRAM MEDIDA) ADO 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.0 0.0 1.0 0.0 1.0 0.0 1.0 0.0 2.0 0.0 3.0 0.0 3.0 0.0 0.0

Página 4 de 11

EJECUCION CRONOLOGIA

PRESUPUESTO

Fecha INIC

DIAS

Fecha FIN

$

12/30/1899 12/30/1899 12/30/1899 12/30/1899 12/30/1899 12/30/1899 2/1/2007 2/1/2007 3/1/2007 4/1/2007 5/1/2007 6/1/2007 7/1/2007 8/1/2007 9/1/2007 12/30/1899 10/1/2007 12/30/1899 11/1/2007 12/1/2007 1/1/2008 2/1/2008 3/1/2008 4/1/2008 5/1/2008 6/1/2008 7/1/2008 12/30/1899 12/30/1899

0 0 0 0 0 0 0 27 30 29 30 29 30 30 29 39355 30 39386 29 30 30 28 30 29 30 29 30 0 0 79270

12/30/1899 12/30/1899 12/30/1899 12/30/1899 12/30/1899 12/30/1899 2/1/2007 2/28/2007 3/31/2007 4/30/2007 5/31/2007 6/30/2007 7/31/2007 8/31/2007 9/30/2007 9/30/2007 10/31/2007 10/31/2007 11/30/2007 12/31/2007 1/31/2008 2/29/2008 3/31/2008 4/30/2008 5/31/2008 6/30/2008 7/31/2008 12/30/1899 12/30/1899

$$$$$$$ 12,187,851,618 $ 76,835,609 $ 109,976,857 $ 511,691,863 $ 900,472,147 $ 1,556,236,950 $ 1,670,601,052 $ 2,170,485,263 $ 1,574,830,628 $ 206,610,200 $ 1,272,770,099 $ 4,745,305,189 $ 1,146,252,659 $ 2,967,559,246 $$$$ 58,956,325 $ 62,837,862 $$$$ 31,219,273,566

PRESUPUESTO EJECUTADO $$$$$$$ 12,187,851,618 $ 12,264,687,227 $ 12,374,664,084 $ 12,886,355,947 $ 13,786,828,094 $ 15,343,065,043 $ 17,013,666,095 $ 19,184,151,358 $ 20,758,981,986 $ 20,965,592,186 $ 22,238,362,285 $ 26,983,667,474 $ 28,129,920,133 $ 31,097,479,379 -

ANTICIPO $ $$$$$$$$ 17,322,102 $ 37,018,765 $ 291,595,614 $ 526,277,448 $ 940,783,027 $ 1,007,863,076 $ 1,320,470,166 $ 937,386,200 $$ 775,411,612 $$ 43,400,412 $ 593,738,598 $ 26,873,279 $ 27,135,723 $$$$$$$ 13,090,552,046

ANTICIPO EJECUTA DO $$$$$$### ### ### ### ### ### ### ### ### ### ### ### ### ### -

AVANCE DRAGADO AVANCE KM

9.1

Página 5 de 11

DRAGADO EJECUTAD O 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 5.7 5.7 1.2 6.9 0.0 6.9 0.6 7.5 0.0 7.5 0.0 7.5 0.0 7.5 0.3 0.6 0.2 0.5 0.0 0.0 -

AVANCE EN ENCAUSAMIENT AVANCE EN ENCAUSAMI KM ENT EJECUTADO 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 -

PUERTOS % 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

ML PUENTES EJECUTADO 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 -

DIQUES DIQUES KM EJECUTAD O 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

MUROS MUROS ESTRUCTUR ESTRUCTU ML R EJECUTAD 0.0 0.0 O 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0

Página 6 de 11

% AVANCE Dias

PRESUP

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

100.0% 100.0% 99.9% 99.6% 89.2% 92.5% 95.9% 100.1% 98.7% 98.8% 93.9% 95.0% 89.5% 96.3% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

AMORTIZ

ANTICIPO

100.0% 100.0% 100.0% 100.2% 99.2% 102.5% 107.0% 115.1% 115.2% 114.8% 105.0% 102.9% 83.8% 66.6% #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!

AVANCE EN KM AVANCE % ENCAUSAM DRAGADO PUERTOS IENT

#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 100.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

#DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%

SEMAFORO % AVANCE normal 85.00% Alerta 85 - 70 Riesgo 70.00%

SEMAFORO DIAS DE ATRASO normal 5 Alerta 5 - 30 Riesgo 30

Página 7 de 11

GRÁFICA AVANCE PRECONTRACTUAL PROYECTO: MANTENIMIENTO CANAL NAVEGABLE 7/6/2009 9/1/2002 10/28/1995 12/23/1988 2/18/1982 4/16/1975

FECHA FIN

6/11/1968 8/7/1961 10/3/1954 11/29/1947 1/24/1941 3/22/1934 5/18/1927 7/13/1920 9/8/1913 11/4/1906 12/30/1899 PREPLIEGOS

PLIEGOS

RECEPCION PROP.

EVALUACION ACTIVIDADES

Column X

Column G

ADJUDICACION

CONTRATO

INCIO OBRA (ANTICIPO)

P.

GRÁFICA AVANCE PRECONTRACTUAL

EVALUACION ACTIVIDADES

olumn X

Column G

ADJUDICACION

CONTRATO

INCIO OBRA (ANTICIPO)

GRAFICA AVANCE FÍSICO-FINANCIERO

PROYECTO: MANTENIMIENTO CANAL NAVEGABLE $ 40,000,000,000

8.5 8.3 8.0 7.8 7.5 7.3 7.0 6.8 6.5 6.3 6.0 5.8 5.5 5.3 5.0 4.8 4.5 4.3 4.0 3.8 3.5 3.3 3.0 2.8 2.5 2.3 2.0 1.8 1.5 1.3 1.0 0.8 0.5 0.3 0.0

$ 38,000,000,000 $ 36,000,000,000 $ 34,000,000,000 $ 32,000,000,000 $ 30,000,000,000 $ 28,000,000,000

$ 24,000,000,000 $ 22,000,000,000 $ 20,000,000,000 $ 18,000,000,000 $ 16,000,000,000 $ 14,000,000,000 $ 12,000,000,000 $ 10,000,000,000 $ 8,000,000,000 $ 6,000,000,000 $ 4,000,000,000 $ 2,000,000,000

MES 18 - FIN DE OBRA MES 19 - FIN DE INTERVENTORIA LIQUIDA CION

MES 17

MES 16

MES 15

MES 14

MES 13

MES 12

MES 11

MES 10

ANTICIP O OBRA

ANTICIPO INTERVENT ORIA MES 9

MES 8

MES 7

MES 6

MES 5

MES 4

MES 3

MES 2

$INCIO OBRA (ANTI CIPO)

INVERSION ($ MILL)

$ 26,000,000,000

ETAPA PRESUPUESTO PROGRAMADO ANTICIPO PROGRAMADO

PRESUPUESTO EJECUTADO ANTICIPO EJECUTADO

DRAGADO MANTENIM PROGRAMADO

AVANCE DRAGADO EJECUTADO

AVANCE EN ENCAUSAMIENT EJECUTADO

GRAFICA AVANCE FÍSICO-FINANCIERO

PROYECTO: MANTENIMIENTO CANAL NAVEGABLE $ 40,000,000,000

32000000000.0 31000000000.0 30000000000.0 29000000000.0 28000000000.0 27000000000.0 26000000000.0 25000000000.0 24000000000.0 23000000000.0 22000000000.0 21000000000.0 20000000000.0 19000000000.0 18000000000.0 17000000000.0 16000000000.0 15000000000.0 14000000000.0 13000000000.0 12000000000.0 11000000000.0 10000000000.0 9000000000.0 8000000000.0 7000000000.0 6000000000.0 5000000000.0 4000000000.0 3000000000.0 2000000000.0 1000000000.0 0.0

$ 38,000,000,000 $ 36,000,000,000 $ 34,000,000,000 $ 32,000,000,000 $ 30,000,000,000 $ 28,000,000,000

$ 24,000,000,000 $ 22,000,000,000 $ 20,000,000,000 $ 18,000,000,000 $ 16,000,000,000 $ 14,000,000,000 $ 12,000,000,000 $ 10,000,000,000 $ 8,000,000,000 $ 6,000,000,000 $ 4,000,000,000 $ 2,000,000,000 MES 19 FIN DE INTERVENT ORIA

MES 17

MES 16

MES 15

MES 14

MES 13

MES 12

MES 11

ANTICIP O OBRA MES 10

MES 9

MES 8

MES 7

MES 6

MES 5

MES 4

MES 3

MES 2

$INCIO OBRA (ANTI CIPO)

INVERSION ($ MILL)

$ 26,000,000,000

ETAPA PRESUPUESTO PROGRAMADO ML PUENTES EJECUTADO

ANTICIPO PROGRAMADO DIQUES EJECUTADO

DIQUES PROGRAMADO MUROS ESTRUCTUR EJECUTADO

PRESUPUESTO EJECUTADO

ANTICIPO EJECUTADO

Related Documents

Documento
May 2020 29
Documento
November 2019 45
Documento.
October 2019 41
Documento
October 2019 38
Documento
December 2019 38
Documento
November 2019 40

More Documents from ""