The District of Columbia Public Library Capital Construction Report November 18, 2009
Document #9C.1 Board of Library Trustees Meeting November 18, 2009
Anacostia Library – New Building Construction
Contacts
Progress
Councilmember Ward 7
Yvette Alexander 202.724.8068
Architect
Freelon Group Philip Freelon 919/941-9790
Project Manager Contractor
DCPL PM Firm
Benning Library – New Building Design
Dedric Boyd
Construction Underway
202.727.1127 Forrester Construction Tom Willerton 301-816-1700 Hill International
Contacts
Progress
Councilmember Ward 7 New State of the Art Library on Good Hope Road SE is under construction. Spring 2010 opening Architect
Yvette Alexander 202.724.8068 Davis, Brody, Bond & Aedas Peter Cook 202/449-1190
Project Manager
Kim Fuller
Construction Underway
202/442-6069 Contractor
Forrester Jon McGee 301-255-1750
DCPL PM Firm
A-1 Consulting
2 New State of the Art Library located at 3935 Benning Road NE is under construction. Spring 2010 opening
Cleveland Park – New Ceiling and Lighting
Contacts
Progress
Councilmember Ward 3
Mary Cheh 202.724.8062
Architect
N?A
Project Manager
Ed Hampton
Contractor
Deanwood – New Community Center and Library Project consists of installing a new ceiling and lighting system.
Project Complete
202.442.6067 Eagle Construction
Contacts
Progress
Councilmember Ward 7
Yvette Alexander 202.724.8068
Architect
EEK Sean O’Donnell
Project Manager
Ayris T. Scales, DMPED 202-727-0376
Contractor
Project is a partnership with the Department of Parks and Recreation to co-locate a 10,000 square foot library within a 54,000 square foot aquatic center and community center. Library and Community Center would share such space as computer lab, senior rooms, tutor rooms and community meeting rooms. Project location is 49th and Quarles St. NE
Construction Underway
Manhattan-FEI
3
Energy Enhancement Projects – Various Locations
Contacts
Progress
Councilmember Various
Capitol View, Cleveland Park, Shepherd Park, Lamond Riggs, Palisades, Southwest, West End and Woodridge
Architect
T.B.D
Project Manager
Ed Hampton
A/E Selected and design work underway
202.442.6067 Contractor
DCPL PM Firm The Library has received Federal Stimulus Money for energy enhancements. Projects will take place at the above locations, Francis A.window Gregory Libraryenergy – Newefficient Building Design focusing on replacements, lighting, and automated building heating and cooling controls
Contacts
Progress
Councilmember Ward 7
Yvette Alexander 202.724.8068
Architect
Wiencek/Adjaye Scott Knudson 301.948.6220
Project Manager
Lisa Deanes (202) 727-5181
Contractor
DCPL PM Firm
Francis A. Gregory Library – Interim Library Project consists of building a 4,200 square foot interim library to serve theofcommunity duringGregory construction; thewill interim will have 30 Design the new Francis Library include computers, CD as well asprogramming traditional collection material communitybooks input on planning and phase. Design and for all age setsare only partially funded. construction
Contacts Councilmember
Construction Manager Selected. Constructability and pricing review underway.
Hess Construction
Jair Lynch Development Partners
Progress Modular Solicitation has been advertised 4
Ward 7
Yvette Alexander 202.724.8068
Architect
Project Manager
Lisa Deanes (202) 727-5181
Contractor
DCPL PM Firm
Georgetown Library – Building Renovation Design
Contacts
Progress
Councilmember Ward 2
Jack Evans 202.724.8058
Architect
Martinez & Johnson
Tom Johnson 202.333.4480 Project Manager
Chris Wright 202.272.4913
Contractor
DCPL PM Firm
Mount Pleasant – Interior Restoration (Design Phase)
Contacts
Phase II of Mount Pleasant Renovation. Interior work will Design of the new Georgetown Library will include community consist of total upgrade and modernization of all mechanical input on planning and programming phase. Design phase is fully equipment as well as provide additional and functional library funded. program space.
Councilmember
All bid packages have been advertised and proposal received. Anticipated CBE participation 63%.
T.B.D.
Smoot Construction
Progress Jim Graham
5
Ward 1 Architect
(202) 724-8181 Core Architects
Dale Stewart 202-466-6116 Project Manager
Chris Wright 202.727.4913
Contractor
DCPL Project Management
Mount Pleasant – Interim Library
T.B.D
Smoot Construction
Contacts Councilmember Ward 1
Design documents in development phase, anticipating construction Winter 2009.
Progress Jim Graham (202) 724-8181
Architect
Project Manager
Dedric Boyd
Recommendation for award sent to Procurement Office.
202.727.1127 Contractor
Project consists of building a 4,200Restoration square foot interim library to Northeast Library – Exterior (Design Phase) serve the community during construction; the interim will have 30 computers, books on CD as well as traditional collection material for all age sets Project consists of Exterior Improvements to windows, doors, security lighting, masonry restoration, landscaping and signage.
T.B.D
Contacts Councilmember
Progress Tommy Wells
6
Ward 6
202.724.8072
Architect
Bell Architects
David Bell 202.548.7570 Project Manager Contractor
Northwest One – New Co-location Facility
Chris Wright 202.727.4913 Monarc Construction C. McDermott, (703) 201-1747
Contacts Councilmember
Work has started. Anticipated completion by end of 2009
Progress Tommy Wells
Ward 6 Architect
Project Manager Contractor
Parklands-Turner – New Storefront Library Project consists of 6,500 SQ FT Library facility as part of Project to fit out approximately 5,000 Sq Ft of storefront space to Elementary School and Recreation Center. This facility replaces replace the existing Parklands-Turner kiosk. The storefront library the Sursum Corda kiosk. will be similar in size, scope, computers, and collections to the Georgetown Interim and Tenley-Friendship Interim Libraries.
Hord Cort Plan
School open in late August Reagan Assoc
Forrester
Contacts Councilmember
Anticipated opening of Library and Rec Center in early December 2009
Marion Barry
Progress Ribbon Cutting October 5, 2009 7
Ward 8
(202) 724-8045
Architect
Mood Nolan - DC
Patrick Williams (202) 244-4199 Project Manager
Dedric Boyd 202.727.1129
Contractor
OPEN TO THE PUBLIC
Lexx Group Ken Postell (202) 393-3085
Petworth – Exterior Restoration
Contacts Councilmember Ward 4 Architect
Progress Muriel Bowser 202.724.8052 Frank and Lohsen
Art Lohsen 202.223.9449 Project Manager
Chris Wright
Work commenced on May 11, 2009
202.727.4913 Contractor
Bennett Group Kolar W. Bowen (202) 625-3330
Petworth – Interior Renovations
Contacts
Project will update the interior of the Petworth Library to be a fully functional state of the art 21st Century Library, while still Project of of Exterior Improvements windows, doors, beingconsists respectful the buildings historic to character. security lighting, masonry restoration, landscaping, signage and new cupola.
Councilmember Councilmember
Progress Design-Build Contract Awarded Muriel Bowser
8
Ward 4 Architect
202.724.8052 Frank and Loshen
Fletcher Farr Anoyte Project Manager
Chris Wright 202.727.4913
Contractor
Sigal Construction
Interim Modular Building to be delivered in November.
Sarah Norman DCPL PM Firm
Takoma Park – Make-Over
McKissack and McKissack
Contacts
Progress
Councilmember Ward 4
Muriel Bowser 202.724.8052
Architect
MJ | A
Jim Reagle 202.333.4480 Project Manager Contractor
Tenley Friendship – New Building Design
Chris Wright 202.727.4913 Forrester Construction Jorge A. Briones
Contacts Councilmember Ward 3
Project Complete. Open to Public March 10, 2009
Progress Construction is Underway Mary Cheh
Project is modeled after the su
Design of the new Tenley Branch Library will include community input on planning and programming phase. Design and construction is fully funded.
9
202.724.8062 Architect
Freelon Group Philip Freelon 919/941-9790
Project Manager
Dedric Boyd 202/727-1113
Contractor
Forrester. Joe Ockershausen (301) 255-1794
DCPL PM Firm
Washington Highlands – New Building Design
Hill International
Contacts
Progress
Councilmember Ward 8
Marion Barry (202) 724-8045
Architect
Wiencek/Adjaye Scott Knudson 301.948.6220
Project Manager Contractor
DCPL PM Firm
Washington Highlands – Interim Library
Contacts
Design of the new Washington Highlands will include community input on planning and programming phase. Design and construction are only partially funded. DCPL is partnering with the DC Department of Housing and Community Development. Project consists of building a 5,000 square foot interim library for the Washington Highlands Community; the interim will have 20 computers, books on CD as well as traditional collection material for all age sets.
Councilmember Ward 8 Architect
Lisa Deanes
Construction Manager contract awarded.
202.727.5181 Coakley-Williams
Jair Lynch Development Partners
Progress Interim scheduled to Open in December Marion Barry (202) 724-8045 Cooper Carry
10
Project Manager
Lisa Deanes 202.727.5181
Contractor
DCPL PM Firm
Watha T. Daniel / Shaw – New Building Design
MCN Build
Jair Lynch Development
Contacts
Progress
Councilmember Ward 2
Architect
Jack Evans 202.724.8058 Davis, Brody Bond & Aedas Peter Cook 202/449-1190
Project Manager
Kim Fuller
Construction Underway
202/442-6069 Contractor
Forrester. Joe Ockershausen (301) 255-1794
DCPL PM Firm
Woodridge Library – Furniture Upgrades
A-1 Construction
Contacts
Progress Planning phase underway.
Councilmember Design of the new Watha T. Daniel / Shaw Branch Library will include community input on planning and programming phase. Design and construction is fully funded.
Project consists of the replacement of existing furniture, reconfiguration of some spaces, new end panels and general interior improvements
Ward 5
Harry Thomas Jr. 202.724.8028
Architect
11
Project Manager
Barbara Norland 202.442.6069
Contractor
Martin Luther King Jr. Library – New Teen Spot and College Information Center
T.B.A.
Contacts
Progress
Councilmember Ward 2
Jack Evans 202.724.8058
Architect
Sorg Associates
Suman Sorg Project Manager
Kim Fuller
Project Complete
202.442.6070 Contractor
Bennett Group Kolar Bowen (202) 625-3330
MLK Jr. Spot Library – Business and Technology New Teen and College Information CenterReconfiguration is a destination for teens. It provides stimulating learning opportunities that support their success in life. This destination provides opportunities to meet their need for homework help, exam preparation, and using computers and software applications. High quality program events are a key to the success of the library in assisting teens.
Improvements and upgrades to west reading room. Entire first floor is under the Historic Landmark Designation. The MLK Design Guidelines will be utilized.
Contacts
Progress Planning Phase
Councilmember Ward 2
Jack Evans 202.724.8058
Architect
12
Project Manager Contractor
13