The District of Columbia Public Library Capital Construction Report November 18, 2009

Document #9C.1 Board of Library Trustees Meeting November 18, 2009

Anacostia Library – New Building Construction

Contacts

Progress

Councilmember Ward 7

Yvette Alexander 202.724.8068

Architect

Freelon Group Philip Freelon 919/941-9790

Project Manager Contractor

DCPL PM Firm

Benning Library – New Building Design

Dedric Boyd

Construction Underway

202.727.1127 Forrester Construction Tom Willerton 301-816-1700 Hill International

Contacts

Progress

Councilmember Ward 7 New State of the Art Library on Good Hope Road SE is under construction. Spring 2010 opening Architect

Yvette Alexander 202.724.8068 Davis, Brody, Bond & Aedas Peter Cook 202/449-1190

Project Manager

Kim Fuller

Construction Underway

202/442-6069 Contractor

Forrester Jon McGee 301-255-1750

DCPL PM Firm

A-1 Consulting

2 New State of the Art Library located at 3935 Benning Road NE is under construction. Spring 2010 opening

Cleveland Park – New Ceiling and Lighting

Contacts

Progress

Councilmember Ward 3

Mary Cheh 202.724.8062

Architect

N?A

Project Manager

Ed Hampton

Contractor

Deanwood – New Community Center and Library Project consists of installing a new ceiling and lighting system.

Project Complete

202.442.6067 Eagle Construction

Contacts

Progress

Councilmember Ward 7

Yvette Alexander 202.724.8068

Architect

EEK Sean O’Donnell

Project Manager

Ayris T. Scales, DMPED 202-727-0376

Contractor

Project is a partnership with the Department of Parks and Recreation to co-locate a 10,000 square foot library within a 54,000 square foot aquatic center and community center. Library and Community Center would share such space as computer lab, senior rooms, tutor rooms and community meeting rooms. Project location is 49th and Quarles St. NE

Construction Underway

Manhattan-FEI

3

Energy Enhancement Projects – Various Locations

Contacts

Progress

Councilmember Various

Capitol View, Cleveland Park, Shepherd Park, Lamond Riggs, Palisades, Southwest, West End and Woodridge

Architect

T.B.D

Project Manager

Ed Hampton

A/E Selected and design work underway

202.442.6067 Contractor

DCPL PM Firm The Library has received Federal Stimulus Money for energy enhancements. Projects will take place at the above locations, Francis A.window Gregory Libraryenergy – Newefficient Building Design focusing on replacements, lighting, and automated building heating and cooling controls

Contacts

Progress

Councilmember Ward 7

Yvette Alexander 202.724.8068

Architect

Wiencek/Adjaye Scott Knudson 301.948.6220

Project Manager

Lisa Deanes (202) 727-5181

Contractor

DCPL PM Firm

Francis A. Gregory Library – Interim Library Project consists of building a 4,200 square foot interim library to serve theofcommunity duringGregory construction; thewill interim will have 30 Design the new Francis Library include computers, CD as well asprogramming traditional collection material communitybooks input on planning and phase. Design and for all age setsare only partially funded. construction

Contacts Councilmember

Construction Manager Selected. Constructability and pricing review underway.

Hess Construction

Jair Lynch Development Partners

Progress Modular Solicitation has been advertised 4

Ward 7

Yvette Alexander 202.724.8068

Architect

Project Manager

Lisa Deanes (202) 727-5181

Contractor

DCPL PM Firm

Georgetown Library – Building Renovation Design

Contacts

Progress

Councilmember Ward 2

Jack Evans 202.724.8058

Architect

Martinez & Johnson

Tom Johnson 202.333.4480 Project Manager

Chris Wright 202.272.4913

Contractor

DCPL PM Firm

Mount Pleasant – Interior Restoration (Design Phase)

Contacts

Phase II of Mount Pleasant Renovation. Interior work will Design of the new Georgetown Library will include community consist of total upgrade and modernization of all mechanical input on planning and programming phase. Design phase is fully equipment as well as provide additional and functional library funded. program space.

Councilmember

All bid packages have been advertised and proposal received. Anticipated CBE participation 63%.

T.B.D.

Smoot Construction

Progress Jim Graham

5

Ward 1 Architect

(202) 724-8181 Core Architects

Dale Stewart 202-466-6116 Project Manager

Chris Wright 202.727.4913

Contractor

DCPL Project Management

Mount Pleasant – Interim Library

T.B.D

Smoot Construction

Contacts Councilmember Ward 1

Design documents in development phase, anticipating construction Winter 2009.

Progress Jim Graham (202) 724-8181

Architect

Project Manager

Dedric Boyd

Recommendation for award sent to Procurement Office.

202.727.1127 Contractor

Project consists of building a 4,200Restoration square foot interim library to Northeast Library – Exterior (Design Phase) serve the community during construction; the interim will have 30 computers, books on CD as well as traditional collection material for all age sets Project consists of Exterior Improvements to windows, doors, security lighting, masonry restoration, landscaping and signage.

T.B.D

Contacts Councilmember

Progress Tommy Wells

6

Ward 6

202.724.8072

Architect

Bell Architects

David Bell 202.548.7570 Project Manager Contractor

Northwest One – New Co-location Facility

Chris Wright 202.727.4913 Monarc Construction C. McDermott, (703) 201-1747

Contacts Councilmember

Work has started. Anticipated completion by end of 2009

Progress Tommy Wells

Ward 6 Architect

Project Manager Contractor

Parklands-Turner – New Storefront Library Project consists of 6,500 SQ FT Library facility as part of Project to fit out approximately 5,000 Sq Ft of storefront space to Elementary School and Recreation Center. This facility replaces replace the existing Parklands-Turner kiosk. The storefront library the Sursum Corda kiosk. will be similar in size, scope, computers, and collections to the Georgetown Interim and Tenley-Friendship Interim Libraries.

Hord Cort Plan

School open in late August Reagan Assoc

Forrester

Contacts Councilmember

Anticipated opening of Library and Rec Center in early December 2009

Marion Barry

Progress Ribbon Cutting October 5, 2009 7

Ward 8

(202) 724-8045

Architect

Mood Nolan - DC

Patrick Williams (202) 244-4199 Project Manager

Dedric Boyd 202.727.1129

Contractor

OPEN TO THE PUBLIC

Lexx Group Ken Postell (202) 393-3085

Petworth – Exterior Restoration

Contacts Councilmember Ward 4 Architect

Progress Muriel Bowser 202.724.8052 Frank and Lohsen

Art Lohsen 202.223.9449 Project Manager

Chris Wright

Work commenced on May 11, 2009

202.727.4913 Contractor

Bennett Group Kolar W. Bowen (202) 625-3330

Petworth – Interior Renovations

Contacts

Project will update the interior of the Petworth Library to be a fully functional state of the art 21st Century Library, while still Project of of Exterior Improvements windows, doors, beingconsists respectful the buildings historic to character. security lighting, masonry restoration, landscaping, signage and new cupola.

Councilmember Councilmember

Progress Design-Build Contract Awarded Muriel Bowser

8

Ward 4 Architect

202.724.8052 Frank and Loshen

Fletcher Farr Anoyte Project Manager

Chris Wright 202.727.4913

Contractor

Sigal Construction

Interim Modular Building to be delivered in November.

Sarah Norman DCPL PM Firm

Takoma Park – Make-Over

McKissack and McKissack

Contacts

Progress

Councilmember Ward 4

Muriel Bowser 202.724.8052

Architect

MJ | A

Jim Reagle 202.333.4480 Project Manager Contractor

Tenley Friendship – New Building Design

Chris Wright 202.727.4913 Forrester Construction Jorge A. Briones

Contacts Councilmember Ward 3

Project Complete. Open to Public March 10, 2009

Progress Construction is Underway Mary Cheh

Project is modeled after the su

Design of the new Tenley Branch Library will include community input on planning and programming phase. Design and construction is fully funded.

9

202.724.8062 Architect

Freelon Group Philip Freelon 919/941-9790

Project Manager

Dedric Boyd 202/727-1113

Contractor

Forrester. Joe Ockershausen (301) 255-1794

DCPL PM Firm

Washington Highlands – New Building Design

Hill International

Contacts

Progress

Councilmember Ward 8

Marion Barry (202) 724-8045

Architect

Wiencek/Adjaye Scott Knudson 301.948.6220

Project Manager Contractor

DCPL PM Firm

Washington Highlands – Interim Library

Contacts

Design of the new Washington Highlands will include community input on planning and programming phase. Design and construction are only partially funded. DCPL is partnering with the DC Department of Housing and Community Development. Project consists of building a 5,000 square foot interim library for the Washington Highlands Community; the interim will have 20 computers, books on CD as well as traditional collection material for all age sets.

Councilmember Ward 8 Architect

Lisa Deanes

Construction Manager contract awarded.

202.727.5181 Coakley-Williams

Jair Lynch Development Partners

Progress Interim scheduled to Open in December Marion Barry (202) 724-8045 Cooper Carry

10

Project Manager

Lisa Deanes 202.727.5181

Contractor

DCPL PM Firm

Watha T. Daniel / Shaw – New Building Design

MCN Build

Jair Lynch Development

Contacts

Progress

Councilmember Ward 2

Architect

Jack Evans 202.724.8058 Davis, Brody Bond & Aedas Peter Cook 202/449-1190

Project Manager

Kim Fuller

Construction Underway

202/442-6069 Contractor

Forrester. Joe Ockershausen (301) 255-1794

DCPL PM Firm

Woodridge Library – Furniture Upgrades

A-1 Construction

Contacts

Progress Planning phase underway.

Councilmember Design of the new Watha T. Daniel / Shaw Branch Library will include community input on planning and programming phase. Design and construction is fully funded.

Project consists of the replacement of existing furniture, reconfiguration of some spaces, new end panels and general interior improvements

Ward 5

Harry Thomas Jr. 202.724.8028

Architect

11

Project Manager

Barbara Norland 202.442.6069

Contractor

Martin Luther King Jr. Library – New Teen Spot and College Information Center

T.B.A.

Contacts

Progress

Councilmember Ward 2

Jack Evans 202.724.8058

Architect

Sorg Associates

Suman Sorg Project Manager

Kim Fuller

Project Complete

202.442.6070 Contractor

Bennett Group Kolar Bowen (202) 625-3330

MLK Jr. Spot Library – Business and Technology New Teen and College Information CenterReconfiguration is a destination for teens. It provides stimulating learning opportunities that support their success in life. This destination provides opportunities to meet their need for homework help, exam preparation, and using computers and software applications. High quality program events are a key to the success of the library in assisting teens.

Improvements and upgrades to west reading room. Entire first floor is under the Historic Landmark Designation. The MLK Design Guidelines will be utilized.

Contacts

Progress Planning Phase

Councilmember Ward 2

Jack Evans 202.724.8058

Architect

12

Project Manager Contractor

13