V.V. RAVI KUMAR
(Metallurgical Engineer) Padra Rewa M.P. Email:
[email protected] Phone: (M) +91 8821891001: 7974357048 13 Metallurgical experience in chemical composition of liquid metal.
Technical expert with 13 years experience in melting metal industry Currently associated with Jaypee Hi-Tech. Casting Center Rewa. Expertise in Handling ARC furnace , Induction furnace, L.R.F.. Comprehensive knowledge of the nature and properties of metals Extensive knowledge of scientific properties of minerals and metals. Familiar with theories ,principal and electro magnetic properties of metals Sound knowledge in metallurgical behaviour of metals. TECHNICAL EXPERIENCE ARC FURNACE : Operation of ARC Furnace with capacity of 5, 10, 15, 20 and 40 tons for preparation of various grades of steel. Induction Furnace : Maintaining chemical composition of various grades of steel and inspecting the lining life and its maintenance. L.R.F. : Handling ladle refining furnace of capacity 15 tons for maintaining chemical composition and for reducing impurities in steel .
PROFESSIONAL EXPERIENCE
Jaypee
Hi-Tech.
Casting
center
Rewa
.:(2012
_
till
now)
(May 12 Present)
(As an Sr.Engineer) Melting for Grinding Media and No-Bake melting Key Responsbilities:-Looking after the production related melting activities. Daily consumption report, Handling melting process of the plant through using various kind of furnace Control and monitor development activity. Co-ordination with molding department for next process. Implement various cost saving methods . Proper manpower management for controlling overall rejection. Effective and efficient utilization of manpower and machinery. Achieve production targets within time set .
Updating departmental records and database. Successfully completed IMS audit. Reporting the overall production activity to Production manager. Topworth
Steel
and
Power
LTD.
:
(
2009_2011)
(Nov 09 Apr 12)
(AS Shift Incharge process in LRF) Key Responsbilites :
Monitoring the ladle furnance operation and induction f/c 20tons . Control over the impurities like phosphorus,sulphur and to bring it down to desired level by process. Finally sending the ladle to C.C.M unit for pouring.
Bhilai Engineering Corp.
: ( 2004_2009 )
( 05
Oct 09)
Jr. Executive Grade E-2 1
Key Responsbilities : To monitor the operation of Arc furnace of 15tons,10 tons, 20 tons,8tons and induction furnance of 3tons for the preparation of liquid metal for the production of casting. Checking the chemical composition by following the spectro analysis report from the lab. Control over the temperature of the liquid bath inside the furnance by using thermocouple. Monitoring the tapping process at the suitable conditions. Taking the ladle to the moulding section and monitoring the teeming process. Overall to look after the entire melting process i.e from charge preparation,ladle preparation, inspecting furnance lining and man power handling.
SALARY Current CTC : 5.5 Lakhs Per annum Expected CTC : Negotiable Computer Skills :
Operating System Packages
Dos , Windows, Ms-Office
Training and Workshops: Six Month Vocational training in bhilai steel plant on Plate mill, Rolling mill, Blast furnace area, coke/oven batteries, Arc furnace . Academic Qualification Secondary School with 76% in 1994 from Charoda English Medium C.G. Higher Secondary School with 68% in 1996 B.N.S.E.M.H.S School Bhilai C.G Metallurgical engineering with 62.45% in 2001 from Govt. Polytechnic College Durg C.G.
Personal Details : DOB : 23rd Nov 1979 Marital Status : Married Address : LIG 67 b Shanti Vihar Colony Padra Rewa 486002 Reference : Available on request Declaration I hereby declare that above information is true in best on my knowledge.
2