Doc-20181123-wa0006.xls

  • Uploaded by: Yoniey Slalueey Dinantiey
  • 0
  • 0
  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Doc-20181123-wa0006.xls as PDF for free.

More details

  • Words: 47,676
  • Pages: 79
Lampiran III : KEPUTUSAN BUPATI PONOROGO Nomor : 188.45/ /405.21/2018 Tanggal : DAFTAR HARGA BAHAN DAN UPAH PEKERJA

NO 1 I 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46

JENIS BAHAN BANGUNAN 2 BAHAN ATAP DAN PLAFOND Asbes gelombang besar tebal 5 mm (3.00 x 1.02 m) ex. Djabesmen Asbes gelombang besar tebal 5 mm (2.50 x 1.02 m) ex. Djabesmen Asbes gelombang kecil tebal 3 mm (3.00 x 1,05 m) ex. Djabesmen/Harflex Asbes gelombang kecil tebal 3 mm (2.10 x 1,05 m) ex. Djabesmen/Harflex Asbes wuwung stel gelombang 1,08 mm Atap galvalum gelombang lebar 0,8 tebal 0,03 Atap galvalum tebal 0,4 mm Genteng gelombang kecil 25 bj/m (Mantili) Genteng gelombang sedang 17 bj/m (Mantili Sedang) Genteng gelombang besar 14 bj/m (Mantili Besar) Genteng Flam Pres Jawa / Lokal 25 bj/m Genteng Kodok 25 bj/m (Kecil) Genteng Beton flat polos 11 bj/m Genteng Karang Pilang kodok 23 bj/m Genteng Bubung Jawa / lokal Genteng kaca kodok Genteng glazzur natural 14 bj/m ex. Kanmuri, kia, mclass Genteng keramik Genteng bubung palentong/WUWUNG KLUNTUNG Genteng bubung kodok /WUWUNG SEGITIGA Genteng bubung glazzur Genteng bubung karang pilang kodok Seng Plat 0.90 x 1.80 m BJLS 28 Seng Plat 0.90 x 1.80 m BJLS 30 Plat Galvanis 0.60 x 1 m Plat Galvanis 0.90 x 1 m Seng gelombang 3.00 x 0.80 BJLS 20 Teakwood jati tebal 3 mm 90 x 210 cm Rolling Door Alumunium Pintu harmonika Pintu kamar mandi aluminium grade A Pintu kamar mandi aluminium grade B Pintu kamar mandi aluminium grade C Gypsum Board t.9 mm ex. Jayaboard ;120 x 240 Grade A Gypsum Board 120 x 240 Tebal 9 mm Grade B Atap polycarbonate Triplek 3 mm 120 x 240 Triplek 4 mm 120 x 240 Triplek 6 mm 120 x 240 Triplek 9 mm 120 x 240 Triplek 12 mm 120 x 240 Kalsiboard 3 mm (120 x 240) cm ex. Gresik Rangka plafond Metal furing termasuk paku ripet & acc Woodplank 8 x 20 x 400 Woodplank 9 x 30 x 400 Eternit 100 X100

SATUAN 3 lbr lbr lbr lbr lbr m² m² bh bh bh bh bh bh bj bj bh bh bh bh bh bh bj lbr lbr m' m' lbr lbr m² m² unit unit unit lbr lbr m² lbr lbr lbr lbr lbr lbr m2 lbr lbr m²

HARGA A Terendah 4 107,000.00 90,000.00 80,000.00 63,000.00 38,000.00 47,000.00 65,000.00 1,800.00 2,500.00 2,700.00 1,400.00 1,750.00 5,500.00 5,500.00 6,500.00 15,000.00 11,500.00 9,450.00 5,000.00 5,000.00 21,000.00 15,000.00 88,500.00 125,000.00 25,000.00 37,500.00 82,500.00 93,500.00 450,000.00 850,000.00 750,000.00 400,000.00 180,000.00 67,500.00 55,000.00 260,000.00 47,000.00 55,000.00 80,000.00 120,000.00 165,000.00 47,000.00 52,000.00 48,000.00 79,000.00 15,000.00

HARGA B Tertinggi 5 110,000.00 95,000.00 86,000.00 65,000.00 39,100.00 52,500.00 70,000.00 2,000.00 3,000.00 3,100.00 1,650.00 2,400.00 6,500.00 6,000.00 8,500.00 22,000.00 13,500.00 10,450.00 7,000.00 7,000.00 25,000.00 17,000.00 90,000.00 127,000.00 27,000.00 39,500.00 85,000.00 97,500.00 500,000.00 1,100,000.00 900,000.00 410,000.00 225,000.00 70,000.00 58,000.00 270,000.00 50,000.00 60,000.00 92,000.00 135,000.00 185,000.00 51,000.00 54,000.00 51,000.00 81,000.00 17,000.00

II 1 2

6 7 8 9 10 11 12 13 14 15 16 17 18

BAHAN MENGGUNAKAN KAYU Dolken kayu Ø 8 - 10 /400 cm Jenis kayu balok Kelas I (kayu jati) Kelas II (kayu balau/borneo) Kelas III (kayu kruing) Kelas IV (kayu meranti/kayu lokal) Jenis kayu usuk/kaso Kelas I (kayu jati) Kelas II (kayu balau/borneo) Kelas III (kayu kruing) Kelas IV (kayu meranti/kayu lokal) Jenis kayu papan Kelas I (kayu jati) Kelas II (kayu balau/borneo) Kelas III (kayu kruing) Kelas IV (kayu meranti/kayu lokal) Jenis kayu reng Kelas I (kayu jati) Kelas II (kayu balau/borneo) Kelas III (kayu kruing) Kelas IV (kayu meranti/kayu lokal) List kayu 2/4 List kayu profil List gypsum profil 5 cm List gypsum profil 10 cm List gypsum profil 12 cm List gypsum profil 15 cm Kayu papan 2/20 meranti/begesting Tali Ijuk Ijuk Bambu Ø 6 - 8 /600 cm Minyak bekisting Kayu Bakar Bambu Ori

III 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32

btg

29,500.00

30,500.00

m³ m³ m³ m³

22,000,000.00 10,000,000.00 5,500,000.00 4,300,000.00

22,684,000.00 12,000,000.00 7,600,000.00 5,000,000.00

m³ m³ m³ m³

15,500,000.00 8,500,000.00 5,700,000.00 3,000,000.00

15,550,000.00 9,900,000.00 5,800,000.00 4,850,000.00

m³ m³ m³ m³

29,700,000.00 12,000,000.00 8,100,000.00 5,900,000.00

30,591,000.00 12,800,000.00 8,400,000.00 6,100,000.00

m³ m³ m³ m³ m' m' m' m' m' m' lbr kg kg btg liter m3 btg

13,000,000.00 8,300,000.00 4,250,000.00 3,100,000.00 6,000.00 11,000.00 11,600.00 13,200.00 16,500.00 22,000.00 16,000.00 20,000.00 10,000.00 12,000.00 4,000.00 357,500.00 25,000.00

14,500,000.00 8,400,000.00 4,750,000.00 3,270,000.00 6,500.00 11,500.00 11,900.00 13,500.00 16,900.00 22,600.00 16,400.00 25,000.00 25,000.00 13,000.00 5,500.00 368,200.00 30,000.00

BAHAN MENGGUNAKAN PASIR/BATU/SEMEN Bata merah 9.5 x 4 x 21 cm (magetan/ngawi) Bata merah 10 x 4.5 x 24 cm (kadipaten) Bata ringan clc Batako Besar Batako Kecil Batu belah 15/20 Batu belah 10/15 Batu belah 6/10 Batu pecah 5/7 Batu pecah 3/5 Batu pecah 2/3 Batu pecah 1/2 Batu pecah 0.5/1 Abu Batu Batu Raen/Muka Batu tempel Pasir beton Pasir pasang Pasir urug Tanah Urug Tanah Katel Sirtu Kerikil Sungai Disaring Kerikil Sungai tak Disaring Semen Warna (Nat Keramik) Semen Portland (Gresik 50 kg) Semen Portland (Tiga Roda 50 kg) Semen Portland (Holcim 50 Kg) Semen Nat Semen Putih Kapur Pasang Air

bh bh m³ bh bh m³ m³ m³ m³ m³ m³ m³ m³ m³ bh m² m³ m³ m³ m³ m³ m³ m³ m³ kg kg kg kg kg kg m³ liter

1,000.00 800.00 750,000.00 5,000.00 3,500.00 220,000.00 275,000.00 215,000.00 255,000.00 255,000.00 280,000.00 262,000.00 325,000.00 225,000.00 7,500.00 150,000.00 325,000.00 225,000.00 115,000.00 90,000.00 75,000.00 110,000.00 145,000.00 130,000.00 12,500.00 1,250.00 1,100.00 1,100.00 13,000.00 15,000.00 296,000.00 1,000.00

1,300.00 950.00 810,000.00 6,500.00 4,500.00 250,000.00 280,000.00 215,000.00 260,000.00 350,000.00 345,000.00 330,000.00 400,000.00 235,000.00 9,500.00 255,000.00 410,000.00 280,000.00 220,000.00 200,000.00 100,000.00 145,000.00 185,000.00 150,000.00 20,000.00 1,350.00 1,300.00 1,300.00 20,000.00 17,000.00 310,000.00 2,000.00

IV 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63

BAHAN MENGGUNAKAN BESI/LOGAM Besi beton polos Besi beton ulir Besi pipa galvanis medium Dia. 1/2" Besi pipa galvanis medium Dia 3/4" Besi pipa galvanis medium Dia 1" Besi pipa galvanis medium Dia 1 1/2" Besi pipa galvanis medium Dia 2" Besi pipa galvanis medium Dia 3" Besi pipa galvanis medium Dia 4" Besi plat baja Besi Profil Besi Baja Profil WF Besi strip Besi scuare tube Besi pipa Kawat ikat beton Kawat Nyamuk Kawat Harmonika Kawat las Kawat Ø 4 mm Jendela nako Kawat jaring Kawat Duri Besi lis kaca (1 x 1) cm Pengelasan Besi Plat bordes 4" x 8" tebal 3 mm Pagar BRC 120 x 240 biasa Pintu Dorong BRC/PMG ukuran 120 x 300 cm Tiang pagar BRC/PMG 2" tinggi 150 cm Kawat Ayakan 2.5 mm Kawat Ayakan 5 mm Kawat Ayakan 10 mm Pintu Harmonika Pintu Pagar Besi komplit dengan mainan Pintu Swing ganda BRC/PMG uk. 1.2. X 3.00 m2 Kawat Bronjong dia 2.70 mm - (2 x 1 x 0.5) m mesh 80 x 100 mm Kawat Bronjong dia 3.00 mm - (2 x 1 x 0.5) m mesh 80 x 100 mm Kawat Bronjong dia 3 dan 4 mm - (2 x 1 x 0.5) m Kawat Bronjong dia 3 mm Jaring kawat baja dilas Wiremesh M6 Wiremesh M8 Wiremesh M10 Pintu Gulung Besi Pintu Lipat Plat Besi Cor Roda gigi M.10 Seal Karet Spie Splite Pen/Pengunci Besi Siku Angker Bolt 19 mm Besi Bulat st. 42 Besi Bulat st. 60 Besi Cor Besi Kanal/INP Dop (Bronze) Dop (Besi Cor) Drucklager kecil/besar Mur Baut 1/2", 5/8", 7/8" Na F + Ring Nipple Plat Bronze

kg kg btg btg btg btg btg btg btg kg kg kg kg kg kg kg m² m' kg kg psg lbr m' m' cm kg unit unit btg m² m² m² m² m² unit lbr lbr lbr kg m² m² m² m² m² bh kg psg m' bh bh kg bh kg kg kg kg kg kg bh kg bh bh kg

10,500.00 11,500.00 130,000.00 175,000.00 260,000.00 270,000.00 450,000.00 700,000.00 950,000.00 12,500.00 16,000.00 15,000.00 13,500.00 14,000.00 55,000.00 19,000.00 28,000.00 30,000.00 55,000.00 35,000.00 230,000.00 45,000.00 72,000.00 22,000.00 25,000.00 24,000.00 250,000.00 2,350,000.00 165,000.00 130,000.00 125,000.00 100,000.00 1,250,000.00 575,000.00 3,200,000.00 70,000.00 85,000.00 380,000.00 105,000.00 500,000.00 325,000.00 750,000.00 6,500.00 420,000.00 525,000.00 18,000.00 17,500.00 115,000.00 7,500.00 60,000.00 14,000.00 27,500.00 20,000.00 21,000.00 20,000.00 17,500.00 150,000.00 22,000.00 700,000.00 20,000.00 110,000.00 2,500.00 140,000.00

13,000.00 14,000.00 130,000.00 175,000.00 270,000.00 280,000.00 450,000.00 700,000.00 950,000.00 13,000.00 18,000.00 20,000.00 13,500.00 14,000.00 55,000.00 22,500.00 30,000.00 37,500.00 60,000.00 40,000.00 230,000.00 45,000.00 75,000.00 22,000.00 30,000.00 24,000.00 300,000.00 2,500,000.00 170,000.00 160,000.00 150,000.00 130,000.00 1,250,000.00 650,000.00 3,200,000.00 80,000.00 90,000.00 380,000.00 110,000.00 57,000.00 325,000.00 750,000.00 21,000.00 420,000.00 525,000.00 18,000.00 24,000.00 115,000.00 9,000.00 60,000.00 15,500.00 33,000.00 20,000.00 21,000.00 20,000.00 22,000.00 150,000.00 22,000.00 700,000.00 30,000.00 110,000.00 4,000.00 140,000.00

V 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23

BAHAN LANTAI DAN DINDING Ubin keramik 20 x 20 Polos Ubin Keramik 20 x 25 Polos Ubin Keramik 20 x 25 Motif Ubin Keramik 30 x 30 Polos Ubin Keramik 30 x 30 Motif Ubin Keramik 40 x 40 Polos Ubin Keramik 40 x 40 Motif Ubin Keramik 60 x 60 Polos Ubin Keramik 60 x 60 Motif Granite tile 40 x 40 (ex. Granito tile) polished Plint Cove Keramik 10 x 20 Plint Cove Granite 10 x 20 Plint keramik 10 x 30 ex. Roman List keramik (Kuku Macan) p = 10 cm List keramik dinding t = 10 cm Step Nosing 10x20 Roster Beton 20 x 20 Roster Beton 30 x 30 Roster Beton 30 x 40 Roster Beton 40 x 40 Roster Keramik 20 x 20 Batu candi Glass Blok 20 x 20 cm

m² m² m² m² m² m² m² m² m² m² m' m' bh bh bh bh bh bh bh bh bh m² bh

45,000.00 50,000.00 55,000.00 45,000.00 50,000.00 52,500.00 55,000.00 75,000.00 75,000.00 90,000.00 72,500.00 20,000.00 12,000.00 1,000.00 14,000.00 150,000.00 25,000.00 30,000.00 35,000.00 40,000.00 35,000.00 140,000.00 23,000.00

60,000.00 60,000.00 60,000.00 60,000.00 68,000.00 65,000.00 65,000.00 80,000.00 87,000.00 95,000.00 86,000.00 21,000.00 12500 2,500.00 28,000.00 176,500.00 27,000.00 33,000.00 37,000.00 45,000.00 42,000.00 152,500.00 28,000.00

VI 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

BAHAN PENGECATAN Cat meni kayu Cat meni besi Cat dasar dinding exterior Cat dasar dinding interior Politur Politur jadi Vernis Dempul Residu Kertas gosok/ Ampelas Plamur tembok Plamur kayu Plamur Besi Thinner A Thinner B / minyak cat Kuas Spiritus Wood filler ex. Impra Cat besi/kayu Emco/avian Cat tembok Vinilek, Aviapaint (sejenis)/cat kw 2 Cat Exterior Weathercoat/weatherproof Cat Interior ex Mowilex, Dulux, Jotun - setara /Cat Kw 1 Minyak cat/ afduner Lem kayu

kg kg ltr kg ltr ltr ltr kg ltr lbr kg kg kg ltr ltr bh ltr kg kg kg ltr ltr ltr kg

27,500.00 30,000.00 60,000.00 21,250.00 71,000.00 72,500.00 52,500.00 37,000.00 1,000.00 3,500.00 14,500.00 25,000.00 30,000.00 31,000.00 15,000.00 10,000.00 20,000.00 37,500.00 66,000.00 90,000.00 150,000.00 120,000.00 25,000.00 12,000.00

30,000.00 42,500.00 497,000.00 380,000.00 74,000.00 75,000.00 60,000.00 65,000.00 1,500.00 4,500.00 27,500.00 40,000.00 55,000.00 46,000.00 25,000.00 20,000.00 25,000.00 60,000.00 70,000.00 100,000.00 200,000.00 250,000.00 28,500.00 16,000.00

VII 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

BAHAN PENGGANTUNG DAN PENGUNCI Engsel jendela ex west, cavell, beleza setara Engsel angin ex west, cavell, beleza setara Engsel pintu ex west, cavell, beleza setara Engsel 3", ex Bos Kunci tanam antik ex west, cavell, beleza setara Kunci tanam biasa ex west, cavell, beleza setara Kunci tanam kamar mandi Kunci silinder Kunci lemari Kunci tanam besar kuda terbang 2 x putar Kunci Tanam Grade A, ex Solid, Dekkson - setara Kunci Tanam Grade B, Muller, Cavell, setara Grendel biasa Grendel tanam Handle/Pegangan pintu Spring knip Door closer Door stop Door holder Kunci selot Slot tanam Kait angin Espanyolet Rambucis Kunci gembok kecil Kunci gembok besar

bh bh bh bh bh bh bh bh bh bj stel stel bh bh bh bh bh bh bh bh bh bh stl bh bh bh

33,000.00 15,000.00 47,000.00 22,500.00 210,000.00 93,000.00 75,000.00 30,000.00 14,000.00 80,000.00 157,500.00 180,000.00 21,000.00 75,000.00 150,000.00 15,000.00 30,000.00 65,000.00 165,000.00 130,000.00 85,000.00 39,500.00 22,500.00 15,500.00 12,500.00 40,000.00

35,000.00 25,000.00 63,000.00 27,500.00 220,000.00 100,000.00 77,500.00 50,000.00 18,000.00 90,000.00 167,500.00 225,000.00 75,000.00 90,000.00 850,000.00 120,000.00 40,000.00 70,000.00 175,000.00 330,000.00 150,000.00 39,500.00 25,000.00 18,000.00 25,000.00 150,000.00

VIII 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25

BAHAN SANITASI Closet Duduk Putih Porselin Komplit Closet Duduk Putih CW 600 J / SW 660 J Komplit & acc Closet Jongkok Porselin Warna Putih Closet Jongkok Porselin type CE 6 ex. Toto Bak Cuci Stainless Steel Bak Cuci Teraso Bak air fibreglass uk.55 x 55 x 60 cm Seal Tape Wastafel Wastafel LW 240 CJ ex Toto, Komplit kran & acc Kran Air Water Drain + Assesories Floor Drain Stainless Tangki Air Fibre Kap. 500 L Tangki Air Fibre Kap. 1100 L Tempat sabun S11 N Ex. Toto Kusen & Pintu PVC toilet ex. Maspion Urinoir type U 57 M ex. Toto Shower spray type THX 20 NBPIV ex. Toto Shower set ex type TX 423 SZ ex. Toto Kran Zink T 30 AR13NV7N ex. Toto atau setara Roof drain metal Pelampung otomatis Kitchenzink Hwaco 1L Kran dinding type T 23 B13V7N ex. Toto

bh unit bh unit bh bh bh bh bh unit bh set bh bh bh bh unit unit unit unit bh bh bh unt bh

1,490,000.00 3,000,000.00 145,000.00 370,000.00 385,000.00 850,000.00 250,000.00 3,500.00 300,000.00 450,000.00 20,000.00 15,000.00 60,000.00 850,000.00 1,600,000.00 170,000.00 375,000.00 2,750,000.00 240,000.00 850,000.00 410,000.00 75,000.00 75,000.00 500,000.00 255,000.00

1,651,000.00 3,500,000.00 390,000.00 390,000.00 650,000.00 1,000,000.00 350,000.00 6,000.00 1,000,000.00 1,000,000.00 70,000.00 60,000.00 75,000.00 892,500.00 1,650,000.00 187,000.00 390,000.00 2,800,000.00 350,000.00 860,000.00 420,000.00 100,000.00 100,000.00 535,000.00 275,000.00

IX 1 2 3 4 5 6 7

BAHAN KACA Kaca Polos Tebal 3 mm Kaca Polos Tebal 5 mm Kaca Polos Tebal 8 mm Kaca Rayban 5 mm Kaca Rayban 8 mm Kaca Rayban 12 mm Sealant

m² m² m² m² m² m² tube

80,000.00 115,000.00 180,000.00 110,000.00 80,000.00 88,000.00 35,000.00

100,000.00 175,000.00 200,000.00 120,000.00 88,000.00 92,500.00 60,000.00

X 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

BAHAN BETON CETAKAN Buis beton diameter 30 cm 100 cm Buis beton diameter 40 cm 100 cm Buis beton diameter 50 cm 100 cm Buis beton diameter 60 cm 100 cm Buis beton diameter 60 cm 50 cm Buis beton diameter 80 cm 50 cm Buis beton diameter 100 cm 50 cm Buis beton U 15 cm 100 cm Buis beton U 20 cm 100 cm Buis beton U 30 cm 100 cm Buis beton U 40 cm 100 cm Buis beton U 50 cm 100 cm Paving blok persegi tebal = 6 cm abu-abu K.175 Paving blok persegi tebal = 6 cm warna K.175 Paving blok persegi tebal = 8 cm abu-abu K.175 Paving blok persegi tebal = 8 cm warna K.175 Paving blok persegi tebal = 6 cm abu-abu K 200 Paving blok persegi tebal = 6 cm warna K 200 Paving blok persegi tebal = 8 cm abu-abu K 200 Paving blok persegi tebal = 8 cm warna K 200 Paving blok persegi tebal = 6 cm abu-abu K.250 Paving blok persegi tebal = 6 cm warna K.250 Paving blok persegi tebal = 8 cm abu-abu K.250 Paving blok persegi tebal = 8 cm warna K.250 Paving blok persegi tebal = 6 cm abu-abu K.300 Paving blok persegi tebal = 6 cm warna K.300 Paving blok persegi tebal = 8 cm abu-abu K.300 Paving blok persegi tebal = 8 cm warna K.300 Kanstin beton cetak 10 x 20 x 40 cm Kanstin beton cetak 15 x 20 x 50 cm Kanstin beton cetak 15 x 30 x 60 cm

bh bh bh bh bh bh bh bh bh bh bh bh m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² m² bh bh bh

55,000.00 75,000.00 130,000.00 150,000.00 82,000.00 130,000.00 150,000.00 30,000.00 40,000.00 60,000.00 75,000.00 70,000.00 60,000.00 75,000.00 79,000.00 86,000.00 65,000.00 70,000.00 80,000.00 85,000.00 75,000.00 80,000.00 90,000.00 95,000.00 85,000.00 90,000.00 100,000.00 110,000.00 15,000.00 25,000.00 30,000.00

80,000.00 95,000.00 130,000.00 150,000.00 87,000.00 130,000.00 155,000.00 33,000.00 43,000.00 63,000.00 78,500.00 75,000.00 70,000.00 75,000.00 85,000.00 90,000.00 75,000.00 80,000.00 90,000.00 95,000.00 85,000.00 90,000.00 100,000.00 110,000.00 95,000.00 100,000.00 110,000.00 115,000.00 19,000.00 25,000.00 30,000.00

XI 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94

BAHAN PLASTIK / PIPA Keni PVC 1/2" Keni PVC 3/4" Keni PVC 2" Keni PVC 3" Keni PVC 4" Keni PVC 5" Keni GI 1/2" Pipa GI 1/2" Pipa paralon 5/8" panjang 4.00 mt (Maspion)/WAVIN) Pipa PVC 1/2" type AW panjang 4.00 mt (Maspion)/POWERMAX/WAVIN) Pipa PVC 3/4" type AW panjang 4.00 mt (Maspion)/POWERMAX/WAVIN) Pipa PVC 1" type AW panjang 4.00 mt (Maspion)/POWERMAX) Pipa PVC 2"type AW panjang 4.00 mt (Maspion)/POWERMAX/WAVIN) Pipa PVC 3" type AW panjang 4.00 mt (Maspion)/POWERMAX/WAVIN) Pipa PVC 4" type AW panjang 4.00 mt (Maspion)/POWERMAX/WAVIN) Pipa PVC 1/2" type AW panjang 6.00 mt Pipa PVC 3/4" type AW panjang 6.00 mt Pipa PVC 1" type AW panjang 6.00 mt Pipa PVC 2" type AW panjang 6.00 mt Pipa PVC 3" type AW panjang 6.00 mt Pipa PVC 4" type AW panjang 6.00 mt Pipa PVC 5" type AW panjang 6.00 mt Pipa PVC RRJ 6 m' S-12,5 Dia 2" Pipa PVC RRJ 6 m' S-12,5 Dia 2 ½ " Pipa PVC RRJ 6 m' S-12,5 Dia 3" Pipa PVC RRJ 6 m' S-12,5 Dia 4" Pipa PVC RRJ 6 m' S-12,5 Dia 6 " Pipa PVC RRJ 6 m' S-12,5 Dia 8" Pipa PVC RRJ 6 m' S-12,5 Dia 10" Pipa PVC RRJ 6 m' S-12,5 Dia 12" Pipa PVC Moof 6 m' S-12,5 Dia 1/2'' Pipa PVC Moof 6 m' S-12,5 Dia 1'' Pipa PVC Moof 6 m' S-12,5 Dia 1½'' Pipa PVC Moof 6 m' S-12,5 Dia 2'' Pipa PVC Moof 6 m' S-12,5 Dia 2½'' Pipa PVC Moof 6 m' S-12,5 Dia 3'' Pipa PVC Moof 6 m' S-12,5 Dia 4'' Pipa PVC Moof 6 m' S-12,5 Dia 6'' Pipa PVC Moof 6 m' S-12,5 Dia 8'' Pipa PVC Moof 6 m' S-12,5 Dia 10'' Pipa PVC Moof 6 m' S-12,5 Dia 12'' Pipa PVC RRJ 6 m' S-10 Dia 2" Pipa PVC RRJ 6 m' S-10 Dia 2 ½ " Pipa PVC RRJ 6 m' S-10 Dia 3" Pipa PVC RRJ 6 m' S-10 Dia 4" Pipa PVC RRJ 6 m' S-10 Dia 6 " Pipa PVC RRJ 6 m' S-10 Dia 8" Pipa PVC RRJ 6 m' S-10 Dia 10" Pipa PVC RRJ 6 m' S-10 Dia 12" Pipa PVC Moof 6 m' S-10 Dia 2'' Pipa PVC Moof 6 m' S-10 Dia 2½'' Pipa PVC Moof 6 m' S-10 Dia 3'' Pipa PVC Moof 6 m' S-10 Dia 4'' Pipa PVC Moof 6 m' S-10 Dia 6'' Pipa PVC Moof 6 m' S-10 Dia 8'' Pipa PVC Moof 6 m' S-10 Dia 10'' Pipa PVC Moof 6 m' S-10 Dia 12'' Bend 90' dia 2" PVC (All Flange) Bend 90' dia 3" PVC (All Flange) Bend 90' dia 4" PVC (All Flange) Dop 2" PVC Dop 3" PVC Dop 4" PVC Flange socket dia 2" PVC Flange socket dia 3" PVC Flange socket dia 4" PVC Reducer dia 3" x 2" PVC RR Reducer dia 4" x 3" PVC RR Stop Kran 1/2" Stop Kran 3/4" Stop Kran 1" Stop Kran 1 1/4" Stop Kran 1 1/2" Stop Kran 2" Stop Kran 2 1/2" Stop Kran 3" Stop Kran 4" Tee' dia 2" x 2" PVC (All Sock) Tee' dia 3" x 3" PVC (All Sock) Tee' dia 4" x 4" PVC (All Sock) Trek mur Water mur 1/2" Water mur 3/4" Water mur 1" Water mur 1 1/4" Water mur 1 1/2" Water mur 2" Water mur 2.5" Water mur 3" Water mur 4" Klep diameter 3/4'' ex.Onda Double neple 1/2 Kran air TBA (seal tape)

bh bh bh bh bh bh bh btng m' btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh

2,000.00 2,000.00 5,000.00 10,000.00 15,000.00 25,000.00 6,500.00 160,000.00 9,000.00 25,200.00 34,400.00 47,000.00 113,000.00 208,000.00 303,000.00 41,000.00 50,000.00 62,500.00 170,000.00 312,000.00 456,000.00 950,500.00 150,000.00 200,000.00 280,000.00 400,000.00 798,500.00 1,289,000.00 2,010,500.00 3,178,800.00 14,300.00 34,200.00 80,500.00 116,200.00 166,750.00 241,500.00 357,150.00 1,182,650.00 1,930,900.00 3,036,150.00 4,839,600.00 242,100.00 344,750.00 483,800.00 722,400.00 1,504,000.00 2,440,450.00 3,798,450.00 6,027,250.00 223,300.00 318,650.00 455,150.00 688,450.00 1,454,150.00 2,374,100.00 3,710,500.00 5,905,000.00 123,500.00 208,500.00 300,000.00 11,000.00 18,000.00 33,000.00 4,000.00 6,000.00 7,000.00 6,000.00 8,000.00 15,500.00 17,500.00 143,250.00 31,000.00 65,000.00 100,000.00 240,000.00 110,000.00 125,000.00 4,000.00 10,000.00 18,000.00 5,000.00 7,000.00 10,000.00 16,000.00 30,000.00 40,000.00 50,000.00 70,000.00 85,000.00 105,000.00 35,000.00 10,000.00 15,500.00 4,000.00

5,500.00 5,500.00 8,000.00 12,500.00 17,500.00 30,000.00 7,600.00 165,000.00 12,000.00 26,110.00 34,500.00 47,000.00 116,300.00 210,000.00 312,000.00 42,000.00 51,000.00 63,500.00 175,100.00 321,300.00 469,600.00 979,000.00 153,000.00 206,500.00 288,000.00 410,000.00 810,000.00 1,329,000.00 2,060,500.00 3,278,800.00 16,000.00 38,300.00 88,600.00 119,600.00 171,700.00 248,700.00 367,800.00 1,202,650.00 1,968,900.00 3,086,150.00 4,939,600.00 247,100.00 351,750.00 492,800.00 735,400.00 1,534,000.00 2,490,450.00 3,848,500.00 6,100,000.00 225,000.00 324,500.00 464,000.00 690,500.00 1,475,500.00 2,418,000.00 3,790,000.00 6,005,000.00 127,200.00 214,700.00 309,000.00 12,100.00 20,750.00 39,600.00 8,000.00 8,500.00 12,000.00 6,000.00 8,000.00 28,000.00 35,000.00 147,500.00 60,000.00 80,000.00 125,000.00 250,000.00 110,000.00 125,000.00 4,000.00 10,000.00 18,000.00 7,500.00 9,000.00 14,000.00 18,500.00 30,000.00 40,000.00 50,000.00 70,000.00 85,000.00 105,000.00 60,000.00 13,000.00 25,000.00 6,000.00

XII 1 2 3 4 5 6 7 8 9 10

BAHAN PAKU Paku Tripleks Paku Biasa Paku Sekrup 100 pcs Paku Payung Paku Gypsum Paku Asbes Paku Reng Paku Usuk Paku Kalsiboard Paku Keling

kg kg dos kg kg kg kg kg kg kg

22,000.00 16,000.00 15,000.00 40,000.00 60,000.00 40,000.00 17,500.00 16,000.00 35,000.00 20,000.00

27,000.00 19,000.00 25,000.00 45,000.00 65,000.00 50,000.00 19,000.00 19,000.00 40,000.00 25,000.00

XIII 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

BAHAN PERLENGKAPAN LISTRIK Stop Kontak ex. Broco Saklar Tunggal ex. Broco Saklar Ganda ex. Broco Lampu TL 20 watt ex Phillips, Osram, Panasonic Lampu TL 40 watt ex Phillips, Osram, Panasonic Lampu SL 14 watt ex Phillips, Osram, Panasonic Lampu SL 18 watt ex Phillips, Osram, Panasonic Downlight ex Phillips, Panasonic 4" Downlight ex Phillips,Panasonic 5" Lampu Pijar 25,40,75 / 220 V T Doos PVC ex Broco Kabel NYA 1 x 1.5 Kabel NYA 1 x 2.5 Kabel NYM 2 x 1,5 Kabel NYM 2 x 2,5 Kabel NYM 3 x 1,5 Kabel NYM 3 x 2,5 Box panel PVC isi 4 MCB ex. Legran/PRETO Isolasi Outlet TV ex. Broco Fitting Plafon + Lampu SL ex. Panasonic

bh bh bh bh bh bh bh bh bh bh bh m' m' m' m' m' m' bh bh bh bh

15,000.00 15,000.00 20,000.00 20,000.00 25,000.00 30,000.00 35,000.00 40,000.00 55,000.00 45,000.00 2,500.00 3,000.00 3,750.00 6,000.00 9,000.00 8,200.00 20,000.00 50,000.00 5,500.00 33,000.00 11,000.00

20,000.00 23,000.00 30,000.00 22,000.00 27,000.00 45,000.00 70,000.00 50,000.00 55,000.00 48,500.00 3,000.00 4,000.00 4,500.00 8,000.00 11,000.00 9,500.00 30,000.00 50,000.00 10,000.00 38,000.00 14,000.00

ltr

32,000.00

44,000.00

3

4

5

XIV BAHAN ASPAL / BBM 1 Minyak Pelumas

2 3 4 5 6 7 8

Minyak Tanah Minyak Aspal Minyak Rem Olie Mesin Solar Industri Bensin/Premium Industri Aspal Drum

XV POMPA 1 Pompa Tangan 2 Pompa Listrik : Panasonic/SHIMIZU Kapasitas : L/dt 200 W Kapasitas : L/dt 125 W Jet pump 3 Mesin Tangki Sprayer 4

Pompa Submersible 3m³/h, 2,2 kw, head 131 m

5

Pompa Submersible 5m³/h, 3 kw, head 123 m

ltr ltr ltr ltr ltr ltr kg

17,000.00 17,000.00 50,000.00 38,000.00 32,500.00 9,000.00 8,500.00

20,000.00 18,000.00 60,000.00 48,000.00 48,000.00 9,500.00 9,000.00

unit unit unit unit unit

675,000.00 450,000.00 2,000,000.00 450,000.00

850,000.00 550,000.00 2,500,000.00 550,000.00

unit

17,000,000.00

17,500,000.00

17,000,000.00

17,500,000.00

unit

XVI 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50

PERALATAN/ALAT BANTU Alat Potong Rumput Tanaka 1,6 Hp/ 7200 Rpm Ban Gerobak Luar Ban Gerobak Dalam Benang Rami Cangkul (lengkap) Cetok Chipping Cikrak Bambu Cikrak Seng Drum Pemasak Aspal Ember Ganco Garuk Besar Garuk Kecil Gedek Bambu Petung Gembok Besar Gembok Kecil Gergaji tangan Gunting Tanaman Hand Sprayer Swan 14 Lt Jas Hujan Karung Goni Karung Plastik Kasut Kayu Kayu Pemikul dan Tali Klaker Roda Gunting Pemotong Baja Kranjang Bambu Linggis Meteran - 30 s/d 50 m Palu Besar Palu Kecil Rambu Pengaman Gerobag Artco Sabit sedang Sabit besar Sand Bag (Kantong Pasir) Sapu Lidi Senter Sepatu Lapangan Sikat Baja Sekop Kecil Tali Rapia Tang Pemotong Tong Sampah Komplit (Besar) Tong Sampah Komplit (Kecil) Tong Sampah Komplit (Sedang) Tusuk Bambu

XVIII A 1 2 B 1 2 3 4 C 1 2 3 D 1 2 3 E 1 2 3 4 5 6 F 1 2 3 4 G 1 2 H 1 2 3 4 5 6 7 8 I 1 2 3 4 5 6 J 1 2 3 4 6 K 1 2 L 1 2 3 4 5 6 7 8 9 10 11 O 1 2 3 4 5 6 7 8 9 10 11

BAHAN PERALATAN LISTRIK JALAN MERCURY Mercury KW I (PAKAI BALAST BHL) Mercury KW I 125 W - E 27 Mercury KW I 250 W - E 40 MERCURY ML (TIDAK PAKAI BALAST) ML 100 W - E 27 ML 160 W - E 27 ML 250 W - E 40 ML 500 W - E 40 Sodium Sodium T 100 W - E 27 (BSN 100 W) Sodium T 250 W - E 40 (BSN 250 W) Sodium T 400 W - E 40 (BSN 400 W) LAMPU TL TL 10 W TL 18 W TL 36 W LHE LHE 8 W LHE 14 W LHE 18 W LHE 23 W DOP 5 W (Pijar) PHILLIPS TORNADO 42 W LAMPU SOROT Halogen 200 W (Cina) Halogen 300 W (Cina) Halogen 500 W (Cina) Halogen 1000 W (Cina) LAMPU HIAS DAN ASCESSORIES Balast BSN 400 W Balast BSN 150 W Black (Polandia) MCB MCB 32 A (1 Pas) MCB 32 A (3 Pas) MCB 50 A (1 Pas) MCB 50 A (3 Pas) MCB 10 A MCB 40 A MCB 6 A MCB 4 A STATER, SEKRING, IGNITOR, CAPASITOR Stater FS 2 (10 - 20 W) Stater FS 4 (40 - 65 W) Sekring otomat Likon 6 A Sekring otomat Likon 10 A Sekring otomat Likon 25 A Ignitor SN 58 KAB E L Kabel NYM 2 X 2.5 mm (100 M) Kabel NYM 2 X 1.5 mm (100 M) Kabel NYY 2 X 2.5 mm (100 M) Kabel NYY 2 X 1.5 mm (100 M) Kabel NYA 1,5 mm KAP LAMPU Kap Hijau E. 27 Kap hijau E. 40 FITTING, CONECTING, DLL Fitting Besi E. 27 Fitting Besi E. 40 Fiting Dop Gantung Fitting tempel E 40 Fitting plastik 5 W Fitting TL 40 W Conector KW 1 Conector KW 2 Service Isolasi Kecil Isolasi Scot Merk 3 M MATERIAL PJU Box MCB Stop Kontak Isi 3 Steker Hadle 3Phase 30 A Plat grounding Obeng Tang kombinasi Tang lancip Tes pen Avometer Tang ampere

XIX A 1 B 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

BAHAN/PERALATAN KEBERSIHAN DAN PERTAMANAN MESIN PEMOTONG RUMPUT Busi BAHAN TANAMAN Glodok Tiang tinggi 2 m Tanjung tinggi 2 m Palem Putri tinggi 2 m Sawo Kecik tinggi 2 m Palem Regu tinggi 2 m Iris Air Paq Kamboja Jepang Asoka Plastik Polibag Trembesi tinggi 2 m Palem Ekor Tupai Teh-tehan 30 cm Aglonema Puring 50 cm Xansivera Kruilia Pucuk Merah tinggi 1/2 m Tree Colour tinggi 1 m Taiwan Beauty Palem Merah tinggi 1 m Cemara Udang Walisanga Adam Hawa Glodok Biasa tinggi 2 m Kelapa sawit tinggi 1m Palem bis markia tinggi 1 m Palem bis markia tinggi 0.5 m Rumput grinting jepang /m² Rumput gajah mini /m² sakura Bakung Kacang-kacangan Ponco warno Krisan

XX SEWA ALAT 1 Sewa Molen + BBM

unit bh bh rol bh bh m³ bh bh bh bh bh bh bh bh bh bh bh bh bh bh bh lbr bh stel bh bh bh bh bh bh bh bh stel bh bh lbr bh bh psg bh bh m' bh bh bh bh dos

1,500,000.00 80,000.00 35,000.00 40,000.00 165,000.00 15,000.00 50,000.00 12,500.00 15,000.00 75,000.00 10,000.00 85,000.00 60,000.00 35,000.00 100,000.00 35,000.00 15,000.00 75,000.00 43,500.00 350,000.00 75,000.00 20,000.00 2,500.00 20,000.00 40,000.00 15,000.00 200,000.00 50,000.00 60,000.00 47,500.00 86,000.00 28,500.00 490,000.00 480,000.00 25,000.00 65,000.00 2,500.00 10,000.00 21,000.00 75,000.00 15,000.00 60,000.00 200.00 25,000.00 320,000.00 115,000.00 150,000.00 6,000.00

4,900,000.00 200,000.00 45,000.00 40,000.00 250,000.00 40,000.00 52,500.00 20,000.00 17,500.00 100,000.00 15,000.00 115,000.00 70,000.00 40,000.00 100,000.00 100,000.00 30,000.00 125,000.00 66,000.00 350,000.00 225,000.00 35,000.00 5,000.00 20,000.00 50,000.00 30,000.00 350,000.00 65,000.00 110,000.00 95,000.00 125,000.00 40,000.00 490,000.00 550,000.00 48,000.00 85,000.00 4,000.00 20,000.00 50,000.00 115,000.00 24,000.00 75,000.00 200.00 50,000.00 425,000.00 160,000.00 225,000.00 10,000.00

bh bh

35,000.00 95,000.00

40,000.00 95,000.00

bh bh bh bh

41,000.00 47,500.00 61,000.00 82,000.00

41,000.00 47,500.00 67,500.00 82,000.00

bh bh bh

80,000.00 100,000.00 107,500.00

80,000.00 100,000.00 107,500.00

bh bh bh

10,000.00 15,000.00 20,000.00

15,000.00 18,000.00 23,000.00

bh bh bh bh bh BH

35,000.00 52,000.00 75,000.00 97,000.00 6,000.00 75,000.00

38,000.00 55,000.00 77,000.00 98,000.00 7,500.00 95,000.00

bh bh bh bh

35,000.00 37,500.00 42,500.00 66,000.00

40,000.00 37,500.00 42,000.00 69,000.00

bh bh

60,000.00 48,000.00

68,000.00 62,500.00

bh bh bh bh BH bh bh bh

60,000.00 250,000.00 140,000.00 475,000.00 40,000.00 65,000.00 65,000.00 65,000.00

60,000.00 250,000.00 140,000.00 475,000.00 60,000.00 65,000.00 75,000.00 85,000.00

bh bh bh bh bh bh

3,000.00 3,000.00 25,000.00 25,000.00 25,000.00 22,500.00

5,000.00 5,000.00 35,000.00 35,000.00 27,500.00 27,500.00

rol rol rol rol m'

670,000.00 470,000.00 880,000.00 660,000.00 4,500.00

700,000.00 530,000.00 1,040,000.00 775,000.00 7,500.00

bh bh

12,000.00 15,000.00

15,000.00 20,000.00

bh bh bh bh bh bh bh bh bh bh bh

9,000.00 22,500.00 3,000.00 10,000.00 10,000.00 12,500.00 10,000.00 7,500.00 10,000.00 3,000.00 7,000.00

13,000.00 22,500.00 5,000.00 15,000.00 15,000.00 15,000.00 15,000.00 10,000.00 25,000.00 5,500.00 10,000.00

bh bh bh bh bh bh bh bh bh bh bh

27,500.00 20,000.00 9,000.00 10,000.00 2,500.00 18,000.00 25,000.00 30,000.00 12,000.00 50,000.00 50,000.00

27,500.00 30,000.00 12,000.00 15,000.00 10,000.00 75,000.00 46,500.00 40,000.00 55,000.00 500,000.00 150,000.00

bh

18,500.00

25,000.00

btg btg btg btg btg btg btg btg btg kg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg btg m2 m2 btg btg btg btg m2

80,000.00 95,500.00 60,500.00 80,000.00 45,000.00 8,000.00 2,000.00 25,000.00 16,000.00 32,000.00 20,000.00 25,000.00 20,000.00 11,000.00 25,000.00 8,000.00 9,000.00 30,000.00 10,000.00 1,000.00 175,000.00 45,000.00 35,000.00 40,000.00 110,000.00 10,000.00 40,000.00 25,000.00 20,000.00 21,000.00 15,000.00 11,000.00 10,000.00 25,000.00 20,000.00

157,000.00 115,000.00 75,000.00 100,000.00 65,000.00 20,000.00 2,500.00 110,000.00 25,000.00 35,000.00 45,000.00 500,000.00 40,000.00 550,000.00 50,000.00 25,000.00 25,000.00 45,000.00 12,000.00 2,000.00 200,000.00 65,000.00 39,000.00 85,000.00 145,000.00 15,000.00 60,000.00 50,000.00 22,000.00 22,500.00 20,500.00 21,000.00 12,000.00 30,000.00 35,000.00

hari

55,000.00

60,000.00

Keterangan : KATEGORI A

KATEGORI B

Kecamatan Ponorogo

Kecamatan Ngrayun

Kecamatan Babadan

Kecamatan Pudak

Kecamatan Jenangan

Kecamatan Ngebel

Kecamatan Balong

Kecamatan Sooko

: Jurug, Ngadirojo, Klepu, Bedoho

Kecamatan Jambon

Kecamatan Badegan

: Dayakan

Kecamatan Jetis

Kecamatan Slahung

: Tugurejo, Wates, Ngilo-Ilo, Caluk, Senepo

Kecamatan Kauman

Kecamatan Sawoo

: Tumpuk, Tempuran, Temon, Sriti, Pangkal, Tumpak Pelem

Kecamatan Mlarak

Kecamatan Sambit

: Gajah, Jrakah

Kecamatan Pulung

Kecamatan Sampung

: Pagerukir

Kecamatan Sambit

Kecamatan Pulung

: Banaran, Bekiring, Wagir Kidul, Wayang, Karangpatihan

Kecamatan Sampung Kecamatan Sawoo

Catatan :

Kecamatan Siman

1. Nama- nama desa di kecamatan yang sama namun tidak tercantum dalam kategori B dimasukkan ke dalam kategori A

Kecamatan Slahung Kecamatan Sukorejo Kecamatan Bungkal Kecamatan Sooko Kecamatan Badegan

2. Penentuan wilayah desa kategori A atau kategori B dapat berubah dengan mempertimbangan faktor kondisi lapangan, biaya dan teknis.

DAFTAR UPAH PEKERJA NO 1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37

TENAGA KERJA 2 MANDOR KEPALA TK. GALI TANAH KEPALA TK. BATU KEPALA TK. KAYU KEPALA TK. BESI KEPALA TK. CAT KEPALA TK. LISTRIK KEPALA TK. PIPA TUKANG BATU TUKANG KAYU TUKANG BESI TUKANG CAT TUKANG PLITUR TUKANG ASPAL TUKANG PIPA TUKANG POTONG POHON TUKANG LISTRIK PEMBANTU TK. BATU PEMBANTU TK. KAYU PEMBANTU TK. BESI PEMBANTU TK. CAT PEMBANTU TK. LISTRIK PEMBANTU TK. PIPA MEKANIK PEMBANTU MEKANIK OPERATOR PENGEMUDI/SOPIR TUKANG TANAM PENJAGA API PENJAGA MALAM SOPIR MATERIAL/TRUCK OPERATOR (FINISHER, BULLDOZER) OPERATOR SEMI TERLATIH PEMBANTU OPERATOR PEMBANTU SOPIR/ KENEK TENAGA POTONG POHON PEKERJA

SATUAN 3 oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh oh

HARGA A 4 90,000.00 85,000.00 85,000.00 85,000.00 85,000.00 85,000.00 85,000.00 85,000.00 80,000.00 80,000.00 80,000.00 80,000.00 80,000.00 80,000.00 80,000.00 80,000.00 80,000.00 70,000.00 70,000.00 70,000.00 70,000.00 70,000.00 70,000.00 85,000.00 70,000.00 75,000.00 75,000.00 70,000.00 70,000.00 70,000.00 75,000.00 80,000.00 80,000.00 70,000.00 70,000.00 70,000.00 70,000.00

HARGA B 5 95,000.00 90,000.00 90,000.00 90,000.00 90,000.00 90,000.00 90,000.00 90,000.00 85,000.00 85,000.00 85,000.00 85,000.00 85,000.00 85,000.00 85,000.00 85,000.00 85,000.00 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 90,000.00 75,000.00 80,000.00 80,000.00 75,000.00 75,000.00 75,000.00 80,000.00 85,000.00 85,000.00 75,000.00 75,000.00 75,000.00 75,000.00

BUPATI PONOROGO

H. IPONG MUCHLISSONI

DAFTAR REKAPITULASI HARGA SATUAN POKOK KEGIATAN KAB. PONOROGO TAHUN 2018 NO

URAIAN KEGIATAN

SATUAN

AHSP A

B

A.

PEKERJAAN PERSIAPAN

1

Pembuatan 1 m2 Pagar sementara dari kayu tinggi 2 meter

m2

358,949.50

519,420.50

2 3 4 5 6

Pembuatan 1 m2 Pagar sementara seng gelombang tinggi 2 m Pembuatan 1 m2 Pagar sementara kawat duri tinggi 1,8 m Pengukuran dan pemasangan 1 m' bowplank Pembuatan 1 m2 Kantor sementara dengan lantai plesteran Pembuatan 1 m2 rumah jaga (konstruksi kayu)

m2 m2 m' m2 m2

545,220.75 2,160,395.75 125,948.00 1,748,724.50 1,860,125.00

714,403.00 2,252,499.25 136,453.25 1,939,009.25 2,060,397.50

7 8 9 10 11 12 13 14 15 B. 1 2 3 4 5 6 7 8 9 10 11

Pembuatan 1 m2 gudang semen dan peralatan Pembuatan 1 m2 bedeng pekerja Pembuatan 1 m2 steger/ perancah dari bambu Pembersihan 1 m2 Lapangan dan Perataan Pembongkaran 1 m3 Beton Bertulang Pembongkaran 1 m3 dinding tembok bata Pemasangan 1 m2 pagar kawat jaring gavalnis panjang 240 cm Pembuatan 1 bh kotak adukan ukuran 40 x 50 x 25 cm Pembuatan 1 m2 jalan sementara PEKERJAAN TANAH Penggalian 1 m3 tanah biasa sedalam 1 meter Penggalian 1 m3 tanah biasa sedalam 2 meter Penggalian 1 m3 tanah biasa sedalam 3 meter Menggali 1 m3 tanah keras sedalam 1 meter Menggali 1 m3 tanah cadas sedalam 1 meter Menggali 1 m3 tanah lumpur sedalam 1 meter Pengerjaan stripping 1 m2 tanah tebing setinggi 1 meter Pengangkutan 1 m3 tanah sejauh 30 meter Pengurugan kembali 1 m3 galian tanah Pemadatan tanah 1 m3 tanah (per 20 cm) Pengurugan 1 m3 dengan pasir urug

m2 m2 m2 m2 m3 m3 m2 bh m2

1,601,030.00 1,537,808.75 306,095.50 13,225.00 1,142,318.00 571,159.00 15,691.75 455,894.50 147,947.50

1,768,153.75 1,697,428.75 327,031.25 14,087.50 1,222,818.00 611,409.00 16,209.25 503,838.00 160,051.25

m3 m3 m3 m3 m3 m3 m2 m3 m3 m3 m3

62,962.50 77,107.50 91,459.50 83,812.00 126,960.00 101,257.50 4,542.50 27,600.00 45,425.00 45,425.00 183,885.00

67,418.75 82,541.25 97,882.25 89,746.00 135,930.00 108,416.25 4,858.75 29,555.00 48,587.50 48,587.50 330,567.50

12 C. 1 2 3

Pengurugan 1 m3 Sirtu padat PEKERJAAN PONDASI Pemasangan 1 m3 pondasi batu belah campuran 1 PC : 3 PP Pemasangan 1 m3 pondasi batu belah campuran 1 PC : 4 PP Pemasangan 1 m3 pondasi batu belah campuran 1 PC : 5 PP

m3

174,512.50

224,393.75

m3 m3 m3

924,312.50 877,306.25 844,703.75

1,033,418.75 984,141.25 949,951.75

4

Pemasangan 1 m3 pondasi batu belah campuran 1 PC : 6 PP

m3

821,790.00

925,928.25

5

Pemasangan 1 m3 pondasi batu belah campuran 1 PC : 8 PP

m3

790,366.25

892,969.25

6 7 8 9

Pemasangan Pemasangan Pemasangan Pemasangan

m3 m3 m3 m3

654,531.13 773,475.05 747,299.90 467,250.75

733,992.68 869,175.75 842,403.75 558,054.75

D. 1 2 3

PEKERJAAN BETON Membuat 1 m3 beton mutu fc = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87 Membuat 1 m3 beton mutu fc = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78 Membuat 1 m3 beton mutu fc = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72

m3 m3 m3

1,242,036.96 1,275,879.67 1,302,392.80

1,645,388.79 1,680,423.63 1,707,833.79

4 5 6 7 8

Membuat Membuat Membuat Membuat Membuat

m3 m3 m3 m3 m3

1,167,147.63 1,333,655.91 1,363,765.99 1,386,084.96 1,401,262.53

1,551,323.53 1,740,143.31 1,771,329.30 1,794,415.10 1,810,225.77

m3 m3 m3 m3 m' m' m' kg kg kg kg m2 m2 m2 m2 m2 m2 m2

1,427,651.07 1,435,720.09 1,512,666.95 1,523,372.45 81,851.25 106,570.50 184,805.00 143,238.25 155,313.25 138,396.75 5,872,952.25 449,592.50 496,167.50 759,661.25 794,161.25 895,361.25 757,936.25 666,281.25

1,837,865.93 1,846,253.63 1,927,777.40 1,938,976.21 87,233.25 112,671.25 188,559.75 174,897.75 186,972.75 169,607.75 677,200.50 363,584.00 858,595.75 718,295.75 759,695.75 858,595.75 620,977.00 647,829.50

9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26

1 1 1 1 1

1 m3 pondasi batu belah campuran 1PC : 1KP : 2PP 1 m3 pondasi batu belah campuran 1PC : 3KP : 10PP 1 m3 pondasi batu belah campuran 1/4PC : 1KP : 4PP Batu Kali Belah Kosongan (anstamping)

m3 m3 m3 m3 m3

lantai kerja beton mutu f’c = 7,4 Mpa (K100) slump (3-6) cm, w/c = 0,87 beton mutu f'c = 14,5 Mpa (K175), slump (120 ± 20 ) mm, w/c = 0,66 beton mutu f'c = 16,9 Mpa (K 200), slump (12 ± 2) cm, w/c = 0,61 beton mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58 beton mutu f'c = 21,7 Mpa (K 250), slump (12 ± 2) cm, w/c = 0,56

Membuat 1 m3 beton mutu f'c = 24 Mpa (K 275), slump (12 ± 2) cm, w/o = 0,53 Membuat 1 m3 beton mutu f'c = 26,4 Mpa (K 300), slump (12 ± 2) cm, w/c = 0,52 Membuat 1 m3 beton mutu f'c = 28,8 Mpa (K 325), slump (12 ± 2) cm, w/c = 0,49 Membuat 1 m3 beton mutu f'c = 31,2 Mpa, (K 350), slump (12 ± 2) cm, w/c = 0,48 Pemasangan 1 m' PVC Waterstop lebar 150 mm Pemasangan 1 m' PVC Waterstop lebar 200 mm Pemasangan 1 m' PVC Waterstop lebar 230 mm - 320 mm Pembesian 10 kg dengan besi polos Pembesian 10 kg dengan besi Ulir Pembesian 10 kg kabel presstressed polos/strands Pembesian 10 kg jaring kawat baja (wire mesh) Pemasangan 1 m2 bekisting untuk pondasi Pemasangan 1 m2 bekisting untuk sloof Pemasangan 1 m2 bekisting untuk kolom Pemasangan 1 m2 bekisting untuk balok Pemasangan 1 m2 bekisting untuk lantai Pemasangan 1 m2 bekisting untuk dinding Pemasangan 1 m2 bekisting untuk tangga

27 28 29

Pemasangan 1 m2 jembatan untuk pengecoran beton Pembuatan 1 m3 pondasi beton bertulang (150 kg besi + bekisting) Pembuatan 1 m3 sloof beton bertulang (200 kg besi + bekisting)

m2 m3 m3

291,910.25 5,510,248.00 6,914,863.75

235,060.00 5,718,553.25 7,124,169.50

30 Pembuatan 1 m3 kolom beton bertulang (300 kg besi + bekisting) 31 Pembuatan 1 m3 balok beton bertulang (200 kg besi + bekisting) 32 Pembuatan 1 m3 plat beton bertulang (150 kg besi + bekisting) 33 Pembuatan 1 m3 dinding beton bertulang (150 kg besi + bekisting) 34 Pembuatan 1 m3 dinding beton bertulang (200 kg besi + bekisting) 35 Pembuatan 1 m' kolom praktis beton bertulang (11 x 11) cm 36 Membuat 1 m' Ring Balok Beton Bertulang Uk.10 x 15 cm E. PEKERJAAN BESI DAN ALUMINIUM 1 Pemasangan 1 kg besi profil 2 Pemasangan 1 kg rangka kuda-kuda baja IWF 3 Pembuatan 1 m2 pintu besi pelat baja tebal 2 mm rangkap, rangkap baja siku 4 Pemasangan 1 m2 pintu rolling door besi 5 Pemasangan 1 m2 rolling door alumunium 6 Pemasangan 1 m2 terali besi strip (2 x 3) mm 7 Pemasangan 1 m2 kawat nyamuk 8 Pemasangan 1 m' talang datar/ jurai seng bjls 28 lebar 90 cm F. PEKERJAAN PASANGAN DINDING 1 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 PC : 2 PP 2 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 Pc : 3 PP 3 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 Pc : 4 PP 4 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 Pc : 5 PP 5 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 Pc : 6 PP 6 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 Pc : 2 PP 7 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 Pc : 3 PP 8 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 Pc : 4 PP 9 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 Pc : 5 PP 10 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 Pc : 6 PP 11 Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 Pc : 8 PP G. PEKERJAAN PLESTERAN 1 Pemasangan 1 m2 plesteran 1 Pc : 1 PP tebal 15 mm 2 Pemasangan 1 m2 plesteran 1 Pc : 2 PP tebal 15 mm 3 Pemasangan 1 m2 plesteran 1 Pc : 3 PP tebal 15 mm 4 Pemasangan 1 m2 plesteran 1 Pc : 4 PP tebal 15 mm 5 Pemasangan 1 m2 plesteran 1 Pc : 5 PP tebal 15 mm 6 Pemasangan 1 m2 plesteran 1 Pc : 6 PP tebal 15 mm 7 Pemasangan 1 m2 plesteran 1 Pc : 7 PP tebal 15 mm 8 Pemasangan 1 m2 plesteran 1 Pc : 8 PP tebal 15 mm 9 Pemasangan 1 m2 plesteran 1 Pc : 1 PP tebal 20 mm 10 Pemasangan 1 m2 plesteran 1 Pc : 3 PP tebal 20 mm 11 Pemasangan 1 m2 plesteran 1 Pc : 4 PP tebal 20 mm 12 Pemasangan 1 m2 plesteran 1 Pc : 5 PP tebal 20 mm 13 Pemasangan 1 m2 plesteran 1 Pc : 6 PP tebal 20 mm 14 Pemasangan 1 m2 finishing siar pasangan bata merah 15 Pemasangan 1 m2 finishing siar pasangan conblock ekspose 16 Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1 Pc : 2 PP 17 Pemasangan 1 m2 acian H. PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING 1 Pemasangan 1 m2 lantai ubin polos ukuran 20 cm x 20 cm 2 Pemasangan 1 m2 lantai ubin polos ukuran 30 cm x 30 cm 3 Pemasangan 1 m2 lantai ubin warna ukuran 30 cm x 30 cm 4 Pemasangan 1 m2 lantai ubin warna ukuran 40 cm x 40 cm 5 Pemasangan 1 m2 lantai ubin granit ukuran 40 cm x 40 cm 6 Pemasangan 1 m' plint ubin warna ukuran 10 cm x 20 cm 7 Pemasangan 1 m2 dinding keramik 20 x 20 cm I. PEKERJAAN LANGIT-LANGIT (PLAFOND) 1 Pemasangan 1 m2 langit-langit asbes semen 5 mm (Eternit Biasa 100 X100) 2 Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 4 mm 3 Pemasangan 1 m2 langit-langit lambriziring kayu, tebal 9 mm Kelas I (kayu jati) 4 Pemasangan 1 m2 langit-langit gypsum board ukuran (1200x2400x9) mm, tebal 9 mm 5 Pemasangan 1 m’ list langit-langit kayu profil J. PEKERJAAN PENUTUP ATAP 1 Pemasangan 1 m2 atap genteng palentong kecil 2 Pemasangan 1 m2 atap genteng kodok 3 Pemasangan 1 m2 atap genteng palentong besar/super 4 Pemasangan 1 m’ bubung genteng palentong 5 Pemasangan 1 m’ bubung genteng kodok 6 Pemasangan 1 m2 atap asbes gelombang 1,02 m x 2 ,5 m x 5 mm 7 Pemasangan 1 m2 atap asbes gelombang 1,02 m x 2,00 m x 5 mm 8 Pemasangan 1 m2 atap asbes gelombang 1,02 m x 1,80 m x 5 mm 9 Pemasangan 1 m2 atap asbes gelombang 1,05 m x 3,00 m x 4 mm 10 Pemasangan 1 m2 atap asbes gelombang 1,05 m x 2,40 m x 4 mm 11 Pemasangan 1 m2 atap asbes gelombang 1,05 m x 2,10 m x 4 mm 12 Pemasangan 1 m2 atap asbes gelombang 1,05 m x 1,80 m x 4 mm 13 Pemasangan 1 m’ bubung stel gelombang 1,08 m 14 Pemasangan 1 m2 genteng beton 15 Pemasangan 1 m’ nok sirap

m3 m3 m3 m3 m3 m' m'

12,556,648.75 10,015,723.75 9,517,141.25 8,960,248.00 8,777,173.75 97,290.00 124,522.00

13,226,012.00 10,509,395.75 9,818,498.75 9,528,388.25 9,337,689.50 106,346.25 133,296.50

kg kg m2 m2 m2 m2 m2 m'

32,407.00 31,084.50 734,027.75 702,351.00 704,950.00 1,187,437.68 400,218.40 320,683.25

35,793.75 38,438.75 780,234.75 716,875.50 774,812.50 498,042.58 467,867.15 281,267.00

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

283,791.25 271,471.88 262,789.38 258,865.00 258,721.25 137,353.13 131,286.88 127,937.50 125,838.75 124,918.75 122,561.25

379,241.25 366,404.38 357,112.38 353,257.00 353,952.75 184,629.63 178,163.18 174,673.50 172,491.95 171,668.55 169,165.00

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

67,395.75 60,840.75 58,098.00 56,148.75 55,148.25 54,303.00 53,871.75 53,440.50 81,414.25 65,555.75 75,072.00 73,824.25 72,611.00 25,052.75 11,960.00 53,187.50 31,984.38

72,950.71 66,041.51 63,206.99 61,144.35 60,148.91 59,278.59 58,855.39 58,432.19 88,381.18 71,543.57 81,744.30 80,524.38 79,256.62 26,795.92 12,793.75 57,435.60 34,198.13

m2 m2 m2 m2 m2 m' m2

181,125.00 183,137.50 752,675.00 487,945.00 764,865.00 110,615.63 1,540,195.00

213,169.75 215,998.75 1,009,947.25 575,644.00 820,479.00 128,873.60 2,024,540.50

m2 m2 m2 m2 m'

29,181.25 43,222.75 662,538.00 43,809.25 22,959.75

32,407.00 46,787.75 687,855.25 47,040.75 24,242.00

m2 m2 m' m' m2 m2 m2 m2 m2 m2 m2 m' m2 m' m2

72,286.13 70,897.50 57,845.00 101,292.00 101,292.00 77,050.00 68,108.75 69,488.75 56,838.75 56,516.75 61,588.25 76,158.75 116,431.75 97,439.50 77,757.25

70,794.00 90,970.75 64,750.75 119,312.50 119,312.50 65,383.25 72,156.75 #REF! 61,921.75 #REF! 65,429.25 #REF! 115,149.50 112,033.00 80,954.25

16 17

Pemasangan 1 m2 atap seng gelombang Pemasangan 1 m’nok atap seng

m' m2

83,168.00 51,088.75

86,353.50 53,084.00

K. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 L. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 M. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 N. 1 2 3 4 5 6 7 8 9 10 11 12

PEKERJAAN KAYU Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II Pembuatan Pembuatan Pembuatan Pembuatan

dan dan dan dan

pemasangan pemasangan pemasangan pemasangan

1 1 1 1

m2 m2 m2 m2

pintu klamp sederhana, kayu kelas III daun pintu panel, kayu kelas I pintu dan jendela kaca, kayu kelas I pintu dan jendela jalusi kayu kelas I

Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 9 Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I Pemasangan 1 m2 jalusi kusen, kayu kelas I Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I bentang 6 meter Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I Pemasangan 1 m3 konstruksi gordeng, kayu kelas II Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II Pemasangan 1 m2 rangka atap sirap, kayu kelas II Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II Pemasangan 1 m2 dinding pemisah triplek rangkap, rangka kayu kelas II Pemasangan 1 m2 dinding lambrisering dari triplek ukuran (120 x 240) cm PEKERJAAN KUNCI DAN KACA Pemasangan 1 buah kunci tanam antik Pemasangan 1 buah kunci tanam biasa Pemasangan 1 buah kunci kamar mandi Pemasanga 1 buah kunci silinder Pemasangan 1 buah engsel pintu Pemasangan 1 buah engsel jendela kupu kupu Pemasangan 1 buah engsel angin Pemasangan 1 buah spring knip Pemasangan 1 buah kait angin Pemasangan 1 buah door closer Pemasangan 1 buah kunci slot Pemasangan 1 buah door holder Pemasangan 1 buah door stop Pemasangan 1 buah kunci lemari Pemasangan 1 m2 kaca tebal 3 mm Pemasangan kaca tebal 1 m2 kaca tebal 5 mm Pemasangan kaca tebal 1 m2 kaca tebal 8 mm Pemasangan 1 m2 kaca buram tebal 12 mm PEKERJAAN PENGECATAN Pengecatan 1 m2 bidang kayu baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) dasar, 2 lapis cat penutup) Pengecatan 1 m2 bidang kayu baru (1 lapis plamir, 1 lapis cat dasar, 3 lapis cat penutup) Pelaburan 1 m2 bidang kayu dengan politur Pelaburan 1 m2 bidang kayu dengan cat residu dan ter Pelaburan 1 m2 bidang kayu dengan vernis Pengecatan 1 m2 tembok interior baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) Pengecatan 1 m2 tembok interior lama (1 lapis cat dasar, 2 lapis cat penutup) Pengecatan 1 m2 tembok exterior baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) Pengecatan 1 m2 tembok exterior lama (1 lapis cat dasar, 2 lapis cat penutup) Pengecatan 1 m2 permukaan baja dengan meni besi Pengecatan 1 m2 permukaan baja dengan meni besi dengan perancah Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 3 lapis Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir PEKERJAAN SANITASI DALAM GEDUNG Pemasangan 1 buah closet duduk / monoblock Pemasangan 1 buah closet jongkok porselen Pemasangan 1 buah wastafel Pemasangan 1 buah Bak air fibreglass uk.55 x 55 x 60 cm Pemasangan 1 buah bak cuci piring stainlessteel Pemasangan 1 buah bak cuci piring teraso Pemasangan 1 buah floor drain Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm Pemasangan 1 buah bak kontrol pasangan bata 45cm x 45cm tinggi 50 cm Pemasangan 1 buah bak kontrol pasangan bata 60 cm x 60 cm tinggi 65 cm Pemasangan 1 m’ pipa galvanis diameter ½” Pemasangan 1 buah kran diameter ½” atau ¾ ”

m3 m3 m2 m2 m2 m2 m2 m2 m2 m2 m3 m3 m3 m2 m2 m2 m2 m2 m' m' m2 m2 m2

30,603,800.00 16,182,800.00 689,821.75 488,229.50 1,771,000.00 1,136,660.00 2,583,820.00 689,402.00 1,302,145.00 1,793,971.25 29,729,915.00 33,315,615.00 15,557,775.00 503,815.00 704,260.00 160,392.80 204,585.00 211,600.00 399,636.50 405,547.50 #REF! 503,159.50 53,728.00

31,653,060.00 19,101,787.50 735,551.50 533,151.50 1,841,598.50 1,182,641.60 2,676,710.10 738,064.25 1,355,389.54 1,858,112.50 30,714,545.00 34,446,438.75 18,265,708.75 532,593.75 735,453.75 233,260.25 233,260.25 241,810.50 412,916.47 418,859.90 452,134.00 542,524.00 39,117.25

bh bh bh bh bh bh bh bh bh bh bh bh bh bh m2 m2 m2 m2

307,705.50 159,160.00 137,850.50 86,100.50 71,351.75 36,909.25 45,706.75 34,551.75 62,726.75 89,723.00 171,568.50 244,973.00 86,250.00 43,690.80 119,769.05 164,044.05 249,280.90 141,728.30

323,362.75 170,458.75 143,934.00 112,309.00 90,832.75 43,352.13 59,049.63 156,382.75 63,807.75 104,690.25 402,954.25 259,940.25 92,718.75 50,023.28 147,546.15 242,421.15 277,771.58 151,165.78

m2

52,072.00

58,408.50

m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2

67,539.50 61,927.50 9,073.50 41,060.75 59,679.83 48,239.05 72,099.83 58,589.05 25,788.75 54,438.13 34,891.00 143,301.50 128,455.00

74,830.50 66,498.75 9,884.25 46,028.75 115,525.55 93,532.95 90,702.70 76,282.95 28,735.63 63,264.38 37,277.25 152,662.50 136,792.50

bh bh bh bh bh bh bh bh bh bh m' bh

2,200,697.50 427,685.00 717,485.00 393,501.25 494,500.00 1,093,937.50 80,500.00 439,944.00 662,428.75 833,106.00 248,026.25 59,972.50

4,677,165.00 726,915.00 1,797,852.50 526,958.75 853,156.25 1,327,243.75 98,468.75 495,966.25 746,591.50 953,597.25 249,061.25 125,321.25

13 14 15 16 17 18 19 20 21 22 23 O. 1 2 3 P. 1 2 3 4 5 6

Pemasangan 1 m’ pipa galvanis diameter ¾ ” Pemasangan 1 m’ pipa galvanis diameter 1” Pemasangan 1 m’ pipa galvanis diameter 1 ½” Pemasangan 1 m’ pipa galvanis diameter 3” Pemasangan 1 m’ pipa galvanis diameter 4” Pemasangan 1 m’ pipa PVC tipe AW diameter ½ ” Pemasangan 1 m’ pipa PVC tipe AW diameter ¾ ” Pemasangan 1 m’ pipa PVC tipe AW diameter 1” Pemasangan 1 m’ pipa PVC tipe AW diameter 2” Pemasangan 1 m’ pipa PVC tipe AW diameter 3” Pemasangan 1 m’ pipa PVC tipe AW diameter 4” PEKERJAAN PERKERASAN PAVING Pembongkaran 1 m2 paving block Pemasangan 1 m2 paving block natural tebal 6 cm K.175 Pemasangan 1 m' kansteen ANALISA MEMBUAT Pembongkaran 1 m2 Genteng lama Pembongkaran 1 m3 Kuda-kuda, Gording Balok Pembongkaran 1 m2 Rangka Atap, Reng dan Kaso Pembongkaran 1 m2 paving blok Pemasangan 1 m' gorong-gorong U 30 cm x 100 cm Pemasangan 1 m' gorong-gorong O 30 cm x 100 cm

m2 m' m' m' m' m' m' m' m' m' m'

328,238.75 479,751.25 508,806.00 1,282,290.25 1,727,915.25 82,294.00 98,336.50 120,617.75 316,842.25 576,814.13 833,494.13

329,273.75 498,611.25 528,419.25 1,284,532.75 1,730,157.75 84,674.50 100,717.00 122,998.25 326,830.00 594,734.00 821,727.50

m2 m2 m'

5,060.00 159,524.55 91,327.25

5,405.00 180,634.53 93,753.75

m2 m3 m2 m2 m' m'

2,645.00 324,070.00 7,992.50 5,060.00 87,377.00 100,004.00

2,817.50 346,035.00 8,538.75 5,405.00 92,074.75 131,249.50

HARGA SATUAN POKOK KEGIATAN PEMERINTAH KABUPATEN PONOROGO TAHUN 2018

A NOMOR

URAIAN KEGIATAN

Koef.

A.

PEKERJAAN PERSIAPAN

1

Pembuatan 1 m2 Pagar sementara dari kayu tinggi 2 meter Tenaga: Mandor Kepala Tukang Kayu Tukang kayu Pekerja/Buruh Tak Terampil Bahan: Dolken kayu Ø 8-10 / 400 cm Semen portland Pasir beton Batu Pecah 2/3 Kayu Meranti kaso 5/7 Paku biasa Residu Peralatan:

HARGA SATUAN

SATUAN

0.0200 0.0200 0.2000 0.4000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

1,800.00 1,700.00 16,000.00 28,000.00

1.2500 5.0000 0.0050 0.0090 0.0720 0.0600 0.4000

Btg Kg m3 m3 m3 Kg Ltr

Rp Rp Rp Rp Rp Rp Rp

29,500.00 1,250.00 325,000.00 280,000.00 3,000,000.00 16,000.00 1,000.00

Rp Rp Rp Rp Rp Rp Rp

36,875.00 6,250.00 1,625.00 2,520.00 216,000.00 960.00 400.00

Rp Rp Rp

312,130.00 46,819.50 358,949.50

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 2

Pembuatan 1 m2 Pagar sementara seng gelombang tinggi 2 m Tenaga: Mandor Kepala Tukang Kayu Tukang kayu Pekerja/Buruh Tak Terampil Bahan: Dolken kayu Ø 8-10 / 400 cm Semen portland (50kg) Seng plat BJLS 30 (0,90 x 1,80) m Pasir beton Batu Pecah 2/3 Kayu Meranti Kaso 5/7 Paku biasa Meni besi Peralatan:

0.0200 0.0200 0.4000 0.2000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

1,800.00 1,700.00 32,000.00 14,000.00

1.2500 2.5000 1.2000 0.0050 0.0090 0.0720 0.0600 0.4500

Batang kg Lembar m3 m3 m3 kg kg

Rp Rp Rp Rp Rp Rp Rp Rp

29,500.00 1,250.00 125,000.00 325,000.00 280,000.00 3,000,000.00 16,000.00 30,000.00

Rp Rp Rp Rp Rp Rp Rp Rp

36,875.00 3,125.00 150,000.00 1,625.00 2,520.00 216,000.00 960.00 13,500.00

Rp Rp Rp

474,105.00 71,115.75 545,220.75

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 3

Pembuatan 1 m2 Pagar sementara kawat duri tinggi 1,8 m Tenaga: Mandor Kepala Tukang Kayu Tukang kayu Pekerja/Buruh Tak Terampil Bahan: Dolken kayu Ø 8-10 / 400 cm Semen portland (50kg) Kawat Duri Pasir beton Batu Pecah 2/3 Paku biasa Peralatan:

0.0200 0.0200 0.3000 0.2000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

1,800.00 1,700.00 24,000.00 14,000.00

1.0000 2.0000 25.0000 0.0050 0.0090 0.0600

m3 kg m1 m3 m3 kg

Rp Rp Rp Rp Rp Rp

29,500.00 1,250.00 72,000.00 325,000.00 280,000.00 16,000.00

Rp Rp Rp Rp Rp Rp

29,500.00 2,500.00 1,800,000.00 1,625.00 2,520.00 960.00

Rp Rp Rp

1,878,605.00 281,790.75 2,160,395.75

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 4

Pengukuran dan pemasangan 1 m' bowplank Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Kayu papan 3/20 Kayu balok 5/7 Paku biasa Peralatan:

5

HARGA

0.0050 0.0100 0.1000 0.1000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

450.00 850.00 8,000.00 7,000.00

0.0070 0.0120 0.0200

m3 m3 kg

Rp Rp Rp

5,900,000.00 4,300,000.00 16,000.00

Rp Rp Rp

41,300.00 51,600.00 320.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pembuatan 1 m2 Kantor sementara dengan lantai plesteran Tenaga Mandor 0.0500 O.H Rp 90,000.00 Kepala Tukang 0.3000 O.H Rp 85,000.00 Tukang Batu 1.0000 O.H Rp 80,000.00 Tukang Kayu 2.0000 O.H Rp 80,000.00 Pekerja 2.0000 O.H Rp 70,000.00 Bahan Dolken kayu Ø 8 - 10 /400 cm 1.2500 Btg Rp 29,500.00 Kayu balok 5/7 0.1800 m3 Rp 4,300,000.00 Paku Biasa 0.0800 Kg Rp 16,000.00 Besi strip 1.1000 Kg Rp 13,500.00 Semen Portland 35.0000 Kg Rp 1,250.00 Pasir pasang 0.1500 m3 Rp 225,000.00

Rp Rp Rp

109,520.00 16,428.00 125,948.00

Rp Rp Rp Rp Rp

4,500.00 25,500.00 80,000.00 160,000.00 140,000.00

Rp Rp Rp Rp Rp Rp

36,875.00 774,000.00 1,280.00 14,850.00 43,750.00 33,750.00

Pasir beton Batu pecah 2/3 Bata merah Seng Plat 0,9 x 1,8 BJLS 28 Jendela nako Kaca Polos Tebal 5 mm Kunci tanam biasa ex west, cavell, beleza setara Triplek tebal 4 mm ukuran (120 x 240) cm Peralatan

0.1000 0.1500 30.0000 0.2500 0.2000 0.0800 0.1500 0.0600

m3 m3 Bh Lbr Bh m2 Bh Lbr

Rp Rp Rp Rp Rp Rp Rp Rp

325,000.00 280,000.00 800.00 88,500.00 230,000.00 115,000.00 180,000.00 55,000.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 6

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

4,500.00 12,750.00 120,000.00 70,000.00

3.0000 0.2760 0.7000 1.5000

Btg m3 Kg Kg

Rp Rp Rp Rp

29,500.00 4,300,000.00 16,000.00 82,500.00

Rp Rp Rp Rp

88,500.00 1,186,800.00 11,200.00 123,750.00

Rp Rp Rp

1,617,500.00 242,625.00 1,860,125.00

Pembuatan 1 m2 gudang semen dan peralatan Tenaga Mandor Kepala Tukang Tukang Kayu Pekerja Bahan Dolken kayu Ø 8 - 10 /400 cm Kayu balok 5/7 Paku Biasa Semen Portland Pasir beton Batu pecah 2/3 Seng gelombang 3 x 0,8 bjls 28 Seng plat 0,9 x 1,8 BJLS 28 Peralatan

0.0500 0.2000 2.0000 1.0000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

4,500.00 17,000.00 160,000.00 70,000.00

1.7000 0.2100 0.3000 10.5000 0.0300 0.0500 1.5000 0.2500

Btg m3 Kg Kg m3 m3 Bh Lbr

Rp Rp Rp Rp Rp Rp Rp Rp

29,500.00 4,300,000.00 16,000.00 1,250.00 325,000.00 280,000.00 82,500.00 88,500.00

Rp Rp Rp Rp Rp Rp Rp Rp

50,150.00 903,000.00 4,800.00 13,125.00 9,750.00 14,000.00 123,750.00 22,125.00

Rp Rp Rp

1,392,200.00 208,830.00 1,601,030.00

Pembuatan 1 m2 bedeng pekerja Tenaga Mandor Kepala Tukang Tukang Kayu Pekerja Bahan Dolken kayu Ø 8 - 10 /400 cm Kayu balok 5/7 Paku Biasa Semen Portland Pasir beton Batu pecah 2/3 Seng gelombang 3 x 0,8 bjls 28 Triplek tebal 4 mm ukuran (120 x 240) cm Peralatan

0.0500 0.2000 2.0000 1.0000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

4,500.00 17,000.00 160,000.00 70,000.00

1.2500 0.1860 0.3000 18.0000 0.0300 0.0500 1.5000 1.3500

Btg m3 Kg Kg m3 m3 Lbr Lbr

Rp Rp Rp Rp Rp Rp Rp Rp

29,500.00 4,300,000.00 16,000.00 1,250.00 325,000.00 280,000.00 82,500.00 55,000.00

Rp Rp Rp Rp Rp Rp Rp Rp

36,875.00 799,800.00 4,800.00 22,500.00 9,750.00 14,000.00 123,750.00 74,250.00

Rp Rp Rp

1,337,225.00 200,583.75 1,537,808.75

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pembuatan 1 m2 steger/ perancah dari bambu Tenaga: Mandor Kepala Tukang Kayu Tukang Kayu Pekerja/Buruh Tak Terampil Bahan: Bambu diameter 6-8/600 cm Tali ijuk Peralatan:

0.0050 0.2000 2.0000 1.0000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

450.00 17,000.00 160,000.00 70,000.00

1.2500 0.1860

Btg m3

Rp Rp

12,000.00 20,000.00

Rp Rp

15,000.00 3,720.00

Rp Rp Rp

266,170.00 39,925.50 306,095.50

Rp Rp

4,500.00 7,000.00

Rp Rp Rp

11,500.00 1,725.00 13,225.00

Rp

59,940.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 10

Pembersihan 1 m2 Lapangan dan Perataan Tenaga: Mandor Pekerja Bahan: Peralatan:

0.0500 0.1000

O.H O.H

Rp Rp

90,000.00 70,000.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 11

1,520,630.00 228,094.50 1,748,724.50

O.H O.H O.H O.H

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

9

Rp Rp Rp

0.0500 0.1500 1.5000 1.0000

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

8

32,500.00 42,000.00 24,000.00 22,125.00 46,000.00 9,200.00 27,000.00 3,300.00

Pembuatan 1 m2 rumah jaga (konstruksi kayu) Tenaga: Mandor Kepala Tukang Kayu Tukang Kayu Pekerja Bahan: Dolken kayu Ø 8 - 10 /400 cm Kayu balok 5/7 Paku Biasa Seng gelombang 3 x 0,8 bjls 28 Peralatan:

7

Rp Rp Rp Rp Rp Rp Rp Rp

Pembongkaran 1 m3 Beton Bertulang Tenaga: Mandor

0.6660

O.H

Rp

90,000.00

Pekerja Bahan: Peralatan:

13.3340

O.H

Rp

70,000.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 12

0.3330 6.6670

O.H O.H

Rp Rp

90,000.00 70,000.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 pagar kawat jaring gavalnis panjang 240 cm Tenaga: Mandor Kepala Tukang Tukang Pekerja Bahan: Kawat jaring Peralatan:

B.

PEKERJAAN TANAH

1

Penggalian 1 m3 tanah biasa sedalam 1 meter Tenaga: Mandor Pekerja

496,660.00 74,499.00 571,159.00

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

3,780.00 170.00 320.00 2,940.00

0.1430

Lbr

Rp

45,000.00

Rp

6,435.00

Rp Rp Rp

13,645.00 2,046.75 15,691.75

0.0300 0.3000

O.H O.H

Rp Rp

85,000.00 80,000.00

Rp Rp

2,550.00 24,000.00

0.0360 0.0140 0.0800

m3 m3 Kg

Rp Rp Rp

8,100,000.00 5,500,000.00 16,000.00

Rp Rp Rp

291,600.00 77,000.00 1,280.00

Rp Rp Rp

396,430.00 59,464.50 455,894.50

0.0050 1.0000

O.H O.H

Rp Rp

90,000.00 70,000.00

Rp Rp

450.00 70,000.00

0.1500 0.0900 0.0100

m3 m3 m3

Rp Rp Rp

220,000.00 255,000.00 225,000.00

Rp Rp Rp

33,000.00 22,950.00 2,250.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp

128,650.00 19,297.50 147,947.50

0.0250 0.7500

O.H Rp 90,000.00 O.H Rp 70,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp

2,250.00 52,500.00 54,750.00 8,212.50 62,962.50

0.0450 0.9000

O.H Rp 90,000.00 O.H Rp 70,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp

4,050.00 63,000.00 67,050.00 10,057.50 77,107.50

0.0670 1.0500

O.H Rp 90,000.00 O.H Rp 70,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp

6,030.00 73,500.00 79,530.00 11,929.50 91,459.50

0.0320 1.0000

O.H Rp 90,000.00 O.H Rp 70,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp

2,880.00 70,000.00 72,880.00 10,932.00 83,812.00

0.0600 1.5000

O.H Rp 90,000.00 O.H Rp 70,000.00 Jumlah Overhead + Profit ( 15 % )

Rp Rp Rp Rp

5,400.00 105,000.00 110,400.00 16,560.00

Penggalian 1 m3 tanah biasa sedalam 3 meter Tenaga: Mandor Pekerja

Menggali 1 m3 tanah keras sedalam 1 meter Tenaga: Mandor Pekerja

5

Rp Rp Rp

Penggalian 1 m3 tanah biasa sedalam 2 meter Tenaga: Mandor Pekerja

4

29,970.00 466,690.00

Pembuatan 1 m2 jalan sementara Tenaga: Mandor Pekerja Bahan: Batu belah 15/20 Batu belah 5/7 Pasir pasang Peralatan:

3

Rp Rp

O.H O.H O.H O.H

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

2

993,320.00 148,998.00 1,142,318.00

Pembuatan 1 bh kotak adukan ukuran 40 x 50 x 25 cm Tenaga: Kepala Tukang Tukang Bahan: Kelas III (kayu kruing) papan Kelas III (kayu kruing) balok Paku biasa Peralatan:

15

Rp Rp Rp

0.0420 0.0020 0.0040 0.0420

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 14

933,380.00

Pembongkaran 1 m3 dinding tembok bata Tenaga: Mandor Pekerja Bahan: Peralatan:

13

Rp

Menggali 1 m3 tanah cadas sedalam 1 meter Tenaga: Mandor Pekerja

6

Tenaga: Mandor Pekerja

7

126,960.00

O.H Rp 90,000.00 O.H Rp 70,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp

4,050.00 84,000.00 88,050.00 13,207.50 101,257.50

0.0050 0.0500

O.H Rp 90,000.00 O.H Rp 70,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp

450.00 3,500.00 3,950.00 592.50 4,542.50

0.0100 0.3300

O.H Rp 90,000.00 O.H Rp 70,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp

900.00 23,100.00 24,000.00 3,600.00 27,600.00

0.0450 1.2000

Pengangkutan 1 m3 tanah sejauh 30 meter Tenaga: Mandor Pekerja

9

Rp

Pengerjaan stripping 1 m2 tanah tebing setinggi 1 meter Tenaga: Mandor Pekerja

8

Nilai HSPK : Menggali 1 m3 tanah lumpur sedalam 1 meter

Pengurugan kembali 1 m3 galian tanah Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian Tenaga: Mandor Pekerja

10

0.0500 0.5000

O.H Rp 90,000.00 O.H Rp 70,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp

4,500.00 35,000.00 39,500.00 5,925.00 45,425.00

0.0500 0.5000

O.H Rp 90,000.00 O.H Rp 70,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp

4,500.00 35,000.00 39,500.00 5,925.00 45,425.00

90,000.00 70,000.00

Rp Rp

900.00 21,000.00

m3 Rp 115,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp

138,000.00 159,900.00 23,985.00 183,885.00

90,000.00 70,000.00

Rp Rp

2,250.00 17,500.00

m3 Rp 110,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp

132,000.00 151,750.00 22,762.50 174,512.50

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

6,750.00 6,375.00 60,000.00 105,000.00

Kg Rp 1,250.00 m3 Rp 225,000.00 m3 Rp 220,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m3 pondasi batu belah campuran 1 PC : 4 PP

Rp Rp Rp Rp Rp Rp

252,500.00 109,125.00 264,000.00 803,750.00 120,562.50 924,312.50

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

6,750.00 6,375.00 60,000.00 105,000.00

Kg Rp 1,250.00 m3 Rp 225,000.00 m3 Rp 220,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m3 pondasi batu belah campuran 1 PC : 5 PP

Rp Rp Rp Rp Rp Rp

203,750.00 117,000.00 264,000.00 762,875.00 114,431.25 877,306.25

Rp Rp

6,750.00 6,375.00

Pemadatan tanah 1 m3 tanah (per 20 cm) Tenaga: Mandor Pekerja

11

Pengurugan 1 m3 dengan pasir urug Tenaga: Mandor Pekerja Bahan: Pasir Urug

12

Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja Bahan: Semen portland Pasir Pasang Batu belah 15/20 cm

3

Rp Rp

0.0250 0.2500 1.2000

O.H O.H

Rp Rp

PEKERJAAN PONDASI Pemasangan 1 m3 pondasi batu belah campuran 1 PC : 3 PP Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja Bahan: Semen portland Pasir Pasang Batu Kali Pecah 15/20 cm

2

1.2000

O.H O.H

Pengurugan 1 m3 Sirtu padat Tenaga: Mandor Pekerja Bahan: Sirtu

C. 1

0.0100 0.3000

Tenaga: Mandor Kepala Tukang

0.0750 0.0750 0.7500 1.5000

O.H O.H O.H O.H

Rp Rp Rp Rp

202.0000 0.4850 1.2000

0.0750 0.0750 0.7500 1.5000

O.H O.H O.H O.H

Rp Rp Rp Rp

163.0000 0.5200 1.2000

0.0750 0.0750

O.H O.H

Rp Rp

90,000.00 85,000.00

Tukang Batu Pekerja Bahan: Semen portland Pasir Pasang Batu belah 15/20 cm

4

80,000.00 70,000.00

Rp Rp

60,000.00 105,000.00

Kg Rp 1,250.00 m3 Rp 225,000.00 m3 Rp 220,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m3 pondasi batu belah campuran 1 PC : 6 PP

Rp Rp Rp Rp Rp Rp

170,000.00 122,400.00 264,000.00 734,525.00 110,178.75 844,703.75

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

6,750.00 6,375.00 60,000.00 105,000.00

Kg Rp 1,250.00 m3 Rp 225,000.00 m3 Rp 220,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m3 pondasi batu belah campuran 1 PC : 8 PP

Rp Rp Rp Rp Rp Rp

146,250.00 126,225.00 264,000.00 714,600.00 107,190.00 821,790.00

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

6,750.00 6,375.00 60,000.00 105,000.00

Kg Rp 1,250.00 m3 Rp 225,000.00 m3 Rp 220,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m3 pondasi batu belah campuran 1PC : 1KP : 2PP

Rp Rp Rp Rp Rp Rp

113,750.00 131,400.00 264,000.00 687,275.00 103,091.25 790,366.25

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

6,750.00 6,375.00 60,000.00 105,000.00

1,250.00 296,000.00 225,000.00 220,000.00

Rp Rp Rp Rp Rp Rp Rp

212.50 50,320.00 76,500.00 264,000.00 569,157.50 85,373.63 654,531.13

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

6,750.00 6,375.00 60,000.00 105,000.00

1,250.00 296,000.00 225,000.00 220,000.00

Rp Rp Rp Rp Rp Rp Rp

76,250.00 43,512.00 110,700.00 264,000.00 672,587.00 100,888.05 773,475.05

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

6,750.00 6,375.00 60,000.00 105,000.00

1,250.00 296,000.00 225,000.00 220,000.00

Rp Rp Rp Rp Rp Rp Rp

51,250.00 38,776.00 117,675.00 264,000.00 649,826.00 97,473.90 747,299.90

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

3,510.00 3,315.00 31,200.00 54,600.00

m3 Rp 220,000.00 m3 Rp 115,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp

264,000.00 49,680.00 406,305.00 60,945.75 467,250.75

Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja Bahan: Semen portland Pasir Pasang Batu belah 15/20 cm

5

Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja Bahan: Semen portland Pasir Pasang Batu belah 15/20 cm

6

Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja Bahan: Semen portland Kapur pasang Pasir Pasang Batu belah 15/20 cm

7

O.H O.H

Rp Rp

136.0000 0.5440 1.2000

0.0750 0.0750 0.7500 1.5000

O.H O.H O.H O.H

Rp Rp Rp Rp

117.0000 0.5610 1.2000

0.0750 0.0750 0.7500 1.5000

O.H O.H O.H O.H

Rp Rp Rp Rp

91.0000 0.5840 1.2000

0.0750 0.0750 0.7500 1.5000

O.H O.H O.H O.H

Rp Rp Rp Rp

Kg Rp m3 Rp m3 Rp m3 Rp Jumlah Overhead + Profit Nilai HSPK : Pemasangan 1 m3 pondasi batu belah campuran 1PC : 3KP : 10PP Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja Bahan: Semen portland Kapur pasang Pasir Pasang Batu belah 15/20 cm

8

0.7500 1.5000

0.1700 0.1700 0.3400 1.2000

0.0750 0.0750 0.7500 1.5000

O.H O.H O.H O.H

Rp Rp Rp Rp

Kg Rp m3 Rp m3 Rp m3 Rp Jumlah Overhead + Profit Nilai HSPK : Pemasangan 1 m3 pondasi batu belah campuran 1/4PC : 1KP : 4PP Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja Bahan: Semen portland Kapur pasang Pasir Pasang Batu belah 15/20 cm

61.0000 0.1470 0.4920 1.2000

0.0750 0.0750 0.7500 1.5000 41.0000 0.1310 0.5230 1.2000

Pemasangan Batu Kali Belah Kosongan (anstamping)

O.H O.H O.H O.H

Rp Rp Rp Rp

Kg Rp m3 Rp m3 Rp m3 Rp Jumlah Overhead + Profit Nilai HSPK :

( 15 % )

( 15 % )

( 15 % )

9 Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja Bahan: Batu belah 15/20 cm Pasir urug

D. 1

0.0390 0.0390 0.3900 0.7800 1.2000 0.4320

O.H O.H O.H O.H

Rp Rp Rp Rp

PEKERJAAN BETON Membuat 1 m3 beton mutu fc = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87

Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja Bahan: Semen portland Pasir Beton Batu Pecah 2/3 Air Peralatan:

2

7,470.00 2,380.00 22,000.00 115,500.00

247.0000 0.6207 0.7400 215.0000

Kg m3 m3 Ltr

Rp Rp Rp Rp

1,250.00 325,000.00 280,000.00 1,000.00

Rp Rp Rp Rp

308,750.00 201,732.14 207,200.00 215,000.00

Rp Rp Rp

1,080,032.14 162,004.82 1,242,036.96

0.0830 0.0280 0.2750 1.6500

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

7,470.00 2,380.00 22,000.00 115,500.00

276.0000 0.5914 0.7496 215.0000

Kg m3 m3 Ltr

Rp Rp Rp Rp

1,250.00 325,000.00 280,000.00 1,000.00

Rp Rp Rp Rp

345,000.00 192,214.29 209,896.30 215,000.00

Rp Rp Rp

1,109,460.58 166,419.09 1,275,879.67

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

7,470.00 2,380.00 22,000.00 115,500.00

299.0000 0.5707 0.7533 215.0000

Kg m3 m3 Ltr

Rp Rp Rp Rp

1,250.00 325,000.00 280,000.00 1,000.00

Rp Rp Rp Rp

373,750.00 185,482.14 210,933.33 215,000.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 Mpa (K100) slump (3-6) cm, w/c = 0,87

Rp Rp Rp

1,132,515.48 169,877.32 1,302,392.80

0.0600 0.0200 0.2000 1.2000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

5,400.00 1,700.00 16,000.00 84,000.00

230.0000 0.6379 0.7607 200.0000

Kg m3 m3 Ltr

Rp Rp Rp Rp

1,250.00 325,000.00 280,000.00 1,000.00

Rp Rp Rp Rp

287,500.00 207,303.57 213,007.41 200,000.00

Rp Rp Rp

1,014,910.98 152,236.65 1,167,147.63

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Membuat 1 m3 beton mutu f'c = 14,5 Mpa (K175), slump (120 ± 20 ) mm, w/c = 0,66 0.0830 0.0280 0.2750 1.6500

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

7,470.00 2,380.00 22,000.00 115,500.00

326.0000 0.5429 0.7622 215.0000

Kg m3 m3 Ltr

Rp Rp Rp Rp

1,250.00 325,000.00 280,000.00 1,000.00

Rp Rp Rp Rp

407,500.00 176,428.57 213,422.22 215,000.00

Rp Rp Rp

1,159,700.79 173,955.12 1,333,655.91

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Membuat 1 m3 beton mutu f'c = 16,9 Mpa (K 200), slump (12 ± 2) cm, w/c = 0,61 Tenaga: Mandor Kepala Tukang Batu Tukang Batu Pekerja/Buruh Tak Terampil Bahan: Semen portland (50kg) Pasir Beton Batu Pecah 2/3 Air Peralatan:

7

Rp Rp Rp Rp

O.H O.H O.H O.H

Tenaga: Mandor Kepala Tukang Batu Tukang Batu Pekerja/Buruh Tak Terampil Bahan: Semen portland (50kg) Pasir Beton Batu Pecah 2/3 Air Peralatan:

6

90,000.00 85,000.00 80,000.00 70,000.00

0.0830 0.0280 0.2750 1.6500

Tenaga: Mandor Kepala Tukang Batu Tukang Batu Pekerja/Buruh Tak Terampil Bahan: Semen portland Pasir Beton Batu Pecah 2/3 Air Peralatan:

5

Rp Rp Rp Rp

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Membuat 1 m3 beton mutu fc = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72 Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja Bahan: Semen portland Pasir Beton Batu Pecah 2/3 Air Peralatan:

4

O.H O.H O.H O.H

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Membuat 1 m3 beton mutu fc = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78 Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja Bahan: Semen portland Pasir Beton Batu Pecah 2/3 Air Peralatan:

3

0.0830 0.0280 0.2750 1.6500

0.0830 0.0280 0.2750 1.6500

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

7,470.00 2,380.00 22,000.00 115,500.00

352.0000 0.5221 0.7637 215.0000

Kg m3 m3 Ltr

Rp Rp Rp Rp

1,250.00 325,000.00 280,000.00 1,000.00

Rp Rp Rp Rp

440,000.00 169,696.43 213,837.04 215,000.00

Rp Rp Rp

1,185,883.47 177,882.52 1,363,765.99

Rp

7,470.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Membuat 1 m3 beton mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58 Tenaga: Mandor

0.0830

O.H

Rp

90,000.00

Kepala Tukang Batu Tukang Batu Pekerja/Buruh Tak Terampil Bahan: Semen portland (50kg) Pasir Beton Batu Pecah 2/3 Air Peralatan:

8

Rp Rp Rp

2,380.00 22,000.00 115,500.00

371.0000 0.4986 0.7756 215.0000

Kg m3 m3 Ltr

Rp Rp Rp Rp

1,250.00 325,000.00 280,000.00 1,000.00

Rp Rp Rp Rp

463,750.00 162,035.71 217,155.56 215,000.00

Rp Rp Rp

1,205,291.27 180,793.69 1,386,084.96

0.0830 0.0280 0.2750 1.6500

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

7,470.00 2,380.00 22,000.00 115,500.00

384.0000 0.4943 0.7696 215.0000

Kg m3 m3 Ltr

Rp Rp Rp Rp

1,250.00 325,000.00 280,000.00 1,000.00

Rp Rp Rp Rp

480,000.00 160,642.86 215,496.30 215,000.00

Rp Rp Rp

1,218,489.15 182,773.37 1,401,262.53

0.0830 0.0280 0.2750 1.6500

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

7,470.00 2,380.00 22,000.00 115,500.00

406.0000 0.4886 0.7600 215.0000

Kg m3 m3 Ltr

Rp Rp Rp Rp

1,250.00 325,000.00 280,000.00 1,000.00

Rp Rp Rp Rp

507,500.00 158,785.71 212,800.00 215,000.00

Rp Rp Rp

1,241,435.71 186,215.36 1,427,651.07

0.0830 0.0280 0.2750 1.6500

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

7,470.00 2,380.00 22,000.00 115,500.00

413.0000 0.4864 0.7563 215.0000

Kg m3 m3 Ltr

Rp Rp Rp Rp

1,250.00 325,000.00 280,000.00 1,000.00

Rp Rp Rp Rp

516,250.00 158,089.29 211,762.96 215,000.00

Rp Rp Rp

1,248,452.25 187,267.84 1,435,720.09

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Membuat 1 m3 beton mutu f'c = 28,8 Mpa (K 325), slump (12 ± 2) cm, w/c = 0,49 Tenaga: Mandor Kepala Tukang Batu Tukang Batu Pekerja/Buruh Tak Terampil Bahan: Semen portland (50kg) Pasir Beton Batu Pecah 2/3 Air Peralatan:

12

85,000.00 80,000.00 70,000.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Membuat 1 m3 beton mutu f'c = 26,4 Mpa (K 300), slump (12 ± 2) cm, w/c = 0,52 Tenaga: Mandor Kepala Tukang Batu Tukang Batu Pekerja/Buruh Tak Terampil Bahan: Semen portland (50kg) Pasir Beton Batu Pecah 2/3 Air Peralatan:

11

Rp Rp Rp

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Membuat 1 m3 beton mutu f'c = 24 Mpa (K 275), slump (12 ± 2) cm, w/o = 0,53 Tenaga: Mandor Kepala Tukang Batu Tukang Batu Pekerja/Buruh Tak Terampil Bahan: Semen portland (50kg) Pasir Beton Batu Pecah 2/3 Air Peralatan:

10

O.H O.H O.H

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Membuat 1 m3 beton mutu f'c = 21,7 Mpa (K 250), slump (12 ± 2) cm, w/c = 0,56 Tenaga: Mandor Kepala Tukang Batu Tukang Batu Pekerja/Buruh Tak Terampil Bahan: Semen portland (50kg) Pasir Beton Batu Pecah 2/3 Air Peralatan:

9

0.0280 0.2750 1.6500

0.1050 0.0350 0.3500 2.1000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

9,450.00 2,975.00 28,000.00 147,000.00

439.0000 0.4786 0.7452 215.0000

Kg m3 m3 Ltr

Rp Rp Rp Rp

1,250.00 325,000.00 280,000.00 1,000.00

Rp Rp Rp Rp

548,750.00 155,535.71 208,651.85 215,000.00

Rp Rp Rp

1,315,362.57 197,304.38 1,512,666.95

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Membuat 1 m3 beton mutu f'c = 31,2 Mpa, (K 350), slump (12 ± 2) cm, w/c = 0,48 Tenaga: Mandor Kepala Tukang Batu Tukang Batu Pekerja/Buruh Tak Terampil Bahan: Semen portland (50kg) Pasir Beton Batu Pecah 2/3 Air Peralatan:

0.1050 0.0350 0.3500 2.1000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

9,450.00 2,975.00 28,000.00 147,000.00

448.0000 0.4764 0.7407 215.0000

Kg m3 m3 Ltr

Rp Rp Rp Rp

1,250.00 325,000.00 280,000.00 1,000.00

Rp Rp Rp Rp

560,000.00 154,839.29 207,407.41 215,000.00

Rp Rp Rp

1,324,671.69 198,700.75 1,523,372.45

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 13

Pemasangan 1 m' PVC Waterstop lebar 150 mm

Tenaga: Mandor Kepala Tukang Tukang Batu/ Pipa Pekerja Bahan: Waterstop lebar 150 mm Peralatan:

0.0030 0.0030 0.0300 0.0600

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

270.00 255.00 2,400.00 4,200.00

1.0500

m'

Rp

61,000.00

Rp

64,050.00

Rp Rp Rp

71,175.00 10,676.25 81,851.25

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 14

Pemasangan 1 m' PVC Waterstop lebar 200 mm Tenaga: Mandor Kepala Tukang Tukang Batu/ Pipa Pekerja Bahan: Waterstop lebar 200 mm Peralatan:

0.0070 0.0040 0.0350 0.0700

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

630.00 340.00 2,800.00 4,900.00

1.0500

m'

Rp

80,000.00

Rp

84,000.00

Rp Rp Rp

92,670.00 13,900.50 106,570.50

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 15

Pemasangan 1 m' PVC Waterstop lebar 230 mm - 320 mm Tenaga: Mandor Kepala Tukang Tukang Batu/ Pipa Pekerja Bahan: Waterstop lebar 230 mm - 320 mm Peralatan:

0.0040 0.0040 0.0400 0.0800

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

360.00 340.00 3,200.00 5,600.00

1.0500

m'

Rp

144,000.00

Rp

151,200.00

Rp Rp Rp

160,700.00 24,105.00 184,805.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 16

Pembesian 10 kg dengan besi polos Tenaga: Mandor Kepala Tukang Tukang Besi Pekerja Bahan: Besi Beton Polos Kawat Beton Peralatan:

0.0040 0.0070 0.0700 0.0700

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

360.00 595.00 5,600.00 4,900.00

10.5000 0.1500

Kg Kg

Rp Rp

10,500.00 19,000.00

Rp Rp

110,250.00 2,850.00

Rp Rp Rp

124,555.00 18,683.25 143,238.25

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 17

Pembesian 10 kg dengan besi Ulir Tenaga: Mandor Kepala Tukang Tukang Besi Pekerja Bahan: Besi Beton Ulir Kawat Beton Peralatan:

0.0040 0.0070 0.0700 0.0700

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

360.00 595.00 5,600.00 4,900.00

10.5000 0.1500

Kg Kg

Rp Rp

11,500.00 19,000.00

Rp Rp

120,750.00 2,850.00

Rp Rp Rp

135,055.00 20,258.25 155,313.25

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 18

Pembesian 10 kg kabel presstressed polos/strands Tenaga: Mandor Kepala Tukang Tukang Besi Pekerja Bahan: Besi Beton Polos Kawat Beton Peralatan:

0.0030 0.0050 0.0500 0.0500

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

270.00 425.00 4,000.00 3,500.00

10.5000 0.1000

Kg Kg

Rp Rp

10,500.00 19,000.00

Rp Rp

110,250.00 1,900.00

Rp Rp Rp

120,345.00 18,051.75 138,396.75

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 19

Pembesian 10 kg jaring kawat baja (wire mesh) Tenaga: Mandor Kepala Tukang Tukang Besi Pekerja Bahan: Jaring kawat baja dilas Kawat Beton Peralatan:

0.0010 0.0250 0.0250 0.0250

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

90.00 2,125.00 2,000.00 1,750.00

10.2000 0.0500

Kg Kg

Rp Rp

500,000.00 19,000.00

Rp Rp

5,100,000.00 950.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 20

0.0260 0.0260 0.2600 0.5200

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

2,340.00 2,210.00 20,800.00 36,400.00

0.0400 0.3000 0.1000

m3 Kg Ltr

Rp Rp Rp

8,100,000.00 16,000.00 4,000.00

Rp Rp Rp

324,000.00 4,800.00 400.00

Rp Rp Rp

390,950.00 58,642.50 449,592.50

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 bekisting untuk sloof Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Kayu kelas III Paku biasa Minyak Bekesting Peralatan:

0.0260 0.0260 0.2600 0.5200

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

2,340.00 2,210.00 20,800.00 36,400.00

0.0450 0.3000 0.1000

m3 Kg Ltr

Rp Rp Rp

8,100,000.00 16,000.00 4,000.00

Rp Rp Rp

364,500.00 4,800.00 400.00

Rp Rp Rp

431,450.00 64,717.50 496,167.50

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 22

5,106,915.00 766,037.25 5,872,952.25

Pemasangan 1 m2 bekisting untuk pondasi Tenaga: Mandor Kepala Tukang Kayu Tukang Kayu Pekerja Terampil Bahan: Kayu kelas III Paku biasa Minyak Bekesting Peralatan:

21

Rp Rp Rp

Pemasangan 1 m2 bekisting untuk kolom Tenaga: Mandor Kepala Tukang Kayu Tukang Kayu Pekerja Bahan: Kayu kelas III Paku Biasa Minyak bekisting Kelas II (kayu kalimantan/borneo) balok Triplek tebal 9 mm (120 x 240) Dolken kayu Ø 8 - 10 /400 cm

0.0330 0.0330 0.3300 0.6600

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

2,970.00 2,805.00 26,400.00 46,200.00

0.0400 0.4000 0.2000 0.0150 0.3500 2.0000

m3 Kg Ltr m3 Lembar Batang

Rp Rp Rp Rp Rp Rp

8,100,000.00 16,000.00 4,000.00 10,000,000.00 120,000.00 29,500.00

Rp Rp Rp Rp Rp Rp

324,000.00 6,400.00 800.00 150,000.00 42,000.00 59,000.00

Rp Rp Rp

660,575.00 99,086.25 759,661.25

Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 23

Pemasangan 1 m2 bekisting untuk balok Tenaga: Mandor Kepala Tukang Kayu Tukang Kayu Pekerja Bahan: Kayu kelas III Paku Biasa Minyak bekisting Kelas II (kayu kalimantan/borneo) balok Triplek tebal 9 mm (120 x 240) Dolken kayu Ø 8 - 10 /400 cm

0.0330 0.0330 0.3300 0.6600

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

2,970.00 2,805.00 26,400.00 46,200.00

0.0400 0.4000 0.2000 0.0180 0.3500 2.0000

m3 Kg Ltr m3 Lembar Batang

Rp Rp Rp Rp Rp Rp

8,100,000.00 16,000.00 4,000.00 10,000,000.00 120,000.00 29,500.00

Rp Rp Rp Rp Rp Rp

324,000.00 6,400.00 800.00 180,000.00 42,000.00 59,000.00

Rp Rp Rp

690,575.00 103,586.25 794,161.25

Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 24

Pemasangan 1 m2 bekisting untuk lantai Tenaga: Mandor Kepala Tukang Kayu Tukang Kayu Pekerja Bahan: Kayu kelas III Paku Biasa Minyak bekisting Kelas II (kayu kalimantan/borneo) balok Triplek tebal 9 mm (120 x 240) Dolken kayu Ø 8 - 10 /400 cm

0.0330 0.0330 0.3300 0.6600

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

2,970.00 2,805.00 26,400.00 46,200.00

0.0400 0.4000 0.2000 0.0150 0.3500 6.0000

m3 Kg Ltr m3 Lembar Batang

Rp Rp Rp Rp Rp Rp

8,100,000.00 16,000.00 4,000.00 10,000,000.00 120,000.00 29,500.00

Rp Rp Rp Rp Rp Rp

324,000.00 6,400.00 800.00 150,000.00 42,000.00 177,000.00

Rp Rp Rp

778,575.00 116,786.25 895,361.25

Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 25

Pemasangan 1 m2 bekisting untuk dinding Tenaga:

Mandor Kepala Tukang Kayu Tukang Kayu Pekerja Bahan: Kayu kelas III Paku Biasa Minyak bekisting Kelas II (kayu kalimantan/borneo) balok Triplek tebal 9 mm (120 x 240) Dolken kayu Ø 8 - 10 /400 cm

0.0330 0.0330 0.3300 0.6600

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

2,970.00 2,805.00 26,400.00 46,200.00

0.0300 0.4000 0.2000 0.0200 0.3500 3.0000

m3 Kg Ltr m3 Lembar Batang

Rp Rp Rp Rp Rp Rp

8,100,000.00 16,000.00 4,000.00 10,000,000.00 120,000.00 29,500.00

Rp Rp Rp Rp Rp Rp

243,000.00 6,400.00 800.00 200,000.00 42,000.00 88,500.00

Rp Rp Rp

659,075.00 98,861.25 757,936.25

Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 26

Pemasangan 1 m2 bekisting untuk tangga Tenaga: Mandor Kepala Tukang Kayu Tukang Kayu Pekerja Bahan: Kayu kelas III Paku Biasa Minyak bekisting Kelas II (kayu kalimantan/borneo) balok Triplek tebal 9 mm (120 x 240) Dolken kayu Ø 8 - 10 /400 cm

0.0330 0.0330 0.3300 0.6600

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

2,970.00 2,805.00 26,400.00 46,200.00

0.0300 0.4000 0.1500 0.0150 0.3500 2.0000

m3 Kg Ltr m3 Lembar Batang

Rp Rp Rp Rp Rp Rp

8,100,000.00 16,000.00 4,000.00 10,000,000.00 120,000.00 29,500.00

Rp Rp Rp Rp Rp Rp

243,000.00 6,400.00 600.00 150,000.00 42,000.00 59,000.00

Rp Rp Rp

579,375.00 86,906.25 666,281.25

Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 27

Pemasangan 1 m2 jembatan untuk pengecoran beton Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Kelas III (kayu kruing) papan Paku Biasa Dolken kayu Ø 8 - 10 /400 cm

0.0080 0.0050 0.0500 0.1500

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

720.00 425.00 4,000.00 10,500.00

0.0264 0.6000 0.5000

m3 Kg Btg

Rp Rp Rp

8,100,000.00 16,000.00 29,500.00

Rp Rp Rp

213,840.00 9,600.00 14,750.00

Rp Rp Rp

253,835.00 38,075.25 291,910.25

Peralatan:

28

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pembuatan 1 m3 pondasi beton bertulang (150 kg besi + bekisting) Tenaga: Mandor Kepala Tukang Tukang Besi Tukang Kayu Tukang Batu Pekerja Bahan: Kayu kelas III Paku Biasa Minyak bekisting Besi beton polos Kawat ikat beton Semen Portland Pasir beton Batu pecah 2/3

0.2650 0.2620 1.0500 1.3000 0.2750 5.3000

O.H O.H O.H O.H O.H O.H

Rp Rp Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 80,000.00 80,000.00 70,000.00

Rp Rp Rp Rp Rp Rp

23,850.00 22,270.00 84,000.00 104,000.00 22,000.00 371,000.00

0.2000 1.5000 0.4000 157.5000 2.2500 336.0000 0.5400 0.8100

m3 Kg Ltr Kg Kg Kg m3 m3

Rp Rp Rp Rp Rp Rp Rp Rp

8,100,000.00 16,000.00 4,000.00 10,500.00 19,000.00 1,250.00 325,000.00 280,000.00

Rp Rp Rp Rp Rp Rp Rp Rp

1,620,000.00 24,000.00 1,600.00 1,653,750.00 42,750.00 420,000.00 175,500.00 226,800.00

Rp Rp Rp

4,791,520.00 718,728.00 5,510,248.00

Peralatan:

29

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pembuatan 1 m3 sloof beton bertulang (200 kg besi + bekisting) Tenaga: Mandor Kepala Tukang Tukang Besi Tukang Kayu Tukang Batu Pekerja Bahan: Kayu kelas III Paku Biasa Minyak bekisting Besi beton polos Kawat ikat beton Semen Portland Pasir beton Batu pecah 2/3

0.2830 0.3230 1.4000 1.5600 0.2750 5.6500

O.H O.H O.H O.H O.H O.H

Rp Rp Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 80,000.00 80,000.00 70,000.00

Rp Rp Rp Rp Rp Rp

25,470.00 27,455.00 112,000.00 124,800.00 22,000.00 395,500.00

0.2700 2.0000 0.6000 210.0000 3.0000 336.0000 0.5400 0.8100

m3 Kg Ltr Kg Kg Kg m3 m3

Rp Rp Rp Rp Rp Rp Rp Rp

8,100,000.00 16,000.00 4,000.00 10,500.00 19,000.00 1,250.00 325,000.00 280,000.00

Rp Rp Rp Rp Rp Rp Rp Rp

2,187,000.00 32,000.00 2,400.00 2,205,000.00 57,000.00 420,000.00 175,500.00 226,800.00

Peralatan:

30

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pembuatan 1 m3 kolom beton bertulang (300 kg besi + bekisting) Tenaga: Mandor Kepala Tukang Tukang Besi Tukang Kayu Tukang Batu Pekerja Bahan: Kayu kelas III Paku Biasa Minyak bekisting Besi beton polos Kawat ikat beton Semen Portland Pasir beton Batu pecah 2/3 Kelas II balok Triplek tebal 9 mm (120 x 240) Dolken kayu Ø 8 - 10 /400 cm

Rp Rp Rp

6,012,925.00 901,938.75 6,914,863.75

0.3530 0.4030 2.1000 1.6500 0.2750 7.0500

O.H O.H O.H O.H O.H O.H

Rp Rp Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 80,000.00 80,000.00 70,000.00

Rp Rp Rp Rp Rp Rp

31,770.00 34,255.00 168,000.00 132,000.00 22,000.00 493,500.00

0.4000 4.0000 2.0000 315.0000 4.5000 336.0000 0.5400 0.8100 0.1500 3.5000 20.0000

m3 Kg Ltr Kg Kg Kg m3 m3 m3 Lbr Btg

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

8,100,000.00 16,000.00 4,000.00 10,500.00 19,000.00 1,250.00 325,000.00 280,000.00 10,000,000.00 120,000.00 29,500.00

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

3,240,000.00 64,000.00 8,000.00 3,307,500.00 85,500.00 420,000.00 175,500.00 226,800.00 1,500,000.00 420,000.00 590,000.00

Rp Rp Rp

10,918,825.00 1,637,823.75 12,556,648.75

Peralatan:

31

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pembuatan 1 m3 balok beton bertulang (200 kg besi + bekisting) Tenaga: Mandor Kepala Tukang Tukang Besi Tukang Kayu Tukang Batu Pekerja Bahan: Kayu kelas III Paku Biasa Minyak bekisting Besi beton polos Kawat ikat beton Semen Portland Pasir beton Batu pecah 2/3 Kelas II balok Triplek tebal 9 mm (120 x 240) Dolken kayu Ø 8 - 10 /400 cm

0.3180 0.3330 1.4000 1.6500 0.2750 6.3500

O.H O.H O.H O.H O.H O.H

Rp Rp Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 80,000.00 80,000.00 70,000.00

Rp Rp Rp Rp Rp Rp

28,620.00 28,305.00 112,000.00 132,000.00 22,000.00 444,500.00

0.3200 3.2000 1.6000 210.0000 3.0000 336.0000 0.5400

m3 Kg Ltr Kg Kg Kg m3

0.8100 0.1400 2.8000 16.0000

m3 m3 Lbr Btg

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

8,100,000.00 16,000.00 4,000.00 10,500.00 19,000.00 1,250.00 325,000.00 280,000.00 10,000,000.00 120,000.00 29,500.00

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

2,592,000.00 51,200.00 6,400.00 2,205,000.00 57,000.00 420,000.00 175,500.00 226,800.00 1,400,000.00 336,000.00 472,000.00

Rp Rp Rp

8,709,325.00 1,306,398.75 10,015,723.75

Peralatan:

32

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pembuatan 1 m3 plat beton bertulang (150 kg besi + bekisting) Tenaga: Mandor Kepala Tukang Tukang Besi Tukang Kayu Tukang Batu Pekerja Bahan: Kayu kelas III Paku Biasa Minyak bekisting Besi beton polos Kawat ikat beton Semen Portland Pasir beton Batu pecah 2/3 Kelas II balok Triplek tebal 9 mm (120 x 240) Dolken kayu Ø 8 - 10 /400 cm

0.2650 0.2650 1.0500 1.3000 0.2750 5.3000

O.H O.H O.H O.H O.H O.H

Rp Rp Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 80,000.00 80,000.00 70,000.00

Rp Rp Rp Rp Rp Rp

23,850.00 22,525.00 84,000.00 104,000.00 22,000.00 371,000.00

0.3200 3.2000 1.6000 157.5000 2.2500 336.0000 0.5400 0.8100 0.1200 2.8000 32.0000

m3 Kg Ltr Kg Kg Kg m3 m3 m3 Lbr Btg

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

8,100,000.00 16,000.00 4,000.00 10,500.00 19,000.00 1,250.00 325,000.00 280,000.00 10,000,000.00 120,000.00 29,500.00

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

2,592,000.00 51,200.00 6,400.00 1,653,750.00 42,750.00 420,000.00 175,500.00 226,800.00 1,200,000.00 336,000.00 944,000.00

Rp Rp Rp

8,275,775.00 1,241,366.25 9,517,141.25

Rp Rp Rp Rp Rp Rp

23,850.00 22,270.00 84,000.00 104,000.00 22,000.00 371,000.00

Peralatan:

33

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pembuatan 1 m3 dinding beton bertulang (150 kg besi + bekisting) Tenaga: Mandor Kepala Tukang Tukang Besi Tukang Kayu Tukang Batu Pekerja

0.2650 0.2620 1.0500 1.3000 0.2750 5.3000

O.H O.H O.H O.H O.H O.H

Rp Rp Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 80,000.00 80,000.00 70,000.00

Bahan: Kayu kelas III Paku Biasa Minyak bekisting Besi beton polos Kawat ikat beton Semen Portland Pasir beton Batu pecah 2/3 Kelas II balok Triplek tebal 9 mm (120 x 240) Dolken kayu Ø 8 - 10 /400 cm

0.2400 3.2000 1.6000 157.5000 2.2500 336.0000 0.5400 0.8100 0.1600 2.8000 24.0000

m3 Kg Ltr Kg Kg Kg m3 m3 m3 Lbr Btg

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

8,100,000.00 16,000.00 4,000.00 10,500.00 19,000.00 1,250.00 325,000.00 280,000.00 10,000,000.00 120,000.00 29,500.00

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

1,944,000.00 51,200.00 6,400.00 1,653,750.00 42,750.00 420,000.00 175,500.00 226,800.00 1,600,000.00 336,000.00 708,000.00

Rp Rp Rp

7,791,520.00 1,168,728.00 8,960,248.00

Peralatan:

34

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pembuatan 1 m3 dinding beton bertulang (200 kg besi + bekisting) Tenaga: Mandor Kepala Tukang Tukang Besi Tukang Kayu Tukang Batu Pekerja Bahan: Kayu kelas III Paku Biasa Minyak bekisting Besi beton polos Kawat ikat beton Semen Portland Pasir beton Batu pecah 2/3 Kelas II balok Triplek tebal 9 mm (120 x 240) Dolken kayu Ø 8 - 10 /400 cm

0.2830 0.3230 1.4000 1.5600 0.2750 5.6500

O.H O.H O.H O.H O.H O.H

Rp Rp Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 80,000.00 80,000.00 70,000.00

Rp Rp Rp Rp Rp Rp

25,470.00 27,455.00 112,000.00 124,800.00 22,000.00 395,500.00

0.2500 3.0000 1.2000 210.0000 3.0000 336.0000 0.5400 0.8100 0.1050 2.5000 14.0000

m3 Kg Ltr Kg Kg Kg m3 m3 m3 Lbr Btg

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

8,100,000.00 16,000.00 4,000.00 10,500.00 19,000.00 1,250.00 325,000.00 280,000.00 10,000,000.00 120,000.00 29,500.00

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

2,025,000.00 48,000.00 4,800.00 2,205,000.00 57,000.00 420,000.00 175,500.00 226,800.00 1,050,000.00 300,000.00 413,000.00

Rp Rp Rp

7,632,325.00 1,144,848.75 8,777,173.75

90,000.00 85,000.00 80,000.00 80,000.00 80,000.00 70,000.00

Rp Rp Rp Rp Rp Rp

810.00 510.00 1,600.00 1,600.00 1,600.00 12,600.00

m3 Rp 8,100,000.00 Kg Rp 16,000.00 Kg Rp 10,500.00 Kg Rp 19,000.00 Semen portland Kg Rp 1,250.00 Pasir beton m3 Rp 325,000.00 Batu pecah 2/3 m3 Rp 280,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Membuat 1 m' Ring Balok Beton Bertulang Uk.10 x 15 cm

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

16,200.00 160.00 31,500.00 8,550.00 5,000.00 1,950.00 2,520.00 84,600.00 12,690.00 97,290.00

90,000.00 85,000.00 80,000.00 80,000.00 80,000.00 70,000.00

Rp Rp Rp Rp Rp Rp

1,350.00 850.00 2,640.00 2,640.00 2,640.00 20,790.00

m3 Rp 8,100,000.00 Kg Rp 16,000.00 Kg Rp 10,500.00 Kg Rp 19,000.00 Kg Rp 1,250.00 m3 Rp 325,000.00 m3 Rp 280,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

24,300.00 320.00 37,800.00 950.00 6,875.00 2,925.00 4,200.00 108,280.00 16,242.00 124,522.00

Rp Rp Rp

270.00 510.00 4,800.00

Peralatan:

35

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pembuatan 1 m' kolom praktis beton bertulang (11 x 11) cm Tenaga: Mandor Kepala Tukang Tukang Besi Tukang Kayu Tukang Batu Pekerja Bahan: Kayu kelas III Paku biasa Besi beton polos Kawat ikat beton

36

Tenaga: Mandor Kepala Tukang Tukang Besi Tukang Kayu Tukang Batu Pekerja Bahan: Kayu kelas III Paku 5 cm - 12 cm Besi beton polos Kawat ikat beton Semen portland Pasir beton Batu Pecah Mesin 2/3

E. 1

0.0090 0.0060 0.0200 0.0200 0.0200 0.1800

O.H O.H O.H O.H O.H O.H

Rp Rp Rp Rp Rp Rp

0.0020 0.0100 3.0000 0.4500 4.0000 0.0060 0.0090

0.0150 0.0100 0.0330 0.0330 0.0330 0.2970 0.0030 0.0200 3.6000 0.0500 5.5000 0.0090 0.0150

O.H O.H O.H O.H O.H O.H

Rp Rp Rp Rp Rp Rp

PEKERJAAN BESI DAN ALUMINIUM Pemasangan 1 kg besi profil Tenaga: Mandor Kepala Tukang Tukang Las Konstruksi

0.0030 0.0060 0.0600

O.H O.H O.H

Rp Rp Rp

90,000.00 85,000.00 80,000.00

Pekerja Bahan: Besi profil

0.0600

O.H

Rp

70,000.00

Rp

4,200.00

1.1500

Kg

Rp

16,000.00

Rp

18,400.00

Rp Rp Rp

28,180.00 4,227.00 32,407.00

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

270.00 510.00 4,800.00 4,200.00

Kg Rp 15,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pembuatan 1 m2 pintu besi pelat baja tebal 2 mm rangkap, rangkap baja siku

Rp Rp Rp Rp

17,250.00 27,030.00 4,054.50 31,084.50

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

450.00 85.00 8,000.00 7,000.00

14,000.00 12,500.00 55,000.00

Rp Rp Rp Rp Rp Rp

210,000.00 410,000.00 2,750.00 638,285.00 95,742.75 734,027.75

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

540.00 10,200.00 96,000.00 84,000.00

m2 Rp 420,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp

420,000.00 610,740.00 91,611.00 702,351.00

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

4,500.00 8,500.00 80,000.00 70,000.00

m2 Rp 450,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp

450,000.00 613,000.00 91,950.00 704,950.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 2

Pemasangan 1 kg rangka kuda-kuda baja IWF Tenaga: Mandor Kepala Tukang Tukang Las Konstruksi Pekerja Bahan: Besi baja IWF

3

Tenaga: Mandor Kepala Tukang Tukang Las Pekerja Bahan: Besi siku L.30.30.3 Besi pelat baja Kawat las

4

Rp Rp Rp Rp

1.1500

0.0050 0.0010 0.1000 0.1000 15.0000 32.8000 0.0500

O.H O.H O.H O.H

Rp Rp Rp Rp

Kg Rp Kg Rp Kg Rp Jumlah Overhead + Profit ( Nilai HSPK :

15 % )

0.0060 0.1200 1.2000 1.2000 1.0000

O.H O.H O.H O.H

Rp Rp Rp Rp

Pemasangan 1 m2 rolling door alumunium Tenaga: Mandor Kepala Tukang Tukang khusus allumunium Pekerja Bahan: Rolling Door Alumunium

6

O.H O.H O.H O.H

Pemasangan 1 m2 pintu rolling door besi Tenaga: Mandor Kepala Tukang Tukang Las Pekerja Bahan: Pintu gulung besi

5

0.0030 0.0060 0.0600 0.0600

0.0500 0.1000 1.0000 1.0000 1.0000

O.H O.H O.H O.H

Rp Rp Rp Rp

Pemasangan 1 m2 terali besi strip (2 x 3) mm Tenaga: Mandor Kepala Tukang Tukang Pekerja Bahan: Besi strip Pengelasan Peralatan:

0.0830 0.1670 1.6700 1.6700

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

7,470.00 14,195.00 133,600.00 116,900.00

6.1770 27.0800

Kg cm

Rp Rp

13,500.00 25,000.00

Rp Rp

83,389.50 677,000.00

Rp Rp Rp

1,032,554.50 154,883.18 1,187,437.68

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 7

Pemasangan 1 m2 kawat nyamuk Tenaga: Mandor Kepala Tukang Tukang Pekerja Bahan: Kawat nyamuk Pengelasan Besi strip

0.0050 0.0100 0.1000 0.1000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

450.00 850.00 8,000.00 7,000.00

1.1000 11.1100 1.7160

m2 cm Kg

Rp Rp Rp

28,000.00 25,000.00 13,500.00

Rp Rp Rp

30,800.00 277,750.00 23,166.00

Rp Rp Rp

348,016.00 52,202.40 400,218.40

Rp Rp

90.00 1,700.00

Peralatan:

8

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m' talang datar/ jurai seng bjls 28 lebar 90 cm Tenaga: Mandor Kepala Tukang

0.0010 0.0200

O.H O.H

Rp Rp

90,000.00 85,000.00

Tukang Pekerja Bahan: Seng Plat 0.90 x 1.80 m BJLS 28 Paku Biasa Kelas III (kayu kruing) papan

0.2000 0.2000

O.H O.H

Rp Rp

80,000.00 70,000.00

Rp Rp

16,000.00 14,000.00

1.0500 0.0150 0.0190

m' Kg m3

Rp Rp Rp

88,500.00 16,000.00 8,100,000.00

Rp Rp Rp

92,925.00 240.00 153,900.00

Rp Rp Rp

278,855.00 41,828.25 320,683.25

Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : F. 1

PEKERJAAN PASANGAN DINDING Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 PC : 2 PP Tenaga: Mandor Kepala Tukang Batu Tukang Batu Pekerja Bahan: Bata Merah Semen Portland Pasir Pasang Peralatan:

2

Rp Rp Rp Rp

2,700.00 1,700.00 16,000.00 42,000.00

buah Kg m3

Rp Rp Rp

800.00 1,250.00 225,000.00

Rp Rp Rp

112,000.00 54,375.00 18,000.00

Rp Rp Rp

246,775.00 37,016.25 283,791.25

0.0300 0.0200 0.2000 0.6000 140.0000 32.9500 0.0910

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

2,700.00 1,700.00 16,000.00 42,000.00

buah Kg m3

Rp Rp Rp

800.00 1,250.00 225,000.00

Rp Rp Rp

112,000.00 41,187.50 20,475.00

Rp Rp Rp

236,062.50 35,409.38 271,471.88

0.0300 0.0200 0.2000 0.6000 140.0000 26.5500 0.0930

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

2,700.00 1,700.00 16,000.00 42,000.00

buah Kg m3

Rp Rp Rp

800.00 1,250.00 225,000.00

Rp Rp Rp

112,000.00 33,187.50 20,925.00

Rp Rp Rp

228,512.50 34,276.88 262,789.38

0.0300 0.0200 0.2000 0.6000 140.0000 22.2000 0.1020

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

2,700.00 1,700.00 16,000.00 42,000.00

buah Kg m3

Rp Rp Rp

800.00 1,250.00 225,000.00

Rp Rp Rp

112,000.00 27,750.00 22,950.00

Rp Rp Rp

225,100.00 33,765.00 258,865.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 Pc : 6 PP Tenaga: Mandor Kepala Tukang Batu Tukang Batu Pekerja Bahan: Bata Merah Semen Portland Pasir Pasang Peralatan:

6

90,000.00 85,000.00 80,000.00 70,000.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 Pc : 5 PP Tenaga: Mandor Kepala Tukang Batu Tukang Batu Pekerja Bahan: Bata Merah Semen Portland Pasir Pasang Peralatan:

5

Rp Rp Rp Rp

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 Pc : 4 PP Tenaga: Mandor Kepala Tukang Batu Tukang Batu Pekerja Bahan: Bata Merah Semen Portland Pasir Pasang Peralatan:

4

140.0000 43.5000 0.0800

O.H O.H O.H O.H

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 Pc : 3 PP Tenaga: Mandor Kepala Tukang Batu Tukang Batu Pekerja Bahan: Bata Merah Semen Portland Pasir Pasang Peralatan:

3

0.0300 0.0200 0.2000 0.6000

0.0300 0.0200 0.2000 0.6000 140.0000 18.5000 0.1220

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

2,700.00 1,700.00 16,000.00 42,000.00

buah Kg m3

Rp Rp Rp

800.00 1,250.00 225,000.00

Rp Rp Rp

112,000.00 23,125.00 27,450.00

Rp Rp Rp

224,975.00 33,746.25 258,721.25

Rp

1,350.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 Pc : 2 PP Tenaga: Mandor

0.0150

O.H

Rp

90,000.00

Kepala Tukang Batu Tukang Batu Pekerja Bahan: Bata Merah Semen Portland Pasir Pasang Peralatan:

7

Rp Rp Rp

850.00 8,000.00 21,000.00

buah Kg m3

Rp Rp Rp

800.00 1,250.00 225,000.00

Rp Rp Rp

56,000.00 23,687.50 8,550.00

Rp Rp Rp

119,437.50 17,915.63 137,353.13

0.0150 0.0100 0.1000 0.3000 70.0000 14.3700 0.0400

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

1,350.00 850.00 8,000.00 21,000.00

buah Kg m3

Rp Rp Rp

800.00 1,250.00 225,000.00

Rp Rp Rp

56,000.00 17,962.50 9,000.00

Rp Rp Rp

114,162.50 17,124.38 131,286.88

0.0150 0.0100 0.1000 0.3000 70.0000 11.5000 0.0430

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

1,350.00 850.00 8,000.00 21,000.00

buah Kg m3

Rp Rp Rp

800.00 1,250.00 225,000.00

Rp Rp Rp

56,000.00 14,375.00 9,675.00

Rp Rp Rp

111,250.00 16,687.50 127,937.50

0.0150 0.0100 0.1000 0.3000 70.0000 9.6800 0.0450

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

1,350.00 850.00 8,000.00 21,000.00

buah Kg m3

Rp Rp Rp

800.00 1,250.00 225,000.00

Rp Rp Rp

56,000.00 12,100.00 10,125.00

Rp Rp Rp

109,425.00 16,413.75 125,838.75

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 Pc : 6 PP Tenaga: Mandor Kepala Tukang Batu Tukang Batu Pekerja Bahan: Bata Merah Semen Portland Pasir Pasang Peralatan:

11

85,000.00 80,000.00 70,000.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 Pc : 5 PP Tenaga: Mandor Kepala Tukang Batu Tukang Batu Pekerja Bahan: Bata Merah Semen Portland Pasir Pasang Peralatan:

10

Rp Rp Rp

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 Pc : 4 PP Tenaga: Mandor Kepala Tukang Batu Tukang Batu Pekerja Bahan: Bata Merah Semen Portland Pasir Pasang Peralatan:

9

70.0000 18.9500 0.0380

O.H kg O.H

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 Pc : 3 PP Tenaga: Mandor Kepala Tukang Batu Tukang Batu Pekerja Bahan: Bata Merah Semen Portland Pasir Pasang Peralatan:

8

0.0100 0.1000 0.3000

0.0150 0.0100 0.1000 0.3000 70.0000 8.3200 0.0490

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

1,350.00 850.00 8,000.00 21,000.00

buah Kg m3

Rp Rp Rp

800.00 1,250.00 225,000.00

Rp Rp Rp

56,000.00 10,400.00 11,025.00

Rp Rp Rp

108,625.00 16,293.75 124,918.75

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 Pc : 8 PP Tenaga: Mandor Kepala Tukang Batu Tukang Batu Pekerja Bahan: Bata Merah Semen Portland Pasir Pasang Peralatan:

0.0150 0.0100 0.1000 0.3000 70.0000 6.5000 0.0500

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

1,350.00 850.00 8,000.00 21,000.00

buah Kg m3

Rp Rp Rp

800.00 1,250.00 225,000.00

Rp Rp Rp

56,000.00 8,125.00 11,250.00

Rp Rp Rp

106,575.00 15,986.25 122,561.25

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : G. 1

PEKERJAAN PLESTERAN Pemasangan 1 m2 plesteran 1 Pc : 1 PP tebal 15 mm Tenaga:

Mandor Kepala Tukang Tukang Batu Pekerja Bahan: Semen portland Pasir Pasang Peralatan:

0.0150 0.0150 0.1500 0.3000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

1,350.00 1,275.00 12,000.00 21,000.00

15.5040 0.0160

Kg m3

Rp Rp

1,250.00 225,000.00

Rp Rp

19,380.00 3,600.00

Rp Rp Rp

58,605.00 8,790.75 67,395.75

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 2

Pemasangan 1 m2 plesteran 1 Pc : 2 PP tebal 15 mm Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja Bahan: Semen portland Pasir Pasang Peralatan:

0.0150 0.0150 0.1500 0.3000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

1,350.00 1,275.00 12,000.00 21,000.00

10.2240 0.0200

Kg m3

Rp Rp

1,250.00 225,000.00

Rp Rp

12,780.00 4,500.00

Rp Rp Rp

52,905.00 7,935.75 60,840.75

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 3

Pemasangan 1 m2 plesteran 1 Pc : 3 PP tebal 15 mm Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja Bahan: Semen portland Pasir Pasang Peralatan:

0.0150 0.0150 0.1500 0.3000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

1,350.00 1,275.00 12,000.00 21,000.00

7.7760 0.0230

Kg m3

Rp Rp

1,250.00 225,000.00

Rp Rp

9,720.00 5,175.00

Rp Rp Rp

50,520.00 7,578.00 58,098.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 4

Pemasangan 1 m2 plesteran 1 Pc : 4 PP tebal 15 mm Tenaga: Mandor Kepala Tukang Batu Tukang Batu Pekerja Bahan: Semen portland Pasir Pasang Peralatan:

0.0150 0.0150 0.1500 0.3000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

1,350.00 1,275.00 12,000.00 21,000.00

6.2400 0.0240

Kg

Rp Rp

1,250.00

m3

225,000.00

Rp Rp

7,800.00 5,400.00

Rp Rp Rp

48,825.00 7,323.75 56,148.75

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 5

Pemasangan 1 m2 plesteran 1 Pc : 5 PP tebal 15 mm Tenaga: Mandor Kepala Tukang Batu Tukang Batu Pekerja Bahan: Semen portland Pasir Pasang Peralatan:

0.0150 0.0150 0.1500 0.3000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

1,350.00 1,275.00 12,000.00 21,000.00

5.1840 0.0260

Kg m3

Rp Rp

1,250.00 225,000.00

Rp Rp

6,480.00 5,850.00

Rp Rp Rp

47,955.00 7,193.25 55,148.25

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 6

Pemasangan 1 m2 plesteran 1 Pc : 6 PP tebal 15 mm Tenaga: Mandor Kepala Tukang Batu Tukang Batu Pekerja Bahan: Semen portland Pasir Pasang Peralatan:

0.0150 0.0150 0.1500 0.3000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

1,350.00 1,275.00 12,000.00 21,000.00

4.4160 0.0270

Kg m3

Rp Rp

1,250.00 225,000.00

Rp Rp

5,520.00 6,075.00

Rp Rp Rp

47,220.00 7,083.00 54,303.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 7

Pemasangan 1 m2 plesteran 1 Pc : 7 PP tebal 15 mm Tenaga: Mandor Kepala Tukang Batu Tukang Batu Pekerja Bahan: Semen portland

0.0150 0.0150 0.1500 0.3000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

1,350.00 1,275.00 12,000.00 21,000.00

3.9360

Kg

Rp

1,250.00

Rp

4,920.00

Pasir Pasang Peralatan:

0.0280

m3

Rp

225,000.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 8

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

1,350.00 1,275.00 12,000.00 21,000.00

3.4560 0.0290

Kg m3

Rp Rp

1,250.00 225,000.00

Rp Rp

4,320.00 6,525.00

Rp Rp Rp

46,470.00 6,970.50 53,440.50

0.0220 0.0200 0.2000 0.4000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

1,980.00 1,700.00 16,000.00 28,000.00

13.6320 0.0270

Kg m3

Rp Rp

1,250.00 225,000.00

Rp Rp

17,040.00 6,075.00

Rp Rp Rp

70,795.00 10,619.25 81,414.25

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 plesteran 1 Pc : 3 PP tebal 20 mm Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja Bahan: Semen portland Pasir Pasang Peralatan:

0.0130 0.0200 0.2000 0.2600

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

1,170.00 1,700.00 16,000.00 18,200.00

10.3680 0.0310

Kg m3

Rp Rp

1,250.00 225,000.00

Rp Rp

12,960.00 6,975.00

Rp Rp Rp

57,005.00 8,550.75 65,555.75

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 plesteran 1 Pc : 4 PP tebal 20 mm Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja Bahan: Semen portland Pasir Pasang Peralatan:

0.0220 0.0200 0.2000 0.4000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

1,980.00 1,700.00 16,000.00 28,000.00

8.3200 0.0320

Kg m3

Rp Rp

1,250.00 225,000.00

Rp Rp

10,400.00 7,200.00

Rp Rp Rp

65,280.00 9,792.00 75,072.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 12

Pemasangan 1 m2 plesteran 1 Pc : 5 PP tebal 20 mm Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja Bahan: Semen portland Pasir Pasang Peralatan:

0.0220 0.0200 0.2000 0.4000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

1,980.00 1,700.00 16,000.00 28,000.00

6.9120 0.0350

Kg m3

Rp Rp

1,250.00 225,000.00

Rp Rp

8,640.00 7,875.00

Rp Rp Rp

64,195.00 9,629.25 73,824.25

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 13

Pemasangan 1 m2 plesteran 1 Pc : 6 PP tebal 20 mm Tenaga: Mandor Kepala Tukang Batu Tukang Batu Pekerja Bahan: Semen portland Pasir Pasang Peralatan:

0.0220 0.0200 0.2000 0.4000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

1,980.00 1,700.00 16,000.00 28,000.00

5.8880 0.0360

Kg m3

Rp Rp

1,250.00 225,000.00

Rp Rp

7,360.00 8,100.00

Rp Rp Rp

63,140.00 9,471.00 72,611.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 14

46,845.00 7,026.75 53,871.75

Pemasangan 1 m2 plesteran 1 Pc : 1 PP tebal 20 mm Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja Bahan: Semen portland Pasir Pasang Peralatan:

11

Rp Rp Rp

0.0150 0.0150 0.1500 0.3000

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

10

6,300.00

Pemasangan 1 m2 plesteran 1 Pc : 8 PP tebal 15 mm Tenaga: Mandor Kepala Tukang Batu Tukang Batu Pekerja Bahan: Semen portland Pasir Pasang Peralatan:

9

Rp

Pemasangan 1 m2 finishing siar pasangan bata merah

Tenaga: Mandor Kepala Tukang Batu Tukang Batu Pekerja Bahan: Semen portland Peralatan:

15

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

720.00 680.00 6,000.00 10,500.00

3.1080

Kg

Rp

1,250.00

Rp

3,885.00

Rp Rp Rp

21,785.00 3,267.75 25,052.75

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 finishing siar pasangan conblock ekspose Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja Bahan: Semen portland Peralatan:

16

0.0080 0.0080 0.0750 0.1500

0.0040 0.0040 0.0350 0.0700

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

360.00 340.00 2,800.00 4,900.00

1.6000

Kg

Rp

1,250.00

Rp

2,000.00

Rp Rp Rp

10,400.00 1,560.00 11,960.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1 Pc : 2 PP Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja Bahan: Semen portland Pasir Pasang Peralatan:

0.0150 0.0150 0.1500 0.3000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

1,350.00 1,275.00 12,000.00 21,000.00

6.3400 0.0120

Kg m3

Rp Rp

1,250.00 225,000.00

Rp Rp

7,925.00 2,700.00

Rp Rp Rp

46,250.00 6,937.50 53,187.50

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 17

Pemasangan 1 m2 acian Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja Bahan: Semen portland Peralatan:

0.0100 0.0100 0.1000 0.2000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

900.00 850.00 8,000.00 14,000.00

3.2500

Kg

Rp

1,250.00

Rp

4,062.50

Rp Rp Rp

27,812.50 4,171.88 31,984.38

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

3,150.00 2,975.00 28,000.00 49,000.00

dos Rp 45,000.00 Kg Rp 1,250.00 Kg Rp 12,500.00 m3 Rp 225,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp Rp Rp

45,000.00 13,000.00 6,250.00 10,125.00 157,500.00 23,625.00 181,125.00

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

3,150.00 2,975.00 28,000.00 49,000.00

dos Rp 45,000.00 Kg Rp 1,250.00 Kg Rp 12,500.00 m3 Rp 225,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp Rp Rp

47,250.00 12,500.00 6,250.00 10,125.00 159,250.00 23,887.50 183,137.50

Rp Rp Rp Rp

1,170.00 1,105.00 10,400.00 18,200.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : H. 1

PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING Pemasangan 1 m2 lantai ubin polos ukuran 20 cm x 20 cm Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja Bahan: Ubin keramik 20 x 20 Polos Semen Portland Semen Warna Pasir Pasang

2

1.0000 10.4000 0.5000 0.0450

O.H O.H O.H O.H

Rp Rp Rp Rp

Pemasangan 1 m2 lantai ubin polos ukuran 30 cm x 30 cm Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja Bahan: Ubin keramik 30 cm x 30 cm Semen Portland Semen Warna Pasir Pasang

3

0.0350 0.0350 0.3500 0.7000

0.0350 0.0350 0.3500 0.7000 1.0500 10.0000 0.5000 0.0450

O.H O.H O.H O.H

Rp Rp Rp Rp

Pemasangan 1 m2 lantai ubin warna ukuran 30 cm x 30 cm Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja Bahan:

0.0130 0.0130 0.1300 0.2600

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Ubin Keramik 30 x 30 Motif Semen Portland Semen Warna Pasir Pasang Peralatan:

11.8700 10.0000 0.6000 0.0450

Bh Kg Kg m3

Rp Rp Rp Rp

50,000.00 1,250.00 12,500.00 225,000.00

Rp Rp Rp Rp

593,500.00 12,500.00 7,500.00 10,125.00

Rp Rp Rp

654,500.00 98,175.00 752,675.00

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

1,170.00 1,105.00 10,000.00 17,500.00

bh Rp 55,000.00 Kg Rp 1,250.00 Kg Rp 12,500.00 m3 Rp 225,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp Rp Rp

364,650.00 12,250.00 7,500.00 10,125.00 424,300.00 63,645.00 487,945.00

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

1,170.00 1,105.00 10,000.00 17,500.00

bh Rp 90,000.00 Kg Rp 1,250.00 Kg Rp 12,500.00 m3 Rp 225,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp Rp Rp

596,700.00 12,250.00 16,250.00 10,125.00 665,100.00 99,765.00 764,865.00

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

450.00 2,975.00 7,200.00 6,300.00

bh Rp 14,500.00 Kg Rp 1,250.00 Kg Rp 12,500.00 m3 Rp 225,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp Rp Rp

76,850.00 1,425.00 312.50 675.00 96,187.50 14,428.13 110,615.63

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 4

Pemasangan 1 m2 lantai ubin warna ukuran 40 cm x 40 cm Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja Bahan: Ubin Keramik 40 x 40 Motif Semen Portland Semen Warna Pasir Pasang

5

Rp Rp Rp Rp

0.0130 0.0130 0.1250 0.2500 6.6300 9.8000 1.3000 0.0450

O.H O.H O.H O.H

Rp Rp Rp Rp

Pemasangan 1 m' plint ubin warna ukuran 10 cm x 20 cm Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja Bahan: Plint Cove Keramik 10 x 20 Semen Portland Semen Warna Pasir Pasang

7

6.6300 9.8000 0.6000 0.0450

O.H O.H O.H O.H

Pemasangan 1 m2 lantai ubin granit ukuran 40 cm x 40 cm Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja Bahan: Granite tile 40 x 40 (ex. Granito tile) polished Semen Portland Semen Warna Pasir Pasang

6

0.0130 0.0130 0.1250 0.2500

Pemasangan 1 m2 dinding keramik 20 x 20 cm Tenaga Mandor Kepala Tukang Tukang Batu Pekerja Bahan Keramik 20 x 20 cm Semen Portland Pasir Pasang Semen Warna Peralatan

0.0050 0.0350 0.0900 0.0900 5.3000 1.1400 0.0250 0.0030

O.H O.H O.H O.H

Rp Rp Rp Rp

0.0450 0.0450 0.4500 0.9000

OH OH OH OH

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

4,050.00 3,825.00 36,000.00 63,000.00

26.5000 9.3000 0.0180 1.9400

Bh Kg m3 Kg

Rp Rp Rp Rp

45,000.00 1,250.00 225,000.00 12,500.00

Rp Rp Rp Rp

1,192,500.00 11,625.00 4,050.00 24,250.00

Rp Rp Rp

1,339,300.00 200,895.00 1,540,195.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : I.

PEKERJAAN LANGIT-LANGIT (PLAFOND)

1

Pemasangan 1 m2 langit-langit asbes semen 5 mm (Eternit Biasa 100 X100) Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Asbes semen (Eternit Biasa 100 X100) Paku tripleks Peralatan

2

0.0040 0.0070 0.0700 0.0300

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

360.00 595.00 5,600.00 2,100.00

1.1000 0.0100

m2 Kg

Rp Rp

15,000.00 22,000.00

Rp Rp

16,500.00 220.00

Rp Rp Rp

25,375.00 3,806.25 29,181.25

Rp Rp

450.00 850.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 4 mm Tenaga: Mandor Kepala Tukang

0.0050 0.0100

O.H O.H

Rp Rp

90,000.00 85,000.00

Tukang Kayu Pekerja Bahan: Tripleks 4 mm (120x240)cm Paku tripleks Peralatan

3

0.3750 0.0300

Lembar Kg

Rp Rp

55,000.00 22,000.00

Rp Rp

20,625.00 660.00

Rp Rp Rp

37,585.00 5,637.75 43,222.75

0.0400 0.0800 0.8000 0.8000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

3,600.00 6,800.00 64,000.00 56,000.00

0.015 0.010

m3 Kg

Rp Rp

29,700,000.00 22,000.00

Rp Rp

445,500.00 220.00

Rp Rp Rp

576,120.00 86,418.00 662,538.00

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

450.00 425.00 4,000.00 7,000.00

Lembar Rp 67,500.00 Kg Rp 15,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp

24,570.00 1,650.00 38,095.00 5,714.25 43,809.25

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

270.00 425.00 4,000.00 3,500.00

m Rp 11,000.00 kg Rp 22,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp

11,550.00 220.00 19,965.00 2,994.75 22,959.75

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

720.00 637.50 6,000.00 10,500.00

buah Rp 1,800.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp

45,000.00 62,857.50 9,428.63 72,286.13

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

720.00 680.00 6,000.00 10,500.00

buah Rp 1,750.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp

43,750.00 61,650.00 9,247.50 70,897.50

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

720.00 680.00 6,000.00 10,500.00

buah Rp 2,700.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp

32,400.00 50,300.00 7,545.00 57,845.00

Rp Rp

180.00 1,700.00

0.0050 0.0050 0.0500 0.1000 0.364 0.1100

O.H O.H O.H O.H

Rp Rp Rp Rp

0.0030 0.0050 0.0500 0.0500 1.050 0.0100

O.H O.H O.H O.H

Rp Rp Rp Rp

0.0080 0.0075 0.0750 0.1500 25.0000

O.H O.H O.H O.H

Rp Rp Rp Rp

0.0080 0.0080 0.0750 0.1500 25.0000

O.H O.H O.H O.H

Rp Rp Rp Rp

Pemasangan 1 m2 atap genteng palentong besar/super Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Genteng palentong besar

4

8,000.00 7,000.00

Pemasangan 1 m2 atap genteng kodok Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Genteng kodok

3

Rp Rp

PEKERJAAN PENUTUP ATAP Pemasangan 1 m2 atap genteng palentong kecil Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Genteng palentong

2

80,000.00 70,000.00

Pemasangan 1 m’ list langit-langit kayu profil Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: List kayu profil Paku

J. 1

Rp Rp

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 langit-langit gypsum board ukuran (1200x2400x9) mm, tebal 9 mm Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Gypsum board t 9 mm (ex. Jayaboard) Paku skrup

5

O.H O.H

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 langit-langit lambriziring kayu, tebal 9 mm Kelas I (kayu jati) Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Kayu Papan Kelas I (kayu jati) Paku tripleks Peralatan

4

0.1000 0.1000

0.0080 0.0080 0.0750 0.1500 12.0000

O.H O.H O.H O.H

Rp Rp Rp Rp

Pemasangan 1 m’ bubung genteng palentong Tenaga: Mandor Kepala Tukang

0.0020 0.0200

O.H O.H

Rp Rp

90,000.00 85,000.00

Tukang Kayu Pekerja Bahan: Genteng bubung Semen Portland Pasir pasang

5

80,000.00 70,000.00

Rp Rp

16,000.00 28,000.00

buah Rp 5,000.00 Kg Rp 1,250.00 m3 Rp 225,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp Rp

25,000.00 10,000.00 7,200.00 88,080.00 13,212.00 101,292.00

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

180.00 1,700.00 16,000.00 28,000.00

buah Rp 5,000.00 Kg Rp 1,250.00 m3 Rp 225,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 atap asbes gelombang 1,02 m x 2,00 m x 5 mm

Rp Rp Rp Rp Rp Rp

25,000.00 10,000.00 7,200.00 88,080.00 13,212.00 101,292.00

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

630.00 595.00 5,600.00 9,800.00

Lbr Rp 63,000.00 Kg Rp 40,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Nilai HSPK : Pemasangan 1 m2 atap asbes gelombang 1,05 m x 3,00 m x 4 mm

Rp Rp Rp Rp Rp Rp

37,800.00 4,800.00 59,225.00 8,883.75 68,108.75 69,488.75

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

630.00 595.00 5,600.00 9,800.00

Lbr Rp 80,000.00 Kg Rp 40,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 atap asbes gelombang 1,05 m x 2,10 m x 4 mm

Rp Rp Rp Rp Rp

28,000.00 4,800.00 49,425.00 7,413.75 56,838.75

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

630.00 595.00 5,600.00 9,800.00

Lbr Rp 63,000.00 Kg Rp 40,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp

32,130.00 4,800.00 53,555.00 8,033.25 61,588.25

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

360.00 1,105.00 10,000.00 5,880.00

Lbr Rp 38,000.00 buah Rp 1,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp

77,900.00 6,000.00 101,245.00 15,186.75 116,431.75

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

900.00 850.00 8,000.00 14,000.00

buah Rp 5,500.00 Kg Rp 16,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp

60,500.00 480.00 84,730.00 12,709.50 97,439.50

Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Asbes gel 102 x 200 cm Paku asbes

7

Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Asbes gel 105 x 300 cm Paku asbes

8

Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Asbes gel 105 x 210 cm Paku asbes

9

0.0020 0.0200 0.2000 0.4000

O.H O.H O.H O.H

Rp Rp Rp Rp

5.0000 8.0000 0.0320

0.0070 0.0070 0.0700 0.1400

O.H O.H O.H O.H

Rp Rp Rp Rp

0.6000 0.1200

0.0070 0.0070 0.0700 0.1400

O.H O.H O.H O.H

Rp Rp Rp Rp

0.3500 0.1200

0.0070 0.0070 0.0700 0.1400 0.5100 0.1200

O.H O.H O.H O.H

Rp Rp Rp Rp

0.0040 0.0130 0.1250 0.0840 2.0500 6.0000

O.H O.H O.H O.H

Rp Rp Rp Rp

Pemasangan 1 m2 genteng beton Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Genteng beton Paku biasa

11

Rp Rp

Pemasangan 1 m’ bubung stel gelombang 1,08 m Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Bubung stel gelombang 1,08 m Paku skrup

10

5.0000 8.0000 0.0320

O.H O.H

Pemasangan 1 m’ bubung genteng kodok Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Genteng bubung Semen Portland Pasir pasang

6

0.2000 0.4000

Pemasangan 1 m’ nok sirap

0.0100 0.0100 0.1000 0.2000 11.0000 0.0300

O.H O.H O.H O.H

Rp Rp Rp Rp

Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Seng pelat 0.90 x 1.80 m BJLS 28 Paku biasa

12

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

540.00 2,125.00 20,000.00 8,750.00

Lbr Rp 88,500.00 Kg Rp 16,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp

35,400.00 800.00 67,615.00 10,142.25 77,757.25

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

540.00 510.00 4,800.00 8,400.00

82,500.00 Lbr Rp 16,000.00 Kg Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp

57,750.00 320.00 72,320.00 10,848.00 83,168.00

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

540.00 595.00 5,600.00 10,500.00

Lbr Rp 88,500.00 Kg Rp 16,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp

26,550.00 640.00 44,425.00 6,663.75 51,088.75

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

31,500.00 178,500.00 1,680,000.00 490,000.00

m3 Rp 22,000,000.00 Kg Rp 16,000.00 Kg Rp 12,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II

Rp Rp Rp Rp Rp Rp

24,200,000.00 20,000.00 12,000.00 26,612,000.00 3,991,800.00 30,603,800.00

0.4000 0.0500

O.H O.H O.H O.H

Rp Rp Rp Rp

Pemasangan 1 m2 atap seng gelombang Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Seng gelombang 3.00 x 0.80 BJLS 28 Paku biasa

13

0.0060 0.0250 0.2500 0.1250

0.0060 0.0060 0.0600 0.1200 0.7000 0.0200

O.H O.H O.H O.H

Rp Rp Rp Rp

Pemasangan 1 m’nok atap seng Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Seng pelat 0.90 x 1.80 m BJLS 28 Paku biasa

0.0060 0.0070 0.0700 0.1500 0.3000 0.0400

O.H O.H O.H O.H

Rp Rp Rp Rp

K.

PEKERJAAN KAYU

1

Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Balok kayu kelas I (kayu jati) Paku biasa Lem kayu

2

Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Balok kayu kelas II (kamper) Paku biasa Lem kayu Peralatan:

3

O.H O.H O.H O.H

Rp Rp Rp Rp

1.1000 1.2500 1.0000

0.3000 1.8000 18.0000 6.0000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

27,000.00 153,000.00 1,440,000.00 420,000.00

1.2000 1.2500 1.0000

m3 Kg Kg

Rp Rp Rp

10,000,000.00 16,000.00 12,000.00

Rp Rp Rp

12,000,000.00 20,000.00 12,000.00

Rp Rp Rp

14,072,000.00 2,110,800.00 16,182,800.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Papan kayu kelas II (kamper) Paku biasa Peralatan:

4

0.3500 2.1000 21.0000 7.0000

0.0180 0.1050 1.0500 0.3500

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

1,620.00 8,925.00 84,000.00 24,500.00

0.0400 0.0500

m3 Kg

Rp Rp

12,000,000.00 16,000.00

Rp Rp

480,000.00 800.00

Rp Rp Rp

599,845.00 89,976.75 689,821.75

Rp Rp Rp Rp

1,620.00 8,925.00 84,000.00 24,500.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan:

0.0180 0.1050 1.0500 0.3500

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Papan kayu kelas III (kruing) Paku biasa Peralatan:

5

324,000.00 800.00

Rp Rp Rp

443,845.00 44,384.50 488,229.50

0.0500 0.3000 3.0000 1.0000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

4,500.00 25,500.00 240,000.00 70,000.00

0.0400 1.0000

m3 Kg

Rp Rp

29,700,000.00 12,000.00

Rp Rp

1,188,000.00 12,000.00

Rp Rp Rp

1,540,000.00 231,000.00 1,771,000.00

0.0400 0.2400 2.4000 0.8000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

3,600.00 20,400.00 192,000.00 56,000.00

0.0240 0.3000

m3 Kg

Rp Rp

29,700,000.00 12,000.00

Rp Rp

712,800.00 3,600.00

Rp Rp Rp

988,400.00 148,260.00 1,136,660.00

0.0500 0.3000 3.0000 1.0000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

4,500.00 25,500.00 240,000.00 70,000.00

0.0640 0.5000

m3 Kg

Rp Rp

29,700,000.00 12,000.00

Rp Rp

1,900,800.00 6,000.00

0.0350 0.2100 2.1000 0.7000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

3,150.00 17,850.00 168,000.00 49,000.00

0.0250 0.0300 0.5000 1.0000

m3 Kg kg Lembar

Rp Rp Rp Rp

12,000,000.00 16,000.00 12,000.00 55,000.00

Rp Rp Rp Rp

300,000.00 480.00 6,000.00 55,000.00

Rp Rp Rp

599,480.00 89,922.00 689,402.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Papan kayu kelas I Paku biasa cm Lem kayu Triplek pintu 4 mm (90x210) cm Peralatan:

0.0400 0.2400 2.4000 0.8000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

3,600.00 20,400.00 192,000.00 56,000.00

0.0256 0.0300 0.5000 1.0000

m3 Kg Kg Lembar

Rp Rp Rp Rp

29,700,000.00 16,000.00 12,000.00 93,500.00

Rp Rp Rp Rp

760,320.00 480.00 6,000.00 93,500.00

Rp Rp Rp

1,132,300.00 169,845.00 1,302,145.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 10

Rp Rp

Jumlah Rp 2,246,800.00 Overhead + Profit ( 15 % ) Rp 337,020.00 Nilai HSPK : Rp 2,583,820.00 Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90 cm) Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Papan kayu kelas II Paku biasa Lem kayu Triplek pintu 4 mm (90x210) cm Peralatan:

9

8,100,000.00 16,000.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Papan kayu kelas I Lem kayu Peralatan:

8

Rp Rp

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Papan kayu kelas I Lem kayu Peralatan:

7

m3 Kg

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Papan kayu kelas I Lem kayu Peralatan:

6

0.0400 0.0500

Pemasangan 1 m2 jalusi kusen, kayu kelas I Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Papan kayu kelas I

0.3350 0.2000 2.0000 0.6700

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

30,150.00 17,000.00 160,000.00 46,900.00

0.0600

m3

Rp

29,700,000.00

Rp

1,782,000.00

Paku biasa Peralatan:

11

Kg

Rp

16,000.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I bentang 6 meter Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Balok kayu kelas I Besi strip mm Paku biasa Peralatan:

12

0.1500

Besi strip mm Paku biasa Peralatan:

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

18,000.00 102,000.00 960,000.00 280,000.00

1.1000 15.0000 5.6000

m3 Kg kg

Rp Rp Rp

22,000,000.00 13,500.00 16,000.00

Rp Rp Rp

24,200,000.00 202,500.00 89,600.00

Rp Rp Rp

25,852,100.00 3,877,815.00 29,729,915.00

0.3350 2.0100 20.1000 6.7000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

30,150.00 170,850.00 1,608,000.00 469,000.00

1.2000 15.0000 5.6000

m3 Kg kg

Rp Rp Rp

22,000,000.00 13,500.00 16,000.00

Rp Rp Rp

26,400,000.00 202,500.00 89,600.00

Rp Rp Rp

28,970,100.00 4,345,515.00 33,315,615.00

0.3350 2.0100 20.1000 6.7000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

30,150.00 170,850.00 1,608,000.00 469,000.00

1.1000 15.0000 3.0000

m3 Kg kg

Rp Rp Rp

10,000,000.00 13,500.00 16,000.00

Rp Rp Rp

11,000,000.00 202,500.00 48,000.00

Rp Rp Rp

13,528,500.00 2,029,275.00 15,557,775.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Kelas II (kayu kamper) kaso Kelas II (kayu kamper) reng Paku biasa Peralatan:

15

0.0050 0.0100 0.1000 0.1000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

450.00 850.00 8,000.00 7,000.00

0.0140 0.0360 0.2500

m3 m3 kg

Rp Rp Rp

8,500,000.00 8,300,000.00 16,000.00

Rp Rp Rp

119,000.00 298,800.00 4,000.00

Rp Rp Rp

438,100.00 65,715.00 503,815.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Kelas II (kayu kamper) kaso Kelas II (kayu kamper) reng Paku biasa Peralatan:

0.0050 0.0100 0.1000 0.1000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

450.00 850.00 8,000.00 7,000.00

0.0140 0.0570 0.2500

m3 m3 kg

Rp Rp Rp

8,500,000.00 8,300,000.00 16,000.00

Rp Rp Rp

119,000.00 473,100.00 4,000.00

Rp Rp Rp

612,400.00 91,860.00 704,260.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 16

2,038,450.00 305,767.50 2,344,217.50

Pemasangan 1 m3 konstruksi gordeng, kayu kelas II Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Balok kayu kelas II (kayu kamper)

14

Rp Rp Rp

O.H O.H O.H O.H

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 13

2,400.00

0.2000 1.2000 12.0000 4.0000

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Balok kayu kelas I (kayu jati) Besi strip mm Paku biasa Peralatan:

Rp

Pemasangan 1 m2 rangka atap sirap, kayu kelas II Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Kayu kelas II (Kayu kamper) kaso Paku biasa

0.0060 0.0120 0.1200 0.1200

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

540.00 1,020.00 9,600.00 8,400.00

0.0140 0.0570

m3 kg

Rp Rp

8,500,000.00 16,000.00

Rp Rp

119,000.00 912.00

Peralatan:

17

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Kaso-kaso 5 x 7cm kayu kelas II Paku biasa Peralatan:

18

19

20

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

6,750.00 2,550.00 24,000.00 10,500.00

0.0154 0.2000

m3 kg

Rp Rp

8,500,000.00 16,000.00

Rp Rp

130,900.00 3,200.00

Rp Rp Rp

177,900.00 26,685.00 204,585.00

0.0100 0.0300 0.3000 0.2000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

900.00 2,550.00 24,000.00 14,000.00

0.0163 0.2500

m3 kg

Rp Rp

8,500,000.00 16,000.00

Rp Rp

138,550.00 4,000.00

Rp Rp Rp

184,000.00 27,600.00 211,600.00

0.0050 0.0200 0.2000 0.1000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

450.00 1,700.00 16,000.00 7,000.00

0.0108 0.1000

m3 kg

Rp Rp

29,700,000.00 16,000.00

Rp Rp

320,760.00 1,600.00

Rp Rp Rp

347,510.00 52,126.50 399,636.50

0.0050 0.0200 0.2000 0.1000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

450.00 1,700.00 16,000.00 7,000.00

0.0110 0.0500

m3 kg

Rp Rp

29,700,000.00 16,000.00

Rp Rp

326,700.00 800.00

Rp Rp Rp

352,650.00 52,897.50 405,547.50

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

720.00 3,825.00 36,000.00 10,500.00

16,000.00

Rp

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Balok kayu kelas II Paku biasa Peralatan:

22

Rp Rp Rp Rp

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Papan kayu kelas I Paku biasa Peralatan:

21

O.H O.H O.H O.H

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Papan kayu kelas I Paku biasa Peralatan:

139,472.00 20,920.80 160,392.80

0.0750 0.0300 0.3000 0.1500

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Kaso-kaso 5 x 7cm kayu kelas II Paku biasa Peralatan:

Rp Rp Rp

0.0080 0.0450 0.4500 0.1500

O.H O.H O.H O.H

0.0280 0.1500

m3 kg

Rp Rp Rp Rp #REF! Rp

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 dinding pemisah triplek rangkap, rangka kayu kelas II Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Kelas II (kayu kamper) balok Paku Biasa Triplek tebal 4 mm ukuran (120 x 240) cm Lem kayu

#REF! 2,400.00 #REF! #REF! #REF!

0.0100 0.0600 0.6000 0.2000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

900.00 5,100.00 48,000.00 14,000.00

0.0280 0.1500 0.8600 0.5600

m3 kg Lembar kg

Rp Rp Rp Rp

10,000,000.00 16,000.00 93,500.00 12,000.00

Rp Rp Rp Rp

280,000.00 2,400.00 80,410.00 6,720.00

Rp Rp Rp

437,530.00 65,629.50 503,159.50

Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

23

Pemasangan 1 m2 dinding lambrisering dari triplek ukuran (120 x 240) cm Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Triplek 4 mm ukuran (120 x 240) cm Paku biasa Peralatan:

0.0010 0.0080 0.0750 0.0250

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

90.00 680.00 6,000.00 1,750.00

0.4000 0.0500

Lembar kg

Rp Rp

93,500.00 16,000.00

Rp Rp

37,400.00 800.00

Rp Rp Rp

46,720.00 7,008.00 53,728.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : L. 1

PEKERJAAN KUNCI DAN KACA Pemasangan 1 buah kunci tanam antik Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Kunci tanam antik ex west, cavell, beleza setara

0.0030 0.0600 0.6000 0.0600

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

270.00 5,100.00 48,000.00 4,200.00

1.0000

buah

Rp

210,000.00

Rp

210,000.00

Rp Rp Rp

267,570.00 40,135.50 307,705.50

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 2

Pemasangan 1 buah kunci tanam biasa Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Kunci tanam biasa ex west, cavell, beleza setara

0.005000 0.050000 0.500000 0.010000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

450.00 4,250.00 40,000.00 700.00

1.000000

buah

Rp

93,000.00

Rp

93,000.00

Rp Rp Rp

138,400.00 20,760.00 159,160.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 3

Pemasangan 1 buah kunci kamar mandi Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Kunci tanam KM

0.0030 0.0500 0.5000 0.0050

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

270.00 4,250.00 40,000.00 350.00

1.0000

buah

Rp

75,000.00

Rp

75,000.00

Rp Rp Rp

119,870.00 17,980.50 137,850.50

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 4

Pemasanga 1 buah kunci silinder Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Kunci silinder

0.0030 0.0500 0.5000 0.0050

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

270.00 4,250.00 40,000.00 350.00

1.0000

buah

Rp

30,000.00

Rp

30,000.00

Rp Rp Rp

74,870.00 11,230.50 86,100.50

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 5

Pemasangan 1 buah engsel pintu Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Engsel pintu ex west, cavell, beleza setara

0.0080 0.0150 0.1500 0.0150

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

720.00 1,275.00 12,000.00 1,050.00

1.0000

buah

Rp

47,000.00

Rp

47,000.00

Rp Rp Rp

62,045.00 9,306.75 71,351.75

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 6

Pemasangan 1 buah engsel jendela kupu kupu Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Engsel kupu kupu

0.0005 0.0100 0.1000 0.0100

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

45.00 850.00 8,000.00 700.00

1.0000

buah

Rp

22,500.00

Rp

22,500.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 7

0.0005 0.0200 0.2000 0.1000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

45.00 1,700.00 16,000.00 7,000.00

1.0000

buah

Rp

15,000.00

Rp

15,000.00

Rp Rp Rp

39,745.00 5,961.75 45,706.75

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 buah spring knip Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: spring knip

0.0080 0.0150 0.1500 0.0150

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

720.00 1,275.00 12,000.00 1,050.00

1.0000

buah

Rp

15,000.00

Rp

15,000.00

Rp Rp Rp

30,045.00 4,506.75 34,551.75

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 9

Pemasangan 1 buah kait angin Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Kait angin

0.0080 0.0150 0.1500 0.0150

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

720.00 1,275.00 12,000.00 1,050.00

1.0000

buah

Rp

39,500.00

Rp

39,500.00

Rp Rp Rp

54,545.00 8,181.75 62,726.75

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 10

Pemasangan 1 buah door closer Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: door closer

0.0030 0.0500 0.5000 0.0500

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

270.00 4,250.00 40,000.00 3,500.00

1.0000

set

Rp

30,000.00

Rp

30,000.00

Rp Rp Rp

78,020.00 11,703.00 89,723.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 11

Pemasangan 1 buah kunci slot Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Kunci slot

0.0010 0.0200 0.2000 0.0200

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

90.00 1,700.00 16,000.00 1,400.00

1.0000

buah

Rp

130,000.00

Rp

130,000.00

Rp Rp Rp

149,190.00 22,378.50 171,568.50

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 12

Pemasangan 1 buah door holder Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: door holder

0.0030 0.0500 0.5000 0.0500

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

270.00 4,250.00 40,000.00 3,500.00

1.0000

buah

Rp

165,000.00

Rp

165,000.00

Rp Rp Rp

213,020.00 31,953.00 244,973.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 13

32,095.00 4,814.25 36,909.25

Pemasangan 1 buah engsel angin Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Engsel angin

8

Rp Rp Rp

Pemasangan 1 buah door stop Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: door stop

0.0050 0.0100 0.1000 0.0100

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

450.00 850.00 8,000.00 700.00

1.0000

buah

Rp

65,000.00

Rp

65,000.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 14

0.0013 0.0250 0.2500 0.0250

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

117.00 2,125.00 20,000.00 1,750.00

1.0000

set

Rp

14,000.00

Rp

14,000.00

Rp Rp Rp

37,992.00 5,698.80 43,690.80

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

72.00 1,275.00 12,000.00 1,050.00

m2 Rp 80,000.00 Kg Rp 35,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp

88,000.00 1,750.00 104,147.00 15,622.05 119,769.05

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

72.00 1,275.00 12,000.00 1,050.00

m2 Rp 115,000.00 Kg Rp 35,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp

126,500.00 1,750.00 142,647.00 21,397.05 164,044.05

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

81.00 1,445.00 13,600.00 1,190.00

m2 Rp 180,000.00 Kg Rp 35,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp

198,000.00 2,450.00 216,766.00 32,514.90 249,280.90

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

117.00 2,125.00 20,000.00 1,750.00

m2 Rp 88,000.00 Kg Rp 35,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp

96,800.00 2,450.00 123,242.00 18,486.30 141,728.30

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 kaca tebal 3 mm Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Kaca tebal 3 mm sealant

16

0.0008 0.0150 0.1500 0.0150 1.1000 0.0500

O.H O.H O.H O.H

Rp Rp Rp Rp

0.0009 0.0170 0.1700 0.0170 1.1000 0.0700

O.H O.H O.H O.H

Rp Rp Rp Rp

0.0013 0.0250 0.2500 0.0250 1.1000 0.0700

O.H O.H O.H O.H

Rp Rp Rp Rp

PEKERJAAN PENGECATAN Pengecatan 1 m2 bidang kayu baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) dasar, 2 lapis cat penutup) Tenaga: Mandor Kepala Tukang Tukang Cat Pekerja Bahan: Cat meni kayu Plamur kayu Cat dasar Cat penutup Kuas Thinner B / minyak cat Kertas gosok/ Ampelas Peralatan:

2

Rp Rp Rp Rp

Pemasangan 1 m2 kaca buram tebal 12 mm Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: kaca buram tebal 12 mm Sealant

M. 1

1.1000 0.0500

O.H O.H O.H O.H

Pemasangan kaca tebal 1 m2 kaca tebal 8 mm Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Kaca tebal 8 mm Sealant

18

0.0008 0.0150 0.1500 0.0150

Pemasangan kaca tebal 1 m2 kaca tebal 5 mm Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Kaca tebal 5 mm Sealant

17

75,000.00 11,250.00 86,250.00

Pemasangan 1 buah kunci lemari Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: kunci lemari

15

Rp Rp Rp

0.0030 0.0060 0.0090 0.0700

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

270.00 510.00 720.00 4,900.00

0.2000 0.1500 0.1700 0.2600 0.0100 0.0300 0.2000

Kg Kg Kg Kg buah Ltr Lbr

Rp Rp Rp Rp Rp Rp Rp

27,500.00 25,000.00 66,000.00 66,000.00 10,000.00 15,000.00 3,500.00

Rp Rp Rp Rp Rp Rp Rp

5,500.00 3,750.00 11,220.00 17,160.00 100.00 450.00 700.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pengecatan 1 m2 bidang kayu baru (1 lapis plamir, 1 lapis cat dasar, 3 lapis cat penutup)

Rp Rp Rp

45,280.00 6,792.00 52,072.00

Tenaga:

Mandor Kepala Tukang Tukang Cat Pekerja Bahan: Cat meni kayu Plamur kayu Cat dasar Cat penutup Kuas Thinner B / minyak cat Kertas gosok/ Ampelas Peralatan:

0.0030 0.0040 0.1050 0.0700

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

270.00 340.00 8,400.00 4,900.00

0.2000 0.1500 0.1700 0.3500 0.0100 0.0300 0.2000

Kg Kg Kg Kg buah Ltr Lbr

Rp Rp Rp Rp Rp Rp Rp

27,500.00 25,000.00 66,000.00 66,000.00 10,000.00 15,000.00 3,500.00

Rp Rp Rp Rp Rp Rp Rp

5,500.00 3,750.00 11,220.00 23,100.00 100.00 450.00 700.00

Rp Rp Rp

58,730.00 8,809.50 67,539.50

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 3

Pelaburan 1 m2 bidang kayu dengan politur Tenaga: Mandor Kepala Tukang Tukang Cat Pekerja Bahan: Politur Politur jadi Kertas gosok/ Ampelas Peralatan:

0.0030 0.0160 0.0600 0.0400

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

270.00 1,360.00 4,800.00 2,800.00

0.1500 0.3720 2.0000

Ltr Ltr Lbr

Rp Rp Rp

71,000.00 72,500.00 3,500.00

Rp Rp Rp

10,650.00 26,970.00 7,000.00

Rp Rp Rp

53,850.00 8,077.50 61,927.50

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 4

Pelaburan 1 m2 bidang kayu dengan cat residu dan ter Tenaga: Mandor Pekerja Bahan: Residu atau ter Peralatan:

0.0060 0.1000

O.H O.H

Rp Rp

90,000.00 70,000.00

Rp Rp

540.00 7,000.00

0.3500

Ltr

Rp

1,000.00

Rp

350.00

Rp Rp Rp

7,890.00 1,183.50 9,073.50

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 5

Pelaburan 1 m2 bidang kayu dengan vernis Tenaga: Mandor Kepala Tukang Tukang Cat Pekerja Bahan: Vernis Dempul Kertas gosok/ Ampelas Peralatan:

6

0.0030 0.0160 0.1600 0.1600

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

270.00 1,360.00 12,800.00 11,200.00

0.1500 0.0500 0.1000

Ltr Kg Lbr

Rp Rp Rp

52,500.00 37,000.00 3,500.00

Rp Rp Rp

7,875.00 1,850.00 350.00

Jumlah Rp Overhead + Profit ( 15 % ) Rp Nilai HSPK : Rp Pengecatan 1 m2 tembok interior baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)

35,705.00 5,355.75 41,060.75

Tenaga: Mandor Kepala Tukang Tukang Cat Pekerja Bahan: Plamur tembok Cat Dasar interior Cat Penutup interior ex Mowilex, Dulux, Jotun - seta Peralatan:

7

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

270.00 535.50 5,040.00 1,400.00

0.1000 0.1000 0.2600

Kg Kg Kg

Rp Rp Rp

14,500.00 120,000.00 120,000.00

Rp Rp Rp

1,450.00 12,000.00 31,200.00

Rp Rp Rp

51,895.50 7,784.33 59,679.83

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pengecatan 1 m2 tembok interior lama (1 lapis cat dasar, 2 lapis cat penutup) Tenaga: Mandor Kepala Tukang Tukang Cat Pekerja Bahan: Cat Dasar interior Cat Penutup interior ex Mowilex, Dulux, Jotun - seta Peralatan:

8

0.0030 0.0063 0.0630 0.0200

0.0030 0.0042 0.0420 0.0280

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

270.00 357.00 3,360.00 1,960.00

0.1200 0.1800

Kg Kg

Rp Rp

120,000.00 120,000.00

Rp Rp

14,400.00 21,600.00

Jumlah Rp Overhead + Profit ( 15 % ) Rp Nilai HSPK : Rp Pengecatan 1 m2 tembok exterior baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)

41,947.00 6,292.05 48,239.05

Tenaga: Mandor Kepala Tukang Tukang Cat Pekerja Bahan: Plamur tembok Cat Dasar exterior Cat Penutup exterior ex Mowilex, Dulux, Jotun - seta

0.0030 0.0063 0.0630 0.0200

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

270.00 535.50 5,040.00 1,400.00

0.1000 0.1000 0.2600

Kg Ltr Kg

Rp Rp Rp

14,500.00 150,000.00 150,000.00

Rp Rp Rp

1,450.00 15,000.00 39,000.00

Peralatan:

9

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pengecatan 1 m2 tembok exterior lama (1 lapis cat dasar, 2 lapis cat penutup) Tenaga: Mandor Kepala Tukang Tukang Cat Pekerja Bahan: Cat Dasar exterior Cat Penutup exterior ex Mowilex, Dulux, Jotun - seta

Rp Rp Rp

62,695.50 9,404.33 72,099.83

0.0030 0.0042 0.0420 0.0280

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

270.00 357.00 3,360.00 1,960.00

0.1200 0.1800

Ltr Kg

Rp Rp

150,000.00 150,000.00

Rp Rp

18,000.00 27,000.00

Rp Rp Rp

50,947.00 7,642.05 58,589.05

Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 10

Pengecatan 1 m2 permukaan baja dengan meni besi Tenaga: Mandor Kepala Tukang Tukang Cat Pekerja Bahan: Cat meni besi Kuas Peralatan:

11

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

225.00 1,700.00 16,000.00 1,400.00

0.1000 0.0100

Kg Buah

Rp Rp

30,000.00 10,000.00

Rp Rp

3,000.00 100.00

Rp Rp Rp

22,425.00 3,363.75 25,788.75

0.0075 0.0225 0.2250 0.2500

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

675.00 1,912.50 18,000.00 17,500.00

0.1000 0.0100 0.0100 0.0020

Kg Ltr Buah m3

Rp Rp Rp Rp

30,000.00 15,000.00 10,000.00 3,000,000.00

Rp Rp Rp Rp

3,000.00 150.00 100.00 6,000.00

Rp Rp Rp

47,337.50 7,100.63 54,438.13

0.0030 0.0120 0.0600 0.0600

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

270.00 1,020.00 4,800.00 4,200.00

0.3000 0.0100 0.0100

Kg Buah Ltr

Rp Rp Rp

66,000.00 10,000.00 15,000.00

Rp Rp Rp

19,800.00 100.00 150.00

Rp Rp Rp

30,340.00 4,551.00 34,891.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 3 lapis Tenaga: Mandor Kepala Tukang Tukang Cat Pekerja Bahan: Cat besi/kayu Emco Kuas Thinner B / minyak cat Peralatan:

14

Rp Rp Rp Rp

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir Tenaga: Mandor Kepala Tukang Tukang Cat Pekerja Bahan: Cat besi/kayu Emco Kuas Thinner B / minyak cat Peralatan:

13

O.H O.H O.H O.H

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pengecatan 1 m2 permukaan baja dengan meni besi dengan perancah Tenaga: Mandor Kepala Tukang Tukang Cat Pekerja Bahan: Cat meni besi Thinner B / minyak cat Kuas Perancah Kayu Peralatan:

12

0.0025 0.0200 0.2000 0.0200

0.0200 0.0800 0.8000 0.4000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

1,800.00 6,800.00 64,000.00 28,000.00

0.3600 0.0100 0.0100

Kg Buah Ltr

Rp Rp Rp

66,000.00 10,000.00 15,000.00

Rp Rp Rp

23,760.00 100.00 150.00

Rp Rp Rp

124,610.00 18,691.50 143,301.50

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir Tenaga: Mandor Kepala Tukang Tukang Cat Pekerja Bahan: Cat besi/kayu Emco Thinner B / minyak cat Peralatan:

0.0200 0.0700 0.7000 0.4000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

1,800.00 5,950.00 56,000.00 28,000.00

0.3000 0.0100

Kg Ltr

Rp Rp

66,000.00 15,000.00

Rp Rp

19,800.00 150.00

Rp Rp Rp

111,700.00 16,755.00 128,455.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : N. 1

PEKERJAAN SANITASI DALAM GEDUNG Pemasangan 1 buah closet duduk / monoblock Tenaga:

Mandor Kepala Tukang Tukang batu Pekerja Bahan: Closet duduk Putih Porselin Komplit Perlengkapan Peralatan:

0.1600 0.0100 1.1000 3.3000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

14,400.00 850.00 88,000.00 231,000.00

1.0000 0.0600

Unit Unit

Rp Rp

1,490,000.00 1,490,000.00

Rp Rp

1,490,000.00 89,400.00

Rp Rp Rp

1,913,650.00 287,047.50 2,200,697.50

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 2

Pemasangan 1 buah closet jongkok porselen Tenaga: Mandor Kepala Tukang Tukang batu Pekerja Bahan: Closet jongkok Porselin Warna Putih Semen Portland Pasir pasang Peralatan:

0.1600 0.1500 1.5000 1.0000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

14,400.00 12,750.00 120,000.00 70,000.00

1.0000 6.0000 0.0100

Unit Kg M3

Rp Rp Rp

145,000.00 1,250.00 225,000.00

Rp Rp Rp

145,000.00 7,500.00 2,250.00

Rp Rp Rp

371,900.00 55,785.00 427,685.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 3

Pemasangan 1 buah wastafel Tenaga: Mandor Kepala Tukang Tukang batu Pekerja Bahan: Wastafel Semen Portland Pasir pasang Perlengkapan Peralatan:

0.0600 0.1500 1.4500 1.2000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

5,400.00 12,750.00 116,000.00 84,000.00

1.2000 6.0000 0.0100 0.1200

Unit Kg M3 Unit

Rp Rp Rp Rp

300,000.00 1,250.00 225,000.00 300,000.00

Rp Rp Rp Rp

360,000.00 7,500.00 2,250.00 36,000.00

Rp Rp Rp

623,900.00 93,585.00 717,485.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 4

Pemasangan 1 buah Bak air fibreglass uk.55 x 55 x 60 cm Tenaga: Mandor Kepala Tukang Tukang batu Pekerja Bahan: Bak air fibreglass uk.55 x 55 x 60 cm Perlengkapan Peralatan:

0.0150 0.0450 0.4500 0.3000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

1,350.00 3,825.00 36,000.00 21,000.00

1.0000 0.1200

Bh Unit

Rp Rp

250,000.00 250,000.00

Rp Rp

250,000.00 30,000.00

Rp Rp Rp

342,175.00 51,326.25 393,501.25

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 5

Pemasangan 1 buah bak cuci piring stainlessteel Tenaga: Mandor Kepala Tukang Tukang batu Pekerja Bahan: Bak cuci stainless steel Water drain + Assesories Peralatan:

0.0150 0.0300 0.3000 0.0300

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

1,350.00 2,550.00 24,000.00 2,100.00

1.0000 1.0000

Unit buah

Rp Rp

385,000.00 15,000.00

Rp Rp

385,000.00 15,000.00

Rp Rp Rp

430,000.00 64,500.00 494,500.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 6

Pemasangan 1 buah bak cuci piring teraso Tenaga: Mandor Kepala Tukang Tukang batu Pekerja Bahan: Bak cuci teraso Water drain + Assesories Semen portland Pasir pasang Peralatan:

0.0250 0.0500 0.5000 0.0500 1.0000 1.0000 20.0000 0.0500

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

2,250.00 4,250.00 40,000.00 3,500.00

Unit buah Kg M3

Rp Rp Rp Rp

850,000.00 15,000.00 1,250.00 225,000.00

Rp Rp Rp Rp

850,000.00 15,000.00 25,000.00 11,250.00

Rp Rp Rp

951,250.00 142,687.50 1,093,937.50

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 7

Pemasangan 1 buah floor drain Tenaga: Mandor Kepala Tukang Tukang batu Pekerja Bahan: Floor drain Stainless Peralatan:

0.0050 0.0100 0.1000 0.0100

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

450.00 850.00 8,000.00 700.00

1.0000

Unit

Rp

60,000.00

Rp

60,000.00

8

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm Tenaga: Mandor Kepala Tukang Tukang batu Pekerja Bahan: Bata merah Semen portland Pasir pasang Pasir beton Batu pecah 2/3 Besi beton polos Peralatan:

9

40.0000 44.0000 0.0700 0.0600 0.0700 1.6000

0.0160 0.0110 1.1500 3.2000 70.0000 77.0000 0.1300 0.0900 0.0200 2.6000

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

990.00 6,120.00 57,600.00 151,200.00

buah Kg M3 M3 M3 Kg

Rp Rp Rp Rp Rp Rp

1,000.00 1,250.00 225,000.00 325,000.00 280,000.00 10,500.00

Rp Rp Rp Rp Rp Rp

40,000.00 55,000.00 15,750.00 19,500.00 19,600.00 16,800.00

Rp Rp Rp

382,560.00 57,384.00 439,944.00

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

1,440.00 935.00 92,000.00 224,000.00

buah Kg M3 M3 M3 Kg

Rp Rp Rp Rp Rp Rp

1,000.00 1,250.00 225,000.00 325,000.00 280,000.00 10,500.00

Rp Rp Rp Rp Rp Rp

70,000.00 96,250.00 29,250.00 29,250.00 5,600.00 27,300.00

Rp Rp Rp

576,025.00 86,403.75 662,428.75

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 buah bak kontrol pasangan bata 60 cm x 60 cm tinggi 65 cm Tenaga: Mandor Kepala Tukang Tukang batu Pekerja Bahan: Bata merah Semen portland Pasir pasang Pasir beton Batu pecah 2/3 Besi beton polos Peralatan:

0.0160 0.0110 1.1500 3.2000 123.0000 114.0000 0.1840 0.1200 0.0330 4.8500

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

1,440.00 935.00 92,000.00 224,000.00

buah Kg M3 M3 M3 Kg

Rp Rp Rp Rp Rp Rp

1,000.00 1,250.00 225,000.00 325,000.00 280,000.00 10,500.00

Rp Rp Rp Rp Rp Rp

123,000.00 142,500.00 41,400.00 39,000.00 9,240.00 50,925.00

Rp Rp Rp

724,440.00 108,666.00 833,106.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 11

Pemasangan 1 m’ pipa galvanis diameter ½” Tenaga: Mandor Kepala Tukang Tukang batu Pekerja Bahan: Pipa galvanis medium ½” Perlengkapan Peralatan:

0.0270 0.0090 0.0900 0.0540

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

2,430.00 765.00 7,200.00 3,780.00

1.2000 0.3500

M Unit

Rp Rp

130,000.00 130,000.00

Rp Rp

156,000.00 45,500.00

Rp Rp Rp

215,675.00 32,351.25 248,026.25

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 12

Pemasangan 1 buah kran diameter ½” atau ¾ ” Tenaga: Mandor Kepala Tukang Tukang batu Pekerja Bahan: Kran air Seal tape Peralatan:

0.0050 0.0400 0.4000 0.0100

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

450.00 3,400.00 32,000.00 700.00

1.0000 0.0250

Bh Buah

Rp Rp

15,500.00 4,000.00

Rp Rp

15,500.00 100.00

Rp Rp Rp

52,150.00 7,822.50 59,972.50

Rp Rp

2,430.00 765.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 13

70,000.00 10,500.00 80,500.00

O.H O.H O.H O.H

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 buah bak kontrol pasangan bata 45cm x 45cm tinggi 50 cm Tenaga: Mandor Kepala Tukang Tukang batu Pekerja Bahan: Bata merah Semen portland Pasir pasang Pasir beton Batu pecah 2/3 Besi beton polos Peralatan:

10

0.0110 0.0720 0.7200 2.1600

Rp Rp Rp

Pemasangan 1 m’ pipa galvanis diameter ¾ ” Tenaga: Mandor Kepala Tukang

0.0270 0.0090

O.H O.H

Rp Rp

90,000.00 85,000.00

Tukang batu Pekerja Bahan: Pipa galvanis medium 3/4” Perlengkapan Peralatan:

0.0900 0.0540

O.H O.H

Rp Rp

80,000.00 70,000.00

Rp Rp

7,200.00 3,780.00

1.2000 0.3500

M Unit

Rp Rp

175,000.00 175,000.00

Rp Rp

210,000.00 61,250.00

Rp Rp Rp

285,425.00 42,813.75 328,238.75

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 14

Pemasangan 1 m’ pipa galvanis diameter 1” Tenaga: Mandor Kepala Tukang Tukang batu Pekerja Bahan: Pipa galvanis medium 1” Perlengkapan Peralatan:

0.0270 0.0090 0.0900 0.0540

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

2,430.00 765.00 7,200.00 3,780.00

1.2000 0.3500

M Unit

Rp Rp

260,000.00 260,000.00

Rp Rp

312,000.00 91,000.00

Rp Rp Rp

417,175.00 62,576.25 479,751.25

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 15

Pemasangan 1 m’ pipa galvanis diameter 1 ½” Tenaga: Mandor Kepala Tukang Tukang batu Pekerja Bahan: Pipa galvanis medium 1½” Perlengkapan Peralatan:

0.0050 0.0180 0.1800 0.1080

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

450.00 1,530.00 14,400.00 7,560.00

1.2000 0.3500

M Unit

Rp Rp

270,000.00 270,000.00

Rp Rp

324,000.00 94,500.00

Rp Rp Rp

442,440.00 66,366.00 508,806.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 16

Pemasangan 1 m’ pipa galvanis diameter 3” Tenaga: Mandor Kepala Tukang Tukang batu Pekerja Bahan: Pipa galvanis medium 3” Perlengkapan Peralatan:

0.0070 0.0230 0.2250 0.1350

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

630.00 1,955.00 18,000.00 9,450.00

1.2000 0.3500

M Unit

Rp Rp

700,000.00 700,000.00

Rp Rp

840,000.00 245,000.00

Rp Rp Rp

1,115,035.00 167,255.25 1,282,290.25

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 17

Pemasangan 1 m’ pipa galvanis diameter 4” Tenaga: Mandor Kepala Tukang Tukang batu Pekerja Bahan: Pipa galvanis medium 4” Perlengkapan Peralatan:

0.0070 0.0230 0.2250 0.1350

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

630.00 1,955.00 18,000.00 9,450.00

1.2000 0.3500

M Unit

Rp Rp

950,000.00 950,000.00

Rp Rp

1,140,000.00 332,500.00

Rp Rp Rp

1,502,535.00 225,380.25 1,727,915.25

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 18

Pemasangan 1 m’ pipa PVC tipe AW diameter ½ ” Tenaga: Mandor Kepala Tukang Tukang batu Pekerja Bahan: Pipa PVC 1/2" type AW panjang 6.00 mt Perlengkapan Peralatan:

0.0020 0.0060 0.0600 0.0360

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

180.00 510.00 4,800.00 2,520.00

1.2000 0.3500

M Unit

Rp Rp

41,000.00 41,000.00

Rp Rp

49,200.00 14,350.00

Rp Rp Rp

71,560.00 10,734.00 82,294.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 19

Pemasangan 1 m’ pipa PVC tipe AW diameter ¾ ” Tenaga: Mandor Kepala Tukang Tukang batu Pekerja Bahan: Pipa PVC 3/4" type AW panjang 6.00 mt Perlengkapan Peralatan:

0.0020 0.0060 0.0600 0.0360

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

180.00 510.00 4,800.00 2,520.00

1.2000 0.3500

M Unit

Rp Rp

50,000.00 50,000.00

Rp Rp

60,000.00 17,500.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 20

0.0020 0.0060 0.0600 0.0360

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

180.00 510.00 4,800.00 2,520.00

1.2000 0.3500

M Unit

Rp Rp

62,500.00 62,500.00

Rp Rp

75,000.00 21,875.00

Rp Rp Rp

104,885.00 15,732.75 120,617.75

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m’ pipa PVC tipe AW diameter 2” Tenaga: Mandor Kepala Tukang Tukang batu Pekerja Bahan: Pipa PVC 2" type AW panjang 6.00 mt Perlengkapan Peralatan:

0.0030 0.0090 0.0900 0.0540

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

270.00 765.00 7,200.00 3,780.00

1.2000 0.3500

M Unit

Rp Rp

170,000.00 170,000.00

Rp Rp

204,000.00 59,500.00

Rp Rp Rp

275,515.00 41,327.25 316,842.25

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 22

Pemasangan 1 m’ pipa PVC tipe AW diameter 3” Tenaga: Mandor Kepala Tukang Tukang batu Pekerja Bahan: Pipa PVC 3" type AW panjang 6.00 mt Perlengkapan Peralatan:

0.0040 0.0135 0.1350 0.0810

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

360.00 1,147.50 10,800.00 5,670.00

1.2000 0.3500

M Unit

Rp Rp

312,000.00 312,000.00

Rp Rp

374,400.00 109,200.00

Rp Rp Rp

501,577.50 75,236.63 576,814.13

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 23

Pemasangan 1 m’ pipa PVC tipe AW diameter 4” Tenaga: Mandor Kepala Tukang Tukang batu Pekerja Bahan: Pipa PVC 4" type AW panjang 6.00 mt Perlengkapan Peralatan:

O. 1

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

1,147.50 10,800.00 5,670.00

360.00

1.2000 0.3500

M Unit

Rp Rp

456,000.00 456,000.00

Rp Rp

547,200.00 159,600.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp

724,777.50 108,716.63 833,494.13

O.H Rp O.H Rp O.H Rp O.H Rp Jumlah Overhead + Profit ( Nilai HSPK :

Rp Rp Rp Rp Rp Rp Rp

900.00 3,500.00 4,400.00 660.00 5,060.00

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

117.00 4,250.00 40,000.00 17,500.00

m2 Rp 60,000.00 m3 Rp 325,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp

60,600.00 16,250.00 138,717.00 20,807.55 159,524.55

Rp Rp Rp Rp

90.00 850.00 8,000.00 14,000.00

0.0100 0.0500

90,000.00 85,000.00 80,000.00 70,000.00 15 % )

Pemasangan 1 m2 paving block natural tebal 6 cm K.175 Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja Bahan: Paving block 6 cm K.175 Pasir beton

3

0.0040 0.0135 0.1350 0.0810

PEKERJAAN PERKERASAN PAVING Pembongkaran 1 m2 paving block Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja

2

85,510.00 12,826.50 98,336.50

Pemasangan 1 m’ pipa PVC tipe AW diameter 1” Tenaga: Mandor Kepala Tukang Tukang batu Pekerja Bahan: Pipa PVC 1" type AW panjang 6.00 mt Perlengkapan Peralatan:

21

Rp Rp Rp

0.0013 0.0500 0.5000 0.2500 1.0100 0.0500

O.H O.H O.H O.H

Rp Rp Rp Rp

Pemasangan 1 m' kansteen Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja Bahan:

0.0010 0.0100 0.1000 0.2000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Semen Portland Pasir Pasang Kansteen beton cetak 15 x 20 x 50 cm

P. 1

5.0000 0.0010 2.0000

kg Rp 1,250.00 m3 Rp 225,000.00 bh Rp 25,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

0.0100 0.0200

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

0.1200 1.2000 2.5000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

0.0050 0.0200 0.0700

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

0.0100 0.0500

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

2,300.00 345.00 2,645.00

Rp Rp Rp Rp

10,800.00 96,000.00 175,000.00

Rp Rp Rp

281,800.00 42,270.00 324,070.00

Rp Rp Rp Rp

450.00 1,600.00 4,900.00

Rp Rp Rp

6,950.00 1,042.50 7,992.50

Rp Rp Rp Rp

900.00 3,500.00

Rp Rp Rp

4,400.00 660.00 5,060.00

Pemasangan 1 m' gorong-gorong U 30 cm x 100 cm Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja Bahan: Buis beton U 30 cm Peralatan:

0.0070 0.0100 0.0500 0.1500

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

630.00 850.00 4,000.00 10,500.00

1.0000

Bh

Rp

60,000.00

Rp

60,000.00

Rp Rp Rp

75,980.00 11,397.00 87,377.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 6

Rp Rp Rp

Pembongkaran 1 m2 paving blok Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja Bahan: Peralatan:

5

900.00 1,400.00

Pembongkaran 1 m2 Rangka Atap, Reng dan Kaso Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja Bahan: Peralatan:

4

Rp Rp Rp Rp

Pembongkaran 1 m3 Kuda-kuda, Gording Balok Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja Bahan: Peralatan:

3

6,250.00 225.00 50,000.00 79,415.00 11,912.25 91,327.25

ANALISA MEMBUAT Pembongkaran 1 m2 Genteng lama Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja Bahan: Peralatan:

2

Rp Rp Rp Rp Rp Rp

Pemasangan 1 m' gorong-gorong O 30 cm x 100 cm Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja Bahan: Buis beton dia. 30 cm Peralatan:

0.0140 0.0200 0.1000 0.3000

O.H O.H O.H O.H

Rp Rp Rp Rp

90,000.00 85,000.00 80,000.00 70,000.00

Rp Rp Rp Rp

1,260.00 1,700.00 8,000.00 21,000.00

1.0000

Bh

Rp

55,000.00

Rp

55,000.00

Rp Rp Rp

86,960.00 13,044.00 100,004.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

HARGA SATUAN POKOK KEGIATAN PEMERINTAH KABUPATEN PONOROGO TAHUN 2018

B NOMOR A. 1

URAIAN KEGIATAN

Koef.

PEKERJAAN PERSIAPAN Pembuatan 1 m2 Pagar sementara dari kayu tinggi 2 meter Tenaga: Mandor 0.0200 Kepala Tukang Kayu 0.0200 Tukang kayu 0.2000 Pekerja/Buruh Tak Terampil 0.4000 Bahan: Dolken kayu Ø 8-10 / 400 cm 1.2500 Semen portland 5.0000 Pasir beton 0.0050 Batu Pecah 2/3 0.0090 Kayu Meranti kaso 5/7 0.0720 Paku biasa 0.0600 Residu 0.4000 Peralatan:

HARGA SATUAN

SATUAN

O.H O.H O.H O.H

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

1,900.00 1,800.00 17,000.00 30,000.00

Btg Kg m3 m3 m3 Kg Ltr

Rp Rp Rp Rp Rp Rp Rp

30,500.00 1,350.00 410,000.00 345,000.00 4,850,000.00 19,000.00 1,500.00

Rp Rp Rp Rp Rp Rp Rp

38,125.00 6,750.00 2,050.00 3,105.00 349,200.00 1,140.00 600.00

Rp Rp Rp

451,670.00 67,750.50 519,420.50

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 2

Pembuatan 1 m2 Pagar sementara seng gelombang tinggi 2 m Tenaga: Mandor Kepala Tukang Kayu Tukang kayu Pekerja/Buruh Tak Terampil Bahan: Dolken kayu Ø 8-10 / 400 cm Semen portland (50kg) Seng plat BJLS 30 (0,90 x 1,80) m Pasir beton Batu Pecah 2/3 Kayu Meranti Kaso 5/7 Paku biasa Meni besi Peralatan:

0.0200 0.0200 0.4000 0.2000

O.H O.H O.H O.H

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

1,900.00 1,800.00 34,000.00 15,000.00

1.2500 2.5000 1.2000 0.0050 0.0090 0.0720 0.0600 0.4500

Batang kg Lembar m3 m3 m3 kg kg

Rp Rp Rp Rp Rp Rp Rp Rp

30,500.00 1,350.00 127,000.00 410,000.00 345,000.00 4,850,000.00 19,000.00 42,500.00

Rp Rp Rp Rp Rp Rp Rp Rp

38,125.00 3,375.00 152,400.00 2,050.00 3,105.00 349,200.00 1,140.00 19,125.00

Rp Rp Rp

621,220.00 93,183.00 714,403.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : 3

4

5

HARGA

Pembuatan 1 m2 Pagar sementara kawat duri tinggi 1,8 m Tenaga: Mandor 0.0200 Kepala Tukang Kayu 0.0200 Tukang kayu 0.3000 Pekerja/Buruh Tak Terampil 0.2000 Bahan: Dolken kayu Ø 8-10 / 400 cm 1.0000 Semen portland (50kg) 2.0000 Kawat Duri 25.0000 Pasir beton 0.0050 Batu Pecah 2/3 0.0090 Paku biasa 0.0600 Peralatan:

O.H O.H O.H O.H

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

1,900.00 1,800.00 25,500.00 15,000.00

m3 kg m1 m3 m3 kg

Rp Rp Rp Rp Rp Rp

30,500.00 1,350.00 75,000.00 410,000.00 345,000.00 19,000.00

Rp Rp Rp Rp Rp Rp

30,500.00 2,700.00 1,875,000.00 2,050.00 3,105.00 1,140.00

Rp Rp Rp

1,958,695.00 293,804.25 2,252,499.25

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pengukuran dan pemasangan 1 m' bowplank Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Kayu papan 3/20 Kayu balok 5/7 Paku biasa Peralatan:

0.0050 0.0100 0.1000 0.1000

O.H O.H O.H O.H

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

475.00 900.00 8,500.00 7,500.00

0.0070 0.0120 0.0200

m3 m3 kg

Rp Rp Rp

6,100,000.00 4,850,000.00 19,000.00

Rp Rp Rp

42,700.00 58,200.00 380.00

Pembuatan 1 m2 Kantor sementara dengan lantai plesteran Tenaga Mandor 0.0500 Kepala Tukang 0.3000 Tukang Batu 1.0000 Tukang Kayu 2.0000 Pekerja 2.0000 Bahan Dolken kayu Ø 8 - 10 /400 cm 1.2500 Kayu balok 5/7 0.1800 Paku Biasa 0.0800 Besi strip 1.1000 Semen Portland 35.0000 Pasir pasang 0.1500 Pasir beton 0.1000 Batu pecah 2/3 0.1500 Bata merah 30.0000 Seng Plat 0,9 x 1,8 BJLS 28 0.2500

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp

118,655.00 17,798.25 136,453.25

O.H O.H O.H O.H O.H

Rp Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 85,000.00 75,000.00

Rp Rp Rp Rp Rp

4,750.00 27,000.00 85,000.00 170,000.00 150,000.00

Btg m3 Kg Kg Kg m3 m3 m3 Bh Lbr

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

30,300.00 4,850,000.00 19,000.00 13,500.00 1,350.00 280,000.00 410,000.00 345,000.00 1,300.00 90,000.00

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

37,875.00 873,000.00 1,520.00 14,850.00 47,250.00 42,000.00 41,000.00 51,750.00 39,000.00 22,500.00

Jendela nako Kaca Polos Tebal 5 mm Kunci tanam biasa ex west, cavell, beleza setara Triplek tebal 4 mm ukuran (120 x 240) cm Peralatan

6

7

8

9

10

11

12

13

0.2000 0.0800 0.1500 0.0600

Bh m2 Bh Lbr

Rp Rp Rp Rp

230,000.00 175,000.00 100,000.00 60,000.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pembuatan 1 m2 rumah jaga (konstruksi kayu) Tenaga: Mandor Kepala Tukang Kayu Tukang Kayu Pekerja Bahan: Dolken kayu Ø 8 - 10 /400 cm Kayu balok 5/7 Paku Biasa Seng gelombang 3 x 0,8 bjls 28 Peralatan:

Pembuatan 1 m2 gudang semen dan peralatan Tenaga Mandor Kepala Tukang Tukang Kayu Pekerja Bahan Dolken kayu Ø 8 - 10 /400 cm Kayu balok 5/7 Paku Biasa Semen Portland Pasir beton Batu pecah 2/3 Seng gelombang 3 x 0,8 bjls 28 Seng plat 0,9 x 1,8 BJLS Peralatan

Pembuatan 1 m2 bedeng pekerja Tenaga Mandor Kepala Tukang Tukang Kayu Pekerja Bahan Dolken kayu Ø 8 - 10 /400 cm Kayu balok 5/7 Paku Biasa Semen Portland Pasir beton Batu pecah 2/3 Seng gelombang 3 x 0,8 bjls 28 Triplek tebal 4 mm ukuran (120 x 240) cm Peralatan

Rp Rp Rp

1,686,095.00 252,914.25 1,939,009.25

O.H O.H O.H O.H

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

4,750.00 13,500.00 127,500.00 75,000.00

3.0000 0.2760 0.7000 1.5000

Btg m3 Kg Kg

Rp Rp Rp Rp

30,500.00 4,850,000.00 19,000.00 85,000.00

Rp Rp Rp Rp

91,500.00 1,338,600.00 13,300.00 127,500.00

Rp Rp Rp

1,791,650.00 268,747.50 2,060,397.50

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

0.0500 0.2000 2.0000 1.0000

O.H O.H O.H O.H

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

4,750.00 18,000.00 170,000.00 75,000.00

1.7000 0.2100 0.3000 10.5000 0.0300 0.0500 1.5000 0.2500

Btg m3 Kg Kg m3 m3 Bh Lbr

Rp Rp Rp Rp Rp Rp Rp Rp

30,500.00 4,850,000.00 19,000.00 1,350.00 410,000.00 345,000.00 85,000.00 90,000.00

Rp Rp Rp Rp Rp Rp Rp Rp

51,850.00 1,018,500.00 5,700.00 14,175.00 12,300.00 17,250.00 127,500.00 22,500.00

Rp Rp Rp

1,537,525.00 230,628.75 1,768,153.75

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

0.0500 0.2000 2.0000 1.0000

O.H O.H O.H O.H

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

4,750.00 18,000.00 170,000.00 75,000.00

1.2500 0.1860 0.3000 18.0000 0.0300 0.0500 1.5000 1.3500

Btg m3 Kg Kg m3 m3 Lbr Lbr

Rp Rp Rp Rp Rp Rp Rp Rp

30,500.00 4,850,000.00 19,000.00 1,350.00 410,000.00 345,000.00 85,000.00 60,000.00

Rp Rp Rp Rp Rp Rp Rp Rp

38,125.00 902,100.00 5,700.00 24,300.00 12,300.00 17,250.00 127,500.00 81,000.00

Rp Rp Rp

1,476,025.00 221,403.75 1,697,428.75

0.0050 0.2000 2.0000 1.0000

O.H O.H O.H O.H

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

475.00 18,000.00 170,000.00 75,000.00

1.2500 0.1860

Btg m3

Rp Rp

13,000.00 25,000.00

Rp Rp

16,250.00 4,650.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pembersihan 1 m2 Lapangan dan Perataan Tenaga: Mandor Pekerja Bahan: Peralatan:

46,000.00 14,000.00 15,000.00 3,600.00

0.0500 0.1500 1.5000 1.0000

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pembuatan 1 m2 steger/ perancah dari bambu Tenaga: Mandor Kepala Tukang Kayu Tukang Kayu Pekerja/Buruh Tak Terampil Bahan: Bambu diameter 6-8/600 cm Tali ijuk Peralatan:

Rp Rp Rp Rp

0.0500 0.1000

O.H O.H

Rp Rp

95,000.00 75,000.00

Rp Rp Rp

284,375.00 42,656.25 327,031.25

Rp Rp

4,750.00 7,500.00

Rp Rp Rp

12,250.00 1,837.50 14,087.50

Rp Rp

63,270.00 1,000,050.00

Rp Rp Rp

1,063,320.00 159,498.00 1,222,818.00

95,000.00 75,000.00

Rp Rp

31,635.00 500,025.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 pagar kawat jaring gavalnis panjang 240 cm Tenaga: Mandor 0.0420 O.H Rp 95,000.00

Rp Rp Rp

531,660.00 79,749.00 611,409.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pembongkaran 1 m3 Beton Bertulang Tenaga: Mandor Pekerja Bahan: Peralatan:

0.6660 13.3340

O.H O.H

Rp Rp

95,000.00 75,000.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pembongkaran 1 m3 dinding tembok bata Tenaga: Mandor Pekerja Bahan: Peralatan:

0.3330 6.6670

O.H O.H

Rp Rp

Rp

3,990.00

Kepala Tukang Tukang Pekerja Bahan: Kawat jaring Peralatan:

14

15

B. 1

2

3

4

5

6

7

8

9

10

0.0020 0.0040 0.0420

O.H O.H O.H

Rp Rp Rp

90,000.00 85,000.00 75,000.00

Rp Rp Rp

180.00 340.00 3,150.00

0.1430

Lbr

Rp

45,000.00

Rp

6,435.00

Rp Rp Rp

14,095.00 2,114.25 16,209.25

Pembuatan 1 bh kotak adukan ukuran 40 x 50 x 25 cm Tenaga: Kepala Tukang 0.0300 Tukang 0.3000 Bahan: Kelas III (kayu kruing) papan 0.0360 Kelas III (kayu kruing) balok 0.0140 Paku biasa 0.0800 Peralatan:

Pembuatan 1 m2 jalan sementara Tenaga: Mandor Pekerja Bahan: Batu belah 15/20 Batu belah 5/7 Pasir pasang Peralatan:

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

O.H O.H

Rp Rp

90,000.00 85,000.00

Rp Rp

2,700.00 25,500.00

m3 m3 Kg

Rp Rp Rp

8,400,000.00 7,600,000.00 14,000.00

Rp Rp Rp

302,400.00 106,400.00 1,120.00

Rp Rp Rp

438,120.00 65,718.00 503,838.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

0.0050 1.0000

O.H O.H

Rp Rp

95,000.00 75,000.00

Rp Rp

475.00 75,000.00

0.1500 0.0900 0.0100

m3 m3 m3

Rp Rp Rp

250,000.00 260,000.00 280,000.00

Rp Rp Rp

37,500.00 23,400.00 2,800.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp

139,175.00 20,876.25 160,051.25

PEKERJAAN TANAH Penggalian 1 m3 tanah biasa sedalam 1 meter Tenaga: Mandor Pekerja

0.0250 0.7500

Penggalian 1 m3 tanah biasa sedalam 2 meter Tenaga: Mandor Pekerja

O.H Rp 95,000.00 O.H Rp 75,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp

2,375.00 56,250.00 58,625.00 8,793.75 67,418.75

0.0450 0.9000

Penggalian 1 m3 tanah biasa sedalam 3 meter Tenaga: Mandor Pekerja

O.H Rp 95,000.00 O.H Rp 75,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp

4,275.00 67,500.00 71,775.00 10,766.25 82,541.25

0.0670 1.0500

Menggali 1 m3 tanah keras sedalam 1 meter Tenaga: Mandor Pekerja

O.H Rp 95,000.00 O.H Rp 75,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp

6,365.00 78,750.00 85,115.00 12,767.25 97,882.25

0.0320 1.0000

Menggali 1 m3 tanah cadas sedalam 1 meter Tenaga: Mandor Pekerja

O.H Rp 95,000.00 O.H Rp 75,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp

3,040.00 75,000.00 78,040.00 11,706.00 89,746.00

0.0600 1.5000

O.H Rp 95,000.00 O.H Rp 75,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp

5,700.00 112,500.00 118,200.00 17,730.00 135,930.00

Menggali 1 m3 tanah lumpur sedalam 1 meter Tenaga: Mandor Pekerja

0.0450 1.2000

O.H Rp 95,000.00 O.H Rp 75,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp

4,275.00 90,000.00 94,275.00 14,141.25 108,416.25

O.H Rp 95,000.00 O.H Rp 75,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp

475.00 3,750.00 4,225.00 633.75 4,858.75

O.H Rp 95,000.00 O.H Rp 75,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp

950.00 24,750.00 25,700.00 3,855.00 29,555.00

Rp Rp Rp Rp Rp

4,750.00 37,500.00 42,250.00 6,337.50 48,587.50

Rp Rp Rp Rp

4,750.00 37,500.00 42,250.00 6,337.50

Pengerjaan stripping 1 m2 tanah tebing setinggi 1 meter Tenaga: Mandor 0.0050 Pekerja 0.0500

Pengangkutan 1 m3 tanah sejauh 30 meter Tenaga: Mandor Pekerja

0.0100 0.3300

Pengurugan kembali 1 m3 galian tanah Pengurugan kembali 1 m3 galian dihitung dari 1/3 kali dari koefisien pekerjaan galian Tenaga: Mandor 0.0500 O.H Rp 95,000.00 Pekerja 0.5000 O.H Rp 75,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemadatan tanah 1 m3 tanah (per 20 cm) Tenaga: Mandor 0.0500 O.H Rp 95,000.00 Pekerja 0.5000 O.H Rp 75,000.00 Jumlah Overhead + Profit ( 15 % )

11

12

C. 1

2

3

4

5

6

7

Nilai HSPK :

Pengurugan 1 m3 dengan pasir urug Tenaga: Mandor Pekerja Bahan: Pasir Urug

0.0100 0.3000

Pengurugan 1 m3 Sirtu padat Tenaga: Mandor Pekerja Bahan: Sirtu

0.0250 0.2500

1.2000

1.2000

O.H O.H

Rp Rp

95,000.00 75,000.00

m3 Rp 220,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

O.H O.H

Rp Rp

95,000.00 75,000.00

48,587.50

Rp Rp

950.00 22,500.00

Rp Rp Rp Rp

Rp Rp

264,000.00 287,450.00 43,117.50 330,567.50

2,375.00 18,750.00

Rp Rp Rp Rp

174,000.00 195,125.00 29,268.75 224,393.75

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

7,125.00 6,750.00 63,750.00 112,500.00

Kg Rp 1,350.00 m3 Rp 280,000.00 m3 Rp 250,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp Rp

272,700.00 135,800.00 300,000.00 898,625.00 134,793.75 1,033,418.75

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

7,125.00 6,750.00 63,750.00 112,500.00

Kg Rp 1,350.00 m3 Rp 280,000.00 m3 Rp 250,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp Rp

220,050.00 145,600.00 300,000.00 855,775.00 128,366.25 984,141.25

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

7,125.00 6,750.00 63,750.00 112,500.00

Kg Rp 1,350.00 m3 Rp 280,000.00 m3 Rp 250,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp Rp

183,600.00 152,320.00 300,000.00 826,045.00 123,906.75 949,951.75

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

7,125.00 6,750.00 63,750.00 112,500.00

Kg Rp 1,350.00 m3 Rp 280,000.00 m3 Rp 250,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp Rp

157,950.00 157,080.00 300,000.00 805,155.00 120,773.25 925,928.25

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

7,125.00 6,750.00 63,750.00 112,500.00

Kg Rp 1,350.00 m3 Rp 280,000.00 m3 Rp 250,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m3 pondasi batu belah campuran 1PC : 1KP : 2PP Tenaga: Mandor 0.0750 O.H Rp 95,000.00 Kepala Tukang 0.0750 O.H Rp 90,000.00 Tukang Batu 0.7500 O.H Rp 85,000.00 Pekerja 1.5000 O.H Rp 75,000.00 Bahan: Semen portland 0.1700 Kg Rp 1,350.00 Kapur pasang 0.1700 m3 Rp 310,000.00 Pasir Pasang 0.3400 m3 Rp 280,000.00 Batu belah 15/20 cm 1.2000 m3 Rp 250,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m3 pondasi batu belah campuran 1PC : 3KP : 10PP Tenaga: Mandor 0.0750 O.H Rp 95,000.00 Kepala Tukang 0.0750 O.H Rp 90,000.00 Tukang Batu 0.7500 O.H Rp 85,000.00

Rp Rp Rp Rp Rp Rp

122,850.00 163,520.00 300,000.00 776,495.00 116,474.25 892,969.25

Rp Rp Rp Rp

7,125.00 6,750.00 63,750.00 112,500.00

Rp Rp Rp Rp Rp Rp Rp

229.50 52,700.00 95,200.00 300,000.00 638,254.50 95,738.18 733,992.68

PEKERJAAN PONDASI Pemasangan 1 m3 pondasi batu belah campuran 1 PC : 3 PP Tenaga: Mandor 0.0750 Kepala Tukang 0.0750 Tukang Batu 0.7500 Pekerja 1.5000 Bahan: Semen portland 202.0000 Pasir Pasang 0.4850 Batu Kali Pecah 15/20 cm 1.2000

Pemasangan 1 m3 pondasi batu belah campuran 1 PC : 4 PP Tenaga: Mandor 0.0750 Kepala Tukang 0.0750 Tukang Batu 0.7500 Pekerja 1.5000 Bahan: Semen portland 163.0000 Pasir Pasang 0.5200 Batu belah 15/20 cm 1.2000

Pemasangan 1 m3 pondasi batu belah campuran 1 PC : 5 PP Tenaga: Mandor 0.0750 Kepala Tukang 0.0750 Tukang Batu 0.7500 Pekerja 1.5000 Bahan: Semen portland 136.0000 Pasir Pasang 0.5440 Batu belah 15/20 cm 1.2000

Pemasangan 1 m3 pondasi batu belah campuran 1 PC : 6 PP Tenaga: Mandor 0.0750 Kepala Tukang 0.0750 Tukang Batu 0.7500 Pekerja 1.5000 Bahan: Semen portland 117.0000 Pasir Pasang 0.5610 Batu belah 15/20 cm 1.2000

Pemasangan 1 m3 pondasi batu belah campuran 1 PC : 8 PP Tenaga: Mandor 0.0750 Kepala Tukang 0.0750 Tukang Batu 0.7500 Pekerja 1.5000 Bahan: Semen portland 91.0000 Pasir Pasang 0.5840 Batu belah 15/20 cm 1.2000

m3 Rp 145,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp

O.H O.H O.H O.H

O.H O.H O.H O.H

O.H O.H O.H O.H

O.H O.H O.H O.H

O.H O.H O.H O.H

Rp Rp Rp Rp

Rp Rp Rp Rp

Rp Rp Rp Rp

Rp Rp Rp Rp

Rp Rp Rp Rp

Rp Rp Rp

7,125.00 6,750.00 63,750.00

Pekerja Bahan: Semen portland Kapur pasang Pasir Pasang Batu belah 15/20 cm

8

9

D. 1

2

3

4

5

1.5000

75,000.00

Rp

112,500.00

Kg Rp 1,350.00 m3 Rp 310,000.00 m3 Rp 280,000.00 m3 Rp 250,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m3 pondasi batu belah campuran 1/4PC : 1KP : 4PP Tenaga: Mandor 0.0750 O.H Rp 95,000.00 Kepala Tukang 0.0750 O.H Rp 90,000.00 Tukang Batu 0.7500 O.H Rp 85,000.00 Pekerja 1.5000 O.H Rp 75,000.00 Bahan: Semen portland 41.0000 Kg Rp 1,350.00 Kapur pasang 0.1310 m3 Rp 310,000.00 Pasir Pasang 0.5230 m3 Rp 280,000.00 Batu belah 15/20 cm 1.2000 m3 Rp 250,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan Batu Kali Belah Kosongan (anstamping) Tenaga: Mandor 0.0390 O.H Rp 95,000.00 Kepala Tukang 0.0390 O.H Rp 90,000.00 Tukang Batu 0.3900 O.H Rp 85,000.00 Pekerja 0.7800 O.H Rp 75,000.00 Bahan: Batu belah 15/20 cm 1.2000 m3 Rp 250,000.00 Pasir urug 0.4320 m3 Rp 200,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : PEKERJAAN BETON Membuat 1 m3 beton mutu fc = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87 Tenaga: Mandor 0.0830 O.H Rp 95,000.00 Kepala Tukang 0.0280 O.H Rp 90,000.00 Tukang Batu 0.2750 O.H Rp 85,000.00 Pekerja 1.6500 O.H Rp 75,000.00 Bahan: Semen portland 247.0000 Kg Rp 1,350.00 Pasir Beton 0.6207 m3 Rp 410,000.00 Batu Pecah 2/3 0.7400 m3 Rp 345,000.00 Air 215.0000 Ltr Rp 2,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Membuat 1 m3 beton mutu fc = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78 Tenaga: Mandor 0.0830 O.H Rp 95,000.00 Kepala Tukang 0.0280 O.H Rp 90,000.00 Tukang Batu 0.2750 O.H Rp 85,000.00 Pekerja 1.6500 O.H Rp 75,000.00 Bahan: Semen portland 276.0000 Kg Rp 1,350.00 Pasir Beton 0.5914 m3 Rp 410,000.00 Batu Pecah 2/3 0.7496 m3 Rp 345,000.00 Air 215.0000 Ltr Rp 2,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Membuat 1 m3 beton mutu fc = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72 Tenaga: Mandor 0.0830 O.H Rp 95,000.00 Kepala Tukang 0.0280 O.H Rp 90,000.00 Tukang Batu 0.2750 O.H Rp 85,000.00 Pekerja 1.6500 O.H Rp 75,000.00 Bahan: Semen portland 299.0000 Kg Rp 1,350.00 Pasir Beton 0.5707 m3 Rp 410,000.00 Batu Pecah 2/3 0.7533 m3 Rp 345,000.00 Air 215.0000 Ltr Rp 2,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Membuat 1 m3 lantai kerja beton mutu f’c = 7,4 Mpa (K100) slump (3-6) cm, w/c = 0,87 Tenaga: Mandor 0.0600 O.H Rp 95,000.00 Kepala Tukang Batu 0.0200 O.H Rp 90,000.00 Tukang Batu 0.2000 O.H Rp 85,000.00 Pekerja/Buruh Tak Terampil 1.2000 O.H Rp 75,000.00 Bahan: Semen portland 230.0000 Kg Rp 1,350.00 Pasir Beton 0.6379 m3 Rp 410,000.00 Batu Pecah 2/3 0.7607 m3 Rp 345,000.00 Air 200.0000 Ltr Rp 2,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Membuat 1 m3 beton mutu f'c = 14,5 Mpa (K175), slump (120 ± 20 ) mm, w/c = 0,66 Tenaga: Mandor 0.0830 O.H Rp 95,000.00 Kepala Tukang Batu 0.0280 O.H Rp 90,000.00 Tukang Batu 0.2750 O.H Rp 85,000.00 Pekerja/Buruh Tak Terampil 1.6500 O.H Rp 75,000.00 Bahan: Semen portland (50kg) 326.0000 Kg Rp 1,350.00

Rp Rp Rp Rp Rp Rp Rp

82,350.00 45,570.00 137,760.00 300,000.00 755,805.00 113,370.75 869,175.75

Rp Rp Rp Rp

7,125.00 6,750.00 63,750.00 112,500.00

Rp Rp Rp Rp Rp Rp Rp

55,350.00 40,610.00 146,440.00 300,000.00 732,525.00 109,878.75 842,403.75

61.0000 0.1470 0.4920 1.2000

O.H

Rp

Rp Rp Rp Rp

3,705.00 3,510.00 33,150.00 58,500.00

Rp Rp Rp Rp Rp

300,000.00 86,400.00 485,265.00 72,789.75 558,054.75

Rp Rp Rp Rp

7,885.00 2,520.00 23,375.00 123,750.00

Rp Rp Rp Rp

333,450.00 254,492.86 255,300.00 430,000.00

Rp Rp Rp

1,430,772.86 214,615.93 1,645,388.79

Rp Rp Rp Rp

7,885.00 2,520.00 23,375.00 123,750.00

Rp Rp Rp Rp

372,600.00 242,485.71 258,622.22 430,000.00

Rp Rp Rp

1,461,237.94 219,185.69 1,680,423.63

Rp Rp Rp Rp

7,885.00 2,520.00 23,375.00 123,750.00

Rp Rp Rp Rp

403,650.00 233,992.86 259,900.00 430,000.00

Rp Rp Rp

1,485,072.86 222,760.93 1,707,833.79

Rp Rp Rp Rp

5,700.00 1,800.00 17,000.00 90,000.00

Rp Rp Rp Rp

310,500.00 261,521.43 262,455.56 400,000.00

Rp Rp Rp

1,348,976.98 202,346.55 1,551,323.53

Rp Rp Rp Rp

7,885.00 2,520.00 23,375.00 123,750.00

Rp

440,100.00

Pasir Beton Batu Pecah 2/3 Air Peralatan:

6

7

8

9

10

11

12

0.5429 0.7622 215.0000

m3 m3 Ltr

Rp Rp Rp

410,000.00 345,000.00 2,000.00

Rp Rp Rp

222,571.43 262,966.67 430,000.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Membuat 1 m3 beton mutu f'c = 16,9 Mpa (K 200), slump (12 ± 2) cm, w/c = 0,61 Tenaga: Mandor 0.0830 O.H Rp 95,000.00 Kepala Tukang Batu 0.0280 O.H Rp 90,000.00 Tukang Batu 0.2750 O.H Rp 85,000.00 Pekerja/Buruh Tak Terampil 1.6500 O.H Rp 75,000.00 Bahan: Semen portland (50kg) 352.0000 Kg Rp 1,350.00 Pasir Beton 0.5221 m3 Rp 410,000.00 Batu Pecah 2/3 0.7637 m3 Rp 345,000.00 Air 215.0000 Ltr Rp 2,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Membuat 1 m3 beton mutu f'c = 19,3 Mpa (K 225), slump (12 ± 2) cm, w/c = 0,58 Tenaga: Mandor 0.0830 O.H Rp 95,000.00 Kepala Tukang Batu 0.0280 O.H Rp 90,000.00 Tukang Batu 0.2750 O.H Rp 85,000.00 Pekerja/Buruh Tak Terampil 1.6500 O.H Rp 75,000.00 Bahan: Semen portland (50kg) 371.0000 Kg Rp 1,350.00 Pasir Beton 0.4986 m3 Rp 410,000.00 Batu Pecah 2/3 0.7756 m3 Rp 345,000.00 Air 215.0000 Ltr Rp 2,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Membuat 1 m3 beton mutu f'c = 21,7 Mpa (K 250), slump (12 ± 2) cm, w/c = 0,56 Tenaga: Mandor 0.0830 O.H Rp 95,000.00 Kepala Tukang Batu 0.0280 O.H Rp 90,000.00 Tukang Batu 0.2750 O.H Rp 85,000.00 Pekerja/Buruh Tak Terampil 1.6500 O.H Rp 75,000.00 Bahan: Semen portland (50kg) 384.0000 Kg Rp 1,350.00 Pasir Beton 0.4943 m3 Rp 410,000.00 Batu Pecah 2/3 0.7696 m3 Rp 345,000.00 Air 215.0000 Ltr Rp 2,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Membuat 1 m3 beton mutu f'c = 24 Mpa (K 275), slump (12 ± 2) cm, w/o = 0,53 Tenaga: Mandor 0.0830 O.H Rp 95,000.00 Kepala Tukang Batu 0.0280 O.H Rp 90,000.00 Tukang Batu 0.2750 O.H Rp 85,000.00 Pekerja/Buruh Tak Terampil 1.6500 O.H Rp 75,000.00 Bahan: Semen portland (50kg) 406.0000 Kg Rp 1,350.00 Pasir Beton 0.4886 m3 Rp 410,000.00 Batu Pecah 2/3 0.7600 m3 Rp 345,000.00 Air 215.0000 Ltr Rp 2,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Membuat 1 m3 beton mutu f'c = 26,4 Mpa (K 300), slump (12 ± 2) cm, w/c = 0,52 Tenaga: Mandor 0.0830 O.H Rp 95,000.00 Kepala Tukang Batu 0.0280 O.H Rp 90,000.00 Tukang Batu 0.2750 O.H Rp 85,000.00 Pekerja/Buruh Tak Terampil 1.6500 O.H Rp 75,000.00 Bahan: Semen portland (50kg) 413.0000 Kg Rp 1,350.00 Pasir Beton 0.4864 m3 Rp 410,000.00 Batu Pecah 2/3 0.7563 m3 Rp 345,000.00 Air 215.0000 Ltr Rp 2,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Membuat 1 m3 beton mutu f'c = 28,8 Mpa (K 325), slump (12 ± 2) cm, w/c = 0,49 Tenaga: Mandor 0.1050 O.H Rp 95,000.00 Kepala Tukang Batu 0.0350 O.H Rp 90,000.00 Tukang Batu 0.3500 O.H Rp 85,000.00 Pekerja/Buruh Tak Terampil 2.1000 O.H Rp 75,000.00 Bahan: Semen portland (50kg) 439.0000 Kg Rp 1,350.00 Pasir Beton 0.4786 m3 Rp 410,000.00 Batu Pecah 2/3 0.7452 m3 Rp 345,000.00 Air 215.0000 Ltr Rp 2,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Membuat 1 m3 beton mutu f'c = 31,2 Mpa, (K 350), slump (12 ± 2) cm, w/c = 0,48 Tenaga: Mandor 0.1050 O.H Rp 95,000.00 Kepala Tukang Batu 0.0350 O.H Rp 90,000.00 Tukang Batu 0.3500 O.H Rp 85,000.00 Pekerja/Buruh Tak Terampil 2.1000 O.H Rp 75,000.00 Bahan:

Rp Rp Rp

1,513,168.10 226,975.21 1,740,143.31

Rp Rp Rp Rp

7,885.00 2,520.00 23,375.00 123,750.00

Rp Rp Rp Rp

475,200.00 214,078.57 263,477.78 430,000.00

Rp Rp Rp

1,540,286.35 231,042.95 1,771,329.30

Rp Rp Rp Rp

7,885.00 2,520.00 23,375.00 123,750.00

Rp Rp Rp Rp

500,850.00 204,414.29 267,566.67 430,000.00

Rp Rp Rp

1,560,360.95 234,054.14 1,794,415.10

Rp Rp Rp Rp

7,885.00 2,520.00 23,375.00 123,750.00

Rp Rp Rp Rp

518,400.00 202,657.14 265,522.22 430,000.00

Rp Rp Rp

1,574,109.37 236,116.40 1,810,225.77

Rp Rp Rp Rp

7,885.00 2,520.00 23,375.00 123,750.00

Rp Rp Rp Rp

548,100.00 200,314.29 262,200.00 430,000.00

Rp Rp Rp

1,598,144.29 239,721.64 1,837,865.93

Rp Rp Rp Rp

7,885.00 2,520.00 23,375.00 123,750.00

Rp Rp Rp Rp

557,550.00 199,435.71 260,922.22 430,000.00

Rp Rp Rp

1,605,437.94 240,815.69 1,846,253.63

Rp Rp Rp Rp

9,975.00 3,150.00 29,750.00 157,500.00

Rp Rp Rp Rp

592,650.00 196,214.29 257,088.89 430,000.00

Rp Rp Rp

1,676,328.17 251,449.23 1,927,777.40

Rp Rp Rp Rp

9,975.00 3,150.00 29,750.00 157,500.00

Semen portland (50kg) Pasir Beton Batu Pecah 2/3 Air Peralatan:

13

14

15

16

17

18

19

20

Pemasangan 1 m' PVC Waterstop lebar 150 mm Tenaga: Mandor Kepala Tukang Tukang Batu/ Pipa Pekerja Bahan: Waterstop lebar 150 mm Peralatan:

Pemasangan 1 m' PVC Waterstop lebar 200 mm Tenaga: Mandor Kepala Tukang Tukang Batu/ Pipa Pekerja Bahan: Waterstop lebar 200 mm Peralatan:

448.0000 0.4764 0.7407 215.0000

Pembesian 10 kg dengan besi Ulir Tenaga: Mandor Kepala Tukang Tukang Besi Pekerja Bahan: Besi Beton Ulir Kawat Beton Peralatan:

Pembesian 10 kg kabel presstressed polos/strands Tenaga: Mandor Kepala Tukang Tukang Besi Pekerja Bahan: Besi Beton Polos Kawat Beton Peralatan:

Pembesian 10 kg jaring kawat baja (wire mesh) Tenaga: Mandor Kepala Tukang Tukang Besi Pekerja Bahan: Jaring kawat baja dilas Kawat Beton Peralatan:

Pemasangan 1 m2 bekisting untuk pondasi Tenaga: Mandor Kepala Tukang Kayu Tukang Kayu Pekerja Terampil Bahan: Kayu kelas III

Rp Rp Rp Rp

1,350.00 410,000.00 345,000.00 2,000.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp

604,800.00 195,335.71 255,555.56 430,000.00

Rp Rp Rp

1,686,066.27 252,909.94 1,938,976.21

0.0030 0.0030 0.0300 0.0600

O.H O.H O.H O.H

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

285.00 270.00 2,550.00 4,500.00

1.0500

m'

Rp

65,000.00

Rp

68,250.00

Rp Rp Rp

75,855.00 11,378.25 87,233.25

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

0.0070 0.0040 0.0350 0.0700

O.H O.H O.H O.H

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

665.00 360.00 2,975.00 5,250.00

1.0500

m'

Rp

84,500.00

Rp

88,725.00

Pemasangan 1 m' PVC Waterstop lebar 230 mm - 320 mm Tenaga: Mandor 0.0040 Kepala Tukang 0.0040 Tukang Batu/ Pipa 0.0400 Pekerja 0.0800 Bahan: Waterstop lebar 230 mm - 320 mm 1.0500 Peralatan:

Pembesian 10 kg dengan besi polos Tenaga: Mandor Kepala Tukang Tukang Besi Pekerja Bahan: Besi Beton Polos Kawat Beton Peralatan:

Kg m3 m3 Ltr

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp

97,975.00 14,696.25 112,671.25

O.H O.H O.H O.H

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

380.00 360.00 3,400.00 6,000.00

m'

Rp

146,500.00

Rp

153,825.00

Rp Rp Rp

163,965.00 24,594.75 188,559.75

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

0.0040 0.0070 0.0700 0.0700

O.H O.H O.H O.H

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

380.00 630.00 5,950.00 5,250.00

10.5000 0.1500

Kg Kg

Rp Rp

13,000.00 22,500.00

Rp Rp

136,500.00 3,375.00

Rp Rp Rp

152,085.00 22,812.75 174,897.75

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

0.0040 0.0070 0.0700 0.0700

O.H O.H O.H O.H

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

380.00 630.00 5,950.00 5,250.00

10.5000 0.1500

Kg Kg

Rp Rp

14,000.00 22,500.00

Rp Rp

147,000.00 3,375.00

Rp Rp Rp

162,585.00 24,387.75 186,972.75

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

0.0030 0.0050 0.0500 0.0500

O.H O.H O.H O.H

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

285.00 450.00 4,250.00 3,750.00

10.5000 0.1000

Kg Kg

Rp Rp

13,000.00 22,500.00

Rp Rp

136,500.00 2,250.00

Rp Rp Rp

147,485.00 22,122.75 169,607.75

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

0.0010 0.0250 0.0250 0.0250

O.H O.H O.H O.H

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

95.00 2,250.00 2,125.00 1,875.00

10.2000 0.0500

Kg Kg

Rp Rp

57,000.00 22,500.00

Rp Rp

581,400.00 1,125.00

Rp Rp Rp

588,870.00 88,330.50 677,200.50

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

0.0260 0.0260 0.2600 0.5200

O.H O.H O.H O.H

Rp Rp Rp Rp

0.0400

m3

Rp

95,000.00 90,000.00 85,000.00 75,000.00 6,100,000.00

Rp Rp Rp Rp

2,470.00 2,340.00 22,100.00 39,000.00

Rp

244,000.00

Paku biasa Minyak Bekesting Peralatan:

21

22

23

24

25

26

Pemasangan 1 m2 bekisting untuk sloof Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Kayu kelas III Paku biasa Minyak Bekesting Peralatan:

Pemasangan 1 m2 bekisting untuk kolom Tenaga: Mandor Kepala Tukang Kayu Tukang Kayu Pekerja Bahan: Kayu kelas III Paku Biasa Minyak bekisting Kelas II (kayu kalimantan/borneo) balok Triplek tebal 9 mm (120 x 240) Dolken kayu Ø 8 - 10 /400 cm Peralatan:

Pemasangan 1 m2 bekisting untuk balok Tenaga: Mandor Kepala Tukang Kayu Tukang Kayu Pekerja Bahan: Kayu kelas III Paku Biasa Minyak bekisting Kelas II (kayu kalimantan/borneo) balok Triplek tebal 9 mm (120 x 240) Dolken kayu Ø 8 - 10 /400 cm Peralatan:

Pemasangan 1 m2 bekisting untuk lantai Tenaga: Mandor Kepala Tukang Kayu Tukang Kayu Pekerja Bahan: Kayu kelas III Paku Biasa Minyak bekisting Kelas II (kayu kalimantan/borneo) balok Triplek tebal 9 mm (120 x 240) Dolken kayu Ø 8 - 10 /400 cm Peralatan:

0.3000 0.1000

Kg Ltr

Rp Rp

19,000.00 5,500.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Pemasangan 1 m2 bekisting untuk tangga Tenaga: Mandor Kepala Tukang Kayu Tukang Kayu Pekerja Bahan: Kayu kelas III Paku Biasa Minyak bekisting Kelas II (kayu kalimantan/borneo) balok Triplek tebal 9 mm (120 x 240) Dolken kayu Ø 8 - 10 /400 cm Peralatan:

Rp Rp Rp

5,700.00 550.00 316,160.00 47,424.00 363,584.00

0.0260 0.0260 0.2600 0.5200

O.H O.H O.H O.H

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

2,470.00 2,340.00 22,100.00 39,000.00

0.0450 0.3000 0.1000

m3 Kg Ltr

Rp Rp Rp

6,100,000.00 19,000.00 5,500.00

Rp Rp Rp

274,500.00 5,700.00 550.00

Rp Rp Rp

346,660.00 51,999.00 398,659.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

0.0330 0.0330 0.3300 0.6600

O.H O.H O.H O.H

0.0400 0.4000 0.2000 0.0150 0.3500 2.0000

m3 Kg Ltr m3 Lembar Batang

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

3,135.00 2,970.00 28,050.00 49,500.00

6,100,000.00 19,000.00 5,500.00 12,000,000.00 135,000.00 30,500.00

Rp Rp Rp Rp Rp Rp

244,000.00 7,600.00 1,100.00 180,000.00 47,250.00 61,000.00

Rp Rp Rp

624,605.00 93,690.75 718,295.75

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

0.0330 0.0330 0.3300 0.6600

O.H O.H O.H O.H

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

3,135.00 2,970.00 28,050.00 49,500.00

0.0400 0.4000 0.2000 0.0180 0.3500 2.0000

m3 Kg Ltr m3 Lembar Batang

Rp Rp Rp Rp Rp Rp

6,100,000.00 19,000.00 5,500.00 12,000,000.00 135,000.00 30,500.00

Rp Rp Rp Rp Rp Rp

244,000.00 7,600.00 1,100.00 216,000.00 47,250.00 61,000.00

Rp Rp Rp

660,605.00 99,090.75 759,695.75

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

0.0330 0.0330 0.3300 0.6600

O.H O.H O.H O.H

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

3,135.00 2,970.00 28,050.00 49,500.00

0.0400 0.4000 0.2000 0.0150 0.3500 6.0000

m3 Kg Ltr m3 Lembar Batang

Rp Rp Rp Rp Rp Rp

6,100,000.00 19,000.00 5,500.00 12,000,000.00 135,000.00 30,500.00

Rp Rp Rp Rp Rp Rp

244,000.00 7,600.00 1,100.00 180,000.00 47,250.00 183,000.00

Rp Rp Rp

746,605.00 111,990.75 858,595.75

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 bekisting untuk dinding Tenaga: Mandor Kepala Tukang Kayu Tukang Kayu Pekerja Bahan: Kayu kelas III Paku Biasa Minyak bekisting Kelas II (kayu kalimantan/borneo) balok Triplek tebal 9 mm (120 x 240) Dolken kayu Ø 8 - 10 /400 cm Peralatan:

Rp Rp

0.0330 0.0330 0.3300 0.6600

O.H O.H O.H O.H

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

3,135.00 2,970.00 28,050.00 49,500.00

0.0300 0.4000 0.2000 0.0200 0.3500 3.0000

m3 Kg Ltr m3 Lembar Batang

Rp Rp Rp Rp Rp Rp

6,100,000.00 19,000.00 5,500.00 12,000,000.00 135,000.00 30,500.00

Rp Rp Rp Rp Rp Rp

183,000.00 7,600.00 1,100.00 240,000.00 47,250.00 91,500.00

Rp Rp Rp

654,105.00 98,115.75 752,220.75

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

0.0330 0.0330 0.3300 0.6600

O.H O.H O.H O.H

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

3,135.00 2,970.00 28,050.00 49,500.00

0.0300 0.4000 0.1500 0.0150 0.3500 2.0000

m3 Kg Ltr m3 Lembar Batang

Rp Rp Rp Rp Rp Rp

6,100,000.00 19,000.00 5,500.00 12,000,000.00 135,000.00 30,500.00

Rp Rp Rp Rp Rp Rp

183,000.00 7,600.00 825.00 180,000.00 47,250.00 61,000.00

Rp Rp

563,330.00 84,499.50

Jumlah Overhead + Profit ( 15 % )

27

28

29

30

31

Nilai HSPK : Pemasangan 1 m2 jembatan untuk pengecoran beton Tenaga: Mandor 0.0080 Kepala Tukang 0.0050 Tukang Kayu 0.0500 Pekerja 0.1500 Bahan: Kelas III (kayu kruing) papan 0.0264 Paku Biasa 0.6000 Dolken kayu Ø 8 - 10 /400 cm 0.5000 Peralatan:

Rp

647,829.50

O.H O.H O.H O.H

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

760.00 450.00 4,250.00 11,250.00

m3 Kg Btg

Rp Rp Rp

6,100,000.00 19,000.00 30,500.00

Rp Rp Rp

161,040.00 11,400.00 15,250.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pembuatan 1 m3 pondasi beton bertulang (150 kg besi + bekisting) Tenaga: Mandor 0.2650 O.H Rp 95,000.00 Kepala Tukang 0.2620 O.H Rp 90,000.00 Tukang Besi 1.0500 O.H Rp 85,000.00 Tukang Kayu 1.3000 O.H Rp 85,000.00 Tukang Batu 0.2750 O.H Rp 85,000.00 Pekerja 5.3000 O.H Rp 75,000.00 Bahan: Kayu kelas III 0.2000 m3 Rp 6,100,000.00 Paku Biasa 1.5000 Kg Rp 19,000.00 Minyak bekisting 0.4000 Ltr Rp 5,500.00 Besi beton polos 157.5000 Kg Rp 13,000.00 Kawat ikat beton 2.2500 Kg Rp 22,500.00 Semen Portland 336.0000 Kg Rp 1,350.00 Pasir beton 0.5400 m3 Rp 410,000.00 Batu pecah 2/3 0.8100 m3 Rp 345,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pembuatan 1 m3 sloof beton bertulang (200 kg besi + bekisting) Tenaga: Mandor 0.2830 O.H Rp 95,000.00 Kepala Tukang 0.3230 O.H Rp 90,000.00 Tukang Besi 1.4000 O.H Rp 85,000.00 Tukang Kayu 1.5600 O.H Rp 85,000.00 Tukang Batu 0.2750 O.H Rp 85,000.00 Pekerja 5.6500 O.H Rp 75,000.00 Bahan: Kayu kelas III 0.2700 m3 Rp 6,100,000.00 Paku Biasa 2.0000 Kg Rp 19,000.00 Minyak bekisting 0.6000 Ltr Rp 5,500.00 Besi beton polos 210.0000 Kg Rp 13,000.00 Kawat ikat beton 3.0000 Kg Rp 22,500.00 Semen Portland 336.0000 Kg Rp 1,350.00 Pasir beton 0.5400 m3 Rp 410,000.00 Batu pecah 2/3 0.8100 m3 Rp 345,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pembuatan 1 m3 kolom beton bertulang (300 kg besi + bekisting) Tenaga: Mandor 0.3530 O.H Rp 95,000.00 Kepala Tukang 0.4030 O.H Rp 90,000.00 Tukang Besi 2.1000 O.H Rp 85,000.00 Tukang Kayu 1.6500 O.H Rp 85,000.00 Tukang Batu 0.2750 O.H Rp 85,000.00 Pekerja 7.0500 O.H Rp 75,000.00 Bahan: Kayu kelas III 0.4000 m3 Rp 6,100,000.00 Paku Biasa 4.0000 Kg Rp 19,000.00 Minyak bekisting 2.0000 Ltr Rp 5,500.00 Besi beton polos 315.0000 Kg Rp 13,000.00 Kawat ikat beton 4.5000 Kg Rp 22,500.00 Semen Portland 336.0000 Kg Rp 1,350.00 Pasir beton 0.5400 m3 Rp 410,000.00 Batu pecah 2/3 0.8100 m3 Rp 345,000.00 Kelas II balok 0.1500 m3 Rp 12,000,000.00 Triplek tebal 9 mm (120 x 240) 3.5000 Lbr Rp 135,000.00 Dolken kayu Ø 8 - 10 /400 cm 20.0000 Btg Rp 30,500.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pembuatan 1 m3 balok beton bertulang (200 kg besi + bekisting) Tenaga: Mandor 0.3180 O.H Rp 95,000.00 Kepala Tukang 0.3330 O.H Rp 90,000.00 Tukang Besi 1.4000 O.H Rp 85,000.00 Tukang Kayu 1.6500 O.H Rp 85,000.00 Tukang Batu 0.2750 O.H Rp 85,000.00 Pekerja 6.3500 O.H Rp 75,000.00 Bahan: Kayu kelas III 0.3200 m3 Rp 6,100,000.00 Paku Biasa 3.2000 Kg Rp 19,000.00 Minyak bekisting 1.6000 Ltr Rp 5,500.00 Besi beton polos 210.0000 Kg Rp 13,000.00 Kawat ikat beton 3.0000 Kg Rp 22,500.00 Semen Portland 336.0000 Kg Rp 1,350.00 Pasir beton 0.5400 m3 Rp 410,000.00 Batu pecah 2/3 0.8100 m3 Rp 345,000.00 Kelas II balok 0.1400 m3 Rp 12,000,000.00 Triplek tebal 9 mm (120 x 240) 2.8000 Lbr Rp 135,000.00 Dolken kayu Ø 8 - 10 /400 cm 16.0000 Btg Rp 30,500.00 Peralatan: Jumlah Overhead + Profit ( 15 % )

Rp Rp Rp

204,400.00 30,660.00 235,060.00

Rp Rp Rp Rp Rp Rp

25,175.00 23,580.00 89,250.00 110,500.00 23,375.00 397,500.00

Rp Rp Rp Rp Rp Rp Rp Rp

1,220,000.00 28,500.00 2,200.00 2,047,500.00 50,625.00 453,600.00 221,400.00 279,450.00

Rp Rp Rp

4,972,655.00 745,898.25 5,718,553.25

Rp Rp Rp Rp Rp Rp

26,885.00 29,070.00 119,000.00 132,600.00 23,375.00 423,750.00

Rp Rp Rp Rp Rp Rp Rp Rp

1,647,000.00 38,000.00 3,300.00 2,730,000.00 67,500.00 453,600.00 221,400.00 279,450.00

Rp Rp Rp

6,194,930.00 929,239.50 7,124,169.50

Rp Rp Rp Rp Rp Rp

33,535.00 36,270.00 178,500.00 140,250.00 23,375.00 528,750.00

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

2,440,000.00 76,000.00 11,000.00 4,095,000.00 101,250.00 453,600.00 221,400.00 279,450.00 1,800,000.00 472,500.00 610,000.00

Rp 11,500,880.00 Rp 1,725,132.00 Rp 13,226,012.00

Rp Rp Rp Rp Rp Rp

30,210.00 29,970.00 119,000.00 140,250.00 23,375.00 476,250.00

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

1,952,000.00 60,800.00 8,800.00 2,730,000.00 67,500.00 453,600.00 221,400.00 279,450.00 1,680,000.00 378,000.00 488,000.00

Rp Rp

9,138,605.00 1,370,790.75

32

33

34

35

36

Nilai HSPK : Pembuatan 1 m3 plat beton bertulang (150 kg besi + bekisting) Tenaga: Mandor 0.2650 O.H Rp 95,000.00 Kepala Tukang 0.2650 O.H Rp 90,000.00 Tukang Besi 1.0500 O.H Rp 85,000.00 Tukang Kayu 1.3000 O.H Rp 85,000.00 Tukang Batu 0.2750 O.H Rp 85,000.00 Pekerja 5.3000 O.H Rp 75,000.00 Bahan: Kayu kelas III 0.3200 m3 Rp 6,100,000.00 Paku Biasa 3.2000 Kg Rp 19,000.00 Minyak bekisting 1.6000 Ltr Rp 5,500.00 Besi beton polos 157.5000 Kg Rp 13,000.00 Kawat ikat beton 2.2500 Kg Rp 22,500.00 Semen Portland 336.0000 Kg Rp 1,350.00 Pasir beton 0.5400 m3 Rp 410,000.00 Batu pecah 2/3 0.8100 m3 Rp 345,000.00 Kelas II balok 0.1200 m3 Rp 12,000,000.00 Triplek tebal 9 mm (120 x 240) 2.8000 Lbr Rp 135,000.00 Dolken kayu Ø 8 - 10 /400 cm 32.0000 Btg Rp 30,500.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pembuatan 1 m3 dinding beton bertulang (150 kg besi + bekisting) Tenaga: Mandor 0.2650 O.H Rp 95,000.00 Kepala Tukang 0.2620 O.H Rp 90,000.00 Tukang Besi 1.0500 O.H Rp 85,000.00 Tukang Kayu 1.3000 O.H Rp 85,000.00 Tukang Batu 0.2750 O.H Rp 85,000.00 Pekerja 5.3000 O.H Rp 75,000.00 Bahan: Kayu kelas III 0.2400 m3 Rp 6,100,000.00 Paku Biasa 3.2000 Kg Rp 19,000.00 Minyak bekisting 1.6000 Ltr Rp 5,500.00 Besi beton polos 157.5000 Kg Rp 13,000.00 Kawat ikat beton 2.2500 Kg Rp 22,500.00 Semen Portland 336.0000 Kg Rp 1,350.00 Pasir beton 0.5400 m3 Rp 410,000.00 Batu pecah 2/3 0.8100 m3 Rp 345,000.00 Kelas II balok 0.1600 m3 Rp 12,000,000.00 Triplek tebal 9 mm (120 x 240) 2.8000 Lbr Rp 135,000.00 Dolken kayu Ø 8 - 10 /400 cm 24.0000 Btg Rp 30,500.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pembuatan 1 m3 dinding beton bertulang (200 kg besi + bekisting) Tenaga: Mandor 0.2830 O.H Rp 95,000.00 Kepala Tukang 0.3230 O.H Rp 90,000.00 Tukang Besi 1.4000 O.H Rp 85,000.00 Tukang Kayu 1.5600 O.H Rp 85,000.00 Tukang Batu 0.2750 O.H Rp 85,000.00 Pekerja 5.6500 O.H Rp 75,000.00 Bahan: Kayu kelas III 0.2500 m3 Rp 6,100,000.00 Paku Biasa 3.0000 Kg Rp 19,000.00 Minyak bekisting 1.2000 Ltr Rp 5,500.00 Besi beton polos 210.0000 Kg Rp 13,000.00 Kawat ikat beton 3.0000 Kg Rp 22,500.00 Semen Portland 336.0000 Kg Rp 1,350.00 Pasir beton 0.5400 m3 Rp 410,000.00 Batu pecah 2/3 0.8100 m3 Rp 345,000.00 Kelas II balok 0.1050 m3 Rp 12,000,000.00 Triplek tebal 9 mm (120 x 240) 2.5000 Lbr Rp 135,000.00 Dolken kayu Ø 8 - 10 /400 cm 14.0000 Btg Rp 30,500.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pembuatan 1 m' kolom praktis beton bertulang (11 x 11) cm Tenaga: Mandor 0.0090 O.H Rp 95,000.00 Kepala Tukang 0.0060 O.H Rp 90,000.00 Tukang Besi 0.0200 O.H Rp 85,000.00 Tukang Kayu 0.0200 O.H Rp 85,000.00 Tukang Batu 0.0200 O.H Rp 85,000.00 Pekerja 0.1800 O.H Rp 75,000.00 Bahan: Kayu kelas III 0.0020 m3 Rp 6,100,000.00 Paku biasa 0.0100 Kg Rp 19,000.00 Besi beton polos 3.0000 Kg Rp 13,000.00 Kawat ikat beton 0.4500 Kg Rp 22,500.00 Semen portland 4.0000 Kg Rp 1,350.00 Pasir beton 0.0060 m3 Rp 410,000.00 Batu pecah 2/3 0.0090 m3 Rp 345,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Membuat 1 m' Ring Balok Beton Bertulang Uk.10 x 15 cm Tenaga: Mandor 0.0150 O.H Rp 95,000.00 Kepala Tukang 0.0100 O.H Rp 90,000.00 Tukang Besi 0.0330 O.H Rp 85,000.00 Tukang Kayu 0.0330 O.H Rp 85,000.00 Tukang Batu 0.0330 O.H Rp 85,000.00 Pekerja 0.2970 O.H Rp 75,000.00 Bahan: Kayu kelas III 0.0030 m3 Rp 6,100,000.00 Paku 5 cm - 12 cm 0.0200 Kg Rp 19,000.00 Besi beton polos 3.6000 Kg Rp 13,000.00

Rp 10,509,395.75

Rp Rp Rp Rp Rp Rp

25,175.00 23,850.00 89,250.00 110,500.00 23,375.00 397,500.00

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

1,952,000.00 60,800.00 8,800.00 2,047,500.00 50,625.00 453,600.00 221,400.00 279,450.00 1,440,000.00 378,000.00 976,000.00

Rp Rp Rp

8,537,825.00 1,280,673.75 9,818,498.75

Rp Rp Rp Rp Rp Rp

25,175.00 23,580.00 89,250.00 110,500.00 23,375.00 397,500.00

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

1,464,000.00 60,800.00 8,800.00 2,047,500.00 50,625.00 453,600.00 221,400.00 279,450.00 1,920,000.00 378,000.00 732,000.00

Rp Rp Rp

8,285,555.00 1,242,833.25 9,528,388.25

Rp Rp Rp Rp Rp Rp

26,885.00 29,070.00 119,000.00 132,600.00 23,375.00 423,750.00

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

1,525,000.00 57,000.00 6,600.00 2,730,000.00 67,500.00 453,600.00 221,400.00 279,450.00 1,260,000.00 337,500.00 427,000.00

Rp Rp Rp

8,119,730.00 1,217,959.50 9,337,689.50

Rp Rp Rp Rp Rp Rp

855.00 540.00 1,700.00 1,700.00 1,700.00 13,500.00

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

12,200.00 190.00 39,000.00 10,125.00 5,400.00 2,460.00 3,105.00 92,475.00 13,871.25 106,346.25

Rp Rp Rp Rp Rp Rp

1,425.00 900.00 2,805.00 2,805.00 2,805.00 22,275.00

Rp Rp Rp

18,300.00 380.00 46,800.00

Kawat ikat beton Semen portland Pasir beton Batu Pecah Mesin 2/3

E. 1

2

3

4

5

6

7

8

PEKERJAAN BESI DAN ALUMINIUM Pemasangan 1 kg besi profil Tenaga: Mandor Kepala Tukang Tukang Las Konstruksi Pekerja Bahan: Besi profil

0.0500 5.5000 0.0090 0.0150

Kg Rp 22,500.00 Kg Rp 1,350.00 m3 Rp 410,000.00 m3 Rp 345,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

0.0030 0.0060 0.0600 0.0600

O.H O.H O.H O.H

1.1500

Kg

Rp Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00 18,000.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 kg rangka kuda-kuda baja IWF Tenaga: Mandor Kepala Tukang Tukang Las Konstruksi Pekerja Bahan: Besi baja IWF

0.0030 0.0060 0.0600 0.0600 1.1500

O.H O.H O.H O.H

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Kg Rp 20,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pembuatan 1 m2 pintu besi pelat baja tebal 2 mm rangkap, rangkap baja siku Tenaga: Mandor 0.0050 O.H Rp 95,000.00 Kepala Tukang 0.0010 O.H Rp 90,000.00 Tukang Las 0.1000 O.H Rp 85,000.00 Pekerja 0.1000 O.H Rp 75,000.00 Bahan: Besi siku L.30.30.3 15.0000 Kg Rp 15,500.00 Besi pelat baja 32.8000 Kg Rp 13,000.00 Kawat las 0.0500 Kg Rp 60,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 pintu rolling door besi Tenaga: Mandor 0.0060 O.H Rp 95,000.00 Kepala Tukang 0.1200 O.H Rp 90,000.00 Tukang Las 1.2000 O.H Rp 85,000.00 Pekerja 1.2000 O.H Rp 75,000.00 Bahan: Pintu gulung besi 1.0000 m2 Rp 420,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 rolling door alumunium Tenaga: Mandor 0.0500 O.H Rp 95,000.00 Kepala Tukang 0.1000 O.H Rp 90,000.00 Tukang khusus allumunium 1.0000 O.H Rp 85,000.00 Pekerja 1.0000 O.H Rp 75,000.00 Bahan: Rolling Door Alumunium 1.0000 m2 Rp 500,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 terali besi strip (2 x 3) mm Tenaga: Mandor 0.0830 O.H Rp 95,000.00 Kepala Tukang 0.1670 O.H Rp 90,000.00 Tukang 1.6700 O.H Rp 85,000.00 Pekerja 1.6700 O.H Rp 75,000.00 Bahan: Besi strip 6.1770 Kg Rp 13,500.00 Pengelasan 27.0800 cm Rp 2,200.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 kawat nyamuk Tenaga: Mandor 0.0050 O.H Rp 95,000.00 Kepala Tukang 0.0100 O.H Rp 90,000.00 Tukang 0.1000 O.H Rp 85,000.00 Pekerja 0.1000 O.H Rp 75,000.00 Bahan: Kawat nyamuk 1.1000 m2 Rp 30,000.00 Pengelasan 11.1100 cm Rp 30,000.00 Besi strip 1.7160 Kg Rp 13,500.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m' talang datar/ jurai seng bjls 28 lebar 90 cm Tenaga: Mandor 0.0010 O.H Rp 95,000.00 Kepala Tukang 0.0200 O.H Rp 90,000.00 Tukang 0.2000 O.H Rp 85,000.00 Pekerja 0.2000 O.H Rp 75,000.00 Bahan: Seng Plat 0.90 x 1.80 m BJLS 28 1.0500 m' Rp 90,000.00 Paku Biasa 0.0150 Kg Rp 19,000.00 Kelas III (kayu kruing) papan 0.0190 m3 Rp 6,100,000.00 Peralatan:

Rp Rp Rp Rp Rp Rp Rp

1,125.00 7,425.00 3,690.00 5,175.00 115,910.00 17,386.50 133,296.50

Rp Rp Rp Rp

285.00 540.00 5,100.00 4,500.00

Rp

20,700.00

Rp Rp Rp

31,125.00 4,668.75 35,793.75

Rp Rp Rp Rp

285.00 540.00 5,100.00 4,500.00

Rp Rp Rp Rp

23,000.00 33,425.00 5,013.75 38,438.75

Rp Rp Rp Rp

475.00 90.00 8,500.00 7,500.00

Rp Rp Rp Rp Rp Rp

232,500.00 426,400.00 3,000.00 678,465.00 101,769.75 780,234.75

Rp Rp Rp Rp

570.00 10,800.00 102,000.00 90,000.00

Rp Rp Rp Rp

420,000.00 623,370.00 93,505.50 716,875.50

Rp Rp Rp Rp

4,750.00 9,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

500,000.00 673,750.00 101,062.50 774,812.50

Rp Rp Rp Rp

7,885.00 15,030.00 141,950.00 125,250.00

Rp Rp

83,389.50 59,576.00

Rp Rp Rp

433,080.50 64,962.08 498,042.58

Rp Rp Rp Rp

475.00 900.00 8,500.00 7,500.00

Rp Rp Rp

33,000.00 333,300.00 23,166.00

Rp Rp Rp

406,841.00 61,026.15 467,867.15

Rp Rp Rp Rp

95.00 1,800.00 17,000.00 15,000.00

Rp Rp Rp

94,500.00 285.00 115,900.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : F. 1

2

3

4

5

6

7

8

PEKERJAAN PASANGAN DINDING Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 PC : 2 PP Tenaga: Mandor 0.0300 O.H Rp 95,000.00 Kepala Tukang Batu 0.0200 O.H Rp 90,000.00 Tukang Batu 0.2000 O.H Rp 85,000.00 Pekerja 0.6000 O.H Rp 75,000.00 Bahan: Bata Merah 140.0000 buah Rp 1,300.00 Semen Portland 43.5000 Kg Rp 1,350.00 Pasir Pasang 0.0800 m3 Rp 280,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 Pc : 3 PP Tenaga: Mandor 0.0300 O.H Rp 95,000.00 Kepala Tukang Batu 0.0200 O.H Rp 90,000.00 Tukang Batu 0.2000 O.H Rp 85,000.00 Pekerja 0.6000 O.H Rp 75,000.00 Bahan: Bata Merah 140.0000 buah Rp 1,300.00 Semen Portland 32.9500 Kg Rp 1,350.00 Pasir Pasang 0.0910 m3 Rp 280,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 Pc : 4 PP Tenaga: Mandor 0.0300 O.H Rp 95,000.00 Kepala Tukang Batu 0.0200 O.H Rp 90,000.00 Tukang Batu 0.2000 O.H Rp 85,000.00 Pekerja 0.6000 O.H Rp 75,000.00 Bahan: Bata Merah 140.0000 buah Rp 1,300.00 Semen Portland 26.5500 Kg Rp 1,350.00 Pasir Pasang 0.0930 m3 Rp 280,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 Pc : 5 PP Tenaga: Mandor 0.0300 O.H Rp 95,000.00 Kepala Tukang Batu 0.0200 O.H Rp 90,000.00 Tukang Batu 0.2000 O.H Rp 85,000.00 Pekerja 0.6000 O.H Rp 75,000.00 Bahan: Bata Merah 140.0000 buah Rp 1,300.00 Semen Portland 22.2000 Kg Rp 1,350.00 Pasir Pasang 0.1020 m3 Rp 280,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal 1 batu campuran 1 Pc : 6 PP Tenaga: Mandor 0.0300 O.H Rp 95,000.00 Kepala Tukang Batu 0.0200 O.H Rp 90,000.00 Tukang Batu 0.2000 O.H Rp 85,000.00 Pekerja 0.6000 O.H Rp 75,000.00 Bahan: Bata Merah 140.0000 buah Rp 1,300.00 Semen Portland 18.5000 Kg Rp 1,350.00 Pasir Pasang 0.1220 m3 Rp 280,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 Pc : 2 PP Tenaga: Mandor 0.0150 O.H Rp 95,000.00 Kepala Tukang Batu 0.0100 O.H Rp 90,000.00 Tukang Batu 0.1000 kg Rp 85,000.00 Pekerja 0.3000 O.H Rp 75,000.00 Bahan: Bata Merah 70.0000 buah Rp 1,300.00 Semen Portland 18.9500 Kg Rp 1,350.00 Pasir Pasang 0.0380 m3 Rp 280,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 Pc : 3 PP Tenaga: Mandor 0.0150 O.H Rp 95,000.00 Kepala Tukang Batu 0.0100 O.H Rp 90,000.00 Tukang Batu 0.1000 O.H Rp 85,000.00 Pekerja 0.3000 O.H Rp 75,000.00 Bahan: Bata Merah 70.0000 buah Rp 1,300.00 Semen Portland 14.3700 Kg Rp 1,350.00 Pasir Pasang 0.0400 m3 Rp 280,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 Pc : 4 PP Tenaga:

Rp Rp Rp

244,580.00 36,687.00 281,267.00

Rp Rp Rp Rp

2,850.00 1,800.00 17,000.00 45,000.00

Rp Rp Rp

182,000.00 58,725.00 22,400.00

Rp Rp Rp

329,775.00 49,466.25 379,241.25

Rp Rp Rp Rp

2,850.00 1,800.00 17,000.00 45,000.00

Rp Rp Rp

182,000.00 44,482.50 25,480.00

Rp Rp Rp

318,612.50 47,791.88 366,404.38

Rp Rp Rp Rp

2,850.00 1,800.00 17,000.00 45,000.00

Rp Rp Rp

182,000.00 35,842.50 26,040.00

Rp Rp Rp

310,532.50 46,579.88 357,112.38

Rp Rp Rp Rp

2,850.00 1,800.00 17,000.00 45,000.00

Rp Rp Rp

182,000.00 29,970.00 28,560.00

Rp Rp Rp

307,180.00 46,077.00 353,257.00

Rp Rp Rp Rp

2,850.00 1,800.00 17,000.00 45,000.00

Rp Rp Rp

182,000.00 24,975.00 34,160.00

Rp Rp Rp

307,785.00 46,167.75 353,952.75

Rp Rp Rp Rp

1,425.00 900.00 8,500.00 22,500.00

Rp Rp Rp

91,000.00 25,582.50 10,640.00

Rp Rp Rp

160,547.50 24,082.13 184,629.63

Rp Rp Rp Rp

1,425.00 900.00 8,500.00 22,500.00

Rp Rp Rp

91,000.00 19,399.50 11,200.00

Rp Rp Rp

154,924.50 23,238.68 178,163.18

Mandor Kepala Tukang Batu Tukang Batu Pekerja Bahan: Bata Merah Semen Portland Pasir Pasang Peralatan:

9

10

11

G. 1

2

3

4

0.0150 0.0100 0.1000 0.3000

O.H O.H O.H O.H

70.0000 11.5000 0.0430

buah Kg m3

Rp Rp Rp Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

1,425.00 900.00 8,500.00 22,500.00

1,300.00 1,350.00 280,000.00

Rp Rp Rp

91,000.00 15,525.00 12,040.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 Pc : 5 PP Tenaga: Mandor 0.0150 O.H Rp 95,000.00 Kepala Tukang Batu 0.0100 O.H Rp 90,000.00 Tukang Batu 0.1000 O.H Rp 85,000.00 Pekerja 0.3000 O.H Rp 75,000.00 Bahan: Bata Merah 70.0000 buah Rp 1,300.00 Semen Portland 9.6800 Kg Rp 1,350.00 Pasir Pasang 0.0450 m3 Rp 280,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 Pc : 6 PP Tenaga: Mandor 0.0150 O.H Rp 95,000.00 Kepala Tukang Batu 0.0100 O.H Rp 90,000.00 Tukang Batu 0.1000 O.H Rp 85,000.00 Pekerja 0.3000 O.H Rp 75,000.00 Bahan: Bata Merah 70.0000 buah Rp 1,300.00 Semen Portland 8.3200 Kg Rp 1,350.00 Pasir Pasang 0.0490 m3 Rp 280,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 dinding bata merah (5x11x22) cm tebal ½ batu campuran 1 Pc : 8 PP Tenaga: Mandor 0.0150 O.H Rp 95,000.00 Kepala Tukang Batu 0.0100 O.H Rp 90,000.00 Tukang Batu 0.1000 O.H Rp 85,000.00 Pekerja 0.3000 O.H Rp 75,000.00 Bahan: Bata Merah 70.0000 buah Rp 1,300.00 Semen Portland 6.5000 Kg Rp 1,350.00 Pasir Pasang 0.0500 m3 Rp 280,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : PEKERJAAN PLESTERAN Pemasangan 1 m2 plesteran 1 Pc : 1 PP tebal 15 mm Tenaga: Mandor 0.0150 O.H Rp 95,000.00 Kepala Tukang 0.0150 O.H Rp 90,000.00 Tukang Batu 0.1500 O.H Rp 85,000.00 Pekerja 0.3000 O.H Rp 75,000.00 Bahan: Semen portland 15.5040 Kg Rp 1,350.00 Pasir Pasang 0.0160 m3 Rp 280,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 plesteran 1 Pc : 2 PP tebal 15 mm Tenaga: Mandor 0.0150 O.H Rp 95,000.00 Kepala Tukang 0.0150 O.H Rp 90,000.00 Tukang Batu 0.1500 O.H Rp 85,000.00 Pekerja 0.3000 O.H Rp 75,000.00 Bahan: Semen portland 10.2240 Kg Rp 1,350.00 Pasir Pasang 0.0200 m3 Rp 280,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 plesteran 1 Pc : 3 PP tebal 15 mm Tenaga: Mandor 0.0150 O.H Rp 95,000.00 Kepala Tukang 0.0150 O.H Rp 90,000.00 Tukang Batu 0.1500 O.H Rp 85,000.00 Pekerja 0.3000 O.H Rp 75,000.00 Bahan: Semen portland 7.7760 Kg Rp 1,350.00 Pasir Pasang 0.0230 m3 Rp 280,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 plesteran 1 Pc : 4 PP tebal 15 mm Tenaga: Mandor 0.0150 O.H Rp 95,000.00 Kepala Tukang Batu 0.0150 O.H Rp 90,000.00 Tukang Batu 0.1500 O.H Rp 85,000.00 Pekerja 0.3000 O.H Rp 75,000.00 Bahan: Semen portland 6.2400 Kg Rp 1,350.00 Pasir Pasang 0.0240 m3 Rp 280,000.00 Peralatan:

Rp Rp Rp

151,890.00 22,783.50 174,673.50

Rp Rp Rp Rp

1,425.00 900.00 8,500.00 22,500.00

Rp Rp Rp

91,000.00 13,068.00 12,600.00

Rp Rp Rp

149,993.00 22,498.95 172,491.95

Rp Rp Rp Rp

1,425.00 900.00 8,500.00 22,500.00

Rp Rp Rp

91,000.00 11,232.00 13,720.00

Rp Rp Rp

149,277.00 22,391.55 171,668.55

Rp Rp Rp Rp

1,425.00 900.00 8,500.00 22,500.00

Rp Rp Rp

91,000.00 8,775.00 14,000.00

Rp Rp Rp

147,100.00 22,065.00 169,165.00

Rp Rp Rp Rp

1,425.00 1,350.00 12,750.00 22,500.00

Rp Rp

20,930.40 4,480.00

Rp Rp Rp

63,435.40 9,515.31 72,950.71

Rp Rp Rp Rp

1,425.00 1,350.00 12,750.00 22,500.00

Rp Rp

13,802.40 5,600.00

Rp Rp Rp

57,427.40 8,614.11 66,041.51

Rp Rp Rp Rp

1,425.00 1,350.00 12,750.00 22,500.00

Rp Rp

10,497.60 6,440.00

Rp Rp Rp

54,962.60 8,244.39 63,206.99

Rp Rp Rp Rp

1,425.00 1,350.00 12,750.00 22,500.00

Rp Rp

8,424.00 6,720.00

5

6

7

8

9

10

11

12

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 plesteran 1 Pc : 5 PP tebal 15 mm Tenaga: Mandor Kepala Tukang Batu Tukang Batu Pekerja Bahan: Semen portland Pasir Pasang Peralatan:

O.H O.H O.H O.H

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

1,425.00 1,350.00 12,750.00 22,500.00

5.1840 0.0260

Kg m3

Rp Rp

1,350.00 280,000.00

Rp Rp

6,998.40 7,280.00

Rp Rp Rp

52,303.40 7,845.51 60,148.91

0.0150 0.0150 0.1500 0.3000

O.H O.H O.H O.H

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

1,425.00 1,350.00 12,750.00 22,500.00

4.4160 0.0270

Kg m3

Rp Rp

1,350.00 280,000.00

Rp Rp

5,961.60 7,560.00

Rp Rp Rp

51,546.60 7,731.99 59,278.59

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 plesteran 1 Pc : 7 PP tebal 15 mm Tenaga: Mandor Kepala Tukang Batu Tukang Batu Pekerja Bahan: Semen portland Pasir Pasang Peralatan:

0.0150 0.0150 0.1500 0.3000

O.H O.H O.H O.H

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

1,425.00 1,350.00 12,750.00 22,500.00

3.9360 0.0280

Kg m3

Rp Rp

1,350.00 280,000.00

Rp Rp

5,313.60 7,840.00

Rp Rp Rp

51,178.60 7,676.79 58,855.39

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 plesteran 1 Pc : 8 PP tebal 15 mm Tenaga: Mandor Kepala Tukang Batu Tukang Batu Pekerja Bahan: Semen portland Pasir Pasang Peralatan:

0.0150 0.0150 0.1500 0.3000

O.H O.H O.H O.H

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

1,425.00 1,350.00 12,750.00 22,500.00

3.4560 0.0290

Kg m3

Rp Rp

1,350.00 280,000.00

Rp Rp

4,665.60 8,120.00

Rp Rp Rp

50,810.60 7,621.59 58,432.19

Pemasangan 1 m2 plesteran 1 Pc : 1 PP tebal 20 mm Tenaga: Mandor 0.0220 Kepala Tukang 0.0200 Tukang Batu 0.2000 Pekerja 0.4000 Bahan: Semen portland 13.6320 Pasir Pasang 0.0270 Peralatan:

Pemasangan 1 m2 plesteran 1 Pc : 3 PP tebal 20 mm Tenaga: Mandor 0.0130 Kepala Tukang 0.0200 Tukang Batu 0.2000 Pekerja 0.2600 Bahan: Semen portland 10.3680 Pasir Pasang 0.0310 Peralatan:

Pemasangan 1 m2 plesteran 1 Pc : 4 PP tebal 20 mm Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja Bahan: Semen portland Pasir Pasang Peralatan:

Pemasangan 1 m2 plesteran 1 Pc : 5 PP tebal 20 mm Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja Bahan: Semen portland Pasir Pasang Peralatan:

53,169.00 7,975.35 61,144.35

0.0150 0.0150 0.1500 0.3000

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 plesteran 1 Pc : 6 PP tebal 15 mm Tenaga: Mandor Kepala Tukang Batu Tukang Batu Pekerja Bahan: Semen portland Pasir Pasang Peralatan:

Rp Rp Rp

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

O.H O.H O.H O.H

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

2,090.00 1,800.00 17,000.00 30,000.00

Kg m3

Rp Rp

1,350.00 280,000.00

Rp Rp

18,403.20 7,560.00

Rp Rp Rp

76,853.20 11,527.98 88,381.18

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

O.H O.H O.H O.H

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

1,235.00 1,800.00 17,000.00 19,500.00

Kg m3

Rp Rp

1,350.00 280,000.00

Rp Rp

13,996.80 8,680.00

Rp Rp Rp

62,211.80 9,331.77 71,543.57

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

0.0220 0.0200 0.2000 0.4000

O.H O.H O.H O.H

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

2,090.00 1,800.00 17,000.00 30,000.00

8.3200 0.0320

Kg m3

Rp Rp

1,350.00 280,000.00

Rp Rp

11,232.00 8,960.00

Rp Rp Rp

71,082.00 10,662.30 81,744.30

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

0.0220 0.0200 0.2000 0.4000

O.H O.H O.H O.H

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

2,090.00 1,800.00 17,000.00 30,000.00

6.9120 0.0350

Kg m3

Rp Rp

1,350.00 280,000.00

Rp Rp

9,331.20 9,800.00

13

14

15

16

17

H. 1

2

3

Pemasangan 1 m2 plesteran 1 Pc : 6 PP tebal 20 mm Tenaga: Mandor Kepala Tukang Batu Tukang Batu Pekerja Bahan: Semen portland Pasir Pasang Peralatan:

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp

70,021.20 10,503.18 80,524.38

0.0220 0.0200 0.2000 0.4000

O.H O.H O.H O.H

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

2,090.00 1,800.00 17,000.00 30,000.00

5.8880 0.0360

Kg m3

Rp Rp

1,350.00 280,000.00

Rp Rp

7,948.80 10,080.00

Rp Rp Rp

68,918.80 10,337.82 79,256.62

Rp Rp Rp Rp

760.00 720.00 6,375.00 11,250.00

Rp

4,195.80

Rp Rp Rp

23,300.80 3,495.12 26,795.92

Rp Rp Rp Rp

380.00 360.00 2,975.00 5,250.00

1,350.00

Rp

2,160.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 finishing siar pasangan batu kali, campuran 1 Pc : 2 PP Tenaga: Mandor 0.0150 O.H Rp 95,000.00 Kepala Tukang 0.0150 O.H Rp 90,000.00 Tukang Batu 0.1500 O.H Rp 85,000.00 Pekerja 0.3000 O.H Rp 75,000.00 Bahan: Semen portland 6.3400 Kg Rp 1,350.00 Pasir Pasang 0.0120 m3 Rp 280,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 acian Tenaga: Mandor 0.0100 O.H Rp 95,000.00 Kepala Tukang 0.0100 O.H Rp 90,000.00 Tukang Batu 0.1000 O.H Rp 85,000.00 Pekerja 0.2000 O.H Rp 75,000.00 Bahan: Semen portland 3.2500 Kg Rp 1,350.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING Pemasangan 1 m2 lantai ubin polos ukuran 20 cm x 20 cm Tenaga: Mandor 0.0350 O.H Rp 95,000.00 Kepala Tukang 0.0350 O.H Rp 90,000.00 Tukang Batu 0.3500 O.H Rp 85,000.00 Pekerja 0.7000 O.H Rp 75,000.00 Bahan: Ubin keramik 20 x 20 Polos 1.0000 dos Rp 60,000.00 Semen Portland 10.4000 Kg Rp 1,350.00 Semen Warna 0.5000 Kg Rp 20,000.00 Pasir Pasang 0.0450 m3 Rp 280,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 lantai ubin polos ukuran 30 cm x 30 cm Tenaga: Mandor 0.0350 O.H Rp 95,000.00 Kepala Tukang 0.0350 O.H Rp 90,000.00 Tukang Batu 0.3500 O.H Rp 85,000.00 Pekerja 0.7000 O.H Rp 75,000.00 Bahan: Ubin keramik 30 cm x 30 cm 1.0500 dos Rp 60,000.00 Semen Portland 10.0000 Kg Rp 1,350.00 Semen Warna 0.5000 Kg Rp 20,000.00 Pasir Pasang 0.0450 m3 Rp 280,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 lantai ubin warna ukuran 30 cm x 30 cm Tenaga: Mandor 0.0130 O.H Rp 95,000.00 Kepala Tukang 0.0130 O.H Rp 90,000.00 Tukang Batu 0.1300 O.H Rp 85,000.00 Pekerja 0.2600 O.H Rp 75,000.00 Bahan: Ubin Keramik 30 x 30 Motif 11.8700 Bh Rp 68,000.00 Semen Portland 10.0000 Kg Rp 1,350.00 Semen Warna 0.6000 Kg Rp 20,000.00

Rp Rp Rp

11,125.00 1,668.75 12,793.75

Rp Rp Rp Rp

1,425.00 1,350.00 12,750.00 22,500.00

Rp Rp

8,559.00 3,360.00

Rp Rp Rp

49,944.00 7,491.60 57,435.60

Rp Rp Rp Rp

950.00 900.00 8,500.00 15,000.00

Rp

4,387.50

Rp Rp Rp

29,737.50 4,460.63 34,198.13

Rp Rp Rp Rp

3,325.00 3,150.00 29,750.00 52,500.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 finishing siar pasangan bata merah Tenaga: Mandor 0.0080 Kepala Tukang Batu 0.0080 Tukang Batu 0.0750 Pekerja 0.1500 Bahan: Semen portland 3.1080 Peralatan:

O.H O.H O.H O.H

Rp Rp Rp Rp

Kg

Rp

95,000.00 90,000.00 85,000.00 75,000.00 1,350.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 finishing siar pasangan conblock ekspose Tenaga: Mandor 0.0040 Kepala Tukang 0.0040 Tukang Batu 0.0350 Pekerja 0.0700 Bahan: Semen portland 1.6000 Peralatan:

O.H O.H O.H O.H

Rp Rp Rp Rp

Kg

Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp Rp Rp Rp

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

60,000.00 14,040.00 10,000.00 12,600.00 185,365.00 27,804.75 213,169.75

3,325.00 3,150.00 29,750.00 52,500.00 63,000.00 13,500.00 10,000.00 12,600.00 187,825.00 28,173.75 215,998.75

Rp Rp Rp Rp

1,235.00 1,170.00 11,050.00 19,500.00

Rp Rp Rp

807,160.00 13,500.00 12,000.00

Pasir Pasang Peralatan:

4

5

6

7

0.0450

Pemasangan 1 m2 lantai ubin warna ukuran 40 cm x 40 cm Tenaga: Mandor 0.0130 Kepala Tukang 0.0130 Tukang Batu 0.1250 Pekerja 0.2500 Bahan: Ubin Keramik 40 x 40 Motif 6.6300 Semen Portland 9.8000 Semen Warna 0.6000 Pasir Pasang 0.0450

Pemasangan 1 m2 lantai ubin granit ukuran 40 cm x 40 cm Tenaga: Mandor 0.0130 Kepala Tukang 0.0130 Tukang Batu 0.1250 Pekerja 0.2500 Bahan: Granite tile 40 x 40 (ex. Granito tile) polished 6.6300 Semen Portland 9.8000 Semen Warna 1.3000 Pasir Pasang 0.0450

Pemasangan 1 m' plint ubin warna ukuran 10 cm x 20 cm Tenaga: Mandor 0.0050 Kepala Tukang 0.0350 Tukang Batu 0.0900 Pekerja 0.0900 Bahan: Plint Cove Keramik 10 x 20 5.3000 Semen Portland 1.1400 Semen Warna 0.0250 Pasir Pasang 0.0030

Pemasangan 1 m2 dinding keramik 20 x 20 cm Tenaga Mandor Kepala Tukang Tukang Batu Pekerja Bahan Keramik 20 x 20 Semen Portland Pasir Pasang Semen Warna Peralatan

m3

Rp

280,000.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

O.H O.H O.H O.H

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

bh Rp 65,000.00 Kg Rp 1,350.00 Kg Rp 20,000.00 m3 Rp 280,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

O.H O.H O.H O.H

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

bh Rp 95,000.00 Kg Rp 1,350.00 Kg Rp 20,000.00 m3 Rp 280,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

O.H O.H O.H O.H

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

bh Rp 17,200.00 Kg Rp 1,350.00 Kg Rp 20,000.00 m3 Rp 280,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

2

3

4

Rp Rp Rp

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

12,600.00 878,215.00 131,732.25 1,009,947.25

1,235.00 1,170.00 10,625.00 18,750.00 430,950.00 13,230.00 12,000.00 12,600.00 500,560.00 75,084.00 575,644.00

1,235.00 1,170.00 10,625.00 18,750.00 629,850.00 13,230.00 26,000.00 12,600.00 713,460.00 107,019.00 820,479.00

475.00 3,150.00 7,650.00 6,750.00 91,160.00 1,539.00 500.00 840.00 112,064.00 16,809.60 128,873.60

0.0450 0.0450 0.4500 0.9000

OH OH OH OH

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

4,275.00 4,050.00 38,250.00 67,500.00

26.5000 9.3000 0.0180 1.9400

Bh Kg m3 Kg

Rp Rp Rp Rp

60,000.00 1,350.00 280,000.00 20,000.00

Rp Rp Rp Rp

1,590,000.00 12,555.00 5,040.00 38,800.00

Rp Rp Rp

1,760,470.00 264,070.50 2,024,540.50

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : I. 1

Rp

PEKERJAAN LANGIT-LANGIT (PLAFOND) Pemasangan 1 m2 langit-langit asbes semen 5 mm (Eternit Biasa 100 X100) Tenaga: Mandor 0.0040 O.H Rp 95,000.00 Kepala Tukang 0.0070 O.H Rp 90,000.00 Tukang Kayu 0.0700 O.H Rp 85,000.00 Pekerja 0.0300 O.H Rp 75,000.00 Bahan: Asbes semen (Eternit Biasa 100 X100) 1.1000 m2 Rp 17,000.00 Paku tripleks 0.0100 Kg Rp 27,000.00 Peralatan Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 langit-langit tripleks ukuran (120 x 240) cm, tebal 4 mm Tenaga: Mandor 0.0050 O.H Rp 95,000.00 Kepala Tukang 0.0100 O.H Rp 90,000.00 Tukang Kayu 0.1000 O.H Rp 85,000.00 Pekerja 0.1000 O.H Rp 75,000.00 Bahan: Tripleks 4 mm (120x240)cm 0.3750 Lembar Rp 60,000.00 Paku tripleks 0.0300 Kg Rp 27,000.00 Peralatan Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 langit-langit lambriziring kayu, tebal 9 mm Kelas I (kayu jati) Tenaga: Mandor 0.0400 O.H Rp 95,000.00 Kepala Tukang 0.0800 O.H Rp 90,000.00 Tukang Kayu 0.8000 O.H Rp 85,000.00 Pekerja 0.8000 O.H Rp 75,000.00 Bahan: Kayu Papan Kelas I (kayu jati) 0.015 m3 Rp 30,591,000.00 Paku tripleks 0.010 Kg Rp 27,000.00 Peralatan Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 langit-langit gypsum board ukuran (1200x2400x9) mm, tebal 9 mm Tenaga:

Rp Rp Rp Rp

380.00 630.00 5,950.00 2,250.00

Rp Rp

18,700.00 270.00

Rp Rp Rp

28,180.00 4,227.00 32,407.00

Rp Rp Rp Rp

475.00 900.00 8,500.00 7,500.00

Rp Rp

22,500.00 810.00

Rp Rp Rp

40,685.00 6,102.75 46,787.75

Rp Rp Rp Rp

3,800.00 7,200.00 68,000.00 60,000.00

Rp Rp

458,865.00 270.00

Rp Rp Rp

598,135.00 89,720.25 687,855.25

Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Gypsum board t 9 mm (ex. Jayaboard) Paku skrup

5

J. 1

2

3

4

5

6

7

Pemasangan 1 m’ list langit-langit kayu profil Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: List kayu profil Paku

PEKERJAAN PENUTUP ATAP Pemasangan 1 m2 atap genteng palentong kecil Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Genteng palentong

Pemasangan 1 m2 atap genteng kodok Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Genteng kodok

0.0050 0.0050 0.0500 0.1000 0.364 0.110

0.003 0.005 0.050 0.050 1.050 0.010

0.0080 0.0075 0.0750 0.1500 25.0000

0.0080 0.0080 0.0750 0.1500 25.0000

Pemasangan 1 m2 atap genteng palentong besar/super Tenaga: Mandor 0.0080 Kepala Tukang 0.0080 Tukang Kayu 0.0750 Pekerja 0.1500 Bahan: Genteng palentong besar 12.0000

Pemasangan 1 m’ bubung genteng palentong Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Genteng bubung Semen Portland Pasir pasang

Pemasangan 1 m’ bubung genteng kodok Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Genteng bubung Semen Portland Pasir pasang

0.0020 0.0200 0.2000 0.4000 5.0000 8.0000 0.0320

0.0020 0.0200 0.2000 0.4000 5.0000 8.0000 0.0320

O.H O.H O.H O.H

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

475.00 450.00 4,250.00 7,500.00

Lembar Rp 70,000.00 Kg Rp 25,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp

25,480.00 2,750.00 40,905.00 6,135.75 47,040.75

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

285.00 450.00 4,250.00 3,750.00

m Rp 11,500.00 kg Rp 27,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp

12,075.00 270.00 21,080.00 3,162.00 24,242.00

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

760.00 675.00 6,375.00 11,250.00

buah Rp 1,700.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp

42,500.00 61,560.00 9,234.00 70,794.00

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

760.00 720.00 6,375.00 11,250.00

buah Rp 2,400.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp

60,000.00 79,105.00 11,865.75 90,970.75

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

760.00 720.00 6,375.00 11,250.00

buah Rp 3,100.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp

37,200.00 56,305.00 8,445.75 64,750.75

Rp Rp Rp Rp

190.00 1,800.00 17,000.00 30,000.00

O.H O.H O.H O.H

O.H O.H O.H O.H

O.H O.H O.H O.H

O.H O.H O.H O.H

O.H O.H O.H O.H

Rp Rp Rp Rp

Rp Rp Rp Rp

Rp Rp Rp Rp

Rp Rp Rp Rp

Rp Rp Rp Rp

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

buah Rp 7,000.00 Kg Rp 1,350.00 m3 Rp 280,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

O.H O.H O.H O.H

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

buah Rp 7,000.00 Kg Rp 1,350.00 m3 Rp 280,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 atap asbes gelombang 1,02 m x 2,00 m x 5 mm Tenaga: Mandor 0.0070 O.H Rp 95,000.00 Kepala Tukang 0.0070 O.H Rp 90,000.00 Tukang Kayu 0.0700 O.H Rp 85,000.00 Pekerja 0.1400 O.H Rp 75,000.00 Bahan: Asbes gel 102 x 200 0.6000 Lbr Rp 65,000.00 Paku asbes 0.1200 Kg Rp 50,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 atap asbes gelombang 1,05 m x 3,00 m x 4 mm Tenaga: Mandor 0.0070 O.H Rp 95,000.00 Kepala Tukang 0.0070 O.H Rp 90,000.00 Tukang Kayu 0.0700 O.H Rp 85,000.00 Pekerja 0.1400 O.H Rp 75,000.00 Bahan: Asbes gel 105 x300 0.3500 Lbr Rp 86,000.00 Paku asbes 0.1200 Kg Rp 50,000.00 Jumlah

Rp Rp Rp Rp Rp Rp

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

35,000.00 10,800.00 8,960.00 103,750.00 15,562.50 119,312.50

190.00 1,800.00 17,000.00 30,000.00 35,000.00 10,800.00 8,960.00 103,750.00 15,562.50 119,312.50

Rp Rp Rp Rp

665.00 630.00 5,950.00 10,500.00

Rp Rp Rp Rp Rp

39,000.00 6,000.00 62,745.00 9,411.75 72,156.75

Rp Rp Rp Rp

665.00 630.00 5,950.00 10,500.00

Rp Rp Rp

30,100.00 6,000.00 53,845.00

8

9

10

11

12

13

K. 1

2

3

Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 atap asbes gelombang 1,05 m x 2,10 m x 4 mm Tenaga: Mandor 0.0070 O.H Rp 95,000.00 Kepala Tukang 0.0070 O.H Rp 90,000.00 Tukang Kayu 0.0700 O.H Rp 85,000.00 Pekerja 0.1400 O.H Rp 75,000.00 Bahan: Asbes gel 105 x 210 0.5100 Lbr Rp 65,000.00 Paku asbes 0.1200 Kg Rp 50,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m’ bubung stel gelombang 1,08 m Tenaga: Mandor 0.0040 O.H Rp 95,000.00 Kepala Tukang 0.0130 O.H Rp 90,000.00 Tukang Kayu 0.1250 O.H Rp 85,000.00 Pekerja 0.0840 O.H Rp 75,000.00 Bahan: Bubung stel gelombang 1,08 m 2.0500 Lbr Rp 39,100.00 Paku skrup 6.0000 buah Rp 250.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 genteng beton Tenaga: Mandor 0.0100 O.H Rp 95,000.00 Kepala Tukang 0.0100 O.H Rp 90,000.00 Tukang Kayu 0.1000 O.H Rp 85,000.00 Pekerja 0.2000 O.H Rp 75,000.00 Bahan: Genteng beton 11.0000 buah Rp 6,500.00 Paku biasa 0.0300 Kg Rp 19,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m’ nok sirap Tenaga: Mandor 0.0060 O.H Rp 95,000.00 Kepala Tukang 0.0250 O.H Rp 90,000.00 Tukang Kayu 0.2500 O.H Rp 85,000.00 Pekerja 0.1250 O.H Rp 75,000.00 Bahan: Seng pelat 0.90 x 1.80 m BJLS 28 0.4000 Lbr Rp 90,000.00 Paku biasa 0.0500 Kg Rp 19,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 atap seng gelombang Tenaga: Mandor 0.0060 O.H Rp 95,000.00 Kepala Tukang 0.0060 O.H Rp 90,000.00 Tukang Kayu 0.0600 O.H Rp 85,000.00 Pekerja 0.1200 O.H Rp 75,000.00 Bahan: 85,000.00 Seng gelombang 3.00 x 0.80 BJLS 28 0.7000 Lbr Rp 19,000.00 Paku biasa 0.0200 Kg Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m’nok atap seng Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Seng pelat 0.90 x 1.80 m BJLS 28 Paku biasa

0.0060 0.0070 0.0700 0.1500 0.3000 0.0400

O.H O.H O.H O.H

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Lbr Rp 90,000.00 Kg Rp 19,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

PEKERJAAN KAYU Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas I Tenaga: Mandor 0.3500 O.H Rp 95,000.00 Kepala Tukang 2.1000 O.H Rp 90,000.00 Tukang Kayu 21.0000 O.H Rp 85,000.00 Pekerja 7.0000 O.H Rp 75,000.00 Bahan: Balok kayu kelas I (kayu jati) 1.1000 m3 Rp 22,684,000.00 Paku biasa 1.2500 Kg Rp 19,000.00 Lem kayu 1.0000 Kg Rp 16,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pembuatan dan pemasangan 1 m3 kusen pintu dan kusen jendela, kayu kelas II Tenaga: Mandor 0.3000 O.H Rp 95,000.00 Kepala Tukang 1.8000 O.H Rp 90,000.00 Tukang Kayu 18.0000 O.H Rp 85,000.00 Pekerja 6.0000 O.H Rp 75,000.00 Bahan: Balok kayu kelas II (kamper) 1.2000 m3 Rp 12,000,000.00 Paku biasa 1.2500 Kg Rp 19,000.00 Lem kayu 1.0000 Kg Rp 16,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pembuatan dan pemasangan 1 m2 pintu klamp standar, kayu kelas II Tenaga:

Rp Rp

8,076.75 61,921.75

Rp Rp Rp Rp

665.00 630.00 5,950.00 10,500.00

Rp Rp Rp Rp Rp

33,150.00 6,000.00 56,895.00 8,534.25 65,429.25

Rp Rp Rp Rp

380.00 1,170.00 10,625.00 6,300.00

Rp Rp Rp Rp Rp

Rp Rp Rp Rp Rp Rp Rp Rp Rp

80,155.00 1,500.00 100,130.00 15,019.50 115,149.50

950.00 900.00 8,500.00 15,000.00 71,500.00 570.00 97,420.00 14,613.00 112,033.00

Rp Rp Rp Rp

570.00 2,250.00 21,250.00 9,375.00

Rp Rp Rp Rp Rp

36,000.00 950.00 70,395.00 10,559.25 80,954.25

Rp Rp Rp Rp

570.00 540.00 5,100.00 9,000.00

Rp Rp Rp Rp Rp

59,500.00 380.00 75,090.00 11,263.50 86,353.50

Rp Rp Rp Rp

570.00 630.00 5,950.00 11,250.00

Rp Rp Rp Rp Rp

27,000.00 760.00 46,160.00 6,924.00 53,084.00

Rp Rp Rp Rp

33,250.00 189,000.00 1,785,000.00 525,000.00

Rp 24,952,400.00 Rp 23,750.00 Rp 16,000.00 Rp 27,524,400.00 Rp 4,128,660.00 Rp 31,653,060.00

Rp Rp Rp Rp

28,500.00 162,000.00 1,530,000.00 450,000.00

Rp Rp Rp

14,400,000.00 23,750.00 16,000.00

Rp 16,610,250.00 Rp 2,491,537.50 Rp 19,101,787.50

Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Papan kayu kelas II (kamper) Paku biasa Peralatan:

4

5

6

7

8

9

10

0.0180 0.1050 1.0500 0.3500

O.H O.H O.H O.H

0.0400 0.0500

m3 Kg

Rp Rp Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

1,710.00 9,450.00 89,250.00 26,250.00

12,800,000.00 19,000.00

Rp Rp

512,000.00 950.00

Jumlah Rp Overhead + Profit ( 15 % ) Rp Nilai HSPK : Rp Pembuatan dan pemasangan 1 m2 pintu klamp sederhana, kayu kelas III Tenaga: Mandor 0.0180 O.H Rp 95,000.00 Rp Kepala Tukang 0.1050 O.H Rp 90,000.00 Rp Tukang Kayu 1.0500 O.H Rp 85,000.00 Rp Pekerja 0.3500 O.H Rp 75,000.00 Rp Bahan: Papan kayu kelas III (kruing) 0.0400 m3 Rp 8,400,000.00 Rp Paku biasa 0.0500 Kg Rp 19,000.00 Rp Peralatan: Jumlah Rp Overhead + Profit ( 15 % ) Rp Nilai HSPK : Rp Pembuatan dan pemasangan 1 m2 daun pintu panel, kayu kelas I Tenaga: Mandor 0.0500 O.H Rp 95,000.00 Rp Kepala Tukang 0.3000 O.H Rp 90,000.00 Rp Tukang Kayu 3.0000 O.H Rp 85,000.00 Rp Pekerja 1.0000 O.H Rp 75,000.00 Rp Bahan: Papan kayu kelas I 0.0400 m3 Rp 30,591,000.00 Rp Lem kayu 1.0000 Kg Rp 16,000.00 Rp Peralatan: Jumlah Rp Overhead + Profit ( 15 % ) Rp Nilai HSPK : Rp Pembuatan dan pemasangan 1 m2 pintu dan jendela kaca, kayu kelas I Tenaga: Mandor 0.0400 O.H Rp 95,000.00 Rp Kepala Tukang 0.2400 O.H Rp 90,000.00 Rp Tukang Kayu 2.4000 O.H Rp 85,000.00 Rp Pekerja 0.8000 O.H Rp 75,000.00 Rp Bahan: Papan kayu kelas I 0.0240 m3 Rp 30,591,000.00 Rp Lem kayu 0.3000 Kg Rp 16,000.00 Rp Peralatan: Jumlah Rp Overhead + Profit ( 15 % ) Rp Nilai HSPK : Rp Pembuatan dan pemasangan 1 m2 pintu dan jendela jalusi kayu kelas I Tenaga: Mandor 0.0500 O.H Rp 95,000.00 Rp Kepala Tukang 0.3000 O.H Rp 90,000.00 Rp Tukang Kayu 3.0000 O.H Rp 85,000.00 Rp Pekerja 1.0000 O.H Rp 75,000.00 Rp Bahan: Papan kayu kelas I 0.0640 m3 Rp 30,591,000.00 Rp Lem kayu 0.5000 Kg Rp 16,000.00 Rp Peralatan: Jumlah Rp Overhead + Profit ( 15 % ) Rp Nilai HSPK : Rp Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90 cm) Tenaga: Mandor 0.0350 O.H Rp 95,000.00 Rp Kepala Tukang 0.2100 O.H Rp 90,000.00 Rp Tukang Kayu 2.1000 O.H Rp 85,000.00 Rp Pekerja 0.7000 O.H Rp 75,000.00 Rp Bahan: Papan kayu kelas II 0.0250 m3 Rp 12,800,000.00 Rp Paku biasa 0.0300 Kg Rp 19,000.00 Rp Lem kayu 0.5000 kg Rp 16,000.00 Rp Triplek pintu 4 mm (90x210) cm 1.0000 Lembar Rp 60,000.00 Rp Peralatan: Jumlah Rp Overhead + Profit ( 15 % ) Rp Nilai HSPK : Rp Pembuatan 1 m2 pintu plywood rangkap, rangka expose kayu kelas I Tenaga: Mandor 0.0400 O.H Rp 95,000.00 Rp Kepala Tukang 0.2400 O.H Rp 90,000.00 Rp Tukang Kayu 2.4000 O.H Rp 85,000.00 Rp Pekerja 0.8000 O.H Rp 75,000.00 Rp Bahan: Papan kayu kelas I 0.0256 m3 Rp 30,591,000.00 Rp Paku biasa 0.0300 Kg Rp 19,000.00 Rp Lem kayu 0.5000 Kg Rp 16,000.00 Rp Triplek pintu 4 mm (90x210) cm 1.0000 Lembar Rp 97,500.00 Rp Peralatan: Jumlah Rp Overhead + Profit ( 15 % ) Rp Nilai HSPK : Rp Pemasangan 1 m2 jalusi kusen, kayu kelas I Tenaga: Mandor 0.3350 O.H Rp 95,000.00 Rp Kepala Tukang 0.2000 O.H Rp 90,000.00 Rp Tukang Kayu 2.0000 O.H Rp 85,000.00 Rp Pekerja 0.6700 O.H Rp 75,000.00 Rp Bahan: Papan kayu kelas I 0.0600 m3 Rp 30,591,000.00 Rp Paku biasa 0.1500 Kg Rp 19,000.00 Rp Peralatan: Jumlah Rp

639,610.00 95,941.50 735,551.50

1,710.00 9,450.00 89,250.00 26,250.00 336,000.00 950.00 463,610.00 69,541.50 533,151.50

4,750.00 27,000.00 255,000.00 75,000.00 1,223,640.00 16,000.00 1,601,390.00 240,208.50 1,841,598.50

3,800.00 21,600.00 204,000.00 60,000.00 734,184.00 4,800.00 1,028,384.00 154,257.60 1,182,641.60

4,750.00 27,000.00 255,000.00 75,000.00 1,957,824.00 8,000.00 2,327,574.00 349,136.10 2,676,710.10

3,325.00 18,900.00 178,500.00 52,500.00 320,000.00 570.00 8,000.00 60,000.00 641,795.00 96,269.25 738,064.25

3,800.00 21,600.00 204,000.00 60,000.00 783,129.60 570.00 8,000.00 97,500.00 1,178,599.60 176,789.94 1,355,389.54

31,825.00 18,000.00 170,000.00 50,250.00 1,835,460.00 2,850.00 2,108,385.00

11

12

13

14

15

16

17

18

Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m3 konstruksi kuda-kuda konvensional, kayu kelas I bentang 6 meter Tenaga: Mandor 0.2000 O.H Rp 95,000.00 Kepala Tukang 1.2000 O.H Rp 90,000.00 Tukang Kayu 12.0000 O.H Rp 85,000.00 Pekerja 4.0000 O.H Rp 75,000.00 Bahan: Balok kayu kelas I 1.1000 m3 Rp 22,684,000.00 Besi strip 15.0000 Kg Rp 13,500.00 Paku biasa 5.6000 kg Rp 19,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m3 konstruksi kuda-kuda expose, kayu kelas I Tenaga: Mandor 0.3350 O.H Rp 95,000.00 Kepala Tukang 2.0100 O.H Rp 90,000.00 Tukang Kayu 20.1000 O.H Rp 85,000.00 Pekerja 6.7000 O.H Rp 75,000.00 Bahan: Balok kayu kelas I (kayu jati) 1.2000 m3 Rp 22,684,000.00 Besi strip 15.0000 Kg Rp 13,500.00 Paku biasa 5.6000 kg Rp 19,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m3 konstruksi gordeng, kayu kelas II Tenaga: Mandor 0.3350 O.H Rp 95,000.00 Kepala Tukang 2.0100 O.H Rp 90,000.00 Tukang Kayu 20.1000 O.H Rp 85,000.00 Pekerja 6.7000 O.H Rp 75,000.00 Bahan: Balok kayu kelas II (kayu kamper) 1.1000 m3 Rp 12,000,000.00 Besi strip 15.0000 Kg Rp 13,500.00 Paku biasa 3.0000 kg Rp 19,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 rangka atap genteng keramik, kayu kelas II Tenaga: Mandor 0.0050 O.H Rp 95,000.00 Kepala Tukang 0.0100 O.H Rp 90,000.00 Tukang Kayu 0.1000 O.H Rp 85,000.00 Pekerja 0.1000 O.H Rp 75,000.00 Bahan: Kelas II (kayu kamper) kaso 0.0140 m3 Rp 9,900,000.00 Kelas II (kayu kamper) reng 0.0360 m3 Rp 8,400,000.00 Paku biasa 0.2500 kg Rp 19,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 rangka atap genteng beton, kayu kelas II Tenaga: Mandor 0.0050 O.H Rp 95,000.00 Kepala Tukang 0.0100 O.H Rp 90,000.00 Tukang Kayu 0.1000 O.H Rp 85,000.00 Pekerja 0.1000 O.H Rp 75,000.00 Bahan: Kelas II (kayu kamper) kaso 0.0140 m3 Rp 9,900,000.00 Kelas II (kayu kamper) reng 0.0570 m3 Rp 8,400,000.00 Paku biasa 0.2500 kg Rp 19,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 rangka atap sirap, kayu kelas II Tenaga: Mandor 0.0060 O.H Rp 95,000.00 Kepala Tukang 0.0120 O.H Rp 90,000.00 Tukang Kayu 0.1200 O.H Rp 85,000.00 Pekerja 0.1200 O.H Rp 75,000.00 Bahan: Kayu kelas II (Kayu kamper) kaso 0.0140 m3 Rp 9,900,000.00 Paku biasa 0.0570 kg Rp 19,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 rangka langit-langit (50 x 100) cm, kayu kelas II Tenaga: Mandor 0.0750 O.H Rp 95,000.00 Kepala Tukang 0.0300 O.H Rp 90,000.00 Tukang Kayu 0.3000 O.H Rp 85,000.00 Pekerja 0.1500 O.H Rp 75,000.00 Bahan: Kaso-kaso 5 x 7cm kayu kelas II 0.0154 m3 Rp 9,900,000.00 Paku biasa 0.2000 kg Rp 19,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 rangka langit-langit (60 x 60) cm, kayu kelas II Tenaga: Mandor 0.0100 O.H Rp 95,000.00 Kepala Tukang 0.0300 O.H Rp 90,000.00 Tukang Kayu 0.3000 O.H Rp 85,000.00 Pekerja 0.2000 O.H Rp 75,000.00

Rp Rp

316,257.75 2,424,642.75

Rp Rp Rp Rp

19,000.00 108,000.00 1,020,000.00 300,000.00

Rp Rp Rp

24,952,400.00 202,500.00 106,400.00

Rp 26,708,300.00 Rp 4,006,245.00 Rp 30,714,545.00

Rp Rp Rp Rp

31,825.00 180,900.00 1,708,500.00 502,500.00

Rp Rp Rp

27,220,800.00 202,500.00 106,400.00

Rp 29,953,425.00 Rp 4,493,013.75 Rp 34,446,438.75

Rp Rp Rp Rp

31,825.00 180,900.00 1,708,500.00 502,500.00

Rp Rp Rp

13,200,000.00 202,500.00 57,000.00

Rp 15,883,225.00 Rp 2,382,483.75 Rp 18,265,708.75

Rp Rp Rp Rp

475.00 900.00 8,500.00 7,500.00

Rp Rp Rp

138,600.00 302,400.00 4,750.00

Rp Rp Rp

463,125.00 69,468.75 532,593.75

Rp Rp Rp Rp

475.00 900.00 8,500.00 7,500.00

Rp Rp Rp

138,600.00 478,800.00 4,750.00

Rp Rp Rp

639,525.00 95,928.75 735,453.75

Rp Rp Rp Rp

570.00 1,080.00 10,200.00 9,000.00

Rp Rp

138,600.00 1,083.00

Rp Rp Rp

160,533.00 24,079.95 184,612.95

Rp Rp Rp Rp

7,125.00 2,700.00 25,500.00 11,250.00

Rp Rp

152,460.00 3,800.00

Rp Rp Rp

202,835.00 30,425.25 233,260.25

Rp Rp Rp Rp

950.00 2,700.00 25,500.00 15,000.00

Bahan: Kaso-kaso 5 x 7cm kayu kelas II Paku biasa Peralatan:

19

20

21

22

23

L. 1

2

3

0.0163 0.2500

m3 kg

Rp Rp

9,900,000.00 19,000.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m’ lisplank ukuran (3 x 20) cm, kayu kelas I Tenaga: Mandor 0.0050 Kepala Tukang 0.0200 Tukang Kayu 0.2000 Pekerja 0.1000 Bahan: Papan kayu kelas I 0.0108 Paku biasa 0.1000 Peralatan:

O.H O.H O.H O.H m3 kg

Rp Rp Rp Rp Rp Rp

O.H O.H O.H O.H

Rp Rp Rp

210,270.00 31,540.50 241,810.50

Rp Rp Rp Rp

475.00 1,800.00 17,000.00 7,500.00

30,591,000.00 19,000.00

Rp Rp

330,382.80 1,900.00

Rp Rp Rp

359,057.80 53,858.67 412,916.47

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

475.00 1,800.00 17,000.00 7,500.00

30,591,000.00 19,000.00

Rp Rp

336,501.00 950.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 rangka dinding pemisah (60 x 120) cm kayu kelas II Tenaga: Mandor 0.0080 O.H Rp 95,000.00 Kepala Tukang 0.0450 O.H Rp 90,000.00 Tukang Kayu 0.4500 O.H Rp 85,000.00 Pekerja 0.1500 O.H Rp 75,000.00 Bahan: Balok kayu kelas II 0.0280 m3 Rp 12,000,000.00 Paku biasa 0.1500 kg Rp 19,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 dinding pemisah triplek rangkap, rangka kayu kelas II Tenaga: Mandor 0.0100 O.H Rp 95,000.00 Kepala Tukang 0.0600 O.H Rp 90,000.00 Tukang Kayu 0.6000 O.H Rp 85,000.00 Pekerja 0.2000 O.H Rp 75,000.00 Bahan: Kelas II (kayu kamper) balok 0.0280 m3 Rp 12,000,000.00 Paku Biasa 0.1500 kg Rp 19,000.00 Triplek tebal 4 mm ukuran (120 x 240) cm 0.8600 Lembar Rp 60,000.00 Lem kayu 0.5600 kg Rp 16,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 dinding lambrisering dari triplek ukuran (120 x 240) cm Tenaga: Mandor 0.0010 O.H Rp 95,000.00 Kepala Tukang 0.0080 O.H Rp 90,000.00 Tukang Kayu 0.0750 O.H Rp 85,000.00 Pekerja 0.0250 O.H Rp 75,000.00 Bahan: Triplek 4 mm ukuran (120 x 240) cm 0.4000 Lembar Rp 60,000.00 Paku biasa 0.0500 kg Rp 19,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp

364,226.00 54,633.90 418,859.90

m3 kg

Rp Rp Rp Rp

161,370.00 4,750.00

95,000.00 90,000.00 85,000.00 75,000.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m’ lisplank ukuran (3 x 30) cm, kayu kelas I Tenaga: Mandor 0.0050 Kepala Tukang 0.0200 Tukang Kayu 0.2000 Pekerja 0.1000 Bahan: Papan kayu kelas I 0.0110 Paku biasa 0.0500 Peralatan:

Rp Rp

Rp Rp

Rp Rp Rp Rp

760.00 4,050.00 38,250.00 11,250.00

Rp Rp

336,000.00 2,850.00

Rp Rp Rp

393,160.00 58,974.00 452,134.00

Rp Rp Rp Rp

950.00 5,400.00 51,000.00 15,000.00

Rp Rp Rp Rp

336,000.00 2,850.00 51,600.00 8,960.00

Rp Rp Rp

471,760.00 70,764.00 542,524.00

Rp Rp Rp Rp

95.00 720.00 6,375.00 1,875.00

Rp Rp

24,000.00 950.00

Rp Rp Rp

34,015.00 5,102.25 39,117.25

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

285.00 5,400.00 51,000.00 4,500.00

220,000.00

Rp

220,000.00

Rp Rp Rp

281,185.00 42,177.75 323,362.75

PEKERJAAN KUNCI DAN KACA Pemasangan 1 buah kunci tanam antik Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Kunci tanam antik ex west, cavell, beleza setara

0.0030 0.0600 0.6000 0.0600

O.H O.H O.H O.H

1.0000

buah

Rp Rp Rp Rp Rp

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 buah kunci tanam biasa Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Kunci tanam biasa ex west, cavell, beleza setara

0.005000 0.050000 0.500000 0.010000

O.H O.H O.H O.H

1.000000

buah

Rp Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

475.00 4,500.00 42,500.00 750.00

100,000.00

Rp

100,000.00

Rp Rp Rp

148,225.00 22,233.75 170,458.75

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 buah kunci kamar mandi Tenaga: Mandor Kepala Tukang

0.0030 0.0500

O.H O.H

Rp Rp

95,000.00 90,000.00

Rp Rp

285.00 4,500.00

Tukang Kayu Pekerja Bahan: Kunci tanam KM

4

5

6

7

8

9

10

11

0.5000 0.0050

O.H O.H

1.0000

buah

Rp Rp Rp

85,000.00 75,000.00 77,500.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasanga 1 buah kunci silinder Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Kunci silinder

0.0030 0.0500 0.5000 0.0050

O.H O.H O.H O.H

1.0000

buah

Rp Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00 50,000.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 buah engsel pintu Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Engsel pintu ex west, cavell, beleza setara

0.0080 0.0150 0.1500 0.0150

O.H O.H O.H O.H

1.0000

buah

Rp Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

0.0005 0.0100 0.1000 0.0100

O.H O.H O.H O.H

1.0000

buah

Rp Rp Rp Rp Rp

0.0005 0.0200 0.2000 0.1000

O.H O.H O.H O.H

1.0000

buah

Rp Rp Rp Rp Rp

0.0080 0.0150 0.1500 0.0150

O.H O.H O.H O.H

1.0000

buah

Rp Rp Rp Rp Rp

0.0080 0.0150 0.1500 0.0150

O.H O.H O.H O.H

1.0000

buah

Rp Rp Rp Rp Rp

0.0030 0.0500 0.5000 0.0500

O.H O.H O.H O.H

1.0000

set

Rp Rp Rp Rp Rp

0.0010 0.0200 0.2000 0.0200

O.H O.H O.H O.H

1.0000

buah

Rp Rp Rp Rp Rp

Rp Rp Rp Rp

285.00 4,500.00 42,500.00 375.00

Rp

50,000.00

Rp Rp Rp

97,660.00 14,649.00 112,309.00

78,985.00 11,847.75 90,832.75

Rp Rp Rp Rp

47.50 900.00 8,500.00 750.00

Rp

27,500.00

Rp Rp Rp

37,697.50 5,654.63 43,352.13

Rp Rp Rp Rp

47.50 1,800.00 17,000.00 7,500.00

Rp

25,000.00

Rp Rp Rp

51,347.50 7,702.13 59,049.63

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

760.00 1,350.00 12,750.00 1,125.00

120,000.00

Rp

120,000.00

Rp Rp Rp

135,985.00 20,397.75 156,382.75

95,000.00 90,000.00 85,000.00 75,000.00 27,500.00

95,000.00 90,000.00 85,000.00 75,000.00 25,000.00

95,000.00 90,000.00 85,000.00 75,000.00 39,500.00

95,000.00 90,000.00 85,000.00 75,000.00 40,000.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 buah kunci slot Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Kunci slot

125,160.00 18,774.00 143,934.00

Rp Rp Rp

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 buah door closer Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: door closer

Rp Rp Rp

63,000.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 buah kait angin Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Kait angin

77,500.00

Rp

63,000.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 buah spring knip Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: spring knip

Rp

760.00 1,350.00 12,750.00 1,125.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 buah engsel angin Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Engsel angin

42,500.00 375.00

Rp Rp Rp Rp

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 buah engsel jendela kupu kupu Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Engsel kupu kupu

Rp Rp

Rp Rp Rp Rp

760.00 1,350.00 12,750.00 1,125.00

Rp

39,500.00

Rp Rp Rp

55,485.00 8,322.75 63,807.75

Rp Rp Rp Rp

285.00 4,500.00 42,500.00 3,750.00

Rp

40,000.00

Rp Rp Rp

91,035.00 13,655.25 104,690.25

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

95.00 1,800.00 17,000.00 1,500.00

330,000.00

Rp

330,000.00

Rp Rp Rp

350,395.00 52,559.25 402,954.25

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

12

13

14

15

16

17

18

M. 1

2

Pemasangan 1 buah door holder Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: door holder

0.0030 0.0500 0.5000 0.0500

O.H O.H O.H O.H

1.0000

buah

Rp Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

285.00 4,500.00 42,500.00 3,750.00

175,000.00

Rp

175,000.00

Rp Rp Rp

226,035.00 33,905.25 259,940.25

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 buah door stop Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: door stop

0.0050 0.0100 0.1000 0.0100

O.H O.H O.H O.H

1.0000

buah

Rp Rp Rp Rp

Rp Rp Rp Rp

475.00 900.00 8,500.00 750.00

Rp

70,000.00

Rp Rp Rp

80,625.00 12,093.75 92,718.75

Rp Rp Rp Rp

123.50 2,250.00 21,250.00 1,875.00

Rp

18,000.00

Rp Rp Rp

43,498.50 6,524.78 50,023.28

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

76.00 1,350.00 12,750.00 1,125.00

m2 Rp 100,000.00 Kg Rp 60,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp

110,000.00 3,000.00 128,301.00 19,245.15 147,546.15

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

76.00 1,350.00 12,750.00 1,125.00

m2 Rp 175,000.00 Kg Rp 60,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp

192,500.00 3,000.00 210,801.00 31,620.15 242,421.15

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

85.50 1,530.00 14,450.00 1,275.00

m2 Rp 200,000.00 Kg Rp 60,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp

220,000.00 4,200.00 241,540.50 36,231.08 277,771.58

Rp

95,000.00 90,000.00 85,000.00 75,000.00 70,000.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 buah kunci lemari Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: kunci lemari

0.0013 0.0250 0.2500 0.0250

O.H O.H O.H O.H

1.0000

set

Rp Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00 18,000.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m2 kaca tebal 3 mm Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Kaca tebal 3 mm sealant

Pemasangan kaca tebal 1 m2 kaca tebal 5 mm Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Kaca tebal 5 mm Sealant

Pemasangan kaca tebal 1 m2 kaca tebal 8 mm Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: Kaca tebal 8 mm Sealant

Pemasangan 1 m2 kaca buram tebal 12 mm Tenaga: Mandor Kepala Tukang Tukang Kayu Pekerja Bahan: kaca buram tebal 12 mm Sealant

0.0008 0.0150 0.1500 0.0150 1.1000 0.0500

0.0008 0.0150 0.1500 0.0150 1.1000 0.0500

0.0009 0.0170 0.1700 0.0170 1.1000 0.0700

0.0013 0.0250 0.2500 0.0250 1.1000 0.0700

O.H O.H O.H O.H

O.H O.H O.H O.H

O.H O.H O.H O.H

O.H O.H O.H O.H

Rp Rp Rp Rp

Rp Rp Rp Rp

Rp Rp Rp Rp

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

m2 Rp 92,500.00 Kg Rp 60,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

PEKERJAAN PENGECATAN Pengecatan 1 m2 bidang kayu baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) Tenaga: Mandor 0.0030 O.H Rp 95,000.00 Kepala Tukang 0.0060 O.H Rp 90,000.00 Tukang Cat 0.0090 O.H Rp 85,000.00 Pekerja 0.0700 O.H Rp 75,000.00 Bahan: Cat meni kayu 0.2000 Kg Rp 30,000.00 Plamur kayu 0.1500 Kg Rp 40,000.00 Cat dasar 0.1700 Kg Rp 70,000.00 Cat penutup 0.2600 Kg Rp 70,000.00 Kuas 0.0100 buah Rp 20,000.00 Thinner B / minyak cat 0.0300 Ltr Rp 25,000.00 Kertas gosok/ Ampelas 0.2000 Lbr Rp 4,500.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pengecatan 1 m2 bidang kayu baru (1 lapis plamir, 1 lapis cat dasar, 3 lapis cat penutup)

Rp Rp Rp Rp Rp Rp Rp Rp Rp

123.50 2,250.00 21,250.00 1,875.00 101,750.00 4,200.00 131,448.50 19,717.28 151,165.78

Rp Rp Rp Rp

285.00 540.00 765.00 5,250.00

Rp Rp Rp Rp Rp Rp Rp

6,000.00 6,000.00 11,900.00 18,200.00 200.00 750.00 900.00

Rp Rp Rp

50,790.00 7,618.50 58,408.50

Tenaga: Mandor Kepala Tukang Tukang Cat Pekerja Bahan: Cat meni kayu Plamur kayu Cat dasar Cat penutup Kuas Thinner B / minyak cat Kertas gosok/ Ampelas Peralatan:

3

4

5

6

7

8

9

0.0030 0.0040 0.1050 0.0700

O.H O.H O.H O.H

0.2000 0.1500 0.1700 0.3500 0.0100 0.0300 0.2000

Kg Kg Kg Kg buah Kg Lbr

Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

285.00 360.00 8,925.00 5,250.00

30,000.00 40,000.00 70,000.00 70,000.00 20,000.00 25,000.00 4,500.00

Rp Rp Rp Rp Rp Rp Rp

6,000.00 6,000.00 11,900.00 24,500.00 200.00 750.00 900.00

Rp Rp Rp

65,070.00 9,760.50 74,830.50

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

285.00 1,440.00 5,100.00 3,000.00

74,000.00 75,000.00 4,500.00

Rp Rp Rp

11,100.00 27,900.00 9,000.00

Rp Rp Rp

57,825.00 8,673.75 66,498.75

95,000.00 75,000.00

Rp Rp

570.00 7,500.00

1,500.00

Rp

525.00

Rp Rp Rp

8,595.00 1,289.25 9,884.25

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

285.00 1,440.00 13,600.00 12,000.00

60,000.00 65,000.00 4,500.00

Rp Rp Rp

9,000.00 3,250.00 450.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pelaburan 1 m2 bidang kayu dengan politur Tenaga: Mandor Kepala Tukang Tukang Cat Pekerja Bahan: Politur Politur jadi Kertas gosok/ Ampelas Peralatan:

0.0030 0.0160 0.0600 0.0400

O.H O.H O.H O.H

0.1500 0.3720 2.0000

Ltr Ltr Lbr

Rp Rp Rp Rp Rp Rp Rp

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pelaburan 1 m2 bidang kayu dengan cat residu dan ter Tenaga: Mandor 0.0060 Pekerja 0.1000 Bahan: Residu atau ter 0.3500 Peralatan:

O.H O.H Ltr

Rp Rp Rp

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pelaburan 1 m2 bidang kayu dengan vernis Tenaga: Mandor Kepala Tukang Tukang Cat Pekerja Bahan: Vernis Dempul Kertas gosok/ Ampelas Peralatan:

0.0030 0.0160 0.1600 0.1600

O.H O.H O.H O.H

0.1500 0.0500 0.1000

Ltr Kg Lbr

Rp Rp Rp Rp Rp Rp Rp

Jumlah Rp Overhead + Profit ( 15 % ) Rp Nilai HSPK : Rp Pengecatan 1 m2 tembok interior baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) Tenaga: Mandor 0.0030 O.H Rp 95,000.00 Rp Kepala Tukang 0.0063 O.H Rp 90,000.00 Rp Tukang Cat 0.0630 O.H Rp 85,000.00 Rp Pekerja 0.0200 O.H Rp 75,000.00 Rp Bahan: Plamur tembok 0.1000 Kg Rp 27,500.00 Rp Cat Dasar interior 0.1000 Kg Rp 250,000.00 Rp Cat Penutup interior ex Mowilex, Dulux, Jotun - setara 0.2600 Kg Rp 250,000.00 Rp Peralatan: Jumlah Rp Overhead + Profit ( 15 % ) Rp Nilai HSPK : Rp Pengecatan 1 m2 tembok interior lama (1 lapis cat dasar, 2 lapis cat penutup) Tenaga: Mandor 0.0030 O.H Rp 95,000.00 Rp Kepala Tukang 0.0042 O.H Rp 90,000.00 Rp Tukang Cat 0.0420 O.H Rp 85,000.00 Rp Pekerja 0.0280 O.H Rp 75,000.00 Rp Bahan: Cat Dasar interior 0.1200 Kg Rp 250,000.00 Rp Cat Penutup interior ex Mowilex, Dulux, Jotun - setara 0.1800 Kg Rp 250,000.00 Rp Peralatan: Jumlah Rp Overhead + Profit ( 15 % ) Rp Nilai HSPK : Rp Pengecatan 1 m2 tembok exterior baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup) Tenaga: Mandor 0.0030 O.H Rp 95,000.00 Rp Kepala Tukang 0.0063 O.H Rp 90,000.00 Rp Tukang Cat 0.0630 O.H Rp 85,000.00 Rp Pekerja 0.0200 O.H Rp 75,000.00 Rp Bahan: Plamur tembok 0.1000 Kg Rp 27,500.00 Rp Cat Dasar exterior 0.1000 Ltr Rp 200,000.00 Rp Cat Penutup exterior ex Mowilex, Dulux, Jotun - setara 0.2600 Kg Rp 200,000.00 Rp Peralatan: Jumlah Rp Overhead + Profit ( 10 % ) Rp Nilai HSPK : Rp Pengecatan 1 m2 tembok exterior lama (1 lapis cat dasar, 2 lapis cat penutup) Tenaga: Mandor 0.0030 O.H Rp 95,000.00 Rp Kepala Tukang 0.0042 O.H Rp 90,000.00 Rp Tukang Cat 0.0420 O.H Rp 85,000.00 Rp Pekerja 0.0280 O.H Rp 75,000.00 Rp Bahan: Cat Dasar exterior 0.1200 Ltr Rp 200,000.00 Rp

40,025.00 6,003.75 46,028.75

285.00 567.00 5,355.00 1,500.00 2,750.00 25,000.00 65,000.00 100,457.00 15,068.55 115,525.55

285.00 378.00 3,570.00 2,100.00 30,000.00 45,000.00 81,333.00 12,199.95 93,532.95

285.00 567.00 5,355.00 1,500.00 2,750.00 20,000.00 52,000.00 82,457.00 8,245.70 90,702.70

285.00 378.00 3,570.00 2,100.00 24,000.00

Cat Penutup exterior ex Mowilex, Dulux, Jotun - setara Peralatan:

10

11

12

13

14

N. 1

2

3

0.1800

Kg

Rp

200,000.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pengecatan 1 m2 permukaan baja dengan meni besi Tenaga: Mandor Kepala Tukang Tukang Cat Pekerja Bahan: Cat meni besi Kuas Peralatan:

Rp

36,000.00

Rp Rp Rp

66,333.00 9,949.95 76,282.95

0.0025 0.0200 0.2000 0.0200

O.H O.H O.H O.H

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

237.50 1,800.00 17,000.00 1,500.00

0.1000 0.0100

Kg Buah

Rp Rp

42,500.00 20,000.00

Rp Rp

4,250.00 200.00

Jumlah Overhead + Profit ( 10 % ) Nilai HSPK : Pengecatan 1 m2 permukaan baja dengan menie besi dengan perancah Tenaga: Mandor 0.0075 O.H Rp 95,000.00 Kepala Tukang 0.0225 O.H Rp 90,000.00 Tukang Cat 0.2250 O.H Rp 85,000.00 Pekerja 0.2500 O.H Rp 75,000.00 Bahan: Cat meni besi 0.1000 Kg Rp 42,500.00 Thinner B / minyak cat 0.0100 Ltr Rp 25,000.00 Kuas 0.0100 Buah Rp 20,000.00 Perancah Kayu 0.0020 m3 Rp 4,850,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 1 lapis cat mutakhir Tenaga: Mandor 0.0030 O.H Rp 95,000.00 Kepala Tukang 0.0120 O.H Rp 90,000.00 Tukang Cat 0.0600 O.H Rp 85,000.00 Pekerja 0.0600 O.H Rp 75,000.00 Bahan: Cat besi/kayu Emco 0.3000 Kg Rp 70,000.00 Kuas 0.0100 Buah Rp 20,000.00 Thinner B / minyak cat 0.0100 Ltr Rp 25,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pengecatan 1 m2 permukaan baja galvanis secara manual sistem 3 lapis Tenaga: Mandor 0.0200 O.H Rp 95,000.00 Kepala Tukang 0.0800 O.H Rp 90,000.00 Tukang Cat 0.8000 O.H Rp 85,000.00 Pekerja 0.4000 O.H Rp 75,000.00 Bahan: Cat besi/kayu Emco 0.3600 Kg Rp 70,000.00 Kuas 0.0100 Buah Rp 20,000.00 Thinner B / minyak cat 0.0100 Ltr Rp 25,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pengecatan 1 m2 permukaan baja galvanis secara semprot sistem 3 lapis cat mutakhir Tenaga: Mandor 0.0200 O.H Rp 95,000.00 Kepala Tukang 0.0700 O.H Rp 90,000.00 Tukang Cat 0.7000 O.H Rp 85,000.00 Pekerja 0.4000 O.H Rp 75,000.00 Bahan: Cat besi/kayu Emco 0.3000 Kg Rp 70,000.00 Thinner B / minyak cat 0.0100 Ltr Rp 25,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : PEKERJAAN SANITASI DALAM GEDUNG Pemasangan 1 buah closet duduk / monoblock Tenaga: Mandor 0.1600 O.H Rp 95,000.00 Kepala Tukang 0.0100 O.H Rp 90,000.00 Tukang batu 1.1000 O.H Rp 85,000.00 Pekerja 3.3000 O.H Rp 75,000.00 Bahan: Closet duduk Putih Porselin Komplit 1.0000 Unit Rp 3,500,000.00 Perlengkapan 0.0600 Ls Rp 3,500,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 buah closet jongkok porselen Tenaga: Mandor 0.1600 O.H Rp 95,000.00 Kepala Tukang 0.1500 O.H Rp 90,000.00 Tukang batu 1.5000 O.H Rp 85,000.00 Pekerja 1.0000 O.H Rp 75,000.00 Bahan: Closet jongkok Porselin Warna Putih 1.0000 Unit Rp 390,000.00 Semen Portland 6.0000 Kg Rp 1,350.00 Pasir pasang 0.0100 M3 Rp 280,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 buah wastafel Tenaga:

Rp Rp Rp

24,987.50 3,748.13 28,735.63

Rp Rp Rp Rp

712.50 2,025.00 19,125.00 18,750.00

Rp Rp Rp Rp

4,250.00 250.00 200.00 9,700.00

Rp Rp Rp

55,012.50 8,251.88 63,264.38

Rp Rp Rp Rp

285.00 1,080.00 5,100.00 4,500.00

Rp Rp Rp

21,000.00 200.00 250.00

Rp Rp Rp

32,415.00 4,862.25 37,277.25

Rp Rp Rp Rp

1,900.00 7,200.00 68,000.00 30,000.00

Rp Rp Rp

25,200.00 200.00 250.00

Rp Rp Rp

132,750.00 19,912.50 152,662.50

Rp Rp Rp Rp

1,900.00 6,300.00 59,500.00 30,000.00

Rp Rp

21,000.00 250.00

Rp Rp Rp

118,950.00 17,842.50 136,792.50

Rp Rp Rp Rp

15,200.00 900.00 93,500.00 247,500.00

Rp Rp

3,500,000.00 210,000.00

Rp Rp Rp

4,067,100.00 610,065.00 4,677,165.00

Rp Rp Rp Rp

15,200.00 13,500.00 127,500.00 75,000.00

Rp Rp Rp

390,000.00 8,100.00 2,800.00

Rp Rp Rp

632,100.00 94,815.00 726,915.00

Mandor Kepala Tukang Tukang batu Pekerja Bahan: Wastafel Semen Portland Pasir pasang Perlengkapan Peralatan:

4

5

6

7

8

9

10

0.0600 0.1500 1.4500 1.2000

O.H O.H O.H O.H

1.2000 6.0000 0.0100 0.1200

Unit Kg M3 %

Rp Rp Rp Rp Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

5,700.00 13,500.00 123,250.00 90,000.00

1,000,000.00 1,350.00 280,000.00 1,000,000.00

Rp Rp Rp Rp

1,200,000.00 8,100.00 2,800.00 120,000.00

Rp Rp Rp

1,563,350.00 234,502.50 1,797,852.50

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 buah bak air fibreglass uk.55 x 55 x 60 cm Tenaga: Mandor 0.0150 Kepala Tukang 0.0450 Tukang batu 0.4500 Pekerja 0.3000 Bahan: Bak air fibreglass uk.55 x 55 x 60 cm 1.0000 Perlengkapan 12%xbak Peralatan:

O.H O.H O.H O.H Unit Ls

Rp Rp Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

1,425.00 4,050.00 38,250.00 22,500.00

350,000.00 350,000.00

Rp Rp

350,000.00 42,000.00

Rp Rp Rp

458,225.00 68,733.75 526,958.75

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 buah bak cuci piring stainlessteel Tenaga: Mandor Kepala Tukang Tukang batu Pekerja Bahan: Bak cuci stainless steel Water drain + Assesories Peralatan:

0.0150 0.0300 0.3000 0.0300

O.H O.H O.H O.H

1.0000 1.0000

Unit buah

Rp Rp Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

1,425.00 2,700.00 25,500.00 2,250.00

650,000.00 60,000.00

Rp Rp

650,000.00 60,000.00

Rp Rp Rp

741,875.00 111,281.25 853,156.25

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 buah bak cuci piring teraso Tenaga: Mandor Kepala Tukang Tukang batu Pekerja Bahan: Bak cuci teraso Water drain + Assesories Semen portland Pasir pasang Peralatan:

0.0250 0.0500 0.5000 0.0500

O.H O.H O.H O.H

1.0000 1.0000 20.0000 0.0500

Unit buah Kg M3

Rp Rp Rp Rp Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

2,375.00 4,500.00 42,500.00 3,750.00

1,000,000.00 60,000.00 1,350.00 280,000.00

Rp Rp Rp Rp

1,000,000.00 60,000.00 27,000.00 14,000.00

Rp Rp Rp

1,154,125.00 173,118.75 1,327,243.75

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 buah floor drain Tenaga: Mandor Kepala Tukang Tukang batu Pekerja Bahan: Floor drain Stainless Peralatan:

0.0050 0.0100 0.1000 0.0100

O.H O.H O.H O.H

1.0000

Unit

Rp Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00 75,000.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 buah bak kontrol pasangan bata 30x30 tinggi 35 cm Tenaga: Mandor 0.0110 O.H Rp 95,000.00 Kepala Tukang 0.0720 O.H Rp 90,000.00 Tukang batu 0.7200 O.H Rp 85,000.00 Pekerja 2.1600 O.H Rp 75,000.00 Bahan: Bata merah 40.0000 buah Rp 1,300.00 Semen portland 44.0000 Kg Rp 1,350.00 Pasir pasang 0.0700 M3 Rp 280,000.00 Pasir beton 0.0600 M3 Rp 410,000.00 Batu pecah 2/3 0.0700 M3 Rp 345,000.00 Besi beton polos 1.6000 Kg Rp 13,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 buah bak kontrol pasangan bata 45cm x 45cm tinggi 50 cm Tenaga: Mandor 0.0160 O.H Rp 95,000.00 Kepala Tukang 0.0110 O.H Rp 90,000.00 Tukang batu 1.1500 O.H Rp 85,000.00 Pekerja 3.2000 O.H Rp 75,000.00 Bahan: Bata merah 70.0000 buah Rp 1,300.00 Semen portland 77.0000 Kg Rp 1,350.00 Pasir pasang 0.1300 M3 Rp 280,000.00 Pasir beton 0.0900 M3 Rp 410,000.00 Batu pecah 2/3 0.0200 M3 Rp 345,000.00 Besi beton polos 2.6000 Kg Rp 13,000.00 Peralatan: Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 buah bak kontrol pasangan bata 60 cm x 60 cm tinggi 65 cm Tenaga: Mandor 0.0160 O.H Rp 95,000.00 Kepala Tukang 0.0110 O.H Rp 90,000.00

Rp Rp Rp Rp

475.00 900.00 8,500.00 750.00

Rp

75,000.00

Rp Rp Rp

85,625.00 12,843.75 98,468.75

Rp Rp Rp Rp

1,045.00 6,480.00 61,200.00 162,000.00

Rp Rp Rp Rp Rp Rp

52,000.00 59,400.00 19,600.00 24,600.00 24,150.00 20,800.00

Rp Rp Rp

431,275.00 64,691.25 495,966.25

Rp Rp Rp Rp

1,520.00 990.00 97,750.00 240,000.00

Rp Rp Rp Rp Rp Rp

91,000.00 103,950.00 36,400.00 36,900.00 6,900.00 33,800.00

Rp Rp Rp

649,210.00 97,381.50 746,591.50

Rp Rp

1,520.00 990.00

Tukang batu Pekerja Bahan: Bata merah Semen portland Pasir pasang Pasir beton Batu pecah 2/3 Besi beton polos Peralatan:

11

12

13

14

15

16

17

1.1500 3.2000

O.H O.H

123.0000 114.0000 0.1840 0.1200 0.0330 4.8500

buah Kg M3 M3 M3 Kg

Rp Rp Rp Rp Rp Rp Rp Rp

85,000.00 75,000.00

Rp Rp

97,750.00 240,000.00

1,300.00 1,350.00 280,000.00 410,000.00 345,000.00 13,000.00

Rp Rp Rp Rp Rp Rp

159,900.00 153,900.00 51,520.00 49,200.00 11,385.00 63,050.00

Rp Rp Rp

829,215.00 124,382.25 953,597.25

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m’ pipa galvanis diameter ½” Tenaga: Mandor Kepala Tukang Tukang batu Pekerja Bahan: Pipa galvanis medium ½” Perlengkapan Peralatan:

0.0270 0.0090 0.0900 0.0540

O.H O.H O.H O.H

1.2000 0.3500

M Ls

Rp Rp Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

2,565.00 810.00 7,650.00 4,050.00

130,000.00 130,000.00

Rp Rp

156,000.00 45,500.00

Rp Rp Rp

216,575.00 32,486.25 249,061.25

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 buah kran diameter ½” atau ¾ ” Tenaga: Mandor Kepala Tukang Tukang batu Pekerja Bahan: Kran air Seal tape Peralatan:

0.0050 0.0400 0.4000 0.0100

O.H O.H O.H O.H

1.0000 0.0250

Bh Buah

Rp Rp Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

475.00 3,600.00 34,000.00 750.00

70,000.00 6,000.00

Rp Rp

70,000.00 150.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m’ pipa galvanis diameter ¾ ” Tenaga: Mandor Kepala Tukang Tukang batu Pekerja Bahan: Pipa galvanis medium 3/4” Perlengkapan Peralatan:

0.0270 0.0090 0.0900 0.0540

O.H O.H O.H O.H

1.2000 0.3500

M %

Rp Rp Rp Rp Rp Rp

0.0270 0.0090 0.0900 0.0540

O.H O.H O.H O.H

1.2000 0.3500

M %

Rp Rp Rp Rp Rp Rp

Rp Rp Rp Rp

2,565.00 810.00 7,650.00 4,050.00

175,000.00 175,000.00

Rp Rp

210,000.00 61,250.00

Rp Rp Rp

286,325.00 42,948.75 329,273.75

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

2,565.00 810.00 7,650.00 4,050.00

270,000.00 270,000.00

Rp Rp

324,000.00 94,500.00

Rp Rp Rp

433,575.00 65,036.25 498,611.25

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m’ pipa galvanis diameter 1 ½” Tenaga: Mandor Kepala Tukang Tukang batu Pekerja Bahan: Pipa galvanis medium 1½” Perlengkapan Peralatan:

0.0050 0.0180 0.1800 0.1080

O.H O.H O.H O.H

1.2000 0.3500

M %

Rp Rp Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

475.00 1,620.00 15,300.00 8,100.00

280,000.00 280,000.00

Rp Rp

336,000.00 98,000.00

Rp Rp Rp

459,495.00 68,924.25 528,419.25

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m’ pipa galvanis diameter 3” Tenaga: Mandor Kepala Tukang Tukang batu Pekerja Bahan: Pipa galvanis medium 3” Perlengkapan Peralatan:

0.0070 0.0230 0.2250 0.1350

O.H O.H O.H O.H

1.2000 0.3500

M %

Rp Rp Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

665.00 2,070.00 19,125.00 10,125.00

700,000.00 700,000.00

Rp Rp

840,000.00 245,000.00

Rp Rp Rp

1,116,985.00 167,547.75 1,284,532.75

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m’ pipa galvanis diameter 4” Tenaga: Mandor Kepala Tukang Tukang batu Pekerja Bahan: Pipa galvanis medium 4” Perlengkapan Peralatan:

0.0070 0.0230 0.2250 0.1350

O.H O.H O.H O.H

1.2000 0.3500

M %

Rp Rp Rp Rp Rp Rp

108,975.00 16,346.25 125,321.25

95,000.00 90,000.00 85,000.00 75,000.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m’ pipa galvanis diameter 1” Tenaga: Mandor Kepala Tukang Tukang batu Pekerja Bahan: Pipa galvanis medium 1” Perlengkapan Peralatan:

Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

665.00 2,070.00 19,125.00 10,125.00

950,000.00 950,000.00

Rp Rp

1,140,000.00 332,500.00

Rp Rp Rp

1,504,485.00 225,672.75 1,730,157.75

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

18

19

20

21

22

23

O. 1

2

3

Pemasangan 1 m’ pipa PVC tipe AW diameter ½ ” Tenaga: Mandor Kepala Tukang Tukang batu Pekerja Bahan: Pipa PVC 1/2" type AW panjang 6.00 mt Perlengkapan Peralatan:

0.0020 0.0060 0.0600 0.0360

O.H O.H O.H O.H

1.2000 0.3500

M %

Rp Rp Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00 42,000.00 42,000.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m’ pipa PVC tipe AW diameter ¾ ” Tenaga: Mandor Kepala Tukang Tukang batu Pekerja Bahan: Pipa PVC 3/4" type AW panjang 6.00 mt Perlengkapan Peralatan:

0.0020 0.0060 0.0600 0.0360

O.H O.H O.H O.H

1.2000 0.3500

M %

Rp Rp Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00 51,000.00 51,000.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m’ pipa PVC tipe AW diameter 1” Tenaga: Mandor Kepala Tukang Tukang batu Pekerja Bahan: Pipa PVC 1" type AW panjang 6.00 mt Perlengkapan Peralatan:

0.0020 0.0060 0.0600 0.0360

O.H O.H O.H O.H

1.2000 0.3500

M %

Rp Rp Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00 63,500.00 63,500.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m’ pipa PVC tipe AW diameter 2” Tenaga: Mandor Kepala Tukang Tukang batu Pekerja Bahan: Pipa PVC 2" type AW panjang 6.00 mt Perlengkapan Peralatan:

0.0030 0.0090 0.0900 0.0540

O.H O.H O.H O.H

1.2000 0.3500

M %

Rp Rp Rp Rp Rp Rp

0.0040 0.0135 0.1350 0.0810

O.H O.H O.H O.H

1.2000 0.3500

M %

Rp Rp Rp Rp Rp Rp

PEKERJAAN PERKERASAN PAVING Pembongkaran 1 m2 paving block Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja

0.0040 0.0135 0.1350 0.0810

O.H O.H O.H O.H

1.2000 0.3500

M %

0.0100 0.0500

Pemasangan 1 m2 paving block natural tebal 6 cm K.175 Tenaga: Mandor 0.0013 Kepala Tukang 0.0500 Tukang Batu 0.5000 Pekerja 0.2500 Bahan: Paving block 6 cm natural 1.0100 Pasir beton 0.0500

Pemasangan 1 m' kansteen Tenaga: Mandor Kepala Tukang

0.0010 0.0100

50,400.00 14,700.00

Rp Rp Rp

73,630.00 11,044.50 84,674.50

Rp Rp Rp Rp

190.00 540.00 5,100.00 2,700.00

Rp Rp

61,200.00 17,850.00

Rp Rp Rp

87,580.00 13,137.00 100,717.00

Rp Rp Rp Rp

190.00 540.00 5,100.00 2,700.00

Rp Rp

76,200.00 22,225.00

Rp Rp Rp

106,955.00 16,043.25 122,998.25

285.00 810.00 7,650.00 4,050.00

175,100.00 175,100.00

Rp Rp

210,120.00 61,285.00

Rp Rp Rp

284,200.00 42,630.00 326,830.00

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

380.00 1,215.00 11,475.00 6,075.00

321,300.00 321,300.00

Rp Rp

385,560.00 112,455.00

Rp Rp Rp

517,160.00 77,574.00 594,734.00

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

380.00 1,215.00 11,475.00 6,075.00

469,600.00 469,600.00

Rp Rp

563,520.00 164,360.00

Jumlah Overhead + Profit ( 10 % ) Nilai HSPK :

Rp Rp Rp

747,025.00 74,702.50 821,727.50

O.H Rp O.H Rp O.H Rp O.H Rp Jumlah Overhead + Profit Nilai HSPK :

Rp Rp Rp Rp Rp Rp Rp

950.00 3,750.00 4,700.00 705.00 5,405.00

Rp Rp Rp Rp

123.50 4,500.00 42,500.00 18,750.00

O.H O.H O.H O.H

Rp Rp Rp Rp

Rp Rp

Rp Rp Rp Rp

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m’ pipa PVC tipe AW diameter 4” Tenaga: Mandor Kepala Tukang Tukang batu Pekerja Bahan: Pipa PVC 4" type AW panjang 6.00 mt Perlengkapan Peralatan:

190.00 540.00 5,100.00 2,700.00

95,000.00 90,000.00 85,000.00 75,000.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK : Pemasangan 1 m’ pipa PVC tipe AW diameter 3” Tenaga: Mandor Kepala Tukang Tukang batu Pekerja Bahan: Pipa PVC 3" type AW panjang 6.00 mt Perlengkapan Peralatan:

Rp Rp Rp Rp

Rp Rp

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00 ( 15 % )

95,000.00 90,000.00 85,000.00 75,000.00

m2 Rp 70,000.00 m3 Rp 410,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

O.H O.H

Rp Rp

95,000.00 90,000.00

Rp Rp Rp Rp Rp

70,700.00 20,500.00 157,073.50 23,561.03 180,634.53

Rp Rp

95.00 900.00

Tukang Batu Pekerja Bahan: Semen Portland Pasir Pasang Kansteen beton cetak 15 x 20 x 50 cm

P. 1

2

3

4

5

6

ANALISA MEMBUAT Pembongkaran 1 m2 Genteng lama Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja Bahan: Peralatan:

Pembongkaran 1 m3 Kuda-kuda, Gording Balok Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja Bahan: Peralatan:

Pembongkaran 1 m2 Rangka Atap, Reng dan Kaso Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja Bahan: Peralatan:

Pembongkaran 1 m2 paving blok Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja Bahan: Peralatan:

Pemasangan 1 m' gorong-gorong U 30 cm x 100 cm Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja Bahan: Buis beton U 30 cm Peralatan:

Pemasangan 1 m' gorong-gorong O 30 cm x 100 cm Tenaga: Mandor Kepala Tukang Tukang Batu Pekerja Bahan: Buis beton dia. 30 cm Peralatan:

0.1000 0.2000 5.0000 0.0010 2.0000

0.0100 0.0200

O.H O.H

85,000.00 75,000.00

Rp Rp

8,500.00 15,000.00

kg Rp 1,350.00 m3 Rp 280,000.00 bh Rp 25,000.00 Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp Rp Rp Rp

6,750.00 280.00 50,000.00 81,525.00 12,228.75 93,753.75

Rp Rp Rp Rp

950.00 1,500.00

Rp Rp Rp

2,450.00 367.50 2,817.50

Rp Rp Rp Rp

11,400.00 102,000.00 187,500.00

Rp Rp Rp

300,900.00 45,135.00 346,035.00

Rp Rp Rp Rp

475.00 1,700.00 5,250.00

Rp Rp Rp

7,425.00 1,113.75 8,538.75

Rp Rp Rp Rp

950.00 3,750.00

Rp Rp Rp

4,700.00 705.00 5,405.00

O.H O.H O.H O.H

Rp Rp

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

0.1200 1.2000 2.5000

O.H O.H O.H O.H

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

0.0050 0.0200 0.0700

O.H O.H O.H O.H

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

0.0100 0.0500

O.H O.H O.H O.H

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

0.0070 0.0100 0.0500 0.1500

O.H O.H O.H O.H

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

665.00 900.00 4,250.00 11,250.00

1.0000

Bh

Rp

63,000.00

Rp

63,000.00

Rp Rp Rp

80,065.00 12,009.75 92,074.75

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

0.0140 0.0200 0.1000 0.3000

O.H O.H O.H O.H

Rp Rp Rp Rp

95,000.00 90,000.00 85,000.00 75,000.00

Rp Rp Rp Rp

1,330.00 1,800.00 8,500.00 22,500.00

1.0000

Bh

Rp

80,000.00

Rp

80,000.00

Jumlah Overhead + Profit ( 15 % ) Nilai HSPK :

Rp Rp Rp

114,130.00 17,119.50 131,249.50

Lampiran V : KEPUTUSAN BUPATI PONOROGO Nomor

: 188.45/

/405.21/2018

Tanggal : PERUBAHAN BIAYA LANGSUNG PERSONIL KONSULTAN (REMUNERATION) KABUPATEN PONOROGO TAHUN 2018 UNTUK TENAGA AHLI BERPENDIDIKAN S1/S2 KELOMPOK AHLI KUALIFIKASI

AHLI KEPALA

AHLI UTAMA

AHLI MADYA

AHLI MUDA

AHLI PRATAMA

S1

TAHUN PENGALAMAN PROFESIONAL

S2

GOLONGAN

TAHUN PENGALAMAN PROFESIONAL

V-D

20

30,450,000

s/d

33,450,000

16

33,450,000

s/d

36,450,000

V-C

19

27,450,000

s/d

30,450,000

15

30,250,000

s/d

33,250,000

V-B

18

24,450,000

s/d

27,450,000

14

27,050,000

s/d

30,050,000

RUPIAH (PERBULAN)

RUPIAH (PERBULAN)

V-A

17

21,450,000

s/d

24,450,000

13

23,850,000

s/d

26,850,000

IV-D

16

19,950,000

s/d

21,450,000

12

22,150,000

s/d

23,650,000

IV-C

15

18,450,000

s/d

19,950,000

11

18,640,000

s/d

20,140,000

IV-B

14

16,950,000

s/d

18,450,000

10

17,120,000

s/d

18,620,000

IV-A

13

15,450,000

s/d

16,950,000

9

15,600,000

s/d

17,100,000

III-D

12

14,250,000

s/d

15,450,000

8

14,380,000

s/d

15,580,000

III-C

11

13,050,000

s/d

14,250,000

7

13,170,000

s/d

14,370,000

III-B

10

11,850,000

s/d

13,050,000

6

11,960,000

s/d

13,160,000

III-A

9

10,650,000

s/d

11,850,000

5

10,740,000

s/d

11,940,000

II-D

8

9,750,000

s/d

10,650,000

4

10,450,000

s/d

11,350,000

II-C

7

8,850,000

s/d

9,750,000

3

9,450,000

s/d

10,350,000

II-B

6

7,950,000

s/d

8,850,000

2

8,450,000

s/d

9,350,000

II-A

5

7,050,000

s/d

7,950,000

1

7,450,000

s/d

8,350,000

I-D

4

6,300,000

s/d

7,050,000

I-C

3

5,550,000

s/d

6,300,000

I-B

2

*)

I-A

1

*)

*) S1 pengalaman 1-2 tahun dianggap Sub Profesional BUPATI PONOROGO

H. IPONG MUCHLISSONI

Lampiran IV : KEPUTUSAN BUPATI PONOROGO Nomor : 188.45/ /405.21/2018 Tanggal : PERUBAHAN BIAYA LANGSUNG PERSONIL KONSULTAN (REMUNERATION) KABUPATEN PONOROGO TAHUN 2018 UNTUK TENAGA SUB PROFESIONAL DAN TENAGA PENDUKUNG TENAGA SUB PROFESIONAL NO

PERSONIL

1

ASISTEN TENAGA AHLI

2

SURVEYOR

3

CAD OPERATOR

4

SOFTWARE PROGRAMER

5

TEKNISI

6

FASILITATOR

7

INSPEKTOR

PENDIDIKAN & PENGALAMAN D3/S0 (>6 Tahun) S1 (3-5 Tahun) S2 (1-3 Tahun) D3/S0 (>3 Tahun) S1 (0-3 Tahun) S2 (0-1 Tahun) D3/S0 (>3 Tahun) S1 (0-3 Tahun) S2 (0-1 Tahun) D3/S0 (>3 Tahun) S1 (0-3 Tahun) S2 (0-1 Tahun) D3/S0 (>3 Tahun) S1 (0-3 Tahun) S2 (0-1 Tahun) D3/S0 (>3 Tahun) S1 (0-3 Tahun) S2 (0-1 Tahun) D3/S0 (>3 Tahun) S1 (0-3 Tahun) S2 (0-1 Tahun)

RUPIAH (PERBULAN) 6,250,000

s/d

7,500,000

2,500,000

s/d

3,250,000

2,750,000

s/d

3,750,000

5,750,000

s/d

6,250,000

2,750,000

s/d

3,750,000

2,750,000

s/d

3,750,000

2,750,000

s/d

3,750,000

TENAGA PENDUKUNG NO

PERSONIL

1 OPERATOR KOMPUTER 2 ADMINISTRASI 3 DRAFTER (MANUAL) 4 OFFICE BOY/PESURUH KANTOR 5 SOPIR 6 PENJAGA KANTOR/SECURITY

PENDIDIKAN & PENGALAMAN

RUPIAH (PERBULAN) 2,500,000 2,500,000 2,500,000 1,500,000 2,000,000 1,500,000

s/d s/d s/d s/d s/d s/d

3,000,000 3,000,000 3,000,000 2,000,000 2,500,000 2,000,000

BUPATI PONOROGO

H. IPONG MUCHLISSONI

LAMPIRAN IV : KEPUTUSAN BUPATI PONOROGO NOMOR : 188.45/ /405.21/2017 TANGGAL :

BIDANG SARANA DAN PRASARANA FISIK KEBUTUHAN PEMERINTAH KABUPATEN PONOROGO TAHUN ANGGARAN 2017

1.

Harga Satuan Pembangunan Gedung Negara (dalam Rupiah/m2 bangunan)

Gedung Tidak Sederhana

Gedung Sederhana 5,120,000

2.

Harga Satuan Pembangunan Rumah Negara (dalam Rupiah/m2 bangunan)

Rumah Tipe A

Rumah Tipe B

4,920,000

3.

4,180,000

Rumah Tipe C,D,E

4,820,000

4,150,000

Harga Satuan Pembangunan Pagar (dalam Rupiah/m1 bangunan)

Pagar Gedung Negara Pagar Depan

Pagar Belakang

2,110,000

1,840,000

Pagar Samping 1,780,000

Pagar Rumah Negara Pagar Depan

Pagar Belakang

1,940,000 4.

1,270,000

Pagar Samping 1,130,000

Harga satuan tersebut termasuk pajak-pajak, IMB, jasa kontraktor, overhead, asuransi, perijinan, tingkat keselamatan dan kesehatan kerja

BUPATI PONOROGO

H. IPONG MUCHLISSONI

KETENTUAN HARGA KONSTRUKSI DI WILAYAH PONORORO KATEGORI A Kecamatan Ponorogo Kecamatan Babadan Kecamatan Jenangan Kecamatan Balong Kecamatan Jambon Kecamatan Jetis Kecamatan Kauman Kecamatan Mlarak Kecamatan Pulung Kecamatan Sambit Kecamatan Sampung Kecamatan Sawoo Kecamatan Siman Kecamatan Slahung Kecamatan Sukorejo Kecamatan Bungkal Kecamatan Sooko Kecamatan Badegan

KATEGORI B Kecamatan Ngrayun Kecamatan Pudak Kecamatan Ngebel Kecamatan Sooko Kecamatan Badegan Kecamatan Slahung Kecamatan Sawoo Kecamatan Sambit Kecamatan Sampung Kecamatan Pulung

: Jurug, Ngadirojo, Klepu, Bedoho : Dayakan : Tugurejo, Wates, Ngilo-Ilo, Caluk, Senepo : Tumpuk, Tempuran, Temon, Sriti, Pangkal, Tumpak Pelem : Gajah, Jrakah : Pagerukir : Banaran, Bekiring, Wagir Kidul, Wayang, Karangpatihan

Catatan : 1. Nama- nama desa di kecamatan yang sama namun tidak tercantum dalam kategori B dimasukkan ke dalam kategori A 2. Penentuan wilayah desa kategori A atau kategori B dapat berubah dengan mempertimbangkan faktor kondisi lapangan, biaya dan teknis.

More Documents from "Yoniey Slalueey Dinantiey"