ITEM PEMBAYARAN NO. JENIS PEKERJAAN

: 1.2 : MOBILISASI

% TERHADAP TOTAL BIAYA PROYEK = ???

No.

URAIAN

A.

SEWA TANAH

B.

PERALATAN Periksa lembar 1.2-2

C. 1 2 3 4 5 6

MOBILISASI FASILITAS KONTRAKTOR Base Camp Kantor Barak Bengkel Gudang, dan lain-lain ......................

1

MOBILISASI FASILITAS LABORATORIUM Ruang Laboratorium (sesuai Gambar)

D.

2

Soil & Aggregate Testing Compaction Test CBR Test Specific Gravity Atterberg Limits Grain Size Analysis Field Density Test by Sand Cone Methode Moisture Content Abrasion of Aggregate by Los Angeles Machine

3

Bituminous Testing Marshall Asphalt Test Extraction Test, Centrifuge/Refflux Method Specific Gravity for Coarse Aggregate Specific Gravity for Fine Aggregate Mix Air Viod Content (Accurate Method) Core Drill Metal Thermometer Accessories and Tolls Penetration Test Softening Point Refusal Density Compactor

4

Concrete Testing

%

SATUAN

M2

HARGA SATUAN (Rp.)

VOL.

1

500

1

50,000

1

3,100

....

set

Slump Cone Cylinder/Cube Mould for Compressive Strength Beam Mould for Flexural Strength (RIGID) Crushing Machine 5

Pendukung

(Periksa Fasilitas Laboratorium)

6

Operasional

(Periksa Fasilitas Laboratorium)

7

Test Luar

E. E.I. 1 2 3 4 5 6

MOBILISASI LAINNYA PEKERJAAN DARURAT Perkuatan Jembatan Lama Pemeliharaan Jalan Kerja / Samping ...................... ...................... ...................... ......................

.... .... .... ....

E.II. 1 2 3 4 5 6

LAIN-LAIN Komunikasi Lapangan Lengkap ...................... ...................... ...................... ...................... ......................

LS

1

100,000,000

Set .... .... .... .... .... ....

1

5,000,000

F.

MANAJEMEN DAN KESELAMATAN LALU LINTAS

LS

1

24,800

G.

DEMOBILISASI

LS

1

1,530

Total Biaya Mobilisasi Catatan :Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.

Lembar 1.2-1 JUMLAH HARGA (Rp.)

500

5,100

50,000

3,100

100,000,000

5,000,000

24,800

1,530

105,085,030

uk over-head dan laba

ITEM PEMBAYARAN NO. JENIS PEKERJAAN

No.

B. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44

: 1.2 : MOBILISASI

JENIS ALAT

KODE ALAT

SATUAN

E01 E02 E03 E04 E05 E06 E07 E08 E09 E10 E11 E12 E13 E14 E15 E16 E17 E18 E19 E20 E21 E22 E23 E24 E25 E26 E27 E28 E29 E30 E31 E32 E33 E34 E35 E37 E36 E38 E39 E40 E41 E42 E43 E44

Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit

HARGA SATUAN (Rp.)

VOL.

PERALATAN ASPHALT MIXING PLANT ASPHALT FINISHER ASPHALT SPRAYER BULLDOZER 100-150 HP COMPRESSOR 4000-6500 L\M CONCRETE MIXER 0.3-0.6 M3 CRANE 10-15 TON DUMP TRUCK 3.5 TON DUMP TRUCK 10 TON EXCAVATOR 80-140 HP FLAT BED TRUCK 3-4 M3 GENERATOR SET MOTOR GRADER >100 HP TRACK LOADER 75-100 HP WHEEL LOADER 1.0-1.6 M3 THREE WHEEL ROLLER 6-8 T TANDEM ROLLER 6-8 T. TIRE ROLLER 8-10 T. VIBRATORY ROLLER 5-8 T. CONCRETE VIBRATOR STONE CRUSHER WATER PUMP 70-100 mm WATER TANKER 3000-4500 L. PEDESTRIAN ROLLER TAMPER JACK HAMMER FULVI MIXER CONCRETE PUMP TRAILER 20 TON PILE DRIVER + HAMMER CRANE ON TRACK 35 TON WELDING SET BORE PILE MACHINE ASPHALT LIQUID MIXER TRONTON COLD MILLING MACHINE ROCK DRILL BREAKER COLD RECYCLER HOT RECYCLER AGGREGAT (CHIP) SPREADER ASPHALT DISTRIBUTOR SLIP FORM PAVER CONCRETE PAN MIXER CONCRETE BREAKER

1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1

100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100

45 46 47 48 49 50 51 52 53

ASPAHLT TANKER CEMENT TANKER CONDRETE MIXER (350) VIBRATING RAMMER TRUK MIXER (AGITATOR) BORE PILE MACHINE CRANE ON TRACK 75-100 TON

Total untuk Item B pada Lembar 1

E45 E46 E47 E48 E49 E50 E51

Unit Unit Unit Unit Unit Unit Unit

1 1 1 1 1 1 1

100 100 100 100 100 100 100

Lembar 1.2-2 JUMLAH HARGA (Rp.)

100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100

100 100 100 100 100 100 100

5,100

MOBILISASI FASILITAS LABORATORIUM SATUAN PENGUKURAN HARGA SATUAN NO.

: : URAIAN

Lump sum Rp. SATUAN

VOLUME

3,100.00 HARGA SATUAN

I. 1.

Laboratory Building Laboratory Building

m2

1

100

II. 1. 2. 3 4 5 6 7 8

Soil & Aggregate Testing Compaction Test CBR Test Specifc Gravity Atterberg Limits Grain Size Analysis Field Density Test by Sand Cone Methode Moisture Content Abrasion of Aggregate by Los Angeles Machine

unit unit unit unit unit unit unit unit

1 1 1 1 1 1 1 1

100 100 100 100 100 100 100 100

III. 1. 2. 3 4 5 6 7 8 9 10 11

Bituminous Testing Marshall Asphalt Test Extraction Test, Centrifuge/Reflux Method Specific Gravity of Coarse Aggregate Specific Gravity of Fine Aggregate Mix Air Viod Content (Accurate Method) Core Drill Metal Thermometer Accessories and Tolls Penetration Test Softening Point Refusal Density Compactor

unit unit unit unit unit unit unit unit unit unit unit

1 1 1 1 1 1 1 1 1 1 1

100 100 100 100 100 100 100 100 100 100 100

IV. 1 2 3 4

Concrete Testing Slump Cone Cylinder/Cube Mould for Compressive Strength Beam Mould for Flexural Strength Crushing Machine

unit unit unit unit

1 1 1 1

100 100 100 100

V. 1 2 3

Peralatan pendukung Mobil Pick Up Komputer + Printer Furniture

unit unit unit

1 1 1

100 100 100

VI. 1 2 3

Operasional 1 1 1

100 100 100

VII.

Test Luar

Test Luar, sesuai kebutuhan atau atas perintah Direksi

TOTAL BIAYA MOBILISASI

1. 2.

ls

1

100

Rp

Catatan : Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar kontrak) dan biaya lain-lainnya. Test luar adalah test ke lembaga pengujian yang disetujui oleh Konsultan Pengawas.

TOTAL

100.00

800.00

1,100.00

400.00

300.00

300.00

100.00

KETERANGAN

3,100.00

pi tidak termasuk PPN

MANAJEMEN DAN KESELAMATAN LALU LINTAS SATUAN PENGUKURAN HARGA SATUAN NO.

RAMBU KONSTRUKSI DAN PENGALIHAN

: :

Lump sum Rp. SATUAN

ZONA 1

24,800.00 VOLUME

1 2 3 4 5 6 7 8

Rambu Tetap Rambu batas kecepatan Rambu perintah mengikuti lajur Rambu pengarah tikungan Rambu larangan berjalan terus (give away) Rambu larangan menyalip kendaraan lain Rambu peringatan jalan licin Rambu pengarah tikungan ganda Rambu APILL

buah buah buah buah buah buah buah buah

8 2 -

8.00 2.00 -

1 2 3 4 5 6 7 8 9 10

Rambu Peringatan Sementara Rambu Peringatan dengan kata kata Rambu Peringatan pekerjaan di jalan Rambu Peringatan lalu liontas dua arah Water barier Traffic Cone Police line Concrete Barier Lampu sementara APILL sementara Marka jalan sementara

buah buah buah buah buah buah buah buah buah buah

8 4 -

8.00 4.00 -

Catatan : Kolom volume adalah jumlah kebutuhan zona di lapangan dikalikan kolom ZONA 1, 2, dstnya contoh : misal di lapangan dibutuhkan dua ZONE 1 maka volume diisi dengan 2 dikali 8 = 16

ZONA 2

VOLUME

ZONA 3

VOLUME

ZONA 4

VOLUME

ZONA 5

8 1 2 -

8.00 1.00 2.00 -

8 4

8.00 4.00

4 2 -

4.00 2.00 -

4 2 -

8 4 -

8.00 4.00 -

8 4 2 -

8.00 4.00 2.00 -

4 2 -

4.00 2.00 -

4 2 -

VOLUME

ZONA 6

VOLUME

ZONA 7

VOLUME

ZONA 8

VOLUME

4.00 2.00 -

8 1 2 4 -

8.00 1.00 2.00 4.00 -

20 4 4 -

20.00 4.00 4.00 -

12 1 2 -

12.00 1.00 2.00 -

4.00 2.00 -

16 4 -

16.00 4.00 -

24 4 -

24.00 4.00 -

10 4 2 -

10.00 4.00 2.00 -

ZONA 9

VOLUME

Biaya mobilisasi

12 1 -

12.00 1.00 -

100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00

10 4 4 -

10.00 4.00 4.00 -

100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00

TOTAL

KETERANGAN

8,400.00 1,300.00 - lihat spesifikasi 100.00 800.00 400.00 200.00 400.00

9,200.00 3,200.00 600.00 200.00 24,800.00

lihat spesifikasi lihat spesifikasi lihat spesifikasi lihat spesifikasi lihat spesifikasi lihat spesifikasi

Related Documents

Divisi Akademik_sks.pptx
April 2020 18
Divisi Chrysophyta
July 2020 19
Divisi 1
August 2019 33
Divisi Acara.docx
April 2020 34
Divisi-5 Spek.docx
April 2020 11

More Documents from "Eri Triana Nugraha"

Bulog Ereke.docx
April 2020 13
Agnes.docx
December 2019 14
Add Kontrak.xls
December 2019 20
Foto Pagar.pdf
April 2020 9