ITEM PEMBAYARAN NO. JENIS PEKERJAAN
: 1.2 : MOBILISASI
% TERHADAP TOTAL BIAYA PROYEK = ???
No.
URAIAN
A.
SEWA TANAH
B.
PERALATAN Periksa lembar 1.2-2
C. 1 2 3 4 5 6
MOBILISASI FASILITAS KONTRAKTOR Base Camp Kantor Barak Bengkel Gudang, dan lain-lain ......................
1
MOBILISASI FASILITAS LABORATORIUM Ruang Laboratorium (sesuai Gambar)
D.
2
Soil & Aggregate Testing Compaction Test CBR Test Specific Gravity Atterberg Limits Grain Size Analysis Field Density Test by Sand Cone Methode Moisture Content Abrasion of Aggregate by Los Angeles Machine
3
Bituminous Testing Marshall Asphalt Test Extraction Test, Centrifuge/Refflux Method Specific Gravity for Coarse Aggregate Specific Gravity for Fine Aggregate Mix Air Viod Content (Accurate Method) Core Drill Metal Thermometer Accessories and Tolls Penetration Test Softening Point Refusal Density Compactor
4
Concrete Testing
%
SATUAN
M2
HARGA SATUAN (Rp.)
VOL.
1
500
1
50,000
1
3,100
....
set
Slump Cone Cylinder/Cube Mould for Compressive Strength Beam Mould for Flexural Strength (RIGID) Crushing Machine 5
Pendukung
(Periksa Fasilitas Laboratorium)
6
Operasional
(Periksa Fasilitas Laboratorium)
7
Test Luar
E. E.I. 1 2 3 4 5 6
MOBILISASI LAINNYA PEKERJAAN DARURAT Perkuatan Jembatan Lama Pemeliharaan Jalan Kerja / Samping ...................... ...................... ...................... ......................
.... .... .... ....
E.II. 1 2 3 4 5 6
LAIN-LAIN Komunikasi Lapangan Lengkap ...................... ...................... ...................... ...................... ......................
LS
1
100,000,000
Set .... .... .... .... .... ....
1
5,000,000
F.
MANAJEMEN DAN KESELAMATAN LALU LINTAS
LS
1
24,800
G.
DEMOBILISASI
LS
1
1,530
Total Biaya Mobilisasi Catatan :Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.
Lembar 1.2-1 JUMLAH HARGA (Rp.)
500
5,100
50,000
3,100
100,000,000
5,000,000
24,800
1,530
105,085,030
uk over-head dan laba
ITEM PEMBAYARAN NO. JENIS PEKERJAAN
No.
B. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44
: 1.2 : MOBILISASI
JENIS ALAT
KODE ALAT
SATUAN
E01 E02 E03 E04 E05 E06 E07 E08 E09 E10 E11 E12 E13 E14 E15 E16 E17 E18 E19 E20 E21 E22 E23 E24 E25 E26 E27 E28 E29 E30 E31 E32 E33 E34 E35 E37 E36 E38 E39 E40 E41 E42 E43 E44
Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit Unit
HARGA SATUAN (Rp.)
VOL.
PERALATAN ASPHALT MIXING PLANT ASPHALT FINISHER ASPHALT SPRAYER BULLDOZER 100-150 HP COMPRESSOR 4000-6500 L\M CONCRETE MIXER 0.3-0.6 M3 CRANE 10-15 TON DUMP TRUCK 3.5 TON DUMP TRUCK 10 TON EXCAVATOR 80-140 HP FLAT BED TRUCK 3-4 M3 GENERATOR SET MOTOR GRADER >100 HP TRACK LOADER 75-100 HP WHEEL LOADER 1.0-1.6 M3 THREE WHEEL ROLLER 6-8 T TANDEM ROLLER 6-8 T. TIRE ROLLER 8-10 T. VIBRATORY ROLLER 5-8 T. CONCRETE VIBRATOR STONE CRUSHER WATER PUMP 70-100 mm WATER TANKER 3000-4500 L. PEDESTRIAN ROLLER TAMPER JACK HAMMER FULVI MIXER CONCRETE PUMP TRAILER 20 TON PILE DRIVER + HAMMER CRANE ON TRACK 35 TON WELDING SET BORE PILE MACHINE ASPHALT LIQUID MIXER TRONTON COLD MILLING MACHINE ROCK DRILL BREAKER COLD RECYCLER HOT RECYCLER AGGREGAT (CHIP) SPREADER ASPHALT DISTRIBUTOR SLIP FORM PAVER CONCRETE PAN MIXER CONCRETE BREAKER
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
45 46 47 48 49 50 51 52 53
ASPAHLT TANKER CEMENT TANKER CONDRETE MIXER (350) VIBRATING RAMMER TRUK MIXER (AGITATOR) BORE PILE MACHINE CRANE ON TRACK 75-100 TON
Total untuk Item B pada Lembar 1
E45 E46 E47 E48 E49 E50 E51
Unit Unit Unit Unit Unit Unit Unit
1 1 1 1 1 1 1
100 100 100 100 100 100 100
Lembar 1.2-2 JUMLAH HARGA (Rp.)
100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100
100 100 100 100 100 100 100
5,100
MOBILISASI FASILITAS LABORATORIUM SATUAN PENGUKURAN HARGA SATUAN NO.
: : URAIAN
Lump sum Rp. SATUAN
VOLUME
3,100.00 HARGA SATUAN
I. 1.
Laboratory Building Laboratory Building
m2
1
100
II. 1. 2. 3 4 5 6 7 8
Soil & Aggregate Testing Compaction Test CBR Test Specifc Gravity Atterberg Limits Grain Size Analysis Field Density Test by Sand Cone Methode Moisture Content Abrasion of Aggregate by Los Angeles Machine
unit unit unit unit unit unit unit unit
1 1 1 1 1 1 1 1
100 100 100 100 100 100 100 100
III. 1. 2. 3 4 5 6 7 8 9 10 11
Bituminous Testing Marshall Asphalt Test Extraction Test, Centrifuge/Reflux Method Specific Gravity of Coarse Aggregate Specific Gravity of Fine Aggregate Mix Air Viod Content (Accurate Method) Core Drill Metal Thermometer Accessories and Tolls Penetration Test Softening Point Refusal Density Compactor
unit unit unit unit unit unit unit unit unit unit unit
1 1 1 1 1 1 1 1 1 1 1
100 100 100 100 100 100 100 100 100 100 100
IV. 1 2 3 4
Concrete Testing Slump Cone Cylinder/Cube Mould for Compressive Strength Beam Mould for Flexural Strength Crushing Machine
unit unit unit unit
1 1 1 1
100 100 100 100
V. 1 2 3
Peralatan pendukung Mobil Pick Up Komputer + Printer Furniture
unit unit unit
1 1 1
100 100 100
VI. 1 2 3
Operasional 1 1 1
100 100 100
VII.
Test Luar
Test Luar, sesuai kebutuhan atau atas perintah Direksi
TOTAL BIAYA MOBILISASI
1. 2.
ls
1
100
Rp
Catatan : Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayar kontrak) dan biaya lain-lainnya. Test luar adalah test ke lembaga pengujian yang disetujui oleh Konsultan Pengawas.
TOTAL
100.00
800.00
1,100.00
400.00
300.00
300.00
100.00
KETERANGAN
3,100.00
pi tidak termasuk PPN
MANAJEMEN DAN KESELAMATAN LALU LINTAS SATUAN PENGUKURAN HARGA SATUAN NO.
RAMBU KONSTRUKSI DAN PENGALIHAN
: :
Lump sum Rp. SATUAN
ZONA 1
24,800.00 VOLUME
1 2 3 4 5 6 7 8
Rambu Tetap Rambu batas kecepatan Rambu perintah mengikuti lajur Rambu pengarah tikungan Rambu larangan berjalan terus (give away) Rambu larangan menyalip kendaraan lain Rambu peringatan jalan licin Rambu pengarah tikungan ganda Rambu APILL
buah buah buah buah buah buah buah buah
8 2 -
8.00 2.00 -
1 2 3 4 5 6 7 8 9 10
Rambu Peringatan Sementara Rambu Peringatan dengan kata kata Rambu Peringatan pekerjaan di jalan Rambu Peringatan lalu liontas dua arah Water barier Traffic Cone Police line Concrete Barier Lampu sementara APILL sementara Marka jalan sementara
buah buah buah buah buah buah buah buah buah buah
8 4 -
8.00 4.00 -
Catatan : Kolom volume adalah jumlah kebutuhan zona di lapangan dikalikan kolom ZONA 1, 2, dstnya contoh : misal di lapangan dibutuhkan dua ZONE 1 maka volume diisi dengan 2 dikali 8 = 16
ZONA 2
VOLUME
ZONA 3
VOLUME
ZONA 4
VOLUME
ZONA 5
8 1 2 -
8.00 1.00 2.00 -
8 4
8.00 4.00
4 2 -
4.00 2.00 -
4 2 -
8 4 -
8.00 4.00 -
8 4 2 -
8.00 4.00 2.00 -
4 2 -
4.00 2.00 -
4 2 -
VOLUME
ZONA 6
VOLUME
ZONA 7
VOLUME
ZONA 8
VOLUME
4.00 2.00 -
8 1 2 4 -
8.00 1.00 2.00 4.00 -
20 4 4 -
20.00 4.00 4.00 -
12 1 2 -
12.00 1.00 2.00 -
4.00 2.00 -
16 4 -
16.00 4.00 -
24 4 -
24.00 4.00 -
10 4 2 -
10.00 4.00 2.00 -
ZONA 9
VOLUME
Biaya mobilisasi
12 1 -
12.00 1.00 -
100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
10 4 4 -
10.00 4.00 4.00 -
100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
TOTAL
KETERANGAN
8,400.00 1,300.00 - lihat spesifikasi 100.00 800.00 400.00 200.00 400.00
9,200.00 3,200.00 600.00 200.00 24,800.00
lihat spesifikasi lihat spesifikasi lihat spesifikasi lihat spesifikasi lihat spesifikasi lihat spesifikasi