Dennis Ku(english Cv)

  • June 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Dennis Ku(english Cv) as PDF for free.

More details

  • Words: 794
  • Pages: 4
Dennis Ku Tel: 886-3-3220409 Cell Phone:886-928001145 E-mail: [email protected] Birthday: 1962/01/30 Education: September 1982 to June 1984 Oriental Industrial College-Taipei, Taiwan Subject Mechanical Engineering Education College September 1987 to June 1989 National Taiwan Institute Technology-Taipei, Taiwan Subject Fiber Engineering Education University Skill and Training: 1. Computer: MS office series, AutoCAD, Pro-E 2. A Grade electrical skilled worker certificate 3. Lifeguard license Professional Experience: April 2007 to December 2008 Suzhou Twinwill Optronic-Suzhou, Jiangsu, China Belong to Taiwan Twinwill Optronic Co., Ltd. Main product: LCD model assembly for Notebook and PC Main customers: Wacom, Wistron, Dell, Asus, Lenovo Position: Plant Manager (Management Duty: 15, Number of Employee 220) Work Contents: 1. Production management and improvement 2. QA system maintain and Quality control 3. Quality issues improvement 4. Develop annual budget and cost down 5. Customs affair handling 6. Safety management Achievements: 1. Within three months, pass Dell’s(Asus) supplier QPA(Quality Process Asses),QSA( Quality Management System Asses)&Green Asus Audit. 2. Got Asus(Dell) OEM order(20.1” &24” All In One PC), replaced competitor(Asus’s main source) cause of excellent quality and quantity. Reason of leaving: 1. Couldn’t be used to Twinwil company’s culture. 2. Family reason. February 2001 to April 2007 TNC Co., Ltd.-Taiwan / NJCNC-Nanjin, Jiangsu, China NJCNC which is TNC and BNC cooperate and invest in Nanjin to set up an all new NC(Nitrocellulose) plant。

Main product: Nitrocellulose, Industrial Acid Position: TNC production manager (Management duty: 12, employee of department 100) / NJCNC project manager (Management duty: 10 ) Work Contents: TNC 1. Production Line management and improvement 2. Quality control 3. Develop production budget and cost control 4. Safety control 5. Material management NJCNC 1. Integrate the process of TNC(Taiwan), BNC(France) and KCNC(Korea) 2. Plant plot plan and layout configuration 3. Equipments configuration 4. Engineering drawing approval 5. Engineering schedule plan and control 6. Report to Board the Engineering schedule and budget execution 7. Pass china construction Assessments (Feasibility study, Environmental Impact Assessment, Safety, Professional Labor health Assessment and Fire fighting Approval). 8. Engineering purchasing, supervising construction, commissioning till commercial running Achievements: TNC 1. Improve Process and equipment raise production from 9000 tons to 15,000 tons per year and reduce cost 5.3% 2. Nitrocellulose is dangerous chemical with strong flammable. Serious safety management keeps zero accident and injury. 3. Aid TNC to get the Certificates of ISO-9001/ ISO-14000/ OHSAS-18000 NJCNC 1. Setup 18,000 tons per year all new NC plant, Group total amount over 68,000 tons located TOP one in the world. (Total requirement around 200,000 tons per year) 2. Process Integrated reduces water and waste water consumption 150 down to 100 tons save a lot cost. Reason of leaving: Boss changed. Ninety percent old staff had left. September 1997 to January 2001 Gemini Handbag factory-Quandong, China Belong to Wearsun industrial Co,.-Taiwan Main product: All kind Plastic and leather handbag Main customer: Samsonite, Lacoste Position: Plant manager (Management duty: 10, Number of employee: 480) Work Contents: 1. Production management and improvement 2. QA system maintain and Quality control 3. Develop annual budget and cost control

4. Customs affair handling 5. Safety management Achievements: 1. Transfer from chemical industrial to Handbag industrial. Two months later, got 10,000pcs cosmetic bag within one and half month delivery on time and quality reach customer’s requirement. The difficulty is to find special adhesive and a heavy loading in a short time for a new man. 2. Good quality and delivery on time, got famous customer’s order, employee increases from 200 to 480 persons. Reason of leaving: Factory closed. April 1994 to August 1997 WaLee Industrial Corp.-Taipei, Taiwan Main product: Agent of all kind industrial material and equipment Position: Sales engineer Work Contents: 1. Selling Composite materials; Fiber glass, resin, FRP module,fiber yarn for PCB use. 2. Agent for golf manufacture industrial ,SMC and SMB equipment and special material. Achievements: 1. Sold several sets filament winding machine to golf industrial. 2. Keep good relation with Research Institute co-work to develop special composite materials. Reason of leaving: Considered Composite material market was a sunset industrial in Taiwan, so changed Job. July 1989 to April 1994 Ever Light chemical Co,. Ltd. Top three of dyer stuff supplier in the world Main product: dyer stuff Position: supervisor Work Contents: 1. Process configuration 2. Planning Plot plan and layout 3. Production and Utilities equipments design 4. Planning Piping system 5. Engineering purchasing, supervising construction, commissioning till commercial running 6. Setup maintenance department and the rule 7. keep equipments normal running and improvement Achievements: 1. Without engineering consultant company, to finish compound factory alone. 2. Spend small cost Continually improve equipment running in high temperature and high acid surrounding Reason of leaving:

Ever light is good and big company in many aspects; in that time, I was young couldn’t endure to know twenty years later what I will to be.

Related Documents

Dennis Ku(english Cv)
June 2020 6
Cheek, Dennis Cv
May 2020 10
Dennis Misao Cv
November 2019 5
Dennis
October 2019 55
Resume Dennis
October 2019 48
Dennis Partridge
December 2019 41