Demand_notice (5).pdf

  • Uploaded by: UMAR TAHIR
  • 0
  • 0
  • June 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Demand_notice (5).pdf as PDF for free.

More details

  • Words: 273
  • Pages: 2
DUE Date: 10-03-2019

Gujranwala Electric Power Company (12473-SAMBRIAL)

16-11-2018

12473001917

New Connection

Security Cost 201812154991

New Connection

Domestic

07-02-2019 0312473663102

Nill 2 (KW)

NBP SAMBRIAL

220

SAMBRIAL

A-1a(01)

Ishfaq Ahmad / Muhammad yousaf / Mohala Rasool pura sambrial

30 2440

0

30

01

Sub-Division Office

12473-SAMBRIAL

SDO Wapda

Line Superintendent

12473-SAMBRIAL

SDO Wapda

Due Date: 10-03-2019

Security Cost Ishfaq Ahmad / Muhammad yousaf / Mohala Rasool pura sambrial

2440

16-11-2018

12473001917

07-02-2019

201812154991 0312473663102 NBP SAMBRIAL

DUE DATE: 10-03-2019

Security Cost NBP SAMBRIAL

201812154991

12473001917

201812154991 2440

NOTE:- Computer generated demand notice, Hence no signature is required.

Date & Time: (06-03-2019 08:46:11)

2440

07-02-2019

DUE DATE: 10-03-2019

Gujranwala Electric Power Company (12473-SAMBRIAL)

16-11-2018

12473001917

New Connection

Service Cost

201812154991

New Connection

Domestic

07-02-2019 0312473663102

Nill 2 (KW)

NBP SAMBRIAL

220

SAMBRIAL

A-1a(01)

Ishfaq Ahmad / Muhammad yousaf / Mohala Rasool pura sambrial

30 4000

0

30

01

Sub-Division Office

12473-SAMBRIAL

SDO Wapda

Line Superintendent

12473-SAMBRIAL

SDO Wapda

DUE DATE: 10-03-2019

Service Cost Ishfaq Ahmad / Muhammad yousaf / Mohala Rasool pura sambrial

4000

16-11-2018

12473001917

07-02-2019

201812154991 0312473663102 NBP SAMBRIAL

DUE DATE: 10-03-2019

201812154991

Service Cost

12473001917

201812154991 4000

07-02-2019

NOTE:- Computer generated demand notice, Hence no signature is required. This subject cited case has been processed in accordance with documents uploded/produced by the owner/applicant. In case any doocument is found false at later stages, the said connection is likely to be cannceled and as a result of concalment of facts or fraud at any stage and if codal formalities are not follwed and company resrved its rights to take legal action against owner/applicant. Date & Time: (06-03-2019 08:46:11)

Powered by TCPDF (www.tcpdf.org)

Related Documents

2.34-5pdf
June 2020 46

More Documents from ""

Demand_notice (5).pdf
June 2020 11
Nilai Uas Kir 8g
December 2019 34
Soal Uas Kir Kelas 8
December 2019 43
Madu Dan Bawang Putih Brian
November 2019 44