Data Npwp Mentoryani.docx

  • Uploaded by: Hamdayani Basir
  • 0
  • 0
  • December 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Data Npwp Mentoryani.docx as PDF for free.

More details

  • Words: 1,436
  • Pages: 11
DATA NPWP MENTOR

NAMA MENTOR

: ARDAN ,S.Sos

PANGKAT/ CORPS/NRP

: LETNAN KOLONEL CKM,33989

JABATAN /SATUAN

:ANGGOTA KOMITE MEDIK RUMAH SAKIT TK II 14.05.01 PELAMONIA

NOMOR NPWP MENTOR

:792749848954000

ALAMAT NPWP MENTOR

:JL JENDERAL SUDIRMAN NO 31 MAKASSAR

SURAT PERNYATAAN KOMITMEN MENTOR

Saya yang bertandatangandibawahini : Nama

: Ardan, S,Sos

Pangkat / Golongan

: Letnan Kolonel Ckm

NRP/NIP

: 33989

Jabatan

: Anggota Komite Medik Rumkit Tk. II 14.05.01 Pelamonia

Dengan ini menyatakan bahwa saya bersedia untuk menjadi mentor dari peserta Diklatpim TK IV gelombang I yaitu: Nama

: Kadriati Junaid, S. Kep.,Ns

Golongan

: PenatamudaTK I III/b

NIP

: 197708181997032002

Jabatan

: Turwatum rawat Inap Rumkit TK II 14.05.01 Pelamonia

KesdamXIV/Hasanuddin Dengan ini memberikan dukungan dan bimbingan langsung kepada Diklat selama menyusun hingga Mengimplementasikan Proyek Perubahan. Demikian surat pernyataan ini saya buat dengan sebenar- benarnya untuk digunakan sebagaimana mestinya.

Makassar, 25 Maret 2018 Mentor

ArdanS,Sos Letnan kolonel Ckm NRP 33989

FORMULIR KESEPAKATAN AREA PERUBAHAN KESEPAKATAN AREA PERUBAHAN PESERTA DIKLAT PIM TK III

1. Deskripsi singkat Tugas dan fungsi Unit kerja Kepala

Ruangan

tugas

pokok

menyelenggarakan

mengkoordinir

dan

melaksanakan penyiapan ruangan dan tempat perawatan pasien rawat inap dan perlengkapan lainnya disetiap ruangan pasien. 1.

Memelihara ruangan dan tempat perawatan pasien dan alat perlengkapan yang terdapat didalamnya danmelaporkan kerusakan gedung /alat perlengkapan yang ditemui

2.

Melaksanakan segala kegiatan s/d seluruh bidang perwatan pasien mulai dari saat pasien dikirim keruangan tempat perawatan sampai dengan saat pasien dipulangkan

3.

Melaksanakan segala tindakan yang dipandang perlu guna mencegah cacat ,derita,dan maut bagi pasien sesuai dengan ketentuan yang berlaku di RS.

4.

Melaksanakan tata usaha perawatan dan penyusunan laporan perawatan secara periodic sesuai procedural.

2. Area Organisasi Yang bermasalah Dalam melaksanakan tugas sehari- hari perawat di Rumah Sakit TK II 14.05.01 Pelamonia. Sudah menerapkan system komunikasi SBAR. Akan tetapi belum optimal masih terdapa tbeberapa kelemahan ,antara lain : 1.

Kurangnya pengetahuan perawat akan komunikasi SBAR

2.

Kepedulian perawat untuk melakukan komunikasi SBAR masih rendah

3.

Tanggung jawab perawat akan komunikasi SBAR kurang optimal.

3. Area Organisasi Yang menjadi Proyek Perubahan Berdasarkan hasil analisis Reading sederhana berdiskusi dan mendapatkan masukan dari mentor

Managemen USG (Urgency,Serioussnes,Growt)

yang

dianggap paling berdampak dalam pelayanan keperawatan untuk dilakukan menjadi perubahan adalah kurangnya pengetahuan perawat akan komunikasi SBAR di Ruang Rawat Inap Rumah Sakit Tk.II I4 07.05.01 Pelamonia Untuk mengatasi tersebut perlu adanya langkah inovasi berupa penyusunan Standar Prosedur Operasional (SPO) system komunikasi SBAR.

Bandung,2 5Maret 2018

Peserta Diklat

Kadriati Junaid, S.Kep., Ns Penata muda TK I III/bNIP 197708181997032002

Atasan langsung

Ihsan Niku, SKM.,M.Adm.Kes Letkol Ckm NRP 575691

FORMULIR KEGIATAN PESERTA DIKLAT PADA TAHAP TAKING OWNERSHIP

1.

NamaPeserta

:Kadriati junaidS.Kep., Ns

2.

Instansi

:Kesdam XIV/Hasanuddin

3.

Rencana Area Perubahan

: Optimalisasi komunikasi efektif dalam pelayanan SPO (Standar prosedur operasional) system komunikasi SBAR pada rawatinap Rumah Sakit TK II 14.05.01 Pelamonia

No.

Hari/tgl

Kegiatan

Output

1 1

2 Rabu 7/3/2018

3

4

Laporan keKarumkit Tk II Pelamonia sekaligus memohon kesediaan sebagai sponsor.

Karumkit TK.II.14.05.01 Pelamonia menerima dan bersedia sebagai sponsor

Melaporkan rencana kegiatan proyek perubahan yang akan dilaksanakan diRumkit Tk II. 14.05.01 Pelamonia

Menerima rencana Proyek Perubahan yang akan diterapkan diruang rawat inap Rumkit TK.II.14. 05.01 Pelamonia

Pembentukan Perubahan

Proyek

Melaporkan kepada Mentor tentang rencana kegiatan area proyek perubahan

Bertemu dan berdiskusi dengan Mentor tentang rencana pelaksanaan proyek perubahan yang akan dikerjakan.

Mentor setuju dengan rencana Area proyek perubahan.

2.

Kamis 8/3/2018

Tim

Dilaporkan kepada Coach tanggal 5 Rabu 7/3/2018 Dinfokanke coach dokumentasi via Wa.

Kamis 8/3/2018 Diinfokanke coach via wa.

Paraf Mentor 6

3.

Jumat 9/3.2018

Persiapan pembuatan judul area proyek perubahan dengan melaksanakan:

Persetujuan dari kainstalwatnap sebagai atasan langsung beliau setuju untuk dilakukan area proyek perubahan

Jumat 9/3/2018 Diinfokanke coach via wa.

Pembuatan judul rencana pelaksanaan proyek perubahan sesuai dengan waktu yang sudah ditentukan oleh Satuan Diklat Kepemimpinan. Dan rapat pembentukan denganTim stake holder.

Proyek perubahan Mentor setuju diadakan rapat.

Senin 12/3/2018

Sosialisasi proyek perubahan dan mendapat masukan dari mentor tentang pembuatan SPO.

Masukan isi SPO.

Koordinasi dengan kainstalwatnap tentang rencana pelaksanaan proyek perubahan sesuai tugas dan tanggung jawab jabatan penulis.

4.

5.

Senin 12/3/2018

Selasa 13/3/2018

Diinfokanke Coach via wa

Selasa 13/3/2018 Diinfokanke Coach via wa

Bandung, Maret 2018 Peserta Diklatpim Tk IV

Kadriati Junaid, S.Kep.,Ns Penata Tk. I III-d/NIP.197708181997032002

DAFTAR HADIR PERTEMUAN TIM KERJA PROYEK PERUBAHAN DIKLAT PIM TK IV TAHUN 2018

Hari/Tanggal : Kamis, 8 Maret 2018 Waktu : 11.00Wita Tempat : Ruang Rapat lantai IV Materi : Rapat pembentukan Tim Stake holder NO

NAMA

PKT/GOL

1.

ArdanS,Sos

Letkol Ckm

2.

Herlina, S.Kep.,Ns

Letkol Ckm(K)

3.

Ihsan Niku, SKM, M.Adm.Kes

Letkol Ckm

4.

Wahyunis, SKM

5.

JABATAN

TANDA TANGAN

1......

Mayor Ckm

Anggota SMF (Mentor) Ketua Komite Keperawatan (Nara sumber) Atasan langsung KaInstalwatnap ( Ketua Tim ) Kasituud

Pns. III/c

PMKP

5......

6.

Andi Arnoli, S.Kep.,Ns.,M.Kep Kadriati J, S.kep Ns

Pns. III/d

Project leader

7.

Hj. Sunarti, Skm

Pns. III/d

Kaur Infokes

8.

St. Hamsinah, S,Kep., Ns.,M.Kep Hariati, S.Kep.,Ns.,M.Kes

Pns. III/b

KKPRS

Pns. III/a

Tim pokja SKP

10. Serly Sappedatu, S.Kep.,Ns

Pns. III/b

Stake holder

11. Fahriani Fattah, Amd. Kom

Pns. II/d

Stake holder

9.

Mengetahui, Mentor

ArdanS,Sos LetkolCkmNRP 33989

2.......

3......

4.......

6....... 7...... 8....... 9...... 10....... 11.......

Notulen

Arnoli, S.Kep.,Ns.,M.Kep Penata Tk. I III-c/NIP.197604232007121001

Hari/Tanggal : Kamis, 27 April 2017 Waktu : 11.00 Wita Tempat : Ruang rapa tlantai IV Materi : Rapat pembentukan Tim Stake Holder NO

NAMA

PKT/GOL

JABATAN

TANDA TANGAN

1.

ArdanS,Sos

LetkolCkm

Mentor

1......

2.

Herlina, S.Kep.,Ns Ihsan Niku, SKM.,M.Adm.Kes Wahyunis, SKM Andi Arnoli, S.Kep.,Ns.,M.Kep Kadriati Junaid, S.Kep.,Ns

LetkolCkm(K)

Nara sumber

2.......

LetkolCkm

Ketua Tim

3......

Mayor Ckm

Stake holder

4.......

Pns. III/c

Stake holder

5......

Pns. III/b

Project leader

Hj Sunarti, Skm St. Hamsinah, S,Kep.,Ns.,M.Kep Hariati, S.Kep.,Ns.,M.Kes

Pns. III/d

Stake holder

Pns. III/d

Stake holder

Pns. III/a

Stake holder

Pns. III/b

Stake holder

Pns. II/d

Stake holder

3. 4. 5. 6. 7. 8. 9.

10. Serly Sappedatu, S.Kep.,Ns 11. Fahriani Fattah, Amd. Kom

Mengetahui, Mentor ArdanS,Sos LetkolCkmNRP 33989

6....... 7...... 8....... 9...... 10....... 11.......

Notulen Arnoli, S.Kep.,Ns.,M.Kep Penata Tk. I III-c/NIP.197604232007121001

LAPORAN PERTEMUAN TIM KERJA Hari/Tanggal : Jumat , 9 Maret 2018 Waktu : 11.00 Wita Tempat : Ruang rapat lantai IV Materi : Rapat Tim Stake holder NO

NAMA

PKT/GOL

JABATAN

TANDA TANGAN

1.

ArdanS,Sos

LetkolCkm

Mentor

1......

2.

Herlina, S.Kep.,Ns Ihsan Niku, SKM.,M.Adm.Kes Wahyunis, SKM Andi Arnoli, S.Kep.,Ns.,M.Kep Kadriati Junaid, S.Kep.,Ns

LetkolCkm(K)

Nara sumber

2.......

LetkolCkm

Ketua Tim

3......

Mayor Ckm

Stake holder

4.......

Pns. III/c

Stake holder

5......

Pns. III/b

Project leader

Hj Sunarti, Skm St. Hamsinah, S,Kep.,Ns.,M.Kep Hariati, S.Kep.,Ns.,M.Kes

Pns. III/d

Stake holder

Pns. III/d

Stake holder

Pns. III/a

Stake holder

Pns. III/b

Stake holder

Pns. II/d

Stake holder

3. 4. 5. 6. 7. 8. 9.

10. Serly Sappedatu, S.Kep.,Ns 11. Fahriani Fattah, Amd. Kom

6....... 7...... 8....... 9...... 10....... 11.......

Mengetahui, Mentor

Notulen

ArdanS,Sos LetkolCkmNRP 33989

Arnoli, S.Kep.,Ns.,M.Kep Penata Tk. I III-c/NIP.197604232007121001

KESEHATAN DAERAH MILITER XIV/HASANUDDIN RUMAH SAKIT TK.II 14.05.01 PELAMONIA

LAPORAN PERTEMUAN TIM KERJA Hari / Tanggal PimpinanRapat

: Jumat 9 Maret 2018 : Letkol Ckm Ihsan Niku, SKM.,M.Adm.Kes (Kainstalwatnap)

A. Pembahasan 1. Area proyek perubahan Diklatpim IV 2. Pembentukan Tim Work Proyek perubahan B. Kesimpulan 1. Area proyek perubahan untuk peserta diklatpim atas nama Kadriati junaid, S.Kep.Ns adalah Optimalisasi Komunikasi Efektif Dalam Pelayanan Keperawatan Melalui SPO (Standar Prosedur Operasional Sistem Komunikasi SBAR pada Rawat Inap Rumah Sakit TK II 14.05.01 Pelamonia 2. Untuk kelancaran pelaksanaan proyek perubahan perlu dibentuk tim yang terdiri ; a. Ketua : Letkol Ckm Ihsan Niku, SKM.,M.Adm.Kes b. Stakeholder : 1. Letkol Ckm(K) Herlina, S.Kep.Ns (Komite Keperawatan) 2. Mayor Ckm Mahyunis, A.Md.Rad.,SKM (Kasituud) 3. Pns. Sunarti, SKM (Infokes) 4. Pns. Andi Arnoli, S.Kep.Ns.,M.Kep (PMKP) 5. Pns. Karyani, S.Kep.Ns ( KPRS) 6. Pns. Hariati, S.Kep.Ns.,M.Kes (Pokja SKP) 7. Pns. Serli Sappedatu,S.Kep.Ns 8. Pns. Fahriani Hatta, Amd.Kom C. Saran-saran 1. Ajukan usulan Sprin ke Karumkit 2. Tim pokja proyek perubahan agar meluangkan waktu dalam mendukung pelaksaksanaan kegiatan komunikasi metode SBAR sehingga pelayanan kepada pasien meningkat dan keselamatan pasien terjamin. Mengetahui, Mentor

ArdanS,Sos LetkolCkmNRP 33989

Notulen

AndiArnoli, S.Kep.,Ns.,M.Kep Penata – III/c NIP.197604232007121001

KESEHATAN DAERAH MILITER XIV/HASANUDDIN RUMAH SAKIT TK.II 04.05.01 PELAMONIA

LAPORAN PERTEMUAN TIM KERJA Hari / Tanggal PimpinanRapat

: Senin,12 Maret 2018 : Letkol Ckm Ihsan Niku, SKM.,M.Adm.Kes (Kainstalwatnap)

A. Pembahasan 1. Area proyek perubahan Diklatpim IV 2. Pertemuan Tim Work Proyek perubahan B. Kesimpulan 1. Pertemuan dengan Tim Work Proyek Perubahan untuk membahas langkahlangkah yang akan di ambil untuk proyek perubahan Optimalisasi Komunikasi Efektif Dalam Pelayanan Keperawatan Melalui SPO (Standar Prosedur Operasional) Sistem Komunikasi SBAR pada Rawat Inap Rumah Sakit TK.II 14.05.01 Pelamonia. 2. Seluruh Tim Work ProyekPerubahanhadir C. Saran-saran 1. Tim pokja proyek perubahan agar meluangkan waktu dalam mendukung pelaksanaan kegiatan komunikasi metode SBAR sehingga pelayanan kepada pasien meningkat dan keselamatan pasien terjamin.

Mengetahui, Mentor

ArdanS,Sos LetkolCkmNRP 33989

Notulen

AndiArnoli, S.Kep.,Ns.,M.Kep Penata – III/c NIP.197604232007121001

Related Documents

Data Npwp Mentoryani.docx
December 2019 5
Npwp
December 2019 8
Npwp
May 2020 5
Npwp
June 2020 4
Npwp
November 2019 13
Npwp...pdf
November 2019 25

More Documents from "Faisal Fais"