Dan Hogan Roof Proposal

  • June 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Dan Hogan Roof Proposal as PDF for free.

More details

  • Words: 628
  • Pages: 4
PROPOSAL M&J General Contracting, Inc. 61371 Barclay Washington, MI48094 Telephone 586-907-1299 Fax 586-992-9248 Client Receiving Proposal

Client Telephone

Dan Hogan

586-784-8563

Street Address

Job Name and Location

18450 Gilmore

09.26 Dhogan roof

City, State, Zip Code

Date of Proposal

Armada Twp. MI 48005

Page Number

11/12/09

Page 1

Description of work to be performed and services to be provided: Furnish labor and materials to replace the roofing at the above mentioned address as follows: Two layer tear off Up to two sheets of plywood replaced at no additional charge if there is any bad wood ( 64 square feet ) All new drip edge Ice and water on lower six feet of roof Ice and water on each valley, as well as 90lb roll in each valley Elk starter shigles on all lower edges 15 lb felt paper 30 yr Dimensional shingles New soil pipe covers All new ridge vent type 2 with matching caps One day installation Re-flash any chimneys Clean gutters, grounds and haul away all debris Solar seal caulk Note: Dan, I would be willing to match a competitors estimate if the same quality products are being used. My Corp is fully licensed and insured as well as workmans comp. Any changes to this proposal must be in written form. License # M&J 2102183763

Marshall Self Builders License # 2101084565

We propose hereby to furnish material and labor, complete in accordance with the above specifications, for the sum of:

TEN THOUSAND SEVEN HUNDRED AND FIFTY DOLLARS (10,750.00) Payments to be made as follow:

50% OF TOTAL COST AT START OF PROJECT AND 50% UPON COMPLETION

All material is guaranteed to be as specified. All work to be completed in a workmanship like manner according to standard practices. If the client requests deviations from the above specifications that represent added costs beyond the time and materials quoted, a separate written addendum will be required before the alterations can be executed. The changes requested by the client will become an additional charge over and above the originally quoted price. The client agrees that M&J General Contracting will not be held liable for delays caused by labor strikes, accidents, adverse weather conditions, or other factors beyond the control of M&J General Contracting. The employees and sub-contractors of M&J General Contracting are fully covered by Workman's Compensation Insurance.

Authorized Signature - Marshall L. Self, President

Date of Proposal

IMPORTANT NOTE: This proposal may be withdrawn if not accepted within Sixty (60) Days

Acceptance of Proposal The above prices, specifications, and conditions are satisfactory and are hereby accepted. Signatures below authorize M&J General Contracting to commence work on the project. Payment for the project will be made as detailed above. Client acknowledges that they carry adequate levels of hazard insurance on the location/premises in which the work will be performed.

Signature

Date of Acceptance

Title/Position

Signature

Date of Acceptance

Title/Position

Proposal/Contract M&J General Contracting, Inc. 36412 Nantucket Drive, Clinton Township, MI 48035 Office Telephone (586) 790-9300, Mobile (586) 907-1299, Fax Line (586) 790-4718 Client Receiving Proposal

Client Telephone

#REF! Street Address

#REF! Job Name and Location

18450 Gilmore City, State, Zip Code

09.26 Dhogan roof Date of Proposal

Armada Twp. MI 48005

11/12/09

Page Number

Page 2 of 2

Description of work to be performed and services to be provided (continued from previous page): 1. 2. 3.

$500.00 Dig massive hole in front yard $625.00 Locate and plug buried sprinkler hose. $150.00 Ruin shoes in process of completing steps number one and two. All debris to be removed from work site; clean-up included. Reconnection of sprinkler system is not included in this bid.

$1,275.00 Total of Above

Acceptance of Proposal For M&J General Cintracting

Signature of Client

Signature of Client

For M&J General Cintracting

Signature of Client

Signature of Client

Related Documents

Kevin Hogan
June 2020 2
Roof
May 2020 13
Marc Hogan
December 2019 20
Robert Hogan
December 2019 7