Cste - June 17 2006

  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Cste - June 17 2006 as PDF for free.

More details

  • Words: 808
  • Pages: 3
CSTE JUNE 17th 2006 - Examination Subjective Questions:

1. There are many factors like maintainability and reliability among software Quality Factors.Give 5 most important software quality factors that u would mention for testing a web based testing? 2. Create a Test plan for a simple project not a complex project? 3. Write a standard template for testpaln,testscript,Status report of a project? 4. Design a screen which will show the fields necessary for a defect description? 5. Question related to usecase like guidelines for writing usecase for customer?

6. Draw a control chart and explain how it can be used to see that the testing process is in control? 7. Difference between system test and acceptance test? 8. Aspects of computer software that should be observed during the demontstration of COTS software? 9. Define unit,integration,system,regression,acceptance testing and explain what would you recommend for the new independent test team formed.Previously in the organisation,testing was being performed by software development team? 10. Question on Preventive Controls? 11. Question on Security Testing technique.What tests you would include in the testpaln for testing security with minimal knowledge about security testing? 12. Risks involved in testing wireless technology and how will u develop controls on it to gain confidence about the wirelesss technolog used. 13. Give MEASUREMENTS for a] Test Effectiveness and b] Test Efficiency? Your Company is about to roll out an E-Commerce application. It is not possible to test the

application on all types of browsers on all platforms and operating systems. What steps would you take in the testing environment to reduce the business risks and commercial risks? 14. Developing compatability and motivation with a test team helps assure effective testing.List atleast four guidelines you would follow to develop compatability and motivation within your test team? 15. In a development project Test planning, resource allocation , test scripting is also completed. Testing is being executed. At this stage if there is a major change in requirement , what will be the tester’s role here(actions in response to the changes) .- The question is already asked in one of the previous year papers . 16. There is a delay of 5 days in the development project. How will the tester handle the testing activities , without changing on resources , working time , … .- The question is already asked in one of the previous year papers . 17. Explanation on total number of defects found Vs defects corrected using Graph. 18. one question on control chart 19.Tester who is not much familiar with security testing is posted to plan for security testing. So he has to plan for the security testing using some of basic security knowledge though he is not an expert in it. Comment on his test plan on what should be considered and included. 20. List 3 issues or constraints in implementing wireless network technology. 21. A question related to Current status report. 22. Below are three risks associated with s/w testing. Explain each of them and give a mitigation for each risk. 1. Not Enough Training/Lack of Test Competency 2. Us versus Them Mentality 3. Lack of Customer and User Involvement Objective Questions: 1. a. b. c. d. e.

A question on fit components. Which of the following contributes to fit . Data Structure People Rule All of the above

2. Reliaability, timeliness, consistency are included in which component of fit a. Data b. Structure c. People d. Rule

3. Who will develop the test process for software development using new technology?.(Almost same question was asked in Part 1 ad part 3) a. Management b. Project team c. Auditor d. Tester and few more options 4. Which of the following are relatively complete acceptance criteria? a. Performance should increase b. Response time should be with in 10 sec Few more statements 5. a. b. c.

Experienced people can be used as a tool for estimating the cost- Budgeting Bottom up Top down Expert judgment

6. The communication type which is rarely emphasized a. Listening Few more options . 7.

There were 2 questions on maturity level e.g which level enforces control for technology.

8.

There were 3 question on standard , policy , procedure

9. which of the following model has these steps .. event identification , risk assessment, risk response a. ERM b. COSO internal control framework c. CobiT model 10. Utilize the computer resources to perform their work.. belong to which type of activity specified below a. Interface b. Development c. Computer operation 11. Obligations of both contractual parties should be spelled out in detail in which part of the contract a. What b. Who c. When d. How 12.

There was a similar question on when the contracted software will be completed

13. a. b. c. d.

Test planning activity which includes starting and end time for each test milestone. Budgeting Scheduling Estimation Staffing

Related Documents

Cste - June 17 2006
November 2019 13
Cste
June 2020 8
Cste
October 2019 21
June 2006
July 2020 15
2006 June
November 2019 11