MUNICIPALIDAD PROVINCIAL DE COTABMBAS -TAMABOBAMBA

CRONOGRAMA ACELERADO DE AVANCE DE OBRA ENERO, FEBRERO, MARZO, ABRIL, MAYO, JUNIO - 2017.

PROYECTO INSTALACION DEL SISTEMA DE RIEGO POR ASPERCION EN LAS COMUNIDADES PARCCO, QUEWINCHA, QUEBRADA DE MARA PITIC, DISTRITO DE TAMBOBAMBA, PROVINCIA DE COTABAMBAS-APURIMAC COSTO DIRECTO TOTAL

S/

5,755,107.05

RESIDENTE DE OBRA

SUPERVISOR : ING. ENRIQUE S. ENRIQUEZ MENDIZU

TIEMPO DE EJECUCION DESDE JULIO 2014 AL DICIEMBRE 2016



PARTIDAS OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES

01

130,214.42 OBRAS PROVISIONALES

01.01

5,784.75 APERTURA DE ACCESO VEHICULAR

JULIO 2014 A DIC. 2015 130,214.42

6.22%

8,093.50 ###

-

E

93.78%

122,120.92

100.00%

8,093.50 ###

-

P

100.00%

5,784.75

E

100.00%

5,784.75

P

93.50%

124,429.67

6.22%

8,093.50 ###

E

93.50%

116,336.17

6.22%

8,093.50 ###

P

100.00%

44,025.00

13.41%

5,902.50

E

86.59%

38,122.50

100.00%

5,902.50 ###

BOCATOMA PARCCOMAYO (1 UNI)

P

100.00%

23,400.43

12.55%

2,936.31 ###

23,400.44

E

87.45%

20,464.12

0.00%

### -

TRABAJOS PRELIMINARES

P

100.00%

1,386.11

###

E

100.00%

1,386.11

###

P

100.00%

3,038.60

### -

0.97%

E

99.03%

3,009.01

###

100.00%

1,386.11

P

100.00%

14,719.34

### -

5.80%

14,719.34

E

94.20%

13,865.57

###

100.00%

REVOQUES Y ENLUCIDOS

P

100.00%

3,362.64

### -

34.47%

E

65.53%

2,203.43

###

100.00%

P

100.00%

893.74

### -

100.00%

E

0.00%

-

### -

ACCESORIOS Y COMPUERTAS

03.05

893.74 DESARENADOR - CAMARA DE TRANSMICION (01 UNI)

04

04.01

P

100.00%

11,437.28

11,437.27

E

90.71%

10,375.03

###

TRABAJOS PRELIMINARES

P

100.00%

45.00

###

E

100.00%

45.00

###

P

100.00%

848.42

### -

8.87%

E

91.13%

773.15

### -

100.00%

P

100.00%

3,614.09

### -

E

100.00%

3,614.09

### -

45.00 MOVIMIENTOS DE TIERRAS 848.43 OBRAS DE CONCRETO

04.03

3,614.09

9.29%

1,062.25 ###

2,936.31

13% 12.5%

03.03

3,362.64

MAYO

JUNIO

-

12.55%

3,038.61

03.04

ABRIL

-

03.02

OBRAS DE CONCRETO

MARZO

-

44,025.00

MOVIMIENTO DE TIERRAS

FEBRERO -

###

02

03.01

ENERO

###

124,429.67

03

###

100.00%

P

01.02

SEGURIDAD Y SALUD

MESES DE PROGRMACION POR 182 DIAS

EJEC. ENERO A DIC. SALDO 2016 MAYO A SET2016 SALDO ENER-MARZO-2017

9.29%

2,936.31 2,936.31

29.59

29.59

853.77

853.77

1,159.21

1,159.21

893.74

893.74

364.45

1,062.25 3.19%

697.80 6.1%

75.28

75.28

-

}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}}} 289.17 REVOQUES Y ENLUCIDOS 100.00% 1,351.43 ### 21.40% 289.17 P

04.04

1,351.43 ACCESORIOS Y COMPUERTAS

04.05

1,679.05

04.06

3,899.27

CANAL DE LIMPIA Y REBOSE

CANAL DE CONDUCCION SECCION RECTANGULAR (L=23.00ml)

05

05.01

05.02

7,111.54

1,062.26

### -

100.00%

1,679.05

### -

41.56%

E

58.44%

981.26

### -

100.00%

P

100.00%

3,899.27

###

E

100.00%

3,899.27

P

100.00%

7,111.54

E

105.07%

7,472.44

728.96 ###

100.00%

44.16

0.86%

0.38 ###

E

99.14%

43.78

100.00%

### -

MOVIMIENTOS DE TIERRAS

P

100.00%

589.46

0.11%

0.62 ###

8.27%

535.44 ###

4,772.12

4,772.12 JUNTAS Y SELLOS

05.05

354.37

05.06

1,351.43

REVOQUES Y ENLUCIDOS

10.25%

### -

P

589.46

100.00% 697.80

-

697.80

### 10.25%

TRABAJOS PRELIMINARES

LOSA DE CANAL DE CONCRETO (TECHO)

05.04

78.60%

P

44.16

OBRAS DE CONCRETO

05.03

E

E

99.89%

588.84

P

100.00%

6,477.92

###

E

63.99%

4,145.41

P

100.00%

1,181.13

E

92.27%

1,089.86

P

100.00%

354.37

E

71.43%

253.12

### -

P

100.00%

1,351.43

### -

E

100.00%

1,351.43

### -

728.96 0.86%

91.27 ###

28.57%

101.25 ###

10.25% 0.38

0.38

100.00% 0.11%

0.62

0.62

100.00% 8.27%

535.44

### 7.73%

728.96

728.96

535.44 -

91.27

91.27

### 101.25

101.25

-

MUNICIPALIDAD PROVINCIAL DE COTABMBAS -TAMABOBAMBA

CRONOGRAMA ACELERADO DE AVANCE DE OBRA ENERO, FEBRERO, MARZO, ABRIL, MAYO, JUNIO - 2017.

PROYECTO INSTALACION DEL SISTEMA DE RIEGO POR ASPERCION EN LAS COMUNIDADES PARCCO, QUEWINCHA, QUEBRADA DE MARA PITIC, DISTRITO DE TAMBOBAMBA, PROVINCIA DE COTABAMBAS-APURIMAC COSTO DIRECTO TOTAL

S/

5,755,107.05

RESIDENTE DE OBRA

SUPERVISOR : ING. ENRIQUE S. ENRIQUEZ MENDIZU

TIEMPO DE EJECUCION DESDE JULIO 2014 AL DICIEMBRE 2016



PARTIDAS CANAL DE CONDUCCION SECCION RECTANGULAR (L=6,200.00ml)

06

2,431,391.60 TRABAJOS PRELIMINARES

06.01

11,904.00 MOVIMIENTO DE TIERRAS

06.02

1,208,010.79

06.03

1,167,769.57

06.04

13,714.20

TUBERIAS Y ACCESORIOS

PRUEBA HIDRAULICA

PLATAFORMA(BOTADERO DE MATERIAL EXCEDENTE)

06.05

29,993.04 DADOS DE CONCRETO PARA ANCLAJE DE TUBERIA

07

156,556.59 TRABAJOS PRELIMINARES

07.01

165.89

07.02

12,061.44

07.03

134,212.06

07.04

10,117.20

MOVIMIENTOS DE TIERRAS

OBRAS DE CONCRETO

ACCESORIOS

CANAL DE ADUCCION SECCION CIRCULAR(L=1,789.00)

08

259,064.21 TRABAJOS PRELIMINARES

08.01

3,434.88 MOVIMIENTOS DE TIERRAS

08.02

62,876.19 TUBERIAS Y ACCESORIOS

08.03

190,015.97

08.04

2,737.17

PRUEBA HIDRAULICA

RED DE DISTRIBUCION(L=32,300.47ml)

09

1,774,691.50 TRABAJOS PRELIMINARES

09.01

62,016.90

09.02

1,048,712.65

09.03

593,223.92

09.04

70,738.03

10

19,447.14

MOVIMIENTOS DE TIERRAS

TUBERIAS Y ACCESORIOS

PRUEBA HIDRAULICA

POZA DE INSPECCION(8.00 UNI)

10.01

10.02

JULIO 2014 A DIC. 2015 P

100.00%

2,431,391.60

65.38%

1,589,664.17 ###

E

34.62%

841,727.43

49.19%

1,195,902.14 ###

P

100.00%

11,904.00

5.22%

621.02 ###

E

94.78%

11,282.98

5.22%

621.02 ###

P

100.00%

1,208,010.79

66.26%

800,444.61 ###

E

33.74%

407,566.18

P

100.00%

1,167,769.57

E

33.67%

393,152.50

P

100.00%

13,714.20

93.42%

12,811.50 ###

E

6.58%

902.70

0.00%

### -

P

100.00%

29,993.04

3.90%

1,169.97 ###

E

96.10%

28,823.07

100.00%

1,169.97 ###

P

100.00%

156,556.59

94.01%

147,178.31 ###

E

6.08%

9,516.29

93.04%

145,654.35 ###

P

100.00%

165.89

86.11%

142.85 ###

E

13.89%

23.04

77.32%

128.26 ###

P

100.00%

12,061.44

96.95%

11,693.59 ###

E

0.00%

-

96.95%

11,693.59 ###

P

100.00%

134,212.06

93.30%

125,224.67 ###

E

6.70%

8,987.39

92.56%

124,221.16 ###

P

100.00%

10,117.20

100.00%

10,117.20 ###

E

5.00%

505.86

95.00%

9,611.34 ###

P

100.00%

259,064.21

42.31%

109,618.45 ###

E

57.96%

150,143.47

41.57%

107,696.50 ###

P

100.00%

3,434.88

100.00%

3,434.88 ###

E

100.00%

3,434.88

P

100.00%

62,876.19

11.09%

E

88.91%

55,901.03

11.09%

6,975.16 ###

P

100.00%

190,015.97

52.21%

99,208.41 ###

E

47.79%

90,807.56

51.20%

97,286.46 ###

P

100.00%

2,737.17

###

E

0.00%

-

###

P

100.00%

1,774,691.50

76.51%

1,357,792.73 ###

E

23.49%

416,898.77

60.91%

1,080,897.79 ###

P

100.00%

62,016.90

61.90%

38,386.72 ###

E

38.10%

23,630.18

100.00%

38,386.72 ###

P

100.00%

1,048,712.65

78.36%

821,784.82 ###

E

21.64%

226,927.83

71.84%

753,414.53 ###

P

100.00%

593,223.92

71.96%

426,883.16 ###

E

28.04%

166,340.76

48.73%

289,096.54 ###

P

100.00%

70,738.03

70,738.03 ###

E

0.00%

-

###

P

100.00%

19,447.14

94.44%

18,366.08 ###

E

5.56%

1,081.06

29.81%

5,797.05 ### 56.68 ###

16.19%

###

ENERO

393,762.04

FEBRERO 35,000.00

1.44%

MARZO 85,000.00

ABRIL 96,405.75

MAYO

JUNIO

30,000.00

125,686.52

21,669.77

30,000.00

20,000.00

15,264.02

0%

3.5%

14.51%

175,264.02

17.61%

205,686.52

93.42%

12,811.50

0.89%

1,385.95

8.79%

14.59

35,000.00

35,000.00

40,000.00

50,000.00

50,000.00

625,180.60 ### 66.33%

774,617.07 ###

105,686.52

568,930.55 ###

3.05%

0.75%

367.85

6,405.75

500.00

150.00

71.36

6,405.75

664.59

14.59

500.00

150.00

71.36

150.00

150.00

500.00

503.51

1,000.00

1,300.00

1,437.17

1,300.00

1,437.17

80,000.00

88,370.29

108,524.64

68,370.29

30,000.00

38,370.29

137,786.61

50,000.00

50,000.00

1,003.51

67.85

-

1.80%

4,659.12

-

-

921.95

-

-

3,434.88 ### 6,975.16 ###

TRABAJOS PRELIMINARES

P

100.00%

69.12

82.00%

69.12

E

18.00%

12.44

82.00%

56.68 ###

MOVIMIENTOS DE TIERRAS

P

100.00%

1,816.95

92.35%

1,677.91 ###

E

7.65%

139.04

52.30%

950.22 ###

1,816.95

MESES DE PROGRMACION POR 182 DIAS

EJEC. ENERO A DIC. SALDO 2016 MAYO A SET2016 SALDO ENER-MARZO-2017

1.01%

1,921.95

100%

2,737.17

15.60%

276,894.93

921.95

-

-

1,000.00

276,894.93

6.52% 100.00% 23.23%

37,786.61

100.00% 100.00%

70,738.03

64.63%

12,569.03

70,738.03

1,987.77

12,569.03

40.05% 100.00%

727.69

727.69

10,581.26

MUNICIPALIDAD PROVINCIAL DE COTABMBAS -TAMABOBAMBA

CRONOGRAMA ACELERADO DE AVANCE DE OBRA ENERO, FEBRERO, MARZO, ABRIL, MAYO, JUNIO - 2017.

PROYECTO INSTALACION DEL SISTEMA DE RIEGO POR ASPERCION EN LAS COMUNIDADES PARCCO, QUEWINCHA, QUEBRADA DE MARA PITIC, DISTRITO DE TAMBOBAMBA, PROVINCIA DE COTABAMBAS-APURIMAC COSTO DIRECTO TOTAL

S/

5,755,107.05

RESIDENTE DE OBRA

SUPERVISOR : ING. ENRIQUE S. ENRIQUEZ MENDIZU

TIEMPO DE EJECUCION DESDE JULIO 2014 AL DICIEMBRE 2016



PARTIDAS OBRAS DE CONCRETO

10.03

9,514.79 REVOQUES Y ENLUCIDOS

10.04

4,757.72

10.05

3,288.56

ACCESORIOS Y COMPUERTAS

VALVULAS DE PURGAY/O CONTROL(11 UNI)

11

5,171.09

JULIO 2014 A DIC. 2015 P

100.00%

E

9.77%

P

0.00%

E

0.00%

P

100.00%

E

0.00%

P

100.00%

E

0.00%

9,514.79

90.23%

8,585.21 ###

929.58

24.44%

2,325.13 ###

4,757.72

100.00%

4,757.72 ###

-

21.74%

1,034.14 ###

3,288.56

100.00%

3,288.56 ###

43.51%

1,430.88 ###

5,171.09

41.50%

2,146.10 ###

-

41.50%

2,146.10 ###

100.00%

17.74 ###

TRABAJOS PRELIMINARES

P

100.00%

17.74

11.01

17.74

E

0.00%

-

MOVIMIENTOS DE TIERRAS

P

100.00%

151.19

11.02

151.19

E

0.00%

-

P

100.00%

783.89

11.03

783.90

E

0.00%

-

ACCESORIOS Y COMPUERTAS

P

100.00%

4,218.26

28.29%

1,193.28 ###

11.04

4,218.26

E

0.00%

-

28.29%

1,193.28 ###

P

100.00%

315,732.14

100.00%

315,732.14 ###

E

0.00%

-

25.33%

79,981.73 ###

P

100.00%

706.41

100.00%

706.41 ###

E

0.00%

-

88.62%

626.00 ###

P

100.00%

6,014.87

100.00%

6,014.87 ###

E

0.00%

-

89.89%

5,406.94 ###

P

100.00%

36,307.02

100.00%

36,307.02 ###

E

0.00%

-

72.81%

26,434.55 ###

P

100.00%

99,242.84

100.00%

99,242.84 ###

E

0.00%

-

47.88%

47,514.24 ###

P

100.00%

173,461.00

100.00%

173,461.00 ###

E

0.00%

-

P

100.00%

48,836.68

100.00%

48,836.68 ###

E

0.00%

-

98.24%

47,975.64 ### 64.97 ###

OBRAS DE CONCRETO

HIDRANTES(438 UNI)

12

315,732.14 TRABAJOS PRELIMINARES

12.01

706.41

12.02

6,014.87

12.03

36,307.02

12.04

99,242.84

12.05

173,461.00

13

48,836.68

MOVIMIENTOS DE TIERRAS

OBRAS DE CONCRETO

ACCESORIOS Y COMPUERTAS

EQUIPO DE RIEGO MOVIL

CAJAS DE VALVULA(47 UNI)

13.01

13.02

100.00% 100.00%

64.97 ###

MOVIMIENTOS DE TIERRAS

P

100.00%

736.25

100.00%

736.25 ###

37,549.71 CAMARA DE ROMPE DE PRESION(47 UNI) 91,306.38 TRABAJOS PRELIMINARES

14.01

342.91

14.02

4,943.81

14.03

32,795.20

MOVIMIENTOS DE TIERRAS

OBRAS DE CONCRETO

MAYO 1,260.08

JUNIO 5,000.00

3,723.58

3,723.58

56.49%

1,857.68

1,857.68

3,024.98

3,024.98

100.00% 58.50%

-

-

-

-

-

-

3,024.98

74.67%

11.38%

235,750.41

3,024.98

-

14,750.00

80.41

111,139.41

E

0.00%

-

100.00%

736.25 ###

P

100.00%

8,513.16

100.00%

8,513.16 ###

E

0.00%

-

89.89%

7,652.12 ###

P

100.00%

1,972.59

100.00%

1,972.59 ###

E

0.00%

-

100.00%

1,972.59 ###

P

100.00%

37,549.71

100.00%

37,549.71 ###

E

0.00%

-

100.00%

37,549.71 ###

P

100.00%

91,306.37

85.24%

77,833.07 ###

E

14.76%

13,473.30

44.81%

40,916.42 ###

P

100.00%

342.91

93.55%

320.79 ###

E

6.45%

22.12

100.00%

290.45 ###

P

100.00%

4,943.81

97.37%

4,813.61 ###

E

2.63%

130.20

88.59%

4,379.80 ###

P

100.00%

32,795.20

59.38%

19,474.22 ###

E

40.62%

13,320.98

18.76%

6,153.24 ###

109,861.00

80.41

607.93

250.00

357.93

9,872.47

4,500.00

5,372.47

52.12%

51,728.60

10,000.00

20,328.60

21,400.00

100.00%

173,461.00

85,000.00

88,461.00

10.11%

27.19%

### -

-

TUBERIAS Y ACCESORIOS

ABRIL

783.89 ###

64.97

REVOQUES Y ENLUCIDOS

MARZO

78.26%

783.89 ###

0.00%

1,972.59

14

100.00%

100.00%

13.04

FEBRERO

6,260.08

151.19 ###

E

8,513.16

ENERO

65.79%

151.19 ###

P

13.03

13.05

100.00%

TRABAJOS PRELIMINARES

OBRAS DE CONCRETO

###

17.74 ###

64.97

736.25

MESES DE PROGRMACION POR 182 DIAS

EJEC. ENERO A DIC. SALDO 2016 MAYO A SET2016 SALDO ENER-MARZO-2017

1.76%

861.04

861.04

10.11%

25.84%

861.04

23,595.67 23,595.67

100.00%

8.77%

0.00%

861.04

5,200.00

30.34

433.81

18,395.67

30.34

200.00

233.81

MUNICIPALIDAD PROVINCIAL DE COTABMBAS -TAMABOBAMBA

CRONOGRAMA ACELERADO DE AVANCE DE OBRA ENERO, FEBRERO, MARZO, ABRIL, MAYO, JUNIO - 2017.

PROYECTO INSTALACION DEL SISTEMA DE RIEGO POR ASPERCION EN LAS COMUNIDADES PARCCO, QUEWINCHA, QUEBRADA DE MARA PITIC, DISTRITO DE TAMBOBAMBA, PROVINCIA DE COTABAMBAS-APURIMAC COSTO DIRECTO TOTAL

S/

5,755,107.05

RESIDENTE DE OBRA

SUPERVISOR : ING. ENRIQUE S. ENRIQUEZ MENDIZU

TIEMPO DE EJECUCION DESDE JULIO 2014 AL DICIEMBRE 2016



PARTIDAS REVOQUES Y ENLUCIDOS

14.04

18,739.61 ACCESORIOS Y COMPUERTAS

14.05

34,484.85

15

72,634.54

CRUCE AEREO L=60.00ml

TRABAJOS PRELIMINARES

15.01

691.20 MOVIMIENTOS DE TIERRAS

15.02

7,003.19

15.03

26,252.88

15.04

1,269.17

15.05

37,418.10

16

8,842.00

OBRAS DE CONCRETO

REVOQUES Y ENLUCIDOS

TENDIDO DE CABLES Y OTROS

CRUCE AEREO L=15.00ml

TRABAJOS PRELIMINARES

16.01

172.80 MOVIMIENTOS DE TIERRAS

16.02

1,063.46 OBRAS DE CONCRETO

16.03

4,037.57

16.04

167.88

16.05

3,400.30

REVOQUES Y ENLUCIDOS

TENDIDO DE CABLES Y OTROS

PRUEBAS DE CONTROL DE CALIDAD DE CONCRETO

17

1,780.00 DISEÑO DE MEZCLA

17.01

730.00 PRUEBA DE RESISTENCIAA A LA COMPRESION

17.02

1,050.00 MITIGACION DE IMPACTO AMBIENTAKL Y FORTALECIMIENTO

18

52,000.00

18.01

14,000.00

MITIGGACION AMBIENTAL

CAPACITACION Y FORTALECIMIENTO DE LA ORGANIZACIÓN COMUNAL

18.02

38,000.00

JULIO 2014 A DIC. 2015 P

0.00%

-

100.00%

18,739.61 ###

34,484.84

100.00%

34,484.84 ###

E

0.00%

-

32.92%

11,353.32 ###

P

100.00%

72,634.54

80.03%

58,126.29 ###

E

0.19%

138.24

78.53%

57,036.40 ###

P

100.00%

691.20

100.00%

691.20 ###

E

20.00%

138.24

80.00%

552.96 ###

P

100.00%

7,003.19

58.64%

4,106.84 ###

E

0.00%

58.64%

4,106.84 ###

P

100.00%

26,252.88

55.77%

14,640.98 ###

E

0.00%

-

55.77%

14,640.98 ###

P

100.00%

1,269.17

100.00%

1,269.17 ###

E

0.00%

-

75.07%

952.72 ###

P

100.00%

37,418.10

100.00%

37,418.10 ###

E

0.00%

-

98.30%

36,782.90 ###

P

100.00%

8,842.00

97.65%

8,634.00 ###

E

2.35%

208.00

22.78%

2,014.11 ###

P

100.00%

172.80

20.00%

34.56 ###

E

80.00%

138.24

20.00%

34.56 ###

P

100.00%

1,063.46

93.44%

993.70 ###

E

6.56%

69.76

93.44%

993.70 ###

P

100.00%

4,037.56

100.00%

4037.56 ###

E

0.00%

-

24.42%

985.85 ###

P

100.00%

167.88

###

E

0.00%

-

### -

P

100.00%

3,400.30

###

E

0.00%

-

### -

P

100.00%

1,780.00

E

100.00%

1,780.00

###

P

100.00%

730.00

###

E

0.00%

-

### -

P

100.00%

1,050.00

###

E

0.00%

-

###

P

100.00%

52,000.00

###

ENERO

FEBRERO

MARZO

ABRIL

MAYO

JUNIO

-

67.08%

21.28%

41.36%

44.23%

24.93%

1.70%

74.87%

23,131.52

5,000.00

15,459.90

15,459.90

2,896.35

2,896.35

11,611.90

11,611.90

316.45

316.45

635.20

635.20

6,619.89

18,131.52

6,619.89

-

3,051.71

3,051.71

167.88

167.88

100.00%

3,400.30

3,400.30

100.0%

1,780.00

850.00

930.00

730.00

350.00

380.00

1,050.00

500.00

550.00

52,000.00

10,000.00

21,500.00

20,500.00

7,500.00

6,500.00

14,000.00

14,000.00

75.58%

100.00%

1,780.00

100%

### 100.00%

14,000.00

###

0.00%

-

### -

P

100.00%

38,000.00

###

E

0.00%

-

### -

100.00%

998.86

998.86

FLETE TERRESTRE

52,000.00 ###

E

19.01

182,505.74

100.00%

1,780.00 ###

P

E

20.01

1.00

E

P

TRANSPORTE DE MATERIALES

18,739.61 ###

100.00%

OBRAS COMPLEMENTARIAS

300,465.66

100.00%

P

998.86

20

18,739.61

E

19

PLACA RECORDATORIA

100.00%

MESES DE PROGRMACION POR 182 DIAS

EJEC. ENERO A DIC. SALDO 2016 MAYO A SET2016 SALDO ENER-MARZO-2017

100.00%

998.86 ###

100.00%

100.00%

100.00%

14,000.00

38,000.00

10,000.00

998.86

998.86

###

P

100.00%

998.86

###

E

0.00%

-

###

P

100.00%

300,465.66

85.47%

256,820.49 ###

E

14.53%

43,645.17

24.73%

74,314.75 ###

P

100.00%

182,505.74

100.00%

182,505.74 ###

E

0.00%

-

### -

100.00%

998.86

998.86

60.74%

182,505.74

100.00%

182,505.74

50,000.00

50,000.00

82,505.74

50,000.00

50,000.00

82,505.74

MUNICIPALIDAD PROVINCIAL DE COTABMBAS -TAMABOBAMBA

CRONOGRAMA ACELERADO DE AVANCE DE OBRA ENERO, FEBRERO, MARZO, ABRIL, MAYO, JUNIO - 2017.

PROYECTO INSTALACION DEL SISTEMA DE RIEGO POR ASPERCION EN LAS COMUNIDADES PARCCO, QUEWINCHA, QUEBRADA DE MARA PITIC, DISTRITO DE TAMBOBAMBA, PROVINCIA DE COTABAMBAS-APURIMAC COSTO DIRECTO TOTAL

S/

5,755,107.05

RESIDENTE DE OBRA

SUPERVISOR : ING. ENRIQUE S. ENRIQUEZ MENDIZU

TIEMPO DE EJECUCION DESDE JULIO 2014 AL DICIEMBRE 2016



PARTIDAS FLETE RURAL

20.02

117,959.92

JULIO 2014 A DIC. 2015

MESES DE PROGRMACION POR 182 DIAS

EJEC. ENERO A DIC. SALDO 2016 MAYO A SET2016 SALDO ENER-MARZO-2017

P

100.00%

117,959.92

63.00%

74,314.75 ###

E

37.00%

43,645.17

100.00%

117,959.92 ###

###

ENERO

FEBRERO

MARZO

ABRIL

MAYO

JUNIO

###

AVANCE MENSUAL %

AVACE ACUMULADO %

PROGRAMADO MENSUAL

100.00%

5,755,107.05

70.62%

4,064,250.89### 21.14%

EJECUTADO MENSUAL

29.14%

1,677,166.74

49.60%

2,854,328.98###

0.64%

1,216,595.08

0.62%

36,893.66

0.00%

PROGRAMADO ACUMULADO

100.00%

5,755,107.05

78.74%

4,531,495.72###

0.00%

0.00%

EJECUTADO ACUMULADO

29.09%

1,674,158.65

78.69%

4,531,495.72###

0.00%

0.00%

35,500.00 -

-

1.48%

85,150.00

1.69%

97,399.06

3.78%

0.00%

-

0.00%

0.00%

0.00%

-

0.00%

-

0.00%

0.00%

-

0.00%

-

0.00%

-

0.00%

217,625.56 -

7.57%

435,423.28

0.00%

0.00%

345,497.18

0.00%

0.00% -

6.00%

0.00% -

0.00%

-

MUNICIPALIDAD PROVINCIAL DE COTABMBAS -TAMABOBAMBA

2,936.31

1,062.25 1,062.25

728.96

MUNICIPALIDAD PROVINCIAL DE COTABMBAS -TAMABOBAMBA

393,762.04

1,385.95

4,659.12 4,659.12

276,894.93

12,569.03

MUNICIPALIDAD PROVINCIAL DE COTABMBAS -TAMABOBAMBA

3,024.98

235,750.41

51,728.60

861.04

23,595.67

MUNICIPALIDAD PROVINCIAL DE COTABMBAS -TAMABOBAMBA

15,459.90

6,619.89

1,780.00

52,000.00

998.86

182,505.74

MUNICIPALIDAD PROVINCIAL DE COTABMBAS -TAMABOBAMBA

1,216,595.08 1,216,595.08

MUNICIPALIDAD PROVINCIAL DE COTABMBAS -TAMABOBAMBA

CRONOGRAMA ACELERADO DE AVANCE DE OBRA DEL 17 DE JULIO, AGOSTO AL 20 DE SETIEMBRE - 2017.

PROYECTO INSTALACION DEL SISTEMA DE RIEGO POR ASPERCION EN LAS COMUNIDADES PARCCO, QUEWINCHA, QUEBRADA DE MARA PITIC, DISTRITO DE TAMBOBAMBA, PROVINCIA DE COTABAMBAS-APURIMAC COSTO DIRECTO TOTAL

S/

5,755,107.05

RESIDENTE DE OBRA : CLODOALDO MELO TITO

SUPERVISOR : ING. ENRIQUE S. ENRIQUEZ MENDIZU

TIEMPO DE EJECUCION DESDE JULIO 2014 AL DICIEMBRE 2016



PARTIDAS OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES

JULIO 2014 A DIC. 2015 P

100.00%

130,214.42

6.22%

8,093.50 ###

E

93.78%

122,120.92

100.00%

8,093.50 ###

P

100.00%

5,784.75

E

100.00%

5,784.75

APERTURA DE ACCESO VEHICULAR

P

2.16%

124,429.67

0.14%

8,093.50 ###

01.02

124,429.67

E

93.50%

116,336.17

6.50%

8,093.50 ###

100.00%

P

100.00%

44,025.00

13.41%

5,902.50

100.00%

02

44,025.00

E

86.59%

38,122.50

100.00%

5,902.50 ###

BOCATOMA PARCCOMAYO (1 UNI)

P

100.00%

23,400.43

12.55%

2,936.31 ###

23,400.44

E

87.45%

20,464.12

0.00%

### -

TRABAJOS PRELIMINARES

P

100.00%

1,386.11

###

E

100.00%

1,386.11

###

P

100.00%

3,038.60

### -

0.97%

E

99.03%

3,009.01

###

100.00%

01

130,214.42 OBRAS PROVISIONALES

01.01

5,784.75

SEGURIDAD Y SALUD

03

03.01

1,386.11 MOVIMIENTO DE TIERRAS

100.00%

100.00%

14,719.34

### -

5.80%

E

94.20%

13,865.57

###

100.00%

REVOQUES Y ENLUCIDOS

P

100.00%

3,362.64

### -

34.47%

E

65.53%

2,203.43

###

100.00%

P

100.00%

893.74

### -

100.00%

E

0.00%

-

### -

P

100.00%

11,437.28

11,437.27

E

90.71%

10,375.03

###

TRABAJOS PRELIMINARES

P

100.00%

45.00

###

E

100.00%

45.00

###

P

100.00%

848.42

### -

8.87%

E

91.13%

773.15

### -

100.00%

P

100.00%

3,614.09

### -

E

100.00%

3,614.09

### -

P

100.00%

1,351.43

### -

21.40%

E

78.60%

1,062.26

### -

100.00%

P

100.00%

1,679.05

### -

41.56%

E

58.44%

981.26

### -

100.00%

P

100.00%

3,899.27

###

E

100.00%

3,899.27

P

100.00%

7,111.54

E

105.07%

7,472.44

893.74 DESARENADOR - CAMARA DE TRANSMICION (01 UNI)

04

04.01

45.00 MOVIMIENTOS DE TIERRAS 848.43 OBRAS DE CONCRETO

04.03

3,614.09 REVOQUES Y ENLUCIDOS

04.04

1,351.43

04.05

1,679.05

04.06

3,899.27

ACCESORIOS Y COMPUERTAS

CANAL DE LIMPIA Y REBOSE

CANAL DE CONDUCCION SECCION RECTANGULAR (L=23.00ml)

05

7,111.54

9.29%

1,062.25 ###

728.96 ###

TRABAJOS PRELIMINARES

P

100.00%

44.16

0.86%

0.38 ###

E

99.14%

43.78

100.00%

### -

MOVIMIENTOS DE TIERRAS

P

100.00%

589.46

0.11%

0.62 ###

05.02

589.46

E

99.89%

588.84

P

100.00%

6,477.92

05.03

4,772.12

E

63.99%

4,145.41

P

100.00%

1,181.13

E

92.27%

1,089.86

P

100.00%

354.37

E

71.43%

253.12

### -

P

100.00%

1,351.43

### -

LOSA DE CANAL DE CONCRETO (TECHO) 4,772.12

05.05

354.37

JUNTAS Y SELLOS

REVOQUES Y ENLUCIDOS

05.06

2,936.31

2,906.71

29.59

29.60

853.77

853.76

1,159.21

1,159.21

893.74

893.74

1,062.25

1,062.25

29.60

2,906.71

#REF!

29.60

853.76

1,159.21

893.74 9.29%

1,062.25

75.28

75.28

#VALUE! 75.28

986.97

#VALUE!

75.28

-

10.25%

### -

44.16

05.04

-

289.17

289.17

697.80

697.80

289.17

697.80

### 10.25%

05.01

OBRAS DE CONCRETO

-

100.00%

P

ACCESORIOS Y COMPUERTAS

SETIEMBRE

-

14,719.34

03.05

AGOSTO

-

###

03.03

3,362.64

JULIO

###

3,038.61

03.04

MESES DE PROGRMACION POR 182 DIAS JUNIO

-

03.02

OBRAS DE CONCRETO

SALDO

EJEC. ENERO A DIC. SALDO 2016 MAYO A SET2016 SALDO ENER-MAYO-2017

### 8.27%

535.44 ###

728.96 728.96

0.86%

0.38

728.96

728.96

728.96 0.38

0.38

0.62

0.62

535.44

535.44

91.27

91.27

100.00% 0.11%

0.62

100.00% 8.27%

535.44

### 7.73%

91.27 ###

91.27

### 28.57%

101.25 ###

101.25

101.25

101.25

-

MUNICIPALIDAD PROVINCIAL DE COTABMBAS -TAMABOBAMBA

CRONOGRAMA ACELERADO DE AVANCE DE OBRA DEL 17 DE JULIO, AGOSTO AL 20 DE SETIEMBRE - 2017.

PROYECTO INSTALACION DEL SISTEMA DE RIEGO POR ASPERCION EN LAS COMUNIDADES PARCCO, QUEWINCHA, QUEBRADA DE MARA PITIC, DISTRITO DE TAMBOBAMBA, PROVINCIA DE COTABAMBAS-APURIMAC COSTO DIRECTO TOTAL

S/

5,755,107.05

RESIDENTE DE OBRA : CLODOALDO MELO TITO

SUPERVISOR : ING. ENRIQUE S. ENRIQUEZ MENDIZU

TIEMPO DE EJECUCION DESDE JULIO 2014 AL DICIEMBRE 2016

Nº 05.06

PARTIDAS 1,351.43 CANAL DE CONDUCCION SECCION RECTANGULAR (L=6,200.00ml)

06

2,431,391.60 TRABAJOS PRELIMINARES

06.01

11,904.00

06.02

1,208,010.79

06.03

1,167,769.57

06.04

13,714.20

MOVIMIENTO DE TIERRAS

TUBERIAS Y ACCESORIOS

PRUEBA HIDRAULICA

PLATAFORMA(BOTADERO DE MATERIAL EXCEDENTE)

06.05

29,993.04 DADOS DE CONCRETO PARA ANCLAJE DE TUBERIA

07

156,556.59 TRABAJOS PRELIMINARES

100.00%

2,431,391.60

65.38%

1,589,664.17 ###

E

34.62%

841,727.43

49.19%

1,195,902.14 ###

P

100.00%

11,904.00

5.22%

621.02 ###

E

94.78%

11,282.98

5.22%

621.02 ###

P

100.00%

1,208,010.79

66.26%

800,444.61 ###

E

33.74%

407,566.18

P

100.00%

1,167,769.57

E

33.67%

393,152.50

P

100.00%

13,714.20

93.42%

12,811.50 ###

E

6.58%

902.70

0.00%

### -

P

100.00%

29,993.04

3.90%

1,169.97 ###

E

96.10%

28,823.07

100.00%

1,169.97 ###

P

100.00%

156,556.59

94.01%

147,178.31 ###

E

6.08%

9,516.29

93.04%

145,654.35 ###

66.33%

774,617.07 ###

86.11%

142.85 ### 128.26 ###

P

100.00%

12,061.44

96.95%

11,693.59 ###

E

0.00%

-

96.95%

11,693.59 ###

P

100.00%

134,212.06

93.30%

125,224.67 ###

E

6.70%

8,987.39

92.56%

124,221.16 ###

P

100.00%

10,117.20

100.00%

10,117.20 ###

E

5.00%

505.86

95.00%

9,611.34 ###

P

100.00%

259,064.21

42.31%

109,618.45 ###

E

57.96%

150,143.47

41.57%

107,696.50 ###

P

100.00%

3,434.88

100.00%

3,434.88 ###

E

100.00%

3,434.88

P

100.00%

62,876.19

11.09%

E

88.91%

55,901.03

11.09%

6,975.16 ###

P

100.00%

190,015.97

52.21%

99,208.41 ###

E

47.79%

90,807.56

51.20%

97,286.46 ###

P

100.00%

2,737.17

###

E

0.00%

-

###

P

100.00%

1,774,691.50

76.51%

1,357,792.73 ###

E

23.49%

416,898.77

60.91%

1,080,897.79 ###

P

100.00%

62,016.90

61.90%

38,386.72 ###

E

38.10%

23,630.18

100.00%

38,386.72 ###

P

100.00%

1,048,712.65

78.36%

821,784.82 ###

E

21.64%

226,927.83

71.84%

753,414.53 ###

P

100.00%

593,223.92

71.96%

426,883.16 ###

E

28.04%

166,340.76

48.73%

289,096.54 ###

P

100.00%

70,738.03

70,738.03 ###

E

0.00%

-

###

P

100.00%

19,447.14

94.44%

18,366.08 ###

E

5.56%

1,081.06

29.81%

5,797.05 ###

TRABAJOS PRELIMINARES

P

100.00%

69.12

82.00%

56.68 ###

69.12

E

18.00%

12.44

82.00%

56.68 ###

07.04

10,117.20

OBRAS DE CONCRETO

ACCESORIOS

CANAL DE ADUCCION SECCION CIRCULAR(L=1,789.00) 259,064.21 TRABAJOS PRELIMINARES 3,434.88 MOVIMIENTOS DE TIERRAS 62,876.19 TUBERIAS Y ACCESORIOS

08.03

190,015.97

08.04

2,737.17

PRUEBA HIDRAULICA

RED DE DISTRIBUCION(L=32,300.47ml) 1,774,691.50 TRABAJOS PRELIMINARES

09.01

62,016.90

09.02

1,048,712.65

09.03

593,223.92

09.04

70,738.03

10

19,447.14

MOVIMIENTOS DE TIERRAS

TUBERIAS Y ACCESORIOS

PRUEBA HIDRAULICA

POZA DE INSPECCION(8.00 UNI)

AGOSTO

SETIEMBRE

16.19%

393,762.04

193,309.50 193,309.50

-

15,000.00

115,933.56 0%

0.6%

52.76

62,375.94

#VALUE!

62,375.94 52.76

14.51%

175,264.02

63,526.78

17.61%

205,686.52

122,375.94

93.42%

12,811.50

0.89%

1,385.95

15,000.00

48,526.78

60,000.00

62,375.94

568,930.55 ###

77.32%

134,212.06

JULIO

625,180.60 ###

23.04

07.03

10.01

P

MESES DE PROGRMACION POR 182 DIAS JUNIO

### -

165.89

MOVIMIENTOS DE TIERRAS

09

1,351.43

13.89%

12,061.44

08.02

100.00%

100.00%

07.02

08.01

E

E

165.89

SALDO

EJEC. ENERO A DIC. SALDO 2016 MAYO A SET2016 SALDO ENER-MAYO-2017

P

07.01

08

JULIO 2014 A DIC. 2015

7,354.02

7,354.02

1,186.79

14.59

1,172.20

1,686.79

1,186.79 8.79%

3.05%

0.75%

14.59

367.85

1,003.51

14.59

14.59

313.40

313.40

858.80

858.80

-

1.80%

4,659.12

4,659.12

-

1,921.95

2,737.17 -

4,659.12

#VALUE! #VALUE!

3,434.88 ### 6,975.16 ###

1.01%

1,921.95

100%

2,737.17

15.60%

276,894.93

1,921.95

1,921.95

2,737.17

274,674.19

2,737.17

-

166,149.55

274,674.19

108,524.64

#VALUE!

108,524.64

276,894.93

6.52%

68,370.29

66,149.55

137,786.61

137,786.61

66,149.55

100.00% 23.23%

100,000.00

37,786.61

100.00% 100.00%

70,738.03

64.63%

12,569.03 12,569.03

70,738.03

12,569.02 12,569.02

70,738.03

12,569.02

#VALUE!

MUNICIPALIDAD PROVINCIAL DE COTABMBAS -TAMABOBAMBA

CRONOGRAMA ACELERADO DE AVANCE DE OBRA DEL 17 DE JULIO, AGOSTO AL 20 DE SETIEMBRE - 2017.

PROYECTO INSTALACION DEL SISTEMA DE RIEGO POR ASPERCION EN LAS COMUNIDADES PARCCO, QUEWINCHA, QUEBRADA DE MARA PITIC, DISTRITO DE TAMBOBAMBA, PROVINCIA DE COTABAMBAS-APURIMAC COSTO DIRECTO TOTAL

S/

5,755,107.05

RESIDENTE DE OBRA : CLODOALDO MELO TITO

SUPERVISOR : ING. ENRIQUE S. ENRIQUEZ MENDIZU

TIEMPO DE EJECUCION DESDE JULIO 2014 AL DICIEMBRE 2016



PARTIDAS MOVIMIENTOS DE TIERRAS

10.02

1,816.95 OBRAS DE CONCRETO

10.03

9,514.79

10.04

4,757.72

10.05

3,288.56

REVOQUES Y ENLUCIDOS

ACCESORIOS Y COMPUERTAS

VALVULAS DE PURGAY/O CONTROL(11 UNI)

11

11.01

5,171.09

JULIO 2014 A DIC. 2015 P

100.00%

1,816.95

92.35%

1,677.91 ###

E

7.65%

139.04

52.30%

950.22 ###

P

100.00%

9,514.79

90.23%

8,585.21 ###

E

9.77%

929.58

24.44%

2,325.13 ###

P

0.00%

4,757.72

100.00%

4,757.72 ###

E

0.00%

-

21.74%

1,034.14 ###

P

100.00%

3,288.56

100.00%

3,288.56 ###

E

0.00%

43.51%

1,430.88 ###

P

100.00%

5,171.09

41.50%

2,146.10 ###

E

0.00%

-

41.50%

2,146.10 ###

TRABAJOS PRELIMINARES

P

100.00%

17.74

17.74

E

0.00%

-

MOVIMIENTOS DE TIERRAS

P

100.00%

151.19

E

0.00%

-

100.00%

17.74 ###

100.00%

151.19 ###

151.19

P

100.00%

783.89

11.03

783.90

E

0.00%

-

ACCESORIOS Y COMPUERTAS

P

100.00%

4,218.26

28.29%

1,193.28 ###

11.04

4,218.26

E

0.00%

-

28.29%

1,193.28 ###

P

100.00%

315,732.14

100.00%

315,732.14 ###

E

0.00%

-

25.33%

79,981.73 ###

P

100.00%

706.41

100.00%

706.41 ###

E

0.00%

-

88.62%

626.00 ###

P

100.00%

6,014.87

100.00%

6,014.87 ###

E

0.00%

-

89.89%

5,406.94 ###

P

100.00%

36,307.02

100.00%

36,307.02 ###

E

0.00%

-

72.81%

26,434.55 ###

P

100.00%

99,242.84

100.00%

99,242.84 ###

E

0.00%

-

47.88%

47,514.24 ###

P

100.00%

173,461.00

100.00%

173,461.00 ###

E

0.00%

-

P

100.00%

48,836.68

100.00%

48,836.68 ###

E

0.00%

-

98.24%

47,975.64 ### 64.97 ###

HIDRANTES(438 UNI)

12

315,732.14 TRABAJOS PRELIMINARES

12.01

706.41

12.02

6,014.87

12.03

36,307.02

12.04

99,242.84

12.05

173,461.00

13

48,836.68

MOVIMIENTOS DE TIERRAS

OBRAS DE CONCRETO

ACCESORIOS Y COMPUERTAS

EQUIPO DE RIEGO MOVIL

CAJAS DE VALVULA(47 UNI)

13.01

13.02

64.97

100.00%

0.00%

-

100.00%

64.97 ###

MOVIMIENTOS DE TIERRAS

P

100.00%

736.25

100.00%

736.25 ###

1,972.59

REVOQUES Y ENLUCIDOS

TUBERIAS Y ACCESORIOS 37,549.71 CAMARA DE ROMPE DE PRESION(47 UNI)

14

91,306.38 TRABAJOS PRELIMINARES

14.01

342.91 MOVIMIENTOS DE TIERRAS

14.02

SETIEMBRE

727.69

65.79%

6,260.08

78.26%

3,723.58

56.49%

1,857.68

6,260.08

6,260.08

3,723.57

3,723.57

1,857.68

1,857.68

100.00% 58.50%

3,024.98

#REF!

3,024.98 3,024.98

3,024.98 -

-

-

-

-

-

3,024.98

74.67%

235,750.41

3,024.98

3,024.98

235,750.41

80.41

113,941.40

121,728.60

#VALUE!

235,750.41 11.38%

10.11%

27.19%

80.41

80.41

607.93

607.93

9,872.47

9,872.47

52.12%

51,728.60

100.00%

173,461.00

51,728.60

173,461.00

80.41

607.93

9,872.47

30,000.00

73,461.00

21,728.60

#VALUE!

100,000.00

### -

100.00%

13.04

AGOSTO S/.

727.69

783.89 ###

E

8,513.16

JULIO

100.00%

783.89 ###

P

13.03

13.05

100.00%

TRABAJOS PRELIMINARES

OBRAS DE CONCRETO

MESES DE PROGRMACION POR 182 DIAS JUNIO

727.69

151.19 ###

64.97

736.25

40.05%

17.74 ###

11.02

OBRAS DE CONCRETO

SALDO

EJEC. ENERO A DIC. SALDO 2016 MAYO A SET2016 SALDO ENER-MAYO-2017

E

0.00%

-

100.00%

736.25 ###

P

100.00%

8,513.16

100.00%

8,513.16 ###

E

0.00%

-

89.89%

7,652.12 ###

P

100.00%

1,972.59

100.00%

1,972.59 ###

E

0.00%

-

100.00%

1,972.59 ###

P

100.00%

37,549.71

100.00%

37,549.71 ###

E

0.00%

-

100.00%

37,549.71 ###

P

100.00%

91,306.37

85.24%

77,833.07 ###

E

14.76%

13,473.30

44.81%

40,916.42 ###

P

100.00%

342.91

93.55%

320.79 ###

E

6.45%

22.12

100.00%

290.45 ###

P

100.00%

4,943.81

97.37%

4,813.61 ###

1.76%

861.04

861.04

#REF!

861.04

861.04

10.11%

25.84%

100.00%

8.77%

861.04

861.04

861.04

23,595.67

23,595.66

8,595.66

23,595.67

23,595.66

30.34

30.33

433.81

433.81

30.33

433.81

15,000.00

#VALUE!

MUNICIPALIDAD PROVINCIAL DE COTABMBAS -TAMABOBAMBA

CRONOGRAMA ACELERADO DE AVANCE DE OBRA DEL 17 DE JULIO, AGOSTO AL 20 DE SETIEMBRE - 2017.

PROYECTO INSTALACION DEL SISTEMA DE RIEGO POR ASPERCION EN LAS COMUNIDADES PARCCO, QUEWINCHA, QUEBRADA DE MARA PITIC, DISTRITO DE TAMBOBAMBA, PROVINCIA DE COTABAMBAS-APURIMAC COSTO DIRECTO TOTAL

S/

5,755,107.05

RESIDENTE DE OBRA : CLODOALDO MELO TITO

SUPERVISOR : ING. ENRIQUE S. ENRIQUEZ MENDIZU

TIEMPO DE EJECUCION DESDE JULIO 2014 AL DICIEMBRE 2016



PARTIDAS

14.02

4,943.81

14.03

32,795.20

14.04

18,739.61

14.05

34,484.85

15

72,634.54

OBRAS DE CONCRETO

REVOQUES Y ENLUCIDOS

ACCESORIOS Y COMPUERTAS

CRUCE AEREO L=60.00ml

TRABAJOS PRELIMINARES

15.01

691.20 MOVIMIENTOS DE TIERRAS

15.02

7,003.19

15.03

26,252.88

OBRAS DE CONCRETO

REVOQUES Y ENLUCIDOS

15.04

1,269.17

15.05

37,418.10

TENDIDO DE CABLES Y OTROS

CRUCE AEREO L=15.00ml

16

8,842.00 TRABAJOS PRELIMINARES

16.01

172.80 MOVIMIENTOS DE TIERRAS

16.02

1,063.46 OBRAS DE CONCRETO

16.03

4,037.57 REVOQUES Y ENLUCIDOS

16.04

167.88

16.05

3,400.30

TENDIDO DE CABLES Y OTROS

PRUEBAS DE CONTROL DE CALIDAD DE CONCRETO

17

1,780.00 DISEÑO DE MEZCLA

17.01

730.00 PRUEBA DE RESISTENCIAA A LA COMPRESION

17.02

1,050.00 MITIGACION DE IMPACTO AMBIENTAKL Y FORTALECIMIENTO

18

52,000.00

18.01

14,000.00

MITIGGACION AMBIENTAL

CAPACITACION Y FORTALECIMIENTO DE LA ORGANIZACIÓN COMUNAL

18.02

38,000.00

JULIO 2014 A DIC. 2015 E

2.63%

130.20

88.59%

4,379.80 ###

P

100.00%

32,795.20

59.38%

19,474.22 ###

E

40.62%

13,320.98

18.76%

6,153.24 ###

P

100.00%

18,739.61

100.00%

18,739.61 ###

E

0.00%

-

100.00%

18,739.61 ###

P

100.00%

34,484.84

100.00%

34,484.84 ###

E

0.00%

-

32.92%

11,353.32 ###

P

100.00%

72,634.54

80.03%

58,126.29 ###

E

0.19%

138.24

78.53%

57,036.40 ###

P

100.00%

691.20

100.00%

691.20 ###

E

20.00%

138.24

80.00%

552.96 ###

P

100.00%

7,003.19

58.64%

4,106.84 ###

E

0.00%

58.64%

4,106.84 ###

P

100.00%

26,252.88

55.77%

14,640.98 ###

E

0.00%

-

55.77%

14,640.98 ###

P

100.00%

1,269.17

100.00%

1,269.17 ###

E

0.00%

-

75.07%

952.72 ###

P

100.00%

37,418.10

100.00%

37,418.10 ###

E

0.00%

-

98.30%

36,782.90 ###

P

100.00%

8,842.00

97.65%

8,634.00 ###

E

2.35%

208.00

22.78%

2,014.11 ###

P

100.00%

172.80

20.00%

34.56 ###

E

80.00%

138.24

20.00%

34.56 ###

P

100.00%

1,063.46

93.44%

993.70 ###

E

6.56%

69.76

93.44%

993.70 ###

P

100.00%

4,037.56

100.00%

4037.56 ###

E

0.00%

-

24.42%

985.85 ###

P

100.00%

167.88

###

E

0.00%

-

### -

P

100.00%

3,400.30

###

E

0.00%

-

### -

P

100.00%

1,780.00

E

100.00%

1,780.00

###

P

100.00%

730.00

###

E

0.00%

-

### -

1,780.00 ###

100.00%

1,050.00

###

E

0.00%

-

###

P

100.00%

52,000.00

100.00%

52,000.00 ###

P

100.00%

14,000.00

###

E

0.00%

-

### -

P

100.00%

38,000.00

###

E

0.00%

-

### -

100.00%

998.86

OBRAS COMPLEMENTARIAS

P E

19.01

998.86

MESES DE PROGRMACION POR 182 DIAS JUNIO

JULIO

AGOSTO

SETIEMBRE

0.00%

-

67.08%

21.28%

23,131.52

15,459.90

23,131.52

15,525.51

8,131.52

15,000.00

-

15,525.51

15,525.51

41.36%

44.23%

24.93%

1.70%

74.87%

2,896.35

2,961.97

11,611.90

11,611.89

316.45

316.45

635.20

635.20

6,619.89

3,378.39

2,961.97

11,611.89

316.45

635.20

-

3,378.39

-

3,378.39

-

75.58%

100.00%

3,051.71

167.88

3,051.71

3,051.71

167.88

167.88

100.00%

3,400.30

100.0%

1,780.00

1,780.00

1,780.00

1,780.00

730.00

730.00

1,050.00

100%

52,000.00

158.80

1,050.00

52,000.00

158.80

1,780.00

#VALUE!

730.00

1,050.00

S/.

52,000.00

S/.

14,000.00

S/.

38,000.00

52,000.00

#VALUE!

###

E

998.86 PLACA RECORDATORIA

1.00

P

19

SALDO

EJEC. ENERO A DIC. SALDO 2016 MAYO A SET2016 SALDO ENER-MAYO-2017

100.00%

998.86 ###

100.00%

100.00%

100.00%

14,000.00

14,000.00

38,000.00

38,000.00

998.86

###

P

100.00%

998.86

###

E

0.00%

-

###

998.86

998.86

998.86 100.00%

998.86

998.86

998.86

#REF!

MUNICIPALIDAD PROVINCIAL DE COTABMBAS -TAMABOBAMBA

CRONOGRAMA ACELERADO DE AVANCE DE OBRA DEL 17 DE JULIO, AGOSTO AL 20 DE SETIEMBRE - 2017.

PROYECTO INSTALACION DEL SISTEMA DE RIEGO POR ASPERCION EN LAS COMUNIDADES PARCCO, QUEWINCHA, QUEBRADA DE MARA PITIC, DISTRITO DE TAMBOBAMBA, PROVINCIA DE COTABAMBAS-APURIMAC COSTO DIRECTO TOTAL

S/

5,755,107.05

RESIDENTE DE OBRA : CLODOALDO MELO TITO

SUPERVISOR : ING. ENRIQUE S. ENRIQUEZ MENDIZU

TIEMPO DE EJECUCION DESDE JULIO 2014 AL DICIEMBRE 2016



PARTIDAS TRANSPORTE DE MATERIALES

20

300,465.66

20.01

182,505.74

20.02

117,959.92

FLETE TERRESTRE

FLETE RURAL

JULIO 2014 A DIC. 2015

SALDO

EJEC. ENERO A DIC. SALDO 2016 MAYO A SET2016 SALDO ENER-MAYO-2017

P

100.00%

300,465.66

85.47%

256,820.49 ###

E

14.53%

43,645.17

24.73%

74,314.75 ###

P

100.00%

182,505.74

100.00%

182,505.74 ###

E

0.00%

-

P

100.00%

117,959.92

63.00%

74,314.75 ###

E

37.00%

43,645.17

100.00%

117,959.92 ###

60.74%

MESES DE PROGRMACION POR 182 DIAS JUNIO

182,505.74

JULIO

AGOSTO

SETIEMBRE

182,505.74

S/.

182,505.74

S/.

182,505.74

182,505.74

#VALUE!

182,505.74 100.00%

182,505.74

182,505.74

### -

###

AVANCE MENSUAL %

AVACE ACUMULADO %

PROGRAMADO MENSUAL

100.00%

5,755,107.05

70.62%

4,064,250.89### 21.14%

1,216,595.08###

484,695.99

0.28%

EJECUTADO MENSUAL

29.14%

1,677,166.74

49.60%

2,854,328.98###

0.64%

36,893.66###

185,771.03

0.00%

PROGRAMADO ACUMULADO

100.00%

5,755,107.05

78.74%

4,531,495.72###

0.00%

###

484,695.99

0.28%

EJECUTADO ACUMULADO

29.09%

1,674,158.65

78.69%

4,531,495.72###

0.00%

###

185,771.03

0.00%

15,928.84 15,928.84 -

7.80%

448,746.94

9.48%

0.00% 8.07% 0.00%

464,675.78

17.56%

-

0.00%

-

0.28%

545,870.95

0.00% 1,010,546.73

1,010,546.73

MUNICIPALIDAD PROVINCIAL DE COTABMBAS -TAMABOBAMBA

MUNICIPALIDAD PROVINCIAL DE COTABMBAS -TAMABOBAMBA

17.56%

MUNICIPALIDAD PROVINCIAL DE COTABMBAS -TAMABOBAMBA

CRONOGRAMA ACELERADO DE AVANCE DE OBRA MES 25 - DE MARZO AL - 05 DE JUNIO - 2019 PROYECTO

" CREACION DE LA PLAZA DE LA LOCALIDAD DE HUANCASCCA DISTRITO DE HAQUIRA PROVINCIA DE COTABAMAS-APURIMAC" COSTO DIRECTO TOTAL

S/

493,381.44

RESIDENTE DE OBRA : ING.SANTOS BENITEZ QUISPE.



PARTIDAS

03 SET AL 26 DICIEMBRE

P OBRAS PROVISIONALES TRABAJOS PRELIMINARES SEGURIDAD Y SALUD S/. 29112.20 1.00.00

5.90%

S/.

29,112.21

6717.93

4750.00

11560.40

6083.88

12.76%

S/.

62,966.33

62,966.33

21.67%

106,933.40

106933.4

9.73%

47,981.64

47981.64

1.80%

S/.

8,891.18

8891.18

24.53%

121,022.62

121022.62

0.62%

3,047.68

3047.68

6.83%

S/.

33,682.96

S/.

29,085.84

S/.

4,597.12

7.93%

S/.

39,125.56

S/.

39,125.56

4.02%

S/.

19,825.23

S/.

PRUEBAS DE CONTROL DE CALIDAD

11.00.00

19,825.23

1,000.00

S/.

1,300.00

S/.

2,000.00

61.12%

65,362.88

21,000.00

44,362.88

21,000.00

44,362.88

3,311.55 65,362.88 3,311.55 99.85%

47,908.45

99.85%

47,908.45

27,908.45

20,000.00

73.19 73.19 73.19

0.00%

-

6,207.30

0.00%

-

6,207.30

0.00%

32,603.58 26.94%

32,603.58

26.94%

32,603.58

S/.

2,683.89

S/.

27,908.45

S/.

20,000.00

2,683.88

2,683.89

2,683.88

0.00% 73.06%

88,419.04

73.06%

88,419.04

25,000.00

42,000.00

21,419.04

25,000.00

42,000.00

21,419.04

3,047.68

3,047.68

E

E

E

E

E

100%

3,047.68

64.13%

21,600.35

10,795.09

61.77%

20,805.26

10,000.00

2.36%

795.09

100%

39,125.56

100%

39,125.56

12,082.60 35.87%

12,082.60

24.58%

8,280.58

11.29%

3,802.02

100%

19,825.23

100%

19,825.23

51.46%

4,240.00

3,047.68

10,805.26

10,805.26

795.09 -

E

E

S/.

-

9,125.23

10,000.00

20,000.00

10,000.00

20,000.00

10,000.00

20,000.00

9,125.23

3,000.00

10,000.00

6,825.23

3,000.00

10,000.00

1,240.00

3,000.00

-

-

E P

AREAS VERDES 100.00%

38,258.97

P

AREAS VERDES

10.00.00

38,258.97

P

VARIOS 100.00%

-

P

VARIOS

9.00.00

E

3,300.00

62,966.33

P

INSTALACIONES DE AGUA Y LUZ 13.65%

62,966.33

P

CONSTRUCCION DE LA FUENTE PRINCIPAL 86.35%

-

0.15%

P

MONOMENTO Y FUENTE CENTRAL

8.00

E

604.52

-

62,966.33

P

BASES PARA MONOMENTOS REPRESENTATIVOS 0.62%

E

01 SETAL 10 SET

-

-

P

BASES PARA MONOMENTOS REPRESENTATIVOS

7.00

E

MAYO 3,604.52

6,083.88

P

AREAS DE CIRCULACION 24.53%

E

S/.

8,260.40

73.19 0.15%

P

AREAS DE CIRCULACION

6.00

E

S/.

38,258.97 35.78%

12.38%

1,000.00

P

SARDINELES 1.80%

E

1,300.00

3,750.00

38,258.97 35.78%

S/.

604.52

P

SARDINELES

5.00

E

P

TRIBUNAS 100.00%

100.00%

P

TRIBUNAS

4.00.00

E

4.47%

TIEMPO DE EJECUCION 01 SET AL 20 SET-2017

ABRIL

0.00%

62,966.33 100.00%

P

MUROS DE CONCRETO CICLOPEO 100.00%

E

-

04 AL 31 DE MARZO 2019 4,904.52

6,113.41

6,083.88 20.90%

P

MUROS DE CONCRETO CICLOPEO

3.00.00

E

24,207.69

16.85%

8,260.40 28.37%

P

MOVIMIENTO DE TIERRAS 100.00%

E

24,207.69

SALDO S/.

3,750.00 12.88%

P

MOVIMIENTO DE TIERRAS

2.00.00

E

P

TRABAJOS PRELIMINARES 20.90%

21.00%

P

SEGURIDAD EN OBRA 39.71%

E

###

6,113.41

P

INSTALACIONES PROVISIONALES 16.32%

83.15%

P

CONSTRUCCIONES PROVISIONALES 23.08%

E

S/.

14-31 ENERO - 2019

INSPECTOR DE OBRA: ING . CLODOALDO MELO TITO.

TIEMPO DE EJECUCION DEL 04 DE MARZO AL 04 DE MAYO - 2019

TIEMPO DE EJECUCION DE 03 SETIEMBRE AL 26 DE DICIEMBRE 2018

E P

-

6,825.23 -

MUNICIPALIDAD PROVINCIAL DE COTABMBAS -TAMABOBAMBA

CRONOGRAMA ACELERADO DE AVANCE DE OBRA MES 25 - DE MARZO AL - 05 DE JUNIO - 2019 PROYECTO

" CREACION DE LA PLAZA DE LA LOCALIDAD DE HUANCASCCA DISTRITO DE HAQUIRA PROVINCIA DE COTABAMAS-APURIMAC" COSTO DIRECTO TOTAL

S/

493,381.44

RESIDENTE DE OBRA : ING.SANTOS BENITEZ QUISPE.



PARTIDAS

11.00.00

1.67%

S/.

03 SET AL 26 DICIEMBRE 8,240.00

S/.

8,240.00

0.23%

S/.

1,131.50

S/.

1,131.50

2.31%

S/.

11,421.13

AVANCE MENSUAL %

AVACE ACUMULADO %

S/.

11,421.13

TIEMPO DE EJECUCION 01 SET AL 20 SET-2017

ABRIL

MAYO

01 SETAL 10 SET

4,240.00

1,240.00

3,000.00

4,000.00 1,039.70

E

-

91.89%

0.00%

1,039.70

91.80

-

1,039.70

1,039.70

91.80 11,421.13

5,421.13

6,000.00

5,421.13

6,000.00

E

-

P

FLETE TERRESTRE 100.00%

E

E

04 AL 31 DE MARZO 2019

51.46%

P

FLETE TERRESTRE

13.00.00

SALDO

4,000.00

P

IMPACTO AMBIENTAL 100.00%

-

###

P

IMPACTO AMBIENTAL

12.00.00

0.00%

14-31 ENERO - 2019

P

PRUEBAS DE CONTROL DE CALIDAD 100.00%

E

INSPECTOR DE OBRA: ING . CLODOALDO MELO TITO.

TIEMPO DE EJECUCION DEL 04 DE MARZO AL 04 DE MAYO - 2019

TIEMPO DE EJECUCION DE 03 SETIEMBRE AL 26 DE DICIEMBRE 2018

100%

11,421.13

E

PROGRAMADO MENSUAL

34.50%

170,192.36

2.76%

13,610.65 62.75%

309,578.43

EJECUTADO MENSUAL

34.50%

170,192.36

2.76%

13,610.65 62.75%

309,578.43

PROGRAMADO ACUMULADO

34.50%

170,192.36

37.25%

183,803.01 62.75%

309,578.43

EJECUTADO ACUMULADO

34.50%

170,192.36

37.25%

183,803.01 62.75%

309,578.43

13.57%

66,961.13

35.36%

174,442.20

13.82%

68,174.76###

76.32%

250,764.14

86.18%

425,206.34

100.00%

493,381.10###

-

0.00 -

0.00%

-

Related Documents

Cron. Plaza Huan 2019.xls
November 2019 9
Huan
November 2019 8
Z Cron Ft.docx
November 2019 4
Cron {automatic Task}
November 2019 5
Plaza Loreto
November 2019 33
Cron Y Asist Tec.xlsx
November 2019 4

More Documents from ""