Criterion C: Project Schedule Date
Action
Details
Comments and follow up
Date Completed
Criterion
Nov. 2018
The teacher introduced the internal assessment.
The class started researching possible clients, problems, and solutions.
I started brainstorming ideas of clients and solutions that I might consider
Nov 8, 2018
A
Nov. 2018
Started a proposal for the project
Began thinking of questions for the consultation
Contacted the client and briefly explained the project and talked about a possible solution to the problem
Nov. 16, 2019
A
Dec. 2018
First interview with Luis
The problem was furthered discuss. A solution to the problem, Luis decided on a website
Started the search for website inspiration that may suit the client’s needs
Dec. 7, 2018
A
Dec. 2018
Write up Criteria A
The solution was finalized and the client approved it.
Discussed the problem and the inadequacies
Dec. 10, 2018
A
Dec. 2018
Write Criteria B
Description of the requirements needed to solve the problem
Requirements of the solutions were discussed, as well as the justification. This
Dec. 10, 2018
B
Jan. 2019
Introduction to Criteria C and D
The teacher introduced the tasks
I brainstormed ideas for the tasks
Jan.
C and D
Feb. 2019
Write Criteria C
Started to schedule tasks and actions
I outlined what will need to be done to complete the project
Feb. 5, 2019
C
Feb. 2019
Draft of Criterion D
Started work on criteria D and finished it
I made a draft of the design and sketched the website. I’ve included annotations as well
Feb. 7, 2019
D
Feb. 2019
Consultation with the client
Present ideas to the client
I showed my draft to the client, he
Feb. 9,2019
D
approved of most of it and made some suggestions. Feb.2019
Changes to Criteria D
Making revisions to the design
I added the changes the client wanted, such as updating the contact information that had been given to me before for the contact us page
Feb. 15, 2019
D
March 2019
Started working on the Website
I started making the basic outline of the website, such as pages and tabs
I finished the overall design of the website/model
March 3, 2019
E
March 2019
Continued Website development
I started outlining what the information on each page is going to say
I finished the home page, contact page, and about page
March 10, 2019
E
March 2019
Continued Website development
I worked on the “ministries” and “services” pages
I finished the “ministries” and “services” pages
March 15, 2019
E
March 2019
Continued Website development
I worked on the events page
I finished the “events” page
March 22, 2019
E
March 2019
Met with client to show the website
I met with the client and showed him the website which was mostly done
The client was March 25, 2019 satisfied with the website and gave me some final pictures to add
E
March 2019
Called the client to get feedback
I called the client to get feedback on the product
The client was March 26, 2019 satisfied with the website and gave me feedback
F
March 2019
Final Submission
I finished the final details on the site
March 28, 2019