Criterion C: Project Schedule Date

Action

Details

Comments and follow up

Date Completed

Criterion

Nov. 2018

The teacher introduced the internal assessment.

The class started researching possible clients, problems, and solutions.

I started brainstorming ideas of clients and solutions that I might consider

Nov 8, 2018

A

Nov. 2018

Started a proposal for the project

Began thinking of questions for the consultation

Contacted the client and briefly explained the project and talked about a possible solution to the problem

Nov. 16, 2019

A

Dec. 2018

First interview with Luis

The problem was furthered discuss. A solution to the problem, Luis decided on a website

Started the search for website inspiration that may suit the client’s needs

Dec. 7, 2018

A

Dec. 2018

Write up Criteria A

The solution was finalized and the client approved it.

Discussed the problem and the inadequacies

Dec. 10, 2018

A

Dec. 2018

Write Criteria B

Description of the requirements needed to solve the problem

Requirements of the solutions were discussed, as well as the justification. This

Dec. 10, 2018

B

Jan. 2019

Introduction to Criteria C and D

The teacher introduced the tasks

I brainstormed ideas for the tasks

Jan.

C and D

Feb. 2019

Write Criteria C

Started to schedule tasks and actions

I outlined what will need to be done to complete the project

Feb. 5, 2019

C

Feb. 2019

Draft of Criterion D

Started work on criteria D and finished it

I made a draft of the design and sketched the website. I’ve included annotations as well

Feb. 7, 2019

D

Feb. 2019

Consultation with the client

Present ideas to the client

I showed my draft to the client, he

Feb. 9,2019

D

approved of most of it and made some suggestions. Feb.2019

Changes to Criteria D

Making revisions to the design

I added the changes the client wanted, such as updating the contact information that had been given to me before for the contact us page

Feb. 15, 2019

D

March 2019

Started working on the Website

I started making the basic outline of the website, such as pages and tabs

I finished the overall design of the website/model

March 3, 2019

E

March 2019

Continued Website development

I started outlining what the information on each page is going to say

I finished the home page, contact page, and about page

March 10, 2019

E

March 2019

Continued Website development

I worked on the “ministries” and “services” pages

I finished the “ministries” and “services” pages

March 15, 2019

E

March 2019

Continued Website development

I worked on the events page

I finished the “events” page

March 22, 2019

E

March 2019

Met with client to show the website

I met with the client and showed him the website which was mostly done

The client was March 25, 2019 satisfied with the website and gave me some final pictures to add

E

March 2019

Called the client to get feedback

I called the client to get feedback on the product

The client was March 26, 2019 satisfied with the website and gave me feedback

F

March 2019

Final Submission

I finished the final details on the site

March 28, 2019