ANALISIS DE COSTOS UNITARIOS PROYECTO: REMODELACION PARQUE ROMA FECHA: Octubre del 2003 PARTIDA DE OBRA: TRAZO POR UNIDAD DE AREA UNIDAD:

M2

ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO TOTAL ($)

SUB TOTAL:

DESCRIPCION

CANTIDAD

$-

UNIDAD

P.UNITARIO

TOTAL ($)

COSTANERA DE PINO

0.080

VARA

$0.47

$0.038

REGLA PACHA DE PINO

0.040

VARA

$0.35

$0.014

CLAVOS 2" CON CABEZA

0.005

LIBRAS

$0.40

$0.002

MANGUERA DE ø 1/2"

0.010

YARDAS

$0.33

$0.003

CORDEL No. 15

0.002

ROLLO

$1.52

$0.003

SUB TOTAL:

3.

$0.06

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

TOTAL ($)

SUB TOTAL:

4. MANO DE OBRA TRABAJADOR MANO DE OBRA

SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL($)

$0.71

1

$0.71

0.12

$0.09

SUB TOTAL:

$0.09

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$0.15

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT.

VALOR TOTAL

32%

$0.05

SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

$0.05

$0.19

ANALISIS DE COSTOS UNITARIOS PROYECTO: REMODELACION PARQUE ROMA FECHA: Octubre del 2003 PARTIDA DE OBRA: RELLENO COMPACTADO CON MATERIAL SELECTO UNIDAD:

M3

ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO TOTAL ($)

SUB TOTAL:

DESCRIPCION

CANTIDAD

TIERRA BLANCA

UNIDAD

P.UNITARIO

TOTAL ($)

1.200

M3

$13.22

$15.864

-

LITROS

$0.01

AGUA

SUB TOTAL:

3.

$-

$-

$15.86

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

TOTAL ($)

SUB TOTAL:

4. MANO DE OBRA TRABAJADOR MANO DE OBRA

SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL($)

$0.71

1

$0.71

12.00

$8.52

SUB TOTAL:

$8.52

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$24.38

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT.

VALOR TOTAL

32%

$7.80

SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

ANALISIS DE COSTOS UNITARIOS

$7.80

$32.19

PROYECTO: REMODELACION PARQUE ROMA FECHA: Octubre del 2003 PARTIDA DE OBRA: RELLENO COMPACTADO SUELO CEMENTO 1:20 C/ MAT. SELECTO UNIDAD: ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO TOTAL ($)

SUB TOTAL:

DESCRIPCION

CANTIDAD

$-

UNIDAD

P.UNITARIO

TOTAL ($)

M3

$13.22

$13.220

2.000

BOLSA

$4.91

$9.820

-

LITROS

$0.01

TIERRA BLANCA

1.000

CEMENTO AGUA

SUB TOTAL:

3.

M3

$-

$23.04

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

TOTAL ($)

SUB TOTAL:

4. MANO DE OBRA TRABAJADOR

SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL($)

$0.71

1

$0.71

1.00

$0.71

ACARREO MATERIALES

0.71

1

$0.71

0.70

$0.50

COMPACTACIÓN

0.71

1

$0.71

1.10

$0.78

SUB TOTAL:

$1.99

MEZCLADO MATERIALES

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$25.03

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT.

VALOR TOTAL

32%

$8.01

SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

$8.01

$33.04

ANALISIS DE COSTOS UNITARIOS PROYECTO: REMODELACION PARQUE ROMA FECHA: Octubre del 2003 PARTIDA DE OBRA: MURO DE KEYSTONE ROCK FACE AMARILLO O ROJO UNIDAD:

M2

ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO TOTAL ($)

SUB TOTAL:

DESCRIPCION

BLOQUE KEYSTONE STRAIGHT FACE ( ROJO Y AMARILLO) KEYSTONE TAPA ROCK FACE ROJO KEYSTONE PIN PEGAMENTO "KAPSEAL" GRAVA No.1 TUBERIA PVC ø 1 1/2"

CANTIDAD

8.00 1.37 16.00 0.10 0.09 2.00

UNIDAD C/U C/U C/U TUBO M3 ML

P.UNITARIO $5.82 $1.90 $0.26 $21.14 $33.37 $1.90

SUB TOTAL:

3.

TOTAL ($) $46.56 $2.60 $4.14 $2.11 $2.94 $3.80

$62.16

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

SUB TOTAL:

TOTAL ($)

$-

4. MANO DE OBRA TRABAJADOR

SUELDO

COLOCACION DE BLOQUES ACARREO COLOCACION TUBO

5.46 0.71 0.71

PREST. 1 1 1

JORN-TOTAL REND (h.h.) $5.46 $0.71 $0.71

1.00 0.50 0.03

SUB TOTAL: SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

TOTAL($) $5.46 $0.36 $0.02

$5.84 $67.99

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION

PORCENT. 32%

INDIRECTOS Y UTILIDAD

SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

ANALISIS DE COSTOS UNITARIOS

VALOR TOTAL $21.76 $21.76

$89.75

PROYECTO: REMODELACION PARQUE ROMA FECHA: 2003DE BLOQUE DE CONCRETO SPLIT FACE PARTIDA Octubre DE OBRAdel : MURO

15 CMS.REF VERT.Ø 1/2" @0.40 CM Y REF HORIZ. @0.40

CMS.

UNIDAD:

CONTRAFUERTE BLOQUE DE CONCRETO 20 CMS REF. 4ø 3/8" + EST.ø 1/4" @0.20

M2

ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

ANDAMIO METALICO CONCRETERA

0.02 0.02

UNIDAD C/U C/U

P.UNITARIO TOTAL ($) $6.98 $17.46 SUB TOTAL:

DESCRIPCION

CANTIDAD

BLOQUE SPLIT FACE COLOR ROJO Y AMARILLO 15 CMS BLOQUE MITAD SPLIT FACE COLOR ROJO Y AMARILLO BLOQUE SPLIT FACE 20 CMS CEMENTO ARENA GRAVA HIERRO ø 1/4" HIERRO ø 3/8" HIERRO ø 1/2" ALAMBRE DE AMARRE COLORANTE

10.00 3.00 2.00 0.52 0.05 0.02 0.03 0.12 0.05 1.02 1.16

$0.49

UNIDAD

P.UNITARIO

TOTAL ($)

C/U C/U C/U BLS M3 M3 QQ QQ QQ LIBRAS LIBRAS

$1.07 $0.62 $1.21 $4.91 $17.14 $33.37 $21.14 $21.14 $21.14 $0.40 $1.98

$10.70 $1.86 $2.42 $2.55 $0.77 $0.57 $0.63 $2.49 $0.97 $0.41 $2.30

SUB TOTAL:

3.

$0.14 $0.35

$25.68

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

SUB TOTAL:

TOTAL ($)

$-

4. MANO DE OBRA TRABAJADOR

SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL(¢)

0.30 10.24 0.12 7.69 0.71

1 1 1 1 1

$0.30 $10.24 $0.12 $7.69 $0.71

14.00 0.03 0.12 0.05 0.72

$4.20 $0.31 $0.01 $0.38 $0.51

SUB TOTAL:

$5.42

PEGAMENTO BLOQUE 2.09.02 HIERRO ø1/4" (qq) 2.08.01 HIERRO ø3/8" (ml) 2.09.04 HIERRO ø1/2" (qq) HECHURA Y LLENADO CONCRETO

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$31.58

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION

PORCENT. 32%

INDIRECTOS Y UTILIDAD

SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

ANALISIS DE COSTOS UNITARIOS PROYECTO: REMODELACION PARQUE ROMA

VALOR TOTAL $10.11 $10.11

$41.69

FECHA: Octubre del 2003 PARTIDA DE OBRA: SOLERA SC Y SOLERA SI DE BLOQUE DE CONCRETO SPLIT FACE 15 CMS. UNIDAD: ML ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

ANDAMIO METALICO CONCRETERA

0.02 0.02

UNIDAD C/U C/U

P.UNITARIO TOTAL ($) 6.98 17.46 SUB TOTAL:

DESCRIPCION

CANTIDAD

BLOCK SOLERA TIPO SPLIT FACE BLOCK MITAD SOLERA SPLIT FACE CEMENTO ARENA GRAVA HIERRO ø 3/8" HIERRO ø 1/4" ALAMBRE DE AMARRE COLORANTE

2.50 0.20 0.27 0.02 0.02 0.03 0.01 0.21 0.16

$0.49

UNIDAD

P.UNITARIO

TOTAL ($)

C/U C/U BLS M3 M3 QQ QQ LIBRAS LIBRAS

$1.21 $0.46 $4.91 $17.14 $33.37 $21.14 $21.14 $0.40 $1.98

$3.03 $0.09 $1.33 $0.26 $0.67 $0.63 $0.23 $0.08 $0.32

SUB TOTAL:

3.

$0.14 $0.35

$6.63

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

SUB TOTAL:

TOTAL ($)

$-

4. MANO DE OBRA TRABAJADOR

SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL($)

0.30 0.36 0.70

1 1 1

$0.30 $0.36 $0.70

2.70 1.00 0.02

$0.81 $0.36 $0.01

SUB TOTAL:

$1.18

PEGAMENTO BLOQUE 2.02.03 MIEMBROS DE 2 VARILLAS NO.3 +EST HECHURA Y LLENADO CONCRETO

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$8.31

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION

PORCENT. 32%

INDIRECTOS Y UTILIDAD

SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

ANALISIS DE COSTOS UNITARIOS PROYECTO: REMODELACION PARQUE ROMA FECHA: Octubre del 2003

VALOR TOTAL $2.66 $2.66

$10.97

PARTIDA DE OBRA: PARED DE BLOQUE DE CONCRETO 15 CMS.REF VERT.Ø 3/8" @0.60 CM Y REF HORIZ.1/4" @0.40 CMS.

UNIDAD:

M2

ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

ANDAMIO METALICO CONCRETERA

0.02 0.02

UNIDAD C/U C/U

P.UNITARIO TOTAL ($) $6.98 $17.46 SUB TOTAL:

DESCRIPCION

CANTIDAD

BLOQUE DE CONCRETO SPLIT FACE BLOQUE MITAD SPLIT FACE CEMENTO ARENA GRAVA HIERRO ø 1/4" HIERRO ø 3/8" ALAMBRE DE AMARRE

10.00 3.00 0.48 0.04 0.02 0.01 0.03 0.39

$0.49

UNIDAD

P.UNITARIO

TOTAL ($)

C/U C/U BLS M3 M3 QQ QQ LIBRAS

$0.89 $0.54 $4.91 $17.14 $33.37 $21.14 $21.14 $0.40

$8.90 $1.62 $2.36 $0.69 $0.57 $0.25 $0.63 $0.16

SUB TOTAL:

3.

$0.14 $0.35

$15.17

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

SUB TOTAL:

TOTAL ($)

$-

4. MANO DE OBRA TRABAJADOR

SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL(¢)

0.30 10.24 0.12 7.69 0.71

1 1 1 1 1

$0.30 $10.24 $0.12 $7.69 $0.71

13.00 0.03 9.00 0.05 0.72

$3.90 $0.31 $1.08 $0.38 $0.51

SUB TOTAL:

$6.18

PEGAMENTO BLOQUE 2.09.02 HIERRO ø1/4" (qq) 2.08.01 HIERRO ø3/8" (ml) 2.09.04 HIERRO ø1/2" (qq) HECHURA Y LLENADO CONCRETO

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$21.85

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION

PORCENT. 32%

INDIRECTOS Y UTILIDAD

SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

ANALISIS DE COSTOS UNITARIOS PROYECTO: REMODELACION PARQUE ROMA FECHA: Octubre del 2003 PARTIDA DE OBRA: MURO JARDINERA TAPA KEYSTONE ROCK FACE AMARILLO O ROJO

VALOR TOTAL $6.99 $6.99

$28.84

UNIDAD:

M2

ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO TOTAL ($)

SUB TOTAL:

DESCRIPCION

CANTIDAD

KEYSTONE TAPA ROCK FACE ROJO PEGAMENTO "KAPSEAL" KEYSTONE PIN

10.43 0.10 16.00

UNIDAD

P.UNITARIO

TOTAL ($)

C/U TUBO C/U

$1.90 $21.14 $0.26

$19.82 $2.11 $4.14

SUB TOTAL:

3.

$26.08

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

SUB TOTAL:

TOTAL (¢)

$-

4. MANO DE OBRA TRABAJADOR

SUELDO

PREST.

2.03 0.71

1 1

COLOCACION DE BLOQUES ACARREO

JORN-TOTAL REND (h.h.) $2.03 $0.71

TOTAL(¢)

1.00 0.50

$2.03 $0.36

SUB TOTAL:

$2.39

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$28.46

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT.

VALOR TOTAL

32%

$9.11

SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

$9.11

$37.57

0.72

ANALISIS DE COSTOS UNITARIOS PROYECTO: FECHA: PARTIDA DE OBRA: UNIDAD: ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

TOTAL ($)

SUB TOTAL: DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

TOTAL ($)

SUB TOTAL: 3.

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

TOTAL (¢)

SUB TOTAL: 4. MANO DE OBRA TRABAJADOR

SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL(¢)

SUB TOTAL: SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4) 5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION

PORCENT.

INDIRECTOS Y UTILIDAD SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

VALOR TOTAL

ANALISIS DE COSTOS UNITARIOS PROYECTO: REMODELACION PARQUE ROMA FECHA: Octubre del 2003 PARTIDA DE OBRA: SOLERA DE FUNDACIÓN ESCENARIO ESP=0.40 ø5/8" @ 12 cms A.S. UNIDAD: ML ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

VIBRADOR CONCRETERA 1 bolsa

0.13 0.13

UNIDAD día día

P.UNITARIO TOTAL ($) $6.98 $17.46 SUB TOTAL:

DESCRIPCION

CANTIDAD

CEMENTO ARENA GRAVA HIERRO ø 5/8" ALAMBRE DE AMARRE

9.90 0.56 0.56 1.07 6.42

$3.18

UNIDAD

P.UNITARIO

TOTAL ($)

BLS M3 M3 QQ LIBRAS

$4.91 $17.14 $33.37 $21.14 $0.40

$48.61 $9.60 $18.69 $22.62 $2.57

SUB TOTAL:

3.

$0.91 $2.27

$102.08

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

SUB TOTAL:

TOTAL ($)

$-

4. MANO DE OBRA TRABAJADOR

SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL(¢)

6.91 1.06 0.71 0.71

1 1 1 1

$6.91 $1.06 $0.71 $0.71

1.07 12.86 2.52 1.89

$7.39 $13.63 $1.79 $1.34

SUB TOTAL:

$24.16

2.09.06 HIERRO ø5/8" (qq) HECHURA Y LLENADO CONCRETO VIBRADO Y CURADO ACARREO MATERIALES

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$129.42

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT. 32% SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

ANALISIS DE COSTOS UNITARIOS

VALOR TOTAL $41.41 $41.41

$170.83

PROYECTO: REMODELACION PARQUE ROMA FECHA: Octubre del 2003 PARTIDA DE OBRA: SOLERA DE FUNDACION SF-1 ESP=0.20 ø1/2" @ 12 cms A.S. UNIDAD: ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

VIBRADOR CONCRETERA 1 bolsa

0.21 0.21

UNIDAD día día

P.UNITARIO TOTAL ($) $6.98 $17.46 SUB TOTAL:

DESCRIPCION

CANTIDAD

CEMENTO ARENA GRAVA HIERRO ø 1/2" ALAMBRE DE AMARRE

2.80 0.16 0.16 0.41 2.48

$1.45 $3.67 $5.12

UNIDAD

P.UNITARIO

TOTAL ($)

BLS M3 M3 QQ LIBRAS

$4.91 $17.14 $33.37 $21.14 $0.40

$13.75 $2.69 $5.24 $8.75 $0.99

SUB TOTAL:

3.

ML

$31.42

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

SUB TOTAL:

TOTAL ($)

$-

4. MANO DE OBRA TRABAJADOR

SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL(¢)

7.69 1.06 0.71 0.71

1 1 1 1

$7.69 $1.06 $0.71 $0.71

0.41 3.64 0.72 0.54

$3.15 $3.86 $0.51 $0.38

SUB TOTAL:

$7.91

2.09.06 HIERRO ø1/2" (qq) HECHURA Y LLENADO CONCRETO VIBRADO Y CURADO ACARREO MATERIALES

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$44.45

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT. 32% SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

ANALISIS DE COSTOS UNITARIOS

VALOR TOTAL $14.22 $14.22

$58.67

PROYECTO: REMODELACION PARQUE ROMA FECHA: Octubre del 2003 PARTIDA DE OBRA: TENSOR T-1, 20 X 20, 3 ø 3/8" + EST. 1/4" @ 15 CM 1: 2: 2 . UNIDAD: ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

VIBRADOR CONCRETERA 1 bolsa

0.02 0.02

UNIDAD día día

P.UNITARIO TOTAL ($) $6.98 $17.46 SUB TOTAL:

DESCRIPCION

CANTIDAD

CEMENTO ARENA GRAVA HIERRO ø 3/8" HIERRO ø 1/4" ALAMBRE DE AMARRE

0.43 0.02 0.02 0.04 0.03 0.42

$0.11 $0.35 $0.46

UNIDAD

P.UNITARIO

TOTAL ($)

BLS M3 M3 QQ QQ LIBRAS

$4.91 $17.14 $33.37 $21.14 $21.14 $0.40

$2.11 $0.41 $0.80 $0.85 $0.63 $0.17

SUB TOTAL:

3.

ML

$4.97

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

SUB TOTAL:

TOTAL ($)

$-

4. MANO DE OBRA TRABAJADOR

SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL(¢)

0.56 1.06 0.71 0.71

1 1 1 1

$0.56 $1.06 $0.71 $0.71

1.00 0.89 0.47 0.20

$0.56 $0.94 $0.33 $0.14

SUB TOTAL:

$1.98

2.02.04 HECHURA MIEMBRO 3 VAR. HECHURA Y LLENADO CONCRETO VIBRADO Y CURADO ACARREO MATERIALES

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$7.41

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT. 32% SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

ANALISIS DE COSTOS UNITARIOS PROYECTO: REMODELACION PARQUE ROMA

VALOR TOTAL $2.37 $2.37

$9.78

FECHA: Octubre del 2003 PARTIDA DE OBRA: BASES TABLERO Y CERCA CANCHA 30 X 30 X 40, ø 3/8" @ 10 CM 1: 2: 4. UNIDAD: ML ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO TOTAL ($)

SUB TOTAL:

DESCRIPCION

CANTIDAD

CEMENTO ARENA GRAVA HIERRO ø 3/8" ALAMBRE DE AMARRE

0.29 0.02 0.03 0.02 0.12

UNIDAD

P.UNITARIO

TOTAL ($)

BLS M3 M3 QQ LIBRAS

$4.91 $17.14 $33.37 $21.14 $0.40

$1.42 $0.34 $1.00 $0.42 $0.05

SUB TOTAL:

3.

$-

$3.24

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

SUB TOTAL:

TOTAL ($)

$-

4. MANO DE OBRA TRABAJADOR

SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL(¢)

9.21 1.06 0.71 0.71

1 1 1 1

$9.21 $1.06 $0.71 $0.71

0.02 0.20 0.20 0.20

$0.18 $0.21 $0.14 $0.14

SUB TOTAL:

$0.68

2.09.03 HIERRO ø 3/8" HECHURA Y LLENADO CONCRETO VIBRADO Y CURADO ACARREO MATERIALES

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$3.92

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT. 32% SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

ANALISIS DE COSTOS UNITARIOS PROYECTO: REMODELACION PARQUE ROMA FECHA: Octubre del 2003

VALOR TOTAL $1.25 $1.25

$5.17

PARTIDA DE OBRA: SOLERA DE FUNDACION SF-2 30 X 20, 4 ø 3/8" + EST. 1/4" @ 15 CM 1: 2: 2 . UNIDAD: ML ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO TOTAL ($)

VIBRADOR

0.02

día

$6.98

$0.11

CONCRETERA 1 bolsa

0.02

día

$17.46

$0.35

SUB TOTAL:

DESCRIPCION

CANTIDAD

UNIDAD

$0.46

P.UNITARIO

TOTAL ($)

CEMENTO

0.65

BLS

$4.91

$3.19

ARENA

0.04

M3

$17.14

$0.63

GRAVA

0.04

M3

$33.37

$1.23

HIERRO ø 3/8"

0.05

QQ

$21.14

$1.06

HIERRO ø 1/4"

0.03

QQ

$21.14

$0.63

ALAMBRE DE AMARRE

0.48

LIBRAS

$0.40

$0.19

SUB TOTAL:

3.

$6.94

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

SUB TOTAL:

TOTAL ($)

$-

4. MANO DE OBRA SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL(¢)

2.02.04 HECHURA MIEMBRO 3 VAR.

TRABAJADOR

0.56

1

$0.56

1.00

$0.56

HECHURA Y LLENADO CONCRETO

1.06

1

$1.06

0.89

$0.94

VIBRADO Y CURADO

0.71

1

$0.71

0.47

$0.33

ACARREO MATERIALES

0.71

1

$0.71

0.20

$0.14

SUB TOTAL:

$1.98

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$9.38

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT.

VALOR TOTAL

32%

$3.00

SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

$3.00

$12.39

ANALISIS DE COSTOS UNITARIOS PROYECTO: REMODELACION PARQUE ROMA FECHA: Octubre del 2003 PARTIDA DE OBRA: ESTRUCTURA DE ESCENARIO DE CONCRETO ESP=0.15 CMS ø1/2" @ 12 cms A.S. REPELLADA Y AFINADA UNIDAD: M2 ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO TOTAL ($)

VIBRADOR

0.12

día

$6.98

$0.84

CONCRETERA 1 bolsa

0.12

día

$17.46

$2.10

SUB TOTAL:

DESCRIPCION

CANTIDAD

CEMENTO ARENA GRAVA HIERRO ø 1/2" ALAMBRE DE AMARRE REGLA PACHA PINO COSTANERA DE PINO TABLA DE PINO CUARTON DE PINO CLAVOS DE 2 1/2" CLAVOS DE 3" CLAVOS DE 4"

2.81 0.17 0.17 0.52 4.14 0.900 2.260 3.000 2.000 0.50 0.14 0.40

UNIDAD

P.UNITARIO

TOTAL ($)

BLS M3 M3 QQ LIBRAS VARA VARA VARA VARA LIBRAS LIBRAS LIBRAS

$4.91 $17.14 $33.37 $21.14 $0.40 $0.35 $0.47 $1.14 $0.91 $0.40 $0.40 $0.40

$13.80 $2.95 $5.67 $10.99 $1.66 $0.32 $1.06 $3.42 $1.82 $0.20 $0.06 $0.16

SUB TOTAL:

3.

$2.93

$42.10

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

SUB TOTAL:

TOTAL ($)

$-

4. MANO DE OBRA TRABAJADOR

SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL(¢)

7.69 1.57 5.80 0.71 1.12 0.69

1 1 1 1 1 1

$7.69 $1.57 $5.80 $0.71 $1.12 $0.69

0.52 2.85 1.00 0.35 2.00 2.00 SUB TOTAL:

$4.00 $4.47 $5.80 $0.25 $2.24 $1.38 $18.14

2.09.06 HIERRO ø1/2" (qq) HECHURA, LLENADO,VIBRADO Y CURADO 3.10.44 MOLDEADO DE PAREDES CURVAS ACARREO MATERIALES 1.18.24. REPELLO (M2) 1.01.08 AFINADO (M2)

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$63.17

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT. 32% SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

VALOR TOTAL $20.22 $20.22

$83.39

ANALISIS DE COSTOS UNITARIOS PROYECTO: REMODELACION PARQUE ROMA FECHA: Octubre del 2003 PARTIDA DE OBRA: FORJADO DE GRADAS UNIDAD:

ML

ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO TOTAL ($)

SUB TOTAL:

DESCRIPCION

CANTIDAD

CEMENTO ARENA GRAVA LADRILLO DE OBRA

0.18 0.01 0.02 7.00

$-

UNIDAD

P.UNITARIO

TOTAL ($)

BLS M3 M3 C/U

$4.91 $17.14 $33.37 $0.09

$0.88 $0.20 $0.67 $0.63

LIBRAS

3.

SUB TOTAL:

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

SUB TOTAL:

$2.38

TOTAL ($)

$-

4. MANO DE OBRA TRABAJADOR

SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL(¢)

0.76 1.57 0.71 1.12 0.69

1 1 1 1 1

$0.76 $1.57 $0.71 $1.12 $0.69

1.00 0.35 0.35 0.60 0.60

$0.76 $0.55 $0.25 $0.67 $0.41

SUB TOTAL:

$2.64

FORJADO DE GRADA HECHURA, LLENADO,VIBRADO Y CURADO ACARREO MATERIALES 1.18.24. REPELLO (M2) AMARTELINADO (M2)

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$5.02

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT.

VALOR TOTAL

32%

$1.61

SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

$1.61

$6.63

ANALISIS DE COSTOS UNITARIOS PROYECTO: FECHA: Octubre del 2003 PARTIDA DE OBRA: ELEMENTO 15X15 CM; PROP. 1:2:2, 10% DESP. 4" ø 3/8", EST.ø 1/4" @15CM CON ENCOFRADO UNIDAD: ML ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO TOTAL ($)

VIBRADOR

0.12

día

$6.98

$0.84

CONCRETERA 1 bolsa

0.12

día

$17.46

$2.10

SUB TOTAL:

DESCRIPCION

CANTIDAD

$2.93

UNIDAD

P.UNITARIO

TOTAL ($)

CEMENTO

0.245

BLS

$4.91

$1.20

ARENA

0.014

M3

$17.14

$0.24

GRAVA

0.014

M3

$33.37

$0.47

HIERRO ø 3/8"

0.733

VARILLA

$21.14

$15.50

HIERRO ø 1/4"

0.64

VARILLA

$21.14

$13.53

ALAMBRE DE AMARRE

0.453

LIBRAS

$0.40

$0.18

REGLA RIOSTA PINO

0.083

PIEZA

$0.47

$0.04

TABLA DE PINO

0.22

PIEZA

$1.14

$0.25

CLAVOS DE 2 1/2"

0.18

LIBRAS

$0.40

$0.07

CLAVOS DE 3"

0.14

LIBRAS

$0.40

$0.06

SUB TOTAL:

3.

$31.53

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

SUB TOTAL:

TOTAL ($)

$-

4. MANO DE OBRA SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL(¢)

ARMADURIA ø 3/8 " (qq)

TRABAJADOR

7.69

1

$7.69

0.05

$0.39

ARMADURIA ø 1/4" (qq)

1.57

1

$1.57

0.02

$0.03

ENCOFRADO (ML)

5.80

1

$5.80

1.00

$5.80

DESENCOFRADO (30% ENCOFRADO) ( ML)

0.71

1

$0.71

1.00

$0.71

MEZCLADO (HH)

1.12

1

$1.12

0.16

$0.18

LLENADO (HH)

0.69

1

$0.69

0.35

$0.24

SUB TOTAL: SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$7.35 $41.82

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT.

VALOR TOTAL

32%

$13.38

SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

ANALISIS DE COSTOS UNITARIOS

$13.38

$55.20

PROYECTO: FECHA: Octubre del 2003 PARTIDA DE OBRA: ELEMENTO 10X15 CM; PROP.1:2:2,10% DESP.2 HO.ø 3/8", EST.ø 1/4"@15CM CON ENCOFRADO UNIDAD: ML ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO TOTAL ($)

VIBRADOR

0.12

día

$6.98

$0.84

CONCRETERA 1 bolsa

0.12

día

$17.46

$2.10

SUB TOTAL:

DESCRIPCION

CANTIDAD

$2.93

UNIDAD

P.UNITARIO

TOTAL ($)

CEMENTO

0.162

BLS

$4.91

$0.80

ARENA

0.009

M3

$17.14

$0.16

GRAVA

0.009

M3

$33.37

$0.30

HIERRO ø 3/8"

0.37

VARILLA

$21.14

$7.82

HIERRO ø 1/4"

0.26

VARILLA

$21.14

$5.50

ALAMBRE DE AMARRE

0.21

LIBRAS

$0.40

$0.08

TABLA DE PINO

0.22

PIEZA

$1.14

$0.25

0.088

LIBRAS

$0.40

$0.04

0.14

LIBRAS

$0.40

$0.06

CLAVOS DE 2 1/2" CLAVOS DE 3"

SUB TOTAL:

3.

$15.00

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

SUB TOTAL:

TOTAL ($)

$-

4. MANO DE OBRA SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL(¢)

ARMADURIA ø 3/8 " (qq)

TRABAJADOR

7.69

1

$7.69

0.05

$0.38

ARMADURIA ø 1/4" (qq)

1.57

1

$1.57

0.01

$0.01

ENCOFRADO (ML)

5.80

1

$5.80

1.00

$5.80

DESENCOFRADO (30% ENCOFRADO) ( ML)

0.71

1

$0.71

1.00

$0.71

MEZCLADO (HH)

1.12

1

$1.12

0.11

$0.12

LLENADO (HH)

0.69

1

$0.69

0.21

$0.14

SUB TOTAL:

$7.18

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$25.11

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT.

VALOR TOTAL

32%

$8.03

SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

ANALISIS DE COSTOS UNITARIOS PROYECTO:

$8.03

$33.14

FECHA: Octubre del 2003 PARTIDA DE OBRA: ELEMENTO 20X50 CM; PROP. 1:2:2, 10% DESP.4" ø1/2", EST.ø1/4" @ 10 CM CON ENCOFRADO UNIDAD: ML ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO TOTAL ($)

VIBRADOR

0.12

día

$6.98

$0.84

CONCRETERA 1 bolsa

0.12

día

$17.46

$2.10

SUB TOTAL:

DESCRIPCION

CANTIDAD

$2.93

UNIDAD

P.UNITARIO

TOTAL ($)

0.65

BLS

$4.91

$3.19

ARENA

0.036

M3

$17.14

$0.62

GRAVA

0.036

M3

$33.37

$1.20

HIERRO ø 1/2"

0.733

VARILLA

$21.14

$15.50

HIERRO ø 1/4"

1.65

VARILLA

$21.14

$34.88

ALAMBRE DE AMARRE

0.96

LIBRAS

$0.40

$0.38

REGLA RIOSTA PINO

0.12

PIEZA

$0.47

$0.06

TABLA DE PINO

0.22

PIEZA

$1.14

$0.25

CLAVOS DE 2 1/2"

0.18

LIBRAS

$0.40

$0.07

CLAVOS DE 3"

0.14

LIBRAS

$0.40

$0.06

CEMENTO

SUB TOTAL:

3.

$56.21

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

SUB TOTAL:

TOTAL ($)

$-

4. MANO DE OBRA SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL(¢)

ARMADURIA ø 1/2 " (qq)

TRABAJADOR

7.69

1

$7.69

0.10

$0.73

ARMADURIA ø 1/4" (qq)

1.57

1

$1.57

0.05

$0.08

ENCOFRADO (ML)

5.80

1

$5.80

1.00

$5.80

DESENCOFRADO (30% ENCOFRADO) ( ML)

0.71

1

$0.71

1.00

$0.71

MEZCLADO (HH)

1.12

1

$1.12

0.43

$0.48

LLENADO (HH)

0.69

1

$0.69

0.92

$0.63

SUB TOTAL: SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$8.43 $67.57

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT.

VALOR TOTAL

32%

$21.62

SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

ANALISIS DE COSTOS UNITARIOS PROYECTO: FECHA: Octubre del 2003

$21.62

$89.19

PARTIDA DE OBRA: ELEMENTO 10X10 CM; PROP.1:2:2,10% DESP.2 HO.ø 3/8", EST.ø 1/4"@ 10CM CON ENCOFRADO UNIDAD: ML ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO TOTAL ($)

VIBRADOR

0.12

día

$6.98

$0.84

CONCRETERA 1 bolsa

0.12

día

$17.46

$2.10

SUB TOTAL:

DESCRIPCION

CANTIDAD

$2.93

UNIDAD

P.UNITARIO

TOTAL ($)

CEMENTO

0.108

BLS

$4.91

$0.53

ARENA

0.006

M3

$17.14

$0.10

GRAVA

0.006

M3

$33.37

$0.20

HIERRO ø 3/8"

0.37

VARILLA

$21.14

$7.82

HIERRO ø 1/4"

0.10

VARILLA

$21.14

$2.11

ALAMBRE DE AMARRE

0.20

LIBRAS

$0.40

$0.08

TABLA DE PINO

0.22

PIEZA

$1.14

$0.25

0.088

LIBRAS

$0.40

$0.04

0.14

LIBRAS

$0.40

$0.06

CLAVOS DE 2 1/2" CLAVOS DE 3"

SUB TOTAL:

3.

$11.20

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

SUB TOTAL:

TOTAL ($)

$-

4. MANO DE OBRA TRABAJADOR

SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL(¢)

ARMADURIA ø 3/8 " (qq)

7.69

1

ARMADURIA ø 1/4" (qq)

1.57

1

$7.69

0.03

$0.20

$1.57

0.005

ENCOFRADO (ML)

5.80

$0.01

1

$5.80

1.00

DESENCOFRADO (30% ENCOFRADO) ( ML)

$5.80

0.71

1

$0.71

1.00

$0.71

MEZCLADO (HH)

1.12

1

$1.12

0.07

$0.08

LLENADO (HH)

0.69

1

$0.69

0.14

$0.10

SUB TOTAL:

$6.89

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$21.02

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT.

VALOR TOTAL

32%

$6.73

SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

$6.73

$27.75

ANALISIS DE COSTOS UNITARIOS PROYECTO: FECHA: Octubre del 2003 PARTIDA DE OBRA: ELEMENTO 10X10 CM; PROP.1:2:2,10% DESP.2 HO.ø 3/8", EST.ø 1/4"@ 10CM

CON ENCOFRADO ESQUEMA:

1.

UNIDAD:

ML

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

VIBRADOR

0.12

día

CONCRETERA 1 bolsa

0.12

día

P.UNITARIO TOTAL ($) $6.98

$0.84

$17.46

$2.10

SUB TOTAL:

DESCRIPCION

CANTIDAD

UNIDAD

$2.93

P.UNITARIO

TOTAL ($)

CEMENTO

0.108

BLS

$4.91

$0.53

ARENA

0.006

M3

$17.14

$0.10

GRAVA

0.006

M3

$33.37

$0.20

HIERRO CERRUGADO ø 3/8"

0.37

VARILLA

$21.14

$7.82

HIERRO ø 1/4"

0.18

VARILLA

$21.14

$3.81

ALAMBRE DE AMARRE

0.20

LIBRAS

$0.40

$0.08

TABLA DE PINO

0.22

PIEZA

$1.14

$0.25

0.088

LIBRAS

$0.40

$0.04

0.14

LIBRAS

$0.40

$0.06

CLAVOS DE 2 1/2" CLAVOS DE 3"

SUB TOTAL:

3.

$12.89

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

SUB TOTAL:

TOTAL ($)

$-

4. MANO DE OBRA TRABAJADOR

SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL(¢)

ARMADURIA ø 3/8 " (qq)

7.69

1

ARMADURIA ø 1/4" (qq)

1.57

1

$7.69

0.03

$0.20

$1.57

0.005

ENCOFRADO (ML)

5.80

$0.01

1

$5.80

1.00

DESENCOFRADO (30% ENCOFRADO) ( ML)

$5.80

0.71

1

$0.71

1.00

$0.71

MEZCLADO (HH)

1.12

1

$1.12

0.07

$0.08

LLENADO (HH)

0.69

1

$0.69

0.14

$0.10

SUB TOTAL:

$6.89

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$22.71

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT.

VALOR TOTAL

32%

$7.27

SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

$7.27

$29.98

ANALISIS DE COSTOS UNITARIOS PROYECTO: FECHA: Octubre del 2003 PARTIDA DE OBRA: ELEMENTO 10X10 CM; PROP.1:2:2,10% DESP.2 HO.ø 3/8", EST.ø 1/4"@15CM CON ENCOFRADO UNIDAD: ML

ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO TOTAL ($)

VIBRADOR

0.12

día

$6.98

$0.84

CONCRETERA 1 bolsa

0.12

día

$17.46

$2.10

SUB TOTAL:

DESCRIPCION

CANTIDAD

UNIDAD

$2.93

P.UNITARIO

TOTAL ($)

CEMENTO

0.108

BLS

$4.91

$0.53

ARENA

0.006

M3

$17.14

$0.10

GRAVA

0.006

M3

$33.37

$0.20

HIERRO CERRUGADO ø 3/8"

0.37

VARILLA

$21.14

$7.82

HIERRO ø 1/4"

0.13

VARILLA

$21.14

$2.75

ALAMBRE DE AMARRE

0.19

LIBRAS

$0.40

$0.08

TABLA DE PINO CLAVOS DE 2 1/2" CLAVOS DE 3"

0.22

PIEZA

$1.14

$0.25

0.088

LIBRAS

$0.40

$0.04

0.14

LIBRAS

$0.40

$0.06

SUB TOTAL:

3.

$11.83

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

SUB TOTAL:

TOTAL ($)

$-

4. MANO DE OBRA SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL(¢)

ARMADURIA ø 3/8 " (qq)

TRABAJADOR

7.69

1

$7.69

0.03

$0.20

ARMADURIA ø 1/4" (qq)

1.57

1

$1.57

0.004

$0.01

ENCOFRADO (ML)

5.80

1

$5.80

1.00

$5.80

DESENCOFRADO (30% ENCOFRADO) ( ML)

0.71

1

$0.71

1.00

$0.71

MEZCLADO (HH)

1.12

1

$1.12

0.07

$0.08

LLENADO (HH)

0.69

1

$0.69

0.14

$0.10

SUB TOTAL:

$6.89

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$21.65

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT.

VALOR TOTAL

32%

$6.93

SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

$6.93

$28.58

ANALISIS DE COSTOS UNITARIOS PROYECTO: FECHA: Octubre del 2003 PARTIDA DE OBRA: ELEMENTO 10X10 CM; PROP.1:2:2,10% DESP.2 HO.ø 3/8", EST.ø 1/4"@20CM CON ENCOFRADO UNIDAD: ML ESQUEMA:

ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO TOTAL ($)

VIBRADOR

0.12

día

$6.98

$0.84

CONCRETERA 1 bolsa

0.12

día

$17.46

$2.10

SUB TOTAL:

DESCRIPCION

CANTIDAD

$2.93

UNIDAD

P.UNITARIO

TOTAL ($)

CEMENTO

0.108

BLS

$4.91

$0.53

ARENA

0.006

M3

$17.14

$0.10

GRAVA

0.006

M3

$33.37

$0.20

HIERRO CERRUGADO ø 3/8"

0.37

VARILLA

$21.14

$7.82

HIERRO ø 1/4"

0.09

VARILLA

$21.14

$1.94

ALAMBRE DE AMARRE

0.16

LIBRAS

$0.40

$0.06

TABLA DE PINO

0.22

PIEZA

$1.14

$0.25

0.088

LIBRAS

$0.40

$0.04

0.14

LIBRAS

$0.40

$0.06

CLAVOS DE 2 1/2" CLAVOS DE 3"

SUB TOTAL:

3.

$11.01

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

SUB TOTAL:

TOTAL ($)

$-

4. MANO DE OBRA SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL(¢)

ARMADURIA ø 3/8 " (qq)

TRABAJADOR

7.69

1

$7.69

0.03

$0.20

ARMADURIA ø 1/4" (qq)

1.57

1

$1.57

0.003

$0.00

ENCOFRADO (ML)

5.80

1

$5.80

1.00

$5.80

DESENCOFRADO (30% ENCOFRADO) ( ML)

0.71

1

$0.71

1.00

$0.71

MEZCLADO (HH)

1.12

1

$1.12

0.07

$0.08

LLENADO (HH)

0.69

1

$0.69

0.14

$0.10

SUB TOTAL:

$6.89

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$20.83

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT.

VALOR TOTAL

32%

$6.67

SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

$6.67

$27.50

ANALISIS DE COSTOS UNITARIOS PROYECTO: FECHA: Octubre del 2003 PARTIDA DE OBRA: ELEMENTO 10X10 CM; PROP.1:2:4,10% DESP.2 HO.ø 3/8", EST.ø 1/4"@10CM CON ENCOFRADO UNIDAD: ML ESQUEMA:

ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO TOTAL ($)

VIBRADOR

0.12

día

$6.98

$0.84

CONCRETERA 1 bolsa

0.12

día

$17.46

$2.10

SUB TOTAL:

DESCRIPCION

CANTIDAD

$2.93

UNIDAD

P.UNITARIO

TOTAL ($)

CEMENTO

0.081

BLS

$4.91

$0.40

ARENA

0.005

M3

$17.14

$0.08

GRAVA

0.009

M3

$33.37

$0.30

HIERRO CERRUGADO ø 3/8"

0.37

VARILLA

$21.14

$7.82

HIERRO ø 1/4"

0.18

VARILLA

$21.14

$3.81

ALAMBRE DE AMARRE

0.20

LIBRAS

$0.40

$0.08

TABLA DE PINO

0.22

PIEZA

$1.14

$0.25

0.088

LIBRAS

$0.40

$0.04

0.14

LIBRAS

$0.40

$0.06

CLAVOS DE 2 1/2" CLAVOS DE 3"

SUB TOTAL:

3.

$12.82

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

SUB TOTAL:

TOTAL ($)

$-

4. MANO DE OBRA SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL(¢)

ARMADURIA ø 3/8 " (qq)

TRABAJADOR

7.69

1

$7.69

0.03

$0.20

ARMADURIA ø 1/4" (qq)

1.57

1

$1.57

0.005

$0.01

ENCOFRADO (ML)

5.80

1

$5.80

1.00

$5.80

DESENCOFRADO (30% ENCOFRADO) ( ML)

0.71

1

$0.71

1.00

$0.71

MEZCLADO (HH)

1.12

1

$1.12

0.07

$0.08

LLENADO (HH)

0.69

1

$0.69

0.14

$0.10

SUB TOTAL:

$6.89

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$22.65

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT.

VALOR TOTAL

32%

$7.25

SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

$7.25

$29.90

ANALISIS DE COSTOS UNITARIOS PROYECTO: REMODELACION PARQUE ROMA FECHA: Octubre del 2003 PARTIDA DE OBRA: MODULO DE JUEGOS DE NIÑOS UNIDAD:

C/U

ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

SUB TOTAL:

DESCRIPCION

CANTIDAD

TUBO CAÑO NEGRO ø 4" TUBO CAÑO NEGRO ø 3" TUBO CAÑO NEGRO ø 2" TUBO CAÑO NEGRO ø 11/2 " ANGULO 11/2" X 1 1/2" X 1/8" PLATINA 11/2" X 1/4" LAMINA DECORATIVA 2 x1 LAMINA ZINC ALUM No.26 LISA PREPINTADA LAMINA ZINC ALUM No.26 ONDULADA PREPINTADA CADENA GALVANIZADA ø 5/16" PINTURA ANTICORROSIVA PINTURA DE ACEITE BASE, ACCESORIOS Y ELECTRODOS

3.

18.000 24.600 6.000 21.460 24.000 20.000 2.000 3.000 3.000 11.000 1.000 1.000 1.000

UNIDAD ML ML ML ML ML ML C/U ML ML YARDA GALON GALON S.G

P.UNITARIO $7.14 $4.67 $1.51 $1.21 $1.71 $1.52 $25.71 $5.98 $5.98 $2.00 $10.62 $16.30 $30.00 SUB TOTAL:

TOTAL ($)

$-

TOTAL ($) $128.52 $114.88 $9.06 $25.97 $41.04 $30.40 $51.42 $17.94 $17.94 $22.00 $10.62 $16.30 $30.00 $516.09

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

TOTAL ($)

SUB TOTAL:

4. MANO DE OBRA TRABAJADOR MANO DE OBRA

SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL($)

$9.43

1

$9.43

19.00

$179.17

SUB TOTAL:

$179.17

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$695.26

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT. 32% SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

VALOR TOTAL $222.48 $222.48

$917.74

ANALISIS DE COSTOS UNITARIOS PROYECTO: REMODELACION PARQUE ROMA FECHA: Octubre del 2003 PARTIDA DE OBRA: JUEGO DE SUBE Y BAJA UNIDAD:

C/U

ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

SUB TOTAL:

DESCRIPCION

CANTIDAD

CAÑO NEGRO ø 21/2" CAÑO NEGRO ø 2" CAÑO NEGRO 11/4" CAÑO NEGRO 1" PLATINA 2" X 3/16" PLATINA 2" X 1/2" PERNOS GALVANIZADO 2" X 3/8" TUERCA GALV. Ø 3/8" (INC. ARANDELA) ELECTRODO 1/8" SOLVENTE MINERAL PINTURA ANTICORROSIVA PINTURA DE ACEITE BASE, ACCESORIOS Y OTROS

3.

6.000 6.000 6.000 6.000 6.000 6.000 13.000 13.000 4.000 0.250 0.250 0.250 1.000

UNIDAD ML ML ML ML ML ML C/U C/U LIBRAS GALON GALON GALON S.G

P.UNITARIO $1.85 $1.51 $1.05 $0.83 $2.85 $3.00 $1.00 $1.50 $0.51 $3.90 $10.62 $16.30 $30.00 SUB TOTAL:

TOTAL ($)

$-

TOTAL ($) $11.10 $9.06 $6.30 $4.98 $17.10 $18.00 $13.00 $19.50 $2.04 $0.98 $2.66 $4.08 $30.00 $138.79

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

TOTAL ($)

SUB TOTAL:

4. MANO DE OBRA TRABAJADOR MANO DE OBRA

SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL($)

$9.43

1

$9.43

10.00

$94.30

SUB TOTAL:

$94.30

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$233.09

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT.

VALOR TOTAL

32%

$74.59

SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

$74.59

$307.67

ANALISIS DE COSTOS UNITARIOS PROYECTO: REMODELACION PARQUE ROMA FECHA: Octubre del 2003 PARTIDA DE OBRA: JUEGO GIRATORIO PARA NIÑOS UNIDAD:

C/U

ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

SUB TOTAL:

DESCRIPCION

CANTIDAD

CAÑO NEGRO ø 3" ESTRUCTURA GIRATORIA DE HIERRO CON CADENA HIERRO ø 3/8" CEMENTO ARENA GRAVA CUERDA DE NYLON CON MANIJA TORNILLO Y TUERCA GALV. Ø 3/8" (INC. ARANDELA) ELECTRODO 1/8" SOLVENTE MINERAL PINTURA ANTICORROSIVA PINTURA DE ACEITE ACCESORIOS Y OTROS

3.

6.000 1.000 0.070 2.690 0.150 0.150 3.000 4.000 1.000 0.100 0.100 0.100 1.000

UNIDAD ML C/U QQ BOLSA M3 M3 C/U C/U LIBRAS GALON GALON GALON S.G

P.UNITARIO $4.67 $12.57 $21.14 $4.91 $17.14 $33.37 $3.50 $2.00 $0.51 $3.90 $10.62 $16.30 $5.00 SUB TOTAL:

TOTAL ($)

$-

TOTAL ($) $28.02 $12.57 $1.48 $13.21 $2.57 $5.01 $10.50 $8.00 $0.51 $0.39 $1.06 $1.63 $5.00 $89.95

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

TOTAL ($)

SUB TOTAL:

4. MANO DE OBRA TRABAJADOR MANO DE OBRA

SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL($)

$9.43

1

$9.43

2.00

$18.86

SUB TOTAL:

$18.86

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$108.81

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT. 32% SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

ANALISIS DE COSTOS UNITARIOS

VALOR TOTAL $34.82 $34.82

$143.62

PROYECTO: REMODELACION PARQUE ROMA FECHA: Octubre del 2003 PARTIDA DE OBRA: CERCO DE TUBO GALVANIZADO Y ELECTROMALLA UNIDAD:

M2

ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

SUB TOTAL:

DESCRIPCION

CANTIDAD

TUBO GALVANIZADO ø 21/2" TUBO GALVANIZADO ø 11/2" ESTRUCTOMALLA 6/6 pieza de 6.0 x 2.35m HIERRO ø 1/4" LISO ELECTRODO 1/8" SOLVENTE MINERAL PINTURA ANTICORROSIVA PINTURA DE ACEITE ACCESORIOS Y OTROS

1.820 1.700 0.090 0.014 0.200 0.100 0.100 0.100 1.000

$-

UNIDAD

P.UNITARIO

TOTAL ($)

ML ML PIEZA QQ LIBRAS GALON GALON GALON S.G

$4.06 $2.80 $23.64 $4.91 $0.51 $3.90 $10.62 $16.30 $0.15

$7.39 $4.76 $2.13 $0.07 $0.10 $0.39 $1.06 $1.63 $0.15

SUB TOTAL:

3.

TOTAL ($)

$17.68

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

TOTAL ($)

SUB TOTAL:

4. MANO DE OBRA TRABAJADOR MANO DE OBRA

SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL($)

$9.43

1

$9.43

0.30

$2.83

SUB TOTAL:

$2.83

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$20.51

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT.

VALOR TOTAL

32%

$6.56

SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

ANALISIS DE COSTOS UNITARIOS

$6.56

$27.07

PROYECTO: REMODELACION PARQUE ROMA FECHA: Octubre del 2003 PARTIDA DE OBRA: VEGETACION VARIADA ( ARBOLES FICUS Y ARREGLOS PIE DE ARBOLES UNIDAD: S.G. ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

SUB TOTAL:

DESCRIPCION

CANTIDAD

TOTAL ($)

$-

UNIDAD

P.UNITARIO

TOTAL ($)

ARBOLES FICUS

18.000

C/U

$6.00

$108.00

ARREGLOS PIE DE ARBOL ( Inc. Camarones, sultana,isora )

10.000

C/U

$9.00

$90.00

SUB TOTAL:

3.

$198.00

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

TOTAL ($)

SUB TOTAL:

4. MANO DE OBRA TRABAJADOR PLANTACION ÁRBOLES

SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL($)

$9.43

1

$9.43

0.30

$2.83

SUB TOTAL:

$2.83

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$200.83

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT.

VALOR TOTAL

32%

$64.27

SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

ANALISIS DE COSTOS UNITARIOS PROYECTO: REMODELACION PARQUE ROMA

$64.27

$265.09

FECHA: Octubre del 2003 PARTIDA DE OBRA: BEBEDERO PILA DE LADRILLO (R.A.P) INCLUYE AZULEJO EN POCETA 2 CHORROS UNIDAD: S.G. ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

SUB TOTAL:

DESCRIPCION

CANTIDAD

TOTAL ($)

$-

UNIDAD

P.UNITARIO

TOTAL ($)

20.000

C/U

$0.10

$2.00

1.500

ML

$0.83

$1.25

CEMENTO

0.29

BLS

$4.91

$1.42

ARENA

0.02

M3

$17.14

$0.34

GRAVA

0.03

M3

$33.37

$1.00

CHORRO ø 1 /2" SIN ROSCA

2.00

C/U

$1.94

$3.88

10.00

C/U

$0.23

$2.30

PORCELANA

0.10

LIBRA

$0.74

$0.07

ADAPTADOR HEMBRA ø 1/2"

2.00

C/U

$0.30

$0.60

CINTA TEFLON

0.20

C/U

$0.30

$0.06

LADRILLO DE OBRA TUBERIA GALVANIZADA ø 1/2"

AZULEJO 15X15

SUB TOTAL:

3.

$12.93

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

TOTAL ($)

SUB TOTAL:

4. MANO DE OBRA SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL($)

HECHURA DE BASE

TRABAJADOR

$0.71

1

$0.71

2.00

$1.42

ENCHAPADO AZULEJO

$1.22

1

$1.22

0.25

$0.31

SUB TOTAL:

$1.73

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$14.65

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT.

VALOR TOTAL

32%

$4.69

SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

ANALISIS DE COSTOS UNITARIOS PROYECTO: REMODELACION PARQUE ROMA FECHA: Octubre del 2003

$4.69

$19.34

PARTIDA DE OBRA: BARANDAL METALICO H=0.60 M UNIDAD:

ML

ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

SUB TOTAL:

DESCRIPCION

CANTIDAD

TOTAL ($)

$-

UNIDAD

P.UNITARIO

TOTAL ($)

TUBO INDUSTRIAL CUADRADO 1 1 /2"

4.900

ML

$0.72

$3.53

TUBO INDUSTRIAL RECTAGULAR 2"X1"

1.000

ML

$0.72

$0.72

SIERRA ACERO PLATA

0.050

C/U

$0.86

$0.04

BROCHA 2 "

0.050

C/U

$1.00

$0.05

ELECTRODO 1/8"

0.100

LIBRAS

$0.51

$0.05

SOLVENTE MINERAL

0.050

GALON

$3.90

$0.20

PINTURA ANTICORROSIVA

0.050

GALON

$10.62

$0.53

PINTURA DE ACEITE

0.050

GALON

$16.30

$0.82

SUB TOTAL:

3.

$5.93

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

TOTAL ($)

SUB TOTAL:

4. MANO DE OBRA TRABAJADOR MANO DE OBRA

SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL($)

$6.15

1

$6.15

1.00

$6.15

SUB TOTAL:

$6.15

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$12.08

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT.

VALOR TOTAL

32%

$3.87

SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

ANALISIS DE COSTOS UNITARIOS PROYECTO: REMODELACION PARQUE ROMA FECHA: Octubre del 2003 PARTIDA DE OBRA: POLIN "C" 4"

$3.87

$15.95

UNIDAD:

ML

ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

SUB TOTAL:

DESCRIPCION

CANTIDAD

TOTAL ($)

$-

UNIDAD

P.UNITARIO

TOTAL ($)

POLIN C DE 4"

1.000

ML

$0.89

$0.89

ELECTRODO

0.150

LIBRA

$0.51

$0.08

PINTURA ANTICORROSIVA

0.033

GALON

$10.62

$0.35

BROCHA DE CERDA DE 21/2"

0.050

C/U

$2.00

$0.10

SIERRA ACERO PLATA

0.083

C/U

$0.86

$0.07

SUB TOTAL:

3.

$1.49

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

TOTAL ($)

SUB TOTAL:

4. MANO DE OBRA TRABAJADOR

SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL($)

INSTALACION POLIN C

$1.33

1

$1.33

1.00

$1.33

PINTURA

$0.71

1

$0.71

0.22

$0.16

SOLDADURA POLIN C

$1.00

1

$1.00

0.80

$0.80

SUB TOTAL:

$2.29

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$3.77

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT.

VALOR TOTAL

32%

$1.21

SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

$1.21

$4.98

ANALISIS DE COSTOS UNITARIOS PROYECTO: REMODELACION PARQUE ROMA FECHA: Octubre del 2003 PARTIDA DE OBRA: CANALETA DE LADRILLO DE OBRA R.A.P.CON PARRILLA ANG.1"x1"x1/8" yø3/8" UNIDAD: ML ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO TOTAL ($)

SUB TOTAL:

DESCRIPCION

CANTIDAD

$-

UNIDAD

P.UNITARIO

TOTAL ($)

CEMENTO

0.22

BLS

$4.91

$1.08

ARENA

0.05

M3

$17.14

$0.81

GRAVA

0.02

M3

$33.37

$0.73

LADRILLO DE BARRO

13.00

C/U

$0.10

$1.30

REGLA RIOSTRA PINO

0.360

VARA

$0.47

$0.17

ANG. 1"x1"x1/8"

2.10

ML

$1.71

$3.59

HIERRO ø 3/8"

0.105

QQ

$21.14

$2.22

PINTURA ANTICORROSIVA

0.100

GALON

$10.62

$1.06

ELECTRODO 1/8"

0.200

LIBRA

$0.51

$0.10

PIEDRA CUARTA

0.070

M3

$9.11

$0.64

SUB TOTAL:

3.

$11.70

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

TOTAL ($)

SUB TOTAL:

4. MANO DE OBRA SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL($)

1.18.24. REPELLO (M2)

TRABAJADOR

1.12

1

$1.12

0.50

$0.56

EMPEDRADO CON PIEDRA CUARTA

0.68

1

$0.68

0.60

$0.41

HECHURA Y LLENADO CONCRETO

2.06

1

$2.06

0.20

$0.41

HECHURA CANALETA

3.76

1

$3.76

1.00

$3.76

HECHURA PARILLA DE HIERRRO

2.10

1

$2.10

1.00

$2.10

SUB TOTAL: SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$7.24 $18.94

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT.

VALOR TOTAL

32%

$6.06

SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

ANALISIS DE COSTOS UNITARIOS

$6.06

$25.00

PROYECTO: REMODELACION PARQUE ROMA FECHA: Octubre del 2003 PARTIDA DE OBRA: CAJA RESUMIDERO DE LADRILLO DE OBRA UNIDAD:

S.G.

ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO TOTAL ($)

SUB TOTAL:

DESCRIPCION

CANTIDAD

$-

UNIDAD

P.UNITARIO

TOTAL ($)

CEMENTO

0.76

BLS

$4.91

$3.73

ARENA

0.06

M3

$17.14

$1.10

GRAVA

0.03

M3

$33.37

$1.07

LADRILLO DE BARRO

37.00

C/U

$0.10

$3.70

REGLA RIOSTRA PINO

0.160

VARA

$0.47

$0.08

ANG. 1"x1"x1/8"

2.10

ML

$1.71

$3.59

HIERRO ø 3/8"

0.070

QQ

$21.14

$1.48

PINTURA ANTICORROSIVA

0.100

GALON

$10.62

$1.06

ELECTRODO 1/8"

0.250

LIBRA

$0.51

$0.13

SUB TOTAL:

3.

$15.93

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

TOTAL ($)

SUB TOTAL:

4. MANO DE OBRA SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL($)

1.18.24. REPELLO (M2)

TRABAJADOR

1.12

1

$1.12

0.80

$0.90

HECHURA Y LLENADO CONCRETO

1.06

1

$1.06

0.20

$0.21

HECHURA CAJA

4.57

1

$4.57

1.00

$4.57

HECHURA PARILLA DE HIERRRO

1.50

1

$1.50

1.00

$1.50

SUB TOTAL:

$7.18

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$23.11

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT.

VALOR TOTAL

32%

$7.40

SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

ANALISIS DE COSTOS UNITARIOS PROYECTO: REMODELACION PARQUE ROMA

$7.40

$30.51

FECHA: Octubre del 2003 PARTIDA DE OBRA: ACOMETIDA AGUA POTABLE PVC ø3/4" JR 250 PSI UNIDAD:

S.G.

ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO TOTAL ($)

SUB TOTAL:

DESCRIPCION

CANTIDAD

$-

UNIDAD

P.UNITARIO

TOTAL ($)

TUBERIA ø 3/4" PVC 250 PSI

10.00

ML

$0.63

$6.30

PEGAMENTO

0.200

GRAMOS

$0.03

$0.01 $-

SUB TOTAL:

3.

$6.31

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

TOTAL ($)

SUB TOTAL:

4. MANO DE OBRA TRABAJADOR MANO DE OBRA

SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL($)

0.78

1

$0.78

10.00

$7.75

SUB TOTAL:

$7.75

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$14.06

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT.

VALOR TOTAL

32%

$4.50

SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

ANALISIS DE COSTOS UNITARIOS PROYECTO: REMODELACION PARQUE ROMA FECHA: Octubre del 2003

$4.50

$18.55

PARTIDA DE OBRA: TUBERIA PVC ø1/2" JR 250 PSI UNIDAD:

ML

ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO TOTAL ($)

SUB TOTAL:

DESCRIPCION

CANTIDAD

TUBERIA ø 1/2" PVC 315 PSI PEGAMENTO

UNIDAD

P.UNITARIO

TOTAL ($)

1.00

ML

$0.45

$0.45

0.050

GRAMOS

$0.03

$0.00

SUB TOTAL:

3.

$-

$0.45

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

TOTAL ($)

SUB TOTAL:

4. MANO DE OBRA TRABAJADOR MANO DE OBRA

SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL($)

1.00

1

$1.00

1.00

$1.00

SUB TOTAL:

$1.00

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$1.45

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT.

VALOR TOTAL

32%

$0.46

SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

ANALISIS DE COSTOS UNITARIOS PROYECTO: REMODELACION PARQUE ROMA FECHA: Octubre del 2003 PARTIDA DE OBRA: TUBERIA PVC ø4" 80 PSI

$0.46

$1.92

UNIDAD:

ML

ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO TOTAL ($)

SUB TOTAL:

DESCRIPCION

CANTIDAD

TUBERIA ø 4" PVC 80 PSI PEGAMENTO

$-

UNIDAD

P.UNITARIO

TOTAL ($)

1.00

ML

$3.44

$3.44

1.000

GRAMOS

$0.03

$0.03

SUB TOTAL:

3.

$3.47

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

TOTAL ($)

SUB TOTAL:

4. MANO DE OBRA TRABAJADOR MANO DE OBRA

SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL($)

2.24

1

$2.24

1.00

$2.24

SUB TOTAL:

$2.24

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$5.71

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT.

VALOR TOTAL

32%

$1.83

SUB TOTAL.

$1.83

COSTO TOTAL PARTIDA ( $ )

$7.54

ANALISIS DE COSTOS UNITARIOS PROYECTO: REMODELACION PARQUE ROMA FECHA: Octubre del 2003 PARTIDA DE OBRA: TUBERIA PVC ø 6" 100 PSI UNIDAD:

ML

ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO TOTAL ($)

SUB TOTAL:

DESCRIPCION

CANTIDAD

TUBERIA ø 6" PVC 100 PSI PEGAMENTO

UNIDAD

P.UNITARIO

TOTAL ($)

1.00

ML

$12.20

$12.20

2.000

GRAMOS

$0.03

$0.06

SUB TOTAL:

3.

$-

$12.26

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

TOTAL ($)

SUB TOTAL:

4. MANO DE OBRA TRABAJADOR MANO DE OBRA

SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL($)

2.80

1

$2.80

1.00

$2.80

SUB TOTAL:

$2.80

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$15.06

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT.

VALOR TOTAL

32%

$4.82

SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

$4.82

$19.88

ANALISIS DE COSTOS UNITARIOS PROYECTO: REMODELACION PARQUE ROMA FECHA: Octubre del 2003 PARTIDA DE OBRA: RELLENO COMPACTADO CON MATERIAL SELECTO UNIDAD:

M3

ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO TOTAL ($)

SUB TOTAL:

DESCRIPCION

CANTIDAD

TIERRA BLANCA

UNIDAD

P.UNITARIO

TOTAL ($)

1.200

M3

$13.22

$15.864

-

LITROS

$0.01

AGUA

SUB TOTAL:

3.

$-

$-

$15.86

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

TOTAL ($)

SUB TOTAL:

4. MANO DE OBRA TRABAJADOR MANO DE OBRA

SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL($)

$0.71

1

$0.71

12.00

$8.52

SUB TOTAL:

$8.52

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$24.38

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT.

VALOR TOTAL

32%

$7.80

SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

ANALISIS DE COSTOS UNITARIOS

$7.80

$32.19

PROYECTO: REMODELACION PARQUE ROMA FECHA: Octubre del 2003 PARTIDA DE OBRA: RELLENO COMPACTADO SUELO CEMENTO 1:20 C/ MAT. SELECTO UNIDAD: M3 ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO TOTAL ($)

SUB TOTAL:

DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

TOTAL ($)

M3

$13.22

$13.220

2.000

BOLSA

$4.91

$9.820

-

LITROS

$0.01

TIERRA BLANCA

1.000

CEMENTO AGUA

SUB TOTAL:

3.

$-

$-

$23.04

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

TOTAL ($)

SUB TOTAL:

4. MANO DE OBRA TRABAJADOR

SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL($)

$0.71

1

$0.71

1.00

$0.71

ACARREO MATERIALES

0.71

1

$0.71

0.70

$0.50

COMPACTACIÓN

0.71

1

$0.71

1.10

$0.78

SUB TOTAL:

$1.99

MEZCLADO MATERIALES

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$25.03

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT.

VALOR TOTAL

32%

$8.01

SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

$8.01

$33.04

ANALISIS DE COSTOS UNITARIOS PROYECTO: REMODELACION PARQUE ROMA FECHA: Octubre del 2003 PARTIDA DE OBRA: LAMPARA DE HALURO METALICO DE 400 WATTS UNIDAD:

S.G.

ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO TOTAL ($)

SUB TOTAL:

DESCRIPCION

CANTIDAD

$-

UNIDAD

P.UNITARIO

TOTAL ($)

LAMPARA HALURO METALICO

1.000

C/U

$152.55

$152.55

CAÑO NEGRO ø 4 "

6.000

ML

$7.14

$42.84

CEMENTO

0.29

BLS

$4.91

$1.42

ARENA

0.02

M3

$17.14

$0.34

GRAVA

0.03

M3

$33.37

$1.00

HIERRO ø 3/8"

0.02

QQ

$21.14

$0.42

ALAMBRE DE AMARRE

0.12

LIBRAS

$0.40

$0.05

CAJA OCTOGONAL

1.00

C/U

$0.33

$0.33

SUB TOTAL:

3.

$198.96

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

TOTAL ($)

SUB TOTAL:

4. MANO DE OBRA TRABAJADOR

SUELDO

PREST.

JORN-TOTAL

RENDIM.

$0.71

1

$0.71

1.00

$0.71

$20.00

1

$20.00

1.00

$20.00

SUB TOTAL:

$20.71

HECHURA DE BASE INSTALACIÓN DE LAMPARA

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

TOTAL($)

$219.67

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT.

VALOR TOTAL

32%

$70.29

SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

ANALISIS DE COSTOS UNITARIOS

$70.29

$289.96

PROYECTO: REMODELACION PARQUE ROMA FECHA: Octubre del 2003 PARTIDA DE OBRA: TABLERO MONOFASICO DE 16 ESPACIOS UNIDAD:

1 TABLERO

ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO TOTAL ($)

SUB TOTAL:

DESCRIPCION

CANTIDAD

CAJA TERMICA DE 16 ESPACIOS DADOS TERMICOS DE 12 AMP.

$-

UNIDAD

P.UNITARIO

TOTAL ($)

1.000

C/U

$99.78

$99.78

16.000

C/U

$3.62

$57.92

CUERPO TERMINAL

1.00

C/U

$0.73

$0.73

POLO TIERRA

1.00

C/U

$1.19

$1.19

CABLE THHN #10

18.00

ML

$0.21

$3.78

CINTA AISLANTE

0.10

C/U

$0.57

$0.06

SUB TOTAL:

3.

$163.46

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

TOTAL ($)

SUB TOTAL:

4. MANO DE OBRA TRABAJADOR INSTALACION TABLERO

SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL($)

$20.00

1

$20.00

1.00

$20.00

SUB TOTAL:

$20.00

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$183.46

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT.

VALOR TOTAL

32%

$58.71

SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

ANALISIS DE COSTOS UNITARIOS PROYECTO: REMODELACION PARQUE ROMA

$58.71

$242.16

FECHA: Octubre del 2003 PARTIDA DE OBRA: LAMPARA DECORATIVA COLONIAL DE UN FAROL UNIDAD:

S.G.

ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO TOTAL ($)

SUB TOTAL:

DESCRIPCION

CANTIDAD

$-

UNIDAD

P.UNITARIO

TOTAL ($)

1.000

C/U

$177.79

$177.79

CAJA OCTOGONAL

1.00

C/U

$0.33

$0.33

CABLE THHN #10

6.00

ML

$0.21

$1.26

CINTA AISLANTE

0.10

C/U

$0.57

$0.06

FAROL DE HIERRO CON BASE DE PIEDRA UNA LUZ

SUB TOTAL:

3.

$179.44

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

TOTAL ($)

SUB TOTAL:

4. MANO DE OBRA TRABAJADOR INSTALACIÓN DE FAROL

SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL($)

$10.00

1

$10.00

1.00

$10.00

SUB TOTAL:

$10.00

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$189.44

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT.

VALOR TOTAL

32%

$60.62

SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

ANALISIS DE COSTOS UNITARIOS PROYECTO: REMODELACION PARQUE ROMA FECHA: Octubre del 2003

$60.62

$250.06

PARTIDA DE OBRA: ACOMETIDA ELECTRICA UNIDAD:

1 C/U

ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO TOTAL ($)

SUB TOTAL:

DESCRIPCION

CANTIDAD

$-

UNIDAD

P.UNITARIO

TOTAL ($)

POLIDUCTO ø 11/4"

7.10

ML

$0.35

$2.49

CABLE THHN #4

6.00

ML

$0.80

$4.80

CABLE THHN #2

12.00

ML

$1.00

$12.00

CINTA AISLANTE

0.15

C/U

$0.57

$0.09

SUB TOTAL:

3.

$19.37

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

TOTAL ($)

SUB TOTAL:

4. MANO DE OBRA TRABAJADOR

SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL($)

$2.00

1

$2.00

5.00

$10.00

SUB TOTAL:

$10.00

INSTALACION

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$29.37

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT.

VALOR TOTAL

32%

$9.40

SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

ANALISIS DE COSTOS UNITARIOS PROYECTO: REMODELACION PARQUE ROMA FECHA: Octubre del 2003 PARTIDA DE OBRA: LINEA SECUNDARIA

$9.40

$38.77

UNIDAD:

S.G.

ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO TOTAL ($)

SUB TOTAL:

DESCRIPCION

CANTIDAD

$-

UNIDAD

P.UNITARIO

TOTAL ($)

THHN #10

333.33

ML

$0.21

$70.00

THHN #12

330.00

ML

$0.12

$39.60

POLIDUCTO ø 3/4

348.88

YARDA

$0.10

$34.89

Tubo PVC ø 2" 125 psi

333.20

ML

$1.84

$613.09

3.000

C/U

$0.57

$1.71

CINTA AISLANTE

SUB TOTAL:

3.

$759.29

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

TOTAL ($)

SUB TOTAL:

4. MANO DE OBRA TRABAJADOR

SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL($)

0.80

1

$0.80

333.00

$266.40

ELECTRICISTA

$-

SUB TOTAL: SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$266.40 $1,025.69

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT.

VALOR TOTAL

32%

$328.22

SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

$328.22

$1,353.90

ANALISIS DE COSTOS UNITARIOS PROYECTO: FECHA: Octubre del 2003 PARTIDA DE OBRA: TECHO DE TEJA S/LÁMINA GALV No. 26 UNIDAD:

M2

ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO TOTAL ($)

SUB TOTAL:

DESCRIPCION

CANTIDAD

$-

UNIDAD

P.UNITARIO

TOTAL ($)

35.200

C/U

$0.23

$8.10

CEMENTO

0.563

BOLSA

$4.91

$2.76

ARENA

0.063

M3

$17.14

$1.09

LAMINA GALV. ONDULADA No26

0.744

PLIEGO

$5.14

$3.82

TRAMOS GALV. C/ ARANDELA Y TUERCA 9"X1/4"

2.230

C/U

$0.30

$0.67

TEJA DE BARRO

SUB TOTAL:

3.

$16.44

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

TOTAL ($)

SUB TOTAL:

4. MANO DE OBRA SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL($)

COLOCACIÓN TEJA ( ML)

TRABAJADOR

$1.33

1

$1.33

6.50

$8.65

3.17.03ENLAMINADOS DE TECHOS QUEBRADOS

$0.76

1

$0.76

1.00

$0.76

SUB TOTAL:

$9.41

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$25.85

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT.

VALOR TOTAL

32%

$8.27

SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

$8.27

$34.12

ANALISIS DE COSTOS UNITARIOS PROYECTO: REMODELACION PARQUE ROMA FECHA: Octubre del 2003 PARTIDA DE OBRA: PISO BLOQUE ROMANO 15.5X15.5X8 MEZCLA 1:9:15 ESP=0.03CMS UNIDAD: M2 ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

APLANADORA PLACA (NEUPRESA)

0.004

UNIDAD C/U

P.UNITARIO TOTAL ($) $45.71

SUB TOTAL:

DESCRIPCION

CANTIDAD

BLOQUE CUADRADO ROMANO 15.5X15.5X8 REGLA PACHA PINO CEMENTO ARENA TIERRA BLANCA TUBERIA PVC ø 1"

36.000 0.200 0.032 0.042 0.004 1.000

$0.17

UNIDAD

P.UNITARIO

TOTAL ($)

C/U VARA BLS M3 M3 ML

$0.34 $0.35 $4.91 $17.14 $13.22 $0.78

$12.24 $0.07 $0.16 $0.72 $0.05 $0.78

SUB TOTAL:

3.

$0.17

$14.01

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

TOTAL ($)

SUB TOTAL:

4. MANO DE OBRA TRABAJADOR

SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL($)

$1.76 $0.14 $0.71 $0.71 $0.71

1 1 1 1 1

$1.76 $0.14 $0.71 $0.71 $0.71

1.00 0.50 0.19 0.84 1.00

$1.76 $0.07 $0.13 $0.60 $0.71

SUB TOTAL:

$3.27

1.04.01 ENLADRILLADO CON ADOQUIN 3.03.02 CANTEADO REGLA NIVELACION REVOLTURA SULACREADO

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$17.46

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT. 32% SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

VALOR TOTAL $5.59 $5.59

$23.04

ANALISIS DE COSTOS UNITARIOS PROYECTO: REMODELACION PARQUE ROMA FECHA: Octubre del 2003 PARTIDA DE OBRA: PISO DE BALDOSA DE COLOR DE 4X20X40 MEZCLA 1:6 UNIDAD: M2 ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO TOTAL ($)

SUB TOTAL:

DESCRIPCION

CANTIDAD

CEMENTO ARENA BALDOSA DE CONCRETO 4X20X40 REGLA PACHA PINO COSTANERA DE PINO

0.110 0.040 12.500 0.900 0.280

UNIDAD

P.UNITARIO

TOTAL ($)

BLS M3 C/U VARA VARA

$4.91 $17.14 $0.29 $0.35 $0.47

$0.54 $0.69 $3.63 $0.32 $0.13

SUB TOTAL:

3.

$-

$5.30

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

SUB TOTAL:

TOTAL ($)

$-

4. MANO DE OBRA TRABAJADOR

SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL($)

2.31 0.71 0.05

1 1 1

$2.31 $0.71 $0.05

1.00 0.10 2.00

$2.31 $0.07 $0.10

SUB TOTAL:

$2.48

1.04.02 ENLADRILLADO BALDOSA HECHURA MEZCLA HECH. Y COLOCACIÓN RIOSTRADO

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$7.78

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT.

VALOR TOTAL

32%

$2.49

SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

$2.49

$10.27

ANALISIS DE COSTOS UNITARIOS PROYECTO: REMODELACION PARQUE ROMA FECHA: del 2003 PARTIDAOctubre DE OBRA: BORDILLO DE BALDOSA COLOR ROJO ( INC. BORDE DE CONCRETO 10X5 CMS )

CONCRETO 1:2:4 ESQUEMA:

1.

UNIDAD:

ML

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO TOTAL ($)

SUB TOTAL:

DESCRIPCION

CANTIDAD

BALDOSA DE CONCRETO 4X20X40 CEMENTO ARENA GRAVA

2.500 0.070 0.024 0.004

UNIDAD

P.UNITARIO

TOTAL ($)

C/U BLS M3 M3

$0.29 $4.91 $17.14 $33.37

$0.73 $0.34 $0.41 $0.13

SUB TOTAL:

3.

$1.61

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

TOTAL ($)

SUB TOTAL:

4. MANO DE OBRA SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL($)

1.12.22 PEGAMENTO BALDOSOA ( c/u)

TRABAJADOR

$2.31

1

$2.31

0.20

$0.46

HECHURA DE CONCRETO

$0.71

1

$0.71

0.30

$0.21

SUB TOTAL:

$0.68

( h.h)

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$2.29

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT. 32% SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

ANALISIS DE COSTOS UNITARIOS

VALOR TOTAL $0.73 $0.73

$3.02

PROYECTO: REMODELACION PARQUE ROMA FECHA: Octubre del 2003 PARTIDA DE OBRA: CONCRETEADO TIPO ACERA S/ PIEDRA CUARTA CONCRETO 1:2:4 SISA @ 1.0 M. AFINADO CON ESCOBILLADO FINO UNIDAD: M2 ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

CONCRETERA 1 BOLSA

0.040

UNIDAD día

P.UNITARIO TOTAL ($) $17.46 SUB TOTAL:

DESCRIPCION

CANTIDAD

CEMENTO ARENA GRAVA REGLA PACHA PINO COSTANERA DE PINO PIEDRA CUARTA

0.460 0.026 0.039 0.050 0.070 0.190

$0.70

UNIDAD

P.UNITARIO

TOTAL ($)

BLS M3 M3 VARA VARA M3

$4.91 $17.14 $33.37 $0.35 $0.47 $9.11

$2.26 $0.45 $1.30 $0.02 $0.03 $1.73

SUB TOTAL:

3.

$0.70

$5.79

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

SUB TOTAL:

TOTAL ($)

$-

4. MANO DE OBRA TRABAJADOR

SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL(¢)

0.68 1.21 0.87

1 1 1

$0.68 $1.21 $0.87

1.00 0.89 1.00

$0.68 $1.08 $0.87

SUB TOTAL:

$2.63

EMPEDRADO CON PIEDRA CUARTA HECHURA Y LLENADO CONCRETO REPELLO Y ACABADO FINAL

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$9.11

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT. 32% SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

ANALISIS DE COSTOS UNITARIOS PROYECTO: REMODELACION PARQUE ROMA

VALOR TOTAL $2.92 $2.92

$12.03

FECHA: Octubre del 2003 PARTIDA DE OBRA: PISO CASCAJO POMEZ COLOREADO ESP=0.10CMS UNIDAD: ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO TOTAL ($)

SUB TOTAL:

DESCRIPCION

CANTIDAD

PIEDRA POMEZ COLORANTE

0.100 0.250

$-

UNIDAD

P.UNITARIO

TOTAL ($)

M3 LIBRA

$12.50 $1.90

$1.25 $0.48

SUB TOTAL:

3.

M2

$1.73

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

TOTAL ($)

SUB TOTAL:

4. MANO DE OBRA TRABAJADOR

SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL($)

$0.71 $0.71

1 1

$0.71 $0.71

1.00 1.00

$0.71 $0.71

SUB TOTAL:

$1.42

ACARREO COLOREADO, NIVELACION Y REGADO

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$3.15

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT. 32% SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

ANALISIS DE COSTOS UNITARIOS PROYECTO: REMODELACION PARQUE ROMA

VALOR TOTAL $1.01 $1.01

$4.15

FECHA: Octubre del 2003 PARTIDA DE OBRA: PISO DE CONCRETO CANCHA ESP=0.07 CMS S/ PIEDRA CUARTA CONCRETO 1:2:4 Y JUNTAS DE DILATACIÓN A 3.50 MTS. A.S. UNIDAD: M2 ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

HERRAMIENTAS METALICAS CONCRETERA 1 BOLSA

0.040 0.040

UNIDAD día día

P.UNITARIO TOTAL ($) $17.46 $17.46 SUB TOTAL:

DESCRIPCION

CANTIDAD

CEMENTO ARENA GRAVA REGLA PACHA PINO REGLA RIOSTRA DE PINO PIEDRA CUARTA ( se rehutilizara piedra de muro)

0.983 0.100 0.045 0.900 0.280 0.064

$1.40

UNIDAD

P.UNITARIO

TOTAL ($)

BLS M3 M3 VARA VARA M3

$4.91 $17.14 $33.37 $0.35 $0.47 $9.11

$4.83 $1.71 $1.50 $0.32 $0.13 $0.58

SUB TOTAL:

3.

$0.70 $0.70

$9.07

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

SUB TOTAL:

TOTAL ($)

$-

4. MANO DE OBRA TRABAJADOR

SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL($)

0.68 1.06 0.40 0.05

1 1 1 1

$0.68 $1.06 $0.40 $0.05

1.00 0.89 1.00 2.00

$0.68 $0.94 $0.40 $0.10

SUB TOTAL:

$2.12

EMPEDRADO CON PIEDRA CUARTA HECHURA Y LLENADO CONCRETO REPELLO Y ACABADO FINAL HECH. Y COLOCACIÓN RIOSTRADO

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$12.59

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT. 32% SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

ANALISIS DE COSTOS UNITARIOS PROYECTO: REMODELACION PARQUE ROMA

VALOR TOTAL $4.03 $4.03

$16.62

FECHA: Octubre del 2003 PARTIDA DE OBRA: PISO PIEDRA LAJA MEZCLA 1:9:15 ESP=0.03CMS UNIDAD: ESQUEMA:

1.

EQUIPO Y HERRAMIENTAS DESCRIPCION

CANTIDAD

APLANADORA PLACA (NEUPRESA)

0.004

UNIDAD C/U

P.UNITARIO TOTAL ($) $45.71

SUB TOTAL:

DESCRIPCION

CANTIDAD

PIEDRA LAJA REGLA PACHA PINO CEMENTO ARENA TIERRA BLANCA

1.000 0.200 0.032 0.042 0.004

$0.17

$0.17

UNIDAD

P.UNITARIO

TOTAL ($)

M2 VARA BLS M3 M3

$5.71 $0.35 $4.91 $17.14 $13.22

$5.71 $0.07 $0.16 $0.72 $0.05

SUB TOTAL:

3.

M2

$6.70

TRANSPORTE DESCRIPCION

CANTIDAD

UNIDAD

P.UNITARIO

TOTAL ($)

SUB TOTAL:

4. MANO DE OBRA TRABAJADOR

SUELDO

PREST.

JORN-TOTAL

RENDIM.

TOTAL($)

$3.04 $0.14 $0.71 $0.71 $0.71

1 1 1 1 1

$3.04 $0.14 $0.71 $0.71 $0.71

1.00 0.50 0.19 0.84 1.00

$3.04 $0.07 $0.13 $0.60 $0.71

SUB TOTAL:

$4.55

1.07.02 COLOCACIÓN LAJA 3.03.02 CANTEADO REGLA NIVELACION REVOLTURA SULACREADO

SUB-TOTAL COSTO DIRECTO (SUMA 1+2+3+4)

$11.43

5. COSTO INDIRECTO Y UTILIDAD DESCRIPCION INDIRECTOS Y UTILIDAD

PORCENT. 32% SUB TOTAL.

COSTO TOTAL PARTIDA ( $ )

VALOR TOTAL $3.66 $3.66

$15.09

Related Documents