1

INDICE PAGINAS INTRODUCCIÓN ......................................................................................................................3 CAPITULO I ..............................................................................................................................4 GENERALIDADES DEL CENTRO DE PRÁCTICAS ................................................................4 1.1. Objetivos de las prácticas pre-profesionales ..................................................................4 1.1.1. Objetivo general: ......................................................................................................4 1.1.2. Objetivos específicos: ..............................................................................................4 1.2. Centro de prácticas pre-profesionales .........................................................................4 1.2.1 Datos generales ........................................................................................................4 1.2.2. Estructura orgánica de la obra .................................................................................6 1.2.3 Organigrama de la obra ............................................................................................7 1.2.4. Funciones del personal en obra .............................................................................7 1.3. Datos generales de la obra ......................................................................................... 11 1.4. Características del proyecto ........................................................................................ 11 1.4.1. De la ubicación: .................................................................................................... 11 1.4.2. Descripción del Proyecto: ..................................................................................... 12 1.5. Presupuesto del Proyecto: .......................................................................................... 15 Tabla 1. Presupuesto y total de inversión de infraestructura del proyecto ............................ 15 CAPÍTULO II .......................................................................................................................... 16 ACTIVIDADES DESARROLLADAS ....................................................................................... 16 2.1. Duración de las prácticas pre-profesionales ............................................................... 16 2.2. Relación de las actividades realizadas ....................................................................... 16 2.3. Descripción de las principales actividades: ................................................................. 16 2.3.1. Apoyo en la revisión del expediente técnico: ....................................................... 17 2.3.2. Apoyo en el replanteo de Planos de la Obra: ....................................................... 17 2.3.3. Apoyo en la elaboración de la Documentación Técnica de Obra: ....................... 18 2.3.4.

Apoyo en la revisión de Especificaciones Técnicas: ..................................... 18

2.3.6. Apoyo en la revisión y elaboración de los Informes Mensuales: .......................... 19 2.3.7. Apoyo en la revisión y elaboración de Valorización de Maquinarias: .................. 19 2.4. Procedimiento de las actividades realizadas en obra y oficina: .................................. 19 2.4.1. Actividades realizadas en el Colegio de Alto Rendimiento COAR: ...................... 19 CAPÍTULO III ......................................................................................................................... 23 APORTE TECNICO - ACADEMICO ...................................................................................... 23 3.1. Valorización de la obra: “AMPLIACION DEL SERVICIO EDUCATIVO PROVISIONAL, DEL COLEGIO DE ALTO RENDIMIENTO (COAR) – TACNA” ........... 23 3.2. Digitalizado del cuaderno de obras perteneciente a: “AMPLIACION DEL SERVICIO EDUCATIVO PROVISIONAL, DEL COLEGIO DE ALTO RENDIMIENTO (COAR) – TACNA” ........................................................................................................................... 23 3.3. Elaboración del Metrado de la actividad: “MANTENIMIENTO DE LA FERIA REGIONAL AGRONÓMICA E INDUSTRIAL - TACNA EN EL DISTRITO GREGORIO ALBARRACÍN, PROVINCIA TACNA - REGIÓN TACNA” .............................................. 23

2 3.4. Elaboración del Plano Final para la actividad: “MANTENIMIENTO DE LA FERIA REGIONAL AGRONÓMICA E INDUSTRIAL - TACNA EN EL DISTRITO GREGORIO ALBARRACÍN, PROVINCIA TACNA - REGIÓN TACNA” .............................................. 24 CAPÍTULO IV ......................................................................................................................... 25 CONCLUSIONES Y RECOMENDACIONES ......................................................................... 25 4.1 CONCLUSIONES ......................................................................................................... 25 4.2 RECOMENDACIONES ................................................................................................ 25 BIBLIOGRAFIA ...................................................................................................................... 26 ANEXOS ................................................................................................................................ 27 Anexo 01…………………………………………………………………………………………..27 Anexo 02…………………………………………………………………………………………..27 Anexo 03…………………………………………………………………………………………..27 Anexo 04…………………………………………………………………………………………..27 Anexo 05…………………………………………………………………………………………..27 Anexo 06…………………………………………………………………………………………..27 Anexo 07…………………………………………………………………………………………..27 Anexo 08…………………………………………………………………………………………..27

INDICE DE TABLAS PAGINAS Tabla 1. Presupuesto y total de inversión de infraestructura del proyecto…………………………………………………………………………....15

INDICE DE FIGURAS PAGINAS

Figura 1. Ubicación departamental de la zona del proyecto…………………………...5 Figura 2. Fotografía Satelital de la zona donde se ejecuta la obra……………………5 Figura 3. Fotografía Satelital de la zona donde realice el trabajo de oficina…………6 Figura 4. Organigrama de la obra…………………………………………………………7 Figura 5. Ubicación del lugar donde se realizaron las practicas……………………..12 Figura 6. Ubicación del lugar donde se realizaron las practicas……………………..12 Figura 7. Ubicación del lugar donde se realizaron las practicas……………………..13

3

INTRODUCCIÓN El presente informe, tiene como finalidad describir el desarrollo de las actividades como practicante de ingeniería civil en el área de sub gerencia de obras para la ejecución de una obra de construcción.

La obra consistió en la construcción, mejoramiento y reforzamiento del colegio de alto rendimiento COAR de las aulas existentes y ambientes para el esparcimiento del alumnado en horas de receso.

Capítulo I, se encontraran todos los datos básico y principales de la obra e institución donde se realizó las practicas pre – profesionales, lo que se busca en este punto es describir el centro de trabajo en el que se desempeñó las labores de practicante.

Capítulo II: en esta parte se encontrará la información de todas las labores que se realizaron durante las horas de trabajo en el Área de Sub Gerencia de Obras. Cabe mencionar que la obra que figura en el contrato no fue la única en la que se desarrollaron las practicas, fueron un total de 3 obras en las que se realizó el apoyo como practicante durante el lapso de los 3 meses establecidos en el contrato.

Capítulo III: por ultimo en esta parte encontraremos el aporte para la institución mediante los trabajos que se desarrollaron de manera independiente y otras asignadas por el residente de obra (jefe inmediato).

4

CAPITULO I

GENERALIDADES DEL CENTRO DE PRÁCTICAS

1.1. Objetivos de las prácticas pre-profesionales 1.1.1. Objetivo general: 

Consolidar mi formación profesional como ingeniero civil poniendo en práctica los conocimientos adquiridos durante mi formación académica.

1.1.2. Objetivos específicos: 

Observar en campo el proceso constructivo de las actividades realizadas en obra y compararlos con el expediente técnico.



Fortalecer mis conocimientos sobre el manejo técnico y administrativo en el campo de la Ingeniería y construcción de Obras.



Tener conocimiento sobre el manejo de recursos humanos y materiales en toda obra civil.

1.2. Centro de prácticas pre-profesionales 

El lugar donde se llevó la mayor parte de las prácticas pre profesional fue en las instalaciones del GOBIERNO REGIONAL DE TACNA, en la oficina de Sub Gerencia de Obras.

1.2.1 Datos generales Nombre de la obra: “AMPLIACIÓN DEL SERVICIO EDUCATIVO PROVISIONAL DEL COLEGIO DE ALTO RENDIMIENTO (COAR) – TACNA”

5

Localización de la Obra

Código SNIP

: 373706

Departamento

: Tacna

Provincia

: Tacna

Distrito

: Tacna

Altitud

: 510 m.s.n.m.

Zona ecológica

: Baja

Región Geográfica

: Costa

Coordenadas

: 70.28° de longitud Oeste

: 18.05°de latitud Sur

Figura 1. Ubicación departamental de la zona del proyecto Fuente: Expediente Técnico.

Figura 2. Fotografía Satelital de la zona donde se ejecuta la obra Fuente: Google earth

6

GOB. REG. TACNA

Figura 3. Fotografía Satelital de la zona donde realice el trabajo de oficina Fuente: Google earth

1.2.2. Estructura orgánica de la obra Gerencia Regional de Infraestructura (GRI)

Está conformado por: Ing. Ulianov Farfán Kehuarucho: Gerente del área de infraestructura

Ing. Karina Nuñez Gonzales Sub Gerente de Obras Ing. Yuri Nilo Pacari Mamani Residente de Obra Ing. Adderly Alferez Quispe Asistente Técnico

7

1.2.3 Organigrama de la obra

Figura 4. Organigrama de la obra Fuente: Elaboración propia 1.2.4. Funciones del personal en obra a) Ingeniero supervisor 

Responder por las funciones técnicas y Administrativas necesarias realizadas en la obra.



Dar conformidad a los procesos constructivos y atender a las consultas del Residente.



Validar los registros en el cuaderno de obra las incidencias de importancia para la obra (consultas, propuestas, incidentes, avances físicos y financieros); en el caso de la utilización de materiales, mano de obra y equipos.



Validar las anotaciones realizadas por el Residente en el Cuaderno de Obra, sobre causales de generación de modificaciones al expediente técnico



Confirmar la fecha de término de Obra.



Dar conformidad al expediente técnico de post-construcción y al de pre liquidación.

8

b) Ingeniero residente 

Responder por las actividades técnicas y administrativas necesarias para ejecutar las obras.



Cumplir estrictamente con el expediente técnico y justificar cualquier modificación que advierta como necesaria para fines de una ejecución satisfactoria.



Requerir el abastecimiento de materiales y equipos en forma oportuna, de acuerdo con el cronograma de adquisición de materiales y requerimiento de los trabajos según corresponda.



Dar conformidad, mediante informes técnicos, a los servicios contratados cuando éstos hayan sido permitidos.



Registrar en el cuaderno de obra las incidencias de importancia para la obra (consultas, propuestas, incidentes, avances físicos y financieros); en el caso de la utilización de materiales, mano de obra y equipos. El registro debe ser diario.



Validar los registros de utilización de mano de obra y de equipos planteados por los responsables respectivos



Anotar en el cuaderno de obra las causales de generación de modificaciones al expediente técnico (plazo y presupuesto).



Elaboración de informes mensuales.



Presentar valorizaciones mensuales.



Formular y presentar el expediente técnico de post construcción.

c ) Asistente administrativo 

Requerimiento de materiales de construcción: el asistente administrativo debe formular los cuadros de necesidades de acuerdo a las necesidades de la obra y conforme al presupuesto analítico del plan de trabajo aprobado, salvo cualquier modificación que disponga el residente de obra, asimismo los requerimientos deben realizarse a tiempo conforme al cronograma de adquisición de materiales.

9



Es responsabilidad del asistente administrativo realizar el seguimiento exhaustivo de los cuadros de necesidades en las diferentes fases de su trámite administrativo.



El asistente administrativo se encarga del cumplimiento de los trámites administrativos en la fecha adecuada dentro de la entidad responsable. Elabora informes, solicitudes que son dadas por el Ingeniero Residente de Obra.

d) Asistente técnico 

El asistente técnico es la persona encargada de asistir al Ingeniero Residente de la Obra en aspectos técnicos, y otros que se sean asignados por el residente.



Se encarga de apoyar en la elaborar las valorizaciones mensuales de la obra, la planilla de metrados, y el control de avance físico y financiero. Asimismo, vela por el cumplimiento de la entrega de materiales, elabora cuadros de necesidades, solicitudes de cotización.



Apoyo en la elabora planos de replanteo, liquidación técnica de obra; en coordinación con Residente de Obra, y sirve como coordinador o nexo entre maestro de obra, almacenero y el Residente de Obra.

e)

Almacenero 

Realizar el stock de materiales semanales.



Coordinar movimientos de materiales en obra.



Controlar diariamente el ingreso y salida de los materiales que ingresan a obra.

f)



Realizar las coordinaciones para el mantenimiento de equipos.



Responsable de la recepción de materiales llegados a la obra.



Coordinar con el equipo técnico sobre la calidad de los materiales.



Mantener ordenado y al día los registros de almacén.

Guardián 

Encargado de salvaguardar los bienes ingresados en la obra y todo tipo de bien entrante y saliente en obra.

10



Relevo diario con almacén de obra.



Reporte diario a residencia.

g) Maestro de obra 

Es la persona encargada de organizar a los trabajadores de acuerdo a sus conocimientos; tiene mucha experiencia en la construcción.



Control y seguimiento de la ejecución de obra.



Interpretación de planos.



Recepción y organización de materiales, zonas de reunión, talleres, etc.



Control de los medios y la maquinaria de obra.



Control de los materiales.



Supervisión y verificación de los procesos y resultados de los trabajos.



Control de calidad.



Control del cumplimiento de las medidas de prevención de riesgos laborales.

h) Operario

Es la persona especializada, sobre quien recae la responsabilidad de la correcta realización de alguna partida específica. Tiene la experiencia necesaria para su especialidad.

i)



Carpintero encofrador



Fierrero



Albañiles



Gasfitero



Electricista



Ebanistería



Operario de Equipos



Operario de maquinaria pesada

Oficial 

Es el obrero que aún no ha alcanzado la plena calificación de la especialidad. Tiene regular experiencia.

11

j) 

Peón

Obrero no calificado, apoyo y/o ayudantes, se desempeñan generalmente como excavadores, carretilleros, cargadores, limpieza y apoyo en general.

1.3. Datos generales de la obra

: “AMPLIACION DEL SERVICIO EDUCATIVO

Nombre del Proyecto

PROVISIONAL, DEL COLEGIO DE ALTO RENDIMIENTO (COAR) – TACNA”

Modalidad

: Por Contrata

Ubicación

: Distrito de Tacna, Provincia Tacna

Supervisión

: Área de Supervisión del GRT

Residente

: Ing. Yuri Nilo Pacari Mamani

Monto De Ejecución De Obra

: S/. 2’648,503.70 Soles

Elaboración De Expediente

: S/. 52,282.00 Soles

Código Snip

: 373706

Plazo Ejecución Contractual

: 120 días Calendarios

1.4. Características del proyecto 1.4.1. De la ubicación: La obra se encuentra ubicado cerca de la Carretera Panamericana Sur

12

Figura 5. Ubicación del lugar donde se realizaron las practicas Fuente: Google earth.

1.4.2. Descripción del Proyecto:

Módulo 1: Servicio de alimentación

Figura 6. Ubicación del lugar donde se realizaron las practicas Fuente: Plano de Ubicación

13

Módulo 2: Residencia Módulo 3: Laboratorios Módulo 4: Servicios Higiénicos Construcción de Cerco Perimétrico y Caseta de Vigilancia Figura 7. Ubicación del lugar donde se realizaron las practicas Fuente: Plano de Ubicación

a) Módulo 1:

En el módulo 1 podemos encontrar la zona donde los escolares, profesores y otros miembros administrativos podrán almorzar y compartir las horas de esparcimiento.

Esta zona o área de trabajo ya se encontraba terminada casi en su totalidad cuando yo empecé mis labores de practicante y no pude ver mucho su proceso constructivo más si su avance plasmado en diagramas y valorizaciones. b) Módulo 2:

En esta zona se encontraran cuartos para a el los alumnos pues está claro que en colegio de alto rendimiento hay alumnado de toda la Región Tacna.

En estos momentos se han instalado en dicha zona las casetas de Residencia de obra provisionalmente. Esta zona durante mi labor de practicante aún no se encontraba construida solo habían conexiones sanitarias.

14

c) Módulo 3:

En este módulo se encontrara el área de Laboratorios con todo el implemento de material necesario y otorgado al Colegio de Alto Rendimiento.

La situación de esta área en el tiempo que estuve de practicante ya se encontraba construida y solo hacía falta la colocación de materiales que se solicitaron por la institución Colegio de Alto Rendimiento COAR.

d) Módulo 4:

En este módulo se encuentran los SSHH de las instalaciones del COAR para el uso de alumnos y profesores.

Esta área se encontraba en ejecución cuando entré de practicante a la obra pero hubo retrasos durante los 3 meses que me encontré ahí pues la falta de cemento era casi muy seguida y temporalmente se paralizaban labores.

e) Construcción de cerco perimétrico y caseta de vigilancia:

El cerco perimétrico se encarga de separar lavía pública y terrenos colindantes y cuenta con una caseta que se encontraba en ese entonces en construcción.

Durante mis 3 meses de practicante pude ver la ejecución de esta área o frente de trabajo pues faltaban detalles y la construcción de la caseta de vigilancia que constaba de una estructura de concreto armado.

15

1.5. Presupuesto del Proyecto: Presupuesto Base Actividades Generales Previas a la

70,057.72

Ejecución Módulo 1: Servicios de Alimentación

61,40762

Módulo 2: Residencia

272,623.74

Módulo 3: Laboratorios

116,073.29

Módulo 4: Servicios Higiénicos

49,751.13

Construcción de Cerco Perimétrico y

217,880.29

Caseta de Vigilancia Losa Deportiva

111,285.75

Áreas de Circulación

93,386.96

Instalaciones Sanitarias

246,045.21

Instalaciones Eléctricas

508,546.54

Mitigación y Control Ambiental

7,141.82 ************************

Costo Directo

1’754,200.06

Gastos Generales (11%)

192,962.01

Utilidad (6%)

105,252.00 ************************

Sub Total

2’052,414.07

IGV (18%)

369,434.53 ************************

Costo de Obra

2’421,848.60

Gastos de Estudio

52,282.00

Gastos de Supervisión (5%)

121,092.43

Gastos de Liquidación (1.2%)

29,062.18

Gastos Administrativos (1%)

24,218.49 ************************

Total de Presupuesto

2’648,503.70

Tabla 1. Presupuesto y total de inversión de infraestructura del proyecto Fuente: Modelo 3D del Expediente Técnico

16

CAPÍTULO II

ACTIVIDADES DESARROLLADAS

2.1. Duración de las prácticas pre-profesionales Las prácticas pre-profesionales se realizaron durante los meses de Junio, Julio, Agosto, Septiembre, en periodo continuo, siendo la fecha de inicio 5 de Junio del 2017 hasta el 5 de Septiembre del 2017. Las prácticas tuvieron una duración de 90 días calendario, cumpliendo con la cantidad mínima de 90 días en período continuo. 2.2. Relación de las actividades realizadas Las actividades realizadas en la obra: “AMPLIACION DEL SERVICIO EDUCATIVO PROVISIONAL DEL COLEGIO DE ALTO RENDIMIENTO (COAR) TACNA” en calidad de practicante tanto en obra y oficina se detalla en los siguientes: 

Revisión del Expediente Técnico.



Apoyo en el replanteo de planos de la obra.



Apoyo en la elaboración de la documentación técnica de obra.



Apoyo en la elaboración de los términos de referencia.



Apoyo en la elaboración de los informes mensuales.



Apoyo en la elaboración de valorización de personal, materiales.



Apoyo en la elaboración de valorización de maquinarias.



Apoyo en las actividades en obra.



Otras funciones encomendadas por el residente de obra.

17

2.3. Descripción de las principales actividades: 2.3.1. Apoyo en la revisión del expediente técnico: Como primera actividad se realizó el estudio del expediente técnico para tener conocimiento en qué consiste la obra y cuáles son las metas físicas que se tienen que cumplir al final de la obra. 

Apoyo en la revisión de las especificaciones técnicas:  Proceso constructivo  Calidad de materiales  Ensayos o parámetros de control de calidad  Unidad de medida  Formas de pago y valorizaciones



Apoyo en la revisión de planos para llevar el control de los niveles y la ubicación correcta de los elementos estructurales.



Apoyo en la revisión del Presupuesto, partidas y subpartidas.



Apoyo en la revisión de los precios unitarios, rendimientos y relación de insumos.

2.3.2. Apoyo en el replanteo de Planos de la Obra: 

Apoyo al Residente de obra en las modificaciones en los planos de Instalaciones Sanitarias, Instalaciones Eléctricas de la obra: “AMPLIACION DEL SERVICIO EDUCATIVO PROVISIONAL DEL COLEGIO DE ALTO RENDIMIENTO (COAR) – TACNA”.



Apoyo en la revisión y elaboración de planos de elevaciones de los Servicios Higiénicos de la obra: “AMPLIACION DEL SERVICIO EDUCATIVO PROVISIONAL DEL COLEGIO DE ALTO RENDIMIENTO (COAR) TACNA” pues no existían planos de dichos detalles.



De igual manera se realizó el replanteo de otros planos referentes a obras distintas que se encontraban en ejecución durante las actividades de practicante, dichos replanteos de otras obras fueron asignadas por el Residente de obra (jefe inmediato) con el fin de adquirir más experiencia en el ámbito laboral.

18

2.3.3. Apoyo en la elaboración de la Documentación Técnica de Obra: Este punto consiste en labor administrativa asignada por el Residente de obra tales actividades fueron: 

Escaneo de cuaderno de obras.



Fotocopiado de distintos documentos.



Foliado de expedientes técnicos e informes mensuales.



Ploteo de planos de obra.



Armado de informes mensuales.



Recepción de comprobantes de pago.



Envio de informes mensuales a supervisión.

2.3.4. Apoyo en la revisión de Especificaciones Técnicas: Apoyo en la revisión de Especificaciones Técnicas del Expediente técnico “AMPLIACIÓN DEL SERVICIO EDUCATIVO PROVISIONAL DEL COLEGIO DE ALTO RENDIMIENTO (COAR) – TACNA”. 

Uso del software SIGA (Sistema Integrado de Gestión Administrativa); cabe mencionar que su manejo es solo para personal del gobierno regional de Tacna.



La revisión de las especificaciones técnicas se realizó en base al uso y maniobrabilidad de los materiales que se emplean.

2.3.5. Apoyo en la verificación de Metrados de Obra:

Una de las actividades realizadas fue la verificación de los metrados de algunas partidas del expediente Técnico de la Obra “AMPLIACIÓN DEL SERVICIO

19

EDUCATIVO PROVISIONAL DEL COLEGIO DE ALTO RENDIMIENTO (COAR) – TACNA”, con el objeto de hacer los cuadros de necesidades de los materiales a utilizar en la obra, se debe mencionar que el tipo de metrado que se realizo fue mediante Software (Auto CAD). 2.3.6. Apoyo en la revisión y elaboración de los Informes Mensuales: Se fue otorgada por el Ingeniero Residente la responsabilidad de realizar la revisión del informe mensual ya elaborado, de encontrarse algún error debía hacerse una observación y notificarla inmediatamente al Ingeniero Residente o en su defecto al Asistente Técnico para la corrección inmediata para luego proceder a la presentación final ante la supervisión de la entidad. 2.3.7. Apoyo en la revisión y elaboración de Valorización de Maquinarias: Se realizó la valorización de la maquinaria del mes de junio y la revisión de la valorización de los meses de abril y mayo.

Para complementar dicho trabajo fue permitido la visita a obra por el Residente, para la obtención de imágenes de las maquinarias que se estaban empleando en obra. 2.4. Procedimiento de las actividades realizadas en obra y oficina: 2.4.1. Actividades realizadas en el Colegio de Alto Rendimiento COAR: 2.4.1.1. Actividad en Oficina: a) Primer mes:

Se realizaron labores de apoyo administrativo las cuales fueron asignadas por el Residente de obra (jefe directo), cabe resaltar que dichas actividades se desarrollaron en las instalaciones Gobierno Regional de Tacna ubicado en la dirección Hipolito Unanue 1269.

Las actividades consistieron en las siguientes: 

Revisión del Expediente Técnico Obra “AMPLIACIÓN DEL SERVICIO EDUCATIVO PROVISIONAL DEL COLEGIO DE ALTO RENDIMIENTO (COAR) – TACNA”.

20



Recepción y revisión de comprobantes de pago correspondiente a la obra “AMPLIACIÓN DEL SERVICIO EDUCATIVO PROVISIONAL DEL COLEGIO DE ALTO RENDIMIENTO (COAR) – TACNA”.



Armado de informes mensuales (fotocopiado y armado físico)



Replanteo de planos correspondientes a las siguientes obras:  “AMPLIACIÓN DEL SERVICIO EDUCATIVO PROVISIONAL DEL COLEGIO DE ALTO RENDIMIENTO (COAR) – TACNA”.  “MANTENIMIENTO DE LA VIA DE INGRESO AL DISTRITO DE ESTIQUE – PROVINCIA DE TARATA – TACNA 2016”.



Ploteo de los Replanteos.



Foleado de expedientes técnicos y cualquier otro documento administrativo.

Estas actividades se realizaron durante el mes de Junio del 2017, el Residente de Obra (jefe directo) al asignar estas tareas básicas puede evaluar las capacidades del practicante en el ámbito laboral rutinario de oficina, pues dichas tareas no demandan una complejidad en su desarrollo pero sirven para poder identificar el compromiso del practicante con cada trabajo asignado.

b) Segundo mes:

Durante el periodo del mes de Julio del 2017, la asignación de responsabilidades incrementa pues ya existe una imagen formada del practicante para con el Residente de Obra.

Las actividades consistieron en las siguientes: 

Apoyo en la elaboración de informes mensuales de la obra: “AMPLIACION DEL SERVICIO EDUCATIVO PROVISIONAL, DEL COLEGIO DE ALTO RENDIMIENTO (COAR) – TACNA”.



Apoyo en la revisión y elaboración de valorizaciones de la obra: “AMPLIACION DEL SERVICIO EDUCATIVO PROVISIONAL, DEL

21

COLEGIO DE ALTO RENDIMIENTO (COAR) – TACNA”, de los meses Enero, Febrero, Marzo (revisión) Abril, Mayo, Junio, Julio (elaboración). 

Apoyo en la elaboración de planos de elevaciones, planos topográficos, dibujo de letras y señales de tránsito en AUTOCAD, la elaboración de los planos topográficos y de dibujo de señales de tránsito y letras de transito fue para la actividad: “MANTENIMIENTO DE LA VIA DE INGRESO AL DISTRITO DE ESTIQUE – PROVINCIA DE TARATA – TACNA 2016”.



Apoyo en la revisión y elaboración de valorizaciones de maquinarias de la Obra: “AMPLIACION DEL SERVICIO EDUCATIVO PROVISIONAL, DEL COLEGIO DE ALTO RENDIMIENTO (COAR) – TACNA, cabe resaltar que se realizó la valorización de la maquinaria del mes de junio y la revisión de la valorización de los meses de abril y mayo.



Obtención de kardex de la obra: “AMPLIACION DEL SERVICIO EDUCATIVO PROVISIONAL, DEL COLEGIO DE ALTO RENDIMIENTO (COAR) – TACNA”, esto con el fin de digitalizar dicha información en la base de datos de la oficina.



Revisión del cuaderno de obras referente a la maquinaria usada en los meses de Abril, Mayo, Junio, julio y Agosto.

c) Tercer mes:

Durante el mes de Agosto del 2017 las actividades realizadas se llevaron a cabo dentro de las oficinas del Gobierno Regional de Tacna en el Área de Subgerencia de Obras y en la obra: “MANTENIMIENTO DE LA FERIA REGIONAL AGRONÓMICA E INDUSTRIAL - TACNA EN EL DISTRITO GREGORIO ALBARRACÍN, PROVINCIA TACNA - REGIÓN TACNA”.

Las actividades fueron las siguientes: 

Apoyo en la elaboración del informe final de la Actividad: “MANTENIMIENTO DE LA VIA DE INGRESO AL DISTRITO DE ESTIQUE – PROVINCIA DE TARATA – TACNA 2016”.

22



Durante esta etapa de las prácticas, la obra: “AMPLIACION DEL SERVICIO EDUCATIVO PROVISIONAL, DEL COLEGIO DE ALTO RENDIMIENTO (COAR) – TACNA”, se vio en problemas administrativos en cuanto a la presentación del informe mensual correspondiente al mes de agosto.



Se realizó la digitalización del cuaderno de obras de la: “AMPLIACION DEL SERVICIO EDUCATIVO PROVISIONAL, DEL COLEGIO DE ALTO RENDIMIENTO (COAR) – TACNA”, para una correcta revisión de los materiales y maquinarias usadas durante todo el proceso constructivo de la obra.



Apoyo en la modificación de los planos correspondientes a la actividad: “MANTENIMIENTO DE LA FERIA REGIONAL AGRONÓMICA E INDUSTRIAL - TACNA EN EL DISTRITO GREGORIO ALBARRACÍN, PROVINCIA TACNA - REGIÓN TACNA”.



Se realizó la revisión de los metrados de la actividad: “MANTENIMIENTO DE LA FERIA REGIONAL AGRONÓMICA E INDUSTRIAL - TACNA EN EL DISTRITO GREGORIO ALBARRACÍN, PROVINCIA TACNA - REGIÓN TACNA”, se pidió una modificación en los planos (Replanteo) y por ende realizar un nuevo presupuesto.



Apoyo en la elaboración de las valorizaciones correspondientes a la actividad: “MANTENIMIENTO DE LA FERIA REGIONAL AGRONÓMICA E INDUSTRIAL - TACNA EN EL DISTRITO GREGORIO ALBARRACÍN, PROVINCIA TACNA - REGIÓN TACNA”, esta tarea se realizó en campo.

23

CAPÍTULO III

APORTE TECNICO - ACADEMICO Se procederá a mostrar las actividades que se realizaron: 3.1. Valorización de la obra: “AMPLIACION DEL SERVICIO EDUCATIVO PROVISIONAL, DEL COLEGIO DE ALTO RENDIMIENTO (COAR) – TACNA” Valorización del mes de Junio de la Obra: “AMPLIACION DEL SERVICIO EDUCATIVO PROVISIONAL, DEL COLEGIO DE ALTO RENDIMIENTO (COAR) – TACNA”

Revisar Anexo 01: Valorización COAR mes de Junio 2017

3.2. Digitalizado del cuaderno de obras perteneciente a: “AMPLIACION DEL SERVICIO EDUCATIVO PROVISIONAL, DEL COLEGIO DE ALTO RENDIMIENTO (COAR) – TACNA” En esta actividad se realizó el proceso de digitalizado del cuaderno de obra, pero solo desde el último cambio de residente siendo este el Ing. Yuri Nilo Pacari Mamani.

Revisar Anexo 02: Cuadro de maquinaria y equipos Revisar Anexo 03: Cuadro de mano de obra Revisar Anexo 04: Cuadro de materiales

3.3. Elaboración del Metrado de la actividad: “MANTENIMIENTO DE LA FERIA REGIONAL AGRONÓMICA E INDUSTRIAL - TACNA EN EL DISTRITO GREGORIO ALBARRACÍN, PROVINCIA TACNA - REGIÓN TACNA” En esta actividad se elaboró el metrado del replanteo de la actividad: “MANTENIMIENTO DE LA FERIA REGIONAL AGRONÓMICA E INDUSTRIAL TACNA EN EL DISTRITO GREGORIO ALBARRACÍN, PROVINCIA TACNA REGIÓN TACNA” Revisar Anexo 05: Metrado del rollizo de eucalipto Revisar Anexo 06: Metrado de instalaciones Sanitarias

24

3.4. Elaboración del Plano Final para la actividad: “MANTENIMIENTO DE LA FERIA REGIONAL AGRONÓMICA E INDUSTRIAL - TACNA EN EL DISTRITO GREGORIO ALBARRACÍN, PROVINCIA TACNA - REGIÓN TACNA” En esta actividad se pidó una propuesta para el plano final de la actividad “MANTENIMIENTO DE LA FERIA REGIONAL AGRONÓMICA E INDUSTRIAL TACNA EN EL DISTRITO GREGORIO ALBARRACÍN, PROVINCIA TACNA REGIÓN TACNA”, que se tomaría en cuenta si dicho plano está correctamente elaborado. Revisar Anexo 07: Plano de la actividad: “MANTENIMIENTO DE LA FERIA REGIONAL AGRONÓMICA E INDUSTRIAL - TACNA EN EL DISTRITO GREGORIO ALBARRACÍN, PROVINCIA TACNA - REGIÓN TACNA”

25

CAPÍTULO IV

CONCLUSIONES Y RECOMENDACIONES

4.1 CONCLUSIONES 

Las Prácticas Pre profesionales realizadas en el Gobierno Regional de Tacna, Área de Sub Gerencia de Obras fueron beneficiosas para la madures profesional que se quiere lograr como ingeniero civil tanto en trabajo de gabinete (oficina) y en campo (lugar de la obra).



Durante la etapa de construcción se presentaron muchos factores que influyeron en el retraso de la obra, principalmente fueron la falta de materiales y la ausencia de maquinaria fueron los principales causales.



En la etapa del desarrollo de la actividad: “MANTENIMIENTO DE LA FERIA REGIONAL AGRONÓMICA E INDUSTRIAL - TACNA EN EL DISTRITO GREGORIO ALBARRACÍN, PROVINCIA TACNA - REGIÓN TACNA”, se pudo aprender el correcto inventariado de los materiales y herramientas que se emplean para la construcción en este caso el mantenimiento del complejo La Agronomica.



El apoyo en la formulación de informes y otros documentos administrativos fueron de importancia para no generar retrasos en la presentación de esto.



El apoyo en los replanteos sirvió para obtener mayor habilidad con la elaboración de planos, de igual manera para llevar a cabo un correcto metrado y por ende realizar un presupuesto óptimo.

4.2 RECOMENDACIONES 

Es necesario la organización y planificación en obra, la comunicación entre la parte técnica y la mano de obra, ya que de ello depende el logro y conclusión de una obra.



Planificar los trabajos de campo por medio de cronogramas que busquen el menor tiempo de desarrollo de las actividades a realizar. También se

26

observó que el avance de obra depende bastante del abastecimiento de materiales, de esta manera se recomienda solicitar por anticipado los materiales para la ejecución de una obra. 

Es necesario fortalecer la parte administrativa pues durante la ejecución de la obra se pueden presentar inconvenientes con la elaboración y presentación de informes mensuales los cuales pueden llevar atrasados mucho tiempo ya que esto uno de los principales puntos negativos y que nunca deben ocurrir en cualquier tipo de obra ya sea ejecutada por una entidad pública o privada.



Es recomendable mejorar las instalaciones del Área de Sub Gerencia de Obras pues las oficinas se encuentran muy desordenadas esto debido a su reducido tamaño y por ende esto genera un ambiente poco favorable para un correcto desempeño de actividades dentro de las oficinas.

BIBLIOGRAFIA  Reglamento Nacional de Edificaciones / ICG- 2016  Expediente Técnico del Proyecto: “AMPLIACION DEL SERVICIO EDUCATIVO PROVISIONAL, DEL COLEGIO DE ALTO RENDIMIENTO (COAR) – TACNA”  Ramos J. /Costos y Presupuestos en Edificaciones/ Cámara Peruana de la Construcción/ 8va Ed. Lima – Perú - 2003.  Ing. Jesús Ramos Salazar/Costos y Presupuestos en Edificaciones/ Lima - Perú: CAPECO 8va Ed. - 2006.  Vargas Neumann, Julio; Torrealva, Daniel y Blondet, Marcial / Manual Básico del Ingeniero Residente en Edificación / Lima - Perú: CAPECO 1era Ed.- 2007.  El Maestro de Obra, Tecnología de la Construcción / SENCICO.  Tecnología del Concreto / Ing. Flavio Abanto Castillo.  Manual de carreteras – Ministerio de transportes y comunicaciones (DG 2014)

27

ANEXOS: Anexo 01: Valorización COAR mes de Junio 2017. Anexo 02: Cuadro de maquinaria y equipos. Anexo 03: Cuadro de mano de obra. Anexo 04: Cuadro de materiales. Anexo 05: Metrado del rollizo de eucalipto. Anexo 06: Metrado de instalaciones Sanitarias. Anexo 07: Plano de la actividad: “MANTENIMIENTO DE LA FERIA REGIONAL AGRONÓMICA E INDUSTRIAL - TACNA EN EL DISTRITO GREGORIO ALBARRACÍN, PROVINCIA TACNA - REGIÓN TACNA”. Anexo 08: Planos de la obra: “AMPLIACION DEL SERVICIO EDUCATIVO PROVISIONAL, DEL COLEGIO DE ALTO RENDIMIENTO (COAR) – TACNA

ANEXOS

ANEXO 01: VALORIZACIÓN COAR MES DE JUNIO 2017. 1. VALORIZACION EXP. TECNICO

IT EM

01 01.01

D EC R IPC ION

UND

M ET .

P.U .

ACTIVIDADES GENERALES PREVIAS A LA EJECUCIÓN OBRAS PROVISIONALES

A C U M U LA D O A N T ER IOR

PA R C IA L

PA R C IA L

%

EJEC U T A D O JU N IO

PA R C IA L

%

79,093.69

78,280.77

98.97%

430.62

0.54%

20,641.76

20,443.52

99.04%

198.24

0.96%

A C U M U LA D O T OT A L

SA LD O POR EJEC U T A R

01.01.01

CARTEL DE IDENTIFICACION DE LA OBRA DE 2.40X3.60 M.

und

1.00

1,029.31

1,029.31

1.00

1,029.31

100.00%

0.00

0.00

0.00%

1.00

0.00

01.01.02

CASETA DE ALMACEN, GUARDIANIA Y OFICINA DEL RESIDENTE

m2

68.25

136.32

9,303.84

68.25

9,303.84

100.00%

0.00

0.00

0.00%

68.25

0.00

01.01.03

VESTUARIO Y SSHH

m2

19.20

149.49

2,870.21

19.20

2,870.21

100.00%

0.00

0.00

0.00%

19.20

0.00

01.01.04

CERCO PROVISIONAL CON MALLA ARPILLERA

m

320.00

18.82

6,022.40

320.00

6,022.40

100.00%

0.00

0.00

0.00%

320.00

0.00

01.01.05

ENERGIA ELECTRICA PROVISIONAL

glb

1.00

885.00

885.00

0.86

761.10

86.00%

0.14

123.90

14.00%

1.00

0.00

01.01.06

AGUA Y DESAGÜE PROVISIONAL PARA LA CONSTRUCCION

glb

1.00

531.00

531.00

0.86

456.66

86.00%

0.14

74.34

14.00%

1.00

0.00

19,396.11

98.29%

0.00

0.00%

01.02

TRABAJOS PRELIMINARES

19,733.68

01.02.01

MOVILIZACION Y DESMOVILIZACION DE EQUIPO

glb

1.00

2,282.53

2,282.53

1.00

2,282.53

100.00%

0.00

0.00

0.00%

1.00

0.00

01.02.02

DESMONTAJE DE VENTANAS Y PUERTAS

m2

39.75

10.95

435.26

39.75

435.26

100.00%

0.00

0.00

0.00%

39.75

0.00

01.02.03

DESMONTAJE DE COBERTURA LIVIANA

m2

118.39

12.31

1,457.38

118.39

1,457.38

100.00%

0.00

0.00

0.00%

118.39

0.00

01.02.04

DESMONTAJE DE TABIQUERIA DRYWALL

m2

169.48

19.33

3,276.05

169.48

3,276.05

100.00%

0.00

0.00

0.00%

169.48

0.00

01.02.05

DESMONTAJE DE APARATOS SANITARIOS

und

2.00

25.48

50.96

2.00

50.96

100.00%

0.00

0.00

0.00%

2.00

0.00

01.02.06

DESMONTAJE DE ACCESORIOS SANITARIOS

und

1.00

12.06

12.06

1.00

12.06

100.00%

0.00

0.00

0.00%

1.00

0.00

01.02.07

DEMOLICION DE MESON DE CONCRETO

m3

2.71

70.86

192.03

2.71

192.03

100.00%

0.00

0.00

0.00%

2.71

0.00

01.02.08

DEMOLICION DE VIGAS Y COLUMNAS DE CºAº

m3

0.76

141.73

107.71

0.51

72.28

67.11%

0.00

0.00

0.00%

0.51

0.25

01.02.09

DEMOLICION DE ALBAÑILERIA

m2

25.08

10.20

255.82

15.18

154.84

60.53%

0.00

0.00

0.00%

15.18

9.90

01.02.10

DEMOLICION DE SOBRECIMIENTOS DE CONCRETO

m3

2.54

70.63

179.40

1.06

74.87

41.73%

0.00

0.00

0.00%

1.06

1.48

01.02.11

DEMOLICION DE PISOS DE CONCRETO SIMPLE INCL. CORTE

m2

17.56

14.17

248.83

17.56

248.83

100.00%

0.00

0.00

0.00%

17.56

0.00

01.02.12

ACARREO DE MATERIAL DEMOLIDO

m3

15.79

22.79

359.85

11.55

263.22

73.15%

0.00

0.00

0.00%

11.55

4.24

01.02.13

ELIMINACION DE MATERIAL DEMOLIDO C/MAQUINARIA

m3

15.79

9.23

145.74

15.79

145.74

100.00%

0.00

0.00

0.00%

15.79

0.00

01.02.14

TRAZO, NIVELES Y REPLANTEO PRELIMINAR GENERAL

m2

5,928.21

1.81

10,730.06

5,928.21

10,730.06

100.00%

0.00

0.00

0.00%

5928.21

0.00

22,256.90

98.77%

232.38

1.03%

01.03

SEGURIDAD Y SALUD

22,534.00

01.03.01

PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO

glb

1.00

2,500.00

2,500.00

1.00

2,500.00

100.00%

0.00

0.00

0.00%

1.00

0.00

01.03.02

EQUIPO DE PROTECCION INDIVIDUAL

und

30.00

466.40

13,992.00

30.00

13,992.00

100.00%

0.00

0.00

0.00%

30.00

0.00

01.03.03

EQUIPO DE PROTECCION COLECTIVO

glb

1.00

950.00

950.00

0.95

902.50

95.00%

0.04

38.00

4.00%

0.99

0.01

01.03.04

SEÑALIZACIÓN TEMPORAL DE SEGURIDAD ZONA DE TRABAJO

glb

1.00

1,662.00

1,662.00

0.95

1,578.90

95.00%

0.04

66.48

4.00%

0.99

0.01

01.03.05

CAPACITACION EN SEGURIDAD YSALUD

glb

1.00

2,500.00

2,500.00

0.96

2,400.00

96.00%

0.04

100.00

4.00%

1.00

0.00

01.03.06

RECURSO PARA RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE glb EL TRABAJO 1.00

930.00

930.00

0.95

883.50

95.00%

0.03

27.90

3.00%

0.98

0.02

16,184.24

100.00%

0.00

0.00%

01.04

MOVIMIENTO DE TIERRAS

16,184.24

01.04.01

CORTE CON MAQUINARIA EN TERRENO NORMAL

m3

587.01

6.17

3,621.85

587.01

3,621.85

100.00%

0.00

0.00

0.00%

587.01

0.00

01.04.02

RELLENO Y COMPACTACION C/MAQUINARIA (MATERIAL PRESTAMO)

m3

133.79

45.30

6,060.69

133.79

6,060.69

100.00%

0.00

0.00

0.00%

133.79

0.00

01.04.03

CARGUIO Y ELIMINACION DE MATERIAL EXCEDENTE DM=10KM

m3

704.41

9.23

6,501.70

704.41

6,501.70

100.00%

0.00

0.00

0.00%

704.41

0.00

30

IT EM

02 02.01

D EC R IPC ION

UND

M ET .

P.U .

A C U M U LA D O A N T ER IOR

PA R C IA L

MODULO 01: SERVICIOS DE ALIMENTACION (AMPLIACION) TRABAJOS PRELIMINARES

PA R C IA L

%

EJEC U T A D O JU N IO

PA R C IA L

%

68,461.44

68,461.44

100.00%

0.00

0.00%

1,184.86

1,184.86

100.00%

0.00

0.00%

A C U M U LA D O T OT A L

SA LD O POR EJEC U T A R

02.01.01

TRAZO NIVELES Y REPLANTEO

m2

424.68

1.77

751.68

424.68

751.68

100.00%

0.00

0.00

0.00%

424.68

0.00

02.01.02

LIMPIEZA DE TERRENO MANUAL

m2

424.68

1.02

433.17

424.68

433.17

100.00%

0.00

0.00

0.00%

424.68

0.00

40.02

100.00%

0.00

0.00%

02.02

OBRAS DE CONCRETO SIMPLE

40.02

02.02.01

SARDINEL CONCRETO F'C=175 KG/CM2

m3

0.05

298.61

14.93

0.05

14.93

100.00%

0.00

0.00

0.00%

0.05

0.00

02.02.02

ENCOFRADO Y DESENCOFRADO NORMAL PARA SARDINEL DE CONCRETO

m2

0.94

26.69

25.09

0.94

25.09

100.00%

0.00

0.00

0.00%

0.94

0.00

1,884.07

100.00%

0.00

0.00%

02.03 02.03.01

OBRAS DE CONCRETO ARMADO

1,884.07

1,884.07

100.00%

0.00

0.00%

02.03.01.01

MESON: CONCRETO F'C=175 KG/CM2

m3

2.05

288.67

591.77

2.05

591.77

100.00%

0.00

0.00

0.00%

2.05

0.00

02.03.01.02

MESON: ENCOFRADO Y DESENCOFRADO NORMAL

m2

23.86

34.84

831.28

23.86

831.28

100.00%

0.00

0.00

0.00%

23.86

0.00

02.03.01.03

MESON: ACERO DE REFUERZO FY=4200 KG/CM2

kg

101.10

4.56

461.02

101.10

461.02

100.00%

0.00

0.00

0.00%

101.10

0.00

28,376.02

100.00%

0.00

0.00%

02.04

MESON DE CONCRETO

1,884.07

MUROS Y TABIQUES

28,376.02

02.04.01

TABIQUE DRYWALL MIXTO SUPERBOARD SQ 8MM Y SUPERBOARD PRO 8MM, PARANTES m2 DE 89MM, 81.24 C/AISLAMIENTO 132.84 ACUST.

10,791.92

81.24

10,791.92

100.00%

0.00

0.00

0.00%

81.24

0.00

02.04.02

TABIQUE DRYWALL SUPERBOARD SQ 8mm, PARANTES DE 89MM, C/AISLAMIENTO ACUST. m2

30.38

133.58

4,058.16

30.38

4,058.16

100.00%

0.00

0.00

0.00%

30.38

0.00

02.04.03

TABIQUE DRYWALL SUPERBOARD PRO 8mm, PARANTES DE 89MM, C/AISLAMIENTO ACUST. m2

81.03

132.10

10,704.06

81.03

10,704.06

100.00%

0.00

0.00

0.00%

81.03

0.00

02.04.04

TABIQUERIA DE MELAMINE E=18MM CON MARCO DE ALUMINIO INC. PUERTA

25.74

109.63

2,821.88

25.74

2,821.88

100.00%

0.00

0.00

0.00%

25.74

0.00

7,850.44

100.00%

0.00

0.00%

7,850.44

100.00%

0.00

0.00%

118.39

0.00

6,175.67

100.00%

0.00

0.00%

02.05 02.05.01 02.06

m2

CIELO RASO FALSO CIELO RASO C/BALDOSA ACUSTICA C/SUSPENCION REBAJADA

7,850.44 m2

118.39

66.31

PISOS

7,850.44

118.39

6,175.67

0.00

02.06.01

PISO DE CERAMICO 45 X 45CM ANTIDESLIZANTE

m2

105.29

51.14

5,384.53

105.29

5,384.53

100.00%

0.00

0.00

0.00%

105.29

0.00

02.06.02

PISO DE CERAMICO 30 X 30CM ANTIDESLIZANTE

m2

15.47

51.14

791.14

15.47

791.14

100.00%

0.00

0.00

0.00%

15.47

0.00

3,039.84

100.00%

0.00

0.00%

02.07

ZOCALOS Y CONTRAZOCALOS

3,039.84

02.07.01

ZOCALO DE CERAMICO 25 X 40 CM

m2

51.62

51.49

2,657.91

51.62

2,657.91

100.00%

0.00

0.00

0.00%

51.62

0.00

02.07.02

CONTRAZOCALO DE CERAMICO H=0.10m

m

17.40

21.95

381.93

17.40

381.93

100.00%

0.00

0.00

0.00%

17.40

0.00

538.07

100.00%

0.00

0.00%

0.00

0.00%

10.45

0.00

0.00

0.00%

02.08 02.08.01 02.09

REVESTIMIENTOS ENCHAPE CON CERAMICO EN MESON DE CONCRETO

538.07 m2

51.49

538.07

10.45

11,202.81

02.09.01

PUERTA DE MADERA CEDRO C/MARCO DE 2"x4

02.09.02

PUERTA CONTRAPLACADA DE MADERA CEDRO C/TRIPLAY DE 4 MM + MARCO CEDROm2 2X4"

02.10

10.45

CARPINTERIA DE MADERA m2

538.07

100.00%

11,202.81

100.00%

0.00

10.08

399.20

4,023.94

10.08

4,023.94

100.00%

0.00

0.00

0.00%

10.08

0.00

29.28

245.18

7,178.87

29.28

7,178.87

100.00%

0.00

0.00

0.00%

29.28

0.00

2,342.16

100.00%

0.00

0.00%

CERRAJERIA

2,342.16

02.10.01

CERRADURA TIPO PARCHE EN PUERTA - 03 GOLPES

und

4.00

100.12

400.48

4.00

400.48

100.00%

0.00

0.00

0.00%

4.00

0.00

02.10.02

CERRADURA TIPO PERILLA

und

12.00

49.89

598.68

12.00

598.68

100.00%

0.00

0.00

0.00%

12.00

0.00

02.10.03

BISAGRA CAPUCHINA ALUMINIZADA 4"x4"

pza

68.00

19.75

1,343.00

68.00

1,343.00

100.00%

0.00

0.00

0.00%

68.00

0.00

736.25

100.00%

0.00

0.00%

02.11

VIDRIOS, CRISTALES Y SIMILARES

736.25

02.11.01

VENTANA TIPO SISTEMA CON VIDRIO DOBLE INCOLORO Y MARCO DE ALUMINIO

m2

4.44

142.63

633.28

4.44

633.28

100.00%

0.00

0.00

0.00%

4.44

0.00

02.11.02

VIDRIO DOBLE EN PUERTAS

p2

10.76

9.57

102.97

10.76

102.97

100.00%

0.00

0.00

0.00%

10.76

0.00

4,365.03

100.00%

0.00

0.00%

02.12

PINTURA

4,365.03

02.12.01

PINTURA LATEX EN MUROS INTERIORES Y EXTERIORES

m2

369.63

8.44

3,119.68

369.63

3,119.68

100.00%

0.00

0.00

0.00%

369.63

0.00

02.12.02

PINTURA BARNIZ 02 MANOS EN CARPINTERIA DE MADERA.

m2

78.72

15.82

1,245.35

78.72

1,245.35

100.00%

0.00

0.00

0.00%

78.72

0.00

726.20

100.00%

0.00

0.00%

726.20

100.00%

0.00

0.00%

424.68

0.00

02.13 02.13.01

03 03.01

VARIOS LIMPIEZA FINAL DE OBRA

726.20 m2

424.68

1.71

726.20

424.68

0.00

MODULO 02: RESIDENCIA

302,345.01

37,160.03

12.29%

13,655.15

0.00%

TRABAJOS PRELIMINARES

1,930.60

1,930.60

100.00%

0.00

0.00%

03.01.01

TRAZO NIVELES Y REPLANTEO

m2

691.97

1.77

1,224.79

691.97

1,224.79

100.00%

0.00

0.00

0.00%

691.97

0.00

03.01.02

LIMPIEZA DE TERRENO MANUAL

m2

691.97

1.02

705.81

691.97

705.81

100.00%

0.00

0.00

0.00%

691.97

0.00

11,601.84

97.06%

351.22

2.94%

362.41

72.31%

138.81

27.69%

14.66

0.00

03.02 03.02.01

MOVIMIENTO DE TIERRAS EXCAVACION MANUAL P/SARDINELES SUMERGIDOS

11,953.05 m3

14.66

34.19

501.23

10.60

4.06

IT EM

04 04.01

D EC R IPC ION

UND

M ET .

P.U .

A C U M U LA D O A N T ER IOR

PA R C IA L

MODULO 03: LABORATORIOS TRABAJOS PRELIMINARES

PA R C IA L

%

EJEC U T A D O JU N IO

PA R C IA L

%

128,972.24

3,788.13

2.94%

10,075.20

0.00%

569.86

569.86

100.00%

0.00

0.00%

A C U M U LA D O T OT A L

SA LD O POR EJEC U T A R

04.01.01

TRAZO NIVELES Y REPLANTEO

m2

204.25

1.77

361.52

204.25

361.52

100.00%

0.00

0.00

0.00%

204.25

0.00

04.01.02

LIMPIEZA DE TERRENO MANUAL

m2

204.25

1.02

208.34

204.25

208.34

100.00%

0.00

0.00

0.00%

204.25

0.00

3,218.27

88.01%

438.29

11.99%

04.02

MOVIMIENTO DE TIERRAS

3,656.56

04.02.01

EXCAVACION MANUAL P/SARDINELES SUMERGIDOS

m3

5.89

34.19

201.38

0.00

0.00

0.00%

5.89

201.38

100.00%

5.89

0.00

04.02.02

NIVELACION Y COMPACTACION PARA PISOS

m2

204.25

3.09

631.13

204.25

631.13

100.00%

0.00

0.00

0.00%

204.25

0.00

04.02.03

TERRAPLEN PARA PISOS E=0.10M

m2

204.25

12.44

2,540.87

204.25

2,540.87

100.00%

0.00

0.00

0.00%

204.25

0.00

04.02.04

ACARREO DE MATERIAL EXCEDENTE HASTA 30 MTS

m3

7.06

22.57

159.34

2.05

46.27

29.04%

5.01

113.08

70.96%

7.06

0.00

04.02.05

ELIMINACION DE MATERIAL EXCEDENTE

m3

7.06

17.54

123.83

0.00

0.00

0.00%

7.06

123.83

100.00%

7.06

0.00

0.00

0.00%

9,045.25

82.34%

04.03

OBRAS DE CONCRETO SIMPLE

10,984.75

04.03.01

SARDINEL SUMERGIDO F'C=175 KG/CM2

m3

5.51

336.35

1,853.29

0.00

0.00

0.00%

2.80

942.25

50.84%

2.80

2.71

04.03.02

PISO DE CONCRETO F'C=175 KG/CM2 E=10CM..ACAB. CEMENTO PULIDO INC. CORTE m2

53.35

42.97

2,292.45

0.00

0.00

0.00%

36.78

1,580.31

68.94%

36.78

16.57

04.03.03

PISO DE CONCRETO F'C=175 KG/CM2 E=10CM..ACAB. FROTACHADO INC. CORTE

m2

150.90

38.65

5,832.29

0.00

0.00

0.00%

150.90

5,832.29

100.00%

150.90

0.00

04.03.04

ENCOFRADO Y DESENCOFRADO NORMAL PARA GRADAS Y PISOS

m2

20.64

33.45

690.41

0.00

0.00

0.00%

20.64

690.41

100.00%

20.64

0.00

04.03.05

SARDINEL CONCRETO F'C=175 KG/CM2

m3

0.38

298.61

113.47

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

0.38

04.03.06

ENCOFRADO Y DESENCOFRADO NORMAL PARA SARDINEL DE CONCRETO

m2

7.60

26.69

202.84

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

7.60

0.00

0.00%

358.82

4.16%

04.04 04.04.01

OBRAS DE CONCRETO ARMADO

8,627.15

0.00

0.00%

0.00

0.00%

04.04.01.01

MESON: CONCRETO F'C=175 KG/CM2

m3

5.27

288.67

1,521.29

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

5.27

04.04.01.02

MESON: ENCOFRADO Y DESENCOFRADO NORMAL

m2

99.32

34.84

3,460.31

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

99.32

MESON: ACERO DE REFUERZO FY=4200 KG/CM2

kg

317.30

4.56

1,446.89

0.00

0.00

0.00%

0.00

0.00

317.30

0.00

0.00%

04.04.01.03 04.04.02

MESON DE CONCRETO

6,428.49

CASETA DE CONCRETO

2,198.66

0.00

0.00%

358.82

16.32%

04.04.02.01

CASETA: CONCRETO F'C=175 KG/CM2

m3

2.25

329.31

740.95

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

2.25

04.04.02.02

CASETA: ENCOFRADO Y DESENCOFRADO NORMAL

m2

25.93

38.92

1,009.20

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

25.93

CASETA: ACERO DE REFUERZO FY=4200 KG/CM2

kg

98.36

4.56

448.52

0.00

0.00

0.00%

78.69

358.82

80.00%

78.69

19.67

0.00

0.00%

0.00

0.00%

04.04.02.03 04.05

MUROS Y TABIQUES

31,579.06

04.05.01

TABIQUE DRYWALL MIXTO SUPERBOARD SQ 8MM Y SUPERBOARD PRO 8MM, PARANTES m2 DE 89MM, 158.72 C/AISLAMIENTO 132.84 ACUST.

21,084.36

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

158.72

04.05.02

TABIQUE DRYWALL SUPERBOARD PRO 8mm, PARANTES DE 89MM, C/AISLAMIENTO ACUST. m2

42.72

132.10

5,643.31

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

42.72

04.05.03

CERRAMIENTO VERTICAL Y HORIZONTAL C/DRYWALL SUPERBOARD ST 8MM , PARANTES m2 DE 89MM 53.16

91.26

4,851.38

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

53.16

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

91.38

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

177.41

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

150.90

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

85.32

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

81.33

0.00

0.00%

0.00

0.00%

04.06 04.06.01 04.07 04.07.01 04.08 04.08.01 04.09 04.09.01 04.10 04.10.01 04.11

REVOQUES ENLUCIDOS Y MOLDURAS TARRAJEO EN INTERIORES Y EXTERIORES MEZCLA 1:5 C:A E=1.5CM

2,338.41 m2

91.38

25.59

CIELO RASO FALSO CIELO RASO C/BALDOSA ACUSTICA C/SUSPENCION REBAJADA

m2

177.41

66.31

PISOS PISO DE CERAMICO 45 X 45CM ANTIDESLIZANTE

m2

150.90

51.14

11,764.06

0.00

7,717.03

0.00

4,393.13 m2

85.32

51.49

REVESTIMIENTOS ENCHAPE CON CERAMICO EN MESON DE CONCRETO

0.00

7,717.03

ZOCALOS Y CONTRAZOCALOS ZOCALO DE CERAMICO 25 X 40 CM

2,338.41 11,764.06

4,393.13

0.00

4,187.68 m2

81.33

51.49

CUBIERTAS

4,187.68

0.00

7,373.24

0.00 0.00 0.00 0.00 0.00

04.11.01

COBERTURA PERFIL GRAN ONDA 1.10 m X 2.40 m E=1.40 mm

m2

155.66

21.87

3,404.28

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

155.66

04.11.02

CUMBRERAS P/COBERTURA

m

26.70

62.31

1,663.68

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

26.70

04.11.03

CANALETA DE PLANCHA GALVANIZADA INCLUYE COLOCACION

m

53.40

43.17

2,305.28

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

53.40

0.00

0.00%

0.00

0.00%

04.12

CARPINTERIA DE MADERA

5,540.28

04.12.01

PUERTA DE MADERA CEDRO C/MARCO DE 2"x4

04.12.02

PUERTA CONTRAPLACADA DE MADERA CEDRO C/TRIPLAY DE 4 MM + MARCO CEDROm2 2X4"

04.13

CARPINTERIA METALICA

m2

11.52

399.20

4,598.78

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

11.52

3.84

245.18

941.49

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

3.84

0.00

0.00%

0.00

0.00%

23,843.06

IT EM

10 10.01 10.01.01 10.02

D EC R IPC ION

UND

M ET .

P.U .

INSTALACIONES ELECTRICAS GENERALES TRABAJOS PRELIMINARES TRAZO, NIVELACION Y REPLANTEO INST. ELECTRICAS

m

974.63

2.15

MOVIMIENTO DE TIERRAS

A C U M U LA D O A N T ER IOR

PA R C IA L

PA R C IA L

%

EJEC U T A D O JU N IO

PA R C IA L

%

579,785.96

38,562.65

6.65%

14,946.88

0.00%

2,095.45

2,095.45

100.00%

0.00

0.00%

2,095.45

100.00%

15,623.33

74.22%

2,095.45

974.63

21,049.57

0.00

0.00

0.00%

5,426.51

25.78%

A C U M U LA D O T OT A L

SA LD O POR EJEC U T A R

974.63

0.00

10.02.01

EXCAVACION MANUAL DE ZANJA P/TUBERIAS

m3

233.91

27.36

6,399.78

175.20

4,793.47

74.90%

58.71

1,606.31

25.10%

233.91

0.00

10.02.02

EXCAVACION MANUAL DE HUECO PARA PUESTA A TIERRA

m3

10.00

46.47

464.70

7.50

348.53

75.00%

2.50

116.18

25.00%

10.00

0.00

10.02.03

CAMA DE APOYO PARA TUBERIA DE 10CM.

m2

389.85

9.78

3,812.73

291.79

2,853.66

74.85%

98.07

959.08

25.15%

389.85

0.00

10.02.04

RELLENO COMPACTADO CON MATERIAL PROPIO

m3

194.93

27.17

5,296.25

146.09

3,969.35

74.95%

48.84

1,326.90

25.05%

194.93

0.00

10.02.05

RELLENO CON ARENA FINA

m3

38.99

69.39

2,705.52

29.40

2,040.00

75.40%

9.59

665.78

24.61%

38.99

0.00

10.02.06

ACARREO DE MATERIAL EXCEDENTE HASTA 30 MTS

m3

58.78

22.79

1,339.60

43.87

999.73

74.63%

14.91

339.87

25.37%

58.78

0.00

10.02.07

ELIMINACION DE MATERIAL EXCEDENTE

m3

58.78

17.54

1,031.00

35.27

618.60

60.00%

23.51

412.40

40.00%

58.78

0.00

0.00

0.00%

0.00

0.00%

10.03

ALAMBRES Y CABLES ELECTRICOS

73,649.55

10.03.01

CONDUCTOR CABLEADO 3-1X95+1X95MM2 N2XOH

m

270.00

181.08

48,891.60

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

270.00

10.03.02

CONDUCTOR CABLEADO 3X25+1X25+T10MM2 NHX-90

m

101.00

55.63

5,618.63

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

101.00

10.03.03

CONDUCTOR CABLEADO 3x6+1x6+T10 MM2 NHX-90

m

388.00

19.93

7,732.84

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

388.00

10.03.04

CONDUCTOR CABLEADO 2x10+T10 MM2 NHX-90

m

66.00

20.26

1,337.16

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

66.00

10.03.05

CONDUCTOR CABLEADO 2x6+T10 MM2 NHX-90

m

109.00

13.68

1,491.12

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

109.00

10.03.06

CONDUCTOR CABLEADO 2x6 MM2 N2XOH+1X4MM2 NH-80

m

284.28

5.79

1,645.98

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

284.28

10.03.07

CONDUCTOR CABLEADO 2X4+1X4 MM2 NH-80

m

336.00

7.57

2,543.52

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

336.00

10.03.08

CONDUCTOR CABLEADO 2X2.5+1X2.5 MM2 NH-80

m

668.00

6.15

4,108.20

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

668.00

10.03.09

CONDUCTOR CABLEADO 3X4+1X4 MM2 NH-80

m

30.00

9.35

280.50

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

30.00

0.00

0.00%

0.00

0.00%

10.04

ELECTRODUCTO DE PVC

72,517.62

10.04.01

SUMINIST. E INSTALACION DE ELECTRODUCTO HFT 20 mm

m

3,012.00

13.45

40,511.40

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

3012.00

10.04.02

SUMINIST. E INSTALACION DE ELECTRODUCTO HFT 35 mm

m

701.83

22.48

15,777.14

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

701.83

10.04.03

SUMINIST. E INSTALACION DE ELECTRODUCTO HFT 40 mm

m

80.80

31.45

2,541.16

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

80.80

10.04.04

SUMINIST. E INSTALACION DE ELECTRODUCTO HFT 90 mm

m

216.00

63.37

13,687.92

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

216.00

10.05

402.68

1.56%

0.00

0.00%

10.05.01

PLACAS Y ACCESORIOS SUMINIST. E INSTALACION DE SALIDA PARA CENTRO DE LUZ

pto

130.00

49.21

25,752.17 6,397.30

3.00

147.63

2.31%

0.00

0.00

0.00%

3.00

127.00

10.05.02

SUMINIST. E INSTALACION DE SALIDA PARA INTERRUPTOR UNIPOLAR

pto

53.00

51.01

2,703.53

2.00

102.02

3.77%

0.00

0.00

0.00%

2.00

51.00

10.05.03

SUMINIST. E INSTALACION DE SALIDA PARA TOMACORRIENTE

pto

84.00

51.01

4,284.84

2.00

102.02

2.38%

0.00

0.00

0.00%

2.00

82.00

10.05.04

SUMINIST. E INSTALACION DE SALIDA PARA LUZ DE EMERGENCIA

pto

37.00

51.01

1,887.37

1.00

51.01

2.70%

0.00

0.00

0.00%

1.00

36.00

10.05.05

SUMINIST. E INSTALACION DE TOMACORRIENTE DOBLE CON T/TIERRA

pza

73.00

69.89

5,101.97

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

73.00

10.05.06

SUMINIST. E INSTALACION DE TOMACORRIENTE DOBLE CON T/TIERRA A PRUEBA DEpza AGUA

11.00

72.24

794.64

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

11.00

10.05.07

SUMINIST. E INSTALACION DE INTERRUPTOR UNIPOLAR SIMPLE

pza

39.00

52.29

2,039.31

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

39.00

10.05.08

SUMINIST. E INSTALACION DE INTERRUPTOR UNIPOLAR DOBLE

pza

8.00

63.46

507.68

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

8.00

10.05.09

SUMINIST. E INSTALACION DE INTERRUPTOR UNIPOLAR TRIPLE

pza

2.00

47.46

94.92

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

2.00

10.05.10

SUMINIST. E INSTALACION DE INTERRUPTOR CONMUTACION SIMPLE

pza

4.00

49.89

199.56

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

4.00

10.05.11

SUMINIST. E INSTALACION DE CAJA DE PASO CUADRADA

pto

15.00

62.21

933.15

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

15.00

10.05.12

SUMINIST. E INSTALACION DE CAJA DE PASO Y CONEXIÓN

pto

15.00

53.86

807.90

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

15.00

IT EM

10.06

D EC R IPC ION

UND

M ET .

P.U .

28,068.06

PA R C IA L

%

EJEC U T A D O JU N IO

PA R C IA L

%

A C U M U LA D O T OT A L

SA LD O POR EJEC U T A R

0.00

0.00%

0.00

0.00%

10.06.01

SUMINIST. E INSTALACION ARTEF. FLUORESCENTE DOBLE 2X28W MASTER

pza

20.00

220.07

4,401.40

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

20.00

10.06.02

SUMINIST. E INSTALACION ARTEF. FLUORESCENTE DOBLE 2X28W MASTER INDIKO pza

22.00

165.77

3,646.94

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

22.00

10.06.03

SUMINIST. E INSTALACION BRAQUETE TIPO RSP L/AHORRADOR 2X18W

pza

26.00

153.97

4,003.22

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

26.00

10.06.04

SUMINIST. E INSTALACION DE LUZ DE EMERGENCIA LED 7.5W

pza

16.00

152.49

2,439.84

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

16.00

10.06.05

SUMINIST. E INSTALACION SPOT LIGHT LED 20W. P/EMPOTRAR

pza

23.00

180.07

4,141.61

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

23.00

10.06.06

SUMINIST. E INSTALACION GALAXIE L/AHORRADOR 2X18W

pza

23.00

180.07

4,141.61

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

23.00

10.06.07

SUMINIST. E INSTALACION REFLECTOR HALOGENURO METALICO 400W

pza

4.00

489.86

1,959.44

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

4.00

10.06.08

FAROLA TIPO ESPEFERICA E-35HALOGENURO METALICO 70W

pza

8.00

280.07

2,240.56

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

8.00

10.06.09

LUMINARIA VAPOR DE SODIO 70W

pza

4.00

273.36

1,093.44

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

4.00

0.00

0.00%

0.00

0.00%

10.07

LUMINARIAS Y ACCESORIOS ELECTRICOS

A C U M U LA D O A N T ER IOR

PA R C IA L

TABLERO DE DISTRIBUCION

14,176.80

10.07.01

TABLERO GENERAL TRIFÁSICO 12 CKTOS TG-02 SISTEMA DE BARRAS 380/230 V

1.00

2,041.45

2,041.45

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

1.00

10.07.02

TABLERO DE DISTRIBUCION TRIFÁSICO 8 CKTOS SISTEMA DE BARRAS 220/380V, TDA-01 und

1.00

1,251.45

1,251.45

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

1.00

10.07.03

TABLERO DE DISTRIBUCION TRIFASICO 8 CKTOS SISTEMA DE BARRAS 220V TDA-02und

1.00

1,560.85

1,560.85

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

1.00

10.07.04

TABLERO DE DISTRIBUCION TRIFÁSICO 10 CKTOS SISTEMA DE BARRAS 380V TDA-03und

1.00

1,285.15

1,285.15

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

1.00

10.07.05

TABLERO DE DISTRIBUCION MONOFASICO 4 CKTOS SISTEMA DE BARRAS 380V STDA-03.01 und

1.00

942.85

942.85

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

1.00

10.07.06

TABLERO DE DISTRIBUCION MONOFASICO 6 CKTOS SISTEMA DE BARRAS 220 - TDA-04 und

1.00

794.55

794.55

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

1.00

10.07.07

TABLERO DE DISTRIBUCION MONOFASICO 6 CKTOS TDA-05

1.00

763.65

763.65

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

1.00

10.07.08

SUB TABLERO DE DISTRIBUCION TRIFÁSICO 12 CKTOS SISTEMA DE BARRAS 230V TDA-06 und

1.00

1,351.75

1,351.75

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

1.00

10.07.09

SUB TABLERO DE DISTRIBUCION TRIFÁSICO 8 CKTOS SISTEMA DE BARRAS 380V STDA-06.01 und

1.00

930.05

930.05

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

1.00

10.07.10

TABLERO DE DISTRIBUCION TTRIFASICO 10 CKTOS SISTEMA DE BARRAS 220 - TDA-07 und

1.00

1,462.15

1,462.15

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

1.00

10.07.11

SUB TABLERO DE DISTRIBUCION TRIFÁSICO 6 CKTOS SISTEMA DE BARRAS 380V TDB-01 und ELECTROBOMBA 1.00 1,025.75

1,025.75

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

1.00

10.07.12

SUB TABLERO DE DISTRIBUCION TRIFASICO 6 CKTOS SISTEMA DE BARRAS 220V TDB-02 und ELECTROBOMBA 1.00 767.15

767.15

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

1.00

11,624.12

43.24%

1,672.06

6.22%

10.08

und

und

SISTEMA DE PROTECCION Y EMPALMES

26,881.48

10.08.01

SUMINIST. E INSTALACION DE EMPALME SUBTERRANEO

pto

60.00

71.79

4,307.40

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

60.00

10.08.02

SUMINIST. E INSTALACION DE CINTA VULCANIZANTE

pto

24.00

316.91

7,605.84

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

24.00

10.08.03

SUMINIST. E INSTALACION DE PUESTA A TIERRA

jgo

4.00

1,672.06

6,688.24

2.00

3,344.12

50.00%

1.00

1,672.06

25.00%

3.00

1.00

10.08.04

SUMINIST. E INSTALACION DE BUZON P/CONEXIÓN ELECTRICA

glb

9.00

920.00

8,280.00

9.00

8,280.00

100.00%

0.00

0.00

0.00%

9.00

0.00

1,545.54

24.68%

0.00

0.00%

10.09

OTROS

6,262.06

10.09.01

POSTE C.A.C. 9/300

und

2.00

772.77

1,545.54

2.00

1,545.54

100.00%

0.00

0.00

0.00%

2.00

0.00

10.09.02

PASTORAL Fo Go PS/1.00/0.50/ 1 1/2'' DIAM C/ABRAZADERA

und

4.00

124.25

497.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

4.00

10.09.03

POSTE ORNAMENTAL DE TUBO DE FoNo 4'' X 4M

und

8.00

302.44

2,419.52

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

8.00

10.09.04

PRUEBA Y MEDICIONES ELECTRICAS

glb

2.00

900.00

1,800.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

2.00

0.00

0.00%

0.00

0.00%

10.10

RED PRIMARIA

10.10.01

TRANSFORMADOR DE POTENCIA 75KVA TRIFASICO 10/0.40-0.23 KV

10.10.02

CONDUCTOR CABLEADO N2XOH 1X50MM2

10.10.03 10.10.04 10.11 10.11.01

20,384.66 und

1.00

16,337.24

16,337.24

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

1.00

m

80.00

39.15

3,132.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

80.00

TABLERO DE DISTRIBUCION C/ABRAZADERA

cjto

1.00

560.30

560.30

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

1.00

DESMONTAJE TRANSFORMADOR 50 KVA

und

1.00

355.12

355.12

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

1.00

7,271.53

4.94%

4,761.31

3.24% -19.68

INSTALACIONES DE COMUNICACIONES

147,074.32

1,801.23

85.74%

1,479.13

0.00%

10.11.01.01

MOVIMIENTO DE TIERRAS EXCAVACION MANUAL DE ZANJA P/TUBERIAS

m3

36.00

27.36

2,100.72 984.96

31.92

873.33

88.67%

23.76

650.07

66.00%

55.68

10.11.01.02

CAMA DE APOYO PARA TUBERIA DE 10CM.

m2

6.00

9.78

58.68

5.32

52.03

88.67%

1.32

12.91

22.00%

6.64

-0.64

10.11.01.03

RELLENO COMPACTADO CON MATERIAL PROPIO

m3

30.00

27.17

815.10

26.70

725.44

89.00%

28.98

787.39

96.60%

55.68

-25.68

10.11.01.04

ACARREO DE MATERIAL EXCEDENTE HASTA 30 MTS

m3

6.00

22.79

136.74

3.83

87.29

63.83%

0.80

18.23

13.33%

4.63

1.37

10.11.01.05

ELIMINACION DE MATERIAL EXCEDENTE

m3

6.00

17.54

105.24

3.60

63.14

60.00%

0.60

10.52

10.00%

4.20

1.80

IT EM

10.14.03

D EC R IPC ION

UND

M ET .

P.U .

1,100.82

PA R C IA L

%

EJEC U T A D O JU N IO

PA R C IA L

%

A C U M U LA D O T OT A L

SA LD O POR EJEC U T A R

0.00

0.00%

1,100.82

0.00%

10.14.03.01

SARDINEL SUMERGIDO F'C=175 KG/CM2

m3

0.74

336.35

248.90

0.00

0.00

0.00%

0.74

248.90

100.00%

0.74

0.00

10.14.03.02

PISO DE CONCRETO F'C=175 KG/CM2 E=10CM..ACAB. CEMENTO PULIDO INC. CORTEm2

16.93

42.97

727.48

0.00

0.00

0.00%

16.93

727.48

100.00%

16.93

0.00

10.14.03.03

ENCOFRADO Y DESENCOFRADO NORMAL PARA GRADAS Y PISOS

3.72

33.45

124.43

0.00

0.00

0.00%

3.72

124.43

100.00%

3.72

0.00

0.00

0.00%

1,279.86

0.00%

10.14.04

OBRAS DE CONCRETO SIMPLE

A C U M U LA D O A N T ER IOR

PA R C IA L

m2

OBRAS DE CONCRETO ARMADO

1,279.86

10.14.04.01

SARDINEL SUMERGIDO: CONCRETO F'C=175 KG/CM2

m3

0.57

336.35

191.72

0.00

0.00

0.00%

0.57

191.72

100.00%

0.57

0.00

10.14.04.02

LOSA ARMADA: CONCRETO F'C=175 KG/CM2

m2

3.77

42.97

162.00

0.00

0.00

0.00%

3.77

162.00

100.00%

3.77

0.00

10.14.04.03

LOSA ARMADA: ENCOFRADO Y DESENCOFRADO NORMAL

m2

24.71

33.45

826.55

0.00

0.00

0.00%

24.71

826.55

100.00%

24.71

0.00

10.14.04.04

LOSA ARMADA: ACERO DE REFUERZO FY=4200 KG/CM2

kg

21.84

4.56

99.59

0.00

0.00

0.00%

21.84

99.59

100.00%

21.84

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

46.53

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

13.80

0.00

0.00%

0.00

0.00%

10.14.05 10.14.05.01 10.14.06 10.14.06.01 10.14.07

MUROS Y TABIQUES

6,146.61

TABIQUE DRYWALL SUPERBOARD PRO 8mm, PARANTES DE 89MM, C/AISLAMIENTOm2 ACUST.

46.53

132.10

ZOCALOS Y CONTRAZOCALOS CONTRAZOCALO DE CERAMICO H=0.10m

6,146.61

0.00

302.91 m

13.80

21.95

CUBIERTAS

302.91

0.00

698.13

0.00 0.00

10.14.07.01

COBERTURA PERFIL GRAN ONDA 1.10 m X 2.40 m E=1.40 mm

m2

21.46

21.87

469.33

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

21.46

10.14.07.02

CANALETA DE PLANCHA GALVANIZADA INCLUYE COLOCACION

m

5.30

43.17

228.80

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

5.30

0.00

0.00%

0.00

0.00%

10.14.08

CARPINTERIA METALICA

2,006.38

10.14.08.01

TIJERAL T-6 C/PERFIL GALVANIZADO INC. IZADO Y MONTAJE

und

5.00

186.94

934.70

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

5.00

10.14.08.02

VIGUETA VG-1 C/PERFIL GALVANIZADO INC. MONTAJE

m

53.00

8.89

471.17

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

53.00

10.14.08.03

PUERTA METALICA C/MALLA COCADA SEGUN DETALLE

m2

4.16

104.36

434.14

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

4.16

10.14.08.04

VENTANA METALICA C/MALLA COCADA

m2

1.92

86.65

166.37

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

1.92

0.00

0.00%

0.00

0.00%

10.14.09

CERRAJERIA

258.12

10.14.09.01

CERRADURA TIPO PARCHE EN PUERTA - 03 GOLPES

und

1.00

100.12

100.12

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

1.00

10.14.09.02

BISAGRA CAPUCHINA ALUMINIZADA 4"x4"

pza

8.00

19.75

158.00

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

8.00

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

93.06

0.00

0.00%

0.00

10.14.10 10.14.10.01 10.14.11

PINTURA PINTURA LATEX EN MUROS INTERIORES Y EXTERIORES

785.43 m2

93.06

8.44

VARIOS

785.43

0.00

293.62

0.00

0.00

0.00%

244.61

0.00%

10.14.11.01

CURADO DE ESTRUCTURAS HORIZONTALES

m2

20.71

1.14

23.61

0.00

0.00

0.00%

20.71

23.61

100.00%

20.71

10.14.11.02

JUNTA DE 3/4" CON RELLENO MATERIAL ELASTOMERICO

m

13.80

17.00

234.60

0.00

0.00

0.00%

13.00

221.00

94.20%

13.00

0.80

10.14.11.03

LIMPIEZA FINAL DE OBRA

m2

20.71

1.71

35.41

0.00

0.00

0.00%

0.00

0.00

0.00%

0.00

20.71

11

7,779.35

95.82%

150.71

0.00%

11.01

MITIGACION Y CONTROL AMBIENTAL CAPACITACION PERMANENTE AL PERSONAL SOBRE SALUD AMBIENTAL

mes

3.00

450.00

1,350.00

2.88

1,296.00

96.00%

0.08

36.00

2.67%

2.96

0.04

11.02

CONTROL DE DESECHOS SOLIDOS

m2

200.00

5.09

1,018.00

192.30

978.81

96.15%

2.90

14.76

1.45%

195.20

4.80

11.03

READECUACION AMBIENTAL DE CASETA DE GUARDIANIA,ALMACEN Y OFICINA DEL RESIDENTE, m2 VESTUARIO 87.50 Y SS.HH. 3.42

299.25

80.60

275.65

92.11%

3.20

10.94

3.66%

83.80

3.70

11.04

CONTROL DE PROPAGACION DE PARTICULAS VOLATILES

m2

1,173.08

551.35

1,123.18

527.89

95.75%

0.00

0.00

0.00%

1123.18

49.90

11.05

REVISION PERIODICA DEL BUEN FUNCIONAMIENTO DE LOS EQUIPOS

mes

3.00

300.00

900.00

2.87

861.00

95.67%

0.08

24.00

2.67%

2.95

0.05

11.06

HABILITACION DE AREAS DE DESMONTE

glb

1.00

2,500.00

2,500.00

0.96

2,400.00

96.00%

0.02

50.00

2.00%

0.98

0.02

11.07

MITIGACION DE RUIDOS

glb

1.00

1,500.00

1,500.00

0.96

1,440.00

96.00%

0.01

15.00

1.00%

0.97

0.03

1.00 2.00

COSTO DIRECTO GASTOS GENERALES (11.00 %) ==============================

3.00

SUB PRESUPUESTO (CD + GG)

4.00 5.00 6.00 7.00 8.00 9.00

GASTOS DE ESTUDIO (2.41 % SP) GASTOS DE SUPERVISION (5.00 % SP) GASTOS DE LIQUIDACION GASTOS ADMINISTRATIVOS (1.00 % SP) ==============================

PRESUPUESTO TOTAL

8,118.60

0.47

1,954,072.39 S/. 214,947.96 ============

648,491.86 S/. 71,334.10 ============

S/. 2,169,020.35

S/. 719,825.97

S/. 52,282.00 S/. 108,451.02 S/. 26,028.24 S/. 21,690.20 ============

S/. 2,377,471.81

33.19%

104,193.83 S/. 11,461.32 ============

S/. 115,655.14

5.33%

2. VALORIZACION MAYORES METRADOS:

ITEM

DECRIPCION

UND

MET.

P.U.

ACUMULADO ACTUAL

PARCIAL

PARCIAL

%

ejecutado junio

PARCIAL

%

SALDO POR EJECUTAR

PARCIAL

%

08.03.02

CURADO DE ELEMENTOS HORIZONTALES

m2

91.44

1.14

104.24

70.23

80.07

76.81%

70.23

80.07

76.81%

21.21

24.18

08.03.03

SOLAQUEO EN BORDES DE VEREDAS DE CONCRETO

m2

13.08

5.22

68.28

13.08

68.28

100.00%

13.08

68.28

100.00%

0.00

0.00

0.00%

0.00

0.00%

0.00

0.00%

6,747.47

100.00%

08.04

INSTALACION DE AREAS VERDES

6,747.47

23.19%

08.04.01

MULLIDO DE CAMPO

m2

168.96

3.42

577.84

0.00

0.00

0.00%

0.00

0.00

0.00%

168.96

577.84

100.00%

08.04.02

SUMINISTRO Y ESPARCIDO DE TIERRA DE CHACRA

m3

33.80

69.51

2,349.44

0.00

0.00

0.00%

0.00

0.00

0.00%

33.80

2,349.44

100.00%

08.04.03

SUMINISTRO E INSTALACION DE CESPED

m2

168.96

22.61

3,820.19

0.00

0.00

0.00%

0.00

0.00

0.00%

168.96

3,820.19

100.00%

31,930.15

16,340.28

51.18%

17,615.53

55.17%

14,314.62

44.83%

9,884.67

1,012.39

10.24%

1,012.39

10.24%

8,872.29

89.76%

3,213.79

511.95

15.93%

511.95

15.93%

2,701.84

84.07% 73.96%

09 09.02 09.02.01

INSTALACIONES SANITARIAS INSTALACION DE SISTEMA AGUA FRIA MOVIMIENTO DE TIERRAS

09.02.01.01

EXCAVACION DE ZANJAS

m3

13.70

39.07

535.26

3.57

139.40

26.04%

3.57

139.40

26.04%

10.13

395.86

09.02.01.02

CAMA DE APOYO PARA TUBERIA E=0.10M.

m

85.63

14.28

1,222.80

20.00

285.60

23.36%

20.00

285.60

23.36%

65.63

937.20

09.02.01.03

RELLENO CON MATERIAL PROPIO

m3

10.28

27.17

279.31

3.20

86.94

31.13%

3.20

86.94

31.13%

7.08

192.36

68.87%

09.02.01.04

ACARREO DE MATERIAL EXCEDENTE HASTA 30 MTS

m3

29.33

22.57

661.98

0.00

0.00

0.00%

0.00

0.00

0.00%

29.33

661.98

100.00%

09.02.01.05

ELIMINACION DE MATERIAL EXCEDENTE

m3

29.33

17.54

514.45

0.00

0.00

0.00%

0.00

0.00

0.00%

29.33

514.45

100.00%

6,170.44

92.50%

09.02.02

RED DE AGUA FRIA

6,670.88

76.64%

500.44

7.50%

500.44

7.50%

09.02.02.03

RED DE DISTRIBUCION TUBERIA DE 1" PVC-SAP

m

140.47

19.51

2,740.57

20.00

390.20

14.24%

20.00

390.20

14.24%

120.47

2,350.37

85.76%

09.02.02.04

RED DE DISTRIBUCION TUBERIA DE 1/2" PVC-SAP.

m

16.74

14.10

236.03

0.00

0.00

0.00%

0.00

0.00

0.00%

16.74

236.03

100.00%

09.02.02.05

CODO 90° PVC SAP C-10 D=2"

und

1.00

21.48

21.48

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

21.48

100.00%

09.02.02.07

CODO 90° PVC SAP C-10 D=1"

und

82.00

16.78

1,375.96

0.00

0.00

0.00%

0.00

0.00

0.00%

82.00

1,375.96

100.00%

09.02.02.09

CODO 90° PVC SAP C-10 D=1/2"

und

1.00

13.78

13.78

8.00

110.24

800.00%

8.00

110.24

800.00%

-7.00

-96.46

-700.00%

09.02.02.10

TEE PVC SAP C-10 D=2"

und

7.00

17.78

124.46

0.00

0.00

0.00%

0.00

0.00

0.00%

7.00

124.46

100.00%

09.02.02.11

TEE PVC SAP C-10 D=1"

und

57.00

16.38

933.66

0.00

0.00

0.00%

0.00

0.00

0.00%

57.00

933.66

100.00%

09.02.02.14

REDUCCION PVC SAP 1" A 1/2"

und

73.00

16.78

1,224.94

0.00

0.00

0.00%

0.00

0.00

0.00%

73.00

1,224.94

100.00%

21,788.38

15,327.90

70.35%

16,603.15

76.20%

5,185.24

23.80%

15,107.08

15,327.90

101.46%

15,327.90

101.46%

-220.81

-1.46% -2.72%

09.03 09.03.01

SISTEMA DE DESAGUE MOVIMIENTO DE TIERRAS

09.03.01.01

EXCAVACION DE ZANJAS

m3

161.60

39.07

6,313.71

166.00

6,485.62

102.72%

166.00

6,485.62

102.72%

-4.40

-171.91

09.03.01.02

CAMA DE APOYO PARA TUBERIA E=0.10M.

m

207.61

14.28

2,964.67

207.61

2,964.67

100.00%

207.61

2,964.67

100.00%

0.00

0.00

0.00%

09.03.01.03

RELLENO CON MATERIAL PROPIO

m3

207.61

27.17

5,640.76

209.41

5,689.67

100.87%

209.41

5,689.67

100.87%

-1.80

-48.91

-0.87%

09.03.01.04

ACARREO DE MATERIAL EXCEDENTE HASTA 30 MTS

m3

4.66

22.79

106.20

4.66

106.20

100.00%

4.66

106.20

100.00%

0.00

0.00

0.00%

09.03.01.05

ELIMINACION DE MATERIAL EXCEDENTE

m3

4.66

17.54

81.74

4.66

81.74

100.00%

4.66

81.74

100.00%

0.00

0.00

0.00%

0.00

0.00%

1,275.25

19.09%

5,406.05

80.91%

09.03.02

RED DE DESAGÜE

6,681.30

09.03.02.04

SUMINISTRO E INSTALACION DE TUBERIA PVC SAL 4"

m

47.84

19.55

935.27

0.00

0.00

0.00%

0.00

0.00

0.00%

47.84

935.27

100.00%

09.03.02.05

SUMINISTRO E INSTALACION DE TUBERIA PVC SAL 2"

m

235.61

16.03

3,776.83

0.00

0.00

0.00%

0.00

0.00

0.00%

235.61

3,776.83

100.00%

09.03.02.07

CODO PVC SAL 4"X45°

pza

3.00

12.85

38.55

0.00

0.00

0.00%

4.00

51.40

133.33%

-1.00

-12.85

-33.33%

09.03.02.09

CODO PVC SAL 2"X45°

pza

49.00

9.35

458.15

0.00

0.00

0.00%

49.00

458.15

100.00%

0.00

0.00

0.00%

09.03.02.10

CODO PVC SAL 2"X90°

und

125.00

11.78

1,472.50

0.00

0.00

0.00%

65.00

765.70

52.00%

60.00

706.80

48.00%

257.09

0.00

0.00%

0.00

0.00%

257.09

100.00%

257.09

0.00

0.00%

0.00

0.00%

257.09

100.00%

257.09

100.00%

09.04 09.04.01 09.04.01.01

10 10.03

INSTALACION DE SISTEMA DE AGUA CALIENTE RED DE AGUA CALIENTE SALIDA DE AGUA CALIENTE CON TUBERIA DE CPVC 1/2"

m

14.75

17.43

INSTALACIONES ELECTRICAS GENERALES ALAMBRES Y CABLES ELECTRICOS

257.09

0.00

0.00

0.00%

0.00

0.00%

25,310.71

3,238.31

12.79%

3,238.31

12.79%

22,072.40

87.21%

2,301.65

0.00

0.00%

0.00

0.00%

2,301.65

100.00%

0.00

14.75

10.03.07

CONDUCTOR CABLEADO 2X4+1X4 MM2 NH-80

m

170.00

7.57

1,286.90

0.00

0.00

0.00%

0.00

0.00

0.00%

170.00

1,286.90

100.00%

10.03.08

CONDUCTOR CABLEADO 2X2.5+1X2.5 MM2 NH-80

m

165.00

6.15

1,014.75

0.00

0.00

0.00%

0.00

0.00

0.00%

165.00

1,014.75

100.00%

0.00

0.00%

0.00

0.00%

591.15

100.00%

10.05

PLACAS Y ACCESORIOS

591.15

DECRIPCION

ITEM

UND

P.U.

MET.

ACUMULADO ACTUAL

PARCIAL

%

PARCIAL

ejecutado junio

%

PARCIAL

SALDO POR EJECUTAR

%

PARCIAL

10.05.01

SUMINIST. E INSTALACION DE SALIDA PARA CENTRO DE LUZ

pto

5.00

49.21

246.05

0.00

0.00

0.00%

0.00

0.00

0.00%

5.00

246.05

100.00%

10.05.02

SUMINIST. E INSTALACION DE SALIDA PARA INTERRUPTOR UNIPOLAR pto

1.00

51.01

51.01

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

51.01

100.00%

10.05.03

SUMINIST. E INSTALACION DE SALIDA PARA TOMACORRIENTE

pto

2.00

51.01

102.02

0.00

0.00

0.00%

0.00

0.00

0.00%

2.00

102.02

100.00%

10.05.05

SUMINIST. E INSTALACION DE TOMACORRIENTE DOBLE CON T/TIERRA

pza

2.00

69.89

139.78

0.00

0.00

0.00%

0.00

0.00

0.00%

2.00

139.78

100.00%

10.05.07

SUMINIST. E INSTALACION DE INTERRUPTOR UNIPOLAR SIMPLE

pza

1.00

52.29

52.29

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

52.29

100.00%

0.00

0.00%

0.00

0.00%

2,832.21

100.00%

10.06

2,832.21

LUMINARIAS Y ACCESORIOS ELECTRICOS

10.06.04

SUMINIST. E INSTALACION DE LUZ DE EMERGENCIA LED 7.5W

pza

1.00

152.49

152.49

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

152.49

100.00%

10.06.06

SUMINIST. E INSTALACION GALAXIE L/AHORRADOR 2X18W

pza

4.00

180.07

720.28

0.00

0.00

0.00%

0.00

0.00

0.00%

4.00

720.28

100.00%

10.06.07

SUMINIST. E INSTALACION REFLECTOR HALOGENURO METALICO 400W pza

4.00

489.86

1,959.44

0.00

0.00

0.00%

0.00

0.00

0.00%

4.00

1,959.44

100.00%

920.00

33.33%

920.00

33.33%

1,840.00

66.67%

920.00

33.33%

920.00

33.33%

1,840.00

66.67%

2,318.31

75.00%

2,318.31

75.00%

2,318.31

75.00%

2,318.31

75.00%

0.00

0.00%

0.00

0.00%

10.08 10.08.04 10.09 10.09.01 10.11

2,760.00

SISTEMA DE PROTECCION Y EMPALMES SUMINIST. E INSTALACION DE BUZON P/CONEXIÓN ELECTRICA

glb

3.00

920.00

und

4.00

772.77

1.00

3,091.08

OTROS POSTE C.A.C. 9/300

2,760.00 3,091.08

3.00

13,734.62

INSTALACIONES DE COMUNICACIONES

1.00 3.00

2.00

772.77 1.00

25.00%

772.77

25.00%

13,734.62

100.00%

0.00

0.00%

0.00

0.00%

1,236.17

100.00%

10.11.01.01

EXCAVACION MANUAL DE ZANJA P/TUBERIAS

m3

19.68

27.36

538.44

0.00

0.00

0.00%

0.00

0.00

0.00%

19.68

538.44

100.00%

10.11.01.03

RELLENO COMPACTADO CON MATERIAL PROPIO

m3

25.68

27.17

697.73

0.00

0.00

0.00%

0.00

0.00

0.00%

25.68

697.73

100.00%

0.00

0.00%

0.00

0.00%

217.02

100.00%

0.00

0.00%

0.00

0.00%

217.02

100.00%

0.00

0.00%

0.00

0.00%

12,281.43

100.00%

10.11.01

10.11.03 10.11.03.06 10.11.06

1,236.17

MOVIMIENTO DE TIERRAS

217.02

SALIDA, CONDUCTOS Y/O TUBERIAS SUMINIST. E INSTALACION DE CAJA PASE DE 8'' X 8'' X 3''

und

6.00

36.17

PUNTO DE RED DE UN PUERTO

10.11.06.03

CABLEADO

11

MITIGACION Y CONTROL AMBIENTAL

12

AMPLIACION DE LOS SERVICIOS HIGIENICOS

0.00

12,281.43

CABLEADO ESTRUCTURADO

10.11.06.01

217.02

0.00

6.00

pto

7.00

261.21

1,828.47

0.00

0.00

0.00%

0.00

0.00

0.00%

7.00

1,828.47

100.00%

m

952.00

10.98

10,452.96

0.00

0.00

0.00%

0.00

0.00

0.00%

952.00

10,452.96

100.00%

48,494.91 S/. 5,334.44 ============

48,254.65 S/. 5,308.01 ============

1.00 2.00

COSTO DIRECTO GASTOS GENERALES (11.00 %) ==============================

96,749.53 S/. 10,642.45 ============

47,219.66 S/. 5,194.16 ============

3.00

SUB PRESUPUESTO (CD + GG)

S/. 107,391.98

S/. 52,413.82

S/. 53,829.35

S/. 53,562.66

4.00 5.00 6.00 7.00 8.00 9.00

GASTOS DE ESTUDIO (2.41 % SP) GASTOS DE SUPERVISION (5.00 % SP) GASTOS DE LIQUIDACION GASTOS ADMINISTRATIVOS (1.00 % SP) ==============================

S/. 0.00 S/. 5,369.60 S/. 0.00 S/. 0.00 ============

S/. 0.00 S/. 2,620.69 S/. 0.00 S/. 0.00 ============

S/. 0.00 S/. 2,691.47 S/. 0.00 S/. 0.00 ============

S/. 0.00 S/. 2,678.13 S/. 0.00 S/. 0.00 ============

PRESUPUESTO TOTAL

S/. 112,761.58

S/. 55,034.52

S/. 56,520.82

S/. 56,240.80

48.81%

50.12%

49.88%

3. VALORIZACION PARTIDAS NUEVAS:

ITEM

09 09.02 09.02.02

DECRIPCION

UND

ACUMULADO ACTUAL

MET.

INSTALACIONES SANITARIAS INSTALACION DE SISTEMA AGUA FRIA RED DE AGUA FRIA

PARCIAL

%

ejecutado junio

PARCIAL

%

SALDO POR EJECUTAR

PARCIAL

%

30,616.03

62.46%

39,719.59

81.04%

9,294.31

18.96%

80.32

0.57%

4,335.91

30.94%

9,676.52

69.06%

80.32

0.78%

4,335.91

42.08%

5,966.89

57.92%

09.02.02.21

CODO DE 1/2" DE F.G.

und

83.00

4.00

41.08

4.82%

60.00

616.20

72.29%

23.00

236.21

27.71%

09.02.02.22

CODO F.G. D=3/4" CON ROSCA

und

13.00

0.00

0.00

0.00%

0.00

0.00

0.00%

13.00

185.51

100.00%

09.02.02.23

TUBO PVC SAP C-10 D=3/4" CON ROSCA

m

35.00

0.00

0.00

0.00%

35.00

295.75

100.00%

0.00

0.00

0.00%

09.02.02.24

TUBO DE F.G. DE 1/2" PESADO

m

10.00

0.00

0.00

0.00%

0.00

0.00

0.00%

10.00

219.80

100.00%

09.02.02.25

CODO PVC SAP C-10 D=3/4" CON ROSCA

und

13.00

0.00

0.00

0.00%

13.00

79.30

100.00%

0.00

09.02.02.26

CRUCETA PVC SAP C-10 D=1" CON ROSCA

und

4.00

0.00

0.00

0.00%

4.00

68.00

100.00%

0.00

0.00

0.00%

09.02.02.27

UNION UNIVERSAL PVC SAP C-10 D=2"

und

6.00

0.00

0.00

0.00%

0.00

0.00

0.00%

6.00

39.60

100.00%

09.02.02.28

UNION SIMPLE PVC SAP C-10 D=2" C/R

und

45.00

0.00

0.00

0.00%

0.00

0.00

0.00%

45.00

3,064.50

100.00%

09.02.02.29

UNION SIMPLE PVC SAP D=1" C/R

und

15.00

0.00

0.00

0.00%

15.00

331.50

100.00%

0.00

0.00

0.00%

09.02.02.30

UNION UNIVERSAL PVC SAP C-10 D=1/2"

und

12.00

0.00

0.00

0.00%

12.00

73.20

100.00%

0.00

0.00

0.00%

09.02.02.31

UNION SIMPLE F.G. D=1/2''

und

12.00

0.00

0.00

0.00%

0.00

0.00

0.00%

12.00

817.20

100.00%

09.02.02.32

TAPON MACHO F.G. SAP C-10 D=1/2"

und

101.00

0.00

0.00

0.00%

101.00

1,007.98

100.00%

0.00

0.00

0.00%

09.02.02.33

TAPON MACHO PVC SAP C-10 D=3/4"

und

20.00

0.00

0.00

0.00%

0.00

0.00

0.00%

20.00

130.00

100.00%

09.02.02.34

TAPON HEMBRA PVC SAP C-10 D=2"

und

2.00

0.00

0.00

0.00%

0.00

0.00

0.00%

2.00

13.00

100.00%

09.02.02.35

TAPON HEMBRA PVC SAP C-10 D=1"

und

10.00

0.00

0.00

0.00%

4.00

26.00

40.00%

6.00

39.00

60.00%

09.02.02.36

TAPON HEMBRA PVC SAP C-10 D=1/2"

und

36.00

0.00

0.00

0.00%

36.00

304.56

100.00%

0.00

0.00

0.00%

09.02.02.37

TAPON HEMBRA F.G. D=1/2"

und

4.00

0.00

0.00

0.00%

0.00

0.00

0.00%

4.00

30.36

100.00%

09.02.02.38

REDUCCION PVC SAP C-10 1" A 3/4"

und

12.00

0.00

0.00

0.00%

0.00

0.00

0.00%

12.00

96.00

100.00%

09.02.02.39

REDUCCION PVC SAP C-10 2" A 3/4"

und

2.00

0.00

0.00

0.00%

0.00

0.00

0.00%

2.00

16.00

100.00%

09.02.02.40

NIPLE PVC SAP C-10 3/4" X 2"

und

52.00

0.00

0.00

0.00%

0.00

0.00

0.00%

52.00

312.00

100.00%

09.02.02.41

NIPLE PVC SAP C-10 1" X 2"

und

56.00

0.00

0.00

0.00%

56.00

336.00

100.00%

0.00

0.00

0.00%

09.02.02.42

NIPLE PVC SAP C-10 1/2" X 2"

und

24.00

0.00

0.00

0.00%

0.00

0.00

0.00%

24.00

144.00

100.00%

09.02.02.43

LLAVE DE PASO PVC SAP 1"

und

15.00

4.00

39.24

26.67%

15.00

147.15

100.00%

0.00

0.00

0.00%

09.02.02.44

LLAVE DE PASO PVC SAP 1/2"

und

6.00

0.00

0.00

0.00%

0.00

0.00

0.00%

6.00

58.86

100.00%

09.02.02.45

LLAVE DE PASO DE BRONCE D=3/4"

und

13.00

0.00

0.00

0.00%

13.00

127.53

100.00%

0.00

0.00

0.00%

09.02.02.46

GRIFO DE RIEGO 3/4"

und

13.00

0.00

0.00

0.00%

0.00

0.00

0.00%

13.00

302.77

100.00%

09.02.02.47

CAJA MEDIDOR DE AGUA

und

13.00

0.00

0.00

0.00%

13.00

922.74

100.00%

0.00

0.00

0.00%

09.02.02.48

UNION UNIVERSAL CON ROSCA PVC SAP C-10 3/4"

und

26.00

0.00

0.00

0.00%

0.00

0.00

0.00%

26.00

262.08

100.00%

09.02.03

TANQUE ELEVADO Y ACCESORIOS

0.00

0.00%

0.00

0.00%

0.00

0.00%

3,709.63

100.00%

09.02.03.04

VALVULAS ESFERICAS METALICAS D=1 1/2''

und

2.00

0.00

0.00

0.00%

0.00

0.00

0.00%

2.00

83.96

100.00%

09.02.03.05

NIPLE DE PVC SAP CON ROSCA 1 1/2" X 2 1/2"

und

12.00

0.00

0.00

0.00%

0.00

0.00

0.00%

12.00

112.92

100.00%

09.02.03.06

BUSHING PVC SAP C-10 CON ROSCA 2" A 1 1/2"

und

3.00

0.00

0.00

0.00%

0.00

0.00

0.00%

3.00

24.00

100.00%

09.02.03.07

BUSHING PVC SAP C-10 CON ROSCA 1 1/2" A 3/4"

und

2.00

0.00

0.00

0.00%

0.00

0.00

0.00%

2.00

16.00

100.00%

09.02.03.08

BUSHING PVC SAP C-10 CON ROSCA 1 1/2" A 1"

und

3.00

0.00

0.00

0.00%

0.00

0.00

0.00%

3.00

24.00

100.00%

09.02.03.13

NIPLE ROMPE AGUAS F.G. C-10 CON ROSCA 1 1/2" A 14"

und

1.00

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

20.48

100.00%

09.02.03.11

TUBO PVC SAP C-10 CON ROSCA 1 1/2"

m

42.00

0.00

0.00

0.00%

0.00

0.00

0.00%

42.00

275.94

100.00%

09.02.03.10

CODO PVC SAP C-10 CON ROSCA 1 1/2"

und

15.00

0.00

0.00

0.00%

0.00

0.00

0.00%

15.00

180.00

100.00%

09.02.03.12

VALVULA DE INGRESO CON BOLLA FLOTADORA METALICA 1 1/2"

und

1.00

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

57.15

100.00%

09.02.03.14

VALVULA DE PIE DE BRONCE CON CANASTILLA DE 1 1/2"

und

2.00

0.00

0.00

0.00%

0.00

0.00

0.00%

2.00

114.30

100.00%

09.02.03.09

TEE PVC SAP C-10 CON ROSCA 1 1/2"

und

5.00

0.00

0.00

0.00%

0.00

0.00

0.00%

5.00

50.00

100.00%

ITEM

09.04.02 09.04.02.04 09.04.02.04.01

DECRIPCION

UND

ACUMULADO ACTUAL

MET.

OTROS POZO SEPTICO - REPARACION MOVIMIENTO DE TIERRAS

PARCIAL

%

ejecutado junio

PARCIAL

%

SALDO POR EJECUTAR

PARCIAL

%

30,535.71

100.00%

30,535.71

100.00%

0.00

0.00%

4,436.29

100.00%

4,436.29

100.00%

0.00

0.00%

2,333.64

100.00%

2,333.64

100.00%

0.00

0.00%

09.04.02.04.01.01

CORTE CON MAQUINARIA EN TERRENO NORMAL

m3

43.87

43.87

270.68

100.00%

43.87

270.68

100.00%

0.00

0.00

0.00%

09.04.02.04.01.02

ACARREO DE MATERIAL EXCEDENTE HASTA 30 MTS

m3

52.64

52.64

1,199.67

100.00%

52.64

1,199.67

100.00%

0.00

0.00

0.00%

09.04.02.04.01.03

ELIMINACION DE MATERIAL EXCEDENTE

m3

52.64

52.64

863.30

100.00%

52.64

863.30

100.00%

0.00

0.00

0.00%

255.09

100.00%

255.09

100.00%

0.00

0.00%

255.09

100.00%

255.09

100.00%

0.00

0.00%

464.76

100.00%

464.76

100.00%

0.00

0.00%

464.76

100.00%

464.76

100.00%

0.00

0.00%

741.96

100.00%

741.96

100.00%

0.00

0.00%

741.96

100.00%

741.96

100.00%

0.00

0.00%

640.84

100.00%

640.84

100.00%

0.00

0.00%

640.84

100.00%

640.84

100.00%

0.00

0.00%

26,099.42

100.00%

26,099.42

100.00%

0.00

0.00%

1,577.39

100.00%

1,577.39

100.00%

0.00

0.00%

09.04.02.04.02 09.04.02.04.02.01 09.04.02.04.03 09.04.02.04.03.01 09.04.02.04.04 09.04.02.04.04.01 09.04.02.04.05 09.04.02.04.05.01 09.04.02.05 09.04.02.05.01

OBRAS PRELIMINARES LIMPIEZA DEL TANQUE SEPTICO

glb

1.00

1.00

RESANE DE GRIETAS CON ADITIVO RESANE DE GRIETAS Y CANGREJERAS CON ADITIVOS

glb

1.00

1.00

TARRAJEO TARRAJEO INTERIOR CON IMPERMEABILIZANTE Y PUENTE DE ADHERENCIA glb

1.00

1.00

OTROS PINTURA EPOXICA

glb

1.00

1.00

TANQUE SEPTICO MOVIMIENTO DE TIERRAS

1.00 1.00 1.00 1.00

0.00 0.00 0.00 0.00

09.04.02.05.01.01

EXCAVACION MASIVA A MAQUINA EN TERRENO NORMAL CON MAQUINARIA. m3

29.85

29.85

309.84

100.00%

29.85

309.84

100.00%

0.00

0.00

0.00%

09.04.02.05.01.02

NIVELACION INTERIOR Y APISONADO MANUAL FONDO DE EXCAVACIONES m2

10.66

10.66

148.17

100.00%

10.66

148.17

100.00%

0.00

0.00

0.00%

09.04.02.05.01.03

ACARREO DE MATERIAL EXCEDENTE HASTA 30 MTS

m3

35.82

35.82

816.34

100.00%

35.82

816.34

100.00%

0.00

0.00

0.00%

09.04.02.05.01.04

ELIMINACION DE MATERIAL EXCEDENTE

m3

35.82

35.82

303.04

100.00%

35.82

303.04

100.00%

0.00

0.00

0.00%

24,522.03

100.00%

24,522.03

100.00%

09.04.02.05.02

CONCRETO ARMADO

0.00

09.04.02.05.02.01

CONCRETO EN TANQUE SEPTICO F'C=210 KG/CM2 + ADITIVO IMPERMEABILIZANTE m3

20.10

20.10

9,354.54

100.00%

20.10

9,354.54

100.00%

0.00

0.00

0.00%

09.04.02.05.02.02

ENCOFRADO Y DESENCOFRADO CARAVISTA EN TANQUE SEPTICO

m2

78.60

78.60

5,339.30

100.00%

78.60

5,339.30

100.00%

0.00

0.00

0.00%

09.04.02.05.02.03

ACERO GRADO 60 EN TANQUE SEPTICO

kg

1,523.75

1523.75

9,828.19

100.00%

1523.75

9,828.19

100.00%

0.00

0.00

0.00%

44,653.62

27.12%

120,011.50

72.88%

10 10.03

INSTALACIONES ELECTRICAS GENERALES

42,876.27

ALAMBRES Y CABLES ELECTRICOS

0.00

0.00%

0.00

0.00%

21,642.80

100.00%

10.03.10

CONDUCTOR CABLEADO 3X10 + 1X10 + T10MM2 N2XOH

m

165.83

0.00

0.00

0.00%

0.00

0.00

0.00%

165.83

4,756.00

100.00%

10.03.11

CONDUCTOR CABLEADO 3X6 + 1X6 + T10MM2 NHX-90

m

90.00

0.00

0.00

0.00%

0.00

0.00

0.00%

90.00

2,221.20

100.00%

10.03.12

CONDUCTOR CABLEADO 3X1X35 + 1X35 + T10MM2 N2XOH

m

72.50

0.00

0.00

0.00%

0.00

0.00

0.00%

72.50

4,870.55

100.00%

10.03.13

CONDUCTOR CABLEADO 3X1X16 + 1X16 + T10MM2 N2XOH

m

107.50

0.00

0.00

0.00%

0.00

0.00

0.00%

107.50

3,729.18

100.00%

10.03.14

CONDUCTOR CABLEADO 2X6 + T10MM2 N2XOH

m

253.23

0.00

0.00

0.00%

0.00

0.00

0.00%

253.23

4,732.87

100.00%

10.03.15

BIPLASTOFLEX NLT 2X4 MM2

m

100.00

0.00

0.00

0.00%

0.00

0.00

0.00%

100.00

1,333.00

100.00%

29,804.96

84.99%

29,804.96

84.99%

5,262.50

15.01%

10.04

ELECTRODUCTO DE PVC

10.04.05

SUMINISTRO E INSTALACION DE ELECTRODUCTO PVC SAP 3/4"

m

3,624.00

3080.40

20,638.68

85.00%

3080.40

20,638.68

85.00%

543.60

3,642.12

15.00%

10.04.06

SUMINISTRO E INSTALACION DE ELECTRODUCTO PVC SAP 1"

m

70.00

59.20

470.64

84.57%

59.20

470.64

84.57%

10.80

85.86

15.43%

10.04.07

SUMINISTRO E INSTALACION DE ELECTRODUCTO PVC SAP 1 1/4"

m

252.00

214.20

5,569.20

85.00%

214.20

5,569.20

85.00%

37.80

982.80

15.00%

10.04.08

SUMINISTRO E INSTALACION DE ELECTRODUCTO PVC SAP 2"

m

130.00

110.50

1,038.70

85.00%

110.50

1,038.70

85.00%

19.50

183.30

15.00%

10.04.09

SUMINISTRO E INSTALACION DE ELECTRODUCTO PVC SAP 3"

m

168.00

142.80

2,087.74

85.00%

142.80

2,087.74

85.00%

25.20

368.42

15.00%

0.00

0.00%

0.00

0.00%

5,462.94

100.00%

0.00

0.00%

0.00

0.00%

5,462.94

100.00%

10.06 10.06.10

LUMINARIAS Y ACCESORIOS ELECTRICOS SUMINISTRO E INSTALACION ARTEF. FLUORESCENTE DOBLE 2X36W REJILLA pza P/EMP

42.00

0.00

0.00

42.00

ITEM

ACUMULADO ACTUAL

10.11.03.18

SUMINIST. E INSTALACION DE CAJA PASE DE F° G° 4'' X 4' X 3''

und

3.00

0.00

0.00

0.00%

0.00

0.00

0.00%

3.00

50.73

100.00%

10.11.03.19

SUMINIST. E INSTALACION DE CAJA PASE DE F° G° 8'' X 8' X 3''

und

7.00

0.00

0.00

0.00%

0.00

0.00

0.00%

7.00

191.87

100.00%

10.11.07.03

SALIDA DE AUDIO

und

14.00

0.00

0.00

0.00%

0.00

0.00

0.00%

14.00

524.58

100.00%

10.11.07.04

SALIDA DE SENSORES DE HUMO

und

4.00

0.00

0.00

0.00%

0.00

0.00

0.00%

4.00

213.56

100.00%

10.11.07.05

SALIDA DE FREE WARE

und

1.00

0.00

0.00

0.00%

0.00

0.00

0.00%

1.00

82.39

100.00%

0.00

0.00%

0.00

0.00%

5,855.00

100.00%

0.00

0.00%

0.00

0.00%

5,855.00

100.00%

0.00

0.00%

0.00

0.00%

15,795.57

100.00%

0.00

0.00%

0.00

0.00%

15,795.57

100.00%

0.00

0.00%

0.00

0.00%

7,978.41

100.00%

0.00

0.00%

0.00

0.00%

7,978.41

100.00%

0.00

0.00%

0.00

0.00%

1,440.00

100.00%

0.00

0.00%

0.00

0.00%

1,440.00

100.00%

0.00

0.00%

0.00

0.00%

49,379.67

100.00%

0.00

0.00%

0.00

0.00%

49,379.67

100.00%

3,000.00

58.52%

3,000.00

58.52%

2,126.63

41.48%

0.00

0.00%

0.00

0.00%

888.08

100.00%

10.11.11.01 10.11.12 10.11.12.01 10.11.13 10.11.13.01 10.11.14 10.11.14.01 10.11.15 10.11.15.01 10.14

SISTEMA INALAMBRICO EXTERIOR SISTEMA INALAMBRICO EXTERIOR

glb

1.00

0.00

SISTEMA DE AUDIO SISTEMA DE AUDIO

glb

1.00

0.00

SISTEMA CONTRA INCENDIO CENTRAL DE HUMOS

glb

1.00

0.00

CERTIFICACION CERTIFICACION DE PUNTOS DE RED

glb

1.00

0.00

SISTEMA DE VIGILANCIA CAMARA DE SEGURIDAD

und

1.00

0.00

CASETA PARA GRUPO ELECTROGENO

10.14.07

CUBIERTAS

PARCIAL

%

0.00 0.00 0.00 0.00 0.00

PARCIAL

%

SALDO POR EJECUTAR

UND

10.11.11

MET.

ejecutado junio

DECRIPCION

1.00 1.00 1.00 1.00 1.00

PARCIAL

%

10.14.07.03

COBERTURA PERFIL GRAN ONDA 1.09 X 2.44 E= 5 mm

m2

21.46

0.00

0.00

0.00%

0.00

0.00

0.00%

21.46

683.72

100.00%

10.14.07.04

CANALETA DE PLANCHA GALVANIZADA INCLUYE COLOCACION

m

5.30

0.00

0.00

0.00%

0.00

0.00

0.00%

5.30

204.37

100.00%

0.00

0.00%

0.00

0.00%

1,238.55

100.00%

10.14.08

CARPINTERIA METALICA

10.14.08.05

TIJERAL T-6 C/PERFIL METALICO INC. IZADO Y MONTAJE

10.14.08.06

CORREAS DE F° N° 60 X 40 X 1.2 MM

10.14.12 10.14.12.01

5.00

0.00

0.00

0.00%

0.00

0.00

0.00%

5.00

987.45

100.00%

m

32.40

0.00

0.00

0.00%

0.00

0.00

0.00%

32.40

251.10

100.00%

3,000.00

100.00%

3,000.00

100.00%

0.00

0.00%

3,000.00

100.00%

3,000.00

100.00%

0.00

0.00%

7,943.27

28.92%

19,518.38

71.08%

49.83

35.73%

89.64

64.27%

49.83

35.73%

307.85

306.09%

MODULO 01: SERVICIOS DE ALIMENTACION ACONDICIONAMIENTO INSTALACIONES ELECTRICAS MODULO 01

11

MITIGACION Y CONTROL AMBIENTAL

12

AMPLIACION DE LOS SERVICIOS HIGIENICOS

12.01

und

glb

1.00

1.00

7,943.27

OBRAS PROVISIONALES

12.01.01 12.02

NIVELACION Y COMPACTACION DEL TERRENO

m2

52.63

18.80

MOVIMIENTO DE TIERRAS

12.02.01 12.03

EXCAVACION DE ZANJA

m3

1.38

4.22

12.04

LOSA DE CONCRETO F'C=150 KG/CM2 E=10CM.

m2

52.63

12.05

MURO DE SOGA LADRILLO BLOCKER II CON CEMENTO-ARENA 1:5

m2

192.06

12.06

COBERTURA CON PLANCHA DE CALAMINA GALVANIZADA Y REFUERZOSm2 DE MADERA 61.22 DUCHAS PROVISIONALES

glb

12.06.02

BAÑOS PROVISIONALES

glb

1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00

1.00 1.00

35.73%

307.85

306.09% 42.35%

4,535.40

42.35%

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00%

3,050.19

70.00%

0.70

1,525.10

70.00%

0.70

1,525.10

70.00%

22.29 0.00 0.00

INSTALACIONES DE RED DE AGUA Y DESAGUE

12.06.01

49.83

306.09%

COBERTURA

12.05.01

35.73%

307.85

TABIQUERIA

12.04.01

49.83

4,535.40

CONCRETO SIMPLE

12.03.01

1.00

COSTO DIRECTO GASTOS GENERALES (11.00 %) ============================== SUB PRESUPUESTO (CD + GG)

96,736.15 S/. 10,640.98 ============ S/. 107,377.12

GASTOS DE ESTUDIO (2.41 % SP) GASTOS DE SUPERVISION (5.00 % SP) GASTOS DE LIQUIDACION GASTOS ADMINISTRATIVOS (1.00 % SP) ============================== PRESUPUESTO TOTAL

S/. 0.00 S/. 5,368.86 S/. 0.00 S/. 0.00 ============ S/. 112,745.98

18.59%

18.80 4.22

307.85

306.09%

4,535.40

42.35%

4,535.40

42.35%

0.00

0.00%

0.00

0.00%

0.00

0.00%

0.00

0.00%

3,050.19

70.00%

0.70

1,525.10

70.00%

0.70

1,525.10

70.00%

22.29 0.00 0.00

107,617.06 S/. 11,837.88 ============ S/. 119,454.93 S/. 0.00 S/. 5,972.75 S/. 0.00 S/. 0.00 ============ S/. 125,427.68

20.68%

0.00

33.83 -2.84 30.34

89.64

64.27%

-207.27

-206.09%

-207.27

-206.09%

6,174.80

57.65%

6,174.80

57.65%

7,152.31

100.00%

7,152.31

100.00%

5,001.67

100.00%

5,001.67

100.00%

1,307.23

30.00%

0.30

653.61

30.00%

0.30

653.61

30.00%

192.06 61.22

412,730.77 S/. 45,400.38 ============ S/. 458,131.16 S/. 0.00 S/. 22,906.56 S/. 0.00 S/. 0.00 ============ S/. 481,037.71

79.32%

4. RESUMEN: D ESCR IPCION

MON T O

EXPED IEN T E T ECN ICO S/ .2,169,020.35 D ED U CT IVO -S/ .300,798.22 AD ICION AL N ° 01 - MAYOR ES MET R AD OS S/ .107,391.98 AD ICION AL N ° 02 - PAR T ID AS N U EVAS S/ .577,586.06 ============ PR ESU PU EST O T OT AL MOD IFICAD O S/ .2,553,200.16

AVAN CE ACU MU LAD O AL MES AN T ER IOR

S/.719,825.97 S/.0.00 S/.0.00 S/.0.00 ============ S/.719,825.97

33.19% 0.00% 0.00% 0.00% 28.19%

AVAN CE D EL PR ESEN T E MES

S/.115,655.14 S/.0.00 S/.52,413.82 S/.107,377.12 ============ S/.275,446.09

AVAN CE ACU MU LAD O

5.33% 0.00% 48.81% 18.59% 10.79%

S/.835,481.11 S/.0.00 S/.52,413.82 S/.107,377.12 ============ S/.995,272.05

38.52% 0.00% 48.81% 18.59% 38.98%

SALD O POR EJECU T AR

S/.1,333,539.24 S/.0.00 S/.54,978.16 S/.470,208.94 ============ S/.1,858,726.33

61.48% 0.00% 51.19% 81.41% 72.80%

5. CUADRO COMPARATIVO DE AVANCE DE OBRA:

CUADRO COMPARATIVO DE AVANCE DE OBRA OBRA PROPIETARIO RESIDENTE INSPECTOR P. DE EJECUCION

: : : : :

AMPLIACION DEL SERVICIO EDUCATIVO PROVISIONAL DEL COLEGIO DE ALTO RENDIMIENTO (COAR) - TACNA GOBIERNO REGIONAL DE TACNA ING.YURI NILO PACARI MAMANI ING.YANETT LOMBARDI FUENTES 180 DIAS CALENDARIOS

INICIO DE OBRA FEBRERO 2017 MARZO 2017 ABRIL 2017 MAYO 2017 JUNIO 2017 JULIO 2017 AGOSTO 2017 TOTAL

8 7 6 5 4 3 2 1 1

MES

VALORIZACION PROGRAMADO % PARC. ACUMUL. 0.00 0.00% S/.62,360.95 2.44% S/.62,360.95 S/.201,764.08 7.90% S/.264,125.03 S/.209,457.90 8.20% S/.473,582.94 S/.247,559.56 9.70% S/.721,142.50 S/.365,533.59 14.32% S/.1,086,676.08 S/.979,512.66 38.36% S/.2,066,188.74 S/.487,011.36 19.07% S/.2,553,200.27

PARCIAL 0.00

2,553,200.27

% ACUM. 0.00% 2.44% 10.34% 18.55% 28.24% 42.56% 80.93% 100.00%

PARCIAL S/. S/. S/. S/. S/. S/. S/. S/.

VALORIZACION EJECUTADA % PARC. ACUMUL.

62,360.95 201,806.89 209,457.90 246,200.23 275,446.09 995,272.05

0.00% 2.44% 7.90% 8.20% 9.64% 10.79% 0.00% 0.00%

S/. S/. S/. S/. S/. S/. S/. S/.

62,360.95 264,167.83 473,625.74 719,825.97 995,272.05 995,272.05 995,272.05

VALOR. EJECUTADO

% ACUM. 0.00% 2.44% 10.35% 18.55% 28.19% 38.98% 38.98% 38.98%

6. CUADRO COMPARATIVO:

CUADRO COMPARATIVO DE AVANCE FISICO DE OBRA EJECUCION DE AVANCE FISICO VALORIZADO MENSUAL

S/.3,000,000.00 S/.2,553,200.27

S/.2,500,000.00

S/.2,066,188.74

S/.2,000,000.00

S/.1,500,000.00 S/.1,086,676.08 S/.995,272.05 S/.995,272.05 S/.995,272.05 S/.721,142.50

S/.1,000,000.00 S/.473,582.94 S/.500,000.00

S/.264,125.03 S/.62,360.95

S/.-

Ejecutado Programado

S/.719,825.97 S/.473,625.74

S/.264,167.83

S/.62,360.95

S/.INICIO DE OBRA

FEBRERO 2017

MARZO 2017

ABRIL 2017

MAYO 2017

JUNIO 2017

JULIO 2017

AGOSTO 2017

S/.-

S/.62,360.9

S/.264,167.

S/.473,625.

S/.719,825.

S/.995,272.

S/.995,272.

S/.995,272.

-

S/.62,360.95

S/.264,125.0

S/.473,582.9

S/.721,142.5

S/.1,086,676

S/.2,066,188

S/.2,553,200

PLAZO DE EJECUCION FISICA DE LA OBRA

ANEXO 02: CUADRO DE MAQUINARIA Y EQUIPOS:

MAQUINARIA Y EQUIPOS MES DE ABRIL

DECRIPCION

CAMIONETA VOLQUETE N°1 VOLQUETE N°2 VOLQUETE N°3 MEZCLADORA N°1 MEZCLADORA N°2 CAMION CISTERNA RETRO ESCAVADORA CARGADOR FRONTAL

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

1

1

1

1

1

1

1

1

1

1

1

1

1

1 02:00

1 03:45

1

1

1

1

1 06:00 06:00

1

1

06:35

07:10

05:15

04:00

06:15

05:40

08:05

08:05

08:05 04:10

05:10

05:30 03:30

08:00 01:00

07:20 04:50

06:15

06:40 05:25

03:40 03:10

04:30

04:00

VALORIZACION JULIO

UND

dia HM HM HM HM HM HM HM HM

1 04:00 04:00 04:00 03:00

05:30 04:15 06:10 03:40 01:45 05:00 03:00 06:50

02:00

%

23 15:45 10:00 4:00 11:05 22:05 3:00 18:20 9:30

01:00

04:00

METRADO MONTO (S/.)

05:30

MAQUINARIA Y EQUIPOS MES DE MAYO DECRIPCION

CAMIONETA VOLQUETE N°1 VOLQUETE N°2 VOLQUETE N°3 MEZCLADORA N°1 MEZCLADORA N°2 CAMION CISTERNA RETRO ESCAVADORA CARGADOR FRONTAL RODILLO LISO

UND

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

M

M

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

dia HM HM HM HM HM HM HM HM HM

1

1

1

1 05:30 05:10

1

1

08:10 06:05 05:05 02:25 03:10 06:50 06:50

1

1

1

1

05:35 07:15

07:45

04:50

04:20 05:50 02:30

1

1

1 04:00

1

1

1 04:50

1

1 01:15

1

1

1

1

1

1

04:00

03:00

04:50

02:20

03:30

04:15

02:00

06:05

08:10

07:20

05:10

04:20

04:50

01:50

01:50

05:00

04:00

03:30

05:00

VALORIZACION JULIO METRADO

1

04:30

03:00

MONTO (S/.)

%

25 15:35 5:10 0:00 12:55 1:05 6:10 12:30 9:30 3:00

MAQUINARIA Y EQUIPOS MES DE JUNIO

DECRIPCION

CAMIONETA VOLQUETE N°1 VOLQUETE N°2 VOLQUETE N°3 MEZCLADORA N°1 MEZCLADORA N°2 CAMION CISTERNA RETRO ESCAVADORA CARGADOR FRONTAL RODILLO LISO

J

V

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

M

M

J

V

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

VALORIZACION JULIO

UND

dia HM HM HM HM HM HM HM HM HM

1

1

1

1 03:00 04:00

1

1

1

1

1

1

04:40 04:10 04:00

07:10

04:50

07:30

04:00

04:00 05:00

02:00

02:30

03:00

01:10 04:50 04:00

06:05 07:40 06:15 06:00 06:25

02:50

04:00

02:00 04:00 01:00 02:30

02:00

02:00

1 03:00

04:00

1

1

1

1

1

1

1 01:00

1

01:05

06:15

04:30

02:30

03:55

07:20 04:10

06:50 04:00 02:00

04:00 01:00

1

04:00

1

1

05:40

06:15 02:00

METRADO MONTO (S/.)

22 12:30 4:00 0:00 15:15 4:10 0:10 6:00 10:00 0:00

%

ANEXO 03: CUADRO DE MANO DE OBRA:

ABRIL ITEM

DECRIPCION

CAPATAZ OPERARIO OFICIAL PEON

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

1 14 3 14

1 14 3 14

1 14 3 14

1 14 3 14

1 14 3 14

1 14 3 14

1 14 3 14

1 17 3 17

1 19 3 17

1 19 3 17

1 18 3 16

1 22 4 22

1 23 4 22

1 23 4 22

1 22 4 21

1 22 4 22

1 22 4 22

1 22 4 22

1 22 4 22

1 22 4 22

1 22 4 22

1 22 4 22

1 22 4 22

MAYO ITEM

DECRIPCION

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

d

l

m

m

j

v

s

d

l

m

m

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

CAPATAZ OPERARIO OFICIAL PEON

1 22 4 21

1 23 3 21

1 23 4 20

1 23 4 21

1 23 4 21

1 22 4 21

1 22 4 20

1 22 4 21

1 22 4 21

1 22 4 20

1 22 4 21

1 16 4 10

1 16 4 11

1 16 4 11

1 16 4 11

1 16 4 11

1 16 4 11

1 16 3 10

1 16 4 11

1 16 4 11

1 16 4 11

1 16 4 11

1 15 3 8

1 15 4 11

JUNIO ITEM

DECRIPCION

CAPATAZ OPERARIO OFICIAL PEON

J

V

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

d

l

m

m

j

v

s

d

l

m

m

J

V

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

1 14 3 10

1 14 3 10

1 14 3 10

1 14 3 10

1 14 5 8

1 13 5 9

1 13 5 9

1 13 5 9

1 13 4 9

1 12 5 9

1 12 5 9

1 13 5 9

1 13 5 9

1 13 5 9

1 13 5 9

1 11 4 9

1 11 4 9

1 11 4 9

1 11 4 9

1 11 4 9

1 8 3 8

1 8 3 8

1 8 3 8

1 8 3 8

1 15 3 11

ANEXO 04: CUADRO DE MATERIALES:

MATERIAL ABRIL INGRESO: ITEM

DECRIPCION

ARENA GRUESA ARENA FINA PIEDRA 1/2'' PIEDRA BASE HORMIGON CEMENTO LADRILLO EQUIPO MULTIFUNCIONAL COP/IMP BOTA DE JEBE CAMISA LENTES TRANSPARENTES ZAPATO PUNTA DE ACERO CASCO DE SEGURIDAD CORTAVIENTOS PANTALON DRILL ZAPATO DIELECTRICO GUANTE BADANA GUANTE CUERO GUANTE JEBE GUANTE DIELECTRICO MASCARILLA 3 PLIEGUES FRANELA 1m CESÉD AMERICANO PETROLEO ADHESIVO EPOXICO EN GEL ADITIVO EPOXICO P/CONCRETO BOLSA DE POLIETILENO 97cm CALVIVA NACIONAL CINTA FLEXIBLE PARA SELLADO CLORO LIQUIDO DETERGENTE GRANULADO X 1kg IMPRIMANTE P/MEMBRANA ASFALTICA LACA DESMOLDEADORA X 1gln PINTURA ASFALTICA IMPERMEABLE POLIESTIRENO EXPLANDIDO DE 1.2X2.4X1.04 RECUBRIMIENTO ACRILICO IMPERMEABLE

UND

m3 m3 m3 m3 m3 und und und und und und und und und und und und und und und pqt m m2 gln und kg ciento kg m lts und gln und gln und kg

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

15

15

15

15

15

20 15

15

15 2000

385 1 20 40 100 30 22 55 40 2 50 80 30 3 4 100 45 200 2 5 1 20 25 12 1 3 3 2 55 44

15 15 15

30 15

30 15

30

VALORIZACION JULIO METRADO

120 15 105 20 45 2000 385 1 20 40 100 30 22 55 40 2 50 80 30 3 4 100 45 200 2 5 1 20 25 12 1 3 3 2 55 44

MONTO (S/.)

%

MATERIAL ABRIL SALIDA: DECRIPCION

CEMENTO PIEDRA 1/2'' ZARANDEADA HORMIGON ARENA FINA ARENA GRUESA CINTA AISLANTE CINTA TEFLON CINTA DE SEGURIDAD WINCHA 8mts BROCHA DE 3'' DISCO CORTE METAL 7'' DISCO CORTE 7 1/4'' GUANTE BADANA GUANTE CUERO GUANTE JEBE CASCO DE SEGURIDAD ZAPATO DE SEGURIDAD BOTA JEBE ALAMBRE N°8 ALAMBRE N°16 CALAMINA GALVANIZADA BIDON AGUA MINERAL BISAGRAS 4X2 BISAGRAS 4X4 PALO EUCALIPTO PANTALON DRILL PROTECTOR SOLAR JABON LIQUIDO JABONERA PAPEL HIGIENICO PAPELERA CORTA VIENTOS CAMISA EQUIPO MULTIFUNCIONAL COP/IMP GASOLINA PETROLEO CANCADADO LADRILLO PLANCHA TRIPLAY 8mm PLANCHA TRIPLAY 4mm

UND

und m3 m3 m3 m3 und und und und und und und und und und und und und kg kg und und und und und und und und und pqt und und und und gln gln und und und und

S

D

1

2

15

L

M

M

J

V

S

D 9

3

4

5

6

7

8

52

30 10 10

48 10 10

20

25 8

6

L

M

M

J

V

13

14

10

11

12

39

94

70

7

S

D

15

16

50

15 15

L

M

M

J

V

S

D

17

18

19

20

21

22

23

105 154 132 115 137 61 15 15 15 15

L 24

77 15

M

M

J

V

S

D

25

26

27

28

29

30

119 123 136 122 90 15 15 30 15

15 15

15

15

2

15 1

30

15

5 1

1

1 1

1 1 1

1

1

1

1

1 1 4

3

8

1

1 1

13

38

6 2

3

4 2

27

3

30

3

18

1

1

8 1

69

3

2 2 8 8 15

1 1 25

3

2

1

39 40

3 1 1

9

2 1 1 1

2 1

1

1

3

1

9 9 3

2

17

6

10

9

52

12

3

3

2

4

2

2

2 2 1

2 1 1

1 1 1

2

1

2

2

2 2

12

2

25 3 2

25 3

2 3 3

6 40

3

60

60

1 6 1 2 3 1 1 70

2 45

224

231 231 231 182 180 319 2 1 6

1 1

6

1 15

2 3

12

1

41 39

2

6 2

2 1

3

8

2 12

265 165 363 1

385

13

2 2

1 30

2 36

2

399 484 448 330 462 2.64 1

1

2 17

2 7

2

4 60

4 4

506 297 308 154 88 10 8 1

5 88 1

VALORIZACIO N JULIO METRADO

1820 133 72 30 120 3 5 3 2 1 6 3 15 36 10 19 22 7 255 156 6 48 2 7 8 49 200 1 6 1 2 55 49 1 34 338 0 6342.64 20 12

MATERIAL MAYO INGRESO: DECRIPCION

UND

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

M

M

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

METRADO

15

15

1

61 15 30 0 0 500 8 0 23 26 4 27 8 17 8 42 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 400 0 0 0 0 160 320 24 80 0 1 0 0 0 0 0 0

ARENA GRUESA m3 ARENA FINA m3 PIEDRA 1/2'' m3 PIEDRA BASE m3 HORMIGON m3 CEMENTO und CEMENTO CONDUCTIVO X25gr und LADRILLO und SPOT PARA LAMPARA DICROICA PARA ADOSAR 20W LUZund CALIDA LUMINARIA A TIPO BRAQUETE CON FOCO AHORRADOR DE und 18 WPHILIPS LUMINARIA CON LAMPARA DE VAPOR DE SODIO DE 70Wund PHILIPS LUMINARIA CIRCULAR 2x18WPARA ADOSAR und LAMPARA REFLECTORA 400W 220V und LAMPARA LUZ DE EMERGENCIA 2 FAROS und FAROLA ESFERICA PHILIPS und EQUIPO FLUORECENTE LINEAL 2x36W und EQUIPO MULTIFUNCIONAL COP/IMP und BOTA DE JEBE und CAMISA und LENTES TRANSPARENTES und ZAPATO PUNTA DE ACERO und CASCO DE SEGURIDAD und CORTAVIENTOS und PANTALON DRILL und ZAPATO DIELECTRICO und GUANTES BADANA und GUANTES CUERO und GUANTES JEBE und GUANTES DIELECTRICO und MASCARILLA 3 PLIEGUES pqt FRANELA 1m m CESÉD AMERICANO m2 PETROLEO gln ADHESIVO EPOXICO EN GEL und ADITIVO EPOXICO P/CONCRETO kg BOLSA DE POLIETILENO 97cm ciento CALVIVA NACIONAL kg CINTA TEFLON 2.5'' und CINTA TEFLON 3/4'' und CINTA AISLANTE VULCANIZANTE DE 19m und CINTA AISLANTE DE 22mm x 5mm und CINTA FLEXIBLE PARA SELLADO m CINTA PLASTICA DE SEÑALIZACION und CLORO LIQUIDO lts DETERGENTE GRANULADO X 1kg und IMPRIMANTE P/MEMBRANA ASFALTICA gln LACA DESMOLDEADORA X 1gln und PINTURA ASFALTICA IMPERMEABLE gln POLIESTIRENO EXPLANDIDO DE 1.2X2.4X1.04 und

15

15 15

15

15

150 350 8 23 26 4 27 8 17 8 42

200

200

160 320 24 80 1

VALORIZACION JULIO MONTO (S/.)

%

MATERIAL MAYO SALIDA: DECRIPCION

CEMENTO PIEDRA 1/2'' ZARANDEADA HORMIGON ARENA FINA ARENA GRUESA CINTA AISLANTE CINTA TEFLON CINTA DE SEGURIDAD WINCHA 5mts WINCHA 8mts BROCHA DE 3'' DISCO CORTE METAL 7'' DISCO CORTE 7 1/4'' DISCO CORTE 7 1/8'' DISCO PARA CONCRETO GUANTE BADANA GUANTE CUERO GUANTE JEBE CASCO DE SEGURIDAD ZAPATO DE SEGURIDAD ZAPATO DI ELECTRICO BOTA JEBE ALAMBRE N°8 ALAMBRE N°16 CALAMINA GALVANIZADA BIDON AGUA MINERAL BISAGRAS 4X2 BISAGRAS 4X4 PALO EUCALIPTO PANTALON DRILL PROTECTOR SOLAR JABON LIQUIDO JABONERA PAPEL HIGIENICO PAPELERA CORTA VIENTOS CAMISA EQUIPO MULTIFUNCIONAL COP/IMP GASOLINA

UND

und m3 m3 m3 m3 und und und und und und und und und und und und und und und und und kg kg und und und und und und und und und pqt und und und und gln

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

M

M

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

31

62

55

62

98 15

17

21

16

35

12

28

38

13

69

34

26

83

27 15

15

15

108 120

104 23

106 73

47

15 15

15

10

1 100 50

40

10

10

10

1 2

2

1 1 1

1

1

1 1

1

1

2 1

2

2

1

3 1

1

1 1

7 1

1

1 1

2 2

1

2

1 1

1 3

2

2

1 1

1 1 1

1 1 8 60

1

3

1

1 1

1 8 5

2

2

1

1 21

3

1

30 9

11 1

5

4

3

1

2

3

4 100

8

1

1

10

2

10

1

5

2

2

20 15 60 1

50

3

4

4

50

2

2

4

32

2

2

5

3

2

1

30

4

1

2

3

2

4

2

3

2

VALORIZACION JULIO METRADO

1194 113 0 15 70 1 220 0 1 1 11 1 3 6 1 20 13 3 1 1 1 4 119 181 0 32 0 0 20 15 222 1 0 0 0 0 0 0 57

MONTO (S/.)

%

MATERIALES INGRESO JUNIO: DECRIPCION

UND

J

V

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

M

M

J

V

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

ARENA GRUESA m3 ARENA FINA m3 PIEDRA 1/2'' m3 PIEDRA BASE m3 HORMIGON m3 CEMENTO und CEMENTO CONDUCTIVO X25gr und LADRILLO und SPOT PARA LAMPARA DICROICA PARA ADOSAR 20W LUZund CALIDA LUMINARIA A TIPO BRAQUETE CON FOCO AHORRADOR DE und 18 WPHILIPS LUMINARIA CON LAMPARA DE VAPOR DE SODIO DE 70Wund PHILIPS LUMINARIA CIRCULAR 2x18WPARA ADOSAR und LAMPARA REFLECTORA 400W 220V und LAMPARA LUZ DE EMERGENCIA 2 FAROS und FAROLA ESFERICA PHILIPS und EQUIPO FLUORECENTE LINEAL 2x36W und EQUIPO MULTIFUNCIONAL COP/IMP und BOTA DE JEBE und CAMISA und LENTES TRANSPARENTES und ZAPATO PUNTA DE ACERO und CASCO DE SEGURIDAD und CORTAVIENTOS und PANTALON DRILL und ZAPATO DIELECTRICO und GUANTE BADANA und GUANTE CUERO und GUANTE JEBE und GUANTE DIELECTRICO und MASCARILLA 3 PLIEGUES pqt FRANELA 1m m CESÉD AMERICANO m2 PETROLEO gln ADHESIVO EPOXICO EN GEL und ADITIVO EPOXICO P/CONCRETO kg BOLSA DE POLIETILENO 97cm ciento CALVIVA NACIONAL kg CINTA TEFLON 2.5'' und CINTA TEFLON 3/4'' und CINTA AISLANTE VULCANIZANTE DE 19m und CINTA AISLANTE DE 22mm x 5mm und CINTA FLEXIBLE PARA SELLADO m CINTA PLASTICA DE SEÑALIZACION und

15

15

30

15

15

15 300 300

200

VALORIZACION JULIO METRADO

60 0 0 0 45 600 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 200 0 0 0 0 0 0 0 0 0 0

MONTO (S/.)

%

MATERIALES DE SALIDA JUNIO: DECRIPCION

CEMENTO PIEDRA 1/2'' ZARANDEADA HORMIGON ARENA FINA ARENA GRUESA CINTA AISLANTE CINTA TEFLON CINTA DE SEGURIDAD WINCHA 5mts WINCHA 8mts BROCHA DE 3'' DISCO CORTE METAL 7'' DISCO CORTE 7 1/4'' DISCO CORTE 7 1/8'' DISCO PARA CONCRETO GUANTES BADANA GUANTES CUERO GUANTES JEBE GUANTES DI ELECTRICOS CASCO DE SEGURIDAD ZAPATOS DE SEGURIDAD ZAPATOS DI ELECTRICO BOTAS DE JEBE ALAMBRE N°8 ALAMBRE N°16 CALAMINA GALVANIZADA BIDON AGUA MINERAL BISAGRAS 4X2 BISAGRAS 4X4 PALO EUCALIPTO PANTALON DRILL PROTECTOR SOLAR JABON LIQUIDO JABON DE TOCADOR JABONERA PAPEL HIGIENICO PAPELERA CORTA VIENTOS CAMISA DRILL EQUIPO MULTIFUNCIONAL COP/IMP GASOLINA PETROLEO CANCADADO LADRILLO LADRILLO HERCULES LADRILLO PASTELERO PLANCHA TRIPLAY 4'' PLANCHA TRIPLAY 8mm PLANCHA TRIPLAY 4mm PLANCHA TRIPLAY 18mm PLANCHA TRIPLAY 18''X1.22X2.44 PLANCHA TRIPLAY 4''X1.22X2.44

UND

und m3 m3 m3 m3 und und und und und und und und und und und und und und und und und und kg kg und und und und und und und und und und pqt und und und und gln gln und und und und und und und und und und

J

V

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

M

M

J

V

S

D

L

M

M

J

V

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

28

29

30

17

43

32

76

53

37

7

22

15

15

15

15

15

15

30

44

15

15

5

10

35

15

10

25

18

4

10

1

1

5

17

10

1 1

1

1 1

1 2

1

1 1

3

2

1

1

1

1

2

6 2

1 2 1 1

1

1

1

1

2

2

28

5

1 12

1

2 69

2 1

2

2 16

1 10

2

7 35

1

2

1

1

1

1

2

3 20

2 7

2 25

1

2 22

1

2 25

2

2

210

1 2

4

4

3

3

3

3

3 11

3 11

28

2

2 30

2

VALORIZACION JULIO METRADO

361 0 45 15 60 0 164 0 2 0 1 3 3 0 0 8 10 8 1 0 3 0 4 0 0 0 11 0 0 0 6 56 0 3 0 3 0 0 6 0 43 299 0 0 0 210 0 0 1 10 0 0

MONTO (S/.)

%

ANEXO 05: METRADO DEL ROLLIZO DE EUCALIPTO

DESCRIPCION

UNIDAD

NRO VECES

TUBO F°N° Ø 2 1/2'' X 3MM Proyección de V- TUBO 1 1/2'' X 2'' Proyección de V- TUBO 2 1/2'' X 2 1/2'' Tensor de cable acerado 1/4''

und und und und

11 80 30 11

Establo Ca1 - Ca8 en los extremos

und

10

MEDIDAS LARGO

ANCHO

ALTO

PARCIAL

SECTOR 06: Jusfamiento de animales

TOTAL

588.28 7.15 3.94 3.94 6.93

<= m <= m <= m <= m

78.65 315.2 118.2 76.23

SECTOR 09: Sector Agropecuario 01 puntales verticales de 6''

146.34

m m m m m m

Establo Ca1 - Ca8 en el medio

und

5

Establo O8 - 14 en los extremos

und

8

Establo O8 - O14 en el medio

und

8

Establo O15 - O22 en los extremos

und

10

Establo O15 - O22 en el medio

und

5

Establo Ca1 - Ca8

und

50

Establo Ca1 - Ca8

und

60

Establo O8 - 14

und

80

Establo O8 - 14

und

105

Establo O15 - O22

und

50

Establo O15 - O22

und

60

2.75

rollizo puertas tronco transversal

und

30

1.50

Establo Ca1 - Ca8

und

10 16 10

3.10

=> => => => => =>

3.80 4.33 3.80 4.33 3.80 4.33

38.00 21.65 30.40 34.64 38.00 21.65

rollizo horizontales 4''

1,203.75

m => 2.75

m => 2.75

m =>

<=m <=m

150.00 165.00 240.00 288.75 150.00 165.00 45.00

<=m <=m <=m

31.00 49.60 31.00

3.00

<=m 3.00

<=m 3.00

rollizo techo de 4''

111.60 Establo O8 - O14

und

Establo O15 - O22

und

rollizo hechado sentodo horizontal Establo Ca1 - Ca8

und

3.10 3.10

rollizo techo de 2''

244.95 rollizo hechado sentodo horizontal Establo O8 - O14

und

rollizo hechado sentodo horizontal Establo O15 - O22

und

Establo Ca1 - Ca8

und

Establo O8 - O14

und

Establo O15 - O22

und

rollizo techo tronco vertical pequeño

und

Establo V1 - V10, extremo exterior

und

3 3 3 10 16 10 36

3.06 3.06 3.06

0.30

m => 19.33 m => 11.00 m => 11.00

57.99 33.00 33.00 30.60 48.96 30.60 10.80

m m m m

33.00 41.80 33.00 41.80

<=m <=m <=m <=m

SECTOR 10: Sector Agropecuario 02 puntales verticales de 4''

149.60 Establo V1 - V10, extremo interior

und

Establo V11 - V20, extremo exterior

und

Establo V11 - V20, extremo interior

und

Establo V1 - V10

und

11 11 11 11

=> => => =>

3.00 3.80 3.00 3.80

rollizo horizontales 4''

276.20 Establo V1 - V10

und

Establo V11 - V20

und

Establo V11 - V20

und

rollizo puertas tronco transversal

und

rollizo hechado sentodo horizontal

und

rollizo hechado sentodo vertical

und

rollizo para techo 2 aguas

und

rollizo interior transversal

puntales verticales C01-C02 puntales verticales C02-C03 puntales verticales C03-C04 puntales verticales C04-C05 puntales verticales C05-C06 puntales verticales C06-C07 puntales verticales C07-C08 puntales verticales C08-C09 puntales verticales C09-C10 puntales verticales C10-C11 puntales verticales C11-C12 puntales verticales C12-C13 puntales verticales C13-C14 puntales verticales C01-C16 puntales verticales C16-C17 puntales verticales C17-C14

20 11 20 11 20

<=m m => 4.10 3.90 <=m m => 4.10 1.50 <=m

78 45.1 78 45.1 30

3.90

rollizo techo de 2''

258.52

11 5

m => 5.32 m => 40.00

58.52 200.00

und

22 22

m => 7.27 m => 4.07

159.94 89.54

und und und und und und und und und und und und und und und und

6 6 6 6 2 5 5 5 2 7 6 7 6 6 7 5

m m m m m m m m m m m m m m m m

rollizo techo de 4''

249.48

SECTOR 12: Corral para toros puntales verticales de 4''

208.8 => => => => => => => => => => => => => => => =>

2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4 2.4

14.40 14.40 14.40 14.40 4.80 12.00 12.00 12.00 4.80 16.80 14.40 16.80 14.40 14.40 16.80 12.00

ANEXO 06: METRADO DE INSTALACIONES SANITARIAS

descripcion

N° de veces

unidad

17

dimenciones ancho

parcial

total

und

17

17

7 9 1

und und und

7 9 1

7 9 1

7 8 3 2

und und und und

7 8 3 2

7 8 3 2

1

m

337.63

337.63

17 3 1

und und und

17 3 1

17 3 1

10 2 2 2

und und und und

10 2 2 2

10 2 2 2

1 1

m m

170.53 88.94

170.53 88.94

largo

alto

SUMINISTRO DE AGUA SUMINISTRO DE ACCESORIOS Valvula tipo compuerta ACCESORIOS DE REDES DE AGUA codo 90° PVC SAP C-10 1/2'' Tee PVC SAP C-10 1/2'' Reduccion de 3/4''a 1/2'' INSTALACION DE APARATOS SANITARIOS Instalacion de lavadero de concreto Instalacion de lavadero de concreto mas escurridero instalacion de tanque elevado pozo de concreto INATALACION DE RED DE DISTRIBUCION tuberia de agua fria PVC - SAP Ø 1/2'' SISTEMA DE DRENAJE ACCESORIOS DE REDES DE DRENAJE DE AGUA CAJA DE 30X60 Yee codo 45° INSTALACION DE APARATOS SANITARIOS Instalacion de lavadero de concreto caja de rejistro de lodos caja de drenaje Tanque biodijestor INATALACION DE RED DE DRENAJE Tuberia PVC Ø 4'' Tuberia PVC Ø 2''

337.63

170.53 88.94

ANEXO 07: Plano de la actividad: “MANTENIMIENTO DE LA FERIA REGIONAL AGRONÓMICA E INDUSTRIAL TACNA EN EL DISTRITO GREGORIO ALBARRACÍN, PROVINCIA TACNA REGIÓN TACNA

53