RENCANA ANGGARAN BIAYA Pekerjaan Lokasi TAHUN ANGGARAN

: Pembangunan Ruang Perpustakaan : SMPN 2 Genteng : Kecamatan Genteng : 2018

NO ITEM PEKERJAAN (1) (2) A REHABILITASI RUANG I PEKERJAAN PERSIAPAN 1 Pembersihan Lokasi 2 Pengukuran dan Pemasangan Bowplank

VOLUME SATUAN (3) (4)

270,31 22,90

m2

m' Sub Total (I) PEKERJAAN PERSIAPAN

II

III

IV

V

VI

PEKERJAAN TANAH DAN URUNGAN 1 Galian tanah 2 Urungan tanah kembali 3 Urungan pasir bawah lantai 4 Urungan pasir bawah pondasi PEKERJAAN PASANGAN 1 Pasangan astamping 2 Pasangan batu kali, 1pc : 3kp : 10 pp 3 Pasangan Bbatu bata, 1pc : 3kp : 8 pp 4 Plesteran 1pc : 2kp : 9 pp 5 Acian 6 Benangan 7 Pas. Lantai Keramik 30/30 8 Rebatan 1pc : 3pc : 5kp PEKERJAAN BETON 1 Kolom beton bertulang (150 kg besi + bekisting) 2 sloof beton bertulang (150 kg besi + bekisting 3 Plat bton bertulang (150 kg besi + bekisting) 4 Balok beton bertulang (150 kg besi + bekisting) PEKERJAAN KUSEN, PINTU, DAN JENDELA 1 Kusen pintu dan kusen jendela, kayu kelas II (ky kamper) 2 Daun pinru panel, kayu kelas II (ky kampel) 3 Pintu dan jendela kaca, kayu kelas II (ky kamper) 4 Pasang engsel pintu 5 Pasang engsel jendela 6 Pasang grendel alumunium 7 Pasang hak angin 8 Pasang kunci PEKERJAAN LISTRIK 1 Pasang instalasi listrik 2 Pasang lampu TL 20 watt

108,20 m3 90,13 m3 27,03 m3 7,33 m3 Sub Total (II) PEKERJAAN TANAH DAN URUNGAN 13,65 m3 49,14 m3 167,38 m2 384,26 m2 334,76 m2 22,25 m' 280,49 m2 28,05 m3 Sub Total (IV) PEKERJAAN PASANGAN 13,87 m3 11,99 m3 15,16 m3 11,99 m3 Sub Total (V) PEKERJAAN KUSEN DAN PARTISI 0,65 m3 3,40 m3 110,25 m2 1,00 m2 9,00 bh 9,00 bh 9,00 bh 1,00 bh Sub Total (V) PEKERJAAN KUSEN DAN PARTISI 15,00 6,00

ttk bh

3 pasang lampu pijar 20 watt 4 pasang saklar & stop kontak VII

4,00 5,00

PEKERJAAN PENGECATAN 1 Cat dinding baru Vinilex/setara

bh bh Sub Total (VI) PEKERJAAN LISTRIK

m2 384,26 Sub Total (VII) PKERJAAN PENGECATAN TOTAL BIAYA REHABILITASI TOTAL BIAYA DIBULATKAN Total Biaya yang Digunakan

TERBILANG SERATUS TUJUH PULUH DUA JUTA LIMA PULUH EMPAT RIBU SERATUS EMPAT PULUH SEMBILAN KOMA LIMA PULUH D

Menyutujui Ketua Tim Pelaksana SMPN 1 GENTENG

M. AGUS SALIM Diketahui dan Disetujui KETUA KOMITE SMPN 1 GENTENG Selaku Penanggung jawab Kegiatan

H. AHMAD SUMADI S

RENCANA ANGGARAN BIAYA Pekerjaan Lokasi TAHUN ANGGARAN

: Pembangunan Ruang Perpustakaan : SMPN 2 Genteng : Kecamatan Genteng : 2016

NO ITEM PEKERJAAN (1) (2) A REHABILITASI RUANG I PEKERJAAN PERSIAPAN 1 Pembersihan Lokasi 2 Pengukuran dan Pemasangan Bowplank

VOLUME SATUAN (3) (4)

270,31 22,90

m2

m' Sub Total (I) PEKERJAAN PERSIAPAN

II

PEKERJAAN TANAH DAN URUNGAN 1 Galian tanah 2 Urungan tanah kembali

108,20 90,13

m3 m3

3 Urungan pasir bawah lantai 4 Urungan pasir bawah pondasi III

IV

V

VI

VII

PEKERJAAN PASANGAN 1 Pasangan astamping 2 Pasangan batu kali, 1pc : 3kp : 10 pp 3 Pasangan Bbatu bata, 1pc : 3kp : 8 pp 4 Plesteran 1pc : 2kp : 9 pp 5 Acian 6 Benangan 7 Pas. Lantai Keramik 30/30 8 Rebatan 1pc : 3pc : 5kp PEKERJAAN BETON 1 Kolom beton bertulang (150 kg besi + bekisting) 2 sloof beton bertulang (150 kg besi + bekisting 3 Plat bton bertulang (150 kg besi + bekisting) 4 Balok beton bertulang (150 kg besi + bekisting) PEKERJAAN KUSEN, PINTU, DAN JENDELA 1 Kusen pintu dan kusen jendela, kayu kelas II (ky kamper) 2 Daun pinru panel, kayu kelas II (ky kampel) 3 Pintu dan jendela kaca, kayu kelas II (ky kamper) 4 Pasang engsel pintu 5 Pasang engsel jendela 6 Pasang grendel alumunium 7 Pasang hak angin 8 Pasang kunci PEKERJAAN LISTRIK 1 Pasang instalasi listrik 2 Pasang lampu TL 20 watt 3 pasang lampu pijar 20 watt 4 pasang saklar & stop kontak PEKERJAAN PENGECATAN 1 Cat dinding baru Vinilex/setara

27,03 m3 7,33 m3 Sub Total (II) PEKERJAAN TANAH DAN URUNGAN 13,65 m3 49,14 m3 167,38 m2 384,26 m2 334,76 m2 22,25 m' 280,49 m2 28,05 m3 Sub Total (IV) PEKERJAAN PASANGAN 13,87 m3 11,99 m3 15,16 m3 11,99 m3 Sub Total (V) PEKERJAAN KUSEN DAN PARTISI 0,65 m3 3,40 m3 110,25 m2 1,00 m2 9,00 bh 9,00 bh 9,00 bh 1,00 bh Sub Total (V) PEKERJAAN KUSEN DAN PARTISI 15,00 6,00 4,00 5,00

ttk bh bh bh Sub Total (VI) PEKERJAAN LISTRIK

m2 384,26 Sub Total (VII) PKERJAAN PENGECATAN TOTAL BIAYA REHABILITASI TOTAL BIAYA DIBULATKAN Total Biaya yang Digunakan

TERBILANG DUA RATUS DUA PULUH DUA JUTA TIGA RATUS DUA PULUH EMPAT RIBU DELAPAN RATUS LIMA PULUH KOMA EMPAT PULUH

Menyutujui Ketua Tim Pelaksana SMPN 1 GENTENG

M. AGUS SALIM Diketahui dan Disetujui KETUA KOMITE SMPN 1 GENTENG Selaku Penanggung jawab Kegiatan

H. AHMAD SUMADI S

GGARAN BIAYA

JUMLAH HARGA (5)

Rp. 8.770,00 Rp. 62.570,00 Sub Total (I) PEKERJAAN PERSIAPAN

Rp. 37.460,00 Rp. 17.100,00 Rp. 130.470,00 Rp. 176.980,00 Total (II) PEKERJAAN TANAH DAN URUNGAN

TOTAL (6)

Rp. 2.370.640,63 Rp. 1.432.853,00 Rp. 3.803.493,63 Rp. 4.053.172,00 Rp. 1.541.208,75 Rp. 27,03 Rp. 1.296.378,50 Rp. 6.890.786,28

Rp. 255.700,00 Rp. 487.290,00 Rp. 75.250,00 Rp. 31.760,00 Rp. 22.270,00 Rp. 12.440,00 Rp. 253.160,00 Rp. 720.180,00 Sub Total (IV) PEKERJAAN PASANGAN

Rp. 3.490.305,00 Rp. 23.945.430,60 Rp. 12.595.345,00 Rp. 12.204.097,60 Rp. 7.455.105,20 Rp. 276.790,00 Rp. 71.008.215,50 Rp. 20.200.148,00 Rp. 151.175.437,68

Rp. 2.664.450,00 Rp. 2.664.450,00 Rp. 3.714.240,00 Rp. 3.203.810,00 Sub Total (V) PEKERJAAN KUSEN DAN PARTISI

Rp. 36.942.599,25 Rp. 31.953.416,63 Rp. 56.293.950,00 Rp. 38.421.691,43 Rp. 163.611.657,30

Rp. 12.279.150,00 Rp. 632.680,00 Rp. 437.920,00 Rp. 37.200,00 Rp. 24.990,00 Rp. 45.000,00 Rp. 25.010,00 Rp. 80.420,00 Sub Total (V) PEKERJAAN KUSEN DAN PARTISI

Rp. 7.987.832,66 Rp. 2.151.112,00 Rp. 48.280.680,00 Rp. 37.200,00 Rp. 224.910,00 Rp. 405.000,00 Rp. 225.090,00 Rp. 80.420,00 Rp. 59.392.244,66

Rp. 150.000,00 Rp. 125.000,00

Rp. 2.250.000,00 Rp. 750.000,00

Rp. 60.000,00 Rp. 240.000,00 Rp. 85.000,00 Rp. 425.000,00 Sub Total (VI) PEKERJAAN LISTRIK Rp. 3.665.000,00 Rp. 15.200,00 Sub Total (VII) PKERJAAN PENGECATAN TOTAL BIAYA REHABILITASI TOTAL BIAYA DIBULATKAN Total Biaya yang Digunakan

Rp. 5.840.752,200 Rp. 5.840.752,200 Rp. 394.379.751,52 Rp. 394.379.000,00 Rp. 172.054.149,52

U SERATUS EMPAT PULUH SEMBILAN KOMA LIMA PULUH DUA RUPIAH

Banyuwangi,

2018

Dibuat Oleh Perencana

EKO PRASETYO BASUKI

GGARAN BIAYA

JUMLAH HARGA (5)

Rp. 8.770,00 Rp. 62.570,00 Sub Total (I) PEKERJAAN PERSIAPAN Rp. 37.460,00 Rp. 17.100,00

TOTAL (6)

Rp. 2.370.640,63 Rp. 1.432.853,00 Rp. 3.803.493,63 Rp. 4.053.172,00 Rp. 1.541.208,75

Rp. 130.470,00 Rp. 27,03 Rp. 176.980,00 Rp. 1.296.378,50 Total (II) PEKERJAAN TANAH DAN URUNGAN Rp. 6.890.786,28 Rp. 255.700,00 Rp. 487.290,00 Rp. 75.250,00 Rp. 31.760,00 Rp. 22.270,00 Rp. 12.440,00 Rp. 253.160,00 Rp. 720.180,00 Sub Total (IV) PEKERJAAN PASANGAN

Rp. 3.490.305,00 Rp. 23.945.430,60 Rp. 12.595.345,00 Rp. 12.204.097,60 Rp. 7.455.105,20 Rp. 276.790,00 Rp. 71.008.215,50 Rp. 20.200.148,00 Rp. 151.175.437,68

Rp. 2.664.450,00 Rp. 2.664.450,00 Rp. 3.714.240,00 Rp. 3.203.810,00 Sub Total (V) PEKERJAAN KUSEN DAN PARTISI

Rp. 36.942.599,25 Rp. 31.953.416,63 Rp. 56.293.950,00 Rp. 38.421.691,43 Rp. 163.611.657,30

Rp. 12.279.150,00 Rp. 632.680,00 Rp. 437.920,00 Rp. 37.200,00 Rp. 24.990,00 Rp. 45.000,00 Rp. 25.010,00 Rp. 80.420,00 Sub Total (V) PEKERJAAN KUSEN DAN PARTISI

Rp. 7.987.832,66 Rp. 2.151.112,00 Rp. 48.280.680,00 Rp. 37.200,00 Rp. 224.910,00 Rp. 405.000,00 Rp. 225.090,00 Rp. 80.420,00 Rp. 59.392.244,66

Rp. 150.000,00 Rp. 125.000,00 Rp. 60.000,00 Rp. 85.000,00 Sub Total (VI) PEKERJAAN LISTRIK Rp. 15.200,00 Sub Total (VII) PKERJAAN PENGECATAN TOTAL BIAYA REHABILITASI TOTAL BIAYA DIBULATKAN Total Biaya yang Digunakan

Rp. 2.250.000,00 Rp. 750.000,00 Rp. 240.000,00 Rp. 425.000,00 Rp. 3.665.000,00 Rp. 5.840.752,200 Rp. 5.840.752,200 Rp. 394.379.751,52 Rp. 394.379.000,00 Rp. 222.324.850,48

T RIBU DELAPAN RATUS LIMA PULUH KOMA EMPAT PULUH DELAPAN RUPIAH

Banyuwangi,

Dibuat Oleh Perencana

2016

39437900000 22232485048 17205414952

EKO PRASETYO BASUKI