Coastal Gujarat Power Ltd Equipment Commissioning Checklist for centrifugal pumps driven by LV Motors (415V 3ph) of rating 150 KW or less

System Equipment

Motor Name Plate Details

Pump Name Plate Details

Sr #

Part/Job/Parameter/Activity

1 Housekeeping 2 Housekeeping 3 Tagging 4 Foundation bolts Pump 5 Foundation bolts Motor 6 Foundation Shims - Motor 7 Foundation Shims - Pump 8 Rotate Pump Shaft 9 Rotate Pump Shaft 10 Pump-Motor Coupling halves 11 Pump-Motor Coupling 12 Pump-Motor Coupling 13 Pump-Motor Coupling 14 Coupling Guard 15 Cable to Motor 16 Oil level in the pump bearing Housing 17 Oil cup for pump 18 Greasing of bearings pump 19 Greasing of bearings motor 20 Pump Gland 21 Deflector 22 Mechanical Seal 23 Mechanical Seal 24 Suction Flange 25 Discharge Flange 26 Pump casing drains 27 Suction Valve 28 Leak tightness of pump 29 Discharge Valve 30 Root Valve of Discharge Pressure guage 31 Tap off for flowmeter 32 Tap off for Suction Strainer DP 33 Suction Strainer 34 Cooling Water flow to pump bearing assembly 35 Pump Priming 36 Direction of Rotation of Pumps 37 Motor Thermal overload 38 Breaker Module

39 Electrical Grounding wire 40 Flick Start Motor 41 Flick Start Motor 42 Continuous Run of Pump 43 Continuous Run of Pump 44 Continuous Run of Pump 45 Continuous Run of Pump 46 Continuous Run of Pump 47 Continuous Run of Pump 48 Continuous Run of Pump 49 Continuous Run of Pump 50 Motor Current 51 Continuous Run of Pump

Coastal Gujarat Power Ltd

gal pumps driven by LV Motors (415V 3ph) of rating 150 KW or less

Check Area around equipment clean Pump drains clear & properly connected Equipment identified & Marked properly by paint Tightness Tightness No looseness No looseness for freeness of pump for freeness of motor fan No looseness, properly secured to shaft Coupling Gap within limits Alignment within limits Flexible elements of couplings are installed Installed properly Connected at inidicated level filled & installed Done Done Gland packing done with adequate margin Properly installed & secured to shaft Check Installation Sealing lines installed Properly tightened with gaskets Properly tightened with gaskets closed & plugged in open condition No leakage from gland or mechanical seal or pump body in open condition in open condition in open condition in open condition Ensure in clean condition Established Ensure Ascertain & Marked properly Check - settings ok Ensure pump designation marked on it

Validate

Remarks

Connected to equipment Direction of Rotation Observe free rotation of pump No leakage from Mechanical Seal Minimun leakage from gland & adjust if necessary Develop rated pressure Develop rated flow Bearing Temperature within limit Vibrations within limit Normal Temperature of Gland bush & leakage No water ingress or splashing on pump bearing assemblies Within normal limits Any abnormal noise

<85 deg. C as per manufacturer

Coastal Gujarat Power Ltd Equipment Commissioning Checklist for Reciprocating pumps driven by LV Motors (415V 3ph) of rating 150 KW or less

System Equipment

Motor Name Plate Details

Pump Name Plate Details

Sr #

Part/Job/Parameter/Activity 1 Housekeeping 2 Housekeeping 3 Tagging 4 Foundation bolts Pump 5 Foundation bolts Motor 6 Foundation Shims - Motor 7 Foundation Shims - Pump 8 Rotate Pump Shaft 9 Rotate Pump Shaft 10 Pump-Motor Coupling halves 11 Pump-Motor Coupling 12 Pump-Motor Coupling 13 Pump-Motor Coupling 14 Coupling Guard 15 Cable to Motor 16 Oil level in the pump hydraulic chamber 17 Oil level in the pump gear box chamber 18 Greasing of bearings motor 19 Pump Gland 20 Suction Flange 21 Discharge Flange 22 Pump casing drains 23 Suction Valve 24 Leak tightness of pump 25 Discharge Valve 26 Root Valve of Discharge Pressure guage 27 Tap off for flowmeter 28 Tap off for Suction Strainer DP 29 Relief Valve 30 Suction Strainer 31 Motor Thermal overload 32 Breaker Module 33 Electrical Grounding wire 34 Flick Start Motor 35 Flick Start Motor 36 Continuous Run of Pump 37 Continuous Run of Pump 38 Continuous Run of Pump

39 Continuous Run of Pump 40 Continuous Run of Pump 41 Motor Current 42 Continuous Run of Pump

`

Coastal Gujarat Power Ltd

g pumps driven by LV Motors (415V 3ph) of rating 150 KW or less

Check Area around equipment clean Pump drains clear & properly connected Equipment identified & Marked properly by paint Tightness Tightness No looseness No looseness for freeness of pump for freeness of motor fan No looseness, properly secured to shaft Coupling Gap within limits Alignment within limits Flexible elements of couplings are installed Installed properly Connected at inidicated level at inidicated level Done Gland packing done with adequate margin Properly tightened with gaskets Properly tightened with gaskets closed & plugged in open condition No leakage from gland or oil seal or pump body in open condition in open condition in open condition in open condition Ascertain it setting at designate pressure Ensure in clean condition Check - settings ok Ensure pump designation marked on it Connected to equipment Direction of Rotation Observe free rotation of pump Minimun leakage from gland & adjust if necessary Develop rated pressure Develop rated flow

Validate

Bearing Temperature within limit Vibrations within limit Within normal limits Any abnormal noise

Remarks

<85 deg. C as per manufacturer

Coastal Gujarat Power Ltd Equipment Commissioning Checklist for Air blower (Twin lobe)

System Equipment

Motor Name Plate Details

Pump Name Plate Details

Sr #

Part/Job/Parameter/Activity 1 Housekeeping 2 Tagging 3 Foundation bolts Air blower 4 Foundation bolts Motor 5 Foundation Shims - Motor 6 Foundation Shims - Air blower 7 Rotate Air blower Shaft 8 Rotate Air blower Shaft 9 Air blower-Motor pulley 10 Air blower-Motor V-belts 11 V-belts pulley gard 12 Cable to Motor 13 Oil level in the Air blower bearing Housing 14 Greasing of bearings motor 15 Pulley & V- belts 16 Oil Seal 17 Suction Flange 18 Discharge Flange 19 Air blower casing drains 20 Suction Valve 21 Leak tightness of Air blower 22 Discharge Valve 23 Root Valve of Discharge Pressure guage 24 Tap off for flowmeter 25 Tap off for Suction Strainer DP 26 Suction Strainer 27 Direction of Rotation of Air blower 28 Relief Valve 29 Motor Thermal overload 30 Electrical Grounding wire 31 Breaker Module 32 Flick Start Motor 33 Flick Start Motor 34 Continuous Run of Air blower 35 Continuous Run of Air blower 36 Continuous Run of Air blower 37 Continuous Run of Air blower 38 Continuous Run of Air blower

39 Motor Current 40 Continuous Run of Air blower

Coastal Gujarat Power Ltd

Twin lobe)

Check Area around equipment clean Equipment identified & Marked properly by paint Tightness Tightness No looseness No looseness for freeness of Air blower for freeness of motor fan No looseness, properly secured to shaft Alignment within limits Installed properly Connected at inidicated level Done Properly installed & secured to shaft Check Installation Properly tightened with gaskets Properly tightened with gaskets closed & plugged in open condition No leakage from brg hsg. or oil seal or Air blower body in open condition in open condition in open condition in open condition Ensure in clean condition Ascertain & Marked properly Ascertain it is set at designate pressure Check - settings ok Connected to equipment Ensure pump designation marked on it Direction of Rotation Observe free rotation of Air blower No leakage from oil Seal Develop rated pressure Develop rated flow Bearing Temperature within limit Vibrations within limit

Validate

Remarks

<85 deg. C as per manufacturer

Within normal limits Any abnormal noise