Construção

Ampliação

Levantamento geral Áreas

TOTAL

Calçada 17.75 m²

Levantamento 17.75

Piso 63.69 m²

16.32 16.85 3.36 1.54 4.76 20.86

Lage Paredes 42.83 m² 109.12 m² Sem abert 99.46 m²

16.32 16.85 3.36 1.54 4.76

17.06 17.06 12.96 3.78 9.18 9.72 9.72 6.32 6.32 17

Portas 5.04 m²

Janelas 4.62 m²

Telhado 84.68 m²

1.89 1.68 1.47

2.16 2.16 0.3

63.69 17.75 3.24

Reforma Levantamento geral Volumes Fech Lat 23.66 m²

Pilares 1.1 m³

2.4 3.06 2.5 1.26 3.96 6.6 2.88 1

0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1

Vigas Inf Vigas Sup Sapatas Pescoços 1.1 m³ 1.4 m³ 0.8 m³ 0.0 m³

TOTAL

Levantamento 0.23 0.23 0.17 0.05 0.13 0.13 0.12

0.23 0.23 0.23 0.05 0.37 0.12 0.13

0.1 0.1 0.1 0.1 0.07 0.07 0.07 0.07 0.07 0.07

Reforma

Casa existente

Levantamento geral Áreas Calçada 0.00 m²

Piso 20.00 m²

Lage 0.00 m²

Paredes 68.86 m² Sem abert 59.41 m²

Portas 8.61 m²

Janelas 0.84 m²

1.68 4.5 6.56 6.75 9.24 9.24 6.52 1.17 1.17 1.17 3.6 3.6 3.6 3.6 0.83 0.83 4.8

1.89 1.89 3.15 1.68

0.84

Telhado 0.00 m²

Mureta 7.56 m²

Levantamento 20

7.56

Volumes Pilares 0.0 m³

Vigas Inf Vigas (cinta) Sapatas Pescoços 0.0 m³ 1.8 m³ 0.0 m³ 0.0 m³

0.14 0.14 0.14 0.43 0.43 0.1 0.1 0.28

Orçamento TOTAL FINAL: Construção

Ampliação

Lista de Materiais

Cimento (saca 50kg) Areia média grossa Areia grossa Brita 3/4" Argamassa p/ assentamento Argamassa p/ reboco Bloco Tijolo Telha

Reforma

Qtde 88.5 sc 7.3 m³ 0.8 m³ 8.1 m³ 0.9 m³ 3.3 m³ 285 blc 2426 tj 1270 tlh

$ Unit R$ 17.00 R$ 27.80 R$ 27.80 R$ 36.00 R$ 50.00 R$ 50.00 R$ 0.22

Casa existente

Lista de Materiais

Cimento (saca 50kg) Areia média grossa Areia grossa Brita 3/4" Argamassa p/ assentamento Argamassa p/ reboco Bloco Tijolo Telha

Qtde 32.9 sc 2.2 m³ 0.5 m³ 2.3 m³ 0.5 m³ 2.0 m³ 91 blc 1449 tj 0 tlh

$ Unit R$ 17.00 R$ 27.80 R$ 27.80 R$ 36.00 R$ 50.00 R$ 50.00 R$ 0.22

TOTAL FINAL:

R$ 3,907.87

R$ R$ R$ R$ R$ R$

Custo 1,503.88 202.94 23.04 291.60 44.58 165.77

R$ 521.56 TOTAL

R$ 2,753.36

R$ R$ R$ R$ R$ R$

Custo 559.61 61.16 13.76 82.80 26.63 99.02

R$ 311.54 TOTAL

R$ 1,154.51

Construção

Ampliação

Concreto para Pilares e Vigas

Reforma Concreto para Pilares e Vigas

FCK (Mpa): 15 Resumo Cimento: Areia: Brita:

Resumo Cimento: Areia: Brita:

23.3 sacas 2.6 m³ 2.9 m³

Pilares

11.7 sacas 1.3 m³ 1.4 m³

Pilares Volume: 1.1 m³

Cimento: Areia: Brita:

7.1 sacas 0.8 m³ 0.9 m³

Cimento: Areia: Brita:

Vigas inferiores

Vigas inferiores Volume: 1.1 m³

Cimento: Areia: Brita:

7.1 sacas 0.8 m³ 0.9 m³

Cimento: Areia: Brita:

Vigas superiores

Vigas superiores Volume: 1.4 m³

Cimento: Areia: Brita:

9.1 sacas 1.0 m³ 1.1 m³

Cimento: Areia: Brita:

11.7 sacas 1.3 m³ 1.4 m³

Casa existente

ra Pilares e Vigas FCK (Mpa): 15

Volume:

Volume:

Volume: 1.8 m³

Construção

Ampliação

Concreto para Pisos, Lages e Calçadas Resumo Cimento: Areia: Brita:

FCK (Mpa): 15 42.7 sacas 4.7 m³ 5.2 m³

Piso Cimento: Areia: Brita: Dados Esp (cm) 6

Dados Esp (cm) 4

Concreto para Pisos, Lages e C Resumo Cimento: Areia: Brita:

7.8 sacas 0.9 m³ 0.9 m³

Piso 24.6 sacas 2.7 m³ 3.0 m³ Área 63.7 m²

Volume 3.8 m³

Lage Cimento: Areia: Brita:

Reforma

Cimento: Areia: Brita:

7.8 sacas 0.9 m³ 0.9 m³

Dados Esp (cm) 6

Área 20.0 m²

Lage 11.0 sacas 1.2 m³ 1.3 m³ Área 42.8 m²

Cimento: Areia: Brita: Volume 1.7 m³

Calçada

Dados Esp (cm)

Área 0.1 m²

Calçada

Cimento: Areia: Brita:

7.1 sacas 0.8 m³ 0.9 m³

Dados Esp (cm) 6

Área 17.8 m²

Cimento: Areia: Brita: Volume 1.1 m³

Dados Esp (cm)

Área 0.0 m²

Casa existente

para Pisos, Lages e Calçadas FCK (Mpa): 15

Volume 1.2 m³

Volume 0.0 m³

Volume 0.0 m³

Construção

Reforma

Ampliação

Blocos Resumo Blocos:

Casa existente

Blocos Resumo Blocos:

285 blc

91 blc

Bloco Larg (cm) Halt (cm) Comp (cm) Área 10 19 39 0.074 m²

Bloco Larg (cm) Halt (cm) Comp (cm) 10 19 39

Fuga Halt (cm) Comp (cm) Área 1.5 1.5 0.0089 m²

Fuga Halt (cm) Comp (cm) Área 1.5 1.5 0.0089 m²

Quantitativo Área Fechamento lateral 23.66 m² TOTAL 23.66 m²

Quantitativo Qtde 285 blc 285 blc

Área Mureta 7.56 m² TOTAL 7.56 m²

Casa existente

Área 0.074 m²

Qtde 91 blc 91 blc

Construção

Reforma

Ampliação

Material para paredes

Material para paredes Traço: 1/5

Resumo Tijolos: 2,426 tj Argamassa p/ assentamento:0.9 m³ Argamassa p/ reboco: 3.3 m³ Areia grossa: 0.8 m³ Cimento: 22.5 sacas

Resumo Tijolos: Argamassa p/ assentamento: Argamassa p/ reboco: Areia grossa: Cimento:

Área Paredes 99.46 m²

Área Paredes 59.41 m²

Volume Chapisco 0.99 m³ Tijolo Larg (cm) 9

Reboco 3.98 m³

Volume Chapisco 0.59 m³

Halt (cm) Comp (cm) Área 19 19 0.036 m²

Tijolo Larg (cm) 9

Assent 1.07 m³

Qtde 2426 tj

Fuga Halt (cm) Comp (cm) Área 1 1.5 0.0049 m²

Fuga Halt (cm) 1

Argamassa Assent Reboco 0.89 m³ 3.32 m³

Argamassa Assent 0.53 m³

TOTAL 4.21 m³

Chapisco Areia grossa 0.83 m³

Chapisco Areia grossa 0.50 m³

Cimento Volume Peso Sacas Saca (kg) TOTAL

Cimento Chapisco 0.17 m³ 281.8 kg 5.6 sc 50 22.5 sc

Assent 0.18 m³ 178.3 kg 3.6 sc

Reboco 0.66 m³ 663.1 kg 13.3 sc

Volume Peso Sacas Saca (kg) TOTAL

Reforma

Casa existente

Material para paredes Traço: 1/5

1,449 tj Argamassa p/ assentamento:0.5 m³ Argamassa p/ reboco: 2.0 m³ Areia grossa: 0.5 m³ 13.4 sacas

Assent 0.64 m³

Reboco 2.38 m³

Halt (cm) Comp (cm) Área 19 19 0.036 m²

Comp (cm) Área 1.5 0.0049 m²

Argamassa Reboco 1.98 m³

TOTAL 2.51 m³

Chapisco 0.10 m³ 168.3 kg 3.4 sc 50 13.4 sc

Assent 0.11 m³ 106.5 kg 2.1 sc

reia grossa

Reboco 0.40 m³ 396.1 kg 7.9 sc

Qtde 1449 tj

Construção Telhado

Ampliação

Reforma Telhado

Resumo Telhas:

1270.2 tlh

Telhado Área 84.7 m²

Telhas 1270.2 tlh

Resumo Qtde:

Telhado Área

Telhas

Casa existente

Lista de Materiais Data : 02/05/2007 Loja: Flor de Nápolis Mat. Construção (Sandro) Tel.: 3257-1773 9902-3103

Ítem

1 2 3 4 4 5 6 7 7 8 9 10 11 12 13 14 15 18 16 17 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

Descrição

Areia média fina Areia média grossa Argamassa p/assentamento Brita 3/4" Ferro 5/16" Ferro 1/4" Ferro 4,2 Tijolo 8 furos 11,5x19x19cm Tijolo 8 furos 9x19x19cm Arame Cimento (saca 50kg) Tábua p/ caixaria 3mx30cm Tábua p/ caixaria 3mx15cm Escora 3m Prego 17x27 Prego cabeça dupla 17x27 Prego 17x27 Ferro 5/16" Ferro 1/4"

Total

Etapa

Ampliação " " " " " " " " " " " " " " " " " "

Qtde

R$ R$ R$ R$ R$ R$ R$ R$ R$ R$ R$ R$ R$ R$ R$

Unit

Comprado

50.00 27.80 50.00 36.00 15.95 10.95 5.30 0.27 0.215 6.50 17.00 8.50 4.15 2.80 5.30

5 m³ 5 m³ 3 m³ 5 m³ 10 br 10 br 8 br 310 tij 2200 tij 2 kg 40 sc 24 12 18 1 kg 2 kg 1 kg 3 br 3 br

R$ 5.30 R$ 15.95 R$ 10.95

A Comprar

Entregue

não sim não sim sim sim sim não não sim 25 sim sim não sim sim sim sim sim

Pagamento: Pago R$ 2,000.00

Data 01/05/2007

Crédito R$ 0.00

A Pagar R$ 675.60

Total

R$ R$ R$ R$ R$ R$ R$ R$ R$ R$ R$ R$ R$ R$ R$

Data Compra

Data Pagam

03/05/07 03/05/07 03/05/07 03/05/07

01/05/07 01/05/07 01/05/07 01/05/07 01/05/07 01/05/07 01/05/07 01/05/07 01/05/07 01/05/07 01/05/07 01/05/07 01/05/07 01/05/07 01/05/07 03/05/07 03/05/07 03/05/07 03/05/07

250.00 139.00 150.00 180.00 159.50 109.50 42.40 83.70 473.00 13.00 680.00 204.00 49.80 50.40 5.30

R$ 5.30 R$ 47.85 R$ 32.85

Total R$ 2,675.60

2675.6

Pago

R$ R$ R$ R$

A pagar

0.00 5.30 47.85 32.85

Pago R$ 2,000.00

A pagar R$ 675.60

675.6

Lista de Materiais Data: 28/04/2007 Loja: Guarezi Tel.: 3357-3233

Ítem

Descrição

Etapa

1 Estribo p/ pilar e viga 4,2mm 9x27cm Ampliação 2 Tábua p/ caixaria 3mx20cm " 3 Estribo p/ pilar e viga 4,2mm 9x27cm " 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35

Total

Qtde

Unit

R$ 0.37 R$ 5.66 R$ 0.41

Comprado

120 24 56

A Comprar

Entregue

sim sim sim

Total

Data Compra

Data Pagam

R$ 44.40 R$ 135.84 R$ 22.96

28/04/07 28/04/07 04/05/07

28/04/07 28/04/07 04/05/07

Total R$ 203.20

Pago

A pagar

R$ 44.40 R$ 135.84 R$ 22.96

Pago R$ 203.20

A pagar R$ 0.00

Mão de Obra Data: 30/04/2007

Profissional: Célio Alexandre Tel.: 33570626 e-mail: [email protected] Serviço: Construção e Reforma Data início: 30/04/07 Data término: xx/xx/07

Custo: Custo do serviço

R$ 8,500.00

Pagamento: Pago R$ 650.00

Data 04/05/07

A Pagar R$ 7,850.00

Fundação Data início: 30/04/07 Data término: 04/05/07 Nota: A fundação da ampliação foi executada por mão-de-obra terceirizada por Célio Alexandre.

Interface de Cálculo FCK (Mpa) 15

Volume (m³) 1.8

Saca (kg) 50

Areia 1.3 m³

Brita 1.4 m³

Materal Cimento 11.7 sacas

Traço do concreto Cimento Areia 1.0 parte 2.6 partes

Brita 3.2 partes

Insira os valores por aqui.

Água 0.6 partes

Cálculo de Concreto FCK (Mpa) 15 Recomendado de 15 a 20 Material Com um Fck Material Cimento Areia Brita Água

1.8 15 Mpa Quant./ m3 Unidade 324.27 Kg 0.712 m3 0.786 m3 162.51 L

Traço final do Concreto Cimento Areia 1 2.55

Brita 3.15

Massa Massa Unitaria kg Kg/dm3 Cimento 324.27 1.5 Areia 827.73 1.5 Brita 1021.59 1.3 Água 195.62 1 Para produzir 1m3 de concreto é nescessario

Material para uma betoneita usando padiola de

Quant. Total Uni 11.67 Sacos 1.28 m3 1.41 m3 292.53 L

agua 0.60

Volume (L) 216.18 551.82 785.84 195.62

20

Volume Corrijido (L) 216.18 711.85 785.84 162.51 1713.87

Litros

Material Areia Brita Água Cimento

Quantidade p/ uma Betoneira 4.42 Padiola 20 L 6.06 Padiola 20 L 1.51 Padiola 20 L 1 Saco 50 KG

1 Betonerira produz Total

Capacidade da Betoneira Capacidade de Mistura Cimento Cimento em Sacos de 25 Kg Areia p/ uma Betoneira Brita p/ uma Betoneira Água p/ uma Betoneira

0.154 11.67

m3 de concreto Betoneiras

500

Litros 275 Litros 52.03 Kg 50 Kg/Betoneira 127.63 Kg/Betoneira 157.52 Kg/Betoneira 30.16 Kg/Betoneira

Massa Massa Unitaria Volume kg Kg/dm3 (L) Cimento 50.00 1.5 33.33 Areia 127.63 1.5 85.09 Brita 157.52 1.3 121.17 Água 30.16 1 30.16 Para produzir 1 Betonerada de concreto é nescessario

Volume Corrijido (L) 33.33 109.76 121.17 25.06 264.26

Insira os valores por aqui.

m3

50

Volume Corrijido (m3) 0.216 0.712 0.786 0.163 1.714

Não alterar Fator Água / Mat. Seco Teor de argamaça Controle do concreto (sd) Densidade do cimento (dc) Densidade da areia (da) Densidade da pedra (dp)

FCJ (Fck após 28 dias) Traço (m) Consumo de Agua Consumo de Areia Consumo de Brita Consumo de Cimento (Cc)

9 % - Tabela 53 % - Tabela 7 Tabela 3.15 Tabela 2.62 Tabela 2.65 Tabela

26.55 Mpa 5.70 195.62 kg/m3 827.73 kg/m3 1021.59 kg/m3 324.27 kg/m3

Volume Corrijido (m3) 0.033 0.110 0.121 0.025 0.264

Related Documents

Controle
November 2019 36
Controle
November 2019 43
Controle
June 2020 26
Controle
July 2020 20
Controle Materiais
October 2019 25
Controle Remessa
April 2020 6