Consultantz Assessement Of Gccs

  • Uploaded by: habyarimana paul
  • 0
  • 0
  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Consultantz Assessement Of Gccs as PDF for free.

More details

  • Words: 412
  • Pages: 2
opinion, these costs will be higher than the direct costs of accepting the risks which I have identified as candidates. 23.4 I cannot prove the cost equation by empirical evidence, and I do not believe that others can. Moreover, I do not fully trust surveys of contractors, even though the contractors have the best information. But, I can say that many who have studied these issues agree with my conclusions. 23.4.1 To begin with, every Government, every international employer and every financing party (such as the World Bank) that has adopted GCCs with risk allocations congruent with those I recommend has done so not out of altruism but because of a conclusion that there is financial justification. 23.4.2 The sponsors of the international forms of contract identified in paragraph 3.5 (ICE, FIDIC, etc.) can be taken to agree. 23.4.3 The Mass Transit Railway Corporation can be taken to agree. 23.4.4 The Construction Industry Institute, the Center for Public Resources, the American Society of Civil Engineers, and the Risk Allocation Subcommittee of a Joint Working Party of the Australia National Public Works Conference and the National Building and Construction Council all agree. 23.4.5 A plethora of respected industry savants 42/ have expressed agreement in their published works. 23.5 To the contrary, however, many employers take the view that their interests are best served by transferring as much risk to the contractor as the market will bear. I suggest that there usually are special reasons for this which do not apply to Government public works. Certainly the rationalia are different for the one time or occasional employer than for a repeat employer on the scale of the Government of the Hong Kong SAR.

CONCLUSION 24. These recommendations need not be viewed as a package; each will stand on its own feet. However, three of them -- ground conditions, utility interferences and impossibility -- are interrelated and lend themselves to joint consideration. I also think that the recommendations work well together as a group. In general, the recommendations assign unfathomable risks to Government while tightening the compensation rules so as to avoid unwarranted recoveries. If adopted, they will appropriately balance risk allocation on Hong Kong public works projects. 25. I trust and hope that Government will find this Report to be worthy of consideration and implementation.

For more information about the issues covered in this report, please contact Paul Berning in our San Francisco office at 415-369-7229 or at [email protected] or contact your Thelen attorney.

Related Documents


More Documents from ""