Construction Change Order

  • June 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Construction Change Order as PDF for free.

More details

  • Words: 298
  • Pages: 2
CONSTRUCTION CHANGE ORDER NOWAK CONSTRUCTION LLC 1133 White Pine Drive Wellington, Florida 33414 Ph 561-779-9577 Fax 561-798-8865

CHANGE NO. 1 DATE: November 23, 2009

CGC#151140 [email protected] YOUR PROPOSAL HAS BEEN ACCEPTED FOR MAKING THE FOLLOWING CHANGES: Eva 500 W. Oakland Park Blvd. Ft. Lauderdale, Fl

Proposed Change

Construction Contract

Description

Increase

Decrease

Plumbing: 1. Bring up to Code Backflow preventer installed at Main Water Line Materials & Labor

$650.00

Kitchen and Bath sinks repiped with new lines to water heater *** As per city or Wilton Maners to get final CO Materials & Labor

contract time:

Days

Complete

$1,500.00

Total Increases/Decreases

present contract:

Decrease to Contract

this change:

Increase to Contract

new contract

Original Contract Price

$2,150.00

New Contract Price These repairs had to be done as per City and were not figured in Original Contract City has also requested a drinking fountain to be installed, we will include a portable one on the plans rather than a permanent one to save you additional cost. This change order is an amendment to the agreement between Owner and Nowak Construction LLC,hereafter called NC and all contract provisions shall apply unless specifically exempted. The amount and time changes designated are the maximum agreed to by both the Owner and NC for this change. In consideration of the foregoing adjustments in contract time and contract sum, NC hereby releases owner from all claims, demands, or causes of action arising out of the transactions, events and occurrences giving rise to this change order. This written change order is the entire agreement between owner and NC with respect to this change order. No other agreement or modification shall apply to this contract amendment unless expressly provided herein.

____________________________________ Owner or Rep. for Owner Date

_______________________________________ Contractor Date

____________________________________ Print Name

_______________________________________ Print Name