CONSTRUCTION CHANGE ORDER NOWAK CONSTRUCTION LLC 1133 White Pine Drive Wellington, Florida 33414 Ph 561-779-9577 Fax 561-798-8865
CHANGE NO. 1 DATE: November 23, 2009
CGC#151140
[email protected] YOUR PROPOSAL HAS BEEN ACCEPTED FOR MAKING THE FOLLOWING CHANGES: Eva 500 W. Oakland Park Blvd. Ft. Lauderdale, Fl
Proposed Change
Construction Contract
Description
Increase
Decrease
Plumbing: 1. Bring up to Code Backflow preventer installed at Main Water Line Materials & Labor
$650.00
Kitchen and Bath sinks repiped with new lines to water heater *** As per city or Wilton Maners to get final CO Materials & Labor
contract time:
Days
Complete
$1,500.00
Total Increases/Decreases
present contract:
Decrease to Contract
this change:
Increase to Contract
new contract
Original Contract Price
$2,150.00
New Contract Price These repairs had to be done as per City and were not figured in Original Contract City has also requested a drinking fountain to be installed, we will include a portable one on the plans rather than a permanent one to save you additional cost. This change order is an amendment to the agreement between Owner and Nowak Construction LLC,hereafter called NC and all contract provisions shall apply unless specifically exempted. The amount and time changes designated are the maximum agreed to by both the Owner and NC for this change. In consideration of the foregoing adjustments in contract time and contract sum, NC hereby releases owner from all claims, demands, or causes of action arising out of the transactions, events and occurrences giving rise to this change order. This written change order is the entire agreement between owner and NC with respect to this change order. No other agreement or modification shall apply to this contract amendment unless expressly provided herein.
____________________________________ Owner or Rep. for Owner Date
_______________________________________ Contractor Date
____________________________________ Print Name
_______________________________________ Print Name