CRONOGRAMA VALORIZADO DE OBRA - INICIAL SAN ISIDRO PROYECTO: INSTALACION DE INSFRAESTRUCTURAS Y EQUIPAMIENTO DE LAS INSTITUCIONES EDUCATIVAS DE NIVEL INICIAL DE LAS LOCALIDADES DE LAYAMPAMPA, LLAULLICA, HUICHCANA, SAN ISIDRO Y LLIHUAMPAMPA , DISTRITO DE TINTAY PUNCU
PART.
CLIENTE: MUNICIPALIDAD DISTRITAL DE TINTAY PUNCU
DEPARTAMENTO: HUANCAVELICA
COSTO DEL PROYECTO: S/. 1,587,917.36
PROVINCIA: TAYACAJA
SUPERVISOR: CONSORCIO JK&M ARQUITECTURA E INGENIERIA
DISTRITO: TINTAY PUNCU
RESIDENTE:
UBICACIÓN: SAN ISIDRO
ING. JAVIER CASTILLON SANABRIA
DESCRIPCION
UNIDA METRA COSTO D DO UNITARIO
COSTO PARCIAL
PRIMER MES
SEGUNDO MES
TERCER MES
CUARTO MES
QUINTO MES
SEXTO MES
TOTAL
01 1.01 01.01.01 01.01.02
ESTRUCTURAS TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO MANUAL TRAZO Y REPLANTEO PRELIMINAR
M2 M2
421.05 421.05
1.92 1.95
808.42 821.05
S/. S/.
808.42 821.05
S/. S/.
808.42 821.05
01.03 01.03.01 01.03.02 01.03.03 01.03.04
MOVIMIENTO DE TIERRAS EXCAVACION PARA ZANJAS Y ZAPATAS EXCAVACION PARA VIGA DE CIMENTACION ZAPATAS HASTA RELLENO CON MATERIAL PROPIO REFINE, NIVELACION Y COMP. EN FONDO ZANJA
M3 M3 M3 M2
130.23 83.89 153.73 397.47
31.88 31.88 39.83 8.01
4151.73 2674.41 6123.07 3183.73
S/. S/.
4,151.73 2,674.41
S/. S/. S/. S/.
4,151.73 2,674.41 6,123.07 3,183.73
01.04 01.04.01 01.04.02 01.04.03 01.04.04 01.04.05
CONCRETO SIMPLE SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-H CONCRETO 1:10 +30% P.G. PARA CIMIENTO CORRIDO CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS ENCOFRADO Y DESENCOF. SOBRECIMIENTO DE 0.30 A 0.6 CONCRETO EN FALSOPISO MEZCLA 1:8 CEMENTO-HORMI
M2 M3 M3 M2 M2
83.79 34.10 7.43 95.09 308.08
35.35 349.07 364.20 50.17 41.16
2961.98 11903.29 2706.01 4770.67 12680.57
S/. S/. S/.
2,961.98 11,903.29 2,706.01 4,770.67 12,680.57
01.04.06 01.04.06.01 01.04.06.02
DADOS DE CONCRETO CONCRETO FC=175 KG/CM2 PARA DADO DE PROTECCION ENCOFRADO Y DESENCOFRADO PARA DADOS DE PROTECCI
M3 M2
0.39 3.50
392.55 44.91
153.09 157.19
01.05 01.05.01 01.05.01.01 01.05.01.02
CONCRETO ARMADO ZAPATAS CONCRETO FC=210 KG/CM2 EN ZAPATAS ACERO ESTRUCTURAL TRABAJO PARA ZAPATAS
M2 M3
42.93 935.95
428.56 3.77
18398.08 3528.53
01.05.02 01.05.02.01 01.05.02.02 01.05.05.02
VIGAS DE CIMENTACION CONCRETO FC=210 KG/CM2 EN ZAPATAS ENCOFRADO Y DESENCOFRADO VIGAS DE CIMENTACION A ACERO ESTRUCTURAL TRABAJO PARA VIGAS DE CIMENTAC
M3 M2 KG
9.08 72.67 1713.01
439.13 45.26 3.61
01.05.03 01.05.03.01 01.05.03.02 01.05.03.03
COLUMNAS CONCRETO EN COLUMNAS FC=210 KG/CM2 ENCOFRADO Y DESENCOFRADO VIGAS DE COLUMNAS ACERO ESTRUCTURAL TRABAJO PARA SARDINELES
M3 M2 KG
20.08 248.14 2737.72
01.05.04 01.05.04.01 01.05.04.02 01.05.04.03
COLUMNETAS DE CONFINAMIENTO CONCRETO EN COLUMNAS FC=210 KG/CM2 ENCOFRADO Y DESENCOFRADO VIGAS DE COLUMNETAS ACERO ESTRUCTURAL TRABAJO PARA COLUMNETAS
M3 M2 KG
01.05.05 01.05.05.01 01.05.05.02 01.05.05.03
VIGAS CONCRETO EN VIGAS DE AMARRE FC=210 KG/CM2 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS ACERO ESTRUCTURAL TRABAJO PARA VIGAS
M3 M2 KG
01.05.06
VIGUETAS DE AMARRE
S/. S/.
6,123.07 3,183.73
S/. S/.
4,770.67 12,680.57
S/. S/. S/. S/. S/.
S/. S/.
153.09 157.19
S/. S/.
153.09 157.19
S/. S/.
9,199.04 1,764.27
S/. S/.
18,398.08 3,528.53
3987.30 3289.04 6183.97
S/. S/. S/.
3,987.30 3,289.04 6,183.97
S/. S/. S/.
3,987.30 3,289.04 6,183.97
525.06 33.40 3.77
10543.20 8287.88 10321.20
5,271.60 4,143.94 5,160.60
S/. S/.
5,271.60 4,143.94
5,160.60
S/. S/. S/.
S/. S/. S/.
10,543.20 8,287.88 10,321.20
14.95 319.91 2048.23
491.34 29.52 3.77
7345.53 9443.74 7721.83
3,672.77 4,721.87 3,860.91
S/. S/.
3,672.77 4,721.87
3,860.91
S/. S/. S/.
S/. S/. S/.
7,345.53 9,443.74 7,721.83
59.16 430.29 3628.89
445.08 40.77 3.77
26330.93 17542.92 13680.92
S/. S/. S/.
26,330.93 17,542.92 13,680.92
S/. S/. S/.
26,330.93 17,542.92 13,680.92
S/. S/.
S/.
S/.
2,961.98 11,903.29 2,706.01
9,199.04 1,764.27
CRONOGRAMA VALORIZADO DE OBRA - INICIAL SAN ISIDRO PROYECTO: INSTALACION DE INSFRAESTRUCTURAS Y EQUIPAMIENTO DE LAS INSTITUCIONES EDUCATIVAS DE NIVEL INICIAL DE LAS LOCALIDADES DE LAYAMPAMPA, LLAULLICA, HUICHCANA, SAN ISIDRO Y LLIHUAMPAMPA , DISTRITO DE TINTAY PUNCU
PART.
CLIENTE: MUNICIPALIDAD DISTRITAL DE TINTAY PUNCU
DEPARTAMENTO: HUANCAVELICA
COSTO DEL PROYECTO: S/. 1,587,917.36
PROVINCIA: TAYACAJA
SUPERVISOR: CONSORCIO JK&M ARQUITECTURA E INGENIERIA
DISTRITO: TINTAY PUNCU
RESIDENTE:
UBICACIÓN: SAN ISIDRO
ING. JAVIER CASTILLON SANABRIA
DESCRIPCION
UNIDA METRA COSTO D DO UNITARIO
COSTO PARCIAL
PRIMER MES
SEGUNDO MES
TERCER MES
CUARTO MES
QUINTO MES
SEXTO MES
TOTAL
01.05.06.01 01.05.06.02 01.05.06.03
CONCRETO EN VIGUETAS DE AMARRE FC=210 KG/CM2 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS ACERO ESTRUCTURAL TRABAJO PARA VIGAS Y DINTELES
M3 M2 KG
2.41 21.74 291.59
445.08 39.19 3.77
1072.64 851.99 1099.29
S/. S/. S/.
1,072.64 851.99 1,099.29
S/. S/. S/.
1,072.64 851.99 1,099.29
01.05.07 01.05.07.01 01.05.07.02 01.05.07.03 01.05.07.04
LOSAS ALIGERADAS CONCRETO EN LOSA ALIGERADA FC=210 KG/CM2 ENCOFRADO Y DESENCOFRADO VIGAS DE COLUMNAS ACERO ESTRUCTURAL TRABAJO EN LOSAS ALIGERADAS LADRILLO HUECO TRABAJADO PARA VIGAS Y DINTELES
M3 M2 KG UND
24.34 286.43 1955.80 1840.93
440.06 30.62 3.77 3.01
10711.06 8770.49 7373.37 5541.20
S/. S/. S/. S/.
10,711.06 8,770.49 7,373.37 5,541.20
S/. S/. S/. S/.
10,711.06 8,770.49 7,373.37 5,541.20
02 02.01 02.01.01 02.01.02
ARQUITECTURA ALBAÑILERIA Y TABIQUERIA MURO DE LADRILLO TIPO IV 18 HUECOS SOGA C:A 1:4*1. MURO DE LADRILLO TIPO IV 18 HUECOS CABEZA C:A 1:4*
M2 M2
311.59 16.16
57.14 94.20
17804.25 1522.27
S/. S/.
17,804.25 1,522.27
S/. S/.
17,804.25 1,522.27
02.02 02.02.01 02.02.02 02.02.03 02.02.04 02.02.05 02.02.06 02.02.07 02.02.08 02.02.09 02.02.10 02.02.11 02.02.12
REVOQUES ENLUCIDOS Y MOLDURAS TARRAJEO PRIMARIO RAYADO CON MEZCLA C:A 1-5 TARRAJEO INTERIOR EN MUROS CON CEMENTO-ARENA 1:5 TARRAJEO EXTERIOR EN MUROS CON CEMENTO-ARENA 1:5 TARRAJEO INTERIOR EN COLUMNAS CON CEMENTO-ARENA TARRAJEO EXTERIOR EN COLUMNAS CON CEMENTO-ARENA TARRAJEO INTERIOR EN VIGAS CON CEMENTO-ARENA E= 1 TARRAJEO EXTERIOR EN VIGAS CON CEMENTO-ARENA E= 1 TARRAJEO INTERIOR EN VIGUETAS Y COLUMNETAS CON CE TARRAJEO EXTERIOR EN VIGUETAS Y COLUMNETAS CON C TARRAJEO EN CIELO RASO CON CEMENTO-ARENA 1:5 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y VANO TARRAJEO CON IMPERMEABILIZANTES EN CANAL PLUVIAL
M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 ML M2
69.42 461.07 216.54 67.53 54.38 80.74 47.09 92.38 87.14 286.73 338.68 136.40
24.90 23.65 25.03 27.17 27.17 27.17 27.17 27.17 27.17 51.62 15.67 31.45
1728.56 10904.31 5420.00 1834.79 1477.50 2193.71 1279.44 2509.96 2367.59 14801.00 5307.12 4289.78
S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. S/.
864.28 5,452.15 2,710.00 917.40 738.75 1,096.85 639.72 1,254.98 1,183.80 7,400.50 2,653.56 2,144.89
S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. S/.
864.28 5,452.15 2,710.00 917.40 738.75 1,096.85 639.72 1,254.98 1,183.80 7,400.50 2,653.56 2,144.89
S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. S/.
1,728.56 10,904.31 5,420.00 1,834.79 1,477.50 2,193.71 1,279.44 2,509.96 2,367.59 14,801.00 5,307.12 4,289.78
02.03 02.03.01 02.03.01.01
PISOS Y PAVIMENTOS CONTRA PISO CONTRA DE 48 MM
M2
397.47
32.06
12742.89
S/.
6,371.44
S/.
6,371.44
S/.
12,742.89
02.03.02 02.03.02.01 02.03.02.02
PISOS PISO MACHIEMBRADO MAD. 1" X 4" DURMIENTE 2"X"2X10 PISO CERAMICO DE 36X36 CM
M2 M2
155.06 57.39
65.77 75.46
10198.30 4330.65
S/. S/.
10,198.30 4,330.65
S/. S/.
10,198.30 4,330.65
02.04 02.04.01 02.04.01.01
ZOCALOS Y CONTRAZOCALOS ZOCALOS ZOCALO DE CERAMICO DE 20 X 30 CM
M2
95.84
79.97
7664.32
S/.
7,664.32
S/.
7,664.32
02.04.02 02.04.02.01
CONTRAZOCALOS CONTRAZOCALO DE CEMENTO S/COLOREAR H= 30 CM
ML
236.23
10.73
2534.75
S/.
2,534.75
S/.
2,534.75
02.05 02.05.01 02.05.02
CARPINTERIA METALICA VENTANA METALICA SEGÚN DISEÑO COLOCACION DE VENTANAS
M2 PIEZA
51.16 53.00
92.94 38.90
4754.81 2061.70
S/. S/.
4,754.81 2,061.70
S/. S/.
4,754.81 2,061.70
CRONOGRAMA VALORIZADO DE OBRA - INICIAL SAN ISIDRO PROYECTO: INSTALACION DE INSFRAESTRUCTURAS Y EQUIPAMIENTO DE LAS INSTITUCIONES EDUCATIVAS DE NIVEL INICIAL DE LAS LOCALIDADES DE LAYAMPAMPA, LLAULLICA, HUICHCANA, SAN ISIDRO Y LLIHUAMPAMPA , DISTRITO DE TINTAY PUNCU CLIENTE: MUNICIPALIDAD DISTRITAL DE TINTAY PUNCU
DEPARTAMENTO: HUANCAVELICA
COSTO DEL PROYECTO: S/. 1,587,917.36
PROVINCIA: TAYACAJA
SUPERVISOR: CONSORCIO JK&M ARQUITECTURA E INGENIERIA
DISTRITO: TINTAY PUNCU
RESIDENTE:
UBICACIÓN: SAN ISIDRO
PART.
ING. JAVIER CASTILLON SANABRIA
DESCRIPCION
02.06 02.06.01 02.06.01.01
CERRAJERIA BISAGRAS BISAGRA CAPUCHINA DE 4" X 4"
02.06.02 02.06.02.01 02.06.02.02 02.06.02.03 02.06.02.04 02.07 02.07.01 02.07.01.01
CERRADURAS CERRADURA DE 2 GOLPES CERRADURA DE PUERTA INTERIOR CON MANIJAS PICAPORTE DE FIERRO REDONDO DE 1/2" X 0.50 MT. COLOCACION E INSTALACION DE SEPARADOR METALICO IN CARPINTERIA DE MADERA PUERTAS PUERTA DE MADERA(SEGÚN DISEÑO)
02.08 02.08.01
UNIDA METRA COSTO D DO UNITARIO
COSTO PARCIAL
PRIMER MES
SEGUNDO MES
TERCER MES
CUARTO MES
QUINTO MES
SEXTO MES
TOTAL
pza
72.00
15.60
1123.20
S/.
1,123.20
S/.
1,123.20
pza pza pza m2
19.00 6.00 10.00 8.61
102.82 47.69 16.13 61.39
1953.58 286.14 161.30 528.57
S/. S/. S/. S/.
1,953.58 286.14 161.30 528.57
S/. S/. S/. S/.
1,953.58 286.14 161.30 528.57
m2
27.00
516.13
13935.51
S/.
13,935.51
S/.
13,935.51
VIDRIOS, CRISTALES Y SIMILARES VIDRIOS TEMPLADO DE 6MM
pie2
550.67
19.44
10705.02
S/.
10,705.02
S/.
10,705.02
02.09 02.09.01 02.09.02 02.09.03 02.09.04 02.09.05 02.09.06 02.09.07 02.09.08 02.09.09 02.09.10 02.09.11 02.09.12 02.09.13
PINTURA PINTURA PINTURA PINTURA PINTURA PINTURA PINTURA PINTURA PINTURA PINTURA PINTURA PINTURA PINTURA PINTURA
m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
461.07 216.54 67.53 54.38 80.74 47.09 92.38 87.14 286.73 338.68 136.40 95.84 236.23
9.98 12.63 11.06 11.06 12.04 12.04 12.04 12.04 13.05 11.06 13.74 12.04 5.54
4601.48 2734.90 746.88 601.44 972.11 566.96 1112.26 1049.17 3741.83 3745.80 1874.14 1153.91 1308.71
S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. S/.
4,601.48 2,734.90 746.88 601.44 972.11 566.96 1,112.26 1,049.17 3,741.83 3,745.80 1,874.14 1,153.91 1,308.71
02.10 02.10.01 02.10.02
COBERTURAS COBERTURA CON TEJA ANDINA DECORATIVA CORREAS DE MADERA DE 2" X 2" P/TEJA ANDINA
m2 MT
416.61 369.74
58.27 11.80
24275.86 4362.93
02.11 02.11.01 02.11.02
VARIOS JUNTA DE CONSTRUCCION CON TEKNOPORT FLETE A SAN ISIDRO
M2 GLB
33.86 1.00
85.42 141433.81
2892.32 141433.81
02.11.03 02.11.03.01 02.11.03.02 02.11.03.03 02.11.03.04
SEÑALETICA SEÑAL DE SEGURIDAD SEÑAL ORIENTATIVA SEÑAL INDICATIVA SEÑAL DIRECCIONALES
UND UND UND UND
5.00 5.00 5.00 5.00
54.19 54.19 54.19 54.19
270.95 270.95 270.95 270.95
03 03.01 03.01.01 03.01.02
INSTALACIONES ELECTRICAS SALIDAS PARA INSTALACIONES ELECTRICAS SALIDA PARA CENTRO DE LUZ SALIDA PARA INTERRUPTOR SIMPLE
PTO PTO
57.00 22.00
89.16 62.57
5082.12 1376.54
LATEX EN MUROS INTERIORES 2 MANOS LATEX EN MUROS EXTERIORES 2 MANOS INTERIOR EN COLUMNAS C/ LATEX LAVABLE EXTERIOR EN COLUMNAS C/ LATEX LAVABLE INTERIOR EN VIGAS C/ LATEX LAVABLE EXTERIOR EN VIGAS C/ LATEX LAVABLE INTERIOR EN VIGUETAS Y COLUMNETAS C/ LATEX EXTERIOR EN VIGUETAS Y COLUMNETAS C/ LATEX LATEX EN CIELO RASO C/ LATEX SUPERMATE LAV EN DERRAMES EN PUERTAS, VENTANAS Y VANOS EN CANAL PLUVIAL CON ESMALTE SINTETICO EN ZOCALO C/ LATEX LAVABLE DE CONTRAZOCALO C/ESMALTE
S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. S/.
S/.
35,358.45
S/.
35,358.45
S/.
35,358.45
4,601.48 2,734.90 746.88 601.44 972.11 566.96 1,112.26 1,049.17 3,741.83 3,745.80 1,874.14 1,153.91 1,308.71
S/. S/.
24,275.86 4,362.93
S/. S/.
24,275.86 4,362.93
S/. S/.
2,892.32 35,358.45
S/. S/.
2,892.32 141,433.81
S/. S/. S/. S/.
270.95 270.95 270.95 270.95
S/. S/.
5,082.12 1,376.54
S/. S/. S/. S/.
S/. S/.
2,541.06 688.27
S/. S/.
2,541.06 688.27
270.95 270.95 270.95 270.95
CRONOGRAMA VALORIZADO DE OBRA - INICIAL SAN ISIDRO PROYECTO: INSTALACION DE INSFRAESTRUCTURAS Y EQUIPAMIENTO DE LAS INSTITUCIONES EDUCATIVAS DE NIVEL INICIAL DE LAS LOCALIDADES DE LAYAMPAMPA, LLAULLICA, HUICHCANA, SAN ISIDRO Y LLIHUAMPAMPA , DISTRITO DE TINTAY PUNCU CLIENTE: MUNICIPALIDAD DISTRITAL DE TINTAY PUNCU
DEPARTAMENTO: HUANCAVELICA
COSTO DEL PROYECTO: S/. 1,587,917.36
PROVINCIA: TAYACAJA
SUPERVISOR: CONSORCIO JK&M ARQUITECTURA E INGENIERIA
DISTRITO: TINTAY PUNCU
RESIDENTE:
UBICACIÓN: SAN ISIDRO
PART.
ING. JAVIER CASTILLON SANABRIA
UNIDA METRA COSTO D DO UNITARIO
DESCRIPCION
03.01.03 03.01.04 03.01.05 03.01.06 03.01.07
SALIDA SALIDA SALIDA SALIDA SALIDA
03.02 03.02.01 03.02.02 03.02.03 03.02.04
COSTO PARCIAL
PRIMER MES
SEGUNDO MES
TERCER MES
1.00 2.00 30.00 8.00 2.00
63.97 61.39 106.04 107.83 120.38
63.97 122.78 3181.20 862.64 240.76
CANALIZACIONES Y/O TUBERIAS CANALIZACIONES DE TUBERIA ENTERRADA 20X30 TUBERIA DIAMETRO 1" PVC SAP ENTERRADO TUBERIA DIAMETRO 1 1/2" PVC SAP ENTERRADO TUBERIA DIAMETRO 20 MM PVC SAP
MT MT MT MT
44.56 49.99 10.77 394.79
28.10 12.61 15.82 13.45
1252.14 630.37 170.38 5309.93
03.03 03.03.01 03.03.02 03.03.03 03.03.04 03.03.05 03.03.06 03.03.07
CONDUCTORES Y CABLES CONDUCTOR LSOH 2.5 MM2 CONDUCTOR LSOH 4.0 MM2 CONDUCTOR N2XOH 4.0 MM2 CONDUCTOR N2XOH 6.0 MM2 CONDUCTOR N2XOH 10.0 MM2 CONDUCTOR N2XOH 16.0 MM2 CONDUCTOR CU DESNUDO 1 X 10 MM2
MT MT MT MT MT MT MT
584.73 373.03 39.64 59.50 37.48 26.09 4.55
5.35 6.21 8.55 10.50 12.81 16.90 12.24
3128.31 2316.52 338.92 624.75 480.12 440.92 55.69
S/. S/. S/. S/. S/. S/. S/.
03.04 03.04.01 03.04.02
TABLEROS TABLERO GENERAL TABLERO DE DISTRIBUCION DE ENERGIA ELECTRICA
PZA UND
1.00 3.00
236.73 236.73
236.73 710.19
03.05 03.05.01 03.05.02 03.05.03 03.05.04 03.05.05 03.05.06
LLAVES DE INTERRUPCION INTERRUPTOR THERMOMANETICO INTERRUPTOR THERMOMANETICO INTERRUPTOR THERMOMANETICO INTERRUPTOR THERMOMANETICO INTERRUPTOR THERMOMANETICO INTERRUPTOR THERMOMANETICO
PZA PZA PZA PZA PZA PZA
3.00 5.00 5.00 5.00 3.00 1.00
52.37 65.37 80.37 83.73 79.73 92.37
03.06 03.06.01
CAJA DE PASE CAJA DE PASE GALVANIZADA DE 4" X 4" X 2"
UND
4.00
03.07 03.07.01 03.07.02 03.07.03 03.07.04
ARTEFACTOS ARTEFACTOS FLUORESENTE 2 X 36W INCLUYENDO EQUIPO ARTEFACTO FOCO AHORRADOR T-BOLA 32 WATT ARTEFACTO CIRCULAR DE 32 WATT (INCLUYE EQUIPO COM LUCES DE EMERGENCIA AUTONOMO (INCLUYE EQUIPO CO
UND UND UND UND
03.08 03.08.01 03.08.02
EQUIPOS ELECTRICOS, MECANICOS Y ESPECIALES POZO PUESTA A TIERRA INC. CABLE MEDIDOR DE LUZ MONOFASICO
UND UND
04 04.01
INSTALACIONES SANITARIAS APARATOS Y ACCESORIOS SANITARIOS
INTERRUPTOR DOBLE INTERRUPTOR TRIPLE TOMACORRIENTE DOBLE TOMACORRIENTE BIPOLAR TRIPLE TOMACORRIENTE BIPOLAR A PRUEBA DE AG
MONOFASICO MONOFASICO MONOFASICO MONOFASICO MONOFASICO MONOFASICO
2 2 2 2 2 2
X X X X X X
10A 15A 20A 25A 30A 50A
31.99 61.39 1,590.60 431.32 120.38
QUINTO MES
PTO PTO PTO PTO PTO
PARA PARA PARA PARA PARA
S/. S/. S/. S/. S/.
CUARTO MES
SEXTO MES
TOTAL
S/. S/. S/. S/. S/.
31.99 61.39 1,590.60 431.32 120.38
S/. S/. S/. S/. S/.
63.97 122.78 3,181.20 862.64 240.76
S/. S/. S/. S/.
1,252.14 630.37 170.38 5,309.93
S/. S/. S/. S/.
1,252.14 630.37 170.38 5,309.93
3,128.31 2,316.52 338.92 624.75 480.12 440.92 55.69
S/. S/. S/. S/. S/. S/. S/.
3,128.31 2,316.52 338.92 624.75 480.12 440.92 55.69
S/. S/.
236.73 710.19
S/. S/.
236.73 710.19
157.11 326.85 401.85 418.65 239.19 92.37
S/. S/. S/. S/. S/. S/.
157.11 326.85 401.85 418.65 239.19 92.37
S/. S/. S/. S/. S/. S/.
157.11 326.85 401.85 418.65 239.19 92.37
12.96
51.84
S/.
51.84
S/.
51.84
22.00 21.00 12.00 9.00
94.46 94.46 75.86 116.66
2078.12 1983.66 910.32 1049.94
S/. S/. S/. S/.
2,078.12 1,983.66 910.32 1,049.94
S/. S/. S/. S/.
2,078.12 1,983.66 910.32 1,049.94
1.00 1.00
1594.79 450.00
1594.79 450.00
S/. S/.
1,594.79 450.00
S/. S/.
1,594.79 450.00
CRONOGRAMA VALORIZADO DE OBRA - INICIAL SAN ISIDRO PROYECTO: INSTALACION DE INSFRAESTRUCTURAS Y EQUIPAMIENTO DE LAS INSTITUCIONES EDUCATIVAS DE NIVEL INICIAL DE LAS LOCALIDADES DE LAYAMPAMPA, LLAULLICA, HUICHCANA, SAN ISIDRO Y LLIHUAMPAMPA , DISTRITO DE TINTAY PUNCU CLIENTE: MUNICIPALIDAD DISTRITAL DE TINTAY PUNCU
DEPARTAMENTO: HUANCAVELICA
COSTO DEL PROYECTO: S/. 1,587,917.36
PROVINCIA: TAYACAJA
SUPERVISOR: CONSORCIO JK&M ARQUITECTURA E INGENIERIA
DISTRITO: TINTAY PUNCU
RESIDENTE:
UBICACIÓN: SAN ISIDRO
PART.
ING. JAVIER CASTILLON SANABRIA
DESCRIPCION
UNIDA METRA COSTO D DO UNITARIO
COSTO PARCIAL
PRIMER MES
SEGUNDO MES
TERCER MES
04.01.01 04.01.02 04.01.03 04.01.04 04.01.05 04.01.06 04.01.07 04.01.08 04.01.09 04.01.10 04.01.11
INODORO TANQUE BABY INODORO TANQUE BAJO EVOLUTION LAVATORIO OVALINES PARA NIÑOS LAVATORIO PEDESTAL MANCORA LAVATORIO PARA COCINA URINARIO BABY URINARIO DE LOZA COLOR BLANCO JABONERA DE COLOR BLANCO TOALLERA C/SOPORTE DE LOSA Y BARRA PLASTICA COLO PAPELERA DE PLASTICO ABATIBLE COLOR BLANCO ESPEJO CON MARCO METALICO PULIDO
PZA PZA PZA PZA GLB PZA PZA UND UND UND PZA
6.00 3.00 10.00 3.00 1.00 6.00 1.00 13.00 9.00 10.00 7.00
260.81 220.82 232.30 157.82 227.81 123.77 98.60 21.18 32.68 43.91 59.72
1564.86 662.46 2323.00 473.46 227.81 742.62 98.60 275.34 294.12 439.10 418.04
04.02 04.02.01 04.02.02 04.02.03
SISTEMA DE DESAGUE SALIDA DE DESAGUE EN PVC 2" SALIDA DE DESAGUE EN PVC 4" SALIDA DE VENTILACION PVC 2"
PTO PTO PTO
22.00 9.00 4.00
57.63 62.06 62.17
1267.86 558.54 248.68
S/. S/. S/.
04.03 04.03.01 04.03.02 04.03.03
REDES DE DISTRIBUCION DE DESAGUE TUBERIA PVC SAL 2" X 90 TUBERIA PVC SAL 2" X 4" TUBERIA PVC VENTILACION PVC 2"
MT MT MT
34.70 42.26 56.27
18.26 18.26 17.42
633.62 771.67 980.22
04.04 04.04.01 04.04.01.01 04.04.01.02 04.04.01.03 04.04.01.04
ACCESORIOS CODO CODO PVC SAL CODO PVC SAL CODO PVC SAL CODO PVC SAL
PZA PZA PZA PZA
56.00 4.00 6.00 4.00
22.01 26.52 19.04 26.39
04.04.02 04.04.02.01 04.04.02.02 04.04.02.03
YEE YEE PVC SAL 2" X 2" YEE PVC SAL 4" X 4" YEE PVC SAL 4" X 2"
PZA PZA PZA
21.00 5.00 12.00
04.04.03 04.04.03.01 04.04.03.02 04.04.03.03 04.04.03.04
ADITAMENTOS VARIOS SUMIDERO DE BRONCE 2" PROVISION Y COLOCACION REGISTRO DE BRONCE DE 4" REGISTRO DE BRONCE DE 2" SOMBRERO DE VENTILACION PVC DE 2"
UND PZA PZA PZA
04.04.04 04.04.04.01
CAMARA DE INSPECCION CAJA DE REGISTRO DE DESAGUE 12" X 24" TAPA 1/2"
04.05 04.05.01
SISTEMA DE AGUA FRIA SALIDA DE AGUA
04.05.01.01 04.05.02
SALIDA DE AGUA FRIA CON TUEBRIA DE PVC SAP 1/2" RED DE DISTRIBUCION
2" 4" 2" 4"
X X X X
90 90 45 45
CUARTO MES
QUINTO MES
SEXTO MES S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. S/.
S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. S/.
1,564.86 662.46 2,323.00 473.46 227.81 742.62 98.60 275.34 294.12 439.10 418.04
1,267.86 558.54 248.68
S/. S/. S/.
1,267.86 558.54 248.68
S/. S/. S/.
633.62 771.67 980.22
S/. S/. S/.
633.62 771.67 980.22
1232.56 106.08 114.24 105.56
S/. S/. S/. S/.
1,232.56 106.08 114.24 105.56
S/. S/. S/. S/.
1,232.56 106.08 114.24 105.56
18.94 22.71 15.81
397.74 113.55 189.72
S/. S/. S/.
397.74 113.55 189.72
S/. S/. S/.
397.74 113.55 189.72
13.00 9.00 4.00 5.00
49.24 78.50 50.30 15.82
640.12 706.50 201.20 79.10
S/. S/. S/. S/.
640.12 706.50 201.20 79.10
S/. S/. S/. S/.
640.12 706.50 201.20 79.10
PZA
4.00
307.84
1231.36
S/.
1,231.36
S/.
1,231.36
PTO
29.00
57.28
1661.12
S/.
1,661.12
S/.
1,661.12
1,564.86 662.46 2,323.00 473.46 227.81 742.62 98.60 275.34 294.12 439.10 418.04
TOTAL
CRONOGRAMA VALORIZADO DE OBRA - INICIAL SAN ISIDRO PROYECTO: INSTALACION DE INSFRAESTRUCTURAS Y EQUIPAMIENTO DE LAS INSTITUCIONES EDUCATIVAS DE NIVEL INICIAL DE LAS LOCALIDADES DE LAYAMPAMPA, LLAULLICA, HUICHCANA, SAN ISIDRO Y LLIHUAMPAMPA , DISTRITO DE TINTAY PUNCU
PART.
CLIENTE: MUNICIPALIDAD DISTRITAL DE TINTAY PUNCU
DEPARTAMENTO: HUANCAVELICA
COSTO DEL PROYECTO: S/. 1,587,917.36
PROVINCIA: TAYACAJA
SUPERVISOR: CONSORCIO JK&M ARQUITECTURA E INGENIERIA
DISTRITO: TINTAY PUNCU
RESIDENTE:
UBICACIÓN: SAN ISIDRO
ING. JAVIER CASTILLON SANABRIA
DESCRIPCION
04.05.02.01 04.05.02.02
TUEBRIA DE PVC SAP C-10 1/2" TUEBRIA DE PVC SAP C-10 3/4"
04.05.03 04.05.03.01 04.05.03.02 04.05.03.03
UNIDA METRA COSTO D DO UNITARIO
COSTO PARCIAL
PRIMER MES
SEGUNDO MES
TERCER MES
CUARTO MES
QUINTO MES
SEXTO MES
TOTAL
MT MT
95.00 38.01
15.40 14.14
1463.00 537.46
S/. S/.
1,463.00 537.46
S/. S/.
1,463.00 537.46
ACCESORIOS CODO PVC SAP 1/2" X 90 CODO PVC SAP 3/4" X 90 TEE PVC SAP 1/2"
PZA PZA UND
20.00 3.00 26.00
12.98 12.88 9.23
259.60 38.64 239.98
S/. S/. S/.
259.60 38.64 239.98
S/. S/. S/.
259.60 38.64 239.98
04.05.04 04.05.05.01 04.05.05.02
LLAVES Y VALVULAS VALVULA COMPUERTA DE BRONCE DE 1/2" GRIFO CROMADO DE 1/2"
UND PZA
5.00 14.00
73.81 24.59
369.05 344.26
S/. S/.
369.05 344.26
S/. S/.
369.05 344.26
04.06 04.06.01 04.06.02
SISTEMA DE EVACUACION PLUVIAL TUBERIA PVC SAP DE 4" P/LLUVIAS PRUEBA HIDRAULICA MAS DESINFECCION
MT MT
60.25 133.01
67.11 3.88
4043.38 516.08
S/. S/.
4,043.38 516.08
S/. S/.
4,043.38 516.08
05 05.01 05.01.01 05.01.01.01 05.01.01.01.01
CONSTRUCCION DE CERCO PERIMETRICO ESTRUCTURA OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO MANUAL M2 208.10
S/.
-
1.92
399.55
S/.
399.55
S/.
399.55
05.01.01.02 DEMOLICIONES 05.01.01.02.01 DEMOLICION DE MURO DE ADOBE
M3
20.00
22.97
459.40
S/.
459.40
S/.
459.40
05.01.01.03 ELIMINACION DE MATERIAL EXCEDENTE 05.01.01.03.01 ELIMINACION DE MATERIAL DE DEMOLICIONES
M3
20.00
64.36
1287.20
S/.
1,287.20
S/.
1,287.20
05.01.01.04 TRAZO, NIVELES Y REPLANTEO 05.01.01.04.01 TRAZO Y REPLANTEO PRELIMINAR 05.01.01.04.02 TRAZO Y REPLANTEO DURANTE LA EJECUCIÓN
M2 M2
208.10 208.10
1.95 2.55
405.80 530.66
S/.
405.80
S/. S/.
405.80 530.66
05.01.01.05 MOVIMIENTO DE TIERRAS 05.01.01.05.01 EXCAVACION PARA ZANJAS Y ZAPATAS 05.01.01.05.02 EXCAVACION PARA CIMIENTOS HASTA 1.00 MT TERRENO
M3 M3
5.52 82.24
31.88 28.10
175.98 2310.94
S/. S/.
175.98 2,310.94
05.01.01.06 RELLENOS 05.01.01.06.01 RELLENO Y COMP. MANUAL- MAT. PROPIO
M3
0.97
2.61
2.53
S/.
2.53
S/.
2.53
05.01.01.07 NIVELACION DE TERRENO 05.01.01.07.01 NIVELACION INTERIOR APISONADO CON EQUIPO
M2
55.77
2.94
163.96
S/.
163.96
S/.
163.96
05.01.01.08 ELIMINACION DE MATERIAL EXCEDENTE 05.01.01.08.01 ELIMINACION DE MATERIAL EXCEDENTE DISTANCIA PROM
M3
109.06
14.05
1532.29
S/.
1,532.29
S/.
1,532.29
05.01.02 05.01.02.01
OBRAS DE CONCRETO SIMPLE SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENTO-H
M2
4.60
35.35
162.61
S/.
81.31
S/.
162.61
05.01.02.03
MURO DE MAMPOSTERIA
S/.
265.33
S/. S/.
175.98 2,310.94
S/.
81.31
S/.
265.33
CRONOGRAMA VALORIZADO DE OBRA - INICIAL SAN ISIDRO PROYECTO: INSTALACION DE INSFRAESTRUCTURAS Y EQUIPAMIENTO DE LAS INSTITUCIONES EDUCATIVAS DE NIVEL INICIAL DE LAS LOCALIDADES DE LAYAMPAMPA, LLAULLICA, HUICHCANA, SAN ISIDRO Y LLIHUAMPAMPA , DISTRITO DE TINTAY PUNCU
PART.
CLIENTE: MUNICIPALIDAD DISTRITAL DE TINTAY PUNCU
DEPARTAMENTO: HUANCAVELICA
COSTO DEL PROYECTO: S/. 1,587,917.36
PROVINCIA: TAYACAJA
SUPERVISOR: CONSORCIO JK&M ARQUITECTURA E INGENIERIA
DISTRITO: TINTAY PUNCU
RESIDENTE:
UBICACIÓN: SAN ISIDRO
ING. JAVIER CASTILLON SANABRIA
DESCRIPCION
UNIDA METRA COSTO D DO UNITARIO
COSTO PARCIAL
PRIMER MES
SEGUNDO MES
TERCER MES
CUARTO MES
QUINTO MES
SEXTO MES
TOTAL
05.01.02.03.01 MURO DE MAMPOSTERIA DE PIEDRA MEZCLA 1:5 + 70% P 05.01.02.03.02 ENCOFRADO Y DESENCOFRADO DE MURO DE MAMPOSTER
M3 M2
89.82 140.07
348.36 37.18
31289.70 5207.80
S/. S/.
15,644.85 2,603.90
S/. S/.
15,644.85 2,603.90
S/. S/.
31,289.70 5,207.80
05.01.02.04 05.01.02.05
M3
18.57
349.07
6482.23
S/.
3,241.11
S/.
3,241.11
S/.
6,482.23
05.01.02.06 SOBRECIMIENTO 05.01.02.06.01 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS 05.01.02.06.02 ENCOFRADO Y DESENCOF. SOBRECIMIENTO DE 0.30 A 0.6
M3 M2
24.18 164.38
364.20 33.97
8806.36 5583.99
S/. S/.
4,403.18 2,791.99
S/. S/.
4,403.18 2,791.99
S/. S/.
8,806.36 5,583.99
05.01.03 05.01.03.01 05.01.03.01.01 05.01.03.01.02
OBRAS DE CONCRETO ARMADO ZAPATAS CONCRETO EN ZAPATAS FC= 210 KG/CM2 ACERO FY= 4200 KG/CM2 EN ZAPATAS
M3 KG
5.52 44.68
525.29 3.89
2899.60 173.81
S/. S/.
1,449.80 86.90
S/. S/.
1,449.80 86.90
S/. S/.
2,899.60 173.81
05.01.03.02 05.01.03.02.01 05.01.03.02.02 05.01.03.02.03
COLUMNAS CONCRETO EN COLUMNAS FC=210 KG/CM2 ENCOFRADO Y DESENCOFRADO VIGAS DE COLUMNAS ACERO ESTRUCTURAL TRABAJO PARA COLUMNAS
M3 M2 KG
6.83 113.91 1285.96
611.45 37.18 3.77
4176.20 4235.17 4848.07
S/. S/. S/.
2,088.10 2,117.59 2,424.03
S/. S/. S/.
2,088.10 2,117.59 2,424.03
S/. S/. S/.
4,176.20 4,235.17 4,848.07
05.01.03.03 05.01.03.03.01 05.01.03.03.02 05.01.03.03.03
VIGAS CONCRETO EN VIGAS AMARRE FC=210 KG/CM2 ENCOFRADO Y DESENCOFRADO EN VIGAS ACERO ESTRUCTURAL TRABAJO PARA VIGAS Y DINTELES
M3 M2 KG
2.19 33.85 185.49
445.08 50.00 3.77
974.73 1692.50 699.30
S/. S/. S/.
487.36 846.25 349.65
S/. S/. S/.
487.36 846.25 349.65
S/. S/. S/.
974.73 1,692.50 699.30
05.01.03.04 05.01.03.04.01 05.01.03.04.02 05.01.03.04.03 05.01.03.04.04
LOSAS ALIGERADAS CONCRETO EN LOSAS ALIGERADAS FC=210 KG/CM2 ENCOFRADO Y DESENCOFRADO EN LOSAS ALIGERADAS ACERO ESTRUCTURAL TRABAJO PARA LOSAS ALIGERADAS LADRILLO DE ARICLLA 15X30X30 PARA TECHO ALIGERADO
M3 M2 KG UND
2.23 6.28 9.35 86.40
440.06 30.62 3.77 3.01
981.33 192.29 35.25 260.06
S/. S/. S/. S/.
981.33 192.29 35.25 260.06
S/. S/. S/. S/.
981.33 192.29 35.25 260.06
05.01.04 05.01.04.01
VARIOS JUNTA DE CONSTRUCCION CON TEKNOPORT
M2
28.80
85.42
2460.10
S/.
1,230.05
S/.
1,230.05
S/.
2,460.10
05.02 05.02.01 05.02.01.01
ARQUITECTURA MUROS Y TABIQUES DE ALBAÑILERIA MURO DE LADRILLO TIPO IV 18 HUECOS SOGA C:A 1:4*1.
M2
163.60
57.14
9348.10
S/.
4,674.05
S/.
4,674.05
S/.
9,348.10
05.02.02 05.02.02.01 05.02.02.02 05.02.02.03
REVOQUES ENLUCIDOS Y MOLDURAS TARRAJEO DE SUPERF. DE SOBRECIMIENTOS TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMENTOTARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-AREN
M2 M2 M2
34.54 74.37 24.85
37.70 34.01 27.17
1302.16 2529.32 675.17
S/. S/. S/.
651.08 1,264.66 337.59
S/. S/. S/.
651.08 1,264.66 337.59
S/. S/. S/.
1,302.16 2,529.32 675.17
05.02.03 05.02.03.01 05.02.03.02
CARPINTERIA METALICA PUERTA METALICA SEGÚN DISEÑO TIPO 1 (INC. COLOR) REJA METALICA SEGÚN DISEÑO INC INSTALACION
M2 MT
6.90 66.44
434.88 103.51
3000.67 6877.20
S/.
3,438.60
05.02.04 05.02.04.01
CERRAJERIA BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2"
PZA
7.00
17.86
125.02
CIMIENTO CORRIDO CONCRETO 1:10 +30% P.G. PARA CIMIENTO CORRIDO
S/. S/.
3,000.67 3,438.60
S/. S/.
3,000.67 6,877.20
S/.
125.02
S/.
125.02
CRONOGRAMA VALORIZADO DE OBRA - INICIAL SAN ISIDRO PROYECTO: INSTALACION DE INSFRAESTRUCTURAS Y EQUIPAMIENTO DE LAS INSTITUCIONES EDUCATIVAS DE NIVEL INICIAL DE LAS LOCALIDADES DE LAYAMPAMPA, LLAULLICA, HUICHCANA, SAN ISIDRO Y LLIHUAMPAMPA , DISTRITO DE TINTAY PUNCU CLIENTE: MUNICIPALIDAD DISTRITAL DE TINTAY PUNCU
DEPARTAMENTO: HUANCAVELICA
COSTO DEL PROYECTO: S/. 1,587,917.36
PROVINCIA: TAYACAJA
SUPERVISOR: CONSORCIO JK&M ARQUITECTURA E INGENIERIA
DISTRITO: TINTAY PUNCU
RESIDENTE:
UBICACIÓN: SAN ISIDRO
PART.
ING. JAVIER CASTILLON SANABRIA
DESCRIPCION
05.02.04.02 05.02.04.03
CHAPA PARA EXTERIOR CON LLAVES INTERIORES Y EXTER CERROJO CROMADO 10"
05.02.05 05.02.05.01 05.02.05.02 05.02.05.03 05.02.05.04 05.02.05.05
PINTURA PINTURA PINTURA PINTURA PINTURA PINTURA
05.02.06 05.02.06.01
UNIDA METRA COSTO D DO UNITARIO
COSTO PARCIAL
PRIMER MES
SEGUNDO MES
TERCER MES
CUARTO MES
QUINTO MES
SEXTO MES
TOTAL
UND UND
2.00 2.00
102.18 43.68
204.36 87.36
S/. S/.
204.36 87.36
S/. S/.
204.36 87.36
M2 M2 M2 M2 M2
82.19 84.25 53.85 29.12 13.80
5.54 13.09 13.74 14.08 14.86
455.33 1102.83 739.90 410.01 205.07
S/. S/. S/. S/. S/.
455.33 1,102.83 739.90 410.01 205.07
S/. S/. S/. S/. S/.
455.33 1,102.83 739.90 410.01 205.07
VARIOS LIMPIEZA PERMANENTE Y FINAL DE OBRA
GLB
1.00
84.30
84.30
S/.
84.30
S/.
84.30
06 06.01 06.01.01 06.01.02 06.01.03 06.01.04 06.01.05
AREA DE CIRCULACION Y OBRAS EXTERNAS OBRAS PROVISIONALES CARTEL DE OBRA ALMACEN PROVISIONAL DE OBRA CERCO PROVISIONAL SEÑALIZACION DURANTE LA EJECUCION INSTALACIONES ELECTRICAS PROVISIONALES EN OBRA
GLB MT MT GLB GLB
1.00 1.00 139.45 1.00 1.00
1200.00 679.81 23.37 359.54 760.87
1200.00 679.81 3258.95 359.54 760.87
1,200.00 679.81 3,258.95 359.54 760.87
06.02 06.02.01 06.02.01.01 06.02.01.02 06.02.01.03 06.02.01.04 06.02.01.05
TRABAJOS PRELIMINARES REMOCION REMOCION DE COBERTURAS REMOCION DE VENTANAS REMOCION DE PUERTAS REMOCION DE INSTALACIONES ELECTRICAS REMOCION DE INSTALACIONES SANITARIAS
M2 UND UND GLB GLB
47.90 2.00 1.00 1.00 1.00
10.98 3.60 3.60 1938.65 2024.58
06.02.02 06.02.02.01 06.02.02.02 06.02.02.03 06.02.02.04 06.02.02.05
DEMOLICION DEMOLICION DE MURO DE ADOBE DEMOLICION DE PISO Y FALSOS PISOS LIMPIEZA DE TERRENO MANUAL TRAZO Y REPLANTEO PRELIMINAR TRAZO Y REPLANTEO DURANTE LA EJECUCIÓN
M3 M2 M2 M2 M2
33.60 47.90 564.46 564.46 564.46
06.03 06.03.01 06.03.01.01 06.03.01.01.01 06.03.01.01.02 06.03.01.01.03 06.03.01.01.04
ESTRUCTURAS MOVIMIENTO DE TIERRAS EXCAVACION EXCAVACION MASIVA A MAQUINA EN TERRENO NORMAL"C" EXCAVACION PARA CIMIENTOS DE MUROS DE MAMPOSTER EXCAVACION MANUAL DE SARDINELES EXCAVACION MANUAL DE CUNETAS
M3 M3 M3 M3
06.03.01.02 06.03.01.02.01 06.03.01.02.02 06.03.01.02.03 06.03.01.02.04
RELLENO RELLENO Y COMP. MANUAL- MAT. PRESTAMO RELLENO Y COMP. MANUAL- MAT. PROPIO NIVELACION INTERIOR APISONADO CON EQUIPO ELIMINACION DE MATERIAL-MANUAL DISTANCIA PROMEDI
M3 M3 M2 M3
EN SOBRECIMIENTO DE H=30cm CON ESMALTE S LATEX EN COLUMNAS 2 MANOS LATEX EN VIGAS 2 MANOS EN PORTON METALICO 2 MANOS ANTICORROSIVA ESMALTE Y ANTICORROSIVO EN CARPINTERIA ME
S/. S/.
679.81 3,258.95
S/.
1,200.00
S/.
760.87
S/. S/. S/. S/. S/.
525.94 7.20 3.60 1938.65 2024.58
S/. S/. S/. S/. S/.
525.94 7.20 3.60 1,938.65 2,024.58
S/. S/. S/. S/. S/.
525.94 7.20 3.60 1,938.65 2,024.58
22.97 15.89 1.92 1.95 2.55
771.79 761.13 1083.76 1100.70 1439.37
S/. S/. S/. S/. S/.
771.79 761.13 1,083.76 1,100.70 1,439.37
S/. S/. S/. S/. S/.
771.79 761.13 1,083.76 1,100.70 1,439.37
2945.75 7.39 11.99 9.52
11.99 28.10 14.05 14.05
35319.54 207.66 168.46 133.76
S/.
35,319.54
S/. S/. S/. S/.
35,319.54 207.66 168.46 133.76
17.60 47.28 564.46 37.57
11.74 2.61 2.94 22.21
206.62 123.40 1659.51 834.43
S/. S/. S/. S/.
206.62 123.40 1,659.51 834.43
S/.
S/.
207.66 S/. S/.
S/. S/. S/. S/.
834.43
359.54
206.62 123.40 1,659.51
168.46 133.76
CRONOGRAMA VALORIZADO DE OBRA - INICIAL SAN ISIDRO PROYECTO: INSTALACION DE INSFRAESTRUCTURAS Y EQUIPAMIENTO DE LAS INSTITUCIONES EDUCATIVAS DE NIVEL INICIAL DE LAS LOCALIDADES DE LAYAMPAMPA, LLAULLICA, HUICHCANA, SAN ISIDRO Y LLIHUAMPAMPA , DISTRITO DE TINTAY PUNCU
PART.
CLIENTE: MUNICIPALIDAD DISTRITAL DE TINTAY PUNCU
DEPARTAMENTO: HUANCAVELICA
COSTO DEL PROYECTO: S/. 1,587,917.36
PROVINCIA: TAYACAJA
SUPERVISOR: CONSORCIO JK&M ARQUITECTURA E INGENIERIA
DISTRITO: TINTAY PUNCU
RESIDENTE:
UBICACIÓN: SAN ISIDRO
ING. JAVIER CASTILLON SANABRIA
DESCRIPCION
UNIDA METRA COSTO D DO UNITARIO
COSTO PARCIAL
PRIMER MES
TERCER MES
CUARTO MES
06.03.01.02.05 ELIMINACION CON MAQUINARIA REN.=150 M3/DIA
M3
2983.33
9.95
29684.13
06.03.02 06.03.02.01 06.03.02.01.01 06.03.02.01.02
M3 M2
15.34 45.89
348.36 37.18
5343.84 1706.19
S/. S/.
06.03.02.02 GRADERIAS 06.03.02.02.01 CONCRETO EN GRADERIAS FC= 175 KG/CM2 06.03.02.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN GRADERIAS
M3 M2
1.19 4.31
463.97 37.18
552.12 160.25
06.03.02.03 RAMPA 06.03.02.03.01 CONCRETO EN PAMPAS FC= 140 KG/CM2 06.03.02.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN RAMPAS
M3 M2
2.90 7.14
453.43 37.18
06.03.02.04 CUNETAS 06.03.02.04.01 CONCRETO EN CUNETAS FC= 140 KG/CM2 06.03.02.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN CUNETAS
M3 M2
6.35 158.68
06.03.02.05 SARDINEL DE CONCRETO 06.03.02.05.01 CONCRETO EN SARDINEL FC= 175 KG/CM2 06.03.02.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN SARDINELES
M3 M2
06.03.02.06 PATIO DE CONCRETO 06.03.02.06.01 CONCRETO EN PATIO FC= 175 KG/CM2 06.03.02.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN PATIO
QUINTO MES
TOTAL 29,684.13
5,343.84 1,706.19
S/. S/.
5,343.84 1,706.19
S/. S/.
552.12 160.25
S/. S/.
552.12 160.25
1314.95 265.47
S/. S/.
1,314.95 265.47
S/. S/.
1,314.95 265.47
453.43 37.18
2879.28 5899.72
S/. S/.
2,879.28 5,899.72
S/. S/.
2,879.28 5,899.72
116.00 31.12
453.43 37.18
52597.88 1157.04
S/. S/.
52,597.88 1,157.04
S/. S/.
52,597.88 1,157.04
M3 M2
20.36 23.62
463.97 37.18
9446.43 878.19
S/. S/.
9,446.43 878.19
S/. S/.
9,446.43 878.19
06.03.02.07 VEREDA DE CONCRETO 06.03.02.07.01 CONCRETO EN VEREDAS FC= 175 KG/CM2 06.03.02.07.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VEREDAS
M3 M2
5.71 15.75
12.07 37.18
68.92 585.59
S/. S/.
68.92 585.59
S/. S/.
68.92 585.59
06.03.02.08 06.03.02.08.01 06.03.02.08.02 06.03.02.08.03
SARDINEL DE CONCRETO ARMADO CONCRETO EN VEREDAS FC= 175 KG/CM2 ENCOFRADO Y DESENCOFRADO NORMAL EN VEREDAS ACERO ESTRUCTURAL TRABAJDO PARA SARDINELES
M3 M2 KG
13.12 174.98 379.14
453.43 37.18 3.77
5949.00 6505.76 1429.36
S/. S/. S/.
5,949.00 6,505.76 1,429.36
S/. S/. S/.
5,949.00 6,505.76 1,429.36
06.03.03 06.03.03.01 06.03.03.01.01 06.03.03.01.02 06.03.03.01.03 06.03.03.01.04
ARQUITECTURA REVOQUES ENLUCIDOS Y MOLDURAS TARRAJEO DE SUPERFICIE DE SARDINEL TARRAJEO DE GRADERIAS CON CEMENTO-ARENA TARRAJEO CON IMPERMEABILIZANTES TARRAJEO EN RAMPAS CON CEMENTO-ARENA
M2 M2 M2 M2
71.45 2.72 31.74 29.04
34.01 34.01 31.45 34.01
2430.01 92.51 998.22 987.65
S/. S/. S/. S/.
2,430.01 92.51 998.22 987.65
S/. S/. S/. S/.
2,430.01 92.51 998.22 987.65
M2 M2
300.58 75.54
33.60 136.87
10099.49 10339.16
S/. S/.
10,099.49 10,339.16
S/. S/.
10,099.49 10,339.16
06.03.03.02 PISOS 06.03.03.02.01 PISO DE CEMENTO FROTACHADO Y BRUÑ. 2" 06.03.03.02.02 PISO DE GRASS SINTETICO
06.03.03.03
CARPINTERIA METALICA Y HERRERIA
29,684.13
SEXTO MES S/.
OBRAS DE CONCRETO SIMPLE MURO DE MAMPOSTERIA MURO DE MAMPOSTERIA DE PIEDRA MEZCLA 1:5 + 70% P ENCOFRADO Y DESENCOFRADO NORMAL. MURO DE MAMP
S/.
SEGUNDO MES
CRONOGRAMA VALORIZADO DE OBRA - INICIAL SAN ISIDRO PROYECTO: INSTALACION DE INSFRAESTRUCTURAS Y EQUIPAMIENTO DE LAS INSTITUCIONES EDUCATIVAS DE NIVEL INICIAL DE LAS LOCALIDADES DE LAYAMPAMPA, LLAULLICA, HUICHCANA, SAN ISIDRO Y LLIHUAMPAMPA , DISTRITO DE TINTAY PUNCU
PART.
CLIENTE: MUNICIPALIDAD DISTRITAL DE TINTAY PUNCU
DEPARTAMENTO: HUANCAVELICA
COSTO DEL PROYECTO: S/. 1,587,917.36
PROVINCIA: TAYACAJA
SUPERVISOR: CONSORCIO JK&M ARQUITECTURA E INGENIERIA
DISTRITO: TINTAY PUNCU
RESIDENTE:
UBICACIÓN: SAN ISIDRO
ING. JAVIER CASTILLON SANABRIA
DESCRIPCION
UNIDA METRA COSTO D DO UNITARIO
COSTO PARCIAL
PRIMER MES
SEGUNDO MES
TERCER MES
CUARTO MES
QUINTO MES
SEXTO MES
TOTAL
06.03.03.03.01 TACHOS DE BASURA EN FIBRA DE VIDRIO
UND
3.00
181.96
545.88
S/.
545.88
S/.
545.88
06.03.04 06.03.04.01 06.03.04.02 06.03.04.03
VARIOS JARDINERIA Y LIMPIEZA SEMBRIO DE PLANTA POR ESQUEJES O MECHONES PLANTAS ORNAMENTALES LIMPIEZA PERMANENTE Y FINAL DE OBRA
M2 UND GLB
6.00 50.00 1.00
8.51 54.24 84.30
51.06 2712.00 84.30
S/. S/. S/.
51.06 2,712.00 84.30
S/. S/. S/.
51.06 2,712.00 84.30
07
TANQUE SEPTICO Y POZO PERCOLADOR
07.01 07.01.01 07.01.02
TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO MANUAL TRAZO Y REPLANTEO PRELIMINAR
M2 M2
23.57 23.57
1.92 1.95
45.25 45.96
S/. S/.
45.25 45.96
07.02 07.02.01 07.02.02 07.02.03 07.02.04
MOVIMIENTO DE TIERRAS EXCAVACION MASIVA MANUAL NIVELACION INTERIOR Y APISONADO MANUAL ACARREO DE MATERIAL EXCEDENTE D=30 MT PROMEDIO ELIMINACION DE MATERIAL EXCEDENTE
M3 M2 M3 M3
68.42 23.21 49.26 82.10
100.39 3.33 6.46 21.48
6868.68 77.29 318.22 1763.51
S/. S/. S/. S/.
6,868.68 77.29 318.22 1,763.51
S/. S/. S/. S/.
6,868.68 77.29 318.22 1,763.51
07.03 07.03.01 07.03.02 07.03.03
CONCRETO SIMPLE SOLADO CONCRETO 1:12 CEMENTO-HORMIGON E= 4" CONCRETO 1:10 +30% P.G. PARA CIMIENTO CORRIDO CIMIENTO MURO ALBAÑILERIA
M2 M3 M3
15.66 41.85 1.06
37.39 349.07 208.11
585.53 14608.58 220.60
S/. S/. S/.
585.53 14,608.58 220.60
S/. S/. S/.
585.53 14,608.58 220.60
07.04 07.04.01 07.04.02 07.04.03
CONCRETO ARMADO CONCRETO FC= 210 KG/CM2 ENCOFRADO Y DESENCOFRADO ACERO FY= 420 KG/CM2 GRADO 60
M3 M2 KG
12.25 64.71 430.71
390.22 43.32 3.89
4780.20 2803.24 1675.46
S/. S/. S/.
4,780.20 2,803.24 1,675.46
S/. S/. S/.
4,780.20 2,803.24 1,675.46
7.05 7.05.01
REVESTIMIENTOS TARRAJEO EN INTERIORES CON IMPERMEABILIZANTE MEZCL M2
63.56
27.49
1747.26
S/.
1,747.26
S/.
1,747.26
7.06 7.05.01
MUROS MURO DE LADRILLO CORRIENTE CABEZA
M2
29.05
61.40
1783.67
S/.
1,783.67
S/.
1,783.67
7.07 07.07.01 07.07.02 07.07.03
ACCESORIOS VARIOS ACCESORIO TEE PVC SAL 6" ACCESORIO TEE PVC SAP 2" ABRAZADERA DE PLATINA DE 4" X 8" EN 3/8"
UND UND UND
5.00 2.00 1.00
33.98 18.10 26.25
169.90 36.20 26.25
S/. S/. S/.
169.90 36.20 26.25
S/. S/. S/.
169.90 36.20 26.25
7.08 07.08.01 07.08.02
OTROS SUMINISTRO Y COLOCACION DE GRAVA SUMINISTRO Y COLOCACION DE GRAVA DE 1/2"
M3 M3
13.76 11.74
30.89 30.89
425.05 362.65
S/. S/.
425.05 362.65
S/. S/.
425.05 362.65
08 08.01 08.01.01 08.01.02
EQUIPAMIENTO CON MOBILIARIO, COMPUTADORAS Y MATERIAL BIBLIOGRAFICO EQUIPAMIENTO DE AULAS ADQUISICION DE MESAS PARA NIÑOS UND 2.00 900.00 MOBILIARIO PARA SECTOR DRAMATIZADOR GLB 1.00 650.00
1800.00 650.00
S/. S/.
1,800.00 650.00
S/. S/.
1,800.00 650.00
S/. S/.
45.25 45.96
CRONOGRAMA VALORIZADO DE OBRA - INICIAL SAN ISIDRO PROYECTO: INSTALACION DE INSFRAESTRUCTURAS Y EQUIPAMIENTO DE LAS INSTITUCIONES EDUCATIVAS DE NIVEL INICIAL DE LAS LOCALIDADES DE LAYAMPAMPA, LLAULLICA, HUICHCANA, SAN ISIDRO Y LLIHUAMPAMPA , DISTRITO DE TINTAY PUNCU
PART.
CLIENTE: MUNICIPALIDAD DISTRITAL DE TINTAY PUNCU
DEPARTAMENTO: HUANCAVELICA
COSTO DEL PROYECTO: S/. 1,587,917.36
PROVINCIA: TAYACAJA
SUPERVISOR: CONSORCIO JK&M ARQUITECTURA E INGENIERIA
DISTRITO: TINTAY PUNCU
RESIDENTE:
UBICACIÓN: SAN ISIDRO
ING. JAVIER CASTILLON SANABRIA
DESCRIPCION
UNIDA METRA COSTO D DO UNITARIO
COSTO PARCIAL
PRIMER MES
SEGUNDO MES
TERCER MES
CUARTO MES
QUINTO MES
SEXTO MES
TOTAL
08.01.03 08.01.04 08.01.05 08.01.06 08.01.07 08.01.08 08.01.09 08.01.10 08.01.11 08.01.12 08.01.13
MOBILIARIO PARA SECTOR JUEGOS TRIANGULOS MOBILIARIO PARA SECTOR COMPUTO MOBILIARIO PARA SECTOR BIBLIOTECA MOBILIARIO PARA SECTOR EXPERIMENTOS MOBILIARIO PARA SECTOR ARTE Y MUSICA MOBILIARIO PARA SECTOR PINTURA ADQUISICION DE SILLAS PARA NIÑOS ADQUISICION DE PUPITRE PARA DOCENTE PIZARRA ACRILICA INC. TICERO EN ALUMINIO DE 3 MT X 1. EQUIPOS DE SONIDO EQUIPOS AUDIO VISUAL
GLB GLB GLB GLB GLB GLB UND UND UND UND UND
1.00 1.00 1.00 1.00 1.00 1.00 2.00 2.00 2.00 1.00 1.00
390.00 350.00 450.00 450.00 680.00 390.00 1000.00 480.00 727.81 1650.00 2030.00
390.00 350.00 450.00 450.00 680.00 390.00 2000.00 960.00 1455.62 1650.00 2030.00
S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. S/.
390.00 350.00 450.00 450.00 680.00 390.00 2,000.00 960.00 1,455.62 1,650.00 2,030.00
S/. S/. S/. S/. S/. S/. S/. S/. S/. S/. S/.
390.00 350.00 450.00 450.00 680.00 390.00 2,000.00 960.00 1,455.62 1,650.00 2,030.00
08.02 08.02.01 08.02.02 08.02.03
EQUIPAMIENTO AREA ADMINISTRATIVA EQUIPO INFORMATICO P/PERSONAL DOCENTE Y ADM. INC ADQUISICION DE MUEBLES PARA AREA ADMINISTRATIVA ADQUISICION DE ESTANTES TIPO ARCHIVADOR
UND GLB UND
1.00 1.00 1.00
2397.35 1570.00 600.00
2397.35 1570.00 600.00
S/. S/. S/.
2,397.35 1,570.00 600.00
S/. S/. S/.
2,397.35 1,570.00 600.00
08.03 08.03.01 08.03.02
EQUIPAMIENTO COCINA-COMEDOR MUEBLES DE COMEDOR COCINA UTENCILIOS DE COMEDOR COCINA
GLB GLB
1.00 1.00
2050.00 2855.80
2050.00 2855.80
S/. S/.
2,050.00 2,855.80
S/. S/.
2,050.00 2,855.80
08.04 08.05 08.06 08.07
JUEGOS MECANICOS VARIOS ADQUISICION DE CASTILLO DE FIBRA DE VIDRIO ADQUISICION DE SUBE Y BAJA DE FIBRA DE VIDRIO ADQUISICION DE TOBOGAN DE FIBRA DE VIDRIO
UND UND UND
1.00 1.00 1.00
2250.00 2500.00 1800.00
2250.00 2500.00 1800.00
S/. S/. S/.
2,250.00 2,500.00 1,800.00
S/. S/. S/.
2,250.00 2,500.00 1,800.00
8.09 08.09.01 08.09.02 08.09.03 08.09.04 08.09.05 08.09.06 08.09.07
ADQUISICION DE MATERIALES DIDACTICOS SECTOR JUEGOS TRIANGULOS SECTOR PINTURA SECTOR ARTE Y MUSICA SECTOR EXPERIMENTOS SECTOR BIBLIOTECA SECTOR COMPUTO SECTOR DRAMATIZACION
GLB GLB GLB GLB GLB GLB GLB
2.00 2.00 2.00 2.00 2.00 2.00 2.00
1375.00 322.00 920.00 305.00 410.00 1850.00 540.00
2750.00 644.00 1840.00 610.00 820.00 3700.00 1080.00
09 09.01 09.01.01
CAPACITACION A PADRES DE FAMILIA CAPACITACION A PADRES DE FAMILIA CAPACITACION A PADRES DE FAMILIA PARA EL APOYO EN E
EVE
2.00
688.00
1376.00
10 10.01 10.01.01 10.01.02 10.01.03
MITIGACION AMBIENTAL MEDIDAS DE PREVENCION DURANTE LA EJECUCION RIEGO PERMANENTE DE AREAS DE TRABAJO REVEGETACION DE TALUD EN CORTE HABILITACION DE BOTADEROS
M2 M2 M2
150.00 75.00 50.00
3.37 18.43 23.18
505.50 1382.25 1159.00
10.02 10.02.01 10.02.02
MEDIDAS DE MITIGACION POST EJECUCION LIMPIEZA GENERAL CLAUSURA Y RECUPERACION DE BOTADEROS
M2 M2
500.00 50.00
1.43 3.62
715.00 181.00
S/.
101.10
S/.
688.00
S/.
101.10
S/.
101.10
S/. S/. S/.
101.10 691.13 579.50
S/. S/. S/. S/. S/. S/. S/.
2,750.00 644.00 1,840.00 610.00 820.00 3,700.00 1,080.00
S/. S/. S/. S/. S/. S/. S/.
2,750.00 644.00 1,840.00 610.00 820.00 3,700.00 1,080.00
S/.
688.00
S/.
1,376.00
S/. S/. S/.
101.10 691.13 579.50
S/. S/. S/.
505.50 1,382.25 1,159.00
S/. S/.
715.00 181.00
S/. S/.
715.00 181.00
CRONOGRAMA VALORIZADO DE OBRA - INICIAL SAN ISIDRO PROYECTO: INSTALACION DE INSFRAESTRUCTURAS Y EQUIPAMIENTO DE LAS INSTITUCIONES EDUCATIVAS DE NIVEL INICIAL DE LAS LOCALIDADES DE LAYAMPAMPA, LLAULLICA, HUICHCANA, SAN ISIDRO Y LLIHUAMPAMPA , DISTRITO DE TINTAY PUNCU
PART. 10.03 10.03.01
CLIENTE: MUNICIPALIDAD DISTRITAL DE TINTAY PUNCU
DEPARTAMENTO: HUANCAVELICA
COSTO DEL PROYECTO: S/. 1,587,917.36
PROVINCIA: TAYACAJA
SUPERVISOR: CONSORCIO JK&M ARQUITECTURA E INGENIERIA
DISTRITO: TINTAY PUNCU
RESIDENTE:
UBICACIÓN: SAN ISIDRO
ING. JAVIER CASTILLON SANABRIA
DESCRIPCION PROGRAMA DE MONITOREO Y SEGUIMIENTO AMBIENTAL MONITOREO AMBIENTAL
TOTAL
UNIDA METRA COSTO D DO UNITARIO MES
3.00
226.93
COSTO PARCIAL
PRIMER MES
680.79
S/. 1,052,725.43 PORCENTAJES %
S/.
164,207.78 15.60%
SEGUNDO MES
S/.
226.93
S/.
105,903.31 10.06%
TERCER MES
S/.
272,902.14 25.92%
CUARTO MES
S/.
226.93
S/.
309,441.72 29.39%
QUINTO MES
S/.
138,137.43 13.12%
SEXTO MES
S/.
226.93
S/.
62,133.05 5.90%
TOTAL
S/.
680.79
S/. 1,052,725.43 100.00%
VALORIZACION DE OBRA CORRESPONDIENTE AL MES DE MAYO - 2,015 - INICIAL SAN ISIDRO OBRA PRESUPUESTO
: INSTALACION DE INSFRAESTRUCTURAS Y EQUIPAMIENTO DE LAS INSTITUCIONES EDUCATIVAS DE NIVEL INICIAL DE LAS LOCALIDADES DE LAYAMPAMPA, LLAULLICA, HUICHCANA, SAN ISIDRO Y LLIHUAMPAMPA , DISTRITO DE TINTAY PUNCU, TAYACAJ - HUANCAVELICA : S/.
1'587,917.36
LUGAR
: SAN ISIDRO
VALORIZACION AL 30 DE NOVIEMBRE - 2008
SUPERVISOR DE OBRA : ARQ. ENRIQUE LOPEZ ORIHUELA RESIDENTE DE OBRA : ING. JAVIER CASTILLON SANABRIA
DISTRITO PROVINCIA
ENTIDAD FINANCIERA : MINISTERIO DE EDUCACION - MUNICIPALIDAD DISTRITAL DE TINTAY PUNCU EJECUTA : CONSORCIO SAN ISIDRO
DEPARTAMENTO: HUANCAVELICA REGION : HUANCAVELICA
PRESUPUESTO REFERENCIAL ITEM
DESCRIPCION
UND
METRADO
COSTO
COSTO
UNIT. S/.
PARCIAL S/.
ANTERIOR METRADO
S/.
: TINTAY PUNCU : TAYACAJA
PLAZO DE EJECUCION : 180 DIAS FECHA DE INICIO DE OBRA : 071/10/2008 FECHA DE INICIO DE OBRA : 071/10/2008 FECHA DE CULM. DE OBRA : 31/03/2009
EVALUACION MENSUAL ACTUAL ACUMULADO % METRADO S/. METRADO S/.
SALDO %
METRADO
S/.
01 1.01 01.01.01 01.01.02
ESTRUCTURAS TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO MANUAL TRAZO Y REPLANTEO PRELIMINAR
M2 M2
421.05 421.05
1.92 1.95
808.42 821.05
-
-
421.05
808.42
100.00
421.05
808.42
100.00
-
-
-
-
421.05
821.05
100.00
421.05
821.05
100.00
-
-
01.03 01.03.01 01.03.02 01.03.03 01.03.04
MOVIMIENTO DE TIERRAS EXCAVACION PARA ZANJAS Y ZAPATAS EXCAVACION PARA VIGA DE CIMENTACION ZAPATAS H RELLENO CON MATERIAL PROPIO REFINE, NIVELACION Y COMP. EN FONDO ZANJA
M3 M3 M3 M2
130.23 83.89 153.73 397.47
31.88 31.88 39.83 8.01
4151.73 2674.41 6123.07 3183.73
-
-
130.23
4,151.73
100.00
130.23
4,151.73
100.00
-
-
-
-
83.89
2,674.41
100.00
83.89
2,674.41
100.00
-
-
-
-
-
-
-
-
-
153.73
6,123.07
-
-
-
-
-
-
-
-
397.47
3,183.73
01.04 01.04.01 01.04.02 01.04.03 01.04.04 01.04.05
CONCRETO SIMPLE SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENT CONCRETO 1:10 +30% P.G. PARA CIMIENTO CORRIDO CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS ENCOFRADO Y DESENCOF. SOBRECIMIENTO DE 0.30 A CONCRETO EN FALSOPISO MEZCLA 1:8 CEMENTO-HO
M2 M3 M3 M2 M2
83.79 34.10 7.43 95.09 308.08
35.35 349.07 364.20 50.17 41.16
2961.98 11903.29 2706.01 4770.67 12680.57
-
-
83.79
2,961.98
100.00
83.79
2,961.98
100.00
-
-
-
-
-
-
-
-
-
-
34.10
11,903.29
-
-
-
-
-
-
-
-
7.43
2,706.01
-
-
-
-
-
-
-
-
95.09
4,770.67
-
-
-
-
-
-
-
-
308.08
12,680.57
01.04.06 01.04.06.01 01.04.06.02
DADOS DE CONCRETO CONCRETO FC=175 KG/CM2 PARA DADO DE PROTECCI ENCOFRADO Y DESENCOFRADO PARA DADOS DE PROT
M3 M2
0.39 3.50
392.55 44.91
153.09 157.19
-
-
-
-
-
-
-
-
0.39
153.09
-
-
-
-
-
-
-
-
3.50
157.19
01.05 01.05.01 01.05.01.01 01.05.01.02
CONCRETO ARMADO ZAPATAS CONCRETO FC=210 KG/CM2 EN ZAPATAS ACERO ESTRUCTURAL TRABAJO PARA ZAPATAS
M2 M3
42.93 935.95
428.56 3.77
18398.08 3528.53
-
-
42.93
18,398.08
100.00
42.93
18,398.08
100.00
-
-
-
-
935.95
3,528.53
100.00
935.95
3,528.53
100.00
-
-
01.05.02 01.05.02.01 01.05.02.02 01.05.05.02
VIGAS DE CIMENTACION CONCRETO FC=210 KG/CM2 EN ZAPATAS ENCOFRADO Y DESENCOFRADO VIGAS DE CIMENTACI ACERO ESTRUCTURAL TRABAJO PARA VIGAS DE CIMEN
M3 M2 KG
9.08 72.67 1713.01
439.13 45.26 3.61
3987.30 3289.04 6183.97
-
-
-
-
-
-
-
-
9.08
3,987.30
-
-
-
-
-
-
-
-
72.67
3,289.04
-
-
6,183.97
100.00
-
-
01.05.03 01.05.03.01 01.05.03.02 01.05.03.03
COLUMNAS CONCRETO EN COLUMNAS FC=210 KG/CM2 ENCOFRADO Y DESENCOFRADO VIGAS DE COLUMNAS ACERO ESTRUCTURAL TRABAJO PARA SARDINELES
M3 M2 KG
20.08 248.14 2737.72
525.06 33.40 3.77
10543.20 8287.88 10321.20
-
-
-
-
-
-
-
-
-
-
-
-
10,321.20
100.00
01.05.04 01.05.04.01
COLUMNETAS DE CONFINAMIENTO CONCRETO EN COLUMNAS FC=210 KG/CM2
M3
14.95
491.34
7345.53
-
-
-
-
###
###
-
###
-
6,183.97
100.00
-
-
-
20.08
10,543.20
-
-
-
248.14
8,287.88
10,321.20
100.00
-
-
-
-
14.95
7,345.53
###
-
01.05.04.02 01.05.04.03
ENCOFRADO Y DESENCOFRADO VIGAS DE COLUMNET ACERO ESTRUCTURAL TRABAJO PARA COLUMNETAS
M2 KG
319.91 2048.23
29.52 3.77
9443.74 7721.83
-
-
-
-
-
-
-
-
-
-
682.74
2,573.94
33.33
682.74
2,573.94
33.33
01.05.05 01.05.05.01 01.05.05.02 01.05.05.03
VIGAS CONCRETO EN VIGAS DE AMARRE FC=210 KG/CM2 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS ACERO ESTRUCTURAL TRABAJO PARA VIGAS
M3 M2 KG
59.16 430.29 3628.89
445.08 40.77 3.77
26330.93 17542.92 13680.92
-
-
-
-
-
-
-
-
59.16
26,330.93
-
-
-
-
-
-
-
-
430.29
17,542.92
-
-
-
-
-
-
-
-
01.05.06 01.05.06.01 01.05.06.02 01.05.06.03
VIGUETAS DE AMARRE CONCRETO EN VIGUETAS DE AMARRE FC=210 KG/CM ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS ACERO ESTRUCTURAL TRABAJO PARA VIGAS Y DINTEL
M3 M2 KG
2.41 21.74 291.59
445.08 39.19 3.77
1072.64 851.99 1099.29
-
-
-
-
-
-
-
-
2.41
-
-
-
-
-
-
-
-
21.74
851.99
-
-
-
-
-
-
-
-
291.59
1,099.29
01.05.07 01.05.07.01 01.05.07.02 01.05.07.03 01.05.07.04
LOSAS ALIGERADAS CONCRETO EN LOSA ALIGERADA FC=210 KG/CM2 ENCOFRADO Y DESENCOFRADO VIGAS DE COLUMNAS ACERO ESTRUCTURAL TRABAJO EN LOSAS ALIGERADA LADRILLO HUECO TRABAJADO PARA VIGAS Y DINTELES
M3 M2 KG UND
24.34 286.43 1955.80 1840.93
440.06 30.62 3.77 3.01
10711.06 8770.49 7373.37 5541.20
-
-
-
-
-
-
-
-
24.34
10,711.06
-
-
-
-
-
-
-
-
286.43
8,770.49
-
-
-
-
-
-
-
-
###
7,373.37
-
-
-
-
-
-
-
-
###
5,541.20
02 02.01 02.01.01 02.01.02
ARQUITECTURA ALBAÑILERIA Y TABIQUERIA MURO DE LADRILLO TIPO IV 18 HUECOS SOGA C:A 1:4 MURO DE LADRILLO TIPO IV 18 HUECOS CABEZA C:A 1
M2 M2
311.59 16.16
57.14 94.20
17804.25 1522.27
-
-
-
-
-
-
-
-
311.59
17,804.25
-
-
-
-
-
-
-
-
16.16
1,522.27
02.02 02.02.01 02.02.02 02.02.03 02.02.04 02.02.05 02.02.06 02.02.07 02.02.08 02.02.09 02.02.10 02.02.11 02.02.12
REVOQUES ENLUCIDOS Y MOLDURAS TARRAJEO PRIMARIO RAYADO CON MEZCLA C:A 1-5 TARRAJEO INTERIOR EN MUROS CON CEMENTO-ARENA TARRAJEO EXTERIOR EN MUROS CON CEMENTO-ARENA TARRAJEO INTERIOR EN COLUMNAS CON CEMENTO-AR TARRAJEO EXTERIOR EN COLUMNAS CON CEMENTO-AR TARRAJEO INTERIOR EN VIGAS CON CEMENTO-ARENA TARRAJEO EXTERIOR EN VIGAS CON CEMENTO-ARENA TARRAJEO INTERIOR EN VIGUETAS Y COLUMNETAS CO TARRAJEO EXTERIOR EN VIGUETAS Y COLUMNETAS CO TARRAJEO EN CIELO RASO CON CEMENTO-ARENA 1:5 VESTIDURA DE DERRAMES EN PUERTAS, VENTANAS Y TARRAJEO CON IMPERMEABILIZANTES EN CANAL PLUV
M2 M2 M2 M2 M2 M2 M2 M2 M2 M2 ML M2
69.42 461.07 216.54 67.53 54.38 80.74 47.09 92.38 87.14 286.73 338.68 136.40
24.90 23.65 25.03 27.17 27.17 27.17 27.17 27.17 27.17 51.62 15.67 31.45
1728.56 10904.31 5420.00 1834.79 1477.50 2193.71 1279.44 2509.96 2367.59 14801.00 5307.12 4289.78
-
-
-
-
-
-
-
-
69.42
1,728.56
-
-
-
-
-
-
-
-
461.07
10,904.31
-
-
-
-
-
-
-
-
216.54
5,420.00
-
-
-
-
-
-
-
-
67.53
1,834.79
-
-
-
-
-
-
-
-
54.38
1,477.50
-
-
-
-
-
-
-
-
80.74
2,193.71
-
-
-
-
-
-
-
-
47.09
1,279.44
-
-
-
-
-
-
-
-
92.38
2,509.96
-
-
-
-
-
-
-
-
87.14
2,367.59
-
-
-
-
-
-
-
-
286.73
14,801.00
-
-
-
-
-
-
-
-
338.68
5,307.12
-
-
-
-
-
-
-
-
136.40
4,289.78
02.03 02.03.01 02.03.01.01
PISOS Y PAVIMENTOS CONTRA PISO CONTRA DE 48 MM
M2
397.47
32.06
12742.89
-
-
-
-
-
-
-
-
397.47
12,742.89
02.03.02 02.03.02.01 02.03.02.02
PISOS PISO MACHIEMBRADO MAD. 1" X 4" DURMIENTE 2"X" PISO CERAMICO DE 36X36 CM
M2 M2
155.06 57.39
65.77 75.46
10198.30 4330.65
-
-
-
-
-
-
-
-
155.06
10,198.30
-
-
-
-
-
-
-
-
57.39
4,330.65
02.04 02.04.01 02.04.01.01
ZOCALOS Y CONTRAZOCALOS ZOCALOS ZOCALO DE CERAMICO DE 20 X 30 CM
M2
95.84
79.97
7664.32
-
-
-
-
-
-
-
-
95.84
7,664.32
02.04.02 02.04.02.01
CONTRAZOCALOS CONTRAZOCALO DE CEMENTO S/COLOREAR H= 30 C
ML
236.23
10.73
2534.75
-
-
-
-
-
-
-
-
236.23
2,534.75
02.05 02.05.01 02.05.02
CARPINTERIA METALICA VENTANA METALICA SEGÚN DISEÑO COLOCACION DE VENTANAS
M2 PIEZA
51.16 53.00
92.94 38.90
4754.81 2061.70
-
-
-
-
-
-
-
-
51.16
4,754.81
-
-
-
-
-
-
-
-
53.00
2,061.70
319.91 ###
###
9,443.74 5,147.88
13,680.92
1,072.64
02.06 02.06.01 02.06.01.01
CERRAJERIA BISAGRAS BISAGRA CAPUCHINA DE 4" X 4"
02.06.02 02.06.02.01 02.06.02.02 02.06.02.03 02.06.02.04 02.07 02.07.01 02.07.01.01
CERRADURAS CERRADURA DE 2 GOLPES CERRADURA DE PUERTA INTERIOR CON MANIJAS PICAPORTE DE FIERRO REDONDO DE 1/2" X 0.50 MT. COLOCACION E INSTALACION DE SEPARADOR METALICO CARPINTERIA DE MADERA PUERTAS PUERTA DE MADERA(SEGÚN DISEÑO)
02.08 02.08.01
pza
72.00
15.60
1123.20
-
-
-
-
-
-
-
-
72.00
1,123.20
pza pza pza m2
19.00 6.00 10.00 8.61
102.82 47.69 16.13 61.39
1953.58 286.14 161.30 528.57
-
-
-
-
-
-
-
-
19.00
1,953.58
-
-
-
-
-
-
-
-
6.00
286.14
-
-
-
-
-
-
-
-
10.00
161.30
-
-
-
-
-
-
-
-
8.61
528.57
m2
27.00
516.13
13935.51
-
-
-
-
-
-
-
-
27.00
13,935.51
VIDRIOS, CRISTALES Y SIMILARES VIDRIOS TEMPLADO DE 6MM
pie2
550.67
19.44
10705.02
-
-
-
-
-
-
-
-
550.67
10,705.02
02.09 02.09.01 02.09.02 02.09.03 02.09.04 02.09.05 02.09.06 02.09.07 02.09.08 02.09.09 02.09.10 02.09.11 02.09.12 02.09.13
PINTURA PINTURA PINTURA PINTURA PINTURA PINTURA PINTURA PINTURA PINTURA PINTURA PINTURA PINTURA PINTURA PINTURA
m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2 m2
461.07 216.54 67.53 54.38 80.74 47.09 92.38 87.14 286.73 338.68 136.40 95.84 236.23
9.98 12.63 11.06 11.06 12.04 12.04 12.04 12.04 13.05 11.06 13.74 12.04 5.54
4601.48 2734.90 746.88 601.44 972.11 566.96 1112.26 1049.17 3741.83 3745.80 1874.14 1153.91 1308.71
-
-
-
-
-
-
-
-
461.07
4,601.48
-
-
-
-
-
-
-
-
216.54
2,734.90
-
-
-
-
-
-
-
-
67.53
746.88
-
-
-
-
-
-
-
-
54.38
601.44
-
-
-
-
-
-
-
-
80.74
972.11
-
-
-
-
-
-
-
-
47.09
566.96
-
-
-
-
-
-
-
-
92.38
1,112.26
-
-
-
-
-
-
-
-
87.14
1,049.17
-
-
-
-
-
-
-
-
286.73
3,741.83
-
-
-
-
-
-
-
-
338.68
3,745.80
-
-
-
-
-
-
-
-
136.40
1,874.14
-
-
-
-
-
-
-
-
95.84
1,153.91
-
-
-
-
-
-
-
-
236.23
1,308.71
02.10 02.10.01 02.10.02
COBERTURAS COBERTURA CON TEJA ANDINA DECORATIVA CORREAS DE MADERA DE 2" X 2" P/TEJA ANDINA
m2 MT
416.61 369.74
58.27 11.80
24275.86 4362.93
-
-
-
-
-
-
-
-
416.61
24,275.86
-
-
-
-
-
-
-
-
369.74
4,362.93
02.11 02.11.01 02.11.02
VARIOS JUNTA DE CONSTRUCCION CON TEKNOPORT FLETE A SAN ISIDRO
M2 GLB
33.86 1.00
85.42 ###
2892.32 141433.81
-
-
-
-
-
-
-
-
33.86
2,892.32
-
-
-
-
-
-
-
-
1.00
141,433.81
02.11.03 02.11.03.01 02.11.03.02 02.11.03.03 02.11.03.04
SEÑALETICA SEÑAL DE SEGURIDAD SEÑAL ORIENTATIVA SEÑAL INDICATIVA SEÑAL DIRECCIONALES
UND UND UND UND
5.00 5.00 5.00 5.00
54.19 54.19 54.19 54.19
270.95 270.95 270.95 270.95
-
-
-
-
-
-
-
-
5.00
270.95
-
-
-
-
-
-
-
-
5.00
270.95
-
-
-
-
-
-
-
-
5.00
270.95
-
-
-
-
-
-
-
-
5.00
270.95
03 03.01 03.01.01 03.01.02 03.01.03 03.01.04 03.01.05 03.01.06 03.01.07
INSTALACIONES ELECTRICAS SALIDAS PARA INSTALACIONES ELECTRICAS SALIDA PARA CENTRO DE LUZ SALIDA PARA INTERRUPTOR SIMPLE SALIDA PARA INTERRUPTOR DOBLE SALIDA PARA INTERRUPTOR TRIPLE SALIDA PARA TOMACORRIENTE DOBLE SALIDA PARA TOMACORRIENTE BIPOLAR TRIPLE SALIDA PARA TOMACORRIENTE BIPOLAR A PRUEBA DE
PTO PTO PTO PTO PTO PTO PTO
57.00 22.00 1.00 2.00 30.00 8.00 2.00
89.16 62.57 63.97 61.39 106.04 107.83 120.38
5082.12 1376.54 63.97 122.78 3181.20 862.64 240.76
-
-
-
-
-
-
-
-
57.00
5,082.12
-
-
-
-
-
-
-
-
22.00
1,376.54
-
-
-
-
-
-
-
-
1.00
63.97
-
-
-
-
-
-
-
-
2.00
122.78
-
-
-
-
-
-
-
-
30.00
3,181.20
-
-
-
-
-
-
-
-
8.00
862.64
-
-
-
-
-
-
-
-
2.00
240.76
03.02
CANALIZACIONES Y/O TUBERIAS
LATEX EN MUROS INTERIORES 2 MANOS LATEX EN MUROS EXTERIORES 2 MANOS INTERIOR EN COLUMNAS C/ LATEX LAVABLE EXTERIOR EN COLUMNAS C/ LATEX LAVABLE INTERIOR EN VIGAS C/ LATEX LAVABLE EXTERIOR EN VIGAS C/ LATEX LAVABLE INTERIOR EN VIGUETAS Y COLUMNETAS C/ L EXTERIOR EN VIGUETAS Y COLUMNETAS C/ L LATEX EN CIELO RASO C/ LATEX SUPERMATE EN DERRAMES EN PUERTAS, VENTANAS Y VAN EN CANAL PLUVIAL CON ESMALTE SINTETICO EN ZOCALO C/ LATEX LAVABLE DE CONTRAZOCALO C/ESMALTE
03.02.01 03.02.02 03.02.03 03.02.04
CANALIZACIONES DE TUBERIA ENTERRADA 20X30 TUBERIA DIAMETRO 1" PVC SAP ENTERRADO TUBERIA DIAMETRO 1 1/2" PVC SAP ENTERRADO TUBERIA DIAMETRO 20 MM PVC SAP
MT MT MT MT
44.56 49.99 10.77 394.79
28.10 12.61 15.82 13.45
1252.14 630.37 170.38 5309.93
-
-
-
-
-
-
-
-
44.56
1,252.14
-
-
-
-
-
-
-
-
49.99
630.37
-
-
-
-
-
-
-
-
10.77
170.38
-
-
-
-
-
-
-
-
394.79
5,309.93
03.03 03.03.01 03.03.02 03.03.03 03.03.04 03.03.05 03.03.06 03.03.07
CONDUCTORES Y CABLES CONDUCTOR LSOH 2.5 MM2 CONDUCTOR LSOH 4.0 MM2 CONDUCTOR N2XOH 4.0 MM2 CONDUCTOR N2XOH 6.0 MM2 CONDUCTOR N2XOH 10.0 MM2 CONDUCTOR N2XOH 16.0 MM2 CONDUCTOR CU DESNUDO 1 X 10 MM2
MT MT MT MT MT MT MT
584.73 373.03 39.64 59.50 37.48 26.09 4.55
5.35 6.21 8.55 10.50 12.81 16.90 12.24
3128.31 2316.52 338.92 624.75 480.12 440.92 55.69
-
-
-
-
-
-
-
-
584.73
3,128.31
-
-
-
-
-
-
-
-
373.03
2,316.52
-
-
-
-
-
-
-
-
39.64
338.92
-
-
-
-
-
-
-
-
59.50
624.75
-
-
-
-
-
-
-
-
37.48
480.12
-
-
-
-
-
-
-
-
26.09
440.92
-
-
-
-
-
-
-
-
4.55
55.69
03.04 03.04.01 03.04.02
TABLEROS TABLERO GENERAL TABLERO DE DISTRIBUCION DE ENERGIA ELECTRICA
PZA UND
1.00 3.00
236.73 236.73
236.73 710.19
-
-
-
-
-
-
-
-
1.00
236.73
-
-
-
-
-
-
-
-
3.00
710.19
03.05 03.05.01 03.05.02 03.05.03 03.05.04 03.05.05 03.05.06
LLAVES DE INTERRUPCION INTERRUPTOR THERMOMANETICO INTERRUPTOR THERMOMANETICO INTERRUPTOR THERMOMANETICO INTERRUPTOR THERMOMANETICO INTERRUPTOR THERMOMANETICO INTERRUPTOR THERMOMANETICO
PZA PZA PZA PZA PZA PZA
3.00 5.00 5.00 5.00 3.00 1.00
52.37 65.37 80.37 83.73 79.73 92.37
157.11 326.85 401.85 418.65 239.19 92.37
-
-
-
-
-
-
-
-
3.00
157.11
-
-
-
-
-
-
-
-
5.00
326.85
-
-
-
-
-
-
-
-
5.00
401.85
-
-
-
-
-
-
-
-
5.00
418.65
-
-
-
-
-
-
-
-
3.00
239.19
-
-
-
-
-
-
-
-
1.00
92.37
03.06 03.06.01
CAJA DE PASE CAJA DE PASE GALVANIZADA DE 4" X 4" X 2"
UND
4.00
12.96
51.84
-
-
-
-
-
-
-
-
4.00
51.84
03.07 03.07.01 03.07.02 03.07.03 03.07.04
ARTEFACTOS ARTEFACTOS FLUORESENTE 2 X 36W INCLUYENDO EQU ARTEFACTO FOCO AHORRADOR T-BOLA 32 WATT ARTEFACTO CIRCULAR DE 32 WATT (INCLUYE EQUIPO LUCES DE EMERGENCIA AUTONOMO (INCLUYE EQUIPO
UND UND UND UND
22.00 21.00 12.00 9.00
94.46 94.46 75.86 116.66
2078.12 1983.66 910.32 1049.94
-
-
-
-
-
-
-
-
22.00
2,078.12
-
-
-
-
-
-
-
-
21.00
1,983.66
-
-
-
-
-
-
-
-
12.00
910.32
-
-
-
-
-
-
-
-
9.00
1,049.94
03.08 03.08.01 03.08.02
EQUIPOS ELECTRICOS, MECANICOS Y ESPECIALES POZO PUESTA A TIERRA INC. CABLE MEDIDOR DE LUZ MONOFASICO
UND UND
1.00 1.00
1594.79 450.00
1594.79 450.00
-
-
-
-
-
-
-
-
1.00
1,594.79
-
-
-
-
-
-
-
-
1.00
450.00
04 04.01 04.01.01 04.01.02 04.01.03 04.01.04 04.01.05 04.01.06 04.01.07 04.01.08 04.01.09 04.01.10 04.01.11
INSTALACIONES SANITARIAS APARATOS Y ACCESORIOS SANITARIOS INODORO TANQUE BABY INODORO TANQUE BAJO EVOLUTION LAVATORIO OVALINES PARA NIÑOS LAVATORIO PEDESTAL MANCORA LAVATORIO PARA COCINA URINARIO BABY URINARIO DE LOZA COLOR BLANCO JABONERA DE COLOR BLANCO TOALLERA C/SOPORTE DE LOSA Y BARRA PLASTICA C PAPELERA DE PLASTICO ABATIBLE COLOR BLANCO ESPEJO CON MARCO METALICO PULIDO
PZA PZA PZA PZA GLB PZA PZA UND UND UND PZA
6.00 3.00 10.00 3.00 1.00 6.00 1.00 13.00 9.00 10.00 7.00
260.81 220.82 232.30 157.82 227.81 123.77 98.60 21.18 32.68 43.91 59.72
1564.86 662.46 2323.00 473.46 227.81 742.62 98.60 275.34 294.12 439.10 418.04
-
-
-
-
-
-
-
-
6.00
1,564.86
-
-
-
-
-
-
-
-
3.00
662.46
-
-
-
-
-
-
-
-
10.00
2,323.00
-
-
-
-
-
-
-
-
3.00
473.46
-
-
-
-
-
-
-
-
1.00
227.81
-
-
-
-
-
-
-
-
6.00
742.62
-
-
-
-
-
-
-
-
1.00
98.60
-
-
-
-
-
-
-
-
13.00
275.34
-
-
-
-
-
-
-
-
9.00
294.12
-
-
-
-
-
-
-
-
10.00
439.10
-
-
-
-
-
-
-
-
7.00
418.04
04.02 04.02.01
SISTEMA DE DESAGUE SALIDA DE DESAGUE EN PVC 2"
PTO
22.00
57.63
1267.86
-
-
-
-
-
-
-
-
22.00
1,267.86
MONOFASICO MONOFASICO MONOFASICO MONOFASICO MONOFASICO MONOFASICO
2 2 2 2 2 2
X X X X X X
1 1 2 2 3 5
04.02.02 04.02.03
SALIDA DE DESAGUE EN PVC 4" SALIDA DE VENTILACION PVC 2"
PTO PTO
9.00 4.00
62.06 62.17
558.54 248.68
-
-
-
-
-
-
-
-
9.00
558.54
-
-
-
-
-
-
-
-
4.00
248.68
04.03 04.03.01 04.03.02 04.03.03
REDES DE DISTRIBUCION DE DESAGUE TUBERIA PVC SAL 2" X 90 TUBERIA PVC SAL 2" X 4" TUBERIA PVC VENTILACION PVC 2"
MT MT MT
34.70 42.26 56.27
18.26 18.26 17.42
633.62 771.67 980.22
-
-
-
-
-
-
-
-
34.70
633.62
-
-
-
-
-
-
-
-
42.26
771.67
-
-
-
-
-
-
-
-
56.27
980.22
04.04 04.04.01 04.04.01.01 04.04.01.02 04.04.01.03 04.04.01.04
ACCESORIOS CODO CODO PVC SAL CODO PVC SAL CODO PVC SAL CODO PVC SAL
PZA PZA PZA PZA
56.00 4.00 6.00 4.00
22.01 26.52 19.04 26.39
1232.56 106.08 114.24 105.56
-
-
-
-
-
-
-
-
56.00
1,232.56
-
-
-
-
-
-
-
-
4.00
106.08
-
-
-
-
-
-
-
-
6.00
114.24
-
-
-
-
-
-
-
-
4.00
105.56
04.04.02 04.04.02.01 04.04.02.02 04.04.02.03
YEE YEE PVC SAL 2" X 2" YEE PVC SAL 4" X 4" YEE PVC SAL 4" X 2"
PZA PZA PZA
21.00 5.00 12.00
18.94 22.71 15.81
397.74 113.55 189.72
-
-
-
-
-
-
-
-
21.00
397.74
-
-
-
-
-
-
-
-
5.00
113.55
-
-
-
-
-
-
-
-
12.00
189.72
04.04.03 04.04.03.01 04.04.03.02 04.04.03.03 04.04.03.04
ADITAMENTOS VARIOS SUMIDERO DE BRONCE 2" PROVISION Y COLOCACION REGISTRO DE BRONCE DE 4" REGISTRO DE BRONCE DE 2" SOMBRERO DE VENTILACION PVC DE 2"
UND PZA PZA PZA
13.00 9.00 4.00 5.00
49.24 78.50 50.30 15.82
640.12 706.50 201.20 79.10
-
-
-
-
-
-
-
-
13.00
640.12
-
-
-
-
-
-
-
-
9.00
706.50
-
-
-
-
-
-
-
-
4.00
201.20
-
-
-
-
-
-
-
-
5.00
79.10
04.04.04 04.04.04.01
CAMARA DE INSPECCION CAJA DE REGISTRO DE DESAGUE 12" X 24" TAPA 1/2"
PZA
4.00
307.84
1231.36
-
-
-
-
-
-
-
-
4.00
1,231.36
04.05 04.05.01
SISTEMA DE AGUA FRIA SALIDA DE AGUA
PTO
29.00
57.28
1661.12
-
-
-
-
-
-
-
-
29.00
1,661.12
04.05.01.01 04.05.02 04.05.02.01 04.05.02.02
SALIDA DE AGUA FRIA CON TUEBRIA DE PVC SAP 1/2" RED DE DISTRIBUCION TUEBRIA DE PVC SAP C-10 1/2" TUEBRIA DE PVC SAP C-10 3/4"
MT MT
95.00 38.01
15.40 14.14
1463.00 537.46
-
-
-
-
-
-
-
-
95.00
1,463.00
-
-
-
-
-
-
-
-
38.01
537.46
04.05.03 04.05.03.01 04.05.03.02 04.05.03.03
ACCESORIOS CODO PVC SAP 1/2" X 90 CODO PVC SAP 3/4" X 90 TEE PVC SAP 1/2"
PZA PZA UND
20.00 3.00 26.00
12.98 12.88 9.23
259.60 38.64 239.98
-
-
-
-
-
-
-
-
20.00
259.60
-
-
-
-
-
-
-
-
3.00
38.64
-
-
-
-
-
-
-
-
26.00
239.98
04.05.04 04.05.05.01 04.05.05.02
LLAVES Y VALVULAS VALVULA COMPUERTA DE BRONCE DE 1/2" GRIFO CROMADO DE 1/2"
UND PZA
5.00 14.00
73.81 24.59
369.05 344.26
-
-
-
-
-
-
-
-
5.00
369.05
-
-
-
-
-
-
-
-
14.00
344.26
04.06 04.06.01 04.06.02
SISTEMA DE EVACUACION PLUVIAL TUBERIA PVC SAP DE 4" P/LLUVIAS PRUEBA HIDRAULICA MAS DESINFECCION
MT MT
60.25 133.01
67.11 3.88
4043.38 516.08
-
-
-
-
-
-
-
-
60.25
4,043.38
-
-
-
-
-
-
-
-
133.01
516.08
05 05.01 05.01.01 05.01.01.01 05.01.01.01.01
CONSTRUCCION DE CERCO PERIMETRICO ESTRUCTURA OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO MANUAL M2 208.10
1.92
399.55
-
-
208.10
399.55
100.00
208.10
399.55
100.00
-
-
05.01.01.02
DEMOLICIONES
2" 4" 2" 4"
X X X X
90 90 45 45
05.01.01.02.01 DEMOLICION DE MURO DE ADOBE
M3
20.00
22.97
459.40
-
-
20.00
459.40
100.00
20.00
459.40
100.00
-
-
05.01.01.03 ELIMINACION DE MATERIAL EXCEDENTE 05.01.01.03.01 ELIMINACION DE MATERIAL DE DEMOLICIONES
M3
20.00
64.36
1287.20
-
-
20.00
1,287.20
100.00
20.00
1,287.20
100.00
-
-
05.01.01.04 TRAZO, NIVELES Y REPLANTEO 05.01.01.04.01 TRAZO Y REPLANTEO PRELIMINAR 05.01.01.04.02 TRAZO Y REPLANTEO DURANTE LA EJECUCIÓN
M2 M2
208.10 208.10
1.95 2.55
405.80 530.66
-
-
208.10
405.80
100.00
208.10
405.80
100.00
-
-
-
-
-
-
-
-
-
-
208.10
530.66
05.01.01.05 MOVIMIENTO DE TIERRAS 05.01.01.05.01 EXCAVACION PARA ZANJAS Y ZAPATAS 05.01.01.05.02 EXCAVACION PARA CIMIENTOS HASTA 1.00 MT TERRE
M3 M3
5.52 82.24
31.88 28.10
175.98 2310.94
-
-
-
-
-
-
-
-
5.52
175.98
-
-
-
-
-
-
-
-
82.24
2,310.94
05.01.01.06 RELLENOS 05.01.01.06.01 RELLENO Y COMP. MANUAL- MAT. PROPIO
M3
0.97
2.61
2.53
-
-
-
-
-
-
-
-
0.97
2.53
05.01.01.07 NIVELACION DE TERRENO 05.01.01.07.01 NIVELACION INTERIOR APISONADO CON EQUIPO
M2
55.77
2.94
163.96
-
-
-
-
-
-
-
-
55.77
163.96
05.01.01.08 ELIMINACION DE MATERIAL EXCEDENTE 05.01.01.08.01 ELIMINACION DE MATERIAL EXCEDENTE DISTANCIA P
M3
109.06
14.05
1532.29
-
-
-
-
-
-
-
-
109.06
1,532.29
05.01.02 05.01.02.01
M2
4.60
35.35
162.61
-
-
-
-
-
-
-
-
4.60
162.61
05.01.02.03 MURO DE MAMPOSTERIA 05.01.02.03.01 MURO DE MAMPOSTERIA DE PIEDRA MEZCLA 1:5 + 7 05.01.02.03.02 ENCOFRADO Y DESENCOFRADO DE MURO DE MAMPOS
M3 M2
89.82 140.07
348.36 37.18
31289.70 5207.80
-
-
-
-
-
-
-
-
89.82
31,289.70
-
-
-
-
-
-
-
-
140.07
5,207.80
05.01.02.04 05.01.02.05
CIMIENTO CORRIDO CONCRETO 1:10 +30% P.G. PARA CIMIENTO CORRIDO
M3
18.57
349.07
6482.23
-
-
-
-
-
-
-
-
18.57
6,482.23
05.01.02.06 SOBRECIMIENTO 05.01.02.06.01 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS 05.01.02.06.02 ENCOFRADO Y DESENCOF. SOBRECIMIENTO DE 0.30 A
M3 M2
24.18 164.38
364.20 33.97
8806.36 5583.99
-
-
-
-
-
-
-
-
24.18
8,806.36
-
-
-
-
-
-
-
-
164.38
5,583.99
05.01.03 05.01.03.01 05.01.03.01.01 05.01.03.01.02
OBRAS DE CONCRETO ARMADO ZAPATAS CONCRETO EN ZAPATAS FC= 210 KG/CM2 ACERO FY= 4200 KG/CM2 EN ZAPATAS
M3 KG
5.52 44.68
525.29 3.89
2899.60 173.81
-
-
-
-
-
-
-
-
5.52
2,899.60
-
-
-
-
-
-
-
-
44.68
173.81
05.01.03.02 05.01.03.02.01 05.01.03.02.02 05.01.03.02.03
COLUMNAS CONCRETO EN COLUMNAS FC=210 KG/CM2 ENCOFRADO Y DESENCOFRADO VIGAS DE COLUMNAS ACERO ESTRUCTURAL TRABAJO PARA COLUMNAS
M3 M2 KG
6.83 113.91 1285.96
611.45 37.18 3.77
4176.20 4235.17 4848.07
-
-
-
-
-
-
-
-
6.83
4,176.20
-
-
-
-
-
-
-
-
113.91
4,235.17
-
-
-
-
-
-
-
-
05.01.03.03 05.01.03.03.01 05.01.03.03.02 05.01.03.03.03
VIGAS CONCRETO EN VIGAS AMARRE FC=210 KG/CM2 ENCOFRADO Y DESENCOFRADO EN VIGAS ACERO ESTRUCTURAL TRABAJO PARA VIGAS Y DINTEL
M3 M2 KG
2.19 33.85 185.49
445.08 50.00 3.77
974.73 1692.50 699.30
-
-
-
-
-
-
-
-
2.19
974.73
-
-
-
-
-
-
-
-
33.85
1,692.50
-
-
-
-
-
-
-
-
185.49
699.30
05.01.03.04 05.01.03.04.01 05.01.03.04.02 05.01.03.04.03 05.01.03.04.04
LOSAS ALIGERADAS CONCRETO EN LOSAS ALIGERADAS FC=210 KG/CM2 ENCOFRADO Y DESENCOFRADO EN LOSAS ALIGERADA ACERO ESTRUCTURAL TRABAJO PARA LOSAS ALIGERA LADRILLO DE ARICLLA 15X30X30 PARA TECHO ALIGER
M3 M2 KG UND
2.23 6.28 9.35 86.40
440.06 30.62 3.77 3.01
981.33 192.29 35.25 260.06
-
-
-
-
-
-
-
-
2.23
981.33
-
-
-
-
-
-
-
-
6.28
192.29
-
-
-
-
-
-
-
-
9.35
35.25
-
-
-
-
-
-
-
-
86.40
260.06
OBRAS DE CONCRETO SIMPLE SOLADO PARA ZAPATAS DE 4" MEZCLA 1:12 CEMENT
###
4,848.07
05.01.04 05.01.04.01
VARIOS JUNTA DE CONSTRUCCION CON TEKNOPORT
M2
28.80
85.42
2460.10
-
-
-
-
-
-
-
-
28.80
2,460.10
05.02 05.02.01 05.02.01.01
ARQUITECTURA MUROS Y TABIQUES DE ALBAÑILERIA MURO DE LADRILLO TIPO IV 18 HUECOS SOGA C:A 1:4
M2
163.60
57.14
9348.10
-
-
-
-
-
-
-
-
163.60
9,348.10
05.02.02 05.02.02.01 05.02.02.02 05.02.02.03
REVOQUES ENLUCIDOS Y MOLDURAS TARRAJEO DE SUPERF. DE SOBRECIMIENTOS TARRAJEO DE SUPERFICIE DE COLUMNAS CON CEMEN TARRAJEO EN SUPERFICIE DE VIGAS CON CEMENTO-
M2 M2 M2
34.54 74.37 24.85
37.70 34.01 27.17
1302.16 2529.32 675.17
-
-
-
-
-
-
-
-
34.54
1,302.16
-
-
-
-
-
-
-
-
74.37
2,529.32
-
-
-
-
-
-
-
-
24.85
675.17
05.02.03 05.02.03.01 05.02.03.02
CARPINTERIA METALICA PUERTA METALICA SEGÚN DISEÑO TIPO 1 (INC. COLOR REJA METALICA SEGÚN DISEÑO INC INSTALACION
M2 MT
6.90 66.44
434.88 103.51
3000.67 6877.20
-
-
-
-
-
-
-
-
6.90
3,000.67
-
-
-
-
-
-
-
-
66.44
6,877.20
05.02.04 05.02.04.01 05.02.04.02 05.02.04.03
CERRAJERIA BISAGRA CAPUCHINA DE 3 1/2" X 3 1/2" CHAPA PARA EXTERIOR CON LLAVES INTERIORES Y EX CERROJO CROMADO 10"
PZA UND UND
7.00 2.00 2.00
17.86 102.18 43.68
125.02 204.36 87.36
-
-
-
-
-
-
-
-
7.00
125.02
-
-
-
-
-
-
-
-
2.00
204.36
-
-
-
-
-
-
-
-
2.00
87.36
05.02.05 05.02.05.01 05.02.05.02 05.02.05.03 05.02.05.04 05.02.05.05
PINTURA PINTURA PINTURA PINTURA PINTURA PINTURA
M2 M2 M2 M2 M2
82.19 84.25 53.85 29.12 13.80
5.54 13.09 13.74 14.08 14.86
455.33 1102.83 739.90 410.01 205.07
-
-
-
-
-
-
-
-
82.19
455.33
-
-
-
-
-
-
-
-
84.25
1,102.83
-
-
-
-
-
-
-
-
53.85
739.90
-
-
-
-
-
-
-
-
29.12
410.01
-
-
-
-
-
-
-
-
13.80
205.07
05.02.06 05.02.06.01
VARIOS LIMPIEZA PERMANENTE Y FINAL DE OBRA
GLB
1.00
84.30
84.30
-
-
-
-
-
-
-
-
1.00
84.30
06 06.01 06.01.01 06.01.02 06.01.03 06.01.04 06.01.05
AREA DE CIRCULACION Y OBRAS EXTERNAS OBRAS PROVISIONALES CARTEL DE OBRA ALMACEN PROVISIONAL DE OBRA CERCO PROVISIONAL SEÑALIZACION DURANTE LA EJECUCION INSTALACIONES ELECTRICAS PROVISIONALES EN OBR
GLB MT MT GLB GLB
1.00 1.00 139.45 1.00 1.00
1200.00 679.81 23.37 359.54 760.87
1200.00 679.81 3258.95 359.54 760.87
-
-
-
-
-
-
-
-
1.00
1,200.00
-
-
1.00
679.81
100.00
1.00
679.81
100.00
-
-
-
-
-
-
-
-
-
-
139.45
3,258.95
-
-
-
-
-
-
-
-
1.00
359.54
-
-
-
-
-
-
-
-
1.00
760.87
06.02 06.02.01 06.02.01.01 06.02.01.02 06.02.01.03 06.02.01.04 06.02.01.05
TRABAJOS PRELIMINARES REMOCION REMOCION DE COBERTURAS REMOCION DE VENTANAS REMOCION DE PUERTAS REMOCION DE INSTALACIONES ELECTRICAS REMOCION DE INSTALACIONES SANITARIAS
M2 UND UND GLB GLB
47.90 2.00 1.00 1.00 1.00
10.98 3.60 3.60 1938.65 2024.58
525.94 7.20 3.60 1938.65 2024.58
-
-
47.90
525.94
100.00
47.90
525.94
100.00
-
-
-
-
2.00
7.20
100.00
2.00
7.20
100.00
-
-
-
-
1.00
3.60
100.00
1.00
3.60
100.00
-
-
-
-
1.00
1,938.65
100.00
1.00
1,938.65
100.00
-
-
-
-
1.00
2,024.58
100.00
1.00
2,024.58
100.00
-
-
06.02.02 06.02.02.01 06.02.02.02 06.02.02.03 06.02.02.04 06.02.02.05
DEMOLICION DEMOLICION DE MURO DE ADOBE DEMOLICION DE PISO Y FALSOS PISOS LIMPIEZA DE TERRENO MANUAL TRAZO Y REPLANTEO PRELIMINAR TRAZO Y REPLANTEO DURANTE LA EJECUCIÓN
M3 M2 M2 M2 M2
33.60 47.90 564.46 564.46 564.46
22.97 15.89 1.92 1.95 2.55
771.79 761.13 1083.76 1100.70 1439.37
-
-
33.60
771.79
100.00
33.60
771.79
100.00
-
-
-
-
47.90
761.13
100.00
47.90
761.13
100.00
-
-
-
-
564.46
1,083.76
100.00
564.46
1,083.76
100.00
-
-
-
-
564.46
1,100.70
100.00
564.46
1,100.70
100.00
-
-
-
-
-
-
-
-
-
-
564.46
1,439.37
06.03 06.03.01 06.03.01.01
ESTRUCTURAS MOVIMIENTO DE TIERRAS EXCAVACION
EN SOBRECIMIENTO DE H=30cm CON ESMALT LATEX EN COLUMNAS 2 MANOS LATEX EN VIGAS 2 MANOS EN PORTON METALICO 2 MANOS ANTICORROS ESMALTE Y ANTICORROSIVO EN CARPINTERIA
06.03.01.01.01 06.03.01.01.02 06.03.01.01.03 06.03.01.01.04
EXCAVACION EXCAVACION EXCAVACION EXCAVACION
06.03.01.02 06.03.01.02.01 06.03.01.02.02 06.03.01.02.03 06.03.01.02.04 06.03.01.02.05 06.03.02 06.03.02.01 06.03.02.01.01 06.03.02.01.02
MASIVA A MAQUINA EN TERRENO NORMAL PARA CIMIENTOS DE MUROS DE MAMPOS MANUAL DE SARDINELES MANUAL DE CUNETAS
M3 M3 M3 M3
2945.75 7.39 11.99 9.52
11.99 28.10 14.05 14.05
35319.54 207.66 168.46 133.76
-
-
35,319.54
100.00
35,319.54
100.00
-
-
-
-
-
-
-
-
-
-
7.39
207.66
-
-
-
-
-
-
-
-
11.99
168.46
-
-
-
-
-
-
-
-
9.52
133.76
RELLENO RELLENO Y COMP. MANUAL- MAT. PRESTAMO RELLENO Y COMP. MANUAL- MAT. PROPIO NIVELACION INTERIOR APISONADO CON EQUIPO ELIMINACION DE MATERIAL-MANUAL DISTANCIA PROM ELIMINACION CON MAQUINARIA REN.=150 M3/DIA
M3 M3 M2 M3 M3
17.60 47.28 564.46 37.57 2983.33
11.74 2.61 2.94 22.21 9.95
206.62 123.40 1659.51 834.43 29684.13
-
-
-
-
-
-
-
-
17.60
206.62
-
-
-
-
-
-
-
-
47.28
123.40
-
-
-
-
-
-
-
-
564.46
1,659.51
-
-
37.57
37.57
-
-
OBRAS DE CONCRETO SIMPLE MURO DE MAMPOSTERIA MURO DE MAMPOSTERIA DE PIEDRA MEZCLA 1:5 + 7 ENCOFRADO Y DESENCOFRADO NORMAL. MURO DE M
M3 M2
15.34 45.89
348.36 37.18
5343.84 1706.19
-
-
-
-
06.03.02.02 GRADERIAS 06.03.02.02.01 CONCRETO EN GRADERIAS FC= 175 KG/CM2 06.03.02.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN GRADERI
M3 M2
1.19 4.31
463.97 37.18
552.12 160.25
-
06.03.02.03 RAMPA 06.03.02.03.01 CONCRETO EN PAMPAS FC= 140 KG/CM2 06.03.02.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN RAMPAS
M3 M2
2.90 7.14
453.43 37.18
1314.95 265.47
06.03.02.04 CUNETAS 06.03.02.04.01 CONCRETO EN CUNETAS FC= 140 KG/CM2 06.03.02.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN CUNETAS
M3 M2
6.35 158.68
453.43 37.18
06.03.02.05 SARDINEL DE CONCRETO 06.03.02.05.01 CONCRETO EN SARDINEL FC= 175 KG/CM2 06.03.02.05.02 ENCOFRADO Y DESENCOFRADO NORMAL EN SARDINE
M3 M2
116.00 31.12
06.03.02.06 PATIO DE CONCRETO 06.03.02.06.01 CONCRETO EN PATIO FC= 175 KG/CM2 06.03.02.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN PATIO
M3 M2
06.03.02.07 VEREDA DE CONCRETO 06.03.02.07.01 CONCRETO EN VEREDAS FC= 175 KG/CM2 06.03.02.07.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VEREDAS 06.03.02.08 06.03.02.08.01 06.03.02.08.02 06.03.02.08.03 06.03.03 06.03.03.01 06.03.03.01.01 06.03.03.01.02 06.03.03.01.03 06.03.03.01.04
###
834.43
100.00
29,684.13
100.00
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
2879.28 5899.72
-
-
-
-
453.43 37.18
52597.88 1157.04
-
20.36 23.62
463.97 37.18
9446.43 878.19
M3 M2
5.71 15.75
12.07 37.18
SARDINEL DE CONCRETO ARMADO CONCRETO EN VEREDAS FC= 175 KG/CM2 ENCOFRADO Y DESENCOFRADO NORMAL EN VEREDAS ACERO ESTRUCTURAL TRABAJDO PARA SARDINELES
M3 M2 KG
13.12 174.98 379.14
ARQUITECTURA REVOQUES ENLUCIDOS Y MOLDURAS TARRAJEO DE SUPERFICIE DE SARDINEL TARRAJEO DE GRADERIAS CON CEMENTO-ARENA TARRAJEO CON IMPERMEABILIZANTES TARRAJEO EN RAMPAS CON CEMENTO-ARENA
M2 M2 M2 M2
M2 M2
06.03.03.02 PISOS 06.03.03.02.01 PISO DE CEMENTO FROTACHADO Y BRUÑ. 2" 06.03.03.02.02 PISO DE GRASS SINTETICO
###
834.43
100.00
-
-
29,684.13
100.00
-
-
-
-
-
15.34
5,343.84
-
-
-
45.89
1,706.19
-
-
-
-
1.19
552.12
-
-
-
-
4.31
160.25
-
-
-
-
-
2.90
1,314.95
-
-
-
-
-
7.14
265.47
-
-
-
-
-
-
6.35
2,879.28
-
-
-
-
-
-
158.68
5,899.72
-
-
-
-
-
-
-
116.00
52,597.88
-
-
-
-
-
-
-
31.12
1,157.04
-
-
-
-
-
-
-
-
20.36
9,446.43
-
-
-
-
-
-
-
-
23.62
878.19
68.92 585.59
-
-
-
-
-
-
-
-
5.71
68.92
-
-
-
-
-
-
-
-
15.75
585.59
453.43 37.18 3.77
5949.00 6505.76 1429.36
-
-
-
-
-
-
-
-
13.12
5,949.00
-
-
-
-
-
-
-
-
174.98
6,505.76
-
-
-
-
-
-
-
-
379.14
1,429.36
71.45 2.72 31.74 29.04
34.01 34.01 31.45 34.01
2430.01 92.51 998.22 987.65
-
-
-
-
-
-
-
-
71.45
2,430.01
-
-
-
-
-
-
-
-
2.72
92.51
-
-
-
-
-
-
-
-
31.74
998.22
-
-
-
-
-
-
-
-
29.04
987.65
300.58 75.54
33.60 136.87
10099.49 10339.16
-
-
-
-
-
-
-
-
300.58
10,099.49
-
-
-
-
-
-
-
-
75.54
10,339.16
###
###
06.03.03.03 CARPINTERIA METALICA Y HERRERIA 06.03.03.03.01 TACHOS DE BASURA EN FIBRA DE VIDRIO
UND
3.00
181.96
545.88
-
-
-
-
-
-
-
-
06.03.04 06.03.04.01 06.03.04.02 06.03.04.03
M2 UND GLB
6.00 50.00 1.00
8.51 54.24 84.30
51.06 2712.00 84.30
-
-
-
-
-
-
-
-
6.00
51.06
-
-
-
-
-
-
-
-
50.00
2,712.00
-
-
-
-
-
-
-
-
1.00
84.30
VARIOS JARDINERIA Y LIMPIEZA SEMBRIO DE PLANTA POR ESQUEJES O MECHONES PLANTAS ORNAMENTALES LIMPIEZA PERMANENTE Y FINAL DE OBRA
3.00
545.88
-
07
TANQUE SEPTICO Y POZO PERCOLADOR
07.01 07.01.01 07.01.02
TRABAJOS PRELIMINARES LIMPIEZA DE TERRENO MANUAL TRAZO Y REPLANTEO PRELIMINAR
M2 M2
23.57 23.57
1.92 1.95
45.25 45.96
-
-
-
-
-
-
-
-
23.57
45.25
-
-
-
-
-
-
-
-
23.57
45.96
07.02 07.02.01 07.02.02 07.02.03 07.02.04
MOVIMIENTO DE TIERRAS EXCAVACION MASIVA MANUAL NIVELACION INTERIOR Y APISONADO MANUAL ACARREO DE MATERIAL EXCEDENTE D=30 MT PROME ELIMINACION DE MATERIAL EXCEDENTE
M3 M2 M3 M3
68.42 23.21 49.26 82.10
100.39 3.33 6.46 21.48
6868.68 77.29 318.22 1763.51
-
-
-
-
-
-
-
-
68.42
6,868.68
-
-
-
-
-
-
-
-
23.21
77.29
-
-
-
-
-
-
-
-
49.26
318.22
-
-
-
-
-
-
-
-
82.10
1,763.51
07.03 07.03.01 07.03.02 07.03.03
CONCRETO SIMPLE SOLADO CONCRETO 1:12 CEMENTO-HORMIGON E= 4" CONCRETO 1:10 +30% P.G. PARA CIMIENTO CORRIDO CIMIENTO MURO ALBAÑILERIA
M2 M3 M3
15.66 41.85 1.06
37.39 349.07 208.11
585.53 14608.58 220.60
-
-
-
-
-
-
-
-
15.66
585.53
-
-
-
-
-
-
-
-
41.85
14,608.58
-
-
-
-
-
-
-
-
1.06
220.60
07.04 07.04.01 07.04.02 07.04.03
CONCRETO ARMADO CONCRETO FC= 210 KG/CM2 ENCOFRADO Y DESENCOFRADO ACERO FY= 420 KG/CM2 GRADO 60
M3 M2 KG
12.25 64.71 430.71
390.22 43.32 3.89
4780.20 2803.24 1675.46
-
-
-
-
-
-
-
-
12.25
4,780.20
-
-
-
-
-
-
-
-
64.71
2,803.24
-
-
-
-
-
-
-
-
430.71
1,675.46
7.05 7.05.01
REVESTIMIENTOS TARRAJEO EN INTERIORES CON IMPERMEABILIZANTE M
M2
63.56
27.49
1747.26
-
-
-
-
-
-
-
-
63.56
1,747.26
7.06 7.05.01
MUROS MURO DE LADRILLO CORRIENTE CABEZA
M2
29.05
61.40
1783.67
-
-
-
-
-
-
-
-
29.05
1,783.67
7.07 07.07.01 07.07.02 07.07.03
ACCESORIOS VARIOS ACCESORIO TEE PVC SAL 6" ACCESORIO TEE PVC SAP 2" ABRAZADERA DE PLATINA DE 4" X 8" EN 3/8"
UND UND UND
5.00 2.00 1.00
33.98 18.10 26.25
169.90 36.20 26.25
-
-
-
-
-
-
-
-
5.00
169.90
-
-
-
-
-
-
-
-
2.00
36.20
-
-
-
-
-
-
-
-
1.00
26.25
7.08 07.08.01 07.08.02
OTROS SUMINISTRO Y COLOCACION DE GRAVA SUMINISTRO Y COLOCACION DE GRAVA DE 1/2"
M3 M3
13.76 11.74
30.89 30.89
425.05 362.65
-
-
-
-
-
-
-
-
13.76
425.05
-
-
-
-
-
-
-
-
11.74
362.65
08 08.01 08.01.01 08.01.02 08.01.03 08.01.04 08.01.05 08.01.06 08.01.07 08.01.08
EQUIPAMIENTO CON MOBILIARIO, COMPUTADORAS Y MATERIAL BIBLIOGRAFICO EQUIPAMIENTO DE AULAS ADQUISICION DE MESAS PARA NIÑOS UND 2.00 900.00 MOBILIARIO PARA SECTOR DRAMATIZADOR GLB 1.00 650.00 MOBILIARIO PARA SECTOR JUEGOS TRIANGULOS GLB 1.00 390.00 MOBILIARIO PARA SECTOR COMPUTO GLB 1.00 350.00 MOBILIARIO PARA SECTOR BIBLIOTECA GLB 1.00 450.00 MOBILIARIO PARA SECTOR EXPERIMENTOS GLB 1.00 450.00 MOBILIARIO PARA SECTOR ARTE Y MUSICA GLB 1.00 680.00 MOBILIARIO PARA SECTOR PINTURA GLB 1.00 390.00
1800.00 650.00 390.00 350.00 450.00 450.00 680.00 390.00
-
-
-
-
-
-
-
-
2.00
1,800.00
-
-
-
-
-
-
-
-
1.00
650.00
-
-
-
-
-
-
-
-
1.00
390.00
-
-
-
-
-
-
-
-
1.00
350.00
-
-
-
-
-
-
-
-
1.00
450.00
-
-
-
-
-
-
-
-
1.00
450.00
-
-
-
-
-
-
-
-
1.00
680.00
-
-
-
-
-
-
-
-
1.00
390.00
-
08.01.09 08.01.10 08.01.11 08.01.12 08.01.13
ADQUISICION DE SILLAS PARA NIÑOS ADQUISICION DE PUPITRE PARA DOCENTE PIZARRA ACRILICA INC. TICERO EN ALUMINIO DE 3 MT EQUIPOS DE SONIDO EQUIPOS AUDIO VISUAL
UND UND UND UND UND
2.00 2.00 2.00 1.00 1.00
1000.00 480.00 727.81 1650.00 2030.00
2000.00 960.00 1455.62 1650.00 2030.00
-
-
-
-
-
-
-
-
2.00
-
-
-
-
-
-
-
-
2.00
960.00
-
-
-
-
-
-
-
-
2.00
1,455.62
-
-
-
-
-
-
-
-
1.00
1,650.00
-
-
-
-
-
-
-
-
1.00
2,030.00
08.02 08.02.01 08.02.02 08.02.03
EQUIPAMIENTO AREA ADMINISTRATIVA EQUIPO INFORMATICO P/PERSONAL DOCENTE Y ADM. ADQUISICION DE MUEBLES PARA AREA ADMINISTRATI ADQUISICION DE ESTANTES TIPO ARCHIVADOR
UND GLB UND
1.00 1.00 1.00
2397.35 1570.00 600.00
2397.35 1570.00 600.00
-
-
-
-
-
-
-
-
1.00
2,397.35
-
-
-
-
-
-
-
-
1.00
1,570.00
-
-
-
-
-
-
-
-
1.00
600.00
08.03 08.03.01 08.03.02
EQUIPAMIENTO COCINA-COMEDOR MUEBLES DE COMEDOR COCINA UTENCILIOS DE COMEDOR COCINA
GLB GLB
1.00 1.00
2050.00 2855.80
2050.00 2855.80
-
-
-
-
-
-
-
-
1.00
2,050.00
-
-
-
-
-
-
-
-
1.00
2,855.80
08.04 08.05 08.06 08.07
JUEGOS MECANICOS VARIOS ADQUISICION DE CASTILLO DE FIBRA DE VIDRIO ADQUISICION DE SUBE Y BAJA DE FIBRA DE VIDRIO ADQUISICION DE TOBOGAN DE FIBRA DE VIDRIO
UND UND UND
1.00 1.00 1.00
2250.00 2500.00 1800.00
2250.00 2500.00 1800.00
-
-
-
-
-
-
-
-
1.00
2,250.00
-
-
-
-
-
-
-
-
1.00
2,500.00
-
-
-
-
-
-
-
-
1.00
1,800.00
8.09 08.09.01 08.09.02 08.09.03 08.09.04 08.09.05 08.09.06 08.09.07
ADQUISICION DE MATERIALES DIDACTICOS SECTOR JUEGOS TRIANGULOS SECTOR PINTURA SECTOR ARTE Y MUSICA SECTOR EXPERIMENTOS SECTOR BIBLIOTECA SECTOR COMPUTO SECTOR DRAMATIZACION
GLB GLB GLB GLB GLB GLB GLB
2.00 2.00 2.00 2.00 2.00 2.00 2.00
1375.00 322.00 920.00 305.00 410.00 1850.00 540.00
2750.00 644.00 1840.00 610.00 820.00 3700.00 1080.00
-
-
-
-
-
-
-
-
2.00
2,750.00
-
-
-
-
-
-
-
-
2.00
644.00
-
-
-
-
-
-
-
-
2.00
1,840.00
-
-
-
-
-
-
-
-
2.00
610.00
-
-
-
-
-
-
-
-
2.00
820.00
-
-
-
-
-
-
-
-
2.00
3,700.00
-
-
-
-
-
-
-
-
2.00
1,080.00
09 09.01 09.01.01
CAPACITACION A PADRES DE FAMILIA CAPACITACION A PADRES DE FAMILIA CAPACITACION A PADRES DE FAMILIA PARA EL APOYO
EVE
2.00
688.00
1376.00
-
-
-
-
-
-
-
-
2.00
1,376.00
10 10.01 10.01.01 10.01.02 10.01.03
MITIGACION AMBIENTAL MEDIDAS DE PREVENCION DURANTE LA EJECUCION RIEGO PERMANENTE DE AREAS DE TRABAJO REVEGETACION DE TALUD EN CORTE HABILITACION DE BOTADEROS
M2 M2 M2
150.00 75.00 50.00
3.37 18.43 23.18
505.50 1382.25 1159.00
-
-
-
-
-
-
-
-
150.00
505.50
-
-
-
-
-
-
-
-
75.00
1,382.25
-
-
-
-
-
-
-
-
50.00
1,159.00
10.02 10.02.01 10.02.02
MEDIDAS DE MITIGACION POST EJECUCION LIMPIEZA GENERAL CLAUSURA Y RECUPERACION DE BOTADEROS
M2 M2
500.00 50.00
1.43 3.62
715.00 181.00
-
-
-
-
-
-
-
-
500.00
715.00
-
-
-
-
-
-
-
-
50.00
181.00
10.03 10.03.01
PROGRAMA DE MONITOREO Y SEGUIMIENTO AMBIENTAL MONITOREO AMBIENTAL MES
3.00
226.93
680.79
-
-
-
-
-
-
-
-
3.00
680.79
-
COSTO DIRECTO TOTAL GASTOS GENERALES (10%) UTILIDADES (10%) SUB TOTAL IGV (18%) TOTAL GASTOS DE SUPERVISION (1.5%) PRESUPUESTO TOTAL DE LA OBRA
-
2,000.00
-
1,052,725.43
-
105,272.54
-
12,971.05
12,971.05
92,301.49
12,971.05 ###
12,971.05 ###
92,301.49 ###
28,017.47 ###
28,017.47 ###
199,371.22 ###
105,272.54
-
1,263,270.52
-
227,388.69
-
1,490,659.21 22,359.89 1,513,019.10
-
###
0.00 -
0.000000
2,755.05 ### 12.32%
###
2,755.05 ### 12.32%
923,014.90
19,604.84 ###
RESIDENTE DE OBRA CONSORCIO SAN ISIDRO ING. JAVIER CASTILLON SANABRIA CIP. N° 55094
Vo Bo SUPERVISOR DE OBRA ARQ. ENRIQUE LOPEZ ORIHUELA CONSORCIO JK&M ARQUITECTURA E INGENIERIA CAP. N° 55133
REPRESENTANTE LEGAL CONSORCIO SAN ISIDRO
Sra. Rosa Tarcila Pongo Ayaypoma DNI. Nro. 20027053
NDIENTE AL MES DE MAYO - 2,015 - INICIAL SAN ISIDRO
ES EDUCATIVAS DE NIVEL INICIAL DE LAS LOCALIDADES DE LAYAMPAMPA, LLAULLICA, HUICHCANA, SAN ISIDRO Y LLIHUAMPAMPA , E TINTAY PUNCU, TAYACAJ - HUANCAVELICA
SALDO %
-
-
100.00 100.00
-
100.00 100.00 100.00 100.00
100.00 100.00
-
100.00 100.00 -
100.00 100.00 -
100.00
100.00 66.67
100.00 100.00 100.00
100.00 100.00 100.00
100.00 100.00 100.00 100.00
100.00 100.00
100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
100.00
100.00 100.00
100.00
100.00
100.00 100.00
100.00
100.00 100.00 100.00 100.00
100.00
100.00
100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
100.00 100.00
100.00 100.00
100.00 100.00 100.00 100.00
100.00 100.00 100.00 100.00 100.00 100.00 100.00
100.00 100.00 100.00 100.00
100.00 100.00 100.00 100.00 100.00 100.00 100.00
100.00 100.00
100.00 100.00 100.00 100.00 100.00 100.00
100.00
100.00 100.00 100.00 100.00
100.00 100.00
100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
100.00
100.00 100.00
100.00 100.00 100.00
100.00 100.00 100.00 100.00
100.00 100.00 100.00
100.00 100.00 100.00 100.00
100.00
100.00
100.00 100.00
100.00 100.00 100.00
100.00 100.00
100.00 100.00
-
-
-
-
100.00
100.00 100.00
100.00
100.00
100.00
100.00
100.00 100.00
100.00
100.00 100.00
100.00 100.00
100.00 100.00 100.00
100.00 100.00 100.00
100.00 100.00 100.00 100.00
100.00
100.00
100.00 100.00 100.00
100.00 100.00
100.00 100.00 100.00
100.00 100.00 100.00 100.00 100.00
100.00
100.00 -
100.00 100.00 100.00
-
-
100.00
-
100.00 100.00 100.00
100.00 100.00 100.00 -
100.00 100.00
100.00 100.00
100.00 100.00
100.00 100.00
100.00 100.00
100.00 100.00
100.00 100.00
100.00 100.00 100.00
100.00 100.00 100.00 100.00
100.00 100.00
100.00
100.00 100.00 100.00
100.00 100.00
100.00 100.00 100.00 100.00
100.00 100.00 100.00
100.00 100.00 100.00
100.00
100.00
100.00 100.00 100.00
100.00 100.00
100.00 100.00 100.00 100.00 100.00 100.00 100.00 100.00
100.00 100.00 100.00 100.00 100.00
100.00 100.00 100.00
100.00 100.00
100.00 100.00 100.00
100.00 100.00 100.00 100.00 100.00 100.00 100.00
100.00
100.00 100.00 100.00
100.00 100.00
100.00
87.68%
REPRESENTANTE LEGAL CONSORCIO SAN ISIDRO