Completed Project

  • May 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Completed Project as PDF for free.

More details

  • Words: 1,332
  • Pages: 9
COMPLETED PROJECTS CURRENT TIME SDN BHD N PROJECT TITLE O

1

2

3

4

Supply, modify and install “GM D&O” and “GM E&C” full high cabinet c/w nyatoh cabinet and glass shelves at Nippon Oil Exploration (M) Ltd. Renovation work at level 35, Petronas Twin Tower 2, Petronas Twin Tower for Nippon Oil Exploration (M) Ltd. Proposed renovation works for Amerada Hess (M) Ltd. At level 9, Menara Tan & Tan, Kuala Lumpur Kerja- kerja membekal dan memasang jubin karpet di tingkat 3, bangunan Pentadbiran 1,

CONTRAC T VALUE (RM)

CONTRA CT DURATIO N

YEAR

CLIENT

CONSULTANT

250,000.00

3 Month

2001

Nippon Oil Exploration Sdn Bhd

Design and Built

345, 170.00

2 Month

2001

Nippon Oil Exploration Sdn Bhd

Nippon Exploration Sdn Bhd

550,158.00

3 Month

2001

Amerada Hess (M) Ltd

Design & Built Current Time Sdn Bhd

25,880.00

2 Week

2001

Malaysia Airlines System Bhd

Design & Built Current Time Sdn Bhd

5

6

Kompleks A, Subang Office furniture supply at 31st Floor, Menara Citibank, Jalan Ampang for Lundin Malaysia Limited Proposed minor renovation works for Tabung Haji Properties, Sikamat, Seremban, N. Sembilan

150,560.00

1 Month

2001

Lundin Malaysia Limited

Design & Built Current Time Sdn Bhd

750,000.00

3 Month

2002

Tabung Haji Properties

Mutiara Reka Sdn Bhd

INTERIOR AND BUILDING SERVICE

COMPLETED PROJECTS CURRENT TIME SDN BHD

INTERIOR AND BUILDING SERVICE 7

8

Proposed interior builder works for Affin Banks Card Centre at Block C-13-1, C-13-4, C-13-5, Megan Phileo Avenue, Jalan Yap Kwan Seng, Off Jalan Ampang Proposed Interior design and renovation work for Kelantan Delight Restaurant at 18th Floor, MBF Plaza, Jalan Yap Kwan Seng,

137,230.00

2 Weeks

2002

Affin Bank Berhad

Affin Bank Berhad

260,000.00

2 Month

2002

Kelantan Delight Restaurant

Mutiara Reka Sdn Bhd

9

10

11

12

13

Kuala Lumpur-Phase III Design and Built of office interior fitout work for Murphy Sarawak oil Co. Ltd at 18th Floor, MBF Plaza, Jalan Yap Kwan Seng, Kuala Lumpur -phase III Proposed for Built of shed and bunk in Selayang District Officer Area Proposed renovation works for LinBrook Services Sdn Bhd at 14th floor, Kompleks Antarabangsa, Kuala Lumpur Proposed renovation works at level 9, bangunan MAS, Jalan Sultan Ismail, Kuala Lumpur For Malaysia Airlines System Bhd Renovation of Staff’s House under Al-Istina Concept at No. 32, Jalan Puteri 7/15, Bandar Tasik Puteri, 48000 Rawang

3,359,840.0 0

2002

Murphy Sarawak Oil Co Ltd.

Design & Built Current Time Sdn Bhd

Sireh Pinang Landscaping

Design & Built Current Time Sdn Bhd

195,000.00

1 Month

2003

2,450,954.0 0

6 Month

2003

LinBrook Services Sdn Bhd

Design & Built Current Time Sdn Bhd

820,933.30

3 Month

2003

Malaysia Airlines Berhad

Design & Built Current Time Sdn Bhd

227,890.00

2 Month

2003

Bank Muamalat Malaysia Berhad

COMPLETED PROJECTS CURRENT TIME SDN BHD

10 Month

Design & Built Current Time Sdn Bhd

INTERIOR AND BUILDING SERVICE 14

15

16

17

18

19

20

Supply and Install of new mobile portion to MAS Office at Bangunan MAS, Jalan Sultan Ismail, Kuala Lumpur Proposed renovation works for Block 6, 6C & 6D at Tadika and Taska Celcom Supply and Install tempered glass door handle complete with sandblast sticker and door handle complete with all accessories and iron mongeries. Design and Built of office Interior fitout works for Murphy Sarawak Oil Co Ltd at 15th floor, MBF Plaza, Jalan Yap Kwan Seng, Kuala Lumpur-phase IV Proposed to Renovate Interior Design in 1st Floor, Office Building at Lurah Temerloh, Pahang Renovation works for IT Division at 17th floor, Menara TR, 161b, Jalan Ampang, 50450 Kuala Lumpur Supply and Install filling cabinet, computer workstation and low cabinet at Operation Room for TNB Generation Sdn Bhd Jalan Bangsar, Kuala Lumpur

33,201.35

210,500.00

107,000.00

4,242,380.00

1,285,620.00

658,650.00

5,850.00

2 Weeks

5 Weeks

1 Month

10 Month

3 Month

2 Month

1 Week

2003

2003

2003

2003

2004

2004

2004

Malaysia Airlines System Berhad

Celcom (M) Sdn Bhd

Celcom Technology (M) Sdn Bhd

Murphy Sarawak Oil Co. Ltd

Bank Islam Malaysia Berhad

Celcom (M) Sdn Bhd

TNB Generation Sdn Bhd

Design & Built Current Time Sdn Bhd Arkitek Ibnu Adam Design & Built Current Time Sdn Bhd

Design & Built Current Time Sdn Bhd

Arkitek Ilham Cipta

Arkitek Ilham Karya

Design & Built Current Time Sdn Bhd

COMPLETED PROJECTS CURRENT TIME SDN BHD

INTERIOR AND BUILDING SERVICE 21

22

23

24

25

26

Supply and install timber built-in cabinet at G.M room 5th floor for TNB Generation Sdn Bhd Jalan Bangsar, Kuala Lumpur Proposed Supply and Install Office Furniture for TNB Generation Sdn Bhd at Level 16, P.J Tower, Amcorp Mall, Petaling Jaya Supply and Install Steel Gate at Rumah Ehsan including cleaning and painting work Proposed supply and install Office Furniture for TNB Generation Sdn Bhd at Level 16, P.J Tower Amcorp Mall, Petaling Jaya- Repeat Order Proposed House Renovation at Seksyen 18, Shah Alam, Selangor Proposed reins statement work to

3,350.00

1 Weeks

2004

TNB Generation Sdn Bhd

Design & Built Current Time Sdn Bhd

2,87,877.0 0

3 Month

2004

TNB Generation Sdn Bhd

Design & Built Current Time Sdn Bhd

6,900.00

1 Weeks

2004

Rumah Ehsan MDHS

280,902.00

1 Month

2004

TNB Generation Sdn Bhd

Design & Built Current Time Sdn Bhd Design & Built Current Time Sdn Bhd

45,900.00

1 Month

2004

En. Abdul Munir

45,900.00

2 Weeks

2005

EON Bank Berhad

Design & Built Current Time Sdn Bhd Eon Bank Berhad

27 28

EON Bank Alor Gajah Melaka Proposed House Renovation at Seksyen 18, Shah Alam, Selangor Proposed reins statement work to EON Bank Klang, Selangor.

30,317.00

2 Weeks

2005

EON BankBerhad

Eon Bank Berhad

52,500.00

4 Weeks

2205

EON Bank Berhad

EON Bank Berhad

COMPLETED PROJECTS CURRENT TIME SDN BHD

INTERIOR AND BUILDING SERVICE 29 30

31

32

Upgrade and Renovating work for physiotherapy unit UKM Hospital Residential Project at Kota Benut, Pontian District, Johore

1,106,208.0 0 5,662,254. 00

2 Month

2005

HUKM

July 3rd – July 4th

2004

Life Development Sdn Bhd

Proposed for Upgrading the hostel room, for administration office training center, UiTM Kg. Gajah Perak Civil and Structural Works for Felcra Kota Semarahan Palm Oil Mill, Kota Samarahan, Sarawak

315,400.00

4 Months

2004

UiTM Shah Alam

Common Vantage Sdn Bhd Life Development Sdn Bhd UiTM Shah Alam

6,173,374. 00

10 Month

2005

Felcra Berhad

Felcra Berhad

COMPLETED PROJECTS CURRENT TIME SDN BHD

ROAD DEVELOPING AND MAINTAINENCE SERVICE NO

PROJECT TITLE

1

Proposed for developing infrastructure and utility, at MARDI Headquarters, Serdang, Selangor Double storey junction

2

CONTRACT CONTRAC VALUE T (RM) DURATIO N 12,000,000.00

YEAR

CLIENT

CONSULTANT

MARDI

Khairi Consultant Khairi Consultant

3

4

5

6

between Jalan Pudu, Jalan Imbi and Jalan Hang Tuah, Kuala Lumpur Proposed for build Jalan Segambut from KTM Bridge to Mont Kiara, Kuala Lumpur. Proposed for upgrading Jalan Lama Bangi to Putrajaya, Simpang Tiga Jenderam, Selangor Darul Ehsan. Proposed for upgrading existing road from Gemas to Ayer Hitam, Johor Proposed for Upgrading existing Federal Road, KM54, Sg. Buloh, Selangor

70,000,000.00

DBKL

80,000,000.00

Khairi Consultant DBKL Khairi Consultant

45,000,000.00 Khairi Consultant 180,000,000.0 0 180,000,000.0 0

Khairi Consultant DBKL

COMPLETED PROJECTS CURRENT TIME SDN BHD

ROAD DEVELOPING AND MAINTAINENCE SERVICE 7

Proposed for building road from Bukit Belachan to Kg.Tasek Tambahan, Hulu Langat District, Ampang Selangor

14,500,000.0 0

MPAJ

Khairi Consultant

8

9

10

11

12

13

Repairing and Maintenance roads in Penang, Path 6, from Bulatan Bagan Jermal/ Jalan Kelawai to Mar Vista, Tanjung Bungah, Penang Maintaining and repairing works on Highway’s cliff and other related work at path 4, east-west Highway, Continuing works from Kerling to Kq. Sungai Tengi, Hulu Selangor, Selangor. Repairing and Maintaining Highway cliff at KM6.2 and KM6.4, Jalan Kompleks Radar Martello, Bukit Ibam, Pahang Proposed for upgrading Jalan Bukit bintang/ Jalan Pudu (phase 1 – Design and built road divider near Jalan Pudu/Jalan Bukit Bintang junction, Kuala Lumpur Access road for main Industrial area (phase 1), Bandar Amanjaya, Sungai Petani Kedah.

75,000,000.0 0

MBPP

Khairi Consultant

75,000,000.0 0

Khairi Consultant

30,000,000.0 0

Khairi Consultant

6,300,000.00

Khairi Consultant

1,300,000.00

7,000,000.00

DBKL

Khairi Consultant

Khairi Consultant

Related Documents