PRICE SCHEDULE - CIVIL / STRUCTURAL [CH.0.00 KM to CH. 88.00 S. NO.

WORK DESCRIPTION AND SUPPLY

UNIT PRICE ( In INR )

UNIT Niranjan

1

2

3

Bore well Providing potable quality water by supplying, providing and placing in position hand pump of approved quality for 40 mm dia G.I. pipe complete with all accessories including providing and placing in position filters of 40 mm dia G.I. pipe with brass strainer of Supply, installation, Testing and commissioning of Hazardously safe Industrial motor (flame proof) of appropriate capacity as per site requirement and as per instruction of Owner/Owner's representative. work shall also include the foundation Supply and installation of 500 liter capacity sintex company water tank over Guard room with proper pipe & other associated fittings arrangement to connect the water tank with motor and providing a tap from water tank to appropriate location. Work should also include the water proofing treatment of guard room and providing of khurra etc

KSS

CE

Target

Nos

225,000.00

260,000.00

213,750.00

LS

60,000.00

80,000.00

57,000.00

20,000.00

25,000.00

19,000.00

LS

50,000.00

PRICE SCHEDULE - CIVIL / STRUCTURAL [CH.0.00 KM to CH. 88.00 S. NO.

4

WORK DESCRIPTION AND SUPPLY Supply and installation of 500 liter capacity sintex company water tank up to a height of 3m with proper pipe & other associated fittings arrangement to connect the water tank with motor and providing a tap from water tank to appropriate location. work shall also include Supply & Installation of structural steel support up to 3m height to place 500 liter capacity sintex company water tank as per site General Civil Works

UNIT PRICE ( In INR )

UNIT Niranjan

KSS

CE

Target

LS

65,000.00

20,000.00

30,000.00

19,000.00

5

PCC 1:4:8

m3

3,100.00

3,700.00

4,500.00

2,945.00

6

PCC 1:3:6

m3

3,500.00

4,200.00

5,000.00

3,325.00

7

PCC 1:5:10

m3

2,800.00

3,550.00

4,300.00

2,660.00

8

RCC M25

m3

5,000.00

8,500.00

9,000.00

4,750.00

9

RCC M20

m3

4,800.00

7,750.00

8,400.00

4,560.00

10

Steel Reinforcement

MT

52,000.00

69,000.00

76,000.00

49,400.00

11

Brick Work in 1:6 CM

m3

4,000.00

4,100.00

4,700.00

3,800.00

PRICE SCHEDULE - CIVIL / STRUCTURAL [CH.0.00 KM to CH. 88.00 S. NO.

WORK DESCRIPTION AND SUPPLY

UNIT PRICE ( In INR )

UNIT Niranjan

KSS

CE

Target

4,150.00

4,700.00

3,942.50

12

230 mm Stone Wall

m3

13

115 mm Brick Work

m2

4,000.00

1,050.00

1,500.00

997.50

14

Shuttering

m2

375.00

320.00

450.00

304.00

15

Chequered Plate

MT

80,000.00

82,000.00

90,000.00

76,000.00

16

Supply of Chain Link fencing

m2

725.00

900.00

688.75

17

Barbed Wire

m

15.00

475.00

530.00

14.25

18

Bolder Packing 150 mm

m2

500.00

685.00

950.00

475.00

19

Excavation upto 2 mt depth

m3

160.00

305.00

300.00

152.00

20

Excavation below 2 mt depth

m3

200.00

350.00

325.00

190.00

21

Excavation by Machine

m3

100.00

225.00

250.00

95.00

Disposal of excavated soil -distance less than 3 Kms Disposal of excavated soil -distance less than 3 Kms

m3

150.00

175.00

225.00

142.50

175.00

225.00

166.25

Filling of excavated soil

m3

75.00

125.00

71.25

22 23 24

m3 80.00

PRICE SCHEDULE - CIVIL / STRUCTURAL [CH.0.00 KM to CH. 88.00 S. NO.

WORK DESCRIPTION AND SUPPLY

UNIT PRICE ( In INR )

UNIT Niranjan

KSS

CE

Target

25

Filling of soil from Borrow pit

m3

300.00

80.00

150.00

76.00

26

Filling of soil/gravel provided by Ace

m3

150.00

205.00

225.00

142.50

27

Sand Filling

m3

750.00

350.00

450.00

332.50

28

Gravel Filling

m3

1,500.00

425.00

500.00

403.75

29

Rubble Soling

m2

500.00

325.00

425.00

308.75

30

Providing of Bolts associated other fittings

KG

80.00

140.00

180.00

76.00

31

Plastering 13 mm thk (1:4)

m2

165.00

160.00

225.00

152.00

32

Plastering 15 mm thk (1:4)

165.00

190.00

250.00

156.75

33

Plastering 20 mm thk (1:4)

m2

200.00

215.00

250.00

190.00

34

Grouting with GP 2

m3

50,000.00

9,000.00

7,000.00

6,650.00

m2

150.00

465.00

600.00

142.50

Road Work 35

WBM 100 mm

PRICE SCHEDULE - CIVIL / STRUCTURAL [CH.0.00 KM to CH. 88.00 S. NO.

WORK DESCRIPTION AND SUPPLY

UNIT PRICE ( In INR )

UNIT Niranjan

KSS

CE

Target

36

WBM 75 mm

m2

145.00

450.00

800.00

137.75

37

Bituminous carpet 50 mm

m2

425.00

1,675.00

2,500.00

403.75

38

Dismantling and Disposal of Brickwork

m3

800.00

475.00

700.00

451.25

39

Dismantling and Disposal of RCC

m3

3,500.00

3,750.00

4,500.00

3,325.00

40

fixing of Chain Link Fencing

m2

280.00

1,200.00

266.00

41

Fixing of Paver Block

m2

175.00

250.00

166.25

42

fixing of sailtex board

m2

225.00

500.00

213.75

43

Supply and fixing of Chain Link Fencing

m2

400.00

1,225.00

2,000.00

380.00

44

Supply and Fixing of Paver Block

m2

700.00

1,600.00

1,500.00

665.00

45

Supply and fixing of sailtex board

m2

2,500.00

6,000.00

8,000.00

2,375.00

PRICE SCHEDULE - CIVIL / STRUCTURAL [CH.0.00 KM to CH. 88.00 S. NO.

WORK DESCRIPTION AND SUPPLY

UNIT PRICE ( In INR )

UNIT Niranjan

KSS

CE

Target

46

Supply and fixing of bituminous sealant

m

40.00

1,100.00

1,500.00

38.00

47

Painting - White Wash

m2

25.00

18.00

25.00

17.10

48

Painting - Cement Paint

m2

50.00

110.00

120.00

47.50

49

Painting - Plastic Paint

m2

150.00

115.00

135.00

109.25

50

Painting - Distemper

m2

90.00

95.00

120.00

85.50

51

Painting - Acrylic Emulsion Paint

m2

120.00

115.00

125.00

109.25

Painting - White Wash (Paint Free Issue) Painting - Cement Paint (Paint Free issue) Painting - Plastic Paint (Paint Free issue)

m2

20.00

30.00

19.00

m2

40.00

50.00

38.00

m2

45.00

55.00

42.75

55

Painting - Distemper (paint free issue)

m2

41.00

60.00

38.95

56

Painting - Acrylic Emulsion Paint (paint free issue)

m2

75.00

100.00

71.25

52 53 54

PRICE SCHEDULE - CIVIL / STRUCTURAL [CH.0.00 KM to CH. 88.00 S. NO.

WORK DESCRIPTION AND SUPPLY

UNIT PRICE ( In INR )

UNIT Niranjan

KSS

CE

Target

1100

2,100.00

2,500.00

1,045.00

350.00

800.00

332.50

1,100.00

900.00

665.00

300.00

450.00

285.00

1,750.00

2,000.00

1,662.50

550.00

800.00

522.50

Flooring 57

Supply and Installation of Vitrified Tiles

m2

58

Installation of Vitrified Tiles

m2

59

Supply and Installation of Kota Stone

m2

60

Installation of Kota Stone

m2

61

Supply and Installation of Acid Proof Tiles

m2

62

Installation of Acid Proof Tiles

m2

63

Water proofing (7 course)

m2

1,000.00

3,500.00

4,000.00

950.00

64

Supply and Installation of False ceiling

m2

3,000.00

1,650.00

2,000.00

1,567.50

65

Installation of false ceiling

m2

725.00

1,000.00

688.75

9,000.00

11,000.00

6,175.00

700

4500

Architectural Works 66

Supply and Installation of door - double shutter

m2

6,500.00

PRICE SCHEDULE - CIVIL / STRUCTURAL [CH.0.00 KM to CH. 88.00 S. NO.

WORK DESCRIPTION AND SUPPLY

UNIT PRICE ( In INR )

UNIT Niranjan

KSS

CE

Target

2,600.00

3,500.00

2,470.00

8,000.00

9,750.00

5,890.00

2,200.00

2,500.00

2,090.00

7,250.00

8,500.00

2,850.00

2,250.00

3,500.00

2,137.50

67

Installation of door - double shutter

m2

68

Supply and Installation of door - single shutter

m2

69

Installation of door - single shutter

m2

70

Supply and Installation of Window

m2

71

Installation of door - Window

m2

72

Supply and Installation of Exhaust fan

LS

4,500.00

7,100.00

7,100.00

4,275.00

73

Manhole

LS

5,000.00

3,600.00

4,500.00

3,420.00

74

Soak Pit

LS

20,000.00

47,000.00

52,000.00

19,000.00

75

Septic Tank

LS

50,000.00

120,000.00

135,000.00

47,500.00

Supply and Installation of tiles 300 x 300 x 8/9.5 WITH MOTAR Installation of tiles 300 x 300 x 8/9.5 WITH CEMENT MOTAR Supply and Installation of Skirting 100 mm high with cement mortar Installation of door - Skirting 100 mm high with cement mortar

m2

1,100.00

1,200.00

2,000.00

1,045.00

600.00

800.00

570.00

1,275.00

1,500.00

1,211.25

1,125.00

1,500.00

1,068.75

76 77 78 79

6,200.00

3,000.00

m2 m2 m2

1,400.00

PRICE SCHEDULE - CIVIL / STRUCTURAL [CH.0.00 KM to CH. 88.00 S. NO.

80 81 82 83 84 85 86

NOTE:

WORK DESCRIPTION AND SUPPLY Supply and Installation of tiles 150 x 300 x 5.5 with cement mortar Installation of tiles 150 X 300 X 5.5 with cement mortar Supply and Installation of tiles 600 x 600 x 10 with 20 mm thick cement Installation of tiles 600 x 600 x 10 with 20 mm thick cement mortar for flooring Supply and Installation of Marble tile 1500 wide x 20 mm thk with cement Supply and Installation of tiles 9.5 mm thick acid proof tiles cement mortar for Installation of tiles 9.5 mm thick acid proof tiles cement mortar for flooring

UNIT PRICE ( In INR )

UNIT

m2

Niranjan

KSS

CE

Target

900.00

1,450.00

1,600.00

855.00

600.00

750.00

570.00

2,100.00

2,500.00

1,140.00

925.00

1,200.00

878.75

m2 m2

1,200.00

m2 m2

1,000.00

2,350.00

2,500.00

950.00

m2

3,000.00

1,900.00

2,000.00

1,805.00

625.00

900.00

593.75

m2

Rates include material and labor rates for supply, installation, and also is inclusive of profit and taxes . Service tax as per gov rule will be extra.

NOTE: All specifications are as per tender specifications provided in RFQ CD

Related Documents


More Documents from ""