PRICE SCHEDULE - CIVIL / STRUCTURAL [CH.0.00 KM to CH. 88.00 S. NO.
WORK DESCRIPTION AND SUPPLY
UNIT PRICE ( In INR )
UNIT Niranjan
1
2
3
Bore well Providing potable quality water by supplying, providing and placing in position hand pump of approved quality for 40 mm dia G.I. pipe complete with all accessories including providing and placing in position filters of 40 mm dia G.I. pipe with brass strainer of Supply, installation, Testing and commissioning of Hazardously safe Industrial motor (flame proof) of appropriate capacity as per site requirement and as per instruction of Owner/Owner's representative. work shall also include the foundation Supply and installation of 500 liter capacity sintex company water tank over Guard room with proper pipe & other associated fittings arrangement to connect the water tank with motor and providing a tap from water tank to appropriate location. Work should also include the water proofing treatment of guard room and providing of khurra etc
KSS
CE
Target
Nos
225,000.00
260,000.00
213,750.00
LS
60,000.00
80,000.00
57,000.00
20,000.00
25,000.00
19,000.00
LS
50,000.00
PRICE SCHEDULE - CIVIL / STRUCTURAL [CH.0.00 KM to CH. 88.00 S. NO.
4
WORK DESCRIPTION AND SUPPLY Supply and installation of 500 liter capacity sintex company water tank up to a height of 3m with proper pipe & other associated fittings arrangement to connect the water tank with motor and providing a tap from water tank to appropriate location. work shall also include Supply & Installation of structural steel support up to 3m height to place 500 liter capacity sintex company water tank as per site General Civil Works
UNIT PRICE ( In INR )
UNIT Niranjan
KSS
CE
Target
LS
65,000.00
20,000.00
30,000.00
19,000.00
5
PCC 1:4:8
m3
3,100.00
3,700.00
4,500.00
2,945.00
6
PCC 1:3:6
m3
3,500.00
4,200.00
5,000.00
3,325.00
7
PCC 1:5:10
m3
2,800.00
3,550.00
4,300.00
2,660.00
8
RCC M25
m3
5,000.00
8,500.00
9,000.00
4,750.00
9
RCC M20
m3
4,800.00
7,750.00
8,400.00
4,560.00
10
Steel Reinforcement
MT
52,000.00
69,000.00
76,000.00
49,400.00
11
Brick Work in 1:6 CM
m3
4,000.00
4,100.00
4,700.00
3,800.00
PRICE SCHEDULE - CIVIL / STRUCTURAL [CH.0.00 KM to CH. 88.00 S. NO.
WORK DESCRIPTION AND SUPPLY
UNIT PRICE ( In INR )
UNIT Niranjan
KSS
CE
Target
4,150.00
4,700.00
3,942.50
12
230 mm Stone Wall
m3
13
115 mm Brick Work
m2
4,000.00
1,050.00
1,500.00
997.50
14
Shuttering
m2
375.00
320.00
450.00
304.00
15
Chequered Plate
MT
80,000.00
82,000.00
90,000.00
76,000.00
16
Supply of Chain Link fencing
m2
725.00
900.00
688.75
17
Barbed Wire
m
15.00
475.00
530.00
14.25
18
Bolder Packing 150 mm
m2
500.00
685.00
950.00
475.00
19
Excavation upto 2 mt depth
m3
160.00
305.00
300.00
152.00
20
Excavation below 2 mt depth
m3
200.00
350.00
325.00
190.00
21
Excavation by Machine
m3
100.00
225.00
250.00
95.00
Disposal of excavated soil -distance less than 3 Kms Disposal of excavated soil -distance less than 3 Kms
m3
150.00
175.00
225.00
142.50
175.00
225.00
166.25
Filling of excavated soil
m3
75.00
125.00
71.25
22 23 24
m3 80.00
PRICE SCHEDULE - CIVIL / STRUCTURAL [CH.0.00 KM to CH. 88.00 S. NO.
WORK DESCRIPTION AND SUPPLY
UNIT PRICE ( In INR )
UNIT Niranjan
KSS
CE
Target
25
Filling of soil from Borrow pit
m3
300.00
80.00
150.00
76.00
26
Filling of soil/gravel provided by Ace
m3
150.00
205.00
225.00
142.50
27
Sand Filling
m3
750.00
350.00
450.00
332.50
28
Gravel Filling
m3
1,500.00
425.00
500.00
403.75
29
Rubble Soling
m2
500.00
325.00
425.00
308.75
30
Providing of Bolts associated other fittings
KG
80.00
140.00
180.00
76.00
31
Plastering 13 mm thk (1:4)
m2
165.00
160.00
225.00
152.00
32
Plastering 15 mm thk (1:4)
165.00
190.00
250.00
156.75
33
Plastering 20 mm thk (1:4)
m2
200.00
215.00
250.00
190.00
34
Grouting with GP 2
m3
50,000.00
9,000.00
7,000.00
6,650.00
m2
150.00
465.00
600.00
142.50
Road Work 35
WBM 100 mm
PRICE SCHEDULE - CIVIL / STRUCTURAL [CH.0.00 KM to CH. 88.00 S. NO.
WORK DESCRIPTION AND SUPPLY
UNIT PRICE ( In INR )
UNIT Niranjan
KSS
CE
Target
36
WBM 75 mm
m2
145.00
450.00
800.00
137.75
37
Bituminous carpet 50 mm
m2
425.00
1,675.00
2,500.00
403.75
38
Dismantling and Disposal of Brickwork
m3
800.00
475.00
700.00
451.25
39
Dismantling and Disposal of RCC
m3
3,500.00
3,750.00
4,500.00
3,325.00
40
fixing of Chain Link Fencing
m2
280.00
1,200.00
266.00
41
Fixing of Paver Block
m2
175.00
250.00
166.25
42
fixing of sailtex board
m2
225.00
500.00
213.75
43
Supply and fixing of Chain Link Fencing
m2
400.00
1,225.00
2,000.00
380.00
44
Supply and Fixing of Paver Block
m2
700.00
1,600.00
1,500.00
665.00
45
Supply and fixing of sailtex board
m2
2,500.00
6,000.00
8,000.00
2,375.00
PRICE SCHEDULE - CIVIL / STRUCTURAL [CH.0.00 KM to CH. 88.00 S. NO.
WORK DESCRIPTION AND SUPPLY
UNIT PRICE ( In INR )
UNIT Niranjan
KSS
CE
Target
46
Supply and fixing of bituminous sealant
m
40.00
1,100.00
1,500.00
38.00
47
Painting - White Wash
m2
25.00
18.00
25.00
17.10
48
Painting - Cement Paint
m2
50.00
110.00
120.00
47.50
49
Painting - Plastic Paint
m2
150.00
115.00
135.00
109.25
50
Painting - Distemper
m2
90.00
95.00
120.00
85.50
51
Painting - Acrylic Emulsion Paint
m2
120.00
115.00
125.00
109.25
Painting - White Wash (Paint Free Issue) Painting - Cement Paint (Paint Free issue) Painting - Plastic Paint (Paint Free issue)
m2
20.00
30.00
19.00
m2
40.00
50.00
38.00
m2
45.00
55.00
42.75
55
Painting - Distemper (paint free issue)
m2
41.00
60.00
38.95
56
Painting - Acrylic Emulsion Paint (paint free issue)
m2
75.00
100.00
71.25
52 53 54
PRICE SCHEDULE - CIVIL / STRUCTURAL [CH.0.00 KM to CH. 88.00 S. NO.
WORK DESCRIPTION AND SUPPLY
UNIT PRICE ( In INR )
UNIT Niranjan
KSS
CE
Target
1100
2,100.00
2,500.00
1,045.00
350.00
800.00
332.50
1,100.00
900.00
665.00
300.00
450.00
285.00
1,750.00
2,000.00
1,662.50
550.00
800.00
522.50
Flooring 57
Supply and Installation of Vitrified Tiles
m2
58
Installation of Vitrified Tiles
m2
59
Supply and Installation of Kota Stone
m2
60
Installation of Kota Stone
m2
61
Supply and Installation of Acid Proof Tiles
m2
62
Installation of Acid Proof Tiles
m2
63
Water proofing (7 course)
m2
1,000.00
3,500.00
4,000.00
950.00
64
Supply and Installation of False ceiling
m2
3,000.00
1,650.00
2,000.00
1,567.50
65
Installation of false ceiling
m2
725.00
1,000.00
688.75
9,000.00
11,000.00
6,175.00
700
4500
Architectural Works 66
Supply and Installation of door - double shutter
m2
6,500.00
PRICE SCHEDULE - CIVIL / STRUCTURAL [CH.0.00 KM to CH. 88.00 S. NO.
WORK DESCRIPTION AND SUPPLY
UNIT PRICE ( In INR )
UNIT Niranjan
KSS
CE
Target
2,600.00
3,500.00
2,470.00
8,000.00
9,750.00
5,890.00
2,200.00
2,500.00
2,090.00
7,250.00
8,500.00
2,850.00
2,250.00
3,500.00
2,137.50
67
Installation of door - double shutter
m2
68
Supply and Installation of door - single shutter
m2
69
Installation of door - single shutter
m2
70
Supply and Installation of Window
m2
71
Installation of door - Window
m2
72
Supply and Installation of Exhaust fan
LS
4,500.00
7,100.00
7,100.00
4,275.00
73
Manhole
LS
5,000.00
3,600.00
4,500.00
3,420.00
74
Soak Pit
LS
20,000.00
47,000.00
52,000.00
19,000.00
75
Septic Tank
LS
50,000.00
120,000.00
135,000.00
47,500.00
Supply and Installation of tiles 300 x 300 x 8/9.5 WITH MOTAR Installation of tiles 300 x 300 x 8/9.5 WITH CEMENT MOTAR Supply and Installation of Skirting 100 mm high with cement mortar Installation of door - Skirting 100 mm high with cement mortar
m2
1,100.00
1,200.00
2,000.00
1,045.00
600.00
800.00
570.00
1,275.00
1,500.00
1,211.25
1,125.00
1,500.00
1,068.75
76 77 78 79
6,200.00
3,000.00
m2 m2 m2
1,400.00
PRICE SCHEDULE - CIVIL / STRUCTURAL [CH.0.00 KM to CH. 88.00 S. NO.
80 81 82 83 84 85 86
NOTE:
WORK DESCRIPTION AND SUPPLY Supply and Installation of tiles 150 x 300 x 5.5 with cement mortar Installation of tiles 150 X 300 X 5.5 with cement mortar Supply and Installation of tiles 600 x 600 x 10 with 20 mm thick cement Installation of tiles 600 x 600 x 10 with 20 mm thick cement mortar for flooring Supply and Installation of Marble tile 1500 wide x 20 mm thk with cement Supply and Installation of tiles 9.5 mm thick acid proof tiles cement mortar for Installation of tiles 9.5 mm thick acid proof tiles cement mortar for flooring
UNIT PRICE ( In INR )
UNIT
m2
Niranjan
KSS
CE
Target
900.00
1,450.00
1,600.00
855.00
600.00
750.00
570.00
2,100.00
2,500.00
1,140.00
925.00
1,200.00
878.75
m2 m2
1,200.00
m2 m2
1,000.00
2,350.00
2,500.00
950.00
m2
3,000.00
1,900.00
2,000.00
1,805.00
625.00
900.00
593.75
m2
Rates include material and labor rates for supply, installation, and also is inclusive of profit and taxes . Service tax as per gov rule will be extra.
NOTE: All specifications are as per tender specifications provided in RFQ CD