Coc 2008

  • May 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Coc 2008 as PDF for free.

More details

  • Words: 611
  • Pages: 14
PT. INDO KARYA ANUGERAH Kick Off Meeting IKA Group Bali, 17-19 January 2008

EV ALU ASI 2007

TAHUN

BUDGET

AKTUAL

% TERCAPAI

2006

Rp. 15 M

Rp. 8.5

57%

2007

Rp. 20 M

Rp. 15 M

75%

2008

Rp. 30 M

???

???

Peningkatan aktual 2006 – 2007: 75% Peningkatan yg hendak dicapai di 2008: 100%

HOW ?????

MOTTO

1. WITH GOD

“When you do the right thing with the right motivates, there’s no limit to what God will do in your life”

ROAD MAP

2.Tampil beda “Serupa namun tak sama

INTERNAL - Memotivasi team - Memperbaiki sistem kerja - Memformat stp dokumen2 kerj EXTERNAL

- Mempertajam segment pasar - Memperluas area dgn memper langsung ke arsitek, consultant, contractor dan user

ROAD MAP

ROAD MAP INTERNAL

Team Marketing • Human Resource: – 2 sales & marketing – Mendevelop salah satunya menjadi manager

• Tools & Training: – Memfasilitasi kebutuhan marketing (tas coc, berisi sampel, brosur, product knowladge, certificate, etc) – Memberikan product knowledge dengan training – Melakukan studi banding di proyek-proyek dan memberikan solusi yang terbaik untuk customer – Memberikan kompensasi yang jelas terhadap nilai penjualan yang didapatkan oleh para sales

ROAD MAP INTERNAL

Installation (memaksimalkan kapasitas SDM dan mesin yang ada) • Human Resource

– 1 admin & inventaris proyek - Mulai mencari PM baru yang nantinya akan menangani proyek besar dan luar kota

• Mengurangi pengeluaran di instalasi dengan: – – – –

Memperbaiki sistem survey lapangan Menyediakan kebutuhan spare parts mesin instalasi Merubah sistem pembayaran harian menjadi borongan Terus mencari alternatif lem, atau memproduksi lem sendiri

• Tools - Mensupport kebutuhan project (ex– notebook)

BUDGETING 2008 EXTERNAL SEGMENT PASAR PROYEK   RETAIL   INDUSTRI   REAL ESTATE   ACOUSTIC PANEL   MIX PRODUCT   TOTAL

NUMBER 22,000,000,000   500,000,000   2,650,000,000   3,000,000,000   1,000,000,000   500,000,000   29,150,000,000

ROAD MAP List Proyek NO

NAMA PROYEK

LUAS

NILAI KONTRAK

TOTAL

 

 

m2

 

 

 

PROYEK 1

INCO

2

Grand Indonesia-Hotel

3

One Stop Studio

4

 

  13,000

  2,000,000,000

 

12,750

850,000,000

 

1,200

350,000,000

 

Trans Studio Makassar

94,118

4,000,000,000

 

5

UIN Syarifudin

10,119

850,000,000

 

6

Menara Medco

1,200

91,200,000

 

7

Bandara Lombok

12,000

720,000,000

 

8

FX Apartment

997

59,820,000

 

9

Bandara Medan

12,000

720,000,000

 

10

Gandaria Main Street

18,000

1,260,000,000

 

11

18,000

1,080,000,000

 

12

Bandara Sempingan, Balikpapan Stadion Sepeda, Samarinda

10,000

700,000,000

 

13

GOR Cibinong

2,500

175,000,000

 

ROAD MAP List Proyek NO

NAMA PROYEK

LUAS

NILAI KONTRAK

TOTAL

 

 

m2

 

 

 

PROYEK

14

Dirjen panas bumi

15

 

 

 

400

24,000,000

 

Ruko Bintaro

2,700

162,000,000

 

16

Seacon City

7,000

420,000,000

 

17

Hotel Medan

700

42,000,000

 

18

Bandara Syahkuala, Pekan Baru

16,000

1,120,000,000

 

19

Dome di Pekan Baru

1,380

107,640,000

 

20

Pamulang Square

6,000

420,000,000

 

21

Resort di Nusa Dua Bali

1,000

78,000,000

 

22

Masjid Makassar (tambahan)

1,000

115,500,000

 

23

Grand Kawanua, Menado

2,000

120,000,000

 

24

Gereja Menado

2,500

250,000,000

 

25

Paragon, Semarang

2,000

120,000,000

 

26

Jakarta Expo (Proyek Baru)

10,000

600,000,000

 

 

TOTAL

 

 

16,435,160,000

ROAD MAP NO

NAMA PROYEK

LUAS m2  

NILAI KONTRAK  

TOTAL

 

RETAIL

1

Gold Gym

2

Lounge Syabah

3

Home Theater Studio - (New)

 

TOTAL

 

 

 

 

 

 

 

 

INDUSTRI

 

 

 

1

Ruang Generator

2

PLTU

3

Pabrik alfa Citra

4

Pabrik Helm, Tangerang

5

New Industri

 

TOTAL

 

 

 

 

 

 

 

 

REAL ESTATE

 

 

 

1

Perumahan Baru (target)

 

 

 

PANEL

 

MIX PRODUCT

90

4,860,000

 

164

39,000,000

 

5,000

500,000,000

  43,860,000

1,600

112,000,000

 

10,000

600,000,000

 

800

48,000,000

 

3,000

180,000,000

 

25,000

1,500,000,000

 

83,333  

 

2,440,000,000

5,000,000,000  

  5,000,000,000

1,000,000,000

1,000,000,000

500,000,000

500,000,000

FUTURE PLANNING 2008 1. COC bukan hanya menjual produk tetapi juga solusi 2. Mendaur ulang limbah proyek menjadi product baru (panel acoustic) 2008-2009 6. Mix Product (ex: Cellulose dengan Gypsum, Cellulose dengan atap metal) 7. Menjadikan Panel Acoustic menjadi product retail yang dapat memasuki pasar (ex: Studio Music, Ace Hadware. Depo Bangunan) 2008-2010 10.Mempersiapkan dan menghasilkan brand baru “thermacoustic” serta team yang siap menjual ke pasar international

FUTURE PLANNING

ACTIO N

Related Documents

Coc 2008
May 2020 16
Coc
October 2019 27
Nang Coc
November 2019 28
Coc&childlabour
October 2019 29
Coc Cases.docx
December 2019 25