Cisterna - 2 Recamaras.xlsx

  • Uploaded by: Richard Hidalgo Genao
  • 0
  • 0
  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Cisterna - 2 Recamaras.xlsx as PDF for free.

More details

  • Words: 2,937
  • Pages: 33
33

EXTERIOR

CISTERNA EXTERIOR GRANDE.Fecha: Thursday, April 04, 2019 No.

DESCRIPCION CISTERNA: Tipo de block: Ancho interno: Largo interno: Altura interno: Ancho externo: Largo externo: Altura total: Espesor losa de fondo: Espesor losa de techo: h flotador de cisterna: Espesor de telford: Sobre ancho para excavación: h dentellón de vigas H.A. h viga de amarre perimetral: Capacidad de la cisterna:

1.1 REPLANTEO a Replanteo

CANTIDAD UNIDAD

0.20 2.65 3.00 2.40 3.05 3.40 2.95 0.20 0.15 0.30 0.20 0.30 0.25 0.20 4,407

mt. ml. ml. ml. ml. ml. ml. mt. ml. mt. mt. mt. mt. mt. mt.

1.00

p.a.

TOTAL 1.2 MOVIMIENTO DE TIERRA a Excavación en material suelto con equipos b Nivelación de terreno a mano Bote de materiales a 5.00 kilómetros; Fabult. = 1.25 d Telford en asiento de arena c

HORMIGON ARMADO Losa de fondo t = 0.20 mts. Dentellón de vigas en H. A. (0.30 x 0.25) Losa de techo t = 0.15 mts.

$2,000.00 RD$

45.26 16.50

mt3 mt3

$217.12 $250.00

56.58

mt3

$258.61

2.92

mt3

$1,050.00

TOTAL 1.3 a b c

PRECIO

RD$

2.92 1.20 1.56

mt3 mt3 mt3

$8,449.10 $10,098.40 $10,879.14

34

EXTERIOR d Viga de amarre perimetral (0.20 x 0.20)

0.77

mt3

TOTAL 1.4 a b c d e

1.5 a b c d e

MUROS y TERMINACIONES Muros de 8" B.N.P. Fraguache con escobas Pañete pulido Zabaleta Fino en losa inferior

$22,472.05 RD$

24.375 31.19 27.12 20.90 7.95

mt2 mt2 mt2 ml. mt2

$2,032.18 $61.93 $288.91 $98.08 $508.69

TOTAL

RD$

SUB-TOTAL OBRA GRIS

RD$

ACCESORIOS DE CISTERNA Tanque de presion - 300 galones Bomba de 2" H.P. Piezas y P.V.C. Tapa p/cisterna acer. inox. 24 x 24 x 21 Mano de Obra

1.00 1.00 1.00 1.00 1.00

p.a. p.a. p.a. unidad p.a.

$17,451.26 $19,421.62 $5,000.00 $5,081.67 $6,000.00

TOTAL

RD$

TOTAL CISTERNA

RD$

35

EXTERIOR

.-

pril 04, 2019 VALOR

$2,000.00 2,000.00

$9,826.90 $4,125.00 $14,630.68 $3,066.00 31,648.57

$24,671.38 $12,080.21 $16,922.51

36 $17,393.36 71,067.46

$49,534.38 $1,931.60 $7,835.32 $2,049.90 $4,044.05 65,395.25 170,111.29

$17,451.26 $19,421.62 $5,000.00 $5,081.67 $6,000.00 52,954.55

223,065.84

EXTERIOR

LISTADO DE INSUMOS PROMEDIO.-

NO. PARTIDA CANTIDAD UNIDAD P.U. RD$ ACERO ESTRUCTURAL y ALAMBRE GALVANIZADO.Acero estructural Ø 3/8" x 20' - G40° 22.26 quintales $51,198.00 Acero estructural Ø 1/2" x 20' - G40° 22.26 quintales $51,198.00 Alambre galvanizado liso cal 18 100.00 libra $45.00 EQUIPOS DE CONTRUCCION.Pala cuadrada "Tramontina"

1.00

unidad

$352.64

Pico c/mango "Tramontina"

1.00

unidad

$527.22

Agua potable

1.00

galón

$5.00

Cal viva pomier (50 libras)

1.00

funda

$180.00

Cemento gris "Titán" tipo portland (42.5 kgs.)

1.00

funda

$310.00

Madera pino americano bruta - 1" x 4"

1.00

pie2

$55.00

Madera pino americano cepillada - 1" x 4"

1.00

pie2

$55.00

1.00

galón

$223.20

ALBAÑILERIAS.Escoba

1.00

unidad

$20.00

AGREGADOS.Arena fina (para pañete)

1.00

mt3

$1,000.00

Arena gruesa "Itabo" (de mina)

1.00

mt

$900.00

Arena gruesa "Itabo" lavada (de planta) Gravilla 3/4" @ 1/2" triturada

1.00 1.00

mt3 mt3

$1,100.00 $1,100.00

1.00

unidad

$35.00

CEMENTOS, CAL, ADITIVOS.-

MADERAS.-

COMBUSTIBLES.Gasolina regular, fecha: 13-04-2018

BLOQUES DE HORMIGON.Bloque de 0.20 mts. (8") "Ochoa"

3

OMEDIO.I.T.B.I.S VALOR $2,300.00 $2,300.00 $4,500.00

$352.64 $527.22

$5.00 $180.00 $310.00

$55.00 $55.00

$223.20

$20.00

$1,000.00 $900.00 $1,100.00 $1,100.00

$35.00

18.00%

UNIDAD PRECIO quintal quintal quintal

$2,300.00 $2,300.00

LISTADO MANO DE OBRA MANO DE OBRA GENERAL.-

NO.

PARTIDA

TARIFA DE ALBANILERIA.ALB-001 Trabajador no calificado (TNC) ALB-002 Trabajador calificado (TC) ALB-003 Ayudante de albañilería (AY) ALB-004 Albañil de tercera categoría (AT) - operario ALB-005 Albañil de segunda categoría (AS) - operario ALB-006 Albañil de primera categoría (AP) - operario ALB-007 Maestro de albañilería (MA) - maestro de cada una de las áreas

NO.

PARTIDA

MUROS DE BLOQUES.1 Bloque de 8 x 8 x 16 pulgs. 2 Llenado de huecos de bloques, bastones a 0.20 mts. 3 Corte y amarre de varillas en bloques, bastones a 0.20 mts.

COSTO UNIT. RD$ $18.19 $5.46 $2.19 COSTO

NO.

PARTIDA UNIT. RD$

EMPAÑETE Y TERMINACION DE PAREDES Y PLAFONES.1

Fraguache con escoba

$19.76

2

Pañete pulido sin color

$143.55 COSTO

NO.

PARTIDA UNIT. RD$

TERMINACION DE TECHOS E IMPERMEABILIZACION.1 Zabaleta en pisos 2

Fino en techo horizontal sin incluir subida de materiales

$40.63 $114.27 COSTO

NO.

PARTIDA UNIT. RD$

TARIFA DE VARILLA.-

1 2

Varillas trabajada Dinteles y vigas de amarre con altura máxima no mayor de 40 x 20 cms., (varillas Ø 1/2" Ø 3/4")

$289.89 $94.62 COSTO

NO.

PARTIDA UNIT. RD$

TARIFA DE CARPINTERIA.VIGAS DE AMARRE.1 Encofrado en viga de amarre (0.20 x 0.20) mts., A.T.C. LOSAS.1

Encofrado de losa (e = 0.13) mts., A.T.C.

$250.00 $260.00 COSTO

NO.

PARTIDA UNIT. RD$

ACARREOS.1 Arranque

$18.29

2

Regado y nivelado de relleno de reposición

$76.00

3

Acarreo de materiales (distancia desde 0.00 kms., hasta 5.00 kms.).

$21.34 COSTO

NO.

PARTIDA UNIT. RD$

ACARREOS y SUBIDAS DE MATERIALES1 Acarreo interno en bloques de 0.20 mts.

$1.38 COSTO

NO.

PARTIDA UNIT. RD$

ANDAMIOS.1

Confección de andamios interiores

$0.23 COSTO

NO.

PARTIDA UNIT. RD$

LABORES VARIAS.1

M.O. mezclado

$200.00

E OBRA

NERAL.FECHA:

11/28/2017

UNIDAD

RESOLUCION 01/2016

TARIFA POR HORA

Día Día Día Día Día Día Día

$572.64 $626.76 $736.63 $956.17 $1,091.63 $1,363.99 $1,719.25

$71.58 $78.35 $92.08 $119.52 $136.45 $170.50 $214.91

RESOLUCION 18/2017 UNIDAD DE COMPOSICION MEDIDA BRIGADA unidad unidad unidad

1AS + 1AY + 1TC 1AS + TC 1AS + TC

UNIDAD DE COMPOSICION

VALOR RD$/Día

RENDIMIENTO

$2,455.02 $1,718.39 $1,718.39

135.00 315.0 785.0

VALOR RENDIMIENTO

MEDIDA

BRIGADA

RD$/Día

mt2

1AY + 1TC

$1,363.39

69.00

mt

1AP + 1AY + 1TC

$2,727.38

19.00

2

UNIDAD DE COMPOSICION

VALOR RENDIMIENTO

MEDIDA

BRIGADA

RD$/Día

ml.

1AS + 1 AY

$1,828.26

45.00

mt

1AS + 1 AY

$1,828.26

16.00

2

UNIDAD DE MEDIDA

quintal ml. UNIDAD DE MEDIDA

ml. mt2 UNIDAD DE MEDIDA km. mt3 mt3n/km. UNIDAD DE MEDIDA unidad UNIDAD DE MEDIDA mt2 UNIDAD DE MEDIDA mt3

TARIFA DE EQUIPOS PARA LA CONSTRUCCION.EQUIPOS Ligadora de 2 fundas

ALQUILER TARIFA UNIDAD COSTO/DIA COSTO/HORA $500.00 $4,000.00 día $4,000.00

TARIFA DE EQUIPOS PESADOS PARA LA CON

460 410 310 335 320 300 270 235 220 200 180 160 140 140 140 140 140 105 75

ALQUILER TARIFA 01-2-2014 $6,050.00 $4,294.82 $5,500.00 $3,630.52 $3,460.58 $3,352.43 $2,935.31 $2,672.68 $2,209.21 $2,301.90 $2,131.96 $1,637.56 $1,838.43 $1,745.74 $1,637.69 $1,745.74 $1,529.45 $1,328.61 $973.29

ALQUILER + 18% ITBIS $7,139.00 $5,067.89 $6,490.00 $4,284.01 $4,083.48 $3,955.87 $3,463.67 $3,153.76 $2,606.87 $2,716.24 $2,515.71 $1,932.32 $2,169.35 $2,059.97 $1,932.47 $2,059.97 $1,804.75 $1,567.76 $1,148.48

140 H

165

$2,100.00

$2,478.00

12 H 12G-CAT GD-37-KOM 12F-CAT 120-OG-CAT 12E-CAT 14 G 16 12-8T-CAT

140 135 125 125 125 115 220 275 100

$1,825.00 $1,606.70 $1,825.00 $1,498.55 $1,483.10 $1,220.47 $1,767.37 $1,944.10 $1,019.63

$2,153.50 $1,895.91 $2,153.50 $1,768.29 $1,750.06 $1,440.15 $2,085.50 $2,294.04 $1,203.16

235-CAT 225-CAT 320-CAT 320B-CAT 330 345 365 B-L 416

215 145 215 128 247 321 404 80

$3,336.98 $2,209.21 $2,670.20 $3,051.18 $3,356.30 $5,500.00 $7,800.00 $1,060.00

$3,937.64 $2,606.87 $3,150.84 $3,600.39 $3,960.43 $6,490.00 $9,204.00 $1,250.80

988B-CAT

375

$3,600.45

$4,248.53

980C-CAT

270

$2,966.21

$3,500.13

EQUIPOS

MODELOS

HP

TRACTORES

D9L-CAT D9H-CAT D8R-CAT D8LCAT D155A-KOM D8K-CAT D8H-46A-CAT D8H-36A-CAT D85-A-KOM D7G-CAT D7F-CAT D7E-CAT D65-A-KOM D6D-CAT D6C-CAT TD-15C-INT D60-A-KOM D5B-CAT D4E-CAT

MOTONIVELADORAS (GREDER)

RETROEXCAVADORAS

CARGADORES FRONTALES

CARGADORES FRONTALES

CARGADORES DE ORUGA

MOTOTRAILLA

COMPACTADORES Y RODILLOS ESTATICOS

RODILLOS VIBRADORES

980-CAT 966 G 966 F 960 F 966D-CAT 966C-CAT 60C-TEREX 530-INTER 950B-CAT 936 E 950-CAT

235 235 220 200 200 170 168 160 155 135 130

$2,827.17 $2,827.17 $2,600.00 $2,500.00 $2,564.53 $2,240.11 $1,992.92 $1,977.47 $1,884.78 $1,725.25 $1,637.59

$3,336.06 $3,336.06 $3,068.00 $2,950.00 $3,026.15 $2,643.33 $2,351.65 $2,333.41 $2,224.04 $2,035.80 $1,932.36

W70-KOM

105

$1,498.55

930-CAT 510-INTER 920-CAT MINICBOBCAT

100 85 80 54

1390.41 $1,235.92 $1,220.47 $700.00

$1,768.29 $1,640.68 $1,458.39 $1,440.15 $826.00

D755-KOM

200

$2,085.62

$2,461.03

977L-CAT 955L-CAT 955K-CAT

190 130 115

$2,023.62 $1,699.39 $1,405.86

$2,387.87 $2,005.28 $1,658.91

631-CAT 631B-CAT 621-CAT DW-21-CAT

450 420 300 300

$4,124.88 $3,105.25 $2,579.88 $2,487.29

$4,867.36 $3,664.20 $3,044.26 $2,935.00

825C-CAT

310

$2,641.78

$3,117.30

815-CAT DW-20A-CAT CAT-45BUF LISO GALION

200 300 150

$2,209.21 $1,326.61 $1,251.37 $250.00

$2,606.87 $1,565.40 $1,476.62 $295.00

600-RAIC CA-25-DINAPAC VDS-84-GALION SD-100-ING.RAN

235 125 120 180

$1,560.35 $1,483.10 $1,483.10 $1,483.10

$1,841.21 $1,750.06 $1,750.06 $1,750.06

ARA LA CONSTRUCCION.COMBUSTIBLE 0.04 x PREC. COMB. $4,106.88 $3,660.48 $2,767.68 $2,990.88 $2,856.96 $2,678.40 $2,410.56 $2,098.08 $1,964.16 $1,785.60 $1,607.04 $1,428.48 $1,249.92 $1,249.92 $1,249.92 $1,249.92 $1,249.92 $937.44 $669.60

LUBRICANTE COSTO 0.20 COMB. RD$ $821.38 $12,067.26 $732.10 $9,460.46 $553.54 $9,811.22 $598.18 $7,873.07 $571.39 $7,511.84 $535.68 $7,169.95 $482.11 $6,356.34 $419.62 $5,671.46 $392.83 $4,963.86 $357.12 $4,858.96 $321.41 $4,444.16 $285.70 $3,646.50 $249.98 $3,669.25 $249.98 $3,559.88 $249.98 $3,432.38 $249.98 $3,559.88 $249.98 $3,304.66 $187.49 $2,692.69 $133.92 $1,952.00

$1,473.12

$294.62

$4,245.74

$1,249.92 $1,205.28 $1,116.00 $1,116.00 $1,116.00 $1,026.72 $1,964.16 $2,455.20 $892.80

$249.98 $241.06 $223.20 $223.20 $223.20 $205.34 $392.83 $491.04 $178.56

$3,653.40 $3,342.24 $3,492.70 $3,107.49 $3,089.26 $2,672.22 $4,442.49 $5,240.28 $2,274.52

$1,919.52 $1,294.56 $1,919.52 $1,142.78 $2,205.22 $2,865.89 $3,606.91 $714.24

$383.90 $258.91 $383.90 $228.56 $441.04 $573.18 $721.38 $142.85

$6,241.06 $4,160.34 $5,454.26 $4,971.73 $6,606.69 $9,929.07 $13,532.29 $2,107.89

$3,348.00

$669.60

$8,266.13

$2,410.56

$482.11

$6,392.80

$2,098.08 $2,098.08 $1,964.16 $1,785.60 $1,785.60 $1,517.76 $1,499.90 $1,428.48 $1,383.84 $1,205.28 $1,160.64

$419.62 $419.62 $392.83 $357.12 $357.12 $303.55 $299.98 $285.70 $276.77 $241.06 $232.13

$5,853.76 $5,853.76 $5,424.99 $5,092.72 $5,168.87 $4,464.64 $4,151.53 $4,047.59 $3,884.65 $3,482.13 $3,325.12

$937.44

$187.49

$2,893.22

$892.80 $758.88 $714.24 $482.11

$178.56 $151.78 $142.85 $96.42

$2,712.04 $2,369.04 $2,297.24 $1,404.53

$1,785.60

$357.12

$4,603.75

$1,696.32 $1,160.64 $1,026.72

$339.26 $232.13 $205.34

$4,423.46 $3,398.05 $2,890.98

$4,017.60 $3,749.76 $2,678.40 $2,678.40

$803.52 $749.95 $535.68 $535.68

$9,688.48 $8,163.91 $6,258.34 $6,149.08

$2,767.68

$553.54

$6,438.52

$1,785.60 $2,678.40 $1,339.20 $0.00

$357.12 $535.68 $267.84 $0.00

$4,749.59 $4,779.48 $3,083.66 $295.00

$2,098.08 $1,116.00 $1,071.36 $1,607.04

$419.62 $223.20 $214.27 $321.41

$4,358.91 $3,089.26 $3,035.69 $3,678.51

ANALISIS PRECIOS UNITARIOS.ANALISIS DE COSTOS.ANALISIS DE MOVIMIENTOS DE TIERRA.NO.

PARTIDA

CANTIDAD

UNIDAD DE MEDIDA

MOV-1 Excavación material inservible con retro excavadora (hasta 1.50 mts. de profundidad) Retro Excavadora, 320-CAT

costo/mt3n = rend. = 35 mt3/hr

Carguío: 950-CAT

costo/mt3e = rend. = 95 mt3/hr

Arranque

costo/mt3n = coef. esponj. = 1.15

MOV-2 Bote de material a 5.00 kms., con carguío mecánico. Carguío con: cargador frontal 950-CAT

Arranque

5.00

mt3e

Transporte

5.00

mt3n/km

0.01 0.01

unidad unidad

1.00 1.20 5.00

mt3 mt3 %

MOV-3 Asiento de arena. 1 Pala cuadrada "Tramontina" 2 Pico c/mango "Tramontina" 3 4 5

costo/mt3n = rend. = 55 mt3/hr

Arena gruesa "Itabo" (de mina) M.O. regado y nivelado de relleno de reposición. Herramientas (5%).

RIOS.-

COSTO UNIT. TOTAL/P.U. RD$

mts. de profundidad) $155.84

$40.25

$21.03

costo/mt3n

$217.12

$60.46

$18.29

$91.45

$21.34

$106.70

costo/mt3e

$258.61

$352.64 $527.22

$3.53 $5.27

$900.00 $76.00 $50.00

$900.00 $91.20 $50.00

costo/mt3

$1,050.00

LISTADO MANO DE OBRA ANALISIS DE COSTOS.MEZCLAS o MORTEROS.NO.

PARTIDA

MEZ-1 Mezcla 1:3 1 Cemento gris "Titán" tipo portland (42.5 kgs.) 2 3 4

Arena gruesa "Itabo" (de mina) Agua potable M.O. mezclado

CANTIDAD

UNIDAD DE MEDIDA

COSTO UNIT. RD$

11.51

fundas

$310.00

1.05 69.04 1.05

mt3 galones mt3

$900.00 $5.00 $200.00 costo/mt3

MEZ-2 Mezcla 1:3-A 1 Cemento gris "Titán" tipo portland (42.5 kgs.) 2 3 4

Arena gruesa "Itabo" lavada (de planta) Agua potable M.O. mezclado

11.51

fundas

$310.00

1.05 69.04 1.05

mt galones mt3

$1,100.00 $5.00 $200.00

3

costo/mt3 MEZ-3 Mezcla 1:6 1 Cemento gris "Titán" tipo portland (42.5 kgs.) 2 3 4

Arena gruesa "Itabo" (de mina) Agua potable M.O. mezclado

6.46

fundas

$310.00

1.12 67.72 1.05

mt galones mt3

$900.00 $5.00 $200.00

3

costo/mt3 MEZ-4 1 2 3 4 5

Mezcla 1:1.5:5 (pañete) Cemento gris "Titán" tipo portland (42.5 kgs.) Arena fina (para pañete) Cal viva (50 libras) Agua potable M.O. mezclado

9.46 0.91 6.29 45.24 1.05

fundas mt3 fundas galones mt3

$310.00 $1,000.00 $180.00 $5.00 $200.00 costo/mt3

TOTAL/P.U.

$3,568.10 $945.00 $345.20 $210.00 $5,068.30

$3,568.10 $1,155.00 $345.20 $210.00 $5,278.30

$2,002.60 $1,008.00 $338.60 $210.00 $3,559.20

$2,932.60 $910.00 $1,132.20 $226.20 $210.00 $5,411.00

ANALISIS PRECIOS UNITARIOS.ANALISIS DE COSTOS.HORMIGONES SIMPLE.NO.

PARTIDA

CANTIDAD

UNIDAD COSTO DE MEDIDA UNIT. RD$

HOR-1 Hormigón Fc' = 140 kg/cm2 (con ligadora) 1 2 3 4

1 2 3

Materiales: Cemento gris "Titán" tipo portland (42.5 kgs.) Arena gruesa "Itabo" lavada (de planta) Gravilla 3/4" @ 3/8" Agua potable Total de materiales:

7.53

fundas

0.52 0.73 54.65

mt3 $1,100.00 3 mt $1,100.00 galones $5.00

Mano de obra: Albañil de primera categoría (AP) (1) Ayudante de albañil (AY) (1) Trabajador no calificado (TNC) - peones (4) Sub-total de mano de obra:

1.00 1.00 1.00

hora hora hora

Rendimiento:

1.75

mt3/hora

Equipos: Ligadora de 2 fundas

1.00

hora

Rendimiento:

1.75

mt3/hora

$310.00

$170.50 $92.08 $71.58

Total mano de obra:

1

$500.00

Sub-total de equipos: Herramientas: 5% M.O.: Total de equipos: costo/mt3 HOR-2 Hormigón Fc' = 210 kg/cm2 (ligadora) 1

Materiales: Cemento gris "Titán" tipo portland (42.5 kgs.)

8.94

fundas

$310.00

2

Arena gruesa "Itabo" lavada (de planta)

0.51

mt

$1,100.00

3

3 4

1 2 3

Gravilla 3/4" @ 3/8" Agua potable Total de materiales:

0.70 51.22

mt3 $1,100.00 galones $5.00

Mano de obra: Albañil de primera categoría (AP) (1) Ayudante de albañil (AY) (1) Trabajador no calificado (TNC) - peones (4) Sub-total de mano de obra:

1.00 1.00 1.00

hora hora hora

Rendimiento:

1.75

mt3/hora

Equipos: Ligadora de 2 fundas

1.00

hora

Rendimiento:

1.75

mt3/hora

$170.50 $92.08 $71.58

Total mano de obra:

1

$500.00

Sub-total de equipos: Herramientas: 5% M.O.: Total de equipos: costo/mt3

S.-

TOTAL/P.U.

$2,334.30 $572.00 $803.00 $273.25 $3,982.55

$170.50 $92.08 $286.32 $548.90

$313.66

$500.00

$285.71 $27.44 $313.16 $4,609.36

$2,771.40 $561.00

$770.00 $256.10 $4,358.50

$170.50 $92.08 $286.32 $548.90

$313.66

$500.00

$285.71 $27.44 $313.16 $4,985.31

ANALISIS DE COSTOS.Hoja No. 1 CODIGO

Fecha: D ESCRIPCION

CANTIDAD. UNIDAD PRECIO

Losa de fondo en cisternas Ø 3/8" @ 0.15 y 0.20 (t = 0.20 mts.) Hormigón Fc' = 210 kg/cm2 (con ligadora) 1.10 mt3 Acero estructural Ø 3/8" x 20' - G40° 0.98 qq Alambre galvanizado liso cal 18 1.96 libra M.O. varillero / acero qq 0.98 qq M.O. / colocación de plantilla 0.35 p.a. Costo de equipos menores 4.00 %

$4,985.31 $2,300.00 $45.00 $289.89 $40.00 $324.97

Total del análisis en .:. mt3 Losa de techo en cisternas Ø 3/8" @ 0.15 y 0.20 (t = 0.15 mts.) Hormigón Fc' = 210 kg/cm2 (con ligadora) 1.10 mt3 Acero estructural Ø 3/8" x 20' - G40° 1.21 qq Alambre galvanizado liso cal 18 2.42 libras M.O. varillero / acero qq 1.21 qq M.O. carpintero / encofrado mt2 6.67 mt2 Costo de equipos menores 4.00 %

$4,985.31 $2,300.00 $45.00 $289.89 $260.00 $418.43

Total del análisis en .:. mt3 Dentellón de vigas en H.A. (0.30 x 0.25) 6 Ø 1/2", est Ø 3/8" 25 cms.) Hormigón Fc' = 210 kg/cm2 (con ligadora) 1.05 mt3 Acero estructural Ø 1/2" x 20' - G40° 1.38 qq Acero estructural Ø 3/8" x 20' - G40° 0.29 qq Alambre galvanizado liso cal 18 3.34 libras M.O. varillero / acero qq 1.67 qq Costo de equipos menores 4.00 % Total del análisis en .:. mt3 Viga de amarre A.N. losa (0.20 x 0.20) 2 Ø 3/8" + 2 Ø 3/8" ancho Sección: 0.20 Espesor de losa: 0.15

altura 0.20

$4,985.31 $2,300.00 $2,300.00 $45.00 $289.89 $388.40

No. de varillas longitudinales: Estribos: Longitud de estribos:

4.00 0.20 1.07

Ø Ø Ø

0.375 0.375 0.375

Hormigón Fc' = 210 kg/cm2 (con ligadora) Acero estructural Ø 3/8" x 20' - G40° - long. Acero estructural Ø 3/8" x 20' - G40° - transv Alambre galvanizado liso cal 18 M.O. varillero / acero ml. M.O. carpintero / vigas ml. Costo de equipos menores

1.10 1.35 1.80 6.28 25.00 25.00 4.00

mt3 qq qq libras ml. ml. %

$4,985.31 $2,300.00 $2,300.00 $45.00 $94.62 $250.00 $864.31

Total del análisis en .:. mt3

Feb. 2018 VALOR

$5,483.85 $2,254.00 $88.20 $284.09 $14.00 $324.97 $8,449.10

$5,483.85 $2,783.00 $108.90 $350.77 $1,734.20 $418.43 $10,879.14

$5,234.58 $3,174.00 $667.00 $150.30 $484.12 $388.40 $10,098.40

78.00 78.00 78.00 $5,483.85 $3,096.15 $4,129.50 $282.74 $2,365.50 $6,250.00 $864.31 $22,472.05

ml. ml. ml.

ANALISIS PRECIOS UNITARIOS.ANALISIS DE COSTOS.ANALISIS ALBAÑILERIA.NO.

PARTIDA

UNIDAD COSTO CANTIDAD DE MEDIDA UNIT. RD$

ANDAMIOS. AND-1 Andamios interiores. 1

Madera pino americano bruta - 1" x 4"

0.182

pie2

$55.00

2 3

M.O. confección de andamios interiores Herramientas (5%)

1.00 5.00

mt2 %

$0.23 $0.51 costo/mt2

OS.-

TOTAL/P.U.

$10.01 $0.23 $0.51 $10.75

ANALISIS PRECIOS UNITARIOS.ANALISIS DE COSTOS.ANALISIS ALBAÑILERIA.NO.

PARTIDA

CANTIDAD

UNIDAD DE MEDIDA

MUROS DE HORMIGON.MUR-1 Muros de block 0.20 mts. c/cruce Ø 3/8" @ 0.20 mts. B.N.P. (sin serpentinas). 1 Bloques de 0.20 mts. (8") "Ochoa", + 4% desp. 13.00 unidad Acero estructural Ø 3/8" x 20' - G40° + 0.40 mts., solape 2 0.089 quintales y traslape 3 Alambre galvanizado #18 - (2 libras/qq) 0.178 libras 4 Mezcla 1:3 0.039 mt3 5 Hormigón simple Fc' = 140 kg/cm2 (con ligadora) 0.089 mt3 6 M.O. colocación en bloques de 8 x 8 x 16 pulgs. (8") 13.00 unidad M.O. llenado de huecos de bloques, bastones a 0.20 7 13.00 unidad mts. M.O. corte y amarre de varillas en bloques, bastones a 8 13.00 unidad 0.20 mts. 9 Acarreo de block 8" "Ochoa" 13.00 unidad 10 Herramientas (5%) 5.00 %

TERMINACION DE SUPERFICIE. TER-1 Pañete en muros y H.A. - pulido (interior). 1 2 3 4 5

TER-2 1 2 3 4 5

Madera pino americano cepillada - 1" x 4" Mezcla 1:1.5:5 (pañete) M.O. pañete en muros interiores, maestriado y a plomo. (pulido)

0.033 0.022

pie2 mt3

1.00

mt2

M.O. andamios interiores Herramientas (5%)

1.00 5.00

mt2 %

Fraguache en muros y techos. Escoba Mezcla 1:6 M.O. fraguache con escoba M.O. andamios interiores Herramientas (5%)

0.01 0.008 1.00 1.00 5.00

unidad mt3 mt2 mt2 %

TERMINACION DE TECHOS. TER-1 Zabaleta de cemento. 1 2 3

Mortero 1:3-A M.O. zabaleta en pisos Herramientas (5%)

0.010 1.00 5.00

mt3 ml. %

0.013 0.07 1.00 5.00

pie2 mt3 mt2 %

TER-2 Fino de mezcla en techo plano. 1 2 3 4

Madera pino americano bruta - 1" x 4" Mezcla 1:3-A M.O. fino en techo horiz. sin incl., subida de materiales Herramientas (5%)

ARIOS.-

COSTO UNIT. RD$

TOTAL/P.U.

$35.00

$455.00

$2,300.00

$204.70

$45.00 $5,068.30 $4,609.36 $18.19

$8.01 $197.66 $410.23 $236.41

$5.46

$70.92

$2.19

$28.46

$1.38 $80.57

$17.94 $402.85

costo/mt2

$2,032.18

$55.00 $5,411.00

$1.82 $119.04

$143.55

$143.55

$10.75 $13.76

$10.75 $13.76

costo/mt2

$288.91

$20.00 $3,559.20 $19.76 $10.75 $2.95

$0.20 $28.47 $19.76 $10.75 $2.95

costo/mt2

$61.93

rpentinas).

$5,278.30 $40.63 $4.67 costo/ml.

$52.78 $40.63 $4.67 $98.08

$55.00 $5,278.30 $114.27 $24.22

$0.72 $369.48 $114.27 $24.22

costo/mt2

$508.69

Related Documents

Cisterna
June 2020 8
Cisterna - 2 Recamaras.xlsx
November 2019 11
10 Cisterna + Sterren
November 2019 11
Cisterna Y Tinaco.docx
October 2019 20

More Documents from "Antonio"