33
EXTERIOR
CISTERNA EXTERIOR GRANDE.Fecha: Thursday, April 04, 2019 No.
DESCRIPCION CISTERNA: Tipo de block: Ancho interno: Largo interno: Altura interno: Ancho externo: Largo externo: Altura total: Espesor losa de fondo: Espesor losa de techo: h flotador de cisterna: Espesor de telford: Sobre ancho para excavación: h dentellón de vigas H.A. h viga de amarre perimetral: Capacidad de la cisterna:
1.1 REPLANTEO a Replanteo
CANTIDAD UNIDAD
0.20 2.65 3.00 2.40 3.05 3.40 2.95 0.20 0.15 0.30 0.20 0.30 0.25 0.20 4,407
mt. ml. ml. ml. ml. ml. ml. mt. ml. mt. mt. mt. mt. mt. mt.
1.00
p.a.
TOTAL 1.2 MOVIMIENTO DE TIERRA a Excavación en material suelto con equipos b Nivelación de terreno a mano Bote de materiales a 5.00 kilómetros; Fabult. = 1.25 d Telford en asiento de arena c
HORMIGON ARMADO Losa de fondo t = 0.20 mts. Dentellón de vigas en H. A. (0.30 x 0.25) Losa de techo t = 0.15 mts.
$2,000.00 RD$
45.26 16.50
mt3 mt3
$217.12 $250.00
56.58
mt3
$258.61
2.92
mt3
$1,050.00
TOTAL 1.3 a b c
PRECIO
RD$
2.92 1.20 1.56
mt3 mt3 mt3
$8,449.10 $10,098.40 $10,879.14
34
EXTERIOR d Viga de amarre perimetral (0.20 x 0.20)
0.77
mt3
TOTAL 1.4 a b c d e
1.5 a b c d e
MUROS y TERMINACIONES Muros de 8" B.N.P. Fraguache con escobas Pañete pulido Zabaleta Fino en losa inferior
$22,472.05 RD$
24.375 31.19 27.12 20.90 7.95
mt2 mt2 mt2 ml. mt2
$2,032.18 $61.93 $288.91 $98.08 $508.69
TOTAL
RD$
SUB-TOTAL OBRA GRIS
RD$
ACCESORIOS DE CISTERNA Tanque de presion - 300 galones Bomba de 2" H.P. Piezas y P.V.C. Tapa p/cisterna acer. inox. 24 x 24 x 21 Mano de Obra
1.00 1.00 1.00 1.00 1.00
p.a. p.a. p.a. unidad p.a.
$17,451.26 $19,421.62 $5,000.00 $5,081.67 $6,000.00
TOTAL
RD$
TOTAL CISTERNA
RD$
35
EXTERIOR
.-
pril 04, 2019 VALOR
$2,000.00 2,000.00
$9,826.90 $4,125.00 $14,630.68 $3,066.00 31,648.57
$24,671.38 $12,080.21 $16,922.51
36 $17,393.36 71,067.46
$49,534.38 $1,931.60 $7,835.32 $2,049.90 $4,044.05 65,395.25 170,111.29
$17,451.26 $19,421.62 $5,000.00 $5,081.67 $6,000.00 52,954.55
223,065.84
EXTERIOR
LISTADO DE INSUMOS PROMEDIO.-
NO. PARTIDA CANTIDAD UNIDAD P.U. RD$ ACERO ESTRUCTURAL y ALAMBRE GALVANIZADO.Acero estructural Ø 3/8" x 20' - G40° 22.26 quintales $51,198.00 Acero estructural Ø 1/2" x 20' - G40° 22.26 quintales $51,198.00 Alambre galvanizado liso cal 18 100.00 libra $45.00 EQUIPOS DE CONTRUCCION.Pala cuadrada "Tramontina"
1.00
unidad
$352.64
Pico c/mango "Tramontina"
1.00
unidad
$527.22
Agua potable
1.00
galón
$5.00
Cal viva pomier (50 libras)
1.00
funda
$180.00
Cemento gris "Titán" tipo portland (42.5 kgs.)
1.00
funda
$310.00
Madera pino americano bruta - 1" x 4"
1.00
pie2
$55.00
Madera pino americano cepillada - 1" x 4"
1.00
pie2
$55.00
1.00
galón
$223.20
ALBAÑILERIAS.Escoba
1.00
unidad
$20.00
AGREGADOS.Arena fina (para pañete)
1.00
mt3
$1,000.00
Arena gruesa "Itabo" (de mina)
1.00
mt
$900.00
Arena gruesa "Itabo" lavada (de planta) Gravilla 3/4" @ 1/2" triturada
1.00 1.00
mt3 mt3
$1,100.00 $1,100.00
1.00
unidad
$35.00
CEMENTOS, CAL, ADITIVOS.-
MADERAS.-
COMBUSTIBLES.Gasolina regular, fecha: 13-04-2018
BLOQUES DE HORMIGON.Bloque de 0.20 mts. (8") "Ochoa"
3
OMEDIO.I.T.B.I.S VALOR $2,300.00 $2,300.00 $4,500.00
$352.64 $527.22
$5.00 $180.00 $310.00
$55.00 $55.00
$223.20
$20.00
$1,000.00 $900.00 $1,100.00 $1,100.00
$35.00
18.00%
UNIDAD PRECIO quintal quintal quintal
$2,300.00 $2,300.00
LISTADO MANO DE OBRA MANO DE OBRA GENERAL.-
NO.
PARTIDA
TARIFA DE ALBANILERIA.ALB-001 Trabajador no calificado (TNC) ALB-002 Trabajador calificado (TC) ALB-003 Ayudante de albañilería (AY) ALB-004 Albañil de tercera categoría (AT) - operario ALB-005 Albañil de segunda categoría (AS) - operario ALB-006 Albañil de primera categoría (AP) - operario ALB-007 Maestro de albañilería (MA) - maestro de cada una de las áreas
NO.
PARTIDA
MUROS DE BLOQUES.1 Bloque de 8 x 8 x 16 pulgs. 2 Llenado de huecos de bloques, bastones a 0.20 mts. 3 Corte y amarre de varillas en bloques, bastones a 0.20 mts.
COSTO UNIT. RD$ $18.19 $5.46 $2.19 COSTO
NO.
PARTIDA UNIT. RD$
EMPAÑETE Y TERMINACION DE PAREDES Y PLAFONES.1
Fraguache con escoba
$19.76
2
Pañete pulido sin color
$143.55 COSTO
NO.
PARTIDA UNIT. RD$
TERMINACION DE TECHOS E IMPERMEABILIZACION.1 Zabaleta en pisos 2
Fino en techo horizontal sin incluir subida de materiales
$40.63 $114.27 COSTO
NO.
PARTIDA UNIT. RD$
TARIFA DE VARILLA.-
1 2
Varillas trabajada Dinteles y vigas de amarre con altura máxima no mayor de 40 x 20 cms., (varillas Ø 1/2" Ø 3/4")
$289.89 $94.62 COSTO
NO.
PARTIDA UNIT. RD$
TARIFA DE CARPINTERIA.VIGAS DE AMARRE.1 Encofrado en viga de amarre (0.20 x 0.20) mts., A.T.C. LOSAS.1
Encofrado de losa (e = 0.13) mts., A.T.C.
$250.00 $260.00 COSTO
NO.
PARTIDA UNIT. RD$
ACARREOS.1 Arranque
$18.29
2
Regado y nivelado de relleno de reposición
$76.00
3
Acarreo de materiales (distancia desde 0.00 kms., hasta 5.00 kms.).
$21.34 COSTO
NO.
PARTIDA UNIT. RD$
ACARREOS y SUBIDAS DE MATERIALES1 Acarreo interno en bloques de 0.20 mts.
$1.38 COSTO
NO.
PARTIDA UNIT. RD$
ANDAMIOS.1
Confección de andamios interiores
$0.23 COSTO
NO.
PARTIDA UNIT. RD$
LABORES VARIAS.1
M.O. mezclado
$200.00
E OBRA
NERAL.FECHA:
11/28/2017
UNIDAD
RESOLUCION 01/2016
TARIFA POR HORA
Día Día Día Día Día Día Día
$572.64 $626.76 $736.63 $956.17 $1,091.63 $1,363.99 $1,719.25
$71.58 $78.35 $92.08 $119.52 $136.45 $170.50 $214.91
RESOLUCION 18/2017 UNIDAD DE COMPOSICION MEDIDA BRIGADA unidad unidad unidad
1AS + 1AY + 1TC 1AS + TC 1AS + TC
UNIDAD DE COMPOSICION
VALOR RD$/Día
RENDIMIENTO
$2,455.02 $1,718.39 $1,718.39
135.00 315.0 785.0
VALOR RENDIMIENTO
MEDIDA
BRIGADA
RD$/Día
mt2
1AY + 1TC
$1,363.39
69.00
mt
1AP + 1AY + 1TC
$2,727.38
19.00
2
UNIDAD DE COMPOSICION
VALOR RENDIMIENTO
MEDIDA
BRIGADA
RD$/Día
ml.
1AS + 1 AY
$1,828.26
45.00
mt
1AS + 1 AY
$1,828.26
16.00
2
UNIDAD DE MEDIDA
quintal ml. UNIDAD DE MEDIDA
ml. mt2 UNIDAD DE MEDIDA km. mt3 mt3n/km. UNIDAD DE MEDIDA unidad UNIDAD DE MEDIDA mt2 UNIDAD DE MEDIDA mt3
TARIFA DE EQUIPOS PARA LA CONSTRUCCION.EQUIPOS Ligadora de 2 fundas
ALQUILER TARIFA UNIDAD COSTO/DIA COSTO/HORA $500.00 $4,000.00 día $4,000.00
TARIFA DE EQUIPOS PESADOS PARA LA CON
460 410 310 335 320 300 270 235 220 200 180 160 140 140 140 140 140 105 75
ALQUILER TARIFA 01-2-2014 $6,050.00 $4,294.82 $5,500.00 $3,630.52 $3,460.58 $3,352.43 $2,935.31 $2,672.68 $2,209.21 $2,301.90 $2,131.96 $1,637.56 $1,838.43 $1,745.74 $1,637.69 $1,745.74 $1,529.45 $1,328.61 $973.29
ALQUILER + 18% ITBIS $7,139.00 $5,067.89 $6,490.00 $4,284.01 $4,083.48 $3,955.87 $3,463.67 $3,153.76 $2,606.87 $2,716.24 $2,515.71 $1,932.32 $2,169.35 $2,059.97 $1,932.47 $2,059.97 $1,804.75 $1,567.76 $1,148.48
140 H
165
$2,100.00
$2,478.00
12 H 12G-CAT GD-37-KOM 12F-CAT 120-OG-CAT 12E-CAT 14 G 16 12-8T-CAT
140 135 125 125 125 115 220 275 100
$1,825.00 $1,606.70 $1,825.00 $1,498.55 $1,483.10 $1,220.47 $1,767.37 $1,944.10 $1,019.63
$2,153.50 $1,895.91 $2,153.50 $1,768.29 $1,750.06 $1,440.15 $2,085.50 $2,294.04 $1,203.16
235-CAT 225-CAT 320-CAT 320B-CAT 330 345 365 B-L 416
215 145 215 128 247 321 404 80
$3,336.98 $2,209.21 $2,670.20 $3,051.18 $3,356.30 $5,500.00 $7,800.00 $1,060.00
$3,937.64 $2,606.87 $3,150.84 $3,600.39 $3,960.43 $6,490.00 $9,204.00 $1,250.80
988B-CAT
375
$3,600.45
$4,248.53
980C-CAT
270
$2,966.21
$3,500.13
EQUIPOS
MODELOS
HP
TRACTORES
D9L-CAT D9H-CAT D8R-CAT D8LCAT D155A-KOM D8K-CAT D8H-46A-CAT D8H-36A-CAT D85-A-KOM D7G-CAT D7F-CAT D7E-CAT D65-A-KOM D6D-CAT D6C-CAT TD-15C-INT D60-A-KOM D5B-CAT D4E-CAT
MOTONIVELADORAS (GREDER)
RETROEXCAVADORAS
CARGADORES FRONTALES
CARGADORES FRONTALES
CARGADORES DE ORUGA
MOTOTRAILLA
COMPACTADORES Y RODILLOS ESTATICOS
RODILLOS VIBRADORES
980-CAT 966 G 966 F 960 F 966D-CAT 966C-CAT 60C-TEREX 530-INTER 950B-CAT 936 E 950-CAT
235 235 220 200 200 170 168 160 155 135 130
$2,827.17 $2,827.17 $2,600.00 $2,500.00 $2,564.53 $2,240.11 $1,992.92 $1,977.47 $1,884.78 $1,725.25 $1,637.59
$3,336.06 $3,336.06 $3,068.00 $2,950.00 $3,026.15 $2,643.33 $2,351.65 $2,333.41 $2,224.04 $2,035.80 $1,932.36
W70-KOM
105
$1,498.55
930-CAT 510-INTER 920-CAT MINICBOBCAT
100 85 80 54
1390.41 $1,235.92 $1,220.47 $700.00
$1,768.29 $1,640.68 $1,458.39 $1,440.15 $826.00
D755-KOM
200
$2,085.62
$2,461.03
977L-CAT 955L-CAT 955K-CAT
190 130 115
$2,023.62 $1,699.39 $1,405.86
$2,387.87 $2,005.28 $1,658.91
631-CAT 631B-CAT 621-CAT DW-21-CAT
450 420 300 300
$4,124.88 $3,105.25 $2,579.88 $2,487.29
$4,867.36 $3,664.20 $3,044.26 $2,935.00
825C-CAT
310
$2,641.78
$3,117.30
815-CAT DW-20A-CAT CAT-45BUF LISO GALION
200 300 150
$2,209.21 $1,326.61 $1,251.37 $250.00
$2,606.87 $1,565.40 $1,476.62 $295.00
600-RAIC CA-25-DINAPAC VDS-84-GALION SD-100-ING.RAN
235 125 120 180
$1,560.35 $1,483.10 $1,483.10 $1,483.10
$1,841.21 $1,750.06 $1,750.06 $1,750.06
ARA LA CONSTRUCCION.COMBUSTIBLE 0.04 x PREC. COMB. $4,106.88 $3,660.48 $2,767.68 $2,990.88 $2,856.96 $2,678.40 $2,410.56 $2,098.08 $1,964.16 $1,785.60 $1,607.04 $1,428.48 $1,249.92 $1,249.92 $1,249.92 $1,249.92 $1,249.92 $937.44 $669.60
LUBRICANTE COSTO 0.20 COMB. RD$ $821.38 $12,067.26 $732.10 $9,460.46 $553.54 $9,811.22 $598.18 $7,873.07 $571.39 $7,511.84 $535.68 $7,169.95 $482.11 $6,356.34 $419.62 $5,671.46 $392.83 $4,963.86 $357.12 $4,858.96 $321.41 $4,444.16 $285.70 $3,646.50 $249.98 $3,669.25 $249.98 $3,559.88 $249.98 $3,432.38 $249.98 $3,559.88 $249.98 $3,304.66 $187.49 $2,692.69 $133.92 $1,952.00
$1,473.12
$294.62
$4,245.74
$1,249.92 $1,205.28 $1,116.00 $1,116.00 $1,116.00 $1,026.72 $1,964.16 $2,455.20 $892.80
$249.98 $241.06 $223.20 $223.20 $223.20 $205.34 $392.83 $491.04 $178.56
$3,653.40 $3,342.24 $3,492.70 $3,107.49 $3,089.26 $2,672.22 $4,442.49 $5,240.28 $2,274.52
$1,919.52 $1,294.56 $1,919.52 $1,142.78 $2,205.22 $2,865.89 $3,606.91 $714.24
$383.90 $258.91 $383.90 $228.56 $441.04 $573.18 $721.38 $142.85
$6,241.06 $4,160.34 $5,454.26 $4,971.73 $6,606.69 $9,929.07 $13,532.29 $2,107.89
$3,348.00
$669.60
$8,266.13
$2,410.56
$482.11
$6,392.80
$2,098.08 $2,098.08 $1,964.16 $1,785.60 $1,785.60 $1,517.76 $1,499.90 $1,428.48 $1,383.84 $1,205.28 $1,160.64
$419.62 $419.62 $392.83 $357.12 $357.12 $303.55 $299.98 $285.70 $276.77 $241.06 $232.13
$5,853.76 $5,853.76 $5,424.99 $5,092.72 $5,168.87 $4,464.64 $4,151.53 $4,047.59 $3,884.65 $3,482.13 $3,325.12
$937.44
$187.49
$2,893.22
$892.80 $758.88 $714.24 $482.11
$178.56 $151.78 $142.85 $96.42
$2,712.04 $2,369.04 $2,297.24 $1,404.53
$1,785.60
$357.12
$4,603.75
$1,696.32 $1,160.64 $1,026.72
$339.26 $232.13 $205.34
$4,423.46 $3,398.05 $2,890.98
$4,017.60 $3,749.76 $2,678.40 $2,678.40
$803.52 $749.95 $535.68 $535.68
$9,688.48 $8,163.91 $6,258.34 $6,149.08
$2,767.68
$553.54
$6,438.52
$1,785.60 $2,678.40 $1,339.20 $0.00
$357.12 $535.68 $267.84 $0.00
$4,749.59 $4,779.48 $3,083.66 $295.00
$2,098.08 $1,116.00 $1,071.36 $1,607.04
$419.62 $223.20 $214.27 $321.41
$4,358.91 $3,089.26 $3,035.69 $3,678.51
ANALISIS PRECIOS UNITARIOS.ANALISIS DE COSTOS.ANALISIS DE MOVIMIENTOS DE TIERRA.NO.
PARTIDA
CANTIDAD
UNIDAD DE MEDIDA
MOV-1 Excavación material inservible con retro excavadora (hasta 1.50 mts. de profundidad) Retro Excavadora, 320-CAT
costo/mt3n = rend. = 35 mt3/hr
Carguío: 950-CAT
costo/mt3e = rend. = 95 mt3/hr
Arranque
costo/mt3n = coef. esponj. = 1.15
MOV-2 Bote de material a 5.00 kms., con carguío mecánico. Carguío con: cargador frontal 950-CAT
Arranque
5.00
mt3e
Transporte
5.00
mt3n/km
0.01 0.01
unidad unidad
1.00 1.20 5.00
mt3 mt3 %
MOV-3 Asiento de arena. 1 Pala cuadrada "Tramontina" 2 Pico c/mango "Tramontina" 3 4 5
costo/mt3n = rend. = 55 mt3/hr
Arena gruesa "Itabo" (de mina) M.O. regado y nivelado de relleno de reposición. Herramientas (5%).
RIOS.-
COSTO UNIT. TOTAL/P.U. RD$
mts. de profundidad) $155.84
$40.25
$21.03
costo/mt3n
$217.12
$60.46
$18.29
$91.45
$21.34
$106.70
costo/mt3e
$258.61
$352.64 $527.22
$3.53 $5.27
$900.00 $76.00 $50.00
$900.00 $91.20 $50.00
costo/mt3
$1,050.00
LISTADO MANO DE OBRA ANALISIS DE COSTOS.MEZCLAS o MORTEROS.NO.
PARTIDA
MEZ-1 Mezcla 1:3 1 Cemento gris "Titán" tipo portland (42.5 kgs.) 2 3 4
Arena gruesa "Itabo" (de mina) Agua potable M.O. mezclado
CANTIDAD
UNIDAD DE MEDIDA
COSTO UNIT. RD$
11.51
fundas
$310.00
1.05 69.04 1.05
mt3 galones mt3
$900.00 $5.00 $200.00 costo/mt3
MEZ-2 Mezcla 1:3-A 1 Cemento gris "Titán" tipo portland (42.5 kgs.) 2 3 4
Arena gruesa "Itabo" lavada (de planta) Agua potable M.O. mezclado
11.51
fundas
$310.00
1.05 69.04 1.05
mt galones mt3
$1,100.00 $5.00 $200.00
3
costo/mt3 MEZ-3 Mezcla 1:6 1 Cemento gris "Titán" tipo portland (42.5 kgs.) 2 3 4
Arena gruesa "Itabo" (de mina) Agua potable M.O. mezclado
6.46
fundas
$310.00
1.12 67.72 1.05
mt galones mt3
$900.00 $5.00 $200.00
3
costo/mt3 MEZ-4 1 2 3 4 5
Mezcla 1:1.5:5 (pañete) Cemento gris "Titán" tipo portland (42.5 kgs.) Arena fina (para pañete) Cal viva (50 libras) Agua potable M.O. mezclado
9.46 0.91 6.29 45.24 1.05
fundas mt3 fundas galones mt3
$310.00 $1,000.00 $180.00 $5.00 $200.00 costo/mt3
TOTAL/P.U.
$3,568.10 $945.00 $345.20 $210.00 $5,068.30
$3,568.10 $1,155.00 $345.20 $210.00 $5,278.30
$2,002.60 $1,008.00 $338.60 $210.00 $3,559.20
$2,932.60 $910.00 $1,132.20 $226.20 $210.00 $5,411.00
ANALISIS PRECIOS UNITARIOS.ANALISIS DE COSTOS.HORMIGONES SIMPLE.NO.
PARTIDA
CANTIDAD
UNIDAD COSTO DE MEDIDA UNIT. RD$
HOR-1 Hormigón Fc' = 140 kg/cm2 (con ligadora) 1 2 3 4
1 2 3
Materiales: Cemento gris "Titán" tipo portland (42.5 kgs.) Arena gruesa "Itabo" lavada (de planta) Gravilla 3/4" @ 3/8" Agua potable Total de materiales:
7.53
fundas
0.52 0.73 54.65
mt3 $1,100.00 3 mt $1,100.00 galones $5.00
Mano de obra: Albañil de primera categoría (AP) (1) Ayudante de albañil (AY) (1) Trabajador no calificado (TNC) - peones (4) Sub-total de mano de obra:
1.00 1.00 1.00
hora hora hora
Rendimiento:
1.75
mt3/hora
Equipos: Ligadora de 2 fundas
1.00
hora
Rendimiento:
1.75
mt3/hora
$310.00
$170.50 $92.08 $71.58
Total mano de obra:
1
$500.00
Sub-total de equipos: Herramientas: 5% M.O.: Total de equipos: costo/mt3 HOR-2 Hormigón Fc' = 210 kg/cm2 (ligadora) 1
Materiales: Cemento gris "Titán" tipo portland (42.5 kgs.)
8.94
fundas
$310.00
2
Arena gruesa "Itabo" lavada (de planta)
0.51
mt
$1,100.00
3
3 4
1 2 3
Gravilla 3/4" @ 3/8" Agua potable Total de materiales:
0.70 51.22
mt3 $1,100.00 galones $5.00
Mano de obra: Albañil de primera categoría (AP) (1) Ayudante de albañil (AY) (1) Trabajador no calificado (TNC) - peones (4) Sub-total de mano de obra:
1.00 1.00 1.00
hora hora hora
Rendimiento:
1.75
mt3/hora
Equipos: Ligadora de 2 fundas
1.00
hora
Rendimiento:
1.75
mt3/hora
$170.50 $92.08 $71.58
Total mano de obra:
1
$500.00
Sub-total de equipos: Herramientas: 5% M.O.: Total de equipos: costo/mt3
S.-
TOTAL/P.U.
$2,334.30 $572.00 $803.00 $273.25 $3,982.55
$170.50 $92.08 $286.32 $548.90
$313.66
$500.00
$285.71 $27.44 $313.16 $4,609.36
$2,771.40 $561.00
$770.00 $256.10 $4,358.50
$170.50 $92.08 $286.32 $548.90
$313.66
$500.00
$285.71 $27.44 $313.16 $4,985.31
ANALISIS DE COSTOS.Hoja No. 1 CODIGO
Fecha: D ESCRIPCION
CANTIDAD. UNIDAD PRECIO
Losa de fondo en cisternas Ø 3/8" @ 0.15 y 0.20 (t = 0.20 mts.) Hormigón Fc' = 210 kg/cm2 (con ligadora) 1.10 mt3 Acero estructural Ø 3/8" x 20' - G40° 0.98 qq Alambre galvanizado liso cal 18 1.96 libra M.O. varillero / acero qq 0.98 qq M.O. / colocación de plantilla 0.35 p.a. Costo de equipos menores 4.00 %
$4,985.31 $2,300.00 $45.00 $289.89 $40.00 $324.97
Total del análisis en .:. mt3 Losa de techo en cisternas Ø 3/8" @ 0.15 y 0.20 (t = 0.15 mts.) Hormigón Fc' = 210 kg/cm2 (con ligadora) 1.10 mt3 Acero estructural Ø 3/8" x 20' - G40° 1.21 qq Alambre galvanizado liso cal 18 2.42 libras M.O. varillero / acero qq 1.21 qq M.O. carpintero / encofrado mt2 6.67 mt2 Costo de equipos menores 4.00 %
$4,985.31 $2,300.00 $45.00 $289.89 $260.00 $418.43
Total del análisis en .:. mt3 Dentellón de vigas en H.A. (0.30 x 0.25) 6 Ø 1/2", est Ø 3/8" 25 cms.) Hormigón Fc' = 210 kg/cm2 (con ligadora) 1.05 mt3 Acero estructural Ø 1/2" x 20' - G40° 1.38 qq Acero estructural Ø 3/8" x 20' - G40° 0.29 qq Alambre galvanizado liso cal 18 3.34 libras M.O. varillero / acero qq 1.67 qq Costo de equipos menores 4.00 % Total del análisis en .:. mt3 Viga de amarre A.N. losa (0.20 x 0.20) 2 Ø 3/8" + 2 Ø 3/8" ancho Sección: 0.20 Espesor de losa: 0.15
altura 0.20
$4,985.31 $2,300.00 $2,300.00 $45.00 $289.89 $388.40
No. de varillas longitudinales: Estribos: Longitud de estribos:
4.00 0.20 1.07
Ø Ø Ø
0.375 0.375 0.375
Hormigón Fc' = 210 kg/cm2 (con ligadora) Acero estructural Ø 3/8" x 20' - G40° - long. Acero estructural Ø 3/8" x 20' - G40° - transv Alambre galvanizado liso cal 18 M.O. varillero / acero ml. M.O. carpintero / vigas ml. Costo de equipos menores
1.10 1.35 1.80 6.28 25.00 25.00 4.00
mt3 qq qq libras ml. ml. %
$4,985.31 $2,300.00 $2,300.00 $45.00 $94.62 $250.00 $864.31
Total del análisis en .:. mt3
Feb. 2018 VALOR
$5,483.85 $2,254.00 $88.20 $284.09 $14.00 $324.97 $8,449.10
$5,483.85 $2,783.00 $108.90 $350.77 $1,734.20 $418.43 $10,879.14
$5,234.58 $3,174.00 $667.00 $150.30 $484.12 $388.40 $10,098.40
78.00 78.00 78.00 $5,483.85 $3,096.15 $4,129.50 $282.74 $2,365.50 $6,250.00 $864.31 $22,472.05
ml. ml. ml.
ANALISIS PRECIOS UNITARIOS.ANALISIS DE COSTOS.ANALISIS ALBAÑILERIA.NO.
PARTIDA
UNIDAD COSTO CANTIDAD DE MEDIDA UNIT. RD$
ANDAMIOS. AND-1 Andamios interiores. 1
Madera pino americano bruta - 1" x 4"
0.182
pie2
$55.00
2 3
M.O. confección de andamios interiores Herramientas (5%)
1.00 5.00
mt2 %
$0.23 $0.51 costo/mt2
OS.-
TOTAL/P.U.
$10.01 $0.23 $0.51 $10.75
ANALISIS PRECIOS UNITARIOS.ANALISIS DE COSTOS.ANALISIS ALBAÑILERIA.NO.
PARTIDA
CANTIDAD
UNIDAD DE MEDIDA
MUROS DE HORMIGON.MUR-1 Muros de block 0.20 mts. c/cruce Ø 3/8" @ 0.20 mts. B.N.P. (sin serpentinas). 1 Bloques de 0.20 mts. (8") "Ochoa", + 4% desp. 13.00 unidad Acero estructural Ø 3/8" x 20' - G40° + 0.40 mts., solape 2 0.089 quintales y traslape 3 Alambre galvanizado #18 - (2 libras/qq) 0.178 libras 4 Mezcla 1:3 0.039 mt3 5 Hormigón simple Fc' = 140 kg/cm2 (con ligadora) 0.089 mt3 6 M.O. colocación en bloques de 8 x 8 x 16 pulgs. (8") 13.00 unidad M.O. llenado de huecos de bloques, bastones a 0.20 7 13.00 unidad mts. M.O. corte y amarre de varillas en bloques, bastones a 8 13.00 unidad 0.20 mts. 9 Acarreo de block 8" "Ochoa" 13.00 unidad 10 Herramientas (5%) 5.00 %
TERMINACION DE SUPERFICIE. TER-1 Pañete en muros y H.A. - pulido (interior). 1 2 3 4 5
TER-2 1 2 3 4 5
Madera pino americano cepillada - 1" x 4" Mezcla 1:1.5:5 (pañete) M.O. pañete en muros interiores, maestriado y a plomo. (pulido)
0.033 0.022
pie2 mt3
1.00
mt2
M.O. andamios interiores Herramientas (5%)
1.00 5.00
mt2 %
Fraguache en muros y techos. Escoba Mezcla 1:6 M.O. fraguache con escoba M.O. andamios interiores Herramientas (5%)
0.01 0.008 1.00 1.00 5.00
unidad mt3 mt2 mt2 %
TERMINACION DE TECHOS. TER-1 Zabaleta de cemento. 1 2 3
Mortero 1:3-A M.O. zabaleta en pisos Herramientas (5%)
0.010 1.00 5.00
mt3 ml. %
0.013 0.07 1.00 5.00
pie2 mt3 mt2 %
TER-2 Fino de mezcla en techo plano. 1 2 3 4
Madera pino americano bruta - 1" x 4" Mezcla 1:3-A M.O. fino en techo horiz. sin incl., subida de materiales Herramientas (5%)
ARIOS.-
COSTO UNIT. RD$
TOTAL/P.U.
$35.00
$455.00
$2,300.00
$204.70
$45.00 $5,068.30 $4,609.36 $18.19
$8.01 $197.66 $410.23 $236.41
$5.46
$70.92
$2.19
$28.46
$1.38 $80.57
$17.94 $402.85
costo/mt2
$2,032.18
$55.00 $5,411.00
$1.82 $119.04
$143.55
$143.55
$10.75 $13.76
$10.75 $13.76
costo/mt2
$288.91
$20.00 $3,559.20 $19.76 $10.75 $2.95
$0.20 $28.47 $19.76 $10.75 $2.95
costo/mt2
$61.93
rpentinas).
$5,278.30 $40.63 $4.67 costo/ml.
$52.78 $40.63 $4.67 $98.08
$55.00 $5,278.30 $114.27 $24.22
$0.72 $369.48 $114.27 $24.22
costo/mt2
$508.69