CENTURY RAYON Environmental and Occupational Health & Safety Policy Century Rayon is the leading manufacturer of Viscose Filament Yarn and Chemicals. The company is committed to the protection of the environment and the health and safety of its employees, customers and community. In this vein the company shall: Regularly review objectives for attaining continual improvement in environmental and occupational health and safety performance. Be committed to prevention of pollution. Implement continual improvement in resource conservation i.e.: Raw Materials and utilities like Energy and Water. Take measures and ensure safe work environment towards reduction of accidents. Monitor and control work place hazards. Train and involve company's employees and contractor's workmen in Environmental and Occupational health and Safety performance. Ensure compliance of legal and other requirements and strive for further improvement. Century Rayon is committed for a cleaner and healthier environment. The Environmental and Safety Policy shall be communicated to all persons working for or on behalf of the organization and is available to the public on request. Date: 28.2.2007
President
CENTURY RAYON Environmental & Occupational Health & Safety Management System
Overview
ISO-14000 is a series of international, voluntary environmental management standards for better environment management. OHSAS-18000 is a set of authorities through which an organization maintains awareness & control over its interactions with worker health & safety. Interfaces directly with business objectives
CENTURY RAYON Definations Environmental Aspect: Element of organizational activities or products or services that can interact with the environment. Environmental Impact: Any change to the environment whether adverse or beneficial wholly or partially resulting from an organization’s environmental aspects. Hazard: Source or situation with a potential for harm. Risk: Combination of the likelihood & consequences of a specified hazardous event. SSPD Score: Product of individual weightages of scale, severity, probability & duration. EMP: Environmental & Occupational Health & Safety management program includes objectives, targets & action plan. EPR: Emergency preparedness & response for potential emergency situation & accident. M&M: Monitoring & measurement of key characteristics that can have significant impact / harm.
CENTURY RAYON
Pre-audit Observations of M/s TUV Sr. No.
Particulars
Remarks
1
Process flow sheet – aspects to be linked to process flowA. / H. included activity.
no.
2
Cross Reference for aspects / significant aspects &Implemented objects/ targets / programs
3
Aspect of contributing factor to be rated
4
Procedure for issue, distribution & maintenance of PPE Implemented
5
External origin documents to be identified & records toImplemented be maintained.
6
Objectives to be displayed and communicated throughImplemented training.
7
Incident report, Frequency Report, Severity Report,Implemented Trend charts of near misses , incidents & accidents
Implemented
CENTURY RAYON
Pre-audit Observations of M/s TUV Sr. No.
Particulars
Remarks
8
Toe Guard for stair cases.
Implemented
9
OCP to be modified as per clause 4.4.6.
Implemented
10
Environmental program - procedure to be modified forImplemented review, changes, benefits & closure of EMP
11
ETP - control measures to be provided for fall hazards. Implemented Plan for DO probe in aeration tank. Aspect & impact evaluation of foam suppression
12
Basic risk, residual risk with existing control, riskNew format classification & corresponding control plan to be includedfor Evaluation in the procedure.
13
M & M plan with frequency & for Key EnvironmentalImplemented performance Indicators (Water, power & Air etc.)
CENTURY RAYON
Pre-audit Observations of M/s TUV Sr. No.
Particulars
Remarks
14
Companywide power consumption.
1% Reduction taken as an objective.
15
Trend of Environmental performance improvement.
Implemented
16
Procedure for legal requirement to include updating,Implemented responsibility for liaison with statutory bodies, M & M etc.
17
Evaluation of compliance- Legal / Statutory regulatoryImplemented requirement. (PCB Act, Bio medical waste, MV Act, Battery Rules etc.)
18
M & M (Legal) to be maintained at one definedImplemented department.
CENTURY RAYON
Pre-audit Observations of M/s TUV Sr. No.
Particulars
Remarks
19
M & M for maximum permissible discharge limit ofImplemented sewage - evidence to be provided.
20
Management programs for sewage treatment withNot Required defined action plan.
21
Recycling of treated water & discharge of excess quantityImplemented through Waldhuni nallah - evidence to be provided.
22
The quality & quantity of treated effluent discharged toImplemented ulhas river thru waldhuni nallah - evidence to be provided.
23
The quality & quantity of effluent from each plant to ETPUnder to be measured and monitored - plan to be definedProgress against set norms.
CENTURY RAYON
Sr. No.
Pre-audit Observations of M/s TUV Particulars
Remarks
24
Water consent order Form No. 5 - consumption forImplemented Industrial cooling - evidence to be provided.
25
License for sulphur storage - evidence to be provided.
26
Monthly Form 3 of PCB to be filled for inventory / stocksNot Required of hazardous waste.
27
Non-ferrous metal waste - to be included in form 13.
28
Investigation format for incident/ accident to include 4.5.2Implemented clause of OHSAS 18001.
29
Water Budget, Water balance as per permitted quantitiesImplemented by MPCB - evidence to be provided.
30
Chlorine leaks , CS2 leaks , fire due to inflammableImplemented material to be included in onsite emergency plan.
Available
Implemented
CENTURY RAYON
Pre-audit Observations of M/s TUV Sr. No.
Particulars
Remarks
31
Management programs for storage of waste oil.
Under progress
32
Hazards during cement unloading.
Implemented
33
Identification of hazardous waste chemical containers.
Implemented
34
Compressed gas cylinder - legal requirement for capping,Being taken as color coding & safety distance, test date and due dates toEMP be displayed on cylinders.
35
Housekeeping in scrap yards.
36
Procedure for maintenance including plant - dustImplemented collectors, scrubbers, blowers, ETP equipment - records to be maintained. Test records from external agency for chain pulley blocks & EOT Cranes.
Implemented
CENTURY RAYON
Pre-audit Observations of M/s TUV Sr. No.
Particulars
Remarks
37
Training - Contractors, material movers, sub-contractorsUnder & transporters - for outside & inside people. Progress
38
Training Calendar to be made
39
Policy & Compliance with legal requirements to beUnder displayed outside. progress
40
Receiving, documenting and responding toImplemented communication from public to be updated & recorded
41
ISI marking on First aid & Fire fighting equipments
42
Canteen – Aspects & Hazards due to LPG leaks, fire dueImplemented to diesel storage, OCP for pest control, license for LPG cylinder storage
Implemented
Implemented
CENTURY RAYON
Pre-audit Observations of M/s TUV Sr. No.
Particulars
Remarks
43
Dust collectors - OCP for downtime analysis, PMImplemented schedules, spare parts & efficiency measurements
44
List of E & S critical equipments – down time analysis ofImplemented ETP, dust monitors,& efficiency measurements – records to be maintained.
45
Drawing/Plot plan indicating domestic sewage lines,Implemented process waste lines, storm water drains, septic tank locations, ETP location, ambient air monitoring station, noise monitoring stations, hazardous storages, evacuation routes, entry, exits & assembly points. Sign boards at emergency exits to be provided
46
Management Review – Agenda to be reviewed to includeImplemented clauses
CENTURY RAYON
Pre-audit Observations of M/s TUV Sr. No.
Particulars
Remarks
47
Documentation System , Levels of Documentation,Implemented Review, Approval & Issue matrix.
48
Master List of Documents & records.
49
Drinking water analysis – Chemical & Bacteriological –Implemented As per ISI Standards.
50
Laboratory – Hazardous chemicals to be considered forImplemented Aspects / Impacts.
51
Overall Roles & Responsibility – As per the Clause
Implemented
Implemented
CENTURY RAYON DETAILS OF NON-CONFORMITIES – CLOSED (ROUND NO. 1) 1. Rayon Viscose (Production) In GCF section no SSPD analysis carried out and aspects /hazards are made significant without analysis. 2. Century Chemicals Laboratory Temperature is abnormal in chemical laboratory. It is unhygienic for staff and workmen especially during summer.
CENTURY RAYON Tyre Cord Plant 1.035
1.036 1.034 1.032
1.031
1.030 1.028
1.028
1.026
1.028 1.025
1.026
1.026 1.026
1.0251.023
1.024
1.026
1.026 1.026
Year
Mar.'07
Feb.'07
Jan.'07
Dec. '06
Nov. '06
Oct.'06
Sept. '06
Aug.'06
July '06
June '06
May '06
Apr '06
1.022 Apr'05- Mar'06
PULP (Kg./ Kg. Yarn)
Pulp Ratio – Apr ’05 to Mar.’07
CENTURY RAYON 3.67
3.77
3.62 3.58
3.39
3.4
3.43
3.27
3.2
3.31 3.12 2.92
Year
Mar.'07
Feb.'07
Jan.'07
Dec. '06
Nov. '06
Oct.'06
Sept. '06
Aug.'06
July '06
June '06
May '06
2.8
Apr '06
3.800 3.700 3.600 3.500 3.400 3.300 3.200 3.100 3.000 2.900 2.800 2.700
Power Ratio – Apr ’05 to Mar.’07
Apr'05- Mar'06
POWER (KWH /Kg. Yarn)
Tyre Cord Plant
CENTURY RAYON Tyre Cord Plant Caustic Ratio – Apr ’05 to Mar.’07 0.760
0 .7 5 5 0.747
0.70.746 48
0 .7 4 5 0 .7 3 5
0.73 0
0 .7 1 5
0.7140 .720
0.717
Ye a r
Jan.'07
Dec. '06
Nov. '06
Oct.'06
Sept. '06
Aug.'06
July '06
June '06
May '06
Apr '06
0 .7 0 5
0.7 11
0.706
Mar.'07
0.717
Feb.'07
0 .7 2 5
0.7 30
0.725
Apr'05- Mar'06
CAUSTIC (Kg./ Kg. Yarn)
0 .7 6 5
Year
28
Mar.'07
37
Feb.'07
37
Jan.'07
Dec. '06
39
Nov. '06
36
Oct.'06
38
Sept. '06
Aug.'06
33
July '06
June '06
32
May '06
30
Apr '06
40 38 36 34 32 30 28 26 24 Apr'05- Mar'06
WATER (Gallons)
CENTURY RAYON Tyre Cord Plant
Water Consumption – Apr ’05 to Mar.’07 39
38
32 28
CENTURY RAYON 22.31 21.51
21.53 21.47 20.73
21.07 20.52
20.77
20.35
20.66 19.77
19.58
Year
Mar.'07
Feb.'07
Jan.'07
Dec. '06
Nov. '06
Oct.'06
Sept. '06
Aug.'06
July '06
June '06
May '06
18.21
Apr '06
22.50 22.00 21.50 21.00 20.50 20.00 19.50 19.00 18.50 18.00
Steam Ratio – Apr ’05 to Mar.’07
Apr'05- Mar'06
STEAM (Kg./ Kg. Yarn)
Tyre Cord Plant
CENTURY RAYON CSY Plant 1.115 1.105
1.095
1.100
1.080 1.075
1.075 1.065
1.067
1.065 1.060
1.059
Year
Mar.'07
Feb.'07
Jan.'07
Dec. '06
Nov. '06
Oct.'06
Sept. '06
Aug.'06
July '06
June '06
May '06
1.044
Apr '06
1.120 1.110 1.100 1.090 1.080 1.070 1.060 1.050 1.040
Apr'05- Mar'06
PULP (Kg./ Kg. Yarn)
Pulp Ratio – Apr ’05 to Mar.’07
CENTURY RAYON 5.86 5.74
5.43
5.48 5.11
5.27
4.74 4.46
Year
Mar.'07
Feb.'07
Jan.'07
Dec. '06
Nov. '06
Oct.'06
Sept. '06
4.16
Aug.'06
3.83
July '06
3.94
June '06
4.05
May '06
4.53
Apr '06
6.200 5.900 5.600 5.300 5.000 4.700 4.400 4.100 3.800 3.500
Power Ratio – Apr ’05 to Mar.’07
Apr'05- Mar'06
POWER (KWH /Kg. Yarn)
CSY Plant
CENTURY RAYON Caustic Ratio – Apr ’05 to Mar.’07
0.655
0.650
0.645 0.630 0.630
0.630 0.630 0.630 0.630
0.625 0.625
0.625
Year
Mar.'07
Feb.'07
Jan.'07
Dec. '06
Nov. '06
July '06
June '06
May '06
Apr '06
Oct.'06
0.620
0.615
Sept. '06
0.625
0.630
Aug.'06
0.635
0.640
Apr'05- Mar'06
CAUSTIC (Kg./ Kg. Yarn)
CSY Plant
Year
60
Mar.'07
Feb.'07
Jan.'07
Dec. '06
Nov. '06
Oct.'06
48
Sept. '06
Aug.'06
39
July '06
42
June '06
May '06
49
Apr '06
62 60 58 56 54 52 50 48 46 44 42 40 38 Apr'05- Mar'06
WATER (Gallons/ Kg. Yarn)
CENTURY RAYON CSY Plant
Water Consumption – Apr ’05 to Mar.’07 61
56
54 56
50
47
42
39
CENTURY RAYON 41.62
43.69
43.29
41.19 39.56 37.01
36.02 35.29
34.81 32.09
30.87
Year
Mar.'07
Feb.'07
Jan.'07
Dec. '06
Nov. '06
Oct.'06
Sept. '06
July '06
June '06
May '06
Aug.'06
28.26
28.63
Apr '06
44.00 42.00 40.00 38.00 36.00 34.00 32.00 30.00 28.00
Steam Ratio – Apr ’05 to Mar.’07
Apr'05- Mar'06
STEAM (Kg./ Kg. Yarn)
CSY Plant
Year
2 1 Mar.'07
1
Feb. '07
5
Jan. '07
2
Dec. '06
2
Nov. '06
4
Oct. '06
4
Sept. '06
Aug. '06
2
July '06
3
June '06
2
May '06
4
Apr. '06
3
Mar.'06
4
Feb. '06
5
Jan '06
3
Avg. (2005)
No. of Accidents
CENTURY RAYON
ACCIDENTS IN TYRE CORD PLANT ( Including Contract Workers )
6
5
4
3 1
1
0
CENTURY RAYON Master List of Objectives & Targets Tyrecord Viscose (P)
To reduce CSY pulp ratio From 1.080 to 1.070 To reduce the total Energy consumption From 12000 kwh to 11880 kwh
Spinbath (P)
Spinning (P)
To reduce Steam consumption of Tyre 20 Tons/Ton of yarn to 19.5 Tons/Ton of yarn
Yarn
To reduce Filtered water gallons/day to 300000 gallons/day
From
consumption
From 350000
To reduce water consumption By 5% To minimise viscose waste due to idle positions By 5%
Textile (P)
To reduce the Mandays loss due to accidents to nil
Maintenance
To reduce the total Energy consumption From 1.5 KW to 1.1 KW To reduce the water pollution