SPE APPLIED TECHNOLOGY WORKSHOP (ATW) PRODUCTION MANAGEMENT BEST PRACTICES FOR CBM FIELDS 30 March-2 April 2009 • Queensland, Australia
Coal Seam Gas Wellhead Facilities Some observations & ideas from Australian practice Geoffrey A . McKee +61 407 456 202 SPE Member 3190919
CSG Wellhead Facilities
Overview. . . . What do we mean by “wellhead facilities”? Design. Where do we start? Benchmarks. What do other operators do? Example. One design approach for one project. Some untested new concepts.
2
Production Management Best Practices for CBM Fields, SPE Applied Technology Workshop, Queensland, 30 March - 2 April, 2009
CSG Wellhead Facilities
Definition. What are wellhead facilities? Wellhead
Produced water API 3000#
Produced gas API 3000#
Gathering system
Wellhead facilities Basic system: Mechanical drive for downhole pumps Fuel gas filter and drier Gas and water lines and fittings Gas flow meter (orifice or proprietary) Safety relief valves on gas & water lines Control panel including flow computer Possible extra items (if justified): Gas (throttling) control valve? Remotely operated gas shutdown valve? Separator for de-gassing water? Separator for de-watering gas? Separator for co-mingled water and gas?
Produced water 150#
HDPE
Produced gas HDPE 150#
Above ground Below ground
3
Production Management Best Practices for CBM Fields, SPE Applied Technology Workshop, Queensland, 30 March - 2 April, 2009
CSG Wellhead Facilities
Real schematic #1 – basic system
4
Production Management Best Practices for CBM Fields, SPE Applied Technology Workshop, Queensland, 30 March - 2 April, 2009
CSG Wellhead Facilities
Real schematic #1. . . . . with separator added for “frothy” water With high water pumping rates: gas drawn into downhole pumps problems with gas separating at high points in water gathering system
Produced water downhole pumps (~300 kPag)
Gas from annulus (140 kPag)
5
Production Management Best Practices for CBM Fields, SPE Applied Technology Workshop, Queensland, 30 March - 2 April, 2009
CSG Wellhead Facilities
Real schematic #2 - characterised by gas pressure control valve
6
Production Management Best Practices for CBM Fields, SPE Applied Technology Workshop, Queensland, 30 March - 2 April, 2009
CSG Wellhead Facilities
Real schematic #3 – comingled gas + water
7
Production Management Best Practices for CBM Fields, SPE Applied Technology Workshop, Queensland, 30 March - 2 April, 2009
CSG Wellhead Facilities
Design. Where do we start? 1
2
3
• Design Basis Memorandum (DBM) • Process Flow Diagram (PFD) • Piping & Instrumentation Diagram (P&ID) Order equipment only after step 3 is complete!
8
Production Management Best Practices for CBM Fields, SPE Applied Technology Workshop, Queensland, 30 March - 2 April, 2009
CSG Wellhead Facilities
Concept schematic – manual gas throttling
9
Production Management Best Practices for CBM Fields, SPE Applied Technology Workshop, Queensland, 30 March - 2 April, 2009
CSG Wellhead Facilities
Concept schematic – remote control
1
Production Management Best Practices for CBM Fields, SPE Applied Technology Workshop, Queensland, 30 March - 2 April, 2009
CSG Wellhead Facilities
Concept schematic – frothy water separator added
1
Production Management Best Practices for CBM Fields, SPE Applied Technology Workshop, Queensland, 30 March - 2 April, 2009
CSG Wellhead Facilities
Concept schematic – comingled water + gas through separator
1
Production Management Best Practices for CBM Fields, SPE Applied Technology Workshop, Queensland, 30 March - 2 April, 2009
CSG Wellhead Facilities
Concept schematic – comingled water + gas through separator
1
Production Management Best Practices for CBM Fields, SPE Applied Technology Workshop, Queensland, 30 March - 2 April, 2009
CSG Gathering Systems
New concept . . . . . Install nodal separation stations to eliminate wellhead separators VERTICAL SEPARATON TANK (MADE FROM LARGE DIAMETER HDPE GAS PIPE)
TO REDUCE HDPE PIPELAYING COST, WITH FAVOURABLE SLOPING GRADIENT CAN HAVE SINGLE 2-PHASE GAS+WATER LINE FROM SELECTED WELLS
1
Production Management Best Practices for CBM Fields, SPE Applied Technology Workshop, Queensland, 30 March - 2 April, 2009
CSG Wellhead Facilities
New concept . . . . Use of PCPump power for boosting gas pressure of weak wells HIGH PRESSURE WATER (FROM DOWNHOLE PC PUMP
WELLHEAD EJECTOR
2-PHASE HDPE WATER+GAS LINE TO NODAL SEPARATION STATION (NEEDS TO HAVE SLIGHT DOWNWARD SLOPING GRADIENT) VERY LOW POSITIVE PRESSURE (OR VACUUM) IN CASING
1
Production Management Best Practices for CBM Fields, SPE Applied Technology Workshop, Queensland, 30 March - 2 April, 2009
CSG Gathering Systems & Central Gas Processing Facilities
New concept . . . . . Eliminate inlet & oily water handling at central compression plant
NODAL (INFIELD) COMPRESSION STATION
HEAT EXCHANGER SKID
“DRY” PIPELINE TO CENTRAL PLANT
DX CHILLER PACKAGE*
* IF ELECTRICAL POWER NOT READILY AVAILABLE, USE NH3 ABSORPTION CHILLER POWERED BY COMPRESSOR ENGINE WASTE HEAT
1
Production Management Best Practices for CBM Fields, SPE Applied Technology Workshop, Queensland, 30 March - 2 April, 2009
Thank you for listening! Any questions? Coal Seam Gas Wellhead Facilities Some observations & ideas from Australian practice Geoffrey A . McKee +61 407 456 202 SPE Member 3190919