GUÍA DE REFERENCIA PARA FORMULAR EL CATÁLOGO DE CONCEPTOS DEL PRESUPUESTO BASE DE OBRA PÚBLICA.

E J E R C I C I O 2019

1

GUÍA DE REFERENCIA PARA FORMULAR EL CATÁLOGO DE CONCEPTOS DEL PRESUPUESTO BASE DE OBRA PÚBLICA. RECOMENDACIONES: ESTA GUÍA SIRVE DE CONSULTA PARA OBTENER UN VALOR APROXIMADO DE LOS PRECIOS UNITARIOS DE LOS DIFERENTES CONCEPTOS DE OBRA PÚBLICA, LAS CUALES SERÁN EJECUTADAS POR LOS AYUNTAMIENTOS. SE TOMARON EN CUENTA LAS OBSERVACIONES Y SUGERENCIAS, QUE EN RELACIÓN A LOS EJERCICIOS ANTERIORES, HICIERON LAS AUTORIDADES MUNICIPALES, PARA LA ADMINISTRACIÓN Y EJERCICIO DE LOS RECURSOS, EN MATERIA DE LA OBRA PÚBLICA. LOS PRECIOS UNITARIOS FUERON ELABORADOS CON BASE A COTIZACIONES Y RENDIMIENTOS DE MAQUINARÍA Y/O EQUIPO, MANO DE OBRA E INSUMOS VIGENTES EN EL MERCADO, SE CONSIDERO UN PORCENTAJE POR UNA POSIBLE INFLACIÓN.

2

ZONA NORTE CLAVE MUNICIPIO CLAVE 008 ALAMO TEMAPACHE 109 025 BENITO JUAREZ 120 032 CASTILLO DE TEAYO 128 034 CAZONES DE HERRERA 130 035 CERRO AZUL 131 036 CITLALTEPETL 135 038 COAHUITLAN 137 041 COATZINTLA 138 051 COXQUIHUI 156 052 COYUTLA 157 056 CHALMA 158 057 CHICONAMEL 159 059 CHICONTEPEC 160 CHINAMPA DE 061 161 GOROSTIZA 063 CHONTLA 164 064 CHUMATLAN 166 065 EL HIGO 172 067 ESPINAL 174 068 FILOMENO MATA 179 070 GUTIERREZ ZAMORA 180 073 HUAYACOCOTLA 195 077 ILAMATLAN 207 079 IXCATEPEC 211 081 IXHUATLAN DE MADERO 212

3

MUNICIPIO MECATLAN NARANJOS-AMATLAN OZULUAMA PANUCO PAPANTLA PLATON SANCHEZ POZA RICA DE HIDALGO PUEBLO VIEJO TAMALIN TAMIAHUA TAMPICO ALTO TANCOCO TANTIMA TANTOYUCA TECOLUTLA TEMPOAL TEPETZINTLA TEXCATEPEC TIHUATLAN TLACHICHILCO TUXPAN ZACUALPAN ZONTECOMATLAN ZOZOCOLCO DE HIDALGO

CONCEPTO

PAGINA

1).-DEMOLICIONES

7

2).-PRELIMINARES

8

3).-RELLENOS

8

4).PLANTILLAS Y ACOSTILLADOS

8

5).-CAMAS PARA TUBERIA

9

6).-AFINES Y COMPACTACIÓN

9

7).-EXCAVACIONES A MANO

9

8).-EXCAVACIONES A MAQUINA SIN AFINE

10

9).-EXCAVACIONES A MAQUINA CON AFINE

10

10).-ZAPATAS CORRIDAS

10

11).-DADOS DE CONCRETO

11

12).-CADENAS DE DESPLANTE

11

13).-CASTILLOS DE CONCRETO

12

14).-CADENAS DE CERRAMIENTO

14

15).-LOSAS DE CONCRETO

15

16).-COLUMNAS

16

17).-TRABES

17

18).-ESCALONES

17

19).-REGISTROS SANITARIOS

18

20).-POZOS DE VISITA

18

21).-FIRMES DE CONCRETO

20

22).-PISOS DE CONCRETO

21

23).-PISOS DE CONCRETO ARMADOS CON MALLA

21

24).-FINOS PARA PISO

21

25).-ACABADOS SOBRE PISO

22

26).-RECUBRIMIENTOS CERAMICOS ASENTADOS CON PEGA AZULEJO

22

27).-RECUBRIMIENTOS CERAMICOS ASENTADOS CON MORTERO CEM-ARENA 1:2

22

28).-MUROS DE TABIQUE

23

29).-MUROS DE BLOCK

23

30).-TEJA

23

31).-PRETILES

24

32).-APLANADO COMUN EN MUROS

24

33).-APLANADO COMUN EN PLAFONES

24

34).-APLANADO FINO EN MUROS

24

35).-APLANADO FINO EN PLAFONES

25

36).-EMBOQUILLADO COMUN

25

37).-HABILITADO DE ACERO

26

38).-HABILITADO DE MALLAS ELECTROSOLDADAS

26

39).-CIMBRAS EN TANQUE ELEVADO

27

40).-CIMBRAS

28

41).-EMPEDRADOS

29

42).-CIMIENTOS DE PIEDRA

29

43).-MUROS DE CONTENCION

29

44).-MUROS DE CONCRETO

30

45).-CONCRETO CICLOPEO

30

46).-CONCRETOS HECHOS EN OBRA

31 4

CONCEPTO

PAGINA

47).-ELABORACION Y VACIADO DE CONCRETO HECHO EN OBRA EN CIMENTACIONES

31

48).-ELABORACION Y VACIADO DE CONCRETO HECHO EN OBRA EN ESTRUCTURAS

31

49).-CONCRETOS PREMEZCLADOS

32

50).-CONCRETOS HECHOS EN OBRA CON IMPERMEABILIZANTE INTEGRAL

32

51).-CONCRETOS PREMEZCLADOS CON IMPERMEABILIZANTE INTEGRAL

33

52).-PAVIMENTOS DE CONCRETO HECHO EN OBRA

34

53).-PAVIMENTOS DE CONCRETO PREMEZCLADO

34

54).-PAVIMENTOS DE CONCRETO MR

34

55).-GUARNICIONES

35

56).-BANQUETAS

37

57).-JUNTAS CONSTRUCTIVAS Y CORTES EN CONCRETO

37

58).-MORTEROS Y LECHADAS

38

59).-PAVIMENTOS ASFALTICOS

38

60).-REHABILITACION Y APERTURA DE CAMINOS

39

61).-BASES HIDRAULICAS

40

62).-CUNETAS

41

63).-PISOS DE ADOQUIN

42

64).-TUBO DE CONCRETO SIMPLE CON JUNTA DE MORTERO

42

65).-TUBO DE CONCRETO SIMPLE CON JUNTA HERMETICA

43

66).-TUBO DE CONCRETO REFORZADO CON JUNTA DE MORTERO GRADO 1 N C-20

43

67).-TUBO DE CONCRETO PERFORADO CON JUNTA DE MORTERO

44

68).-TUBERIA PAD ADS SANITARIO

44

69).-TUBERIA PAD ADS PLUVIAL

45

70).-TUBERIA ALCANTARILLADO DE PVC S-25

45

71).-TUBERIA ALCANTARILLADO DE PVC S-20

46

72).-SILLETAS PARA DESCARGAS SANITARIAS

46

73).-TUBERIA DE PVC RD-26

46

74).-TUBERIA DE PVC RD-32.5

47

75).-TUBERIA DE PVC RD-41

47

76).-VÁLVULA DE COMPUERTA DE VÁSTAGO FIJO

47

77).-CAJAS PARA OPERACIÓN DE VÁLVULAS

48

78).-CONTRAMARCO SENCILLO CENTRADO

50

79).-BOMBEO DE ACHIQUE CON BOMBA AUTOCEBANTE

51

80).-INSTALACION HIDRAULICA

51

81).-LUMINARIAS

51

82).- ELEMENTOS ELECTRICOS

52

83).-REGISTRO AUXILIAR PARA ALUMBRADO PÚBLICO

52

84).- RETENIDAS

52

85).-TRANSFORMADORES

52

86).-POSTES DE CONCRETO

53

87).-CABLES Y CONDUCTORES

54

88).- EDIFICACION

54

89).- MALLA CICLONICA

54

90).- PASTO

55

91).-PINTURA EN MUROS Y HERRERIA

55 5

CONCEPTO

PAGINA

92).-PINTURA EN GUARNICIONES

55

93).- IMPERMEABILIZANTES

55

94).-ACARREOS

55

95).- TECHUMBRES

56

6

NO.

CONCEPTO

UNIDAD

P.U.

1.-)DEMOLICIONES 1

DEMOLICION A MANO DE MAMPOSTERIA PIEDRA BRAZA HASTA 1.50 M. DE PROFUNDIDAD, VOLUMEN MEDIDO EN BANCO, INCLUYE: APILE DE MATERIAL.

M3

$ 481.76

2

DEMOLICION A MANO DE MAMPOSTERIA PIEDRA BRAZA DE 30 A 40 CM DE ESPESOR Y HASTA 3.50M. DE ALTURA, INCLUYE APILE DE MATERIAL.

M2

$ 416.55

3

DEMOLICION A MANO DE CELOSIAS DE 10 A 15 CM. Y HASTA 3.50 M. DE ALTURA, INCLUYE: APILE DEL MATERIAL.

M2

$ 39.34

4

DEMOLICION A MANO DE APLANADOS DE MEZCLA DE 2.5 CM. DE ESPESOR HASTA 3.50 M. DE ALTURA, INCLUYE: APILE DEL MATERIAL.

M2

$ 46.72

5

DEMOLICION A MANO DE PISO O BANQUETA DE CONCRETO SIMPLE DE 8 A 10 CM. DE ESPESOR, INCLUYE: APILE DEL MATERIAL.

M2

$ 57.81

6

DEMOLICION A MANO DE PISO O BANQUETA DE CONCRETO REFORZADO, DE 8 A 10 CM. DE ESPESOR, INCLUYE: APILE DEL MATERIAL.

M2

$ 138.71

7

DEMOLICION A MANO DE PAVIMENTO DE CONCRETO HIDRAULICO REFORZADO, DE 15 CM. DE ESPESOR, INCLUYE: APILE DEL MATERIAL.

M2

$ 208.09

8

DEMOLICION A MANO DE ELEMENTOS DE CONCRETO ARMADO EN ESTRUCTURA (LOSA), SIN RECUPERACION DE ACERO, DE 10 CM. DE ESPESOR, HASTA UNA ALTURA DE 3.50 M., INCLUYE: APILE DEL MATERIAL, MANO DE OBRA Y HERRAMIENTA.

M2

$ 166.41

9

DEMOLICION A MANO DE CONCRETO SIMPLE, INCLUYE: APILE DEL MATERIAL.

M3

$ 412.70

10

DEMOLICION A MANO DE LAMBRINES DE AZULEJOS, MATERIALES VIDRIADOS Y MOSAICOS HASTA 3.50 M. DE ALTURA, INCLUYE: MORTERO Y APILE DEL MATERIAL.

M2

$ 41.11

11

DEMOLICION A MANO DE ELEMENTOS DE CONCRETO ARMADO EN ESTRUCTURA (LOSA ), SIN RECUPERACION DE ACERO, MEDIDO EN BANCO, HASTA UNA ALTURA DE 3.50 M., INCLUYE: APILE DEL MATERIAL, MANO DE OBRA Y HERRAMIENTA.

M3

$ 1,377.04

12

DEMOLICION A MANO DE ELEMENTOS DE CONCRETO ARMADO SIN RECUPERACION DE ACERO, MEDIDO EN BANCO, INCLUYE APILE DE MATERIAL.

M3

$ 1,156.01

13

DEMOLICION A MANO DE MURO DE TABIQUE DE BARRO RECOCIDO DE 14 CM. INCLUYE: APILE DEL MATERIAL.

M2

$ 33.28

14

DEMOLICION A MANO DE MURO DE BLOCK DE CONCRETO, INCLUYE: APILE DEL MATERIAL.

M2

$ 65.31

15

DEMOLICION A MAQUINA DE CONCRETO HIDRAULICO SIMPLE, INCLUYE APILE DEL MATERIAL.

M3

$ 332.98

16

DEMOLICION A MAQUINA DE CONCRETO HIDRAULICO REFORZADO, INCLUYE APILE DEL MATERIAL.

M3

$ 598.54

17

DEMOLICION A MAQUINA DE CONCRETO HIDRAULICO SIMPLE DE 10 CM. DE ESPESOR, INCLUYE APILE DEL MATERIAL.

M2

$ 32.90

18

DEMOLICION A MAQUINA DE PAVIMENTO DE CONCRETO HIDRAULICO REFORZADO DE 15 CM. DE ESPESOR, INCLUYE APILE DEL MATERIAL.

M2

$ 89.77

19

PICADO DE LOSA DE CONCRETO PARA ELIMINAR EXCEDENTES Y RECIBIR APLANADO.

M2

$ 19.24

20

DEMOLICION A MANO DE MAMPOSTERIA PIEDRA BRAZA CON UN ESPESOR DE 20 CM.

M2

$ 72.41

21

DESPRENDIMIENTO DE IMPERMEABILIZANTE REMOVIENDO PARTES SUELTAS Y LIMPIEZA, INCLUYE: ACARREOS A 1ª ESTACIÓN A 20.00 M., MANO DE OBRA Y HERRAMIENTA.

M2

$ 29.19

22

DEMOLICIÓN A MANO DE FIRME DE CONCRETO DE 10 CM DE ESPESOR REFORZADO CON MALLA EN AREA DE GRADAS EXISTENTES SIN RECUPERACIÓN DEL MATERIAL.

M2

$ 77.06

23

DEMOLICIÓN A MANO DE MURO DE BLOCK DE 12X20X40 CMS. DE ESPESOR, ASENTADO CON MORTERO CEMENTO: ARENA SIN RECUPERACIÓN DE MATERIAL.

M2

$ 44.37

24

DEMOLICIÓN A MANO DE CASTILLO DE CONCRETO DE 15X20 CMS. ARMADO CON VAR. DE 3/8" Y ALAMBRÓN SIN RECUPERACIÓN DE MATERIAL. INCLUYE ACARREO DE MATERIAL A PIE DE OBRA.

ML

$ 55.04

7

NO.

CONCEPTO

UNIDAD

P.U.

25

DEMOLICIÓN A MANO DE CADENA DE DESPLANTE Y CERRAMIENTO DE 15X20 CMS. ARMADO CON VAR. DE 3/8" Y ALAMBRÓN SIN RECUPERACIÓN DE MATERIAL. INCLUYE ACARREO DE MATERIAL A PIE DE OBRA.

ML

$ 64.23

26

DEMOLICIÓN A MANO DE REPISON DE CONCRETO SOBRE MURETE SIN RECUPERACIÓN DE MATERIAL. INCLUYE ACARREO DE MATERIAL A PIE DE OBRA.

ML

$ 36.12

27

DEMOLICIÓN A MANO DE LOSA DE CONCRETO ARMADA CON VAR. DE 3/8" EN BAÑOS SIN RECUPERACIÓN DE MATERIAL. INCLUYE ACARREO DE MATERIAL A PIE DE OBRA.

M2

$ 109.82

28

DEMOLICIÓN A MANO DE MURO DE PIEDRA, ASENTADO CON MORTERO CEMENTOARENA SIN RECUPERACIÓN DE MATERIAL.

M3

$ 387.94

29

DESMANTELAMIENTO DE ESTRUCTURA DE ACERO Y LÁMINA GALVANIZADA SIN RECUPERACIÓN DEL MATERIAL.

M2

$ 47.54

2).- PRELIMINARES 30

LIMPIEZA Y DESENRAICE A MANO DE TERRENO CON MALEZA DE HASTA 1.00 M. DE ALTURA, INCLUYE: APILE DE YERBA EN EL LUGAR.

HA

$ 11.57

31

LIMPIEZA DE TERRENO PLANO A MANO, INCLUYE: APILE DEL MATERIAL EN EL LUGAR Y ACARREOS A PRIMERA ESTACION DE 20.00 M.

M2

$ 21.40

32

TRAZO Y NIVELACION DE TERRENO PLANO POR MEDIOS MANUALES PARA DESPLANTE DE ESTRUCTURAS ESTABLECIENDO EJES AUXILIARES Y REFERENCIAS.

M2

$ 9.48

33

LIMPIEZA Y CORTE DE HIERBA, MALEZA Y/O MATERIAL EXISTENTE CON MAQUINARIA EN AMPLIACION DEL CAMINO EN LOS EXTREMOS DEL CUERPO DEL TERRAPLEN.

M2

$ 13.61

34

DESMONTE EN ZONAS ARIDAS PARA UNA DENSIDAD DEL 100% INCLUYE: TALA, ROZA, DESENRAICE, MAQUINARIA, MANO DE OBRA Y LIMPIEZA DEL TERRENO.

HA

$ 5,917.26

35

DESMONTE EN ZONAS SEMIARIDAS PARA UNA DENSIDAD DEL 100% INCLUYE: TALA, ROZA, DESENRAICE, MAQUINARIA, MANO DE OBRA Y LIMPIEZA DEL TERRENO.

HA

$ 5,650.77

36

DESMONTE EN ZONAS DE BOSQUE PARA UNA DENSIDAD DEL 100% INCLUYE: TALA, ROZA, DESENRAICE, MAQUINARIA, MANO DE OBRA Y LIMPIEZA DEL TERRENO.

HA

$ 4,962.61

37

DESMONTE EN ZONAS DE SELVA PARA UNA DENSIDAD DEL 100% INCLUYE: TALA, ROZA, DESENRAICE, MAQUINARIA, MANO DE OBRA Y LIMPIEZA DEL TERRENO.

HA

$ 5,518.95

M3

$ 139.34

M3

$ 410.69

M3

$ 166.08

3).- RELLENOS 38

39

40

RELLENO COMPACTADO CON PISON DE MANO EN CAPAS DE 20 CM. UTILIZANDO MATERIAL PRODUCTO DE LA EXCAVACION, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO. RELLENO COMPACTADO CON PISON DE MANO EN CAPAS DE 20 CM. UTILIZANDO MATERIAL DE BANCO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO. RELLENO DE CEPAS CON MATERIAL " A " O " B " PRODUCTO DE LA EXCAVACION, COMPACTADO CON EQUIPO MANUAL (BAILARINA) AL 85% PROCTOR INCLUYE: VOLTEO CON PALA, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

41

RELLENO EN CEPAS CON MATERIAL PRODUCTO DE EXCAVACION, COMPACTADO AL 90% PROCTOR, CON COMPACTADOR MANUAL (BAILARINA), INCLUYE: VOLTEO CON PALA.

M3

$ 188.39

42

RELLENO EN CEPAS CON MATERIAL DE BANCO, COMPACTADO AL 90% PROCTOR, CON COMPACTADOR MANUAL (BAILARINA), INCLUYE: VOLTEO CON PALA.

M3

$ 459.73

43

RELLENO Y COMPACTADO CON PIZON DE MANO, INCLUYE: ACOSTILLADO EN CAPAS DE 20 CM. UTILIZANDO MATERIAL PRODUCTO DE LA EXCAVACION.

M3

$ 150.90

4).- PLANTILLAS Y ACOSTILLADOS 44

PLANTILLA DE 5 CM. DE ESPESOR DE CONCRETO HECHO EN OBRA F'C=100 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: ACARREO A PRIMERA ESTACION A 20.00 M., MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 132.86

45

PLANTILLA DE 8 CM. DE ESPESOR DE CONCRETO HECHO EN OBRA F'C=100 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: ACARREO A PRIMERA ESTACION A 20.00 M., MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 216.91

8

NO.

CONCEPTO

UNIDAD

P.U.

46

PLANTILLA DE 10 CM. DE ESPESOR DE CONCRETO HECHO EN OBRA F'C=100 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: ACARREO A PRIMERA ESTACION A 20.00 M., MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 276.50

47

PLANTILLA DE 5 CM. DE ESPESOR DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: ACARREO A PRIMERA ESTACION A 20.00 M., MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 144.09

48

PLANTILLA DE 8 CM. DE ESPESOR DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: ACARREO A PRIMERA ESTACION A 20.00 M., MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 233.62

49

PLANTILLA DE 10 CM. DE ESPESOR DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: ACARREO A PRIMERA ESTACION A 20.00 M., MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 297.64

50

ELABORACION DE PLANTILLA Y ACOSTILLADO DE TUBERIA CON MATERIAL TIPO I (PRODUCTO DE EXCAVACIÓN), INCLUYE: LIMPIEZA DEL MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 175.74

51

ELABORACION DE PLANTILLA Y ACOSTILLADO DE TUBERIA CON MATERIAL TIPO II (PRODUCTO DE EXCAVACIÓN), INCLUYE: LIMPIEZA DEL MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 175.74

52

PLANTILLA CON MATERIAL PRODUCTO DE EXCAVACIÓN PARA APOYO DE TUBERÍAS, INCLUYE: MANO DE OBRA, HERRAMIENTA, ACARREOS, MEDIDO COMPACTO.

M3

$ 116.11

53

PLANTILLA CON MATERIAL DE BANCO PARA APOYO DE TUBERÍAS, INCLUYE: SUMINISTRO DE MATERIAL, MANO DE OBRA, HERRAMIENTA, ACARREOS, MEDIDO COMPACTO.

M3

$ 370.73

5).-CAMAS PARA TUBERÍA 54

TENDIDO DE CAMA DE ARENA PARA TUBERIAS, INCLUYE: APISONADO Y ACOSTILLADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 399.63

55

TENDIDO DE CAMA DE ARENA (CEMENTANTE) PARA TUBERIAS, INCLUYE: APISONADO Y ACOSTILLADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 366.44

6).- AFINES Y COMPACTACIÓN 56

AFINE DE TALUDES Y FONDO A MANO, MATERIAL SECO TIPO I EN CEPA PARA MEJORAR LA EXCAVACION REALIZADA POR MEDIOS MECANICOS, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 34.69

57

AFINE DE TALUDES Y FONDO A MANO, MATERIAL SECO TIPO II EN CEPA PARA MEJORAR LA EXCAVACION REALIZADA POR MEDIOS MECANICOS, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 40.46

58

AFINE DE TERRACERIA POR MEDIOS MECANICOS, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 12.41

59

COMPACTACION CON EQUIPO (BAILARINA), HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 52.73

60

AFINE A MANO DE FONDO DE EXCAVACIÓN, EFECTUADA POR MEDIOS MECÁNICOS, ESPESOR PROMEDIO 15.0 CM. DE ESPESOR.

M2

$ 16.51

61

NIVELACIÓN, CONFORMACIÓN Y COMPACTACIÓN POR MEDIOS MANUALES. INCLUYE INCORPORACIÓN DE AGUA PARA SU COMPACTACIÓN.

M2

$ 32.84

INCLUYE:

MANO

DE

OBRA,

7).-EXCAVACIONES A MANO 62

EXCAVACION A MANO EN CEPAS MATERIAL SECO TIPO I, PROFUNDIDAD DE 0.00 A 2.00 M., INCLUYE: AFINE DE TALUDES Y FONDO, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 128.49

63

EXCAVACION A MANO EN CEPAS MATERIAL SECO TIPO II, PROFUNDIDAD DE 0.00 A 2.00 M., INCLUYE: AFINE DE TALUDES Y FONDO, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 213.86

64

EXCAVACION A MANO EN CEPAS MATERIAL TIPO III, PROFUNDIDAD DE 0.00 A 2.00 M., INCLUYE: APILE DEL MATERIAL EN EL LUGAR, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 578.01

9

NO.

CONCEPTO

UNIDAD

P.U.

65

EXCAVACIÓN DE CEPA EN TERRENO TIPO "B" Y "C" (50-50%) PARA RECIBIR ZAPATA DE CIMENTACIÓN DE 1.20X1.20 MTS. INCLUYE: AFINE Y COMPACTACIÓN.

M3

$ 231.21

66

EXCAVACIÓN EN CAJA EN FORMA MANUAL EN MATERIAL TIPO "B" TEPETATOSO, 80% Y "C" ROCA 20%. INCLUYE: AFINE Y FONDO. ACARREOS DENTRO Y FUERA DE LA OBRA.

M3

$ 115.59

8).-EXCAVACIONES A MÁQUINA SIN AFINE 67

EXCAVACION A MAQUINA EN MATERIAL TIPO I DE 0.00 A 2.00 M. DE PROFUNDIDAD, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 20.88

68

EXCAVACION A MAQUINA EN MATERIAL TIPO II DE 0.00 A 2.00 M. DE PROFUNDIDAD, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 34.42

69

EXCAVACION A MAQUINA EN MATERIAL TIPO II DE 0.00 A 3.00 M. DE PROFUNDIDAD, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 54.67

70

EXCAVACION A MAQUINA EN MATERIAL TIPO II DE 0.00 A 4.00 M, DE PROFUNDIDAD, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 69.59

71

EXCAVACION A MAQUINA EN MATERIAL TIPO II-A DE 0.00 A 2.00 M. DE PROFUNDIDAD, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 54.70

72

EXCAVACION A MAQUINA EN MATERIAL TIPO III DE 0.00 A 2.00 M. DE PROFUNDIDAD, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 605.89

73

EXCAVACION MECANICA EN ROCA (MATERIAL III), EN CAJA A UNA PROFUNDIDAD DE 0.00 A 2.00 M., INCLUYE: RUPTURA CON MARTILLO HIDRAULICO, EXTRACCION Y ACARREO MANUAL A PIE DE CAJA MAX= 20 M.

M3

$ 733.05

74

EXCAVACION MECANICA EN ROCA (MATERIAL III), EN CEPA A UNA PROFUNDIDAD DE 0.00 A 2.00 M., INCLUYE: RUPTURA CON MARTILLO HIDRAULICO, EXTRACION Y ACARREO MANUAL A PIE DE CEPA.

M3

$ 747.32

9).- EXCAVACIÓN A MÁQUINA CON AFINE 75

EXCAVACION A MAQUINA EN MATERIAL TIPO I DE 0.00 A 2.00 M. DE PROFUNDIDAD, INCLUYE: AFINE DE TALUDES Y FONDO, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 43.74

76

EXCAVACION A MAQUINA EN MATERIAL TIPO II DE 0.00 A 2.00 M. DE PROFUNDIDAD, INCLUYE: AFINE DE TALUDES Y FONDO, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 72.17

77

EXCAVACION A MAQUINA EN MATERIAL TIPO II DE 0.00 A 3.00 M. DE PROFUNDIDAD, INCLUYE: AFINE DE TALUDES Y FONDO, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 95.32

78

EXCAVACION A MAQUINA EN MATERIAL TIPO II DE 0.00 A 4.00 M, DE PROFUNDIDAD, INCLUYE: AFINE DE TALUDES Y FONDO, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 120.05

79

EXCAVACION A MAQUINA EN MATERIAL TIPO II-A DE 0.00 A 2.00 M. DE PROFUNDIDAD, INCLUYE: AFINE DE TALUDES Y FONDO, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 103.16

80

EXCAVACION A MAQUINA EN MATERIAL TIPO III DE 0.00 A 2.00 M. DE PROFUNDIDAD, INCLUYE: AFINE DE TALUDES Y FONDO, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 666.41

81

SUMINISTRO Y ELABORACION DE ZAPATA CORRIDA DE CONCRETO F'C=200 KG/CM2. DE 80 CM. DE ANCHO Y 20 CM. DE ALTURA, HABILITADO CON 65 KG. DE ACERO DE 1/2" X M3. DE CONCRETO, INCLUYE: PLANTILLA DE 5 CM. DE ESPESOR CONCRETO F'C=100 KG/CM2., CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 6,850.58

82

SUMINISTRO Y ELABORACION DE ZAPATA CORRIDA DE CONCRETO F'C=250 KG/CM2. DE 80 CM. DE ANCHO Y 20 CM. DE ALTURA, HABILITADO CON 65 KG. DE ACERO DE 1/2" X M3. DE CONCRETO, INCLUYE: PLANTILLA DE 5 CM. DE ESPESOR CONCRETO F'C=100 KG/CM2., CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 7,680.46

10).- ZAPATAS CORRIDAS

10

NO.

CONCEPTO

UNIDAD

P.U.

83

SUMINISTRO Y ELABORACION DE ZAPATA CORRIDA DE CONCRETO F'C=200 KG/CM2. DE 80 CM. DE ANCHO Y 20 CM. DE ALTURA, HABILITADO CON 65 KG. DE ACERO DE 1/2" X M3. DE CONCRETO, INCLUYE: PLANTILLA DE 5 CM. DE ESPESOR CONCRETO F'C=100 KG/CM2., CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 979.33

84

SUMINISTRO Y ELABORACION DE ZAPATA CORRIDA DE CONCRETO F'C=250 KG/CM2. DE 80 CM. DE ANCHO Y 20 CM. DE ALTURA, HABILITADO CON 65 KG. DE ACERO DE 1/2" X M3. DE CONCRETO, INCLUYE: PLANTILLA DE 5 CM. DE ESPESOR CONCRETO F'C=100 KG/CM2., CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,107.01

85

SUMINISTRO Y ELABORACION DE DADO DE CIMENTACION DE 30 X 30 X 80 CM., CONCRETO F'C=200 KG/CM2., ARMADO CON 6 VARS. DE 1/2" Y ESTRIBOS DEL No. 3 A CADA 15 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

PZA

$ 804.16

86

SUMINISTRO Y ELABORACION DE DADO DE CIMENTACION DE 30 X 30 X 80 CM., CONCRETO F'C=250 KG/CM2., ARMADO CON 6 VARS. DE 1/2" Y ESTRIBOS DEL No. 3 A CADA 15 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

PZA

$ 861.60

87

SUMINISTRO Y ELABORACION DE DADO DE CIMENTACION DE 40 X 40 X 80 CM., CONCRETO F'C=200 KG/CM2., ARMADO CON 6 VARS. DE 1/2" Y ESTRIBOS DEL No. 3 A CADA 15 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

PZA

$ 1,082.53

88

SUMINISTRO Y ELABORACION DE DADO DE CIMENTACION DE 40 X 40 X 80 CM., CONCRETO F'C=250 KG/CM2., ARMADO CON 6 VARS. DE 1/2" Y ESTRIBOS DEL No. 3 A CADA 15 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

PZA

$ 1,184.69

89

SUMINISTRO Y ELABORACION DE DADO DE CIMENTACION DE 50 X 50 X 80 CM., CONCRETO F'C=200 KG/CM2., ARMADO CON 8 VARS. DE 1/2" Y ESTRIBOS DEL No. 3 A CADA 15 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

PZA

$ 1,474.96

90

SUMINISTRO Y ELABORACION DE DADO DE CIMENTACION DE 50 X 50 X 80 CM., CONCRETO F'C=250 KG/CM2., ARMADO CON 8 VARS. DE 1/2" Y ESTRIBOS DEL No. 3 A CADA 15 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

PZA

$ 1,634.55

11).- DADOS DE CONCRETO

12).- CADENAS DE DESPLANTE CADENAS ARMADAS CON ARMEX 91

CADENA DE DESPLANTE DE 15 X 20 CM., CONCRETO F'C= 150 KG/CM2., ARMEX 15X20-4, INCLUYE: CIMBRA, DESCIMBRA, ACABADO COMUN, MANO DE OBRA, EQUIPO NECESARIO, MATERIALES, ACARREO A PRIMERA ESTACION A 20.00 M.

ML

$ 268.83

92

CADENA DE DESPLANTE DE 15 X 20 CM., CONCRETO F'C= 200 KG/CM2., ARMEX 15X20-4, INCLUYE: CIMBRA, DESCIMBRA, ACABADO COMUN, MANO DE OBRA, EQUIPO NECESARIO, MATERIALES, ACARREO A PRIMERA ESTACION A 20.00 M.

ML

$ 275.46

93

CADENA DE DESPLANTE DE 15 X 20 CM., CONCRETO F'C= 250 KG/CM2., ARMEX 15X20-4, INCLUYE: CIMBRA, DESCIMBRA, ACABADO COMUN, MANO DE OBRA, EQUIPO NECESARIO, MATERIALES, ACARREO A PRIMERA ESTACION A 20.00 M.

ML

$ 274.52

94

CADENA DE DESPLANTE DE SECCION 15 X 20 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8", ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 324.84

95

CADENA DE DESPLANTE DE SECCION 15 X 20 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8", ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 329.22

CADENAS ARMADAS CON VARILLA

11

NO.

CONCEPTO

UNIDAD

P.U.

96

CADENA DE DESPLANTE DE SECCION 15 X 20 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8" ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 335.12

97

CADENA DE DESPLANTE DE SECCION 15 X 25 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8", ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 363.87

98

CADENA DE DESPLANTE DE SECCION 15 X 25 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8", ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 369.91

99

CADENA DE DESPLANTE DE SECCION 15 X 25 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8", ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 376.77

100

CADENA DE DESPLANTE DE SECCION 15 X 30 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8", ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 413.89

101

CADENA DE DESPLANTE DE SECCION 15 X 30 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8", ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 421.51

102

CADENA DE DESPLANTE DE SECCION 15 X 30 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8", ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 430.14

103

CADENA DE DESPLANTE DE SECCION 20 X 30 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8", ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 473.77

104

CADENA DE DESPLANTE DE SECCION 20 X 30 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8", ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 483.91

105

CADENA DE DESPLANTE DE SECCION 20 X 30 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8", ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 495.42

106

CADENA DE DESPLANTE DE SECCION 30 X 30 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8", ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 535.05

107

CADENA DE DESPLANTE DE SECCION 30 X 30 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8", ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 550.15

108

CADENA DE DESPLANTE DE SECCION 30 X 30 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8", ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 566.01

ML

$ 258.59

13).- CASTILLOS DE CONCRETO CASTILLOS ARMADOS CON ARMEX 109

CASTILLO DE SECCION 15 X 15 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4" REFORZADA CON ARMEX 15 -15 - 4, INCLUYE: CIMBRA 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

12

NO.

CONCEPTO

UNIDAD

P.U.

110

CASTILLO DE SECCION 15 X 15 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4" REFORZADA CON ARMEX 15 -15 - 4, INCLUYE: CIMBRA 4 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 305.86

111

CASTILLO DE SECCION 15 X 15 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4" REFORZADA CON ARMEX 15 -15 - 4, INCLUYE: CIMBRA 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA YEQUIPO NECESARIO.

ML

$ 262.41

112

CASTILLO DE SECCION 15 X 15 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4" REFORZADA CON ARMEX 15 -15 - 4, INCLUYE: CIMBRA 4 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 309.67

113

CASTILLO DE SECCION 15 X 15 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 304.45

114

CASTILLO DE SECCION 15 X 15 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 4 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 345.83

115

CASTILLO DE SECCION 15 X 15 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 308.32

116

CASTILLO DE SECCION 15 X 15 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 4 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 349.70

117

CASTILLO DE SECCION 15 X 20 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 356.76

118

CASTILLO DE SECCION 15 X 20 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 4 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 404.05

119

CASTILLO DE SECCION 15 X 20 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 361.83

120

CASTILLO DE SECCION 15 X 20 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 4 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 409.12

121

CASTILLO DE SECCION 15 X 25 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 402.45

122

CASTILLO DE SECCION 15 X 25 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 4 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 449.71

123

CASTILLO DE SECCION 15 X 25 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 408.80

CASTILLOS ARMADOS CON VARILLA

13

NO.

CONCEPTO

UNIDAD

P.U.

124

CASTILLO DE SECCION 15 X 25 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 4 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 456.07

125

CASTILLO DE SECCION 15 X 30 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 471.19

126

CASTILLO DE SECCION 15 X 30 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM, INCLUYE: CIMBRA COMUN 4 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 518.45

127

CASTILLO DE SECCION 15 X 30 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 460.08

128

CASTILLO DE SECCION 15 X 30 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 4 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 507.34

129

CASTILLO DE SECCION 20 X 20 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 394.45

130

CASTILLO DE SECCION 20 X 20 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 4 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 457.47

131

CASTILLO DE SECCION 20 X 20 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 422.99

132

CASTILLO DE SECCION 20 X 20 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 4 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 486.04

14).- CADENAS DE CERRAMIENTO CADENAS DE CERRAMIENTO ARMADAS CON ARMEX

133

CADENA DE CERRAMIENTO DE SECCION 15 X 20 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON ARMEX 15 X 20 - 4, INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 311.63

134

CADENA DE CERRAMIENTO DE SECCION 15 X 20 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON ARMEX 15 X 20 - 4, INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 316.70

135

CADENA DE CERRAMIENTO DE SECCION 15 X 20 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DEL No. 3 (3/8") ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 376.50

136

CADENA DE CERRAMIENTO DE SECCION 15 X 20 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DEL No. 3 (3/8") ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 381.57

CADENAS DE CERRAMIENTO ARMADAS CON VARILLA

14

NO.

CONCEPTO

UNIDAD

P.U.

137

CADENA DE CERRAMIENTO DE SECCION 20 X 20 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DEL No. 3 (3/8") ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 416.23

138

CADENA DE CERRAMIENTO DE SECCION 20 X 20 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DEL No. 3 (3/8") ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 422.99

15).- LOSAS DE CONCRETO LOSAS ARMADAS CON VARILLA 139

LOSA PLANA EN ESTRUCTURA, PERALTE 10 CM., CIMBRA COMUN REFORZADA CON 60 KG. DE ACERO POR M3., CONCRETO F'C = 200 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 859.63

140

LOSA PLANA EN ESTRUCTURA, PERALTE 10 CM., CIMBRA COMUN REFORZADA CON 60 KG. DE ACERO POR M3., CONCRETO F'C = 250 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 860.92

141

LOSA PLANA EN ESTRUCTURA, PERALTE 12 CM., CIMBRA COMUN REFORZADA CON 72 KG DE ACERO POR M3., CONCRETO F'C = 200 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 958.80

142

LOSA PLANA EN ESTRUCTURA, PERALTE 12 CM., CIMBRA COMUN REFORZADA CON 72 KG DE ACERO POR M3., CONCRETO F'C = 250 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 960.80

143

LOSA PLANA EN ESTRUCTURA, PERALTE 15 CM., CIMBRA COMUN REFORZADA CON 90 KG. DE ACERO POR M3., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 1,107.54

144

LOSA PLANA EN ESTRUCTURA, PERALTE 15 CM., CIMBRA COMUN REFORZADA CON 90 KG. DE ACERO POR M3., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 1,109.49

145

LOSA PLANA EN ESTRUCTURA, PERALTE 20 CM., CIMBRA COMUN REFORZADA CON 60 KG DE ACERO POR M3., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 1,154.40

146

LOSA PLANA EN ESTRUCTURA, PERALTE 20 CM., CIMBRA COMUN REFORZADA CON 60 KG. DE ACERO POR M3., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 1,157.01

147

LOSA PLANA EN ESTRUCTURA, PERALTE 20 CM., CIMBRA COMUN REFORZADA CON 120 KG. DE ACERO POR M3. CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 1,355.45

148

LOSA PLANA EN ESTRUCTURA, PERALTE 20 CM., CIMBRA COMUN REFORZADA CON 120 KG. DE ACERO POR M3. CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 1,358.07

149

LOSA PLANA EN ESTRUCTURA, PERALTE 10 CM., CIMBRA COMUN ARMADA CON MALLA ELECTROSOLDADA 6 -6 / 10 - 10, CONCRETO F'C = 200 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 717.22

150

LOSA PLANA EN ESTRUCTURA, PERALTE 10 CM., CIMBRA COMUN ARMADA CON MALLA ELECTROSOLDADA 6 -6 / 10 - 10, CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 718.53

M2

$ 691.20

LOSAS ARMADAS CON MALLA

LOSA DE VIGUETA Y BOVEDILLA

151

LOSA CONSTRUIDA CON EL SISTEMA DE VIGUETA Y BOVEDILLA DE 20 CM. DE ESPESOR CON CAPA DE COMPRESION DE 5 CM., CONCRETO F'C=200 KG/CM2., ARMADA CON MALLA ELECTROSOLDADA 6X6/10-10, INCLUYE: MANO DE OBRA, MATERIALES, HERRAMIENTA. 15

NO.

CONCEPTO

UNIDAD

P.U.

152

COLUMNA EN ESTRUCTURA DE SECCION 30 X 30 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", CIMBRA COMÚN, HABILITADA CON 190 KG. DE ACERO DE 5/8" Y 1/2" POR M3., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 13,551.30

153

COLUMNA EN ESTRUCTURA DE SECCION 30 X 30 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", CIMBRA COMÚN, HABILITADA CON 190 KG. DE ACERO DE 5/8" Y 1/2" POR M3., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 13,727.37

154

COLUMNA EN ESTRUCTURA DE SECCION 30 X 30 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", CIMBRA COMÚN, ARMADA CON 4 VARILLAS DEL No. 4 (1/2") Y ESTRIBOS DEL No. 3 (3/8") A CADA 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 923.31

155

COLUMNA EN ESTRUCTURA DE SECCION 30 X 30 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", CIMBRA COMÚN, ARMADA CON 4 VARILLAS DEL No. 4 (1/2") Y ESTRIBOS DEL No. 3 (3/8") A CADA 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 939.64

156

COLUMNA EN ESTRUCTURA DE SECCION 30 X 30 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", CIMBRA COMÚN, ARMADA CON 6 VARILLAS DEL No. 4 (1/2") Y ESTRIBOS DEL No. 3 (3/8") A CADA 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 988.03

157

COLUMNA EN ESTRUCTURA DE SECCION 30 X 30 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", CIMBRA COMÚN, ARMADA CON 6 VARILLAS DEL No. 4 (1/2") Y ESTRIBOS DEL No. 3 (3/8") A CADA 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,004.37

158

COLUMNA EN ESTRUCTURA DE SECCION 40 X 40 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", CIMBRA COMÚN, ARMADA CON 4 VARILLAS DEL No. 8 (1"), 4 VARILLAS DE 1/2" Y ESTRIBOS DEL No. 2 (1/4") A CADA 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,706.97

159

COLUMNA EN ESTRUCTURA DE SECCION 40 X 40 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", CIMBRA COMÚN, ARMADA CON 8 VARILLAS DE 1/2" Y ESTRIBOS DEL No. 2 (1/4") A CADA 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,345.58

160

COLUMNA EN ESTRUCTURA DE SECCION 40 X 40 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", CIMBRA COMÚN, ARMADA CON 6 VARILLAS DEL No. 6 (3/4") Y ESTRIBOS DEL No. 3 (3/8") A CADA 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,590.40

161

COLUMNA EN ESTRUCTURA DE SECCION 40 X 40 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", CIMBRA COMÚN, ARMADA CON 6 VARILLAS DEL No. 6 (3/4") Y ESTRIBOS DEL No. 3 (3/8") A CADA 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,624.24

162

COLUMNA EN ESTRUCTURA DE SECCION 40 X 40 CM., CONCRETO F'C=300 KG/CM2. AGREGADO MAXIMO 3/4", CIMBRA COMÚN, ARMADA CON 6 VARILLAS DEL No. 6 (3/4") Y ESTRIBOS DEL No. 3 (3/8") A CADA 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,612.62

163

COLUMNA EN ESTRUCTURA DE SECCION 40 X 40 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", CIMBRA COMÚN, ARMADA CON 8 VARILLAS DE 1/2" Y ESTRIBOS DEL No. 2 (1/4") A CADA 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,387.18

164

COLUMNA EN ESTRUCTURA DE SECCION 40 X 40 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", CIMBRA COMÚN, ARMADA CON 4 VARILLAS DEL No. 8 ( 1" ), 4 VARILLAS DE 1/2" Y ESTRIBOS DEL No. 2 ( 1/4" ) A CADA 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,759.19

16).-COLUMNAS COLUMNAS POR METRO CÚBICO

COLUMNAS POR METRO LINEAL

16

NO.

CONCEPTO

UNIDAD

P.U.

165

COLUMNA CIRCULAR EN ESTRUCTURA DE 40 CM. DE DIAMETRO REFORZADA CON 6 VARILLAS DEL 5/8" Y ESTRIBOS DE 3/8" @ 15 CM. DE FORMA HELICOIDAL, CON CONCRETO F'C=250 KG/CM2, INCLUYE: MATERIALES, MANO DE OBRA, CIMBRA Y DESCIMBRA, VIBRADO Y CURADO.

ML

$ 1,118.67

166

COLUMNA CIRCULAR EN ESTRUCTURA DE 55 CM. DE DIAMETRO, REFORZADA CON 8 VARILLAS DE 5/8", 6 VARILLAS DE 1/2" Y ESTRIBOS DE 3/8" @ 15 CM. DE FORMA HELICOIDAL, CONCRETO F'C= 250 KG/CM2 AGREGADO TRITURADO DE 3/4", INCLUYE: MATERIALES, MANO DE OBRA, CIMBRA Y DESCIMBRA, VIBRADO Y CURADO.

ML

$ 2,091.63

167

TRABE EN ESTRUCTURA DE SECCION 25 X 40 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4" CIMBRA COMUN, HABILITADO CON 140 KG. DE ACERO DE 5/8" Y 1/2" POR M3., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 10,452.13

168

TRABE EN ESTRUCTURA DE SECCION 25 X 40 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4" CIMBRA COMUN, HABILITADO CON 140 KG. DE ACERO DE 5/8" Y 1/2" POR M3., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 10,628.21

169

TRABE EN ESTRUCTURA DE SECCION 40 X 60 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4" CIMBRA COMUN, HABILITADO CON 140 KG. DE ACERO DE 5/8" Y 1/2" POR M3., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 9,289.43

170

TRABE EN ESTRUCTURA DE SECCION 40 X 60 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4" CIMBRA COMUN, HABILITADO CON 140 KG. DE ACERO DE 5/8" Y 1/2" POR M3., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 9,465.51

171

TRABE EN ESTRUCTURA DE SECCION 25 X 40 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4" CIMBRA COMUN, HABILITADO CON 140 KG. DE ACERO DE 5/8" Y 1/2" POR M3., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,060.05

172

TRABE EN ESTRUCTURA DE SECCION 25 X 40 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4" CIMBRA COMUN, HABILITADO CON 140 KG. DE ACERO DE 5/8" Y 1/2" POR M3., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,077.65

173

TRABE EN ESTRUCTURA DE SECCION 30 X 50 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4" CIMBRA COMÚN, ARMADA CON 8 VARILLAS DEL No. 4 (1/2") Y ESTRIBOS DEL No. 3 (3/8") A CADA 20 CM., INCLUYE: CIMBRADO Y DESCIMBRADO.

ML

$ 1,229.99

174

TRABE EN ESTRUCTURA DE SECCION 30 X 50 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4" CIMBRA COMÚN, ARMADA CON 8 VARILLAS DEL No. 4 (1/2") Y ESTRIBOS DEL No. 3 (3/8") A CADA 20 CM., INCLUYE: CIMBRADO Y DESCIMBRADO.

ML

$ 1,256.40

ML

$ 168.81

ML

$ 168.98

ML

$ 164.73

17).- TRABES TRABES POR METRO CÚBICO

TRABES POR METRO LINEAL

18).- ESCALONES

175

176

177

ESCALONES DE 30 CM. DE HUELLA X 17 CM. DE PERALTE, FORJADOS CON TABIQUE ROJO RECOCIDO, ASENTADO CON MORTERO CEMENTO-CAL-ARENA 1:1:6, INCLUYE: ACARREOS 1a. ESTACION A 20.00 M., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO. ESCALONES DE 30 CM. DE HUELLA X 17 CM. DE PERALTE, FORJADOS CON TABIQUE ROJO RECOCIDO, ASENTADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: ACARREOS 1a. ESTACION A 20.00 M., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO. ESCALONES DE 25 CM. DE HUELLA X 17 CM. DE PERALTE, FORJADOS CON TABIQUE ROJO RECOCIDO, ASENTADO CON MORTERO CEMENTO-CAL-ARENA 1:1:6, INCLUYE: ACARREOS 1a. ESTACION A 20.00 M., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

17

NO.

CONCEPTO

UNIDAD

P.U.

178

ESCALONES DE 25 CM. DE HUELLA X 17 CM. DE PERALTE, FORJADOS CON TABIQUE ROJO RECOCIDO, ASENTADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: ACARREOS 1a. ESTACION A 20.00 M., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 164.85

179

ESCALONES DE 30 CM. DE HUELLA X 17 CM. DE PERALTE, FORJADOS CON CONCRETO F'C=100 KG/CM2., INCLUYE: ACARREOS 1a. ESTACION A 20.00 M., MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 156.30

180

ESCALONES DE 30 CM. DE HUELLA X 17 CM. DE PERALTE, FORJADOS CON CONCRETO F'C=150 KG/CM2., INCLUYE: ACARREOS 1a. ESTACION A 20.00 M., MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 161.73

PZA

$ 2,540.13

PZA

$ 2,513.34

PZA

$ 2,578.91

PZA

$ 2,547.19

185

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 1.50 M.

PZA

$ 9,809.22

186

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 1.75 M.

PZA

$ 10,601.15

187

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 2.00 M.

PZA

$ 11,493.79

188

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 2.25 M.

PZA

$ 12,255.89

189

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 2.50 M.

PZA

$ 12,905.24

190

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 2.75 M.

PZA

$ 13,676.78

191

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 3.00 M.

PZA

$ 14,445.82

19).- REGISTROS SANITARIOS

181

182

183

184

REGISTRO DE 0.40 X 0.60 X 1.00 M. MEDIDAS INTERIORES, DE TABIQUE ROJO RECOCIDO EN 14CM. DE ESPESOR, JUNTEADO CON MORTERO CEMENTO-ARENA 1:4, ACABADO PULIDO Y PLANTILLA DE CONCRETO F'C=100 KG/CM2., INCLUYE: MARCO, CONTRAMARCO, TAPA DE CONCRETO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO. REGISTRO DE 0.40 X 0.60 X 1.00 M. MEDIDAS INTERIORES, DE TABIQUE ROJO RECOCIDO EN 14 CM. DE ESPESOR, JUNTEADO CON MORTERO CEMENTO-ARENA 1:5, ACABADO PULIDO Y PLANTILLA DE CONCRETO F'C=150 KG/CM2., INCLUYE: MARCO, CONTRAMARCO, TAPA DE CONCRETO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO. REGISTRO DE 0.60 X 0.60 X 1.00 M. MEDIDAS INTERIORES, DE TABIQUE ROJO RECOCIDO EN 14 CM. DE ESPESOR, JUNTEADO CON MORTERO CEMENTO-ARENA 1:4, ACABADO PULIDO Y PLANTILLA DE CONCRETO F'C=100 KG/CM2, INCLUYE: MARCO, CONTRAMARCO, TAPA DE CONCRETO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO. REGISTRO DE 0.60 X 0.60 X 1.00 M. MEDIDAS INTERIORES DE TABIQUE ROJO RECOCIDO EN 14 CM. DE ESPESOR, JUNTEADO CON MORTERO CEMENTO-ARENA 1:5, ACABADO PULIDO Y PLANTILLA DE CONCRETO F'C=150 KG/CM2, INCLUYE: MARCO, CONTRAMARCO, TAPA DE CONCRETO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO. 20).-POZOS DE VISITA

18

NO.

CONCEPTO

UNIDAD

P.U.

192

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 3.25 M.

PZA

$ 15,219.70

193

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 3.50 M.

PZA

$ 16,115.36

194

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 3.75 M.

PZA

$ 16,760.47

195

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 4.00 M.

PZA

$ 17,412.31

196

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 4.25 M.

PZA

$ 18,185.98

197

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 4.50 M.

PZA

$ 18,833.36

198

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 4.75 M.

PZA

$ 19,731.40

199

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 5.00 M.

PZA

$ 20,999.20

200

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 1.50 M.

PZA

$ 7,786.70

201

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 1.75 M.

PZA

$ 8,678.35

202

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 2.00 M.

PZA

$ 9,263.49

203

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 2.25 M.

PZA

$ 9,997.56

204

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 2.50 M.

PZA

$ 10,758.39

205

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 2.75 M.

PZA

$ 11,524.57

206

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 3.00 M.

PZA

$ 12,379.57

19

NO.

UNIDAD

P.U.

PZA

$ 13,055.78

PZA

$ 13,890.76

209

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 3.75 M.

PZA

$ 14,598.50

210

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 4.00 M.

PZA

$ 15,382.35

211

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 4.25 M.

PZA

$ 16,183.52

212

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 4.50 M.

PZA

$ 16,772.93

PZA

$ 17,914.01

PZA

$ 19,045.21

PZA

$ 2,732.80

207

208

213

214

215

CONCEPTO POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M. PROFUNDIDAD RASANTE HIDR. 3.25 M. POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M. PROFUNDIDAD RASANTE HIDR. 3.50 M.

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M. PROFUNDIDAD RASANTE HIDR. 4.75 M. POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 5.00 M. SUMINISTRO Y COLOCACION DE BROCAL Y TAPA DE CONCRETO PARA POZO DE VISITA.

216

SUMINISTRO Y COLOCACION DE BROCAL Y TAPA DE Fo. Fo. MEDIANO DE 130 KG.

PZA

$ 3,755.99

217

SUMINISTRO Y COLOCACION DE BROCAL Y TAPA DE POLIETILENO (LIGERO).

PZA

$ 2,757.32

218

SUMINISTRO Y COLOCACION DE BROCAL Y TAPA DE POLIETILENO (PESADO).

PZA

$ 3,014.10

21).-FIRMES DE CONCRETO 219

FIRME DE 5 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA RESISTENCIA NORMAL F'C=100 KG/CM2., AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 161.10

220

FIRME DE 8 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA RESISTENCIA NORMAL F'C=100 KG/CM2., AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 230.77

221

FIRME DE 10 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA RESISTENCIA NORMAL F'C=100 KG/CM2., AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 270.31

222

FIRME DE 5 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA RESISTENCIA NORMAL F'C=150 KG/CM2., AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 171.58

223

FIRME DE 8 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA RESISTENCIA NORMAL F'C=150 KG/CM2., AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 247.56

224

FIRME DE 10 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA RESISTENCIA NORMAL F'C=150 KG/CM2., AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 291.27

20

NO.

CONCEPTO

UNIDAD

P.U.

22).- PISOS DE CONCRETO 225

PISO DE 5 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., AGREGADO MAXIMO 3/4", ACABADO PULIDO, INCLUYE: CIMBRADO, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 271.83

226

PISO DE 8 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., AGREGADO MAXIMO 3/4", ACABADO PULIDO, INCLUYE: CIMBRADO, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 340.90

227

PISO DE 10 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., AGREGADO MAXIMO 3/4", ACABADO PULIDO, INCLUYE: CIMBRADO, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 371.26

228

PISO DE 5 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., AGREGADO MAXIMO 3/4", ACABADO ESCOBILLADO, INCLUYE: CIMBRADO, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 240.79

229

PISO DE 8 CM. DE ESPESOR DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., AGREGADO MAXIMO 3/4", ACABADO ESCOBILLADO, INCLUYE: CIMBRADO, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 301.40

230

PISO DE 10 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., AGREGADO MAXIMO 3/4", ACABADO ESCOBILLADO, INCLUYE: CIMBRADO, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 359.04

231

PISO DE 8.0 CM. DE ESPESOR, DE CONCRETO F'C = 150 KG/CM2., REVENIMIENTO NORMAL, TAMAÑO MÁXIMO AGREGADO DE 19 MM. (3/4"), PULIDO INTEGRAL CON LLANA METÁLICA, INCLUYE: LA PREPARACIÓN DE LA BASE Y CURADO.

M2

$ 296.19

232

PISO DE 10.0 CM. DE ESPESOR, DE CONCRETO F'C = 150 KG/CM2., REVENIMIENTO NORMAL, TAMAÑO MÁXIMO AGREGADO DE 19 MM. (3/4"), PULIDO INTEGRAL CON LLANA METÁLICA, INCLUYE: LA PREPARACIÓN DE LA BASE Y CURADO.

M2

$ 341.91

23).-PISOS DE CONCRETO ARMADOS CON MALLA 233

PISO DE 8 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., AGREGADO MAXIMO 3/4", ACABADO PULIDO, REFORZADO CON MALLA ELECTROSOLDADA 6-6/10-10, INCLUYE: CIMBRADO, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 380.86

234

PISO DE 8 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., AGREGADO MAXIMO 3/4", ACABADO ESCOBILLADO, REFORZADO CON MALLA ELECTROSOLDADA 6-6/10-10, INCLUYE: CIMBRADO, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 360.58

235

PISO DE 10 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., AGREGADO MAXIMO 3/4", ACABADO PULIDO, REFORZADO CON MALLA ELECTROSOLDADA 6-6/10-10, INCLUYE: CIMBRADO, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 426.59

236

PISO DE 10 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., AGREGADO MAXIMO 3/4", ACABADO ESCOBILLADO, REFORZADO CON MALLA ELECTROSOLDADA 6-6 /10-10, INCLUYE: CIMBRADO, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 406.31

237

PISO DE 10 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA F'C=200 KG/CM2., AGREGADO MAXIMO 3/4", ACABADO PULIDO, REFORZADO CON MALLA ELECTROSOLDADA 6-6/ 10-10, INCLUYE: CIMBRADO, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 436.55

238

PISO DE 10 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA F'C=200 KG/CM2., AGREGADO MAXIMO 3/4," ACABADO ESCOBILLADO, REFORZADO CON MALLA ELECTROSOLDADA 6-6/10-10, INCLUYE: CIMBRADO, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 416.26

24).-FINOS PARA PISO 239

FINO DE MORTERO CEMENTO-ARENA 1:4, DE 2.5 CM. DE ESPESOR, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 116.28

240

FINO DE MORTERO CEMENTO-ARENA 1:5, DE 2.5 CM. DE ESPESOR, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 109.13

241

FINO DE MORTERO CEMENTO-ARENA 1:4, DE 3 CM. DE ESPESOR, ACABADO PULIDO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 141.30

21

NO.

CONCEPTO

UNIDAD

P.U.

242

FINO DE MORTERO CEMENTO-ARENA 1:5, DE 3 CM. DE ESPESOR, ACABADO PULIDO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 132.44

243

FINO DE MORTERO CEMENTO-ARENA 1:4, DE 5 CM. DE ESPESOR, ACABADO PULIDO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 200.23

244

FINO DE MORTERO CEMENTO-ARENA 1:5, DE 5 CM. DE ESPESOR, ACABADO PULIDO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 185.47

M2

$ 33.58

25).-ACABADOS SOBRE PISO 245

ACABADO ESCOBILLADO INTEGRAL SOBRE PISO DE CONCRETO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

INCLUYE:

246

ACABADO PULIDO INTEGRAL SOBRE PISO DE CONCRETO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 56.22

247

ACABADO MARTELINADO EN PISOS DE CONCRETO, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 372.38

248

ACABADO ESTAMPADO EN CONCRETO, INCLUYE: MANO DE OBRA, COLOR ENDURECEDOR, DESMOLDANTE, SELLADOR ACRILICO, MANO DE OBRA, Y MOLDE.

M2

$ 145.24

249

SUMINISTRO Y COLOCACION DE PISO INTERCERAMIC DESERT CADIR DE 33 X 33 CM. DE PRIMERA, ASENTADO CON PEGA AZULEJO, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 401.98

250

SUMINISTRO Y COLOCACION DE PISO INTERCERAMIC CREMA MARFIL CLARO DE 40 X 40 CM. DE PRIMERA, ASENTADO CON PEGA AZULEJO, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 426.20

251

SUMINISTRO Y COLOCACION DE PISO INTERCERAMIC DESERT CADIR DE 50 X 50 CM. DE PRIMERA, ASENTADO CON PEGA AZULEJO, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 430.47

252

SUMINISTRO Y COLOCACION DE PISO INTERCERAMIC CREEK STONE TERRACOTA DE 33 X 33 CM. DE PRIMERA, ASENTADO CON PEGA AZULEJO, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 552.57

253

SUMINISTRO Y COLOCACION DE PISO INTERCERAMIC HABITAT CANVAS DE 40 X 40 CM. DE PRIMERA, ASENTADO CON PEGA AZULEJO, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 572.07

254

SUMINISTRO Y COLOCACION DE PISO INTERCERAMIC CREMA MARFIL NATURAL DE 60 X 60 CM. DE PRIMERA, ASENTADO CON PEGA AZULEJO, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 506.90

255

SUMINISTRO Y COLOCACION DE PISO INTERCERAMIC SAND STONE BEIGE DE 40 X 60 CM. DE PRIMERA, ASENTADO CON PEGA AZULEJO, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 493.88

256

SUMINISTRO Y COLOCACION DE PISO FILADELFIA HUESO PORCELANITE DE 20 X 20 CM. ASENTADO CON PEGA AZULEJO, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 398.40

M2

$ 390.41

26).-RECUBRIMIENTOS CERAMICOS ASENTADOS CON PEGA AZULEJO

27).-RECUBRIMIENTOS CERAMICOS ASENTADOS CON MORTERO CEMENTO-ARENA 1:2

257

SUMINISTRO Y COLOCACION DE PISO INTERCERAMIC DESERT CADIR DE 33 X 33 CM. DE PRIMERA, ASENTADO CON MORTERO CEM-ARENA 1:2, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

22

NO.

CONCEPTO

UNIDAD

P.U.

258

SUMINISTRO Y COLOCACION DE PISO INTERCERAMIC CREMA MARFIL CLARO DE 40 X 40 CM. DE PRIMERA, ASENTADO CON MORTERO CEM-ARENA 1:2, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 422.39

259

SUMINISTRO Y COLOCACION DE PISO INTERCERAMIC DESERT CADIR DE 50 X 50 CM. DE PRIMERA, ASENTADO CON MORTERO CEM-ARENA 1:2, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 410.98

260

SUMINISTRO Y COLOCACION DE PISO INTERCERAMIC CREEK STONE TERRACOTA DE 33 X 33 CM. DE PRIMERA, ASENTADO CON MORTERO CEM-ARENA 1:2, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 493.16

261

SUMINISTRO Y COLOCACION DE PISO INTERCERAMIC HABITAT CANVAS DE 40 X 40 CM. DE PRIMERA, ASENTADO CON MORTERO CEM-ARENA 1:2, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 565.05

262

SUMINISTRO Y COLOCACION DE PISO INTERCERAMIC CREMA MARFIL NATURAL DE 60 X 60 CM. DE PRIMERA, ASENTADO CON MORTERO CEM-ARENA 1:2, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 498.63

263

SUMINISTRO Y COLOCACION DE PISO INTERCERAMIC SAND STONE BEIGE DE 40 X 60 CM. DE PRIMERA, ASENTADO CON MORTERO CEM-ARENA 1:2, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 485.36

264

SUMINISTRO Y COLOCACION DE PISO FILADELFIA HUESO PORCELANITE DE 20 X 20 CM. ASENTADO CON MORTERO CEM-ARENA 1:2, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 436.88

265

MURO DE TABIQUE DE BARRO ROJO RECOCIDO DE 6 X 13 X 26 CM. DE 13 CM. DE ESPESOR, ASENTADO CON MORTERO CEMENTO-ARENA 1:4, JUNTAS DE 1.5 CM. CON ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 520.99

266

MURO DE TABIQUE DE BARRO ROJO RECOCIDO DE 6 X 13 X 26 CM. DE 6 CM. DE ESPESOR, ASENTADO CON MORTERO CEMENTO-ARENA 1:4, JUNTAS DE 1.5 CM. CON ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 270.11

267

MURO DE TABIQUE DE BARRO ROJO RECOCIDO DE 6 X 13 X 26 CM. DE 13 CM. DE ESPESOR, ASENTADO CON MORTERO CEMENTO-ARENA 1:5, JUNTAS DE 1.5 CM. CON ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 510.55

268

MURO DE TABIQUE DE BARRO ROJO RECOCIDO DE 6 X 13 X 26 CM. DE 26 CM. DE ESPESOR, ASENTADO CON MORTERO CEMENTO-ARENA 1:5, JUNTAS DE 1.5 CM. CON ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 1,004.26

28).-MUROS DE TABIQUE

29).-MUROS DE BLOCK 269

MURO DE BLOCK DE 12 X 20 X 40 CM. EN 12 CM. DE ESPESOR ASENTADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 272.44

270

MURO DE BLOCK DE 12 X 20 X 40 CM. EN 12 CM. DE ESPESOR ASENTADO CON MORTERO CEMENTO-ARENA 1:5, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 269.32

M2

$ 399.92

30).-TEJA 271

SUMINISTRO Y COLOCACION DE TEJA DE BARRO ASENTADA CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO. 23

NO.

CONCEPTO

UNIDAD

P.U.

31).-PRETILES 272

PRETIL DE TABIQUE ROJO 14 CM. DE ESPESOR, ACABADO COMUN, ASENTADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: ACARREO A 1A. ESTACION 20.00 M., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 365.99

273

PRETIL DE TABIQUE ROJO 14 CM. DE ESPESOR, ACABADO COMUN, ASENTADO CON MORTERO CEMENTO-ARENA 1:5, INCLUYE: ACARREO A 1A. ESTACION 20.00 M., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 356.36

32).- APLANADO COMÚN EN MUROS 274

APLANADO COMUN EN MUROS A PLOMO Y REGLA CON MORTERO CEMENTO-ARENA 1:2, ESPESOR PROMEDIO 2 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 164.73

275

APLANADO COMUN EN MUROS A PLOMO Y REGLA CON MORTERO CEMENTO-ARENA 1:3, ESPESOR PROMEDIO 2 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO

M2

$ 154.63

276

APLANADO COMUN EN MUROS A PLOMO Y REGLA CON MORTERO CEMENTO-ARENA 1:4, ESPESOR PROMEDIO 2 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 147.05

277

APLANADO COMUN EN MUROS A PLOMO Y REGLA CON MORTERO CEMENTO-ARENA 1:5, ESPESOR PROMEDIO 2 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 140.16

278

APLANADO COMUN EN MUROS A PLOMO Y REGLA CON MORTERO CEMENTO-ARENA 1:6 ESPESOR PROMEDIO 2 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 135.05

279

APLANADO COMUN EN MUROS A PLOMO Y REGLA CON MORTERO CEMENTOCALHIDRA-ARENA 1:1:6, ESPESOR PROMEDIO 2 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 146.59

280

APLANADO COMUN EN MUROS A PLOMO Y REGLA CON MORTERO CEMENTOCALHIDRA-ARENA 1:1:8, ESPESOR PROMEDIO 2 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 129.65

33).-APLANADO COMÚN EN PLAFONES 281

APLANADO COMUN EN PLAFONES A REGLA Y NIVEL CON MORTERO CEMENTOARENA 1:2, ESPESOR PROMEDIO 2 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 174.52

282

APLANADO COMUN EN PLAFONES A REGLA Y NIVEL CON MORTERO CEMENTOARENA 1:3, ESPESOR PROMEDIO 2 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 164.42

283

APLANADO COMUN EN PLAFONES A REGLA Y NIVEL CON MORTERO CEMENTOARENA 1:4, ESPESOR PROMEDIO 2 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 156.84

284

APLANADO COMUN EN PLAFONES A REGLA Y NIVEL CON MORTERO CEMENTOARENA 1:5, ESPESOR PROMEDIO 2 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 149.95

285

APLANADO COMUN EN PLAFONES A REGLA Y NIVEL CON MORTERO CEMENTOARENA 1:6, ESPESOR PROMEDIO 2 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 144.84

286

APLANADO COMUN EN PLAFONES A REGLA Y NIVEL CON MORTERO CEMENTOCALHIDRA-ARENA 1:1:6, ESPESOR PROMEDIO 2 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 156.38

287

APLANADO COMUN EN PLAFONES A REGLA Y NIVEL CON MORTERO CEMENTOCALHIDRA-ARENA 1:1:8, ESPESOR PROMEDIO 2 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 139.44

M2

$ 223.63

34).-APLANADO FINO EN MUROS 288

APLANADO FINO EN MUROS A PLOMO Y REGLA CON MORTERO CEMENTO-ARENA 1:2, ESPESOR PROMEDIO 2.5 CM., INCLUYE: ACABADO PULIDO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO. 24

NO.

CONCEPTO

UNIDAD

P.U.

289

APLANADO FINO EN MUROS A PLOMO Y REGLA CON MORTERO CEMENTO-ARENA 1:3, ESPESOR PROMEDIO 2.5 CM., INCLUYE: ACABADO PULIDO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 211.11

290

APLANADO FINO EN MUROS A PLOMO Y REGLA CON MORTERO CEMENTO-ARENA 1:4, ESPESOR PROMEDIO 2.5 CM., INCLUYE: ACABADO PULIDO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 201.72

291

APLANADO FINO EN MUROS A PLOMO Y REGLA CON MORTERO CEMENTO-ARENA 1:5, ESPESOR PROMEDIO 2.5 CM., INCLUYE: ACABADO PULIDO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 193.17

292

APLANADO FINO EN MUROS A PLOMO Y REGLA CON MORTERO CEMENTO-ARENA 1:6, ESPESOR PROMEDIO 2.5 CM., INCLUYE: ACABADO PULIDO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 186.82

293

APLANADO FINO EN MUROS A PLOMO Y MUROS CON MORTERO CEMENTOCALHIDRA-ARENA 1:1:6, ESPESOR PROMEDIO 2.5 CM., INCLUYE: ACABADO PULIDO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 201.16

294

APLANADO FINO EN MUROS A PLOMO Y MUROS CON MORTERO CEMENTOCALHIDRA-ARENA 1:1:8, ESPESOR PROMEDIO 2.5 CM., INCLUYE: ACABADO PULIDO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 180.13

35).-APLANADO FINO EN PLAFONES 295

APLANADO FINO EN PLAFONES A REGLA Y NIVEL CON MORTERO CEMENTO-ARENA 1:2, ESPESOR PROMEDIO 2.5 CM., INCLUYE: ACABADO PULIDO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 244.23

296

APLANADO FINO EN PLAFONES A REGLA Y NIVEL CON MORTERO CEMENTO-ARENA 1:3, ESPESOR PROMEDIO 2.5 CM., INCLUYE: ACABADO PULIDO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 231.72

297

APLANADO FINO EN PLAFONES A REGLA Y NIVEL CON MORTERO CEMENTO-ARENA 1:4, ESPESOR PROMEDIO 2.5 CM., INCLUYE: ACABADO PULIDO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 222.32

298

APLANADO FINO EN PLAFONES A REGLA Y NIVEL CON MORTERO CEMENTO-ARENA 1:5, ESPESOR PROMEDIO 2.5 CM., INCLUYE: ACABADO PULIDO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 213.80

299

APLANADO FINO EN PLAFONES A REGLA Y NIVEL CON MORTERO CEMENTO-ARENA 1:6, ESPESOR PROMEDIO 2.5 CM., INCLUYE: ACABADO PULIDO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 207.43

300

APLANADO FINO EN PLAFONES A REGLA Y NIVEL CON MORTERO CEMENTOCALHIDRA-ARENA 1:1:6, ESPESOR PROMEDIO 2.5 CM., INCLUYE: ACABADO PULIDO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 221.76

301

APLANADO FINO EN PLAFONES A REGLA Y NIVEL CON MORTERO CEMENTOCALHIDRA-ARENA 1:1:8, ESPESOR PROMEDIO 2.5 CM., INCLUYE: ACABADO PULIDO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 200.73

36).-EMBOQUILLADO COMÚN 302

EMBOQUILLADO APLANADO UNA ARISTA CON MORTERO CEMENTO-ARENA 1:2, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 98.95

303

EMBOQUILLADO APLANADO UNA ARISTA CON MORTERO CEMENTO-ARENA 1:3, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 98.32

304

EMBOQUILLADO APLANADO UNA ARISTA CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 97.87

305

EMBOQUILLADO APLANADO UNA ARISTA CON MORTERO CEMENTO-ARENA 1:5, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 97.47

306

EMBOQUILLADO APLANADO UNA ARISTA CON MORTERO CEMENTO-ARENA 1:6, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 97.15

307

EMBOQUILLADO PERFILADO UNA ARISTA CON MORTERO CEMENTO-CALHIDRAARENA 1:1:6, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 97.85

25

NO.

CONCEPTO

UNIDAD

P.U.

308

EMBOQUILLADO PERFILADO UNA ARISTA CON MORTERO CEMENTO-CALHIDRAARENA 1:1:8, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 96.83

37).- HABILITADO DE ACERO EN CIMENTACIÓN 309

ACERO DE REFUERZO EN CIMENTACION DEL No. 2 (1/4") ALAMBRON, INCLUYE: HABILITADO, ARMADO, GANCHOS, TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

TON

$ 38,207.26

310

ACERO DE REFUERZO EN CIMENTACION DEL No. 3 (3/8"), INCLUYE: HABILITADO, ARMADO, GANCHOS, TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

TON

$ 32,181.96

311

ACERO DE REFUERZO EN CIMENTACION DEL No. 4 (1/2"), INCLUYE: HABILITADO, ARMADO, GANCHOS, TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

TON

$ 31,569.33

312

ACERO DE REFUERZO EN CIMENTACION DEL No. 5 (5/8"), INCLUYE: HABILITADO, ARMADO, GANCHOS, TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

TON

$ 30,898.37

313

ACERO DE REFUERZO EN CIMENTACION DEL No. 6 (3/4"), INCLUYE: HABILITADO, ARMADO, GANCHOS, TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

TON

$ 30,667.12

314

ACERO DE REFUERZO EN CIMENTACION DEL No. 8 (1"), INCLUYE: HABILITADO, ARMADO, GANCHOS, TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

TON

$ 29,984.57

EN ESTRUCTURA 315

ACERO DE REFUERZO EN ESTRUCTURA DEL No. 2 (1/4") ALAMBRON, INCLUYE: HABILITADO, ARMADO, GANCHOS, TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

TON

$ 40,443.28

316

ACERO DE REFUERZO EN ESTRUCTURA DEL No. 3 (3/8"), INCLUYE: HABILITADO, ARMADO, GANCHOS, TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

TON

$ 33,876.16

317

ACERO DE REFUERZO EN ESTRUCTURA DEL No. 4 (1/2"), INCLUYE: HABILITADO, ARMADO, GANCHOS, TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

TON

$ 32,892.46

318

ACERO DE REFUERZO EN ESTRUCTURA DEL No. 5 (5/8"), INCLUYE: HABILITADO, ARMADO, GANCHOS, TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

TON

$ 32,207.27

319

ACERO DE REFUERZO EN ESTRUCTURA DEL No. 6 (3/4"), INCLUYE: HABILITADO, ARMADO, GANCHOS, TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

TON

$ 31,886.81

320

ACERO DE REFUERZO EN ESTRUCTURA DEL No. 8 (1"), INCLUYE: HABILITADO, ARMADO, GANCHOS, TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

TON

$ 31,016.59

321

SUMINISTRO Y COLOCACION DE MALLA DE ACERO ELECTROSOLDADA 6 X 6 - 4 / 4 EN LOSAS, PISOS, FIRMES DE CIMENTACION, PLANTA BAJA, INCLUYE: TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 93.32

322

SUMINISTRO Y COLOCACION DE MALLA DE ACERO ELECTROSOLDADA 6 X 6 - 6 / 6 EN LOSAS, PISOS, FIRMES DE CIMENTACION, PLANTA BAJA, INCLUYE: TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 72.35

323

SUMINISTRO Y COLOCACION DE MALLA DE ACERO ELECTROSOLDADA 6 X 6 - 10 / 10 EN LOSAS, PISOS, FIRMES DE CIMENTACION, PLANTA BAJA, INCLUYE: TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 58.67

38).-HABILITADO DE MALLAS ELECTROSOLDADAS

26

NO.

CONCEPTO

UNIDAD

P.U.

324

SUMINISTRO Y COLOCACION DE MALLA DE ACERO ELECTROSOLDADA 6 X 6 - 4 / 4 EN MUROS DE CIMENTACION Y PLANTA BAJA, INCLUYE: TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 114.51

325

SUMINISTRO Y COLOCACION DE MALLA DE ACERO ELECTROSOLDADA 6 X 6 - 6 / 6 EN MUROS DE CIMENTACION Y PLANTA BAJA, INCLUYE: TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 91.23

326

SUMINISTRO Y COLOCACION DE MALLA DE ACERO ELECTROSOLDADA 6 X 6 - 10 /10 EN MUROS DE CIMENTACION Y PLANTA BAJA, INCLUYE: TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 74.91

327

SUMINISTRO Y COLOCACION DE MALLA DE ACERO ELECTROSOLDADA 6 X 6 - 4 / 4 EN CUBIERTAS DE LOSAS DE CONCRETO, INCLUYE: TRASLAPES, DESPERDICIOS, ACARREO A 1A ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO

M2

$ 105.81

328

SUMINISTRO Y COLOCACION DE MALLA DE ACERO ELECTROSOLDADA 6 X 6 - 6 / 6 EN CUBIERTAS DE LOSAS DE CONCRETO, INCLUYE: TRASLAPES, DESPERDICIOS, ACARREO A 1A ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO

M2

$ 86.90

329

SUMINISTRO Y COLOCACION DE MALLA DE ACERO ELECTROSOLDADA 6 X 6 - 10 / 10 EN CUBIERTAS DE LOSAS DE CONCRETO, INCLUYE: TRASLAPES, DESPERDICIOS, ACARREO A 1A ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO

M2

$ 74.10

39).-CIMBRAS EN TANQUE ELEVADO 330

CIMBRA EN FRONTERAS EN LOSA DE CIMENTACION DE 0.30 M. DE ALTO Y 0.35 M. DE ESPESOR, ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 195.70

331

CIMBRA COMUN EN CONTRATRABES DE CIMENTACION DE 0.35 M. DE BASE X 0.95 M. DE ALTURA (LA ALTURA INCLUYE 0.30 M. DE ESPESOR DE LOSA CIMENTACION), POR AMBAS CARAS, ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 248.24

332

CIMBRA COMUN EN CONTRATRABES DE CIMENTACION DE 0.20 M. DE BASE X 0.50 M. DE ALTURA, POR AMBAS CARAS, ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 220.50

333

CIMBRA COMUN EN COLUMNAS DE ESTRUCTURA DE ANCHO VARIABLE, SIENDO 1.25 M. EL ANCHO PROMEDIO Y UN ESPESOR DE 0.30 M., HASTA UNA ALTURA DE 2.50 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 553.53

334

CIMBRA COMUN EN COLUMNAS DE ESTRUCTURA DE ANCHO VARIABLE, SIENDO 1.25 M. EL ANCHO PROMEDIO Y UN ESPESOR DE 0.30 M., A UNA ALTURA DE 2.50 M. A 5.00 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 643.69

335

CIMBRA COMUN EN COLUMNAS DE ESTRUCTURA DE ANCHO VARIABLE, SIENDO 1.25 M. EL ANCHO PROMEDIO Y UN ESPESOR DE 0.30 M., A UNA ALTURA DE 5.00 M. A 7.50 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 667.21

336

CIMBRA COMUN EN COLUMNAS DE ESTRUCTURA DE ANCHO VARIABLE, SIENDO 1.25 M. EL ANCHO PROMEDIO Y UN ESPESOR DE 0.30 M., A UNA ALTURA DE 7.50 M. A 10.00 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 712.97

337

CIMBRA COMUN EN COLUMNAS DE ESTRUCTURA DE ANCHO VARIABLE, SIENDO 1.25 M. EL ANCHO PROMEDIO Y UN ESPESOR DE 0.30 M., A UNA ALTURA DE 10.00 M. A 12.50 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 775.89

338

CIMBRA COMUN EN COLUMNAS DE ESTRUCTURA DE ANCHO VARIABLE, SIENDO 1.25 M. EL ANCHO PROMEDIO Y UN ESPESOR DE 0.30 M., A UNA ALTURA DE 12.50 M. A 15.00 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 875.06

27

NO.

CONCEPTO

UNIDAD

P.U.

339

CIMBRA COMUN EN TRABE DE ESTRUCTURA DE 0.25 M. DE ANCHO Y 0.35 M. DE ALTO, HASTA UNA ALTURA DE 2.50 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 267.21

340

CIMBRA COMUN EN TRABE DE ESTRUCTURA DE 0.25 M. DE ANCHO Y 0.35 M. DE ALTO, A UNA ALTURA DE 2.50 M. A 5.00 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 280.12

341

CIMBRA COMUN EN TRABE DE ESTRUCTURA DE 0.25 M. DE ANCHO Y 0.35 M. DE ALTO, A UNA ALTURA DE 5.00 M. A 7.50 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 288.23

342

CIMBRA COMUN EN TRABE DE ESTRUCTURA DE 0.25 M. DE ANCHO Y 0.35 M. DE ALTO, A UNA ALTURA DE 7.50 M. A 10.00 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 300.42

343

CIMBRA COMUN EN TRABE DE ESTRUCTURA DE 0.25 M. DE ANCHO Y 0.35 M. DE ALTO, A UNA ALTURA DE 10.00 M. A 12.50 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 307.75

344

CIMBRA COMUN EN TRABE DE ESTRUCTURA DE 0.25 M. DE ANCHO Y 0.35 M. DE ALTO, A UNA ALTURA DE 12.50 M. A 15.00 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 319.42

345

CIMBRA COMUN EN TRABE DE ESTRUCTURA DE 0.25 M. DE ANCHO Y 0.55 M. DE ALTO, A UNA ALTURA DE 12.50 M. A 15.00 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 307.85

346

CIMBRA COMUN EN MENSULA DE 0.80 M. DE LARGO X 0.90 M. DE ALTURA Y 0.25 M. DE ESPESOR, A UNA ALTURA DE 12.50 M. A 15.00 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 239.75

347

CIMBRA COMUN EN LOSA DE ESTRUCTURA DE 0.25 M. DE ESPESOR, A UNA ALTURA MAXIMA DE 15.00 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 366.54

348

CIMBRA COMUN EN MURO DE ESTRUCTURA DE 0.29 M. DE ESPESOR Y ALTURA DE 1.90 M., A UNA ALTURA MAXIMA DE 15.00 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: AMBAS CARAS DE CIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 478.17

349

CIMBRA COMUN EN LOSA DE ESTRUCTURA DE 0.15 M. DE ESPESOR, A UNA ALTURA MAXIMA DE 17.30 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 376.94

40).-CIMBRAS 350

CIMBRA COMUN EN COLUMNAS HASTA 3.50 M. DE ALTURA, INCLUYE: MATERIALES Y MANO DE OBRA.

M2

$ 309.36

351

CIMBRA APARENTE EN COLUMNAS 30 X 30 CM. CON TRIPLAY HASTA 3.50 M. DE ALTURA, INCLUYE: MATERIALES Y MANO DE OBRA.

M2

$ 339.50

352

CIMBRA COMUN EN ZAPATAS DE CIMENTACION INCLUYE: MATERIALES Y MANO DE OBRA.

M2

$ 268.36

353

CIMBRA COMUN EN CONTRATRABES, MATERIALES Y MANO DE OBRA.

M2

$ 305.32

354

CIMBRA COMUN EN DALAS, CASTILLOS, CERRAMIENTOS, CEJAS, REPISONES DE SECCION IGUAL O MENOR A 0.020 M2. INCLUYE: MATERIALES Y MANO DE OBRA.

M2

$ 132.11

355

CIMBRA APARENTE EN DALAS, CASTILLOS, CERRAMIENTOS, CEJAS, REPISONES DE SECCION IGUAL O MENOR A 0.020 M2. INCLUYE: MATERIALES Y MANO DE OBRA.

M2

$ 261.48

DADOS

28

DE

CIMENTACION,

INCLUYE:

NO.

CONCEPTO

UNIDAD

P.U.

356

CIMBRA COMUN EN CADENAS, CASTILLOS, CEJAS, REPISONES DE SECCION MAYOR A 0.020 M2. INCLUYE: MATERIALES Y MANO DE OBRA.

M2

$ 157.58

357

CIMBRA APARENTE EN CADENAS, CASTILLOS, CEJAS, REPISONES DE SECCION MAYOR A 0.020 M2. INCLUYE: MATERIALES Y MANO DE OBRA.

M2

$ 295.90

358

CIMBRA COMUN EN TRABES 25 X 40 CM. CON DUELA HASTA 3.50 M. DE ALTURA, INCLUYE: MATERIALES Y MANO DE OBRA.

M2

$ 318.54

359

CIMBRA APARENTE EN TRABES DE 25 X 40 CM., HASTA 3.50 M. DE ALTURA INCLUYE: MATERIALES Y MANO DE OBRA.

M2

$ 340.90

360

CIMBRA COMUN EN LOSAS HASTA 3.50 M. DE ALTURA INCLUYE: MATERIALES Y MANO DE OBRA.

M2

$ 314.70

361

CIMBRA APARENTE EN LOSAS HASTA 3.50 M. DE ALTURA INCLUYE: MATERIALES Y MANO DE OBRA.

M2

$ 382.81

41).-EMPEDRADOS 362

EMPEDRADO DE PIEDRA BRAZA, ACABADO RUSTICO, COLOCADA CON MORTERO CEMENTO-ARENA 1:4 Y CONCRETO HECHO EN OBRA F'C=150 KG/CM2, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 455.19

363

EMPEDRADO DE PIEDRA BRAZA, ACABADO RUSTICO, COLOCADA CON MORTERO CEMENTO-ARENA 1:5 Y CONCRETO HECHO EN OBRA F'C=150 KG/CM2, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 441.90

364

EMPEDRADO DE PIEDRA BRAZA, ACABADO RUSTICO, COLOCADA CON MORTERO CEMENTO-ARENA 1:4 Y CONCRETO HECHO EN OBRA F'C=200 KG/CM2, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 465.85

365

EMPEDRADO DE PIEDRA BRAZA, ACABADO RUSTICO, COLOCADA CON MORTERO CEMENTO-ARENA 1:5 Y CONCRETO HECHO EN OBRA F'C=200 KG/CM2, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 452.65

366

CIMIENTOS DE MAMPOSTERIA DE PIEDRA BRAZA ASENTADA CON MORTERO CEMENTO-CALHIDRA-ARENA1:1:6, INCLUYE: ACARREOS A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,656.04

367

CIMIENTOS DE MAMPOSTERIA DE PIEDRA BRAZA ASENTADA CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: ACARREOS A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,661.75

368

CIMIENTOS DE MAMPOSTERIA DE PIEDRA BRAZA ASENTADA CON MORTERO CEMENTO-ARENA 1:5, INCLUYE: ACARREOS A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,576.39

369

CONSTRUCCION DE CIMENTACION DE PIEDRA BOLA DE RIO ASENTADA CON MORTERO CEMENTO-CAL-ARENA 1:1:8, INCLUYE: ACARREOS A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,676.57

370

CONSTRUCCION DE CIMENTACION DE PIEDRA BOLA DE RIO ASENTADA CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: ACARREOS A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 2,045.01

371

CONSTRUCCION DE CIMENTACION DE PIEDRA BOLA DE RIO ASENTADA CON MORTERO CEMENTO-ARENA 1:5, INCLUYE: ACARREOS A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,902.41

372

MURO DE MAMPOSTERIA DE PIEDRA BRAZA DE BANCO, CARAS ROSTREADAS HASTA UNA ALTURA DE 4.80 M. Y UN ESPESOR MENOR 0.60 M., ASENTADA CON MORTERO CEMENTO-ARENA1:4, INCLUYE: ELABORACION DEL MORTERO Y ACARREO EN CARRETILLA DEL MATERIAL A 1A. ESTACION A 20.00 M. DE DISTANCIA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 2,011.08

373

MURO DE MAMPOSTERIA DE PIEDRA BRAZA DE BANCO, CARAS ROSTREADAS HASTA UNA ALTURA DE 4.80 M. Y UN ESPESOR MENOR 0.60 M., ASENTADA CON MORTERO CEMENTO-ARENA 1:5, INCLUYE: ELABORACION DEL MORTERO Y ACARREO EN CARRETILLA DEL MATERIAL A 1A. ESTACION A 20.00 M. DE DISTANCIA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,994.42

42).-CIMIENTOS DE PIEDRA

43).-MUROS DE CONTENCIÓN

29

NO.

CONCEPTO

UNIDAD

P.U.

374

MURO DE MAMPOSTERIA DE PIEDRA BRAZA DE BANCO, CARAS ROSTREADAS HASTA UNA ALTURA DE 4.80 M. Y UN ESPESOR DE 0.61 A 1.00 M., ASENTADA CON MORTERO CEMENTO-ARENA1:4, INCLUYE: ELABORACION DEL MORTERO Y ACARREO EN CARRETILLA DEL MATERIAL A 1A. ESTACION A 20.00 M. DE DISTANCIA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 2,106.65

375

MURO DE MAMPOSTERIA DE PIEDRA BRAZA DE BANCO, CARAS ROSTREADAS HASTA UNA ALTURA DE 4.80 M. Y UN ESPESOR DE 0.61 A 1.00 M., ASENTADA CON MORTERO CEMENTO-ARENA 1:5, INCLUYE: ELABORACION DEL MORTERO Y ACARREO EN CARRETILLA DEL MATERIAL A 1A. ESTACION A 20.00 M. DE DISTANCIA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,937.83

376

MURO DE MAMPOSTERIA DE PIEDRA BRAZA DE BANCO, CARAS ROSTREADAS HASTA UNA ALTURA DE 3.60 M. Y UN ESPESOR MENOR DE 0.60 M., ASENTADA CON MORTERO CEMENTO-ARENA1:4, INCLUYE: ELABORACION DEL MORTERO Y ACARREO EN CARRETILLA DEL MATERIAL A 1A. ESTACION A 20.00 M. DE DISTANCIA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,925.72

377

MURO DE MAMPOSTERIA DE PIEDRA BRAZA DE BANCO, CARAS ROSTREADAS HASTA UNA ALTURA DE 3.60 M. Y UN ESPESOR MENOR DE 0.60 M., ASENTADA CON MORTERO CEMENTO-ARENA1:5, INCLUYE: ELABORACION DEL MORTERO Y ACARREO EN CARRETILLA DEL MATERIAL A 1A. ESTACION A 20.00 M. DE DISTANCIA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,836.37

378

MURO DE MAMPOSTERIA DE PIEDRA BRAZA DE BANCO, CARAS ROSTREADAS HASTA UNA ALTURA DE 3.60 M. Y UN ESPESOR DE 0.61 A 1.00 M., ASENTADA CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: ELABORACION DEL MORTERO Y ACARREO EN CARRETILLA DEL MATERIAL A 1A. ESTACION A 20.00 M. DE DISTANCIA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,897.79

379

MURO DE MAMPOSTERIA DE PIEDRA BRAZA DE BANCO, CARAS ROSTREADAS HASTA UNA ALTURA DE 3.60 M. Y UN ESPESOR DE 0.61 A 1.00 M., ASENTADA CON MORTERO CEMENTO-ARENA 1:5, INCLUYE: ELABORACION DEL MORTERO Y ACARREO EN CARRETILLA DEL MATERIAL A 1A. ESTACION A 20.00 M. DE DISTANCIA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,781.68

380

MURO DE CONCRETO ARMADO DE 15 CM. DE ESPESOR, CONCRETO F'C=200 KG/CM2. HABILITADO CON 75 KG. DE ACERO DE 3/8" Y 41 KG. DE ACERO DE 1/4", INCLUYE: CIMBRA COMUN, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 1,358.38

381

MURO DE CONCRETO ARMADO DE 15 CM. DE ESPESOR, CONCRETO F'C=250 KG/CM2. HABILITADO CON 75 KG. DE ACERO DE 3/8" Y 41 KG. DE ACERO DE 1/4", INCLUYE: CIMBRA COMUN, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 1,384.27

382

MURO DE CONCRETO ARMADO DE 20 CM. DE ESPESOR, CONCRETO F'C=200 KG/CM2. HABILITADO CON 85 KG. DE ACERO DE 1/2" Y 41 KG. DE ACERO DE 1/4", INCLUYE: CIMBRA COMUN, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 1,540.79

383

MURO DE CONCRETO ARMADO DE 20 CM. DE ESPESOR, CONCRETO F'C=250 KG/CM2. HABILITADO CON 85 KG. DE ACERO DE 1/2" Y 41 KG. DE ACERO DE 1/4", INCLUYE: CIMBRA COMUN, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 1,619.75

384

MURO DE CONCRETO ARMADO CONCRETO F'C=200 KG/CM2. HABILITADO CON 126 KG. DE ACERO, INCLUYE: CIMBRA COMUN, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 7,841.34

385

MURO DE CONCRETO ARMADO CONCRETO F'C=250 KG/CM2. HABILITADO CON 126 KG. DE ACERO, INCLUYE: CIMBRA COMUN, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 8,235.89

M3

$ 1,668.39

44).-MUROS DE CONCRETO

45).-CONCRETO CICLÓPEO 386

CONCRETO CICLOPEO (60 - 40) CON PIEDRA BRAZA LIMPIA Y CONCRETO HECHO EN OBRA F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: ACARREOS A 1A ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO. 30

NO.

CONCEPTO

UNIDAD

P.U.

387

CONCRETO CICLOPEO (60 - 40) CON PIEDRA BRAZA LIMPIA Y CONCRETO HECHO EN OBRA F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: ACARREOS A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,774.10

388

CONCRETO CICLOPEO (60 - 40) CON PIEDRA BRAZA LIMPIA Y CONCRETO PREMEZCLADO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: ACARREOS A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,651.57

389

CONCRETO CICLOPEO (60 - 40) CON PIEDRA BRAZA LIMPIA Y CONCRETO PREMEZCLADO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: ACARREOS A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,738.99

46).-CONCRETOS HECHOS EN OBRA 390

CONCRETO F'C= 100 KG/CM2., RESISTENCIA NORMAL, AGREGADO MAX. 3/4", FABRICADO EN OBRA CON REVOLVEDORA, INCLUYE ACARREOS A 1A. ESTACION A 20.00 M.

M3

$ 1,717.75

391

CONCRETO F'C= 150 KG/CM2., RESISTENCIA NORMAL, AGREGADO MAX. 3/4", FABRICADO EN OBRA CON REVOLVEDORA, INCLUYE ACARREOS A 1A. ESTACION A 20.00 M.

M3

$ 1,917.43

392

CONCRETO F'C= 200 KG/CM2., RESISTENCIA NORMAL, AGREGADO MAX. 3/4", FABRICADO EN OBRA CON REVOLVEDORA, INCLUYE ACARREOS A 1A. ESTACION A 20.00 M.

M3

$ 2,077.17

393

CONCRETO F'C= 250 KG/CM2., RESISTENCIA NORMAL, AGREGADO MAX. 3/4", FABRICADO EN OBRA CON REVOLVEDORA, INCLUYE ACARREOS A 1A. ESTACION A 20.00 M.

M3

$ 2,244.88

394

CONCRETO F'C= 300 KG/CM2., RESISTENCIA NORMAL, AGREGADO MAX. 3/4", FABRICADO EN OBRA CON REVOLVEDORA, INCLUYE ACARREOS A 1A. ESTACION A 20.00 M.

M3

$ 2,372.67

47).-ELABORACIÓN Y VACIADO DE CONCRETO HECHO EN OBRA EN CIMENTACIONES 395

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=100 KG/CM2. HECHO EN OBRA EN CIMENTACION, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,244.90

396

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=150 KG/CM2. HECHO EN OBRA EN CIMENTACION, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,454.56

397

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=200 KG/CM2. HECHO EN OBRA EN CIMENTACION, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,622.28

398

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=250 KG/CM2. HECHO EN OBRA EN CIMENTACION, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,798.36

399

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=300 KG/CM2. HECHO EN OBRA EN CIMENTACION, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,932.56

48).-ELABORACIÓN Y VACIADO DE CONCRETO HECHO EN OBRA EN ESTRUCTURAS EN COLUMNAS 400

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=150 KG/CM2. HECHO EN OBRA EN COLUMNAS PLANTA BAJA, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,569.94

401

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=200 KG/CM2. HECHO EN OBRA EN COLUMNAS PLANTA BAJA, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,737.66

402

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=250 KG/CM2. HECHO EN OBRA EN COLUMNAS PLANTA BAJA, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,913.74

31

NO.

CONCEPTO

UNIDAD

P.U.

403

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=300 KG/CM2. HECHO EN OBRA EN COLUMNAS PLANTA BAJA, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 3,047.94

EN TRABES 404

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=200 KG/CM2. HECHO EN OBRA EN TRABES, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,627.99

405

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=250 KG/CM2. HECHO EN OBRA EN TRABES, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,804.07

406

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=300 KG/CM2. HECHO EN OBRA EN TRABES, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,938.24

407

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=150 KG/CM2. HECHO EN OBRA EN LOSAS PLANAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,564.46

408

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=200 KG/CM2. HECHO EN OBRA EN LOSAS PLANAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,732.21

409

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=250 KG/CM2. HECHO EN OBRA EN LOSAS PLANAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,908.29

410

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=300 KG/CM2. HECHO EN OBRA EN LOSAS PLANAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 3,042.47

411

CONCRETO PREMEZCLADO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REVENIMIENTO DE 10 CM., VACIADO CON CARRETILLA Y BOTES EN CIMENTACION, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 2,590.36

412

CONCRETO PREMEZCLADO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", REVENIMIENTO DE 10 CM., VACIADO CON CARRETILLA Y BOTES EN CIMENTACION, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 2,770.31

413

CONCRETO PREMEZCLADO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REVENIMIENTO DE 10 CM. VACIADO CON CARRETILLA Y BOTES EN COLUMNAS Y MUROS, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 2,677.48

414

CONCRETO PREMEZCLADO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", REVENIMIENTO DE 10 CM., VACIADO CON CARRETILLA Y BOTES EN COLUMNAS Y MUROS, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 2,823.10

415

CONCRETO PREMEZCLADO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REVENIMIENTO DE 10 CM. VACIADO CON CARRETILLA Y BOTES EN TRABES Y LOSAS, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 2,718.60

416

CONCRETO PREMEZCLADO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", REVENIMIENTO DE 10 CM., VACIADO CON CARRETILLA Y BOTES EN TRABES Y LOSAS, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 2,843.34

417

CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, VACIADO CON CARRETILLA Y BOTES F'C=100 KG/CM2., REVENIMIENTO DE 10 CM., AGREGADO MAXIMO 3/4" EN CIMENTACION, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 2,921.35

418

CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, VACIADO CON CARRETILLA Y BOTES F'C=150 KG/CM2., REVENIMIENTO DE 10 CM., AGREGADO MAXIMO 3/4" EN CIMENTACION, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,131.01

EN LOSAS

49).-CONCRETOS PREMEZCLADOS

50).-CONCRETOS HECHOS EN OBRA CON IMPERMEABILIZANTE INTEGRAL

32

NO.

CONCEPTO

UNIDAD

P.U.

419

CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, VACIADO CON CARRETILLA Y BOTES F'C=200 KG/CM2., REVENIMIENTO DE 10 CM., AGREGADO MAXIMO 3/4" EN CIMENTACION, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,298.75

420

CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, VACIADO CON CARRETILLA Y BOTES F'C=250 KG/CM2., REVENIMIENTO DE 10 CM., AGREGADO MAXIMO 3/4" EN CIMENTACION, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,474.82

421

CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, VACIADO CON CARRETILLA Y BOTES F'C=300 KG/CM2., REVENIMIENTO DE 10 CM., AGREGADO MAXIMO 3/4" EN CIMENTACION, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,609.00

422

CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, VACIADO CON CARRETILLA Y BOTES F'C=200 KG/CM2., REVENIMIENTO DE 10 CM., AGREGADO MAXIMO 3/4" COLUMNAS Y MUROS, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,414.13

423

CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, VACIADO CON CARRETILLA Y BOTES F'C=250 KG/CM2., REVENIMIENTO DE 10 CM., AGREGADO MAXIMO 3/4" EN COLUMNAS Y MUROS, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,590.20

424

CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, VACIADO CON CARRETILLA Y BOTES F'C=300 KG/CM2., REVENIMIENTO DE 10 CM., AGREGADO MAXIMO 3/4" EN COLUMNAS Y MUROS, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,724.38

425

CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, VACIADO CON CARRETILLA Y BOTES F'C=200 KG/CM2., REVENIMIENTO DE 10 CM., AGREGADO MAXIMO 3/4" EN TRABES Y LOSAS, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,304.46

426

CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, VACIADO CON CARRETILLA Y BOTES F'C=250 KG/CM2., REVENIMIENTO DE 10 CM., AGREGADO MAXIMO 3/4" EN TRABES Y LOSAS, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,480.53

427

CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, VACIADO CON CARRETILLA Y BOTES F'C=300 KG/CM2., REVENIMIENTO DE 10 CM., AGREGADO MAXIMO 3/4" EN TRABES Y LOSAS, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,614.71

51).-CONCRETOS PREMEZCLADOS CON IMPERMEABILIZANTE INTEGRAL

428

CONCRETO PREMEZCLADO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REVENIMIENTO DE 10 CM., VACIADO CON CARRETILLA Y BOTES EN CIMENTACION, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,266.80

429

CONCRETO PREMEZCLADO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", REVENIMIENTO DE 10 CM., VACIADO CON CARRETILLA Y BOTES EN CIMENTACION, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,446.75

430

CONCRETO PREMEZCLADO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REVENIMIENTO DE 10 CM., VACIADO CON CARRETILLA Y BOTES EN COLUMNAS Y MUROS, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,353.94

431

CONCRETO PREMEZCLADO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", REVENIMIENTO DE 10 CM., VACIADO CON CARRETILLA Y BOTES EN COLUMNAS Y MUROS, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,499.54

432

CONCRETO PREMEZCLADO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REVENIMIENTO DE 10 CM., VACIADO CON CARRETILLA Y BOTES EN TRABES Y LOSAS, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,395.06

33

NO.

CONCEPTO

UNIDAD

P.U.

433

CONCRETO PREMEZCLADO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", REVENIMIENTO DE 10 CM., VACIADO CON CARRETILLA Y BOTES EN TRABES Y LOSAS, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,519.78

52).-PAVIMENTOS DE CONCRETO HECHO EN OBRA 434

PAVIMENTO DE CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, DE 15 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, RESISTENCIA F'C=200 KG/CM2. AGREGADO MAXIMO 3/4".

M2

$ 532.65

435

PAVIMENTO DE CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, DE 18 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, RESISTENCIA F'C=200 KG/CM2. AGREGADO MAXIMO 3/4".

M2

$ 611.60

436

PAVIMENTO DE CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, DE 20 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, RESISTENCIA F'C=200 KG/CM2. AGREGADO MAXIMO 3/4".

M2

$ 663.87

437

PAVIMENTO DE CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, DE 15 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, RESISTENCIA F'C=250 KG/CM2. AGREGADO MAXIMO 3/4".

M2

$ 558.57

438

PAVIMENTO DE CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, DE 18 CM. DE ESPESOR VACIADO CON CARRETILLA Y BOTES, RESISTENCIA F'C=250 KG/CM2. AGREGADO MAXIMO 3/4".

M2

$ 642.69

439

PAVIMENTO DE CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, DE 20 CM. DE ESPESOR VACIADO CON CARRETILLA Y BOTES, RESISTENCIA F'C=250 KG/CM2. AGREGADO MAXIMO 3/4".

M2

$ 698.42

53).- PAVIMENTOS DE CONCRETO PREMEZCLADO 440

PAVIMENTO DE CONCRETO PREMEZCLADO RESISTENCIA NORMAL, DE 15 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, RESISTENCIA F'C=200 KG/CM2. AGREGADO MAXIMO 3/4".

M2

$ 611.26

441

PAVIMENTO DE CONCRETO PREMEZCLADO RESISTENCIA NORMAL, DE 18 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, RESISTENCIA F'C=200 KG/CM2. AGREGADO MAXIMO 3/4".

M2

$ 687.93

442

PAVIMENTO DE CONCRETO PREMEZCLADO RESISTENCIA NORMAL, DE 20 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, RESISTENCIA F'C=200 KG/CM2. AGREGADO MAXIMO 3/4".

M2

$ 739.04

443

PAVIMENTO DE CONCRETO PREMEZCLADO RESISTENCIA NORMAL, DE 15 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, RESISTENCIA F'C=250 KG/CM2. AGREGADO MAXIMO 3/4".

M2

$ 632.89

444

PAVIMENTO DE CONCRETO PREMEZCLADO RESISTENCIA NORMAL, DE 18 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, RESISTENCIA F'C=250 KG/CM2. AGREGADO MAXIMO 3/4".

M2

$ 713.87

445

PAVIMENTO DE CONCRETO PREMEZCLADO RESISTENCIA NORMAL, DE 20 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, RESISTENCIA F'C=250 KG/CM2. AGREGADO MAXIMO 3/4".

M2

$ 767.88

54).-PAVIMENTOS DE CONCRETO MR 446

PAVIMENTO DE CONCRETO MR. 36 RESISTENCIA NORMAL, DE 15 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, NCLUYE: MANO DE OBRA, MATERIALES, EQUIPO NECESARIO Y HERRAMIENTA.

M2

$ 532.18

447

PAVIMENTO DE CONCRETO MR. 36 RESISTENCIA NORMAL, DE 18 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, NCLUYE: MANO DE OBRA, MATERIALES, EQUIPO NECESARIO Y HERRAMIENTA.

M2

$ 589.79

448

PAVIMENTO DE CONCRETO MR. 36 RESISTENCIA NORMAL, DE 20 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, NCLUYE: MANO DE OBRA, MATERIALES, EQUIPO NECESARIO Y HERRAMIENTA.

M2

$ 627.44

449

PAVIMENTO DE CONCRETO MR. 38 RESISTENCIA NORMAL, DE 15 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, INCLUYE: MANO DE OBRA, MATERIALES, EQUIPO NECESARIO Y HERRAMIENTA.

M2

$ 552.71

34

NO.

CONCEPTO

UNIDAD

P.U.

450

PAVIMENTO DE CONCRETO MR. 38 RESISTENCIA NORMAL, DE 18 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, INCLUYE: MANO DE OBRA, MATERIALES, EQUIPO NECESARIO Y HERRAMIENTA.

M2

$ 614.30

451

PAVIMENTO DE CONCRETO MR. 38 RESISTENCIA NORMAL, DE 20 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, INCLUYE: MANO DE OBRA, MATERIALES, EQUIPO NECESARIO Y HERRAMIENTA.

M2

$ 655.07

452

PAVIMENTO DE CONCRETO MR. 40 RESISTENCIA NORMAL, DE 15 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, NCLUYE: MANO DE OBRA, MATERIALES, EQUIPO NECESARIO Y HERRAMIENTA.

M2

$ 560.52

453

PAVIMENTO DE CONCRETO MR. 40 RESISTENCIA NORMAL, DE 18 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, NCLUYE: MANO DE OBRA, MATERIALES, EQUIPO NECESARIO Y HERRAMIENTA.

M2

$ 624.11

454

PAVIMENTO DE CONCRETO MR. 40 RESISTENCIA NORMAL, DE 20 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, NCLUYE: MANO DE OBRA, MATERIALES, EQUIPO NECESARIO Y HERRAMIENTA.

M2

$ 665.59

455

PAVIMENTO DE CONCRETO MR. 42 RESISTENCIA NORMAL, DE 15 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, NCLUYE: MANO DE OBRA, MATERIALES, EQUIPO NECESARIO Y HERRAMIENTA.

M2

$ 585.94

456

PAVIMENTO DE CONCRETO MR. 42 RESISTENCIA NORMAL, DE 18 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, NCLUYE: MANO DE OBRA, MATERIALES, EQUIPO NECESARIO Y HERRAMIENTA.

M2

$ 654.91

457

PAVIMENTO DE CONCRETO MR. 42 RESISTENCIA NORMAL, DE 20 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, NCLUYE: MANO DE OBRA, MATERIALES, EQUIPO NECESARIO Y HERRAMIENTA.

M2

$ 699.80

55).-GUARNICIONES 458

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., DE 15 X 20 X 30 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 233.20

459

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=150 KG/CM2., DE 15 X 20 X 30 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 216.57

460

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., DE 15 X 20 X 40 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 307.11

461

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=150 KG/CM2., DE 15 X 20 X 40 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 284.93

462

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., DE 15 X 20 X 45 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 350.04

463

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=150 KG/CM2., DE 15 X 20 X 45 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 325.13

464

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., DE 15 X 20 X 50 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 380.47

465

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=150 KG/CM2., DE 15 X 20 X 50 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 352.78

466

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=200 KG/CM2., DE 15 X 20 X 30 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 241.84

467

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=200 KG/CM2., DE 15 X 20 X 30 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 222.96

35

NO.

CONCEPTO

UNIDAD

P.U.

468

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=200 KG/CM2., DE 15 X 20 X 40 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 318.62

469

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=200 KG/CM2., DE 15 X 20 X 40 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 293.46

470

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=200 KG/CM2., DE 15 X 20 X 45 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 363.00

471

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=200 KG/CM2., DE 15 X 20 X 45 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 334.70

472

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=200 KG/CM2., DE 15 X 20 X 50 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 394.86

473

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=200 KG/CM2., DE 15 X 20 X 50 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 363.42

474

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., DE 15 X 20 X 30 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 222.01

475

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=150 KG/CM2., DE 15 X 20 X 30 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 205.40

476

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., DE 15 X 20 X 40 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 293.26

477

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=150 KG/CM2., DE 15 X 20 X 40 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 271.08

478

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., DE 15 X 20 X 45 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 334.86

479

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=150 KG/CM2., DE 15 X 20 X 45 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 309.95

480

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., DE 15 X 20 X 50 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 363.96

481

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=150 KG/CM2., DE 15 X 20 X 50 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 336.26

482

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=200 KG/CM2. DE 15 X 20 X 30 CM. DE SECCIÓN, INCLUYE: CIMBRA DE METALICA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 230.67

483

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=200 KG/CM2., DE 15 X 20 X 30 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 211.79

484

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=200 KG/CM2., DE 15 X 20 X 40 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 304.77

485

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=200 KG/CM2., DE 15 X 20 X 40 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 279.61

36

NO.

CONCEPTO

UNIDAD

P.U.

486

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=200 KG/CM2., DE 15 X 20 X 45 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 343.61

487

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=200 KG/CM2., DE 15 X 20 X 45 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 315.30

488

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=200 KG/CM2., DE 15 X 20 X 50 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 373.65

489

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=200 KG/CM2., DE 15 X 20 X 50 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 342.21

490

BANQUETA DE CONCRETO PREMEZCLADO F'C=150 KG/CM2. AGREGADO MAXIMO DE 3/4", DE 8 CM. DE ESPESOR, ACABADO ESCOBILLADO, INCLUYE: CEMENTO, VOLTEADOR, CIMBRA EN FRONTERAS, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 219.59

491

BANQUETA DE CONCRETO HECHO EN OBRA DE F'C=150 KG/CM2. AGREGADO MAXIMO DE 3/4", DE 8 CM. DE ESPESOR, ACABADO ESCOBILLADO, INCLUYE: CEMENTO, VOLTEADOR, CIMBRA EN FRONTERAS, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 245.40

492

BANQUETA DE CONCRETO PREMEZCLADO F'C=150 KG/CM2. AGREGADO MAXIMO DE 3/4", DE 10 CM. DE ESPESOR, ACABADO ESCOBILLADO, INCLUYE: CEMENTO, VOLTEADOR, CIMBRA EN FRONTERAS, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 256.86

493

BANQUETA DE CONCRETO HECHO EN OBRA DE F'C=150 KG/CM2. AGREGADO MAXIMO DE 3/4", DE 10 CM. DE ESPESOR, ACABADO ESCOBILLADO, INCLUYE: CEMENTO, VOLTEADOR, CIMBRA EN FRONTERAS, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 289.11

494

BANQUETA DE CONCRETO PREMEZCLADO F'C=200 KG/CM2. AGREGADO MAXIMO DE 3/4", DE 8 CM. DE ESPESOR, ACABADO ESCOBILLADO, INCLUYE: CEMENTO, VOLTEADOR, CIMBRA EN FRONTERAS, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 228.21

495

BANQUETA DE CONCRETO HECHO EN OBRA DE F'C=200 KG/CM2. AGREGADO MAXIMO DE 3/4", DE 8 CM. DE ESPESOR, ACABADO ESCOBILLADO, INCLUYE: CEMENTO, VOLTEADOR, CIMBRA EN FRONTERAS, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 258.83

496

BANQUETA DE CONCRETO PREMEZCLADO F'C=200 KG/CM2. AGREGADO MAXIMO DE 3/4", DE 10 CM. DE ESPESOR, ACABADO ESCOBILLADO, INCLUYE: CEMENTO, VOLTEADOR, CIMBRA EN FRONTERAS, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 269.25

497

BANQUETA DE CONCRETO HECHO EN OBRA DE F'C=200 KG/CM2. AGREGADO MAXIMO DE 3/4", DE 10 CM. DE ESPESOR, ACABADO ESCOBILLADO, INCLUYE: CEMENTO, VOLTEADOR, CIMBRA EN FRONTERAS, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 305.90

56).-BANQUETAS

57).- JUNTAS CONSTRUCTIVAS Y CORTES EN CONCRETO 498

JUNTA CONSTRUCTIVA EN PAVIMENTOS A BASE DE CELOTEX DE 10 MM. DE ANCHO Y 25 CM. DE PROFUNDIDAD, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 41.80

499

JUNTA CONSTRUCTIVA EN PAVIMENTOS A BASE DE CELOTEX DE 10 MM. DE ANCHO Y 25 CM. DE PROFUNDIDAD, IMPREGNADO CON ASFALTO OXIDADO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 47.74

500

JUNTA DE DILATACION A BASE DE VARILLA DE 5/8" DE DIAM. A CADA 60 CM., DE 1.20 M. DE LARGO, CON UN EXTREMO FIJO Y EL OTRO RECUBIERTO CON GRASA DENTRO DE UN POLIDUCTO DE 1" DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 63.43

37

NO.

CONCEPTO

UNIDAD

P.U.

501

CORTE CON DISCO DE 3.18 CM. DE ESPESOR CON CORTADORA DE DISCO DIAMANTE, INCLUYE: MANO DE OBRA, EQUIPO Y HERRAMIENTA.

ML

$ 10.49

502

CORTE CON DISCO DE 6.35 CM. DE ESPESOR CON CORTADORA DE DISCO DIAMANTE, INCLUYE: MANO DE OBRA, EQUIPO Y HERRAMIENTA.

ML

$ 11.23

503

SUMINISTRO Y COLOCACION DE JUNTAS DE DILATACIÓN PARA CALAFATEO DE 10 MM. DE ANCHO Y 25 MM. DE PROFUNDIDAD, A BASE DE ASFALTO OXIDADO, INCLUYE: LIMPIEZA DE LA JUNTA, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 26.30

504

SUMINISTRO Y APLICACION DE CURACRETO.

M2

$ 15.32

58).- MORTEROS Y LECHADAS 505

SUMINISTRO Y ELABORACION DE MORTERO CEMENTO-CALHIDRA-ARENA 1:1:6, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 2,041.08

506

SUMINISTRO Y ELABORACION DE MORTERO CEMENTO-CALHIDRA-ARENA 1:1:8, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,362.94

507

SUMINISTRO Y ELABORACION DE MORTERO CEMENTO-CALHIDRA-ARENA 1:1:10, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,257.39

508

SUMINISTRO Y ELABORACION DE MORTERO CAL-ARENA 1:2, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 989.22

509

SUMINISTRO Y ELABORACION DE MORTERO CAL-ARENA 1:3, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 820.75

510

SUMINISTRO Y ELABORACION DE MORTERO CEMENTO-ARENA 1:2, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 2,762.54

511

SUMINISTRO Y ELABORACION DE MORTERO CEMENTO-ARENA 1:3, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 2,362.32

512

SUMINISTRO Y ELABORACION DE MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 2,059.52

513

SUMINISTRO Y ELABORACION DE MORTERO CEMENTO-ARENA 1:5, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,784.16

514

SUMINISTRO Y ELABORACION DE MORTERO CEMENTO-ARENA 1:6, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,578.98

515

SUMINISTRO Y ELABORACION DE MORTERO CEMENTO-ARENA 1:7, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,403.13

516

SUMINISTRO Y ELABORACION DE MORTERO CEMENTO-ARENA 1:8, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,251.71

517

SUMINISTRO Y ELABORACION DE LECHADA CEMENTO GRIS-AGUA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 5,272.38

518

SUMINISTRO Y ELABORACION DE LECHADA CEMENTO BLANCO-AGUA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 9,824.55

59).-PAVIMENTOS ASFÁLTICOS 519

SUMINISTRO Y APLICACION DE RIEGO DE LIGA CON EMULSION ASFALTICA EN PROPORCION 1.2 L. POR M2, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 29.85

520

SUMINISTRO Y APLICACION DE RIEGO DE IMPREGNACION CON EMULSION ASFALTICA EN PROPORCION DE 1.5 L. POR M2, INCLUYE: BARRIDO DE LA SUPERFICIE, POREO, MATERIALES, MANO DE OBRA Y HERRAMIENTA.

M2

$ 36.06

521

SUMINISTRO Y APLICACIÓN DE RIEGO DE SELLO CON MATERIAL 3A. Y EMULSIÓN CATIÓNICA DE ROMPIMIENTO RÁPIDO EN PROPORCIÓN 1.5 LTS. POR M2., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 80.63

522

ESCARIFICADO Y REMOCION DE LA CARPETA EXISTENTE CONSTRUIDA CON ANTERIORIDAD, POR UNIDAD DE OBRA TERMINADA, DESPERDICIANDO EL MATERIAL.

M2

$ 16.64

38

NO.

CONCEPTO

UNIDAD

P.U.

523

CARPETA DE CONCRETO ASFALTICO EN CALIENTE DE 5 CM. DE ESPESOR, CON, CEMENTO ASFALTICO ASFALTO EKBE SUPERPAVE PG 64-22, Y/O AC-20 Y AGREGADO PETREO DE 3/4" A FINOS, INCLUYE: HUMECTACION DE SUPERFICIE PARA EVITAR POLVO Y COMPACTACION AL 95% DE LA PRUEBA V.R.S. (NO INCLUYE ACARREO DE MEZCLA ASFALTICA DE PLANTA DE ASFALTO A EL NORTE DE GRAVEDAD DE LA OBRA).

M2

$ 210.35

524

CARPETA DE CONCRETO ASFALTICO EN CALIENTE DE 7 CM. DE ESPESOR, CON CEMENTO ASFALTICO ASFALTO EKBE SUPERPAVE PG 64-22, Y/O AC-20 Y AGREGADO PETREO DE 3/4" A FINOS, INCLUYE: HUMECTACION DE SUPERFICIE PARA EVITAR POLVO Y COMPACTACION AL 95% DE LA PRUEBA V.R.S. (NO INCLUYE ACARREO DE MEZCLA ASFALTICA DE PLANTA DE ASFALTO A EL NORTE DE GRAVEDAD DE LA OBRA).

M2

$ 282.45

525

CARPETA DE CONCRETO ASFALTICO EN CALIENTE DE 8 CM. DE ESPESOR, CON CEMENTO ASFALTICO ASFALTO EKBE SUPERPAVE PG 64-22, Y/O AC-20 Y AGREGADO PETREO DE 3/4" A FINOS, INCLUYE: HUMECTACION DE SUPERFICIE PARA EVITAR POLVO Y COMPACTACION AL 95% DE LA PRUEBA V.R.S. (NO INCLUYE ACARREO DE MEZCLA ASFALTICA DE PLANTA DE ASFALTO A EL NORTE DE GRAVEDAD DE LA OBRA).

M2

$ 330.88

526

CARPETA DE CONCRETO ASFALTICO EN CALIENTE DE 10 CM. DE ESPESOR, CON CEMENTO ASFALTICO ASFALTO EKBE SUPERPAVE PG 64-22, Y/O AC-20 Y AGREGADO PETREO DE 3/4" A FINOS, INCLUYE: HUMECTACION DE SUPERFICIE PARA EVITAR POLVO Y COMPACTACION AL 95% DE LA PRUEBA V.R.S. (NO INCLUYE ACARREO DE MEZCLA ASFALTICA DE PLANTA DE ASFALTO A EL NORTE DE GRAVEDAD DE LA OBRA).

M2

$ 406.48

527

CARPETA DE CONCRETO ASFALTICO EN CALIENTE, CON CEMENTO ASFALTICO ASFALTO EKBE SUPERPAVE PG 64-22, Y/O AC-20 Y AGREGADO PETREO DE 3/4" A FINOS, INCLUYE: HUMECTACION DE SUPERFICIE PARA EVITAR POLVO Y COMPACTACION AL 95% DE LA PRUEBA V.R.S. (NO INCLUYE ACARREO DE MEZCLA ASFALTICA DE PLANTA DE ASFALTO A EL NORTE DE GRAVEDAD DE LA OBRA).

M3

$ 3,986.41

60).-REHABILITACIÓN Y APERTURA DE CAMINOS 528

EXCAVACIONES EN CORTES Y ADICIONALES DEBAJO DE LA SUBRASANTE EN MATERIAL TIPO II, CUANDO EL MATERIAL SE DESPERDICIE, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 34.52

529

EXCAVACIONES EN CORTES Y ADICIONALES DEBAJO DE LA SUBRASANTE EN MATERIAL TIPO III, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 148.48

530

CONFORMACION Y AFINAMIENTO PARA DAR ACABADO SUPERFICIAL A TERRAPLENES EXISTENTES, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

KM

$ 28,911.04

531

DESPALME A 20 CM. DE PROFUNDIDAD EN MATERIAL TIPO II PARA DESPLANTE DE TERRAPLENES, DEPOSITANDO EL PRODUCTO EN LA ORILLA DE LA EXCAVACION CUANDO EL MATERIAL SE DESPERDICIE.

M3

$ 16.21

532

DESPALME A MANO DE HASTA 20 CM. EN MATERIAL TIPO II, DESPERDICIANDO EL MATERIAL, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO, ACARREO LIBRE A 20 M.

M2

$ 89.42

533

EXCAVACION POR MEDIOS MECANICOS PARA ABRIR CAJA HASTA 50 CM. DE PROFUNDIDAD EN MATERIAL TIPO II, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 36.39

534

COMPACTACION DEL TERRENO NATURAL CON EQUIPO MECANICO EN EL AREA DE DESPLANTE DE LOS TERRAPLENES, AL 95 % DE SU PVSM, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 34.76

535

RASTREO Y CUNETEO CON MAQUINARIA EN MATERIAL TIPO II, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

KM

$ 10,970.04

536

CUNETEO CON MAQUINARIA DEPOSITANDO EL MATERIAL A LOS COSTADOS DEL TRAMO POR REHABILITAR, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

KM

$ 7,432.44

39

NO.

CONCEPTO

UNIDAD

P.U.

537

CUNETEO CON MAQUINARIA DEPOSITANDO EL MATERIAL A LOS COSTADOS DEL TRAMO POR REHABILITAR, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 8.87

538

CONFORMADO, PERFILADO DE SUPERFICIES Y CUNETAS CON MOTOCONFORMADORA, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 10.57

539

ESCARIFICADO, DISGREGADO Y ACAMELLONADO DE MATERIAL PRODUCTO DE CORTE EN SUPERFICIES DE RODAMIENTO, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 10.91

540

NIVELADO Y AFINADO DE CORONA, PARA RECIBIR MATERIAL DE REVESTIMIENTO, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 4.93

541

CORTE PARA AMPLIACION DE CORONA EN MATERIAL TIPO II, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 102.49

542

TENDIDO DE MATERIAL DE REVESTIMIENTO CON MAQUINARIA EN SUPERFICIE DE RODAMIENTO, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 39.12

543

BARRIDO DE LA SUPERFICIE A TRATAR POR MEDIOS MANUALES, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 3.53

544

RENIVELACION, AFINE Y COMPACTACION DE LA TERRACERIA CON MAQUINARIA, INCLUYE: COMPACTACION SIN CONTROL DE LABORATORIO, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 52.24

545

EXTRACCION DE MATERIAL TIPO II PARA REVESTIMIENTO, INCLUYE: DESMONTE, DESPALME, EXCAVACION, CARGA POR MEDIOS MECANICOS Y PAGO DE REGALIAS.

M3

$ 73.90

546

OPERACION DE TENDIDO, CONFORMACION Y AFINAMIENTO PARA DAR ACABADO AL MATERIAL DE REVESTIMIENTO, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 85.06

547

CORTE DE TERRENO NATURAL PARA APERTURA DE CAMINO SOBRE MATERIAL TIPO I, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 87.32

548

CORTE DE TERRENO NATURAL PARA APERTURA DE CAMINO SOBRE MATERIAL TIPO II, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 102.49

549

CORTE DE TERRENO NATURAL PARA APERTURA DE CAMINO SOBRE MATERIAL TIPO III, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 415.76

550

RASTREO PARA FORMACION DE CORONA Y FORMACION DE CUNETA, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 9.59

551

FORMACION Y COMPACTACION DE TERRAPLEN COMPACTADO AL 90 % PROCTOR, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 60.03

552

OPERACION DE MEZCLADO, TENDIDO Y COMPACTACION DE LA SUB-BASE O BASE, (NO INCLUYE SUMINISTRO Y ACARREO DE MATERIAL) COMPACTADO AL 95 % DE SU PVSM, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 116.31

553

TERRAPLÉN COMPACTADO AL 90 % PROCTOR, POR MEDIOS MECÁNICOS CONSIDERADO EL AGUA, MEZCLADO, CONFORMACIÓN, TENDIDO Y COMPACTACIÓN, SIN INCLUIR ADQUISICIÓN NI ACARREO DE LOS MATERIALES.

M3

$ 267.80

61).-BASES HIDRÁULICAS 554

BASE HIDRAULICA 70 - 30 % (GRAVA 1 1/2" - CEMENTANTE) DE 20 CM. DE ESPESOR COMPACTADA AL 95 % DE SU PVSM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 99.44

555

BASE HIDRAULICA DE TEZONTLE O GRAVA EN GREÑA DE 20 CM. DE ESPESOR, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO

M2

$ 109.01

556

OPERACION DE MEZCLADO, TENDIDO Y COMPACTACION DE BASE, COMPACTADO AL 95 % DE SU PVSM., INCLUYE: SUMINISTRO, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 433.24

557

OPERACION DE MEZCLADO, TENDIDO Y COMPACTACION DE BASE, COMPACTADO AL 95% DE SU PVSM., (NO INCLUYE: SUMINISTRO NI ACARREO DESDE EL BANCO DEL MATERIAL ARENO-GRAVOSO), INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 97.76

40

NO.

CONCEPTO

UNIDAD

P.U.

558

OPERACION DE MEZCLADO, TENDIDO Y COMPACTACION DE SUB-BASE, COMPACTADO AL 95% DE SU PVSM., NO INCLUYE SUMINISTRO NI ACARREO DESDE EL BANCO DEL MATERIAL ARENO-GRAVOSO, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 97.76

559

AFINE Y COMPACTACION DE LA SUB-BASE (SUPERFICIE DESCUBIERTA POR CAJA) POR MEDIOS MECANICOS AL 90% DE SU PVSM, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 24.57

560

SUB-BASE DE GRAVA CEMENTADA CONTROLADA DE 15.0 CM. DE ESPESOR, COMPACTADA AL 90 % PROCTOR, INCLUYE: SUMINISTRO DE MATERIALES, AGUA, MANO DE OBRA Y EQUIPO.

M2

$ 67.53

561

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 5 CM. DE ESPESOR, A BASE DE CONCRETO ARMADO DE F'C=100 KG/CM2., REFORZADO CON MALLA ELECTROSOLDADA 6X6 - 10/10, INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 236.31

562

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 8 CM. DE ESPESOR, A BASE DE CONCRETO ARMADO DE F'C=100 KG/CM2., REFORZADO CON MALLA ELECTROSOLDADA 6X6 - 10/10, INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 275.03

563

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 10 CM. DE ESPESOR, A BASE DE CONCRETO ARMADO DE F'C=100 KG/CM2., REFORZADO CON MALLA ELECTROSOLDADA 6X6 - 10/10, INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 314.22

564

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 5 CM. DE ESPESOR, A BASE DE CONCRETO ARMADO DE F'C=100 KG/CM2. REFORZADO CON MALLA ELECTROSOLDADA 6X6 - 6/6, INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 253.22

565

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 8 CM. DE ESPESOR, A BASE DE CONCRETO ARMADO DE F'C=100 KG/CM2., REFORZADO CON MALLA ELECTROSOLDADA 6X6 - 6/6, INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 297.04

566

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 10 CM. DE ESPESOR, A BASE DE CONCRETO ARMADO DE F'C=100 KG/CM2., REFORZADO CON MALLA ELECTROSOLDADA 6X6 - 6/6, INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 341.44

567

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 5 CM. DE ESPESOR, A BASE DE CONCRETO ARMADO DE F'C=150 KG/CM2., REFORZADO CON MALLA ELECTROSOLDADA 6X6 - 6/6, INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 287.74

568

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 8 CM. DE ESPESOR A BASE DE CONCRETO, ARMADO DE F'C=150 KG/CM2., REFORZADO CON MALLA ELECTROSOLDADA 6X6 - 6/6, INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 336.03

569

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 10 CM. DE ESPESOR, A BASE DE CONCRETO ARMADO DE F'C=150 KG/CM2., REFORZADO CON MALLA ELECTROSOLDADA 6X6 - 6/6, INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 384.93

570

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 5 CM. DE ESPESOR, A BASE DE CONCRETO SIMPLE DE F'C=100 KG/CM2., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 205.13

571

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 8 CM. DE ESPESOR, A BASE DE CONCRETO SIMPLE DE F'C=100 KG/CM2., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 247.90

572

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 10 CM. DE ESPESOR, A BASE DE CONCRETO SIMPLE DE F'C=100 KG/CM2., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 291.18

62).-CUNETAS

41

NO.

CONCEPTO

UNIDAD

P.U.

573

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 5 CM. DE ESPESOR, A BASE DE CONCRETO SIMPLE DE F'C=150 KG/CM2., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 226.84

574

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 8 CM. DE ESPESOR, A BASE DE CONCRETO SIMPLE DE F'C=150 KG/CM2., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 275.09

575

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 10 CM. DE ESPESOR, A BASE DE CONCRETO SIMPLE DE F'C=150 KG/CM2., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 323.99

576

ELABORACION DE CUNETAS A BASE DE CONCRETO SIMPLE DE F'C=100 KG/CM2, INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 2,964.69

577

ELABORACION DE CUNETAS A BASE DE CONCRETO SIMPLE DE F'C=150 KG/CM2, INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,184.62

578

PISO DE ADOQUIN DE CONCRETO TIPO HEXAGONAL DE 26 X 23 X 8 CM. EN COLOR ROSA, NEGRO O NATURAL, ASENTADO SOBRE CAMA DE ARENA DE 5 CM., INCLUYE: ACARREOS A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA YEQUIPO NECESARIO.

M2

$ 356.88

579

PISO DE ADOQUIN DE CONCRETO TIPO CUADRADO DE 20.3 X 20.3 X 8 CM. EN COLOR ROSA, NEGRO O NATURAL, ASENTADO SOBRE CAMA DE ARENA DE 5 CM., INCLUYE: ACARREOS A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA YEQUIPO NECESARIO.

M2

$ 349.54

580

PISO DE ADOQUIN DE CONCRETO TIPO PENTAGONAL DE 25 X 25 X 8 CM. EN COLOR ROSA, NEGRO O NATURAL, ASENTADO SOBRE CAMA DE ARENA DE 5 CM., INCLUYE: ACARREOS A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA YEQUIPO NECESARIO.

M2

$ 349.54

581

PISO DE ADOQUIN DE CONCRETO TIPO TABASCO DE 26 X 23 X 8 CM. EN COLOR ROSA, NEGRO O NATURAL, ASENTADO SOBRE CAMA DE ARENA DE 5 CM., INCLUYE: ACARREOS A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA YEQUIPO NECESARIO.

M2

$ 349.54

582

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO SIMPLE DE 15 CM. (6") DE DIAMETRO, JUNTEADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 147.00

583

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO SIMPLE DE 20 CM. (8") DE DIAMETRO, ASENTADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 175.26

584

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO SIMPLE DE 25 CM. (10") DE DIAMETRO, ASENTADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 218.65

585

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO SIMPLE DE 30 CM. (12") DE DIAMETRO, ASENTADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 254.54

586

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO SIMPLE DE 38 CM. (15") DE DIAMETRO, ASENTADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 594.00

587

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO SIMPLE DE 45 CM. (18") DE DIAMETRO, ASENTADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 652.84

588

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO SIMPLE DE 61 CM. (24") DE DIAMETRO, ASENTADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 879.03

63).-PISOS DE ADOQUÍN

64).-TUBO DE CONCRETO SIMPLE CON JUNTA DE MORTERO

42

NO.

CONCEPTO

UNIDAD

P.U.

65).-TUBO DE CONCRETO SIMPLE CON JUNTA HERMETICA 589

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO SIMPLE CON JUNTA HERMETICA, DE 15 CM. (6") DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 179.83

590

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO SIMPLE CON JUNTA HERMETICA, DE 20 CM. (8") DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 211.50

591

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO SIMPLE CON JUNTA HERMETICA, DE 25 CM. (10") DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 268.90

592

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO SIMPLE CON JUNTA HERMETICA, DE 30 CM. (12") DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 338.01

593

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO SIMPLE CON JUNTA HERMETICA, DE 38 CM. (15") DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 711.38

594

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO SIMPLE CON JUNTA HERMETICA, DE 45 CM. (18") DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 878.17

595

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO SIMPLE CON JUNTA HERMETICA, DE 61 CM. (24") DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,137.61

66).- TUBO DE CONCRETO REFORZADO CON JUNTA DE MORTERO GRADO 1 NMA C-20 596

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO REFORZADO DE 61 CM. (24") GRADO 1 NORMA C-20, JUNTEADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,762.52

597

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO REFORZADO DE 76 CM. (30") GRADO 1 NORMA C-20, JUNTEADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 2,233.52

598

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO REFORZADO DE 91 CM. (36") GRADO 1 NORMA C-20, JUNTEADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 2,877.82

599

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO REFORZADO DE 107 CM. (42") GRADO 1 NORMA C-20, JUNTEADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 3,557.03

600

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO REFORZADO DE 122 CM. (48") GRADO 1 NORMA C-20, JUNTEADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 4,356.79

601

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO REFORZADO DE 152 CM. (60") GRADO 1 NORMA C-20, JUNTEADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 6,438.17

602

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO REFORZADO DE 183 CM. (72") GRADO 1 NORMA C-20, JUNTEADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 7,882.42

603

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO REFORZADO DE 213 CM. (84") GRADO 1 NORMA C-20, JUNTEADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 11,112.26

604

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO REFORZADO DE 244 CM. (96") GRADO 1 NORMA C-20, JUNTEADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 15,692.81

605

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO REFORZADO DE 306 CM. (120") GRADO 1 NORMA C-20, JUNTEADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 21,143.08

43

NO.

CONCEPTO

UNIDAD

P.U.

67).-TUBO DE CONCRETO PERFORADO CON JUNTA DE MORTERO 606

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO PERFORADO PARA DREN, DIAMETRO DE 15 CM. (6”).

ML

$ 209.99

607

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO PERFORADO PARA DREN, DIAMETRO DE 20 CM. (8”).

ML

$ 225.01

608

SUMINISTRO Y COLOCACION DE TUBERIA DE 4" (10 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE SANITARIO, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 149.47

609

SUMINISTRO Y COLOCACION DE TUBERIA DE 6" (15 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE SANITARIO, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 228.00

610

SUMINISTRO Y COLOCACION DE TUBERIA DE 8" (20 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE SANITARIO, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 369.99

611

SUMINISTRO Y COLOCACION DE TUBERIA DE 10" (25 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE SANITARIO, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 566.62

612

SUMINISTRO Y COLOCACION DE TUBERIA DE 12" (30 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE SANITARIO, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 730.46

613

SUMINISTRO Y COLOCACION DE TUBERIA DE 15" (38 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE SANITARIO, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,121.62

614

SUMINISTRO Y COLOCACION DE TUBERIA DE 18" (46 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE SANITARIO, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,433.65

615

SUMINISTRO Y COLOCACION DE TUBERIA DE 24" (61 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE SANITARIO, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 2,373.91

616

SUMINISTRO Y COLOCACION DE TUBERIA DE 30" (76 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE SANITARIO, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 3,697.24

617

SUMINISTRO Y COLOCACION DE TUBERIA DE 36" (91 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE SANITARIO, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 4,864.96

618

SUMINISTRO Y COLOCACION DE TUBERIA DE 42" (107 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE SANITARIO, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 6,651.43

619

SUMINISTRO Y COLOCACION DE TUBERIA DE 48" (122 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE SANITARIO, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 7,527.75

620

SUMINISTRO Y COLOCACION DE TUBERIA DE 60" (152 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE SANITARIO, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 12,674.31

68).-TUBERÍA PAD ADS SANITARIO

44

NO.

CONCEPTO

UNIDAD

P.U.

69).-TUBERÍA PAD ADS PLUVIAL

621

SUMINISTRO Y COLOCACION DE TUBERIA DE 12" (30 CM ) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE PLUVIAL, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 650.53

622

SUMINISTRO Y COLOCACION DE TUBERIA DE 15" (38 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE PLUVIAL, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 939.63

623

SUMINISTRO Y COLOCACION DE TUBERIA DE 18" (46 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE PLUVIAL, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,320.63

624

SUMINISTRO Y COLOCACION DE TUBERIA DE 24" (61 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE PLUVIAL, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 2,399.34

625

SUMINISTRO Y COLOCACION DE TUBERIA DE 30" (76 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE PLUVIAL, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 3,683.91

626

SUMINISTRO Y COLOCACION DE TUBERIA DE 36" (91 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA ( PAD ) MARCA "ADS" PARA DRENAJE PLUVIAL, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 4,695.04

627

SUMINISTRO Y COLOCACION DE TUBERIA DE 42" (107 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE PLUVIAL, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 4,948.96

628

SUMINISTRO Y COLOCACION DE TUBERIA DE 48" (122 CM.) DE DIAMETRO DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE PLUVIAL, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 7,850.22

629

SUMINISTRO Y COLOCACION DE TUBERIA DE 60" (152 CM.) DE DIAMETRO DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE PLUVIAL, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 12,208.36

70).-TUBERÍA ALCANTARILLADO DE PVC S-25 630

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-25 SANITARIO DE 6" (15 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 196.36

631

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-25 SANITARIO DE 8" (20 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 273.03

632

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-25 SANITARIO DE 10" (25 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 416.60

633

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-25 SANITARIO DE 12" (30 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 633.79

634

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-25 SANITARIO DE 14" (35 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 862.86

635

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-25 SANITARIO DE 16" (40 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,076.36

45

NO.

CONCEPTO

UNIDAD

P.U.

71).-TUBERIA ALCANTARILLADO DE PVC S-20 636

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-20 SANITARIO DE 4" (10 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 144.73

637

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-20 SANITARIO DE 6" (15 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 228.72

638

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-20 SANITARIO DE 8" (20 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 334.07

639

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-20 SANITARIO DE 10" (25 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 512.07

640

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-20 SANITARIO DE 12" (30 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 789.53

641

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-20 SANITARIO DE 14" (35 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,100.23

642

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-20 SANITARIO DE 16" (40 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,285.57

643

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-20 SANITARIO DE 18" (45 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,610.82

644

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-20 SANITARIO DE 20" (50 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 2,048.01

72).-SILLETAS PARA DESCARGAS SANITARIAS 645

SUMINISTRO Y COLOCACION DE SILLETA DE P.V.C. DE 12" X 6", PARA DESCARGA DOMICILIARIA, INCLUYE: MATERIALES, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 421.38

646

SUMINISTRO Y COLOCACION DE SILLETA DE P.V.C. DE 10" X 6", PARA DESCARGA DOMICILIARIA, INCLUYE: MATERIALES, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 318.66

647

SUMINISTRO Y COLOCACION DE SILLETA DE P.V.C. DE 8" X 6", PARA DESCARGA DOMICILIARIA, INCLUYE: MATERIALES, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 292.99

73).-TUBERÍA DE PVC RD-26 648

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-26 DE 1 1/2" (38 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 65.90

649

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-26 DE 2" (51 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 91.59

650

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-26 DE 2 1/2" (63 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 127.57

651

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-26 DE 3" (76 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 152.31

652

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-26 DE 4" (100 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 225.68

653

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-26 DE 6" (152 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 426.02

46

NO.

CONCEPTO

UNIDAD

P.U.

654

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-26 DE 8" (200 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 655.16

74).-TUBERIA DE PVC RD-32.5 655

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-32.5 DE 1 1/2" (38 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 68.30

656

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-32.5 DE 2" (51 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 92.04

657

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-32.5 DE 2 1/2" (63 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 109.13

658

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-32.5 DE 3" (76 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 162.60

659

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-32.5 DE 4" (100 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 222.07

660

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-32.5 DE 6" (152 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 384.26

661

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-32.5 DE 8" (200 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 627.33

75).-TUBERÍA DE PVC RD-41 662

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-41 DE 2" (51 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 80.01

663

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-41 DE 2 1/2" (63 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 99.23

664

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-41 DE 3" (76 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 132.30

665

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-41 DE 4" (100 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 184.31

666

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-41 DE 6" (152 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 380.11

667

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-41 DE 8" (200 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 488.18

76).-VÁLVULA DE COMPUERTA DE VÁSTAGO FIJO 668

SUMINISTRO E INSTALACIÓN DE VÁLVULA DE COMPUERTA DE VÁSTAGO FIJO DE 2" DE DIÁMETRO, BRIDADA DE ( 150 PSI ), PUESTA EN OBRA

PZA

$ 3,218.99

669

SUMINISTRO E INSTALACIÓN DE VÁLVULA DE COMPUERTA DE VÁSTAGO FIJO DE 21/2" DE DIÁMETRO, BRIDADA DE ( 150 PSI ), PUESTA EN OBRA

PZA

$ 3,555.70

670

SUMINISTRO E INSTALACIÓN DE VÁLVULA DE COMPUERTA DE VÁSTAGO FIJO DE 3" DE DIÁMETRO, BRIDADA DE ( 150 PSI ), PUESTA EN OBRA

PZA

$ 4,257.76

47

NO.

CONCEPTO

UNIDAD

P.U.

671

SUMINISTRO E INSTALACIÓN DE VÁLVULA DE COMPUERTA DE VÁSTAGO FIJO DE 4" DE DIÁMETRO, BRIDADA DE ( 150 PSI ), PUESTA EN OBRA

PZA

$ 5,450.08

672

SUMINISTRO E INSTALACIÓN DE VÁLVULA DE COMPUERTA DE VÁSTAGO FIJO DE 6" DE DIÁMETRO, BRIDADA DE ( 150 PSI ), PUESTA EN OBRA

PZA

$ 9,285.82

673

SUMINISTRO E INSTALACIÓN DE VÁLVULA DE COMPUERTA DE VÁSTAGO FIJO DE 8" DE DIÁMETRO, BRIDADA DE ( 150 PSI ), PUESTA EN OBRA

PZA

$ 14,821.02

674

CAJA PARA VALVULAS DE 1.56 X 1.56 X 1.65 METROS, PARA 1 CONTRAMARCO SENCILLO CENTRADO DE 1.40 M Y 1 MARCO CON TAPA DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 34,576.82

675

CAJA PARA VALVULAS DE 1.86 X 1.56 X 1.65 METROS, PARA 1 CONTRAMARCO SENCILLO CENTRADO DE 1.40 M Y 1 MARCO CON TAPA DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 34,994.10

676

CAJA PARA VALVULAS DE 1.86 X 1.56 X 1.65 METROS, PARA 2 CONTRAMARCOS SENCILLOS CENTRADOS DE 1.40 M Y 2 MARCOS CON TAPAS DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 38,205.84

677

CAJA PARA VALVULAS DE 1.56 X 2.26 X 1.65 METROS, PARA 2 CONTRAMARCOS SENCILLOS CENTRADOS DE 1.40 M Y 2 MARCOS CON TAPAS DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 44,386.76

678

CAJA PARA VALVULAS DE 1.86 X 1.96 X 1.65 METROS, PARA 1 CONTRAMARCO SENCILLO CENTRADO DE 1.80 M, 1 CONTRAMARCO SENCILLO DESCENTRADO DE 1.80 Y 2 MARCOS CON TAPA DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 44,176.45

77).-CAJAS PARA OPERACIÓN DE VÁLVULAS

48

NO.

CONCEPTO

UNIDAD

P.U.

679

CAJA PARA VALVULAS DE 1.86 X 1.96 X 1.65 METROS, PARA 1 CONTRAMARCO SENCILLO CENTRADO DE 1.80 M, 1 CONTRAMARCO DOBLE DE 1.80, Y 3 MARCOS CON TAPAS DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 46,910.19

680

CAJA PARA VALVULAS DE 2.26 X 2.26 X 1.65 METROS, PARA 1 CONTRAMARCO SENCILLO CENTRADO DE 2.10 M, 1 CONTRAMARCO SENCILLO DESCENTRADO DE 2.10 Y 3 MARCOS CON TAPAS DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 51,949.63

681

CAJA PARA VALVULAS DE 2.26 X 2.26 X 1.65 METROS, PARA 1 CONTRAMARCO SENCILLO CENTRADO DE 2.10 M, 1 CONTRAMARCO DOBLE DE 2.10 M, Y 3 MARCOS CON TAPAS DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 53,394.41

682

CAJA PARA VALVULAS DE 1.86 X 1.96 X 1.65 METROS, PARA 1 CONTRAMARCO DOBLE CENTRADO DE 1.80 M, 1 CONTRAMARCO SENCILLO DESCENTRADO DE 1.80 M Y 3 MARCOS CON TAPAS DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 45,633.23

683

CAJA PARA VALVULAS DE 1.86 X 1.96 X 1.65 METROS, PARA 2 CONTRAMARCOS DOBLES DE 1.80 M Y 4 MARCOS CON TAPAS DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 47,167.29

684

CAJA PARA VALVULAS DE 2.26 X 2.26 X 1.65 METROS, PARA 1 CONTRAMARCO DOBLE DE 2.10 M, 1 CONTRAMARCO SENCILLO DESCENTRADO DE 2.10 M Y 3 MARCOS CON TAPAS DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 53,457.66

49

NO.

CONCEPTO

UNIDAD

P.U.

685

CAJA PARA VALVULAS DE 2.26 X 2.26 X 1.65 METROS, PARA 2 CONTRAMARCOS DOBLES DE 2.10 M Y 4 MARCOS CON TAPAS DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 54,903.84

686

CAJA PARA VALVULAS DE 1.96 X 2.46 X 1.65 METROS, PARA 1 CONTRAMARCO DOBLE DE 1.80M, 1 CONTRAMARCO SENCILLO DESCENTRADO DE 1.80, 1 CONTRAMARCO SENCILLO CENTRADO DE 1.80 Y 4 MARCOS CON TAPAS DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 57,762.24

687

CAJA PARA VALVULAS DE 1.96 X 2.46 X 1.65 METROS, PARA 1 CONTRAMARCO DOBLE DE 1.80 M, 1 CONTRAMARCO SENCILLO DESCENTRADO DE 1.80 M, 1 CONTRAMARCO SENCILLO CENTRADO DE 1.80 Y 4 MARCOS CON TAPAS DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 59,294.94

688

CAJA PARA VALVULAS DE 2.26 X 2.86 X 1.65 METROS, PARA 1 CONTRAMARCO DOBLE DE 2.10 M, 1 CONTRAMARCO SENCILLO CENTRADO DE 2.10, 1 CONTRAMARCO SENCILLO DESCENTRADO DE 2.10 M, Y 4 MARCOS CON TAPAS DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 66,524.72

689

CAJA PARA VALVULAS DE 2.26 X 2.86 X 1.65 METROS, PARA 2 CONTRAMARCOS DOBLES DE 2.10 M, 1 CONTRAMARCO SENCILLO CENTRADO DE 2.10 M, Y 5 MARCOS CON TAPAS DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 67,984.46

78).-CONTRAMARCO SENCILLO CENTRADO 690

CONTRAMARCO DE ACERO CANAL DE 102MM (4") DE 25 KG, SENCILLO CENTRADO DE 90 CMS. MARCA FUNDIDORA TENAYUCA, INCLUYE: MATERIAL, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 1,235.41

691

CONTRAMARCO DE ACERO CANAL DE 102MM (4") DE 27 KG, SENCILLO CENTRADO DE 1.05 MTS, MARCA FUNDIDORA TENAYUCA, INCLUYE: MATERIAL, MANO DE OBRA Y HERRAMIENTA

PZA

$ 1,288.44

50

NO.

CONCEPTO

UNIDAD

P.U.

692

CONTRAMARCO DE ACERO CANAL DE 102MM (4") DE 28 KG, SENCILLO CENTRADO DE 1.10 MTS, MARCA FUNDIDORA TENAYUCA, INCLUYE: MATERIAL, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 1,412.82

693

CONTRAMARCO DE ACERO CANAL DE 102MM (4") DE 31 KG, SENCILLO CENTRADO DE 1.30 MTS, MARCA FUNDIDORA TENAYUCA, INCLUYE: MATERIAL, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 1,446.35

694

CONTRAMARCO DE ACERO CANAL DE 102MM (4") DE 33 KG, SENCILLO CENTRADO DE 1.40 MTS, MARCA FUNDIDORA TENAYUCA, INCLUYE: MATERIAL, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 1,509.60

695

CONTRAMARCO DE ACERO CANAL DE 102MM (4") DE 40KG. SENCILLO CENTRADO DE 1.80 MTS, MARCA FUNDIDORA TENAYUCA, INCLUYE: MATERIAL, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 1,554.77

696

CONTRAMARCO DE ACERO CANAL 102MM (4") DE 44 KG. SENCILLO CENTRADO DE 2.10 MTS, MARCA FUNDIDORA TENAYUCA, INCLUYE: MATERIAL, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 1,631.55

697

CONTRAMARCO DE ACERO CANAL DE 152MM (6") DE 50 KG, SENCILLO CENTRADO DE 1.40 MTS, MARCA FUNDIDORA TENAYUCA, INCLUYE: MATERIAL, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 1,786.73

698

CONTRAMARCO DE ACERO CANAL DE 152MM (6") DE 62 KG. SENCILLO CENTRADO DE 1.80 MTS, MARCA FUNDIDORA TENAYUCA, INCLUYE: MATERIAL, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 2,036.85

699

CONTRAMARCO DE ACERO CANAL DE 152MM (6") DE 66 KG, SENCILLO DESCENTRADO DE 2.10 MTS, MARCA FUNDIDORA TENAYUCA, INCLUYE: MATERIAL, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 2,284.43

700

CONTRAMARCO DE ACERO CANAL DE 152MM(6") DE 50 KG, SENCILLO DESCENTRADO DE 1.40 MTS, MARCA FUNDIDORA TENAYUCA, INCLUYE: MATERIAL, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 1,672.88

701

CONTRAMARCO DE ACERO CANAL DE 152MM (6") DE 62 KG, SENCILLO DESCENTRADO DE 1.80 MTS, MARCA FUNDIDORA TENAYUCA, INCLUYE: MATERIAL, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 2,036.85

702

CONTRAMARCO DE ACERO CANAL DE 152MM (6") DE 66 KG, SENCILLO DESCENTRADO DE 2.10 MTS, MARCA FUNDIDORA TENAYUCA, INCLUYE: MATERIAL, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 2,284.43

79).-BOMBEO DE ACHIQUE CON BOMBA AUTOCEBANTE 703

BOMBEO DE ACHIQUE CON BOMBA AUTOCEBANTE, PROPIEDAD DEL CONTRATISTA, DE 2" DE DIÁMETRO Y 8 H.P.

HRA

$ 129.98

704

BOMBEO DE ACHIQUE CON BOMBA AUTOCEBANTE, PROPIEDAD DEL CONTRATISTA, DE 4" DE DIÁMETRO Y 16 H. P.

HRA

$ 159.45

705

ATRAQUE DE 30.0 X 30.0 X 30.0 CM. DE CONCRETO F'C = 150 KG/CM2. RESISTENCIA NORMAL, CON TAMAÑO MÁXIMO DE AGREGADO 38 MM. HECHO EN OBRA, EN CRUCEROS DE AGUA POTABLE, INCLUYE: MATERIALES, MANO DE OBRA, CIMBRA Y ACARREOS.

HRA

$ 155.18

80).- INSTALACIÓN HIDRÁULICA 706

SUMINISTRO Y COLOCACION DE TINACO DE 1100 L. MARCA ROTOPLAS, CON ACCESORIOS SIN INCLUIR BASE, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 3,842.51

707

SUMINISTRO E INSTALACION DE TOMA DOMICILIARIA DE 13 MM. ( 1/2" ) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 1,760.73

PZA

$ 3,134.70

81).-LUMINARIAS 708

SUMINISTRO Y COLOCACION DE LUMINARIA PARA ALUMBRADO PÚBLICO TIPO OV-15 SIN INCLUIR POSTE, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO. 51

NO.

CONCEPTO

UNIDAD

P.U.

82).- ELEMENTOS ELÉCTRICOS 709

SUMINISTRO Y COLOCACION DE APARTARRAYO OXIDO DE ZINC DE 12 KVA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 1,605.09

710

SUMINISTRO Y COLOCACION DE ACOMETIDA ELECTRICA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS. (NO INCLUYE MURETE DE MEDICION).

PZA

$ 1,667.53

711

SUMINISTRO Y COLOCACION DE ACOMETIDA ELECTRICA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS, (INCLUYE MURETE DE MEDICION).

PZA

$ 3,418.47

712

REGISTRO AUXILIAR PARA ALUMBRADO PÚBLICO DE 40X60X65 CM. A BASE DE MURO DE 14 CM. DE ESPESOR, DE TABIQUE ROJO RECOCIDO DE 7X14X28 CM. ASENTADO Y APLANADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: PLANTILLA DE CONCRETO F'C=100 KG/CM2 DE 10.0 CM. DE ESPESOR, MARCO Y CONTRAMARCO DE ÁNGULO DE 1-1/4", CONCRETO F'C= 200 KG/CM2. EN TAPA Y FIJACIÓN DE MARCO, DRÉN DE GRAVA DE 20 CM. DE ESPESOR, INCLUYE: MATERIALES, MANO DE OBRA, ACARREOS Y DESPERDICIOS.

PZA

$ 2,113.25

713

REGISTRO DE CONCRETO PARA ALUMBRADO CON TAPA Y MARCO PINTADO 0.40X0.40X0.60 M DE 91 KG, INCLUYE: SUMINISTRO Y COLOCACIÓN.

PZA

$ 1,228.45

714

REGISTRO DE CONCRETO PARA ALUMBRADO CON TAPA Y MARCO GALVANIZADO 0.40X0.460X0.80 M DE 152 KG, INCLUYE: SUMINISTRO Y COLOCACIÓN.

PZA

$ 1,631.21

83).-REGISTRO AUXILIAR PARA ALUMBRADO PÚBLICO

84).-RETENIDAS 715

SUMINISTRO Y COLOCACION DE RETENIDA TIPO RSA (RETENIDA SENCILLA DE ANCLA) CON CABLE DE ACERO AG 5/16, INCLUYE: EXCAVACION EN MATERIAL TIPO II-A, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 2,277.78

716

SUMINISTRO Y COLOCACION DE RETENIDA TIPO REA (RETENIDA ESTACA ANCLA) CON CABLE DE ACERO AG 5/16, INCLUYE: POSTE 7-500, EXCAVACION EN MATERIAL TIPO II-A, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 9,246.02

717

SUMINISTRO Y COLOCACION DE RETENIDA TIPO RBA (RETENIDA DE BANQUETA) CON CABLE DE ACERO AG 5/16, INCLUYE: EXCAVACION EN MATERIAL TIPO II-A, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 3,572.50

718

SUMINISTRO Y COLOCACION DE RETENIDA TIPO RDA (RETENIDA DOBLE ANCLA) CON CABLE DE ACERO AG 5/16, INCLUYE: EXCAVACION EN MATERIAL TIPO II-A, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 4,380.21

85).-TRANSFORMADORES 719

SUMINISTRO Y COLOCACION DE TRANSFORMADOR MONOFASICO YT 10 KVA AUTOPROTEGIDO DE 1 BOQUILLA MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 34,117.58

720

SUMINISTRO Y COLOCACION DE TRANSFORMADOR MONOFASICO YT 15 KVA AUTOPROTEGIDO DE 1 BOQUILLA MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 36,278.84

721

SUMINISTRO Y COLOCACION DE TRANSFORMADOR MONOFASICO YT 25 KVA AUTOPROTEGIDO DE 1 BOQUILLA MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 44,072.56

722

SUMINISTRO Y COLOCACION DE TRANSFORMADOR MONOFASICO YT 37.5 KVA AUTOPROTEGIDO DE 1 BOQUILLA MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 50,415.82

723

SUMINISTRO Y COLOCACION DE TRANSFORMADOR MONOFASICO YT 50 KVA AUTOPROTEGIDO DE 1 BOQUILLA MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 59,986.78

724

SUMINISTRO Y COLOCACION DE TRANSFORMADOR MONOFASICO DE 10 KVA AUTOPROTEGIDO DE 2 BOQUILLAS MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 36,024.56

52

NO.

CONCEPTO

UNIDAD

P.U.

725

SUMINISTRO Y COLOCACION DE TRANSFORMADOR MONOFASICO DE 15 KVA AUTOPROTEGIDO DE 2 BOQUILLAS MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 38,185.82

726

SUMINISTRO Y COLOCACION DE TRANSFORMADOR MONOFASICO DE 25 KVA AUTOPROTEGIDO DE 2 BOQUILLAS MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 43,945.42

727

SUMINISTRO Y COLOCACION DE TRANSFORMADOR MONOFASICO DE 37.5 KVA AUTOPROTEGIDO DE 2 BOQUILLAS MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 52,704.21

728

SUMINISTRO Y COLOCACION DE TRANSFORMADOR MONOFASICO DE 50 KVA AUTOPROTEGIDO DE 2 BOQUILLAS MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 61,258.10

729

SUMINISTRO Y COLOCACION DE TRANSFORMADOR BIFASICO YT 10 KVA AUTOPROTEGIDO DE 1 BOQUILLA MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 31,320.67

730

SUMINISTRO Y COLOCACION DE TRANSFORMADOR BIFASICO YT 15 KVA AUTOPROTEGIDO DE 1 BOQUILLA MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 33,736.19

731

SUMINISTRO Y COLOCACION DE TRANSFORMADOR MONOFASICO 25 KVA, PEDESTAL, MARCA TRAMEX 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 83,497.99

732

SUMINISTRO Y COLOCACION DE TRANSFORMADOR MONOFASICO 37.5 KVA, PEDESTAL, MARCA TRAMEX 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 89,457.52

733

SUMINISTRO Y COLOCACION DE TRANSFORMADOR MONOFASICO 50 KVA, PEDESTAL, MARCA TRAMEX 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 91,364.50

734

SUMINISTRO Y COLOCACION DE TRANSFORMADOR BIFASICO DE 10 KVA AUTOPROTEGIDO DE 2 BOQUILLAS MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 33,863.32

735

SUMINISTRO Y COLOCACION DE TRANSFORMADOR BIFASICO DE 15 KVA AUTOPROTEGIDO DE 2 BOQUILLAS MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 35,897.44

736

SUMINISTRO Y COLOCACION DE TRANSFORMADOR BIFASICO DE 25 KVA AUTOPROTEGIDO DE 2 BOQUILLAS MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 43,691.14

737

SUMINISTRO Y COLOCACION DE TRANSFORMADOR BIFASICO DE 37.5 KVA AUTOPROTEGIDO DE 2 BOQUILLAS MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 49,208.05

738

SUMINISTRO Y COLOCACION DE TRANSFORMADOR BIFASICO DE 50 KVA AUTOPROTEGIDO DE 2 BOQUILLAS MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 60,270.14

86).-POSTES DE CONCRETO 739

SUMINISTRO Y COLOCACION DE POSTE 7-500 DE CONCRETO, INCLUYE: HINCADO, PLOMEADO, CEPA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 4,695.83

740

SUMINISTRO Y COLOCACION DE POSTE 9-400 DE CONCRETO, INCLUYE: HINCADO, PLOMEADO, CEPA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 5,456.92

741

SUMINISTRO Y COLOCACION DE POSTE 11-500 DE CONCRETO, INCLUYE: HINCADO, PLOMEADO, CEPA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 6,817.86

742

SUMINISTRO Y COLOCACION DE POSTE 11-700 DE CONCRETO, INCLUYE: HINCADO, PLOMEADO, CEPA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 8,008.29

53

NO.

CONCEPTO

UNIDAD

P.U.

743

SUMINISTRO Y COLOCACION DE POSTE 12-750 DE CONCRETO, INCLUYE: HINCADO, PLOMEADO, CEPA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 9,739.25

744

SUMINISTRO Y COLOCACION DE POSTE 13-600 DE CONCRETO, INCLUYE: HINCADO, PLOMEADO, CEPA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 10,525.10

87).-CABLES Y CONDUCTORES 745

SUMINISTRO Y COLOCACION DE CABLE DE COBRE DESNUDO CAL 1/0 AWG, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

KG

$ 357.37

746

SUMINISTRO Y COLOCACION DE CABLE DE COBRE DESNUDO CAL 3/0 AWG, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

KG

$ 357.37

747

SUMINISTRO Y COLOCACION DE CABLE MULTIPLE DE ALUMINIO 2 + 1 CAL 1/0 (NT), INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 155.55

748

SUMINISTRO Y COLOCACION DE CABLE MULTIPLE DE ALUMINIO 2 + 1 CAL 3/0 (NT), INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 163.28

749

SUMINISTRO Y COLOCACION DE CABLE ALAMBRE DE COBRE No 4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

KG

$ 355.88

750

SUMINISTRO Y COLOCACION DE CONDUCTOR ACSR 1/0, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

KG

$ 312.55

751

SUMINISTRO Y COLOCACION DE CONDUCTOR ACSR 3/0, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

KG

$ 271.69

752

SUMINISTRO Y COLOCACION DE CONDUCTOR ACSR 1/0, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 35.48

753

SUMINISTRO Y COLOCACION DE CONDUCTOR ACSR 3/0, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 45.65

754

SUMINISTRO Y COLOCACION DE CABLE DE ALUMINIO AAC CALIBRE 1/0, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

KG

$ 187.77

755

SUMINISTRO Y COLOCACION DE CABLE DE ALUMINIO AAC CALIBRE 3/0, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

KG

$ 193.50

756

SUMINISTRO Y COLOCACION DE CABLE DE ALUMINIO AAC CALIBRE 1/0, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 52.49

757

SUMINISTRO Y COLOCACION DE CABLE DE ALUMINIO AAC CALIBRE 3/0, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 58.31

88).-EDIFICACIÓN 758

SUMINISTRO Y COLOCACION DE CABLE THW CALIBRE 8, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 51.33

759

SUMINISTRO Y COLOCACION DE CABLE THW CALIBRE 10, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 31.91

760

SUMINISTRO Y COLOCACION DE VENTANA DE ALUMINIO NATURAL, CORREDIZA, PERFIL DE 2", VIDRIO MEDIO DE 3 MM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA.

M2

$ 1,711.14

761

SUMINISTRO Y COLOCACION DE PUERTA ABATIBLE DE 1.20 X 2.10 M. FABRICADA CON PERFILES TUBULARES Y TABLERO DE LÁMINA NO. 18, INCLUYE: MATERIALES, HERRAJES, SOLDADURA, PRIMER ANTICORROSIVO, PINTURA ESMALTE, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 4,996.56

762

SUMINISTRO Y COLOCACION DE VENTANA DE 1.20 X 1.50 M. CON UNA HOJA ABATIBLE, FABRICADA CON PERFILES TUBULARES CON UN PESO DE 15 KG/CM2, INCLUYE: MATERIALES, HERRAJES, SOLDADURA, PRIMER ANTICORROSIVO, PINTURA ESMALTE, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 2,217.24

ML

$ 441.85

89).-MALLA CICLÓNICA 763

SUMINISTRO Y COLOCACIÓN DE MALLA CICLÓN CALIBRE 11 DE 2.00 M. DE ALTURA, INCLUYE: POSTES DE LINEA, BARRA HORIZONTAL, ESPADAS METÁLICAS, Y ALAMBRE DE PUAS ASI COMO TODOS LOS ACCESORIOS PARA SU CORRECTO FUNCIONAMIENTO. 54

NO.

CONCEPTO

UNIDAD

P.U.

764

SUMINISTRO Y COLOCACIÓN DE MALLA CICLÓN CALIBRE 12.5 FORRADA CON P.V.C. DE 2.00 M. DE ALTURA, INCLUYE: POSTES DE LINEA, BARRA HORIZONTAL, ESPADAS METÁLICAS, Y ALAMBRE DE PUAS ASI COMO TODOS LOS ACCESORIOS PARA SU CORRECTO FUNCIONAMIENTO.

ML

$ 464.29

90).- PASTO 765

SUMINISTRO Y COLOCACION DE PASTO ALFOMBRA, INCLUYE: COLOCACION Y SUMINISTRO DE CAPA VEGETAL DE 7 CM. DESPESOR A BASE DE TIERRA LIMPIA.

M2

$ 98.07

766

SUMINISTRO Y PLANTADO DE ARBOL CASUARINAS DE 30 CM. DE ALTO, INCLUYE: EXCAVACION, VARA DE APOYO PARA SOPORTAR LA LLUVIA Y EL VIENTO Y TODO LO NECESARIO PARA SU CORRECTA TERMINACION.

PZA

$ 264.87

91).- PINTURA EN MUROS Y HERRERÍA 767

SUMINISTRO Y APLICACION DE PINTURA VINÍLICA EN MUROS Y PLAFONES CON MEZCLA FINA HASTA 3.00 M. DE ALTURA, INCLUYE: UNA MANO DE SELLADOR Y DOS DE PINTURA.

M2

$ 84.65

768

SUMINISTRO Y APLICACION DE PINTURA DE ESMALTE COMEX 100 EN MUROS Y PLAFONES DE YESO, INCLUYE: DOS APLICACIONES DE PINTURA Y UNA DE SELLADOR.

M2

$ 94.74

769

SUMINISTRO Y APLICACION DE PINTURA DE ESMALTE COMEX 100, EN LAMINA DE FIERRO, INCLUYE: DOS APLICACIONES DE PINTURA.

M2

$ 96.49

770

SUMINISTRO Y APLICACION DE PINTURA DE ESMALTE COMEX 100 EN HERRERIA CON DESARROLLO DE 0.30 M2. EN AMBAS CARAS POR M2. DE CLARO, INCLUYE: DOS APLICACIONES DE PINTURA.

M2

$ 76.98

771

SUMINISTRO Y APLICACION DE PINTURA DE ESMALTE COMEX 100 EN HERRERIA CON DESARROLLO DE 0.40 M2. EN AMBAS CARAS POR M2. DE CLARO, INCLUYE: DOS APLICACIONES DE PINTURA.

M2

$ 74.40

772

SUMINISTRO Y APLICACION DE PINTURA DE ESMALTE COMEX 100 EN HERRERIA CON DESARROLLO DE 0.50 M2. EN AMBAS CARAS POR M2. DE CLARO, INCLUYE: DOS APLICACIONES DE PINTURA.

M2

$ 71.14

92).- PINTURA EN GUARNICIONES 773

SUMINISTRO Y APLICACION DE PINTURA VINÍLICA EN GUARNICIONES CON UN DESARROLLO DE 30 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 39.50

774

SUMINISTRO Y APLICACIÓN DE PINTURA AMARILLO TRÁFICO PESADO EN GUARNICIONES CON UN DESARROLLO DE 30 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 50.58

93).-IMPERMEABILIZANTES 775

SUMINISTRO Y APLICACION DE IMPERMEABILIZANTE EN AZOTEA CON MEMBRANA DE FESTER O SIMILAR, CON SELLO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 276.22

776

SUMINISTRO Y APLICACION DE IMPERMEABILIZANTE EN AZOTEA CON TAPETE PREFABRICADO VITROLY GRANULAR SBS DE 3.5 MM. DE ESPESOR, INCLUYE: 1 MANO DE PRIMARIO BASE AGUA, RESANES DE HASTA 5% DE LA SUPERFICIE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 409.34

777

SUMINISTRO Y APLICACION DE IMPERMEABILIZANTE EN AZOTEA CON TAPETE PREFABRICADO VITROLY GRANULAR SBS DE 3.5 MM. DE ESPESOR, INCLUYE: 1 MANO DE PRIMARIO BASE SOLVENTE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 450.79

778

ACARREO EN CAMION 1er. KILOMETRO, DE MATERIAL MIXTO EN CAMINO PLANO PAVIMENTADO, NO INCLUYE CARGA A CAMION.

M3

$ 25.36

779

ACARREO EN CAMION 1er. KILOMETRO, DE MATERIAL MIXTO EN CAMINO LOMERIO SUAVE, BRECHA, TERRACERIA PRONUNCIADA, MONTAÑOSO REVESTIDO, NO INCLUYE CARGA A CAMION.

M3

$ 50.22

780

ACARREO EN CAMION 1er. KILOMETRO, DE MATERIAL MIXTO EN CAMINO PLANO PAVIMENTADO, INCLUYE CARGA MANUAL.

M3

$ 126.89

94.-ACARREOS

55

NO.

CONCEPTO

UNIDAD

P.U.

781

ACARREO EN CAMION 1er. KILOMETRO, DE MATERIAL MIXTO EN CAMINO PLANO PAVIMENTADO, INCLUYE CARGA CON MAQUINA.

M3

$ 42.70

782

ACARREO EN CAMION 1er. KILOMETRO, DE MATERIAL MIXTO EN CAMINO LOMERIO SUAVE, BRECHA, TERRACERIA PRONUNCIADA, MONTAÑOSO REVESTIDO, INCLUYE CARGA MANUAL.

M3

$ 137.80

783

ACARREO EN CAMION 1er. KILOMETRO, DE MATERIAL MIXTO EN CAMINO LOMERIO SUAVE, BRECHA, TERRACERIA PRONUNCIADA, MONTAÑOSO REVESTIDO, INCLUYE CARGA A MAQUINA.

M3

$ 67.56

784

ACARREO EN CAMION KILOMETRO SUBSECUENTE, DE MATERIAL MIXTO EN CAMINO PLANO PAVIMENTADO.

M3

$ 8.89

785

ACARREO EN CAMION KILOMETRO SUBSECUENTE, DE MATERIAL MIXTO EN CAMINO LOMERIO SUAVE, BRECHA, TERRACERIA PRONUNCIADA, MONTAÑOSO REVESTIDO.

M3

$ 15.07

786

CARGA CON MAQUINA (CARGADOR FRONTAL CAT 950 SOBRE NEUMATICOS) DE LOS MATERIALES ALMACENADOS.

M3

$ 8.11

787

ACARREO HORIZONTAL SIN PENDIENTE, DE PIEDRA BRAZA, EN CARRETILLA DE 5.0 FT3 A 20.00 M. INCLUYE CARGA Y DESCARGA DEL MATERIAL.

M3

$ 88.24

788

ACARREO EN CARRETILLA DE MATERIALES, EN ESTACIONES SUBSECUENTES DE 20.0 M. ACARREO MÁXIMO, DOS ESTACIONES.

M3

$ 92.48

789

ACARREO DEL MATERIAL PRODUCTO DE DEMOLICIONES DEL INTERIOR A PIE DE LA OBRA.

M3

$ 52.01

790

ACARREO DEL MATERIAL PRODUCTO DE LA DEMOLICIÓN A PRIMER KILÓMETRO. INCLUYE CARGA A MANO EN CAMIÓN VOLTEO.

M3

$ 195.21

M2

$ 330.07

M2

$ 301.55

M2

$ 271.50

M2

$ 245.05

95).-TECHUMBRES 791

SUMINISTRO E INSTALACION DE LAMINA ZINTRO-ALUM MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

CAL.

26,

INCLUYE:

792

SUMINISTRO E INSTALACION DE LAMINA ZINTRO-ALUM MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

CAL.

28,

INCLUYE:

793

SUMINISTRO E INSTALACION DE LAMINA ZINTRO-ALUM MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

CAL.

30,

INCLUYE:

794

SUMINISTRO E INSTALACION DE LAMINA ZINTRO-ALUM MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

CAL.

32,

INCLUYE:

795

SUMINISTRO E INSTALACION DE GALVATEJA ROJA CAL. 26, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

M2

$ 524.79

796

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL (SOLERA), INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

KG

$ 53.34

797

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL (ANGULO), INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

KG

$ 51.99

798

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL (MON-TEN), INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

KG

$ 57.40

799

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL MON-TEN DE 4" X 2" CAL.14, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

ML

$ 224.46

800

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL MON-TEN DE 4" X 2" CAL.12, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

ML

$ 309.03

801

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL MON-TEN DE 4" X 2" CAL.10, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

ML

$ 390.92

802

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL MON-TEN DE 5" X 2" CAL.14, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

ML

$ 251.04

803

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL MON-TEN DE 5" X 2" CAL.12, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

ML

$ 345.90

56

NO.

CONCEPTO

UNIDAD

P.U.

804

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL MON-TEN DE 5" X 2" CAL.10, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

ML

$ 437.99

805

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL MON-TEN DE 6" X 2 1/2" CAL.14, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

ML

$ 304.27

806

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL MON-TEN DE 6" X 2 1/2" CAL.12, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

ML

$ 420.26

807

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL MON-TEN DE 6" X 2 1/2" CAL.10, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

ML

$ 533.49

808

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL MON-TEN DE 8" X 3" CAL.14, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

ML

$ 383.41

809

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL MON-TEN DE 8" X 3" CAL.12, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

ML

$ 530.77

810

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL MON-TEN DE 8" X 3" CAL.10, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

ML

$ 676.07

57

CLAVE

MUNICIPIO

ZONA CENTRO CLAVE MUNICIPIO HUILOAPAN DE 075 CUAUHTEMOC IXHUACAN DE LOS 080 REYES 082 IXHUATLAN DEL CAFE

CLAVE 144

MUNICIPIO SAN ANDRES TENEJAPAN

001

ACAJETE

002

ACATLAN

004

ACTOPAN

006

ACULTZINGO

084

IXHUATLANCILLO

153

009

ALPATLAHUAC

086

IXTACZOQUITLAN

154

087

JALACINGO

163

TATATILA

088

JALCOMULCO

165

TEHUIPANGO

090

JAMAPA

167

TENAMPA

092 095 096 097 098 100

168 169 170 171 173 175

TENOCHTITLAN TEOCELO TEPATLAXCO TEPETLAN TEQUILA TEXHUACAN

177

TEZONAPA

182

TLACOLULAN TLACOTEPEC DE MEJIA TLALIXCOYAN TLALNELHUAYOC AN

147

SAN RAFAEL

151

SOCHIAPA SOLEDAD ATZOMPA SOLEDAD DE DOBLADO

016 017 018 019 020 021

ALTO LUCERO DE GUTIERREZ BARRIOS ALTOTONGA AMATLAN DE LOS REYES APAZAPAN AQUILA ASTACINGA ATLAHUILCO ATOYAC ATZACAN

022

ATZALAN

101

023

AYAHUALULCO

103

JILOTEPEC JUCHIQUE DE FERRER LA ANTIGUA LA PERLA LANDERO Y COSS LAS MINAS LAS VIGAS DE RAMIREZ LOS REYES

024

BANDERILLA

104

MAGDALENA

184

026

BOCA DEL RIO

105

185

027

CALCAHUALCO

106

MALTRATA MANLIO FABIO ALTAMIRANO MARIANO ESCOBEDO

187

TLALTETELA

188

TLAPACOYAN

189 190 191

TLAQUILPA TLILAPAN TOMATLAN

192

TONAYAN

193 197

TOTUTLA URSULO GALVAN VEGA DE ALATORRE

010 011 014

186

031 037 039

CAMARON DE TEJEDA CAMERINO Z. MENDOZA CARRILLO PUERTO COACOATZINTLA COATEPEC

042

COETZALA

115

043 044

COLIPA COMAPA

118 119

MARTINEZ DE LA TORRE MEDELLIN MIAHUATLAN MISANTLA MIXTLA DE ALTAMIRANO NAOLINCO NARANJAL

045

CORDOBA

121

NAUTLA

199

122

NOGALES

200

VERACRUZ

124 125 132 133 134 139 140 141 142

OMEALCA ORIZABA PASO DE OVEJAS PASO DEL MACHO PEROTE PUENTE NACIONAL RAFAEL DELGADO RAFAEL LUCIO RIO BLANCO

201 202 203 204 205 206 209 210

VILLA ALDAMA XALAPA XICO XOXOCOTLA YANGA YECUATLA ZENTLA ZONGOLICA

028 029

047 048 050 053 054 058 062 066 069 072

COSAUTLAN DE CARVAJAL COSCOMATEPEC COTAXTLA CUICHAPA CUITLAHUAC CHICONQUIACO CHOCAMAN EMILIANO ZAPATA FORTIN HUATUSCO

107 108 111 112 114

58

CONCEPTO

PAGINA

1).-DEMOLICIONES

62

2).-PRELIMINARES

63

3).-RELLENOS

63

4).PLANTILLAS Y ACOSTILLADOS

63

5).-CAMAS PARA TUBERIA

64

6).-AFINES Y COMPACTACIÓN

64

7).-EXCAVACIONES A MANO

64

8).-EXCAVACIONES A MAQUINA SIN AFINE

65

9).-EXCAVACIONES A MAQUINA CON AFINE

65

10).-ZAPATAS CORRIDAS

65

11).-DADOS DE CONCRETO

66

12).-CADENAS DE DESPLANTE

66

13).-CASTILLOS DE CONCRETO

68

14).-CADENAS DE CERRAMIENTO

69

15).-LOSAS DE CONCRETO

70

16).-COLUMNAS

71

17).-TRABES

72

18).-ESCALONES

72

19).-REGISTROS SANITARIOS

73

20).-POZOS DE VISITA

73

21).-FIRMES DE CONCRETO

75

22).-PISOS DE CONCRETO

76

23).-PISOS DE CONCRETO ARMADOS CON MALLA

76

24).-FINOS PARA PISO

77

25).-ACABADOS SOBRE PISO

77

26).-RECUBRIMIENTOS CERAMICOS ASENTADOS CON PEGA AZULEJO

77

27).-RECUBRIMIENTOS CERAMICOS ASENTADOS CON MORTERO CEM-ARENA 1:2

78

28).-MUROS DE TABIQUE

78

29).-MUROS DE BLOCK

78

30).-TEJA

79

31).-PRETILES

79

32).-APLANADO COMUN EN MUROS

79

33).-APLANADO COMUN EN PLAFONES

79

34).-APLANADO FINO EN MUROS

80

35).-APLANADO FINO EN PLAFONES

80

36).-EMBOQUILLADO COMUN

80

37).-HABILITADO DE ACERO

81

38).-HABILITADO DE MALLAS ELECTROSOLDADAS

81

39).-CIMBRAS EN TANQUE ELEVADO

82

40).-CIMBRAS

83

41).-EMPEDRADOS

84

42).-CIMIENTOS DE PIEDRA

84

43).-MUROS DE CONTENCION

85

44).-MUROS DE CONCRETO

85

45).-CONCRETO CICLOPEO

86

46).-CONCRETOS HECHOS EN OBRA

86 59

CONCEPTO

PAGINA

47).-ELABORACION Y VACIADO DE CONCRETO HECHO EN OBRA EN CIMENTACIONES

86

48).-ELABORACION Y VACIADO DE CONCRETO HECHO EN OBRA EN ESTRUCTURAS

87

49).-CONCRETOS PREMEZCLADOS

87

50).-CONCRETOS HECHOS EN OBRA CON IMPERMEABILIZANTE INTEGRAL

88

51).-CONCRETOS PREMEZCLADOS CON IMPERMEABILIZANTE INTEGRAL

88

52).-PAVIMENTOS DE CONCRETO HECHO EN OBRA

89

53).-PAVIMENTOS DE CONCRETO PREMEZCLADO

89

54).-PAVIMENTOS DE CONCRETO MR

90

55).-GUARNICIONES

90

56).-BANQUETAS

92

57).-JUNTAS CONSTRUCTIVAS Y CORTES EN CONCRETO

93

58).-MORTEROS Y LECHADAS

93

59).-PAVIMENTOS ASFALTICOS

94

60).-REHABILITACION Y APERTURA DE CAMINOS

94

61).-BASES HIDRAULICAS

96

62).-CUNETAS

96

63).-PISOS DE ADOQUIN

97

64).-TUBO DE CONCRETO SIMPLE CON JUNTA DE MORTERO

97

65).-TUBO DE CONCRETO SIMPLE CON JUNTA HERMETICA

98

66).-TUBO DE CONCRETO REFORZADO CON JUNTA DE MORTERO GRADO 1 N C-20

98

67).-TUBO DE CONCRETO PERFORADO CON JUNTA DE MORTERO

99

68).-TUBERIA PAD ADS SANITARIO

99

69).-TUBERIA PAD ADS PLUVIAL

100

70).-TUBERIA ALCANTARILLADO DE PVC S-25

100

71).-TUBERIA ALCANTARILLADO DE PVC S-20

101

72).-SILLETAS PARA DESCARGAS SANITARIAS

101

73).-TUBERIA DE PVC RD-26

101

74).-TUBERIA DE PVC RD-32.5

102

75).-TUBERIA DE PVC RD-41

102

76).-VÁLVULA DE COMPUERTA DE VÁSTAGO FIJO

103

77).-CAJAS PARA OPERACIÓN DE VÁLVULAS

103

78).-CONTRAMARCO SENCILLO CENTRADO

106

79).-BOMBEO DE ACHIQUE CON BOMBA AUTOCEBANTE

106

80).-INSTALACION HIDRAULICA

106

81).-LUMINARIAS

107

82).- ELEMENTOS ELECTRICOS

107

83).-REGISTRO AUXILIAR PARA ALUMBRADO PÚBLICO

107

84).- RETENIDAS

107

85).-TRANSFORMADORES

107

86).-POSTES DE CONCRETO

108

87).-CABLES Y CONDUCTORES

109

88).- EDIFICACION

109

89).- MALLA CICLONICA

110

90).- PASTO

110

91).-PINTURA EN MUROS Y HERRERIA

110 60

CONCEPTO

PAGINA

92).-PINTURA EN GUARNICIONES

110

93).- IMPERMEABILIZANTES

110

94).-ACARREOS

111

95).- TECHUMBRES

111

61

NO.

CONCEPTO

UNIDAD

P.U

1.-)DEMOLICIONES 1

DEMOLICION A MANO DE MAMPOSTERIA PIEDRA BRAZA HASTA 1.50 M. DE PROFUNDIDAD, VOLUMEN MEDIDO EN BANCO, INCLUYE: APILE DE MATERIAL.

M3

$ 472.41

2

DEMOLICION A MANO DE MAMPOSTERIA PIEDRA BRAZA DE 30 A 40 CM DE ESPESOR Y HASTA 3.50M. DE ALTURA, INCLUYE APILE DE MATERIAL.

M2

$ 408.85

3

DEMOLICION A MANO DE CELOSIAS DE 10 A 15 CM. Y HASTA 3.50 M. DE ALTURA, INCLUYE: APILE DEL MATERIAL.

M2

$ 38.52

4

DEMOLICION A MANO DE APLANADOS DE MEZCLA DE 2.5 CM. DE ESPESOR HASTA 3.50 M. DE ALTURA, INCLUYE: APILE DEL MATERIAL.

M2

$ 46.42

5

DEMOLICION A MANO DE PISO O BANQUETA DE CONCRETO SIMPLE DE 8 A 10 CM. DE ESPESOR, INCLUYE: APILE DEL MATERIAL.

M2

$ 56.67

6

DEMOLICION A MANO DE PISO O BANQUETA DE CONCRETO REFORZADO, DE 8 A 10 CM. DE ESPESOR, INCLUYE: APILE DEL MATERIAL.

M2

$ 136.02

7

DEMOLICION A MANO DE PAVIMENTO DE CONCRETO HIDRAULICO REFORZADO, DE 15 CM. DE ESPESOR, INCLUYE: APILE DEL MATERIAL.

M2

$ 204.04

8

DEMOLICION A MANO DE ELEMENTOS DE CONCRETO ARMADO EN ESTRUCTURA (LOSA), SIN RECUPERACION DE ACERO, DE 10 CM. DE ESPESOR, HASTA UNA ALTURA DE 3.50 M., INCLUYE: APILE DEL MATERIAL, MANO DE OBRA Y HERRAMIENTA.

M2

$ 163.33

9

DEMOLICION A MANO DE CONCRETO SIMPLE, INCLUYE: APILE DEL MATERIAL.

M3

$ 404.67

10

DEMOLICION A MANO DE LAMBRINES DE AZULEJOS, MATERIALES VIDRIADOS Y MOSAICOS HASTA 3.50 M. DE ALTURA, INCLUYE: MORTERO Y APILE DEL MATERIAL.

M2

$ 40.49

11

DEMOLICION A MANO DE ELEMENTOS DE CONCRETO ARMADO EN ESTRUCTURA (LOSA ), SIN RECUPERACION DE ACERO, MEDIDO EN BANCO, HASTA UNA ALTURA DE 3.50 M., INCLUYE: APILE DEL MATERIAL, MANO DE OBRA Y HERRAMIENTA.

M3

$ 1,351.69

12

DEMOLICION A MANO DE ELEMENTOS DE CONCRETO ARMADO SIN RECUPERACION DE ACERO, MEDIDO EN BANCO, INCLUYE APILE DE MATERIAL.

M3

$ 1,133.55

13

DEMOLICION A MANO DE MURO DE TABIQUE DE BARRO RECOCIDO DE 14 CM. INCLUYE: APILE DEL MATERIAL.

M2

$ 32.67

14

DEMOLICION A MANO DE MURO DE BLOCK DE CONCRETO, INCLUYE: APILE DEL MATERIAL.

M2

$ 64.24

15

DEMOLICION A MAQUINA DE CONCRETO HIDRAULICO SIMPLE, INCLUYE APILE DEL MATERIAL.

M3

$ 329.95

16

DEMOLICION A MAQUINA DE CONCRETO HIDRAULICO REFORZADO, INCLUYE APILE DEL MATERIAL.

M3

$ 579.39

17

DEMOLICION A MAQUINA DE CONCRETO HIDRAULICO SIMPLE DE 10 CM. DE ESPESOR, INCLUYE APILE DEL MATERIAL.

M2

$ 28.17

18

DEMOLICION A MAQUINA DE PAVIMENTO DE CONCRETO HIDRAULICO REFORZADO DE 15 CM. DE ESPESOR, INCLUYE APILE DEL MATERIAL.

M2

$ 79.48

19

PICADO DE LOSA DE CONCRETO PARA ELIMINAR EXCEDENTES Y RECIBIR APLANADO.

M2

$ 18.87

20

DEMOLICION A MANO DE MAMPOSTERIA PIEDRA BRAZA CON UN ESPESOR DE 20 CM.

M2

$ 71.02

21

DESPRENDIMIENTO DE IMPERMEABILIZANTE REMOVIENDO PARTES SUELTAS Y LIMPIEZA, INCLUYE: ACARREOS A 1ª ESTACIÓN A 20.00 M., MANO DE OBRA Y HERRAMIENTA.

M2

$ 28.90

22

DEMOLICIÓN A MANO DE FIRME DE CONCRETO DE 10 CM DE ESPESOR REFORZADO CON MALLA EN AREA DE GRADAS EXISTENTES SIN RECUPERACIÓN DEL MATERIAL.

M2

$ 75.55

23

DEMOLICIÓN A MANO DE MURO DE BLOCK DE 12X20X40 CMS. DE ESPESOR, ASENTADO CON MORTERO CEMENTO: ARENA SIN RECUPERACIÓN DE MATERIAL.

M2

$ 43.55

24

DEMOLICIÓN A MANO DE CASTILLO DE CONCRETO DE 15X20 CMS. ARMADO CON VAR. DE 3/8" Y ALAMBRÓN SIN RECUPERACIÓN DE MATERIAL. INCLUYE ACARREO DE MATERIAL A PIE DE OBRA.

ML

$ 53.98

62

NO.

CONCEPTO

UNIDAD

P.U

25

DEMOLICIÓN A MANO DE CADENA DE DESPLANTE Y CERRAMIENTO DE 15X20 CMS. ARMADO CON VAR. DE 3/8" Y ALAMBRÓN SIN RECUPERACIÓN DE MATERIAL. INCLUYE ACARREO DE MATERIAL A PIE DE OBRA.

ML

$ 62.96

26

DEMOLICIÓN A MANO DE REPISON DE CONCRETO SOBRE MURETE SIN RECUPERACIÓN DE MATERIAL. INCLUYE ACARREO DE MATERIAL A PIE DE OBRA.

ML

$ 35.42

27

DEMOLICIÓN A MANO DE LOSA DE CONCRETO ARMADA CON VAR. DE 3/8" EN BAÑOS SIN RECUPERACIÓN DE MATERIAL. INCLUYE ACARREO DE MATERIAL A PIE DE OBRA.

M2

$ 107.80

28

DEMOLICIÓN A MANO DE MURO DE PIEDRA, ASENTADO CON MORTERO CEMENTOARENA SIN RECUPERACIÓN DE MATERIAL.

M3

$ 381.65

29

DESMANTELAMIENTO DE ESTRUCTURA DE ACERO Y LÁMINA GALVANIZADA SIN RECUPERACIÓN DEL MATERIAL.

M2

$ 47.58

2).- PRELIMINARES 30

LIMPIEZA Y DESENRAICE A MANO DE TERRENO CON MALEZA DE HASTA 1.00 M. DE ALTURA, INCLUYE: APILE DE YERBA EN EL LUGAR.

HA

$ 11.33

31

LIMPIEZA DE TERRENO PLANO A MANO, INCLUYE: APILE DEL MATERIAL EN EL LUGAR Y ACARREOS A PRIMERA ESTACION DE 20.00 M.

M2

$ 20.97

32

TRAZO Y NIVELACION DE TERRENO PLANO POR MEDIOS MANUALES PARA DESPLANTE DE ESTRUCTURAS ESTABLECIENDO EJES AUXILIARES Y REFERENCIAS.

M2

$ 9.33

33

LIMPIEZA Y CORTE DE HIERBA, MALEZA Y/O MATERIAL EXISTENTE CON MAQUINARIA EN AMPLIACION DEL CAMINO EN LOS EXTREMOS DEL CUERPO DEL TERRAPLEN.

M2

$ 13.60

34

DESMONTE EN ZONAS ARIDAS PARA UNA DENSIDAD DEL 100% INCLUYE: TALA, ROZA, DESENRAICE, MAQUINARIA, MANO DE OBRA Y LIMPIEZA DEL TERRENO.

HA

$ 5,899.30

35

DESMONTE EN ZONAS SEMIARIDAS PARA UNA DENSIDAD DEL 100% INCLUYE: TALA, ROZA, DESENRAICE, MAQUINARIA, MANO DE OBRA Y LIMPIEZA DEL TERRENO.

HA

$ 5,637.40

36

DESMONTE EN ZONAS DE BOSQUE PARA UNA DENSIDAD DEL 100% INCLUYE: TALA, ROZA, DESENRAICE, MAQUINARIA, MANO DE OBRA Y LIMPIEZA DEL TERRENO.

HA

$ 4,944.64

37

DESMONTE EN ZONAS DE SELVA PARA UNA DENSIDAD DEL 100% INCLUYE: TALA, ROZA, DESENRAICE, MAQUINARIA, MANO DE OBRA Y LIMPIEZA DEL TERRENO.

HA

$ 5,501.00

38

RELLENO COMPACTADO CON PISON DE MANO EN CAPAS DE 20 CM. UTILIZANDO MATERIAL PRODUCTO DE LA EXCAVACION, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 138.46

39

RELLENO COMPACTADO CON PISON DE MANO EN CAPAS DE 20 CM. UTILIZANDO MATERIAL DE BANCO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 351.11

40

RELLENO DE CEPAS CON MATERIAL " A " O " B " PRODUCTO DE LA EXCAVACION, COMPACTADO CON EQUIPO MANUAL (BAILARINA) AL 85% PROCTOR INCLUYE: VOLTEO CON PALA, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 166.47

41

RELLENO EN CEPAS CON MATERIAL PRODUCTO DE EXCAVACION, COMPACTADO AL 90% PROCTOR, CON COMPACTADOR MANUAL (BAILARINA), INCLUYE: VOLTEO CON PALA.

M3

$ 187.76

42

RELLENO EN CEPAS CON MATERIAL DE BANCO, COMPACTADO AL 90% PROCTOR, CON COMPACTADOR MANUAL (BAILARINA), INCLUYE: VOLTEO CON PALA.

M3

$ 400.41

43

RELLENO Y COMPACTADO CON PIZON DE MANO, INCLUYE: ACOSTILLADO EN CAPAS DE 20 CM. UTILIZANDO MATERIAL PRODUCTO DE LA EXCAVACION.

M3

$ 149.79

M2

$ 128.90

3).- RELLENOS

4).- PLANTILLAS Y ACOSTILLADOS 44

PLANTILLA DE 5 CM. DE ESPESOR DE CONCRETO HECHO EN OBRA F'C=100 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: ACARREO A PRIMERA ESTACION A 20.00 M., MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

63

NO.

CONCEPTO

UNIDAD

P.U

45

PLANTILLA DE 8 CM. DE ESPESOR DE CONCRETO HECHO EN OBRA F'C=100 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: ACARREO A PRIMERA ESTACION A 20.00 M., MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 210.43

46

PLANTILLA DE 10 CM. DE ESPESOR DE CONCRETO HECHO EN OBRA F'C=100 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: ACARREO A PRIMERA ESTACION A 20.00 M., MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 268.24

47

PLANTILLA DE 5 CM. DE ESPESOR DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: ACARREO A PRIMERA ESTACION A 20.00 M., MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 139.54

48

PLANTILLA DE 8 CM. DE ESPESOR DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: ACARREO A PRIMERA ESTACION A 20.00 M., MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 226.19

49

PLANTILLA DE 10 CM. DE ESPESOR DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: ACARREO A PRIMERA ESTACION A 20.00 M., MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 288.21

50

ELABORACION DE PLANTILLA Y ACOSTILLADO DE TUBERIA CON MATERIAL TIPO I (PRODUCTO DE EXCAVACIÓN), INCLUYE: LIMPIEZA DEL MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 173.45

51

ELABORACION DE PLANTILLA Y ACOSTILLADO DE TUBERIA CON MATERIAL TIPO II (PRODUCTO DE EXCAVACIÓN), INCLUYE: LIMPIEZA DEL MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 173.45

52

PLANTILLA CON MATERIAL PRODUCTO DE EXCAVACIÓN PARA APOYO DE TUBERÍAS, INCLUYE: MANO DE OBRA, HERRAMIENTA, ACARREOS, MEDIDO COMPACTO.

M3

$ 115.38

53

PLANTILLA CON MATERIAL DE BANCO PARA APOYO DE TUBERÍAS, INCLUYE: SUMINISTRO DE MATERIAL, MANO DE OBRA, HERRAMIENTA, ACARREOS, MEDIDO COMPACTO.

M3

$ 367.74

5).-CAMAS PARA TUBERÍA 54

TENDIDO DE CAMA DE ARENA PARA TUBERIAS, INCLUYE: APISONADO Y ACOSTILLADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 396.90

55

TENDIDO DE CAMA DE ARENA (CEMENTANTE) PARA TUBERIAS, INCLUYE: APISONADO Y ACOSTILLADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 311.01

6).- AFINES Y COMPACTACIÓN 56

AFINE DE TALUDES Y FONDO A MANO, MATERIAL SECO TIPO I EN CEPA PARA MEJORAR LA EXCAVACION REALIZADA POR MEDIOS MECANICOS, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 34.01

57

AFINE DE TALUDES Y FONDO A MANO, MATERIAL SECO TIPO II EN CEPA PARA MEJORAR LA EXCAVACION REALIZADA POR MEDIOS MECANICOS, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 39.67

58

AFINE DE TERRACERIA POR MEDIOS MECANICOS, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 12.41

59

COMPACTACION CON EQUIPO (BAILARINA), HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 52.10

60

AFINE A MANO DE FONDO DE EXCAVACIÓN, EFECTUADA POR MEDIOS MECÁNICOS, ESPESOR PROMEDIO 15.0 CM. DE ESPESOR.

M2

$ 16.19

61

NIVELACIÓN, CONFORMACIÓN Y COMPACTACIÓN POR MEDIOS MANUALES. INCLUYE INCORPORACIÓN DE AGUA PARA SU COMPACTACIÓN.

M2

$ 32.38

INCLUYE:

MANO

DE

OBRA,

7).-EXCAVACIONES A MANO 62

EXCAVACION A MANO EN CEPAS MATERIAL SECO TIPO I, PROFUNDIDAD DE 0.00 A 2.00 M., INCLUYE: AFINE DE TALUDES Y FONDO, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 125.99

63

EXCAVACION A MANO EN CEPAS MATERIAL SECO TIPO II, PROFUNDIDAD DE 0.00 A 2.00 M., INCLUYE: AFINE DE TALUDES Y FONDO, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 209.69

64

NO.

CONCEPTO

UNIDAD

P.U

64

EXCAVACION A MANO EN CEPAS MATERIAL TIPO III, PROFUNDIDAD DE 0.00 A 2.00 M., INCLUYE: APILE DEL MATERIAL EN EL LUGAR, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 566.76

65

EXCAVACIÓN DE CEPA EN TERRENO TIPO "B" Y "C" (50-50%) PARA RECIBIR ZAPATA DE CIMENTACIÓN DE 1.20X1.20 MTS. INCLUYE: AFINE Y COMPACTACIÓN.

M3

$ 226.71

66

EXCAVACIÓN EN CAJA EN FORMA MANUAL EN MATERIAL TIPO "B" TEPETATOSO, 80% Y "C" ROCA 20%. INCLUYE: AFINE Y FONDO. ACARREOS DENTRO Y FUERA DE LA OBRA.

M3

$ 113.36

8).-EXCAVACIONES A MÁQUINA SIN AFINE 67

EXCAVACION A MAQUINA EN MATERIAL TIPO I DE 0.00 A 2.00 M. DE PROFUNDIDAD, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 20.80

68

EXCAVACION A MAQUINA EN MATERIAL TIPO II DE 0.00 A 2.00 M. DE PROFUNDIDAD, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 34.34

69

EXCAVACION A MAQUINA EN MATERIAL TIPO II DE 0.00 A 3.00 M. DE PROFUNDIDAD, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 54.53

70

EXCAVACION A MAQUINA EN MATERIAL TIPO II DE 0.00 A 4.00 M, DE PROFUNDIDAD, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 69.38

71

EXCAVACION A MAQUINA EN MATERIAL TIPO II-A DE 0.00 A 2.00 M. DE PROFUNDIDAD, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 54.55

72

EXCAVACION A MAQUINA EN MATERIAL TIPO III DE 0.00 A 2.00 M. DE PROFUNDIDAD, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 604.70

73

EXCAVACION MECANICA EN ROCA (MATERIAL III), EN CAJA A UNA PROFUNDIDAD DE 0.00 A 2.00 M., INCLUYE: RUPTURA CON MARTILLO HIDRAULICO, EXTRACCION Y ACARREO MANUAL A PIE DE CAJA MAX= 20 M.

M3

$ 729.41

74

EXCAVACION MECANICA EN ROCA (MATERIAL III), EN CEPA A UNA PROFUNDIDAD DE 0.00 A 2.00 M., INCLUYE: RUPTURA CON MARTILLO HIDRAULICO, EXTRACION Y ACARREO MANUAL A PIE DE CEPA.

M3

$ 743.62

9).- EXCAVACIÓN A MÁQUINA CON AFINE 75

EXCAVACION A MAQUINA EN MATERIAL TIPO I DE 0.00 A 2.00 M. DE PROFUNDIDAD, INCLUYE: AFINE DE TALUDES Y FONDO, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 43.22

76

EXCAVACION A MAQUINA EN MATERIAL TIPO II DE 0.00 A 2.00 M. DE PROFUNDIDAD, INCLUYE: AFINE DE TALUDES Y FONDO, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 71.34

77

EXCAVACION A MAQUINA EN MATERIAL TIPO II DE 0.00 A 3.00 M. DE PROFUNDIDAD, INCLUYE: AFINE DE TALUDES Y FONDO, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 94.29

78

EXCAVACION A MAQUINA EN MATERIAL TIPO II DE 0.00 A 4.00 M, DE PROFUNDIDAD, INCLUYE: AFINE DE TALUDES Y FONDO, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 118.94

79

EXCAVACION A MAQUINA EN MATERIAL TIPO II-A DE 0.00 A 2.00 M. DE PROFUNDIDAD, INCLUYE: AFINE DE TALUDES Y FONDO, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 102.01

80

EXCAVACION A MAQUINA EN MATERIAL TIPO III DE 0.00 A 2.00 M. DE PROFUNDIDAD, INCLUYE: AFINE DE TALUDES Y FONDO, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 662.40

M3

$ 6,704.43

10).- ZAPATAS CORRIDAS

81

SUMINISTRO Y ELABORACION DE ZAPATA CORRIDA DE CONCRETO F'C=200 KG/CM2. DE 80 CM. DE ANCHO Y 20 CM. DE ALTURA, HABILITADO CON 65 KG. DE ACERO DE 1/2" X M3. DE CONCRETO, INCLUYE: PLANTILLA DE 5 CM. DE ESPESOR CONCRETO F'C=100 KG/CM2., CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

65

NO.

CONCEPTO

UNIDAD

P.U

82

SUMINISTRO Y ELABORACION DE ZAPATA CORRIDA DE CONCRETO F'C=250 KG/CM2. DE 80 CM. DE ANCHO Y 20 CM. DE ALTURA, HABILITADO CON 65 KG. DE ACERO DE 1/2" X M3. DE CONCRETO, INCLUYE: PLANTILLA DE 5 CM. DE ESPESOR CONCRETO F'C=100 KG/CM2., CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 7,512.91

83

SUMINISTRO Y ELABORACION DE ZAPATA CORRIDA DE CONCRETO F'C=200 KG/CM2. DE 80 CM. DE ANCHO Y 20 CM. DE ALTURA, HABILITADO CON 65 KG. DE ACERO DE 1/2" X M3. DE CONCRETO, INCLUYE: PLANTILLA DE 5 CM. DE ESPESOR CONCRETO F'C=100 KG/CM2., CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 957.73

84

SUMINISTRO Y ELABORACION DE ZAPATA CORRIDA DE CONCRETO F'C=250 KG/CM2. DE 80 CM. DE ANCHO Y 20 CM. DE ALTURA, HABILITADO CON 65 KG. DE ACERO DE 1/2" X M3. DE CONCRETO, INCLUYE: PLANTILLA DE 5 CM. DE ESPESOR CONCRETO F'C=100 KG/CM2., CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,082.11

85

SUMINISTRO Y ELABORACION DE DADO DE CIMENTACION DE 30 X 30 X 80 CM., CONCRETO F'C=200 KG/CM2., ARMADO CON 6 VARS. DE 1/2" Y ESTRIBOS DEL No. 3 A CADA 15 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

PZA

$ 801.55

86

SUMINISTRO Y ELABORACION DE DADO DE CIMENTACION DE 30 X 30 X 80 CM., CONCRETO F'C=250 KG/CM2., ARMADO CON 6 VARS. DE 1/2" Y ESTRIBOS DEL No. 3 A CADA 15 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

PZA

$ 857.53

87

SUMINISTRO Y ELABORACION DE DADO DE CIMENTACION DE 40 X 40 X 80 CM., CONCRETO F'C=200 KG/CM2., ARMADO CON 6 VARS. DE 1/2" Y ESTRIBOS DEL No. 3 A CADA 15 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

PZA

$ 1,076.59

88

SUMINISTRO Y ELABORACION DE DADO DE CIMENTACION DE 40 X 40 X 80 CM., CONCRETO F'C=250 KG/CM2., ARMADO CON 6 VARS. DE 1/2" Y ESTRIBOS DEL No. 3 A CADA 15 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

PZA

$ 1,176.10

89

SUMINISTRO Y ELABORACION DE DADO DE CIMENTACION DE 50 X 50 X 80 CM., CONCRETO F'C=200 KG/CM2., ARMADO CON 8 VARS. DE 1/2" Y ESTRIBOS DEL No. 3 A CADA 15 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

PZA

$ 1,463.62

90

SUMINISTRO Y ELABORACION DE DADO DE CIMENTACION DE 50 X 50 X 80 CM., CONCRETO F'C=250 KG/CM2., ARMADO CON 8 VARS. DE 1/2" Y ESTRIBOS DEL No. 3 A CADA 15 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

PZA

$ 1,619.08

11).- DADOS DE CONCRETO

12).- CADENAS DE DESPLANTE CADENAS ARMADAS CON ARMEX 91

CADENA DE DESPLANTE DE 15 X 20 CM., CONCRETO F'C= 150 KG/CM2., ARMEX 15X20-4, INCLUYE: CIMBRA, DESCIMBRA, ACABADO COMUN, MANO DE OBRA, EQUIPO NECESARIO, MATERIALES, ACARREO A PRIMERA ESTACION A 20.00 M.

ML

$ 266.00

92

CADENA DE DESPLANTE DE 15 X 20 CM., CONCRETO F'C= 200 KG/CM2., ARMEX 15X20-4, INCLUYE: CIMBRA, DESCIMBRA, ACABADO COMUN, MANO DE OBRA, EQUIPO NECESARIO, MATERIALES, ACARREO A PRIMERA ESTACION A 20.00 M.

ML

$ 272.26

93

CADENA DE DESPLANTE DE 15 X 20 CM., CONCRETO F'C= 250 KG/CM2., ARMEX 15X20-4, INCLUYE: CIMBRA, DESCIMBRA, ACABADO COMUN, MANO DE OBRA, EQUIPO NECESARIO, MATERIALES, ACARREO A PRIMERA ESTACION A 20.00 M.

ML

$ 271.25

ML

$ 322.34

CADENAS ARMADAS CON VARILLA 94

CADENA DE DESPLANTE DE SECCION 15 X 20 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8", ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

66

NO.

CONCEPTO

UNIDAD

P.U

95

CADENA DE DESPLANTE DE SECCION 15 X 20 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8", ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 326.82

96

CADENA DE DESPLANTE DE SECCION 15 X 20 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8" ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 332.00

97

CADENA DE DESPLANTE DE SECCION 15 X 25 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8", ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 361.28

98

CADENA DE DESPLANTE DE SECCION 15 X 25 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8", ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 367.39

99

CADENA DE DESPLANTE DE SECCION 15 X 25 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8", ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 373.45

100

CADENA DE DESPLANTE DE SECCION 15 X 30 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8", ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 410.87

101

CADENA DE DESPLANTE DE SECCION 15 X 30 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8", ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 418.59

102

CADENA DE DESPLANTE DE SECCION 15 X 30 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8", ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 426.22

103

CADENA DE DESPLANTE DE SECCION 20 X 30 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8", ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 469.12

104

CADENA DE DESPLANTE DE SECCION 20 X 30 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8", ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 479.39

105

CADENA DE DESPLANTE DE SECCION 20 X 30 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8", ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 489.58

106

CADENA DE DESPLANTE DE SECCION 30 X 30 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8", ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 528.88

107

CADENA DE DESPLANTE DE SECCION 30 X 30 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8", ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 543.11

108

CADENA DE DESPLANTE DE SECCION 30 X 30 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8", ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 558.10

67

NO.

CONCEPTO

UNIDAD

P.U

13).- CASTILLOS DE CONCRETO CASTILLOS ARMADOS CON ARMEX 109

CASTILLO DE SECCION 15 X 15 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4" REFORZADA CON ARMEX 15 -15 - 4, INCLUYE: CIMBRA 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 256.65

110

CASTILLO DE SECCION 15 X 15 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4" REFORZADA CON ARMEX 15 -15 - 4, INCLUYE: CIMBRA 4 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 305.64

111

CASTILLO DE SECCION 15 X 15 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4" REFORZADA CON ARMEX 15 -15 - 4, INCLUYE: CIMBRA 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA YEQUIPO NECESARIO.

ML

$ 260.48

112

CASTILLO DE SECCION 15 X 15 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4" REFORZADA CON ARMEX 15 -15 - 4, INCLUYE: CIMBRA 4 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 309.49

113

CASTILLO DE SECCION 15 X 15 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 302.18

114

CASTILLO DE SECCION 15 X 15 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 4 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 344.62

115

CASTILLO DE SECCION 15 X 15 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 306.10

116

CASTILLO DE SECCION 15 X 15 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 4 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 348.54

117

CASTILLO DE SECCION 15 X 20 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 354.10

118

CASTILLO DE SECCION 15 X 20 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 4 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 403.11

119

CASTILLO DE SECCION 15 X 20 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 359.25

120

CASTILLO DE SECCION 15 X 20 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 4 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 408.23

121

CASTILLO DE SECCION 15 X 25 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 399.54

122

CASTILLO DE SECCION 15 X 25 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 4 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 448.51

123

CASTILLO DE SECCION 15 X 25 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 405.97

CASTILLOS ARMADOS CON VARILLA

68

NO.

CONCEPTO

UNIDAD

P.U

124

CASTILLO DE SECCION 15 X 25 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 4 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 454.94

125

CASTILLO DE SECCION 15 X 30 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 467.85

126

CASTILLO DE SECCION 15 X 30 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM, INCLUYE: CIMBRA COMUN 4 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 516.82

127

CASTILLO DE SECCION 15 X 30 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 456.96

128

CASTILLO DE SECCION 15 X 30 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 4 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 505.96

129

CASTILLO DE SECCION 20 X 20 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 390.78

130

CASTILLO DE SECCION 20 X 20 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 4 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 456.08

131

CASTILLO DE SECCION 20 X 20 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 419.20

132

CASTILLO DE SECCION 20 X 20 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 4 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 484.53

133

CADENA DE CERRAMIENTO DE SECCION 15 X 20 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON ARMEX 15 X 20 - 4, INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 309.51

134

CADENA DE CERRAMIENTO DE SECCION 15 X 20 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON ARMEX 15 X 20 - 4, INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 314.63

135

CADENA DE CERRAMIENTO DE SECCION 15 X 20 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DEL No. 3 (3/8") ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 373.73

136

CADENA DE CERRAMIENTO DE SECCION 15 X 20 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DEL No. 3 (3/8") ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 378.85

14).- CADENAS DE CERRAMIENTO CADENAS DE CERRAMIENTO ARMADAS CON ARMEX

CADENAS DE CERRAMIENTO ARMADAS CON VARILLA

69

NO.

CONCEPTO

UNIDAD

P.U

137

CADENA DE CERRAMIENTO DE SECCION 20 X 20 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DEL No. 3 (3/8") ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 412.36

138

CADENA DE CERRAMIENTO DE SECCION 20 X 20 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DEL No. 3 (3/8") ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 419.20

15).- LOSAS DE CONCRETO LOSAS ARMADAS CON VARILLA 139

LOSA PLANA EN ESTRUCTURA, PERALTE 10 CM., CIMBRA COMUN REFORZADA CON 60 KG. DE ACERO POR M3., CONCRETO F'C = 200 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 859.67

140

LOSA PLANA EN ESTRUCTURA, PERALTE 10 CM., CIMBRA COMUN REFORZADA CON 60 KG. DE ACERO POR M3., CONCRETO F'C = 250 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 860.08

141

LOSA PLANA EN ESTRUCTURA, PERALTE 12 CM., CIMBRA COMUN REFORZADA CON 72 KG DE ACERO POR M3., CONCRETO F'C = 200 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 956.66

142

LOSA PLANA EN ESTRUCTURA, PERALTE 12 CM., CIMBRA COMUN REFORZADA CON 72 KG DE ACERO POR M3., CONCRETO F'C = 250 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 958.66

143

LOSA PLANA EN ESTRUCTURA, PERALTE 15 CM., CIMBRA COMUN REFORZADA CON 90 KG. DE ACERO POR M3., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 1,102.17

144

LOSA PLANA EN ESTRUCTURA, PERALTE 15 CM., CIMBRA COMUN REFORZADA CON 90 KG. DE ACERO POR M3., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 1,102.78

145

LOSA PLANA EN ESTRUCTURA, PERALTE 20 CM., CIMBRA COMUN REFORZADA CON 60 KG DE ACERO POR M3., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 1,145.02

146

LOSA PLANA EN ESTRUCTURA, PERALTE 20 CM., CIMBRA COMUN REFORZADA CON 60 KG. DE ACERO POR M3., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 1,145.86

147

LOSA PLANA EN ESTRUCTURA, PERALTE 20 CM., CIMBRA COMUN REFORZADA CON 120 KG. DE ACERO POR M3. CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 1,344.66

148

LOSA PLANA EN ESTRUCTURA, PERALTE 20 CM., CIMBRA COMUN REFORZADA CON 120 KG. DE ACERO POR M3. CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 1,345.50

LOSAS ARMADAS CON MALLA 149

LOSA PLANA EN ESTRUCTURA, PERALTE 10 CM., CIMBRA COMUN ARMADA CON MALLA ELECTROSOLDADA 6 -6 / 10 - 10, CONCRETO F'C = 200 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 718.08

150

LOSA PLANA EN ESTRUCTURA, PERALTE 10 CM., CIMBRA COMUN ARMADA CON MALLA ELECTROSOLDADA 6 -6 / 10 - 10, CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 718.51

M2

$ 501.24

LOSA DE VIGUETA Y BOVEDILLA

151

LOSA CONSTRUIDA CON EL SISTEMA DE VIGUETA Y BOVEDILLA DE 20 CM. DE ESPESOR CON CAPA DE COMPRESION DE 5 CM., CONCRETO F'C=200 KG/CM2., ARMADA CON MALLA ELECTROSOLDADA 6X6/10-10, INCLUYE: MANO DE OBRA, MATERIALES, HERRAMIENTA. 70

NO.

CONCEPTO

UNIDAD

P.U

152

COLUMNA EN ESTRUCTURA DE SECCION 30 X 30 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", CIMBRA COMÚN, HABILITADA CON 190 KG. DE ACERO DE 5/8" Y 1/2" POR M3., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 13,574.96

153

COLUMNA EN ESTRUCTURA DE SECCION 30 X 30 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", CIMBRA COMÚN, HABILITADA CON 190 KG. DE ACERO DE 5/8" Y 1/2" POR M3., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 13,741.29

154

COLUMNA EN ESTRUCTURA DE SECCION 30 X 30 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", CIMBRA COMÚN, ARMADA CON 4 VARILLAS DEL No. 4 (1/2") Y ESTRIBOS DEL No. 3 (3/8") A CADA 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 927.64

155

COLUMNA EN ESTRUCTURA DE SECCION 30 X 30 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", CIMBRA COMÚN, ARMADA CON 4 VARILLAS DEL No. 4 (1/2") Y ESTRIBOS DEL No. 3 (3/8") A CADA 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 943.05

156

COLUMNA EN ESTRUCTURA DE SECCION 30 X 30 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", CIMBRA COMÚN, ARMADA CON 6 VARILLAS DEL No. 4 (1/2") Y ESTRIBOS DEL No. 3 (3/8") A CADA 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 991.88

157

COLUMNA EN ESTRUCTURA DE SECCION 30 X 30 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", CIMBRA COMÚN, ARMADA CON 6 VARILLAS DEL No. 4 (1/2") Y ESTRIBOS DEL No. 3 (3/8") A CADA 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,007.29

158

COLUMNA EN ESTRUCTURA DE SECCION 40 X 40 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", CIMBRA COMÚN, ARMADA CON 4 VARILLAS DEL No. 8 (1"), 4 VARILLAS DE 1/2" Y ESTRIBOS DEL No. 2 (1/4") A CADA 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,702.72

159

COLUMNA EN ESTRUCTURA DE SECCION 40 X 40 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", CIMBRA COMÚN, ARMADA CON 8 VARILLAS DE 1/2" Y ESTRIBOS DEL No. 2 (1/4") A CADA 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,344.28

160

COLUMNA EN ESTRUCTURA DE SECCION 40 X 40 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", CIMBRA COMÚN, ARMADA CON 6 VARILLAS DEL No. 6 (3/4") Y ESTRIBOS DEL No. 3 (3/8") A CADA 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,585.83

161

COLUMNA EN ESTRUCTURA DE SECCION 40 X 40 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", CIMBRA COMÚN, ARMADA CON 6 VARILLAS DEL No. 6 (3/4") Y ESTRIBOS DEL No. 3 (3/8") A CADA 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,618.03

162

COLUMNA EN ESTRUCTURA DE SECCION 40 X 40 CM., CONCRETO F'C=300 KG/CM2. AGREGADO MAXIMO 3/4", CIMBRA COMÚN, ARMADA CON 6 VARILLAS DEL No. 6 (3/4") Y ESTRIBOS DEL No. 3 (3/8") A CADA 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,605.77

163

COLUMNA EN ESTRUCTURA DE SECCION 40 X 40 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", CIMBRA COMÚN, ARMADA CON 8 VARILLAS DE 1/2" Y ESTRIBOS DEL No. 2 (1/4") A CADA 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,384.28

164

COLUMNA EN ESTRUCTURA DE SECCION 40 X 40 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", CIMBRA COMÚN, ARMADA CON 4 VARILLAS DEL No. 8 ( 1" ), 4 VARILLAS DE 1/2" Y ESTRIBOS DEL No. 2 ( 1/4" ) A CADA 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,753.35

16).-COLUMNAS COLUMNAS POR METRO CÚBICO

COLUMNAS POR METRO LINEAL

71

NO.

CONCEPTO

UNIDAD

P.U

165

COLUMNA CIRCULAR EN ESTRUCTURA DE 40 CM. DE DIAMETRO REFORZADA CON 6 VARILLAS DEL 5/8" Y ESTRIBOS DE 3/8" @ 15 CM. DE FORMA HELICOIDAL, CON CONCRETO F'C=250 KG/CM2, INCLUYE: MATERIALES, MANO DE OBRA, CIMBRA Y DESCIMBRA, VIBRADO Y CURADO.

ML

$ 1,098.41

166

COLUMNA CIRCULAR EN ESTRUCTURA DE 55 CM. DE DIAMETRO, REFORZADA CON 8 VARILLAS DE 5/8", 6 VARILLAS DE 1/2" Y ESTRIBOS DE 3/8" @ 15 CM. DE FORMA HELICOIDAL, CONCRETO F'C= 250 KG/CM2 AGREGADO TRITURADO DE 3/4", INCLUYE: MATERIALES, MANO DE OBRA, CIMBRA Y DESCIMBRA, VIBRADO Y CURADO.

ML

$ 2,053.05

167

TRABE EN ESTRUCTURA DE SECCION 25 X 40 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4" CIMBRA COMUN, HABILITADO CON 140 KG. DE ACERO DE 5/8" Y 1/2" POR M3., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 10,628.09

168

TRABE EN ESTRUCTURA DE SECCION 25 X 40 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4" CIMBRA COMUN, HABILITADO CON 140 KG. DE ACERO DE 5/8" Y 1/2" POR M3., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 10,794.44

169

TRABE EN ESTRUCTURA DE SECCION 40 X 60 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4" CIMBRA COMUN, HABILITADO CON 140 KG. DE ACERO DE 5/8" Y 1/2" POR M3., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 9,199.25

170

TRABE EN ESTRUCTURA DE SECCION 40 X 60 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4" CIMBRA COMUN, HABILITADO CON 140 KG. DE ACERO DE 5/8" Y 1/2" POR M3., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 9,365.58

171

TRABE EN ESTRUCTURA DE SECCION 25 X 40 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4" CIMBRA COMUN, HABILITADO CON 140 KG. DE ACERO DE 5/8" Y 1/2" POR M3., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,079.13

172

TRABE EN ESTRUCTURA DE SECCION 25 X 40 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4" CIMBRA COMUN, HABILITADO CON 140 KG. DE ACERO DE 5/8" Y 1/2" POR M3., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,095.78

173

TRABE EN ESTRUCTURA DE SECCION 30 X 50 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4" CIMBRA COMÚN, ARMADA CON 8 VARILLAS DEL No. 4 (1/2") Y ESTRIBOS DEL No. 3 (3/8") A CADA 20 CM., INCLUYE: CIMBRADO Y DESCIMBRADO.

ML

$ 1,220.12

174

TRABE EN ESTRUCTURA DE SECCION 30 X 50 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4" CIMBRA COMÚN, ARMADA CON 8 VARILLAS DEL No. 4 (1/2") Y ESTRIBOS DEL No. 3 (3/8") A CADA 20 CM., INCLUYE: CIMBRADO Y DESCIMBRADO.

ML

$ 1,245.07

175

ESCALONES DE 30 CM. DE HUELLA X 17 CM. DE PERALTE, FORJADOS CON TABIQUE ROJO RECOCIDO, ASENTADO CON MORTERO CEMENTO-CAL-ARENA 1:1:6, INCLUYE: ACARREOS 1a. ESTACION A 20.00 M., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 152.21

176

ESCALONES DE 30 CM. DE HUELLA X 17 CM. DE PERALTE, FORJADOS CON TABIQUE ROJO RECOCIDO, ASENTADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: ACARREOS 1a. ESTACION A 20.00 M., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 152.27

177

ESCALONES DE 25 CM. DE HUELLA X 17 CM. DE PERALTE, FORJADOS CON TABIQUE ROJO RECOCIDO, ASENTADO CON MORTERO CEMENTO-CAL-ARENA 1:1:6, INCLUYE: ACARREOS 1a. ESTACION A 20.00 M., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 148.29

17).- TRABES TRABES POR METRO CÚBICO

TRABES POR METRO LINEAL

18).- ESCALONES

72

NO.

CONCEPTO

UNIDAD

P.U

178

ESCALONES DE 25 CM. DE HUELLA X 17 CM. DE PERALTE, FORJADOS CON TABIQUE ROJO RECOCIDO, ASENTADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: ACARREOS 1a. ESTACION A 20.00 M., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 148.32

179

ESCALONES DE 30 CM. DE HUELLA X 17 CM. DE PERALTE, FORJADOS CON CONCRETO F'C=100 KG/CM2., INCLUYE: ACARREOS 1a. ESTACION A 20.00 M., MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 154.97

180

ESCALONES DE 30 CM. DE HUELLA X 17 CM. DE PERALTE, FORJADOS CON CONCRETO F'C=150 KG/CM2., INCLUYE: ACARREOS 1a. ESTACION A 20.00 M., MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 160.09

181

REGISTRO DE 0.40 X 0.60 X 1.00 M. MEDIDAS INTERIORES, DE TABIQUE ROJO RECOCIDO EN 14CM. DE ESPESOR, JUNTEADO CON MORTERO CEMENTO-ARENA 1:4, ACABADO PULIDO Y PLANTILLA DE CONCRETO F'C=100 KG/CM2., INCLUYE: MARCO, CONTRAMARCO, TAPA DE CONCRETO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 2,207.13

182

REGISTRO DE 0.40 X 0.60 X 1.00 M. MEDIDAS INTERIORES, DE TABIQUE ROJO RECOCIDO EN 14 CM. DE ESPESOR, JUNTEADO CON MORTERO CEMENTO-ARENA 1:5, ACABADO PULIDO Y PLANTILLA DE CONCRETO F'C=150 KG/CM2., INCLUYE: MARCO, CONTRAMARCO, TAPA DE CONCRETO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 2,181.70

183

REGISTRO DE 0.60 X 0.60 X 1.00 M. MEDIDAS INTERIORES, DE TABIQUE ROJO RECOCIDO EN 14 CM. DE ESPESOR, JUNTEADO CON MORTERO CEMENTO-ARENA 1:4, ACABADO PULIDO Y PLANTILLA DE CONCRETO F'C=100 KG/CM2, INCLUYE: MARCO, CONTRAMARCO, TAPA DE CONCRETO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 2,245.35

184

REGISTRO DE 0.60 X 0.60 X 1.00 M. MEDIDAS INTERIORES DE TABIQUE ROJO RECOCIDO EN 14 CM. DE ESPESOR, JUNTEADO CON MORTERO CEMENTO-ARENA 1:5, ACABADO PULIDO Y PLANTILLA DE CONCRETO F'C=150 KG/CM2, INCLUYE: MARCO, CONTRAMARCO, TAPA DE CONCRETO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 2,215.28

185

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 1.50 M.

PZA

$ 9,467.82

186

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 1.75 M.

PZA

$ 10,474.54

187

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 2.00 M.

PZA

$ 11,357.07

188

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 2.25 M.

PZA

$ 12,109.37

189

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 2.50 M.

PZA

$ 12,749.99

190

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 2.75 M.

PZA

$ 13,511.77

19).- REGISTROS SANITARIOS

20).-POZOS DE VISITA

73

NO.

CONCEPTO

UNIDAD

P.U

191

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 3.00 M.

PZA

$ 14,271.20

192

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 3.25 M.

PZA

$ 15,035.46

193

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 3.50 M.

PZA

$ 15,920.45

194

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 3.75 M.

PZA

$ 16,556.84

195

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 4.00 M.

PZA

$ 17,199.84

196

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 4.25 M.

PZA

$ 17,963.89

197

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 4.50 M.

PZA

$ 18,602.45

198

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 4.75 M.

PZA

$ 19,489.92

199

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 5.00 M.

PZA

$ 20,744.37

200

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 1.50 M.

PZA

$ 7,570.32

201

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 1.75 M.

PZA

$ 8,577.04

202

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 2.00 M.

PZA

$ 8,291.26

203

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 2.25 M.

PZA

$ 9,095.11

204

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 2.50 M.

PZA

$ 9,910.31

205

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 2.75 M.

PZA

$ 10,723.66

74

NO.

CONCEPTO

UNIDAD

P.U

206

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 3.00 M.

PZA

$ 11,534.64

207

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M. PROFUNDIDAD RASANTE HIDR. 3.25 M.

PZA

$ 12,350.29

208

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M. PROFUNDIDAD RASANTE HIDR. 3.50 M.

PZA

$ 13,311.06

209

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 3.75 M.

PZA

$ 13,974.83

210

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 4.00 M.

PZA

$ 14,792.46

211

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 4.25 M.

PZA

$ 15,607.85

212

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 4.50 M.

PZA

$ 16,421.24

213

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M. PROFUNDIDAD RASANTE HIDR. 4.75 M.

PZA

$ 17,236.88

214

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 5.00 M.

PZA

$ 18,050.04

215

SUMINISTRO Y COLOCACION DE BROCAL Y TAPA DE CONCRETO PARA POZO DE VISITA.

PZA

$ 2,692.37

216

SUMINISTRO Y COLOCACION DE BROCAL Y TAPA DE Fo. Fo. MEDIANO DE 130 KG.

PZA

$ 3,702.67

217

SUMINISTRO Y COLOCACION DE BROCAL Y TAPA DE POLIETILENO (LIGERO).

PZA

$ 2,737.57

218

SUMINISTRO Y COLOCACION DE BROCAL Y TAPA DE POLIETILENO (PESADO).

PZA

$ 2,990.57

21).-FIRMES DE CONCRETO 219

FIRME DE 5 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA RESISTENCIA NORMAL F'C=100 KG/CM2., AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 157.55

220

FIRME DE 8 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA RESISTENCIA NORMAL F'C=100 KG/CM2., AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 225.04

221

FIRME DE 10 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA RESISTENCIA NORMAL F'C=100 KG/CM2., AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 263.19

222

FIRME DE 5 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA RESISTENCIA NORMAL F'C=150 KG/CM2., AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 167.51

75

NO.

CONCEPTO

UNIDAD

P.U

223

FIRME DE 8 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA RESISTENCIA NORMAL F'C=150 KG/CM2., AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 240.99

224

FIRME DE 10 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA RESISTENCIA NORMAL F'C=150 KG/CM2., AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 283.13

22).- PISOS DE CONCRETO 225

PISO DE 5 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., AGREGADO MAXIMO 3/4", ACABADO PULIDO, INCLUYE: CIMBRADO, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 266.60

226

PISO DE 8 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., AGREGADO MAXIMO 3/4", ACABADO PULIDO, INCLUYE: CIMBRADO, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 333.30

227

PISO DE 10 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., AGREGADO MAXIMO 3/4", ACABADO PULIDO, INCLUYE: CIMBRADO, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 356.68

228

PISO DE 5 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., AGREGADO MAXIMO 3/4", ACABADO ESCOBILLADO, INCLUYE: CIMBRADO, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 220.90

229

PISO DE 8 CM. DE ESPESOR DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., AGREGADO MAXIMO 3/4", ACABADO ESCOBILLADO, INCLUYE: CIMBRADO, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 292.67

230

PISO DE 10 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., AGREGADO MAXIMO 3/4", ACABADO ESCOBILLADO, INCLUYE: CIMBRADO, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 349.87

231

PISO DE 8.0 CM. DE ESPESOR, DE CONCRETO F'C = 150 KG/CM2., REVENIMIENTO NORMAL, TAMAÑO MÁXIMO AGREGADO DE 19 MM. (3/4"), PULIDO INTEGRAL CON LLANA METÁLICA, INCLUYE: LA PREPARACIÓN DE LA BASE Y CURADO.

M2

$ 288.92

232

PISO DE 10.0 CM. DE ESPESOR, DE CONCRETO F'C = 150 KG/CM2., REVENIMIENTO NORMAL, TAMAÑO MÁXIMO AGREGADO DE 19 MM. (3/4"), PULIDO INTEGRAL CON LLANA METÁLICA, INCLUYE: LA PREPARACIÓN DE LA BASE Y CURADO.

M2

$ 333.06

233

PISO DE 8 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., AGREGADO MAXIMO 3/4", ACABADO PULIDO, REFORZADO CON MALLA ELECTROSOLDADA 6-6/10-10, INCLUYE: CIMBRADO, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 372.37

234

PISO DE 8 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., AGREGADO MAXIMO 3/4", ACABADO ESCOBILLADO, REFORZADO CON MALLA ELECTROSOLDADA 6-6/10-10, INCLUYE: CIMBRADO, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 352.51

235

PISO DE 10 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., AGREGADO MAXIMO 3/4", ACABADO PULIDO, REFORZADO CON MALLA ELECTROSOLDADA 6-6/10-10, INCLUYE: CIMBRADO, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 416.49

236

PISO DE 10 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., AGREGADO MAXIMO 3/4", ACABADO ESCOBILLADO, REFORZADO CON MALLA ELECTROSOLDADA 6-6 /10-10, INCLUYE: CIMBRADO, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 396.65

237

PISO DE 10 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA F'C=200 KG/CM2., AGREGADO MAXIMO 3/4", ACABADO PULIDO, REFORZADO CON MALLA ELECTROSOLDADA 6-6/ 10-10, INCLUYE: CIMBRADO, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 425.51

238

PISO DE 10 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA F'C=200 KG/CM2., AGREGADO MAXIMO 3/4," ACABADO ESCOBILLADO, REFORZADO CON MALLA ELECTROSOLDADA 6-6/10-10, INCLUYE: CIMBRADO, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 405.65

23).-PISOS DE CONCRETO ARMADOS CON MALLA

76

NO.

CONCEPTO

UNIDAD

P.U

24).-FINOS PARA PISO 239

FINO DE MORTERO CEMENTO-ARENA 1:4, DE 2.5 CM. DE ESPESOR, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 113.47

240

FINO DE MORTERO CEMENTO-ARENA 1:5, DE 2.5 CM. DE ESPESOR, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 106.71

241

FINO DE MORTERO CEMENTO-ARENA 1:4, DE 3 CM. DE ESPESOR, ACABADO PULIDO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 137.17

242

FINO DE MORTERO CEMENTO-ARENA 1:5, DE 3 CM. DE ESPESOR, ACABADO PULIDO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 128.83

243

FINO DE MORTERO CEMENTO-ARENA 1:4, DE 5 CM. DE ESPESOR, ACABADO PULIDO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 194.16

244

FINO DE MORTERO CEMENTO-ARENA 1:5, DE 5 CM. DE ESPESOR, ACABADO PULIDO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 180.18

M2

$ 33.04

25).-ACABADOS SOBRE PISO 245

ACABADO ESCOBILLADO INTEGRAL SOBRE PISO DE CONCRETO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

INCLUYE:

246

ACABADO PULIDO INTEGRAL SOBRE PISO DE CONCRETO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 55.13

247

ACABADO MARTELINADO EN PISOS DE CONCRETO, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 369.67

248

ACABADO ESTAMPADO EN CONCRETO, INCLUYE: MANO DE OBRA, COLOR ENDURECEDOR, DESMOLDANTE, SELLADOR ACRILICO, MANO DE OBRA, Y MOLDE.

M2

$ 143.06

26).-RECUBRIMIENTOS CERAMICOS ASENTADOS CON PEGA AZULEJO 249

SUMINISTRO Y COLOCACION DE PISO INTERCERAMIC DESERT CADIR DE 33 X 33 CM. DE PRIMERA, ASENTADO CON PEGA AZULEJO, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 394.35

250

SUMINISTRO Y COLOCACION DE PISO INTERCERAMIC CREMA MARFIL CLARO DE 40 X 40 CM. DE PRIMERA, ASENTADO CON PEGA AZULEJO, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 419.01

251

SUMINISTRO Y COLOCACION DE PISO INTERCERAMIC DESERT CADIR DE 50 X 50 CM. DE PRIMERA, ASENTADO CON PEGA AZULEJO, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 424.73

252

SUMINISTRO Y COLOCACION DE PISO INTERCERAMIC CREEK STONE TERRACOTA DE 33 X 33 CM. DE PRIMERA, ASENTADO CON PEGA AZULEJO, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 498.88

253

SUMINISTRO Y COLOCACION DE PISO INTERCERAMIC HABITAT CANVAS DE 40 X 40 CM. DE PRIMERA, ASENTADO CON PEGA AZULEJO, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 563.86

254

SUMINISTRO Y COLOCACION DE PISO INTERCERAMIC CREMA MARFIL NATURAL DE 60 X 60 CM. DE PRIMERA, ASENTADO CON PEGA AZULEJO, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 498.72

255

SUMINISTRO Y COLOCACION DE PISO INTERCERAMIC SAND STONE BEIGE DE 40 X 60 CM. DE PRIMERA, ASENTADO CON PEGA AZULEJO, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 485.69

256

SUMINISTRO Y COLOCACION DE PISO FILADELFIA HUESO PORCELANITE DE 20 X 20 CM. ASENTADO CON PEGA AZULEJO, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 393.54

77

NO.

CONCEPTO

UNIDAD

P.U

27).-RECUBRIMIENTOS CERAMICOS ASENTADOS CON MORTERO CEMENTO-ARENA 1:2

257

SUMINISTRO Y COLOCACION DE PISO INTERCERAMIC DESERT CADIR DE 33 X 33 CM. DE PRIMERA, ASENTADO CON MORTERO CEM-ARENA 1:2, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 383.27

258

SUMINISTRO Y COLOCACION DE PISO INTERCERAMIC CREMA MARFIL CLARO DE 40 X 40 CM. DE PRIMERA, ASENTADO CON MORTERO CEM-ARENA 1:2, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 415.43

259

SUMINISTRO Y COLOCACION DE PISO INTERCERAMIC DESERT CADIR DE 50 X 50 CM. DE PRIMERA, ASENTADO CON MORTERO CEM-ARENA 1:2, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 403.98

260

SUMINISTRO Y COLOCACION DE PISO INTERCERAMIC CREEK STONE TERRACOTA DE 33 X 33 CM. DE PRIMERA, ASENTADO CON MORTERO CEM-ARENA 1:2, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 438.55

261

SUMINISTRO Y COLOCACION DE PISO INTERCERAMIC HABITAT CANVAS DE 40 X 40 CM. DE PRIMERA, ASENTADO CON MORTERO CEM-ARENA 1:2, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 556.77

262

SUMINISTRO Y COLOCACION DE PISO INTERCERAMIC CREMA MARFIL NATURAL DE 60 X 60 CM. DE PRIMERA, ASENTADO CON MORTERO CEM-ARENA 1:2, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 490.35

263

SUMINISTRO Y COLOCACION DE PISO INTERCERAMIC SAND STONE BEIGE DE 40 X 60 CM. DE PRIMERA, ASENTADO CON MORTERO CEM-ARENA 1:2, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 477.06

264

SUMINISTRO Y COLOCACION DE PISO FILADELFIA HUESO PORCELANITE DE 20 X 20 CM. ASENTADO CON MORTERO CEM-ARENA 1:2, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 429.45

265

MURO DE TABIQUE DE BARRO ROJO RECOCIDO DE 6 X 13 X 26 CM. DE 13 CM. DE ESPESOR, ASENTADO CON MORTERO CEMENTO-ARENA 1:4, JUNTAS DE 1.5 CM. CON ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 426.02

266

MURO DE TABIQUE DE BARRO ROJO RECOCIDO DE 6 X 13 X 26 CM. DE 6 CM. DE ESPESOR, ASENTADO CON MORTERO CEMENTO-ARENA 1:4, JUNTAS DE 1.5 CM. CON ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 221.95

267

MURO DE TABIQUE DE BARRO ROJO RECOCIDO DE 6 X 13 X 26 CM. DE 13 CM. DE ESPESOR, ASENTADO CON MORTERO CEMENTO-ARENA 1:5, JUNTAS DE 1.5 CM. CON ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 416.15

268

MURO DE TABIQUE DE BARRO ROJO RECOCIDO DE 6 X 13 X 26 CM. DE 26 CM. DE ESPESOR, ASENTADO CON MORTERO CEMENTO-ARENA 1:5, JUNTAS DE 1.5 CM. CON ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 819.08

28).-MUROS DE TABIQUE

29).-MUROS DE BLOCK 269

MURO DE BLOCK DE 12 X 20 X 40 CM. EN 12 CM. DE ESPESOR ASENTADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 219.33

270

MURO DE BLOCK DE 12 X 20 X 40 CM. EN 12 CM. DE ESPESOR ASENTADO CON MORTERO CEMENTO-ARENA 1:5, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 216.24

78

NO.

CONCEPTO

UNIDAD

P.U

M2

$ 396.41

30).-TEJA 271

SUMINISTRO Y COLOCACION DE TEJA DE BARRO ASENTADA CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO. 31).-PRETILES

272

PRETIL DE TABIQUE ROJO 14 CM. DE ESPESOR, ACABADO COMUN, ASENTADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: ACARREO A 1A. ESTACION 20.00 M., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 299.62

273

PRETIL DE TABIQUE ROJO 14 CM. DE ESPESOR, ACABADO COMUN, ASENTADO CON MORTERO CEMENTO-ARENA 1:5, INCLUYE: ACARREO A 1A. ESTACION 20.00 M., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 290.54

32).- APLANADO COMÚN EN MUROS 274

APLANADO COMUN EN MUROS A PLOMO Y REGLA CON MORTERO CEMENTO-ARENA 1:2, ESPESOR PROMEDIO 2 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 161.14

275

APLANADO COMUN EN MUROS A PLOMO Y REGLA CON MORTERO CEMENTO-ARENA 1:3, ESPESOR PROMEDIO 2 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO

M2

$ 151.62

276

APLANADO COMUN EN MUROS A PLOMO Y REGLA CON MORTERO CEMENTO-ARENA 1:4, ESPESOR PROMEDIO 2 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 144.47

277

APLANADO COMUN EN MUROS A PLOMO Y REGLA CON MORTERO CEMENTO-ARENA 1:5, ESPESOR PROMEDIO 2 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 137.96

278

APLANADO COMUN EN MUROS A PLOMO Y REGLA CON MORTERO CEMENTO-ARENA 1:6 ESPESOR PROMEDIO 2 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 133.11

279

APLANADO COMUN EN MUROS A PLOMO Y REGLA CON MORTERO CEMENTOCALHIDRA-ARENA 1:1:6, ESPESOR PROMEDIO 2 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 144.34

280

APLANADO COMUN EN MUROS A PLOMO Y REGLA CON MORTERO CEMENTOCALHIDRA-ARENA 1:1:8, ESPESOR PROMEDIO 2 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 128.23

33).-APLANADO COMÚN EN PLAFONES 281

APLANADO COMUN EN PLAFONES A REGLA Y NIVEL CON MORTERO CEMENTOARENA 1:2, ESPESOR PROMEDIO 2 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 170.87

282

APLANADO COMUN EN PLAFONES A REGLA Y NIVEL CON MORTERO CEMENTOARENA 1:3, ESPESOR PROMEDIO 2 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 161.36

283

APLANADO COMUN EN PLAFONES A REGLA Y NIVEL CON MORTERO CEMENTOARENA 1:4, ESPESOR PROMEDIO 2 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 154.19

284

APLANADO COMUN EN PLAFONES A REGLA Y NIVEL CON MORTERO CEMENTOARENA 1:5, ESPESOR PROMEDIO 2 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 147.70

285

APLANADO COMUN EN PLAFONES A REGLA Y NIVEL CON MORTERO CEMENTOARENA 1:6, ESPESOR PROMEDIO 2 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 142.85

286

APLANADO COMUN EN PLAFONES A REGLA Y NIVEL CON MORTERO CEMENTOCALHIDRA-ARENA 1:1:6, ESPESOR PROMEDIO 2 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 154.06

79

NO.

CONCEPTO

UNIDAD

P.U

287

APLANADO COMUN EN PLAFONES A REGLA Y NIVEL CON MORTERO CEMENTOCALHIDRA-ARENA 1:1:8, ESPESOR PROMEDIO 2 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 137.96

34).-APLANADO FINO EN MUROS 288

APLANADO FINO EN MUROS A PLOMO Y REGLA CON MORTERO CEMENTO-ARENA 1:2, ESPESOR PROMEDIO 2.5 CM., INCLUYE: ACABADO PULIDO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 218.22

289

APLANADO FINO EN MUROS A PLOMO Y REGLA CON MORTERO CEMENTO-ARENA 1:3, ESPESOR PROMEDIO 2.5 CM., INCLUYE: ACABADO PULIDO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 206.42

290

APLANADO FINO EN MUROS A PLOMO Y REGLA CON MORTERO CEMENTO-ARENA 1:4, ESPESOR PROMEDIO 2.5 CM., INCLUYE: ACABADO PULIDO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 197.53

291

APLANADO FINO EN MUROS A PLOMO Y REGLA CON MORTERO CEMENTO-ARENA 1:5, ESPESOR PROMEDIO 2.5 CM., INCLUYE: ACABADO PULIDO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 189.46

292

APLANADO FINO EN MUROS A PLOMO Y REGLA CON MORTERO CEMENTO-ARENA 1:6, ESPESOR PROMEDIO 2.5 CM., INCLUYE: ACABADO PULIDO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 183.47

293

APLANADO FINO EN MUROS A PLOMO Y MUROS CON MORTERO CEMENTOCALHIDRA-ARENA 1:1:6, ESPESOR PROMEDIO 2.5 CM., INCLUYE: ACABADO PULIDO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 197.37

294

APLANADO FINO EN MUROS A PLOMO Y MUROS CON MORTERO CEMENTOCALHIDRA-ARENA 1:1:8, ESPESOR PROMEDIO 2.5 CM., INCLUYE: ACABADO PULIDO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 177.41

35).-APLANADO FINO EN PLAFONES 295

APLANADO FINO EN PLAFONES A REGLA Y NIVEL CON MORTERO CEMENTO-ARENA 1:2, ESPESOR PROMEDIO 2.5 CM., INCLUYE: ACABADO PULIDO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 238.72

296

APLANADO FINO EN PLAFONES A REGLA Y NIVEL CON MORTERO CEMENTO-ARENA 1:3, ESPESOR PROMEDIO 2.5 CM., INCLUYE: ACABADO PULIDO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 226.92

297

APLANADO FINO EN PLAFONES A REGLA Y NIVEL CON MORTERO CEMENTO-ARENA 1:4, ESPESOR PROMEDIO 2.5 CM., INCLUYE: ACABADO PULIDO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 218.05

298

APLANADO FINO EN PLAFONES A REGLA Y NIVEL CON MORTERO CEMENTO-ARENA 1:5, ESPESOR PROMEDIO 2.5 CM., INCLUYE: ACABADO PULIDO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 209.99

299

APLANADO FINO EN PLAFONES A REGLA Y NIVEL CON MORTERO CEMENTO-ARENA 1:6, ESPESOR PROMEDIO 2.5 CM., INCLUYE: ACABADO PULIDO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 203.97

300

APLANADO FINO EN PLAFONES A REGLA Y NIVEL CON MORTERO CEMENTOCALHIDRA-ARENA 1:1:6, ESPESOR PROMEDIO 2.5 CM., INCLUYE: ACABADO PULIDO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 217.90

301

APLANADO FINO EN PLAFONES A REGLA Y NIVEL CON MORTERO CEMENTOCALHIDRA-ARENA 1:1:8, ESPESOR PROMEDIO 2.5 CM., INCLUYE: ACABADO PULIDO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 197.91

36).-EMBOQUILLADO COMÚN 302

EMBOQUILLADO APLANADO UNA ARISTA CON MORTERO CEMENTO-ARENA 1:2, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 98.11

303

EMBOQUILLADO APLANADO UNA ARISTA CON MORTERO CEMENTO-ARENA 1:3, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 97.53

304

EMBOQUILLADO APLANADO UNA ARISTA CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 97.11

80

NO.

CONCEPTO

UNIDAD

P.U

305

EMBOQUILLADO APLANADO UNA ARISTA CON MORTERO CEMENTO-ARENA 1:5, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 96.70

306

EMBOQUILLADO APLANADO UNA ARISTA CON MORTERO CEMENTO-ARENA 1:6, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 96.43

307

EMBOQUILLADO PERFILADO UNA ARISTA CON MORTERO CEMENTO-CALHIDRAARENA 1:1:6, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 97.11

308

EMBOQUILLADO PERFILADO UNA ARISTA CON MORTERO CEMENTO-CALHIDRAARENA 1:1:8, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 96.13

37).- HABILITADO DE ACERO EN CIMENTACIÓN 309

ACERO DE REFUERZO EN CIMENTACION DEL No. 2 (1/4") ALAMBRON, INCLUYE: HABILITADO, ARMADO, GANCHOS, TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

TON

$ 38,645.51

310

ACERO DE REFUERZO EN CIMENTACION DEL No. 3 (3/8"), INCLUYE: HABILITADO, ARMADO, GANCHOS, TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

TON

$ 31,952.09

311

ACERO DE REFUERZO EN CIMENTACION DEL No. 4 (1/2"), INCLUYE: HABILITADO, ARMADO, GANCHOS, TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

TON

$ 31,335.95

312

ACERO DE REFUERZO EN CIMENTACION DEL No. 5 (5/8"), INCLUYE: HABILITADO, ARMADO, GANCHOS, TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

TON

$ 30,665.68

313

ACERO DE REFUERZO EN CIMENTACION DEL No. 6 (3/4"), INCLUYE: HABILITADO, ARMADO, GANCHOS, TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

TON

$ 30,431.56

314

ACERO DE REFUERZO EN CIMENTACION DEL No. 8 (1"), INCLUYE: HABILITADO, ARMADO, GANCHOS, TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

TON

$ 29,744.92

EN ESTRUCTURA 315

ACERO DE REFUERZO EN ESTRUCTURA DEL No. 2 (1/4") ALAMBRON, INCLUYE: HABILITADO, ARMADO, GANCHOS, TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

TON

$ 40,885.15

316

ACERO DE REFUERZO EN ESTRUCTURA DEL No. 3 (3/8"), INCLUYE: HABILITADO, ARMADO, GANCHOS, TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

TON

$ 33,649.02

317

ACERO DE REFUERZO EN ESTRUCTURA DEL No. 4 (1/2"), INCLUYE: HABILITADO, ARMADO, GANCHOS, TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

TON

$ 32,661.24

318

ACERO DE REFUERZO EN ESTRUCTURA DEL No. 5 (5/8"), INCLUYE: HABILITADO, ARMADO, GANCHOS, TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

TON

$ 31,976.71

319

ACERO DE REFUERZO EN ESTRUCTURA DEL No. 6 (3/4"), INCLUYE: HABILITADO, ARMADO, GANCHOS, TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

TON

$ 31,653.23

320

ACERO DE REFUERZO EN ESTRUCTURA DEL No. 8 (1"), INCLUYE: HABILITADO, ARMADO, GANCHOS, TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

TON

$ 30,778.63

M2

$ 91.86

38).-HABILITADO DE MALLAS ELECTROSOLDADAS 321

SUMINISTRO Y COLOCACION DE MALLA DE ACERO ELECTROSOLDADA 6 X 6 - 4 / 4 EN LOSAS, PISOS, FIRMES DE CIMENTACION, PLANTA BAJA, INCLUYE: TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO. 81

NO.

CONCEPTO

UNIDAD

P.U

322

SUMINISTRO Y COLOCACION DE MALLA DE ACERO ELECTROSOLDADA 6 X 6 - 6 / 6 EN LOSAS, PISOS, FIRMES DE CIMENTACION, PLANTA BAJA, INCLUYE: TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 69.99

323

SUMINISTRO Y COLOCACION DE MALLA DE ACERO ELECTROSOLDADA 6 X 6 - 10 / 10 EN LOSAS, PISOS, FIRMES DE CIMENTACION, PLANTA BAJA, INCLUYE: TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 58.08

324

SUMINISTRO Y COLOCACION DE MALLA DE ACERO ELECTROSOLDADA 6 X 6 - 4 / 4 EN MUROS DE CIMENTACION Y PLANTA BAJA, INCLUYE: TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 109.63

325

SUMINISTRO Y COLOCACION DE MALLA DE ACERO ELECTROSOLDADA 6 X 6 - 6 / 6 EN MUROS DE CIMENTACION Y PLANTA BAJA, INCLUYE: TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 88.14

326

SUMINISTRO Y COLOCACION DE MALLA DE ACERO ELECTROSOLDADA 6 X 6 - 10 /10 EN MUROS DE CIMENTACION Y PLANTA BAJA, INCLUYE: TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 74.35

327

SUMINISTRO Y COLOCACION DE MALLA DE ACERO ELECTROSOLDADA 6 X 6 - 4 / 4 EN CUBIERTAS DE LOSAS DE CONCRETO, INCLUYE: TRASLAPES, DESPERDICIOS, ACARREO A 1A ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO

M2

$ 102.91

328

SUMINISTRO Y COLOCACION DE MALLA DE ACERO ELECTROSOLDADA 6 X 6 - 6 / 6 EN CUBIERTAS DE LOSAS DE CONCRETO, INCLUYE: TRASLAPES, DESPERDICIOS, ACARREO A 1A ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO

M2

$ 85.46

329

SUMINISTRO Y COLOCACION DE MALLA DE ACERO ELECTROSOLDADA 6 X 6 - 10 / 10 EN CUBIERTAS DE LOSAS DE CONCRETO, INCLUYE: TRASLAPES, DESPERDICIOS, ACARREO A 1A ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO

M2

$ 73.54

39).-CIMBRAS EN TANQUE ELEVADO 330

CIMBRA EN FRONTERAS EN LOSA DE CIMENTACION DE 0.30 M. DE ALTO Y 0.35 M. DE ESPESOR, ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 196.61

331

CIMBRA COMUN EN CONTRATRABES DE CIMENTACION DE 0.35 M. DE BASE X 0.95 M. DE ALTURA (LA ALTURA INCLUYE 0.30 M. DE ESPESOR DE LOSA CIMENTACION), POR AMBAS CARAS, ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 248.15

332

CIMBRA COMUN EN CONTRATRABES DE CIMENTACION DE 0.20 M. DE BASE X 0.50 M. DE ALTURA, POR AMBAS CARAS, ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 220.48

333

CIMBRA COMUN EN COLUMNAS DE ESTRUCTURA DE ANCHO VARIABLE, SIENDO 1.25 M. EL ANCHO PROMEDIO Y UN ESPESOR DE 0.30 M., HASTA UNA ALTURA DE 2.50 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 554.39

334

CIMBRA COMUN EN COLUMNAS DE ESTRUCTURA DE ANCHO VARIABLE, SIENDO 1.25 M. EL ANCHO PROMEDIO Y UN ESPESOR DE 0.30 M., A UNA ALTURA DE 2.50 M. A 5.00 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 644.35

335

CIMBRA COMUN EN COLUMNAS DE ESTRUCTURA DE ANCHO VARIABLE, SIENDO 1.25 M. EL ANCHO PROMEDIO Y UN ESPESOR DE 0.30 M., A UNA ALTURA DE 5.00 M. A 7.50 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 667.88

82

NO.

CONCEPTO

UNIDAD

P.U

336

CIMBRA COMUN EN COLUMNAS DE ESTRUCTURA DE ANCHO VARIABLE, SIENDO 1.25 M. EL ANCHO PROMEDIO Y UN ESPESOR DE 0.30 M., A UNA ALTURA DE 7.50 M. A 10.00 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 713.79

337

CIMBRA COMUN EN COLUMNAS DE ESTRUCTURA DE ANCHO VARIABLE, SIENDO 1.25 M. EL ANCHO PROMEDIO Y UN ESPESOR DE 0.30 M., A UNA ALTURA DE 10.00 M. A 12.50 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 776.81

338

CIMBRA COMUN EN COLUMNAS DE ESTRUCTURA DE ANCHO VARIABLE, SIENDO 1.25 M. EL ANCHO PROMEDIO Y UN ESPESOR DE 0.30 M., A UNA ALTURA DE 12.50 M. A 15.00 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 875.89

339

CIMBRA COMUN EN TRABE DE ESTRUCTURA DE 0.25 M. DE ANCHO Y 0.35 M. DE ALTO, HASTA UNA ALTURA DE 2.50 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 267.12

340

CIMBRA COMUN EN TRABE DE ESTRUCTURA DE 0.25 M. DE ANCHO Y 0.35 M. DE ALTO, A UNA ALTURA DE 2.50 M. A 5.00 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 280.05

341

CIMBRA COMUN EN TRABE DE ESTRUCTURA DE 0.25 M. DE ANCHO Y 0.35 M. DE ALTO, A UNA ALTURA DE 5.00 M. A 7.50 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 288.26

342

CIMBRA COMUN EN TRABE DE ESTRUCTURA DE 0.25 M. DE ANCHO Y 0.35 M. DE ALTO, A UNA ALTURA DE 7.50 M. A 10.00 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 300.59

343

CIMBRA COMUN EN TRABE DE ESTRUCTURA DE 0.25 M. DE ANCHO Y 0.35 M. DE ALTO, A UNA ALTURA DE 10.00 M. A 12.50 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 307.99

344

CIMBRA COMUN EN TRABE DE ESTRUCTURA DE 0.25 M. DE ANCHO Y 0.35 M. DE ALTO, A UNA ALTURA DE 12.50 M. A 15.00 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 319.79

345

CIMBRA COMUN EN TRABE DE ESTRUCTURA DE 0.25 M. DE ANCHO Y 0.55 M. DE ALTO, A UNA ALTURA DE 12.50 M. A 15.00 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 308.30

346

CIMBRA COMUN EN MENSULA DE 0.80 M. DE LARGO X 0.90 M. DE ALTURA Y 0.25 M. DE ESPESOR, A UNA ALTURA DE 12.50 M. A 15.00 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 239.97

347

CIMBRA COMUN EN LOSA DE ESTRUCTURA DE 0.25 M. DE ESPESOR, A UNA ALTURA MAXIMA DE 15.00 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 367.31

348

CIMBRA COMUN EN MURO DE ESTRUCTURA DE 0.29 M. DE ESPESOR Y ALTURA DE 1.90 M., A UNA ALTURA MAXIMA DE 15.00 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: AMBAS CARAS DE CIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 479.01

349

CIMBRA COMUN EN LOSA DE ESTRUCTURA DE 0.15 M. DE ESPESOR, A UNA ALTURA MAXIMA DE 17.30 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 377.69

40).-CIMBRAS 350

CIMBRA COMUN EN COLUMNAS HASTA 3.50 M. DE ALTURA, INCLUYE: MATERIALES Y MANO DE OBRA.

M2

$ 317.58

351

CIMBRA APARENTE EN COLUMNAS 30 X 30 CM. CON TRIPLAY HASTA 3.50 M. DE ALTURA, INCLUYE: MATERIALES Y MANO DE OBRA.

M2

$ 351.80

83

NO.

CONCEPTO

UNIDAD

P.U

352

CIMBRA COMUN EN ZAPATAS DE CIMENTACION INCLUYE: MATERIALES Y MANO DE OBRA.

M2

$ 275.58

353

CIMBRA COMUN EN CONTRATRABES, MATERIALES Y MANO DE OBRA.

M2

$ 313.07

354

CIMBRA COMUN EN DALAS, CASTILLOS, CERRAMIENTOS, CEJAS, REPISONES DE SECCION IGUAL O MENOR A 0.020 M2. INCLUYE: MATERIALES Y MANO DE OBRA.

M2

$ 135.39

355

CIMBRA APARENTE EN DALAS, CASTILLOS, CERRAMIENTOS, CEJAS, REPISONES DE SECCION IGUAL O MENOR A 0.020 M2. INCLUYE: MATERIALES Y MANO DE OBRA.

M2

$ 259.61

356

CIMBRA COMUN EN CADENAS, CASTILLOS, CEJAS, REPISONES DE SECCION MAYOR A 0.020 M2. INCLUYE: MATERIALES Y MANO DE OBRA.

M2

$ 163.28

357

CIMBRA APARENTE EN CADENAS, CASTILLOS, CEJAS, REPISONES DE SECCION MAYOR A 0.020 M2. INCLUYE: MATERIALES Y MANO DE OBRA.

M2

$ 293.63

358

CIMBRA COMUN EN TRABES 25 X 40 CM. CON DUELA HASTA 3.50 M. DE ALTURA, INCLUYE: MATERIALES Y MANO DE OBRA.

M2

$ 326.72

359

CIMBRA APARENTE EN TRABES DE 25 X 40 CM., HASTA 3.50 M. DE ALTURA INCLUYE: MATERIALES Y MANO DE OBRA.

M2

$ 339.16

360

CIMBRA COMUN EN LOSAS HASTA 3.50 M. DE ALTURA INCLUYE: MATERIALES Y MANO DE OBRA.

M2

$ 326.18

361

CIMBRA APARENTE EN LOSAS HASTA 3.50 M. DE ALTURA INCLUYE: MATERIALES Y MANO DE OBRA.

M2

$ 374.64

DADOS

DE

CIMENTACION,

INCLUYE:

41).-EMPEDRADOS 362

EMPEDRADO DE PIEDRA BRAZA, ACABADO RUSTICO, COLOCADA CON MORTERO CEMENTO-ARENA 1:4 Y CONCRETO HECHO EN OBRA F'C=150 KG/CM2, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 442.18

363

EMPEDRADO DE PIEDRA BRAZA, ACABADO RUSTICO, COLOCADA CON MORTERO CEMENTO-ARENA 1:5 Y CONCRETO HECHO EN OBRA F'C=150 KG/CM2, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 429.62

364

EMPEDRADO DE PIEDRA BRAZA, ACABADO RUSTICO, COLOCADA CON MORTERO CEMENTO-ARENA 1:4 Y CONCRETO HECHO EN OBRA F'C=200 KG/CM2, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 452.77

365

EMPEDRADO DE PIEDRA BRAZA, ACABADO RUSTICO, COLOCADA CON MORTERO CEMENTO-ARENA 1:5 Y CONCRETO HECHO EN OBRA F'C=200 KG/CM2, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 440.29

42).-CIMIENTOS DE PIEDRA 366

CIMIENTOS DE MAMPOSTERIA DE PIEDRA BRAZA ASENTADA CON MORTERO CEMENTO-CALHIDRA-ARENA1:1:6, INCLUYE: ACARREOS A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,617.29

367

CIMIENTOS DE MAMPOSTERIA DE PIEDRA BRAZA ASENTADA CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: ACARREOS A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,618.75

368

CIMIENTOS DE MAMPOSTERIA DE PIEDRA BRAZA ASENTADA CON MORTERO CEMENTO-ARENA 1:5, INCLUYE: ACARREOS A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,538.13

369

CONSTRUCCION DE CIMENTACION DE PIEDRA BOLA DE RIO ASENTADA CON MORTERO CEMENTO-CAL-ARENA 1:1:8, INCLUYE: ACARREOS A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,585.90

370

CONSTRUCCION DE CIMENTACION DE PIEDRA BOLA DE RIO ASENTADA CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: ACARREOS A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,930.57

371

CONSTRUCCION DE CIMENTACION DE PIEDRA BOLA DE RIO ASENTADA CON MORTERO CEMENTO-ARENA 1:5, INCLUYE: ACARREOS A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,795.67

84

NO.

CONCEPTO

UNIDAD

P.U

372

MURO DE MAMPOSTERIA DE PIEDRA BRAZA DE BANCO, CARAS ROSTREADAS HASTA UNA ALTURA DE 4.80 M. Y UN ESPESOR MENOR 0.60 M., ASENTADA CON MORTERO CEMENTO-ARENA1:4, INCLUYE: ELABORACION DEL MORTERO Y ACARREO EN CARRETILLA DEL MATERIAL A 1A. ESTACION A 20.00 M. DE DISTANCIA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,965.94

373

MURO DE MAMPOSTERIA DE PIEDRA BRAZA DE BANCO, CARAS ROSTREADAS HASTA UNA ALTURA DE 4.80 M. Y UN ESPESOR MENOR 0.60 M., ASENTADA CON MORTERO CEMENTO-ARENA 1:5, INCLUYE: ELABORACION DEL MORTERO Y ACARREO EN CARRETILLA DEL MATERIAL A 1A. ESTACION A 20.00 M. DE DISTANCIA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,952.76

374

MURO DE MAMPOSTERIA DE PIEDRA BRAZA DE BANCO, CARAS ROSTREADAS HASTA UNA ALTURA DE 4.80 M. Y UN ESPESOR DE 0.61 A 1.00 M., ASENTADA CON MORTERO CEMENTO-ARENA1:4, INCLUYE: ELABORACION DEL MORTERO Y ACARREO EN CARRETILLA DEL MATERIAL A 1A. ESTACION A 20.00 M. DE DISTANCIA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 2,057.54

375

MURO DE MAMPOSTERIA DE PIEDRA BRAZA DE BANCO, CARAS ROSTREADAS HASTA UNA ALTURA DE 4.80 M. Y UN ESPESOR DE 0.61 A 1.00 M., ASENTADA CON MORTERO CEMENTO-ARENA 1:5, INCLUYE: ELABORACION DEL MORTERO Y ACARREO EN CARRETILLA DEL MATERIAL A 1A. ESTACION A 20.00 M. DE DISTANCIA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,896.54

376

MURO DE MAMPOSTERIA DE PIEDRA BRAZA DE BANCO, CARAS ROSTREADAS HASTA UNA ALTURA DE 3.60 M. Y UN ESPESOR MENOR DE 0.60 M., ASENTADA CON MORTERO CEMENTO-ARENA1:4, INCLUYE: ELABORACION DEL MORTERO Y ACARREO EN CARRETILLA DEL MATERIAL A 1A. ESTACION A 20.00 M. DE DISTANCIA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,881.52

377

MURO DE MAMPOSTERIA DE PIEDRA BRAZA DE BANCO, CARAS ROSTREADAS HASTA UNA ALTURA DE 3.60 M. Y UN ESPESOR MENOR DE 0.60 M., ASENTADA CON MORTERO CEMENTO-ARENA1:5, INCLUYE: ELABORACION DEL MORTERO Y ACARREO EN CARRETILLA DEL MATERIAL A 1A. ESTACION A 20.00 M. DE DISTANCIA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,797.14

378

MURO DE MAMPOSTERIA DE PIEDRA BRAZA DE BANCO, CARAS ROSTREADAS HASTA UNA ALTURA DE 3.60 M. Y UN ESPESOR DE 0.61 A 1.00 M., ASENTADA CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: ELABORACION DEL MORTERO Y ACARREO EN CARRETILLA DEL MATERIAL A 1A. ESTACION A 20.00 M. DE DISTANCIA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,853.26

379

MURO DE MAMPOSTERIA DE PIEDRA BRAZA DE BANCO, CARAS ROSTREADAS HASTA UNA ALTURA DE 3.60 M. Y UN ESPESOR DE 0.61 A 1.00 M., ASENTADA CON MORTERO CEMENTO-ARENA 1:5, INCLUYE: ELABORACION DEL MORTERO Y ACARREO EN CARRETILLA DEL MATERIAL A 1A. ESTACION A 20.00 M. DE DISTANCIA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,742.61

380

MURO DE CONCRETO ARMADO DE 15 CM. DE ESPESOR, CONCRETO F'C=200 KG/CM2. HABILITADO CON 75 KG. DE ACERO DE 3/8" Y 41 KG. DE ACERO DE 1/4", INCLUYE: CIMBRA COMUN, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 1,356.64

381

MURO DE CONCRETO ARMADO DE 15 CM. DE ESPESOR, CONCRETO F'C=250 KG/CM2. HABILITADO CON 75 KG. DE ACERO DE 3/8" Y 41 KG. DE ACERO DE 1/4", INCLUYE: CIMBRA COMUN, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 1,381.11

382

MURO DE CONCRETO ARMADO DE 20 CM. DE ESPESOR, CONCRETO F'C=200 KG/CM2. HABILITADO CON 85 KG. DE ACERO DE 1/2" Y 41 KG. DE ACERO DE 1/4", INCLUYE: CIMBRA COMUN, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 1,525.23

383

MURO DE CONCRETO ARMADO DE 20 CM. DE ESPESOR, CONCRETO F'C=250 KG/CM2. HABILITADO CON 85 KG. DE ACERO DE 1/2" Y 41 KG. DE ACERO DE 1/4", INCLUYE: CIMBRA COMUN, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 1,560.06

43).-MUROS DE CONTENCIÓN

44).-MUROS DE CONCRETO

85

NO.

CONCEPTO

UNIDAD

P.U

384

MURO DE CONCRETO ARMADO CONCRETO F'C=200 KG/CM2. HABILITADO CON 126 KG. DE ACERO, INCLUYE: CIMBRA COMUN, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 7,493.54

385

MURO DE CONCRETO ARMADO CONCRETO F'C=250 KG/CM2. HABILITADO CON 126 KG. DE ACERO, INCLUYE: CIMBRA COMUN, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 7,659.87

45).-CONCRETO CICLÓPEO 386

CONCRETO CICLOPEO (60 - 40) CON PIEDRA BRAZA LIMPIA Y CONCRETO HECHO EN OBRA F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: ACARREOS A 1A ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,610.39

387

CONCRETO CICLOPEO (60 - 40) CON PIEDRA BRAZA LIMPIA Y CONCRETO HECHO EN OBRA F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: ACARREOS A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,710.27

388

CONCRETO CICLOPEO (60 - 40) CON PIEDRA BRAZA LIMPIA Y CONCRETO PREMEZCLADO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: ACARREOS A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,626.56

389

CONCRETO CICLOPEO (60 - 40) CON PIEDRA BRAZA LIMPIA Y CONCRETO PREMEZCLADO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: ACARREOS A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,712.68

46).-CONCRETOS HECHOS EN OBRA 390

CONCRETO F'C= 100 KG/CM2., RESISTENCIA NORMAL, AGREGADO MAX. 3/4", FABRICADO EN OBRA CON REVOLVEDORA, INCLUYE ACARREOS A 1A. ESTACION A 20.00 M.

M3

$ 1,654.11

391

CONCRETO F'C= 150 KG/CM2., RESISTENCIA NORMAL, AGREGADO MAX. 3/4", FABRICADO EN OBRA CON REVOLVEDORA, INCLUYE ACARREOS A 1A. ESTACION A 20.00 M.

M3

$ 1,843.88

392

CONCRETO F'C= 200 KG/CM2., RESISTENCIA NORMAL, AGREGADO MAX. 3/4", FABRICADO EN OBRA CON REVOLVEDORA, INCLUYE ACARREOS A 1A. ESTACION A 20.00 M.

M3

$ 1,994.59

393

CONCRETO F'C= 250 KG/CM2., RESISTENCIA NORMAL, AGREGADO MAX. 3/4", FABRICADO EN OBRA CON REVOLVEDORA, INCLUYE ACARREOS A 1A. ESTACION A 20.00 M.

M3

$ 2,153.00

394

CONCRETO F'C= 300 KG/CM2., RESISTENCIA NORMAL, AGREGADO MAX. 3/4", FABRICADO EN OBRA CON REVOLVEDORA, INCLUYE ACARREOS A 1A. ESTACION A 20.00 M.

M3

$ 2,274.11

47).-ELABORACIÓN Y VACIADO DE CONCRETO HECHO EN OBRA EN CIMENTACIONES 395

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=100 KG/CM2. HECHO EN OBRA EN CIMENTACION, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,161.07

396

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=150 KG/CM2. HECHO EN OBRA EN CIMENTACION, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,360.31

397

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=200 KG/CM2. HECHO EN OBRA EN CIMENTACION, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,518.55

398

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=250 KG/CM2. HECHO EN OBRA EN CIMENTACION, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,684.88

399

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=300 KG/CM2. HECHO EN OBRA EN CIMENTACION, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,812.05

86

NO.

CONCEPTO

UNIDAD

P.U

48).-ELABORACIÓN Y VACIADO DE CONCRETO HECHO EN OBRA EN ESTRUCTURAS EN COLUMNAS 400

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=150 KG/CM2. HECHO EN OBRA EN COLUMNAS PLANTA BAJA, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,473.45

401

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=200 KG/CM2. HECHO EN OBRA EN COLUMNAS PLANTA BAJA, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,631.68

402

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=250 KG/CM2. HECHO EN OBRA EN COLUMNAS PLANTA BAJA, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,798.02

403

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=300 KG/CM2. HECHO EN OBRA EN COLUMNAS PLANTA BAJA, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,925.19

EN TRABES 404

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=200 KG/CM2. HECHO EN OBRA EN TRABES, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,526.17

405

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=250 KG/CM2. HECHO EN OBRA EN TRABES, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,692.53

406

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=300 KG/CM2. HECHO EN OBRA EN TRABES, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,819.70

EN LOSAS 407

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=150 KG/CM2. HECHO EN OBRA EN LOSAS PLANAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,468.82

408

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=200 KG/CM2. HECHO EN OBRA EN LOSAS PLANAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,627.05

409

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=250 KG/CM2. HECHO EN OBRA EN LOSAS PLANAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,793.41

410

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=300 KG/CM2. HECHO EN OBRA EN LOSAS PLANAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,920.58

411

CONCRETO PREMEZCLADO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REVENIMIENTO DE 10 CM., VACIADO CON CARRETILLA Y BOTES EN CIMENTACION, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 2,542.08

412

CONCRETO PREMEZCLADO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", REVENIMIENTO DE 10 CM., VACIADO CON CARRETILLA Y BOTES EN CIMENTACION, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 2,714.72

413

CONCRETO PREMEZCLADO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REVENIMIENTO DE 10 CM. VACIADO CON CARRETILLA Y BOTES EN COLUMNAS Y MUROS, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 2,629.07

414

CONCRETO PREMEZCLADO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", REVENIMIENTO DE 10 CM., VACIADO CON CARRETILLA Y BOTES EN COLUMNAS Y MUROS, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 2,772.53

415

CONCRETO PREMEZCLADO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REVENIMIENTO DE 10 CM. VACIADO CON CARRETILLA Y BOTES EN TRABES Y LOSAS, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 2,669.45

49).-CONCRETOS PREMEZCLADOS

87

NO.

CONCEPTO

UNIDAD

P.U

416

CONCRETO PREMEZCLADO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", REVENIMIENTO DE 10 CM., VACIADO CON CARRETILLA Y BOTES EN TRABES Y LOSAS, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 2,792.42

50).-CONCRETOS HECHOS EN OBRA CON IMPERMEABILIZANTE INTEGRAL 417

CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, VACIADO CON CARRETILLA Y BOTES F'C=100 KG/CM2., REVENIMIENTO DE 10 CM., AGREGADO MAXIMO 3/4" EN CIMENTACION, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 2,833.22

418

CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, VACIADO CON CARRETILLA Y BOTES F'C=150 KG/CM2., REVENIMIENTO DE 10 CM., AGREGADO MAXIMO 3/4" EN CIMENTACION, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,032.46

419

CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, VACIADO CON CARRETILLA Y BOTES F'C=200 KG/CM2., REVENIMIENTO DE 10 CM., AGREGADO MAXIMO 3/4" EN CIMENTACION, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,190.69

420

CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, VACIADO CON CARRETILLA Y BOTES F'C=250 KG/CM2., REVENIMIENTO DE 10 CM., AGREGADO MAXIMO 3/4" EN CIMENTACION, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,357.02

421

CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, VACIADO CON CARRETILLA Y BOTES F'C=300 KG/CM2., REVENIMIENTO DE 10 CM., AGREGADO MAXIMO 3/4" EN CIMENTACION, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,484.20

422

CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, VACIADO CON CARRETILLA Y BOTES F'C=200 KG/CM2., REVENIMIENTO DE 10 CM., AGREGADO MAXIMO 3/4" COLUMNAS Y MUROS, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,303.83

423

CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, VACIADO CON CARRETILLA Y BOTES F'C=250 KG/CM2., REVENIMIENTO DE 10 CM., AGREGADO MAXIMO 3/4" EN COLUMNAS Y MUROS, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,470.16

424

CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, VACIADO CON CARRETILLA Y BOTES F'C=300 KG/CM2., REVENIMIENTO DE 10 CM., AGREGADO MAXIMO 3/4" EN COLUMNAS Y MUROS, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,597.33

425

CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, VACIADO CON CARRETILLA Y BOTES F'C=200 KG/CM2., REVENIMIENTO DE 10 CM., AGREGADO MAXIMO 3/4" EN TRABES Y LOSAS, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,198.32

426

CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, VACIADO CON CARRETILLA Y BOTES F'C=250 KG/CM2., REVENIMIENTO DE 10 CM., AGREGADO MAXIMO 3/4" EN TRABES Y LOSAS, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,364.67

427

CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, VACIADO CON CARRETILLA Y BOTES F'C=300 KG/CM2., REVENIMIENTO DE 10 CM., AGREGADO MAXIMO 3/4" EN TRABES Y LOSAS, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,491.84

51).-CONCRETOS PREMEZCLADOS CON IMPERMEABILIZANTE INTEGRAL

428

CONCRETO PREMEZCLADO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REVENIMIENTO DE 10 CM., VACIADO CON CARRETILLA Y BOTES EN CIMENTACION, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,214.22

429

CONCRETO PREMEZCLADO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", REVENIMIENTO DE 10 CM., VACIADO CON CARRETILLA Y BOTES EN CIMENTACION, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,386.87

88

NO.

CONCEPTO

UNIDAD

P.U

430

CONCRETO PREMEZCLADO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REVENIMIENTO DE 10 CM., VACIADO CON CARRETILLA Y BOTES EN COLUMNAS Y MUROS, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,301.21

431

CONCRETO PREMEZCLADO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", REVENIMIENTO DE 10 CM., VACIADO CON CARRETILLA Y BOTES EN COLUMNAS Y MUROS, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,444.67

432

CONCRETO PREMEZCLADO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REVENIMIENTO DE 10 CM., VACIADO CON CARRETILLA Y BOTES EN TRABES Y LOSAS, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,341.59

433

CONCRETO PREMEZCLADO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", REVENIMIENTO DE 10 CM., VACIADO CON CARRETILLA Y BOTES EN TRABES Y LOSAS, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,464.56

52).-PAVIMENTOS DE CONCRETO HECHO EN OBRA 434

PAVIMENTO DE CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, DE 15 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, RESISTENCIA F'C=200 KG/CM2. AGREGADO MAXIMO 3/4".

M2

$ 517.48

435

PAVIMENTO DE CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, DE 18 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, RESISTENCIA F'C=200 KG/CM2. AGREGADO MAXIMO 3/4".

M2

$ 593.21

436

PAVIMENTO DE CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, DE 20 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, RESISTENCIA F'C=200 KG/CM2. AGREGADO MAXIMO 3/4".

M2

$ 643.41

437

PAVIMENTO DE CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, DE 15 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, RESISTENCIA F'C=250 KG/CM2. AGREGADO MAXIMO 3/4".

M2

$ 541.95

438

PAVIMENTO DE CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, DE 18 CM. DE ESPESOR VACIADO CON CARRETILLA Y BOTES, RESISTENCIA F'C=250 KG/CM2. AGREGADO MAXIMO 3/4".

M2

$ 622.58

439

PAVIMENTO DE CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, DE 20 CM. DE ESPESOR VACIADO CON CARRETILLA Y BOTES, RESISTENCIA F'C=250 KG/CM2. AGREGADO MAXIMO 3/4".

M2

$ 676.04

53).- PAVIMENTOS DE CONCRETO PREMEZCLADO 440

PAVIMENTO DE CONCRETO PREMEZCLADO RESISTENCIA NORMAL, DE 15 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, RESISTENCIA F'C=200 KG/CM2. AGREGADO MAXIMO 3/4".

M2

$ 598.70

441

PAVIMENTO DE CONCRETO PREMEZCLADO RESISTENCIA NORMAL, DE 18 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, RESISTENCIA F'C=200 KG/CM2. AGREGADO MAXIMO 3/4".

M2

$ 673.82

442

PAVIMENTO DE CONCRETO PREMEZCLADO RESISTENCIA NORMAL, DE 20 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, RESISTENCIA F'C=200 KG/CM2. AGREGADO MAXIMO 3/4".

M2

$ 723.89

443

PAVIMENTO DE CONCRETO PREMEZCLADO RESISTENCIA NORMAL, DE 15 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, RESISTENCIA F'C=250 KG/CM2. AGREGADO MAXIMO 3/4".

M2

$ 620.00

444

PAVIMENTO DE CONCRETO PREMEZCLADO RESISTENCIA NORMAL, DE 18 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, RESISTENCIA F'C=250 KG/CM2. AGREGADO MAXIMO 3/4".

M2

$ 699.40

445

PAVIMENTO DE CONCRETO PREMEZCLADO RESISTENCIA NORMAL, DE 20 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, RESISTENCIA F'C=250 KG/CM2. AGREGADO MAXIMO 3/4".

M2

$ 752.29

89

NO.

CONCEPTO

UNIDAD

P.U

54).-PAVIMENTOS DE CONCRETO MR 446

PAVIMENTO DE CONCRETO MR. 36 RESISTENCIA NORMAL, DE 15 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, NCLUYE: MANO DE OBRA, MATERIALES, EQUIPO NECESARIO Y HERRAMIENTA.

M2

$ 521.96

447

PAVIMENTO DE CONCRETO MR. 36 RESISTENCIA NORMAL, DE 18 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, NCLUYE: MANO DE OBRA, MATERIALES, EQUIPO NECESARIO Y HERRAMIENTA.

M2

$ 578.47

448

PAVIMENTO DE CONCRETO MR. 36 RESISTENCIA NORMAL, DE 20 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, NCLUYE: MANO DE OBRA, MATERIALES, EQUIPO NECESARIO Y HERRAMIENTA.

M2

$ 615.41

449

PAVIMENTO DE CONCRETO MR. 38 RESISTENCIA NORMAL, DE 15 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, INCLUYE: MANO DE OBRA, MATERIALES, EQUIPO NECESARIO Y HERRAMIENTA.

M2

$ 541.49

450

PAVIMENTO DE CONCRETO MR. 38 RESISTENCIA NORMAL, DE 18 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, INCLUYE: MANO DE OBRA, MATERIALES, EQUIPO NECESARIO Y HERRAMIENTA.

M2

$ 601.80

451

PAVIMENTO DE CONCRETO MR. 38 RESISTENCIA NORMAL, DE 20 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, INCLUYE: MANO DE OBRA, MATERIALES, EQUIPO NECESARIO Y HERRAMIENTA.

M2

$ 641.72

452

PAVIMENTO DE CONCRETO MR. 40 RESISTENCIA NORMAL, DE 15 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, NCLUYE: MANO DE OBRA, MATERIALES, EQUIPO NECESARIO Y HERRAMIENTA.

M2

$ 541.49

453

PAVIMENTO DE CONCRETO MR. 40 RESISTENCIA NORMAL, DE 18 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, NCLUYE: MANO DE OBRA, MATERIALES, EQUIPO NECESARIO Y HERRAMIENTA.

M2

$ 602.14

454

PAVIMENTO DE CONCRETO MR. 40 RESISTENCIA NORMAL, DE 20 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, NCLUYE: MANO DE OBRA, MATERIALES, EQUIPO NECESARIO Y HERRAMIENTA.

M2

$ 641.72

455

PAVIMENTO DE CONCRETO MR. 42 RESISTENCIA NORMAL, DE 15 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, NCLUYE: MANO DE OBRA, MATERIALES, EQUIPO NECESARIO Y HERRAMIENTA.

M2

$ 570.80

456

PAVIMENTO DE CONCRETO MR. 42 RESISTENCIA NORMAL, DE 18 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, NCLUYE: MANO DE OBRA, MATERIALES, EQUIPO NECESARIO Y HERRAMIENTA.

M2

$ 637.67

457

PAVIMENTO DE CONCRETO MR. 42 RESISTENCIA NORMAL, DE 20 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, NCLUYE: MANO DE OBRA, MATERIALES, EQUIPO NECESARIO Y HERRAMIENTA.

M2

$ 681.19

55).-GUARNICIONES 458

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., DE 15 X 20 X 30 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 227.99

459

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=150 KG/CM2., DE 15 X 20 X 30 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 214.05

460

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., DE 15 X 20 X 40 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 300.26

461

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=150 KG/CM2., DE 15 X 20 X 40 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 281.69

462

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., DE 15 X 20 X 45 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 342.38

90

NO.

CONCEPTO

UNIDAD

P.U

463

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=150 KG/CM2., DE 15 X 20 X 45 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 321.49

464

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., DE 15 X 20 X 50 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 372.03

465

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=150 KG/CM2., DE 15 X 20 X 50 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 348.81

466

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=200 KG/CM2., DE 15 X 20 X 30 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 236.13

467

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=200 KG/CM2., DE 15 X 20 X 30 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 220.34

468

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=200 KG/CM2., DE 15 X 20 X 40 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 311.14

469

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=200 KG/CM2., DE 15 X 20 X 40 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 290.09

470

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=200 KG/CM2., DE 15 X 20 X 45 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 354.59

471

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=200 KG/CM2., DE 15 X 20 X 45 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 330.92

472

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=200 KG/CM2., DE 15 X 20 X 50 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 385.61

473

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=200 KG/CM2., DE 15 X 20 X 50 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 359.29

474

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., DE 15 X 20 X 30 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 217.20

475

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=150 KG/CM2., DE 15 X 20 X 30 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 203.26

476

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., DE 15 X 20 X 40 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 286.80

477

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=150 KG/CM2., DE 15 X 20 X 40 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 268.24

478

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., DE 15 X 20 X 45 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 327.59

479

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=150 KG/CM2., DE 15 X 20 X 45 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 306.70

480

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., DE 15 X 20 X 50 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 355.93

91

NO.

CONCEPTO

UNIDAD

P.U

481

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=150 KG/CM2., DE 15 X 20 X 50 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 332.73

482

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=200 KG/CM2. DE 15 X 20 X 30 CM. DE SECCIÓN, INCLUYE: CIMBRA DE METALICA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 225.34

483

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=200 KG/CM2., DE 15 X 20 X 30 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 209.55

484

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=200 KG/CM2., DE 15 X 20 X 40 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 297.68

485

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=200 KG/CM2., DE 15 X 20 X 40 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 276.64

486

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=200 KG/CM2., DE 15 X 20 X 45 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 335.64

487

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=200 KG/CM2., DE 15 X 20 X 45 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 311.98

488

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=200 KG/CM2., DE 15 X 20 X 50 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 364.87

489

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=200 KG/CM2., DE 15 X 20 X 50 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 338.56

490

BANQUETA DE CONCRETO PREMEZCLADO F'C=150 KG/CM2. AGREGADO MAXIMO DE 3/4", DE 8 CM. DE ESPESOR, ACABADO ESCOBILLADO, INCLUYE: CEMENTO, VOLTEADOR, CIMBRA EN FRONTERAS, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 216.51

491

BANQUETA DE CONCRETO HECHO EN OBRA DE F'C=150 KG/CM2. AGREGADO MAXIMO DE 3/4", DE 8 CM. DE ESPESOR, ACABADO ESCOBILLADO, INCLUYE: CEMENTO, VOLTEADOR, CIMBRA EN FRONTERAS, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 238.14

492

BANQUETA DE CONCRETO PREMEZCLADO F'C=150 KG/CM2. AGREGADO MAXIMO DE 3/4", DE 10 CM. DE ESPESOR, ACABADO ESCOBILLADO, INCLUYE: CEMENTO, VOLTEADOR, CIMBRA EN FRONTERAS, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 253.22

493

BANQUETA DE CONCRETO HECHO EN OBRA DE F'C=150 KG/CM2. AGREGADO MAXIMO DE 3/4", DE 10 CM. DE ESPESOR, ACABADO ESCOBILLADO, INCLUYE: CEMENTO, VOLTEADOR, CIMBRA EN FRONTERAS, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 280.28

494

BANQUETA DE CONCRETO PREMEZCLADO F'C=200 KG/CM2. AGREGADO MAXIMO DE 3/4", DE 8 CM. DE ESPESOR, ACABADO ESCOBILLADO, INCLUYE: CEMENTO, VOLTEADOR, CIMBRA EN FRONTERAS, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 224.97

495

BANQUETA DE CONCRETO HECHO EN OBRA DE F'C=200 KG/CM2. AGREGADO MAXIMO DE 3/4", DE 8 CM. DE ESPESOR, ACABADO ESCOBILLADO, INCLUYE: CEMENTO, VOLTEADOR, CIMBRA EN FRONTERAS, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 250.80

496

BANQUETA DE CONCRETO PREMEZCLADO F'C=200 KG/CM2. AGREGADO MAXIMO DE 3/4", DE 10 CM. DE ESPESOR, ACABADO ESCOBILLADO, INCLUYE: CEMENTO, VOLTEADOR, CIMBRA EN FRONTERAS, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 265.45

56).-BANQUETAS

92

NO.

CONCEPTO

UNIDAD

P.U

497

BANQUETA DE CONCRETO HECHO EN OBRA DE F'C=200 KG/CM2. AGREGADO MAXIMO DE 3/4", DE 10 CM. DE ESPESOR, ACABADO ESCOBILLADO, INCLUYE: CEMENTO, VOLTEADOR, CIMBRA EN FRONTERAS, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 296.11

57).- JUNTAS CONSTRUCTIVAS Y CORTES EN CONCRETO 498

JUNTA CONSTRUCTIVA EN PAVIMENTOS A BASE DE CELOTEX DE 10 MM. DE ANCHO Y 25 CM. DE PROFUNDIDAD, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 41.72

499

JUNTA CONSTRUCTIVA EN PAVIMENTOS A BASE DE CELOTEX DE 10 MM. DE ANCHO Y 25 CM. DE PROFUNDIDAD, IMPREGNADO CON ASFALTO OXIDADO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 47.61

500

JUNTA DE DILATACION A BASE DE VARILLA DE 5/8" DE DIAM. A CADA 60 CM., DE 1.20 M. DE LARGO, CON UN EXTREMO FIJO Y EL OTRO RECUBIERTO CON GRASA DENTRO DE UN POLIDUCTO DE 1" DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 62.74

501

CORTE CON DISCO DE 3.18 CM. DE ESPESOR CON CORTADORA DE DISCO DIAMANTE, INCLUYE: MANO DE OBRA, EQUIPO Y HERRAMIENTA.

ML

$ 10.45

502

CORTE CON DISCO DE 6.35 CM. DE ESPESOR CON CORTADORA DE DISCO DIAMANTE, INCLUYE: MANO DE OBRA, EQUIPO Y HERRAMIENTA.

ML

$ 11.18

503

SUMINISTRO Y COLOCACION DE JUNTAS DE DILATACIÓN PARA CALAFATEO DE 10 MM. DE ANCHO Y 25 MM. DE PROFUNDIDAD, A BASE DE ASFALTO OXIDADO, INCLUYE: LIMPIEZA DE LA JUNTA, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 26.09

504

SUMINISTRO Y APLICACION DE CURACRETO.

M2

$ 15.15

58).- MORTEROS Y LECHADAS 505

SUMINISTRO Y ELABORACION DE MORTERO CEMENTO-CALHIDRA-ARENA 1:1:6, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,962.50

506

SUMINISTRO Y ELABORACION DE MORTERO CEMENTO-CALHIDRA-ARENA 1:1:8, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,317.92

507

SUMINISTRO Y ELABORACION DE MORTERO CEMENTO-CALHIDRA-ARENA 1:1:10, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,216.88

508

SUMINISTRO Y ELABORACION DE MORTERO CAL-ARENA 1:2, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 977.39

509

SUMINISTRO Y ELABORACION DE MORTERO CAL-ARENA 1:3, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 811.84

510

SUMINISTRO Y ELABORACION DE MORTERO CEMENTO-ARENA 1:2, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 2,630.79

511

SUMINISTRO Y ELABORACION DE MORTERO CEMENTO-ARENA 1:3, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 2,253.75

512

SUMINISTRO Y ELABORACION DE MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,967.30

513

SUMINISTRO Y ELABORACION DE MORTERO CEMENTO-ARENA 1:5, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,707.23

514

SUMINISTRO Y ELABORACION DE MORTERO CEMENTO-ARENA 1:6, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,513.55

515

SUMINISTRO Y ELABORACION DE MORTERO CEMENTO-ARENA 1:7, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,348.80

516

SUMINISTRO Y ELABORACION DE MORTERO CEMENTO-ARENA 1:8, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,205.86

517

SUMINISTRO Y ELABORACION DE LECHADA CEMENTO GRIS-AGUA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 5,005.18

93

NO.

CONCEPTO

UNIDAD

P.U

518

SUMINISTRO Y ELABORACION DE LECHADA CEMENTO BLANCO-AGUA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 7,247.74

59).-PAVIMENTOS ASFÁLTICOS 519

SUMINISTRO Y APLICACION DE RIEGO DE LIGA CON EMULSION ASFALTICA EN PROPORCION 1.2 L. POR M2, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 29.35

520

SUMINISTRO Y APLICACION DE RIEGO DE IMPREGNACION CON EMULSION ASFALTICA EN PROPORCION DE 1.5 L. POR M2, INCLUYE: BARRIDO DE LA SUPERFICIE, POREO, MATERIALES, MANO DE OBRA Y HERRAMIENTA.

M2

$ 35.42

521

SUMINISTRO Y APLICACIÓN DE RIEGO DE SELLO CON MATERIAL 3A. Y EMULSIÓN CATIÓNICA DE ROMPIMIENTO RÁPIDO EN PROPORCIÓN 1.5 LTS. POR M2., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 79.60

522

ESCARIFICADO Y REMOCION DE LA CARPETA EXISTENTE CONSTRUIDA CON ANTERIORIDAD, POR UNIDAD DE OBRA TERMINADA, DESPERDICIANDO EL MATERIAL.

M2

$ 16.59

523

CARPETA DE CONCRETO ASFALTICO EN CALIENTE DE 5 CM. DE ESPESOR, CON, CEMENTO ASFALTICO ASFALTO EKBE SUPERPAVE PG 64-22, Y/O AC-20 Y AGREGADO PETREO DE 3/4" A FINOS, INCLUYE: HUMECTACION DE SUPERFICIE PARA EVITAR POLVO Y COMPACTACION AL 95% DE LA PRUEBA V.R.S. (NO INCLUYE ACARREO DE MEZCLA ASFALTICA DE PLANTA DE ASFALTO A EL NORTE DE GRAVEDAD DE LA OBRA).

M2

$ 206.86

524

CARPETA DE CONCRETO ASFALTICO EN CALIENTE DE 7 CM. DE ESPESOR, CON CEMENTO ASFALTICO ASFALTO EKBE SUPERPAVE PG 64-22, Y/O AC-20 Y AGREGADO PETREO DE 3/4" A FINOS, INCLUYE: HUMECTACION DE SUPERFICIE PARA EVITAR POLVO Y COMPACTACION AL 95% DE LA PRUEBA V.R.S. (NO INCLUYE ACARREO DE MEZCLA ASFALTICA DE PLANTA DE ASFALTO A EL NORTE DE GRAVEDAD DE LA OBRA).

M2

$ 277.52

525

CARPETA DE CONCRETO ASFALTICO EN CALIENTE DE 8 CM. DE ESPESOR, CON CEMENTO ASFALTICO ASFALTO EKBE SUPERPAVE PG 64-22, Y/O AC-20 Y AGREGADO PETREO DE 3/4" A FINOS, INCLUYE: HUMECTACION DE SUPERFICIE PARA EVITAR POLVO Y COMPACTACION AL 95% DE LA PRUEBA V.R.S. (NO INCLUYE ACARREO DE MEZCLA ASFALTICA DE PLANTA DE ASFALTO A EL NORTE DE GRAVEDAD DE LA OBRA).

M2

$ 325.03

526

CARPETA DE CONCRETO ASFALTICO EN CALIENTE DE 10 CM. DE ESPESOR, CON CEMENTO ASFALTICO ASFALTO EKBE SUPERPAVE PG 64-22, Y/O AC-20 Y AGREGADO PETREO DE 3/4" A FINOS, INCLUYE: HUMECTACION DE SUPERFICIE PARA EVITAR POLVO Y COMPACTACION AL 95% DE LA PRUEBA V.R.S. (NO INCLUYE ACARREO DE MEZCLA ASFALTICA DE PLANTA DE ASFALTO A EL NORTE DE GRAVEDAD DE LA OBRA).

M2

$ 399.17

527

CARPETA DE CONCRETO ASFALTICO EN CALIENTE, CON CEMENTO ASFALTICO ASFALTO EKBE SUPERPAVE PG 64-22, Y/O AC-20 Y AGREGADO PETREO DE 3/4" A FINOS, INCLUYE: HUMECTACION DE SUPERFICIE PARA EVITAR POLVO Y COMPACTACION AL 95% DE LA PRUEBA V.R.S. ( NO INCLUYE ACARREO DE MEZCLA ASFALTICA DE PLANTA DE ASFALTO A EL NORTE DE GRAVEDAD DE LA OBRA).

M3

$ 3,914.02

60).-REHABILITACIÓN Y APERTURA DE CAMINOS 528

EXCAVACIONES EN CORTES Y ADICIONALES DEBAJO DE LA SUBRASANTE EN MATERIAL TIPO II, CUANDO EL MATERIAL SE DESPERDICIE, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 34.52

529

EXCAVACIONES EN CORTES Y ADICIONALES DEBAJO DE LA SUBRASANTE EN MATERIAL TIPO III, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 148.48

530

CONFORMACION Y AFINAMIENTO PARA DAR ACABADO SUPERFICIAL A TERRAPLENES EXISTENTES, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

KM

$ 28,873.90

531

DESPALME A 20 CM. DE PROFUNDIDAD EN MATERIAL TIPO II PARA DESPLANTE DE TERRAPLENES, DEPOSITANDO EL PRODUCTO EN LA ORILLA DE LA EXCAVACION CUANDO EL MATERIAL SE DESPERDICIE.

M3

$ 16.21

94

NO.

CONCEPTO

UNIDAD

P.U

532

DESPALME A MANO DE HASTA 20 CM. EN MATERIAL TIPO II, DESPERDICIANDO EL MATERIAL, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO, ACARREO LIBRE A 20 M.

M2

$ 87.69

533

EXCAVACION POR MEDIOS MECANICOS PARA ABRIR CAJA HASTA 50 CM. DE PROFUNDIDAD EN MATERIAL TIPO II, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 36.39

534

COMPACTACION DEL TERRENO NATURAL CON EQUIPO MECANICO EN EL AREA DE DESPLANTE DE LOS TERRAPLENES, AL 95 % DE SU PVSM, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 35.55

535

RASTREO Y CUNETEO CON MAQUINARIA EN MATERIAL TIPO II, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

KM

$ 10,950.18

536

CUNETEO CON MAQUINARIA DEPOSITANDO EL MATERIAL A LOS COSTADOS DEL TRAMO POR REHABILITAR, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

KM

$ 7,430.06

537

CUNETEO CON MAQUINARIA DEPOSITANDO EL MATERIAL A LOS COSTADOS DEL TRAMO POR REHABILITAR, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 8.83

538

CONFORMADO, PERFILADO DE SUPERFICIES Y CUNETAS CON MOTOCONFORMADORA, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 10.57

539

ESCARIFICADO, DISGREGADO Y ACAMELLONADO DE MATERIAL PRODUCTO DE CORTE EN SUPERFICIES DE RODAMIENTO, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 10.93

540

NIVELADO Y AFINADO DE CORONA, PARA RECIBIR MATERIAL DE REVESTIMIENTO, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 4.92

541

CORTE PARA AMPLIACION DE CORONA EN MATERIAL TIPO II, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 102.50

542

TENDIDO DE MATERIAL DE REVESTIMIENTO CON MAQUINARIA EN SUPERFICIE DE RODAMIENTO, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 39.11

543

BARRIDO DE LA SUPERFICIE A TRATAR POR MEDIOS MANUALES, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 3.44

544

RENIVELACION, AFINE Y COMPACTACION DE LA TERRACERIA CON MAQUINARIA, INCLUYE: COMPACTACION SIN CONTROL DE LABORATORIO, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 52.86

545

EXTRACCION DE MATERIAL TIPO II PARA REVESTIMIENTO, INCLUYE: DESMONTE, DESPALME, EXCAVACION, CARGA POR MEDIOS MECANICOS Y PAGO DE REGALIAS.

M3

$ 72.62

546

OPERACION DE TENDIDO, CONFORMACION Y AFINAMIENTO PARA DAR ACABADO AL MATERIAL DE REVESTIMIENTO, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 85.83

547

CORTE DE TERRENO NATURAL PARA APERTURA DE CAMINO SOBRE MATERIAL TIPO I, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 87.32

548

CORTE DE TERRENO NATURAL PARA APERTURA DE CAMINO SOBRE MATERIAL TIPO II, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 102.50

549

CORTE DE TERRENO NATURAL PARA APERTURA DE CAMINO SOBRE MATERIAL TIPO III, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 415.76

550

RASTREO PARA FORMACION DE CORONA Y FORMACION DE CUNETA, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 9.57

551

FORMACION Y COMPACTACION DE TERRAPLEN COMPACTADO AL 90 % PROCTOR, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 60.78

552

OPERACION DE MEZCLADO, TENDIDO Y COMPACTACION DE LA SUB-BASE O BASE, (NO INCLUYE SUMINISTRO Y ACARREO DE MATERIAL) COMPACTADO AL 95 % DE SU PVSM, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 117.04

95

NO.

CONCEPTO

UNIDAD

P.U

553

TERRAPLÉN COMPACTADO AL 90 % PROCTOR, POR MEDIOS MECÁNICOS CONSIDERADO EL AGUA, MEZCLADO, CONFORMACIÓN, TENDIDO Y COMPACTACIÓN, SIN INCLUIR ADQUISICIÓN NI ACARREO DE LOS MATERIALES.

M3

$ 219.84

61).-BASES HIDRÁULICAS 554

BASE HIDRAULICA 70 - 30 % (GRAVA 1 1/2" - CEMENTANTE) DE 20 CM. DE ESPESOR COMPACTADA AL 95 % DE SU PVSM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 99.07

555

BASE HIDRAULICA DE TEZONTLE O GRAVA EN GREÑA DE 20 CM. DE ESPESOR, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO

M2

$ 108.48

556

OPERACION DE MEZCLADO, TENDIDO Y COMPACTACION DE BASE, COMPACTADO AL 95 % DE SU PVSM., INCLUYE: SUMINISTRO, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 427.39

557

OPERACION DE MEZCLADO, TENDIDO Y COMPACTACION DE BASE, COMPACTADO AL 95% DE SU PVSM., (NO INCLUYE: SUMINISTRO NI ACARREO DESDE EL BANCO DEL MATERIAL ARENO-GRAVOSO), INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 98.49

558

OPERACION DE MEZCLADO, TENDIDO Y COMPACTACION DE SUB-BASE, COMPACTADO AL 95% DE SU PVSM., NO INCLUYE SUMINISTRO NI ACARREO DESDE EL BANCO DEL MATERIAL ARENO-GRAVOSO, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 98.49

559

AFINE Y COMPACTACION DE LA SUB-BASE (SUPERFICIE DESCUBIERTA POR CAJA ) POR MEDIOS MECANICOS AL 90% DE SU PVSM, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 25.19

560

SUB-BASE DE GRAVA CEMENTADA CONTROLADA DE 15.0 CM. DE ESPESOR, COMPACTADA AL 90 % PROCTOR, INCLUYE: SUMINISTRO DE MATERIALES, AGUA, MANO DE OBRA Y EQUIPO.

M2

$ 66.77

561

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 5 CM. DE ESPESOR, A BASE DE CONCRETO ARMADO DE F'C=100 KG/CM2., REFORZADO CON MALLA ELECTROSOLDADA 6X6 - 10/10, INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 231.68

562

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 8 CM. DE ESPESOR, A BASE DE CONCRETO ARMADO DE F'C=100 KG/CM2., REFORZADO CON MALLA ELECTROSOLDADA 6X6 - 10/10, INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 269.08

563

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 10 CM. DE ESPESOR, A BASE DE CONCRETO ARMADO DE F'C=100 KG/CM2., REFORZADO CON MALLA ELECTROSOLDADA 6X6 - 10/10, INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 307.00

564

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 5 CM. DE ESPESOR, A BASE DE CONCRETO ARMADO DE F'C=100 KG/CM2. REFORZADO CON MALLA ELECTROSOLDADA 6X6 - 6/6, INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 248.13

565

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 8 CM. DE ESPESOR, A BASE DE CONCRETO ARMADO DE F'C=100 KG/CM2., REFORZADO CON MALLA ELECTROSOLDADA 6X6 - 6/6, INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 290.62

566

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 10 CM. DE ESPESOR, A BASE DE CONCRETO ARMADO DE F'C=100 KG/CM2., REFORZADO CON MALLA ELECTROSOLDADA 6X6 - 6/6, INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 333.72

567

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 5 CM. DE ESPESOR, A BASE DE CONCRETO ARMADO DE F'C=150 KG/CM2., REFORZADO CON MALLA ELECTROSOLDADA 6X6 - 6/6, INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 281.78

62).-CUNETAS

96

NO.

CONCEPTO

UNIDAD

P.U

568

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 8 CM. DE ESPESOR A BASE DE CONCRETO, ARMADO DE F'C=150 KG/CM2., REFORZADO CON MALLA ELECTROSOLDADA 6X6 - 6/6, INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 328.52

569

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 10 CM. DE ESPESOR, A BASE DE CONCRETO ARMADO DE F'C=150 KG/CM2., REFORZADO CON MALLA ELECTROSOLDADA 6X6 - 6/6, INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 375.86

570

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 5 CM. DE ESPESOR, A BASE DE CONCRETO SIMPLE DE F'C=100 KG/CM2., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 201.00

571

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 8 CM. DE ESPESOR, A BASE DE CONCRETO SIMPLE DE F'C=100 KG/CM2., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 242.43

572

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 10 CM. DE ESPESOR, A BASE DE CONCRETO SIMPLE DE F'C=100 KG/CM2., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 284.44

573

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 5 CM. DE ESPESOR, A BASE DE CONCRETO SIMPLE DE F'C=150 KG/CM2., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 221.94

574

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 8 CM. DE ESPESOR, A BASE DE CONCRETO SIMPLE DE F'C=150 KG/CM2., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 268.63

575

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 10 CM. DE ESPESOR, A BASE DE CONCRETO SIMPLE DE F'C=150 KG/CM2., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 315.98

576

ELABORACION DE CUNETAS A BASE DE CONCRETO SIMPLE DE F'C=100 KG/CM2, INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 2,896.58

577

ELABORACION DE CUNETAS A BASE DE CONCRETO SIMPLE DE F'C=150 KG/CM2, INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,104.75

578

PISO DE ADOQUIN DE CONCRETO TIPO HEXAGONAL DE 26 X 23 X 8 CM. EN COLOR ROSA, NEGRO O NATURAL, ASENTADO SOBRE CAMA DE ARENA DE 5 CM., INCLUYE: ACARREOS A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA YEQUIPO NECESARIO.

M2

$ 352.79

579

PISO DE ADOQUIN DE CONCRETO TIPO CUADRADO DE 20.3 X 20.3 X 8 CM. EN COLOR ROSA, NEGRO O NATURAL, ASENTADO SOBRE CAMA DE ARENA DE 5 CM., INCLUYE: ACARREOS A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA YEQUIPO NECESARIO.

M2

$ 302.30

580

PISO DE ADOQUIN DE CONCRETO TIPO PENTAGONAL DE 25 X 25 X 8 CM. EN COLOR ROSA, NEGRO O NATURAL, ASENTADO SOBRE CAMA DE ARENA DE 5 CM., INCLUYE: ACARREOS A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA YEQUIPO NECESARIO.

M2

$ 302.30

581

PISO DE ADOQUIN DE CONCRETO TIPO TABASCO DE 26 X 23 X 8 CM. EN COLOR ROSA, NEGRO O NATURAL, ASENTADO SOBRE CAMA DE ARENA DE 5 CM., INCLUYE: ACARREOS A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA YEQUIPO NECESARIO.

M2

$ 302.30

63).-PISOS DE ADOQUÍN

64).-TUBO DE CONCRETO SIMPLE CON JUNTA DE MORTERO 582

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO SIMPLE DE 15 CM. (6") DE DIAMETRO, JUNTEADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 145.94

583

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO SIMPLE DE 20 CM. (8") DE DIAMETRO, ASENTADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 173.88

97

NO.

CONCEPTO

UNIDAD

P.U

584

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO SIMPLE DE 25 CM. (10") DE DIAMETRO, ASENTADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 216.94

585

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO SIMPLE DE 30 CM. (12") DE DIAMETRO, ASENTADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 252.40

586

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO SIMPLE DE 38 CM. (15") DE DIAMETRO, ASENTADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 590.26

587

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO SIMPLE DE 45 CM. (18") DE DIAMETRO, ASENTADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 646.33

588

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO SIMPLE DE 61 CM. (24") DE DIAMETRO, ASENTADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 867.67

65).-TUBO DE CONCRETO SIMPLE CON JUNTA HERMETICA 589

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO SIMPLE CON JUNTA HERMETICA, DE 15 CM. (6") DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 178.33

590

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO SIMPLE CON JUNTA HERMETICA, DE 20 CM. (8") DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 209.65

591

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO SIMPLE CON JUNTA HERMETICA, DE 25 CM. (10") DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 266.51

592

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO SIMPLE CON JUNTA HERMETICA, DE 30 CM. (12") DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 334.73

593

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO SIMPLE CON JUNTA HERMETICA, DE 38 CM. (15") DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 705.99

594

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO SIMPLE CON JUNTA HERMETICA, DE 45 CM. (18") DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 870.39

595

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO SIMPLE CON JUNTA HERMETICA, DE 61 CM. (24") DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,126.63

66).- TUBO DE CONCRETO REFORZADO CON JUNTA DE MORTERO GRADO 1 NMA C-20 596

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO REFORZADO DE 61 CM. (24") GRADO 1 NORMA C-20, JUNTEADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,747.09

597

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO REFORZADO DE 76 CM. (30") GRADO 1 NORMA C-20, JUNTEADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 2,212.18

598

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO REFORZADO DE 91 CM. (36") GRADO 1 NORMA C-20, JUNTEADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 2,817.63

599

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO REFORZADO DE 107 CM. (42") GRADO 1 NORMA C-20, JUNTEADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 3,378.66

600

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO REFORZADO DE 122 CM. (48") GRADO 1 NORMA C-20, JUNTEADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 4,027.20

98

NO.

CONCEPTO

UNIDAD

P.U

601

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO REFORZADO DE 152 CM. (60") GRADO 1 NORMA C-20, JUNTEADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 5,728.99

602

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO REFORZADO DE 183 CM. (72") GRADO 1 NORMA C-20, JUNTEADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 7,789.66

603

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO REFORZADO DE 213 CM. (84") GRADO 1 NORMA C-20, JUNTEADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 10,985.94

604

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO REFORZADO DE 244 CM. (96") GRADO 1 NORMA C-20, JUNTEADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 15,496.86

605

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO REFORZADO DE 306 CM. (120") GRADO 1 NORMA C-20, JUNTEADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 20,891.29

67).-TUBO DE CONCRETO PERFORADO CON JUNTA DE MORTERO 606

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO PERFORADO PARA DREN, DIAMETRO DE 15 CM. (6”).

ML

$ 209.01

607

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO PERFORADO PARA DREN, DIAMETRO DE 20 CM. (8”).

ML

$ 223.95

608

SUMINISTRO Y COLOCACION DE TUBERIA DE 4" (10 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE SANITARIO, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 147.48

609

SUMINISTRO Y COLOCACION DE TUBERIA DE 6" (15 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE SANITARIO, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 225.51

610

SUMINISTRO Y COLOCACION DE TUBERIA DE 8" (20 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE SANITARIO, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 365.63

611

SUMINISTRO Y COLOCACION DE TUBERIA DE 10" (25 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE SANITARIO, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 559.70

612

SUMINISTRO Y COLOCACION DE TUBERIA DE 12" (30 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE SANITARIO, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 721.35

613

SUMINISTRO Y COLOCACION DE TUBERIA DE 15" (38 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE SANITARIO, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,107.39

614

SUMINISTRO Y COLOCACION DE TUBERIA DE 18" (46 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE SANITARIO, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,415.48

615

SUMINISTRO Y COLOCACION DE TUBERIA DE 24" (61 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE SANITARIO, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 2,343.31

616

SUMINISTRO Y COLOCACION DE TUBERIA DE 30" (76 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE SANITARIO, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 3,648.91

68).-TUBERÍA PAD ADS SANITARIO

99

NO.

CONCEPTO

UNIDAD

P.U

617

SUMINISTRO Y COLOCACION DE TUBERIA DE 36" (91 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE SANITARIO, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 4,800.80

618

SUMINISTRO Y COLOCACION DE TUBERIA DE 42" (107 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE SANITARIO, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 6,563.66

619

SUMINISTRO Y COLOCACION DE TUBERIA DE 48" (122 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE SANITARIO, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 7,427.02

620

SUMINISTRO Y COLOCACION DE TUBERIA DE 60" (152 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE SANITARIO, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 12,506.33

621

SUMINISTRO Y COLOCACION DE TUBERIA DE 12" (30 CM) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE PLUVIAL, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 642.60

622

SUMINISTRO Y COLOCACION DE TUBERIA DE 15" (38 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE PLUVIAL, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 928.00

623

SUMINISTRO Y COLOCACION DE TUBERIA DE 18" (46 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE PLUVIAL, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,304.02

624

SUMINISTRO Y COLOCACION DE TUBERIA DE 24" (61 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE PLUVIAL, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 2,368.15

625

SUMINISTRO Y COLOCACION DE TUBERIA DE 30" (76 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE PLUVIAL, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 3,635.57

626

SUMINISTRO Y COLOCACION DE TUBERIA DE 36" (91 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA ( PAD ) MARCA "ADS" PARA DRENAJE PLUVIAL, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 4,631.75

627

SUMINISTRO Y COLOCACION DE TUBERIA DE 42" (107 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE PLUVIAL, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 4,883.36

628

SUMINISTRO Y COLOCACION DE TUBERIA DE 48" (122 CM.) DE DIAMETRO DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE PLUVIAL, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 7,746.66

629

SUMINISTRO Y COLOCACION DE TUBERIA DE 60" (152 CM.) DE DIAMETRO DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE PLUVIAL, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 12,046.61

ML

$ 194.33

69).-TUBERÍA PAD ADS PLUVIAL

70).-TUBERÍA ALCANTARILLADO DE PVC S-25 630

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-25 SANITARIO DE 6" (15 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO. 100

NO.

CONCEPTO

UNIDAD

P.U

631

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-25 SANITARIO DE 8" (20 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 269.93

632

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-25 SANITARIO DE 10" (25 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 411.59

633

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-25 SANITARIO DE 12" (30 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 625.90

634

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-25 SANITARIO DE 14" (35 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 852.05

635

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-25 SANITARIO DE 16" (40 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,062.53

71).-TUBERIA ALCANTARILLADO DE PVC S-20 636

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-20 SANITARIO DE 4" (10 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 143.25

637

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-20 SANITARIO DE 6" (15 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 226.18

638

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-20 SANITARIO DE 8" (20 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 330.13

639

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-20 SANITARIO DE 10" (25 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 505.79

640

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-20 SANITARIO DE 12" (30 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 740.08

641

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-20 SANITARIO DE 14" (35 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,086.55

642

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-20 SANITARIO DE 16" (40 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,265.81

643

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-20 SANITARIO DE 18" (45 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,586.46

644

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-20 SANITARIO DE 20" (50 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 2,018.41

72).-SILLETAS PARA DESCARGAS SANITARIAS 645

SUMINISTRO Y COLOCACION DE SILLETA DE P.V.C. DE 12" X 6", PARA DESCARGA DOMICILIARIA, INCLUYE: MATERIALES, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 416.16

646

SUMINISTRO Y COLOCACION DE SILLETA DE P.V.C. DE 10" X 6", PARA DESCARGA DOMICILIARIA, INCLUYE: MATERIALES, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 314.96

647

SUMINISTRO Y COLOCACION DE SILLETA DE P.V.C. DE 8" X 6", PARA DESCARGA DOMICILIARIA, INCLUYE: MATERIALES, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 289.66

ML

$ 61.06

73).-TUBERÍA DE PVC RD-26 648

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-26 DE 1 1/2" (38 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO. 101

NO.

CONCEPTO

UNIDAD

P.U

649

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-26 DE 2" (51 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 91.12

650

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-26 DE 2 1/2" (63 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 126.35

651

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-26 DE 3" (76 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 150.34

652

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-26 DE 4" (100 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 225.72

653

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-26 DE 6" (152 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 413.97

654

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-26 DE 8" (200 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 635.22

74).-TUBERIA DE PVC RD-32.5 655

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-32.5 DE 1 1/2" (38 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 67.65

656

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-32.5 DE 2" (51 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 91.54

657

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-32.5 DE 2 1/2" (63 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 108.49

658

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-32.5 DE 3" (76 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 161.41

659

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-32.5 DE 4" (100 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 220.43

660

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-32.5 DE 6" (152 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 370.02

661

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-32.5 DE 8" (200 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 619.96

75).-TUBERÍA DE PVC RD-41 662

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-41 DE 2" (51 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 79.72

663

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-41 DE 2 1/2" (63 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 98.77

664

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-41 DE 3" (76 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 131.56

665

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-41 DE 4" (100 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 183.07

102

NO.

CONCEPTO

UNIDAD

P.U

666

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-41 DE 6" (152 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 338.12

667

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-41 DE 8" (200 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 464.55

76).-VÁLVULA DE COMPUERTA DE VÁSTAGO FIJO 668

SUMINISTRO E INSTALACIÓN DE VÁLVULA DE COMPUERTA DE VÁSTAGO FIJO DE 2" DE DIÁMETRO, BRIDADA DE ( 150 PSI ), PUESTA EN OBRA

PZA

$ 3,120.51

669

SUMINISTRO E INSTALACIÓN DE VÁLVULA DE COMPUERTA DE VÁSTAGO FIJO DE 21/2" DE DIÁMETRO, BRIDADA DE ( 150 PSI ), PUESTA EN OBRA

PZA

$ 3,460.42

670

SUMINISTRO E INSTALACIÓN DE VÁLVULA DE COMPUERTA DE VÁSTAGO FIJO DE 3" DE DIÁMETRO, BRIDADA DE ( 150 PSI ), PUESTA EN OBRA

PZA

$ 4,208.13

671

SUMINISTRO E INSTALACIÓN DE VÁLVULA DE COMPUERTA DE VÁSTAGO FIJO DE 4" DE DIÁMETRO, BRIDADA DE ( 150 PSI ), PUESTA EN OBRA

PZA

$ 5,393.61

672

SUMINISTRO E INSTALACIÓN DE VÁLVULA DE COMPUERTA DE VÁSTAGO FIJO DE 6" DE DIÁMETRO, BRIDADA DE ( 150 PSI ), PUESTA EN OBRA

PZA

$ 9,185.54

673

SUMINISTRO E INSTALACIÓN DE VÁLVULA DE COMPUERTA DE VÁSTAGO FIJO DE 8" DE DIÁMETRO, BRIDADA DE ( 150 PSI ), PUESTA EN OBRA

PZA

$ 14,634.60

PZA

$ 32,162.98

PZA

$ 32,569.05

PZA

$ 34,680.44

PZA

$ 39,968.57

674

675

676

677

77).-CAJAS PARA OPERACIÓN DE VÁLVULAS CAJA PARA VALVULAS DE 1.56 X 1.56 X 1.65 METROS, PARA 1 CONTRAMARCO SENCILLO CENTRADO DE 1.40 M Y 1 MARCO CON TAPA DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR. CAJA PARA VALVULAS DE 1.86 X 1.56 X 1.65 METROS, PARA 1 CONTRAMARCO SENCILLO CENTRADO DE 1.40 M Y 1 MARCO CON TAPA DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR. CAJA PARA VALVULAS DE 1.86 X 1.56 X 1.65 METROS, PARA 2 CONTRAMARCOS SENCILLOS CENTRADOS DE 1.40 M Y 2 MARCOS CON TAPAS DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR. CAJA PARA VALVULAS DE 1.56 X 2.26 X 1.65 METROS, PARA 2 CONTRAMARCOS SENCILLOS CENTRADOS DE 1.40 M Y 2 MARCOS CON TAPAS DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR. 103

NO.

CONCEPTO

UNIDAD

P.U

678

CAJA PARA VALVULAS DE 1.86 X 1.96 X 1.65 METROS, PARA 1 CONTRAMARCO SENCILLO CENTRADO DE 1.80 M, 1 CONTRAMARCO SENCILLO DESCENTRADO DE 1.80 Y 2 MARCOS CON TAPA DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 40,276.15

679

CAJA PARA VALVULAS DE 1.86 X 1.96 X 1.65 METROS, PARA 1 CONTRAMARCO SENCILLO CENTRADO DE 1.80 M, 1 CONTRAMARCO DOBLE DE 1.80, Y 3 MARCOS CON TAPAS DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 43,206.54

680

CAJA PARA VALVULAS DE 2.26 X 2.26 X 1.65 METROS, PARA 1 CONTRAMARCO SENCILLO CENTRADO DE 2.10 M, 1 CONTRAMARCO SENCILLO DESCENTRADO DE 2.10 Y 3 MARCOS CON TAPAS DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 47,325.88

681

CAJA PARA VALVULAS DE 2.26 X 2.26 X 1.65 METROS, PARA 1 CONTRAMARCO SENCILLO CENTRADO DE 2.10 M, 1 CONTRAMARCO DOBLE DE 2.10 M, Y 3 MARCOS CON TAPAS DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 49,041.63

682

CAJA PARA VALVULAS DE 1.86 X 1.96 X 1.65 METROS, PARA 1 CONTRAMARCO DOBLE CENTRADO DE 1.80 M, 1 CONTRAMARCO SENCILLO DESCENTRADO DE 1.80 M Y 3 MARCOS CON TAPAS DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 42,006.42

683

CAJA PARA VALVULAS DE 1.86 X 1.96 X 1.65 METROS, PARA 2 CONTRAMARCOS DOBLES DE 1.80 M Y 4 MARCOS CON TAPAS DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 43,738.07

104

NO.

CONCEPTO

UNIDAD

P.U

684

CAJA PARA VALVULAS DE 2.26 X 2.26 X 1.65 METROS, PARA 1 CONTRAMARCO DOBLE DE 2.10 M, 1 CONTRAMARCO SENCILLO DESCENTRADO DE 2.10 M Y 3 MARCOS CON TAPAS DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 49,041.63

685

CAJA PARA VALVULAS DE 2.26 X 2.26 X 1.65 METROS, PARA 2 CONTRAMARCOS DOBLES DE 2.10 M Y 4 MARCOS CON TAPAS DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 50,758.75

686

CAJA PARA VALVULAS DE 1.96 X 2.46 X 1.65 METROS, PARA 1 CONTRAMARCO DOBLE DE 1.80M, 1 CONTRAMARCO SENCILLO DESCENTRADO DE 1.80, 1 CONTRAMARCO SENCILLO CENTRADO DE 1.80 Y 4 MARCOS CON TAPAS DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 53,212.29

687

CAJA PARA VALVULAS DE 1.96 X 2.46 X 1.65 METROS, PARA 1 CONTRAMARCO DOBLE DE 1.80 M, 1 CONTRAMARCO SENCILLO DESCENTRADO DE 1.80 M, 1 CONTRAMARCO SENCILLO CENTRADO DE 1.80 Y 4 MARCOS CON TAPAS DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 54,942.54

688

CAJA PARA VALVULAS DE 2.26 X 2.86 X 1.65 METROS, PARA 1 CONTRAMARCO DOBLE DE 2.10 M, 1 CONTRAMARCO SENCILLO CENTRADO DE 2.10, 1 CONTRAMARCO SENCILLO DESCENTRADO DE 2.10 M, Y 4 MARCOS CON TAPAS DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 61,209.71

689

CAJA PARA VALVULAS DE 2.26 X 2.86 X 1.65 METROS, PARA 2 CONTRAMARCOS DOBLES DE 2.10 M, 1 CONTRAMARCO SENCILLO CENTRADO DE 2.10 M, Y 5 MARCOS CON TAPAS DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 62,940.09

105

NO.

CONCEPTO

UNIDAD

P.U

78).-CONTRAMARCO SENCILLO CENTRADO 690

CONTRAMARCO DE ACERO CANAL DE 102MM (4") DE 25 KG, SENCILLO CENTRADO DE 90 CMS. MARCA FUNDIDORA TENAYUCA, INCLUYE: MATERIAL, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 1,212.88

691

CONTRAMARCO DE ACERO CANAL DE 102MM (4") DE 27 KG, SENCILLO CENTRADO DE 1.05 MTS, MARCA FUNDIDORA TENAYUCA, INCLUYE: MATERIAL, MANO DE OBRA Y HERRAMIENTA

PZA

$ 817.80

692

CONTRAMARCO DE ACERO CANAL DE 102MM (4") DE 28 KG, SENCILLO CENTRADO DE 1.10 MTS, MARCA FUNDIDORA TENAYUCA, INCLUYE: MATERIAL, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 1,387.05

693

CONTRAMARCO DE ACERO CANAL DE 102MM (4") DE 31 KG, SENCILLO CENTRADO DE 1.30 MTS, MARCA FUNDIDORA TENAYUCA, INCLUYE: MATERIAL, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 958.24

694

CONTRAMARCO DE ACERO CANAL DE 102MM (4") DE 33 KG, SENCILLO CENTRADO DE 1.40 MTS, MARCA FUNDIDORA TENAYUCA, INCLUYE: MATERIAL, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 994.68

695

CONTRAMARCO DE ACERO CANAL DE 102MM (4") DE 40KG. SENCILLO CENTRADO DE 1.80 MTS, MARCA FUNDIDORA TENAYUCA, INCLUYE: MATERIAL, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 1,269.85

696

CONTRAMARCO DE ACERO CANAL 102MM (4") DE 44 KG. SENCILLO CENTRADO DE 2.10 MTS, MARCA FUNDIDORA TENAYUCA, INCLUYE: MATERIAL, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 1,412.24

697

CONTRAMARCO DE ACERO CANAL DE 152MM (6") DE 50 KG, SENCILLO CENTRADO DE 1.40 MTS, MARCA FUNDIDORA TENAYUCA, INCLUYE: MATERIAL, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 1,664.36

698

CONTRAMARCO DE ACERO CANAL DE 152MM (6") DE 62 KG. SENCILLO CENTRADO DE 1.80 MTS, MARCA FUNDIDORA TENAYUCA, INCLUYE: MATERIAL, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 2,034.26

699

CONTRAMARCO DE ACERO CANAL DE 152MM (6") DE 66 KG, SENCILLO DESCENTRADO DE 2.10 MTS, MARCA FUNDIDORA TENAYUCA, INCLUYE: MATERIAL, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 2,281.31

700

CONTRAMARCO DE ACERO CANAL DE 152MM(6") DE 50 KG, SENCILLO DESCENTRADO DE 1.40 MTS, MARCA FUNDIDORA TENAYUCA, INCLUYE: MATERIAL, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 1,664.36

701

CONTRAMARCO DE ACERO CANAL DE 152MM (6") DE 62 KG, SENCILLO DESCENTRADO DE 1.80 MTS, MARCA FUNDIDORA TENAYUCA, INCLUYE: MATERIAL, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 2,034.26

702

CONTRAMARCO DE ACERO CANAL DE 152MM (6") DE 66 KG, SENCILLO DESCENTRADO DE 2.10 MTS, MARCA FUNDIDORA TENAYUCA, INCLUYE: MATERIAL, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 2,281.31

79).-BOMBEO DE ACHIQUE CON BOMBA AUTOCEBANTE 703

BOMBEO DE ACHIQUE CON BOMBA AUTOCEBANTE, PROPIEDAD DEL CONTRATISTA, DE 2" DE DIÁMETRO Y 8 H.P.

HRA

$ 129.86

704

BOMBEO DE ACHIQUE CON BOMBA AUTOCEBANTE, PROPIEDAD DEL CONTRATISTA, DE 4" DE DIÁMETRO Y 16 H. P.

HRA

$ 159.26

705

ATRAQUE DE 30.0 X 30.0 X 30.0 CM. DE CONCRETO F'C = 150 KG/CM2. RESISTENCIA NORMAL, CON TAMAÑO MÁXIMO DE AGREGADO 38 MM. HECHO EN OBRA, EN CRUCEROS DE AGUA POTABLE, INCLUYE: MATERIALES, MANO DE OBRA, CIMBRA Y ACARREOS.

HRA

$ 140.81

PZA

$ 3,834.36

80).- INSTALACIÓN HIDRÁULICA 706

SUMINISTRO Y COLOCACION DE TINACO DE 1100 L. MARCA ROTOPLAS, CON ACCESORIOS SIN INCLUIR BASE, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

106

NO.

CONCEPTO

UNIDAD

P.U

707

SUMINISTRO E INSTALACION DE TOMA DOMICILIARIA DE 13 MM. ( 1/2" ) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 1,694.15

PZA

$ 3,129.04

81).-LUMINARIAS 708

SUMINISTRO Y COLOCACION DE LUMINARIA PARA ALUMBRADO PÚBLICO TIPO OV-15 SIN INCLUIR POSTE, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO. 82).- ELEMENTOS ELÉCTRICOS

709

SUMINISTRO Y COLOCACION DE APARTARRAYO OXIDO DE ZINC DE 12 KVA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 1,581.91

710

SUMINISTRO Y COLOCACION DE ACOMETIDA ELECTRICA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS. (NO INCLUYE MURETE DE MEDICION).

PZA

$ 1,642.42

711

SUMINISTRO Y COLOCACION DE ACOMETIDA ELECTRICA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS, (INCLUYE MURETE DE MEDICION).

PZA

$ 3,359.02

712

REGISTRO AUXILIAR PARA ALUMBRADO PÚBLICO DE 40X60X65 CM. A BASE DE MURO DE 14 CM. DE ESPESOR, DE TABIQUE ROJO RECOCIDO DE 7X14X28 CM. ASENTADO Y APLANADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: PLANTILLA DE CONCRETO F'C=100 KG/CM2 DE 10.0 CM. DE ESPESOR, MARCO Y CONTRAMARCO DE ÁNGULO DE 1-1/4", CONCRETO F'C= 200 KG/CM2. EN TAPA Y FIJACIÓN DE MARCO, DRÉN DE GRAVA DE 20 CM. DE ESPESOR, INCLUYE: MATERIALES, MANO DE OBRA, ACARREOS Y DESPERDICIOS.

PZA

$ 1,908.18

713

REGISTRO DE CONCRETO PARA ALUMBRADO CON TAPA Y MARCO PINTADO 0.40X0.40X0.60 M DE 91 KG, INCLUYE: SUMINISTRO Y COLOCACIÓN.

PZA

$ 1,218.90

714

REGISTRO DE CONCRETO PARA ALUMBRADO CON TAPA Y MARCO GALVANIZADO 0.40X0.460X0.80 M DE 152 KG, INCLUYE: SUMINISTRO Y COLOCACIÓN.

PZA

$ 1,616.11

83).-REGISTRO AUXILIAR PARA ALUMBRADO PÚBLICO

84).-RETENIDAS 715

SUMINISTRO Y COLOCACION DE RETENIDA TIPO RSA (RETENIDA SENCILLA DE ANCLA) CON CABLE DE ACERO AG 5/16, INCLUYE: EXCAVACION EN MATERIAL TIPO II-A, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 2,082.66

716

SUMINISTRO Y COLOCACION DE RETENIDA TIPO REA (RETENIDA ESTACA ANCLA) CON CABLE DE ACERO AG 5/16, INCLUYE: POSTE 7-500, EXCAVACION EN MATERIAL TIPO II-A, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 8,844.36

717

SUMINISTRO Y COLOCACION DE RETENIDA TIPO RBA (RETENIDA DE BANQUETA) CON CABLE DE ACERO AG 5/16, INCLUYE: EXCAVACION EN MATERIAL TIPO II-A, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 3,473.42

718

SUMINISTRO Y COLOCACION DE RETENIDA TIPO RDA (RETENIDA DOBLE ANCLA) CON CABLE DE ACERO AG 5/16, INCLUYE: EXCAVACION EN MATERIAL TIPO II-A, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 4,116.86

719

SUMINISTRO Y COLOCACION DE TRANSFORMADOR MONOFASICO YT 10 KVA AUTOPROTEGIDO DE 1 BOQUILLA MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 33,954.53

720

SUMINISTRO Y COLOCACION DE TRANSFORMADOR MONOFASICO YT 15 KVA AUTOPROTEGIDO DE 1 BOQUILLA MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 36,105.03

721

SUMINISTRO Y COLOCACION DE TRANSFORMADOR MONOFASICO YT 25 KVA AUTOPROTEGIDO DE 1 BOQUILLA MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 43,865.78

722

SUMINISTRO Y COLOCACION DE TRANSFORMADOR MONOFASICO YT 37.5 KVA AUTOPROTEGIDO DE 1 BOQUILLA MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 50,177.33

85).-TRANSFORMADORES

107

NO.

CONCEPTO

UNIDAD

P.U

723

SUMINISTRO Y COLOCACION DE TRANSFORMADOR MONOFASICO YT 50 KVA AUTOPROTEGIDO DE 1 BOQUILLA MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 59,703.35

724

SUMINISTRO Y COLOCACION DE TRANSFORMADOR MONOFASICO DE 10 KVA AUTOPROTEGIDO DE 2 BOQUILLAS MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 35,852.03

725

SUMINISTRO Y COLOCACION DE TRANSFORMADOR MONOFASICO DE 15 KVA AUTOPROTEGIDO DE 2 BOQUILLAS MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 38,002.53

726

SUMINISTRO Y COLOCACION DE TRANSFORMADOR MONOFASICO DE 25 KVA AUTOPROTEGIDO DE 2 BOQUILLAS MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 43,739.28

727

SUMINISTRO Y COLOCACION DE TRANSFORMADOR MONOFASICO DE 37.5 KVA AUTOPROTEGIDO DE 2 BOQUILLAS MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 52,454.33

728

SUMINISTRO Y COLOCACION DE TRANSFORMADOR MONOFASICO DE 50 KVA AUTOPROTEGIDO DE 2 BOQUILLAS MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 60,968.35

729

SUMINISTRO Y COLOCACION DE TRANSFORMADOR BIFASICO YT 10 KVA AUTOPROTEGIDO DE 1 BOQUILLA MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 31,171.53

730

SUMINISTRO Y COLOCACION DE TRANSFORMADOR BIFASICO YT 15 KVA AUTOPROTEGIDO DE 1 BOQUILLA MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 33,575.03

731

SUMINISTRO Y COLOCACION DE TRANSFORMADOR MONOFASICO 25 KVA, PEDESTAL, MARCA TRAMEX 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 83,123.41

732

SUMINISTRO Y COLOCACION DE TRANSFORMADOR MONOFASICO 37.5 KVA, PEDESTAL, MARCA TRAMEX 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 89,055.69

733

SUMINISTRO Y COLOCACION DE TRANSFORMADOR MONOFASICO 50 KVA, PEDESTAL, MARCA TRAMEX 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 90,953.19

734

SUMINISTRO Y COLOCACION DE TRANSFORMADOR BIFASICO DE 10 KVA AUTOPROTEGIDO DE 2 BOQUILLAS MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 33,701.53

735

SUMINISTRO Y COLOCACION DE TRANSFORMADOR BIFASICO DE 15 KVA AUTOPROTEGIDO DE 2 BOQUILLAS MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 35,725.53

736

SUMINISTRO Y COLOCACION DE TRANSFORMADOR BIFASICO DE 25 KVA AUTOPROTEGIDO DE 2 BOQUILLAS MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 43,486.28

737

SUMINISTRO Y COLOCACION DE TRANSFORMADOR BIFASICO DE 37.5 KVA AUTOPROTEGIDO DE 2 BOQUILLAS MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 48,975.58

738

SUMINISTRO Y COLOCACION DE TRANSFORMADOR BIFASICO DE 50 KVA AUTOPROTEGIDO DE 2 BOQUILLAS MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 59,425.05

86).-POSTES DE CONCRETO 739

SUMINISTRO Y COLOCACION DE POSTE 7-500 DE CONCRETO, INCLUYE: HINCADO, PLOMEADO, CEPA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 4,609.69

740

SUMINISTRO Y COLOCACION DE POSTE 9-400 DE CONCRETO, INCLUYE: HINCADO, PLOMEADO, CEPA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 5,387.71

108

NO.

CONCEPTO

UNIDAD

P.U

741

SUMINISTRO Y COLOCACION DE POSTE 11-500 DE CONCRETO, INCLUYE: HINCADO, PLOMEADO, CEPA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 6,729.93

742

SUMINISTRO Y COLOCACION DE POSTE 11-700 DE CONCRETO, INCLUYE: HINCADO, PLOMEADO, CEPA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 7,906.86

743

SUMINISTRO Y COLOCACION DE POSTE 12-750 DE CONCRETO, INCLUYE: HINCADO, PLOMEADO, CEPA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 9,615.13

744

SUMINISTRO Y COLOCACION DE POSTE 13-600 DE CONCRETO, INCLUYE: HINCADO, PLOMEADO, CEPA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 10,390.90

87).-CABLES Y CONDUCTORES 745

SUMINISTRO Y COLOCACION DE CABLE DE COBRE DESNUDO CAL 1/0 AWG, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

KG

$ 352.58

746

SUMINISTRO Y COLOCACION DE CABLE DE COBRE DESNUDO CAL 3/0 AWG, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

KG

$ 352.58

747

SUMINISTRO Y COLOCACION DE CABLE MULTIPLE DE ALUMINIO 2 + 1 CAL 1/0 (NT), INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 154.30

748

SUMINISTRO Y COLOCACION DE CABLE MULTIPLE DE ALUMINIO 2 + 1 CAL 3/0 (NT), INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 161.92

749

SUMINISTRO Y COLOCACION DE CABLE ALAMBRE DE COBRE No 4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

KG

$ 352.41

750

SUMINISTRO Y COLOCACION DE CONDUCTOR ACSR 1/0, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

KG

$ 310.57

751

SUMINISTRO Y COLOCACION DE CONDUCTOR ACSR 3/0, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

KG

$ 269.89

752

SUMINISTRO Y COLOCACION DE CONDUCTOR ACSR 1/0, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 35.18

753

SUMINISTRO Y COLOCACION DE CONDUCTOR ACSR 3/0, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 45.18

754

SUMINISTRO Y COLOCACION DE CABLE DE ALUMINIO AAC CALIBRE 1/0, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

KG

$ 186.03

755

SUMINISTRO Y COLOCACION DE CABLE DE ALUMINIO AAC CALIBRE 3/0, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

KG

$ 191.73

756

SUMINISTRO Y COLOCACION DE CABLE DE ALUMINIO AAC CALIBRE 1/0, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 52.14

757

SUMINISTRO Y COLOCACION DE CABLE DE ALUMINIO AAC CALIBRE 3/0, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 57.86

88).-EDIFICACIÓN 758

SUMINISTRO Y COLOCACION DE CABLE THW CALIBRE 8, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 50.75

759

SUMINISTRO Y COLOCACION DE CABLE THW CALIBRE 10, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 31.56

760

SUMINISTRO Y COLOCACION DE VENTANA DE ALUMINIO NATURAL, CORREDIZA, PERFIL DE 2", VIDRIO MEDIO DE 3 MM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA.

M2

$ 1,685.68

761

SUMINISTRO Y COLOCACION DE PUERTA ABATIBLE DE 1.20 X 2.10 M. FABRICADA CON PERFILES TUBULARES Y TABLERO DE LÁMINA NO. 18, INCLUYE: MATERIALES, HERRAJES, SOLDADURA, PRIMER ANTICORROSIVO, PINTURA ESMALTE, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 4,969.54

109

NO.

CONCEPTO

UNIDAD

P.U

762

SUMINISTRO Y COLOCACION DE VENTANA DE 1.20 X 1.50 M. CON UNA HOJA ABATIBLE, FABRICADA CON PERFILES TUBULARES CON UN PESO DE 15 KG/CM2, INCLUYE: MATERIALES, HERRAJES, SOLDADURA, PRIMER ANTICORROSIVO, PINTURA ESMALTE, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 2,207.79

763

SUMINISTRO Y COLOCACIÓN DE MALLA CICLÓN CALIBRE 11 DE 2.00 M. DE ALTURA, INCLUYE: POSTES DE LINEA, BARRA HORIZONTAL, ESPADAS METÁLICAS, Y ALAMBRE DE PUAS ASI COMO TODOS LOS ACCESORIOS PARA SU CORRECTO FUNCIONAMIENTO.

ML

$ 435.02

764

SUMINISTRO Y COLOCACIÓN DE MALLA CICLÓN CALIBRE 12.5 FORRADA CON P.V.C. DE 2.00 M. DE ALTURA, INCLUYE: POSTES DE LINEA, BARRA HORIZONTAL, ESPADAS METÁLICAS, Y ALAMBRE DE PUAS ASI COMO TODOS LOS ACCESORIOS PARA SU CORRECTO FUNCIONAMIENTO.

ML

$ 457.02

765

SUMINISTRO Y COLOCACION DE PASTO ALFOMBRA, INCLUYE: COLOCACION Y SUMINISTRO DE CAPA VEGETAL DE 7 CM. DESPESOR A BASE DE TIERRA LIMPIA.

M2

$ 97.38

766

SUMINISTRO Y PLANTADO DE ARBOL CASUARINAS DE 30 CM. DE ALTO, INCLUYE: EXCAVACION, VARA DE APOYO PARA SOPORTAR LA LLUVIA Y EL VIENTO Y TODO LO NECESARIO PARA SU CORRECTA TERMINACION.

PZA

$ 263.25

89).-MALLA CICLÓNICA

90).- PASTO

91).- PINTURA EN MUROS Y HERRERÍA 767

SUMINISTRO Y APLICACION DE PINTURA VINÍLICA EN MUROS Y PLAFONES CON MEZCLA FINA HASTA 3.00 M. DE ALTURA, INCLUYE: UNA MANO DE SELLADOR Y DOS DE PINTURA.

M2

$ 84.16

768

SUMINISTRO Y APLICACION DE PINTURA DE ESMALTE COMEX 100 EN MUROS Y PLAFONES DE YESO, INCLUYE: DOS APLICACIONES DE PINTURA Y UNA DE SELLADOR.

M2

$ 94.13

769

SUMINISTRO Y APLICACION DE PINTURA DE ESMALTE COMEX 100, EN LAMINA DE FIERRO, INCLUYE: DOS APLICACIONES DE PINTURA.

M2

$ 96.11

770

SUMINISTRO Y APLICACION DE PINTURA DE ESMALTE COMEX 100 EN HERRERIA CON DESARROLLO DE 0.30 M2. EN AMBAS CARAS POR M2. DE CLARO, INCLUYE: DOS APLICACIONES DE PINTURA.

M2

$ 76.93

771

SUMINISTRO Y APLICACION DE PINTURA DE ESMALTE COMEX 100 EN HERRERIA CON DESARROLLO DE 0.40 M2. EN AMBAS CARAS POR M2. DE CLARO, INCLUYE: DOS APLICACIONES DE PINTURA.

M2

$ 74.32

772

SUMINISTRO Y APLICACION DE PINTURA DE ESMALTE COMEX 100 EN HERRERIA CON DESARROLLO DE 0.50 M2. EN AMBAS CARAS POR M2. DE CLARO, INCLUYE: DOS APLICACIONES DE PINTURA.

M2

$ 70.98

92).- PINTURA EN GUARNICIONES 773

SUMINISTRO Y APLICACION DE PINTURA VINÍLICA EN GUARNICIONES CON UN DESARROLLO DE 30 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 39.36

774

SUMINISTRO Y APLICACIÓN DE PINTURA AMARILLO TRÁFICO PESADO EN GUARNICIONES CON UN DESARROLLO DE 30 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 50.09

93).-IMPERMEABILIZANTES 775

SUMINISTRO Y APLICACION DE IMPERMEABILIZANTE EN AZOTEA CON MEMBRANA DE FESTER O SIMILAR, CON SELLO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 273.90

776

SUMINISTRO Y APLICACION DE IMPERMEABILIZANTE EN AZOTEA CON TAPETE PREFABRICADO VITROLY GRANULAR SBS DE 3.5 MM. DE ESPESOR, INCLUYE: 1 MANO DE PRIMARIO BASE AGUA, RESANES DE HASTA 5% DE LA SUPERFICIE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 407.47

777

SUMINISTRO Y APLICACION DE IMPERMEABILIZANTE EN AZOTEA CON TAPETE PREFABRICADO VITROLY GRANULAR SBS DE 3.5 MM. DE ESPESOR, INCLUYE: 1 MANO DE PRIMARIO BASE SOLVENTE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 448.97

110

NO.

CONCEPTO

UNIDAD

P.U

94.-ACARREOS 778

ACARREO EN CAMION 1er. KILOMETRO, DE MATERIAL MIXTO EN CAMINO PLANO PAVIMENTADO, NO INCLUYE CARGA A CAMION.

M3

$ 25.36

779

ACARREO EN CAMION 1er. KILOMETRO, DE MATERIAL MIXTO EN CAMINO LOMERIO SUAVE, BRECHA, TERRACERIA PRONUNCIADA, MONTAÑOSO REVESTIDO, NO INCLUYE CARGA A CAMION.

M3

$ 50.22

780

ACARREO EN CAMION 1er. KILOMETRO, DE MATERIAL MIXTO EN CAMINO PLANO PAVIMENTADO, INCLUYE CARGA MANUAL.

M3

$ 125.55

781

ACARREO EN CAMION 1er. KILOMETRO, DE MATERIAL MIXTO EN CAMINO PLANO PAVIMENTADO, INCLUYE CARGA CON MAQUINA.

M3

$ 42.70

782

ACARREO EN CAMION 1er. KILOMETRO, DE MATERIAL MIXTO EN CAMINO LOMERIO SUAVE, BRECHA, TERRACERIA PRONUNCIADA, MONTAÑOSO REVESTIDO, INCLUYE CARGA MANUAL.

M3

$ 136.47

783

ACARREO EN CAMION 1er. KILOMETRO, DE MATERIAL MIXTO EN CAMINO LOMERIO SUAVE, BRECHA, TERRACERIA PRONUNCIADA, MONTAÑOSO REVESTIDO, INCLUYE CARGA A MAQUINA.

M3

$ 67.56

784

ACARREO EN CAMION KILOMETRO SUBSECUENTE, DE MATERIAL MIXTO EN CAMINO PLANO PAVIMENTADO.

M3

$ 8.89

785

ACARREO EN CAMION KILOMETRO SUBSECUENTE, DE MATERIAL MIXTO EN CAMINO LOMERIO SUAVE, BRECHA, TERRACERIA PRONUNCIADA, MONTAÑOSO REVESTIDO.

M3

$ 15.07

786

CARGA CON MAQUINA (CARGADOR FRONTAL CAT 950 SOBRE NEUMATICOS) DE LOS MATERIALES ALMACENADOS.

M3

$ 8.11

787

ACARREO HORIZONTAL SIN PENDIENTE, DE PIEDRA BRAZA, EN CARRETILLA DE 5.0 FT3 A 20.00 M. INCLUYE CARGA Y DESCARGA DEL MATERIAL.

M3

$ 86.53

788

ACARREO EN CARRETILLA DE MATERIALES, EN ESTACIONES SUBSECUENTES DE 20.0 M. ACARREO MÁXIMO, DOS ESTACIONES.

M3

$ 91.58

789

ACARREO DEL MATERIAL PRODUCTO DE DEMOLICIONES DEL INTERIOR A PIE DE LA OBRA.

M3

$ 51.50

790

ACARREO DEL MATERIAL PRODUCTO DE LA DEMOLICIÓN A PRIMER KILÓMETRO. INCLUYE CARGA A MANO EN CAMIÓN VOLTEO.

M3

$ 193.85

M2

$ 327.09

M2

$ 298.85

M2

$ 269.17

M2

$ 243.10

95).-TECHUMBRES 791

SUMINISTRO E INSTALACION DE LAMINA ZINTRO-ALUM MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

CAL.

26,

INCLUYE:

792

SUMINISTRO E INSTALACION DE LAMINA ZINTRO-ALUM MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

CAL.

28,

INCLUYE:

793

SUMINISTRO E INSTALACION DE LAMINA ZINTRO-ALUM MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

CAL.

30,

INCLUYE:

794

SUMINISTRO E INSTALACION DE LAMINA ZINTRO-ALUM MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

CAL.

32,

INCLUYE:

795

SUMINISTRO E INSTALACION DE GALVATEJA ROJA CAL. 26, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

M2

$ 470.51

796

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL (SOLERA), INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

KG

$ 52.78

797

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL (ANGULO), INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

KG

$ 51.45

798

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL (MON-TEN), INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

KG

$ 56.77

799

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL MON-TEN DE 4" X 2" CAL.14, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

ML

$ 222.19

111

NO.

CONCEPTO

UNIDAD

P.U

800

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL MON-TEN DE 4" X 2" CAL.12, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

ML

$ 305.95

801

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL MON-TEN DE 4" X 2" CAL.10, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

ML

$ 386.98

802

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL MON-TEN DE 5" X 2" CAL.14, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

ML

$ 248.56

803

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL MON-TEN DE 5" X 2" CAL.12, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

ML

$ 342.42

804

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL MON-TEN DE 5" X 2" CAL.10, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

ML

$ 433.60

805

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL MON-TEN DE 6" X 2 1/2" CAL.14, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

ML

$ 301.22

806

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL MON-TEN DE 6" X 2 1/2" CAL.12, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

ML

$ 416.04

807

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL MON-TEN DE 6" X 2 1/2" CAL.10, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

ML

$ 528.14

808

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL MON-TEN DE 8" X 3" CAL.14, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

ML

$ 379.56

809

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL MON-TEN DE 8" X 3" CAL.12, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

ML

$ 525.44

810

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL MON-TEN DE 8" X 3" CAL.10, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

ML

$ 669.30

112

ZONA SUR CLAVE MUNICIPIO CLAVE MUNICIPIO 003 ACAYUCAN 113 MINATITLAN 005 ACULA 116 MOLOACAN NANCHITAL DE LAZARO 007 AGUA DULCE 117 CARDENAS DEL RIO 012 ALVARADO 123 OLUTA 013 AMATITLAN 126 OTATITLAN 015 ANGEL R. CABADA 127 OTEAPAN 030 CARLOS A. CARRILLO 129 PAJAPAN 033 CATEMACO 136 PLAYA VICENTE 040 COATZACOALCOS 143 SALTABARRANCA 046 COSAMALOAPAN 145 SAN ANDRES TUXTLA 049 COSOLEACAQUE 146 SAN JUAN EVANGELISTA 055 CHACALTIANGUIS 148 SANTIAGO SOCHIAPAN 060 CHINAMECA 149 SANTIAGO TUXTLA 071 HIDALGOTITLAN 150 SAYULA DE ALEMAN 074 HUEYAPAN DE OCAMPO 152 SOCONUSCO 076 IGNACIO DE LA LLAVE 155 SOTEAPAN 078 ISLA 162 TATAHUICAPAN DE JUAREZ 083 IXHUATLAN DEL SURESTE 176 TEXISTEPEC 085 IXMATLAHUACAN 178 TIERRA BLANCA 089 JALTIPAN 181 TLACOJALPAN 091 JESUS CARRANZA 183 TLACOTALPAN 093 JOSE AZUETA 194 TRES VALLES 094 JUAN RODRIGUEZ CLARA 196 TUXTILLA 099 LAS CHOAPAS 198 UXPANAPA 102 LERDO DE TEJADA 208 ZARAGOZA 110 MECAYAPAN

113

CONCEPTO

PAGINA

1).-DEMOLICIONES

117

2).-PRELIMINARES

118

3).-RELLENOS

118

4).PLANTILLAS Y ACOSTILLADOS

118

5).-CAMAS PARA TUBERIA

119

6).-AFINES Y COMPACTACIÓN

119

7).-EXCAVACIONES A MANO

119

8).-EXCAVACIONES A MAQUINA SIN AFINE

120

9).-EXCAVACIONES A MAQUINA CON AFINE

120

10).-ZAPATAS CORRIDAS

120

11).-DADOS DE CONCRETO

121

12).-CADENAS DE DESPLANTE

121

13).-CASTILLOS DE CONCRETO

122

14).-CADENAS DE CERRAMIENTO

124

15).-LOSAS DE CONCRETO

125

16).-COLUMNAS

125

17).-TRABES

127

18).-ESCALONES

127

19).-REGISTROS SANITARIOS

128

20).-POZOS DE VISITA

128

21).-FIRMES DE CONCRETO

130

22).-PISOS DE CONCRETO

130

23).-PISOS DE CONCRETO ARMADOS CON MALLA

131

24).-FINOS PARA PISO

131

25).-ACABADOS SOBRE PISO

132

26).-RECUBRIMIENTOS CERAMICOS ASENTADOS CON PEGA AZULEJO

132

27).-RECUBRIMIENTOS CERAMICOS ASENTADOS CON MORTERO CEM-ARENA 1:2

132

28).-MUROS DE TABIQUE

133

29).-MUROS DE BLOCK

133

30).-TEJA

133

31).-PRETILES

133

32).-APLANADO COMUN EN MUROS

134

33).-APLANADO COMUN EN PLAFONES

134

34).-APLANADO FINO EN MUROS

134

35).-APLANADO FINO EN PLAFONES

135

36).-EMBOQUILLADO COMUN

135

37).-HABILITADO DE ACERO

136

38).-HABILITADO DE MALLAS ELECTROSOLDADAS

136

39).-CIMBRAS EN TANQUE ELEVADO

137

40).-CIMBRAS

138

41).-EMPEDRADOS

139

42).-CIMIENTOS DE PIEDRA

139

43).-MUROS DE CONTENCION

139

44).-MUROS DE CONCRETO

140

45).-CONCRETO CICLOPEO

140

46).-CONCRETOS HECHOS EN OBRA

141 114

CONCEPTO

PAGINA

47).-ELABORACION Y VACIADO DE CONCRETO HECHO EN OBRA EN CIMENTACIONES

141

48).-ELABORACION Y VACIADO DE CONCRETO HECHO EN OBRA EN ESTRUCTURAS

141

49).-CONCRETOS PREMEZCLADOS

142

50).-CONCRETOS HECHOS EN OBRA CON IMPERMEABILIZANTE INTEGRAL

142

51).-CONCRETOS PREMEZCLADOS CON IMPERMEABILIZANTE INTEGRAL

143

52).-PAVIMENTOS DE CONCRETO HECHO EN OBRA

144

53).-PAVIMENTOS DE CONCRETO PREMEZCLADO

144

54).-PAVIMENTOS DE CONCRETO MR

144

55).-GUARNICIONES

145

56).-BANQUETAS

147

57).-JUNTAS CONSTRUCTIVAS Y CORTES EN CONCRETO

147

58).-MORTEROS Y LECHADAS

148

59).-PAVIMENTOS ASFALTICOS

148

60).-REHABILITACION Y APERTURA DE CAMINOS

149

61).-BASES HIDRAULICAS

150

62).-CUNETAS

151

63).-PISOS DE ADOQUIN

152

64).-TUBO DE CONCRETO SIMPLE CON JUNTA DE MORTERO

152

65).-TUBO DE CONCRETO SIMPLE CON JUNTA HERMETICA

152

66).-TUBO DE CONCRETO REFORZADO CON JUNTA DE MORTERO GRADO 1 N C-20

153

67).-TUBO DE CONCRETO PERFORADO CON JUNTA DE MORTERO

153

68).-TUBERIA PAD ADS SANITARIO

154

69).-TUBERIA PAD ADS PLUVIAL

154

70).-TUBERIA ALCANTARILLADO DE PVC S-25

155

71).-TUBERIA ALCANTARILLADO DE PVC S-20

155

72).-SILLETAS PARA DESCARGAS SANITARIAS

156

73).-TUBERIA DE PVC RD-26

156

74).-TUBERIA DE PVC RD-32.5

157

75).-TUBERIA DE PVC RD-41

157

76).-VÁLVULA DE COMPUERTA DE VÁSTAGO FIJO

157

77).-CAJAS PARA OPERACIÓN DE VÁLVULAS

158

78).-CONTRAMARCO SENCILLO CENTRADO

160

79).-BOMBEO DE ACHIQUE CON BOMBA AUTOCEBANTE

161

80).-INSTALACION HIDRAULICA

161

81).-LUMINARIAS

161

82).- ELEMENTOS ELECTRICOS

161

83).-REGISTRO AUXILIAR PARA ALUMBRADO PÚBLICO

162

84).- RETENIDAS

162

85).-TRANSFORMADORES

162

86).-POSTES DE CONCRETO

163

87).-CABLES Y CONDUCTORES

163

88).- EDIFICACION

164

89).- MALLA CICLONICA

164

90).- PASTO

164

91).-PINTURA EN MUROS Y HERRERIA

165 115

CONCEPTO

PAGINA

92).-PINTURA EN GUARNICIONES

165

93).- IMPERMEABILIZANTES

165

94).-ACARREOS

165

95).- TECHUMBRES

166

116

NO.

CONCEPTO

UNIDAD

P.U

1.-)DEMOLICIONES 1

DEMOLICION A MANO DE MAMPOSTERIA PIEDRA BRAZA HASTA 1.50 M. DE PROFUNDIDAD, VOLUMEN MEDIDO EN BANCO, INCLUYE: APILE DE MATERIAL.

M3

$ 484.57

2

DEMOLICION A MANO DE MAMPOSTERIA PIEDRA BRAZA DE 30 A 40 CM DE ESPESOR Y HASTA 3.50M. DE ALTURA, INCLUYE APILE DE MATERIAL.

M2

$ 419.16

3

DEMOLICION A MANO DE CELOSIAS DE 10 A 15 CM. Y HASTA 3.50 M. DE ALTURA, INCLUYE: APILE DEL MATERIAL.

M2

$ 39.51

4

DEMOLICION A MANO DE APLANADOS DE MEZCLA DE 2.5 CM. DE ESPESOR HASTA 3.50 M. DE ALTURA, INCLUYE: APILE DEL MATERIAL.

M2

$47.03

5

DEMOLICION A MANO DE PISO O BANQUETA DE CONCRETO SIMPLE DE 8 A 10 CM. DE ESPESOR, INCLUYE: APILE DEL MATERIAL.

M2

$ 58.15

6

DEMOLICION A MANO DE PISO O BANQUETA DE CONCRETO REFORZADO, DE 8 A 10 CM. DE ESPESOR, INCLUYE: APILE DEL MATERIAL.

M2

$ 139.52

7

DEMOLICION A MANO DE PAVIMENTO DE CONCRETO HIDRAULICO REFORZADO, DE 15 CM. DE ESPESOR, INCLUYE: APILE DEL MATERIAL.

M2

$ 209.30

8

DEMOLICION A MANO DE ELEMENTOS DE CONCRETO ARMADO EN ESTRUCTURA (LOSA), SIN RECUPERACION DE ACERO, DE 10 CM. DE ESPESOR, HASTA UNA ALTURA DE 3.50 M., INCLUYE: APILE DEL MATERIAL, MANO DE OBRA Y HERRAMIENTA.

M2

$ 167.45

9

DEMOLICION A MANO DE CONCRETO SIMPLE, INCLUYE: APILE DEL MATERIAL.

M3

$ 415.10

10

DEMOLICION A MANO DE LAMBRINES DE AZULEJOS, MATERIALES VIDRIADOS Y MOSAICOS HASTA 3.50 M. DE ALTURA, INCLUYE: MORTERO Y APILE DEL MATERIAL.

M2

$ 41.34

11

DEMOLICION A MANO DE ELEMENTOS DE CONCRETO ARMADO EN ESTRUCTURA (LOSA ), SIN RECUPERACION DE ACERO, MEDIDO EN BANCO, HASTA UNA ALTURA DE 3.50 M., INCLUYE: APILE DEL MATERIAL, MANO DE OBRA Y HERRAMIENTA.

M3

$ 1,385.12

12

DEMOLICION A MANO DE ELEMENTOS DE CONCRETO ARMADO SIN RECUPERACION DE ACERO, MEDIDO EN BANCO, INCLUYE APILE DE MATERIAL.

M3

$ 1,162.74

13

DEMOLICION A MANO DE MURO DE TABIQUE DE BARRO RECOCIDO DE 14 CM. INCLUYE: APILE DEL MATERIAL.

M2

$ 33.50

14

DEMOLICION A MANO DE MURO DE BLOCK DE CONCRETO, INCLUYE: APILE DEL MATERIAL.

M2

$ 65.78

15

DEMOLICION A MAQUINA DE CONCRETO HIDRAULICO SIMPLE, INCLUYE APILE DEL MATERIAL.

M3

$ 333.98

16

DEMOLICION A MAQUINA DE CONCRETO HIDRAULICO REFORZADO, INCLUYE APILE DEL MATERIAL.

M3

$ 599.65

17

DEMOLICION A MAQUINA DE CONCRETO HIDRAULICO SIMPLE DE 10 CM. DE ESPESOR, INCLUYE APILE DEL MATERIAL.

M2

$ 33.54

18

DEMOLICION A MAQUINA DE PAVIMENTO DE CONCRETO HIDRAULICO REFORZADO DE 15 CM. DE ESPESOR, INCLUYE APILE DEL MATERIAL.

M2

$ 91.43

19

PICADO DE LOSA DE CONCRETO PARA ELIMINAR EXCEDENTES Y RECIBIR APLANADO.

M2

$ 19.35

20

DEMOLICION A MANO DE MAMPOSTERIA PIEDRA BRAZA CON UN ESPESOR DE 20 CM.

M2

$ 72.85

21

DESPRENDIMIENTO DE IMPERMEABILIZANTE REMOVIENDO PARTES SUELTAS Y LIMPIEZA, INCLUYE: ACARREOS A 1ª ESTACIÓN A 20.00 M., MANO DE OBRA Y HERRAMIENTA.

M2

$ 29.36

22

DEMOLICIÓN A MANO DE FIRME DE CONCRETO DE 10 CM DE ESPESOR REFORZADO CON MALLA EN AREA DE GRADAS EXISTENTES SIN RECUPERACIÓN DEL MATERIAL.

M2

$ 77.48

23

DEMOLICIÓN A MANO DE MURO DE BLOCK DE 12X20X40 CMS. DE ESPESOR, ASENTADO CON MORTERO CEMENTO: ARENA SIN RECUPERACIÓN DE MATERIAL.

M2

$ 48.90

24

DEMOLICIÓN A MANO DE CASTILLO DE CONCRETO DE 15X20 CMS. ARMADO CON VAR. DE 3/8" Y ALAMBRÓN SIN RECUPERACIÓN DE MATERIAL. INCLUYE ACARREO DE MATERIAL A PIE DE OBRA.

ML

$ 55.36

117

NO.

CONCEPTO

UNIDAD

P.U

25

DEMOLICIÓN A MANO DE CADENA DE DESPLANTE Y CERRAMIENTO DE 15X20 CMS. ARMADO CON VAR. DE 3/8" Y ALAMBRÓN SIN RECUPERACIÓN DE MATERIAL. INCLUYE ACARREO DE MATERIAL A PIE DE OBRA.

ML

$ 64.59

26

DEMOLICIÓN A MANO DE REPISON DE CONCRETO SOBRE MURETE SIN RECUPERACIÓN DE MATERIAL. INCLUYE ACARREO DE MATERIAL A PIE DE OBRA.

ML

$ 36.32

27

DEMOLICIÓN A MANO DE LOSA DE CONCRETO ARMADA CON VAR. DE 3/8" EN BAÑOS SIN RECUPERACIÓN DE MATERIAL. INCLUYE ACARREO DE MATERIAL A PIE DE OBRA.

M2

$ 110.51

28

DEMOLICIÓN A MANO DE MURO DE PIEDRA, ASENTADO CON MORTERO CEMENTOARENA SIN RECUPERACIÓN DE MATERIAL.

M3

$ 390.27

29

DESMANTELAMIENTO DE ESTRUCTURA DE ACERO Y LÁMINA GALVANIZADA SIN RECUPERACIÓN DEL MATERIAL.

M2

$ 48.93

30

LIMPIEZA Y DESENRAICE A MANO DE TERRENO CON MALEZA DE HASTA 1.00 M. DE ALTURA, INCLUYE: APILE DE YERBA EN EL LUGAR.

HA

$ 11.63

31

LIMPIEZA DE TERRENO PLANO A MANO, INCLUYE: APILE DEL MATERIAL EN EL LUGAR Y ACARREOS A PRIMERA ESTACION DE 20.00 M.

M2

$ 21.52

32

TRAZO Y NIVELACION DE TERRENO PLANO POR MEDIOS MANUALES PARA DESPLANTE DE ESTRUCTURAS ESTABLECIENDO EJES AUXILIARES Y REFERENCIAS.

M2

$ 9.56

33

LIMPIEZA Y CORTE DE HIERBA, MALEZA Y/O MATERIAL EXISTENTE CON MAQUINARIA EN AMPLIACION DEL CAMINO EN LOS EXTREMOS DEL CUERPO DEL TERRAPLEN.

M2

$ 13.61

34

DESMONTE EN ZONAS ARIDAS PARA UNA DENSIDAD DEL 100% INCLUYE: TALA, ROZA, DESENRAICE, MAQUINARIA, MANO DE OBRA Y LIMPIEZA DEL TERRENO.

HA

$ 5,926.46

35

DESMONTE EN ZONAS SEMIARIDAS PARA UNA DENSIDAD DEL 100% INCLUYE: TALA, ROZA, DESENRAICE, MAQUINARIA, MANO DE OBRA Y LIMPIEZA DEL TERRENO.

HA

$ 5,659.83

36

DESMONTE EN ZONAS DE BOSQUE PARA UNA DENSIDAD DEL 100% INCLUYE: TALA, ROZA, DESENRAICE, MAQUINARIA, MANO DE OBRA Y LIMPIEZA DEL TERRENO.

HA

$ 4,971.47

37

DESMONTE EN ZONAS DE SELVA PARA UNA DENSIDAD DEL 100% INCLUYE: TALA, ROZA, DESENRAICE, MAQUINARIA, MANO DE OBRA Y LIMPIEZA DEL TERRENO.

HA

$ 5,528.01

2).- PRELIMINARES

3).- RELLENOS 38

RELLENO COMPACTADO CON PISON DE MANO EN CAPAS DE 20 CM. UTILIZANDO MATERIAL PRODUCTO DE LA EXCAVACION, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 140.38

39

RELLENO COMPACTADO CON PISON DE MANO EN CAPAS DE 20 CM. UTILIZANDO MATERIAL DE BANCO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 413.38

40

RELLENO DE CEPAS CON MATERIAL " A " O " B " PRODUCTO DE LA EXCAVACION, COMPACTADO CON EQUIPO MANUAL (BAILARINA) AL 85% PROCTOR INCLUYE: VOLTEO CON PALA, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 167.00

41

RELLENO EN CEPAS CON MATERIAL PRODUCTO DE EXCAVACION, COMPACTADO AL 90% PROCTOR, CON COMPACTADOR MANUAL (BAILARINA), INCLUYE: VOLTEO CON PALA.

M3

$ 189.60

42

RELLENO EN CEPAS CON MATERIAL DE BANCO, COMPACTADO AL 90% PROCTOR, CON COMPACTADOR MANUAL (BAILARINA), INCLUYE: VOLTEO CON PALA.

M3

$ 462.59

43

RELLENO Y COMPACTADO CON PIZON DE MANO, INCLUYE: ACOSTILLADO EN CAPAS DE 20 CM. UTILIZANDO MATERIAL PRODUCTO DE LA EXCAVACION.

M3

$ 152.02

4).- PLANTILLAS Y ACOSTILLADOS 44

PLANTILLA DE 5 CM. DE ESPESOR DE CONCRETO HECHO EN OBRA F'C=100 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: ACARREO A PRIMERA ESTACION A 20.00 M., MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 133.35

45

PLANTILLA DE 8 CM. DE ESPESOR DE CONCRETO HECHO EN OBRA F'C=100 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: ACARREO A PRIMERA ESTACION A 20.00 M., MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 217.72

118

NO.

CONCEPTO

UNIDAD

P.U

46

PLANTILLA DE 10 CM. DE ESPESOR DE CONCRETO HECHO EN OBRA F'C=100 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: ACARREO A PRIMERA ESTACION A 20.00 M., MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 277.51

47

PLANTILLA DE 5 CM. DE ESPESOR DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: ACARREO A PRIMERA ESTACION A 20.00 M., MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 144.62

48

PLANTILLA DE 8 CM. DE ESPESOR DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: ACARREO A PRIMERA ESTACION A 20.00 M., MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 234.50

49

PLANTILLA DE 10 CM. DE ESPESOR DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: ACARREO A PRIMERA ESTACION A 20.00 M., MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 298.75

50

ELABORACION DE PLANTILLA Y ACOSTILLADO DE TUBERIA CON MATERIAL TIPO I (PRODUCTO DE EXCAVACIÓN), INCLUYE: LIMPIEZA DEL MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 176.91

51

ELABORACION DE PLANTILLA Y ACOSTILLADO DE TUBERIA CON MATERIAL TIPO II (PRODUCTO DE EXCAVACIÓN), INCLUYE: LIMPIEZA DEL MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 176.91

52

PLANTILLA CON MATERIAL PRODUCTO DE EXCAVACIÓN PARA APOYO DE TUBERÍAS, INCLUYE: MANO DE OBRA, HERRAMIENTA, ACARREOS, MEDIDO COMPACTO.

M3

$ 117.01

53

PLANTILLA CON MATERIAL DE BANCO PARA APOYO DE TUBERÍAS, INCLUYE: SUMINISTRO DE MATERIAL, MANO DE OBRA, HERRAMIENTA, ACARREOS, MEDIDO COMPACTO.

M3

$ 372.69

5).-CAMAS PARA TUBERÍA 54

TENDIDO DE CAMA DE ARENA PARA TUBERIAS, INCLUYE: APISONADO Y ACOSTILLADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 401.91

55

TENDIDO DE CAMA DE ARENA (CEMENTANTE) PARA TUBERIAS, INCLUYE: APISONADO Y ACOSTILLADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 368.75

6).- AFINES Y COMPACTACIÓN 56

AFINE DE TALUDES Y FONDO A MANO, MATERIAL SECO TIPO I EN CEPA PARA MEJORAR LA EXCAVACION REALIZADA POR MEDIOS MECANICOS, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 34.88

57

AFINE DE TALUDES Y FONDO A MANO, MATERIAL SECO TIPO II EN CEPA PARA MEJORAR LA EXCAVACION REALIZADA POR MEDIOS MECANICOS, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 40.69

58

AFINE DE TERRACERIA POR MEDIOS MECANICOS, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 12.42

59

COMPACTACION CON EQUIPO (BAILARINA), HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 53.30

60

AFINE A MANO DE FONDO DE EXCAVACIÓN, EFECTUADA POR MEDIOS MECÁNICOS, ESPESOR PROMEDIO 15.0 CM. DE ESPESOR.

M2

$ 16.60

61

NIVELACIÓN, CONFORMACIÓN Y COMPACTACIÓN POR MEDIOS MANUALES. INCLUYE INCORPORACIÓN DE AGUA PARA SU COMPACTACIÓN.

M2

$ 33.04

INCLUYE:

MANO

DE

OBRA,

7).-EXCAVACIONES A MANO 62

EXCAVACION A MANO EN CEPAS MATERIAL SECO TIPO I, PROFUNDIDAD DE 0.00 A 2.00 M., INCLUYE: AFINE DE TALUDES Y FONDO, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 129.23

63

EXCAVACION A MANO EN CEPAS MATERIAL SECO TIPO II, PROFUNDIDAD DE 0.00 A 2.00 M., INCLUYE: AFINE DE TALUDES Y FONDO, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 215.09

64

EXCAVACION A MANO EN CEPAS MATERIAL TIPO III, PROFUNDIDAD DE 0.00 A 2.00 M., INCLUYE: APILE DEL MATERIAL EN EL LUGAR, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 581.37

119

NO.

CONCEPTO

UNIDAD

P.U

65

EXCAVACIÓN DE CEPA EN TERRENO TIPO "B" Y "C" (50-50%) PARA RECIBIR ZAPATA DE CIMENTACIÓN DE 1.20X1.20 MTS. INCLUYE: AFINE Y COMPACTACIÓN.

M3

$ 232.55

66

EXCAVACIÓN EN CAJA EN FORMA MANUAL EN MATERIAL TIPO "B" TEPETATOSO, 80% Y "C" ROCA 20%. INCLUYE: AFINE Y FONDO. ACARREOS DENTRO Y FUERA DE LA OBRA.

M3

$ 116.27

8).-EXCAVACIONES A MÁQUINA SIN AFINE 67

EXCAVACION A MAQUINA EN MATERIAL TIPO I DE 0.00 A 2.00 M. DE PROFUNDIDAD, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 20.88

68

EXCAVACION A MAQUINA EN MATERIAL TIPO II DE 0.00 A 2.00 M. DE PROFUNDIDAD, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 34.43

69

EXCAVACION A MAQUINA EN MATERIAL TIPO II DE 0.00 A 3.00 M. DE PROFUNDIDAD, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 54.68

70

EXCAVACION A MAQUINA EN MATERIAL TIPO II DE 0.00 A 4.00 M, DE PROFUNDIDAD, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 69.60

71

EXCAVACION A MAQUINA EN MATERIAL TIPO II-A DE 0.00 A 2.00 M. DE PROFUNDIDAD, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 54.71

72

EXCAVACION A MAQUINA EN MATERIAL TIPO III DE 0.00 A 2.00 M. DE PROFUNDIDAD, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 606.07

73

EXCAVACION MECANICA EN ROCA (MATERIAL III), EN CAJA A UNA PROFUNDIDAD DE 0.00 A 2.00 M., INCLUYE: RUPTURA CON MARTILLO HIDRAULICO, EXTRACCION Y ACARREO MANUAL A PIE DE CAJA MAX= 20 M.

M3

$ 733.99

74

EXCAVACION MECANICA EN ROCA (MATERIAL III), EN CEPA A UNA PROFUNDIDAD DE 0.00 A 2.00 M., INCLUYE: RUPTURA CON MARTILLO HIDRAULICO, EXTRACION Y ACARREO MANUAL A PIE DE CEPA.

M3

$ 748.24

9).- EXCAVACIÓN A MÁQUINA CON AFINE 75

EXCAVACION A MAQUINA EN MATERIAL TIPO I DE 0.00 A 2.00 M. DE PROFUNDIDAD, INCLUYE: AFINE DE TALUDES Y FONDO, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 43.87

76

EXCAVACION A MAQUINA EN MATERIAL TIPO II DE 0.00 A 2.00 M. DE PROFUNDIDAD, INCLUYE: AFINE DE TALUDES Y FONDO, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 72.38

77

EXCAVACION A MAQUINA EN MATERIAL TIPO II DE 0.00 A 3.00 M. DE PROFUNDIDAD, INCLUYE: AFINE DE TALUDES Y FONDO, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 95.61

78

EXCAVACION A MAQUINA EN MATERIAL TIPO II DE 0.00 A 4.00 M, DE PROFUNDIDAD, INCLUYE: AFINE DE TALUDES Y FONDO, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 120.32

79

EXCAVACION A MAQUINA EN MATERIAL TIPO II-A DE 0.00 A 2.00 M. DE PROFUNDIDAD, INCLUYE: AFINE DE TALUDES Y FONDO, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 103.46

80

EXCAVACION A MAQUINA EN MATERIAL TIPO III DE 0.00 A 2.00 M. DE PROFUNDIDAD, INCLUYE: AFINE DE TALUDES Y FONDO, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 667.37

81

SUMINISTRO Y ELABORACION DE ZAPATA CORRIDA DE CONCRETO F'C=200 KG/CM2. DE 80 CM. DE ANCHO Y 20 CM. DE ALTURA, HABILITADO CON 65 KG. DE ACERO DE 1/2" X M3. DE CONCRETO, INCLUYE: PLANTILLA DE 5 CM. DE ESPESOR CONCRETO F'C=100 KG/CM2., CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 6,884.60

82

SUMINISTRO Y ELABORACION DE ZAPATA CORRIDA DE CONCRETO F'C=250 KG/CM2. DE 80 CM. DE ANCHO Y 20 CM. DE ALTURA, HABILITADO CON 65 KG. DE ACERO DE 1/2" X M3. DE CONCRETO, INCLUYE: PLANTILLA DE 5 CM. DE ESPESOR CONCRETO F'C=100 KG/CM2., CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 7,715.37

10).- ZAPATAS CORRIDAS

120

NO.

UNIDAD

P.U

ML

$ 984.18

ML

$ 1,111.99

85

SUMINISTRO Y ELABORACION DE DADO DE CIMENTACION DE 30 X 30 X 80 CM., CONCRETO F'C=200 KG/CM2., ARMADO CON 6 VARS. DE 1/2" Y ESTRIBOS DEL No. 3 A CADA 15 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

PZA

$ 808.78

86

SUMINISTRO Y ELABORACION DE DADO DE CIMENTACION DE 30 X 30 X 80 CM., CONCRETO F'C=250 KG/CM2., ARMADO CON 6 VARS. DE 1/2" Y ESTRIBOS DEL No. 3 A CADA 15 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

PZA

$ 866.29

87

SUMINISTRO Y ELABORACION DE DADO DE CIMENTACION DE 40 X 40 X 80 CM., CONCRETO F'C=200 KG/CM2., ARMADO CON 6 VARS. DE 1/2" Y ESTRIBOS DEL No. 3 A CADA 15 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

PZA

$ 1,088.74

88

SUMINISTRO Y ELABORACION DE DADO DE CIMENTACION DE 40 X 40 X 80 CM., CONCRETO F'C=250 KG/CM2., ARMADO CON 6 VARS. DE 1/2" Y ESTRIBOS DEL No. 3 A CADA 15 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

PZA

$ 1,190.98

89

SUMINISTRO Y ELABORACION DE DADO DE CIMENTACION DE 50 X 50 X 80 CM., CONCRETO F'C=200 KG/CM2., ARMADO CON 8 VARS. DE 1/2" Y ESTRIBOS DEL No. 3 A CADA 15 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

PZA

$ 1,483.27

90

SUMINISTRO Y ELABORACION DE DADO DE CIMENTACION DE 50 X 50 X 80 CM., CONCRETO F'C=250 KG/CM2., ARMADO CON 8 VARS. DE 1/2" Y ESTRIBOS DEL No. 3 A CADA 15 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

PZA

$ 1,643.04

83

84

CONCEPTO SUMINISTRO Y ELABORACION DE ZAPATA CORRIDA DE CONCRETO F'C=200 KG/CM2. DE 80 CM. DE ANCHO Y 20 CM. DE ALTURA, HABILITADO CON 65 KG. DE ACERO DE 1/2" X M3. DE CONCRETO, INCLUYE: PLANTILLA DE 5 CM. DE ESPESOR CONCRETO F'C=100 KG/CM2., CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO. SUMINISTRO Y ELABORACION DE ZAPATA CORRIDA DE CONCRETO F'C=250 KG/CM2. DE 80 CM. DE ANCHO Y 20 CM. DE ALTURA, HABILITADO CON 65 KG. DE ACERO DE 1/2" X M3. DE CONCRETO, INCLUYE: PLANTILLA DE 5 CM. DE ESPESOR CONCRETO F'C=100 KG/CM2., CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO. 11).- DADOS DE CONCRETO

12).- CADENAS DE DESPLANTE CADENAS ARMADAS CON ARMEX 91

CADENA DE DESPLANTE DE 15 X 20 CM., CONCRETO F'C= 150 KG/CM2., ARMEX 15X20-4, INCLUYE: CIMBRA, DESCIMBRA, ACABADO COMUN, MANO DE OBRA, EQUIPO NECESARIO, MATERIALES, ACARREO A PRIMERA ESTACION A 20.00 M.

ML

$ 269.91

92

CADENA DE DESPLANTE DE 15 X 20 CM., CONCRETO F'C= 200 KG/CM2., ARMEX 15X20-4, INCLUYE: CIMBRA, DESCIMBRA, ACABADO COMUN, MANO DE OBRA, EQUIPO NECESARIO, MATERIALES, ACARREO A PRIMERA ESTACION A 20.00 M.

ML

$ 276.57

93

CADENA DE DESPLANTE DE 15 X 20 CM., CONCRETO F'C= 250 KG/CM2., ARMEX 15X20-4, INCLUYE: CIMBRA, DESCIMBRA, ACABADO COMUN, MANO DE OBRA, EQUIPO NECESARIO, MATERIALES, ACARREO A PRIMERA ESTACION A 20.00 M.

ML

$ 275.62

94

CADENA DE DESPLANTE DE SECCION 15 X 20 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8", ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 326.89

95

CADENA DE DESPLANTE DE SECCION 15 X 20 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8", ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 331.55

96

CADENA DE DESPLANTE DE SECCION 15 X 20 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8" ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 337.21

CADENAS ARMADAS CON VARILLA

121

NO.

CONCEPTO

UNIDAD

P.U

97

CADENA DE DESPLANTE DE SECCION 15 X 25 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8", ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 366.16

98

CADENA DE DESPLANTE DE SECCION 15 X 25 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8", ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 372.55

99

CADENA DE DESPLANTE DE SECCION 15 X 25 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8", ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 379.12

100

CADENA DE DESPLANTE DE SECCION 15 X 30 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8", ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 416.44

101

CADENA DE DESPLANTE DE SECCION 15 X 30 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8", ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 424.50

102

CADENA DE DESPLANTE DE SECCION 15 X 30 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8", ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 432. 78

103

CADENA DE DESPLANTE DE SECCION 20 X 30 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8", ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 476.61

104

CADENA DE DESPLANTE DE SECCION 20 X 30 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8", ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 487.32

105

CADENA DE DESPLANTE DE SECCION 20 X 30 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8", ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 489.38

106

CADENA DE DESPLANTE DE SECCION 30 X 30 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8", ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 538.76

107

CADENA DE DESPLANTE DE SECCION 30 X 30 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8", ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 553.94

108

CADENA DE DESPLANTE DE SECCION 30 X 30 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DE 3/8", ESTRIBOS DE 1/4" @ 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA Y EQUIPO NECESARIO.

ML

$ 569.87

13).- CASTILLOS DE CONCRETO CASTILLOS ARMADOS CON ARMEX 109

CASTILLO DE SECCION 15 X 15 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4" REFORZADA CON ARMEX 15 -15 - 4, INCLUYE: CIMBRA 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 260.45

110

CASTILLO DE SECCION 15 X 15 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4" REFORZADA CON ARMEX 15 -15 - 4, INCLUYE: CIMBRA 4 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 308.02

111

CASTILLO DE SECCION 15 X 15 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4" REFORZADA CON ARMEX 15 -15 - 4, INCLUYE: CIMBRA 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA YEQUIPO NECESARIO.

ML

$ 264.46

122

NO.

CONCEPTO

UNIDAD

P.U

112

CASTILLO DE SECCION 15 X 15 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4" REFORZADA CON ARMEX 15 -15 - 4, INCLUYE: CIMBRA 4 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 312.04

CASTILLOS ARMADOS CON VARILLA

113

CASTILLO DE SECCION 15 X 15 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 306.48

114

CASTILLO DE SECCION 15 X 15 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 4 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 348.15

115

CASTILLO DE SECCION 15 X 15 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 310.56

116

CASTILLO DE SECCION 15 X 15 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 4 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 352.23

117

CASTILLO DE SECCION 15 X 20 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 359.12

118

CASTILLO DE SECCION 15 X 20 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 4 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 406.69

119

CASTILLO DE SECCION 15 X 20 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 364.49

120

CASTILLO DE SECCION 15 X 20 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 4 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 412.06

121

CASTILLO DE SECCION 15 X 25 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 405.03

122

CASTILLO DE SECCION 15 X 25 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 4 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 452.63

123

CASTILLO DE SECCION 15 X 25 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 411.75

124

CASTILLO DE SECCION 15 X 25 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 4 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 459.33

125

CASTILLO DE SECCION 15 X 30 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 474.22

123

NO.

CONCEPTO

UNIDAD

P.U

126

CASTILLO DE SECCION 15 X 30 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM, INCLUYE: CIMBRA COMUN 4 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 521.79

127

CASTILLO DE SECCION 15 X 30 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 463.39

128

CASTILLO DE SECCION 15 X 30 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 4 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 510.95

129

CASTILLO DE SECCION 20 X 20 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 396.91

130

CASTILLO DE SECCION 20 X 20 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 4 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 460.35

131

CASTILLO DE SECCION 20 X 20 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 426.10

132

CASTILLO DE SECCION 20 X 20 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADO CON 4 VARILLAS DEL No. 3 (3/8") Y ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 4 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 489.53

133

CADENA DE CERRAMIENTO DE SECCION 15 X 20 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON ARMEX 15 X 20 - 4, INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 313.76

134

CADENA DE CERRAMIENTO DE SECCION 15 X 20 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON ARMEX 15 X 20 - 4, INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 319.13

135

CADENA DE CERRAMIENTO DE SECCION 15 X 20 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DEL No. 3 (3/8") ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 379.03

136

CADENA DE CERRAMIENTO DE SECCION 15 X 20 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DEL No. 3 (3/8") ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 384.40

137

CADENA DE CERRAMIENTO DE SECCION 20 X 20 CM., CONCRETO F'C=150 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DEL No. 3 (3/8") ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 418.95

138

CADENA DE CERRAMIENTO DE SECCION 20 X 20 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REFORZADA CON 4 VARILLAS DEL No. 3 (3/8") ESTRIBOS DEL No. 2 A CADA 20 CM., INCLUYE: CIMBRA COMUN 2 CARAS, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 426.10

14).- CADENAS DE CERRAMIENTO CADENAS DE CERRAMIENTO ARMADAS CON ARMEX

CADENAS DE CERRAMIENTO ARMADAS CON VARILLA

124

NO.

CONCEPTO

UNIDAD

P.U

15).- LOSAS DE CONCRETO LOSAS ARMADAS CON VARILLA 139

LOSA PLANA EN ESTRUCTURA, PERALTE 10 CM., CIMBRA COMUN REFORZADA CON 60 KG. DE ACERO POR M3., CONCRETO F'C = 200 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 865.02

140

LOSA PLANA EN ESTRUCTURA, PERALTE 10 CM., CIMBRA COMUN REFORZADA CON 60 KG. DE ACERO POR M3., CONCRETO F'C = 250 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 866.25

141

LOSA PLANA EN ESTRUCTURA, PERALTE 12 CM., CIMBRA COMUN REFORZADA CON 72 KG DE ACERO POR M3., CONCRETO F'C = 200 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 964.76

142

LOSA PLANA EN ESTRUCTURA, PERALTE 12 CM., CIMBRA COMUN REFORZADA CON 72 KG DE ACERO POR M3., CONCRETO F'C = 250 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 966.77

143

LOSA PLANA EN ESTRUCTURA, PERALTE 15 CM., CIMBRA COMUN REFORZADA CON 90 KG. DE ACERO POR M3., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 1,114.36

144

LOSA PLANA EN ESTRUCTURA, PERALTE 15 CM., CIMBRA COMUN REFORZADA CON 90 KG. DE ACERO POR M3., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 1,116.21

145

LOSA PLANA EN ESTRUCTURA, PERALTE 20 CM., CIMBRA COMUN REFORZADA CON 60 KG DE ACERO POR M3., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 1,161.58

146

LOSA PLANA EN ESTRUCTURA, PERALTE 20 CM., CIMBRA COMUN REFORZADA CON 60 KG. DE ACERO POR M3., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 1,164.06

147

LOSA PLANA EN ESTRUCTURA, PERALTE 20 CM., CIMBRA COMUN REFORZADA CON 120 KG. DE ACERO POR M3. CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 1,363.68

148

LOSA PLANA EN ESTRUCTURA, PERALTE 20 CM., CIMBRA COMUN REFORZADA CON 120 KG. DE ACERO POR M3. CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 1,366.17

149

LOSA PLANA EN ESTRUCTURA, PERALTE 10 CM., CIMBRA COMUN ARMADA CON MALLA ELECTROSOLDADA 6 -6 / 10 - 10, CONCRETO F'C = 200 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 722.11

150

LOSA PLANA EN ESTRUCTURA, PERALTE 10 CM., CIMBRA COMUN ARMADA CON MALLA ELECTROSOLDADA 6 -6 / 10 - 10, CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 725.38

M2

$ 700.88

152

COLUMNA EN ESTRUCTURA DE SECCION 30 X 30 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", CIMBRA COMÚN, HABILITADA CON 190 KG. DE ACERO DE 5/8" Y 1/2" POR M3., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 13,636.16

153

COLUMNA EN ESTRUCTURA DE SECCION 30 X 30 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", CIMBRA COMÚN, HABILITADA CON 190 KG. DE ACERO DE 5/8" Y 1/2" POR M3., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 13,813.10

LOSAS ARMADAS CON MALLA

LOSA DE VIGUETA Y BOVEDILLA 151

LOSA CONSTRUIDA CON EL SISTEMA DE VIGUETA Y BOVEDILLA DE 20 CM. DE ESPESOR CON CAPA DE COMPRESION DE 5 CM., CONCRETO F'C=200 KG/CM2., ARMADA CON MALLA ELECTROSOLDADA 6X6/10-10, INCLUYE: MANO DE OBRA, MATERIALES, HERRAMIENTA. 16).-COLUMNAS COLUMNAS POR METRO CÚBICO

125

NO.

CONCEPTO

UNIDAD

P.U

154

COLUMNA EN ESTRUCTURA DE SECCION 30 X 30 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", CIMBRA COMÚN, ARMADA CON 4 VARILLAS DEL No. 4 (1/2") Y ESTRIBOS DEL No. 3 (3/8") A CADA 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 929.47

155

COLUMNA EN ESTRUCTURA DE SECCION 30 X 30 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", CIMBRA COMÚN, ARMADA CON 4 VARILLAS DEL No. 4 (1/2") Y ESTRIBOS DEL No. 3 (3/8") A CADA 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 945.86

156

COLUMNA EN ESTRUCTURA DE SECCION 30 X 30 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", CIMBRA COMÚN, ARMADA CON 6 VARILLAS DEL No. 4 (1/2") Y ESTRIBOS DEL No. 3 (3/8") A CADA 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 994.51

157

COLUMNA EN ESTRUCTURA DE SECCION 30 X 30 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", CIMBRA COMÚN, ARMADA CON 6 VARILLAS DEL No. 4 (1/2") Y ESTRIBOS DEL No. 3 (3/8") A CADA 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,010.92

158

COLUMNA EN ESTRUCTURA DE SECCION 40 X 40 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", CIMBRA COMÚN, ARMADA CON 4 VARILLAS DEL No. 8 (1"), 4 VARILLAS DE 1/2" Y ESTRIBOS DEL No. 2 (1/4") A CADA 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,717.55

159

COLUMNA EN ESTRUCTURA DE SECCION 40 X 40 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", CIMBRA COMÚN, ARMADA CON 8 VARILLAS DE 1/2" Y ESTRIBOS DEL No. 2 (1/4") A CADA 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,354.29

160

COLUMNA EN ESTRUCTURA DE SECCION 40 X 40 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", CIMBRA COMÚN, ARMADA CON 6 VARILLAS DEL No. 6 (3/4") Y ESTRIBOS DEL No. 3 (3/8") A CADA 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,600.38

161

COLUMNA EN ESTRUCTURA DE SECCION 40 X 40 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", CIMBRA COMÚN, ARMADA CON 6 VARILLAS DEL No. 6 (3/4") Y ESTRIBOS DEL No. 3 (3/8") A CADA 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,634.37

162

COLUMNA EN ESTRUCTURA DE SECCION 40 X 40 CM., CONCRETO F'C=300 KG/CM2. AGREGADO MAXIMO 3/4", CIMBRA COMÚN, ARMADA CON 6 VARILLAS DEL No. 6 (3/4") Y ESTRIBOS DEL No. 3 (3/8") A CADA 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,622.72

163

COLUMNA EN ESTRUCTURA DE SECCION 40 X 40 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", CIMBRA COMÚN, ARMADA CON 8 VARILLAS DE 1/2" Y ESTRIBOS DEL No. 2 (1/4") A CADA 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,396.11

164

COLUMNA EN ESTRUCTURA DE SECCION 40 X 40 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", CIMBRA COMÚN, ARMADA CON 4 VARILLAS DEL No. 8 ( 1" ), 4 VARILLAS DE 1/2" Y ESTRIBOS DEL No. 2 ( 1/4" ) A CADA 20 CM., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,770.01

165

COLUMNA CIRCULAR EN ESTRUCTURA DE 40 CM. DE DIAMETRO REFORZADA CON 6 VARILLAS DEL 5/8" Y ESTRIBOS DE 3/8" @ 15 CM. DE FORMA HELICOIDAL, CON CONCRETO F'C=250 KG/CM2, INCLUYE: MATERIALES, MANO DE OBRA, CIMBRA Y DESCIMBRA, VIBRADO Y CURADO.

ML

$ 1,126.24

166

COLUMNA CIRCULAR EN ESTRUCTURA DE 55 CM. DE DIAMETRO, REFORZADA CON 8 VARILLAS DE 5/8", 6 VARILLAS DE 1/2" Y ESTRIBOS DE 3/8" @ 15 CM. DE FORMA HELICOIDAL, CONCRETO F'C= 250 KG/CM2 AGREGADO TRITURADO DE 3/4", INCLUYE: MATERIALES, MANO DE OBRA, CIMBRA Y DESCIMBRA, VIBRADO Y CURADO.

ML

$ 2,104.82

COLUMNAS POR METRO LINEAL

126

NO.

CONCEPTO

UNIDAD

P.U

167

TRABE EN ESTRUCTURA DE SECCION 25 X 40 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4" CIMBRA COMUN, HABILITADO CON 140 KG. DE ACERO DE 5/8" Y 1/2" POR M3., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 10,516.59

168

TRABE EN ESTRUCTURA DE SECCION 25 X 40 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4" CIMBRA COMUN, HABILITADO CON 140 KG. DE ACERO DE 5/8" Y 1/2" POR M3., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 10,693.53

169

TRABE EN ESTRUCTURA DE SECCION 40 X 60 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4" CIMBRA COMUN, HABILITADO CON 140 KG. DE ACERO DE 5/8" Y 1/2" POR M3., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 9,344.20

170

TRABE EN ESTRUCTURA DE SECCION 40 X 60 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4" CIMBRA COMUN, HABILITADO CON 140 KG. DE ACERO DE 5/8" Y 1/2" POR M3., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 9,521.16

17).- TRABES TRABES POR METRO CÚBICO

TRABES POR METRO LINEAL

171

TRABE EN ESTRUCTURA DE SECCION 25 X 40 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4" CIMBRA COMUN, HABILITADO CON 140 KG. DE ACERO DE 5/8" Y 1/2" POR M3., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,066.63

172

TRABE EN ESTRUCTURA DE SECCION 25 X 40 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4" CIMBRA COMUN, HABILITADO CON 140 KG. DE ACERO DE 5/8" Y 1/2" POR M3., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,084.33

173

TRABE EN ESTRUCTURA DE SECCION 30 X 50 CM., CONCRETO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4" CIMBRA COMÚN, ARMADA CON 8 VARILLAS DEL No. 4 (1/2") Y ESTRIBOS DEL No. 3 (3/8") A CADA 20 CM., INCLUYE: CIMBRADO Y DESCIMBRADO.

ML

$ 1,237.63

174

TRABE EN ESTRUCTURA DE SECCION 30 X 50 CM., CONCRETO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4" CIMBRA COMÚN, ARMADA CON 8 VARILLAS DEL No. 4 (1/2") Y ESTRIBOS DEL No. 3 (3/8") A CADA 20 CM., INCLUYE: CIMBRADO Y DESCIMBRADO.

ML

$ 1,264.16

175

ESCALONES DE 30 CM. DE HUELLA X 17 CM. DE PERALTE, FORJADOS CON TABIQUE ROJO RECOCIDO, ASENTADO CON MORTERO CEMENTO-CAL-ARENA 1:1:6, INCLUYE: ACARREOS 1a. ESTACION A 20.00 M., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 171.30

176

ESCALONES DE 30 CM. DE HUELLA X 17 CM. DE PERALTE, FORJADOS CON TABIQUE ROJO RECOCIDO, ASENTADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: ACARREOS 1a. ESTACION A 20.00 M., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 171.48

177

ESCALONES DE 25 CM. DE HUELLA X 17 CM. DE PERALTE, FORJADOS CON TABIQUE ROJO RECOCIDO, ASENTADO CON MORTERO CEMENTO-CAL-ARENA 1:1:6, INCLUYE: ACARREOS 1a. ESTACION A 20.00 M., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 167.19

178

ESCALONES DE 25 CM. DE HUELLA X 17 CM. DE PERALTE, FORJADOS CON TABIQUE ROJO RECOCIDO, ASENTADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: ACARREOS 1a. ESTACION A 20.00 M., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 167.32

179

ESCALONES DE 30 CM. DE HUELLA X 17 CM. DE PERALTE, FORJADOS CON CONCRETO F'C=100 KG/CM2., INCLUYE: ACARREOS 1a. ESTACION A 20.00 M., MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 157.43

180

ESCALONES DE 30 CM. DE HUELLA X 17 CM. DE PERALTE, FORJADOS CON CONCRETO F'C=150 KG/CM2., INCLUYE: ACARREOS 1a. ESTACION A 20.00 M., MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 162.91

18).- ESCALONES

127

NO.

CONCEPTO

UNIDAD

P.U

181

REGISTRO DE 0.40 X 0.60 X 1.00 M. MEDIDAS INTERIORES, DE TABIQUE ROJO RECOCIDO EN 14CM. DE ESPESOR, JUNTEADO CON MORTERO CEMENTO-ARENA 1:4, ACABADO PULIDO Y PLANTILLA DE CONCRETO F'C=100 KG/CM2., INCLUYE: MARCO, CONTRAMARCO, TAPA DE CONCRETO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 2,583.03

182

REGISTRO DE 0.40 X 0.60 X 1.00 M. MEDIDAS INTERIORES, DE TABIQUE ROJO RECOCIDO EN 14 CM. DE ESPESOR, JUNTEADO CON MORTERO CEMENTO-ARENA 1:5, ACABADO PULIDO Y PLANTILLA DE CONCRETO F'C=150 KG/CM2., INCLUYE: MARCO, CONTRAMARCO, TAPA DE CONCRETO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 2,556.13

183

REGISTRO DE 0.60 X 0.60 X 1.00 M. MEDIDAS INTERIORES, DE TABIQUE ROJO RECOCIDO EN 14 CM. DE ESPESOR, JUNTEADO CON MORTERO CEMENTO-ARENA 1:4, ACABADO PULIDO Y PLANTILLA DE CONCRETO F'C=100 KG/CM2, INCLUYE: MARCO, CONTRAMARCO, TAPA DE CONCRETO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 2,622.21

184

REGISTRO DE 0.60 X 0.60 X 1.00 M. MEDIDAS INTERIORES DE TABIQUE ROJO RECOCIDO EN 14 CM. DE ESPESOR, JUNTEADO CON MORTERO CEMENTO-ARENA 1:5, ACABADO PULIDO Y PLANTILLA DE CONCRETO F'C=150 KG/CM2, INCLUYE: MARCO, CONTRAMARCO, TAPA DE CONCRETO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 2,590.34

185

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 1.50 M.

PZA

$ 9,934.58

186

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 1.75 M.

PZA

$ 10,739.89

187

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 2.00 M.

PZA

$ 11,646.45

188

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 2.25 M.

PZA

$ 12,421.40

189

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 2.50 M.

PZA

$ 13,082.65

190

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 2.75 M.

PZA

$ 13,867.08

191

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 3.00 M.

PZA

$ 14,649.02

192

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 3.25 M.

PZA

$ 15,435.94

193

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 3.50 M.

PZA

$ 16,345.63

19).- REGISTROS SANITARIOS

20).-POZOS DE VISITA

128

NO.

CONCEPTO

UNIDAD

P.U

194

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 3.75 M.

PZA

$ 17,002.55

195

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 4.00 M.

PZA

$ 17,666.30

196

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 4.25 M.

PZA

$ 18,453.00

197

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 4.50 M.

PZA

$ 19,112.17

198

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 4.75 M.

PZA

$ 20,024.32

199

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 5.00 M.

PZA

$ 21,309.50

200

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 1.50 M.

PZA

$ 7,892.14

201

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 1.75 M.

PZA

$ 8,797.87

202

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 2.00 M.

PZA

$ 9,308.23

203

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 2.25 M.

PZA

$ 10,045.86

204

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 2.50 M.

PZA

$ 10,810.35

205

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 2.75 M.

PZA

$ 11,580.24

206

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 3.00 M.

PZA

$ 12,439.38

207

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M. PROFUNDIDAD RASANTE HIDR. 3.25 M.

PZA

$ 13,118.86

208

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M. PROFUNDIDAD RASANTE HIDR. 3.50 M.

PZA

$ 13,957.86

129

NO.

CONCEPTO

UNIDAD

P.U

209

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 3.75 M.

PZA

$ 14,669.03

210

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 4.00 M.

PZA

$ 15,456.66

211

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 4.25 M.

PZA

$ 16,261.70

212

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 4.50 M.

PZA

$ 16,853.98

PZA

$ 18,000.55

PZA

$ 19,137.22

213

214

POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M. PROFUNDIDAD RASANTE HIDR. 4.75 M. POZO DE VISITA DE MURO DE TABIQUE DE 0.25 M. A TIZON, APLANADO PULIDO, DESPLANTE SOBRE MAMPOSTERIA, ESCALONES, NO INCLUYE: BROCAL Y TAPA DE CONCRETO, DIAMETRO DE 0.60 A 0.90 M. SOBRE TUBO DE 0.30 A 0.45 M., PROFUNDIDAD RASANTE HIDR. 5.00 M.

215

SUMINISTRO Y COLOCACION DE BROCAL Y TAPA DE CONCRETO PARA POZO DE VISITA.

PZA

$ 2,758.36

216

SUMINISTRO Y COLOCACION DE BROCAL Y TAPA DE Fo. Fo. MEDIANO DE 130 KG.

PZA

$ 3,792.46

217

SUMINISTRO Y COLOCACION DE BROCAL Y TAPA DE POLIETILENO (LIGERO).

PZA

$ 2,782.87

218

SUMINISTRO Y COLOCACION DE BROCAL Y TAPA DE POLIETILENO (PESADO).

PZA

$ 3,042.24

21).-FIRMES DE CONCRETO 219

FIRME DE 5 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA RESISTENCIA NORMAL F'C=100 KG/CM2., AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 162.25

220

FIRME DE 8 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA RESISTENCIA NORMAL F'C=100 KG/CM2., AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 232.36

221

FIRME DE 10 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA RESISTENCIA NORMAL F'C=100 KG/CM2., AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 272.11

222

FIRME DE 5 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA RESISTENCIA NORMAL F'C=150 KG/CM2., AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 172.78

223

FIRME DE 8 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA RESISTENCIA NORMAL F'C=150 KG/CM2., AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 249.23

224

FIRME DE 10 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA RESISTENCIA NORMAL F'C=150 KG/CM2., AGREGADO MAXIMO 3/4", INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 293.17

22).- PISOS DE CONCRETO 225

PISO DE 5 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., AGREGADO MAXIMO 3/4", ACABADO PULIDO, INCLUYE: CIMBRADO, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 273.87

226

PISO DE 8 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., AGREGADO MAXIMO 3/4", ACABADO PULIDO, INCLUYE: CIMBRADO, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 343.35

130

NO.

CONCEPTO

UNIDAD

P.U

227

PISO DE 10 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., AGREGADO MAXIMO 3/4", ACABADO PULIDO, INCLUYE: CIMBRADO, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 376.50

228

PISO DE 5 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., AGREGADO MAXIMO 3/4", ACABADO ESCOBILLADO, INCLUYE: CIMBRADO, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 244.24

229

PISO DE 8 CM. DE ESPESOR DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., AGREGADO MAXIMO 3/4", ACABADO ESCOBILLADO, INCLUYE: CIMBRADO, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 305.97

230

PISO DE 10 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., AGREGADO MAXIMO 3/4", ACABADO ESCOBILLADO, INCLUYE: CIMBRADO, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 361.46

231

PISO DE 8.0 CM. DE ESPESOR, DE CONCRETO F'C = 150 KG/CM2., REVENIMIENTO NORMAL, TAMAÑO MÁXIMO AGREGADO DE 19 MM. (3/4"), PULIDO INTEGRAL CON LLANA METÁLICA, INCLUYE: LA PREPARACIÓN DE LA BASE Y CURADO.

M2

$ 298.23

232

PISO DE 10.0 CM. DE ESPESOR, DE CONCRETO F'C = 150 KG/CM2., REVENIMIENTO NORMAL, TAMAÑO MÁXIMO AGREGADO DE 19 MM. (3/4"), PULIDO INTEGRAL CON LLANA METÁLICA, INCLUYE: LA PREPARACIÓN DE LA BASE Y CURADO.

M2

$ 344.22

233

PISO DE 8 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., AGREGADO MAXIMO 3/4", ACABADO PULIDO, REFORZADO CON MALLA ELECTROSOLDADA 6-6/10-10, INCLUYE: CIMBRADO, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 383.66

234

PISO DE 8 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., AGREGADO MAXIMO 3/4", ACABADO ESCOBILLADO, REFORZADO CON MALLA ELECTROSOLDADA 6-6/10-10, INCLUYE: CIMBRADO, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 363.18

235

PISO DE 10 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., AGREGADO MAXIMO 3/4", ACABADO PULIDO, REFORZADO CON MALLA ELECTROSOLDADA 6-6/10-10, INCLUYE: CIMBRADO, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 429.63

236

PISO DE 10 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., AGREGADO MAXIMO 3/4", ACABADO ESCOBILLADO, REFORZADO CON MALLA ELECTROSOLDADA 6-6 /10-10, INCLUYE: CIMBRADO, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 409.17

237

PISO DE 10 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA F'C=200 KG/CM2., AGREGADO MAXIMO 3/4", ACABADO PULIDO, REFORZADO CON MALLA ELECTROSOLDADA 6-6/ 10-10, INCLUYE: CIMBRADO, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 439.67

238

PISO DE 10 CM. DE ESPESOR, DE CONCRETO HECHO EN OBRA F'C=200 KG/CM2., AGREGADO MAXIMO 3/4," ACABADO ESCOBILLADO, REFORZADO CON MALLA ELECTROSOLDADA 6-6/10-10, INCLUYE: CIMBRADO, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 419.19

23).-PISOS DE CONCRETO ARMADOS CON MALLA

24).-FINOS PARA PISO 239

FINO DE MORTERO CEMENTO-ARENA 1:4, DE 2.5 CM. DE ESPESOR, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 117.15

240

FINO DE MORTERO CEMENTO-ARENA 1:5, DE 2.5 CM. DE ESPESOR, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 109.95

241

FINO DE MORTERO CEMENTO-ARENA 1:4, DE 3 CM. DE ESPESOR, ACABADO PULIDO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 142.25

242

FINO DE MORTERO CEMENTO-ARENA 1:5, DE 3 CM. DE ESPESOR, ACABADO PULIDO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 133.38

243

FINO DE MORTERO CEMENTO-ARENA 1:4, DE 5 CM. DE ESPESOR, ACABADO PULIDO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 201.56

244

FINO DE MORTERO CEMENTO-ARENA 1:5, DE 5 CM. DE ESPESOR, ACABADO PULIDO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 186.73

131

NO.

CONCEPTO

UNIDAD

P.U

M2

$ 33.86

25).-ACABADOS SOBRE PISO 245

ACABADO ESCOBILLADO INTEGRAL SOBRE PISO DE CONCRETO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

INCLUYE:

246

ACABADO PULIDO INTEGRAL SOBRE PISO DE CONCRETO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 56.68

247

ACABADO MARTELINADO EN PISOS DE CONCRETO, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 375.72

248

ACABADO ESTAMPADO EN CONCRETO, INCLUYE: MANO DE OBRA, COLOR ENDURECEDOR, DESMOLDANTE, SELLADOR ACRILICO, MANO DE OBRA, Y MOLDE.

M2

$ 146.59

249

SUMINISTRO Y COLOCACION DE PISO INTERCERAMIC DESERT CADIR DE 33 X 33 CM. DE PRIMERA, ASENTADO CON PEGA AZULEJO, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 405.16

250

SUMINISTRO Y COLOCACION DE PISO INTERCERAMIC CREMA MARFIL CLARO DE 40 X 40 CM. DE PRIMERA, ASENTADO CON PEGA AZULEJO, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 429.61

251

SUMINISTRO Y COLOCACION DE PISO INTERCERAMIC DESERT CADIR DE 50 X 50 CM. DE PRIMERA, ASENTADO CON PEGA AZULEJO, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 433.84

252

SUMINISTRO Y COLOCACION DE PISO INTERCERAMIC CREEK STONE TERRACOTA DE 33 X 33 CM. DE PRIMERA, ASENTADO CON PEGA AZULEJO, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 557.00

253

SUMINISTRO Y COLOCACION DE PISO INTERCERAMIC HABITAT CANVAS DE 40 X 40 CM. DE PRIMERA, ASENTADO CON PEGA AZULEJO, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 576.94

254

SUMINISTRO Y COLOCACION DE PISO INTERCERAMIC CREMA MARFIL NATURAL DE 60 X 60 CM. DE PRIMERA, ASENTADO CON PEGA AZULEJO, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 511.13

255

SUMINISTRO Y COLOCACION DE PISO INTERCERAMIC SAND STONE BEIGE DE 40 X 60 CM. DE PRIMERA, ASENTADO CON PEGA AZULEJO, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 497.97

256

SUMINISTRO Y COLOCACION DE PISO FILADELFIA HUESO PORCELANITE DE 20 X 20 CM. ASENTADO CON PEGA AZULEJO, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 401.54

257

SUMINISTRO Y COLOCACION DE PISO INTERCERAMIC DESERT CADIR DE 33 X 33 CM. DE PRIMERA, ASENTADO CON MORTERO CEM-ARENA 1:2, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 392.94

258

SUMINISTRO Y COLOCACION DE PISO INTERCERAMIC CREMA MARFIL CLARO DE 40 X 40 CM. DE PRIMERA, ASENTADO CON MORTERO CEM-ARENA 1:2, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 425.25

259

SUMINISTRO Y COLOCACION DE PISO INTERCERAMIC DESERT CADIR DE 50 X 50 CM. DE PRIMERA, ASENTADO CON MORTERO CEM-ARENA 1:2, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 413.73

26).-RECUBRIMIENTOS CERAMICOS ASENTADOS CON PEGA AZULEJO

27).-RECUBRIMIENTOS CERAMICOS ASENTADOS CON MORTERO CEMENTO-ARENA 1:2

132

NO.

CONCEPTO

UNIDAD

P.U

260

SUMINISTRO Y COLOCACION DE PISO INTERCERAMIC CREEK STONE TERRACOTA DE 33 X 33 CM. DE PRIMERA, ASENTADO CON MORTERO CEM-ARENA 1:2, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 496.73

261

SUMINISTRO Y COLOCACION DE PISO INTERCERAMIC HABITAT CANVAS DE 40 X 40 CM. DE PRIMERA, ASENTADO CON MORTERO CEM-ARENA 1:2, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 569.35

262

SUMINISTRO Y COLOCACION DE PISO INTERCERAMIC CREMA MARFIL NATURAL DE 60 X 60 CM. DE PRIMERA, ASENTADO CON MORTERO CEM-ARENA 1:2, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 502.26

263

SUMINISTRO Y COLOCACION DE PISO INTERCERAMIC SAND STONE BEIGE DE 40 X 60 CM. DE PRIMERA, ASENTADO CON MORTERO CEM-ARENA 1:2, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 488.84

264

SUMINISTRO Y COLOCACION DE PISO FILADELFIA HUESO PORCELANITE DE 20 X 20 CM. ASENTADO CON MORTERO CEM-ARENA 1:2, JUNTEADO CON LECHADA DE CEMENTO BLANCO-AGUA, INCLUYE: RECORTES, MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS.

M2

$ 439.88

265

MURO DE TABIQUE DE BARRO ROJO RECOCIDO DE 6 X 13 X 26 CM. DE 13 CM. DE ESPESOR, ASENTADO CON MORTERO CEMENTO-ARENA 1:4, JUNTAS DE 1.5 CM. CON ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 531.66

266

MURO DE TABIQUE DE BARRO ROJO RECOCIDO DE 6 X 13 X 26 CM. DE 6 CM. DE ESPESOR, ASENTADO CON MORTERO CEMENTO-ARENA 1:4, JUNTAS DE 1.5 CM. CON ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 274.92

267

MURO DE TABIQUE DE BARRO ROJO RECOCIDO DE 6 X 13 X 26 CM. DE 13 CM. DE ESPESOR, ASENTADO CON MORTERO CEMENTO-ARENA 1:5, JUNTAS DE 1.5 CM. CON ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 521.18

268

MURO DE TABIQUE DE BARRO ROJO RECOCIDO DE 6 X 13 X 26 CM. DE 26 CM. DE ESPESOR, ASENTADO CON MORTERO CEMENTO-ARENA 1:5, JUNTAS DE 1.5 CM. CON ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 1,024.85

28).-MUROS DE TABIQUE

29).-MUROS DE BLOCK 269

MURO DE BLOCK DE 12 X 20 X 40 CM. EN 12 CM. DE ESPESOR ASENTADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 276.25

270

MURO DE BLOCK DE 12 X 20 X 40 CM. EN 12 CM. DE ESPESOR ASENTADO CON MORTERO CEMENTO-ARENA 1:5, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 273.08

M2

$ 403.57

30).-TEJA 271

SUMINISTRO Y COLOCACION DE TEJA DE BARRO ASENTADA CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO. 31).-PRETILES

272

PRETIL DE TABIQUE ROJO 14 CM. DE ESPESOR, ACABADO COMUN, ASENTADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: ACARREO A 1A. ESTACION 20.00 M., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 373.41

273

PRETIL DE TABIQUE ROJO 14 CM. DE ESPESOR, ACABADO COMUN, ASENTADO CON MORTERO CEMENTO-ARENA 1:5, INCLUYE: ACARREO A 1A. ESTACION 20.00 M., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 363.72

133

NO.

CONCEPTO

UNIDAD

P.U

32).- APLANADO COMÚN EN MUROS 274

APLANADO COMUN EN MUROS A PLOMO Y REGLA CON MORTERO CEMENTO-ARENA 1:2, ESPESOR PROMEDIO 2 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

165.96

275

APLANADO COMUN EN MUROS A PLOMO Y REGLA CON MORTERO CEMENTO-ARENA 1:3, ESPESOR PROMEDIO 2 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO

M2

$ 155.80

276

APLANADO COMUN EN MUROS A PLOMO Y REGLA CON MORTERO CEMENTO-ARENA 1:4, ESPESOR PROMEDIO 2 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 148.20

277

APLANADO COMUN EN MUROS A PLOMO Y REGLA CON MORTERO CEMENTO-ARENA 1:5, ESPESOR PROMEDIO 2 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 141.28

278

APLANADO COMUN EN MUROS A PLOMO Y REGLA CON MORTERO CEMENTO-ARENA 1:6 ESPESOR PROMEDIO 2 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 136.11

279

APLANADO COMUN EN MUROS A PLOMO Y REGLA CON MORTERO CEMENTOCALHIDRA-ARENA 1:1:6, ESPESOR PROMEDIO 2 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 147.77

280

APLANADO COMUN EN MUROS A PLOMO Y REGLA CON MORTERO CEMENTOCALHIDRA-ARENA 1:1:8, ESPESOR PROMEDIO 2 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 130.72

281

APLANADO COMUN EN PLAFONES A REGLA Y NIVEL CON MORTERO CEMENTOARENA 1:2, ESPESOR PROMEDIO 2 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 175.85

282

APLANADO COMUN EN PLAFONES A REGLA Y NIVEL CON MORTERO CEMENTOARENA 1:3, ESPESOR PROMEDIO 2 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 165.67

283

APLANADO COMUN EN PLAFONES A REGLA Y NIVEL CON MORTERO CEMENTOARENA 1:4, ESPESOR PROMEDIO 2 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 158.07

284

APLANADO COMUN EN PLAFONES A REGLA Y NIVEL CON MORTERO CEMENTOARENA 1:5, ESPESOR PROMEDIO 2 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 151.15

285

APLANADO COMUN EN PLAFONES A REGLA Y NIVEL CON MORTERO CEMENTOARENA 1:6, ESPESOR PROMEDIO 2 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 146.00

286

APLANADO COMUN EN PLAFONES A REGLA Y NIVEL CON MORTERO CEMENTOCALHIDRA-ARENA 1:1:6, ESPESOR PROMEDIO 2 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 157.66

287

APLANADO COMUN EN PLAFONES A REGLA Y NIVEL CON MORTERO CEMENTOCALHIDRA-ARENA 1:1:8, ESPESOR PROMEDIO 2 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 140.61

33).-APLANADO COMÚN EN PLAFONES

34).-APLANADO FINO EN MUROS 288

APLANADO FINO EN MUROS A PLOMO Y REGLA CON MORTERO CEMENTO-ARENA 1:2, ESPESOR PROMEDIO 2.5 CM., INCLUYE: ACABADO PULIDO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 225.29

289

APLANADO FINO EN MUROS A PLOMO Y REGLA CON MORTERO CEMENTO-ARENA 1:3, ESPESOR PROMEDIO 2.5 CM., INCLUYE: ACABADO PULIDO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 212.69

290

APLANADO FINO EN MUROS A PLOMO Y REGLA CON MORTERO CEMENTO-ARENA 1:4, ESPESOR PROMEDIO 2.5 CM., INCLUYE: ACABADO PULIDO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 203.26

134

NO.

CONCEPTO

UNIDAD

P.U

291

APLANADO FINO EN MUROS A PLOMO Y REGLA CON MORTERO CEMENTO-ARENA 1:5, ESPESOR PROMEDIO 2.5 CM., INCLUYE: ACABADO PULIDO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 194.67

292

APLANADO FINO EN MUROS A PLOMO Y REGLA CON MORTERO CEMENTO-ARENA 1:6, ESPESOR PROMEDIO 2.5 CM., INCLUYE: ACABADO PULIDO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 188.28

293

APLANADO FINO EN MUROS A PLOMO Y MUROS CON MORTERO CEMENTOCALHIDRA-ARENA 1:1:6, ESPESOR PROMEDIO 2.5 CM., INCLUYE: ACABADO PULIDO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 202.74

294

APLANADO FINO EN MUROS A PLOMO Y MUROS CON MORTERO CEMENTOCALHIDRA-ARENA 1:1:8, ESPESOR PROMEDIO 2.5 CM., INCLUYE: ACABADO PULIDO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 181.60

295

APLANADO FINO EN PLAFONES A REGLA Y NIVEL CON MORTERO CEMENTO-ARENA 1:2, ESPESOR PROMEDIO 2.5 CM., INCLUYE: ACABADO PULIDO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 246.07

296

APLANADO FINO EN PLAFONES A REGLA Y NIVEL CON MORTERO CEMENTO-ARENA 1:3, ESPESOR PROMEDIO 2.5 CM., INCLUYE: ACABADO PULIDO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 233.46

297

APLANADO FINO EN PLAFONES A REGLA Y NIVEL CON MORTERO CEMENTO-ARENA 1:4, ESPESOR PROMEDIO 2.5 CM., INCLUYE: ACABADO PULIDO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 224.04

298

APLANADO FINO EN PLAFONES A REGLA Y NIVEL CON MORTERO CEMENTO-ARENA 1:5, ESPESOR PROMEDIO 2.5 CM., INCLUYE: ACABADO PULIDO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 215.45

299

APLANADO FINO EN PLAFONES A REGLA Y NIVEL CON MORTERO CEMENTO-ARENA 1:6, ESPESOR PROMEDIO 2.5 CM., INCLUYE: ACABADO PULIDO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 209.08

300

APLANADO FINO EN PLAFONES A REGLA Y NIVEL CON MORTERO CEMENTOCALHIDRA-ARENA 1:1:6, ESPESOR PROMEDIO 2.5 CM., INCLUYE: ACABADO PULIDO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 223.52

301

APLANADO FINO EN PLAFONES A REGLA Y NIVEL CON MORTERO CEMENTOCALHIDRA-ARENA 1:1:8, ESPESOR PROMEDIO 2.5 CM., INCLUYE: ACABADO PULIDO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 202.38

35).-APLANADO FINO EN PLAFONES

36).-EMBOQUILLADO COMÚN 302

EMBOQUILLADO APLANADO UNA ARISTA CON MORTERO CEMENTO-ARENA 1:2, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 99.81

303

EMBOQUILLADO APLANADO UNA ARISTA CON MORTERO CEMENTO-ARENA 1:3, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 99.19

304

EMBOQUILLADO APLANADO UNA ARISTA CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 98.73

305

EMBOQUILLADO APLANADO UNA ARISTA CON MORTERO CEMENTO-ARENA 1:5, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 98.33

306

EMBOQUILLADO APLANADO UNA ARISTA CON MORTERO CEMENTO-ARENA 1:6, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 98.01

307

EMBOQUILLADO PERFILADO UNA ARISTA CON MORTERO CEMENTO-CALHIDRAARENA 1:1:6, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 98.71

308

EMBOQUILLADO PERFILADO UNA ARISTA CON MORTERO CEMENTO-CALHIDRAARENA 1:1:8, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 97.69

135

NO.

CONCEPTO

UNIDAD

P.U

37).- HABILITADO DE ACERO EN CIMENTACIÓN 309

ACERO DE REFUERZO EN CIMENTACION DEL No. 2 (1/4") ALAMBRON, INCLUYE: HABILITADO, ARMADO, GANCHOS, TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

TON

$ 38,404.62

310

ACERO DE REFUERZO EN CIMENTACION DEL No. 3 (3/8"), INCLUYE: HABILITADO, ARMADO, GANCHOS, TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

TON

$ 32,349.25

311

ACERO DE REFUERZO EN CIMENTACION DEL No. 4 (1/2"), INCLUYE: HABILITADO, ARMADO, GANCHOS, TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

TON

$ 31,733.56

312

ACERO DE REFUERZO EN CIMENTACION DEL No. 5 (5/8"), INCLUYE: HABILITADO, ARMADO, GANCHOS, TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

TON

$ 31,057.43

313

ACERO DE REFUERZO EN CIMENTACION DEL No. 6 (3/4"), INCLUYE: HABILITADO, ARMADO, GANCHOS, TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

TON

$ 30,825.03

314

ACERO DE REFUERZO EN CIMENTACION DEL No. 8 (1"), INCLUYE: HABILITADO, ARMADO, GANCHOS, TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

TON

$ 30,138.16

EN ESTRUCTURA 315

ACERO DE REFUERZO EN ESTRUCTURA DEL No. 2 (1/4") ALAMBRON, INCLUYE: HABILITADO, ARMADO, GANCHOS, TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

TON

$ 40,651.82

316

ACERO DE REFUERZO EN ESTRUCTURA DEL No. 3 (3/8"), INCLUYE: HABILITADO, ARMADO, GANCHOS, TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

TON

$ 34,051.90

317

ACERO DE REFUERZO EN ESTRUCTURA DEL No. 4 (1/2"), INCLUYE: HABILITADO, ARMADO, GANCHOS, TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

TON

$ 33,063.27

318

ACERO DE REFUERZO EN ESTRUCTURA DEL No. 5 (5/8"), INCLUYE: HABILITADO, ARMADO, GANCHOS, TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

TON

$ 32,372.87

319

ACERO DE REFUERZO EN ESTRUCTURA DEL No. 6 (3/4"), INCLUYE: HABILITADO, ARMADO, GANCHOS, TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

TON

$ 32,050.82

320

ACERO DE REFUERZO EN ESTRUCTURA DEL No. 8 (1"), INCLUYE: HABILITADO, ARMADO, GANCHOS, TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

TON

$ 31,175.33

321

SUMINISTRO Y COLOCACION DE MALLA DE ACERO ELECTROSOLDADA 6 X 6 - 4 / 4 EN LOSAS, PISOS, FIRMES DE CIMENTACION, PLANTA BAJA, INCLUYE: TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 94.22

322

SUMINISTRO Y COLOCACION DE MALLA DE ACERO ELECTROSOLDADA 6 X 6 - 6 / 6 EN LOSAS, PISOS, FIRMES DE CIMENTACION, PLANTA BAJA, INCLUYE: TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 73.50

323

SUMINISTRO Y COLOCACION DE MALLA DE ACERO ELECTROSOLDADA 6 X 6 - 10 / 10 EN LOSAS, PISOS, FIRMES DE CIMENTACION, PLANTA BAJA, INCLUYE: TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 59.20

324

SUMINISTRO Y COLOCACION DE MALLA DE ACERO ELECTROSOLDADA 6 X 6 - 4 / 4 EN MUROS DE CIMENTACION Y PLANTA BAJA, INCLUYE: TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 116.59

38).-HABILITADO DE MALLAS ELECTROSOLDADAS

136

NO.

CONCEPTO

UNIDAD

P.U

325

SUMINISTRO Y COLOCACION DE MALLA DE ACERO ELECTROSOLDADA 6 X 6 - 6 / 6 EN MUROS DE CIMENTACION Y PLANTA BAJA, INCLUYE: TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 92.64

326

SUMINISTRO Y COLOCACION DE MALLA DE ACERO ELECTROSOLDADA 6 X 6 - 10 /10 EN MUROS DE CIMENTACION Y PLANTA BAJA, INCLUYE: TRASLAPES, DESPERDICIOS, ACARREO A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 75.54

327

SUMINISTRO Y COLOCACION DE MALLA DE ACERO ELECTROSOLDADA 6 X 6 - 4 / 4 EN CUBIERTAS DE LOSAS DE CONCRETO, INCLUYE: TRASLAPES, DESPERDICIOS, ACARREO A 1A ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO

M2

$ 106.90

328

SUMINISTRO Y COLOCACION DE MALLA DE ACERO ELECTROSOLDADA 6 X 6 - 6 / 6 EN CUBIERTAS DE LOSAS DE CONCRETO, INCLUYE: TRASLAPES, DESPERDICIOS, ACARREO A 1A ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO

M2

$ 88.17

329

SUMINISTRO Y COLOCACION DE MALLA DE ACERO ELECTROSOLDADA 6 X 6 - 10 / 10 EN CUBIERTAS DE LOSAS DE CONCRETO, INCLUYE: TRASLAPES, DESPERDICIOS, ACARREO A 1A ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO

M2

$ 74.71

39).-CIMBRAS EN TANQUE ELEVADO 330

CIMBRA EN FRONTERAS EN LOSA DE CIMENTACION DE 0.30 M. DE ALTO Y 0.35 M. DE ESPESOR, ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 197.05

331

CIMBRA COMUN EN CONTRATRABES DE CIMENTACION DE 0.35 M. DE BASE X 0.95 M. DE ALTURA (LA ALTURA INCLUYE 0.30 M. DE ESPESOR DE LOSA CIMENTACION), POR AMBAS CARAS, ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 250.13

332

CIMBRA COMUN EN CONTRATRABES DE CIMENTACION DE 0.20 M. DE BASE X 0.50 M. DE ALTURA, POR AMBAS CARAS, ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 222.15

333

CIMBRA COMUN EN COLUMNAS DE ESTRUCTURA DE ANCHO VARIABLE, SIENDO 1.25 M. EL ANCHO PROMEDIO Y UN ESPESOR DE 0.30 M., HASTA UNA ALTURA DE 2.50 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 611.40

334

CIMBRA COMUN EN COLUMNAS DE ESTRUCTURA DE ANCHO VARIABLE, SIENDO 1.25 M. EL ANCHO PROMEDIO Y UN ESPESOR DE 0.30 M., A UNA ALTURA DE 2.50 M. A 5.00 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 648.67

335

CIMBRA COMUN EN COLUMNAS DE ESTRUCTURA DE ANCHO VARIABLE, SIENDO 1.25 M. EL ANCHO PROMEDIO Y UN ESPESOR DE 0.30 M., A UNA ALTURA DE 5.00 M. A 7.50 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 674.91

336

CIMBRA COMUN EN COLUMNAS DE ESTRUCTURA DE ANCHO VARIABLE, SIENDO 1.25 M. EL ANCHO PROMEDIO Y UN ESPESOR DE 0.30 M., A UNA ALTURA DE 7.50 M. A 10.00 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 718.39

337

CIMBRA COMUN EN COLUMNAS DE ESTRUCTURA DE ANCHO VARIABLE, SIENDO 1.25 M. EL ANCHO PROMEDIO Y UN ESPESOR DE 0.30 M., A UNA ALTURA DE 10.00 M. A 12.50 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 781.75

338

CIMBRA COMUN EN COLUMNAS DE ESTRUCTURA DE ANCHO VARIABLE, SIENDO 1.25 M. EL ANCHO PROMEDIO Y UN ESPESOR DE 0.30 M., A UNA ALTURA DE 12.50 M. A 15.00 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 881.56

137

NO.

CONCEPTO

UNIDAD

P.U

339

CIMBRA COMUN EN TRABE DE ESTRUCTURA DE 0.25 M. DE ANCHO Y 0.35 M. DE ALTO, HASTA UNA ALTURA DE 2.50 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 274.10

340

CIMBRA COMUN EN TRABE DE ESTRUCTURA DE 0.25 M. DE ANCHO Y 0.35 M. DE ALTO, A UNA ALTURA DE 2.50 M. A 5.00 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 287.97

341

CIMBRA COMUN EN TRABE DE ESTRUCTURA DE 0.25 M. DE ANCHO Y 0.35 M. DE ALTO, A UNA ALTURA DE 5.00 M. A 7.50 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 296.66

342

CIMBRA COMUN EN TRABE DE ESTRUCTURA DE 0.25 M. DE ANCHO Y 0.35 M. DE ALTO, A UNA ALTURA DE 7.50 M. A 10.00 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 307.75

343

CIMBRA COMUN EN TRABE DE ESTRUCTURA DE 0.25 M. DE ANCHO Y 0.35 M. DE ALTO, A UNA ALTURA DE 10.00 M. A 12.50 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 319.18

344

CIMBRA COMUN EN TRABE DE ESTRUCTURA DE 0.25 M. DE ANCHO Y 0.35 M. DE ALTO, A UNA ALTURA DE 12.50 M. A 15.00 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 332.92

345

CIMBRA COMUN EN TRABE DE ESTRUCTURA DE 0.25 M. DE ANCHO Y 0.55 M. DE ALTO, A UNA ALTURA DE 12.50 M. A 15.00 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 323.02

346

CIMBRA COMUN EN MENSULA DE 0.80 M. DE LARGO X 0.90 M. DE ALTURA Y 0.25 M. DE ESPESOR, A UNA ALTURA DE 12.50 M. A 15.00 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 248.25

347

CIMBRA COMUN EN LOSA DE ESTRUCTURA DE 0.25 M. DE ESPESOR, A UNA ALTURA MAXIMA DE 15.00 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 405.87

348

CIMBRA COMUN EN MURO DE ESTRUCTURA DE 0.29 M. DE ESPESOR Y ALTURA DE 1.90 M., A UNA ALTURA MAXIMA DE 15.00 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: AMBAS CARAS DE CIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 482.08

349

CIMBRA COMUN EN LOSA DE ESTRUCTURA DE 0.15 M. DE ESPESOR, A UNA ALTURA MAXIMA DE 17.30 M., ELABORADA CON MADERA DE PINO DE 3A., ACABADO COMUN, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 405.81

40).-CIMBRAS 350

CIMBRA COMUN EN COLUMNAS HASTA 3.50 M. DE ALTURA, INCLUYE: MATERIALES Y MANO DE OBRA.

M2

$ 311.52

351

CIMBRA APARENTE EN COLUMNAS 30 X 30 CM. CON TRIPLAY HASTA 3.50 M. DE ALTURA, INCLUYE: MATERIALES Y MANO DE OBRA.

M2

$ 349.15

352

CIMBRA COMUN EN ZAPATAS DE CIMENTACION INCLUYE: MATERIALES Y MANO DE OBRA.

M2

$ 270.11

353

CIMBRA COMUN EN CONTRATRABES, MATERIALES Y MANO DE OBRA.

M2

$ 307.43

354

CIMBRA COMUN EN DALAS, CASTILLOS, CERRAMIENTOS, CEJAS, REPISONES DE SECCION IGUAL O MENOR A 0.020 M2. INCLUYE: MATERIALES Y MANO DE OBRA.

M2

$ 132.91

355

CIMBRA APARENTE EN DALAS, CASTILLOS, CERRAMIENTOS, CEJAS, REPISONES DE SECCION IGUAL O MENOR A 0.020 M2. INCLUYE: MATERIALES Y MANO DE OBRA.

M2

$ 263.73

DADOS

138

DE

CIMENTACION,

INCLUYE:

NO.

CONCEPTO

UNIDAD

P.U

356

CIMBRA COMUN EN CADENAS, CASTILLOS, CEJAS, REPISONES DE SECCION MAYOR A 0.020 M2. INCLUYE: MATERIALES Y MANO DE OBRA.

M2

$ 158.58

357

CIMBRA APARENTE EN CADENAS, CASTILLOS, CEJAS, REPISONES DE SECCION MAYOR A 0.020 M2. INCLUYE: MATERIALES Y MANO DE OBRA.

M2

$ 298.51

358

CIMBRA COMUN EN TRABES 25 X 40 CM. CON DUELA HASTA 3.50 M. DE ALTURA, INCLUYE: MATERIALES Y MANO DE OBRA.

M2

$ 323.11

359

CIMBRA APARENTE EN TRABES DE 25 X 40 CM., HASTA 3.50 M. DE ALTURA INCLUYE: MATERIALES Y MANO DE OBRA.

M2

$ 345.46

360

CIMBRA COMUN EN LOSAS HASTA 3.50 M. DE ALTURA INCLUYE: MATERIALES Y MANO DE OBRA.

M2

$ 316.79

361

CIMBRA APARENTE EN LOSAS HASTA 3.50 M. DE ALTURA INCLUYE: MATERIALES Y MANO DE OBRA.

M2

$ 388.60

41).-EMPEDRADOS 362

EMPEDRADO DE PIEDRA BRAZA, ACABADO RUSTICO, COLOCADA CON MORTERO CEMENTO-ARENA 1:4 Y CONCRETO HECHO EN OBRA F'C=150 KG/CM2, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 457.95

363

EMPEDRADO DE PIEDRA BRAZA, ACABADO RUSTICO, COLOCADA CON MORTERO CEMENTO-ARENA 1:5 Y CONCRETO HECHO EN OBRA F'C=150 KG/CM2, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 444.62

364

EMPEDRADO DE PIEDRA BRAZA, ACABADO RUSTICO, COLOCADA CON MORTERO CEMENTO-ARENA 1:4 Y CONCRETO HECHO EN OBRA F'C=200 KG/CM2, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 468.69

365

EMPEDRADO DE PIEDRA BRAZA, ACABADO RUSTICO, COLOCADA CON MORTERO CEMENTO-ARENA 1:5 Y CONCRETO HECHO EN OBRA F'C=200 KG/CM2, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 455.41

366

CIMIENTOS DE MAMPOSTERIA DE PIEDRA BRAZA ASENTADA CON MORTERO CEMENTO-CALHIDRA-ARENA1:1:6, INCLUYE: ACARREOS A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,666.86

367

CIMIENTOS DE MAMPOSTERIA DE PIEDRA BRAZA ASENTADA CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: ACARREOS A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,672.04

368

CIMIENTOS DE MAMPOSTERIA DE PIEDRA BRAZA ASENTADA CON MORTERO CEMENTO-ARENA 1:5, INCLUYE: ACARREOS A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,586.27

369

CONSTRUCCION DE CIMENTACION DE PIEDRA BOLA DE RIO ASENTADA CON MORTERO CEMENTO-CAL-ARENA 1:1:8, INCLUYE: ACARREOS A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,768.93

370

CONSTRUCCION DE CIMENTACION DE PIEDRA BOLA DE RIO ASENTADA CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: ACARREOS A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 2,059.99

371

CONSTRUCCION DE CIMENTACION DE PIEDRA BOLA DE RIO ASENTADA CON MORTERO CEMENTO-ARENA 1:5, INCLUYE: ACARREOS A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,932.98

372

MURO DE MAMPOSTERIA DE PIEDRA BRAZA DE BANCO, CARAS ROSTREADAS HASTA UNA ALTURA DE 4.80 M. Y UN ESPESOR MENOR 0.60 M., ASENTADA CON MORTERO CEMENTO-ARENA1:4, INCLUYE: ELABORACION DEL MORTERO Y ACARREO EN CARRETILLA DEL MATERIAL A 1A. ESTACION A 20.00 M. DE DISTANCIA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 2,024.18

373

MURO DE MAMPOSTERIA DE PIEDRA BRAZA DE BANCO, CARAS ROSTREADAS HASTA UNA ALTURA DE 4.80 M. Y UN ESPESOR MENOR 0.60 M., ASENTADA CON MORTERO CEMENTO-ARENA 1:5, INCLUYE: ELABORACION DEL MORTERO Y ACARREO EN CARRETILLA DEL MATERIAL A 1A. ESTACION A 20.00 M. DE DISTANCIA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 2,007.61

42).-CIMIENTOS DE PIEDRA

43).-MUROS DE CONTENCIÓN

139

NO.

CONCEPTO

UNIDAD

P.U

374

MURO DE MAMPOSTERIA DE PIEDRA BRAZA DE BANCO, CARAS ROSTREADAS HASTA UNA ALTURA DE 4.80 M. Y UN ESPESOR DE 0.61 A 1.00 M., ASENTADA CON MORTERO CEMENTO-ARENA1:4, INCLUYE: ELABORACION DEL MORTERO Y ACARREO EN CARRETILLA DEL MATERIAL A 1A. ESTACION A 20.00 M. DE DISTANCIA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 2,120.36

375

MURO DE MAMPOSTERIA DE PIEDRA BRAZA DE BANCO, CARAS ROSTREADAS HASTA UNA ALTURA DE 4.80 M. Y UN ESPESOR DE 0.61 A 1.00 M., ASENTADA CON MORTERO CEMENTO-ARENA 1:5, INCLUYE: ELABORACION DEL MORTERO Y ACARREO EN CARRETILLA DEL MATERIAL A 1A. ESTACION A 20.00 M. DE DISTANCIA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,950.49

376

MURO DE MAMPOSTERIA DE PIEDRA BRAZA DE BANCO, CARAS ROSTREADAS HASTA UNA ALTURA DE 3.60 M. Y UN ESPESOR MENOR DE 0.60 M., ASENTADA CON MORTERO CEMENTO-ARENA1:4, INCLUYE: ELABORACION DEL MORTERO Y ACARREO EN CARRETILLA DEL MATERIAL A 1A. ESTACION A 20.00 M. DE DISTANCIA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,938.27

377

MURO DE MAMPOSTERIA DE PIEDRA BRAZA DE BANCO, CARAS ROSTREADAS HASTA UNA ALTURA DE 3.60 M. Y UN ESPESOR MENOR DE 0.60 M., ASENTADA CON MORTERO CEMENTO-ARENA1:5, INCLUYE: ELABORACION DEL MORTERO Y ACARREO EN CARRETILLA DEL MATERIAL A 1A. ESTACION A 20.00 M. DE DISTANCIA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,848.45

378

MURO DE MAMPOSTERIA DE PIEDRA BRAZA DE BANCO, CARAS ROSTREADAS HASTA UNA ALTURA DE 3.60 M. Y UN ESPESOR DE 0.61 A 1.00 M., ASENTADA CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: ELABORACION DEL MORTERO Y ACARREO EN CARRETILLA DEL MATERIAL A 1A. ESTACION A 20.00 M. DE DISTANCIA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,909.94

379

MURO DE MAMPOSTERIA DE PIEDRA BRAZA DE BANCO, CARAS ROSTREADAS HASTA UNA ALTURA DE 3.60 M. Y UN ESPESOR DE 0.61 A 1.00 M., ASENTADA CON MORTERO CEMENTO-ARENA 1:5, INCLUYE: ELABORACION DEL MORTERO Y ACARREO EN CARRETILLA DEL MATERIAL A 1A. ESTACION A 20.00 M. DE DISTANCIA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,793.45

44).-MUROS DE CONCRETO 380

MURO DE CONCRETO ARMADO DE 15 CM. DE ESPESOR, CONCRETO F'C=200 KG/CM2. HABILITADO CON 75 KG. DE ACERO DE 3/8" Y 41 KG. DE ACERO DE 1/4", INCLUYE: CIMBRA COMUN, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 1,366.55

381

MURO DE CONCRETO ARMADO DE 15 CM. DE ESPESOR, CONCRETO F'C=250 KG/CM2. HABILITADO CON 75 KG. DE ACERO DE 3/8" Y 41 KG. DE ACERO DE 1/4", INCLUYE: CIMBRA COMUN, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 1,400.88

382

MURO DE CONCRETO ARMADO DE 20 CM. DE ESPESOR, CONCRETO F'C=200 KG/CM2. HABILITADO CON 85 KG. DE ACERO DE 1/2" Y 41 KG. DE ACERO DE 1/4", INCLUYE: CIMBRA COMUN, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 1,562.46

383

MURO DE CONCRETO ARMADO DE 20 CM. DE ESPESOR, CONCRETO F'C=250 KG/CM2. HABILITADO CON 85 KG. DE ACERO DE 1/2" Y 41 KG. DE ACERO DE 1/4", INCLUYE: CIMBRA COMUN, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 1,642.84

384

MURO DE CONCRETO ARMADO CONCRETO F'C=200 KG/CM2. HABILITADO CON 126 KG. DE ACERO, INCLUYE: CIMBRA COMUN, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 7,951.14

385

MURO DE CONCRETO ARMADO CONCRETO F'C=250 KG/CM2. HABILITADO CON 126 KG. DE ACERO, INCLUYE: CIMBRA COMUN, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 8,351.19

M3

$ 1,677.60

45).-CONCRETO CICLÓPEO 386

CONCRETO CICLOPEO (60 - 40) CON PIEDRA BRAZA LIMPIA Y CONCRETO HECHO EN OBRA F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: ACARREOS A 1A ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO. 140

NO.

CONCEPTO

UNIDAD

P.U

387

CONCRETO CICLOPEO (60 - 40) CON PIEDRA BRAZA LIMPIA Y CONCRETO HECHO EN OBRA F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: ACARREOS A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,783.85

388

CONCRETO CICLOPEO (60 - 40) CON PIEDRA BRAZA LIMPIA Y CONCRETO PREMEZCLADO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: ACARREOS A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,666.94

389

CONCRETO CICLOPEO (60 - 40) CON PIEDRA BRAZA LIMPIA Y CONCRETO PREMEZCLADO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", INCLUYE: ACARREOS A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,755.25

46).-CONCRETOS HECHOS EN OBRA 390

CONCRETO F'C= 100 KG/CM2., RESISTENCIA NORMAL, AGREGADO MAX. 3/4", FABRICADO EN OBRA CON REVOLVEDORA, INCLUYE ACARREOS A 1A. ESTACION A 20.00 M.

M3

$ 1,726.75

391

CONCRETO F'C= 150 KG/CM2., RESISTENCIA NORMAL, AGREGADO MAX. 3/4", FABRICADO EN OBRA CON REVOLVEDORA, INCLUYE ACARREOS A 1A. ESTACION A 20.00 M.

M3

$ 1,927.40

392

CONCRETO F'C= 200 KG/CM2., RESISTENCIA NORMAL, AGREGADO MAX. 3/4", FABRICADO EN OBRA CON REVOLVEDORA, INCLUYE ACARREOS A 1A. ESTACION A 20.00 M.

M3

$ 2,087.94

393

CONCRETO F'C= 250 KG/CM2., RESISTENCIA NORMAL, AGREGADO MAX. 3/4", FABRICADO EN OBRA CON REVOLVEDORA, INCLUYE ACARREOS A 1A. ESTACION A 20.00 M.

M3

$ 2,256.45

394

CONCRETO F'C= 300 KG/CM2., RESISTENCIA NORMAL, AGREGADO MAX. 3/4", FABRICADO EN OBRA CON REVOLVEDORA, INCLUYE ACARREOS A 1A. ESTACION A 20.00 M.

M3

$ 2,384.90

47).-ELABORACIÓN Y VACIADO DE CONCRETO HECHO EN OBRA EN CIMENTACIONES 395

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=100 KG/CM2. HECHO EN OBRA EN CIMENTACION, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,254.54

396

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=150 KG/CM2. HECHO EN OBRA EN CIMENTACION, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,465.23

397

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=200 KG/CM2. HECHO EN OBRA EN CIMENTACION, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,633.80

398

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=250 KG/CM2. HECHO EN OBRA EN CIMENTACION, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,810.73

399

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=300 KG/CM2. HECHO EN OBRA EN CIMENTACION, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,945.59

48).-ELABORACIÓN Y VACIADO DE CONCRETO HECHO EN OBRA EN ESTRUCTURAS EN COLUMNAS 400

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=150 KG/CM2. HECHO EN OBRA EN COLUMNAS PLANTA BAJA, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,580.61

401

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=200 KG/CM2. HECHO EN OBRA EN COLUMNAS PLANTA BAJA, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,749.20

402

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=250 KG/CM2. HECHO EN OBRA EN COLUMNAS PLANTA BAJA, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,926.13

403

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=300 KG/CM2. HECHO EN OBRA EN COLUMNAS PLANTA BAJA, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 3,060.98

141

NO.

CONCEPTO

UNIDAD

P.U

EN TRABES 404

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=200 KG/CM2. HECHO EN OBRA EN TRABES, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,639.47

405

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=250 KG/CM2. HECHO EN OBRA EN TRABES, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,816.41

406

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=300 KG/CM2. HECHO EN OBRA EN TRABES, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,951.27

EN LOSAS 407

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=150 KG/CM2. HECHO EN OBRA EN LOSAS PLANAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,575.13

408

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=200 KG/CM2. HECHO EN OBRA EN LOSAS PLANAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,743.71

409

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=250 KG/CM2. HECHO EN OBRA EN LOSAS PLANAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 2,920.64

410

ELABORACION Y VACIADO CON CARRETILLA Y BOTES DE CONCRETO F'C=300 KG/CM2. HECHO EN OBRA EN LOSAS PLANAS, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTAS Y ACARREOS A 1A. ESTACION A 20 M.

M3

$ 3,055.50

49).-CONCRETOS PREMEZCLADOS 411

CONCRETO PREMEZCLADO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REVENIMIENTO DE 10 CM., VACIADO CON CARRETILLA Y BOTES EN CIMENTACION, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 2,612.09

412

CONCRETO PREMEZCLADO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", REVENIMIENTO DE 10 CM., VACIADO CON CARRETILLA Y BOTES EN CIMENTACION, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 2,793.65

413

CONCRETO PREMEZCLADO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REVENIMIENTO DE 10 CM. VACIADO CON CARRETILLA Y BOTES EN COLUMNAS Y MUROS, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 2,699.19

414

CONCRETO PREMEZCLADO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", REVENIMIENTO DE 10 CM., VACIADO CON CARRETILLA Y BOTES EN COLUMNAS Y MUROS, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 2,846.25

415

CONCRETO PREMEZCLADO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REVENIMIENTO DE 10 CM. VACIADO CON CARRETILLA Y BOTES EN TRABES Y LOSAS, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 2,740.32

416

CONCRETO PREMEZCLADO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", REVENIMIENTO DE 10 CM., VACIADO CON CARRETILLA Y BOTES EN TRABES Y LOSAS, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 2,866.50

417

CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, VACIADO CON CARRETILLA Y BOTES F'C=100 KG/CM2., REVENIMIENTO DE 10 CM., AGREGADO MAXIMO 3/4" EN CIMENTACION, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 2,937.48

418

CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, VACIADO CON CARRETILLA Y BOTES F'C=150 KG/CM2., REVENIMIENTO DE 10 CM., AGREGADO MAXIMO 3/4" EN CIMENTACION, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,148.18

419

CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, VACIADO CON CARRETILLA Y BOTES F'C=200 KG/CM2., REVENIMIENTO DE 10 CM., AGREGADO MAXIMO 3/4" EN CIMENTACION, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,316.76

50).-CONCRETOS HECHOS EN OBRA CON IMPERMEABILIZANTE INTEGRAL

142

NO.

CONCEPTO

UNIDAD

P.U

420

CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, VACIADO CON CARRETILLA Y BOTES F'C=250 KG/CM2., REVENIMIENTO DE 10 CM., AGREGADO MAXIMO 3/4" EN CIMENTACION, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

3,493.70

421

CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, VACIADO CON CARRETILLA Y BOTES F'C=300 KG/CM2., REVENIMIENTO DE 10 CM., AGREGADO MAXIMO 3/4" EN CIMENTACION, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,628.54

422

CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, VACIADO CON CARRETILLA Y BOTES F'C=200 KG/CM2., REVENIMIENTO DE 10 CM., AGREGADO MAXIMO 3/4" COLUMNAS Y MUROS, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,432.14

423

CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, VACIADO CON CARRETILLA Y BOTES F'C=250 KG/CM2., REVENIMIENTO DE 10 CM., AGREGADO MAXIMO 3/4" EN COLUMNAS Y MUROS, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,609.08

424

CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, VACIADO CON CARRETILLA Y BOTES F'C=300 KG/CM2., REVENIMIENTO DE 10 CM., AGREGADO MAXIMO 3/4" EN COLUMNAS Y MUROS, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,743.92

425

CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, VACIADO CON CARRETILLA Y BOTES F'C=200 KG/CM2., REVENIMIENTO DE 10 CM., AGREGADO MAXIMO 3/4" EN TRABES Y LOSAS, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,322.42

426

CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, VACIADO CON CARRETILLA Y BOTES F'C=250 KG/CM2., REVENIMIENTO DE 10 CM., AGREGADO MAXIMO 3/4" EN TRABES Y LOSAS, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$3,499.35

427

CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, VACIADO CON CARRETILLA Y BOTES F'C=300 KG/CM2., REVENIMIENTO DE 10 CM., AGREGADO MAXIMO 3/4" EN TRABES Y LOSAS, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,634.21

428

CONCRETO PREMEZCLADO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REVENIMIENTO DE 10 CM., VACIADO CON CARRETILLA Y BOTES EN CIMENTACION, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,295.04

429

CONCRETO PREMEZCLADO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", REVENIMIENTO DE 10 CM., VACIADO CON CARRETILLA Y BOTES EN CIMENTACION, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,476.59

430

CONCRETO PREMEZCLADO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REVENIMIENTO DE 10 CM., VACIADO CON CARRETILLA Y BOTES EN COLUMNAS Y MUROS, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,382.14

431

CONCRETO PREMEZCLADO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", REVENIMIENTO DE 10 CM., VACIADO CON CARRETILLA Y BOTES EN COLUMNAS Y MUROS, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,529.20

432

CONCRETO PREMEZCLADO F'C=200 KG/CM2. AGREGADO MAXIMO 3/4", REVENIMIENTO DE 10 CM., VACIADO CON CARRETILLA Y BOTES EN TRABES Y LOSAS, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,423.27

433

CONCRETO PREMEZCLADO F'C=250 KG/CM2. AGREGADO MAXIMO 3/4", REVENIMIENTO DE 10 CM., VACIADO CON CARRETILLA Y BOTES EN TRABES Y LOSAS, INCLUYE: IMPERMEABILIZANTE INTEGRAL, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,549.45

51).-CONCRETOS PREMEZCLADOS CON IMPERMEABILIZANTE INTEGRAL

143

NO.

CONCEPTO

UNIDAD

P.U

52).-PAVIMENTOS DE CONCRETO HECHO EN OBRA 434

PAVIMENTO DE CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, DE 15 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, RESISTENCIA F'C=200 KG/CM2. AGREGADO MAXIMO 3/4".

M2

$ 535.71

435

PAVIMENTO DE CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, DE 18 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, RESISTENCIA F'C=200 KG/CM2. AGREGADO MAXIMO 3/4".

M2

$ 615.01

436

PAVIMENTO DE CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, DE 20 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, RESISTENCIA F'C=200 KG/CM2. AGREGADO MAXIMO 3/4".

M2

$ 667.51

437

PAVIMENTO DE CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, DE 15 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, RESISTENCIA F'C=250 KG/CM2. AGREGADO MAXIMO 3/4".

M2

$ 561.76

438

PAVIMENTO DE CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, DE 18 CM. DE ESPESOR VACIADO CON CARRETILLA Y BOTES, RESISTENCIA F'C=250 KG/CM2. AGREGADO MAXIMO 3/4".

M2

$ 646.27

439

PAVIMENTO DE CONCRETO HECHO EN OBRA RESISTENCIA NORMAL, DE 20 CM. DE ESPESOR VACIADO CON CARRETILLA Y BOTES, RESISTENCIA F'C=250 KG/CM2. AGREGADO MAXIMO 3/4".

M2

$ 702.21

53).- PAVIMENTOS DE CONCRETO PREMEZCLADO 440

PAVIMENTO DE CONCRETO PREMEZCLADO RESISTENCIA NORMAL, DE 15 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, RESISTENCIA F'C=200 KG/CM2. AGREGADO MAXIMO 3/4".

M2

$ 616.62

441

PAVIMENTO DE CONCRETO PREMEZCLADO RESISTENCIA NORMAL, DE 18 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, RESISTENCIA F'C=200 KG/CM2. AGREGADO MAXIMO 3/4".

M2

$ 694.02

442

PAVIMENTO DE CONCRETO PREMEZCLADO RESISTENCIA NORMAL, DE 20 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, RESISTENCIA F'C=200 KG/CM2. AGREGADO MAXIMO 3/4".

M2

$ 745.61

443

PAVIMENTO DE CONCRETO PREMEZCLADO RESISTENCIA NORMAL, DE 15 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, RESISTENCIA F'C=250 KG/CM2. AGREGADO MAXIMO 3/4".

M2

$ 638.45

444

PAVIMENTO DE CONCRETO PREMEZCLADO RESISTENCIA NORMAL, DE 18 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, RESISTENCIA F'C=250 KG/CM2. AGREGADO MAXIMO 3/4".

M2

$ 720.24

445

PAVIMENTO DE CONCRETO PREMEZCLADO RESISTENCIA NORMAL, DE 20 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, RESISTENCIA F'C=250 KG/CM2. AGREGADO MAXIMO 3/4".

M2

$ 774.73

54).-PAVIMENTOS DE CONCRETO MR 446

PAVIMENTO DE CONCRETO MR. 36 RESISTENCIA NORMAL, DE 15 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, NCLUYE: MANO DE OBRA, MATERIALES, EQUIPO NECESARIO Y HERRAMIENTA.

M2

$ 536.51

447

PAVIMENTO DE CONCRETO MR. 36 RESISTENCIA NORMAL, DE 18 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, NCLUYE: MANO DE OBRA, MATERIALES, EQUIPO NECESARIO Y HERRAMIENTA.

M2

$ 594.67

448

PAVIMENTO DE CONCRETO MR. 36 RESISTENCIA NORMAL, DE 20 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, NCLUYE: MANO DE OBRA, MATERIALES, EQUIPO NECESARIO Y HERRAMIENTA.

M2

$ 632.67

449

PAVIMENTO DE CONCRETO MR. 38 RESISTENCIA NORMAL, DE 15 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, INCLUYE: MANO DE OBRA, MATERIALES, EQUIPO NECESARIO Y HERRAMIENTA.

M2

$ 557.24

450

PAVIMENTO DE CONCRETO MR. 38 RESISTENCIA NORMAL, DE 18 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, INCLUYE: MANO DE OBRA, MATERIALES, EQUIPO NECESARIO Y HERRAMIENTA.

M2

$ 619.41

144

NO.

CONCEPTO

UNIDAD

P.U

451

PAVIMENTO DE CONCRETO MR. 38 RESISTENCIA NORMAL, DE 20 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, INCLUYE: MANO DE OBRA, MATERIALES, EQUIPO NECESARIO Y HERRAMIENTA.

M2

$ 664.87

452

PAVIMENTO DE CONCRETO MR. 40 RESISTENCIA NORMAL, DE 15 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, NCLUYE: MANO DE OBRA, MATERIALES, EQUIPO NECESARIO Y HERRAMIENTA.

M2

$ 565.14

453

PAVIMENTO DE CONCRETO MR. 40 RESISTENCIA NORMAL, DE 18 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, NCLUYE: MANO DE OBRA, MATERIALES, EQUIPO NECESARIO Y HERRAMIENTA.

M2

$ 629.33

454

PAVIMENTO DE CONCRETO MR. 40 RESISTENCIA NORMAL, DE 20 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, NCLUYE: MANO DE OBRA, MATERIALES, EQUIPO NECESARIO Y HERRAMIENTA.

M2

$ 671.19

455

PAVIMENTO DE CONCRETO MR. 42 RESISTENCIA NORMAL, DE 15 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, NCLUYE: MANO DE OBRA, MATERIALES, EQUIPO NECESARIO Y HERRAMIENTA.

M2

$ 590.80

456

PAVIMENTO DE CONCRETO MR. 42 RESISTENCIA NORMAL, DE 18 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, NCLUYE: MANO DE OBRA, MATERIALES, EQUIPO NECESARIO Y HERRAMIENTA.

M2

$ 660.44

457

PAVIMENTO DE CONCRETO MR. 42 RESISTENCIA NORMAL, DE 20 CM. DE ESPESOR, VACIADO CON CARRETILLA Y BOTES, NCLUYE: MANO DE OBRA, MATERIALES, EQUIPO NECESARIO Y HERRAMIENTA.

M2

$ 705.74

55).-GUARNICIONES 458

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., DE 15 X 20 X 30 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 234.81

459

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=150 KG/CM2., DE 15 X 20 X 30 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 218.54

460

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., DE 15 X 20 X 40 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 309.27

461

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=150 KG/CM2., DE 15 X 20 X 40 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 287.55

462

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., DE 15 X 20 X 45 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 352.55

463

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=150 KG/CM2., DE 15 X 20 X 45 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 328.12

464

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., DE 15 X 20 X 50 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 383.17

465

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=150 KG/CM2., DE 15 X 20 X 50 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 356.03

466

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=200 KG/CM2., DE 15 X 20 X 30 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 243.51

467

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=200 KG/CM2., DE 15 X 20 X 30 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 224.98

468

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=200 KG/CM2., DE 15 X 20 X 40 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 320.83

145

NO.

CONCEPTO

UNIDAD

P.U

469

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=200 KG/CM2., DE 15 X 20 X 40 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 296.15

470

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=200 KG/CM2., DE 15 X 20 X 45 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 365.56

471

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=200 KG/CM2., DE 15 X 20 X 45 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 337.81

472

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=200 KG/CM2., DE 15 X 20 X 50 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 397.65

473

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=200 KG/CM2., DE 15 X 20 X 50 CM. DE SECCIÓN, INCLUYE: CIMBRA DE MADERA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 366.78

474

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., DE 15 X 20 X 30 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 223.51

475

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=150 KG/CM2., DE 15 X 20 X 30 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 207.24

476

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., DE 15 X 20 X 40 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 295.26

477

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=150 KG/CM2., DE 15 X 20 X 40 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 273.55

478

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., DE 15 X 20 X 45 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 337.19

479

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=150 KG/CM2., DE 15 X 20 X 45 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 312.76

480

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=150 KG/CM2., DE 15 X 20 X 50 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 366.49

481

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=150 KG/CM2., DE 15 X 20 X 50 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 339.33

482

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=200 KG/CM2. DE 15 X 20 X 30 CM. DE SECCIÓN, INCLUYE: CIMBRA DE METALICA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 232.21

483

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=200 KG/CM2., DE 15 X 20 X 30 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO.

ML

$ 213.69

484

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=200 KG/CM2., DE 15 X 20 X 40 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 306.82

485

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=200 KG/CM2., DE 15 X 20 X 40 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 282.15

486

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=200 KG/CM2., DE 15 X 20 X 45 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 345.96

146

NO.

CONCEPTO

UNIDAD

P.U

487

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=200 KG/CM2., DE 15 X 20 X 45 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 318.21

488

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO HECHO EN OBRA F'C=200 KG/CM2., DE 15 X 20 X 50 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 376.22

489

ELABORACIÓN DE GUARNICIÓN TRAPEZOIDAL DE CONCRETO PREMEZCLADO F'C=200 KG/CM2., DE 15 X 20 X 50 CM. DE SECCIÓN, INCLUYE: CIMBRA METALICA, DESCIMBRADO, MATERIAL, HERRAMIENTA Y MANO DE OBRA.

ML

$ 345.36

56).-BANQUETAS

490

BANQUETA DE CONCRETO PREMEZCLADO F'C=150 KG/CM2. AGREGADO MAXIMO DE 3/4", DE 8 CM. DE ESPESOR, ACABADO ESCOBILLADO, INCLUYE: CEMENTO, VOLTEADOR, CIMBRA EN FRONTERAS, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 221.67

491

BANQUETA DE CONCRETO HECHO EN OBRA DE F'C=150 KG/CM2. AGREGADO MAXIMO DE 3/4", DE 8 CM. DE ESPESOR, ACABADO ESCOBILLADO, INCLUYE: CEMENTO, VOLTEADOR, CIMBRA EN FRONTERAS, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 246.97

492

BANQUETA DE CONCRETO PREMEZCLADO F'C=150 KG/CM2. AGREGADO MAXIMO DE 3/4", DE 10 CM. DE ESPESOR, ACABADO ESCOBILLADO, INCLUYE: CEMENTO, VOLTEADOR, CIMBRA EN FRONTERAS, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 259.30

493

BANQUETA DE CONCRETO HECHO EN OBRA DE F'C=150 KG/CM2. AGREGADO MAXIMO DE 3/4", DE 10 CM. DE ESPESOR, ACABADO ESCOBILLADO, INCLUYE: CEMENTO, VOLTEADOR, CIMBRA EN FRONTERAS, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 290.94

494

BANQUETA DE CONCRETO PREMEZCLADO F'C=200 KG/CM2. AGREGADO MAXIMO DE 3/4", DE 8 CM. DE ESPESOR, ACABADO ESCOBILLADO, INCLUYE: CEMENTO, VOLTEADOR, CIMBRA EN FRONTERAS, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 230.40

495

BANQUETA DE CONCRETO HECHO EN OBRA DE F'C=200 KG/CM2. AGREGADO MAXIMO DE 3/4", DE 8 CM. DE ESPESOR, ACABADO ESCOBILLADO, INCLUYE: CEMENTO, VOLTEADOR, CIMBRA EN FRONTERAS, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 260.46

496

BANQUETA DE CONCRETO PREMEZCLADO F'C=200 KG/CM2. AGREGADO MAXIMO DE 3/4", DE 10 CM. DE ESPESOR, ACABADO ESCOBILLADO, INCLUYE: CEMENTO, VOLTEADOR, CIMBRA EN FRONTERAS, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 271.84

497

BANQUETA DE CONCRETO HECHO EN OBRA DE F'C=200 KG/CM2. AGREGADO MAXIMO DE 3/4", DE 10 CM. DE ESPESOR, ACABADO ESCOBILLADO, INCLUYE: CEMENTO, VOLTEADOR, CIMBRA EN FRONTERAS, DESCIMBRADO, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 307.80

57).- JUNTAS CONSTRUCTIVAS Y CORTES EN CONCRETO 498

JUNTA CONSTRUCTIVA EN PAVIMENTOS A BASE DE CELOTEX DE 10 MM. DE ANCHO Y 25 CM. DE PROFUNDIDAD, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 42.20

499

JUNTA CONSTRUCTIVA EN PAVIMENTOS A BASE DE CELOTEX DE 10 MM. DE ANCHO Y 25 CM. DE PROFUNDIDAD, IMPREGNADO CON ASFALTO OXIDADO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 48.20

500

JUNTA DE DILATACION A BASE DE VARILLA DE 5/8" DE DIAM. A CADA 60 CM., DE 1.20 M. DE LARGO, CON UN EXTREMO FIJO Y EL OTRO RECUBIERTO CON GRASA DENTRO DE UN POLIDUCTO DE 1" DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 63.82

501

CORTE CON DISCO DE 3.18 CM. DE ESPESOR CON CORTADORA DE DISCO DIAMANTE, INCLUYE: MANO DE OBRA, EQUIPO Y HERRAMIENTA.

ML

$ 10.57

147

NO.

CONCEPTO

UNIDAD

P.U

502

CORTE CON DISCO DE 6.35 CM. DE ESPESOR CON CORTADORA DE DISCO DIAMANTE, INCLUYE: MANO DE OBRA, EQUIPO Y HERRAMIENTA.

ML

$ 11.30

503

SUMINISTRO Y COLOCACION DE JUNTAS DE DILATACIÓN PARA CALAFATEO DE 10 MM. DE ANCHO Y 25 MM. DE PROFUNDIDAD, A BASE DE ASFALTO OXIDADO, INCLUYE: LIMPIEZA DE LA JUNTA, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 26.44

504

SUMINISTRO Y APLICACION DE CURACRETO.

M2

$ 15.40

58).- MORTEROS Y LECHADAS 505

SUMINISTRO Y ELABORACION DE MORTERO CEMENTO-CALHIDRA-ARENA 1:1:6, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 2,053.61

506

SUMINISTRO Y ELABORACION DE MORTERO CEMENTO-CALHIDRA-ARENA 1:1:8, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,371.55

507

SUMINISTRO Y ELABORACION DE MORTERO CEMENTO-CALHIDRA-ARENA 1:1:10, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,265.22

508

SUMINISTRO Y ELABORACION DE MORTERO CAL-ARENA 1:2, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 998.23

509

SUMINISTRO Y ELABORACION DE MORTERO CAL-ARENA 1:3, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 828.01

510

SUMINISTRO Y ELABORACION DE MORTERO CEMENTO-ARENA 1:2, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 2,776.91

511

SUMINISTRO Y ELABORACION DE MORTERO CEMENTO-ARENA 1:3, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 2,374.70

512

SUMINISTRO Y ELABORACION DE MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 2,070.34

513

SUMINISTRO Y ELABORACION DE MORTERO CEMENTO-ARENA 1:5, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,793.59

514

SUMINISTRO Y ELABORACION DE MORTERO CEMENTO-ARENA 1:6, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,587.37

515

SUMINISTRO Y ELABORACION DE MORTERO CEMENTO-ARENA 1:7, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,410.67

516

SUMINISTRO Y ELABORACION DE MORTERO CEMENTO-ARENA 1:8, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 1,258.49

517

SUMINISTRO Y ELABORACION DE LECHADA CEMENTO GRIS-AGUA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 5,300.57

518

SUMINISTRO Y ELABORACION DE LECHADA CEMENTO BLANCO-AGUA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 9,876.33

59).-PAVIMENTOS ASFÁLTICOS 519

SUMINISTRO Y APLICACION DE RIEGO DE LIGA CON EMULSION ASFALTICA EN PROPORCION 1.2 L. POR M2, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 30.14

520

SUMINISTRO Y APLICACION DE RIEGO DE IMPREGNACION CON EMULSION ASFALTICA EN PROPORCION DE 1.5 L. POR M2, INCLUYE: BARRIDO DE LA SUPERFICIE, POREO, MATERIALES, MANO DE OBRA Y HERRAMIENTA.

M2

$ 36.39

521

SUMINISTRO Y APLICACIÓN DE RIEGO DE SELLO CON MATERIAL 3A. Y EMULSIÓN CATIÓNICA DE ROMPIMIENTO RÁPIDO EN PROPORCIÓN 1.5 LTS. POR M2., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 80.82

522

ESCARIFICADO Y REMOCION DE LA CARPETA EXISTENTE CONSTRUIDA CON ANTERIORIDAD, POR UNIDAD DE OBRA TERMINADA, DESPERDICIANDO EL MATERIAL.

M2

$ 16.68

148

NO.

CONCEPTO

UNIDAD

P.U

523

CARPETA DE CONCRETO ASFALTICO EN CALIENTE DE 5 CM. DE ESPESOR, CON, CEMENTO ASFALTICO ASFALTO EKBE SUPERPAVE PG 64-22, Y/O AC-20 Y AGREGADO PETREO DE 3/4" A FINOS, INCLUYE: HUMECTACION DE SUPERFICIE PARA EVITAR POLVO Y COMPACTACION AL 95% DE LA PRUEBA V.R.S. (NO INCLUYE ACARREO DE MEZCLA ASFALTICA DE PLANTA DE ASFALTO A EL NORTE DE GRAVEDAD DE LA OBRA).

M2

$ 212.65

524

CARPETA DE CONCRETO ASFALTICO EN CALIENTE DE 7 CM. DE ESPESOR, CON CEMENTO ASFALTICO ASFALTO EKBE SUPERPAVE PG 64-22, Y/O AC-20 Y AGREGADO PETREO DE 3/4" A FINOS, INCLUYE: HUMECTACION DE SUPERFICIE PARA EVITAR POLVO Y COMPACTACION AL 95% DE LA PRUEBA V.R.S. (NO INCLUYE ACARREO DE MEZCLA ASFALTICA DE PLANTA DE ASFALTO A EL NORTE DE GRAVEDAD DE LA OBRA).

M2

$ 285.44

525

CARPETA DE CONCRETO ASFALTICO EN CALIENTE DE 8 CM. DE ESPESOR, CON CEMENTO ASFALTICO ASFALTO EKBE SUPERPAVE PG 64-22, Y/O AC-20 Y AGREGADO PETREO DE 3/4" A FINOS, INCLUYE: HUMECTACION DE SUPERFICIE PARA EVITAR POLVO Y COMPACTACION AL 95% DE LA PRUEBA V.R.S. (NO INCLUYE ACARREO DE MEZCLA ASFALTICA DE PLANTA DE ASFALTO A EL NORTE DE GRAVEDAD DE LA OBRA).

M2

$ 334.37

526

CARPETA DE CONCRETO ASFALTICO EN CALIENTE DE 10 CM. DE ESPESOR, CON CEMENTO ASFALTICO ASFALTO EKBE SUPERPAVE PG 64-22, Y/O AC-20 Y AGREGADO PETREO DE 3/4" A FINOS, INCLUYE: HUMECTACION DE SUPERFICIE PARA EVITAR POLVO Y COMPACTACION AL 95% DE LA PRUEBA V.R.S. (NO INCLUYE ACARREO DE MEZCLA ASFALTICA DE PLANTA DE ASFALTO A EL NORTE DE GRAVEDAD DE LA OBRA).

M2

$ 410.73

527

CARPETA DE CONCRETO ASFALTICO EN CALIENTE, CON CEMENTO ASFALTICO ASFALTO EKBE SUPERPAVE PG 64-22, Y/O AC-20 Y AGREGADO PETREO DE 3/4" A FINOS, INCLUYE: HUMECTACION DE SUPERFICIE PARA EVITAR POLVO Y COMPACTACION AL 95% DE LA PRUEBA V.R.S. (NO INCLUYE ACARREO DE MEZCLA ASFALTICA DE PLANTA DE ASFALTO A EL NORTE DE GRAVEDAD DE LA OBRA).

M3

$ 4,025.26

60).-REHABILITACIÓN Y APERTURA DE CAMINOS 528

EXCAVACIONES EN CORTES Y ADICIONALES DEBAJO DE LA SUBRASANTE EN MATERIAL TIPO II, CUANDO EL MATERIAL SE DESPERDICIE, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 34.53

529

EXCAVACIONES EN CORTES Y ADICIONALES DEBAJO DE LA SUBRASANTE EN MATERIAL TIPO III, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 148.54

530

CONFORMACION Y AFINAMIENTO PARA DAR ACABADO SUPERFICIAL A TERRAPLENES EXISTENTES, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

KM

$ 28,948.94

531

DESPALME A 20 CM. DE PROFUNDIDAD EN MATERIAL TIPO II PARA DESPLANTE DE TERRAPLENES, DEPOSITANDO EL PRODUCTO EN LA ORILLA DE LA EXCAVACION CUANDO EL MATERIAL SE DESPERDICIE.

M3

$ 16.21

532

DESPALME A MANO DE HASTA 20 CM. EN MATERIAL TIPO II, DESPERDICIANDO EL MATERIAL, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO, ACARREO LIBRE A 20 M.

M2

$ 89.94

533

EXCAVACION POR MEDIOS MECANICOS PARA ABRIR CAJA HASTA 50 CM. DE PROFUNDIDAD EN MATERIAL TIPO II, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 36.40

534

COMPACTACION DEL TERRENO NATURAL CON EQUIPO MECANICO EN EL AREA DE DESPLANTE DE LOS TERRAPLENES, AL 95 % DE SU PVSM, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 35.08

535

RASTREO Y CUNETEO CON MAQUINARIA EN MATERIAL TIPO II, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

KM

$ 10,986.03

536

CUNETEO CON MAQUINARIA DEPOSITANDO EL MATERIAL A LOS COSTADOS DEL TRAMO POR REHABILITAR, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

KM

$ 7,437.06

537

CUNETEO CON MAQUINARIA DEPOSITANDO EL MATERIAL A LOS COSTADOS DEL TRAMO POR REHABILITAR, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 8.87

149

NO.

CONCEPTO

UNIDAD

P.U

538

CONFORMADO, PERFILADO DE SUPERFICIES Y CUNETAS CON MOTOCONFORMADORA, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 10.57

539

ESCARIFICADO, DISGREGADO Y ACAMELLONADO DE MATERIAL PRODUCTO DE CORTE EN SUPERFICIES DE RODAMIENTO, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 10.92

540

NIVELADO Y AFINADO DE CORONA, PARA RECIBIR MATERIAL DE REVESTIMIENTO, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 4.93

541

CORTE PARA AMPLIACION DE CORONA EN MATERIAL TIPO II, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 102.52

542

TENDIDO DE MATERIAL DE REVESTIMIENTO CON MAQUINARIA EN SUPERFICIE DE RODAMIENTO, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 39.34

543

BARRIDO DE LA SUPERFICIE A TRATAR POR MEDIOS MANUALES, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 3.54

544

RENIVELACION, AFINE Y COMPACTACION DE LA TERRACERIA CON MAQUINARIA, INCLUYE: COMPACTACION SIN CONTROL DE LABORATORIO, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 52.48

545

EXTRACCION DE MATERIAL TIPO II PARA REVESTIMIENTO, INCLUYE: DESMONTE, DESPALME, EXCAVACION, CARGA POR MEDIOS MECANICOS Y PAGO DE REGALIAS.

M3

$ 74.87

546

OPERACION DE TENDIDO, CONFORMACION Y AFINAMIENTO PARA DAR ACABADO AL MATERIAL DE REVESTIMIENTO, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 85.40

547

CORTE DE TERRENO NATURAL PARA APERTURA DE CAMINO SOBRE MATERIAL TIPO I, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 87.34

548

CORTE DE TERRENO NATURAL PARA APERTURA DE CAMINO SOBRE MATERIAL TIPO II, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 102.52

549

CORTE DE TERRENO NATURAL PARA APERTURA DE CAMINO SOBRE MATERIAL TIPO III, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 415.90

550

RASTREO PARA FORMACION DE CORONA Y FORMACION DE CUNETA, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 9.60

551

FORMACION Y COMPACTACION DE TERRAPLEN COMPACTADO AL 90 % PROCTOR, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 60.35

552

OPERACION DE MEZCLADO, TENDIDO Y COMPACTACION DE LA SUB-BASE O BASE, (NO INCLUYE SUMINISTRO Y ACARREO DE MATERIAL) COMPACTADO AL 95 % DE SU PVSM, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 116.66

553

TERRAPLÉN COMPACTADO AL 90 % PROCTOR, POR MEDIOS MECÁNICOS CONSIDERADO EL AGUA, MEZCLADO, CONFORMACIÓN, TENDIDO Y COMPACTACIÓN, SIN INCLUIR ADQUISICIÓN NI ACARREO DE LOS MATERIALES.

M3

$ 296.48

554

BASE HIDRAULICA 70 - 30 % (GRAVA 1 1/2" - CEMENTANTE) DE 20 CM. DE ESPESOR COMPACTADA AL 95 % DE SU PVSM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 100.05

555

BASE HIDRAULICA DE TEZONTLE O GRAVA EN GREÑA DE 20 CM. DE ESPESOR, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO

M2

$ 109.67

556

OPERACION DE MEZCLADO, TENDIDO Y COMPACTACION DE BASE, COMPACTADO AL 95 % DE SU PVSM., INCLUYE: SUMINISTRO, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 435.27

557

OPERACION DE MEZCLADO, TENDIDO Y COMPACTACION DE BASE, COMPACTADO AL 95% DE SU PVSM., (NO INCLUYE: SUMINISTRO NI ACARREO DESDE EL BANCO DEL MATERIAL ARENO-GRAVOSO), INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 98.11

558

OPERACION DE MEZCLADO, TENDIDO Y COMPACTACION DE SUB-BASE, COMPACTADO AL 95% DE SU PVSM., NO INCLUYE SUMINISTRO NI ACARREO DESDE EL BANCO DEL MATERIAL ARENO-GRAVOSO, INCLUYE: MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 98.11

61).-BASES HIDRÁULICAS

150

NO.

CONCEPTO

UNIDAD

P.U

559

AFINE Y COMPACTACION DE LA SUB-BASE (SUPERFICIE DESCUBIERTA POR CAJA ) POR MEDIOS MECANICOS AL 90% DE SU PVSM, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 24.83

560

SUB-BASE DE GRAVA CEMENTADA CONTROLADA DE 15.0 CM. DE ESPESOR, COMPACTADA AL 90 % PROCTOR, INCLUYE: SUMINISTRO DE MATERIALES, AGUA, MANO DE OBRA Y EQUIPO.

M2

$ 67.91

561

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 5 CM. DE ESPESOR, A BASE DE CONCRETO ARMADO DE F'C=100 KG/CM2., REFORZADO CON MALLA ELECTROSOLDADA 6X6 - 10/10, INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 238.11

562

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 8 CM. DE ESPESOR, A BASE DE CONCRETO ARMADO DE F'C=100 KG/CM2., REFORZADO CON MALLA ELECTROSOLDADA 6X6 - 10/10, INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 277.00

563

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 10 CM. DE ESPESOR, A BASE DE CONCRETO ARMADO DE F'C=100 KG/CM2., REFORZADO CON MALLA ELECTROSOLDADA 6X6 - 10/10, INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 316.43

564

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 5 CM. DE ESPESOR, A BASE DE CONCRETO ARMADO DE F'C=100 KG/CM2. REFORZADO CON MALLA ELECTROSOLDADA 6X6 - 6/6, INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 255.17

565

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 8 CM. DE ESPESOR, A BASE DE CONCRETO ARMADO DE F'C=100 KG/CM2., REFORZADO CON MALLA ELECTROSOLDADA 6X6 - 6/6, INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 299.22

566

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 10 CM. DE ESPESOR, A BASE DE CONCRETO ARMADO DE F'C=100 KG/CM2., REFORZADO CON MALLA ELECTROSOLDADA 6X6 - 6/6, INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 343.90

567

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 5 CM. DE ESPESOR, A BASE DE CONCRETO ARMADO DE F'C=150 KG/CM2., REFORZADO CON MALLA ELECTROSOLDADA 6X6 - 6/6, INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 289.94

568

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 8 CM. DE ESPESOR A BASE DE CONCRETO, ARMADO DE F'C=150 KG/CM2., REFORZADO CON MALLA ELECTROSOLDADA 6X6 - 6/6, INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 338.50

569

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 10 CM. DE ESPESOR, A BASE DE CONCRETO ARMADO DE F'C=150 KG/CM2., REFORZADO CON MALLA ELECTROSOLDADA 6X6 - 6/6, INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 387.70

570

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 5 CM. DE ESPESOR, A BASE DE CONCRETO SIMPLE DE F'C=100 KG/CM2., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 206.58

571

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 8 CM. DE ESPESOR, A BASE DE CONCRETO SIMPLE DE F'C=100 KG/CM2., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 249.58

572

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 10 CM. DE ESPESOR, A BASE DE CONCRETO SIMPLE DE F'C=100 KG/CM2., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 293.14

573

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 5 CM. DE ESPESOR, A BASE DE CONCRETO SIMPLE DE F'C=150 KG/CM2., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 228.44

574

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 8 CM. DE ESPESOR, A BASE DE CONCRETO SIMPLE DE F'C=150 KG/CM2., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 276.95

62).-CUNETAS

151

NO.

CONCEPTO

UNIDAD

P.U

575

ELABORACION DE CUNETAS DE 1.20 M. DE DESARROLLO, DE 10 CM. DE ESPESOR, A BASE DE CONCRETO SIMPLE DE F'C=150 KG/CM2., INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 326.15

576

ELABORACION DE CUNETAS A BASE DE CONCRETO SIMPLE DE F'C=100 KG/CM2, INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 2,984.52

577

ELABORACION DE CUNETAS A BASE DE CONCRETO SIMPLE DE F'C=150 KG/CM2, INCLUYE: CIMBRA, DESCIMBRA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M3

$ 3,205.58

63).-PISOS DE ADOQUÍN

578

PISO DE ADOQUIN DE CONCRETO TIPO HEXAGONAL DE 26 X 23 X 8 CM. EN COLOR ROSA, NEGRO O NATURAL, ASENTADO SOBRE CAMA DE ARENA DE 5 CM., INCLUYE: ACARREOS A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA YEQUIPO NECESARIO.

M2

$ 360.28

579

PISO DE ADOQUIN DE CONCRETO TIPO CUADRADO DE 20.3 X 20.3 X 8 CM. EN COLOR ROSA, NEGRO O NATURAL, ASENTADO SOBRE CAMA DE ARENA DE 5 CM., INCLUYE: ACARREOS A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA YEQUIPO NECESARIO.

M2

$ 354.37

580

PISO DE ADOQUIN DE CONCRETO TIPO PENTAGONAL DE 25 X 25 X 8 CM. EN COLOR ROSA, NEGRO O NATURAL, ASENTADO SOBRE CAMA DE ARENA DE 5 CM., INCLUYE: ACARREOS A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA YEQUIPO NECESARIO.

M2

$ 354.37

581

PISO DE ADOQUIN DE CONCRETO TIPO TABASCO DE 26 X 23 X 8 CM. EN COLOR ROSA, NEGRO O NATURAL, ASENTADO SOBRE CAMA DE ARENA DE 5 CM., INCLUYE: ACARREOS A 1A. ESTACION, MATERIAL, MANO DE OBRA, HERRAMIENTA YEQUIPO NECESARIO.

M2

$ 354.37

64).-TUBO DE CONCRETO SIMPLE CON JUNTA DE MORTERO 582

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO SIMPLE DE 15 CM. (6") DE DIAMETRO, JUNTEADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 148.14

583

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO SIMPLE DE 20 CM. (8") DE DIAMETRO, ASENTADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 176.64

584

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO SIMPLE DE 25 CM. (10") DE DIAMETRO, ASENTADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 220.41

585

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO SIMPLE DE 30 CM. (12") DE DIAMETRO, ASENTADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 256.59

586

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO SIMPLE DE 38 CM. (15") DE DIAMETRO, ASENTADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 596.77

587

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO SIMPLE DE 45 CM. (18") DE DIAMETRO, ASENTADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 661.97

588

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO SIMPLE DE 61 CM. (24") DE DIAMETRO, ASENTADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 890.97

65).-TUBO DE CONCRETO SIMPLE CON JUNTA HERMETICA 589

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO SIMPLE CON JUNTA HERMETICA, DE 15 CM. (6") DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 181.31

590

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO SIMPLE CON JUNTA HERMETICA, DE 20 CM. (8") DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 213.24

152

NO.

CONCEPTO

UNIDAD

P.U

591

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO SIMPLE CON JUNTA HERMETICA, DE 25 CM. (10") DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 271.16

592

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO SIMPLE CON JUNTA HERMETICA, DE 30 CM. (12") DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 341.85

593

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO SIMPLE CON JUNTA HERMETICA, DE 38 CM. (15") DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 715.33

594

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO SIMPLE CON JUNTA HERMETICA, DE 45 CM. (18") DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 883.77

595

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO SIMPLE CON JUNTA HERMETICA, DE 61 CM. (24") DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,145.46

66).- TUBO DE CONCRETO REFORZADO CON JUNTA DE MORTERO GRADO 1 NMA C-20 596

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO REFORZADO DE 61 CM. (24") GRADO 1 NORMA C-20, JUNTEADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,773.51

597

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO REFORZADO DE 76 CM. (30") GRADO 1 NORMA C-20, JUNTEADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 2,248.57

598

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO REFORZADO DE 91 CM. (36") GRADO 1 NORMA C-20, JUNTEADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 2,917.72

599

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO REFORZADO DE 107 CM. (42") GRADO 1 NORMA C-20, JUNTEADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 3,606.11

600

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO REFORZADO DE 122 CM. (48") GRADO 1 NORMA C-20, JUNTEADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 4,420.22

601

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO REFORZADO DE 152 CM. (60") GRADO 1 NORMA C-20, JUNTEADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 6,526.95

602

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO REFORZADO DE 183 CM. (72") GRADO 1 NORMA C-20, JUNTEADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 7,948.03

603

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO REFORZADO DE 213 CM. (84") GRADO 1 NORMA C-20, JUNTEADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 11,201.81

604

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO REFORZADO DE 244 CM. (96") GRADO 1 NORMA C-20, JUNTEADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 15,825.29

605

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO REFORZADO DE 306 CM. (120") GRADO 1 NORMA C-20, JUNTEADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 21,371.65

67).-TUBO DE CONCRETO PERFORADO CON JUNTA DE MORTERO 606

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO PERFORADO PARA DREN, DIAMETRO DE 15 CM. (6”).

ML

$ 211.35

607

SUMINISTRO Y COLOCACION DE TUBO DE CONCRETO PERFORADO PARA DREN, DIAMETRO DE 20 CM. (8”).

ML

$ 226.51

153

NO.

CONCEPTO

UNIDAD

P.U

68).-TUBERÍA PAD ADS SANITARIO

608

SUMINISTRO Y COLOCACION DE TUBERIA DE 4" (10 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE SANITARIO, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 150.74

609

SUMINISTRO Y COLOCACION DE TUBERIA DE 6" (15 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE SANITARIO, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 230.01

610

SUMINISTRO Y COLOCACION DE TUBERIA DE 8" (20 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE SANITARIO, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 373.32

611

SUMINISTRO Y COLOCACION DE TUBERIA DE 10" (25 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE SANITARIO, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 571.82

612

SUMINISTRO Y COLOCACION DE TUBERIA DE 12" (30 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE SANITARIO, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 737.22

613

SUMINISTRO Y COLOCACION DE TUBERIA DE 15" (38 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE SANITARIO, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,132.10

614

SUMINISTRO Y COLOCACION DE TUBERIA DE 18" (46 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE SANITARIO, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,448.29

615

SUMINISTRO Y COLOCACION DE TUBERIA DE 24" (61 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE SANITARIO, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 2,429.32

616

SUMINISTRO Y COLOCACION DE TUBERIA DE 30" (76 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE SANITARIO, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 3,732.27

617

SUMINISTRO Y COLOCACION DE TUBERIA DE 36" (91 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE SANITARIO, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 4,911.19

618

SUMINISTRO Y COLOCACION DE TUBERIA DE 42" (107 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE SANITARIO, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 6,729.80

619

SUMINISTRO Y COLOCACION DE TUBERIA DE 48" (122 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE SANITARIO, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 7,599.76

620

SUMINISTRO Y COLOCACION DE TUBERIA DE 60" (152 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE SANITARIO, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 12,795.05

ML

$ 656.50

69).-TUBERÍA PAD ADS PLUVIAL 621

SUMINISTRO Y COLOCACION DE TUBERIA DE 12" (30 CM) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE PLUVIAL, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO. 154

NO.

CONCEPTO

UNIDAD

P.U

622

SUMINISTRO Y COLOCACION DE TUBERIA DE 15" (38 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE PLUVIAL, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 948.34

623

SUMINISTRO Y COLOCACION DE TUBERIA DE 18" (46 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE PLUVIAL, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,332.93

624

SUMINISTRO Y COLOCACION DE TUBERIA DE 24" (61 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE PLUVIAL, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 2,422.02

625

SUMINISTRO Y COLOCACION DE TUBERIA DE 30" (76 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE PLUVIAL, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 3,718.88

626

SUMINISTRO Y COLOCACION DE TUBERIA DE 36" (91 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE PLUVIAL, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 4,740.10

627

SUMINISTRO Y COLOCACION DE TUBERIA DE 42" (107 CM.) DE DIAMETRO, DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE PLUVIAL, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 4,995.27

628

SUMINISTRO Y COLOCACION DE TUBERIA DE 48" (122 CM.) DE DIAMETRO DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE PLUVIAL, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 7,924.84

629

SUMINISTRO Y COLOCACION DE TUBERIA DE 60" (152 CM.) DE DIAMETRO DE POLIETILENO DE ALTA DENSIDAD CORRUGADA (PAD) MARCA "ADS" PARA DRENAJE PLUVIAL, INCLUYE: EMPAQUE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 12,324.63

70).-TUBERÍA ALCANTARILLADO DE PVC S-25 630

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-25 SANITARIO DE 6" (15 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 198.06

631

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-25 SANITARIO DE 8" (20 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 276.79

632

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-25 SANITARIO DE 10" (25 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 421.76

633

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-25 SANITARIO DE 12" (30 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 650.27

634

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-25 SANITARIO DE 14" (35 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 870.89

635

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-25 SANITARIO DE 16" (40 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,086.45

ML

$ 145.94

71).-TUBERIA ALCANTARILLADO DE PVC S-20 636

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-20 SANITARIO DE 4" (10 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO. 155

NO.

CONCEPTO

UNIDAD

P.U

637

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-20 SANITARIO DE 6" (15 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 232.07

638

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-20 SANITARIO DE 8" (20 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 338.82

639

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-20 SANITARIO DE 10" (25 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 516.79

640

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-20 SANITARIO DE 12" (30 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 796.91

641

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-20 SANITARIO DE 14" (35 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,110.46

642

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-20 SANITARIO DE 16" (40 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,302.96

643

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-20 SANITARIO DE 18" (45 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 1,632.65

644

SUMINISTRO Y COLOCACION DE TUBO PARA ALCANTARILLADO DE PVC S-20 SANITARIO DE 20" (50 CM.) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 2,076.69

72).-SILLETAS PARA DESCARGAS SANITARIAS 645

SUMINISTRO Y COLOCACION DE SILLETA DE P.V.C. DE 12" X 6", PARA DESCARGA DOMICILIARIA, INCLUYE: MATERIALES, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 425.27

646

SUMINISTRO Y COLOCACION DE SILLETA DE P.V.C. DE 10" X 6", PARA DESCARGA DOMICILIARIA, INCLUYE: MATERIALES, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 321.53

647

SUMINISTRO Y COLOCACION DE SILLETA DE P.V.C. DE 8" X 6", PARA DESCARGA DOMICILIARIA, INCLUYE: MATERIALES, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 295.61

73).-TUBERÍA DE PVC RD-26 648

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-26 DE 1 1/2" (38 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 66.39

649

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-26 DE 2" (51 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 92.75

650

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-26 DE 2 1/2" (63 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 128.58

651

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-26 DE 3" (76 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 154.94

652

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-26 DE 4" (100 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 227.50

653

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-26 DE 6" (152 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 429.58

654

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-26 DE 8" (200 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 660.89

156

NO.

CONCEPTO

UNIDAD

P.U

74).-TUBERIA DE PVC RD-32.5 655

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-32.5 DE 1 1/2" (38 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 70.22

656

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-32.5 DE 2" (51 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 92.73

657

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-32.5 DE 2 1/2" (63 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 109.98

658

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-32.5 DE 3" (76 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 165.31

659

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-32.5 DE 4" (100 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 223.84

660

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-32.5 DE 6" (152 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 387.42

661

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-32.5 DE 8" (200 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 633.35

662

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-41 DE 2" (51 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 82.01

663

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-41 DE 2 1/2" (63 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 101.37

664

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-41 DE 3" (76 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 134.74

665

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-41 DE 4" (100 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 187.75

666

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-41 DE 6" (152 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 383.21

667

SUMINISTRO Y COLOCACION DE TUBO P.V.C. HIDRAULICO RD-41 DE 8" (200 MM.) DE DIAMETRO CON CAMPANA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 492.24

75).-TUBERÍA DE PVC RD-41

76).-VÁLVULA DE COMPUERTA DE VÁSTAGO FIJO 668

SUMINISTRO E INSTALACIÓN DE VÁLVULA DE COMPUERTA DE VÁSTAGO FIJO DE 2" DE DIÁMETRO, BRIDADA DE ( 150 PSI ), PUESTA EN OBRA

PZA

$ 3,332.45

669

SUMINISTRO E INSTALACIÓN DE VÁLVULA DE COMPUERTA DE VÁSTAGO FIJO DE 21/2" DE DIÁMETRO, BRIDADA DE ( 150 PSI ), PUESTA EN OBRA

PZA

$ 3,831.78

670

SUMINISTRO E INSTALACIÓN DE VÁLVULA DE COMPUERTA DE VÁSTAGO FIJO DE 3" DE DIÁMETRO, BRIDADA DE ( 150 PSI ), PUESTA EN OBRA

PZA

$ 4,536.83

671

SUMINISTRO E INSTALACIÓN DE VÁLVULA DE COMPUERTA DE VÁSTAGO FIJO DE 4" DE DIÁMETRO, BRIDADA DE ( 150 PSI ), PUESTA EN OBRA

PZA

$ 5,731.98

672

SUMINISTRO E INSTALACIÓN DE VÁLVULA DE COMPUERTA DE VÁSTAGO FIJO DE 6" DE DIÁMETRO, BRIDADA DE ( 150 PSI ), PUESTA EN OBRA

PZA

$ 9,464.69

673

SUMINISTRO E INSTALACIÓN DE VÁLVULA DE COMPUERTA DE VÁSTAGO FIJO DE 8" DE DIÁMETRO, BRIDADA DE ( 150 PSI ), PUESTA EN OBRA

PZA

$ 15,014.25

157

NO.

CONCEPTO

UNIDAD

P.U

674

CAJA PARA VALVULAS DE 1.56 X 1.56 X 1.65 METROS, PARA 1 CONTRAMARCO SENCILLO CENTRADO DE 1.40 M Y 1 MARCO CON TAPA DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 34,925.66

675

CAJA PARA VALVULAS DE 1.86 X 1.56 X 1.65 METROS, PARA 1 CONTRAMARCO SENCILLO CENTRADO DE 1.40 M Y 1 MARCO CON TAPA DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 35,345.89

676

CAJA PARA VALVULAS DE 1.86 X 1.56 X 1.65 METROS, PARA 2 CONTRAMARCOS SENCILLOS CENTRADOS DE 1.40 M Y 2 MARCOS CON TAPAS DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 38,679.98

677

CAJA PARA VALVULAS DE 1.56 X 2.26 X 1.65 METROS, PARA 2 CONTRAMARCOS SENCILLOS CENTRADOS DE 1.40 M Y 2 MARCOS CON TAPAS DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 44,932.34

678

CAJA PARA VALVULAS DE 1.86 X 1.96 X 1.65 METROS, PARA 1 CONTRAMARCO SENCILLO CENTRADO DE 1.80 M, 1 CONTRAMARCO SENCILLO DESCENTRADO DE 1.80 Y 2 MARCOS CON TAPA DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 44,721.47

679

CAJA PARA VALVULAS DE 1.86 X 1.96 X 1.65 METROS, PARA 1 CONTRAMARCO SENCILLO CENTRADO DE 1.80 M, 1 CONTRAMARCO DOBLE DE 1.80, Y 3 MARCOS CON TAPAS DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 47,482.80

77).-CAJAS PARA OPERACIÓN DE VÁLVULAS

158

NO.

CONCEPTO

UNIDAD

P.U

680

CAJA PARA VALVULAS DE 2.26 X 2.26 X 1.65 METROS, PARA 1 CONTRAMARCO SENCILLO CENTRADO DE 2.10 M, 1 CONTRAMARCO SENCILLO DESCENTRADO DE 2.10 Y 3 MARCOS CON TAPAS DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 52,594.47

681

CAJA PARA VALVULAS DE 2.26 X 2.26 X 1.65 METROS, PARA 1 CONTRAMARCO SENCILLO CENTRADO DE 2.10 M, 1 CONTRAMARCO DOBLE DE 2.10 M, Y 3 MARCOS CON TAPAS DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 54,054.09

682

CAJA PARA VALVULAS DE 1.86 X 1.96 X 1.65 METROS, PARA 1 CONTRAMARCO DOBLE CENTRADO DE 1.80 M, 1 CONTRAMARCO SENCILLO DESCENTRADO DE 1.80 M Y 3 MARCOS CON TAPAS DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 46,193.19

683

CAJA PARA VALVULAS DE 1.86 X 1.96 X 1.65 METROS, PARA 2 CONTRAMARCOS DOBLES DE 1.80 M Y 4 MARCOS CON TAPAS DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 47,742.96

684

CAJA PARA VALVULAS DE 2.26 X 2.26 X 1.65 METROS, PARA 1 CONTRAMARCO DOBLE DE 2.10 M, 1 CONTRAMARCO SENCILLO DESCENTRADO DE 2.10 M Y 3 MARCOS CON TAPAS DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 54,117.98

685

CAJA PARA VALVULAS DE 2.26 X 2.26 X 1.65 METROS, PARA 2 CONTRAMARCOS DOBLES DE 2.10 M Y 4 MARCOS CON TAPAS DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 55,579.00

159

NO.

CONCEPTO

UNIDAD

P.U

686

CAJA PARA VALVULAS DE 1.96 X 2.46 X 1.65 METROS, PARA 1 CONTRAMARCO DOBLE DE 1.80M, 1 CONTRAMARCO SENCILLO DESCENTRADO DE 1.80, 1 CONTRAMARCO SENCILLO CENTRADO DE 1.80 Y 4 MARCOS CON TAPAS DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 58,455.55

687

CAJA PARA VALVULAS DE 1.96 X 2.46 X 1.65 METROS, PARA 1 CONTRAMARCO DOBLE DE 1.80 M, 1 CONTRAMARCO SENCILLO DESCENTRADO DE 1.80 M, 1 CONTRAMARCO SENCILLO CENTRADO DE 1.80 Y 4 MARCOS CON TAPAS DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 60,003.96

688

CAJA PARA VALVULAS DE 2.26 X 2.86 X 1.65 METROS, PARA 1 CONTRAMARCO DOBLE DE 2.10 M, 1 CONTRAMARCO SENCILLO CENTRADO DE 2.10, 1 CONTRAMARCO SENCILLO DESCENTRADO DE 2.10 M, Y 4 MARCOS CON TAPAS DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 67,327.30

689

CAJA PARA VALVULAS DE 2.26 X 2.86 X 1.65 METROS, PARA 2 CONTRAMARCOS DOBLES DE 2.10 M, 1 CONTRAMARCO SENCILLO CENTRADO DE 2.10 M, Y 5 MARCOS CON TAPAS DE 50 X 50 CM CON LEYENDA DE AGUA POTABLE. INCLUYE : EXCAVACION A MAQUINA EN MATERIAL B, PLANTILLA DE 15 CM CON PEDACERIA TABIQUE, LOSA PISO DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, MURO DE 28 CM CON TABIQUE, PASO DE 60 X 60 CM PARA EXTREMIDADES, CADENA PERIMETRAL DE 28 X 10 CM, LOSA TAPA DE 15 CM DE CONCRETO FC = 200 KG/CM2 ARMADA, CADENA DE 20 X 20 CM PARA SOPORTE DE CONTRAMARCOS, REPELLADO EXTERIOR, APLANADO FINO INTERIOR Y RELLENO CON MATERIAL PRODUCTO DE EXCAVACION COMPACTADO AL 90 % DE LA PRUEBA PROCTOR.

PZA

$ 68,801.96

78).-CONTRAMARCO SENCILLO CENTRADO 690

CONTRAMARCO DE ACERO CANAL DE 102MM (4") DE 25 KG, SENCILLO CENTRADO DE 90 CMS. MARCA FUNDIDORA TENAYUCA, INCLUYE: MATERIAL, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 1,247.61

691

CONTRAMARCO DE ACERO CANAL DE 102MM (4") DE 27 KG, SENCILLO CENTRADO DE 1.05 MTS, MARCA FUNDIDORA TENAYUCA, INCLUYE: MATERIAL, MANO DE OBRA Y HERRAMIENTA

PZA

$ 1,301.16

692

CONTRAMARCO DE ACERO CANAL DE 102MM (4") DE 28 KG, SENCILLO CENTRADO DE 1.10 MTS, MARCA FUNDIDORA TENAYUCA, INCLUYE: MATERIAL, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 1,426.79

693

CONTRAMARCO DE ACERO CANAL DE 102MM (4") DE 31 KG, SENCILLO CENTRADO DE 1.30 MTS, MARCA FUNDIDORA TENAYUCA, INCLUYE: MATERIAL, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 1,460.62

694

CONTRAMARCO DE ACERO CANAL DE 102MM (4") DE 33 KG, SENCILLO CENTRADO DE 1.40 MTS, MARCA FUNDIDORA TENAYUCA, INCLUYE: MATERIAL, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 1,524.51

160

NO.

CONCEPTO

UNIDAD

P.U

695

CONTRAMARCO DE ACERO CANAL DE 102MM (4") DE 40KG. SENCILLO CENTRADO DE 1.80 MTS, MARCA FUNDIDORA TENAYUCA, INCLUYE: MATERIAL, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 1,570.10

696

CONTRAMARCO DE ACERO CANAL 102MM (4") DE 44 KG. SENCILLO CENTRADO DE 2.10 MTS, MARCA FUNDIDORA TENAYUCA, INCLUYE: MATERIAL, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 1,647.60

697

CONTRAMARCO DE ACERO CANAL DE 152MM (6") DE 50 KG, SENCILLO CENTRADO DE 1.40 MTS, MARCA FUNDIDORA TENAYUCA, INCLUYE: MATERIAL, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 1,804.30

698

CONTRAMARCO DE ACERO CANAL DE 152MM (6") DE 62 KG. SENCILLO CENTRADO DE 1.80 MTS, MARCA FUNDIDORA TENAYUCA, INCLUYE: MATERIAL, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 2,056.88

699

CONTRAMARCO DE ACERO CANAL DE 152MM (6") DE 66 KG, SENCILLO DESCENTRADO DE 2.10 MTS, MARCA FUNDIDORA TENAYUCA, INCLUYE: MATERIAL, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 2,306.88

700

CONTRAMARCO DE ACERO CANAL DE 152MM(6") DE 50 KG, SENCILLO DESCENTRADO DE 1.40 MTS, MARCA FUNDIDORA TENAYUCA, INCLUYE: MATERIAL, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 1,689.33

701

CONTRAMARCO DE ACERO CANAL DE 152MM (6") DE 62 KG, SENCILLO DESCENTRADO DE 1.80 MTS, MARCA FUNDIDORA TENAYUCA, INCLUYE: MATERIAL, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 2,056.88

702

CONTRAMARCO DE ACERO CANAL DE 152MM (6") DE 66 KG, SENCILLO DESCENTRADO DE 2.10 MTS, MARCA FUNDIDORA TENAYUCA, INCLUYE: MATERIAL, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 2,306.88

79).-BOMBEO DE ACHIQUE CON BOMBA AUTOCEBANTE 703

BOMBEO DE ACHIQUE CON BOMBA AUTOCEBANTE, PROPIEDAD DEL CONTRATISTA, DE 2" DE DIÁMETRO Y 8 H.P.

HRA

$ 133.89

704

BOMBEO DE ACHIQUE CON BOMBA AUTOCEBANTE, PROPIEDAD DEL CONTRATISTA, DE 4" DE DIÁMETRO Y 16 H. P.

HRA

$ 162.92

705

ATRAQUE DE 30.0 X 30.0 X 30.0 CM. DE CONCRETO F'C = 150 KG/CM2. RESISTENCIA NORMAL, CON TAMAÑO MÁXIMO DE AGREGADO 38 MM. HECHO EN OBRA, EN CRUCEROS DE AGUA POTABLE, INCLUYE: MATERIALES, MANO DE OBRA, CIMBRA Y ACARREOS.

HRA

$ 160.00

80).- INSTALACIÓN HIDRÁULICA 706

SUMINISTRO Y COLOCACION DE TINACO DE 1100 L. MARCA ROTOPLAS, CON ACCESORIOS SIN INCLUIR BASE, INCLUYE: MATERIALES, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 3,894.40

707

SUMINISTRO E INSTALACION DE TOMA DOMICILIARIA DE 13 MM. ( 1/2" ) DE DIAMETRO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 1,774.09

PZA

$ 3,150.35

81).-LUMINARIAS 708

SUMINISTRO Y COLOCACION DE LUMINARIA PARA ALUMBRADO PÚBLICO TIPO OV-15 SIN INCLUIR POSTE, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO. 82).- ELEMENTOS ELÉCTRICOS

709

SUMINISTRO Y COLOCACION DE APARTARRAYO OXIDO DE ZINC DE 12 KVA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 1,613.68

710

SUMINISTRO Y COLOCACION DE ACOMETIDA ELECTRICA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS. (NO INCLUYE MURETE DE MEDICION).

PZA

$ 1,682.58

711

SUMINISTRO Y COLOCACION DE ACOMETIDA ELECTRICA, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIOS, (INCLUYE MURETE DE MEDICION).

PZA

$ 3,706.31

161

NO.

CONCEPTO

UNIDAD

P.U

712

REGISTRO AUXILIAR PARA ALUMBRADO PÚBLICO DE 40X60X65 CM. A BASE DE MURO DE 14 CM. DE ESPESOR, DE TABIQUE ROJO RECOCIDO DE 7X14X28 CM. ASENTADO Y APLANADO CON MORTERO CEMENTO-ARENA 1:4, INCLUYE: PLANTILLA DE CONCRETO F'C=100 KG/CM2 DE 10.0 CM. DE ESPESOR, MARCO Y CONTRAMARCO DE ÁNGULO DE 1-1/4", CONCRETO F'C= 200 KG/CM2. EN TAPA Y FIJACIÓN DE MARCO, DRÉN DE GRAVA DE 20 CM. DE ESPESOR, INCLUYE: MATERIALES, MANO DE OBRA, ACARREOS Y DESPERDICIOS.

PZA

$ 2,142.87

713

REGISTRO DE CONCRETO PARA ALUMBRADO CON TAPA Y MARCO PINTADO 0.40X0.40X0.60 M DE 91 KG, INCLUYE: SUMINISTRO Y COLOCACIÓN.

PZA

$ 1,233.89

714

REGISTRO DE CONCRETO PARA ALUMBRADO CON TAPA Y MARCO GALVANIZADO 0.40X0.460X0.80 M DE 152 KG, INCLUYE: SUMINISTRO Y COLOCACIÓN.

PZA

$ 1,638.66

83).-REGISTRO AUXILIAR PARA ALUMBRADO PÚBLICO

84).-RETENIDAS 715

SUMINISTRO Y COLOCACION DE RETENIDA TIPO RSA (RETENIDA SENCILLA DE ANCLA) CON CABLE DE ACERO AG 5/16, INCLUYE: EXCAVACION EN MATERIAL TIPO II-A, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 2,293.80

716

SUMINISTRO Y COLOCACION DE RETENIDA TIPO REA (RETENIDA ESTACA ANCLA) CON CABLE DE ACERO AG 5/16, INCLUYE: POSTE 7-500, EXCAVACION EN MATERIAL TIPO II-A, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 9,343.32

717

SUMINISTRO Y COLOCACION DE RETENIDA TIPO RBA (RETENIDA DE BANQUETA) CON CABLE DE ACERO AG 5/16, INCLUYE: EXCAVACION EN MATERIAL TIPO II-A, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 3,592.62

718

SUMINISTRO Y COLOCACION DE RETENIDA TIPO RDA (RETENIDA DOBLE ANCLA) CON CABLE DE ACERO AG 5/16, INCLUYE: EXCAVACION EN MATERIAL TIPO II-A, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 4,412.16

85).-TRANSFORMADORES 719

SUMINISTRO Y COLOCACION DE TRANSFORMADOR MONOFASICO YT 10 KVA AUTOPROTEGIDO DE 1 BOQUILLA MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 34,286.40

720

SUMINISTRO Y COLOCACION DE TRANSFORMADOR MONOFASICO YT 15 KVA AUTOPROTEGIDO DE 1 BOQUILLA MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 37,002.41

721

SUMINISTRO Y COLOCACION DE TRANSFORMADOR MONOFASICO YT 25 KVA AUTOPROTEGIDO DE 1 BOQUILLA MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 44,289.82

722

SUMINISTRO Y COLOCACION DE TRANSFORMADOR MONOFASICO YT 37.5 KVA AUTOPROTEGIDO DE 1 BOQUILLA MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 50,665.85

723

SUMINISTRO Y COLOCACION DE TRANSFORMADOR MONOFASICO YT 50 KVA AUTOPROTEGIDO DE 1 BOQUILLA MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 60,287.36

724

SUMINISTRO Y COLOCACION DE TRANSFORMADOR MONOFASICO DE 10 KVA AUTOPROTEGIDO DE 2 BOQUILLAS MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 36,519.16

725

SUMINISTRO Y COLOCACION DE TRANSFORMADOR MONOFASICO DE 15 KVA AUTOPROTEGIDO DE 2 BOQUILLAS MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 38,374.99

726

SUMINISTRO Y COLOCACION DE TRANSFORMADOR MONOFASICO DE 25 KVA AUTOPROTEGIDO DE 2 BOQUILLAS MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 44,162.04

727

SUMINISTRO Y COLOCACION DE TRANSFORMADOR MONOFASICO DE 37.5 KVA AUTOPROTEGIDO DE 2 BOQUILLAS MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 52,965.68

162

NO.

CONCEPTO

UNIDAD

P.U

728

SUMINISTRO Y COLOCACION DE TRANSFORMADOR MONOFASICO DE 50 KVA AUTOPROTEGIDO DE 2 BOQUILLAS MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 61,565.04

729

SUMINISTRO Y COLOCACION DE TRANSFORMADOR BIFASICO YT 10 KVA AUTOPROTEGIDO DE 1 BOQUILLA MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 31,475.50

730

SUMINISTRO Y COLOCACION DE TRANSFORMADOR BIFASICO YT 15 KVA AUTOPROTEGIDO DE 1 BOQUILLA MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 36,268.63

731

SUMINISTRO Y COLOCACION DE TRANSFORMADOR MONOFASICO 25 KVA, PEDESTAL, MARCA TRAMEX 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 90,992.42

732

SUMINISTRO Y COLOCACION DE TRANSFORMADOR MONOFASICO 37.5 KVA, PEDESTAL, MARCA TRAMEX 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 91,035.70

733

SUMINISTRO Y COLOCACION DE TRANSFORMADOR MONOFASICO 50 KVA, PEDESTAL, MARCA TRAMEX 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 92,863.68

734

SUMINISTRO Y COLOCACION DE TRANSFORMADOR BIFASICO DE 10 KVA AUTOPROTEGIDO DE 2 BOQUILLAS MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 34,030.85

735

SUMINISTRO Y COLOCACION DE TRANSFORMADOR BIFASICO DE 15 KVA AUTOPROTEGIDO DE 2 BOQUILLAS MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 36,075.14

736

SUMINISTRO Y COLOCACION DE TRANSFORMADOR BIFASICO DE 25 KVA AUTOPROTEGIDO DE 2 BOQUILLAS MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 43,906.50

737

SUMINISTRO Y COLOCACION DE TRANSFORMADOR BIFASICO DE 37.5 KVA AUTOPROTEGIDO DE 2 BOQUILLAS MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 49,452.05

738

SUMINISTRO Y COLOCACION DE TRANSFORMADOR BIFASICO DE 50 KVA AUTOPROTEGIDO DE 2 BOQUILLAS MARCA EMSA 13.2 / 7620 / 127, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 61,204.63

86).-POSTES DE CONCRETO 739

SUMINISTRO Y COLOCACION DE POSTE 7-500 DE CONCRETO, INCLUYE: HINCADO, PLOMEADO, CEPA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 4,763.44

740

SUMINISTRO Y COLOCACION DE POSTE 9-400 DE CONCRETO, INCLUYE: HINCADO, PLOMEADO, CEPA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 5,481.19

741

SUMINISTRO Y COLOCACION DE POSTE 11-500 DE CONCRETO, INCLUYE: HINCADO, PLOMEADO, CEPA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 6,848.22

742

SUMINISTRO Y COLOCACION DE POSTE 11-700 DE CONCRETO, INCLUYE: HINCADO, PLOMEADO, CEPA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 8,044.18

743

SUMINISTRO Y COLOCACION DE POSTE 12-750 DE CONCRETO, INCLUYE: HINCADO, PLOMEADO, CEPA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 9,783.36

744

SUMINISTRO Y COLOCACION DE POSTE 13-600 DE CONCRETO, INCLUYE: HINCADO, PLOMEADO, CEPA, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

PZA

$ 10,572.14

KG

$ 360.55

87).-CABLES Y CONDUCTORES 745

SUMINISTRO Y COLOCACION DE CABLE DE COBRE DESNUDO CAL 1/0 AWG, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO. 163

NO.

CONCEPTO

UNIDAD

P.U

746

SUMINISTRO Y COLOCACION DE CABLE DE COBRE DESNUDO CAL 3/0 AWG, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

KG

$ 360.55

747

SUMINISTRO Y COLOCACION DE CABLE MULTIPLE DE ALUMINIO 2 + 1 CAL 1/0 (NT), INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 156.59

748

SUMINISTRO Y COLOCACION DE CABLE MULTIPLE DE ALUMINIO 2 + 1 CAL 3/0 (NT), INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 164.41

749

SUMINISTRO Y COLOCACION DE CABLE ALAMBRE DE COBRE No 4, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

KG

$ 358.61

750

SUMINISTRO Y COLOCACION DE CONDUCTOR ACSR 1/0, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

KG

$ 314.37

751

SUMINISTRO Y COLOCACION DE CONDUCTOR ACSR 3/0, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

KG

$ 273.26

752

SUMINISTRO Y COLOCACION DE CONDUCTOR ACSR 1/0, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 35.75

753

SUMINISTRO Y COLOCACION DE CONDUCTOR ACSR 3/0, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 46.02

754

SUMINISTRO Y COLOCACION DE CABLE DE ALUMINIO AAC CALIBRE 1/0, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

KG

$ 189.18

755

SUMINISTRO Y COLOCACION DE CABLE DE ALUMINIO AAC CALIBRE 3/0, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

KG

$ 194.92

756

SUMINISTRO Y COLOCACION DE CABLE DE ALUMINIO AAC CALIBRE 1/0, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 52.82

757

SUMINISTRO Y COLOCACION DE CABLE DE ALUMINIO AAC CALIBRE 3/0, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 58.70

88).-EDIFICACIÓN 758

SUMINISTRO Y COLOCACION DE CABLE THW CALIBRE 8, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 51.74

759

SUMINISTRO Y COLOCACION DE CABLE THW CALIBRE 10, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 32.16

760

SUMINISTRO Y COLOCACION DE VENTANA DE ALUMINIO NATURAL, CORREDIZA, PERFIL DE 2", VIDRIO MEDIO DE 3 MM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA.

M2

$ 1,725.99

761

SUMINISTRO Y COLOCACION DE PUERTA ABATIBLE DE 1.20 X 2.10 M. FABRICADA CON PERFILES TUBULARES Y TABLERO DE LÁMINA NO. 18, INCLUYE: MATERIALES, HERRAJES, SOLDADURA, PRIMER ANTICORROSIVO, PINTURA ESMALTE, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 5,036.04

762

SUMINISTRO Y COLOCACION DE VENTANA DE 1.20 X 1.50 M. CON UNA HOJA ABATIBLE, FABRICADA CON PERFILES TUBULARES CON UN PESO DE 15 KG/CM2, INCLUYE: MATERIALES, HERRAJES, SOLDADURA, PRIMER ANTICORROSIVO, PINTURA ESMALTE, MANO DE OBRA Y HERRAMIENTA.

PZA

$ 2,228.70

763

SUMINISTRO Y COLOCACIÓN DE MALLA CICLÓN CALIBRE 11 DE 2.00 M. DE ALTURA, INCLUYE: POSTES DE LINEA, BARRA HORIZONTAL, ESPADAS METÁLICAS, Y ALAMBRE DE PUAS ASI COMO TODOS LOS ACCESORIOS PARA SU CORRECTO FUNCIONAMIENTO.

ML

$ 445.91

764

SUMINISTRO Y COLOCACIÓN DE MALLA CICLÓN CALIBRE 12.5 FORRADA CON P.V.C. DE 2.00 M. DE ALTURA, INCLUYE: POSTES DE LINEA, BARRA HORIZONTAL, ESPADAS METÁLICAS, Y ALAMBRE DE PUAS ASI COMO TODOS LOS ACCESORIOS PARA SU CORRECTO FUNCIONAMIENTO.

ML

$ 468.57

M2

$ 99.02

89).-MALLA CICLÓNICA

90).- PASTO 765

SUMINISTRO Y COLOCACION DE PASTO ALFOMBRA, INCLUYE: COLOCACION Y SUMINISTRO DE CAPA VEGETAL DE 7 CM. DESPESOR A BASE DE TIERRA LIMPIA. 164

NO.

CONCEPTO

UNIDAD

P.U

766

SUMINISTRO Y PLANTADO DE ARBOL CASUARINAS DE 30 CM. DE ALTO, INCLUYE: EXCAVACION, VARA DE APOYO PARA SOPORTAR LA LLUVIA Y EL VIENTO Y TODO LO NECESARIO PARA SU CORRECTA TERMINACION.

PZA

$ 267.29

91).- PINTURA EN MUROS Y HERRERÍA 767

SUMINISTRO Y APLICACION DE PINTURA VINÍLICA EN MUROS Y PLAFONES CON MEZCLA FINA HASTA 3.00 M. DE ALTURA, INCLUYE: UNA MANO DE SELLADOR Y DOS DE PINTURA.

M2

$ 85.17

768

SUMINISTRO Y APLICACION DE PINTURA DE ESMALTE COMEX 100 EN MUROS Y PLAFONES DE YESO, INCLUYE: DOS APLICACIONES DE PINTURA Y UNA DE SELLADOR.

M2

$ 95.33

769

SUMINISTRO Y APLICACION DE PINTURA DE ESMALTE COMEX 100, EN LAMINA DE FIERRO, INCLUYE: DOS APLICACIONES DE PINTURA.

M2

$ 97.04

770

SUMINISTRO Y APLICACION DE PINTURA DE ESMALTE COMEX 100 EN HERRERIA CON DESARROLLO DE 0.30 M2. EN AMBAS CARAS POR M2. DE CLARO, INCLUYE: DOS APLICACIONES DE PINTURA.

M2

$ 79.12

771

SUMINISTRO Y APLICACION DE PINTURA DE ESMALTE COMEX 100 EN HERRERIA CON DESARROLLO DE 0.40 M2. EN AMBAS CARAS POR M2. DE CLARO, INCLUYE: DOS APLICACIONES DE PINTURA.

M2

$ 74.90

772

SUMINISTRO Y APLICACION DE PINTURA DE ESMALTE COMEX 100 EN HERRERIA CON DESARROLLO DE 0.50 M2. EN AMBAS CARAS POR M2. DE CLARO, INCLUYE: DOS APLICACIONES DE PINTURA.

M2

$ 71.58

92).- PINTURA EN GUARNICIONES 773

SUMINISTRO Y APLICACION DE PINTURA VINÍLICA EN GUARNICIONES CON UN DESARROLLO DE 30 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 39.75

774

SUMINISTRO Y APLICACIÓN DE PINTURA AMARILLO TRÁFICO PESADO EN GUARNICIONES CON UN DESARROLLO DE 30 CM., INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

ML

$ 50.93

93).-IMPERMEABILIZANTES 775

SUMINISTRO Y APLICACION DE IMPERMEABILIZANTE EN AZOTEA CON MEMBRANA DE FESTER O SIMILAR, CON SELLO, INCLUYE: MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 278.31

776

SUMINISTRO Y APLICACION DE IMPERMEABILIZANTE EN AZOTEA CON TAPETE PREFABRICADO VITROLY GRANULAR SBS DE 3.5 MM. DE ESPESOR, INCLUYE: 1 MANO DE PRIMARIO BASE AGUA, RESANES DE HASTA 5% DE LA SUPERFICIE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 412.50

777

SUMINISTRO Y APLICACION DE IMPERMEABILIZANTE EN AZOTEA CON TAPETE PREFABRICADO VITROLY GRANULAR SBS DE 3.5 MM. DE ESPESOR, INCLUYE: 1 MANO DE PRIMARIO BASE SOLVENTE, MATERIAL, MANO DE OBRA, HERRAMIENTA Y EQUIPO NECESARIO.

M2

$ 454.01

94.-ACARREOS 778

ACARREO EN CAMION 1er. KILOMETRO, DE MATERIAL MIXTO EN CAMINO PLANO PAVIMENTADO, NO INCLUYE CARGA A CAMION.

M3

$ 25.61

779

ACARREO EN CAMION 1er. KILOMETRO, DE MATERIAL MIXTO EN CAMINO LOMERIO SUAVE, BRECHA, TERRACERIA PRONUNCIADA, MONTAÑOSO REVESTIDO, NO INCLUYE CARGA A CAMION.

M3

$ 50.70

780

ACARREO EN CAMION 1er. KILOMETRO, DE MATERIAL MIXTO EN CAMINO PLANO PAVIMENTADO, INCLUYE CARGA MANUAL.

M3

$ 127.31

781

ACARREO EN CAMION 1er. KILOMETRO, DE MATERIAL MIXTO EN CAMINO PLANO PAVIMENTADO, INCLUYE CARGA CON MAQUINA.

M3

$ 42.74

165

NO.

CONCEPTO

UNIDAD

P.U

782

ACARREO EN CAMION 1er. KILOMETRO, DE MATERIAL MIXTO EN CAMINO LOMERIO SUAVE, BRECHA, TERRACERIA PRONUNCIADA, MONTAÑOSO REVESTIDO, INCLUYE CARGA MANUAL.

M3

$ 138.20

783

ACARREO EN CAMION 1er. KILOMETRO, DE MATERIAL MIXTO EN CAMINO LOMERIO SUAVE, BRECHA, TERRACERIA PRONUNCIADA, MONTAÑOSO REVESTIDO, INCLUYE CARGA A MAQUINA.

M3

$ 67.61

784

ACARREO EN CAMION KILOMETRO SUBSECUENTE, DE MATERIAL MIXTO EN CAMINO PLANO PAVIMENTADO.

M3

$ 8.98

785

ACARREO EN CAMION KILOMETRO SUBSECUENTE, DE MATERIAL MIXTO EN CAMINO LOMERIO SUAVE, BRECHA, TERRACERIA PRONUNCIADA, MONTAÑOSO REVESTIDO.

M3

$ 15.68

786

CARGA CON MAQUINA (CARGADOR FRONTAL CAT 950 SOBRE NEUMATICOS) DE LOS MATERIALES ALMACENADOS.

M3

$ 8.21

787

ACARREO HORIZONTAL SIN PENDIENTE, DE PIEDRA BRAZA, EN CARRETILLA DE 5.0 FT3 A 20.00 M. INCLUYE CARGA Y DESCARGA DEL MATERIAL.

M3

$ 88.75

788

ACARREO EN CARRETILLA DE MATERIALES, EN ESTACIONES SUBSECUENTES DE 20.0 M. ACARREO MÁXIMO, DOS ESTACIONES.

M3

$ 93.01

789

ACARREO DEL MATERIAL PRODUCTO DE DEMOLICIONES DEL INTERIOR A PIE DE LA OBRA.

M3

$ 52.32

790

ACARREO DEL MATERIAL PRODUCTO DE LA DEMOLICIÓN A PRIMER KILÓMETRO. INCLUYE CARGA A MANO EN CAMIÓN VOLTEO.

M3

$ 196.02

M2

$ 332.16

M2

$ 303.46

M2

$ 273.13

M2

$ 247.08

95).-TECHUMBRES 791

SUMINISTRO E INSTALACION DE LAMINA ZINTRO-ALUM MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

CAL.

26,

INCLUYE:

792

SUMINISTRO E INSTALACION DE LAMINA ZINTRO-ALUM MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

CAL.

28,

INCLUYE:

793

SUMINISTRO E INSTALACION DE LAMINA ZINTRO-ALUM MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

CAL.

30,

INCLUYE:

794

SUMINISTRO E INSTALACION DE LAMINA ZINTRO-ALUM MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

CAL.

32,

INCLUYE:

795

SUMINISTRO E INSTALACION DE GALVATEJA ROJA CAL. 26, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

M2

$ 529.43

796

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL (SOLERA), INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

KG

$ 53.75

797

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL (ANGULO), INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

KG

$ 52.38

798

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL (MON-TEN), INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

KG

$ 57.85

799

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL MON-TEN DE 4" X 2" CAL.14, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

ML

$ 226.33

800

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL MON-TEN DE 4" X 2" CAL.12, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

ML

$ 311.63

801

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL MON-TEN DE 4" X 2" CAL.10, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

ML

$ 394.17

802

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL MON-TEN DE 5" X 2" CAL.14, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

ML

$ 253.15

803

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL MON-TEN DE 5" X 2" CAL.12, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

ML

$ 348.78

166

NO.

CONCEPTO

UNIDAD

P.U

804

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL MON-TEN DE 5" X 2" CAL.10, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

ML

$ 441.63

805

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL MON-TEN DE 6" X 2 1/2" CAL.14, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

ML

$ 306.80

806

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL MON-TEN DE 6" X 2 1/2" CAL.12, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

ML

$ 423.74

807

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL MON-TEN DE 6" X 2 1/2" CAL.10, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

ML

$ 537.93

808

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL MON-TEN DE 8" X 3" CAL.14, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

ML

$ 386.61

809

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL MON-TEN DE 8" X 3" CAL.12, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

ML

$ 535.19

810

SUMINISTRO, HABILITADO Y COLOCACION DE ACERO ESTRUCTURAL MON-TEN DE 8" X 3" CAL.10, INCLUYE: MATERIALES, MANO DE OBRA, EQUIPO Y HERRAMIENTA.

ML

$ 681.73

167