Cashflow-1.docx

  • Uploaded by: Mia Dictado Morales
  • 0
  • 0
  • May 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Cashflow-1.docx as PDF for free.

More details

  • Words: 314
  • Pages: 3
WaterProofing

Tile Works Painting Works

I

J K

30 CD PHP 757,500.00 PHP 441,872.00 PHP 1,325,616.00

60 CD

120 CD

150 CD

180 CD

210 CD

240 CD

PHP 8,724,163.50 PHP 8,724,163.50 PHP 4,921,323.00 PHP 63,346,056.94 PHP 63,346,056.94 PHP 51,747,483.12 PHP 4,120,975.01 PHP 7,904,808.06 PHP 7,904,808.06 PHP 7,904,808.06

90 CD

CASH FLOW

300 CD

330 CD

PHP 7,904,808.06 PHP 5,466,795.73 PHP 3,868,944.99 PHP 10,677,250.44 PHP 10,677,250.44 PHP 2,279,311.13

270 CD

PHP 6,040,177.00

PHP 4,487,680.12 PHP 325,615.88 PHP 24,084,352.76

360 CD

% OF WORK

0.385%

15.029%

22.083%

22.404%

24.648%

9.257%

14.067%

14.708%

15.350%

22.404%

29.458%

36.512%

TOTAL PHP 1,199,372.00 PHP 1,325,616.00 PHP 72,070,220.44 PHP 72,070,220.44 PHP 60,789,781.13 PHP 7,904,808.06 PHP 7,904,808.06 PHP 7,904,808.06 PHP 11,773,753.06 PHP 16,144,046.17 PHP 12,956,561.57 PHP 34,937,825.75 PHP 46,872,705.95 PHP 68,873,468.27 PHP 69,874,230.59 PHP 76,874,230.59 PHP 28,871,181.31 PHP 43,871,943.63 PHP 45,872,705.95 PHP 47,873,468.27 PHP 69,874,230.59 PHP 91,874,992.91 PHP 113,875,755.23 CUMULATIVE

Activity Mobilization Earth works Rebars Forms and Scaffoldings Concrete Masonry Works Doors and Windows Ceiling Finishes

Item A B C D E F G H

SUMMARY COST ESTIMATE FOR ACTIVITIES CONTAINING COST WITH MARKUPS

CASHFLOW

PHP 1,833,758.87 PHP 564,847.38

420 CD

43.567%

50.621%

PHP 22,888,343.95 PHP 2,398,606.25 PHP 135,876,517.55 PHP 157,877,279.87

PHP 20,180,153.13 PHP 519,659.59

PHP 2,188,531.24

390CD

PHP 564,847.38

480 CD

57.675%

64.729%

PHP 564,847.38 PHP 564,847.38 PHP 179,878,042.19 PHP 201,878,804.51

PHP 564,847.38

450 CD

PHP 45,187.79

PHP 45,187.79 PHP 311,882,616.11

100.000%

PHP 564,847.38 PHP 289,881,853.79

92.946%

PHP 564,847.38 PHP 267,881,091.47

85.892%

PHP 564,847.38 PHP 245,880,329.15

78.837%

PHP 564,847.38 PHP 223,879,566.83

71.783%

630 CD

PHP 564,847.38

600 CD

PHP 564,847.38

570 CD

PHP 564,847.38

540 CD

PHP 564,847.38

510 CD

S-CURVE

Calendar Days

% of work

0 30 60 90 120 150 180 210 240 270 300 330 360 390 420 450 480 510 540 570 600 630

0 0.38% 15.03% 22.08% 22.40% 24.65% 9.26% 14.07% 14.71% 15.35% 22.40% 29.46% 36.51% 43.57% 50.62% 57.67% 64.73% 71.78% 78.84% 85.89% 92.95% 100.00%

More Documents from "Mia Dictado Morales"

Cashflow-1.docx
May 2020 5
Art Prevencion
August 2019 45
June 2020 32
Kesimpulan Pkn.docx
May 2020 22
Pertanyaan Metpen.docx
August 2019 67