University of Edinburgh _______________________________________________________________________________________________________
Stage: Build Build Test Document [PROJECT NAME] [PROGRAMME NAME] [PROJECT CODE] [ANNUAL PLAN NUMBER]
Document Version: [x.x] Date: [dd/mm/yy]
___________________________________________________________________________________ Information Services - Template Revised August 2007
Build: Build Test Document [Version: x.x]
[Project Name]
_______________________________________________________________________________________________________
Contents 1 DOCUMENT MANAGEMENT........................................................................3 1.1 Contributors...........................................................................................................3 1.2 Version Control.......................................................................................................3 2 BUILD TESTING ...........................................................................................4 2.1 Build Test Definition..............................................................................................4 2.2 Build Testing Responsibilities................................................................................4 3 PRIMARY DEVELOPER TESTING................................................................5 4 PEER TESTING..............................................................................................6 5 DBA TESTING................................................................................................7 6 BUILD TEST SUMMARY...............................................................................8 6.1 Open Issues.............................................................................................................8 6.2 Document Sign Off.................................................................................................8
___________________________________________________________________________________ Page 2 of 8
Build: Build Test Document [Version: x.x]
[Project Name]
_______________________________________________________________________________________________________
1 Document Management When completing this document, please mark any section that is not required as ‘N/A’. A brief description of why the section is not required should also be included.
1.1 Contributors Please provide details of all contributors to this document. Role Owner Contributor Contributor Contributor
Department MIS <Business Partner> <Business Partner> <Business Partner>
Name
1.2 Version Control Please document all changes made to this document since initial distribution. Date
Version
Author
Section
Amendment
___________________________________________________________________________________ Page 3 of 8
Build: Build Test Document [Version: x.x]
[Project Name]
_______________________________________________________________________________________________________
2 BUILD TESTING 2.1 Build Test Definition Build testing should allow issues to be identified and resolved prior to the application moving into test. Testing should refer to the System Design Spec. Testing should be conducted by the Primary Developer, Peer Tester, and a DBA where required.
2.2 Build Testing Responsibilities Role Project Manager Primary Developer
Name
Responsibilities Resource the Primary Developer, Peer Tester, and DBA Resource Must check their work against the SDS and MIS standards Must notify the project manager that code has gone to Peer Testing
Peer Tester
Must test the application against the SDS and MIS standards Must inform the project manager of any rework required
DBA Resource
Must ensure database standard compliance
___________________________________________________________________________________ Page 4 of 8
Build: Build Test Document [Version: x.x]
[Project Name]
_______________________________________________________________________________________________________
3 PRIMARY DEVELOPER TESTING The Primary Developer of the application must check their work against the System Design Spec, and against MIS standards. Activity Web Style Standards and Interface Design Browser Standard Compliance Accessibility Requirements
Date Tested
Notes
___________________________________________________________________________________ Page 5 of 8
Build: Build Test Document [Version: x.x]
[Project Name]
_______________________________________________________________________________________________________
4 PEER TESTING The Peer Tester should focus on testing each process as specified in the SDS. Process Testing SDS Process Name
SDS Paragraph Ref
Pass/Fail
Notes
If any processes fail, please include the issue number from the Test Log. Section 6.1 provides details of open issues. Other Requirements Activity Web Style Standards and Interface Design Browser Standard Compliance Accessibility Requirements
Pass/Fail
Notes
___________________________________________________________________________________ Page 6 of 8
Build: Build Test Document [Version: x.x]
[Project Name]
_______________________________________________________________________________________________________
5 DBA TESTING A DBA Tester may be required to ensure database standard compliance. The Technical Services team have DBA checks that should be cross referenced and linked to this document to ensure that more detailed checks have been completed prior to code being copied to Test. This standard is linked at: http://www.intra.mis.ed.ac.uk/Organisation/DSG/TechServ/Procedures/Oracle/DBA_test_review_check list.htm Exceptions from DBA Testing
Link to completed DBA test review document State Pass or Fail
___________________________________________________________________________________ Page 7 of 8
Build: Build Test Document [Version: x.x]
[Project Name]
_______________________________________________________________________________________________________
6 BUILD TEST SUMMARY Use this section to detail any issues that have not already been covered by the preceding sections
6.1 Open Issues Please insert a copy of any open issues from the Test Log, together with details of why these issues remain open at the sign off of the Build Stage.
6.2 Document Sign Off Primary Developer Peer Tester DBA Project Manager
Name Name Name Name
___________________________________________________________________________________ Page 8 of 8