Q1. If fire alarm starts then elevators are one of the best ways to get out of the building, as it is fastest. (TRUE or FALSE) Answer:Q.2. What is the difference between business continuity and disaster recovery? Answer:________________________________________________________ ________________________________________________________ __________ Q3. Business continuity is proactive or reactive? Answer:Q4. When is the emergency actually over for a company? A. When all people are safe and accounted for B. When all operations and people are moved back into the primary site C. When operations are safely moved to the off-site facility D. When a civil official declares that all is safe Answer:-

Q5. There are several reasons for a company to develop and implement a disaster recovery plan. What is the most important goal of disaster recovery? A. Protect the integrity of the business B. Protect critical operating systems C. Protect human life D. Protect customer relationships Answer:Q6. In the moments following a disaster, who should be called first? A. CEO B. The person designated in the continuity plan C. Board of directors D. Family of the injured Answer:Q7. What is the time frame for BCP? A. One Month B. One Year C. Three Years D. Continuous

Answer:Q8. What is the risk of inadequate humidity control? A. Overheating processors

B. Demagnetization of media C. Loss of power D. Static electricity discharge Answer:Q9. Which of the following service does disaster recovery planning forward? A. Availability B. Accuracy C. Acceptability D. Authenticity Answer:Q10. Which is not the step of business recovery process? A. Disaster B. Response C. Restoration

D. Return Answer:Q11. Contingency planner should never consider simple loss of data or erroneous erasure of data as disasters that materially affect the entire organization. (TRUE/ FALSE) Answer:Q12. Which of them is not the objective of business continuity? A. Reduce the likelihood of a disruption occurring that affects your business, through risk management process B. Maximize the impact of that interruption C. Protect business D. Protect employee Answer:Q13. The maximum allowable downtime after an outage for recovering systems, applications, and functions is A. Recovery Point Objective B. Recovery Time Objective C. Maximum Outage Objective D. Maximum tolerable period

Answer:Q14. What is the most common data recovery strategy and usually the best location for storage of backup tapes? A. In the primary server room in a fireproof container B. In the system administrator’s office in a fireproof container C. In an off-site location in a fireproof container D. In the security officer’s home in a fireproof container Answer:-

Q15. Recovery strategies consider all EXCEPT: A. User recovery B. Expense recovery C. Data recovery D. Facility recovery Answer:-