EQUIPMENT FAILURE ANALYSIS WORKSHEET Date of Failure Equipment Brief description of failure which caused the stoppage/breakdown:
Shift & Time
Is the equipment covered under an existing Planned Maintenance Scheme? If yes above, was it carried out on time and all appropriate checks completed? Sketch must accompany each failure were feasible:
Using the description & sketch, list all the factors which have contributed to the equipment failure:
List all the countermeasure which will prevent the above factors:
Name of analyser
Design by D R McLaren (4th Feb 2003)
Date of analysis