REKAPITULASI BOQ KEGIATAN PEMBANGUNAN /RENOVASI GEDUNG DAN BANGUNAN PEKERJAAN REKONTRUKSI RUMAH DINAS TYPE 70 DAN TYPE 50 PADA KANTOR PELAYANAN PERBENDAHARAAN NEGARA KARAWANG TAHUN ANGGARAN 2018 LOKASI : JALAN CAKRADIREJA NO. KARAWANG NO
JUMLAH TOTAL
URAIAN PEKERJAAN
1
( Rp. ) 2
I II III IV V VI VII
3
PEKERJAAN PERSIAPAN PEKERJAAN TANAH PEKERJAAN PONDASI PEKERJAAN BETON PEKERJAAN DINDING , PLESTERAN + ACIAN, PEKERJAAN KUSEN ALUMUNIUM ( UKURAN 3 " PEKERJAAN KONSTRUKSI KUDA - KUDA , RANGKA ATAP
-
VIII PEKERJAAN PLAFOUND
-
IX X XI XII XIII
-
PEKERJAAN PENGECATAN PEKERJAAN INSTALASI LISTRIK PEKERJAAN PASANGAN KERAMIK LANTAI DAN DINDING PEKERJAAN SANITASI , AIR BERSIH DAN AIR KOTOR PEKERJAAN LAIN LAIN SUB JUMLAH ( I s/d XIII ) PPn JUMLAH TOTAL PEMBULATAN
10%
TERBILANG : ### EM.......................................................................................................................................... ### Karawang , ... ............. 2018 Penawar, Penyedia Jasa, CV./PT. .................................
................................. Direktris/Direktur
BOQ KEGIATAN PEMBANGUNAN /RENOVASI GEDUNG DAN BANGUNAN PEKERJAAN REKONTRUKSI RUMAH DINAS TYPE 70 DAN TYPE 50 PADA KANTOR PELAYANAN PERBENDAHARAAN NEGARA KARAWANG TAHUN ANGGARAN 2018 LOKASI : JALAN CAKRADIREJA NO. KARAWANG NO 1 I
URAIAN PEKERJAAN
VOL. T-50
2 PEKERJAAN PERSIAPAN 1 Papan Nama Kegiatan 2 Dokumen rekaman kegiatan 3 Pek.Bongkaran Bangunan lama : untuk type 70 pondasi lama masih dipergunakan , untuk type 50 pondasi lama dan dinding bata lama masih dipergunakan , bongkaran dinding type 70 ,bongkaran plesteran type 50 ,atap, kusen ,plafound , Stripping lahan dari sampah ,pepohonan , kotoran dibuang ke TPA 4 Pekerjaan Pengukuran Dan Bouwplank
II PEKERJAAN TANAH 1 Galian tanah lubang pondasi ≤1 m ( type. 70 , type.50 ) 2 Urugan Pasir dibawah pondasi jalur ,lantai dan rabat 3 Urugan tanah peninggian lantai dan rabat t.30 cm , tanah biasa dari luar lokasi pembangunan di padatkan dengan STAMPPER 4 Urugan Kembali tanah bekas galian III PEKERJAAN PONDASI 1 Pasangan Pondasi batu belah 1 : 5 ( type. 70 , type.50 ) IV PEKERJAAN BETON 1 Pekerjaan beton sloof 15/20 cm ,K - 175 site mix Pembesian U - 24 ( KS ) Bekisting papan 2 Pekerjaan beton kolom K1 , 15/30 cm K - 175 site mix Pembesian U - 24 ( KS ) Bekisting papan Stoot werk kayu 3 Pekerjaan beton kolom K 2 , 15/15 cm ,K - 175 site mix Pembesian U - 24 ( KS ) Bekisting papan 4 Pekerjaan beton kolom K 3 , 12/12 cm ,K - 175 site mix Pembesian U - 24 ( KS ) Bekisting papan 5 Pekerjaan beton ring balok , RB , 15/20 cm ,K - 175 site mix Pembesian U - 24 ( KS ) Bekisting papan 6 Pekerjaan beton , BA , BD ; 12/12 cm ,K - 175 site mix Pembesian U - 24 ( KS ) Bekisting papan 7 Pekerjaan beton , BE , 15/20 cm , 10/20 cm K - 175 site mix Pembesian U - 24 ( KS ) Bekisting papan Stoot werk kayu 8 Pekerjaan beton ,BT 1 , BT 2 ,BL ; 10/10 cm K - 175 site mix Pembesian U - 24 ( KS ) Bekisting papan Stoot werk kayu 9 Pek. beton meja dapur T.10 cm, Dak beton T.12 cm ,K - 175 site mix Pembesian U - 24 ( KS ) Bekisting papan Stoot werk kayu 10 Pek. beton tanpa tulangan 10/15 cm, ,K - 175 site mix 11 Pekerjaan Rabat beton keliling bangunan adukan 1 PC : 3 PSR : 5 SPLIT 12 Water Profing Dak Beton ( Sikka ) 13 Finishing beton halus ( PC ) V
VOL. T-70
PEKERJAAN DINDING , PLESTERAN + ACIAN, 1 Pasangan Bata Merah dinding dan Penahan rabat untuk beton adukan : 1 PC : 5 PSR 2 Plesteran dinding dan Openingan kusen adukan 1 : 5 + acian
VI PEKERJAAN KUSEN ALUMUNIUM ( UKURAN 3 " WARNA SILVER , SEK . ALEXINDO ) 1 Kusen Type P1, T.70, T.50 2 Kusen Type P2, T.70, T.50 3 Kusen Type P3 ( ( KM/WC ) T.70, T.50 4 Kusen Type J1, T.70, T.50 5 Kusen Type J2, T.70, T.50 6 Kusen Type J3, T. 70 7 Kusen Type J4, T. 50 8 Kusen Type J5, T. 50 9 Kusen Type BV, T.70, T.50
JUMLAH VOLUME
SAT.
3 1,00 1,00
1.00 #VALUE!
Rp.
Rp.
4
5
bh ls
-
ls
-
1,00
1.00
1,00
1,00 ls JUMLAH I m3 m3
-
8.74 5.22
5.88 4.20
26.800 0.83
17.360 1.90
44.16 m3 2.73 m3 JUMLAH II
-
6.660
3.240
9.90 m3 JUMLAH III
-
1.790 289.71 23.86 0.36 33.98 7.20 4.10 1.80 291.33 23.99 0.32 72.22 5.33 1.79 289.71 23.86 0.63 101.96 10.50 0.25 29.02 3.75 1.75 0.63 108.69 14.72 7,70 0.23 19.95 2.75 2.31 0.30 1.16 3.00 13.37
0.360 42.66 4.80 0.36 42.66 2.70 1.54 0.74 123.68 9.81 0.26 58.64 4.32 1.46 172.49 19.40 0.59 133.39 20.62
2.15 m3 332.37 kg 28.66 m2 0.72 m3 76.64 kg 9.90 m2 5.64 m2 2.54 m3 415.01 kg 33.80 m2 0.58 m3 130.86 kg 9.65 m2 3.25 m3 462.20 kg 43.26 m2 1.22 m3 235.35 kg 31.12 m2 0.25 m3 29.02 kg 3.75 m2 1.75 m2 1.05 m3 189.61 kg 29.72 m2 #VALUE! m2 0.40 m3 34.98 kg 4.78 m2 4.05 m2 0.30 m3 2.53 m3 6.00 m2 20.57 m2 JUMLAH IV
215.17 363.83
113.71 354.20
328.88 m2 718.03 m2 JUMLAH V
-
1.00 5.00 1.00 4.00 3.00 2.00 1.00
1.00 3.00 1.00 2.00 2.00
2.00 unit 8.00 unit 2.00 unit 6.00 unit 5.00 unit 2.00 unit 2.00 unit 1.00 unit 3.00 unit JUMLAH VI
-
1.00
0.42 80.92 15.00 0.17 15.03 2.03 1.74 1.37 3.00 7.20
1.00 1.00 2.00
14.62 9.42
HARGA SATUAN JUMLAH HARGA
#VALUE! -
NO
URAIAN PEKERJAAN
1 2 VII PEKERJAAN KONSTRUKSI KUDA - KUDA , RANGKA ATAP BAJA RINGAN DAN PENUTUP ATAP 1 Pasangan Kuda kuda dan atap baja ringan ( sudut kemiringan 30 ⁰ ) , lengkap assesories setara TASSO METAL CNP ( C 75 x 35x 0.8 ), Tebal plat CNP : 1 mm,berikut atap METAL ROOF, setara SAKURA tebal 0.35 mm ,Type Vlam warna, berpasir 2 Pasangan bubungan genting Metal Roof, tebal 0,35 mm setara SAKURA ,Type Nok As,warna, berpasir 3 Pasangan Papan Listplank GRC Plate 1/20 cm motif serat kayu ( warna ) VIII PEKERJAAN PLAFOUND 1 Pasangan rangka plafound menggunakan PIPA PERSEGI HOLLOW GALVANIS ; rangka utama 4/4 cm , rangka pembagi 4/4 cm dan gantungan 4/4 cm dan kawat seng 2 Pasangan plafound menggunakan GYPSUM PLATE Plate T. 9 mm, untuk plafound ruanganberikut couting dan strimin, setara JAYA BOARD 3 Pasangan list Gypsum Type HK : 5 CM IX PEKERJAAN PENGECATAN 1 Cat/laburan dinding dan kolom dengan cat tembok + plamur setara SUNLEX ( 3 x ) 2 Cat/laburan plafound + list dgn cat tembok , setara SUNILEX (3 x ) X
PEKERJAAN INSTALASI LISTRIK 1 BP listrik 2 Sertifikasi laik operasi ( SLO ) dari konsuil 3 Distribusi Panel MCB 3 Grup,HAGER ( 400x300x200 ), berikut MCB dan Assesories 4 Instalasi titik peneranagan berikut shakclar , bahan dan pasang 5 Instalasi stop kontak biasa berikut bahan dan pasang 6 Instalasi stop kontak AC berikut bahan dan pasang 7 Pasangan Lampu LED - 14 watt berikut fiting ( setara Philips ) 8 Pasangan Lampu LED - 9 watt berikut fiting ( setara Philips ) 9 Pasangan Lampu LED - 20 Watt berikut Kap baret Type Bulat
XI PEKERJAAN PASANGAN KERAMIK LANTAI DAN DINDING 1 Pasangan lantai keramik ruangan , teras ukuran 30/30 cm, Setara MULIA 2 Pasangan lantai keramik KM/WC , ukuran 20/20 cm Setara MULIA 3 Pasangan Border Keramik dinding KM/WC, meja dapur ,ukuran 8/20 cm Setara MULIA 4 Pasangan keramik Dinding meja dapur dan KM/WC , tiang kolom depan T.70 ( motif batu alam) ukuran 20/25 cm Setara MULIA XII PEKERJAAN SANITASI , AIR BERSIH DAN AIR KOTOR 1 Penyambungan air PDAM ( SR ) 2 Instalasi pipa air bersih dari sumber air ke kran PVC dia. 3/4 ",1 " , 1 1/2 " , setara wavin-AW 3 Instalasi air kotor dari kloset, floor drain , kitchenzink ke septicktank pipa PVC dia. 2" , 3 " , 4 " setara wavin-AW berikut assesories 4 Pas. Septictank BIO -PRO ( Kap. 2000 lt ), berikut pipa inlet PVC - 4" ,pipa suling suling PVC 4 " Rembesan, pipa PVC - 3 " untuk hawa , hand hole untuk penguras, ( untuk 2 KM/WC ) 5 Pasangan Closet Jongkok lengkap , setara TOTO 6 Pasangan Kithcn zink Stainless berikut Kran air type Leher Angsa dia. 3/4 ", setara TOHO 7 Kran air type kait dia. 1/2 " untuk KM/WC , Taman , setara TOHO 8 Pasangan Ember , Gayung dan Tutup 9 Pasangan floor drain , stainless stell XIII PEKERJAAN LAIN LAIN 1 Pembersihan halaman bekas pekerjaan
VOL. T-70
VOL. T-50
JUMLAH VOLUME
SAT.
3
Rp.
Rp.
4
5
130.62
83.50
214.12
11.65 35.30
7.00 20.20
18.65 m' 55.50 m' JUMLAH VII
-
86.16
62.44
148.60
-
86.16 144.00
62.44 86.40
148.60 m2 230.40 m' JUMLAH VIII
-
352.97 86.16
361.40 62.44
714.37 m2 148.60 m2 JUMLAH IX
-
1,300 1,300
900 900
1.00 13.00 6.00 4.00 11.00 1.00 1.00
1.00 13.00 4.00 3.00 11.00 1.00 1.00
74.32 2.50
47.46 2.50
121.78 5.00
m2 m2
-
54.75
48.00
102.75
bh
-
20.83
13.30
1.00
1.00
2.00
unit
-
1.00
1.00
2.00
ls
-
1.00
1.00
2.00
ls
1.00
unit
2.00
unit
-
1,00 1.00
1.00
1.00 2.00 1.00 1.00
1.00 2.00 1.00 1.00
1,00
2,200.00 2,200.00
m2
HARGA SATUAN JUMLAH HARGA
m2
VA VA
2.00 unit 26.00 ttk 10.00 ttk 7.00 ttk 22.00 bh 2.00 bh 2.00 bh JUMLAH X
34.13 m2 JUMLAH XI
2.00 unit 4.00 bh 2.00 bh 2.00 bh JUMLAH XII #VALUE! ls JUMLAH XIII
-
-
-
#VALUE! -
No.
JENIS
HAR GA
SATUAN
KETERANGAN
1
2
3
4
5
I.
U PA H 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
95,000.00 110,000.00 120,000.00 110,000.00 120,000.00 110,000.00 120,000.00 110,000.00 120,000.00 110,000.00 120,000.00 110,000.00 120,000.00 150,000.00 120,000.00 150,000.00
1 TANAH SETEMPAT 2 TANAH MERAH PENINGGIAN LANTAI/SITE 3 SIRTU DISARING
Rp. Rp. Rp.
M3 M3 120,000.00 M3
4 PASIR URUG
Rp.
120,000.00 M3
5 PASIR PASANG
Rp.
240,000.00 M3
6 PASIR BETON
Rp.
230,000.00 M3
7 SCRENING
Rp.
M3
8 BATU PECAH 1-2 CM
Rp.
220,000.00 M3
II.
PEKERJA TUKANG BATU KEPALA TUKANG BATU TUKANG KAYU KEPALA TUKANG KAYU TUKANG CAT/PLITUR KEPALA TUKANG CAT/PLITUR TUKANG BESI BETON KEPALA TUKANG BESI BETON TUKANG BESI PROFIL KEPALA TUKANG BESI PROFIL PEMBANTU OPERATOR OPERATOR TERLATIH SUPIR TERAMPIL PEMBANTU SUPIR MAN D O R
1 ORANG/HR 1 ORANG/HR 1 ORANG/HR 1 ORANG/HR 1 ORANG/HR 1 ORANG/HR 1 ORANG/HR 1 ORANG/HR 1 ORANG/HR 1 ORANG/HR 1 ORANG/HR 1 ORANG/HR 1 ORANG/HR 1 ORANG/HR 1 ORANG/HR 1 ORANG/HR
BAHAN
9 BATU PECAH MESIN 2/3
Rp.
M3
10 BATU PECAH MESIN 3/5
Rp.
M3
11 BATU BELAH UNTUK PONDASI
Rp.
M3
12 BATU ANDESIT BERIKUT FINISHING COUTING WARNA NATURAL GLOSS
Rp.
M2
13 BATU CANDI 10/20 CM , 15/30 CM BERIKUT COUTING WARNA HITAM GLOSS
Rp.
M2
14 BATU TEMPLEK BERIKUT FINISHING COUTING WARNA NATURAL GLOSS
Rp.
M2
15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
BATA MERAH BAKAR ROSTER/KRAWANG PAVING BLOCK NATURAL 8 CM (LOKAL) PAVING BLOCK WARNA 8 CM (LOKAL) BATU KAPUR (PUDEL) SEMEN PC (TIGA RODA - 50 KG/ZAK) SEMEN WARNA (DUA GUNUNG) SEMEN WARNA (MITZUBISHI) PLAMIR TEMBOK (SANLEX) CAT TEMBOK ( SUNLEX) CAT TEMBOK (VINILEX) CAT DASAR ( ALKALI ICI INTERIOR) CAT TEMBOK ( ICI INTERIOR) CAT TEMBOK ( ICI EXTERIOR ) DULUX ROL CAT TEMBOK KAPE TEMBOK KAPE KAYU SOLIGNEUM KWAS 2" KWAS 3" KWAS 4" OKER (MATAHARI) OYAN OTEM (PEWARNA PLITUR) SPIRTUS SODA API BAHAN PLITUR KRIPIK (SIRLAK INDIA) DEMPUL LILIN DEMPUL PLITUR DEMPUL HALUS.IMPRA (WOOD FILLER) TERPENTIN TINNER B
BH BH M2 M2 M3 1,500.00 ZAK 1,900.00 KG 1,900.00 KG KG KG KG LTR LTR LTR BH BH BH LTR BH BH BH KG BKS BKS LTR BKS KG KG KG KG LTR LTR
No.
JENIS
1
HAR GA
2 47 48 49 50 51 52 53 54 55 56 57 58 59 59 60 61 62 63 64 65 66 67 68
KUMPON MELAMIK AMPELAS DUCO VERNIS (COPAL) PLITUR JADI (KEMUDI) DEMPUL KAYU (GENTONG) MENI KAYU/BESI (GENTONG) CAT KAYU (SEIV) CAT KAYU (DECOLUX) CAT BESI (SEIV) CAT BESI (DECOLUX) FLINGCOAT (GENTONG) COATING / VERNISH BATU ALAM KAYU LOKAL/RAWA (ALBASIAH) KAYU BALOK MARANTI KAYU PAPAN MARANTI KAYU BALOK MAHONI KAYU PAPAN MAHONI KAYU TERENTANG KAYU BALOK BORNEO SUPER KAYU PAPAN BORNEO SUPER KAYU BALOK KAMPER BANJAR KAYU PAPAN KAMPER BANJAR
SATUAN
KETERANGAN
4
5
3 Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
KG KG LBR LTR LTR KG KG KG KG KG KG LTR KG M3 M3 M3 M3 M3 M3 M3 M3 M3 M3
69 KAYU BALOK KAMPER OVEN
Rp.
M3
70 KAYU PAPAN KAMPER OVEN
Rp.
M3
71 LIST PROFIL 5/5 72 LIST PROFIL 1 x 8 (PLIN) 73 LIST PROFIL 1 x 5
Rp. Rp. Rp.
M' M' M'
74 LIST KAYU 1,5 x 10 cm
Rp.
M'
75 LIST KAYU 1 x 4 cm
Rp.
4,000.00 M'
76 77 78 79 80 81 82 83 84 85
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
M' LBR LBR LBR LBR 85,000.00 LBR LBR LBR LBR LBR
Rp.
R0L
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
LBR LBR LBR LBR LBR LBR SET BH BH BH M2 M2 M2 M2 M2 M2 BH BH
105 GRAVEL Ø 20 CM
Rp.
BH
106 GRAVEL Ø 30 CM
Rp.
BH
107 108 109 110
Rp. Rp. Rp. Rp.
11,000.00 KG KG M3 M3
LIST PROFIL UNTUK KUSEN BAHAN PLAFOND GRC 4 MM TRIPLEK 3 MM (120 x 240 CM) TRIPLEK 4 MM (120 x 240 CM) TRIPLEK 3 MM (UKURAN PINTU) TRIPLEK 6 MM (120 x 240 CM) TRIPLEK 9 MM (120 x 240 CM) MULTIPLEK 9 MM (120 x 240 CM) MULTIPLEK 12 MM (120 x 240 CM) MULTIPLEK 15 MM (120 x 240 CM)
86 WALL PAPER 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104
MEGATEK TEAKWOOD 4 MM (UKURAN PINTU) TEAKWOOD 4 MM (120 x 240 CM) MELAMIN 4 MM ( 120X240 CM) FORMIKA ( UKURAN PINTU ) ALUMUNIUM T.0.2 MM( UKURAN PINTU ) PINTU KM/WC BAHAN FIBRE (MOTIF) KUKU MACAN (PINGGULAN KERAMIK) KERAMIK STAIR NOSING 20 CM LIST / BORDER KERAMIK 8/20 KERAMIK 20/20 KW 1 ANTI SLIP (KM/WC) (MULIA) KERAMIK DINDING 20/25 KW 1 WARNA (MULIA) KERAMIK 40/40 WARNA (MULIA) KERAMIK 30/30 PUTIH (MULIA) KERAMIK 60/60 WARNA ( MULIA ,ROMAN) GRANIT 60 x 60 cm EX. CINA GRAVEL 1/2 Ø 20 CM GRAVEL 1/2 Ø 30 CM
BESI BETON U 24 (RATA-RATA) BESI BETON U 39/U 32 (RATA-RATA) BETON READY MIX K-175 (6 M2) BETON READY MIX K-225 (6 M2)
5 M2/ROL
No.
JENIS
1
2 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145
BETON READY MIX K-250 (6 M2) BETON READY MIX K-300 (6 M2) BETON READY MIX K-350 (6 M2) BESI PLAT STRIP BESI PLAT ESSER 1,4 MM BESI PROFIL DN SII BESI SIKU EX DN BESI IWF EX. DN SII KAWAT LAS KARBIT KAWAT BRONJONG KAWAT BETON BESI HOLLOW 6 x 6 CM T.2 MM BESI HOLLOW 4 x 6 CM T.2 MM BESI HOLLOW 4 x 4 CM T.2 MM BESI HOLLOW 2 x 4 CM T.2 MM BESI HOLLOW 2 x 2 CM T.2 MM SENG PLAT BJLS 30 LEBAR 55 CM (100 M') SENG PLAT BJLS 30 LEBAR 90 CM (100 M') SENG GELOMBANG BJLS 28 (80 x 180) WIREMESH M10 ZINK ALUME TYPE BONDECK T.0,35 ZINK ALUME TYPE SPANDECK T.0,35 BAJA RINGAN CNP ( C 75 x 35x 0.8 ), Tebal plat CNP : 1 mm GENTENG PLENTONG PRES BAKAR SOLAR (JATIWANGI/PLERED) GENTENG PLENTONG PRES BAKAR SOLAR (LOKAL) Rp. BH BUBUNGAN GENTENG PLENTONG PRES (JATIWANGI/PLERED) BUBUNGAN GENTENG PLENTONG PRES (LOKAL) GENTENG BETON (MAHKOTA) BUBUNGAN GENTENG BETON (MAHKOTA) ASBES MOTIP GENTENG ASBES GELOMBANG (105 x 180) BUBUNGAN ASBES KACA POLOS 3 MM KACA POLOS 5 MM KACA RAYBEN 3 MM
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
HAR GA
SATUAN
KETERANGAN
3
4
5
M3 M3 M3 KG KG KG KG KG KG KG 20,000.00 KG BTG BTG BTG BTG BTG M' M' LBR M2 M2 M2 M2 BH BH BH BH BH BH BH BH BH M2 M2 M2
146 KACA TEMPERED GLASS 8 MM
Rp.
M2
147 KACA RAYBAND 8 MM
Rp.
M2
148 KACA RAYBAND 5 MM
Rp.
M2
149 PAKU SUMBAT
Rp.
BH
150 151 152 153 154
Rp. Rp. Rp. Rp. Rp.
KG
155 SKRUP GYPSUM 156 PENYAMBUNGAN PDAM
Rp.
KG
Rp.
PAKET
157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174
Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
M' M' M' M' M' M' M' M' M' M' M' TUBE KG KG BH BH BH BH
Rp.
BTG
PAKU REPERT PAKU 1 - 3 Cm PAKU 5 - 7 Cm PAKU 8 - 12 Cm RODA / GEAR
PIPA PVC Ø 1/2" AW (Wavin) PIPA PVC Ø 3/4" AW (Wavin) PIPA PVC Ø 1" AW (Wavin) PIPA PVC Ø 1 1/4" AW (Wavin) PIPA PVC Ø 1 1/2" AW (Wavin) PIPA PVC Ø 2" AW (Wavin) PIPA PVC Ø 2 1/2" AW (Wavin) PIPA PVC Ø 3" AW (Wavin) PIPA PVC Ø 4" AW (Wavin) PIPA PVC Ø 3" D (Wavin) PIPA PVC Ø 4" D (Wavin) LEM PARALON LEM PUTIH (FOX) LEM KUNING (AICA/AIBON) CLOSET JONGKOK (TOTO) KITCHEN ZINK KRAN AIR LEHER ANGSA TOHO SARINGAN LANTAI/FLOOR DRAIN
175 HOLLOW 4 x 4 CM (SEDANG) GLV UNTUK PLAFOUND
6 M'/BTG 6 M'/BTG 6 M'/BTG 6 M'/BTG 6 M'/BTG
KG KG BH
4 M'/BTG
No.
JENIS
1
2
HAR GA
SATUAN
3
4
KETERANGAN 5
176 HOLLOW 2 x 4 CM (SEDANG) GLV UNTUK PLAFOUND
Rp.
BTG
4 M'/BTG
177 HOLLOW 2 x 4 CM (SEDANG) (GALVALUME) UNTUK PARTISI
Rp.
BTG
4 M'/BTG
178 HOLLOW 4 x 4 CM (SEDANG) (GALVALUME) UNTUK PARTISI
Rp.
BTG
4 M'/BTG
179 KUSEN ALUMINIUM 1 1/2 X 3" WARNA BROWN (ELEXINDO)
Rp.
M'
180 KUSEN ALUMINIUM 1 1/2 X 3" WARNA SILVER (ELEXINDO)
Rp.
M'
181 KUSEN ALUMINIUM 1 1/2 X 3" POWDER COATING (ELEXINDO)
Rp.
M'
182 KUSEN ALUMINIUM 1 3/4 X 4" WARNA (ELEXINDO)
Rp.
M'
183 KUSEN ALUMINIUM 1 3/4 X 4" SILVER (ELEXINDO)
Rp.
M'
184 KUSEN ALUMINIUM 1 3/4 X 4" POWDER COATING (ELEXINDO)
Rp.
M'
185 KARET KACA + GASKET
Rp.
M'
186 PAKU KLEM
Rp.
kg
187 SILIKON
Rp.
M'
188 PRIME PINTU ALUMINIUM, WARNA BROWN (ELEXINDO)
Rp.
M'
189 PRIME JENDELA ALUMINIUM , WARNA BROWN (ELEXINDO)
Rp.
M'
190 RAMBUNCIS
Rp.
BH
191 ENGSEL CASEMENT 16"
Rp.
SET
1 SET 2 BH
192 ENGSEL CASEMENT 12"
Rp.
SET
1 SET 2 BH
193 PRIME JENDELA ALUMINIUM WARNA
Rp.
M'
194 HANDLE/PEGANGAN PINTU ALUMINIUM
Rp.
SET
195 KUNCI PINTU ALUMINIUM
Rp.
SET
196 EXPAGNOLTE/KUNCI TANAM
Rp.
SET
INSTALASI AIR BERSIH 197 PENYAMBUNGAN PDAM
Rp.
198 GATE VALVE 1,5 "kuningan KITZ
Rp.
BH
199 BIAYA GALIAN DAN URUGAN KEMBALI INSTALASI PIPA DISTRIBUSI AIR BERSIH 200 BAK KONTROL
Rp. Rp.
BH
Rp.
UNIT
201 POMPA JET-PUMP 500 WATT SEK. GROUNDPOSE LENGKAP DENGAN RUMAH POMPA DAN KABEL DAYA 202 TANGKI ATAS KAPASITAS 1 M3 SEKUALITAS PENGUIN LENGKAP Rp.
UNIT
203 WATERLEVEL KONTROL LENGKAP KABEL NYM 3 X 2.5 MM2
DENGAN DUDUKAN
Rp.
BH
204 SARINGAN LANTAI/FLOOR DRAIN STAINLESS -STELL
Rp.
BH
205 TEMPAT SABUN WASTAFEL
Rp.
BH
206 CLOSET JONGKOK (TOTO)
Rp.
SET
207 BAK KM 60 X 60 FIBRE
Rp.
BH
208 STOP KRAN 1/2" (taho)
Rp.
BH
209 STOP KRAN 1,5" (KITZ)/GATE VALVE
Rp.
BH
210 UPAH PENGEBORAN
Rp.
M
PEKERJAAN ELEKTRIKAL 211 BIAYA PENYAMBUNGAN KE PLN
Rp.
VA
212 SERTIFIKASI LAIK OPRASI ( SLO) DARI KONSUIL
Rp.
VA
213 UANG JAMINAN LANGGANAN ( UJL )
Rp.
VA
214 DISTRIBUSI PANEL ( BERIKUT MCB 4 Grup,HAGER ( 400x300x200 )
Rp.
UNIT
215 Lampu gantung SL- 18 watt berikut kap ( setara Philips )
Rp.
BH
216 Lampu TL .1 x 20 watt berikut kap ( setara Philips )
Rp.
BH
217 LAMPU FITTING LED 5 - 10 Watt
Rp.
BH
218 LAMPU FITTING LED 18 watt, KAP BARET
Rp.
BH
219 SAKLAR TUNGGALl 16 A, 1 phasa
Rp.
BH
220 SAKLAR GANDA 16 A, 1 phasa
Rp.
BH
221 STOP KONTAK TUNGGAL 16 A, 1 phasa
Rp.
BH
222 STOP KONTAK GANDA 16 A, 1 phasa
Rp.
BH
223 STOP KONTAK AC c/w INDICATOR LAMP. 16 A, 1 phasa
Rp.
BH
224 INSTALASI PENERANGAN NYM 3X2,5 mm2
Rp.
TTK
225 INSTALASI STOP KONTAK NYM 3x 2,5 mm2
Rp.
TTK
226 INSTALASI STOP KOTAK AC NYM 3x 2,5 mm2
Rp.
TTK
227 228 229 230 231 232
Rp. Rp. Rp. Rp. Rp. Rp.
M2 BH M2 BH BH BH
GENTENG METAL (TABUR PASIR) TEBAL 0,35 MM BUBUNGAN GENTENG METAL (TABUR PASIR) TEBAL 0,35 MM GENTENG METAL (WARNA) TEBAL 0,35 MM (TERPASANG) BUBUNGAN GENTENG METAL (WARNA) TEBAL 0,35 MM (TERPASANG) KUNCI TANAM ANTIK KUNCI TANAM BESAR SLYNDER , 3 ANAK KUNCI SETARA SEIS
No.
JENIS
1
HAR GA
2 233 234 235 236 237 238 239 240 241 242 243 244
REL PINTU GESER ( MARATHON ) LENGKAP TARIKAN ,TUTUP REL FLOORING HANGER DORMA PEGANGAN PINTU KAIT ANGIN (KUNINGAN) ENGSEL PINTU (UNILON) ENGSEL JENDELA (UNILON) ENGSEL ANGIN MINYAK BAKAR SOLAR MINYAK BAKAR PREMIUM MINYAK TANAH MINYAK PELUMAS KAWAT LAS LISTRIK
SATUAN
KETERANGAN
4
5
3 Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp. Rp.
SET SET SET BH BH BH BH LITER LITER LITER LITER KG
245 BAMBU (Ukuran SEDANG)
Rp.
BTG
246 INJUK 247 AIR UNTUK KERJA
Rp. Rp.
KG LTR
248 BAHAN PLAFOND GYPSUM 9 mm
Rp.
LBR
249 LIST GIFSUM 5 CM
Rp.
BTG
2 M'/BTG
250 LIST GIFSUM 8 CM
Rp.
BTG
2 M'/BTG
251 LIST GIFSUM 10 CM
Rp.
BTG
2 M'/BTG
252 LIST GIFSUM 12 CM
Rp.
BTG
2 M'/BTG
253 KAIN STRIMIN
Rp.
ROL
10 M'/ROL
254 LEM PLAMIR GIFSUM
Rp.
ZAK
30 KG/ZAK
255 GLASS BLOCK
Rp.
BH
256 WASTAFEL ( TOTO ) LENGKAP KRAN KEHER ANGSA , CERMIN , G. HANDUK
Rp.
UNIT
257 CLOSET DUDUK ( TOTO ) MONO BLOCK LKP ZET SHOWER , SHOWER SPRAY
Rp.
UNIT
258 WATER PROOFING (AQUA PROF)
Rp.
KG
259 BAK MANDI FIBRE ( 0. 3 M3 )
Rp.
BH
260 SEPTICTANK (SETARA BIOPRO BST-03-N), KAP. 2000 LT
Rp.
Unit
261 POLYCARBONAT 9 MM (UK. 2,1 M' X 11,8 M')
Rp.
LBR
262 LIST GRC 10 CM
Rp.
BTG/2,5
2,5 M'/BTG
263 LIST GRC 20 CM
Rp.
BTG/2,5
2,5 M'/BTG
264 PIPA GIV MEDIUM Ø 1 "
Rp.
BTG
6 M'/BTG
265 PIPA GIV MEDIUM Ø 1 1/2"
Rp.
BTG
6 M'/BTG
266 PIPA GIV MEDIUM Ø 2"
Rp.
BTG
6 M'/BTG
267 PIPA GIV MEDIUM Ø 2 1/2"
Rp.
BTG
6 M'/BTG
268 PIPA GIV MEDIUM Ø 3"
Rp.
BTG
6 M'/BTG
269 ESPAGNOLET/SLOT TANAM
Rp.
BH
270 COATING / VERNISH BATU ALAM
Rp.
KG
271 LANTAI VINYL
Rp.
M2
Karawang , ... ............. 2018 CV./PT. .................................
................................. Direktris Utama
PENGADAAN JASA KONSTRUKSI
KEGIATAN PEMBANGUNAN /RENOVASI GEDUNG DAN BANGUNAN PEKERJAAN REKONTRUKSI RUMAH DINAS TYPE 70 DAN TYPE 50
PADA KANTOR PELAYANAN PERBENDAHARAAN NEGARA KARAWANG TAHUN ANGGARAN 2018
DAFTAR HARGA UPAH DAN BAHAN TAHUN 2018 KABUPATEN KARAWANG
No.
KODE ANALISA
1
U RAIAN
2
HARGA SATUAN
3
4
1
A.002
1 M' PEK. PASANGAN BOUWPLANK
Rp.
2
A.007
1 M3 PEK. GALIAN TANAH BIASA MAX. KEDALAMAN 1 M'
Rp.
3
A.015
1 M3 URUGAN TANAH KEMBALI
Rp.
4
A.024
1 M3 URUGAN PASIR URUG
Rp.
5
A.025
1 M3 LANTAI KERJA BETON MUTU fc=7,4 Mpa (K 100), slump (3-6) cm, w/c=0,87
Rp.
6
A.027
1 M3 BETON MUTU fc=14,5 Mpa (K 175), slump (12±2) cm, w/c=0,66
Rp.
7
A.033
1 KG BESI BETON TERPASANG POLOS
Rp.
8
A.041
1 M2 BEKISTING DENGAN PAPAN
Rp.
9
A.050
1 M3 PASANGAN BATU BELAH, CAMP. 1 PC : 5 PP
Rp.
10
A.056.2
1 M2 DINDING KERAMIK 20 X 25 CM DN BERCORAK
Rp.
11
A.058
1 M2 LANTAI KERAMIK UKURAN 20 X 20 CM CORAK/ ANTI SLIP
Rp.
12
A.059
1 M2 LANTAI KERAMIK 30 X 30 DN PUTIH ( POLOS )
Rp.
13
A.084
1 M2 PASANGAN DINDING BATA MERAH 1 PC : 5 PP, TEBAL 1/2 BATA
Rp.
14
A.088
1 M2 PLESTERAN 1 PC ; 5 PP, TEBAL 15 MM + ACIAN
Rp.
15
A.089
1 M2 ACIAN PC
Rp.
16
A.097
1 M2 PENGECATAN DINDING SUNLEX (3x)
Rp.
17
A.098
1 M2 PENGECATAN PLAFOND SUNLEX (3x)
Rp.
18
A.104
1 M2 PAS. RANGKA PLAFOND RANGKA BESI HOLLOW 4X4 CM,BERIKUT GANTUNGAN KAWAT
Rp.
19
A.106
1 M' PAS. LIST GYPSUM 5 CM
Rp.
20
A.107
1 M2 PAS. BAHAN PLAFOND GYPSUM 9 MM PENUTUP PADA RANGKANYA
Rp.
21
200.08.2
1 M3 URUGAN TANAH MERAH DIRATAKAN
Rp.
22
550.03.R
1 BH PAS. CLOSET JONGKOK TOTO LENGKAP
Rp.
23
550.03.R
1 UNIT PAS. KITCHENZINK LENGKAP KRAN LEHER ANGSA SAN-AI
Rp.
24
ST.BIO-2
1 UNIT SEPTICTANK BIOPRO KAP. 2.000 LT
25
BR
1 M2 PAS. KUDA-KUDA BAJA RINGAN + GENTENG METAL ROOP BERPASIR
Rp.
26
BR
1 M2 PAS. GENTENG METAL BERPASIR
Rp.
27
BR A.106
1 M1 PAS. BUBUNGAN GENTENG METAL BERPASIR
Rp.
1 UNIT KUSEN TYPE P3 FIBRE ( KM/WC )
Rp.
29
L-GRC
1 M' PEK. LISTPLANK GRC 20 cm
Rp.
30
A.106
1 UNIT KUSEN TYPE P1
Rp.
31
A.106
1 UNIT KUSEN TYPE P2
Rp.
32
A.106
1 UNIT KUSEN TYPE J 1
Rp.
33
A.106
1 UNIT KUSEN TYPE J 2
Rp.
34
A.106
1 UNIT KUSEN TYPE J3
Rp.
35
A.106
1 UNIT KUSEN TYPE J4
Rp.
36
A.106
1 UNIT KUSEN TYPE BV1
Rp.
28
Rp.
Karawang , ... ............. 2018 Penawar, Penyedia Jasa, CV./PT. .................................
................................. Direktris/Direktur
-
PENGADAAN JASA KONSTRUKSI
KEGIATAN PEMBANGUNAN /RENOVASI GEDUNG DAN BANGUNAN PEKERJAAN REKONTRUKSI RUMAH DINAS TYPE 70 DAN TYPE 50
PADA KANTOR PELAYANAN PERBENDAHARAAN NEGARA KARAWANG TAHUN ANGGARAN 2018
DAFTAR : ANALISA HARGA SATUAN TAHUN 2018 KABUPATEN KARAWANG
No.
KODE ANALISA
1 1
2 A.002 a. b. c. d.
2
A.005.1 a. b. c. d. e. f. g.
3
A.007 a. b.
4
A.015 a. b.
5
A.024 a. b. c. d.
6
A.025 a. b. c. d. e. f.
URAIAN
KOEFISIEN SATUAN
3 4 5 1 M' PEK. PASANGAN BOUWPLANK Kayu Kuat Kelas II (Maranti) 0.0100 M3 Paku 5 - 7 0.0380 Kg Ongkos Pasang 0.1550 Ls Upah Angkut 0.0000 Lot Jumlah Keuntungan Max. = 10.0000 % x Jumlah Dibulatkan 1 BH PAPAN NAMA KEGIATAN Kayu Kuat Kelas II (Maranti) 0.0060 M3 Triplek 3 mm 0.3472 Lbr Paku 5 - 7 Cm 0.2500 Kg Cat Minyak 1.0000 M2 Penulisan 0.2000 Ls Ongkos Pasang 0.3000 Ls Upah Angkut 0.0000 Lot Papan Nama Uk. 1,2 m x 0,8 m 0.9600 M2 Kaso 4/6 Kuat Kelas II (Maranti) (Tiang Penyangga) 0.0140 M3 Sub Jumlah Keuntungan Max. = 10.0000 % x Jumlah Dibulatkan 1 M3 PEK. GALIAN TANAH BIASA MAX. KEDALAMAN 1 M' Pekerja 0.7500 OH Mandor 0.0250 OH Jumlah Keuntungan Max. = 10.0000 % x Jumlah Dibulatkan 1 M3 URUGAN TANAH KEMBALI Pekerja 0.2500 OH Mandor 0.0083 OH Jumlah Keuntungan Max. = 10.0000 % x Jumlah Dibulatkan 1 M3 URUGAN PASIR URUG Pasir Urug 1.2000 M3 Pekerja 0.3000 OH Mandor 0.0100 OH Upah Angkut 0.0000 Lot Jumlah Keuntungan Max. = 10.0000 % x Jumlah Dibulatkan 1 M3 LANTAI KERJA BETON MUTU fc=7,4 Mpa (K 100), slump (3-6) cm, w/c=0,87 Semen PC (1 Zak 50 Kg) 4.6000 Zak Split Pecah Mesin 2/3 0.9300 M3 Pasir Beton 0.5500 M3 Air 200.0000 Liter Pekerja 1.2000 OH Tukang Batu 0.2000 OH
HARGA SATUAN
JUMLAH [4 x 6]
(Rp.)
(Rp.)
6
7 -
-
25,000.00 25,000.00 50,000.00 50,000.00 -
5,000.00 7,500.00 48,000.00 60,500.00 605,000.00 665,500.00 665,500.00
No.
KODE ANALISA
URAIAN
1
2 g. h. i.
3
7
8
A.027 a. b. c. d. e. f. g. h. i.
A.033 a. b. c. d. e. f. g.
9
10
11
A.041 a. b. c. d. e. f. g. h.
A.050 a. b. c. d. e. f. g. h.
A.056.2 a.
KOEFISIEN SATUAN
4
Kepala Tukang Batu 0.0200 Mandor 0.0600 Upah Angkut 0.0000 Jumlah Keuntungan Max. = 10.0000 % Jumlah Dibulatkan 1 M3 BETON MUTU fc=14,5 Mpa (K 175), slump (12±2) cm, w/c=0,66 Semen PC (1 Zak 50 Kg) 6.5200 Split Pecah Mesin 2/3 0.8300 Pasir Beton 0.5400 Air 215.0000 Pekerja 1.6500 Tukang Batu 0.2750 Kepala Tukang Batu 0.0280 Mandor 0.0830 Upah Angkut 0.0000 Jumlah Keuntungan Max. = 10.0000 % Jumlah Dibulatkan 1 KG BESI BETON TERPASANG POLOS UNTUK 10 KG Besi Beton Polos 10.5000 Kawat Beton 0.1500 Pekerja 0.0700 Tukang Besi 0.0700 Kepala Tukang Besi 0.0070 Mandor 0.0040 Upah Angkut 0.0000 Jumlah Untuk 1 Kg Besi Beton terpasang Keuntungan Max. = 10.0000 % Jumlah Dibulatkan 1 M2 BEKISTING DENGAN PAPAN Kaso 5/7 Kayu Kuat Kelas II (Maranti) (2x pakai) 50% 0.0170 Papan/Kayu Rawa (Albasiah) (2 X Pakai) 75 % 0.0240 Paku 0.4000 Pekerja 0.1200 Tukang Kayu 0.2700 Kepala Tukang Kayu 0.1500 Mandor 0.0500 Upah Angkut 0.0000 Jumlah Jumlah untuk 1 M2 Keuntungan Max. = 10.0000 % Jumlah Dibulatkan 1 M3 PASANGAN BATU BELAH, CAMP. 1 PC : 5 PP Batu Belah 15 Cm/ 20 Cm 1.2000 Semen PC (1 Zak 50 Kg) 2.7200 Pasir Pasang 0.5440 Pekerja 1.5000 Tukang Batu 0.7500 Kepala Tukang Batu 0.0750 Mandor 0.0750 Upah Angkut 0.0000 Jumlah Keuntungan Max. = 10.0000 % Jumlah Dibulatkan 1 M2 DINDING KERAMIK 20 X 25 CM DN BERCORAK Keramik KW 1 DN (warna ) 1.0600
5 OH OH Lot x
Zak M3 M3 Liter OH OH OH OH Lot x
Kg Kg OH OH OH OH Lot
x
M3 M3 Kg OH OH OH OH Lot
x
M3 Zak M3 OH OH OH OH Lot x
Dus
HARGA SATUAN
JUMLAH [4 x 6]
(Rp.)
(Rp.)
6
7
No.
KODE ANALISA
URAIAN
1
2 b. c. d. e. f. g. h. i.
3
12
13
14
15
A.058 a. b. c. d. e. f. g. h. i.
A.059 a. b. c. d. e. f. g. h. i.
A.084 a. b. c. d. e. f. g. h.
A.088 a. b. c. d. e. f. g.
KOEFISIEN SATUAN
4
Semen PC (1 Zak 50 Kg) 0.1860 Pasir Pasang 0.0180 Semen Warna 1.9400 Pekerja 0.9000 Tukang Batu 0.4500 Kepala Tukang Batu 0.0450 Mandor 0.0450 Upah Angkut 0.0000 Jumlah Keuntungan Max. = 10.0000 % Jumlah Dibulatkan 1 M2 LANTAI KERAMIK UKURAN 20 X 20 CM CORAK/ ANTI SLIP Keramik 20/20 KW 1 DN Corak/ Anti Slip 1.0600 Semen PC (1 Zak 50 Kg) 0.2080 Pasir Pasang 0.0450 Semen Warna 1.6200 Pekerja 0.7000 Tukang Batu 0.3500 Kepala Tukang Batu 0.0350 Mandor 0.0350 Upah Angkut 0.0000 Jumlah Keuntungan Max. = 10.0000 % Jumlah Dibulatkan 1 M2 LANTAI KERAMIK 30 X 30 DN PUTIH ( POLOS ) Keramik 30 x 30 cm ,KW 1 DN 1.0683 Semen PC (1 Zak 50 Kg) 0.2000 Pasir Pasang 0.0450 Semen Warna 1.0000 Pekerja 0.7000 Tukang Batu 0.3500 Kepala Tukang Batu 0.0350 Mandor 0.0350 Upah Angkut 0.0000 Jumlah Keuntungan Max. = 10.0000 % Jumlah Dibulatkan 1 M2 PASANGAN DINDING BATA MERAH 1 PC : 5 PP, TEBAL 1/2 BATA Bata Merah (5x11x22 Cm) 70.0000 Semen PC 0.1936 Pasir Pasang 0.0450 Pekerja 0.3000 Tukang Batu 0.1000 Kepala Tukang Batu 0.0100 Mandor 0.0150 Upah Angkut 0.0000 Jumlah Keuntungan Max. = 10.0000 % Jumlah Dibulatkan 1 M2 PLESTERAN 1 PC ; 5 PP, TEBAL 15 MM + ACIAN Semen PC 0.16868 Pasir Pasang 0.0260 Pekerja 0.3000 Tukang Batu 0.1500 Kepala Tukang Batu 0.0150 Mandor 0.0150 Upah Angkut 0.0000 Jumlah Keuntungan Max. = 10.0000 % Jumlah
5 Zak M3 Kg OH OH OH OH Lot x
Dus Zak M3 Kg OH OH OH OH Lot x
Dus Zak M3 Kg OH OH OH OH Lot x
Bh Zak M3 OH OH OH OH Lot x
Zak M3 OH OH OH OH Lot x
HARGA SATUAN
JUMLAH [4 x 6]
(Rp.)
(Rp.)
6
7
No.
KODE ANALISA
URAIAN
1
2
3
16
A.089 a. b. c. d. e. f.
17
A.097 a. b. c. d. e. f. g. h. i. j.
18
A.098 a. b. c. d. e. f. g. h. i. j.
19
A.104 a. b. c. d. e. f. g. h.
20
A.106 a. b. c. d. e. f. g. h.
KOEFISIEN SATUAN
4
5
HARGA SATUAN
JUMLAH [4 x 6]
(Rp.)
(Rp.)
6
7
Dibulatkan 1 M2 ACIAN PC Semen PC 0.0650 Zak Pekerja 0.2000 OH Tukang Batu 0.1000 OH Kepala Tukang Batu 0.0100 OH Mandor 0.0100 OH Upah Angkut 0.0000 Lot Jumlah Keuntungan Max. = 10.0000 % x Jumlah Dibulatkan 1 M2 PENGECATAN DINDING SUNLEX (3x) Cat Tembok Sunlex 0.1750 Kg Plamir Tembok 0.1600 Kg Rol Cat 0.0100 Bh Ampelas 0.5000 Lbr Pekerja 0.1040 OH Tukang Cat 0.1820 OH Kepala Tukang Cat 0.0195 OH Mandor 0.0100 OH Steger Werk 0.0450 Lot Upah Angkut 0.0000 Lot Jumlah Keuntungan Max. = 10.0000 % x Jumlah Dibulatkan 1 M2 PENGECATAN PLAFOND SUNLEX (3x) Cat Tembok Sunlex 0.2000 Kg Plamir Tembok 0.1600 Kg Rol Cat 0.0100 Bh Ampelas 0.5000 Lbr Pekerja 0.1040 OH Tukang Cat 0.1820 OH Kepala Tukang Cat 0.0195 OH Mandor 0.0100 OH Steger Werk 0.0425 Lot Upah Angkut 0.0000 Lot Jumlah Keuntungan Max. = 10.0000 % x Jumlah Dibulatkan 1 M2 PAS. RANGKA PLAFOND RANGKA BESI HOLLOW 4X4 CM,BERIKUT GANTUNGAN KAWAT Hollow 4 x 4 cm , GLV 5.0000 M' Paku repert 0.2000 Kg Gantungan kawat 2.0000 M' Pekerja 0.1500 OH Tukang Kayu 0.3000 OH Kepala Tukang Kayu 0.0300 OH Mandor 0.0750 OH Upah Angkut 0.0000 Lot Jumlah Keuntungan Max. = 10.0000 % x Jumlah Dibulatkan 1 M' PAS. LIST GYPSUM 5 CM List gypsum 5 cm 1.1000 m' Lem gypsum 0.2000 Kg paku gypsum 0.0100 kg Pekerja 0.1000 OH Tukang Kayu 0.0500 OH Kepala Tukang Kayu 0.0050 OH Mandor 0.0050 OH Upah Angkut 0.0000 Lot
No.
KODE ANALISA
URAIAN
1
2
3
21
22
23
24
25
26
KOEFISIEN SATUAN
4
5
Jumlah Keuntungan Max. = 10.0000 % x Jumlah Dibulatkan A.107 1 M2 PAS. BAHAN PLAFOND GYPSUM 9 MM PENUTUP PADA RANGKANYA a. Gyfsum 9 mm (uk. 120 x 240 cm) 0.3640 Lbr b. Paku Sekrup 0.1100 Kg c. Pekerja 0.1000 OH d. Tukang Kayu 0.0500 OH e. Kepala Tukang Kayu 0.0050 OH f. Mandor 0.0050 OH g. Upah Angkut 0.0000 Lot Jumlah Keuntungan Max. = 10.0000 % x Jumlah Dibulatkan 200.08.2 1 M3 URUGAN TANAH MERAH DIRATAKAN a. Tanah Merah 1.2000 M3 b. Pekerja 0.5600 OH c. Mandor 0.0150 OH d. Upah Angkut 0.0000 Lot Jumlah Keuntungan Max. = 10.0000 % x Jumlah Dibulatkan 550.03.R 1 BH PAS. CLOSET JONGKOK TOTO LENGKAP a. Closet Jongkok Standard TOTO 1.0000 Bh e. Pekerja 0.1000 OH f. Tukang Batu 0.1500 OH g. Kepala Tukang Batu 0.0300 OH h. Mandor 0.0110 OH i. Upah Angkut 0.0000 Lot Jumlah Keuntungan Max. = 10.0000 % x Jumlah Dibulatkan 550.03.R 1 UNIT PAS. KITCHENZINK LENGKAP KRAN LEHER ANGSA SAN-AI a. Kitchenzink lengkap kran leher angsa TOHO 1.0000 Bh e. Pekerja 0.1000 OH f. Tukang Batu 0.1500 OH g. Kepala Tukang Batu 0.0300 OH h. Mandor 0.0110 OH i. Upah Angkut 0.0000 Lot Jumlah Keuntungan Max. = 10.0000 % x Jumlah Dibulatkan ST.BIO-2 1 UNIT SEPTICTANK BIOPRO KAP. 2.000 LT a. Galian Tanah 5.4015 M3 b. Urugan Pasir 0.2262 M3 c. Urugan Tanah Kembali 1.8523 M3 d. Septictank setara Biopro BST-03-N, Kap. 2.000 Lt 1.0000 Unit e. Pipa PVC Ø 4" berlubang Lengkap 4.0000 M' f. Upah Pasang 0.1000 Lot Jumlah Keuntungan dan Over Head Max. = 10.0000 % x Jumlah Dibulatkan BR 1 M2 PAS. KUDA-KUDA BAJA RINGAN + GENTENG METAL ROOP BERPASIR a. Baja Ringan ( Setara TASSO METAL ) 1.0000 M2 b Genteng metal roop 1.0000 m2 c. Upah Pasang dan Alat Bantu 0.0000 Kg d Upah Angkut 0.0000 Lot Jumlah
HARGA SATUAN
JUMLAH [4 x 6]
(Rp.)
(Rp.)
6
7
No.
KODE ANALISA
URAIAN
1
2
3
27
28
29
30
31
32
BR a. b. c.
BR a. b. c.
A.106 a. b. c.
L-GRC a. b. c. d. e. f. g.
A.106 a. b. c. d. e. f. g. h.
A.106 a. b. c. d. e. f. g. h.
Keuntungan Max. Jumlah Dibulatkan 1 M2 PAS. GENTENG METAL BERPASIR Genteng Metal Berpasir Upah Pasang dan Alat Bantu Upah Angkut Jumlah Keuntungan Max. = Jumlah Dibulatkan 1 M1 PAS. BUBUNGAN GENTENG METAL BERPASIR Bubungan Genteng Metal Upah Pasang dan Alat Bantu Upah Angkut Jumlah Keuntungan Max. = Jumlah Dibulatkan 1 UNIT KUSEN TYPE P3 FIBRE ( KM/WC ) Kusen Dan Daun Pintu PVC ( Polos ) Fibre , lengkap Tukang Kayu / Tukang Batu Upah Angkut Jumlah Keuntungan Max. Jumlah Dibulatkan 1 M' PEK. LISTPLANK GRC 20 cm Pas. GRC 20 Cm , motif serat kayu Paku Skrup Pekerja Tukang Kayu Kepala Tukang Kayu Mandor Upah Angkut Jumlah Keuntungan Max. Jumlah Dibulatkan 1 UNIT KUSEN TYPE P1 Kusen Aluminium 1 1/2 x 3" ( SILVER ) Daun Pintu Papan Rk. Papan Kayu Mahoni Frame daun Jendela Alumunium ( SILVER ) Kaca Rayban 5 mm Kunci Pintu Ukuran Besar 2 Slagg ( Logam ) Polituran Daun Pintu Acessoreis Upah Pasang Jumlah Keuntungan Max. Jumlah Dibulatkan 1 UNIT KUSEN TYPE P2 Kusen Aluminium 1 1/2 x 3" ( SILVER ) Daun Pintu Double Teakwood Rk. Papan Kayu Mahoni Frame daun Jendela Alumunium ( SILVER ) Kaca Rayban 5 mm Kunci Pintu Ukuran Besar 2 Slagg ( Logam ) Polituran Daun Pintu Acessoreis Upah Pasang Jumlah Keuntungan Max. Jumlah
KOEFISIEN SATUAN
=
4 10.0000 %
5
1.0000 0.0000 0.0000
M2 Kg Lot
x
10.0000 %
0.7500 0.0000 0.0000
x
m' Kg Lot
10.0000 %
1.0000 0.1500 0.0000 =
0.1600 1.0000 3.4400 1.0000 0.0000
M' Bh Org Org Org Org Lot x
M' M2 M' M2 BH M2 ls Lot
10.0000 %
7.7000 1.7200 0.1600 1.0000 3.4400 1.0000 0.0000 =
x
10.0000 %
7.7000 1.7200
=
unit Org Lot
10.0000 %
1.0000 3.0000 0.0350 0.1000 0.0100 0.0020 0.0000 =
x
10.0000 %
x
M' M2 M' M2 BH M2 ls Lot x
HARGA SATUAN
JUMLAH [4 x 6]
(Rp.)
(Rp.)
6
7
No.
KODE ANALISA
URAIAN
1
2
3
33
34
35
36
37
38
A.106 a. b. c. d. e.
A.106 a. b. c. d. e.
A.106 a. b. c. d. e.
A.106 a. b. c. d. e.
A.106 a. b. c. d. e.
A.106 a. b. e. h. i.
Dibulatkan 1 UNIT KUSEN TYPE J 1 Kusen Aluminium 1 1/2 x 3" ( SILVER ) Frame daun Jendela Alumunium ( SILVER ) Kaca Rayban 5 mm Acessoreis Upah Pasang Jumlah Keuntungan Max. Jumlah Dibulatkan 1 UNIT KUSEN TYPE J 2 Kusen Aluminium 1 1/2 x 3"( SILVER ) Frame daun Jendela Alumunium ( SILVER ) Kaca Rayban 5 mm Acessoreis Upah Pasang Jumlah Keuntungan Max. Jumlah Dibulatkan 1 UNIT KUSEN TYPE J3 Kusen Aluminium 1 1/2 x 3" ( SILVER ) Frame daun Jendela Alumunium ( SILVER ) Kaca Rayban 5 mm Acessoreis Upah Pasang Jumlah Keuntungan Max. Jumlah Dibulatkan 1 UNIT KUSEN TYPE J4 Kusen Aluminium 1 1/2 x 3" ( SILVER ) Frame daun Jendela Alumunium ( SILVER ) Kaca Rayban 5 mm Acessoreis Upah Pasang Jumlah Keuntungan Max. Jumlah Dibulatkan 1 UNIT KUSEN TYPE J5 Kusen Aluminium 1 1/2 x 3" ( SILVER ) Frame daun Jendela Alumunium ( SILVER ) Kaca Rayban 5 mm Acessoreis Upah Pasang Jumlah Keuntungan Max. Jumlah Dibulatkan 1 UNIT KUSEN TYPE BV1 Kusen Aluminium 1 1/2 x 3" ( SILVER ) Frame daun Jendela Alumunium ( SILVER ) Kaca Rayban 5 mm Acessoreis Upah Pasang Jumlah Keuntungan Max. Jumlah Dibulatkan
KOEFISIEN SATUAN
4
5
5.5000 3.3000 0.6600 1.0000 0.0000 =
=
=
=
=
0.3500 1.0000 0.0000 =
M' M' M2 ls Lot x
M' M' M2 ls Lot x
M' M' M2 ls Lot
10.0000 %
3.8000
10.0000 %
7
x
10.0000 %
12.8000 10.2000 1.8200 1.0000 0.0000
(Rp.)
6
M' M' M2 ls Lot
10.0000 %
8.6500 6.2000 0.9100 1.0000 0.0000
(Rp.)
x
10.0000 %
5.8000 4.0000 0.8500 1.0000 0.0000
JUMLAH [4 x 6]
M' M' M2 ls Lot
10.0000 %
9.2500 6.6000 1.2000 1.0000 0.0000
HARGA SATUAN
x
M' M' M2 ls Lot x
Karawang , ... ............. 2018
No.
KODE ANALISA
URAIAN
1
2
3
HARGA SATUAN
JUMLAH [4 x 6]
(Rp.)
(Rp.)
6 Penawar, Penyedia Jasa, CV./PT. .................................
7
KOEFISIEN SATUAN
4
5
Direktris/Direktur