NO

JENIS BAHAN

BAHAN AGREGAT KASAR, BAHAN PEREKAT DAN BAHAN JADINYA Pasir Urug Sirtu Pasir Pasang Pasir Beton Batu Pecah Mesin 1/2 Batu Pecah Mesin 2/3 Batu Pecah Mesin 3/5 Batu Pecah Mesin 5/7 Batu Belah Pondasi Batu Tempel Hitam Bata merah kelas I Inter Blok Natural 6 cm Paving Blok natural 8 cm Paving Blok Warna 6 cm Kanstin Paving Blok Glass Block Semen PC Tiga Roda / 50 kg Semen Putih Semen warna Aspal (ESO) 1 Drum 150 kg

SATUAN

HARGA BAHAN Rp.

m3 m3 m3 m3 m3 m3 m3 m3 m3 m2 bh m2 m2 m2 m1 m2 zak kg kg kg

70,000.00 150,000.00 240,000.00 250,000.00 250,000.00 250,000.00 250,000.00 250,000.00 175,000.00 80,000.00 500.00 25,000.00 28,000.00 30,000.00 30,000.00 15,000.00 40,000.00 3,500.00 3,500.00 8,000.00

Dempul Kayu Cap Kucing Dempul Kayu Avian Meni Kayu/ Besi Sincromat Cat Kayu pinoguar Cat Besi Seiv Cat Kayu Avian Cat Besi Duco Danaglos / ICI Lem Kayu Putih (Fox) Lem Kayu Kuning (AIBON)

kg kg bh bh bh 5 ltr bh bks ltr kg kg ltr ltr lbr kg kg kg kg kg kg kg kg kg kg

18,000.00 5,100.00 15,000.00 5,000.00 5,000.00 12,000.00 7,500.00 1,000.00 2,500.00 6,000.00 21,500.00 2,000.00 18,000.00 2,500.00 9,500.00 6,000.00 20,000.00 60,000.00 24,000.00 60,000.00 45,000.00 130,000.00 8,500.00 14,000.00

BAHAN KAYU BERIKUT BAHAN JADINYA Kayu Terentang Kayu Balok Borneo Super Kayu papan Borneo Super Kayu kaso 5/7 Borneo Super

m3 m3 m3 m3

310,000.00 1,700,000.00 1,700,000.00 1,700,000.00

BAHAN FINISHING : LABURAN , PENGISI DAN ALATNYA Plamir Tembok Ex. Paragon Cat Tembok Sanlex Rool Cat Tembok Kape Tembok Kape Kayu Soligneum 1 Blek Kwas 3 " Otem (Pewarna Plitur) Spirtus Bahan Plitur Kripik (Sirlak India) Dempul Halus/ Infra (Wood Filler)/Impra Terpentin Tiner Ampelas

NO

JENIS BAHAN

SATUAN

HARGA BAHAN

Kayu 5/10 kayu awet kls I Kayu Awet Kls I Kayu KAMPER Kayu Balok Rasamala Kayu papan Rasamala Kayu Balok Kamper Medan (Kruing) Kayu Papan Kamper Medan (Kruing) Kayu Balok Kamper Banjar Kayu Papan Kamper Banjar Kayu Balok Kamper Samarinda Kayu Papan Kamper Samarinda Kayu Jati jabar Dolken 5 s/d 7 Dolken 7 s/d 10 / kaso 4/6 untuk stootwork List Profil kamper 1 cm List Profil kamper 2 cm (45x45) Kayu Reng 2/3 Borneo Super Kayu Reng 3/4 Borneo Super kayu ulin

m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 bt bt m1 m1 m1 m1 m3

Rp. 1,700,000.00 1,250,000.00 3,600,000.00 2,100,000.00 2,100,000.00 1,600,000.00 1,600,000.00 2,100,000.00 2,100,000.00 5,500,000.00 5,500,000.00 7,000,000.00 7,000.00 11,500.00 1,000.00 2,750.00 1,500.00 3,000.00 1,650,000.00

BAHAN PENUTUP RANGKA PLAPON Bahan Plapon Eternit 4 mm Kalsiboard List Kayu 4 / 4 List Kayu 5 / 5 Gypsum 9 mm

lbr lbr btng btng lbr

42,500.00 38,000.00 18,000.00 27,000.00 75,000.00

BAHAN KAYU LAPIS Triplek 3 mm 120 x 240 Triplek 4 mm 120 x 240 Triplek 6 mm 120 x 240 Multiplek 12 mm 120 x 240 Multiplek 12 mm ukuran pintu Teak Wood 4 mm 120 x240 Formika

lbr lbr lbr lbr lbr lbr lbr

33,000.00 39,000.00 42,000.00 112,500.00 236,250.00 75,000.00 69,000.00

BAHAN LANTAI DAN PELAPIS DINDING Keramik lantai 20 x 20 Putih Polos "MULIA" Keramik dinding 20 x 25 Putih Polos "MULIA" Keramik 30X30 Putih Polos "MULIA" Lantai Pear Stone Floor Hardener Ferofax sekualitas Metaltop

m2 m2 m2 m2 kg

45,000.00 48,000.00 46,000.00 89,000.00 60,000.00

G. BAHAN SALURAN AIR KOTOR / BERSIH Grafel U 20 cm Grafel U 30 cm Buis Beton dia. 20 cm ( 1 m ) Buis Beton dia.30 cm (1 m )

m' m' m' m'

20,000.00 30,000.00 45,000.00 60,000.00

BAHAN LOGAM DAN BAHAN JADINYA Besi Beton U-24 Rata-rata Pagar BRC T.120 Lengkap Tiang Pagar BRC T.175 Lengkap Tiang Besi Canal Besi Siku L Besi IWF DN SII Besi HWF Besi plat Kawat Beton

kg m1 m1 kg kg kg kg kg kg

14,000.00 132,000.00 612,500.00 14,000.00 14,000.00 14,000.00 14,000.00 14,000.00 19,500.00

NO

JENIS BAHAN Kawat Duri Seng plat BJLS 28 ( lebar = 90 cm ) Seng Glb BJLS 28 Ram kawat

SATUAN

HARGA BAHAN Rp.

kg m1 lbr m2

12,500.00 35,000.00 20,500.00 35,000.00

Cermin

m2 m2 m2

57,000.00 65,000.00 89,000.00

BAHAN PAKU DAN MUR BAUT Paku biasa Paku hak Pj. 15 cm

kg bh

15,000.00 6,000.00

Pipa GIP Medium B dia. 1/2"

bt

17,000.00

Pipa GIP Medium B dia. 3/4"

bt

23,000.00

Pipa GIP Medium B dia. 1"

bt

25,000.00

Pipa GIP Medium B dia. 1 1/2"

bt

43,000.00

Pipa GIP Medium B dia. 2"

bt

60,000.00

Pipa PVC MASPION ABU dia. 2" (AW)

bt

75,000.00

Pipa PVC MASPION ABU dia. 3" (AW)

bt

140,000.00

Pipa PVC MASPION ABU dia. 4" (AW)

bt

230,000.00

Grefel beton 1/2 dia. 30 cm

m1

30,000.00

BAHAN KACA Kaca polos 3 mm (ASAHI) Kaca polos 5 mm (ASAHI)

BAHAN PERPIPAAN

BAHAN SANITAIR DAN PERPIPAAN Stop Kran 3/4 " KIT

bh

75,000.00

Stop Kran 1 1/2 " KIT

bh

125,000.00

Kran bebek Sun Ei 1/2 "

bh

85,000.00

Floor drain

bh

20,000.00

Wastafel Lengkap Toto Type L 34

bh

350,000.00

Closet Jongkok Standard Putih Poslin INA

unit

125,000.00

closet duduk ex toto

unit

1,050,000.00

kran air 1/2"

bh

37,300.00

shower

unit

250,000.00

kichensink

unit

250,000.00

BAHAN PENUTUP ATAP Genteng Palentong

bh

1,000.00

Wuwung Genteng

bh

18,500.00

Atap genteng Morando glazur

bh

2,000.00

Wuwung Genteng morando glazur

bh

4,000.00

Genteng Ex KIA (11 bh )

m2

58,685.00

BAHAN ELEKTRIKAL Saklar Broko Tunggal Standard (1Phase) Saklar Broko Seri Standard (1 Phase) Stop Kontak Broko Standard (1 Phase) Lampu Neon TL Philip 1 X 36 W Type TKI Pentanahan Penangkal Petir lengkap bak kontrol pipa kabel Kabel NYY 2 X 2,5 mm Prima Kabel NYY 3 X 2,5 mm Prima

bh bh bh bh ttk bt m1 M1

16,000.00 16,000.00 9,000.00 17,500.00 900,000.00 8,000.00 4,000.00 5,000.00

NO

JENIS BAHAN

SATUAN

HARGA BAHAN Rp.

BAHAN ALAT PENGGANTUNG DAN KUNCI Kunci 2 Slaag Kunci KM Bulat ALPA Espanyolet/Slot Tanam Hak Angin Kait Jendela Biasa ( Kait ) Engsel Pintu Arch Standard Engsel Jendela Arch Pasang roda type 61. K/ N ex Henderson

bh bh bh bh bh bh bh

75,000.00 75,000.00 30,000.00 15,000.00 6,000.00 4,000.00 65,000.00

BAHAN PENGHISAP AIR SUMUR DALAM Mesin Pompa Air 400 W - Sanyo

unit

650,000.00

BAHAN PENAMPUNG AIR Tangki Air Fiber Glass 0.5 m3 ( Pinguinl ) Tangki Air Fiber Glass 2000 liter ( Pinguinl ) Bak km Fiber 50 X 50

bh bh bh

1,200,000.00 1,900,000.00 125,000.00

ANALISA HARGA SATUAN PEKERJAAN

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA SATUAN BAHAN Rp.

HARGA SATUAN UPAH Rp.

A

B

C

D

E

F

II

JUMLAH BAHAN

JUMLAH UPAH

TOTAL HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

PEKERJAAN TANAH 1 1 m3 Mengerjakan Galian Tanah Biasa Sedalam 1 meter

-

26,800.00

26,800.00

2 1 m3 Mengerjakan Galian Tanah Biasa Sedalam 2 meter

-

32,940.00

32,940.00

3 1 m3 Mengerjakan Galian Tanah Biasa Sedalam 3 meter

-

39,184.00

39,184.00

Tenaga Pekerja

1.0500

OH

34,000.00

35,700.00

Mandor

0.0670

OH

52,000.00

3,484.00

4 1 m3 Mengerjakan Galian Tanah Keras Sedalam 1 meter

-

35,664.00

35,664.00

Tenaga Pekerja

1.0000

OH

34,000.00

34,000.00

Mandor

0.0320

OH

52,000.00

1,664.00

5 1 m3 Mengerjakan Galian Tanah Cadas Sedalam 1 meter

-

54,120.00

54,120.00

Tenaga Pekerja

1.5000

OH

34,000.00

51,000.00

Mandor

0.0600

OH

52,000.00

3,120.00

6 1 m3 Pekerjaan Mengerjakan Galian Tanah Lumpur Sedalam 1 meter

-

43,140.00

43,140.00

Tenaga Pekerja

1.2000

OH

34,000.00

40,800.00

Mandor

0.0450

OH

52,000.00

2,340.00

7 1 m2 Pekerjaan Stripping tanah tebing setinggi 1 m

-

1,960.00

1,960.00

8 1 m3 Pembuangan Tanah sejauh 15 m

-

11,740.00

11,740.00

9 1 m3 Urugan Tanah Kembali

-

8,933.33

8,933.33

-

19,600.00

19,600.00

10,720.00

76,720.00

Cat. Mengurug Kembali 1 m3 Galian Tanah dihitung dari 1/3 kali indeks Pekerjaan Galian Tanah 1 m3 Urugan Tanah Kembali Galian Tanah Biasa Maksimal keadalaman 1 m' 10 1 m3 Memadatan tanah (Per 20 cm) 11 1 m3 Pekerjaan Urugan Pasir

66,000.00

Analisa Harga Satuan Halaman 5

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA SATUAN BAHAN Rp.

HARGA SATUAN UPAH Rp.

A

B

C

D

E

F

JUMLAH BAHAN

JUMLAH UPAH

TOTAL HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

12 1 m3 Pekerjaan Urugan Tanah

50,400.00

10,720.00

61,120.00

13 1 m3 Urugan Sirtu padat untuk peninggian Lantai Bangunan

56,400.00

9,800.00

66,200.00

Bahan Sirtu

1.2000

m3

47,000.00

56,400.00

Pekerja

0.2500

OH

34,000.00

8,500.00

Mandor

0.0250

OH

52,000.00

1,300.00

Tenaga

III

PEKERJAAN PONDASI 14 1 m3 Pasangan Batu Kosong (Aanstamping)

149,760.00

45,786.00

195,546.00

15 1 m3 Pasangan Pondasi Batu Belah, Campuran 1 Pc : 3Ps

455,850.00

88,050.00

543,900.00

16 1 m3 Pasangan Pondasi Batu Belah, Campuran 1 Pc : 5Ps

374,608.00

88,050.00

462,658.00

2,039,500.00

148,410.00

2,187,910.00

17 1 m3 pondasi siklop, 60% beton campuran 1 PC : 2 PB : 3 KR dan 40% batu belah Bahan Batu Belah 15 cm/ 20 cm

0.4800

m3

105,000.00

50,400.00

194.0000

Kg

1,340.00

259,960.00

Pasir Beton

0.3120

m3

154,000.00

48,048.00

Kerikil

0.4680

m3

214,000.00

100,152.00

126.0000

kg

12,240.00

1,542,240.00

1.8000

kg

21,500.00

38,700.00

Pekerja

3.0000

OH

34,000.00

102,000.00

Tukang Batu

0.8500

OH

39,500.00

33,575.00

Kepala Tukang

0.0850

OH

47,000.00

3,995.00

Mandor

0.1700

OH

52,000.00

8,840.00

Semen Portland

Besi Beton Kawat Beton Tenaga

Analisa Harga Satuan Halaman 6

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA SATUAN BAHAN Rp.

HARGA SATUAN UPAH Rp.

A

B

C

D

E

F

18 1 m3 Pasangan Pondasi Sumuran, diameter 100 cm

JUMLAH BAHAN

JUMLAH UPAH

TOTAL HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

455,410.00

123,148.00

578,558.00

Bahan Batu Belah 15 cm/ 20 cm

0.4500

m3

105,000.00

47,250.00

194.0000

Kg

1,340.00

259,960.00

Pasir Beton

0.3120

m3

154,000.00

48,048.00

Kerikil

0.4680

m3

214,000.00

100,152.00

Pekerja

2.4000

OH

34,000.00

81,600.00

Tukang Batu

0.8000

OH

39,500.00

31,600.00

Kepala Tukang

0.0800

OH

47,000.00

3,760.00

Mandor

0.1190

OH

52,000.00

6,188.00

Semen Portland

Tenaga

IV

PEKERJAAN DINDING 19 1 m2 Pasangan dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1Pc : 3Ps

62,635.80

15,400.00

78,035.80

Bahan Bata merah

70.0000

bh

550.00

38,500.00

Semen Portland

14.3700

Kg

1,340.00

19,255.80

0.0400

m3

122,000.00

4,880.00

Pekerja

0.3000

OH

34,000.00

10,200.00

Tukang Batu

0.1000

OH

39,500.00

3,950.00

Kepala Tukang

0.0100

OH

47,000.00

470.00

Mandor

0.0150

OH

52,000.00

780.00

Pasir Pasang Tenaga

20 1 m2 Pasangan dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1Pc : 5Ps 21 1 m2 Pasangan dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC:3Ps

56,961.20

15,400.00

72,361.20

150,164.00

15,400.00

165,564.00

Bahan Terawang (roster)

30.0000

bh

4,250.00

127,500.00

Semen Portland

14.0000

Kg

1,340.00

18,760.00

0.0320

m3

122,000.00

3,904.00

Pekerja

0.3000

OH

34,000.00

10,200.00

Tukang Batu

0.1000

OH

39,500.00

3,950.00

Kepala Tukang

0.0100

OH

47,000.00

470.00

Mandor

0.0150

OH

52,000.00

780.00

Pasir Pasang Tenaga

22 1 m2 Pasangan dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC:4Ps

146,510.00

15,400.00

161,910.00

Bahan Terawang (roster)

30.0000

bh

4,250.00

127,500.00

Semen Portland

11.0000

Kg

1,340.00

14,740.00

0.0350

m3

122,000.00

4,270.00

Pekerja

0.3000

OH

34,000.00

10,200.00

Tukang Batu

0.1000

OH

39,500.00

3,950.00

Kepala Tukang

0.0100

OH

47,000.00

470.00

Mandor

0.0150

OH

52,000.00

780.00

Pasir Pasang Tenaga

V

PEKERJAAN PELESTERAN 23 1 m2 Plesteran Dinding 1Pc : 3Ps tebal 15 mm

13,225.84

17,610.00

30,835.84

Analisa Harga Satuan Halaman 7

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA SATUAN BAHAN Rp.

HARGA SATUAN UPAH Rp.

A

B

C

D

E

F

JUMLAH BAHAN

JUMLAH UPAH

TOTAL HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

24 1 m2 Plesteran Dinding 1Pc : 5Ps tebal 15 mm

10,118.56

17,610.00

27,728.56

25 1 m2 Plesteran Dinding 1Pc : 3Ps tebal 20 mm

17,675.12

18,356.00

36,031.12

Bahan Semen Portland

10.3680

Kg

1,340.00

13,893.12

0.0310

m3

122,000.00

3,782.00

Pekerja

0.2600

OH

34,000.00

8,840.00

Tukang Batu

0.2000

OH

39,500.00

7,900.00

Kepala Tukang

0.0200

OH

47,000.00

940.00

Mandor

0.0130

OH

52,000.00

676.00

Pasir Pasang Tenaga

26 1 m2 Plesteran Dinding 1Pc : 5Ps tebal 20 mm

13,532.08

23,584.00

37,116.08

Bahan Semen Portland

6.9120

Kg

1,340.00

9,262.08

Pasir Pasang

0.0350

m3

122,000.00

4,270.00

Pekerja

0.4000

OH

34,000.00

13,600.00

Tukang Batu

0.2000

OH

39,500.00

7,900.00

Kepala Tukang

0.0200

OH

47,000.00

940.00

Mandor

0.0220

OH

52,000.00

1,144.00

Tenaga

27 1 m2 Plesteran Berapen 1Pc : 5Ps, tebal 15 mm

10,118.56

8,805.00

18,923.56

28 1 m2 Plesteran Skoning 1Pc : 2Ps, Lebar 10 mm

2,256.00

20,608.00

22,864.00

Bahan Semen Portland

0.5000

Kg

1,340.00

670.00

Pasir Pasang

0.0130

m3

122,000.00

1,586.00

Pekerja

0.0800

OH

34,000.00

2,720.00

Tukang Batu

0.4000

OH

39,500.00

15,800.00

Kepala Tukang

0.0400

OH

47,000.00

1,880.00

Mandor

0.0040

OH

52,000.00

208.00

Tenaga

29 1 m2 Pelesteran Ciprat 1 Pc : 2 Ps

6,520.80

15,400.00

21,920.80

Analisa Harga Satuan Halaman 8

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA SATUAN BAHAN Rp.

HARGA SATUAN UPAH Rp.

A

B

C

D

E

F

JUMLAH BAHAN

JUMLAH UPAH

TOTAL HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

30 1 m2 Pelesteran Siar Pasangan Dinding Bata Merah (= 20 m')

4,164.72

8,805.00

12,969.72

31 1 m2 Pelesteran Siar Pasangan Dinding con Block ekspose (= 8 m')

2,144.00

4,109.00

6,253.00

Bahan Semen Portland

1.6000

Kg

1,340.00

2,144.00

Pekerja

0.0700

OH

34,000.00

2,380.00

Tukang Batu

0.0350

OH

39,500.00

1,382.50

Kepala Tukang

0.0035

OH

47,000.00

164.50

Mandor

0.0035

OH

52,000.00

182.00

Tenaga

32 1 m2 Acian

4,355.00

11,740.00

16,095.00

Bahan Semen Portland

3.2500

Kg

1,340.00

4,355.00

Pekerja

0.2000

OH

34,000.00

6,800.00

Tukang Batu

0.1000

OH

39,500.00

3,950.00

Kepala Tukang

0.0100

OH

47,000.00

470.00

Mandor

0.0100

OH

52,000.00

520.00

Tenaga

VI

PEKERJAAN KAYU 33 1m3 Pasang Kusen Pintu dan Jendela, Kayu Kelas II Atau Kelas III

3,277,750.00

1,051,200.00

4,328,950.00

Bahan Kayu Balok Kelas II Atau Kelas III

1.2000

m3

2,685,000.00

3,222,000.00

Paku 10 Cm

1.2500

Kg

19,000.00

23,750.00

Lem Kayu

1.0000

Kg

32,000.00

32,000.00

Tenaga Pekerja

6.0000

OH

34,000.00

204,000.00

18.0000

OH

41,500.00

747,000.00

Kepala Tukang

1.8000

OH

47,000.00

84,600.00

Mandor

0.3000

OH

52,000.00

15,600.00

Tukang Kayu

34 1m3 Pasang Kusen Pintu dan Jendela Kayu Lanan 35 1m2 Pasang Pintu Panel Kayu Lanan

7,123,200.00

1,051,200.00

8,174,400.00

298,240.00

175,200.00

473,440.00

Analisa Harga Satuan Halaman 9

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA SATUAN BAHAN Rp.

HARGA SATUAN UPAH Rp.

A

B

C

D

E

F

JUMLAH BAHAN

JUMLAH UPAH

TOTAL HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

36 1m2 Pasang Pintu dan Jendela Kaca Kayu Lanan

178,944.00

140,160.00

319,104.00

37 1m2 Pasang Pintu Kayu Lapis (Plywood) rangkap, rangka tertutup kayu borneo (lebar sampai 90 cm)

262,620.00

122,640.00

385,260.00

38 1m2 Pasang Pintu Kayu Lapis (Plywood) rangkap, rangka tertutup kayu lanan (lebar sampai 90 cm)

290,620.00

122,640.00

413,260.00

Bahan Papan Kayu Lanan

0.0250

m3

7,056,000.00

Paku Biasa 1 cm - 2.5 cm

0.0300

Kg

24,000.00

176,400.00 720.00

Lem Kayu

0.5000

Kg

32,000.00

16,000.00

Plywood tebal 4mm (90x220) cm

1.0000

lbr

97,500.00

97,500.00

Pekerja

0.7000

OH

34,000.00

23,800.00

Tukang Kayu

2.1000

OH

41,500.00

87,150.00

Kepala Tukang

0.2100

OH

47,000.00

9,870.00

Mandor

0.0350

OH

52,000.00

1,820.00

Tenaga

39 1m2 Pasang Pintu Kayu Lapis (Plywood) rangkap, rangka tertutup kayu lokal (lebar sampai 90 cm)

186,720.00

122,640.00

309,360.00

Bahan Papan Kayu lokal

0.0250

m3

2,900,000.00

Paku Biasa 1 cm - 2.5 cm

0.0300

Kg

24,000.00

72,500.00 720.00

Lem Kayu

0.5000

Kg

32,000.00

16,000.00

Plywood tebal 4mm (90x220) cm

1.0000

lbr

97,500.00

97,500.00

Pekerja

0.7000

OH

34,000.00

23,800.00

Tukang Kayu

2.1000

OH

41,500.00

87,150.00

Kepala Tukang

0.2100

OH

47,000.00

9,870.00

Mandor

0.0350

OH

52,000.00

1,820.00

Tenaga

40 1m2 Pasang Pintu Kayu Lapis (Plywood) rangkap, rangka tertutup kayu lokal (lebar sampai 90 cm) dilapis Alumi

205,296.00

122,640.00

327,936.00

Bahan Papan Kayu lokal

0.0250

m3

2,900,000.00

Paku Biasa 1 cm - 2.5 cm

0.0300

Kg

24,000.00

72,500.00 720.00

Lem Kayu

0.5000

Kg

32,000.00

16,000.00

Plywood tebal 4mm (90x220) cm

1.0000

lbr

97,500.00

97,500.00

Aluminium

1.0800

lbr

17,200.00

18,576.00

Pekerja

0.7000

OH

34,000.00

23,800.00

Tukang Kayu

2.1000

OH

41,500.00

87,150.00

Kepala Tukang

0.2100

OH

47,000.00

9,870.00

Mandor

0.0350

OH

52,000.00

1,820.00

Tenaga

41 1m2 Pasang Pintu Plywood Rangkap, rangka ekspose Kayu Lanan

294,853.60

140,160.00

435,013.60

Analisa Harga Satuan Halaman 10

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA SATUAN BAHAN Rp.

HARGA SATUAN UPAH Rp.

A

B

C

D

E

F

42 1m2 Pasang Pintu Plywood Rangkap, rangka ekspose Kayu Borneo

JUMLAH BAHAN

JUMLAH UPAH

TOTAL HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

266,181.60

140,160.00

406,341.60

Bahan Papan Kayu Borneo

0.0256

m3

5,936,000.00

Paku Biasa 1 cm - 2.5 cm

0.0300

Kg

24,000.00

151,961.60 720.00

Lem Kayu

0.5000

Ltr

32,000.00

16,000.00

Plywood tebal 4mm (90x220) cm

1.0000

lbr

97,500.00

97,500.00

Pekerja

0.8000

OH

34,000.00

27,200.00

Tukang Kayu

2.4000

OH

41,500.00

99,600.00

Kepala Tukang

0.2400

OH

47,000.00

11,280.00

Mandor

0.0400

OH

52,000.00

2,080.00

Tenaga

43 1m2 Pasang Pintu Teakwood Rangkap, rangka ekspose Kayu Lanan

271,720.00

140,160.00

411,880.00

Bahan Papan Kayu Lanan

0.0250

m3

7,056,000.00

Paku Biasa 1 cm - 2.5 cm

0.0300

Kg

24,000.00

176,400.00 720.00

Lem Kayu

0.3000

Kg

32,000.00

9,600.00

Teakwood tebal 4 mm ukuran (90x220) cm

1.0000

lbr

85,000.00

85,000.00

Pekerja

0.8000

OH

34,000.00

27,200.00

Tukang Kayu

2.4000

OH

41,500.00

99,600.00

Kepala Tukang

0.2400

OH

47,000.00

11,280.00

Mandor

0.0400

OH

52,000.00

2,080.00

Tenaga

44 1m2 Pasang Pintu Teakwood Rangkap, rangka ekspose Kayu Borneo

243,720.00

140,160.00

383,880.00

Bahan Papan Kayu Borneo

0.0250

m3

5,936,000.00

Paku Biasa 1 cm - 2.5 cm

0.0300

Kg

24,000.00

148,400.00 720.00

Lem Kayu

0.3000

Ltr

32,000.00

9,600.00

Teakwood tebal 4 mm ukuran (90x220) cm

1.0000

lbr

85,000.00

85,000.00

Pekerja

0.8000

OH

34,000.00

27,200.00

Tukang Kayu

2.4000

OH

41,500.00

99,600.00

Kepala Tukang

0.2400

OH

47,000.00

11,280.00

Mandor

0.0400

OH

52,000.00

2,080.00

Tenaga

45 1m3 Pasang Konstruksi Kuda - kuda Kayu Lanan

7,093,500.00

700,800.00

7,794,300.00

46 1m3 Pasang Konstruksi Kuda - kuda Kayu kls II (Lokal)

3,517,400.00

700,800.00

4,218,200.00

Bahan Balok Kayu kls II Besi Strip tebal 5 mm Paku 12 cm

1.1000

m3

2,685,000.00

2,953,500.00

15.0000

Kg

30,500.00

457,500.00

5.6000

Kg

19,000.00

106,400.00

Tenaga Pekerja

4.0000

OH

34,000.00

136,000.00

12.0000

OH

41,500.00

498,000.00

Kepala Tukang

1.2000

OH

47,000.00

56,400.00

Mandor

0.2000

OH

52,000.00

10,400.00

Tukang Kayu

47 1m3 Pasang Konstruksi Gordeng, Kayu Lanan

7,044,100.00

420,480.00

7,464,580.00

Analisa Harga Satuan Halaman 11

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA SATUAN BAHAN Rp.

HARGA SATUAN UPAH Rp.

A

B

C

D

E

F

48 1m3 Pasang Konstruksi Gordeng, Kayu Kelas II (Lokal)

JUMLAH BAHAN

JUMLAH UPAH

TOTAL HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

3,468,000.00

420,480.00

3,888,480.00

Bahan Balok Kayu Kelas II

1.1000

m3

2,685,000.00

2,953,500.00

15.0000

Kg

30,500.00

457,500.00

3.0000

Kg

19,000.00

57,000.00

Pekerja

2.4000

OH

34,000.00

81,600.00

Tukang Kayu

7.2000

OH

41,500.00

298,800.00

Kepala Tukang

0.7200

OH

47,000.00

33,840.00

Mandor

0.1200

OH

52,000.00

6,240.00

Besi Strip Tebal 5 mm Paku 12 cm Tenaga

49 1m2 Pasang Rangka Atap Genteng Keramik Kayu Kelas II

62,330.00

8,280.00

70,610.00

Bahan Kaso 5/7 cm Kayu Kelas II

0.0140

m3

3,650,000.00

51,100.00

Reng 2/3 cm Kayu Kelas II

0.0036

m3

1,800,000.00

6,480.00

Paku Biasa 5 cm dan 10 cm

0.2500

Kg

19,000.00

4,750.00

Pekerja

0.1000

OH

34,000.00

3,400.00

Tukang Kayu

0.1000

OH

41,500.00

4,150.00

Kepala Tukang

0.0100

OH

47,000.00

470.00

Mandor

0.0050

OH

52,000.00

260.00

Tenaga

50 1m2 Pasang Rangka Atap Genteng Keramik Kayu Lanan

62,330.00

8,280.00

70,610.00

Bahan Kaso 5/7 cm (Lanan)

0.0140

m3

3,650,000.00

51,100.00

Reng 2/3 cm (Lanan)

0.0036

m3

1,800,000.00

6,480.00

Paku Biasa 5 cm dan 10 cm

0.2500

Kg

19,000.00

4,750.00

Pekerja

0.1000

OH

34,000.00

3,400.00

Tukang Kayu

0.1000

OH

41,500.00

4,150.00

Kepala Tukang

0.0100

OH

47,000.00

470.00

Mandor

0.0050

OH

52,000.00

260.00

Tenaga

51 1m2 Pasang Rangka Atap Genteng Beton Kayu Kelas II

31,206.00

8,280.00

39,486.00

Bahan Kaso 5/7 cm Kayu Kelas II

0.0140

m3

1,540,000.00

21,560.00

Reng 2/3 cm Kayu Kelas II

0.0036

m3

1,360,000.00

4,896.00

Paku Biasa 5 cm dan 10 cm

0.2500

Kg

19,000.00

4,750.00

Pekerja

0.1000

OH

34,000.00

3,400.00

Tukang Kayu

0.1000

OH

41,500.00

4,150.00

Kepala Tukang

0.0100

OH

47,000.00

470.00

Mandor

0.0050

OH

52,000.00

260.00

Tenaga

52 1m2 Pasang Rangka Atap Sirap Beton Kayu Lanan

983,240.00

9,936.00

993,176.00

Bahan Kayu Lanan

0.1650

m3

5,936,000.00

979,440.00

Paku Biasa 5 cm dan 10 cm

0.2000

Kg

19,000.00

3,800.00

Pekerja

0.1200

OH

34,000.00

4,080.00

Tukang Kayu

0.1200

OH

41,500.00

4,980.00

Kepala Tukang

0.0120

OH

47,000.00

564.00

Mandor

0.0060

OH

52,000.00

312.00

Tenaga

53 1m' Pasang Lisplank ( 3 x 20 )cm Kayu Lanan

78,104.80

12,900.00

91,004.80

Analisa Harga Satuan Halaman 12

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA SATUAN BAHAN Rp.

HARGA SATUAN UPAH Rp.

A

B

C

D

E

F

JUMLAH BAHAN

JUMLAH UPAH

TOTAL HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

54 1m' Pasang Lisplank ( 3 x 30 )cm Kayu lanan

78,566.00

12,900.00

91,466.00

55 1m' Pasang Lisplank ( 3 x 30 )cm Kayu klas II

32,850.00

12,900.00

45,750.00

Bahan Papan Kayu klas II

0.0110

m3

2,900,000.00

31,900.00

Paku Biasa 5 dan 7 cm

0.0500

Kg

19,000.00

950.00

Pekerja

0.1000

OH

34,000.00

3,400.00

Tukang Kayu

0.2000

OH

41,500.00

8,300.00

Kepala Tukang

0.0200

OH

47,000.00

940.00

Mandor

0.0050

OH

52,000.00

260.00

Tenaga

56 1m' Pasang Calsiplank GRC (0,8 x 20) cm

17,450.00

12,900.00

30,350.00

Bahan Papan calsiplank

1.1000

btg

15,000.00

16,500.00

Paku Biasa 5 dan 7 cm

0.0500

Kg

19,000.00

950.00

Pekerja

0.1000

OH

34,000.00

3,400.00

Tukang Kayu

0.2000

OH

41,500.00

8,300.00

Kepala Tukang

0.0200

OH

47,000.00

940.00

Mandor

0.0050

OH

52,000.00

260.00

Tenaga

57 1m2 Pasang Rangka Dinding Pemisah (60 x 120) cm Kayu Kelas II atau III

169,058.00

26,306.00

195,364.00

Bahan Balok Kayu Kelas II atau III

0.0280

m3

5,936,000.00

166,208.00

Paku Biasa 5 dan 7 cm

0.1500

Kg

19,000.00

2,850.00

Pekerja

0.1500

OH

34,000.00

5,100.00

Tukang Kayu

0.4500

OH

41,500.00

18,675.00

Kepala Tukang

0.0450

OH

47,000.00

2,115.00

Mandor

0.0080

OH

52,000.00

416.00

Tenaga

58 1m2 Pasang Rangka Dinding Pemisah Kayu Lanan (60 x 120) cm Kayu Lanan

169,058.00

26,306.00

195,364.00

59 1m2 Pasang Dinding Pemisah Teakwood Rangkap, Rangka Kayu Lanan

248,131.33

29,790.00

277,921.33

60 1m2 Pasang Dinding Pemisah Plywood Rangkap, Rangka Kayu Lanan

258,881.33

35,040.00

293,921.33

Analisa Harga Satuan Halaman 13

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA SATUAN BAHAN Rp.

HARGA SATUAN UPAH Rp.

A

B

C

D

E

F

VII

JUMLAH BAHAN

JUMLAH UPAH

TOTAL HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

PEKERJAAN BETON ( SNI 7394 : 2008 ) CATATAN Bobot isi pasir beton

1,400

kg/m3

Bobot isi kerikil

1,350

kg/m3

Bukling factor pasir = 20 % 61 1 m3 Membuat beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87

584,930.00

72,594.50

657,524.50

Bahan Semen Portland

247.0000

Kg

1,340.00

Pasir Beton

869.0000

Kg

110.00

330,980.00 95,590.00

Kerikil (Masimal 30 mm)

999.0000

Kg

158.52

158,360.00

Air

215.0000

Ltr

Pekerja

1.6500

OH

34,000.00

56,100.00

Tukang Batu

0.2750

OH

39,500.00

10,862.50

Kepala Tukang

0.0280

OH

47,000.00

1,316.00

Mandor

0.0830

OH

52,000.00

4,316.00

-

-

Tenaga

62 1 m3 Membuat beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78

621,120.74

72,594.50

693,715.24

Bahan Semen Portland

276.0000

Kg

1,340.00

Pasir Beton

826.0000

Kg

110.00

90,860.00

1,012.0000

Kg

158.52

160,420.74

215.0000

Ltr

Pekerja

1.6500

OH

34,000.00

56,100.00

Tukang Batu

0.2750

OH

39,500.00

10,862.50

Kepala Tukang

0.0280

OH

47,000.00

1,316.00

Mandor

0.0830

OH

52,000.00

4,316.00

Kerikil (Masimal 30 mm) Air

369,840.00

-

-

Tenaga

63 1 m3 Membuat beton mutu f’c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72

649,763.33

72,594.50

722,357.83

Bahan Semen Portland

299.0000

Kg

1,340.00

Pasir Beton

799.0000

Kg

110.00

87,890.00

1,017.0000

Kg

158.52

161,213.33

215.0000

Ltr

Pekerja

1.6500

OH

34,000.00

56,100.00

Tukang Batu

0.2750

OH

39,500.00

10,862.50

Kepala Tukang

0.0280

OH

47,000.00

1,316.00

Mandor

0.0830

OH

52,000.00

4,316.00

Kerikil (Masimal 30 mm) Air

400,660.00

-

-

Tenaga

64 1 m3 Membuat lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87

569,228.52

49,952.00

619,180.52

Bahan Semen Portland

230.0000

Kg

1,340.00

Pasir Beton

893.0000

Kg

110.00

98,230.00

1,027.0000

Kg

158.52

162,798.52

200.0000

Ltr

Pekerja

1.2000

OH

34,000.00

40,800.00

Tukang Batu

0.2000

OH

39,500.00

7,900.00

Kepala Tukang

0.0200

OH

47,000.00

940.00

Mandor

0.0060

OH

52,000.00

312.00

Kerikil (Masimal 30 mm) Air

308,200.00

-

-

Tenaga

65 1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66

683,555.56

72,594.50

756,150.06

Bahan Semen Portland

326.0000

Kg

1,340.00

Pasir Beton

760.0000

Kg

110.00

83,600.00

1,029.0000

Kg

158.52

163,115.56

Kerikil (Masimal 30 mm)

436,840.00

Analisa Harga Satuan Halaman 14

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA SATUAN BAHAN Rp.

HARGA SATUAN UPAH Rp.

A

B

C

D

E

F

Air

-

JUMLAH BAHAN

JUMLAH UPAH

TOTAL HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

215.0000

Ltr

-

Pekerja

1.6500

OH

34,000.00

56,100.00

Tukang Batu

0.2750

OH

39,500.00

10,862.50

Kepala Tukang

0.0280

OH

47,000.00

1,316.00

Mandor

0.0830

OH

52,000.00

4,316.00

Tenaga

Analisa Harga Satuan Halaman 15

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA SATUAN BAHAN Rp.

HARGA SATUAN UPAH Rp.

A

B

C

D

E

F

66 1 m3 Membuat beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61

JUMLAH BAHAN

JUMLAH UPAH

TOTAL HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

715,522.59

72,594.50

788,117.09

Bahan Semen Portland

352.0000

Kg

1,340.00

Pasir Beton

731.0000

Kg

110.00

80,410.00

1,031.0000

Kg

158.52

163,432.59

215.0000

Ltr

Pekerja

1.6500

OH

34,000.00

56,100.00

Tukang Batu

0.2750

OH

39,500.00

10,862.50

Kepala Tukang

0.0280

OH

47,000.00

1,316.00

Mandor

0.0830

OH

52,000.00

4,316.00

Kerikil (Masimal 30 mm) Air

471,680.00

-

-

Tenaga

67 1 m3 Membuat beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58

739,888.89

72,594.50

812,483.39

Bahan Semen Portland

371.0000

Kg

1,340.00

Pasir Beton

698.0000

Kg

110.00

76,780.00

1,047.0000

Kg

158.52

165,968.89

215.0000

Ltr

Pekerja

1.6500

OH

34,000.00

56,100.00

Tukang Batu

0.2750

OH

39,500.00

10,862.50

Kepala Tukang

0.0280

OH

47,000.00

1,316.00

Mandor

0.0830

OH

52,000.00

4,316.00

Kerikil (Masimal 30 mm) Air

497,140.00

-

-

Tenaga

68 1 m3 Membuat beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56

755,380.74

72,594.50

827,975.24

Bahan Semen Portland

384.0000

Kg

1,340.00

Pasir Beton

692.0000

Kg

110.00

76,120.00

1,039.0000

Kg

158.52

164,700.74

215.0000

Ltr

Pekerja

1.6500

OH

34,000.00

56,100.00

Tukang Batu

0.2750

OH

39,500.00

10,862.50

Kepala Tukang

0.0280

OH

47,000.00

1,316.00

Mandor

0.0830

OH

52,000.00

4,316.00

Kerikil (Masimal 30 mm) Air

514,560.00

-

-

Tenaga

69 1 m3 Membuat beton mutu f’c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53

781,920.00

72,594.50

854,514.50

Bahan Semen Portland

406.0000

Kg

1,340.00

Pasir Beton

684.0000

Kg

110.00

75,240.00

1,026.0000

Kg

158.52

162,640.00

215.0000

Ltr

Pekerja

1.6500

OH

34,000.00

56,100.00

Tukang Batu

0.2750

OH

39,500.00

10,862.50

Kepala Tukang

0.0280

OH

47,000.00

1,316.00

Mandor

0.0830

OH

52,000.00

4,316.00

Kerikil (Masimal 30 mm) Air

544,040.00

-

-

Tenaga

70 1 m3 Membuat beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52

790,177.41

72,594.50

862,771.91

Bahan Semen Portland

413.0000

Kg

1,340.00

Pasir Beton

681.0000

Kg

110.00

74,910.00

1,021.0000

Kg

158.52

161,847.41

215.0000

Ltr

Pekerja

1.6500

OH

34,000.00

56,100.00

Tukang Batu

0.2750

OH

39,500.00

10,862.50

Kepala Tukang

0.0280

OH

47,000.00

1,316.00

Mandor

0.0830

OH

52,000.00

4,316.00

Kerikil (Masimal 30 mm) Air

553,420.00

-

-

Tenaga

Analisa Harga Satuan Halaman 16

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA SATUAN BAHAN Rp.

HARGA SATUAN UPAH Rp.

A

B

C

D

E

F

71 1 m3 Membuat beton mutu f’c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = 0,49

JUMLAH BAHAN

JUMLAH UPAH

TOTAL HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

821,429.63

92,330.00

913,759.63

Bahan Semen Portland

439.0000

Kg

1,340.00

Pasir Beton

670.0000

Kg

110.00

73,700.00

1,006.0000

Kg

158.52

159,469.63

215.0000

Ltr

Pekerja

2.1000

OH

34,000.00

71,400.00

Tukang Batu

0.3500

OH

39,500.00

13,825.00

Kepala Tukang

0.0350

OH

47,000.00

1,645.00

Mandor

0.1050

OH

52,000.00

5,460.00

Kerikil (Masimal 30 mm) Air

588,260.00

-

-

Tenaga

72 1 m3 Membuat beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,48

832,208.52

92,330.00

924,538.52

Bahan Semen Portland

448.0000

Kg

1,340.00

Pasir Beton

667.0000

Kg

110.00

73,370.00

1,000.0000

Kg

158.52

158,518.52

215.0000

Ltr

Pekerja

2.1000

OH

34,000.00

71,400.00

Tukang Batu

0.3500

OH

39,500.00

13,825.00

Kepala Tukang

0.0350

OH

47,000.00

1,645.00

Mandor

0.1050

OH

52,000.00

5,460.00

Kerikil (Masimal 30 mm) Air

600,320.00

-

-

Tenaga

73 1 Kg Pembesian dengan Besi Polos atau Besi Ulir 10 Kg Pembesian dengan Besi Polos atau Besi Ulir 74 1 Kg Pembesian Kabel presstressed polos/strands 10 Kg Pembesian Kabel presstressed polos/strands

13,174.50

582.20

13,756.70

131,745.00

5,822.00

137,567.00

13,067.00

416.60

13,483.60

130,670.00

4,166.00

134,836.00

Bahan Besi Beton ( Polos / Ulir )

10.5000

Kg

12,240.00

128,520.00

0.1000

Kg

21,500.00

2,150.00

Perkerja

0.0500

OH

34,000.00

1,700.00

Tukang Besi

0.0500

OH

41,500.00

2,075.00

Kepala Tukang

0.0050

OH

47,000.00

235.00

Mandor

0.0030

OH

52,000.00

156.00

Kawat Beton Tenaga

75 1 Kg Jaring kawat baja/wire mesh

13,315.00

2,033.50

15,348.50

Bahan Jaring Kawat Beton/wiremesh dilas

1.0200

Kg

12,000.00

12,240.00

Kawat Beton

0.0500

Kg

21,500.00

1,075.00

Perkerja

0.0250

OH

34,000.00

850.00

Tukang Besi

0.0250

OH

41,500.00

1,037.50

Kepala Tukang

0.0020

OH

47,000.00

94.00

Mandor

0.0010

OH

52,000.00

52.00

Tenaga

76 1 m2 Pasang Bekisting untuk Pondasi

52,000.00

31,044.00

83,044.00

Analisa Harga Satuan Halaman 17

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA SATUAN BAHAN Rp.

HARGA SATUAN UPAH Rp.

A

B

C

D

E

F

77 1 m2 Pasang Bekisting untuk Sloof

JUMLAH BAHAN

JUMLAH UPAH

TOTAL HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

57,750.00

31,044.00

88,794.00

78 1 m2 Pasang Bekisting untuk Kolom (Menggunakan Plywood)

142,955.00

39,402.00

182,357.00

79 1 m2 Pasang Bekisting untuk Balok (Menggunakan Plywood)

147,881.00

39,402.00

187,283.00

80 1 m2 Pasang Bekisting untuk Lantai (Menggunakan Plywood)

202,955.00

38,742.00

241,697.00

81 1 m2 Pasang Bekisting untuk Dinding

156,243.06

38,742.00

194,985.06

Bahan Kayu Kelas III (Papan Terentang)

0.0300

m3

1,150,000.00

34,500.00

Paku Biasa 5 - 12 Cm

0.4000

Kg

19,000.00

7,600.00

Minyak Bekisting

0.2000

Ltr

3,000.00

600.00

Balok Kayu Kelas II (Stoot)

0.0200

m3

1,642,000.00

32,840.00

Plywood 9mm

0.3500

lbr

97,500.00

34,125.00

Dolken Kayu Galam Ø 8 - 10 / 4m

3.0000

btg

15,000.00

45,000.00

Formite/penjaga jarak bekisting/spacer

4.0000

bh

394.51

1,578.06

Perkerja

0.6600

OH

34,000.00

22,440.00

Tukang Batu

0.3300

OH

39,500.00

13,035.00

Kepala Tukang

0.0330

OH

47,000.00

1,551.00

Mandor

0.0330

OH

52,000.00

1,716.00

Tenaga

Analisa Harga Satuan Halaman 18

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA SATUAN BAHAN Rp.

HARGA SATUAN UPAH Rp.

A

B

C

D

E

F

82 1 m2 Pasang Bekisting untuk Tangga

JUMLAH BAHAN

JUMLAH UPAH

TOTAL HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

131,305.00

38,742.00

170,047.00

Bahan Kayu Kelas III (Papan Terentang)

0.0300

m3

1,150,000.00

34,500.00

Paku Biasa 5 - 12 Cm

0.4000

Kg

19,000.00

7,600.00

Minyak Bekisting

0.1500

Ltr

3,000.00

450.00

Balok Kayu Kelas II (Stoot)

0.0150

m3

1,642,000.00

24,630.00

Plywood 9mm

0.3500

lbr

97,500.00

34,125.00

Dolken Kayu Galam Ø 8 - 10 / 4m

2.0000

btg

15,000.00

30,000.00

Perkerja

0.6600

OH

34,000.00

22,440.00

Tukang Batu

0.3300

OH

39,500.00

13,035.00

Kepala Tukang

0.0330

OH

47,000.00

1,551.00

Mandor

0.0330

OH

52,000.00

1,716.00

Tenaga

83 1 m2 Jembatan untuk pengecoran beton

49,260.00

7,726.00

56,986.00

Bahan Kayu Kelas III (Papan Terentang)

0.0264

m3

1,150,000.00

30,360.00

Paku Biasa 5 - 12 Cm

0.6000

Kg

19,000.00

11,400.00

Dolken Kayu Galam Ø 8 - 10 / 4m

0.5000

btg

15,000.00

7,500.00

Perkerja

0.1500

OH

34,000.00

5,100.00

Tukang Batu

0.0500

OH

39,500.00

1,975.00

Kepala Tukang

0.0050

OH

47,000.00

235.00

Mandor

0.0080

OH

52,000.00

416.00

Tenaga

84 1 m3 Pekerjaan Sloof Beton ukuran 15x20 cm (4Æ12, Æ 8-200) K.175 1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175) 1 Kg Pembesian dengan Besi Polos atau Besi Ulir 1 m2 Pasang Bekisting untuk Sloof (2x pakai / 50%)

3,071,078.59

575,007.87

72,594.50

683,555.56

72,594.50

13,174.50

582.20

2,002,524.00

88,494.40

28,875.00

31,044.00

384,999.04

413,918.97

3,362,876.82

878,681.46

m3

683,555.56

72,594.50

683,555.56

72,594.50

154.0496

kg

13,174.50

582.20

2,029,526.46

89,687.68

18.1818

m2

35,738.75

39,402.00

649,794.80

716,399.28

3,812,616.06

935,738.30

m3

683,555.56

72,594.50

683,555.56

72,594.50

129.0000

kg

13,174.50

582.20

1,699,510.50

75,103.80

20.0000

m2

71,477.50

39,402.00

1,429,550.00

788,040.00

3,869,034.72

865,744.91

m3

683,555.56

72,594.50

683,555.56

72,594.50

144.1333

kg

13,174.50

582.20

1,898,884.16

83,914.41

18.0000

m2

71,477.50

39,402.00

1,286,595.00

709,236.00

3,586,022.54

684,101.55

m3

683,555.56

72,594.50

683,555.56

72,594.50

147.9704

kg

13,174.50

582.20

1,949,436.03

86,148.37

13.3333

m2

71,477.50

39,402.00

953,030.95

525,358.69

3,721,360.55

1,236,881.10

m3

683,555.56

72,594.50

683,555.56

72,594.50

154.0496

kg

13,174.50

582.20

2,029,526.46

89,687.68

27.2727

m2

36,970.25

39,402.00

1,008,278.54

1,074,598.93

3,710,650.19

893,060.58

m3

683,555.56

72,594.50

683,555.56

72,594.50

178.7475

kg

13,174.50

582.20

2,354,908.94

104,066.79

18.1818

m2

36,970.25

39,402.00

672,185.69

716,399.28

1.0000

m3

683,555.56

152.0000

kg

13.3333

m2

85 1 m3 Pekerjaan Beton Kolom Praktis ukuran 11x11 cm (4Æ10, Æ 6-200) K.175 1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175) 1 Kg Pembesian dengan Besi Polos atau Besi Ulir 1 m2 Pasang Bekisting untuk Kolom (4x pakai / 25%)

1.0000

86 1 m3 Pekerjaan Kolom Beton ukuran 20x20 cm (4Æ12, Æ 8-150) K.175 1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175) 1 Kg Pembesian dengan Besi Polos atau Besi Ulir 1 m2 Pasang Bekisting untuk Kolom (2x pakai / 50%)

1.0000

87 1 m3 Pekerjaan Kolom Beton ukuran 20x25 cm (6Æ12, Æ 8-150) K.175 1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175) 1 Kg Pembesian dengan Besi Polos atau Besi Ulir 1 m2 Pasang Bekisting untuk Kolom (2x pakai / 50%)

1.0000

88 1 m3 Pekerjaan Kolom Beton ukuran 30x30 cm (8Æ14, Æ 10-150) K.175 1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175) 1 Kg Pembesian dengan Besi Polos atau Besi Ulir 1 m2 Pasang Bekisting untuk Kolom (2x pakai / 50%)

1.0000

88 1 m3 Pekerjaan Balok Lintel Beton ukuran 11x11 cm (4Æ10, Æ 6-200) K.175 1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175) 1 Kg Pembesian dengan Besi Polos atau Besi Ulir 1 m2 Pasang Bekisting untuk Balok (4x pakai / 25%)

1.0000

89 1 m3 Pekerjaan Ring Balok Beton ukuran 11x15 cm (4Æ10, Æ 6-200) K.175 1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175) 1 Kg Pembesian dengan Besi Polos atau Besi Ulir 1 m2 Pasang Bekisting untuk Balok (4x pakai / 25%)

1.0000

3,646,086.46

4,241,558.28

4,748,354.36

4,734,779.62

4,270,124.09

4,958,241.65

4,603,710.76

Analisa Harga Satuan Halaman 19

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA SATUAN BAHAN Rp.

HARGA SATUAN UPAH Rp.

A

B

C

D

E

F

90 1 m3 Pekerjaan Ring Balok Beton ukuran 15x20 cm (4Æ12, Æ 8-150) K.175 1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175) 1 Kg Pembesian dengan Besi Polos atau Besi Ulir 1 m2 Pasang Bekisting untuk Balok (2x pakai / 50%)

1.0000

JUMLAH BAHAN

JUMLAH UPAH

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

4,188,036.11

889,926.47

72,594.50

683,555.56

72,594.50

13,174.50

582.20

2,148,907.19

94,963.28

73,940.50

39,402.00

1,355,573.37

722,368.69

m3

683,555.56

163.1111

kg

18.3333

m2

TOTAL HARGA

5,077,962.58

Analisa Harga Satuan Halaman 20

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA SATUAN BAHAN Rp.

HARGA SATUAN UPAH Rp.

A

B

C

D

E

F

91 1 m3 Pekerjaan Balok Beton ukuran 15x25 cm (6Æ12, Æ 8-150) K.175 1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175) 1 Kg Pembesian dengan Besi Polos atau Besi Ulir 1 m2 Pasang Bekisting untuk Balok (2x pakai / 50%)

1 Kg Pembesian dengan Besi Polos atau Besi Ulir 1 m2 Pasang Bekisting untuk Balok (2x pakai / 50%)

1 Kg Pembesian dengan Besi Polos atau Besi Ulir 1 m2 Pasang Bekisting untuk Plat

1 Kg Pembesian dengan Besi Polos atau Besi Ulir 1 m2 Pasang Bekisting untuk Plat

Rp. I=(G+H)

72,594.50

13,174.50

582.20

2,438,161.24

107,745.83

73,940.50

39,402.00

1,281,632.87

682,966.69

4,146,378.66

707,413.25

m3

683,555.56

72,594.50

683,555.56

72,594.50

188.0111

kg

13,174.50

582.20

2,476,952.24

109,460.06

13.3333

m2

73,940.50

39,402.00

985,870.87

525,358.69

3,763,432.76

456,807.09

m3

683,555.56

72,594.50

683,555.56

72,594.50

185.0667

kg

17.3333

m2

1.0000

1.0000 105.4000

kg

13,174.50

582.20

1,388,592.30

61,363.88

8.3333

m2

202,955.00

38,742.00

1,691,284.90

322,848.71

4,346,743.56

532,207.30

m3

683,555.56

72,594.50

683,555.56

72,594.50

1.0000 124.0000

kg

13,174.50

582.20

1,633,638.00

72,192.80

10.0000

m2

202,955.00

38,742.00

2,029,550.00

387,420.00

3,891,969.43

642,598.45

m3

683,555.56

72,594.50

683,555.56

72,594.50

95 1 m3 Pekerjaan Plat Beton Tebal 8 cm (Æ10 -100, 1 Lapis) K.175 1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175)

Rp. H = (C X F ) 863,307.02

94 1 m3 Pekerjaan Plat Beton Tebal 10 cm (Æ10 -200 2 Lapis) K.175 1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175)

Rp.

683,555.56

683,555.56

1.0000

1 Kg Pembesian dengan Besi Polos atau Besi Ulir

147.2500

kg

13,174.50

582.20

1,939,945.13

85,728.95

1 m2 Pasang Bekisting untuk Plat (2x pakai / 50%)

12.5000

m2

101,477.50

38,742.00

1,268,468.75

484,275.00

4,043,621.04

792,041.14

m3

683,555.56

72,594.50

683,555.56

72,594.50

96 1 m3 Pekerjaan Plat Beton Tebal 6 cm (Æ8 -100, 1 Lapis) K.175 1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175)

1.0000

TOTAL HARGA

G=(CXE) 4,403,349.66

m3

93 1 m3 Pekerjaan Plat Beton Tebal 12 cm (Æ10 -200 2 Lapis) K.175 1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175)

JUMLAH UPAH

72,594.50

1.0000

92 1 m3 Pekerjaan Balok Beton ukuran 20x30 cm (8Æ12, Æ 8-150) K.175 1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175)

JUMLAH BAHAN

5,266,656.68

4,853,791.91

4,220,239.85

4,878,950.86

4,534,567.88

4,835,662.19

1 Kg Pembesian dengan Besi Polos atau Besi Ulir

126.6667

kg

13,174.50

582.20

1,668,770.44

73,745.35

1 m2 Pasang Bekisting untuk Plat (2x pakai / 50%)

16.6667

m2

101,477.50

38,742.00

1,691,295.05

645,701.29

97 1 m3 Membuat Pondasi Beton Bertulang ( 150 Kg + bekisting )

2,942,615.00

314,681.50

3,257,296.50

98 1 m3 Membuat sloof beton bertulang (200 kg besi + bekisting)

3,691,940.00

355,699.50

4,047,639.50

CATATAN : PEKERJAAN BETON ( Belum ada Gambar Detailnya )

Bahan Kayu Kelas III

0.2700

m3

1,150,000.00

310,500.00

Paku Biasa 5 - 12 Cm

2.0000

Kg

19,000.00

38,000.00

Minyak Bekisting

0.6000

Ltr

3,000.00

1,800.00

Besi Beton Polos

210.0000

Kg

12,240.00

2,570,400.00

Kawat Beton

3.0000

Kg

21,500.00

64,500.00

336.0000

Kg

1,340.00

450,240.00

Pasir Beton

0.5400

m3

154,000.00

83,160.00

Koral Beton

0.8100

m3

214,000.00

173,340.00

Perkerja

5.6500

OH

34,000.00

192,100.00

Tukang Batu

0.2750

OH

39,500.00

10,862.50

Tukang Kayu

1.5600

OH

41,500.00

64,740.00

Tukang Besi

1.4000

OH

41,500.00

58,100.00

Kepala Tukang

0.3230

OH

47,000.00

15,181.00

Mandor

0.2830

OH

52,000.00

14,716.00

Semen Portland

Tenaga

Analisa Harga Satuan Halaman 21

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA SATUAN BAHAN Rp.

HARGA SATUAN UPAH Rp.

A

B

C

D

E

F

99 1 m3 Membuat kolom beton bertulang (300 kg besi + bekisting)

JUMLAH BAHAN

JUMLAH UPAH

TOTAL HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

6,088,640.00

443,484.50

6,532,124.50

Bahan Kayu Kelas III

0.4000

m3

1,150,000.00

460,000.00

Paku Biasa 5 - 12 Cm

4.0000

Kg

19,000.00

76,000.00

Minyak Bekisting

2.0000

Ltr

3,000.00

6,000.00

Besi Beton Polos

315.0000

Kg

12,240.00

3,855,600.00

Kawat Beton

4.5000

Kg

21,500.00

96,750.00

336.0000

Kg

1,340.00

450,240.00

Pasir Beton

0.5400

m3

154,000.00

83,160.00

Koral Beton

0.8100

m3

214,000.00

173,340.00

Kayu Kelas II

0.1500

m3

1,642,000.00

246,300.00

Plywood 9 mm

3.5000

lbr

97,500.00

341,250.00

20.0000

btg

15,000.00

300,000.00

Perkerja

7.0500

OH

34,000.00

239,700.00

Tukang Batu

0.2750

OH

39,500.00

10,862.50

Tukang Kayu

1.6500

OH

41,500.00

68,475.00

Tukang Besi

2.1000

OH

41,500.00

87,150.00

Kepala Tukang

0.4030

OH

47,000.00

18,941.00

Mandor

0.3530

OH

52,000.00

18,356.00

Semen Portland

Dolken kayu galam, φ (8-10) cm, panjang 4 m Tenaga

100 1 m3 Membuat Balok beton bertulang (200 kg besi + bekisting)

4,518,120.00

385,524.50

4,903,644.50

Bahan Kayu Kelas III

0.3200

m3

1,150,000.00

368,000.00

Paku Biasa 5 - 12 Cm

3.2000

Kg

19,000.00

60,800.00

Minyak Bekisting

1.6000

Ltr

3,000.00

4,800.00

Besi Beton Polos

210.0000

Kg

12,240.00

2,570,400.00

Kawat Beton

3.0000

Kg

21,500.00

64,500.00

336.0000

Kg

1,340.00

450,240.00

Pasir Beton

0.5400

m3

154,000.00

83,160.00

Koral Beton

0.8100

m3

214,000.00

173,340.00

Kayu Kelas II

0.1400

m3

1,642,000.00

229,880.00

Plywood 9 mm

2.8000

lbr

97,500.00

273,000.00

16.0000

btg

15,000.00

240,000.00

Perkerja

6.3500

OH

34,000.00

215,900.00

Tukang Batu

0.2750

OH

39,500.00

10,862.50

Tukang Kayu

1.6500

OH

41,500.00

68,475.00

Tukang Besi

1.4000

OH

41,500.00

58,100.00

Kepala Tukang

0.3330

OH

47,000.00

15,651.00

Mandor

0.3180

OH

52,000.00

16,536.00

Semen Portland

Dolken kayu galam, φ (8-10) cm, panjang 4 m Tenaga

101 1 m3 Membuat plat beton bertulang (150 kg besi + bekisting)

4,066,555.00

314,822.50

4,381,377.50

Bahan Kayu Kelas III

0.3200

m3

1,150,000.00

368,000.00

Paku Biasa 5 - 12 Cm

3.2000

Kg

19,000.00

60,800.00

Minyak Bekisting

1.6000

Ltr

3,000.00

4,800.00

Besi Beton Polos

157.5000

Kg

12,240.00

1,927,800.00

Kawat Beton

2.2500

Kg

21,500.00

48,375.00

336.0000

Kg

1,340.00

450,240.00

Pasir Beton

0.5400

m3

154,000.00

83,160.00

Koral Beton

0.8100

m3

214,000.00

173,340.00

Kayu Kelas II

0.1200

m3

1,642,000.00

197,040.00

Plywood 9 mm

2.8000

lbr

97,500.00

273,000.00

32.0000

btg

15,000.00

480,000.00

Perkerja

5.3000

OH

34,000.00

180,200.00

Tukang Batu

0.2750

OH

39,500.00

10,862.50

Tukang Kayu

1.3000

OH

41,500.00

53,950.00

Tukang Besi

1.0500

OH

41,500.00

43,575.00

Semen Portland

Dolken kayu galam, φ (8-10) cm, panjang 4 m Tenaga

Analisa Harga Satuan Halaman 22

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA SATUAN BAHAN Rp.

HARGA SATUAN UPAH Rp.

A

B

C

D

E

F

JUMLAH BAHAN

JUMLAH UPAH

TOTAL HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

Kepala Tukang

0.2650

OH

47,000.00

12,455.00

Mandor

0.2650

OH

52,000.00

13,780.00

Analisa Harga Satuan Halaman 23

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA SATUAN BAHAN Rp.

HARGA SATUAN UPAH Rp.

A

B

C

D

E

F

102 1 m3 Membuat Dinding beton bertulang (150 kg besi + bekisting)

JUMLAH BAHAN

JUMLAH UPAH

TOTAL HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

3,920,235.00

314,681.50

4,234,916.50

Bahan Kayu Kelas III

0.2400

m3

1,150,000.00

276,000.00

Paku Biasa 5 - 12 Cm

3.2000

Kg

19,000.00

60,800.00

Minyak Bekisting

1.6000

Ltr

3,000.00

4,800.00

Besi Beton Polos

157.5000

Kg

12,240.00

1,927,800.00

Kawat Beton

2.2500

Kg

21,500.00

48,375.00

336.0000

Kg

1,340.00

450,240.00

Pasir Beton

0.5400

m3

154,000.00

83,160.00

Koral Beton

0.8100

m3

214,000.00

173,340.00

Kayu Kelas II

0.1600

m3

1,642,000.00

262,720.00

Plywood 9 mm

2.8000

lbr

97,500.00

273,000.00

24.0000

btg

15,000.00

360,000.00

Perkerja

5.3000

OH

34,000.00

180,200.00

Tukang Batu

0.2750

OH

39,500.00

10,862.50

Tukang Kayu

1.3000

OH

41,500.00

53,950.00

Tukang Besi

1.0500

OH

41,500.00

43,575.00

Kepala Tukang

0.2620

OH

47,000.00

12,314.00

Mandor

0.2650

OH

52,000.00

13,780.00

Semen Portland

Dolken kayu galam, φ (8-10) cm, panjang 4 m Tenaga

103 1 m3 Membuat Dinding beton bertulang (200 kg besi + bekisting)

4,315,900.00

355,699.50

4,671,599.50

Bahan Kayu Kelas III

0.2500

m3

1,150,000.00

287,500.00

Paku Biasa 5 - 12 Cm

3.0000

Kg

19,000.00

57,000.00

Minyak Bekisting

1.2000

Ltr

3,000.00

3,600.00

Besi Beton Polos

210.0000

Kg

12,240.00

2,570,400.00

Kawat Beton

3.0000

Kg

21,500.00

64,500.00

336.0000

Kg

1,340.00

450,240.00

Pasir Beton

0.5400

m3

154,000.00

83,160.00

Koral Beton

0.8100

m3

214,000.00

173,340.00

Kayu Kelas II

0.1050

m3

1,642,000.00

172,410.00

Plywood 9 mm

2.5000

lbr

97,500.00

243,750.00

14.0000

btg

15,000.00

210,000.00

Perkerja

5.6500

OH

34,000.00

192,100.00

Tukang Batu

0.2750

OH

39,500.00

10,862.50

Tukang Kayu

1.5600

OH

41,500.00

64,740.00

Tukang Besi

1.4000

OH

41,500.00

58,100.00

Kepala Tukang

0.3230

OH

47,000.00

15,181.00

Mandor

0.2830

OH

52,000.00

14,716.00

Semen Portland

Dolken kayu galam, φ (8-10) cm, panjang 4 m Tenaga

104 1 M' kolom praktis beton bertulang (11 x 11) cm

48,387.50

9,320.00

57,707.50

Bahan Kayu Kelas III

0.0020

m3

1,150,000.00

Paku Biasa 5 - 12 Cm

0.0100

Kg

19,000.00

2,300.00 190.00

Besi Beton Polos

3.0000

Kg

12,240.00

36,720.00

Kawat Beton

0.0450

Kg

21,500.00

967.50

Semen Portland

4.0000

Kg

1,340.00

5,360.00

Pasir Beton

0.0060

m3

154,000.00

924.00

Koral Beton

0.0090

m3

214,000.00

1,926.00

Perkerja

0.1800

OH

34,000.00

6,120.00

Tukang Batu

0.0200

OH

39,500.00

790.00

Tukang Kayu

0.0200

OH

41,500.00

830.00

Tukang Besi

0.0200

OH

41,500.00

830.00

Kepala Tukang

0.0060

OH

47,000.00

282.00

Mandor

0.0090

OH

52,000.00

468.00

Tenaga

Analisa Harga Satuan Halaman 24

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA SATUAN BAHAN Rp.

HARGA SATUAN UPAH Rp.

A

B

C

D

E

F

105 1 M' Ring Balok beton bertulang (10 x 15) cm

JUMLAH BAHAN

JUMLAH UPAH

TOTAL HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

60,935.00

15,390.50

76,325.50

Bahan Kayu kelas III

0.0030

m3

1,150,000.00

Paku Biasa 5 - 12 Cm

0.0200

Kg

19,000.00

3,450.00 380.00

Besi Beton Polos

3.6000

Kg

12,240.00

44,064.00

Kawat Beton

0.0500

Kg

21,500.00

1,075.00

Semen Portland

5.5000

Kg

1,340.00

7,370.00

Pasir Beton

0.0090

m3

154,000.00

1,386.00

Koral Beton

0.0150

m3

214,000.00

3,210.00

Perkerja

0.2970

OH

34,000.00

10,098.00

Tukang Batu

0.0330

OH

39,500.00

1,303.50

Tukang Kayu

0.0330

OH

41,500.00

1,369.50

Tukang Besi

0.0330

OH

41,500.00

1,369.50

Kepala Tukang

0.0100

OH

47,000.00

470.00

Mandor

0.0150

OH

52,000.00

780.00

Tenaga

VIII

PEKERJAAN PENTUP ATAP

106 1m2 Pasang Atap Genteng Palentong Kecil

45,000.00

9,004.50

54,004.50

107 1m' Pasang Genteng Bubung Palentong

32,124.00

22,944.00

55,068.00

108 1m' Pasang Genteng Bubung Palentong Besar

28,624.00

22,944.00

51,568.00

109 1m2 Pasang Atap Genteng Metal

117,020.00

11,472.00

128,492.00

110 1m2 Pasang Atap Sirap

169,800.00

17,610.00

187,410.00

Bahan Atap sirap 5 mm

60.000

lbr

2,750.00

165,000.00

Paku Biasa ½" - 1"

0.200

Kg

24,000.00

4,800.00

Perkerja

0.166

OH

34,000.00

5,644.00

Tukang Kayu

0.250

OH

41,500.00

10,375.00

Kepala Tukang

0.025

OH

47,000.00

1,175.00

Mandor

0.008

OH

52,000.00

416.00

Tenaga

Analisa Harga Satuan Halaman 25

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA SATUAN BAHAN Rp.

HARGA SATUAN UPAH Rp.

A

B

C

D

E

F

111 1m' Pasang Nok Genteng Beton

JUMLAH BAHAN

JUMLAH UPAH

TOTAL HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

205,326.00

23,880.00

229,206.00

Bahan Genteng Beton

3.500

bh

49,000.00

Paku Biasa 2" - 5"

0.050

Kg

19,000.00

171,500.00 950.00

Semen PC

10.800

Kg

1,340.00

14,472.00

Pasir Pasang

0.032

m3

122,000.00

3,904.00

Semen Warna

1.000

Kg

14,500.00

14,500.00

Perkerja

0.400

OH

34,000.00

13,600.00

Tukang Kayu

0.200

OH

41,500.00

8,300.00

Kepala Tukang

0.020

OH

47,000.00

940.00

Mandor

0.020

OH

52,000.00

1,040.00

Tenaga

112 1m' Pasang Nok Genteng Metal

53,900.00

16,106.00

70,006.00

Bahan Nok Genteng Metal

1.100

lbr

49,000.00

Paku Biasa 1/2" - 1"

0.050

Kg

24,000.00

53,900.00

Perkerja

0.250

OH

34,000.00

8,500.00

Tukang Kayu

0.150

OH

41,500.00

6,225.00

Kepala Tukang

0.015

OH

47,000.00

705.00

Mandor

0.013

OH

52,000.00

676.00

Tenaga

113 1m' Pasang Atap Nok Seng IX

10,260.00

4,103.00

14,363.00

37,620.00

18,021.00

55,641.00

PEKERJAAN LANGIT - LANGIT

114 1 m2 Pas. Rangka Plapond Kayu Lokal Kelas II (Hanya Rangka) Bahan Kayu Lokal Kelas II

0.0210

m3

1,540,000.00

32,340.00

Paku

0.2200

kg

24,000.00

5,280.00

Perkerja

0.1875

org

34,000.00

6,375.00

Tukang Kayu

0.2250

org

41,500.00

9,337.50

Kepala Tukang

0.0375

org

47,000.00

1,762.50

Mandor

0.0105

org

52,000.00

546.00

Tenaga

115 1 m2 Pas. Rangka Plapond Besi Hollow (Hanya Rangka)

59,250.00

17,650.00

76,900.00

Bahan Skrup 1"

25.0000

bh

240.00

Hollow 20/40 mm

0.2500

btg

30,000.00

6,000.00 7,500.00

Hollow 40/40 mm

0.6250

btg

46,000.00

28,750.00

Penggantungan

2.0000

bh

8,500.00

17,000.00

Perkerja

0.3000

org

34,000.00

10,200.00

Tukang Kayu

0.1500

org

41,500.00

6,225.00

Kepala Tukang

0.0150

org

47,000.00

705.00

Mandor

0.0100

org

52,000.00

520.00

Tenaga

116 1 m2 Pas. Langit-langit gypsum board ukuran (1200x2400x9) mm

27,938.00

5,970.00

33,908.00

Bahan Gypsum Board

0.3640

Lbr

69,500.00

25,298.00

Paku Skrup

0.1100

kg

24,000.00

2,640.00

Perkerja

0.1000

OH

34,000.00

3,400.00

Tukang Kayu

0.0500

OH

41,500.00

2,075.00

Kepala Tukang

0.0050

OH

47,000.00

235.00

Mandor

0.0050

OH

52,000.00

260.00

Tenaga

Analisa Harga Satuan Halaman 26

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA SATUAN BAHAN Rp.

HARGA SATUAN UPAH Rp.

A

B

C

D

E

F

117 1 m2 langit-langit dari GRC Internal tebal 4 mm

JUMLAH BAHAN

JUMLAH UPAH

TOTAL HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

24,480.00

5,970.00

30,450.00

Bahan GRC internal

0.3640

Lbr

60,000.00

21,840.00

Paku Skrup

0.1100

kg

24,000.00

2,640.00

Perkerja

0.1000

OH

34,000.00

3,400.00

Tukang Kayu

0.0500

OH

41,500.00

2,075.00

Kepala Tukang

0.0050

OH

47,000.00

235.00

Mandor

0.0050

OH

52,000.00

260.00

Tenaga

118 1 m' Pas. List Plapond gypsum board profil

10,455.00

4,968.00

15,423.00

Bahan List Gypsum profil

1.0500

m'

9,000.00

9,450.00

Tepung gypsum

0.1500

kg

6,700.00

1,005.00

Perkerja

0.0600

OH

34,000.00

2,040.00

Tukang Kayu

0.0600

OH

41,500.00

2,490.00

Kepala Tukang

0.0060

OH

47,000.00

282.00

Mandor

0.0030

OH

52,000.00

156.00

Tenaga

119 1 m2 List Langit - langit Kayu Profil X

4,965.00

4,166.00

9,131.00

1,131,000.00

164,017.00

1,295,017.00

254,260.00

172,070.00

426,330.00

2,349,260.00

83,400.00

2,432,660.00

PEKERJAAN SANITASI

120 Memasang 1 buah Kloset Duduk / Monoblok 121 Memasang 1 buah Kloset Jongkok Porselen 122 Memasang 1 buah Urinoir

Analisa Harga Satuan Halaman 27

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA SATUAN BAHAN Rp.

HARGA SATUAN UPAH Rp.

A

B

C

D

E

F

JUMLAH BAHAN

JUMLAH UPAH

TOTAL HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

123 Memasang 1 buah Wastafel

681,260.00

103,525.00

784,785.00

124 Memasang 1 buah Bak Mandi Fiberglass, volume 0.30 m3

258,420.00

198,950.00

457,370.00

125 Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (45 x 45 )cm, t = 50cm

280,317.50

72,864.50

353,182.00

Bahan Bata merah

0.2500

m3

550.00

137.50

77.0000

Kg

1,340.00

103,180.00

Pasir Pasang

0.1300

m3

122,000.00

15,860.00

Batu Kerikil

0.0200

m3

214,000.00

4,280.00

Besi Beton

2.6000

m3

55,000.00

143,000.00

Pasir Beton

0.0900

m3

154,000.00

13,860.00

Perkerja

1.4200

OH

34,000.00

48,280.00

Tukang Batu

0.4730

OH

39,500.00

18,683.50

Kepala Tukang

0.0470

OH

47,000.00

2,209.00

Mandor

0.0710

OH

52,000.00

3,692.00

Semen Portland

Tenaga

126 Memasang 1 m' Pipa PVC tipe AW Ø ½"

7,517.50

3,969.60

11,487.10

127 Memasang 1 m' Pipa PVC tipe AW Ø ¾"

10,075.00

3,969.60

14,044.60

128 Memasang 1 m' Pipa PVC tipe AW Ø 1"

10,230.00

3,969.60

14,199.60

Analisa Harga Satuan Halaman 28

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA SATUAN BAHAN Rp.

HARGA SATUAN UPAH Rp.

A

B

C

D

E

F

129 Memasang 1 m' Pipa PVC tipe D Ø 2½"

JUMLAH BAHAN

JUMLAH UPAH

TOTAL HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

22,823.75

3,969.60

26,793.35

Bahan Pipa PVC tipe D Ø 2½"

1.2000

m'

14,725.00

17,670.00

Perlengkapan

35% Harga Pipa

5,153.75

5,153.75

Tenaga Perkerja

0.0360

OH

34,000.00

1,224.00

Tukang Batu

0.0600

OH

39,500.00

2,370.00

Kepala Tukang

0.0060

OH

47,000.00

282.00

Mandor

0.0018

OH

52,000.00

93.60

130 Memasang 1 m' Pipa PVC tipe D Ø 4"

47,817.50

8,934.20

56,751.70

Bahan Pipa PVC tipe D Ø 4"

1.2000

m'

30,850.00

37,020.00

Perlengkapan

35% Harga Pipa

10,797.50

10,797.50

Tenaga Perkerja

0.0810

OH

34,000.00

2,754.00

Tukang Batu

0.1350

OH

39,500.00

5,332.50

Kepala Tukang

0.0135

OH

47,000.00

634.50

Mandor

0.0041

OH

52,000.00

213.20

131 Memasang 1 bh Kran Ø ¾" atau ½"

81,592.50

5,020.00

86,612.50

132 Memasang 1 bh Floor Drain

55,000.00

5,020.00

60,020.00

103,000.00

3,342.80

106,342.80

XI

PEKERJAAN BESI DAN ALLUMINIUM

133 1 M' Kusen Alumunium Bahan Profil alumunium

1.1000

m'

92,600.00

101,860.00

Sealent

0.0600

tube

19,000.00

1,140.00

Perkerja

0.0430

OH

34,000.00

1,462.00

Tukang Khusus Alumunium

0.0430

OH

36,500.00

1,569.50

Kepala Tukang

0.0043

OH

47,000.00

202.10

Mandor

0.0021

OH

52,000.00

109.20

Tenaga

134 1 Unit Pasang Pintu PVC KM/WC lengkap Accessories

220,000.00

84,480.40

304,480.40

Bahan Pintu PVC lengkap Accessories

1.0000

unit

220,000.00

220,000.00

Perkerja

1.0500

OH

34,000.00

35,700.00

Tukang Kayu

1.0500

OH

41,500.00

43,575.00

Kepala Tukang

0.1050

OH

47,000.00

4,935.00

Mandor

0.0052

OH

52,000.00

270.40

Tenaga

Analisa Harga Satuan Halaman 29

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA SATUAN BAHAN Rp.

HARGA SATUAN UPAH Rp.

A

B

C

D

E

F

135 1 m' Pasang Talang Datar/Jurai , Seng BJLS 28 lebar 90 cm

JUMLAH BAHAN

JUMLAH UPAH

TOTAL HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

157,779.50

25,095.00

182,874.50

48,047.00

19,376.00

67,423.00

137 1 Buah Pasang Kunci Tanam Antik

108,000.00

29,916.00

137,916.00

138 1 Buah Pasang Kunci Tanam Biasa

42,000.00

21,820.00

63,820.00

139 1 Buah Pasang Kunci Slot

30,500.00

9,972.00

40,472.00

136 1 m' Pasang Talang ½ Lingkaran Ø 15 cm, Seng BJLS 28 Lebar 45 cm XII

PEKERJAAN KUNCI DAN KACA

Bahan Kunci Slot

1.0000

Bh

30,500.00

30,500.00

Pekerja

0.0200

OH

34,000.00

680.00

Tukang Kayu

0.2000

OH

41,500.00

8,300.00

Kepala Tukang

0.0200

OH

47,000.00

940.00

Mandor

0.0010

OH

52,000.00

52.00

Tenaga

140 1 Buah Pasang Engsel Pintu

18,000.00

7,479.00

25,479.00

141 1 Buah Pasang Engsel Angin Untuk Pintu

12,500.00

10,440.00

22,940.00

8,000.00

7,479.00

15,479.00

142 1 Buah Pasang Engsel Jendela

Analisa Harga Satuan Halaman 30

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA SATUAN BAHAN Rp.

HARGA SATUAN UPAH Rp.

A

B

C

D

E

F

1.0000

Bh

8,000.00

Pekerja

0.0150

OH

34,000.00

510.00

Tukang Kayu

0.1500

OH

41,500.00

6,225.00

Kepala Tukang

0.0150

OH

47,000.00

705.00

Mandor

0.0008

OH

52,000.00

39.00

JUMLAH BAHAN

JUMLAH UPAH

TOTAL HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

Bahan Engsel Jendela

8,000.00

Tenaga

143 1 Buah Pasang Kait angin 144 1 Buah Door Closer

12,500.00

7,479.00

19,979.00

300,000.00

24,930.00

324,930.00

Bahan Door Closer

1.0000

Bh

300,000.00

300,000.00

Pekerja

0.0500

OH

34,000.00

1,700.00

Tukang Kayu

0.5000

OH

41,500.00

20,750.00

Kepala Tukang

0.0500

OH

47,000.00

2,350.00

Mandor

0.0025

OH

52,000.00

130.00

Tenaga

145 1 Buah Pegangan Pintu/ Door Holder

215,000.00

24,930.00

239,930.00

Bahan Door Holder

1.0000

Bh

215,000.00

215,000.00

Pekerja

0.0500

OH

34,000.00

1,700.00

Tukang Kayu

0.5000

OH

41,500.00

20,750.00

Kepala Tukang

0.0500

OH

47,000.00

2,350.00

Mandor

0.0025

OH

52,000.00

130.00

Tenaga

146 1 Buah Door Stop

310,000.00

4,986.00

314,986.00

Bahan Door Stop

1.0000

Bh

310,000.00

310,000.00

Pekerja

0.0100

OH

34,000.00

340.00

Tukang Kayu

0.1000

OH

41,500.00

4,150.00

Kepala Tukang

0.0100

OH

47,000.00

470.00

Mandor

0.0005

OH

52,000.00

26.00

Tenaga

147 1 Buah Pasang Kaca tebal 3 mm

97,350.00

7,479.00

104,829.00

148 1 Buah Pasang Kaca tebal 5 mm

129,800.00

7,479.00

137,279.00

Bahan Kaca Polos

1.1000

m2

118,000.00

129,800.00

Perkerja

0.0150

OH

34,000.00

510.00

Tukang Kayu

0.1500

OH

41,500.00

6,225.00

Kepala Tukang

0.0150

OH

47,000.00

705.00

Mandor

0.0008

OH

52,000.00

39.00

Tenaga

149 1 Buah Pasang Kaca riben tebal 5 mm

129,800.00

12,871.00

142,671.00

Analisa Harga Satuan Halaman 31

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA SATUAN BAHAN Rp.

HARGA SATUAN UPAH Rp.

A

B

C

D

E

F

XIII

JUMLAH BAHAN

JUMLAH UPAH

TOTAL HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

PEKERJAAN PENUTUP LANTAI DAN DINDING

150 1 m2 Pasang Lantai Keramik 30 x 30 cm

80,640.00

41,090.00

121,730.00

151 1 m2 Pasang Lantai Keramik 30 x 30 cm (Corak)

83,640.00

41,090.00

124,730.00

Bahan Ubin Keramik 30 x 30 cm

11.8700

bh

3,622.58

43,000.00

Semen Portland

10.0000

Kg

1,340.00

13,400.00

Pasir Pasang

0.0450

m3

122,000.00

5,490.00

Semen Warna

1.5000

Kg

14,500.00

21,750.00

Perkerja

0.7000

OH

34,000.00

23,800.00

Tukang Batu

0.3500

OH

39,500.00

13,825.00

Kepala Tukang

0.0350

OH

47,000.00

1,645.00

Mandor

0.0350

OH

52,000.00

1,820.00

Tenaga

152 1 m2 Pasang Lantai Keramik 40 x 40 cm

88,140.00

41,090.00

129,230.00

Bahan Ubin Keramik 40 x 40 cm

6.2500

bh

7,600.00

47,500.00

10.0000

Kg

1,340.00

13,400.00

Pasir Pasang

0.0450

m3

122,000.00

5,490.00

Semen Warna

1.5000

Kg

14,500.00

21,750.00

Perkerja

0.7000

OH

34,000.00

23,800.00

Tukang Batu

0.3500

OH

39,500.00

13,825.00

Kepala Tukang

0.0350

OH

47,000.00

1,645.00

Mandor

0.0350

OH

52,000.00

1,820.00

Semen Portland

Tenaga

153 1 m2 Pasang Lantai Keramik 20 x 20 cm Anti Slip

90,416.00

41,090.00

131,506.00

Bahan Ubin Keramik

26.5000

bh

1,792.45

47,500.00

Semen Portland

10.4000

Kg

1,340.00

13,936.00

Pasir Pasang

0.0450

m3

122,000.00

5,490.00

Semen Warna

1.6200

Kg

14,500.00

23,490.00

Perkerja

0.7000

OH

34,000.00

23,800.00

Tukang Batu

0.3500

OH

39,500.00

13,825.00

Kepala Tukang

0.0350

OH

47,000.00

1,645.00

Mandor

0.0350

OH

52,000.00

1,820.00

Tenaga

154 1 m2 Pasang Dinding Keramik 20 x 25 cm (KIA)

101,388.00

52,830.00

154,218.00

Bahan Keramik 20 x 25 cm

20.0000

Bh

2,930.00

58,600.00

Semen Portland

9.3000

Kg

1,340.00

12,462.00

Pasir Pasang

0.0180

m3

122,000.00

2,196.00

Semen Warna

1.9400

Kg

14,500.00

28,130.00

Perkerja

0.9000

OH

34,000.00

30,600.00

Tukang Batu

0.4500

OH

39,500.00

17,775.00

Kepala Tukang

0.0450

OH

47,000.00

2,115.00

Mandor

0.0450

OH

52,000.00

2,340.00

Tenaga

155 1 m2 Pasang Dinding Keramik 25 x 40 cm (KIA)

102,788.00

52,830.00

155,618.00

Bahan Keramik 25 x 40 cm

10.0000

Bh

6,000.00

60,000.00

Semen Portland

9.3000

Kg

1,340.00

12,462.00

Pasir Pasang

0.0180

m3

122,000.00

2,196.00

Semen Warna

1.9400

Kg

14,500.00

28,130.00

0.9000

OH

Tenaga Perkerja

34,000.00

30,600.00

Analisa Harga Satuan Halaman 32

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA SATUAN BAHAN Rp.

HARGA SATUAN UPAH Rp.

A

B

C

D

E

F

JUMLAH BAHAN

JUMLAH UPAH

TOTAL HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

Tukang Batu

0.4500

OH

39,500.00

17,775.00

Kepala Tukang

0.0450

OH

47,000.00

2,115.00

Mandor

0.0450

OH

52,000.00

2,340.00

Analisa Harga Satuan Halaman 33

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA SATUAN BAHAN Rp.

HARGA SATUAN UPAH Rp.

A

B

C

D

E

F

156 1 m2 Pasang Dinding batu Hitam uk.20x40 cm

JUMLAH BAHAN

JUMLAH UPAH

TOTAL HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

151,940.00

41,090.00

193,030.00

Bahan Batu Tempel Hitam

1.1000

m2

112,000.00

123,200.00

11.7500

Kg

1,340.00

15,745.00

Pasir Pasang

0.0350

m3

122,000.00

4,270.00

Vernsi

0.1000

kg

84,000.00

8,400.00

Kwas 3"

0.0500

bh

6,500.00

325.00

Perkerja

0.7000

OH

34,000.00

23,800.00

Tukang Batu

0.3500

OH

39,500.00

13,825.00

Kepala Tukang

0.0350

OH

47,000.00

1,645.00

Mandor

0.0350

OH

52,000.00

1,820.00

Semen Portland (PC)

Tenaga

157 1 m2 Pasangan Glass Block

616,562.90

25,690.10

642,253.00

142,609.76

9,450.00

152,059.76

Bahan 158 1 m' Saluran Grevel Beton 1/2 DIA.20 CM + Pasangan Bahan Galian tanah

0.1500

m3

26,800.00

4,020.00

Grevel beton 20 cm

1.0000

bh

38,500.00

38,500.00

Pas.bata + Plesteran

1.0000

m'

100,089.76

100,089.76

1.0000

ls

9,450.00

Tenaga Upah kerja

9,450.00

159 1 M2 Pasangan Paving Block Natural 6 & 8 CM

79,393.60

32,581.00

111,974.60

Bahan Paving block natural 6 & 8 cm

1.0100

m2

63,360.00

63,993.60

Pasir beton

0.1000

m3

154,000.00

15,400.00

Perkerja

0.2500

org

34,000.00

8,500.00

Tukang Batu

0.5000

org

39,500.00

19,750.00

Kepala Tukang

0.0250

org

47,000.00

1,175.00

Mandor

0.0030

org

52,000.00

156.00

Peralatan

1.0000

lot

3,000.00

3,000.00

Tenaga

XIV

PEKERJAAN PENGECATAN

160 1 m2 Mengecatan Bidang Kayu Lama

24,040.00

5,975.00

30,015.00

161 1 m2 Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 2 Lapis Cat Penutup

35,930.00

3,165.50

39,095.50

Analisa Harga Satuan Halaman 34

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA SATUAN BAHAN Rp.

HARGA SATUAN UPAH Rp.

A

B

C

D

E

F

JUMLAH BAHAN

JUMLAH UPAH

TOTAL HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

162 1 m2 Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup

41,420.00

7,055.50

48,475.50

163 1 m2 Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )

12,820.00

3,720.60

16,540.60

164 1 m2 Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )

7,020.00

3,720.60

10,740.60

Bahan Cat Tembok (Metrolite)

0.2600

Kg

27,000.00

7,020.00

Perkerja

0.0200

OH

34,000.00

680.00

Tukang Cat

0.0630

OH

41,500.00

2,614.50

Kepala Tukang

0.0063

OH

47,000.00

296.10

Mandor

0.0025

OH

52,000.00

130.00

Tenaga

165 1 m2 Pengecatan Tembok Lama ( 2 Lapis Cat Penutup )

7,020.00

3,720.60

10,740.60

Bahan Cat Tembok (Metrolite)

0.2600

Kg

27,000.00

7,020.00

Perkerja

0.0200

OH

34,000.00

680.00

Tukang Cat

0.0630

OH

41,500.00

2,614.50

Kepala Tukang

0.0063

OH

47,000.00

296.10

Mandor

0.0025

OH

52,000.00

130.00

Tenaga

XIV

PEKERJAAN INSTALASI LISTRIK

166 1 Bh Titik Lampu Lengkap TL 20 Wat

85,000.00

4,954.50

89,954.50

Bahan 1.0000

titik

Tukang Listrik

0.0630

OH

41,500.00

2,614.50

Mandor

0.0450

OH

52,000.00

2,340.00

Titik Lampu Komplit

85,000.00

85,000.00

Tenaga

167 1 Bh Titik Sakelar Single

16,000.00

4,954.50

20,954.50

Bahan 1.0000

Bh

Tukang Listrik

0.0630

OH

41,500.00

2,614.50

Mandor

0.0450

OH

52,000.00

2,340.00

Sakelar single

16,000.00

16,000.00

Tenaga

168 1 Bh Titik Sakelar Doubel

20,000.00

4,954.50

24,954.50

Bahan 1.0000

Bh

Tukang Listrik

0.0630

OH

41,500.00

2,614.50

Mandor

0.0450

OH

52,000.00

2,340.00

Sakelar Doubel

20,000.00

20,000.00

Tenaga

169 1 M Pasang Kabel NYM 3 x 2 1/2

11,940.00

4,954.50

16,894.50

Bahan 1.0000

m'

Tukang Listrik

0.0630

OH

41,500.00

2,614.50

Mandor

0.0450

OH

52,000.00

2,340.00

Kabel NYM 3 x 2 1/2

11,940.00

11,940.00

Tenaga

Analisa Harga Satuan Halaman 35

NO.

URAIAN KEBUTUHAN

INDEKS

SATUAN

HARGA SATUAN BAHAN Rp.

HARGA SATUAN UPAH Rp.

A

B

C

D

E

F

170 1 Bh Box MCB

JUMLAH BAHAN

JUMLAH UPAH

TOTAL HARGA

Rp.

Rp.

Rp.

G=(CXE)

H = (C X F )

I=(G+H)

366,000.00

4,954.50

370,954.50

Bahan 1.0000

Bh

Tukang Listrik

0.0630

OH

41,500.00

2,614.50

Mandor

0.0450

OH

52,000.00

2,340.00

Bok MCB

366,000.00

366,000.00

Tenaga

171 1 Bh Titik Stop Kontak

15,000.00

4,954.50

19,954.50

Bahan 1.0000

Bh

Tukang Listrik

0.0630

OH

41,500.00

2,614.50

Mandor

0.0450

OH

52,000.00

2,340.00

Stop Kontak

15,000.00

15,000.00

Tenaga

172 1 Bh Pipa Arde

-

4,954.50

4,954.50

Bahan 1.0000

Bh

Tukang Listrik

0.0630

OH

41,500.00

2,614.50

Mandor

0.0450

OH

52,000.00

2,340.00

Pipa Arde P.3 m

-

-

Tenaga

173 1 Bh Pasangan Lampu

55,000.00

4,954.50

59,954.50

Bahan Lampu XL 14 watt (Philips)

1.0000

Bh

Dudukan Lampu

1.0000

Bh

Tukang Listrik

0.0630

OH

41,500.00

2,614.50

Mandor

0.0450

OH

52,000.00

2,340.00

55,000.00

55,000.00

Tenaga

KUNINGAN, JANUARI 2012

Analisa Harga Satuan Halaman 36

1 2 4 5

#REF!

6 7 174 175 176 182 183 189

218 224 225 231 232

238 239 245 246

Analisa Harga Satuan Halaman 37

5

#REF!

6 7 254 255 263

273 274 293 302 303 313 314 324

Analisa Harga Satuan Halaman 38

5

#REF!

6 7

325 326

360 370

371 372 373 382

Analisa Harga Satuan Halaman 39

5

#REF!

6 7 383 392

478 487

659 668

Analisa Harga Satuan Halaman 40

5

#REF!

6 7 669 678

710 711

731 778 779

Analisa Harga Satuan Halaman 41

5

#REF!

6 7 806 807 870 881

905 906

Analisa Harga Satuan Halaman 42

5

#REF!

6 7

1029 1039

1059 1060

Analisa Harga Satuan Halaman 43

5

#REF!

6 7

1

3000

0.0006 1666.6666667 5000000

1221 1230

Analisa Harga Satuan Halaman 44

5

#REF!

6 7 1250

1283 1293 1316 1326 1327 1339

Analisa Harga Satuan Halaman 45

5

#REF!

6 7 1370 1371

0.6207142857 0.0880176211

Analisa Harga Satuan Halaman 46

5

#REF!

6 7

1611 1620

1664 1674

Analisa Harga Satuan Halaman 47

5

#REF!

6 7 1675 1685 1686 1699 1700 1713 1714 1727

Analisa Harga Satuan Halaman 48

5

#REF!

6 7

33.333333333 1

0.7 1.4285714286

23.333333333

82.6446280992 51322.855142

#REF!

82.6446280992

59994.72397

60.6060606061 75961.227604

Analisa Harga Satuan Halaman 49

5

#REF!

6 7

1757

Analisa Harga Satuan Halaman 50

5

#REF!

6 7

1974 1975 1976 1984 2003 2013 2025 2035 2298 2307

Analisa Harga Satuan Halaman 51

5

#REF!

6 7

2374 2383 2413 2414

Analisa Harga Satuan Halaman 52

5

#REF!

6 7

1256 70 1326

2610 2619 2665 2666 2667 2676 2677 2687 2700 2711

Analisa Harga Satuan Halaman 53

5

#REF!

6 7 2712 2723 2735

0.6

0.6

0.9

0.324

2744

2931 2940 2941 2950 2951 2960

Analisa Harga Satuan Halaman 54

5

#REF!

6 7

3033 3042 3043 3051 3072 3073

Analisa Harga Satuan Halaman 55

5

#REF!

6 7 3238 3249 3262 3273 3286 3287 3288 3296 3297 3305

3324 3332 3342 3350

Analisa Harga Satuan Halaman 56

5

#REF!

6 7

3360 3368

3423 3431

3432 3440

Analisa Harga Satuan Halaman 57

5

#REF!

6 7 3504 3505 4009 4020

0.2

1

0.25

20

0.05

Analisa Harga Satuan Halaman 58

5

#REF!

6 7

4329 4338

4429 4430 4490 4500 4501 4512

Analisa Harga Satuan Halaman 59

5

#REF!

6 7 4526 4538 4580 4590

Analisa Harga Satuan Halaman 60

HARGA SATUAN UPAH

NO.

JENIS UPAH

1

2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17

Perkerja / Buruh tak terlatih Buruh terlatih Tukang Batu Tukang Besi Tukang Besi Konstruksi Tukang Cat Tukang Gali Tukang Kayu Tukang Listrik Tukang Las Kepala Tukang Mandor Operator kurang terlatih Operator terlatih Supir truk Pembantu supir Tukang plituran

HARGA UPAH Rp. 3 34,000.00 36,500.00 39,500.00 41,500.00 49,500.00 41,500.00 34,500.00 41,500.00 41,500.00 43,000.00 47,000.00 52,000.00 50,000.00 53,000.00 44,500.00 36,000.00 42,500.00

SATUAN 4 Org/Hr Org/Hr Org/Hr Org/Hr Org/Hr Org/Hr Org/Hr Org/Hr Org/Hr Org/Hr Org/Hr Org/Hr Org/Hr Org/Hr Org/Hr Org/Hr Org/Hr

#REF!

32,200.00 33,000.00 37,500.00 39,500.00 47,250.00 39,500.00 33,000.00 39,500.00 39,500.00 41,000.00 44,500.00 49,500.00 47,850.00 50,600.00 42,350.00 34,100.00 39,500.00

HARGA SATUAN BAHAN

NO

JENIS BAHAN

1

2

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52

Aluminium foil @60 m Bak mandi fiber glass oval 120 ltr Bata merah Batu belah uk. 15-20 cm Batu candi Rooster bata Uk. 12 x 22 untuk gapura (biasa) Besi beton/Baja tulangan beton Besi U / langko kuda-kuda Besi Hollow 40/40 mm Cat luar EMCO LUX warna sedang Cat meni Emco Cat tembok Metrolit Vernis / coating Closet duduk TOTO/INA Closet jongkok porselin merk INA / TOTO (putih) Engsel jendela nylon Engsel pintu nylon Genteng Natural Nok Bulat Genteng pres jatiwangi tipe Plentong Natural Grevel beton dia 1/2 dia. 20 cm Kabel NYM 3 x 2 1/2 - 50 m' Kaca polos tebal 3 mm Kaca polos tebal 5 mm Kait Angin Kawat beton Kayu dolken dia. 10 cm Kayu lokal kelas II Kayu lanan Kayu Stoot bekisting Kayu Usuk 5/7 lanan Kayu Reng 2/3 Lanan Kayu kaso 5/7 kelas II Kayu Reng 2/3 kelas II Keramik dinding 20/25 motif (KIA) Keramik dinding 25/40 motif (KIA) Keramik 20/20 anti slip Keramik Lantai 30/30 motif sekw. Mulia Keramik Lantai 30/30 putih sekw. Mulia Keramik Lantai 40/40 putih sekw. KIA Krikil beton (split) uk. 2-3 cm Kran dia. 1/2'' SAN''EI Kunci tanam besar merk Viali Kunci tanam sedang Js Itali kwas 3" Langko kuda-kuda Lem kayu fox List kayu profil 3 x 3 cm Minyak Bekisting Paku biasa 1'' Paku biasa 2' - 5'' Paku Seng Paku skrup 1''

HARGA BAHAN Rp. 3 430,000.00 219,000.00 550.00 105,000.00 112,000.00 4,250.00 12,240.00 30,500.00 46,000.00 61,000.00 32,000.00 27,000.00 84,000.00 870,000.00 245,000.00 8,000.00 18,000.00 3,500.00 1,800.00 38,500.00 597,000.00 88,500.00 118,000.00 12,500.00 21,500.00 15,000.00 2,685,000.00 5,936,000.00 1,642,000.00 3,650,000.00 1,800,000.00 1,540,000.00 1,360,000.00 58,600.00 60,000.00 47,500.00 43,000.00 40,000.00 47,500.00 214,000.00 81,500.00 108,000.00 42,000.00 6,500.00 30,500.00 32,000.00 18,000.00 3,000.00 24,000.00 19,000.00 24,700.00 240.00

SATUAN 4 rol bh bh m³ m² bh kg kg btg kg kg kg kg bh bh bh bh bh bh m' rol m² m² bh kg btg m³ m³ m³ m³ m³ m³ m³ m² m² m² m² m² m² m³ bh bh bh bh bh kg btg ltr kg kg kg bh

Halaman : 93

NO

JENIS BAHAN

1

2

53 54 55 56 57 58 59 60 61

Panel Box Zekering / MCB Papan borneo / MC Papan gipsum (plapond) 9 mm Papan Lanan Papan kayu lokal kelas II (mahoni) Papan terentang (Perancah/Acuan beton) Paping blok/conblok T = 6 cm Papan Calsiplank GRC (0,8x20)cm Pasir beton

HARGA BAHAN Rp. 3 366,000.00 5,936,000.00 69,500.00 7,056,000.00 2,900,000.00 1,150,000.00 1,760.00 45,000.00 154,000.00

SATUAN 4 unit m³ lbr m³ m³ m³ bh btg m³

Halaman : 93

NO

JENIS BAHAN

1

2

62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107

Pasir pasang Pasir urug/ timbunan Plamir kayu tawon kensai Plamour tembok Viny paint Semen adepsip (Gip) Semen Portlan (PC) (50 kg) Semen Warna Seng Plat 0,3 (lebar = 55 cm) Seng Plat 0,3 (lebar = 90 cm) Sirtu tidak tersaring Tanah urug / bahan timbuhan tindihan Teakwood 0,9 x 2,2 x 3 mm ukuran pintu Wastafel lengkap Lampu TL 20 watt komplit Lampu SL 14 watt (Philip) Besi Pipa dia. 6" Medium Pipa Paralon / PVC dia. 1/2" wavin type AW Pipa Paralon / PVC dia. 3/4" wavin type AW Pipa Paralon / PVC dia. 1" wavin type AW Pipe paralon / PVC dia. 2 1/2" wavin type D Pipa paralon /PVC dia. 4" wavin type D Lem PVC Seal Tape Plafond GRC Internal 4mm Polywood 1.20 x 2 .40 cm Kusen Alumunium 4" Daun pintu rangka alumunium natural kaca bening 5 mm Daun jendela natural kaca bening 5 mm Atap metal List gypsum 7 cm Pintu Fiber KM/WC Floor drain stainless Glass block 20 x 20 cm Rooster keramik 20/20 Baja ringan Genting metal untuk konstruksi baja ringan Genting bubungan metal untuk konstruksi baja ringan Wiremesh di las Kunci Door Holder Kunci Door Stop Kunci Door Closer Urinoir (lengkap) Atap sirap 5 mm Saklar single (broco) Saklar doble (broco) Stop kontak

HARGA BAHAN Rp. 3 122,000.00 55,000.00 22,000.00 31,000.00 6,700.00 67,000.00 14,500.00 31,000.00 42,500.00 47,000.00 42,000.00 85,000.00 600,000.00 85,000.00 55,000.00 2,422,800.00 19,400.00 26,000.00 26,400.00 58,900.00 123,400.00 8,200.00 3,700.00 60,000.00 97,500.00 92,600.00 1,525,000.00 732,000.00 111,000.00 18,000.00 220,000.00 55,000.00 24,500.00 33,600.00 167,500.00 110,000.00 49,000.00 12,000.00 215,000.00 310,000.00 300,000.00 1,800,000.00 165,000.00 16,000.00 20,000.00 15,000.00

SATUAN 4 m³ m³ kg kg kg zax kg lbr lbr m³ m³ lbr bh bh bh btg btg btg btg btg btg tube bh lbr lbr m' m² m² m² m' bh bh bh bh m² bh bh kg bh bh bh unit ikat bh bh bh

Halaman : 93

430,000.00 219,000.00 540.00 96,000.00 112,000.00 4,250.00 12,100.00 26,000.00 46,000.00 54,900.00 32,000.00 25,000.00 68,000.00 870,000.00 150,000.00 7,000.00 17,500.00 3,250.00 1,200.00 27,000.00 420,000.00 43,000.00 67,000.00 12,500.00 21,000.00 14,600.00 2,684,000.00 5,936,000.00 1,500,000.00 3,561,000.00 1,543,000.00 1,540,000.00 1,320,000.00 58,560.00 59,000.00 42,500.00 40,200.00 30,500.00 39,000.00 185,000.00 81,500.00 103,000.00 39,800.00 6,500.00 24,400.00 32,000.00 18,000.00 3,000.00 24,000.00 19,000.00 24,700.00 240.00

Halaman : 93

366,000.00 5,936,000.00 63,000.00 7,056,000.00 2,900,000.00 1,037,000.00 1,200.00 45,000.00 154,000.00

Halaman : 93

120,000.00 55,000.00 22,000.00 30,500.00 6,000.00 64,000.00 14,000.00 30,500.00 40,000.00 47,000.00 42,000.00 81,000.00 608,000.00 61,000.00 54,900.00 2,202,600.00 17,700.00 23,650.00 24,000.00 53,550.00 112,200.00 2,900.00 58,000.00 84,000.00 76,000.00 1,525,000.00 732,000.00 111,000.00 18,000.00 220,000.00 55,000.00 22,400.00 33,600.00 167,500.00 110,000.00 49,000.00 12,000.00 215,000.00 310,000.00 300,000.00 1,800,000.00 165,000.00 12,000.00 15,500.00 12,000.00

Halaman : 93

RENCANA ANGGARAN BIAYA PEMBANGUNAN RUMAH TINGGAL TYPE 58 M2 TAHUN 2016

NO.

URAIAN

VOLUME

1

2

3

I

HARGA SATUAN

JUMLAH

Rp.

Rp.

4

5

PEKERJAAN PERSIAPAN 1 Pekerjaan Pengukuran kembali (site) & Pemasangan Bouwplank

1.00 ls

500,000.00

500,000.00

2 Pembuatan gudang kerja / Direksikeet

1.00 ls

3,000,000.00

3,000,000.00

3 Pembuatan Stegger dari Bambu

1.00 ls

500,000.00

500,000.00

Jumlah

II

4,000,000.00

PEKERJAAN TANAH 1 Pek. Galian tanah biasa max kedalaman 1 m'

83.58 m³

26,800.00

2,239,944.00

2 Pek. Urugan tanah kembali bekas galian dipadatkan (Per 20 cm)

28.36 m³

8,933.33

253,331.47

3 Pek. Pemadatan tanah Per 20 cm

18.90 m³

19,600.00

370,440.00

Jumlah

III

2,863,715.47

PEKERJAAN PONDASI 1 Pek. Urugan pasir dibawah pondasi

5.56 m³

76,720.00

426,870.08

2 Pasangan Batu kosong (Aanstamping)

12.02 m³

195,546.00

2,349,876.28

3 Pasangan Pondasi batu belah camp.1 Pc : 5Psr

24.51 m³

462,658.00

11,339,747.58

Jumlah

IV

14,116,493.94

PEKERJAAN BETON 1 Pas. Sloof beton bertulang uk. 15x20 cm (K.75) - Adukan beton (175) - Pembesian - Bekisting (2 x pakai)

2.93 m³

756,150.06

2,214,007.36

445.06 kg

13,756.70

6,122,501.88

39.04 m²

88,794.00

3,466,509.09

1.52 m³

756,150.06

1,150,104.23

231.19 kg

13,756.70

3,180,438.99

20.28 m²

88,794.00

1,800,737.82

1.41 m³

756,150.06

1,066,171.58

229.99 kg

13,756.70

3,163,857.36

25.85 m²

88,794.00

2,295,320.73

2 Pas. Kolom beton bertulang uk. 15x20 cm (K.175) - Adukan beton (175) - Pembesian - Bekisting (2 x pakai) 3 Pas. Ring Balok beton bertulang uk. 15x20 cm (K.175) - Adukan beton (175) - Pembesian - Bekisting (2 x pakai) Jumlah

24,459,649.04

Hal : 69

NO.

URAIAN

VOLUME

1

2

3

V

HARGA SATUAN

JUMLAH

Rp.

Rp.

4

5

PEKERJAAN DINDING 1 Pas. Dinding bata merah uk(5 x 11 x 22) cm tebal ½ bata, camp.1Pc : 3Ps

7.20 m²

78,035.80

561,857.76

2 Pas. Dinding bata merah uk(5 x 11 x 22) cm tebal ½ bata, camp.1Pc : 5Ps

158.71 m²

72,361.20

11,484,373.69

3 Pek. Plesteran dinding 1Pc : 3Ps tebal 15 mm

14.40 m²

30,835.84

444,036.10

4 Pek. Plesteran dinding 1Pc : 5Ps tebal 15 mm

317.42 m²

27,728.56

8,801,544.06

5 Pekerjaan Acian pada plesteran

331.82 m²

16,095.00

5,340,610.71

14.40 m²

154,218.00

2,220,739.20

6 Pasangan Dinding keramik uk.20x25 cm (KM/WC) Jumlah

VI

28,853,161.51

PEKERJAAN KUSEN PINTU, JENDELA, DAUN PINTU, dan DAUN JENDELA 1 Pasang Kusen pintu dan jendela kayu lanan 2 Pasang Daun pintu panel kayu lanan 3 Pemasangan Pintu PVC KM/WC lengkap accessories

0.69 m³

8,174,400.00

5,607,638.40

18.86 m²

473,440.00

8,928,131.52

304,480.40

304,480.40

1.00 unit Jumlah

14,840,250.32

VII PEKERJAAN KONSTRUKSI ATAP DAN PENUTUP ATAP 1 Pasang Konstruksi Kuda - kuda Kayu Lanan

1.78 m³

7,794,300.00

13,905,031.20

2 Pasang Konstruksi Gordeng, Ikatan angin, Ikatan gempa Kayu Lanan

1.81 m³

7,464,580.00

13,525,818.96

173.59 m²

70,610.00

12,257,189.90

44.00 m'

91,466.00

4,024,504.00

3 Pasang Rangka Atap Kayu Lanan 4 Pasang Lisplank ( 3 x 30 )cm Kayu lanan Jumlah

43,712,544.06

Hal : 70

NO.

URAIAN

VOLUME

1

2

3

HARGA SATUAN

JUMLAH

Rp.

Rp.

4

5

VIII PEKERJAAN PLAPOND 1 Pemasangan rangka plapond Kayu Kls II (Hanya Rangka)

104.00 m²

55,641.00

5,786,664.00

2 Pemasangan plapond dari GRC tebal 4 mm

104.00 m²

30,450.00

3,166,800.00

85.00 m'

9,131.00

776,135.00

3 Pemasangan list plapond kayu profil Jumlah

IX

9,729,599.00

PEKERJAAN PENUTUP LANTAI 1 Pek. Urugan pasir dibawah lantai

3.15 m³

76,720.00

241,668.00

2 Pasang Lantai Keramik uk.20 x 20 cm Anti Slip KM/WC

1.50 m²

131,506.00

197,259.00

61.50 m²

121,730.00

7,486,395.00

3 Pasang Lantai Keramik uk.30 x 30 cm (polos) Jumlah

X

7,925,322.00

PEKERJAAN SANITASI 1 Pemasangan kloset jongkok porselen

1.00 unit

426,330.00

426,330.00

2 Pasang bak mandi fiberglass vol. 0,03 m³

1.00 bh

457,370.00

457,370.00

3 Memasang Pipa PVC tipe AW Ø ½"

21.00 m'

11,487.10

241,229.10

4 Memasang Pipa PVC tipe D Ø 2½"

21.00 m'

26,793.35

562,660.35

5 Memasang 1 m' Pipa PVC tipe D Ø 4"

21.00 m'

56,751.70

1,191,785.70

6 Memasang Kran Ø ¾" atau ½"

5.00 bh

86,612.50

433,062.50

7 Memasang Floor Drain

1.00 bh

60,020.00

60,020.00

8 Memasang Septic tank 3.75 m³ berikut rembesan

unit

1,750,000.00

-

9 Pengadaan air bersih (sumur gali, water turn, pompa) lengkap dengan accesories

ls

5,500,000.00

-

Jumlah

3,372,457.65

Hal : 71

NO.

URAIAN

VOLUME

1

2

3

XI

HARGA SATUAN

JUMLAH

Rp.

Rp.

4

5

PEKERJAAN KUNCI DAN KACA 1 Pasang Kunci Tanam Biasa

6.00 bh

63,820.00

382,920.00

2 Pasang Engsel Pintu

18.00 bh

25,479.00

458,622.00

3 Pasang Engsel Jendela

28.00 bh

15,479.00

433,412.00

5 Pasang Kait angin

14.00 bh

19,979.00

279,706.00

6 Pasang Kunci Selot pintu dan jendela

14.00 bh

40,472.00

566,608.00

8 Pasang Kaca tebal 5 mm

14.42 m²

137,279.00

1,979,563.18

Jumlah

XII

4,100,831.18

PEKERJAAN INSTALASI LISTRIK 1 Biaya Pasang Baru termasuk Instalasi dari PLN (900 watt) 2 Biaya Penambahan daya dari PLN 3 Pemasangan Box MCB

1.00 Ls

3,000,000.00

Ls

750,000.00

1.00 unit

370,954.50

3,000,000.00 370,954.50

4 Pemasangan kabel listrik

m'

16,894.50

-

5 Pemasangan titik lampu TL 25 watt (kumplit)

ttk

89,954.50

-

6 Pemasangan lampu XL 14 watt (Philips)

9.00 bh

59,954.50

539,590.50

7 Pemasangan stop kontak

5.00 bh

19,954.50

99,772.50

8 Pemasangan saklar single

2.00 bh

20,954.50

41,909.00

9 Pemasangan saklar double

3.00 bh

24,954.50

74,863.50

Ls

2,500,000.00

10 Pemasangan instalasi anti petir (Arde) Jumlah

4,127,090.00

XIII PEKERJAAN PENGECATAN 1 Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 2 Lapis Cat Penu

150.02 m²

39,095.50

5,864,911.43

2 Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )

317.42 m²

16,540.60

5,250,284.17

3 Pengecatan plapond dengan cat tembok

104.00 m²

10,740.60

1,117,022.40

4 Mengecatan Bidang Kayu Lama



30,015.00

-

5 Pengecatan Tembok Lama (2 Lapis Cat Penutup)



10,740.60

-

Jumlah

12,232,218.00

XIV PEKERJAAN LAIN LAIN 1 Pengadaan alat pemadam kebakaran

bh

1,250,000.00

2 Biaya pemberesan dan penyelesaian

1.00 Ls

500,000.00

500,000.00 -

Hal : 72

NO.

URAIAN

VOLUME

1

2

3

HARGA SATUAN

JUMLAH

Rp.

Rp.

4

5

Jumlah

500,000.00

REKAPITULASI RENCANA ANGGARAN BIAYA PEMBANGUNAN RUMAH TINGGAL TYPE 58 M2 TAHUN 2016

NAMA KEGIATAN LOKASI

: :

NO.

URAIAN

1

I II III IV V VI VII VIII IX X XI XII XIII XIV

JUMLAH

2

3

PEKERJAAN PERSIAPAN

4,000,000.00

PEKERJAAN TANAH PEKERJAAN PONDASI PEKERJAAN BETON PEKERJAAN DINDING PEKERJAAN KUSEN PINTU, JENDELA, DAUN PINTU, dan DAUN JENDELA PEKERJAAN KONSTRUKSI ATAP DAN PENUTUP ATAP PEKERJAAN PLAPOND PEKERJAAN PENUTUP LANTAI PEKERJAAN SANITASI PEKERJAAN KUNCI DAN KACA PEKERJAAN INSTALASI LISTRIK PEKERJAAN PENGECATAN PEKERJAAN LAIN LAIN

2,863,715.47 14,116,493.94 24,459,649.04 28,853,161.51 14,840,250.32 43,712,544.06 9,729,599.00 7,925,322.00 3,372,457.65 4,100,831.18 4,127,090.00 12,232,218.00 500,000.00 JUMLAH I DIBULATKAN

174,833,332.17 174,833,000.00

TERBILANG : ( SERATUS TUJUH PULUH EMPAT JUTA DELAPAN RATUS TIGA PULUH TIGA RIBU RUPIAH )

Hal : 73

RENCANA ANGGARAN BIAYA PEMBANGUNAN RUMAH TINGGAL TYPE 58 M2 TAHUN 2016

BOBOT POS PEKERJAAN NO.

URAIAN

VOLUME

TERHADAP

TINGKAT PELAKSANAAN POS PEKERJAAN

SELESAI PEKERJAAN 1 I

2

3

5

PEKERJAAN PERSIAPAN 1 Pekerjaan Pengukuran kembali (site) & Pemasangan Bouwplank

1.00 ls

0.286

2 Pembuatan gudang kerja / Direksikeet

1.00 ls

1.716

3 Pembuatan Stegger dari Bambu

1.00 ls

0.286

Jumlah

II

4

2.29

PEKERJAAN TANAH 1 Pek. Galian tanah biasa max kedalaman 1 m'

83.58 m³

1.281

2 Pek. Urugan tanah kembali bekas galian dipadatkan (Per 20 cm)

28.36 m³

0.145

3 Pek. Pemadatan tanah Per 20 cm

18.90 m³

0.212

Jumlah

III

1.64

PEKERJAAN PONDASI 1 Pek. Urugan pasir dibawah pondasi

5.56 m³

0.244

2 Pasangan Batu kosong (Aanstamping)

12.02 m³

1.344

3 Pasangan Pondasi batu belah camp.1 Pc : 5Psr

24.51 m³

6.486

Jumlah

IV

8.07

PEKERJAAN BETON 1 Pas. Sloof beton bertulang uk. 15x20 cm (K.75) - Adukan beton (175) - Pembesian - Bekisting (2 x pakai)

2.93 m³

1.266

445.06 kg

3.502

39.04 m²

1.983

1.52 m³

0.658

231.19 kg

1.819

20.28 m²

1.030

1.41 m³

0.610

2 Pas. Kolom beton bertulang uk. 15x20 cm (K.175) - Adukan beton (175) - Pembesian - Bekisting (2 x pakai) 3 Pas. Ring Balok beton bertulang uk. 15x20 cm (K.175) - Adukan beton (175)

- Pembesian - Bekisting (2 x pakai)

229.99 kg

1.810

25.85 m²

1.313

Jumlah

V

13.99

PEKERJAAN DINDING 1 Pas. Dinding bata merah uk(5 x 11 x 22) cm tebal ½ bata, camp.1Pc : 3Ps

7.20 m²

0.321

2 Pas. Dinding bata merah uk(5 x 11 x 22) cm tebal ½ bata, camp.1Pc : 5Ps

158.71 m²

6.569

3 Pek. Plesteran dinding 1Pc : 3Ps tebal 15 mm

14.40 m²

0.254

4 Pek. Plesteran dinding 1Pc : 5Ps tebal 15 mm

317.42 m²

5.034

5 Pekerjaan Acian pada plesteran

331.82 m²

3.055

14.40 m²

1.270

6 Pasangan Dinding keramik uk.20x25 cm (KM/WC) Jumlah

VI

16.50

PEKERJAAN KUSEN PINTU, JENDELA, DAUN PINTU, dan DAUN JENDELA 1 Pasang Kusen pintu dan jendela kayu lanan 2 Pasang Daun pintu panel kayu lanan 3 Pemasangan Pintu PVC KM/WC lengkap accessories

0.69 m³

3.207

18.86 m²

5.107

1.00 unit Jumlah

0.174 8.49

VII PEKERJAAN KONSTRUKSI ATAP DAN PENUTUP ATAP 1 Pasang Konstruksi Kuda - kuda Kayu Lanan

1.78 m³

7.953

2 Pasang Konstruksi Gordeng, Ikatan angin, Ikatan gempa Kayu Lanan

1.81 m³

7.736

173.59 m²

7.011

44.00 m'

2.302

3 Pasang Rangka Atap Kayu Lanan 4 Pasang Lisplank ( 3 x 30 )cm Kayu lanan Jumlah

25.00

VIII PEKERJAAN PLAPOND 1 Pemasangan rangka plapond Kayu Kls II (Hanya Rangka)

104.00 m²

3.310

2 Pemasangan plapond dari GRC tebal 4 mm

104.00 m²

1.811

85.00 m'

0.444

3 Pemasangan list plapond kayu profil Jumlah

IX

5.57

PEKERJAAN PENUTUP LANTAI 1 Pek. Urugan pasir dibawah lantai

3.15 m³

0.138

2 Pasang Lantai Keramik uk.20 x 20 cm Anti Slip KM/WC

1.50 m²

0.113

61.50 m²

4.282

3 Pasang Lantai Keramik uk.30 x 30 cm (polos) Jumlah

4.53

X

PEKERJAAN SANITASI 1 Pemasangan kloset jongkok porselen

1.00 unit

0.244

2 Pasang bak mandi fiberglass vol. 0,03 m³

1.00 bh

0.262

3 Memasang Pipa PVC tipe AW Ø ½"

21.00 m'

0.138

4 Memasang Pipa PVC tipe D Ø 2½"

21.00 m'

0.322

5 Memasang 1 m' Pipa PVC tipe D Ø 4"

21.00 m'

0.682

6 Memasang Kran Ø ¾" atau ½"

5.00 bh

0.248

7 Memasang Floor Drain

1.00 bh

0.034

8 Memasang Septic tank 3.75 m³ berikut rembesan

unit

9 Pengadaan air bersih (sumur gali, water turn, pompa) lengkap dengan accesories

ls

Jumlah

XI

1.93

PEKERJAAN KUNCI DAN KACA 1 Pasang Kunci Tanam Biasa

6.00 bh

0.219

2 Pasang Engsel Pintu

18.00 bh

0.262

3 Pasang Engsel Jendela

28.00 bh

0.248

5 Pasang Kait angin

14.00 bh

0.160

6 Pasang Kunci Selot pintu dan jendela

14.00 bh

0.324

8 Pasang Kaca tebal 5 mm

14.42 m²

1.132

Jumlah

XII

2.35

PEKERJAAN INSTALASI LISTRIK 1 Biaya Pasang Baru termasuk Instalasi dari PLN (900 watt)

1.00 Ls

1.716

3 Pemasangan Box MCB

1.00 unit

0.212

6 Pemasangan lampu XL 14 watt (Philips)

9.00 bh

0.309

7 Pemasangan stop kontak

5.00 bh

0.057

8 Pemasangan saklar single

2.00 bh

0.024

9 Pemasangan saklar double

3.00 bh

0.043

Jumlah

2.36

XIII PEKERJAAN PENGECATAN 1 Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 2 Lapis Cat Pe

150.02 m²

3.355

2 Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )

317.42 m²

3.003

3 Pengecatan plapond dengan cat tembok

104.00 m²

0.639

Jumlah

7.00

XIV PEKERJAAN LAIN LAIN 1 Pengadaan alat pemadam kebakaran

bh

2 Biaya pemberesan dan penyelesaian

1.00 Ls

0.286

Jumlah

0.29

REKAPITULASI RENCANA ANGGARAN BIAYA PEMBANGUNAN RUMAH TINGGAL TYPE 58 M2 TAHUN 2016

NAMA KEGIATAN LOKASI

: : BOBOT POS PEKERJAAN

NO.

URAIAN

TERHADAP SELESAI PEKERJAAN

1

2

I

PEKERJAAN PERSIAPAN

2.288

II

PEKERJAAN TANAH

1.638

TINGKAT PELAKSANAAN POS PEKERJAAN

III IV V VI VII VIII IX X XI XII XIII XIV

PEKERJAAN PONDASI PEKERJAAN BETON PEKERJAAN DINDING PEKERJAAN KUSEN PINTU, JENDELA, DAUN PINTU, dan DAUN JENDELA PEKERJAAN KONSTRUKSI ATAP DAN PENUTUP ATAP PEKERJAAN PLAPOND PEKERJAAN PENUTUP LANTAI PEKERJAAN SANITASI PEKERJAAN KUNCI DAN KACA PEKERJAAN INSTALASI LISTRIK PEKERJAAN PENGECATAN PEKERJAAN LAIN LAIN

8.074 13.990 16.503 8.488 25.002 5.565 4.533 1.929 2.346 2.361 6.997 0.29

JUMLAH I DIBULATKAN TERBILANG : ( SERATUS TUJUH PULUH EMPAT JUTA DELAPAN RATUS TIGA PULUH TIGA RIBU RUPIAH )

100.00

NGKAT PELAKSANAAN

HARGA SATUAN

JUMLAH

Rp.

Rp.

4

5

500,000.00

500,000.00

3,000,000.00

3,000,000.00

500,000.00

500,000.00

BOBOT

6

4,000,000.00

26,800.00

2,239,944.00

8,933.33

253,331.47

19,600.00

370,440.00

2,863,715.47

76,720.00

426,870.08

195,546.00

2,349,876.28

462,658.00

11,339,747.58 14,116,493.94

756,150.06

2,214,007.36

13,756.70

6,122,501.88

88,794.00

3,466,509.09

756,150.06

1,150,104.23

13,756.70

3,180,438.99

88,794.00

1,800,737.82

756,150.06

1,066,171.58

13,756.70

3,163,857.36

88,794.00

2,295,320.73 24,459,649.04

78,035.80

561,857.76

72,361.20

11,484,373.69

30,835.84

444,036.10

27,728.56

8,801,544.06

16,095.00

5,340,610.71

154,218.00

2,220,739.20 28,853,161.51

8,174,400.00

5,607,638.40

473,440.00

8,928,131.52

304,480.40

304,480.40 14,840,250.32

7,794,300.00

13,905,031.20

7,464,580.00

13,525,818.96

70,610.00

12,257,189.90

91,466.00

4,024,504.00 43,712,544.06

55,641.00

5,786,664.00

30,450.00

3,166,800.00

9,131.00

776,135.00 9,729,599.00

76,720.00

241,668.00

131,506.00

197,259.00

121,730.00

7,486,395.00 7,925,322.00

72.80

426,330.00

426,330.00

457,370.00

457,370.00

11,487.10

241,229.10

26,793.35

562,660.35

56,751.70

1,191,785.70

86,612.50

433,062.50

60,020.00

60,020.00

1,750,000.00

-

5,500,000.00

3,372,457.65

63,820.00

382,920.00

25,479.00

458,622.00

15,479.00

433,412.00

19,979.00

279,706.00

40,472.00

566,608.00

137,279.00

1,979,563.18

4,100,831.18

3,000,000.00

3,000,000.00

370,954.50

370,954.50

59,954.50

539,590.50

19,954.50

99,772.50

20,954.50

41,909.00

24,954.50

74,863.50 4,127,090.00

39,095.50

5,864,911.43

16,540.60

5,250,284.17

10,740.60

1,117,022.40 12,232,218.00

1,250,000.00

-

500,000.00

500,000.00 500,000.00

NGKAT PELAKSANAAN

JUMLAH

BOBOT

Rp. 3

4,000,000.00 2,863,715.47

14,116,493.94 24,459,649.04 28,853,161.51 14,840,250.32 43,712,544.06 9,729,599.00 7,925,322.00 3,372,457.65 4,100,831.18 4,127,090.00 12,232,218.00 500,000.00 174,833,332.17 174,833,000.00

TIME SCHEDULE PEMBANGUNAN RUMAH TINGGAL TYPE 61 M2

No

I II III IV V VI VII VIII IX X XI XII

URAIAN PEKERJAAN

BOBOT

PERSIAPAN PEKERJAAN TANAH & PONDASI PEKERJAAN STRUKTUR PEKERJAAN ATAP PEKERJAAN LANTAI PEKERJAAN DINDING PEKERJAAN PLAFOND PEKERJAAN KUSEN, PINTU, & JENDELA PEKERJAAN PENGECATAN PEKERJAAN LISTRIK PEKERJAAN PERPIPAAN & SANITAIR Pekerjaan Lain-lain

1.81 2.97 11.82 13.78 7.48

JUMLAH BOBOT

100.00

0

PRESTASI MINGGUAN PRESTASI FISIK KOMULATIF KECEPATAN / KELAMBATAN

Menyetujui

0

MG 2

0.90 1.5

MG 3

MG 4

MG 5

3.94

3.94

MG 6

0.90 1.5 3.94

6.89

20.49 2.92 9.59 2.98 2.07 5.83 18.26

RENCANA MINGGUAN RENCANA KOMULATIF MINGGUAN

MG 1

5.1

5.10

5.10

4.80

2.92

2.39

4.40

4.85

9.06

20.73

5.10

2.39

6.78

11.63

20.69

41.42

46.52

TYPE 61 M2

MG 7

MG 8

MG 9 MG 10 MG 11 MG12 MG13 MG14 MG 15 MG16

6.89 3.7

3.74

5.10 1.50

1.5

4.80 1.5

1.5 1.0

1.00 2.92 9.131 9.13

5.10

11.69

3.92

9.13

9.1

51.62

63.31 67.05 72.29 75.24 76.74 77.77 81.69

3.74

5.24

2.95

1.50

1.04

90.8

100

Dibuat Oleh, Tim Perencana

ADE SUPRIATNA

XII TGB 3

No

0 0 0 0 1 I II III IV V VI VII VIII

URAIAN PEKERJAAN

PEKERJAAN PERSIAPAN, GALIAN DAN URUGAN PEKERJAAN PONDASI DAN BETON PEKERJAAN PASANGAN DAN PLESTERAN PEKERJAAN LANTAI DAN DINDING PEKERJAAN ATAP PEKERJAAN PLAFON PEKERJAAN KUSEN PINTU DAN JENDELA PEKERJAAN PERLENGKAPAN PINTU DAN JENDELA PEKERJAAN SANITAIR PEKERJAAN INSTALASI AIR PEKERJAAN INSTALASI LISTRIK PEKERJAAN PENGECATAN PEKERJAAN PEMBERSIHAN

BOBOT

4.65 23.48 8.28 2.40 21.26 7.23 8.53 3.63 1.00 4.99 4.49 9.50 0.56

Chart

Chart Title

Related Documents

Rumah Type 70-model.pdf
November 2019 14
Rb
October 2019 31
Ade
May 2020 40

More Documents from "rivaldi"

Tgs 2.docx
November 2019 17
Tugas Mandiri Ke 2.docx
November 2019 19
Kimia.docx
November 2019 17
Lembar Pengesahan.docx
November 2019 34