NO
JENIS BAHAN
BAHAN AGREGAT KASAR, BAHAN PEREKAT DAN BAHAN JADINYA Pasir Urug Sirtu Pasir Pasang Pasir Beton Batu Pecah Mesin 1/2 Batu Pecah Mesin 2/3 Batu Pecah Mesin 3/5 Batu Pecah Mesin 5/7 Batu Belah Pondasi Batu Tempel Hitam Bata merah kelas I Inter Blok Natural 6 cm Paving Blok natural 8 cm Paving Blok Warna 6 cm Kanstin Paving Blok Glass Block Semen PC Tiga Roda / 50 kg Semen Putih Semen warna Aspal (ESO) 1 Drum 150 kg
SATUAN
HARGA BAHAN Rp.
m3 m3 m3 m3 m3 m3 m3 m3 m3 m2 bh m2 m2 m2 m1 m2 zak kg kg kg
70,000.00 150,000.00 240,000.00 250,000.00 250,000.00 250,000.00 250,000.00 250,000.00 175,000.00 80,000.00 500.00 25,000.00 28,000.00 30,000.00 30,000.00 15,000.00 40,000.00 3,500.00 3,500.00 8,000.00
Dempul Kayu Cap Kucing Dempul Kayu Avian Meni Kayu/ Besi Sincromat Cat Kayu pinoguar Cat Besi Seiv Cat Kayu Avian Cat Besi Duco Danaglos / ICI Lem Kayu Putih (Fox) Lem Kayu Kuning (AIBON)
kg kg bh bh bh 5 ltr bh bks ltr kg kg ltr ltr lbr kg kg kg kg kg kg kg kg kg kg
18,000.00 5,100.00 15,000.00 5,000.00 5,000.00 12,000.00 7,500.00 1,000.00 2,500.00 6,000.00 21,500.00 2,000.00 18,000.00 2,500.00 9,500.00 6,000.00 20,000.00 60,000.00 24,000.00 60,000.00 45,000.00 130,000.00 8,500.00 14,000.00
BAHAN KAYU BERIKUT BAHAN JADINYA Kayu Terentang Kayu Balok Borneo Super Kayu papan Borneo Super Kayu kaso 5/7 Borneo Super
m3 m3 m3 m3
310,000.00 1,700,000.00 1,700,000.00 1,700,000.00
BAHAN FINISHING : LABURAN , PENGISI DAN ALATNYA Plamir Tembok Ex. Paragon Cat Tembok Sanlex Rool Cat Tembok Kape Tembok Kape Kayu Soligneum 1 Blek Kwas 3 " Otem (Pewarna Plitur) Spirtus Bahan Plitur Kripik (Sirlak India) Dempul Halus/ Infra (Wood Filler)/Impra Terpentin Tiner Ampelas
NO
JENIS BAHAN
SATUAN
HARGA BAHAN
Kayu 5/10 kayu awet kls I Kayu Awet Kls I Kayu KAMPER Kayu Balok Rasamala Kayu papan Rasamala Kayu Balok Kamper Medan (Kruing) Kayu Papan Kamper Medan (Kruing) Kayu Balok Kamper Banjar Kayu Papan Kamper Banjar Kayu Balok Kamper Samarinda Kayu Papan Kamper Samarinda Kayu Jati jabar Dolken 5 s/d 7 Dolken 7 s/d 10 / kaso 4/6 untuk stootwork List Profil kamper 1 cm List Profil kamper 2 cm (45x45) Kayu Reng 2/3 Borneo Super Kayu Reng 3/4 Borneo Super kayu ulin
m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 m3 bt bt m1 m1 m1 m1 m3
Rp. 1,700,000.00 1,250,000.00 3,600,000.00 2,100,000.00 2,100,000.00 1,600,000.00 1,600,000.00 2,100,000.00 2,100,000.00 5,500,000.00 5,500,000.00 7,000,000.00 7,000.00 11,500.00 1,000.00 2,750.00 1,500.00 3,000.00 1,650,000.00
BAHAN PENUTUP RANGKA PLAPON Bahan Plapon Eternit 4 mm Kalsiboard List Kayu 4 / 4 List Kayu 5 / 5 Gypsum 9 mm
lbr lbr btng btng lbr
42,500.00 38,000.00 18,000.00 27,000.00 75,000.00
BAHAN KAYU LAPIS Triplek 3 mm 120 x 240 Triplek 4 mm 120 x 240 Triplek 6 mm 120 x 240 Multiplek 12 mm 120 x 240 Multiplek 12 mm ukuran pintu Teak Wood 4 mm 120 x240 Formika
lbr lbr lbr lbr lbr lbr lbr
33,000.00 39,000.00 42,000.00 112,500.00 236,250.00 75,000.00 69,000.00
BAHAN LANTAI DAN PELAPIS DINDING Keramik lantai 20 x 20 Putih Polos "MULIA" Keramik dinding 20 x 25 Putih Polos "MULIA" Keramik 30X30 Putih Polos "MULIA" Lantai Pear Stone Floor Hardener Ferofax sekualitas Metaltop
m2 m2 m2 m2 kg
45,000.00 48,000.00 46,000.00 89,000.00 60,000.00
G. BAHAN SALURAN AIR KOTOR / BERSIH Grafel U 20 cm Grafel U 30 cm Buis Beton dia. 20 cm ( 1 m ) Buis Beton dia.30 cm (1 m )
m' m' m' m'
20,000.00 30,000.00 45,000.00 60,000.00
BAHAN LOGAM DAN BAHAN JADINYA Besi Beton U-24 Rata-rata Pagar BRC T.120 Lengkap Tiang Pagar BRC T.175 Lengkap Tiang Besi Canal Besi Siku L Besi IWF DN SII Besi HWF Besi plat Kawat Beton
kg m1 m1 kg kg kg kg kg kg
14,000.00 132,000.00 612,500.00 14,000.00 14,000.00 14,000.00 14,000.00 14,000.00 19,500.00
NO
JENIS BAHAN Kawat Duri Seng plat BJLS 28 ( lebar = 90 cm ) Seng Glb BJLS 28 Ram kawat
SATUAN
HARGA BAHAN Rp.
kg m1 lbr m2
12,500.00 35,000.00 20,500.00 35,000.00
Cermin
m2 m2 m2
57,000.00 65,000.00 89,000.00
BAHAN PAKU DAN MUR BAUT Paku biasa Paku hak Pj. 15 cm
kg bh
15,000.00 6,000.00
Pipa GIP Medium B dia. 1/2"
bt
17,000.00
Pipa GIP Medium B dia. 3/4"
bt
23,000.00
Pipa GIP Medium B dia. 1"
bt
25,000.00
Pipa GIP Medium B dia. 1 1/2"
bt
43,000.00
Pipa GIP Medium B dia. 2"
bt
60,000.00
Pipa PVC MASPION ABU dia. 2" (AW)
bt
75,000.00
Pipa PVC MASPION ABU dia. 3" (AW)
bt
140,000.00
Pipa PVC MASPION ABU dia. 4" (AW)
bt
230,000.00
Grefel beton 1/2 dia. 30 cm
m1
30,000.00
BAHAN KACA Kaca polos 3 mm (ASAHI) Kaca polos 5 mm (ASAHI)
BAHAN PERPIPAAN
BAHAN SANITAIR DAN PERPIPAAN Stop Kran 3/4 " KIT
bh
75,000.00
Stop Kran 1 1/2 " KIT
bh
125,000.00
Kran bebek Sun Ei 1/2 "
bh
85,000.00
Floor drain
bh
20,000.00
Wastafel Lengkap Toto Type L 34
bh
350,000.00
Closet Jongkok Standard Putih Poslin INA
unit
125,000.00
closet duduk ex toto
unit
1,050,000.00
kran air 1/2"
bh
37,300.00
shower
unit
250,000.00
kichensink
unit
250,000.00
BAHAN PENUTUP ATAP Genteng Palentong
bh
1,000.00
Wuwung Genteng
bh
18,500.00
Atap genteng Morando glazur
bh
2,000.00
Wuwung Genteng morando glazur
bh
4,000.00
Genteng Ex KIA (11 bh )
m2
58,685.00
BAHAN ELEKTRIKAL Saklar Broko Tunggal Standard (1Phase) Saklar Broko Seri Standard (1 Phase) Stop Kontak Broko Standard (1 Phase) Lampu Neon TL Philip 1 X 36 W Type TKI Pentanahan Penangkal Petir lengkap bak kontrol pipa kabel Kabel NYY 2 X 2,5 mm Prima Kabel NYY 3 X 2,5 mm Prima
bh bh bh bh ttk bt m1 M1
16,000.00 16,000.00 9,000.00 17,500.00 900,000.00 8,000.00 4,000.00 5,000.00
NO
JENIS BAHAN
SATUAN
HARGA BAHAN Rp.
BAHAN ALAT PENGGANTUNG DAN KUNCI Kunci 2 Slaag Kunci KM Bulat ALPA Espanyolet/Slot Tanam Hak Angin Kait Jendela Biasa ( Kait ) Engsel Pintu Arch Standard Engsel Jendela Arch Pasang roda type 61. K/ N ex Henderson
bh bh bh bh bh bh bh
75,000.00 75,000.00 30,000.00 15,000.00 6,000.00 4,000.00 65,000.00
BAHAN PENGHISAP AIR SUMUR DALAM Mesin Pompa Air 400 W - Sanyo
unit
650,000.00
BAHAN PENAMPUNG AIR Tangki Air Fiber Glass 0.5 m3 ( Pinguinl ) Tangki Air Fiber Glass 2000 liter ( Pinguinl ) Bak km Fiber 50 X 50
bh bh bh
1,200,000.00 1,900,000.00 125,000.00
ANALISA HARGA SATUAN PEKERJAAN
NO.
URAIAN KEBUTUHAN
INDEKS
SATUAN
HARGA SATUAN BAHAN Rp.
HARGA SATUAN UPAH Rp.
A
B
C
D
E
F
II
JUMLAH BAHAN
JUMLAH UPAH
TOTAL HARGA
Rp.
Rp.
Rp.
G=(CXE)
H = (C X F )
I=(G+H)
PEKERJAAN TANAH 1 1 m3 Mengerjakan Galian Tanah Biasa Sedalam 1 meter
-
26,800.00
26,800.00
2 1 m3 Mengerjakan Galian Tanah Biasa Sedalam 2 meter
-
32,940.00
32,940.00
3 1 m3 Mengerjakan Galian Tanah Biasa Sedalam 3 meter
-
39,184.00
39,184.00
Tenaga Pekerja
1.0500
OH
34,000.00
35,700.00
Mandor
0.0670
OH
52,000.00
3,484.00
4 1 m3 Mengerjakan Galian Tanah Keras Sedalam 1 meter
-
35,664.00
35,664.00
Tenaga Pekerja
1.0000
OH
34,000.00
34,000.00
Mandor
0.0320
OH
52,000.00
1,664.00
5 1 m3 Mengerjakan Galian Tanah Cadas Sedalam 1 meter
-
54,120.00
54,120.00
Tenaga Pekerja
1.5000
OH
34,000.00
51,000.00
Mandor
0.0600
OH
52,000.00
3,120.00
6 1 m3 Pekerjaan Mengerjakan Galian Tanah Lumpur Sedalam 1 meter
-
43,140.00
43,140.00
Tenaga Pekerja
1.2000
OH
34,000.00
40,800.00
Mandor
0.0450
OH
52,000.00
2,340.00
7 1 m2 Pekerjaan Stripping tanah tebing setinggi 1 m
-
1,960.00
1,960.00
8 1 m3 Pembuangan Tanah sejauh 15 m
-
11,740.00
11,740.00
9 1 m3 Urugan Tanah Kembali
-
8,933.33
8,933.33
-
19,600.00
19,600.00
10,720.00
76,720.00
Cat. Mengurug Kembali 1 m3 Galian Tanah dihitung dari 1/3 kali indeks Pekerjaan Galian Tanah 1 m3 Urugan Tanah Kembali Galian Tanah Biasa Maksimal keadalaman 1 m' 10 1 m3 Memadatan tanah (Per 20 cm) 11 1 m3 Pekerjaan Urugan Pasir
66,000.00
Analisa Harga Satuan Halaman 5
NO.
URAIAN KEBUTUHAN
INDEKS
SATUAN
HARGA SATUAN BAHAN Rp.
HARGA SATUAN UPAH Rp.
A
B
C
D
E
F
JUMLAH BAHAN
JUMLAH UPAH
TOTAL HARGA
Rp.
Rp.
Rp.
G=(CXE)
H = (C X F )
I=(G+H)
12 1 m3 Pekerjaan Urugan Tanah
50,400.00
10,720.00
61,120.00
13 1 m3 Urugan Sirtu padat untuk peninggian Lantai Bangunan
56,400.00
9,800.00
66,200.00
Bahan Sirtu
1.2000
m3
47,000.00
56,400.00
Pekerja
0.2500
OH
34,000.00
8,500.00
Mandor
0.0250
OH
52,000.00
1,300.00
Tenaga
III
PEKERJAAN PONDASI 14 1 m3 Pasangan Batu Kosong (Aanstamping)
149,760.00
45,786.00
195,546.00
15 1 m3 Pasangan Pondasi Batu Belah, Campuran 1 Pc : 3Ps
455,850.00
88,050.00
543,900.00
16 1 m3 Pasangan Pondasi Batu Belah, Campuran 1 Pc : 5Ps
374,608.00
88,050.00
462,658.00
2,039,500.00
148,410.00
2,187,910.00
17 1 m3 pondasi siklop, 60% beton campuran 1 PC : 2 PB : 3 KR dan 40% batu belah Bahan Batu Belah 15 cm/ 20 cm
0.4800
m3
105,000.00
50,400.00
194.0000
Kg
1,340.00
259,960.00
Pasir Beton
0.3120
m3
154,000.00
48,048.00
Kerikil
0.4680
m3
214,000.00
100,152.00
126.0000
kg
12,240.00
1,542,240.00
1.8000
kg
21,500.00
38,700.00
Pekerja
3.0000
OH
34,000.00
102,000.00
Tukang Batu
0.8500
OH
39,500.00
33,575.00
Kepala Tukang
0.0850
OH
47,000.00
3,995.00
Mandor
0.1700
OH
52,000.00
8,840.00
Semen Portland
Besi Beton Kawat Beton Tenaga
Analisa Harga Satuan Halaman 6
NO.
URAIAN KEBUTUHAN
INDEKS
SATUAN
HARGA SATUAN BAHAN Rp.
HARGA SATUAN UPAH Rp.
A
B
C
D
E
F
18 1 m3 Pasangan Pondasi Sumuran, diameter 100 cm
JUMLAH BAHAN
JUMLAH UPAH
TOTAL HARGA
Rp.
Rp.
Rp.
G=(CXE)
H = (C X F )
I=(G+H)
455,410.00
123,148.00
578,558.00
Bahan Batu Belah 15 cm/ 20 cm
0.4500
m3
105,000.00
47,250.00
194.0000
Kg
1,340.00
259,960.00
Pasir Beton
0.3120
m3
154,000.00
48,048.00
Kerikil
0.4680
m3
214,000.00
100,152.00
Pekerja
2.4000
OH
34,000.00
81,600.00
Tukang Batu
0.8000
OH
39,500.00
31,600.00
Kepala Tukang
0.0800
OH
47,000.00
3,760.00
Mandor
0.1190
OH
52,000.00
6,188.00
Semen Portland
Tenaga
IV
PEKERJAAN DINDING 19 1 m2 Pasangan dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1Pc : 3Ps
62,635.80
15,400.00
78,035.80
Bahan Bata merah
70.0000
bh
550.00
38,500.00
Semen Portland
14.3700
Kg
1,340.00
19,255.80
0.0400
m3
122,000.00
4,880.00
Pekerja
0.3000
OH
34,000.00
10,200.00
Tukang Batu
0.1000
OH
39,500.00
3,950.00
Kepala Tukang
0.0100
OH
47,000.00
470.00
Mandor
0.0150
OH
52,000.00
780.00
Pasir Pasang Tenaga
20 1 m2 Pasangan dinding bata merah ukuran (5 x 11 x 22) cm tebal ½ bata, campuran spesi 1Pc : 5Ps 21 1 m2 Pasangan dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC:3Ps
56,961.20
15,400.00
72,361.20
150,164.00
15,400.00
165,564.00
Bahan Terawang (roster)
30.0000
bh
4,250.00
127,500.00
Semen Portland
14.0000
Kg
1,340.00
18,760.00
0.0320
m3
122,000.00
3,904.00
Pekerja
0.3000
OH
34,000.00
10,200.00
Tukang Batu
0.1000
OH
39,500.00
3,950.00
Kepala Tukang
0.0100
OH
47,000.00
470.00
Mandor
0.0150
OH
52,000.00
780.00
Pasir Pasang Tenaga
22 1 m2 Pasangan dinding terawang (roster) ukuran (12 x 11 x 24) cm, campuran spesi 1 PC:4Ps
146,510.00
15,400.00
161,910.00
Bahan Terawang (roster)
30.0000
bh
4,250.00
127,500.00
Semen Portland
11.0000
Kg
1,340.00
14,740.00
0.0350
m3
122,000.00
4,270.00
Pekerja
0.3000
OH
34,000.00
10,200.00
Tukang Batu
0.1000
OH
39,500.00
3,950.00
Kepala Tukang
0.0100
OH
47,000.00
470.00
Mandor
0.0150
OH
52,000.00
780.00
Pasir Pasang Tenaga
V
PEKERJAAN PELESTERAN 23 1 m2 Plesteran Dinding 1Pc : 3Ps tebal 15 mm
13,225.84
17,610.00
30,835.84
Analisa Harga Satuan Halaman 7
NO.
URAIAN KEBUTUHAN
INDEKS
SATUAN
HARGA SATUAN BAHAN Rp.
HARGA SATUAN UPAH Rp.
A
B
C
D
E
F
JUMLAH BAHAN
JUMLAH UPAH
TOTAL HARGA
Rp.
Rp.
Rp.
G=(CXE)
H = (C X F )
I=(G+H)
24 1 m2 Plesteran Dinding 1Pc : 5Ps tebal 15 mm
10,118.56
17,610.00
27,728.56
25 1 m2 Plesteran Dinding 1Pc : 3Ps tebal 20 mm
17,675.12
18,356.00
36,031.12
Bahan Semen Portland
10.3680
Kg
1,340.00
13,893.12
0.0310
m3
122,000.00
3,782.00
Pekerja
0.2600
OH
34,000.00
8,840.00
Tukang Batu
0.2000
OH
39,500.00
7,900.00
Kepala Tukang
0.0200
OH
47,000.00
940.00
Mandor
0.0130
OH
52,000.00
676.00
Pasir Pasang Tenaga
26 1 m2 Plesteran Dinding 1Pc : 5Ps tebal 20 mm
13,532.08
23,584.00
37,116.08
Bahan Semen Portland
6.9120
Kg
1,340.00
9,262.08
Pasir Pasang
0.0350
m3
122,000.00
4,270.00
Pekerja
0.4000
OH
34,000.00
13,600.00
Tukang Batu
0.2000
OH
39,500.00
7,900.00
Kepala Tukang
0.0200
OH
47,000.00
940.00
Mandor
0.0220
OH
52,000.00
1,144.00
Tenaga
27 1 m2 Plesteran Berapen 1Pc : 5Ps, tebal 15 mm
10,118.56
8,805.00
18,923.56
28 1 m2 Plesteran Skoning 1Pc : 2Ps, Lebar 10 mm
2,256.00
20,608.00
22,864.00
Bahan Semen Portland
0.5000
Kg
1,340.00
670.00
Pasir Pasang
0.0130
m3
122,000.00
1,586.00
Pekerja
0.0800
OH
34,000.00
2,720.00
Tukang Batu
0.4000
OH
39,500.00
15,800.00
Kepala Tukang
0.0400
OH
47,000.00
1,880.00
Mandor
0.0040
OH
52,000.00
208.00
Tenaga
29 1 m2 Pelesteran Ciprat 1 Pc : 2 Ps
6,520.80
15,400.00
21,920.80
Analisa Harga Satuan Halaman 8
NO.
URAIAN KEBUTUHAN
INDEKS
SATUAN
HARGA SATUAN BAHAN Rp.
HARGA SATUAN UPAH Rp.
A
B
C
D
E
F
JUMLAH BAHAN
JUMLAH UPAH
TOTAL HARGA
Rp.
Rp.
Rp.
G=(CXE)
H = (C X F )
I=(G+H)
30 1 m2 Pelesteran Siar Pasangan Dinding Bata Merah (= 20 m')
4,164.72
8,805.00
12,969.72
31 1 m2 Pelesteran Siar Pasangan Dinding con Block ekspose (= 8 m')
2,144.00
4,109.00
6,253.00
Bahan Semen Portland
1.6000
Kg
1,340.00
2,144.00
Pekerja
0.0700
OH
34,000.00
2,380.00
Tukang Batu
0.0350
OH
39,500.00
1,382.50
Kepala Tukang
0.0035
OH
47,000.00
164.50
Mandor
0.0035
OH
52,000.00
182.00
Tenaga
32 1 m2 Acian
4,355.00
11,740.00
16,095.00
Bahan Semen Portland
3.2500
Kg
1,340.00
4,355.00
Pekerja
0.2000
OH
34,000.00
6,800.00
Tukang Batu
0.1000
OH
39,500.00
3,950.00
Kepala Tukang
0.0100
OH
47,000.00
470.00
Mandor
0.0100
OH
52,000.00
520.00
Tenaga
VI
PEKERJAAN KAYU 33 1m3 Pasang Kusen Pintu dan Jendela, Kayu Kelas II Atau Kelas III
3,277,750.00
1,051,200.00
4,328,950.00
Bahan Kayu Balok Kelas II Atau Kelas III
1.2000
m3
2,685,000.00
3,222,000.00
Paku 10 Cm
1.2500
Kg
19,000.00
23,750.00
Lem Kayu
1.0000
Kg
32,000.00
32,000.00
Tenaga Pekerja
6.0000
OH
34,000.00
204,000.00
18.0000
OH
41,500.00
747,000.00
Kepala Tukang
1.8000
OH
47,000.00
84,600.00
Mandor
0.3000
OH
52,000.00
15,600.00
Tukang Kayu
34 1m3 Pasang Kusen Pintu dan Jendela Kayu Lanan 35 1m2 Pasang Pintu Panel Kayu Lanan
7,123,200.00
1,051,200.00
8,174,400.00
298,240.00
175,200.00
473,440.00
Analisa Harga Satuan Halaman 9
NO.
URAIAN KEBUTUHAN
INDEKS
SATUAN
HARGA SATUAN BAHAN Rp.
HARGA SATUAN UPAH Rp.
A
B
C
D
E
F
JUMLAH BAHAN
JUMLAH UPAH
TOTAL HARGA
Rp.
Rp.
Rp.
G=(CXE)
H = (C X F )
I=(G+H)
36 1m2 Pasang Pintu dan Jendela Kaca Kayu Lanan
178,944.00
140,160.00
319,104.00
37 1m2 Pasang Pintu Kayu Lapis (Plywood) rangkap, rangka tertutup kayu borneo (lebar sampai 90 cm)
262,620.00
122,640.00
385,260.00
38 1m2 Pasang Pintu Kayu Lapis (Plywood) rangkap, rangka tertutup kayu lanan (lebar sampai 90 cm)
290,620.00
122,640.00
413,260.00
Bahan Papan Kayu Lanan
0.0250
m3
7,056,000.00
Paku Biasa 1 cm - 2.5 cm
0.0300
Kg
24,000.00
176,400.00 720.00
Lem Kayu
0.5000
Kg
32,000.00
16,000.00
Plywood tebal 4mm (90x220) cm
1.0000
lbr
97,500.00
97,500.00
Pekerja
0.7000
OH
34,000.00
23,800.00
Tukang Kayu
2.1000
OH
41,500.00
87,150.00
Kepala Tukang
0.2100
OH
47,000.00
9,870.00
Mandor
0.0350
OH
52,000.00
1,820.00
Tenaga
39 1m2 Pasang Pintu Kayu Lapis (Plywood) rangkap, rangka tertutup kayu lokal (lebar sampai 90 cm)
186,720.00
122,640.00
309,360.00
Bahan Papan Kayu lokal
0.0250
m3
2,900,000.00
Paku Biasa 1 cm - 2.5 cm
0.0300
Kg
24,000.00
72,500.00 720.00
Lem Kayu
0.5000
Kg
32,000.00
16,000.00
Plywood tebal 4mm (90x220) cm
1.0000
lbr
97,500.00
97,500.00
Pekerja
0.7000
OH
34,000.00
23,800.00
Tukang Kayu
2.1000
OH
41,500.00
87,150.00
Kepala Tukang
0.2100
OH
47,000.00
9,870.00
Mandor
0.0350
OH
52,000.00
1,820.00
Tenaga
40 1m2 Pasang Pintu Kayu Lapis (Plywood) rangkap, rangka tertutup kayu lokal (lebar sampai 90 cm) dilapis Alumi
205,296.00
122,640.00
327,936.00
Bahan Papan Kayu lokal
0.0250
m3
2,900,000.00
Paku Biasa 1 cm - 2.5 cm
0.0300
Kg
24,000.00
72,500.00 720.00
Lem Kayu
0.5000
Kg
32,000.00
16,000.00
Plywood tebal 4mm (90x220) cm
1.0000
lbr
97,500.00
97,500.00
Aluminium
1.0800
lbr
17,200.00
18,576.00
Pekerja
0.7000
OH
34,000.00
23,800.00
Tukang Kayu
2.1000
OH
41,500.00
87,150.00
Kepala Tukang
0.2100
OH
47,000.00
9,870.00
Mandor
0.0350
OH
52,000.00
1,820.00
Tenaga
41 1m2 Pasang Pintu Plywood Rangkap, rangka ekspose Kayu Lanan
294,853.60
140,160.00
435,013.60
Analisa Harga Satuan Halaman 10
NO.
URAIAN KEBUTUHAN
INDEKS
SATUAN
HARGA SATUAN BAHAN Rp.
HARGA SATUAN UPAH Rp.
A
B
C
D
E
F
42 1m2 Pasang Pintu Plywood Rangkap, rangka ekspose Kayu Borneo
JUMLAH BAHAN
JUMLAH UPAH
TOTAL HARGA
Rp.
Rp.
Rp.
G=(CXE)
H = (C X F )
I=(G+H)
266,181.60
140,160.00
406,341.60
Bahan Papan Kayu Borneo
0.0256
m3
5,936,000.00
Paku Biasa 1 cm - 2.5 cm
0.0300
Kg
24,000.00
151,961.60 720.00
Lem Kayu
0.5000
Ltr
32,000.00
16,000.00
Plywood tebal 4mm (90x220) cm
1.0000
lbr
97,500.00
97,500.00
Pekerja
0.8000
OH
34,000.00
27,200.00
Tukang Kayu
2.4000
OH
41,500.00
99,600.00
Kepala Tukang
0.2400
OH
47,000.00
11,280.00
Mandor
0.0400
OH
52,000.00
2,080.00
Tenaga
43 1m2 Pasang Pintu Teakwood Rangkap, rangka ekspose Kayu Lanan
271,720.00
140,160.00
411,880.00
Bahan Papan Kayu Lanan
0.0250
m3
7,056,000.00
Paku Biasa 1 cm - 2.5 cm
0.0300
Kg
24,000.00
176,400.00 720.00
Lem Kayu
0.3000
Kg
32,000.00
9,600.00
Teakwood tebal 4 mm ukuran (90x220) cm
1.0000
lbr
85,000.00
85,000.00
Pekerja
0.8000
OH
34,000.00
27,200.00
Tukang Kayu
2.4000
OH
41,500.00
99,600.00
Kepala Tukang
0.2400
OH
47,000.00
11,280.00
Mandor
0.0400
OH
52,000.00
2,080.00
Tenaga
44 1m2 Pasang Pintu Teakwood Rangkap, rangka ekspose Kayu Borneo
243,720.00
140,160.00
383,880.00
Bahan Papan Kayu Borneo
0.0250
m3
5,936,000.00
Paku Biasa 1 cm - 2.5 cm
0.0300
Kg
24,000.00
148,400.00 720.00
Lem Kayu
0.3000
Ltr
32,000.00
9,600.00
Teakwood tebal 4 mm ukuran (90x220) cm
1.0000
lbr
85,000.00
85,000.00
Pekerja
0.8000
OH
34,000.00
27,200.00
Tukang Kayu
2.4000
OH
41,500.00
99,600.00
Kepala Tukang
0.2400
OH
47,000.00
11,280.00
Mandor
0.0400
OH
52,000.00
2,080.00
Tenaga
45 1m3 Pasang Konstruksi Kuda - kuda Kayu Lanan
7,093,500.00
700,800.00
7,794,300.00
46 1m3 Pasang Konstruksi Kuda - kuda Kayu kls II (Lokal)
3,517,400.00
700,800.00
4,218,200.00
Bahan Balok Kayu kls II Besi Strip tebal 5 mm Paku 12 cm
1.1000
m3
2,685,000.00
2,953,500.00
15.0000
Kg
30,500.00
457,500.00
5.6000
Kg
19,000.00
106,400.00
Tenaga Pekerja
4.0000
OH
34,000.00
136,000.00
12.0000
OH
41,500.00
498,000.00
Kepala Tukang
1.2000
OH
47,000.00
56,400.00
Mandor
0.2000
OH
52,000.00
10,400.00
Tukang Kayu
47 1m3 Pasang Konstruksi Gordeng, Kayu Lanan
7,044,100.00
420,480.00
7,464,580.00
Analisa Harga Satuan Halaman 11
NO.
URAIAN KEBUTUHAN
INDEKS
SATUAN
HARGA SATUAN BAHAN Rp.
HARGA SATUAN UPAH Rp.
A
B
C
D
E
F
48 1m3 Pasang Konstruksi Gordeng, Kayu Kelas II (Lokal)
JUMLAH BAHAN
JUMLAH UPAH
TOTAL HARGA
Rp.
Rp.
Rp.
G=(CXE)
H = (C X F )
I=(G+H)
3,468,000.00
420,480.00
3,888,480.00
Bahan Balok Kayu Kelas II
1.1000
m3
2,685,000.00
2,953,500.00
15.0000
Kg
30,500.00
457,500.00
3.0000
Kg
19,000.00
57,000.00
Pekerja
2.4000
OH
34,000.00
81,600.00
Tukang Kayu
7.2000
OH
41,500.00
298,800.00
Kepala Tukang
0.7200
OH
47,000.00
33,840.00
Mandor
0.1200
OH
52,000.00
6,240.00
Besi Strip Tebal 5 mm Paku 12 cm Tenaga
49 1m2 Pasang Rangka Atap Genteng Keramik Kayu Kelas II
62,330.00
8,280.00
70,610.00
Bahan Kaso 5/7 cm Kayu Kelas II
0.0140
m3
3,650,000.00
51,100.00
Reng 2/3 cm Kayu Kelas II
0.0036
m3
1,800,000.00
6,480.00
Paku Biasa 5 cm dan 10 cm
0.2500
Kg
19,000.00
4,750.00
Pekerja
0.1000
OH
34,000.00
3,400.00
Tukang Kayu
0.1000
OH
41,500.00
4,150.00
Kepala Tukang
0.0100
OH
47,000.00
470.00
Mandor
0.0050
OH
52,000.00
260.00
Tenaga
50 1m2 Pasang Rangka Atap Genteng Keramik Kayu Lanan
62,330.00
8,280.00
70,610.00
Bahan Kaso 5/7 cm (Lanan)
0.0140
m3
3,650,000.00
51,100.00
Reng 2/3 cm (Lanan)
0.0036
m3
1,800,000.00
6,480.00
Paku Biasa 5 cm dan 10 cm
0.2500
Kg
19,000.00
4,750.00
Pekerja
0.1000
OH
34,000.00
3,400.00
Tukang Kayu
0.1000
OH
41,500.00
4,150.00
Kepala Tukang
0.0100
OH
47,000.00
470.00
Mandor
0.0050
OH
52,000.00
260.00
Tenaga
51 1m2 Pasang Rangka Atap Genteng Beton Kayu Kelas II
31,206.00
8,280.00
39,486.00
Bahan Kaso 5/7 cm Kayu Kelas II
0.0140
m3
1,540,000.00
21,560.00
Reng 2/3 cm Kayu Kelas II
0.0036
m3
1,360,000.00
4,896.00
Paku Biasa 5 cm dan 10 cm
0.2500
Kg
19,000.00
4,750.00
Pekerja
0.1000
OH
34,000.00
3,400.00
Tukang Kayu
0.1000
OH
41,500.00
4,150.00
Kepala Tukang
0.0100
OH
47,000.00
470.00
Mandor
0.0050
OH
52,000.00
260.00
Tenaga
52 1m2 Pasang Rangka Atap Sirap Beton Kayu Lanan
983,240.00
9,936.00
993,176.00
Bahan Kayu Lanan
0.1650
m3
5,936,000.00
979,440.00
Paku Biasa 5 cm dan 10 cm
0.2000
Kg
19,000.00
3,800.00
Pekerja
0.1200
OH
34,000.00
4,080.00
Tukang Kayu
0.1200
OH
41,500.00
4,980.00
Kepala Tukang
0.0120
OH
47,000.00
564.00
Mandor
0.0060
OH
52,000.00
312.00
Tenaga
53 1m' Pasang Lisplank ( 3 x 20 )cm Kayu Lanan
78,104.80
12,900.00
91,004.80
Analisa Harga Satuan Halaman 12
NO.
URAIAN KEBUTUHAN
INDEKS
SATUAN
HARGA SATUAN BAHAN Rp.
HARGA SATUAN UPAH Rp.
A
B
C
D
E
F
JUMLAH BAHAN
JUMLAH UPAH
TOTAL HARGA
Rp.
Rp.
Rp.
G=(CXE)
H = (C X F )
I=(G+H)
54 1m' Pasang Lisplank ( 3 x 30 )cm Kayu lanan
78,566.00
12,900.00
91,466.00
55 1m' Pasang Lisplank ( 3 x 30 )cm Kayu klas II
32,850.00
12,900.00
45,750.00
Bahan Papan Kayu klas II
0.0110
m3
2,900,000.00
31,900.00
Paku Biasa 5 dan 7 cm
0.0500
Kg
19,000.00
950.00
Pekerja
0.1000
OH
34,000.00
3,400.00
Tukang Kayu
0.2000
OH
41,500.00
8,300.00
Kepala Tukang
0.0200
OH
47,000.00
940.00
Mandor
0.0050
OH
52,000.00
260.00
Tenaga
56 1m' Pasang Calsiplank GRC (0,8 x 20) cm
17,450.00
12,900.00
30,350.00
Bahan Papan calsiplank
1.1000
btg
15,000.00
16,500.00
Paku Biasa 5 dan 7 cm
0.0500
Kg
19,000.00
950.00
Pekerja
0.1000
OH
34,000.00
3,400.00
Tukang Kayu
0.2000
OH
41,500.00
8,300.00
Kepala Tukang
0.0200
OH
47,000.00
940.00
Mandor
0.0050
OH
52,000.00
260.00
Tenaga
57 1m2 Pasang Rangka Dinding Pemisah (60 x 120) cm Kayu Kelas II atau III
169,058.00
26,306.00
195,364.00
Bahan Balok Kayu Kelas II atau III
0.0280
m3
5,936,000.00
166,208.00
Paku Biasa 5 dan 7 cm
0.1500
Kg
19,000.00
2,850.00
Pekerja
0.1500
OH
34,000.00
5,100.00
Tukang Kayu
0.4500
OH
41,500.00
18,675.00
Kepala Tukang
0.0450
OH
47,000.00
2,115.00
Mandor
0.0080
OH
52,000.00
416.00
Tenaga
58 1m2 Pasang Rangka Dinding Pemisah Kayu Lanan (60 x 120) cm Kayu Lanan
169,058.00
26,306.00
195,364.00
59 1m2 Pasang Dinding Pemisah Teakwood Rangkap, Rangka Kayu Lanan
248,131.33
29,790.00
277,921.33
60 1m2 Pasang Dinding Pemisah Plywood Rangkap, Rangka Kayu Lanan
258,881.33
35,040.00
293,921.33
Analisa Harga Satuan Halaman 13
NO.
URAIAN KEBUTUHAN
INDEKS
SATUAN
HARGA SATUAN BAHAN Rp.
HARGA SATUAN UPAH Rp.
A
B
C
D
E
F
VII
JUMLAH BAHAN
JUMLAH UPAH
TOTAL HARGA
Rp.
Rp.
Rp.
G=(CXE)
H = (C X F )
I=(G+H)
PEKERJAAN BETON ( SNI 7394 : 2008 ) CATATAN Bobot isi pasir beton
1,400
kg/m3
Bobot isi kerikil
1,350
kg/m3
Bukling factor pasir = 20 % 61 1 m3 Membuat beton mutu f’c = 7,4 MPa (K 100), slump (12 ± 2) cm, w/c = 0,87
584,930.00
72,594.50
657,524.50
Bahan Semen Portland
247.0000
Kg
1,340.00
Pasir Beton
869.0000
Kg
110.00
330,980.00 95,590.00
Kerikil (Masimal 30 mm)
999.0000
Kg
158.52
158,360.00
Air
215.0000
Ltr
Pekerja
1.6500
OH
34,000.00
56,100.00
Tukang Batu
0.2750
OH
39,500.00
10,862.50
Kepala Tukang
0.0280
OH
47,000.00
1,316.00
Mandor
0.0830
OH
52,000.00
4,316.00
-
-
Tenaga
62 1 m3 Membuat beton mutu f’c = 9,8 MPa (K 125), slump (12 ± 2) cm, w/c = 0,78
621,120.74
72,594.50
693,715.24
Bahan Semen Portland
276.0000
Kg
1,340.00
Pasir Beton
826.0000
Kg
110.00
90,860.00
1,012.0000
Kg
158.52
160,420.74
215.0000
Ltr
Pekerja
1.6500
OH
34,000.00
56,100.00
Tukang Batu
0.2750
OH
39,500.00
10,862.50
Kepala Tukang
0.0280
OH
47,000.00
1,316.00
Mandor
0.0830
OH
52,000.00
4,316.00
Kerikil (Masimal 30 mm) Air
369,840.00
-
-
Tenaga
63 1 m3 Membuat beton mutu f’c = 12,2 MPa (K 150), slump (12 ± 2) cm, w/c = 0,72
649,763.33
72,594.50
722,357.83
Bahan Semen Portland
299.0000
Kg
1,340.00
Pasir Beton
799.0000
Kg
110.00
87,890.00
1,017.0000
Kg
158.52
161,213.33
215.0000
Ltr
Pekerja
1.6500
OH
34,000.00
56,100.00
Tukang Batu
0.2750
OH
39,500.00
10,862.50
Kepala Tukang
0.0280
OH
47,000.00
1,316.00
Mandor
0.0830
OH
52,000.00
4,316.00
Kerikil (Masimal 30 mm) Air
400,660.00
-
-
Tenaga
64 1 m3 Membuat lantai kerja beton mutu f’c = 7,4 MPa (K 100), slump (3-6) cm, w/c = 0,87
569,228.52
49,952.00
619,180.52
Bahan Semen Portland
230.0000
Kg
1,340.00
Pasir Beton
893.0000
Kg
110.00
98,230.00
1,027.0000
Kg
158.52
162,798.52
200.0000
Ltr
Pekerja
1.2000
OH
34,000.00
40,800.00
Tukang Batu
0.2000
OH
39,500.00
7,900.00
Kepala Tukang
0.0200
OH
47,000.00
940.00
Mandor
0.0060
OH
52,000.00
312.00
Kerikil (Masimal 30 mm) Air
308,200.00
-
-
Tenaga
65 1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175), slump (12 ± 2) cm, w/c = 0,66
683,555.56
72,594.50
756,150.06
Bahan Semen Portland
326.0000
Kg
1,340.00
Pasir Beton
760.0000
Kg
110.00
83,600.00
1,029.0000
Kg
158.52
163,115.56
Kerikil (Masimal 30 mm)
436,840.00
Analisa Harga Satuan Halaman 14
NO.
URAIAN KEBUTUHAN
INDEKS
SATUAN
HARGA SATUAN BAHAN Rp.
HARGA SATUAN UPAH Rp.
A
B
C
D
E
F
Air
-
JUMLAH BAHAN
JUMLAH UPAH
TOTAL HARGA
Rp.
Rp.
Rp.
G=(CXE)
H = (C X F )
I=(G+H)
215.0000
Ltr
-
Pekerja
1.6500
OH
34,000.00
56,100.00
Tukang Batu
0.2750
OH
39,500.00
10,862.50
Kepala Tukang
0.0280
OH
47,000.00
1,316.00
Mandor
0.0830
OH
52,000.00
4,316.00
Tenaga
Analisa Harga Satuan Halaman 15
NO.
URAIAN KEBUTUHAN
INDEKS
SATUAN
HARGA SATUAN BAHAN Rp.
HARGA SATUAN UPAH Rp.
A
B
C
D
E
F
66 1 m3 Membuat beton mutu f’c = 16,9 MPa (K 200), slump (12 ± 2) cm, w/c = 0,61
JUMLAH BAHAN
JUMLAH UPAH
TOTAL HARGA
Rp.
Rp.
Rp.
G=(CXE)
H = (C X F )
I=(G+H)
715,522.59
72,594.50
788,117.09
Bahan Semen Portland
352.0000
Kg
1,340.00
Pasir Beton
731.0000
Kg
110.00
80,410.00
1,031.0000
Kg
158.52
163,432.59
215.0000
Ltr
Pekerja
1.6500
OH
34,000.00
56,100.00
Tukang Batu
0.2750
OH
39,500.00
10,862.50
Kepala Tukang
0.0280
OH
47,000.00
1,316.00
Mandor
0.0830
OH
52,000.00
4,316.00
Kerikil (Masimal 30 mm) Air
471,680.00
-
-
Tenaga
67 1 m3 Membuat beton mutu f’c = 19,3 MPa (K 225), slump (12 ± 2) cm, w/c = 0,58
739,888.89
72,594.50
812,483.39
Bahan Semen Portland
371.0000
Kg
1,340.00
Pasir Beton
698.0000
Kg
110.00
76,780.00
1,047.0000
Kg
158.52
165,968.89
215.0000
Ltr
Pekerja
1.6500
OH
34,000.00
56,100.00
Tukang Batu
0.2750
OH
39,500.00
10,862.50
Kepala Tukang
0.0280
OH
47,000.00
1,316.00
Mandor
0.0830
OH
52,000.00
4,316.00
Kerikil (Masimal 30 mm) Air
497,140.00
-
-
Tenaga
68 1 m3 Membuat beton mutu f’c = 21,7 MPa (K 250), slump (12 ± 2) cm, w/c = 0,56
755,380.74
72,594.50
827,975.24
Bahan Semen Portland
384.0000
Kg
1,340.00
Pasir Beton
692.0000
Kg
110.00
76,120.00
1,039.0000
Kg
158.52
164,700.74
215.0000
Ltr
Pekerja
1.6500
OH
34,000.00
56,100.00
Tukang Batu
0.2750
OH
39,500.00
10,862.50
Kepala Tukang
0.0280
OH
47,000.00
1,316.00
Mandor
0.0830
OH
52,000.00
4,316.00
Kerikil (Masimal 30 mm) Air
514,560.00
-
-
Tenaga
69 1 m3 Membuat beton mutu f’c = 24,0 MPa (K 275), slump (12 ± 2) cm, w/c = 0,53
781,920.00
72,594.50
854,514.50
Bahan Semen Portland
406.0000
Kg
1,340.00
Pasir Beton
684.0000
Kg
110.00
75,240.00
1,026.0000
Kg
158.52
162,640.00
215.0000
Ltr
Pekerja
1.6500
OH
34,000.00
56,100.00
Tukang Batu
0.2750
OH
39,500.00
10,862.50
Kepala Tukang
0.0280
OH
47,000.00
1,316.00
Mandor
0.0830
OH
52,000.00
4,316.00
Kerikil (Masimal 30 mm) Air
544,040.00
-
-
Tenaga
70 1 m3 Membuat beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52
790,177.41
72,594.50
862,771.91
Bahan Semen Portland
413.0000
Kg
1,340.00
Pasir Beton
681.0000
Kg
110.00
74,910.00
1,021.0000
Kg
158.52
161,847.41
215.0000
Ltr
Pekerja
1.6500
OH
34,000.00
56,100.00
Tukang Batu
0.2750
OH
39,500.00
10,862.50
Kepala Tukang
0.0280
OH
47,000.00
1,316.00
Mandor
0.0830
OH
52,000.00
4,316.00
Kerikil (Masimal 30 mm) Air
553,420.00
-
-
Tenaga
Analisa Harga Satuan Halaman 16
NO.
URAIAN KEBUTUHAN
INDEKS
SATUAN
HARGA SATUAN BAHAN Rp.
HARGA SATUAN UPAH Rp.
A
B
C
D
E
F
71 1 m3 Membuat beton mutu f’c = 28,8 MPa (K 325), slump (12 ± 2) cm, w/c = 0,49
JUMLAH BAHAN
JUMLAH UPAH
TOTAL HARGA
Rp.
Rp.
Rp.
G=(CXE)
H = (C X F )
I=(G+H)
821,429.63
92,330.00
913,759.63
Bahan Semen Portland
439.0000
Kg
1,340.00
Pasir Beton
670.0000
Kg
110.00
73,700.00
1,006.0000
Kg
158.52
159,469.63
215.0000
Ltr
Pekerja
2.1000
OH
34,000.00
71,400.00
Tukang Batu
0.3500
OH
39,500.00
13,825.00
Kepala Tukang
0.0350
OH
47,000.00
1,645.00
Mandor
0.1050
OH
52,000.00
5,460.00
Kerikil (Masimal 30 mm) Air
588,260.00
-
-
Tenaga
72 1 m3 Membuat beton mutu f’c = 31,2 MPa (K 350), slump (12 ± 2) cm, w/c = 0,48
832,208.52
92,330.00
924,538.52
Bahan Semen Portland
448.0000
Kg
1,340.00
Pasir Beton
667.0000
Kg
110.00
73,370.00
1,000.0000
Kg
158.52
158,518.52
215.0000
Ltr
Pekerja
2.1000
OH
34,000.00
71,400.00
Tukang Batu
0.3500
OH
39,500.00
13,825.00
Kepala Tukang
0.0350
OH
47,000.00
1,645.00
Mandor
0.1050
OH
52,000.00
5,460.00
Kerikil (Masimal 30 mm) Air
600,320.00
-
-
Tenaga
73 1 Kg Pembesian dengan Besi Polos atau Besi Ulir 10 Kg Pembesian dengan Besi Polos atau Besi Ulir 74 1 Kg Pembesian Kabel presstressed polos/strands 10 Kg Pembesian Kabel presstressed polos/strands
13,174.50
582.20
13,756.70
131,745.00
5,822.00
137,567.00
13,067.00
416.60
13,483.60
130,670.00
4,166.00
134,836.00
Bahan Besi Beton ( Polos / Ulir )
10.5000
Kg
12,240.00
128,520.00
0.1000
Kg
21,500.00
2,150.00
Perkerja
0.0500
OH
34,000.00
1,700.00
Tukang Besi
0.0500
OH
41,500.00
2,075.00
Kepala Tukang
0.0050
OH
47,000.00
235.00
Mandor
0.0030
OH
52,000.00
156.00
Kawat Beton Tenaga
75 1 Kg Jaring kawat baja/wire mesh
13,315.00
2,033.50
15,348.50
Bahan Jaring Kawat Beton/wiremesh dilas
1.0200
Kg
12,000.00
12,240.00
Kawat Beton
0.0500
Kg
21,500.00
1,075.00
Perkerja
0.0250
OH
34,000.00
850.00
Tukang Besi
0.0250
OH
41,500.00
1,037.50
Kepala Tukang
0.0020
OH
47,000.00
94.00
Mandor
0.0010
OH
52,000.00
52.00
Tenaga
76 1 m2 Pasang Bekisting untuk Pondasi
52,000.00
31,044.00
83,044.00
Analisa Harga Satuan Halaman 17
NO.
URAIAN KEBUTUHAN
INDEKS
SATUAN
HARGA SATUAN BAHAN Rp.
HARGA SATUAN UPAH Rp.
A
B
C
D
E
F
77 1 m2 Pasang Bekisting untuk Sloof
JUMLAH BAHAN
JUMLAH UPAH
TOTAL HARGA
Rp.
Rp.
Rp.
G=(CXE)
H = (C X F )
I=(G+H)
57,750.00
31,044.00
88,794.00
78 1 m2 Pasang Bekisting untuk Kolom (Menggunakan Plywood)
142,955.00
39,402.00
182,357.00
79 1 m2 Pasang Bekisting untuk Balok (Menggunakan Plywood)
147,881.00
39,402.00
187,283.00
80 1 m2 Pasang Bekisting untuk Lantai (Menggunakan Plywood)
202,955.00
38,742.00
241,697.00
81 1 m2 Pasang Bekisting untuk Dinding
156,243.06
38,742.00
194,985.06
Bahan Kayu Kelas III (Papan Terentang)
0.0300
m3
1,150,000.00
34,500.00
Paku Biasa 5 - 12 Cm
0.4000
Kg
19,000.00
7,600.00
Minyak Bekisting
0.2000
Ltr
3,000.00
600.00
Balok Kayu Kelas II (Stoot)
0.0200
m3
1,642,000.00
32,840.00
Plywood 9mm
0.3500
lbr
97,500.00
34,125.00
Dolken Kayu Galam Ø 8 - 10 / 4m
3.0000
btg
15,000.00
45,000.00
Formite/penjaga jarak bekisting/spacer
4.0000
bh
394.51
1,578.06
Perkerja
0.6600
OH
34,000.00
22,440.00
Tukang Batu
0.3300
OH
39,500.00
13,035.00
Kepala Tukang
0.0330
OH
47,000.00
1,551.00
Mandor
0.0330
OH
52,000.00
1,716.00
Tenaga
Analisa Harga Satuan Halaman 18
NO.
URAIAN KEBUTUHAN
INDEKS
SATUAN
HARGA SATUAN BAHAN Rp.
HARGA SATUAN UPAH Rp.
A
B
C
D
E
F
82 1 m2 Pasang Bekisting untuk Tangga
JUMLAH BAHAN
JUMLAH UPAH
TOTAL HARGA
Rp.
Rp.
Rp.
G=(CXE)
H = (C X F )
I=(G+H)
131,305.00
38,742.00
170,047.00
Bahan Kayu Kelas III (Papan Terentang)
0.0300
m3
1,150,000.00
34,500.00
Paku Biasa 5 - 12 Cm
0.4000
Kg
19,000.00
7,600.00
Minyak Bekisting
0.1500
Ltr
3,000.00
450.00
Balok Kayu Kelas II (Stoot)
0.0150
m3
1,642,000.00
24,630.00
Plywood 9mm
0.3500
lbr
97,500.00
34,125.00
Dolken Kayu Galam Ø 8 - 10 / 4m
2.0000
btg
15,000.00
30,000.00
Perkerja
0.6600
OH
34,000.00
22,440.00
Tukang Batu
0.3300
OH
39,500.00
13,035.00
Kepala Tukang
0.0330
OH
47,000.00
1,551.00
Mandor
0.0330
OH
52,000.00
1,716.00
Tenaga
83 1 m2 Jembatan untuk pengecoran beton
49,260.00
7,726.00
56,986.00
Bahan Kayu Kelas III (Papan Terentang)
0.0264
m3
1,150,000.00
30,360.00
Paku Biasa 5 - 12 Cm
0.6000
Kg
19,000.00
11,400.00
Dolken Kayu Galam Ø 8 - 10 / 4m
0.5000
btg
15,000.00
7,500.00
Perkerja
0.1500
OH
34,000.00
5,100.00
Tukang Batu
0.0500
OH
39,500.00
1,975.00
Kepala Tukang
0.0050
OH
47,000.00
235.00
Mandor
0.0080
OH
52,000.00
416.00
Tenaga
84 1 m3 Pekerjaan Sloof Beton ukuran 15x20 cm (4Æ12, Æ 8-200) K.175 1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175) 1 Kg Pembesian dengan Besi Polos atau Besi Ulir 1 m2 Pasang Bekisting untuk Sloof (2x pakai / 50%)
3,071,078.59
575,007.87
72,594.50
683,555.56
72,594.50
13,174.50
582.20
2,002,524.00
88,494.40
28,875.00
31,044.00
384,999.04
413,918.97
3,362,876.82
878,681.46
m3
683,555.56
72,594.50
683,555.56
72,594.50
154.0496
kg
13,174.50
582.20
2,029,526.46
89,687.68
18.1818
m2
35,738.75
39,402.00
649,794.80
716,399.28
3,812,616.06
935,738.30
m3
683,555.56
72,594.50
683,555.56
72,594.50
129.0000
kg
13,174.50
582.20
1,699,510.50
75,103.80
20.0000
m2
71,477.50
39,402.00
1,429,550.00
788,040.00
3,869,034.72
865,744.91
m3
683,555.56
72,594.50
683,555.56
72,594.50
144.1333
kg
13,174.50
582.20
1,898,884.16
83,914.41
18.0000
m2
71,477.50
39,402.00
1,286,595.00
709,236.00
3,586,022.54
684,101.55
m3
683,555.56
72,594.50
683,555.56
72,594.50
147.9704
kg
13,174.50
582.20
1,949,436.03
86,148.37
13.3333
m2
71,477.50
39,402.00
953,030.95
525,358.69
3,721,360.55
1,236,881.10
m3
683,555.56
72,594.50
683,555.56
72,594.50
154.0496
kg
13,174.50
582.20
2,029,526.46
89,687.68
27.2727
m2
36,970.25
39,402.00
1,008,278.54
1,074,598.93
3,710,650.19
893,060.58
m3
683,555.56
72,594.50
683,555.56
72,594.50
178.7475
kg
13,174.50
582.20
2,354,908.94
104,066.79
18.1818
m2
36,970.25
39,402.00
672,185.69
716,399.28
1.0000
m3
683,555.56
152.0000
kg
13.3333
m2
85 1 m3 Pekerjaan Beton Kolom Praktis ukuran 11x11 cm (4Æ10, Æ 6-200) K.175 1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175) 1 Kg Pembesian dengan Besi Polos atau Besi Ulir 1 m2 Pasang Bekisting untuk Kolom (4x pakai / 25%)
1.0000
86 1 m3 Pekerjaan Kolom Beton ukuran 20x20 cm (4Æ12, Æ 8-150) K.175 1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175) 1 Kg Pembesian dengan Besi Polos atau Besi Ulir 1 m2 Pasang Bekisting untuk Kolom (2x pakai / 50%)
1.0000
87 1 m3 Pekerjaan Kolom Beton ukuran 20x25 cm (6Æ12, Æ 8-150) K.175 1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175) 1 Kg Pembesian dengan Besi Polos atau Besi Ulir 1 m2 Pasang Bekisting untuk Kolom (2x pakai / 50%)
1.0000
88 1 m3 Pekerjaan Kolom Beton ukuran 30x30 cm (8Æ14, Æ 10-150) K.175 1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175) 1 Kg Pembesian dengan Besi Polos atau Besi Ulir 1 m2 Pasang Bekisting untuk Kolom (2x pakai / 50%)
1.0000
88 1 m3 Pekerjaan Balok Lintel Beton ukuran 11x11 cm (4Æ10, Æ 6-200) K.175 1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175) 1 Kg Pembesian dengan Besi Polos atau Besi Ulir 1 m2 Pasang Bekisting untuk Balok (4x pakai / 25%)
1.0000
89 1 m3 Pekerjaan Ring Balok Beton ukuran 11x15 cm (4Æ10, Æ 6-200) K.175 1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175) 1 Kg Pembesian dengan Besi Polos atau Besi Ulir 1 m2 Pasang Bekisting untuk Balok (4x pakai / 25%)
1.0000
3,646,086.46
4,241,558.28
4,748,354.36
4,734,779.62
4,270,124.09
4,958,241.65
4,603,710.76
Analisa Harga Satuan Halaman 19
NO.
URAIAN KEBUTUHAN
INDEKS
SATUAN
HARGA SATUAN BAHAN Rp.
HARGA SATUAN UPAH Rp.
A
B
C
D
E
F
90 1 m3 Pekerjaan Ring Balok Beton ukuran 15x20 cm (4Æ12, Æ 8-150) K.175 1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175) 1 Kg Pembesian dengan Besi Polos atau Besi Ulir 1 m2 Pasang Bekisting untuk Balok (2x pakai / 50%)
1.0000
JUMLAH BAHAN
JUMLAH UPAH
Rp.
Rp.
Rp.
G=(CXE)
H = (C X F )
I=(G+H)
4,188,036.11
889,926.47
72,594.50
683,555.56
72,594.50
13,174.50
582.20
2,148,907.19
94,963.28
73,940.50
39,402.00
1,355,573.37
722,368.69
m3
683,555.56
163.1111
kg
18.3333
m2
TOTAL HARGA
5,077,962.58
Analisa Harga Satuan Halaman 20
NO.
URAIAN KEBUTUHAN
INDEKS
SATUAN
HARGA SATUAN BAHAN Rp.
HARGA SATUAN UPAH Rp.
A
B
C
D
E
F
91 1 m3 Pekerjaan Balok Beton ukuran 15x25 cm (6Æ12, Æ 8-150) K.175 1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175) 1 Kg Pembesian dengan Besi Polos atau Besi Ulir 1 m2 Pasang Bekisting untuk Balok (2x pakai / 50%)
1 Kg Pembesian dengan Besi Polos atau Besi Ulir 1 m2 Pasang Bekisting untuk Balok (2x pakai / 50%)
1 Kg Pembesian dengan Besi Polos atau Besi Ulir 1 m2 Pasang Bekisting untuk Plat
1 Kg Pembesian dengan Besi Polos atau Besi Ulir 1 m2 Pasang Bekisting untuk Plat
Rp. I=(G+H)
72,594.50
13,174.50
582.20
2,438,161.24
107,745.83
73,940.50
39,402.00
1,281,632.87
682,966.69
4,146,378.66
707,413.25
m3
683,555.56
72,594.50
683,555.56
72,594.50
188.0111
kg
13,174.50
582.20
2,476,952.24
109,460.06
13.3333
m2
73,940.50
39,402.00
985,870.87
525,358.69
3,763,432.76
456,807.09
m3
683,555.56
72,594.50
683,555.56
72,594.50
185.0667
kg
17.3333
m2
1.0000
1.0000 105.4000
kg
13,174.50
582.20
1,388,592.30
61,363.88
8.3333
m2
202,955.00
38,742.00
1,691,284.90
322,848.71
4,346,743.56
532,207.30
m3
683,555.56
72,594.50
683,555.56
72,594.50
1.0000 124.0000
kg
13,174.50
582.20
1,633,638.00
72,192.80
10.0000
m2
202,955.00
38,742.00
2,029,550.00
387,420.00
3,891,969.43
642,598.45
m3
683,555.56
72,594.50
683,555.56
72,594.50
95 1 m3 Pekerjaan Plat Beton Tebal 8 cm (Æ10 -100, 1 Lapis) K.175 1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175)
Rp. H = (C X F ) 863,307.02
94 1 m3 Pekerjaan Plat Beton Tebal 10 cm (Æ10 -200 2 Lapis) K.175 1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175)
Rp.
683,555.56
683,555.56
1.0000
1 Kg Pembesian dengan Besi Polos atau Besi Ulir
147.2500
kg
13,174.50
582.20
1,939,945.13
85,728.95
1 m2 Pasang Bekisting untuk Plat (2x pakai / 50%)
12.5000
m2
101,477.50
38,742.00
1,268,468.75
484,275.00
4,043,621.04
792,041.14
m3
683,555.56
72,594.50
683,555.56
72,594.50
96 1 m3 Pekerjaan Plat Beton Tebal 6 cm (Æ8 -100, 1 Lapis) K.175 1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175)
1.0000
TOTAL HARGA
G=(CXE) 4,403,349.66
m3
93 1 m3 Pekerjaan Plat Beton Tebal 12 cm (Æ10 -200 2 Lapis) K.175 1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175)
JUMLAH UPAH
72,594.50
1.0000
92 1 m3 Pekerjaan Balok Beton ukuran 20x30 cm (8Æ12, Æ 8-150) K.175 1 m3 Membuat beton mutu f’c = 14,5 MPa (K 175)
JUMLAH BAHAN
5,266,656.68
4,853,791.91
4,220,239.85
4,878,950.86
4,534,567.88
4,835,662.19
1 Kg Pembesian dengan Besi Polos atau Besi Ulir
126.6667
kg
13,174.50
582.20
1,668,770.44
73,745.35
1 m2 Pasang Bekisting untuk Plat (2x pakai / 50%)
16.6667
m2
101,477.50
38,742.00
1,691,295.05
645,701.29
97 1 m3 Membuat Pondasi Beton Bertulang ( 150 Kg + bekisting )
2,942,615.00
314,681.50
3,257,296.50
98 1 m3 Membuat sloof beton bertulang (200 kg besi + bekisting)
3,691,940.00
355,699.50
4,047,639.50
CATATAN : PEKERJAAN BETON ( Belum ada Gambar Detailnya )
Bahan Kayu Kelas III
0.2700
m3
1,150,000.00
310,500.00
Paku Biasa 5 - 12 Cm
2.0000
Kg
19,000.00
38,000.00
Minyak Bekisting
0.6000
Ltr
3,000.00
1,800.00
Besi Beton Polos
210.0000
Kg
12,240.00
2,570,400.00
Kawat Beton
3.0000
Kg
21,500.00
64,500.00
336.0000
Kg
1,340.00
450,240.00
Pasir Beton
0.5400
m3
154,000.00
83,160.00
Koral Beton
0.8100
m3
214,000.00
173,340.00
Perkerja
5.6500
OH
34,000.00
192,100.00
Tukang Batu
0.2750
OH
39,500.00
10,862.50
Tukang Kayu
1.5600
OH
41,500.00
64,740.00
Tukang Besi
1.4000
OH
41,500.00
58,100.00
Kepala Tukang
0.3230
OH
47,000.00
15,181.00
Mandor
0.2830
OH
52,000.00
14,716.00
Semen Portland
Tenaga
Analisa Harga Satuan Halaman 21
NO.
URAIAN KEBUTUHAN
INDEKS
SATUAN
HARGA SATUAN BAHAN Rp.
HARGA SATUAN UPAH Rp.
A
B
C
D
E
F
99 1 m3 Membuat kolom beton bertulang (300 kg besi + bekisting)
JUMLAH BAHAN
JUMLAH UPAH
TOTAL HARGA
Rp.
Rp.
Rp.
G=(CXE)
H = (C X F )
I=(G+H)
6,088,640.00
443,484.50
6,532,124.50
Bahan Kayu Kelas III
0.4000
m3
1,150,000.00
460,000.00
Paku Biasa 5 - 12 Cm
4.0000
Kg
19,000.00
76,000.00
Minyak Bekisting
2.0000
Ltr
3,000.00
6,000.00
Besi Beton Polos
315.0000
Kg
12,240.00
3,855,600.00
Kawat Beton
4.5000
Kg
21,500.00
96,750.00
336.0000
Kg
1,340.00
450,240.00
Pasir Beton
0.5400
m3
154,000.00
83,160.00
Koral Beton
0.8100
m3
214,000.00
173,340.00
Kayu Kelas II
0.1500
m3
1,642,000.00
246,300.00
Plywood 9 mm
3.5000
lbr
97,500.00
341,250.00
20.0000
btg
15,000.00
300,000.00
Perkerja
7.0500
OH
34,000.00
239,700.00
Tukang Batu
0.2750
OH
39,500.00
10,862.50
Tukang Kayu
1.6500
OH
41,500.00
68,475.00
Tukang Besi
2.1000
OH
41,500.00
87,150.00
Kepala Tukang
0.4030
OH
47,000.00
18,941.00
Mandor
0.3530
OH
52,000.00
18,356.00
Semen Portland
Dolken kayu galam, φ (8-10) cm, panjang 4 m Tenaga
100 1 m3 Membuat Balok beton bertulang (200 kg besi + bekisting)
4,518,120.00
385,524.50
4,903,644.50
Bahan Kayu Kelas III
0.3200
m3
1,150,000.00
368,000.00
Paku Biasa 5 - 12 Cm
3.2000
Kg
19,000.00
60,800.00
Minyak Bekisting
1.6000
Ltr
3,000.00
4,800.00
Besi Beton Polos
210.0000
Kg
12,240.00
2,570,400.00
Kawat Beton
3.0000
Kg
21,500.00
64,500.00
336.0000
Kg
1,340.00
450,240.00
Pasir Beton
0.5400
m3
154,000.00
83,160.00
Koral Beton
0.8100
m3
214,000.00
173,340.00
Kayu Kelas II
0.1400
m3
1,642,000.00
229,880.00
Plywood 9 mm
2.8000
lbr
97,500.00
273,000.00
16.0000
btg
15,000.00
240,000.00
Perkerja
6.3500
OH
34,000.00
215,900.00
Tukang Batu
0.2750
OH
39,500.00
10,862.50
Tukang Kayu
1.6500
OH
41,500.00
68,475.00
Tukang Besi
1.4000
OH
41,500.00
58,100.00
Kepala Tukang
0.3330
OH
47,000.00
15,651.00
Mandor
0.3180
OH
52,000.00
16,536.00
Semen Portland
Dolken kayu galam, φ (8-10) cm, panjang 4 m Tenaga
101 1 m3 Membuat plat beton bertulang (150 kg besi + bekisting)
4,066,555.00
314,822.50
4,381,377.50
Bahan Kayu Kelas III
0.3200
m3
1,150,000.00
368,000.00
Paku Biasa 5 - 12 Cm
3.2000
Kg
19,000.00
60,800.00
Minyak Bekisting
1.6000
Ltr
3,000.00
4,800.00
Besi Beton Polos
157.5000
Kg
12,240.00
1,927,800.00
Kawat Beton
2.2500
Kg
21,500.00
48,375.00
336.0000
Kg
1,340.00
450,240.00
Pasir Beton
0.5400
m3
154,000.00
83,160.00
Koral Beton
0.8100
m3
214,000.00
173,340.00
Kayu Kelas II
0.1200
m3
1,642,000.00
197,040.00
Plywood 9 mm
2.8000
lbr
97,500.00
273,000.00
32.0000
btg
15,000.00
480,000.00
Perkerja
5.3000
OH
34,000.00
180,200.00
Tukang Batu
0.2750
OH
39,500.00
10,862.50
Tukang Kayu
1.3000
OH
41,500.00
53,950.00
Tukang Besi
1.0500
OH
41,500.00
43,575.00
Semen Portland
Dolken kayu galam, φ (8-10) cm, panjang 4 m Tenaga
Analisa Harga Satuan Halaman 22
NO.
URAIAN KEBUTUHAN
INDEKS
SATUAN
HARGA SATUAN BAHAN Rp.
HARGA SATUAN UPAH Rp.
A
B
C
D
E
F
JUMLAH BAHAN
JUMLAH UPAH
TOTAL HARGA
Rp.
Rp.
Rp.
G=(CXE)
H = (C X F )
I=(G+H)
Kepala Tukang
0.2650
OH
47,000.00
12,455.00
Mandor
0.2650
OH
52,000.00
13,780.00
Analisa Harga Satuan Halaman 23
NO.
URAIAN KEBUTUHAN
INDEKS
SATUAN
HARGA SATUAN BAHAN Rp.
HARGA SATUAN UPAH Rp.
A
B
C
D
E
F
102 1 m3 Membuat Dinding beton bertulang (150 kg besi + bekisting)
JUMLAH BAHAN
JUMLAH UPAH
TOTAL HARGA
Rp.
Rp.
Rp.
G=(CXE)
H = (C X F )
I=(G+H)
3,920,235.00
314,681.50
4,234,916.50
Bahan Kayu Kelas III
0.2400
m3
1,150,000.00
276,000.00
Paku Biasa 5 - 12 Cm
3.2000
Kg
19,000.00
60,800.00
Minyak Bekisting
1.6000
Ltr
3,000.00
4,800.00
Besi Beton Polos
157.5000
Kg
12,240.00
1,927,800.00
Kawat Beton
2.2500
Kg
21,500.00
48,375.00
336.0000
Kg
1,340.00
450,240.00
Pasir Beton
0.5400
m3
154,000.00
83,160.00
Koral Beton
0.8100
m3
214,000.00
173,340.00
Kayu Kelas II
0.1600
m3
1,642,000.00
262,720.00
Plywood 9 mm
2.8000
lbr
97,500.00
273,000.00
24.0000
btg
15,000.00
360,000.00
Perkerja
5.3000
OH
34,000.00
180,200.00
Tukang Batu
0.2750
OH
39,500.00
10,862.50
Tukang Kayu
1.3000
OH
41,500.00
53,950.00
Tukang Besi
1.0500
OH
41,500.00
43,575.00
Kepala Tukang
0.2620
OH
47,000.00
12,314.00
Mandor
0.2650
OH
52,000.00
13,780.00
Semen Portland
Dolken kayu galam, φ (8-10) cm, panjang 4 m Tenaga
103 1 m3 Membuat Dinding beton bertulang (200 kg besi + bekisting)
4,315,900.00
355,699.50
4,671,599.50
Bahan Kayu Kelas III
0.2500
m3
1,150,000.00
287,500.00
Paku Biasa 5 - 12 Cm
3.0000
Kg
19,000.00
57,000.00
Minyak Bekisting
1.2000
Ltr
3,000.00
3,600.00
Besi Beton Polos
210.0000
Kg
12,240.00
2,570,400.00
Kawat Beton
3.0000
Kg
21,500.00
64,500.00
336.0000
Kg
1,340.00
450,240.00
Pasir Beton
0.5400
m3
154,000.00
83,160.00
Koral Beton
0.8100
m3
214,000.00
173,340.00
Kayu Kelas II
0.1050
m3
1,642,000.00
172,410.00
Plywood 9 mm
2.5000
lbr
97,500.00
243,750.00
14.0000
btg
15,000.00
210,000.00
Perkerja
5.6500
OH
34,000.00
192,100.00
Tukang Batu
0.2750
OH
39,500.00
10,862.50
Tukang Kayu
1.5600
OH
41,500.00
64,740.00
Tukang Besi
1.4000
OH
41,500.00
58,100.00
Kepala Tukang
0.3230
OH
47,000.00
15,181.00
Mandor
0.2830
OH
52,000.00
14,716.00
Semen Portland
Dolken kayu galam, φ (8-10) cm, panjang 4 m Tenaga
104 1 M' kolom praktis beton bertulang (11 x 11) cm
48,387.50
9,320.00
57,707.50
Bahan Kayu Kelas III
0.0020
m3
1,150,000.00
Paku Biasa 5 - 12 Cm
0.0100
Kg
19,000.00
2,300.00 190.00
Besi Beton Polos
3.0000
Kg
12,240.00
36,720.00
Kawat Beton
0.0450
Kg
21,500.00
967.50
Semen Portland
4.0000
Kg
1,340.00
5,360.00
Pasir Beton
0.0060
m3
154,000.00
924.00
Koral Beton
0.0090
m3
214,000.00
1,926.00
Perkerja
0.1800
OH
34,000.00
6,120.00
Tukang Batu
0.0200
OH
39,500.00
790.00
Tukang Kayu
0.0200
OH
41,500.00
830.00
Tukang Besi
0.0200
OH
41,500.00
830.00
Kepala Tukang
0.0060
OH
47,000.00
282.00
Mandor
0.0090
OH
52,000.00
468.00
Tenaga
Analisa Harga Satuan Halaman 24
NO.
URAIAN KEBUTUHAN
INDEKS
SATUAN
HARGA SATUAN BAHAN Rp.
HARGA SATUAN UPAH Rp.
A
B
C
D
E
F
105 1 M' Ring Balok beton bertulang (10 x 15) cm
JUMLAH BAHAN
JUMLAH UPAH
TOTAL HARGA
Rp.
Rp.
Rp.
G=(CXE)
H = (C X F )
I=(G+H)
60,935.00
15,390.50
76,325.50
Bahan Kayu kelas III
0.0030
m3
1,150,000.00
Paku Biasa 5 - 12 Cm
0.0200
Kg
19,000.00
3,450.00 380.00
Besi Beton Polos
3.6000
Kg
12,240.00
44,064.00
Kawat Beton
0.0500
Kg
21,500.00
1,075.00
Semen Portland
5.5000
Kg
1,340.00
7,370.00
Pasir Beton
0.0090
m3
154,000.00
1,386.00
Koral Beton
0.0150
m3
214,000.00
3,210.00
Perkerja
0.2970
OH
34,000.00
10,098.00
Tukang Batu
0.0330
OH
39,500.00
1,303.50
Tukang Kayu
0.0330
OH
41,500.00
1,369.50
Tukang Besi
0.0330
OH
41,500.00
1,369.50
Kepala Tukang
0.0100
OH
47,000.00
470.00
Mandor
0.0150
OH
52,000.00
780.00
Tenaga
VIII
PEKERJAAN PENTUP ATAP
106 1m2 Pasang Atap Genteng Palentong Kecil
45,000.00
9,004.50
54,004.50
107 1m' Pasang Genteng Bubung Palentong
32,124.00
22,944.00
55,068.00
108 1m' Pasang Genteng Bubung Palentong Besar
28,624.00
22,944.00
51,568.00
109 1m2 Pasang Atap Genteng Metal
117,020.00
11,472.00
128,492.00
110 1m2 Pasang Atap Sirap
169,800.00
17,610.00
187,410.00
Bahan Atap sirap 5 mm
60.000
lbr
2,750.00
165,000.00
Paku Biasa ½" - 1"
0.200
Kg
24,000.00
4,800.00
Perkerja
0.166
OH
34,000.00
5,644.00
Tukang Kayu
0.250
OH
41,500.00
10,375.00
Kepala Tukang
0.025
OH
47,000.00
1,175.00
Mandor
0.008
OH
52,000.00
416.00
Tenaga
Analisa Harga Satuan Halaman 25
NO.
URAIAN KEBUTUHAN
INDEKS
SATUAN
HARGA SATUAN BAHAN Rp.
HARGA SATUAN UPAH Rp.
A
B
C
D
E
F
111 1m' Pasang Nok Genteng Beton
JUMLAH BAHAN
JUMLAH UPAH
TOTAL HARGA
Rp.
Rp.
Rp.
G=(CXE)
H = (C X F )
I=(G+H)
205,326.00
23,880.00
229,206.00
Bahan Genteng Beton
3.500
bh
49,000.00
Paku Biasa 2" - 5"
0.050
Kg
19,000.00
171,500.00 950.00
Semen PC
10.800
Kg
1,340.00
14,472.00
Pasir Pasang
0.032
m3
122,000.00
3,904.00
Semen Warna
1.000
Kg
14,500.00
14,500.00
Perkerja
0.400
OH
34,000.00
13,600.00
Tukang Kayu
0.200
OH
41,500.00
8,300.00
Kepala Tukang
0.020
OH
47,000.00
940.00
Mandor
0.020
OH
52,000.00
1,040.00
Tenaga
112 1m' Pasang Nok Genteng Metal
53,900.00
16,106.00
70,006.00
Bahan Nok Genteng Metal
1.100
lbr
49,000.00
Paku Biasa 1/2" - 1"
0.050
Kg
24,000.00
53,900.00
Perkerja
0.250
OH
34,000.00
8,500.00
Tukang Kayu
0.150
OH
41,500.00
6,225.00
Kepala Tukang
0.015
OH
47,000.00
705.00
Mandor
0.013
OH
52,000.00
676.00
Tenaga
113 1m' Pasang Atap Nok Seng IX
10,260.00
4,103.00
14,363.00
37,620.00
18,021.00
55,641.00
PEKERJAAN LANGIT - LANGIT
114 1 m2 Pas. Rangka Plapond Kayu Lokal Kelas II (Hanya Rangka) Bahan Kayu Lokal Kelas II
0.0210
m3
1,540,000.00
32,340.00
Paku
0.2200
kg
24,000.00
5,280.00
Perkerja
0.1875
org
34,000.00
6,375.00
Tukang Kayu
0.2250
org
41,500.00
9,337.50
Kepala Tukang
0.0375
org
47,000.00
1,762.50
Mandor
0.0105
org
52,000.00
546.00
Tenaga
115 1 m2 Pas. Rangka Plapond Besi Hollow (Hanya Rangka)
59,250.00
17,650.00
76,900.00
Bahan Skrup 1"
25.0000
bh
240.00
Hollow 20/40 mm
0.2500
btg
30,000.00
6,000.00 7,500.00
Hollow 40/40 mm
0.6250
btg
46,000.00
28,750.00
Penggantungan
2.0000
bh
8,500.00
17,000.00
Perkerja
0.3000
org
34,000.00
10,200.00
Tukang Kayu
0.1500
org
41,500.00
6,225.00
Kepala Tukang
0.0150
org
47,000.00
705.00
Mandor
0.0100
org
52,000.00
520.00
Tenaga
116 1 m2 Pas. Langit-langit gypsum board ukuran (1200x2400x9) mm
27,938.00
5,970.00
33,908.00
Bahan Gypsum Board
0.3640
Lbr
69,500.00
25,298.00
Paku Skrup
0.1100
kg
24,000.00
2,640.00
Perkerja
0.1000
OH
34,000.00
3,400.00
Tukang Kayu
0.0500
OH
41,500.00
2,075.00
Kepala Tukang
0.0050
OH
47,000.00
235.00
Mandor
0.0050
OH
52,000.00
260.00
Tenaga
Analisa Harga Satuan Halaman 26
NO.
URAIAN KEBUTUHAN
INDEKS
SATUAN
HARGA SATUAN BAHAN Rp.
HARGA SATUAN UPAH Rp.
A
B
C
D
E
F
117 1 m2 langit-langit dari GRC Internal tebal 4 mm
JUMLAH BAHAN
JUMLAH UPAH
TOTAL HARGA
Rp.
Rp.
Rp.
G=(CXE)
H = (C X F )
I=(G+H)
24,480.00
5,970.00
30,450.00
Bahan GRC internal
0.3640
Lbr
60,000.00
21,840.00
Paku Skrup
0.1100
kg
24,000.00
2,640.00
Perkerja
0.1000
OH
34,000.00
3,400.00
Tukang Kayu
0.0500
OH
41,500.00
2,075.00
Kepala Tukang
0.0050
OH
47,000.00
235.00
Mandor
0.0050
OH
52,000.00
260.00
Tenaga
118 1 m' Pas. List Plapond gypsum board profil
10,455.00
4,968.00
15,423.00
Bahan List Gypsum profil
1.0500
m'
9,000.00
9,450.00
Tepung gypsum
0.1500
kg
6,700.00
1,005.00
Perkerja
0.0600
OH
34,000.00
2,040.00
Tukang Kayu
0.0600
OH
41,500.00
2,490.00
Kepala Tukang
0.0060
OH
47,000.00
282.00
Mandor
0.0030
OH
52,000.00
156.00
Tenaga
119 1 m2 List Langit - langit Kayu Profil X
4,965.00
4,166.00
9,131.00
1,131,000.00
164,017.00
1,295,017.00
254,260.00
172,070.00
426,330.00
2,349,260.00
83,400.00
2,432,660.00
PEKERJAAN SANITASI
120 Memasang 1 buah Kloset Duduk / Monoblok 121 Memasang 1 buah Kloset Jongkok Porselen 122 Memasang 1 buah Urinoir
Analisa Harga Satuan Halaman 27
NO.
URAIAN KEBUTUHAN
INDEKS
SATUAN
HARGA SATUAN BAHAN Rp.
HARGA SATUAN UPAH Rp.
A
B
C
D
E
F
JUMLAH BAHAN
JUMLAH UPAH
TOTAL HARGA
Rp.
Rp.
Rp.
G=(CXE)
H = (C X F )
I=(G+H)
123 Memasang 1 buah Wastafel
681,260.00
103,525.00
784,785.00
124 Memasang 1 buah Bak Mandi Fiberglass, volume 0.30 m3
258,420.00
198,950.00
457,370.00
125 Memasang 1 m' buah Bak Kontrol pasangan Batu Bata ukuran (45 x 45 )cm, t = 50cm
280,317.50
72,864.50
353,182.00
Bahan Bata merah
0.2500
m3
550.00
137.50
77.0000
Kg
1,340.00
103,180.00
Pasir Pasang
0.1300
m3
122,000.00
15,860.00
Batu Kerikil
0.0200
m3
214,000.00
4,280.00
Besi Beton
2.6000
m3
55,000.00
143,000.00
Pasir Beton
0.0900
m3
154,000.00
13,860.00
Perkerja
1.4200
OH
34,000.00
48,280.00
Tukang Batu
0.4730
OH
39,500.00
18,683.50
Kepala Tukang
0.0470
OH
47,000.00
2,209.00
Mandor
0.0710
OH
52,000.00
3,692.00
Semen Portland
Tenaga
126 Memasang 1 m' Pipa PVC tipe AW Ø ½"
7,517.50
3,969.60
11,487.10
127 Memasang 1 m' Pipa PVC tipe AW Ø ¾"
10,075.00
3,969.60
14,044.60
128 Memasang 1 m' Pipa PVC tipe AW Ø 1"
10,230.00
3,969.60
14,199.60
Analisa Harga Satuan Halaman 28
NO.
URAIAN KEBUTUHAN
INDEKS
SATUAN
HARGA SATUAN BAHAN Rp.
HARGA SATUAN UPAH Rp.
A
B
C
D
E
F
129 Memasang 1 m' Pipa PVC tipe D Ø 2½"
JUMLAH BAHAN
JUMLAH UPAH
TOTAL HARGA
Rp.
Rp.
Rp.
G=(CXE)
H = (C X F )
I=(G+H)
22,823.75
3,969.60
26,793.35
Bahan Pipa PVC tipe D Ø 2½"
1.2000
m'
14,725.00
17,670.00
Perlengkapan
35% Harga Pipa
5,153.75
5,153.75
Tenaga Perkerja
0.0360
OH
34,000.00
1,224.00
Tukang Batu
0.0600
OH
39,500.00
2,370.00
Kepala Tukang
0.0060
OH
47,000.00
282.00
Mandor
0.0018
OH
52,000.00
93.60
130 Memasang 1 m' Pipa PVC tipe D Ø 4"
47,817.50
8,934.20
56,751.70
Bahan Pipa PVC tipe D Ø 4"
1.2000
m'
30,850.00
37,020.00
Perlengkapan
35% Harga Pipa
10,797.50
10,797.50
Tenaga Perkerja
0.0810
OH
34,000.00
2,754.00
Tukang Batu
0.1350
OH
39,500.00
5,332.50
Kepala Tukang
0.0135
OH
47,000.00
634.50
Mandor
0.0041
OH
52,000.00
213.20
131 Memasang 1 bh Kran Ø ¾" atau ½"
81,592.50
5,020.00
86,612.50
132 Memasang 1 bh Floor Drain
55,000.00
5,020.00
60,020.00
103,000.00
3,342.80
106,342.80
XI
PEKERJAAN BESI DAN ALLUMINIUM
133 1 M' Kusen Alumunium Bahan Profil alumunium
1.1000
m'
92,600.00
101,860.00
Sealent
0.0600
tube
19,000.00
1,140.00
Perkerja
0.0430
OH
34,000.00
1,462.00
Tukang Khusus Alumunium
0.0430
OH
36,500.00
1,569.50
Kepala Tukang
0.0043
OH
47,000.00
202.10
Mandor
0.0021
OH
52,000.00
109.20
Tenaga
134 1 Unit Pasang Pintu PVC KM/WC lengkap Accessories
220,000.00
84,480.40
304,480.40
Bahan Pintu PVC lengkap Accessories
1.0000
unit
220,000.00
220,000.00
Perkerja
1.0500
OH
34,000.00
35,700.00
Tukang Kayu
1.0500
OH
41,500.00
43,575.00
Kepala Tukang
0.1050
OH
47,000.00
4,935.00
Mandor
0.0052
OH
52,000.00
270.40
Tenaga
Analisa Harga Satuan Halaman 29
NO.
URAIAN KEBUTUHAN
INDEKS
SATUAN
HARGA SATUAN BAHAN Rp.
HARGA SATUAN UPAH Rp.
A
B
C
D
E
F
135 1 m' Pasang Talang Datar/Jurai , Seng BJLS 28 lebar 90 cm
JUMLAH BAHAN
JUMLAH UPAH
TOTAL HARGA
Rp.
Rp.
Rp.
G=(CXE)
H = (C X F )
I=(G+H)
157,779.50
25,095.00
182,874.50
48,047.00
19,376.00
67,423.00
137 1 Buah Pasang Kunci Tanam Antik
108,000.00
29,916.00
137,916.00
138 1 Buah Pasang Kunci Tanam Biasa
42,000.00
21,820.00
63,820.00
139 1 Buah Pasang Kunci Slot
30,500.00
9,972.00
40,472.00
136 1 m' Pasang Talang ½ Lingkaran Ø 15 cm, Seng BJLS 28 Lebar 45 cm XII
PEKERJAAN KUNCI DAN KACA
Bahan Kunci Slot
1.0000
Bh
30,500.00
30,500.00
Pekerja
0.0200
OH
34,000.00
680.00
Tukang Kayu
0.2000
OH
41,500.00
8,300.00
Kepala Tukang
0.0200
OH
47,000.00
940.00
Mandor
0.0010
OH
52,000.00
52.00
Tenaga
140 1 Buah Pasang Engsel Pintu
18,000.00
7,479.00
25,479.00
141 1 Buah Pasang Engsel Angin Untuk Pintu
12,500.00
10,440.00
22,940.00
8,000.00
7,479.00
15,479.00
142 1 Buah Pasang Engsel Jendela
Analisa Harga Satuan Halaman 30
NO.
URAIAN KEBUTUHAN
INDEKS
SATUAN
HARGA SATUAN BAHAN Rp.
HARGA SATUAN UPAH Rp.
A
B
C
D
E
F
1.0000
Bh
8,000.00
Pekerja
0.0150
OH
34,000.00
510.00
Tukang Kayu
0.1500
OH
41,500.00
6,225.00
Kepala Tukang
0.0150
OH
47,000.00
705.00
Mandor
0.0008
OH
52,000.00
39.00
JUMLAH BAHAN
JUMLAH UPAH
TOTAL HARGA
Rp.
Rp.
Rp.
G=(CXE)
H = (C X F )
I=(G+H)
Bahan Engsel Jendela
8,000.00
Tenaga
143 1 Buah Pasang Kait angin 144 1 Buah Door Closer
12,500.00
7,479.00
19,979.00
300,000.00
24,930.00
324,930.00
Bahan Door Closer
1.0000
Bh
300,000.00
300,000.00
Pekerja
0.0500
OH
34,000.00
1,700.00
Tukang Kayu
0.5000
OH
41,500.00
20,750.00
Kepala Tukang
0.0500
OH
47,000.00
2,350.00
Mandor
0.0025
OH
52,000.00
130.00
Tenaga
145 1 Buah Pegangan Pintu/ Door Holder
215,000.00
24,930.00
239,930.00
Bahan Door Holder
1.0000
Bh
215,000.00
215,000.00
Pekerja
0.0500
OH
34,000.00
1,700.00
Tukang Kayu
0.5000
OH
41,500.00
20,750.00
Kepala Tukang
0.0500
OH
47,000.00
2,350.00
Mandor
0.0025
OH
52,000.00
130.00
Tenaga
146 1 Buah Door Stop
310,000.00
4,986.00
314,986.00
Bahan Door Stop
1.0000
Bh
310,000.00
310,000.00
Pekerja
0.0100
OH
34,000.00
340.00
Tukang Kayu
0.1000
OH
41,500.00
4,150.00
Kepala Tukang
0.0100
OH
47,000.00
470.00
Mandor
0.0005
OH
52,000.00
26.00
Tenaga
147 1 Buah Pasang Kaca tebal 3 mm
97,350.00
7,479.00
104,829.00
148 1 Buah Pasang Kaca tebal 5 mm
129,800.00
7,479.00
137,279.00
Bahan Kaca Polos
1.1000
m2
118,000.00
129,800.00
Perkerja
0.0150
OH
34,000.00
510.00
Tukang Kayu
0.1500
OH
41,500.00
6,225.00
Kepala Tukang
0.0150
OH
47,000.00
705.00
Mandor
0.0008
OH
52,000.00
39.00
Tenaga
149 1 Buah Pasang Kaca riben tebal 5 mm
129,800.00
12,871.00
142,671.00
Analisa Harga Satuan Halaman 31
NO.
URAIAN KEBUTUHAN
INDEKS
SATUAN
HARGA SATUAN BAHAN Rp.
HARGA SATUAN UPAH Rp.
A
B
C
D
E
F
XIII
JUMLAH BAHAN
JUMLAH UPAH
TOTAL HARGA
Rp.
Rp.
Rp.
G=(CXE)
H = (C X F )
I=(G+H)
PEKERJAAN PENUTUP LANTAI DAN DINDING
150 1 m2 Pasang Lantai Keramik 30 x 30 cm
80,640.00
41,090.00
121,730.00
151 1 m2 Pasang Lantai Keramik 30 x 30 cm (Corak)
83,640.00
41,090.00
124,730.00
Bahan Ubin Keramik 30 x 30 cm
11.8700
bh
3,622.58
43,000.00
Semen Portland
10.0000
Kg
1,340.00
13,400.00
Pasir Pasang
0.0450
m3
122,000.00
5,490.00
Semen Warna
1.5000
Kg
14,500.00
21,750.00
Perkerja
0.7000
OH
34,000.00
23,800.00
Tukang Batu
0.3500
OH
39,500.00
13,825.00
Kepala Tukang
0.0350
OH
47,000.00
1,645.00
Mandor
0.0350
OH
52,000.00
1,820.00
Tenaga
152 1 m2 Pasang Lantai Keramik 40 x 40 cm
88,140.00
41,090.00
129,230.00
Bahan Ubin Keramik 40 x 40 cm
6.2500
bh
7,600.00
47,500.00
10.0000
Kg
1,340.00
13,400.00
Pasir Pasang
0.0450
m3
122,000.00
5,490.00
Semen Warna
1.5000
Kg
14,500.00
21,750.00
Perkerja
0.7000
OH
34,000.00
23,800.00
Tukang Batu
0.3500
OH
39,500.00
13,825.00
Kepala Tukang
0.0350
OH
47,000.00
1,645.00
Mandor
0.0350
OH
52,000.00
1,820.00
Semen Portland
Tenaga
153 1 m2 Pasang Lantai Keramik 20 x 20 cm Anti Slip
90,416.00
41,090.00
131,506.00
Bahan Ubin Keramik
26.5000
bh
1,792.45
47,500.00
Semen Portland
10.4000
Kg
1,340.00
13,936.00
Pasir Pasang
0.0450
m3
122,000.00
5,490.00
Semen Warna
1.6200
Kg
14,500.00
23,490.00
Perkerja
0.7000
OH
34,000.00
23,800.00
Tukang Batu
0.3500
OH
39,500.00
13,825.00
Kepala Tukang
0.0350
OH
47,000.00
1,645.00
Mandor
0.0350
OH
52,000.00
1,820.00
Tenaga
154 1 m2 Pasang Dinding Keramik 20 x 25 cm (KIA)
101,388.00
52,830.00
154,218.00
Bahan Keramik 20 x 25 cm
20.0000
Bh
2,930.00
58,600.00
Semen Portland
9.3000
Kg
1,340.00
12,462.00
Pasir Pasang
0.0180
m3
122,000.00
2,196.00
Semen Warna
1.9400
Kg
14,500.00
28,130.00
Perkerja
0.9000
OH
34,000.00
30,600.00
Tukang Batu
0.4500
OH
39,500.00
17,775.00
Kepala Tukang
0.0450
OH
47,000.00
2,115.00
Mandor
0.0450
OH
52,000.00
2,340.00
Tenaga
155 1 m2 Pasang Dinding Keramik 25 x 40 cm (KIA)
102,788.00
52,830.00
155,618.00
Bahan Keramik 25 x 40 cm
10.0000
Bh
6,000.00
60,000.00
Semen Portland
9.3000
Kg
1,340.00
12,462.00
Pasir Pasang
0.0180
m3
122,000.00
2,196.00
Semen Warna
1.9400
Kg
14,500.00
28,130.00
0.9000
OH
Tenaga Perkerja
34,000.00
30,600.00
Analisa Harga Satuan Halaman 32
NO.
URAIAN KEBUTUHAN
INDEKS
SATUAN
HARGA SATUAN BAHAN Rp.
HARGA SATUAN UPAH Rp.
A
B
C
D
E
F
JUMLAH BAHAN
JUMLAH UPAH
TOTAL HARGA
Rp.
Rp.
Rp.
G=(CXE)
H = (C X F )
I=(G+H)
Tukang Batu
0.4500
OH
39,500.00
17,775.00
Kepala Tukang
0.0450
OH
47,000.00
2,115.00
Mandor
0.0450
OH
52,000.00
2,340.00
Analisa Harga Satuan Halaman 33
NO.
URAIAN KEBUTUHAN
INDEKS
SATUAN
HARGA SATUAN BAHAN Rp.
HARGA SATUAN UPAH Rp.
A
B
C
D
E
F
156 1 m2 Pasang Dinding batu Hitam uk.20x40 cm
JUMLAH BAHAN
JUMLAH UPAH
TOTAL HARGA
Rp.
Rp.
Rp.
G=(CXE)
H = (C X F )
I=(G+H)
151,940.00
41,090.00
193,030.00
Bahan Batu Tempel Hitam
1.1000
m2
112,000.00
123,200.00
11.7500
Kg
1,340.00
15,745.00
Pasir Pasang
0.0350
m3
122,000.00
4,270.00
Vernsi
0.1000
kg
84,000.00
8,400.00
Kwas 3"
0.0500
bh
6,500.00
325.00
Perkerja
0.7000
OH
34,000.00
23,800.00
Tukang Batu
0.3500
OH
39,500.00
13,825.00
Kepala Tukang
0.0350
OH
47,000.00
1,645.00
Mandor
0.0350
OH
52,000.00
1,820.00
Semen Portland (PC)
Tenaga
157 1 m2 Pasangan Glass Block
616,562.90
25,690.10
642,253.00
142,609.76
9,450.00
152,059.76
Bahan 158 1 m' Saluran Grevel Beton 1/2 DIA.20 CM + Pasangan Bahan Galian tanah
0.1500
m3
26,800.00
4,020.00
Grevel beton 20 cm
1.0000
bh
38,500.00
38,500.00
Pas.bata + Plesteran
1.0000
m'
100,089.76
100,089.76
1.0000
ls
9,450.00
Tenaga Upah kerja
9,450.00
159 1 M2 Pasangan Paving Block Natural 6 & 8 CM
79,393.60
32,581.00
111,974.60
Bahan Paving block natural 6 & 8 cm
1.0100
m2
63,360.00
63,993.60
Pasir beton
0.1000
m3
154,000.00
15,400.00
Perkerja
0.2500
org
34,000.00
8,500.00
Tukang Batu
0.5000
org
39,500.00
19,750.00
Kepala Tukang
0.0250
org
47,000.00
1,175.00
Mandor
0.0030
org
52,000.00
156.00
Peralatan
1.0000
lot
3,000.00
3,000.00
Tenaga
XIV
PEKERJAAN PENGECATAN
160 1 m2 Mengecatan Bidang Kayu Lama
24,040.00
5,975.00
30,015.00
161 1 m2 Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 2 Lapis Cat Penutup
35,930.00
3,165.50
39,095.50
Analisa Harga Satuan Halaman 34
NO.
URAIAN KEBUTUHAN
INDEKS
SATUAN
HARGA SATUAN BAHAN Rp.
HARGA SATUAN UPAH Rp.
A
B
C
D
E
F
JUMLAH BAHAN
JUMLAH UPAH
TOTAL HARGA
Rp.
Rp.
Rp.
G=(CXE)
H = (C X F )
I=(G+H)
162 1 m2 Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup
41,420.00
7,055.50
48,475.50
163 1 m2 Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
12,820.00
3,720.60
16,540.60
164 1 m2 Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
7,020.00
3,720.60
10,740.60
Bahan Cat Tembok (Metrolite)
0.2600
Kg
27,000.00
7,020.00
Perkerja
0.0200
OH
34,000.00
680.00
Tukang Cat
0.0630
OH
41,500.00
2,614.50
Kepala Tukang
0.0063
OH
47,000.00
296.10
Mandor
0.0025
OH
52,000.00
130.00
Tenaga
165 1 m2 Pengecatan Tembok Lama ( 2 Lapis Cat Penutup )
7,020.00
3,720.60
10,740.60
Bahan Cat Tembok (Metrolite)
0.2600
Kg
27,000.00
7,020.00
Perkerja
0.0200
OH
34,000.00
680.00
Tukang Cat
0.0630
OH
41,500.00
2,614.50
Kepala Tukang
0.0063
OH
47,000.00
296.10
Mandor
0.0025
OH
52,000.00
130.00
Tenaga
XIV
PEKERJAAN INSTALASI LISTRIK
166 1 Bh Titik Lampu Lengkap TL 20 Wat
85,000.00
4,954.50
89,954.50
Bahan 1.0000
titik
Tukang Listrik
0.0630
OH
41,500.00
2,614.50
Mandor
0.0450
OH
52,000.00
2,340.00
Titik Lampu Komplit
85,000.00
85,000.00
Tenaga
167 1 Bh Titik Sakelar Single
16,000.00
4,954.50
20,954.50
Bahan 1.0000
Bh
Tukang Listrik
0.0630
OH
41,500.00
2,614.50
Mandor
0.0450
OH
52,000.00
2,340.00
Sakelar single
16,000.00
16,000.00
Tenaga
168 1 Bh Titik Sakelar Doubel
20,000.00
4,954.50
24,954.50
Bahan 1.0000
Bh
Tukang Listrik
0.0630
OH
41,500.00
2,614.50
Mandor
0.0450
OH
52,000.00
2,340.00
Sakelar Doubel
20,000.00
20,000.00
Tenaga
169 1 M Pasang Kabel NYM 3 x 2 1/2
11,940.00
4,954.50
16,894.50
Bahan 1.0000
m'
Tukang Listrik
0.0630
OH
41,500.00
2,614.50
Mandor
0.0450
OH
52,000.00
2,340.00
Kabel NYM 3 x 2 1/2
11,940.00
11,940.00
Tenaga
Analisa Harga Satuan Halaman 35
NO.
URAIAN KEBUTUHAN
INDEKS
SATUAN
HARGA SATUAN BAHAN Rp.
HARGA SATUAN UPAH Rp.
A
B
C
D
E
F
170 1 Bh Box MCB
JUMLAH BAHAN
JUMLAH UPAH
TOTAL HARGA
Rp.
Rp.
Rp.
G=(CXE)
H = (C X F )
I=(G+H)
366,000.00
4,954.50
370,954.50
Bahan 1.0000
Bh
Tukang Listrik
0.0630
OH
41,500.00
2,614.50
Mandor
0.0450
OH
52,000.00
2,340.00
Bok MCB
366,000.00
366,000.00
Tenaga
171 1 Bh Titik Stop Kontak
15,000.00
4,954.50
19,954.50
Bahan 1.0000
Bh
Tukang Listrik
0.0630
OH
41,500.00
2,614.50
Mandor
0.0450
OH
52,000.00
2,340.00
Stop Kontak
15,000.00
15,000.00
Tenaga
172 1 Bh Pipa Arde
-
4,954.50
4,954.50
Bahan 1.0000
Bh
Tukang Listrik
0.0630
OH
41,500.00
2,614.50
Mandor
0.0450
OH
52,000.00
2,340.00
Pipa Arde P.3 m
-
-
Tenaga
173 1 Bh Pasangan Lampu
55,000.00
4,954.50
59,954.50
Bahan Lampu XL 14 watt (Philips)
1.0000
Bh
Dudukan Lampu
1.0000
Bh
Tukang Listrik
0.0630
OH
41,500.00
2,614.50
Mandor
0.0450
OH
52,000.00
2,340.00
55,000.00
55,000.00
Tenaga
KUNINGAN, JANUARI 2012
Analisa Harga Satuan Halaman 36
1 2 4 5
#REF!
6 7 174 175 176 182 183 189
218 224 225 231 232
238 239 245 246
Analisa Harga Satuan Halaman 37
5
#REF!
6 7 254 255 263
273 274 293 302 303 313 314 324
Analisa Harga Satuan Halaman 38
5
#REF!
6 7
325 326
360 370
371 372 373 382
Analisa Harga Satuan Halaman 39
5
#REF!
6 7 383 392
478 487
659 668
Analisa Harga Satuan Halaman 40
5
#REF!
6 7 669 678
710 711
731 778 779
Analisa Harga Satuan Halaman 41
5
#REF!
6 7 806 807 870 881
905 906
Analisa Harga Satuan Halaman 42
5
#REF!
6 7
1029 1039
1059 1060
Analisa Harga Satuan Halaman 43
5
#REF!
6 7
1
3000
0.0006 1666.6666667 5000000
1221 1230
Analisa Harga Satuan Halaman 44
5
#REF!
6 7 1250
1283 1293 1316 1326 1327 1339
Analisa Harga Satuan Halaman 45
5
#REF!
6 7 1370 1371
0.6207142857 0.0880176211
Analisa Harga Satuan Halaman 46
5
#REF!
6 7
1611 1620
1664 1674
Analisa Harga Satuan Halaman 47
5
#REF!
6 7 1675 1685 1686 1699 1700 1713 1714 1727
Analisa Harga Satuan Halaman 48
5
#REF!
6 7
33.333333333 1
0.7 1.4285714286
23.333333333
82.6446280992 51322.855142
#REF!
82.6446280992
59994.72397
60.6060606061 75961.227604
Analisa Harga Satuan Halaman 49
5
#REF!
6 7
1757
Analisa Harga Satuan Halaman 50
5
#REF!
6 7
1974 1975 1976 1984 2003 2013 2025 2035 2298 2307
Analisa Harga Satuan Halaman 51
5
#REF!
6 7
2374 2383 2413 2414
Analisa Harga Satuan Halaman 52
5
#REF!
6 7
1256 70 1326
2610 2619 2665 2666 2667 2676 2677 2687 2700 2711
Analisa Harga Satuan Halaman 53
5
#REF!
6 7 2712 2723 2735
0.6
0.6
0.9
0.324
2744
2931 2940 2941 2950 2951 2960
Analisa Harga Satuan Halaman 54
5
#REF!
6 7
3033 3042 3043 3051 3072 3073
Analisa Harga Satuan Halaman 55
5
#REF!
6 7 3238 3249 3262 3273 3286 3287 3288 3296 3297 3305
3324 3332 3342 3350
Analisa Harga Satuan Halaman 56
5
#REF!
6 7
3360 3368
3423 3431
3432 3440
Analisa Harga Satuan Halaman 57
5
#REF!
6 7 3504 3505 4009 4020
0.2
1
0.25
20
0.05
Analisa Harga Satuan Halaman 58
5
#REF!
6 7
4329 4338
4429 4430 4490 4500 4501 4512
Analisa Harga Satuan Halaman 59
5
#REF!
6 7 4526 4538 4580 4590
Analisa Harga Satuan Halaman 60
HARGA SATUAN UPAH
NO.
JENIS UPAH
1
2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
Perkerja / Buruh tak terlatih Buruh terlatih Tukang Batu Tukang Besi Tukang Besi Konstruksi Tukang Cat Tukang Gali Tukang Kayu Tukang Listrik Tukang Las Kepala Tukang Mandor Operator kurang terlatih Operator terlatih Supir truk Pembantu supir Tukang plituran
HARGA UPAH Rp. 3 34,000.00 36,500.00 39,500.00 41,500.00 49,500.00 41,500.00 34,500.00 41,500.00 41,500.00 43,000.00 47,000.00 52,000.00 50,000.00 53,000.00 44,500.00 36,000.00 42,500.00
SATUAN 4 Org/Hr Org/Hr Org/Hr Org/Hr Org/Hr Org/Hr Org/Hr Org/Hr Org/Hr Org/Hr Org/Hr Org/Hr Org/Hr Org/Hr Org/Hr Org/Hr Org/Hr
#REF!
32,200.00 33,000.00 37,500.00 39,500.00 47,250.00 39,500.00 33,000.00 39,500.00 39,500.00 41,000.00 44,500.00 49,500.00 47,850.00 50,600.00 42,350.00 34,100.00 39,500.00
HARGA SATUAN BAHAN
NO
JENIS BAHAN
1
2
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52
Aluminium foil @60 m Bak mandi fiber glass oval 120 ltr Bata merah Batu belah uk. 15-20 cm Batu candi Rooster bata Uk. 12 x 22 untuk gapura (biasa) Besi beton/Baja tulangan beton Besi U / langko kuda-kuda Besi Hollow 40/40 mm Cat luar EMCO LUX warna sedang Cat meni Emco Cat tembok Metrolit Vernis / coating Closet duduk TOTO/INA Closet jongkok porselin merk INA / TOTO (putih) Engsel jendela nylon Engsel pintu nylon Genteng Natural Nok Bulat Genteng pres jatiwangi tipe Plentong Natural Grevel beton dia 1/2 dia. 20 cm Kabel NYM 3 x 2 1/2 - 50 m' Kaca polos tebal 3 mm Kaca polos tebal 5 mm Kait Angin Kawat beton Kayu dolken dia. 10 cm Kayu lokal kelas II Kayu lanan Kayu Stoot bekisting Kayu Usuk 5/7 lanan Kayu Reng 2/3 Lanan Kayu kaso 5/7 kelas II Kayu Reng 2/3 kelas II Keramik dinding 20/25 motif (KIA) Keramik dinding 25/40 motif (KIA) Keramik 20/20 anti slip Keramik Lantai 30/30 motif sekw. Mulia Keramik Lantai 30/30 putih sekw. Mulia Keramik Lantai 40/40 putih sekw. KIA Krikil beton (split) uk. 2-3 cm Kran dia. 1/2'' SAN''EI Kunci tanam besar merk Viali Kunci tanam sedang Js Itali kwas 3" Langko kuda-kuda Lem kayu fox List kayu profil 3 x 3 cm Minyak Bekisting Paku biasa 1'' Paku biasa 2' - 5'' Paku Seng Paku skrup 1''
HARGA BAHAN Rp. 3 430,000.00 219,000.00 550.00 105,000.00 112,000.00 4,250.00 12,240.00 30,500.00 46,000.00 61,000.00 32,000.00 27,000.00 84,000.00 870,000.00 245,000.00 8,000.00 18,000.00 3,500.00 1,800.00 38,500.00 597,000.00 88,500.00 118,000.00 12,500.00 21,500.00 15,000.00 2,685,000.00 5,936,000.00 1,642,000.00 3,650,000.00 1,800,000.00 1,540,000.00 1,360,000.00 58,600.00 60,000.00 47,500.00 43,000.00 40,000.00 47,500.00 214,000.00 81,500.00 108,000.00 42,000.00 6,500.00 30,500.00 32,000.00 18,000.00 3,000.00 24,000.00 19,000.00 24,700.00 240.00
SATUAN 4 rol bh bh m³ m² bh kg kg btg kg kg kg kg bh bh bh bh bh bh m' rol m² m² bh kg btg m³ m³ m³ m³ m³ m³ m³ m² m² m² m² m² m² m³ bh bh bh bh bh kg btg ltr kg kg kg bh
Halaman : 93
NO
JENIS BAHAN
1
2
53 54 55 56 57 58 59 60 61
Panel Box Zekering / MCB Papan borneo / MC Papan gipsum (plapond) 9 mm Papan Lanan Papan kayu lokal kelas II (mahoni) Papan terentang (Perancah/Acuan beton) Paping blok/conblok T = 6 cm Papan Calsiplank GRC (0,8x20)cm Pasir beton
HARGA BAHAN Rp. 3 366,000.00 5,936,000.00 69,500.00 7,056,000.00 2,900,000.00 1,150,000.00 1,760.00 45,000.00 154,000.00
SATUAN 4 unit m³ lbr m³ m³ m³ bh btg m³
Halaman : 93
NO
JENIS BAHAN
1
2
62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107
Pasir pasang Pasir urug/ timbunan Plamir kayu tawon kensai Plamour tembok Viny paint Semen adepsip (Gip) Semen Portlan (PC) (50 kg) Semen Warna Seng Plat 0,3 (lebar = 55 cm) Seng Plat 0,3 (lebar = 90 cm) Sirtu tidak tersaring Tanah urug / bahan timbuhan tindihan Teakwood 0,9 x 2,2 x 3 mm ukuran pintu Wastafel lengkap Lampu TL 20 watt komplit Lampu SL 14 watt (Philip) Besi Pipa dia. 6" Medium Pipa Paralon / PVC dia. 1/2" wavin type AW Pipa Paralon / PVC dia. 3/4" wavin type AW Pipa Paralon / PVC dia. 1" wavin type AW Pipe paralon / PVC dia. 2 1/2" wavin type D Pipa paralon /PVC dia. 4" wavin type D Lem PVC Seal Tape Plafond GRC Internal 4mm Polywood 1.20 x 2 .40 cm Kusen Alumunium 4" Daun pintu rangka alumunium natural kaca bening 5 mm Daun jendela natural kaca bening 5 mm Atap metal List gypsum 7 cm Pintu Fiber KM/WC Floor drain stainless Glass block 20 x 20 cm Rooster keramik 20/20 Baja ringan Genting metal untuk konstruksi baja ringan Genting bubungan metal untuk konstruksi baja ringan Wiremesh di las Kunci Door Holder Kunci Door Stop Kunci Door Closer Urinoir (lengkap) Atap sirap 5 mm Saklar single (broco) Saklar doble (broco) Stop kontak
HARGA BAHAN Rp. 3 122,000.00 55,000.00 22,000.00 31,000.00 6,700.00 67,000.00 14,500.00 31,000.00 42,500.00 47,000.00 42,000.00 85,000.00 600,000.00 85,000.00 55,000.00 2,422,800.00 19,400.00 26,000.00 26,400.00 58,900.00 123,400.00 8,200.00 3,700.00 60,000.00 97,500.00 92,600.00 1,525,000.00 732,000.00 111,000.00 18,000.00 220,000.00 55,000.00 24,500.00 33,600.00 167,500.00 110,000.00 49,000.00 12,000.00 215,000.00 310,000.00 300,000.00 1,800,000.00 165,000.00 16,000.00 20,000.00 15,000.00
SATUAN 4 m³ m³ kg kg kg zax kg lbr lbr m³ m³ lbr bh bh bh btg btg btg btg btg btg tube bh lbr lbr m' m² m² m² m' bh bh bh bh m² bh bh kg bh bh bh unit ikat bh bh bh
Halaman : 93
430,000.00 219,000.00 540.00 96,000.00 112,000.00 4,250.00 12,100.00 26,000.00 46,000.00 54,900.00 32,000.00 25,000.00 68,000.00 870,000.00 150,000.00 7,000.00 17,500.00 3,250.00 1,200.00 27,000.00 420,000.00 43,000.00 67,000.00 12,500.00 21,000.00 14,600.00 2,684,000.00 5,936,000.00 1,500,000.00 3,561,000.00 1,543,000.00 1,540,000.00 1,320,000.00 58,560.00 59,000.00 42,500.00 40,200.00 30,500.00 39,000.00 185,000.00 81,500.00 103,000.00 39,800.00 6,500.00 24,400.00 32,000.00 18,000.00 3,000.00 24,000.00 19,000.00 24,700.00 240.00
Halaman : 93
366,000.00 5,936,000.00 63,000.00 7,056,000.00 2,900,000.00 1,037,000.00 1,200.00 45,000.00 154,000.00
Halaman : 93
120,000.00 55,000.00 22,000.00 30,500.00 6,000.00 64,000.00 14,000.00 30,500.00 40,000.00 47,000.00 42,000.00 81,000.00 608,000.00 61,000.00 54,900.00 2,202,600.00 17,700.00 23,650.00 24,000.00 53,550.00 112,200.00 2,900.00 58,000.00 84,000.00 76,000.00 1,525,000.00 732,000.00 111,000.00 18,000.00 220,000.00 55,000.00 22,400.00 33,600.00 167,500.00 110,000.00 49,000.00 12,000.00 215,000.00 310,000.00 300,000.00 1,800,000.00 165,000.00 12,000.00 15,500.00 12,000.00
Halaman : 93
RENCANA ANGGARAN BIAYA PEMBANGUNAN RUMAH TINGGAL TYPE 58 M2 TAHUN 2016
NO.
URAIAN
VOLUME
1
2
3
I
HARGA SATUAN
JUMLAH
Rp.
Rp.
4
5
PEKERJAAN PERSIAPAN 1 Pekerjaan Pengukuran kembali (site) & Pemasangan Bouwplank
1.00 ls
500,000.00
500,000.00
2 Pembuatan gudang kerja / Direksikeet
1.00 ls
3,000,000.00
3,000,000.00
3 Pembuatan Stegger dari Bambu
1.00 ls
500,000.00
500,000.00
Jumlah
II
4,000,000.00
PEKERJAAN TANAH 1 Pek. Galian tanah biasa max kedalaman 1 m'
83.58 m³
26,800.00
2,239,944.00
2 Pek. Urugan tanah kembali bekas galian dipadatkan (Per 20 cm)
28.36 m³
8,933.33
253,331.47
3 Pek. Pemadatan tanah Per 20 cm
18.90 m³
19,600.00
370,440.00
Jumlah
III
2,863,715.47
PEKERJAAN PONDASI 1 Pek. Urugan pasir dibawah pondasi
5.56 m³
76,720.00
426,870.08
2 Pasangan Batu kosong (Aanstamping)
12.02 m³
195,546.00
2,349,876.28
3 Pasangan Pondasi batu belah camp.1 Pc : 5Psr
24.51 m³
462,658.00
11,339,747.58
Jumlah
IV
14,116,493.94
PEKERJAAN BETON 1 Pas. Sloof beton bertulang uk. 15x20 cm (K.75) - Adukan beton (175) - Pembesian - Bekisting (2 x pakai)
2.93 m³
756,150.06
2,214,007.36
445.06 kg
13,756.70
6,122,501.88
39.04 m²
88,794.00
3,466,509.09
1.52 m³
756,150.06
1,150,104.23
231.19 kg
13,756.70
3,180,438.99
20.28 m²
88,794.00
1,800,737.82
1.41 m³
756,150.06
1,066,171.58
229.99 kg
13,756.70
3,163,857.36
25.85 m²
88,794.00
2,295,320.73
2 Pas. Kolom beton bertulang uk. 15x20 cm (K.175) - Adukan beton (175) - Pembesian - Bekisting (2 x pakai) 3 Pas. Ring Balok beton bertulang uk. 15x20 cm (K.175) - Adukan beton (175) - Pembesian - Bekisting (2 x pakai) Jumlah
24,459,649.04
Hal : 69
NO.
URAIAN
VOLUME
1
2
3
V
HARGA SATUAN
JUMLAH
Rp.
Rp.
4
5
PEKERJAAN DINDING 1 Pas. Dinding bata merah uk(5 x 11 x 22) cm tebal ½ bata, camp.1Pc : 3Ps
7.20 m²
78,035.80
561,857.76
2 Pas. Dinding bata merah uk(5 x 11 x 22) cm tebal ½ bata, camp.1Pc : 5Ps
158.71 m²
72,361.20
11,484,373.69
3 Pek. Plesteran dinding 1Pc : 3Ps tebal 15 mm
14.40 m²
30,835.84
444,036.10
4 Pek. Plesteran dinding 1Pc : 5Ps tebal 15 mm
317.42 m²
27,728.56
8,801,544.06
5 Pekerjaan Acian pada plesteran
331.82 m²
16,095.00
5,340,610.71
14.40 m²
154,218.00
2,220,739.20
6 Pasangan Dinding keramik uk.20x25 cm (KM/WC) Jumlah
VI
28,853,161.51
PEKERJAAN KUSEN PINTU, JENDELA, DAUN PINTU, dan DAUN JENDELA 1 Pasang Kusen pintu dan jendela kayu lanan 2 Pasang Daun pintu panel kayu lanan 3 Pemasangan Pintu PVC KM/WC lengkap accessories
0.69 m³
8,174,400.00
5,607,638.40
18.86 m²
473,440.00
8,928,131.52
304,480.40
304,480.40
1.00 unit Jumlah
14,840,250.32
VII PEKERJAAN KONSTRUKSI ATAP DAN PENUTUP ATAP 1 Pasang Konstruksi Kuda - kuda Kayu Lanan
1.78 m³
7,794,300.00
13,905,031.20
2 Pasang Konstruksi Gordeng, Ikatan angin, Ikatan gempa Kayu Lanan
1.81 m³
7,464,580.00
13,525,818.96
173.59 m²
70,610.00
12,257,189.90
44.00 m'
91,466.00
4,024,504.00
3 Pasang Rangka Atap Kayu Lanan 4 Pasang Lisplank ( 3 x 30 )cm Kayu lanan Jumlah
43,712,544.06
Hal : 70
NO.
URAIAN
VOLUME
1
2
3
HARGA SATUAN
JUMLAH
Rp.
Rp.
4
5
VIII PEKERJAAN PLAPOND 1 Pemasangan rangka plapond Kayu Kls II (Hanya Rangka)
104.00 m²
55,641.00
5,786,664.00
2 Pemasangan plapond dari GRC tebal 4 mm
104.00 m²
30,450.00
3,166,800.00
85.00 m'
9,131.00
776,135.00
3 Pemasangan list plapond kayu profil Jumlah
IX
9,729,599.00
PEKERJAAN PENUTUP LANTAI 1 Pek. Urugan pasir dibawah lantai
3.15 m³
76,720.00
241,668.00
2 Pasang Lantai Keramik uk.20 x 20 cm Anti Slip KM/WC
1.50 m²
131,506.00
197,259.00
61.50 m²
121,730.00
7,486,395.00
3 Pasang Lantai Keramik uk.30 x 30 cm (polos) Jumlah
X
7,925,322.00
PEKERJAAN SANITASI 1 Pemasangan kloset jongkok porselen
1.00 unit
426,330.00
426,330.00
2 Pasang bak mandi fiberglass vol. 0,03 m³
1.00 bh
457,370.00
457,370.00
3 Memasang Pipa PVC tipe AW Ø ½"
21.00 m'
11,487.10
241,229.10
4 Memasang Pipa PVC tipe D Ø 2½"
21.00 m'
26,793.35
562,660.35
5 Memasang 1 m' Pipa PVC tipe D Ø 4"
21.00 m'
56,751.70
1,191,785.70
6 Memasang Kran Ø ¾" atau ½"
5.00 bh
86,612.50
433,062.50
7 Memasang Floor Drain
1.00 bh
60,020.00
60,020.00
8 Memasang Septic tank 3.75 m³ berikut rembesan
unit
1,750,000.00
-
9 Pengadaan air bersih (sumur gali, water turn, pompa) lengkap dengan accesories
ls
5,500,000.00
-
Jumlah
3,372,457.65
Hal : 71
NO.
URAIAN
VOLUME
1
2
3
XI
HARGA SATUAN
JUMLAH
Rp.
Rp.
4
5
PEKERJAAN KUNCI DAN KACA 1 Pasang Kunci Tanam Biasa
6.00 bh
63,820.00
382,920.00
2 Pasang Engsel Pintu
18.00 bh
25,479.00
458,622.00
3 Pasang Engsel Jendela
28.00 bh
15,479.00
433,412.00
5 Pasang Kait angin
14.00 bh
19,979.00
279,706.00
6 Pasang Kunci Selot pintu dan jendela
14.00 bh
40,472.00
566,608.00
8 Pasang Kaca tebal 5 mm
14.42 m²
137,279.00
1,979,563.18
Jumlah
XII
4,100,831.18
PEKERJAAN INSTALASI LISTRIK 1 Biaya Pasang Baru termasuk Instalasi dari PLN (900 watt) 2 Biaya Penambahan daya dari PLN 3 Pemasangan Box MCB
1.00 Ls
3,000,000.00
Ls
750,000.00
1.00 unit
370,954.50
3,000,000.00 370,954.50
4 Pemasangan kabel listrik
m'
16,894.50
-
5 Pemasangan titik lampu TL 25 watt (kumplit)
ttk
89,954.50
-
6 Pemasangan lampu XL 14 watt (Philips)
9.00 bh
59,954.50
539,590.50
7 Pemasangan stop kontak
5.00 bh
19,954.50
99,772.50
8 Pemasangan saklar single
2.00 bh
20,954.50
41,909.00
9 Pemasangan saklar double
3.00 bh
24,954.50
74,863.50
Ls
2,500,000.00
10 Pemasangan instalasi anti petir (Arde) Jumlah
4,127,090.00
XIII PEKERJAAN PENGECATAN 1 Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 2 Lapis Cat Penu
150.02 m²
39,095.50
5,864,911.43
2 Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
317.42 m²
16,540.60
5,250,284.17
3 Pengecatan plapond dengan cat tembok
104.00 m²
10,740.60
1,117,022.40
4 Mengecatan Bidang Kayu Lama
m²
30,015.00
-
5 Pengecatan Tembok Lama (2 Lapis Cat Penutup)
m²
10,740.60
-
Jumlah
12,232,218.00
XIV PEKERJAAN LAIN LAIN 1 Pengadaan alat pemadam kebakaran
bh
1,250,000.00
2 Biaya pemberesan dan penyelesaian
1.00 Ls
500,000.00
500,000.00 -
Hal : 72
NO.
URAIAN
VOLUME
1
2
3
HARGA SATUAN
JUMLAH
Rp.
Rp.
4
5
Jumlah
500,000.00
REKAPITULASI RENCANA ANGGARAN BIAYA PEMBANGUNAN RUMAH TINGGAL TYPE 58 M2 TAHUN 2016
NAMA KEGIATAN LOKASI
: :
NO.
URAIAN
1
I II III IV V VI VII VIII IX X XI XII XIII XIV
JUMLAH
2
3
PEKERJAAN PERSIAPAN
4,000,000.00
PEKERJAAN TANAH PEKERJAAN PONDASI PEKERJAAN BETON PEKERJAAN DINDING PEKERJAAN KUSEN PINTU, JENDELA, DAUN PINTU, dan DAUN JENDELA PEKERJAAN KONSTRUKSI ATAP DAN PENUTUP ATAP PEKERJAAN PLAPOND PEKERJAAN PENUTUP LANTAI PEKERJAAN SANITASI PEKERJAAN KUNCI DAN KACA PEKERJAAN INSTALASI LISTRIK PEKERJAAN PENGECATAN PEKERJAAN LAIN LAIN
2,863,715.47 14,116,493.94 24,459,649.04 28,853,161.51 14,840,250.32 43,712,544.06 9,729,599.00 7,925,322.00 3,372,457.65 4,100,831.18 4,127,090.00 12,232,218.00 500,000.00 JUMLAH I DIBULATKAN
174,833,332.17 174,833,000.00
TERBILANG : ( SERATUS TUJUH PULUH EMPAT JUTA DELAPAN RATUS TIGA PULUH TIGA RIBU RUPIAH )
Hal : 73
RENCANA ANGGARAN BIAYA PEMBANGUNAN RUMAH TINGGAL TYPE 58 M2 TAHUN 2016
BOBOT POS PEKERJAAN NO.
URAIAN
VOLUME
TERHADAP
TINGKAT PELAKSANAAN POS PEKERJAAN
SELESAI PEKERJAAN 1 I
2
3
5
PEKERJAAN PERSIAPAN 1 Pekerjaan Pengukuran kembali (site) & Pemasangan Bouwplank
1.00 ls
0.286
2 Pembuatan gudang kerja / Direksikeet
1.00 ls
1.716
3 Pembuatan Stegger dari Bambu
1.00 ls
0.286
Jumlah
II
4
2.29
PEKERJAAN TANAH 1 Pek. Galian tanah biasa max kedalaman 1 m'
83.58 m³
1.281
2 Pek. Urugan tanah kembali bekas galian dipadatkan (Per 20 cm)
28.36 m³
0.145
3 Pek. Pemadatan tanah Per 20 cm
18.90 m³
0.212
Jumlah
III
1.64
PEKERJAAN PONDASI 1 Pek. Urugan pasir dibawah pondasi
5.56 m³
0.244
2 Pasangan Batu kosong (Aanstamping)
12.02 m³
1.344
3 Pasangan Pondasi batu belah camp.1 Pc : 5Psr
24.51 m³
6.486
Jumlah
IV
8.07
PEKERJAAN BETON 1 Pas. Sloof beton bertulang uk. 15x20 cm (K.75) - Adukan beton (175) - Pembesian - Bekisting (2 x pakai)
2.93 m³
1.266
445.06 kg
3.502
39.04 m²
1.983
1.52 m³
0.658
231.19 kg
1.819
20.28 m²
1.030
1.41 m³
0.610
2 Pas. Kolom beton bertulang uk. 15x20 cm (K.175) - Adukan beton (175) - Pembesian - Bekisting (2 x pakai) 3 Pas. Ring Balok beton bertulang uk. 15x20 cm (K.175) - Adukan beton (175)
- Pembesian - Bekisting (2 x pakai)
229.99 kg
1.810
25.85 m²
1.313
Jumlah
V
13.99
PEKERJAAN DINDING 1 Pas. Dinding bata merah uk(5 x 11 x 22) cm tebal ½ bata, camp.1Pc : 3Ps
7.20 m²
0.321
2 Pas. Dinding bata merah uk(5 x 11 x 22) cm tebal ½ bata, camp.1Pc : 5Ps
158.71 m²
6.569
3 Pek. Plesteran dinding 1Pc : 3Ps tebal 15 mm
14.40 m²
0.254
4 Pek. Plesteran dinding 1Pc : 5Ps tebal 15 mm
317.42 m²
5.034
5 Pekerjaan Acian pada plesteran
331.82 m²
3.055
14.40 m²
1.270
6 Pasangan Dinding keramik uk.20x25 cm (KM/WC) Jumlah
VI
16.50
PEKERJAAN KUSEN PINTU, JENDELA, DAUN PINTU, dan DAUN JENDELA 1 Pasang Kusen pintu dan jendela kayu lanan 2 Pasang Daun pintu panel kayu lanan 3 Pemasangan Pintu PVC KM/WC lengkap accessories
0.69 m³
3.207
18.86 m²
5.107
1.00 unit Jumlah
0.174 8.49
VII PEKERJAAN KONSTRUKSI ATAP DAN PENUTUP ATAP 1 Pasang Konstruksi Kuda - kuda Kayu Lanan
1.78 m³
7.953
2 Pasang Konstruksi Gordeng, Ikatan angin, Ikatan gempa Kayu Lanan
1.81 m³
7.736
173.59 m²
7.011
44.00 m'
2.302
3 Pasang Rangka Atap Kayu Lanan 4 Pasang Lisplank ( 3 x 30 )cm Kayu lanan Jumlah
25.00
VIII PEKERJAAN PLAPOND 1 Pemasangan rangka plapond Kayu Kls II (Hanya Rangka)
104.00 m²
3.310
2 Pemasangan plapond dari GRC tebal 4 mm
104.00 m²
1.811
85.00 m'
0.444
3 Pemasangan list plapond kayu profil Jumlah
IX
5.57
PEKERJAAN PENUTUP LANTAI 1 Pek. Urugan pasir dibawah lantai
3.15 m³
0.138
2 Pasang Lantai Keramik uk.20 x 20 cm Anti Slip KM/WC
1.50 m²
0.113
61.50 m²
4.282
3 Pasang Lantai Keramik uk.30 x 30 cm (polos) Jumlah
4.53
X
PEKERJAAN SANITASI 1 Pemasangan kloset jongkok porselen
1.00 unit
0.244
2 Pasang bak mandi fiberglass vol. 0,03 m³
1.00 bh
0.262
3 Memasang Pipa PVC tipe AW Ø ½"
21.00 m'
0.138
4 Memasang Pipa PVC tipe D Ø 2½"
21.00 m'
0.322
5 Memasang 1 m' Pipa PVC tipe D Ø 4"
21.00 m'
0.682
6 Memasang Kran Ø ¾" atau ½"
5.00 bh
0.248
7 Memasang Floor Drain
1.00 bh
0.034
8 Memasang Septic tank 3.75 m³ berikut rembesan
unit
9 Pengadaan air bersih (sumur gali, water turn, pompa) lengkap dengan accesories
ls
Jumlah
XI
1.93
PEKERJAAN KUNCI DAN KACA 1 Pasang Kunci Tanam Biasa
6.00 bh
0.219
2 Pasang Engsel Pintu
18.00 bh
0.262
3 Pasang Engsel Jendela
28.00 bh
0.248
5 Pasang Kait angin
14.00 bh
0.160
6 Pasang Kunci Selot pintu dan jendela
14.00 bh
0.324
8 Pasang Kaca tebal 5 mm
14.42 m²
1.132
Jumlah
XII
2.35
PEKERJAAN INSTALASI LISTRIK 1 Biaya Pasang Baru termasuk Instalasi dari PLN (900 watt)
1.00 Ls
1.716
3 Pemasangan Box MCB
1.00 unit
0.212
6 Pemasangan lampu XL 14 watt (Philips)
9.00 bh
0.309
7 Pemasangan stop kontak
5.00 bh
0.057
8 Pemasangan saklar single
2.00 bh
0.024
9 Pemasangan saklar double
3.00 bh
0.043
Jumlah
2.36
XIII PEKERJAAN PENGECATAN 1 Mengecatan Bidang Kayu Baru ( 1 Lapis Plamir ), 1 Lapis Cat Dasar, 2 Lapis Cat Pe
150.02 m²
3.355
2 Pengecatan Tembok Baru ( 1 Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup )
317.42 m²
3.003
3 Pengecatan plapond dengan cat tembok
104.00 m²
0.639
Jumlah
7.00
XIV PEKERJAAN LAIN LAIN 1 Pengadaan alat pemadam kebakaran
bh
2 Biaya pemberesan dan penyelesaian
1.00 Ls
0.286
Jumlah
0.29
REKAPITULASI RENCANA ANGGARAN BIAYA PEMBANGUNAN RUMAH TINGGAL TYPE 58 M2 TAHUN 2016
NAMA KEGIATAN LOKASI
: : BOBOT POS PEKERJAAN
NO.
URAIAN
TERHADAP SELESAI PEKERJAAN
1
2
I
PEKERJAAN PERSIAPAN
2.288
II
PEKERJAAN TANAH
1.638
TINGKAT PELAKSANAAN POS PEKERJAAN
III IV V VI VII VIII IX X XI XII XIII XIV
PEKERJAAN PONDASI PEKERJAAN BETON PEKERJAAN DINDING PEKERJAAN KUSEN PINTU, JENDELA, DAUN PINTU, dan DAUN JENDELA PEKERJAAN KONSTRUKSI ATAP DAN PENUTUP ATAP PEKERJAAN PLAPOND PEKERJAAN PENUTUP LANTAI PEKERJAAN SANITASI PEKERJAAN KUNCI DAN KACA PEKERJAAN INSTALASI LISTRIK PEKERJAAN PENGECATAN PEKERJAAN LAIN LAIN
8.074 13.990 16.503 8.488 25.002 5.565 4.533 1.929 2.346 2.361 6.997 0.29
JUMLAH I DIBULATKAN TERBILANG : ( SERATUS TUJUH PULUH EMPAT JUTA DELAPAN RATUS TIGA PULUH TIGA RIBU RUPIAH )
100.00
NGKAT PELAKSANAAN
HARGA SATUAN
JUMLAH
Rp.
Rp.
4
5
500,000.00
500,000.00
3,000,000.00
3,000,000.00
500,000.00
500,000.00
BOBOT
6
4,000,000.00
26,800.00
2,239,944.00
8,933.33
253,331.47
19,600.00
370,440.00
2,863,715.47
76,720.00
426,870.08
195,546.00
2,349,876.28
462,658.00
11,339,747.58 14,116,493.94
756,150.06
2,214,007.36
13,756.70
6,122,501.88
88,794.00
3,466,509.09
756,150.06
1,150,104.23
13,756.70
3,180,438.99
88,794.00
1,800,737.82
756,150.06
1,066,171.58
13,756.70
3,163,857.36
88,794.00
2,295,320.73 24,459,649.04
78,035.80
561,857.76
72,361.20
11,484,373.69
30,835.84
444,036.10
27,728.56
8,801,544.06
16,095.00
5,340,610.71
154,218.00
2,220,739.20 28,853,161.51
8,174,400.00
5,607,638.40
473,440.00
8,928,131.52
304,480.40
304,480.40 14,840,250.32
7,794,300.00
13,905,031.20
7,464,580.00
13,525,818.96
70,610.00
12,257,189.90
91,466.00
4,024,504.00 43,712,544.06
55,641.00
5,786,664.00
30,450.00
3,166,800.00
9,131.00
776,135.00 9,729,599.00
76,720.00
241,668.00
131,506.00
197,259.00
121,730.00
7,486,395.00 7,925,322.00
72.80
426,330.00
426,330.00
457,370.00
457,370.00
11,487.10
241,229.10
26,793.35
562,660.35
56,751.70
1,191,785.70
86,612.50
433,062.50
60,020.00
60,020.00
1,750,000.00
-
5,500,000.00
3,372,457.65
63,820.00
382,920.00
25,479.00
458,622.00
15,479.00
433,412.00
19,979.00
279,706.00
40,472.00
566,608.00
137,279.00
1,979,563.18
4,100,831.18
3,000,000.00
3,000,000.00
370,954.50
370,954.50
59,954.50
539,590.50
19,954.50
99,772.50
20,954.50
41,909.00
24,954.50
74,863.50 4,127,090.00
39,095.50
5,864,911.43
16,540.60
5,250,284.17
10,740.60
1,117,022.40 12,232,218.00
1,250,000.00
-
500,000.00
500,000.00 500,000.00
NGKAT PELAKSANAAN
JUMLAH
BOBOT
Rp. 3
4,000,000.00 2,863,715.47
14,116,493.94 24,459,649.04 28,853,161.51 14,840,250.32 43,712,544.06 9,729,599.00 7,925,322.00 3,372,457.65 4,100,831.18 4,127,090.00 12,232,218.00 500,000.00 174,833,332.17 174,833,000.00
TIME SCHEDULE PEMBANGUNAN RUMAH TINGGAL TYPE 61 M2
No
I II III IV V VI VII VIII IX X XI XII
URAIAN PEKERJAAN
BOBOT
PERSIAPAN PEKERJAAN TANAH & PONDASI PEKERJAAN STRUKTUR PEKERJAAN ATAP PEKERJAAN LANTAI PEKERJAAN DINDING PEKERJAAN PLAFOND PEKERJAAN KUSEN, PINTU, & JENDELA PEKERJAAN PENGECATAN PEKERJAAN LISTRIK PEKERJAAN PERPIPAAN & SANITAIR Pekerjaan Lain-lain
1.81 2.97 11.82 13.78 7.48
JUMLAH BOBOT
100.00
0
PRESTASI MINGGUAN PRESTASI FISIK KOMULATIF KECEPATAN / KELAMBATAN
Menyetujui
0
MG 2
0.90 1.5
MG 3
MG 4
MG 5
3.94
3.94
MG 6
0.90 1.5 3.94
6.89
20.49 2.92 9.59 2.98 2.07 5.83 18.26
RENCANA MINGGUAN RENCANA KOMULATIF MINGGUAN
MG 1
5.1
5.10
5.10
4.80
2.92
2.39
4.40
4.85
9.06
20.73
5.10
2.39
6.78
11.63
20.69
41.42
46.52
TYPE 61 M2
MG 7
MG 8
MG 9 MG 10 MG 11 MG12 MG13 MG14 MG 15 MG16
6.89 3.7
3.74
5.10 1.50
1.5
4.80 1.5
1.5 1.0
1.00 2.92 9.131 9.13
5.10
11.69
3.92
9.13
9.1
51.62
63.31 67.05 72.29 75.24 76.74 77.77 81.69
3.74
5.24
2.95
1.50
1.04
90.8
100
Dibuat Oleh, Tim Perencana
ADE SUPRIATNA
XII TGB 3
No
0 0 0 0 1 I II III IV V VI VII VIII
URAIAN PEKERJAAN
PEKERJAAN PERSIAPAN, GALIAN DAN URUGAN PEKERJAAN PONDASI DAN BETON PEKERJAAN PASANGAN DAN PLESTERAN PEKERJAAN LANTAI DAN DINDING PEKERJAAN ATAP PEKERJAAN PLAFON PEKERJAAN KUSEN PINTU DAN JENDELA PEKERJAAN PERLENGKAPAN PINTU DAN JENDELA PEKERJAAN SANITAIR PEKERJAAN INSTALASI AIR PEKERJAAN INSTALASI LISTRIK PEKERJAAN PENGECATAN PEKERJAAN PEMBERSIHAN
BOBOT
4.65 23.48 8.28 2.40 21.26 7.23 8.53 3.63 1.00 4.99 4.49 9.50 0.56
Chart
Chart Title