Bina Program3

  • November 2019
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Bina Program3 as PDF for free.

More details

  • Words: 301
  • Pages: 5
KONDISI SEKARANG PERSAMPAHAN DI KABUPATEN TAPANULI TENGAH PENYEBAB PENYAKIT DAN MENGGANGGU KESEHATAN

PENCEMARAN LINGKUNGAN DAN KESAN KUMUH

SAMPAH YANG TERBAKAR MENCEMARI UDARA

KONDISI JALAN

PEMBANGUNAN TPA REGIONAL AEK NABOBAR CELL METHODE

DARI KOTA SIBOLGA

KOLAM LINDI

TPA REGIONAL AEK NABOBAR

DARI P.SIDEMPUAN – TAPSEL – MANDAILING NATAL -

No. 1. 2. 3. 4. 5.

Ibukota Kabupaten / Kota / Kecamatan PANDAN – AEK NABOBAR SIBOLGA – AEK NABOBAR TARUTUNG – AEK NABOBAR P. SIDEMPUAN – AEK NABOBAR MADAILING NATAL – AEK NABOBAR

Jarak (Km) 15 25 60 60 80

Waktu (Jam) + + + + +

0.5 1 1.5 1.5 2

POTENSI SAMPAH 

Jumlah Penduduk Kab. Tapanuli Tengah Tahun 2007

Kecamatan Pandan Kecamatan Sarudik Kecamatan Tukka Kecamatan Tapian Nauli Kecamatan Badiri Kecamatan Pinangsori

= 38,823 Jiwa = 17,649 Jiwa = 11,508 Jiwa = 17,885 Jiwa = 20,179 Jiwa = 21,732 Jiwa --------------127,776 Jiwa

  

 

Asumsi Sampah Dihasilkan = 2.25 liter/orang/hari Sampah yang dihasilkan per hari = 242 M3/ hari Ritasi Armada Pengangkutan Sampah : Dump Truck = 2 Rit/hari Dump Truck = 20 Unit Presentase Pelayanan =1% 3 Jumlah Sampah Rata-rata yg masuk ke TPA= 242 M / hari

POTENSI SAMPAH 

Jumlah Penduduk Kota Sibolga Tahun 2007

Kecamatan Sibolga Utara = 20,854 Jiwa Kecamatan Sibolga Kota = 16,802 Jiwa Kecamatan Sibolga Selatan = 33,350 Jiwa Kecamatan Sibolga Sambas = 22,314 Jiwa ---------------

93,320 Jiwa   

 

Asumsi Sampah Dihasilkan = 2.25 liter/orang/hari Sampah yang dihasilkan per hari = 210 M3/ hari Ritasi Armada Pengangkutan Sampah : Dump Truck ( 5 – 6 M 3 ) = 13 Unit Arm Roll Truck ( 8 m 3 ) = 3 Unit Presentase Pelayanan = 60 % 3 Jumlah Sampah Rata-rata yg masuk ke TPA= 210 M / hari

PRIORITAS PEMBANGUNAN TPA REGIONAL AEK NABOBAR

Related Documents

Bina Program3
November 2019 36
Matan Bina'
April 2020 35
Bina Ayat.docx
May 2020 35
Bina Perkataan.docx
October 2019 59
Bina Ayat.docx
April 2020 35
Bina Damai.docx
May 2020 22