Cotton soil taking out – 2 weeks Himming 1 water Hard stones – 9 x 9 = 5 lorries Ballast 44 tons = 2 lorries Sand 44 tons = 2 lorries Cement 200 bags Twister bars Y 10 = 36 Twister bars Y 8 = 30 Twister bars R 8 = 30 Twister bars R 6 = 30 Binding wire on roll 30 kg Hard core = 10 lorries 6 lorries 6 x 9 for main walls Iron sheets 3 meters 47 per Iron sheets 2 meters 32 per Roofing nails = 18 keg 5 Ordinary nails = 18 – 5 Ordinary nails = 18 – 4 Ordinary nails = 18 – 3 Ordinary nails = 10 – 2 Hard –boards 30 pieces Soft – boards 30 pieces Mukuwa one roll 25 kg Lintel or Ring beam Damp proof course one roll Painters at Doors 16 – 4 each hours Windows 16 – 4 each hours Timber 4 x 2 – 1600 feet Timber 3 x 2 – 190 feet Timber 6 x 1 – 200 feet 18 Ridge Board = 8 x 1 – 156 feet TOTAL
35,000 41,000 44,000 60,000 126,000 12,600 8,700 7,500 5,400 2,400 40,000 96,000 25,850 14,040 2,160 1,440 1,440 1,440 800 21,000 21,000 7,000 8,000 5,000 30,000 36,000 16,000 40,000 4,320 3,600 3,900 721,590