IRCON International Limited (A Govt. Of India Undertaking) Qazigund-Baramulla New Rail Line Project, Srinagar SUB CONTRACTORS RUNNING ACCOUNT BILL/CC RA Bill/CC No.8TH Name of work: Construction of Miscellaneous External Development Works at Anantnag Yard, (Package M-12) on Qazigund - Baramulla Section of New BG Rail Line Project (J&K) Name of Agency: A.N. Builders, K.P.Road, Anantnag, Kashmir Contract agreement / work Order No.IRCON/ 1008/ J&K -DLI/ Ext Devlp. Works/ M-12/1172 Date: 31-08-2007 Contract Value: Rs. 3,28,55,914.91 Date of commencement of Work: 31-08-2007 Date of completion of work: Scheduled: 31-12-2007 Extension granted upto: 31-05-2008; Further extension on process
Date: 31-07-2008
Date of Measurement: MB no 1019, 1102 Date: 31-07-2008 Sl no
BOQ Item
Description of Item
Unit
BOQ Qty.
Qty executed upto this bill
Qty executed upto last bill
Qty executed since last bill
Rate (in Rs.)
6,193.617
-
91.50
Amount upto this bill
Amount upto last bill
Amount since last bill
SCHEDULE A: Quoted rete 45% Above 1 2 3 4 5 6 7 8 9 10 11
9172379.xls
SUB HEAD NO-1: EARTH WORK Earth work in 1.1 excavation width more cum 4,200.00 than 1.5m Excavating trenches for 2.1.1 metre 800.00 pipes Extra for excavating 3 metre 50.00 trenches EW in excavation width 4 cum 6,000.00 less than 1.5m Extra for excavating for 5.1 cum 4,000.00 additional 1.5m Filling with available 6 cum 8,000.00 soil SUB HEAD NO-2: WATER SUPPLY 1.1 GI pipes 32 mm NB metre 800.00 1.2 GI pipes 40 mm NB metre 1,200.00 1.3 GI pipes 50 mm NB metre 400.00 1.4 GI pipes 65 mm NB metre 600.00 1.5 GI pipes 80 mm NB metre 300.00
12 13 14 15 16
2.1 2.2 2.3 2.4 2.5
17
3.1
18
3.2
19
3.3
Gate vulve 32 mm NB Gate vulve 40 mm NB Gate vulve 50 mm NB Gate vulve 65 mm NB Gate vulve 80 mm NB Painting 32 mm NB Pipes Painting 40 mm NB Pipes Painting 50 mm NB Pipes
6,193.617
566,715.96
566,715.96
-
-
-
-
95.55
-
-
-
-
-
-
125.17
-
-
-
440.060
369.260
4,132.096
4,132.096
4,324.467
70.800
93.55
41,167.61
34,544.27
6,623.34
-
12.45
51,444.60
51,444.60
-
4,324.467
-
30.25
130,815.13
130,815.13
-
190.10 420.00 100.70 452.30 66.60 -
-
19,684.86 48,930.00 16,303.33 88,311.58 17,991.99 -
19,684.86 48,930.00 16,303.33 88,311.58 17,991.99 -
-
metre metre metre metre metre
15.00 8.00 5.00 5.00 4.00
190.10 420.00 100.70 452.30 66.60 -
metre
800.00
190.10
190.10
-
3.10
589.31
589.31
-
metre
1,200.00
420.00
420.00
-
3.50
1,470.00
1,470.00
-
metre
400.00
35.50
35.50
-
4.15
147.33
147.33
-
Page 1 of 8
103.55 116.50 161.90 195.25 270.15 230.85 287.35 427.15 566.95 902.20
20
3.4
21
3.5
22
4.1
23
4.2
24
4.3
25
4.4
26
4.5
27
5.1
28
6.1
29
7.1
30 31 32 33 34 35 36 37 38 39 40 41 42
9172379.xls
Painting 65 mm NB Pipes Painting 80 mm NB Pipes Zone V sand filling around the pipes 32 mm NB Zone V sand filling around the pipes 40 mm NB Zone V sand filling around the pipes 50 mm NB Zone V sand filling around the pipes 65 mm NB Zone V sand filling around the pipes 80 mm NB Double acting CI air vulve Masonry Chamber 300x300x500 Masonry Chamber 600x600x750
metre
600.00
300.00
300.00
-
5.10
1,530.00
1,530.00
-
metre
300.00
66.60
66.60
-
5.95
396.27
396.27
-
metre
800.00
-
-
-
16.60
-
-
-
metre
1,200.00
-
-
-
16.80
-
-
-
metre
400.00
-
-
-
17.40
-
-
-
metre
600.00
-
-
-
27.50
-
-
-
metre
300.00
-
-
-
28.35
-
-
-
nos
1
-
-
-
3940.00
-
-
-
nos
25
-
-
-
385.70
-
-
-
nos
8
-
-
-
2187.65
-
-
-
SUB HEAD NO-3: BRICK WORK Brick work in 1:4 1 cum 200.00 124.617 morter SUB HEAD NO-4: STONE MASONRY 1.1 CRM cum 1,000.00 extra in CRM above 1.2 cum plinth SUB HEAD NO-5: FINISHING 1 12 MM Thk morter sqm 2,000.00 1,084.60 2 Net Cement punning sqm 2,000.00 3 Synthetic enamel paint sqm 80.00 SUB HEAD NO-6: FLOORING 1.1 50 mm thk flooring sqm 400.00 SUB HEAD NO-7: CEMENT CONCRETE 1.1 1:2:4 Concrete cum 50.00 24.570 1.2 1:4:8 PCC cum 500.00 263.268 SUB HEAD NO-8: REINFORCED CEMENT CONCRETE M-20 Concrete in 1.1 cum 1,000.00 797.565 foundation M-20 Concrete in Wall 1.2.1 cum 100.00 269.457 column piller M-20 Concrete in 1.2.2 cum 50.00 15.063 Beam, girder etc. 2.1 Add for M-25 concrete cum 1,000.00 1,082.085
119.857
4.760
1383.00
443.730
(443.730)
1335.20
-
240.05
-
-
-
1,030.00 -
54.60 -
15.176 254.908
9.394 8.360
797.565 246.957 15.063 1,059.585
Page 2 of 8
22.500 22.500
52.00 13.30 24.25
172,345.31
165,762.23
6,583.08
592,468.30
(592,468.30)
-
-
133.60
56,399.20 -
53,560.00 -
2,839.20 -
1843.00 1404.70
45,282.51 369,812.56
27,969.37 358,069.27
17,313.14 11,743.29
2284.05
1,821,678.34
1,821,678.34
2411.40
649,768.61
595,512.11
2518.25
37,932.40
37,932.40
84.00
90,895.14
89,005.14
54,256.50 1,890.00
9172379.xls
43
3.1
44
3.2
45
3.3
46
3.4
47
3.5
48
3.6
49
3.7.1
50 51
1 2
52
1.1.1
53
1.2.1
54
2.1.1
55
2.2.1
56 57 58
3 4.1.1 5.1
59
6.1
60
7.1
61
8
62
9.1
63
10.1
Centring shuttering at foundation Centring shuttering at wall etc. Centring shuttering at roof etc. Centring shuttering for column etc. Centring shuttering at Lintel etc. Centring shuttering at Stair.
195.577
195.577
-
61.10
11,949.75
11,949.75
-
3,374.019
3,374.019
-
106.40
358,995.62
358,995.62
-
120.00
83.04
83.04
-
111.20
9,234.05
9,234.05
-
sqm
20.00
29.792
29.792
-
87.95
2,620.21
2,620.21
-
sqm
22.00
29.250
29.250
-
135.80
3,972.15
3,972.15
-
sqm
100.00
105.373
105.373
-
106.40
11,211.69
11,211.69
-
metre
1,500.00
60.28
60.28
-
29.90
1,802.37
1,802.37
-
SUB HEAD NO-9: FENCING 2.5m long post nos RCC struts nos SUB HEAD NO-10: SEWERAGE 900x800x600 manhole nos 10 600mm dia SFRC nos 15 cover Extra for manhole size metre 1.20 900x800x600 Extra for manhole size metre 8.00 120x900x900 MS foot rest nos 25 Spun pipe metre 12.00 Stone ware pipe metre 600.00 Painting 100 mm dia metre 16.00 pipe Soak pit 2.50m Dia nos 18 3.0m deep 1:5:10 PCC around metre 900.00 150mm dia SW pipe 150mm dia CI drop nos 4 connection extra for 150mm dia CI metre 8.00 drop connection SUB HEAD NO-11: ROADS & PATHWAYS Excavation for road sqm 5,000.00 39cm depth Stone aggregate 90 to cum 975.00 45 mm 150mm thk Stone aggregate 65 to cum 650.00 45 mm 100mm thk
6.00
-
6.00
2437.24
-
-
-
3796.85
-
-
-
-
-
-
1702.15
-
-
-
-
-
-
2039.15
-
-
-
-
-
-
70.00 361.45 111.60
-
-
-
-
-
-
12.65
-
-
-
3.00
3.00
-
6396.25
-
-
-
233.35
-
-
-
-
-
-
3268.85
-
-
-
-
-
-
1265.25
-
-
-
-
-
-
-
-
-
Centring shuttering at Edges of slab and break in floor and walls under 20cm wide.
sqm
100.00
sqm
1,200.00
sqm
64
1
65
2.1
66
2.2
67
2.3
Stone aggregate 53 to 22.4 mm 100mm thk
cum
68
3.1
Laying for sub base 90 to 45 mm agg.
cum
488.00 165.05
14,623.44
19,188.75
-
19,188.75
14,623.44
-
2,287.649
2,287.649
-
37.27
85,260.68
85,260.68
-
499.0680
499.0680
-
374.65
186,975.83
186,975.83
-
312.0450
312.0450
-
389.65
121,588.33
121,588.33
-
650.00
334.100
112.500
432.55
144,514.96
48,661.88
975.00
499.0680
499.0680
128.90
64,329.87
64,329.87
Page 3 of 8
221.600 -
95,853.08 -
69
3.2
70
3.3
71
4
72
5.1
73
5.2
74
6.1
75 76
7.1 8.1
77
1.1
78
2
79
3
80
1
81
2.1
82
3
83
4
84
5
Laying for base course with 63 to 45 mm agg.
cum
650.00
Laying for base course cum 650.00 with 53 to 22.4 mm agg. Morrum supply cum 1,200.00 Stone screening 13.2 cum 1,200.00 mm nominal size (Type-A) Stone screening 11.1mm nominal size cum 1,200.00 (Type-B) Tack coat using sqm 1,000.00 bitumen on WBM Asphalt paving sqm 10,000.00 Brick edging metre 2,000.00 SUB HEAD NO-12: DRAINAGE 20 cm deep BW drain metre 300.00 laying PCC 1:5:10 around 300 dia hume metre 1,200.00 pipe laying PCC 1:5:10 around 500 dia hume metre 50.00 pipe SUB HEAD NO-13: MISCELLANEOUS Supply and filling of stone aggregate 90 to cum 1,000.00 45mm PVC pipe 110 mm dia. metre 2,000.00 300mm dia S&S spun metre 60.00 pipe 300 mm dia lead nos 2 caulked jionts. Supplying pig lead at Quintal 0.100 site of work. TOTAL OF SCHEDULE A :
312.0450
312.0450
334.100
112.500
221.600
122.00
38,069.49
38,069.49
122.00
40,760.20
13,725.00
27,035.20
-
-
-
264.70
-
-
-
-
-
-
470.95
-
-
-
-
-
-
465.10
-
-
-
-
-
-
11.50
-
-
-
-
-
-
105.00 35.80
-
-
-
202.50
137.50
65.00
-
-
-
-
-
-
195.20 452.95 360.95
91,722.38
62,280.63
29,441.75
-
-
-
-
-
-
898.80
368.94
529.86
425.80
382,709.04
157,094.65
225,614.39
284.900
178.834
106.066
126.65
36,082.59
22,649.33
13,433.26
-
-
-
1820.85
-
-
-
-
-
-
176.00
-
-
-
-
-
-
3781.15
-
-
-
145% OF SCHEDULE A : Quoted Rate 45% Above
9172379.xls
-
Page 4 of 8
-
-
-
5855223.39
5940442.02
-85218.63
8490073.92
8613640.93
-123567.01
SCHEDULE B : Quoted rete 28% Above 85
1.1
86
2.1
87
3
DSR STEEL ITEM 1.8m fencing with GI barbed wire. 1.2m fencing with GI barbed wire.
-
-
-
-
-
-
metre
2,500.00
-
-
-
38.50
-
-
-
metre
300.00
-
-
-
55.90
-
-
-
kg
700.00
-
-
-
37.30
-
-
-
TOTAL OF SCHEDULE B :
0.00
0.00
0.00
128% OF SCHEDULE B : Quoted Rate 28% Above
0.00
0.00
0.00
40mm GI pipe hand rail
SCHEDULE C : Quoted rete 30% Above
9172379.xls
88
1
89
2
90
3
TMT steel bar kg 80,000.00 95,229.182 structural steel in kg 1,200.00 builtup section structural steel work in kg 800.00 single section TOTAL OF SCHEDULE C : 130% OF SCHEDULE C : Quoted Rate 30% Above
78,480.192
16,748.990
40.60
3,866,304.79
3,186,295.80
680,008.99
-
-
48.35
-
-
-
-
-
44.00
-
-
-
3866304.79 5026196.23
Page 5 of 8
3186295.80 4142184.53
680008.99 884011.69
SCHEDULE D : Quoted rete 32% Above 91
1
92
2
93
3
94
4
95
5
96
6
97
7
98
8
99
9
100
10
101
11
102
12
DRAINAGE AND SEWARAGE 400 mm wide drain metre cover 560 mm dia SFRC nos Manhole cover Trolley mounted 22.5kg capacity fire nos extinguisher Trolley mounted 50ltr capacity foam tipe fire nos extinguisher Sand bucket fire nos extinguisher set. M-30 grade interlocking paver block
sqm
2,000.00
70.00
-
70.00
715.00
50,050.00
-
50,050.00
25
-
-
-
880.00
-
-
-
3
-
-
-
22110.00
-
-
-
2
-
-
-
11110.00
-
-
-
2
-
-
-
1155.00
-
-
-
700.00
Kerb stone metre 300.00 earth filling in cum 30,000.00 embankment. 300 mm dia NP3 RCC metre 400.00 hume pipe 500 mm dia NP3 RCC metre 20.00 hume pipe M-40 grade Precast sqm 150.00 cement concrete chequred tiles. GSB filling cum 3,500.00 TOTAL OF SCHEDULE D : 132% OF SCHEDULE D : Quoted Rate 32% Above
743.468
303.668
439.800
632.50
470,243.51
192,070.01
278,173.50
702.00
419.70
282.30
165.00
115,830.00
69,250.50
46,579.50
29,140.00
26,340.00
2,800.00
90.00
2,622,600.00
2,370,600.00
252,000.00
342.50
207.50
135.00
726.00
248,655.00
150,645.00
98,010.00
-
-
75.35
75.35
3,481.805
2,096.689
-
1089.00
-
-
-
589.60
44,426.36
44,426.36
1,385.116
400.00
1,392,722.00 4944526.87 6526775.47
838,675.60 3665667.47 4838681.06
554,046.40 1278859.40 1688094.41
NON SCHEDULE ITEMS: 1
NS-1 Blanketing
320.00
308.311
-
308.31
530.00
163,404.83
-
163,404.83
2
NS-2 Stair case railing
35.00
23.400
-
23.40
541.21
12,664.40
-
12,664.40
3
NS-3
600.00
311.000
-
311.00
453.00
140,883.00
-
140,883.00
4
NS-4 RRM in 1:6 Morter
1,000.00
468.370
-
468.37
1826.64
855,543.38
-
855,543.38
1,172,495.60
-
1,172,495.60
150mm PVC sewar pipe
TOTAL OF NON SCHEDULE ITEMS : Grand Total: (A+B+C+D)= Amount held up for incomplete ramp and stair railing and other finishing work is Rs.50,000/-
21,215,541.22
17,594,506.52 Say : Amount payable Rs.
3,621,034.70
3,621,035.00 3,571,035.00
Amount Payable in this 8th RA bill is Rupees Thirty Five Lakhs Seventy One Thousand and thirty five only.. CHECK LIST
9172379.xls
Page 6 of 8
Certified that the foregoing claim is correct, for which necessary measurement were taken and recorded at the MB-1019, 1102 by sh. Surajit Ghosh, AM/Civil, dated 31-07-2008and that the work has been satisfactorily as per drawing and specification.
Date: Certified that,
JGM/ Civil
1
Measurements Recorded in MB No. 1019, 1102 are fully accepted by me and I do not have any other claim against this bill.
2
The labour employed by me have been paid minimum wages as fixed in similar type of work in the area.
3
All taxes including Royalty charges. Cess, etc. due to the govt. on the materials used for this work have been fully paid and no payment is due to them.
4
All the insurance polices as per previous of the contract has been taken by me and are valid as on date.
5
I have extended the provident fund benefits to the staff engaged by me and requisites amount of providend fund has been remitted to the providend fund commissioner.
6
The statury formalities and guidelines has been complied with.
Date:
Contractor
Certified that, 1
The quantity billed is not more than the quantity actually executed at site.
2
No material has been issued to the contractor, for which the cost was to be recovered except such as specially provided in the agreement/ work order.
3
No departmental tools & plants have been issued to the contractor other than those for which hire charges have been recovered in this bill.
4
In case of lump sum payment, approximate quantity billed is not more than the quantity actually at site.
5
The work has been executed as per approved drawing and specifications and the method of measurement is correct.
6
That the statury formalities and guidelines has been complied with.
AM/C
DGM/ Mgr/ Civil
Chargeble to ........................................................................ and to be included in the account for the month of ................... To be paid at …………................... in presence of ............................................................. by Cheque on or before................
Date:
Manager/Finance
Name of work: Construction of Miscellaneous External Development Works at Anantnag, (Package M-12) on Qazigund - Baramulla Section of New BG Rail Line Project (J&K) Contract agreement / work Order No.IRCON/ 1008/ J&K -DLI/ Ext Devlp. Works/ M-12/1172 Date: 31-08-2007 Contract Value: Rs. 3,28,55,914.91
Date of commencement of Work: 31-08-2007 Date of completion of work: Scheduled: 31-12-2007