Bandra Worli

  • June 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Bandra Worli as PDF for free.

More details

  • Words: 1,335
  • Pages: 2
PART 3: Worli Link Bridge

Maharashtra State Road Development Corporation Limited

The Worli end of the main bridge will be Segmental / Cast-In-Situ box girder sections to cater to dispersing traffic and provisions for the future interchange for a second phase (Worli to Nariman Point).

PART 4:Toll Plaza & Control Centre The Toll Plaza shall be of 16 lanes with an approximate length of 410 m at Bandra and equipped with all modern tolling facilities. The plaza building will house O&M operations and facilities for toll-operator, MSRDC & visitors. The control system for the ITS will also be housed here.

Bandra Worli Sea Link

Functions l

l

l

Toll Collection, monitoring & control. ITS Control Centre with CCTV, Traffic counting & Classifying, Variable Message Signs, Remote Weather Information Station and Emergency Telephones systems for surveillance monitoring & control. Operation and Maintenance centre for Sea Link

Communications System Fibre-optic cable housed in HDPE ducts run parallel to the Bandra-Worli corridor. In addition, pullout locations will assist drivers and enforcement officers in pulling distressed vehicle out of traffic stream safely.

Work to be commenced Improvements Along KAGK Road l l l l

New Sidewalks Traffic Railings New Foot Over Bridges Landscaping and Signages

Ancillary Structures l l

4-lane approach road to W.T.T. Parking area for 200 vehicles

Contact Mr. Anil Kumar Lakhina Vice Chairman & Managing Director MSRDC Tel.: 23685909 Fax: 23691031 Email: [email protected]

Steering beyond land limits

Mr. D.G. Marathe Joint Managing Director MSRDC Tel.: 2368 5910 Fax: Email: [email protected] Mr. J. T. Nashikkar Chief Engineer MSRDC Tel.: 26558175 Fax: Email: [email protected]

Maharashtra State Road Development Corporation Limited Priyadarshini Park, Nepean Sea Road, Mumbai 400 036, Maharashtra, India. Tel: (91 22) 2368 5909, 2369 6109 Fax: (91 22) 2369 1031 Website: www.msrdc.org Email: [email protected]

Maharashtra State Road Development Corporation Limited

Bandra Worli Sea Link

Benefits

The Bandra Worli Sea Link (BWSL) Project has been one of the most highly recommended links by transport studies conducted for the metropolitan region over the last thirty years.

l

l

Current Scenario: Mahim Causeway, the North-South connector between the western suburbs and the island city of Mumbai is gets increasingly bottleneck prone. With 1,20,000 vehicles crossing the causeway daily, it takes nearly an hour to travel the 8 km from Mahim to Worli. Bandra Worli Sea Link is first phase of Western Freeway Sea Link (Bandra to Nariman Point) the second phase being Worli - Nariman Point.

Stress free driving

l

Reduced accidents

l

:

MSRDC

Cost

:

Rs. 1306 Crore

Type of Project

:

Build Operate Transfer (BOT)

Concession Period

:

30 years

Layout

:

This 6 km link commences from the Mahim interchange (i.e. intersection of the Western Express Highway and S. V. Road at Bandra) and ends at Love Grove Junction in Worli.

Reduction in traffic on existing roads because of traffic diversion to the Sea Link Reduction in Carbon Monoxide and Nitrogen Oxide Levels in Mahim, Dadar, Prabhadevi and Worli along existing roads

Part

Power Supply and Road Lighting Systems l

l

Entrepreneur

Bridge Layout

Considerable savings in travel time (20 to 30 minutes) due to increased speed and reduced delays (23 signals avoided)

l

l

The BWSL (a part of the Western Freeway) will increase the route options of passengers traveling from the island city to the western suburbs and vice-versa and thereby decongest the overstrained Mahim Causeway and western corridor.

Estimated savings in Vehicle Operating Costs (VOC): Rs. 100 Crores per annum

l

l

l

Reduced noise pollution in Mahim, Dadar, Prabhadevi and Worli along existing roads No adverse effect on fisheries, marine life and livelihood of fisherman Landscaping along the approaches and waterfront promenade will enhance the environment and add green spots to the city Mumbai gets a new landmark

Diesel generators and auto mains failure panels to cater as emergency backups.

l

Adequate lighting levels and energy saving luminaries.

l

Lightening protection at bridge tower and control room.

l

l

Duplicate cables will ensure reliability and availability of equipment. Facade lighting for bridge tower and special lighting in landscaped area.

Package

Status

I

Flyover at Love Grove junction, Worli

Completed

II

Cloverleaf interchange at Mahim intersection

Completed

III

Solid approach road from Mahim interchange to the start of the Toll Plaza at Bandra and a Public Promenade

Completed

IV

Cable Stayed Bridge with viaduct approaches extending from solid approach road to KAGK Road & Toll Plaza

In progress

V

Improvements to the existing KAGK Road

Yet to commence

Features incorporated to enhance bridge performance and durability include: l

l

l

Project Features l

2 lanes proposed to be reserved for buses.

l

16-lane toll plaza with automated toll collection system.

l

"Intelligent Bridge" with sophisticated surveillance, information, guidance and emergency support systems.

l

Main Cable Stayed Bridge 500 m long spanning across Bandra Channel.

l

Second Cable Stayed Bridge 150 m long spanning across Worli Channel. Landscaping and promenade development.

l

High performance concrete (grade M60 with micro silica slurry) to enhance durability

A cloverleaf interchange at Mahim intersection and a flyover at Love Grove junction to ensure faster and safer traffic dispersal of both ends

l

Maximum clearance of 20 m below Bandra Cable Stayed Bridge for water transport

l

State-of-the-art construction technology

l

Emergency crossovers and Disaster Management Program

Bandra approach bridge with precast (PC) segmental construction of 50 m spans.

2

Two Cable Stayed Bridges of 500m & 150m main spans

3

Worli approach bridge with precast (PC) segmental construction of 50 m spans.

4

Cast-In-Situ (CIS) approach structure for link bridge at Worli end

l

The bridge comprises typical units of five continuous spans of 50 m each. There are three such units. The ends of each unit have expansion joints. Superstructure and substructure are designed in accordance with IRC & AASHTO codes. Sub-structure consists of 1.5 m, diameter drilled piles with pile caps and some of the piers near Worli end will be directly socketed into the rock. Longitudinal and lateral, bridge bearing supports (disc type) at various locations will limit displacement. Superstructure will be pre-cast, post-tensioned, fish belly shaped, twin segmented concrete box girder sections., A typical precast segment is 18m wide, 3m deep and 3m long weighing about 100t. Segments will be epoxied together with nominal pre-stressing

l

Facility for emergency cross over at spans P4 - P5

l

Provision for an access ramp connection to Bandstand near Searock Hotel

l

Bandra & Worli apporach bridges are structurally identical.

Fusion bonded epoxy coated reinforcement as anti-corrosive treatment

PART 2: Cable Stayed Bridges

Pre-cast technology ensures quality production of segments

Main Cable - Stayed Bridge over Bandra channel Total length:600 m.

Instrumentation to monitor vital bridge parameters

Main span :500 m (2 spans of 250 m each supported by central tower of 130m height) Second Cable Stayed Bridge over Worli channel

8 lanes exclusively for fast moving vehicles with limited access (four wheelers and above).

l

l

Quality Assurance

l

l

l

l

Components

1

PART 1: Approach Bridges

l

Project Brief

Constituents

Total length:350 m

Main Bridge (PackageIV)

Main span:150 m (Single central main span of 150 m with towers on either side of 56 m height)

Work in Progress Details

The superstructure comprises of twin pre-cast concrete box girders with a fish belly cross sectional shape, identical to the approaches.

Bridge Structure Bridge consists of twin continuous concrete box girder bridges for traffic in each direction. The Bridge (except the cable-stayed portion) is supported on piers typically spaced at 50 meters. Each section is meant for four lanes of traffic, with anti-crash barriers and service sidewalks on one side.

cross sectional shape, identical to the approaches. Boxes are deepened and widened at the edges in order to accommodate cable anchorage. A typical pre-cast segment is 22 meters wide, 3m deep, 2.5m long and weighs about 120t. Every alternate segment has cables attached to it.. The main tower foundation at Bandra comprises 2m drilled shafts, approximately 25 meter in length. The 6 meters deep, pile cap is constructed on a tremie seal within a Cofferdam.

Related Documents