LAPORAN KERJA PRAKTEK S1 TEKNIK SIPIL – FAKULTAS TEKNIK UNIVERSITAS JEMBER

BAB 2. URAIAN UMUM PROYEK

2.1 Proyek Pembangunan Auditorium of the University of Jember Pembangunan Auditorium of the University of Jember merupakan salah satu proyek pembangunan Universitas Jember dan Islamic Development Bank, selain proyek Auditorium ini ada beberapa

proyek lagi antara lain The

Construction Of Integred Laboratories,Agrotechnopack Complex. Proyek ini dikontraktori oleh PT. Hutama Karya (Persero) – PT. Nindya Karya (Persero) (Jv) dengan konsultan PT.Widha Konsultan. Proyek ini berlokasi di Jubung dan Tegal Boto, Jember . 2.2 Data Umum Proyek Proyek Pembangunan Auditorium of the University of Jember ini memiliki data proyek sebagai berikut : 1.

Nama Proyek

: The Construction Of Integred Laboratories,Agrotechnopack Complex, Auditorium of the University of Jember

2.

Lokasi Proyek

: Jubung dan Tegal Boto , Jember

3.

Jenis Kontrak

: Unit Price

4.

Konsultan

: PT. Widha Konsultan

5.

Kontraktor

: PT. Hutama Karya (Persero) – PT. Nindya Karya (Persero) (Jv)

4

LAPORAN KERJA PRAKTEK S1 TEKNIK SIPIL – FAKULTAS TEKNIK UNIVERSITAS JEMBER

2.3 Peta Lokasi Proyek

Gambar 2.1 Peta Lokasi Proyek (Sumber : Google Maps)

5

Related Documents

Bab
April 2020 88
Bab
June 2020 76
Bab
July 2020 76
Bab
May 2020 82
Bab I - Bab Iii.docx
December 2019 87
Bab I - Bab Ii.docx
April 2020 72

More Documents from "Putri Putry"