Attribute_study_report Np Chart Format

  • Uploaded by: M.saravanan
  • 0
  • 0
  • May 2020
  • PDF

This document was uploaded by user and they confirmed that they have the permission to share it. If you are author or own the copyright of this book, please report to us by using this DMCA report form. Report DMCA


Overview

Download & View Attribute_study_report Np Chart Format as PDF for free.

More details

  • Words: 480
  • Pages: 1
Control Chart for Attribute Data - "Initial Study" P

Plant Department 10.000 9.500 9.000 8.500 8.000 7.500 7.000 6.500 6.000 5.500 5.000 4.500 4.000 3.500 3.000 2.500 2.000 1.500 1.000 0.500 0.000 Colum nB

np



c

u

Part Number

Operation number and Name

Colum nC

Colum nD

Colum nE

Colum nF

Colum nG

Colum nH

Colum nI

Colum nJ

Colum nK

Colum nL

Part Name

Colum nM

Colum nN

Colum nO

Colum nP

Colum nQ

Colum nR

Colum nS

Colum nT

Colum nU

Colum nV

Colum nW

Colum nX

Colum nY

Colum nZ

SAMPLE n

62

62

62

62

62

62

62

62

62

62

62

62

62

62

62

62

62

62

62

62

62

62

62

62

NUMBER ( np, c )

2

5

4

3

3

6

5

0

7

5

4

1

2

3

6

3

8

4

4

4

6

4

2

3

7

0.032

0.081

0.065

0.048

0.048

0.097

0.081

0.000

0.113

0.081

0.065

0.016

0.032

0.048

0.097

0.048

0.129

0.065

0.065

0.065

0.097

0.065

0.032

0.048

0.113

PROPORTION ( p, u )

62

Date Shift / Time ANY CHANGE IN IN PEOPLE, MATERIAL EQUIPMENT, METHODS, ENVIRONMENT, OR MEASUREMENT SYSTEMS SHOULD BE NOTED. THESE NOTES WILL HELP YOU TO TAKE CORRECTIVE OR PROCESS IMPROVEMENT ACTION WHEN SIGNALLED BY THE CONTROL CHART DATE

TIME

COMMENTS

np1+np2+………+npk K

Average proportion nonconfroming np =

np

UCLp

=

A point above the upper control limit (higher proportion nonconforming is generally a sign of one or more of the following 1. The control limit or plot point are in error 2. The process performance has worsened, either at that point in time or as part of a trend 3. The evaluation system has changed (e.g., inspector, gauge)

4.0400

A point below the lower control limit (lower proportion nonconforming) is generally a sign of one or more of the following 1. The control limit or plot point are in error 2. The process performance has improved (this should be studied for improvements that might be incorporated on a parmanent basis) 3. The measurement system has changed

UCLnp

=

np + 3

np ( 1 - np/n)

=

9.8702

LCLp

=

np - 3

np ( 1 - np/n)

=

-1.790

9.870

9.870

9.870

9.870

9.870

9.870

9.870

9.870

9.870

9.870

9.870

9.870

9.870

9.870

9.870

9.870

9.870

9.870

9.870

9.870

9.870

9.870

9.870

9.870

9.870

2

5

4

3

3

6

5

0

7

5

4

1

2

3

6

3

8

4

4

4

6

4

2

3

7

p

4.0400 4.0400 4.0400 4.0400 4.0400 4.0400 4.0400 4.0400 4.0400 4.0400 4.0400 4.0400 4.0400 4.0400 4.0400 4.0400 4.0400 4.0400 4.0400 4.0400 4.0400 4.0400 4.0400 4.0400 4.0400

LCLp

0.000

** Green cell only to be filled

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

0.000

Related Documents

Canyonlands Np
June 2020 10
Katmai Np
June 2020 9
Acadia Np
June 2020 8
Fundamentos Np
December 2019 39