GEZJH Modification Job Card
STNXXWS FUSELAGE/CABIN
1000
Perform work ASB/737-53A1253_000_O0
AFT
PRESS
BUU(HEA
easyJet
JCID:
4
Page:
5 of 6
CLP End Date:
OUT OF PHASE VISIT
(~L0-737
NC MSN:
AMM Ef1
A/C Type:
Op. Start Date:
30240
008
737-73V
05.07.2008
MECH RECORD THE FOLLOWING INFORMA11ON (IF APPLICABLE): RECORD BATCH NO:
________________________
RECORD FINDINGS:
________________________
NRC RAISED: YES / NO. NRC NO:
__________________
DRS RAISED: YES / NO, DRS PAGE_____ OF
.
NUMBER OF DEFECTS RAISED_____
UPON COMPLETION OF TASK(S) INSPECTOR TO ENSURE ALL TOOLS AND LOOSE AR11CLES HAVE BEEN ACCOUNTED FOR. _____________ Chg. No.: 800000005163 OWD: TL-No: 00786092 AMM Rev. No.: Rev. Dale: 20080114 EdIted: Rev. Date:
Print Date: 23.6.2008
__________________
C SR Technics UK
C.rtVIcM. ofRat.... to Service: CesiWies that the asvk specified except asotherwwa specif ledwas calTied out In accoidance with EASA R~iRTi45 and I~respect to Il~twork theaircraft? aircraft component ieconsidered ready for releas. to ssMce.
Stabc Start: 150
INSP